CALCULO DE ESTRUCTURAL RESERVORIO APOYADO 3M3

DATOS
UBICACIN:

ACERO MUROS

POMACANCHIS SANTA LUCIA

EXPEDIENTE : :..

FECHA

26-Jan-16

CARACTERISTICAS GEOMETRICAS
VOLUMEN RESERVORIO

3.00

m3

ALTURA UTIL RESERVORIO

1.25

mts.

LADO UTIL RESERVORIO

1.55

mts.

=
=

ACERO fy

210 Kg/cm2
150 Kg/m2

RESISTENCIA DEL SUELO

1.00 Kg/cm2

COEF. SISMICO
RECUBRIMIENTO r =

=
=

0.12
4.00 Cm

fs

fc

4,200

3/8

Pulg.

DIAMETRO

0.953

Cms.

AREA

0.713

Cms2.

PESO

0.560

Kg/ml

ACERO HORIZONTAL

3/8

Pulg.

DIAMETRO

0.953

Cms.

AREA

0.713

Cms2.

PESO

0.560

Kg/ml

ACERO LOSA DE TECHO

ESPECIFICACIONES
CONCRETO f'c
SOBRECARGA EN LOSA

ACERO VERTICAL

Kg/cm2

ACERO HORIZONTAL

3/8

Pulg.

DIAMETRO

0.953

Cms.

AREA

0.713

Cms2.

PESO

0.560

Kg/ml

ACERO LOSA DE FONDO


ACERO HORIZONTAL
DIAMETRO

=
=

3/8
0.953

Pulg.
Cms.

2,100 Kg/cm2

AREA

0.713

Cms2.

94.5 Kg/cm2

PESO

0.560

Kg/ml

0.20

0.15

0.78

1.13
1.13

Sc

Wc

SL
A'

B'
WL

NIVEL DE AGUA

S1

Ea
1.85

1.80

W1

0.417

0.98

Wa
A

B
S2

0.10
C

W2
0.28
0.57
0.74

CALCULO DE ESTRUCTURAL RESERVORIO APOYADO 3M3

0.10
0.30
NIVEL DE AGUA

1.25

0.20

CALCULOS

W1= Pc x V1

558.00 Kg

W2 = Pc x V2

542.40 Kg

Wa = Pa x Va
WL = Pc x VL

975.00 Kg
223.20 Kg

Ws = Sc x A

139.50 Kg

S1 = 0,12 x W1
S2 = 0,12 x W2

100.44 Kg
97.63 Kg

SL = 0,12 x WL

40.18 Kg

Ss = 0,12 x Ws

30.13 Kg

1312.50 Kg

Ea = 1,12 x 0,5 x Pa x H12

VERIFICACION DEL ESFUERZO CORTANTE EN LA BASE AB


V = Fh / A

0.99 Kg/cm2

Vc = 0,29 ( f'c )^1/2

4.20 Kg/cm2
V=

0.99

Kg/cm2

<

Vc =

4.20

CALCULO DE LA ARMADURA
ACERO VERTICAL CARA B'-B
MOMENTO MAXIMO EN LA BASE A-B
Mu

738.72 Kg-mts.

d = t1 - r - D/2

10.52 Cms.

AREA DE ACERO
As1 =
As2 =

87.55 Cms2
1.90 Cms2

SE ASUME :

1.90 Cms2

0.0012649

CUANTIA = As / t1 x b
CUANTIA MINIMA POR FLEXION
USAR :

3/8

0.0012

<

0.30

0.0013

BIEN!!

mts.

ACERO HORIZONTAL B'B


ASUMIR CUANTIA MINIMA PARA EL ACERO HORIZONTAL, CONSIDERANDO P = 0,0018
As = P x b x t1
USAR :

2.70 Cms2

3/8

0.25

mts.

ACERO EN LA ZAPATA
ASUMIR EL AREA DE ACERO HALLADA PARA LA BASE DE MURO
USAR :

3/8

0.30

mts.

ACERO EN LA LOSA DE FONDO


P1
P2

1245.456
3113.64

P3
P4

2611.44
3677.47

P5

4563.00

LUEGO:

WuD :
WuL :

4396.75
270.00
Wu :

4666.75

Kg/cm2

BIEN !!

CALCULO DEL MOMENTO ULTIMO

Mu = 0,0513 * Wu * L2

828.24 Kg--mts

d = t1 - r - D/2

15.52 Cms.

AREA DE ACERO
As1 =
130.52 Cms2
As2 =

1.43 Cms2

SE ASUME :

2.41 Cms2

0.001205

CUANTIA = As / t1 x b
CUANTIA MINIMA POR FLEXION

USAR :

3/8

0.0012

<

0.25

0.0012

BIEN!!

mts.

ACERO EN LA LOSA DE TECHO


WuD = 2400 * t1 * 1,5

360

WuL = SC * 1,8

270
Wu =

630

CALCULO DEL MOMENTO ULTIMO


Mu = 0,0479 * Wu * L2

73.44 Kg--mts

d = t1 - r - D/2

5.72 Cms.

AREA DE ACERO
As1 =
48.28 Cms2
As2 =

0.34 Cms2

SE ASUME :

0.34 Cms2

0.000342

CUANTIA = As / t1 x b

CUANTIA MINIMA POR FLEXION

0.0012

>

0.0003

As = P * t1 * b

USAR :

MAL!! SE ASUME CUANTIA MINIMA P= 0.0012

1.20 Cms2

3/8

0.25

mts

2.25
0.15

0.20

0.30

0.15

0.15

1.65

0.10

1.55

ESCALINES FG
VER DETALLE

DETALLE DE ESCALINES

BUZON 0,60 x 0,60 Mts.


