Documentos de Académico
Documentos de Profesional
Documentos de Cultura
ACTIVIDAD
Pared 1
Pared 1
Pared 2
Pared 2
Pared 3
Pared 3
Pared 4
Pared 5
Pared 5
Pared 6
Pared 6
Pared 7
Pared 8
Pared 9
Pared 10
Pared 11
Pared 12
Pared 12
Pared 13
Pared 14
Pared 15
Pared 16
Pared 17
Pared 18
Pared 18
Pared 19
Pared 20
TOTAL
MATERIAL
Panelit
Cermica
Panelit
Cermica
Panelit
Cermica
Panelit
Bloque de 6"
Cermica
Panelit
Cermica
Panelit
Panelit
Panelit
Panelit
Panelit
Panelit
Cermica
Panelit
Panelit
Panelit
Panelit
Panelit
Panelit
Cermica
Panelit
Bloque de 6"
CANTIDAD MT
10.37
8.51
3.38
4.88
6.3
5.17
1.45
4.8
4.8
7.31
5.36
12.6
9.02
2.88
5.97
3.37
2.3
1.51
6.35
3.75
4.87
4.74
8.95
1.28
1.05
0.69
6.27
137.93
CANTIDAD DE PINTURA
ACTIVIDAD
Pared 1
Pared 2
Pared 3
Pared 6
Pared 12
Pared 18
TOTAL
MATERIAL
Pintura
Pintura
Pintura
Pintura
Pintura
Pintura
CANTIDAD MT
1.86
0.61
0.36
1.96
0.79
0.23
5.81
PRESUPUESTO DE PAREDES
ACTIVIDAD
Pared
Pared
Pared
Pintura
TOTAL
MATERIAL
Panelit
Cermica
Bloque de 6"
Aceite
CANTIDAD MT
95.58
31.28
11.07
5.81
PRECIO MT
L. 369.74
L. 270.00
L. 420.00
L. 14.80
PRECIO TOTAL
L. 35,339.75
L. 8,445.60
L. 4,649.40
L. 85.99
L. 48,520.74
INSTALACIONES DE UCI
ACTIVIDAD
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
TOTAL
TIPO
Tomas normales
Tomas especiales
Interruptores
Aire
Oxigeno
Vacio
Telfono
CANTIDAD UND
8.00
10.00
21.00
10.00
10.00
10.00
1.00
70.00
PRECIO UND
L. 400.00
L. 400.00
L. 400.00
L. 3,000.00
L. 3,000.00
L. 3,000.00
L. 3,000.00
L. 13,200.00
PRECIO TOTAL
L. 3,200.00
L. 4,000.00
L. 8,400.00
L. 30,000.00
L. 30,000.00
L. 30,000.00
L. 3,000.00
L. 108,600.00
TIPO
Salida oxigeno
Salida vacio
Salida aire
Tubo de 1"
Tubo de 3/4"
Tubo de 1/2"
Codo de 1"
Codo de 3/4"
Codo de 1/2"
Angulo 45 de 1"
Angulo 45 de 3/2"
Angulo 45 de 1/2"
Tee de 1"
Tee de 3/4"
Tee de 1/2"
Cople de 1"
CANTIDAD
10.00
10.00
10.00
0.00
0.00
0.00
UNIDAD
UND
UND
UND
Lance
Lance
Lance
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
PRECIO
L. 3,000.00
L. 3,000.00
L. 3,000.00
L. 700.00
L. 600.00
L. 500.00
PRECIO TOTAL
L. 30,000.00
L. 30,000.00
L. 30,000.00
L. 0.00
L. 0.00
L. 0.00
L. 0.00
L. 0.00
L. 0.00
L. 0.00
L. 0.00
L. 0.00
L. 0.00
L. 0.00
L. 0.00
L. 0.00
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
TOTAL
Cople de 3/4"
Cople de 1/2"
Reductor 1 - 3/4
Reductor 3/4 - 1/2
Vlvula oxigeno
Vlvula aire
Vlvula vacio
1.00
1.00
1.00
UND
UND
UND
UND
UND
UND
UND
L. 6,000.00
L. 6,000.00
L. 6,000.00
L. 0.00
L. 0.00
L. 0.00
L. 0.00
L. 6,000.00
L. 6,000.00
L. 6,000.00
L. 108,000.00
INSTALACIONES HIDRAULICAS
ACTIVIDAD
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
Instalaciones
TIPO
Tubo de 1/2"
Tubo de 3/4"
Tubo de 1"
Tubo de 2"
Tubo de 4"
Tubo de 6"
Codo 90 de 1"
Codo 90 de 3/4"
Codo 90 de 1/2"
Codo 45 de 2"
Codo 45 de 4"
Codo 90 de 2"
Cople de 1/2"
Cople de 3/4"
Cople de 1"
Cople de 2"
Tee de 1/2"
Tee de 3/4"
Tee de 1"
Tee de 2"
Yee 4"
Yee 6"
Reductor 1 - 3/4
Reductor 3/4 - 1/2
Reductor 2 - 1
Cajas de Registro
Vlvula compuerta
CANTIDAD
0.37
3.01
6.60
2.66
3.77
4.06
33.00
14.00
4.00
9.00
13
11.00
0.00
2.00
2.00
0.00
0.00
0.00
2.00
0.00
3.00
7.00
1.00
0.00
3.00
1.00
1.00
UNIDAD
Lance
Lance
Lance
Lance
Lance
Lance
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
PRECIO
L. 40.50
L. 48.00
L. 73.00
L. 120.00
L. 240.00
L. 420.00
L. 7.60
L. 4.40
L. 2.90
L. 25.00
L. 60.00
L. 25.00
L. 2.90
L. 4.40
L. 7.60
L. 25.00
L. 3.65
L. 5.45
L. 8.75
L. 25.00
L. 170.00
L. 100.00
L. 3.65
L. 2.00
L. 50.00
L. 1,200.00
L. 185.00
PRECIO TOTAL
L. 14.99
L. 144.48
L. 481.80
L. 319.20
L. 904.80
L. 1,705.20
L. 250.80
L. 61.60
L. 11.60
L. 225.00
L. 780.00
L. 275.00
L. 0.00
L. 8.80
L. 15.20
L. 0.00
L. 0.00
L. 0.00
L. 17.50
L. 0.00
L. 510.00
L. 700.00
L. 3.65
L. 0.00
L. 150.00
L. 1,200.00
L. 185.00
TOTAL
L. 7,964.62
PRECIO FINAL
ACTIVIDAD
Demolicin paredes
Demolicin baos
Paredes de panelit
Paredes de bloque
Cermica para paredes .
Pintura
Inst. De oxigeno, aire y va.
Inst. elctricas (tomas)
Inst. elctricas (lmparas)
Inst. hidrulicas
Inst. aire acondicionado
Piso de concreto
Piso de linleo
Remocin de puertas
Instalacin de puertas
Instalacin de fascias
Instalacin de inodoros
Instalacin de lavabos
TOTAL
UNIDAD
mt
und
mt
mt
mt
mt
glb
und
und
glb
und
mt
mt
und
und
mt
und
und
CANTIDAD
38.43
2.00
95.58
11.07
31.28
5.81
1.00
68.00
21.00
1.00
1.00
18.20
109.40
8.00
15.00
12.00
4.00
5.00
PRECIO MATERIALES
/
/
L. 369.74
L. 304.00
L. 270.00
L. 14.80
L. 280,899.13
L. 320.00
L. 320.00
L. 7,964.62
L. 30,000.00
L. 58.00
/
L. 865.00
L. 369.74
L. 4,700.00
L. 385.00
PRECIO TOTAL
L. 341.64
L. 200.00
L. 45,941.67
L. 4,760.10
L. 10,979.28
L. 376.49
L. 365,168.87
L. 27,200.00
L. 8,400.00
L. 10,354.01
L. 39,000.00
L. 0.00
L. 8,248.76
L. 640.00
L. 16,867.50
L. 5,767.94
L. 24,440.00
L. 2,502.50
L. 571,188.76
PRECIO TOTAL
ACTIVIDAD
Demolicin
Paredes de bloques
Paredes de panelit
lmparas
Tomas
Lavabos
Inodoros
Puertas
Picado y Acuado
En pared
En losa
Paredes
Paredes de bloque de 4"
Paredes de bloques de 6"
Paredes de Panelit liso
Enchape de cermica
Pintura
Repello
Pulido
Fascia de Panelit
Puertas
Puertas de tambor de pino
Puerta de 6 paneles
Ventanas
Celosa
Instalaciones hidrulicas
Inodoro de fluxometro
Lavabos
Pileta
Cajas de Registro
UNIDAD
CANTIDAD
PRECIO MATERIALES
PRECIO TOTAL
mt
mt
und
und
und
und
und
38.43
12.05
5
1
2
8
L. 0.00
L. 0.00
L. 0.00
L. 0.00
L. 0.00
L. 0.00
L. 0.00
L. 8.89
L. 8.89
L. 80.00
L. 80.00
L. 100.00
L. 100.00
L. 80.00
L. 341.64
L. 107.12
L. 0.00
L. 400.00
L. 100.00
L. 200.00
L. 640.00
ml
ml
33.86
50.17
L. 0.00
L. 0.00
L. 5.00
L. 5.00
L. 169.30
L. 250.85
mt
mt
mt
mt
mt
mt
mt
mt
11.07
0
95.58
31.28
11.01
12.06
12.06
12
L. 304.00
L. 304.00
L. 369.74
L. 270.00
L. 14.80
L. 369.74
L. 91.20
L. 91.20
L. 110.92
L. 81.00
L. 50.00
L. 38.00
L. 38.00
L. 110.92
L. 4,374.86
L. 0.00
L. 45,941.67
L. 10,979.28
L. 713.45
L. 38.00
L. 38.00
L. 5,767.94
und
und
15
0
L. 865.00
L. 640.00
L. 120.00
L. 120.00
L. 14,775.00
L. 0.00
und
L. 100.00
L. 100.00
und
und
und
und
4
5
0
1
L. 150.00
L. 260.00
L. 450.00
L. 360.00
L. 19,400.00
L. 3,225.00
L. 0.00
L. 1,560.00
L. 4,700.00
L. 385.00
L. 1,500.00
L. 1,200.00
glb
glb
1
1
L. 5,177.03
L. 2,787.62
L. 1,553.11
L. 836.29
L. 6,730.14
L. 3,623.91
und
und
und
und
und
10
58
21
1
L. 320.00
L. 320.00
L. 320.00
L. 0.00
L. 320.00
L. 80.00
L. 80.00
L. 80.00
L. 80.00
L. 80.00
L. 4,000.00
L. 23,200.00
L. 8,400.00
L. 0.00
L. 400.00
glb
L. 280,899.13
L. 84,269.74
L. 365,168.87
mt
mt
mt
18.2
109.4
15.05
L. 86.40
L. 58.00
L. 125.00
L. 85.00
L. 80.00
L. 95.00
L. 3,119.48
L. 15,097.20
L. 3,311.00
und
L. 30,000.00
L. 6,000.00
L. 36,000.00
ml
ml
ml
2
4.2
12.6
L. 11.52
L. 11.52
L. 11.52
L. 112.00
L. 71.00
L. 60.00
L. 247.04
L. 346.58
L. 901.15
und
L. 22,000.00
L. 6,600.00
L. 28,600.00
L. 608,267.50
COSTO GENERAL
AMBIENTE
COSTO DIRECTO
Inhaloterapia
L. 207,392.51
Unidad de cuidados Inter.. L. 608,267.50
TOTAL
UTILIDAD
COSTO TOTAL
L. 62,217.75
L. 182,480.25
L. 269,610.26
L. 790,747.74
L. 1,060,358.00