TAPA SANITARIA METALICA

ESPECIFICACIONES TECNICAS
0.15

0.20

0.20

0.15

1.55

0.15

0.20

RESISTENCIA DEL CONCRETO

f'c

210

FLUENCIA DEL ACERO

fy

4200

30

TRASLAPE MINIMO DE VARILLAS

TUB. FG 3/4"
@ 0,30 Mts.

UNIONES
ELECTROSOLDADAS

ESPECIFICACIONES TECNICAS
Kg/cm2
Kg/cm2
cm

TAPA SANITARIA METALICA

3/8

0.25

TUBERIA DE VENTILACION FG 2"

0,60 x 0,60 mts.

0.10

0.30
NIVEL DE AGUA

3/8

0.20

3/8

0.25

3/8

0.30

3/8

TARRAJEO C / IMPERMEABILIZANTE

1.55

1.25

3/8

0.25

PENDIENTE DE FONDO 1%

0.30

0.20

0.200

0.52

0.20

0.15

SOLADO DE CONCRETO

1.55

0.15

0.20

RESERVORIO APOYADO

RESERVORIO APOYADO

3 M3

3/8

0.25

1.85
2

3/8

ESPECIFICACIONES TECNICAS
RESISTENCIA DEL CONCRETO

f'c

FLUENCIA DEL ACERO

fy

TRASLAPE MINIMO DE VARILLAS

1.85

RESERVORIO APOYADO

ESPECIFICACIONES TECNICAS
=

210

Kg/cm2

4200

Kg/cm2

30

RESERVORIO APOYADO

cm

3 M3

HOJA DE METRADOS DE RESERVORIO


CAPACIDAD :
PROYEC.:

POMACANCHIS SANTA LUCIA

EXPED.:

EVALUADOR:

:..

PARTIDA

DESCRIPCION

FECHA:
VECES

LONG.

ANCHO

ALTURA

6.00

RESERVORIO

3.00

M3

6.01

TRAZO Y REPLANTEO

1.00

2.25

2.25

6.02

EXCAVACION MANUAL

1.00

2.25

2.25

6.03

SOLADO DE CONCRETO E= 0.05 Mts.

1.00

2.25

2.25

6.04

CONCRETO F'C= 210 KG/CM2

1.00

2.25

2.25

0.20

2.00

1.85

0.15

1.55

2.00

1.55

0.15

1.55

1.00

1.85

1.85

0.10

1.55

6.05

CONFOR. DE PENDIENTE DE FONDO C F'C= 175 KG/CM2

1.00

1.55

6.06

ENCOFRADO Y DESENCOFRADO

4.00

1.85

4.00

1.55

1.00

1.55

6.07

ACERO FY= 4,200 KG/CM2

1.00

242.14

6.08

ESCALINES DE FIERRO GALVANIZADO

2.00

2.20

5.00

0.30

4.00

1.55

1.00

1.55

4.00

1.85

1.00

1.85

6.09
6.10

TARRAJEO INTERIOR CON IMPERMEABILIZANTE


TARRAJEO EXTERIOR MEZCLA 1:5

6.11

TAPA SANITARIA METALICA 0,60 x 0,60 Mts.

1.00

6.12

TUBERIA DE VENTILACION FG D= 2"

1.00

6.13

PRUEBA HIDRAULICA Y DESINFEC. RESERVORIO

1.00

6.14

SUMINISTRO Y COLOCACION DE HIPOCLORADOR

1.00

6.15

PINTADO DE MUROS EXTERIORES

4.00

1.85

1.00

1.85

1.00

7.40

0.80

1.65
1.55
1.55

1.55
1.55
1.65
1.85

1.65
1.85

6.15

JUNTA WATER STOP

8.00

CAMARA DE VALVULAS

8.01

TRAZO Y REPLANTEO

1.00

1.50

1.25

8.02

EXCAVACION MANUAL

1.00

1.50

1.25

0.80

8.03

CONCRETO F'C= 175 KG/CM2

1.00

1.50

1.25

0.10

2.00

1.00

0.15

1.10

1.00

1.30

0.15

1.10

1.00

1.30

1.15

0.10

3.00

1.00

1.10

2.00

1.15

1.10

1.00

1.30

1.00

1.00

1.00

16.00

1.45

0.56

6.50

1.55

0.56

10.00

1.55

0.56

6.00

4.05

0.56

13.00

1.50

0.56

2.00

1.15

1.00

1.30

1.00

1.30

8.04

8.05

ENCOFRADO Y DESENCOFRADO

ACERO FY= 4,200 KG/CM2


FIERRO CORRUGADO D= 3/8"

8.06

1.10

TARRAJEO EXTERIOR MEZCLA 1:5

8.07

TAPA METALICA

8.08

ACCESORIOS PVC Y FG

8.09

SUMINISTRO DE ACCESORIOS
VALVULAS COMPUERTA D =1"
VALVULAS COMPUERTA D =2"
TRANSICION PVC-SAP D=1"
TRANSICION PVC-SAP D= 2"
UNION UNIVERSAL FG D= 1"
UNION UNIVERSAL FG D= 2"
NIPLE FG D= 1" x 4"
CODO PVC-SAP D= 2" x 90
CODO PVC-SAP D= 1" x 90
TEE PVC-SAP D= 2" x 90
TEE PVC-SAP D= 1" x 90
CANASTILLA DE BRONCE D= 1"

1.00

1.15
1.15
1.30

UNION PVC-SAP D= 1"


CONO DE REBOSE DE 6" a 2"
TUBERIA PVC-SAP D=1"
TUBERIA PVC-SAP D= 2"
8.10

COLOCACION DE ACCESORIOS

8.11

PINTADO DE MUROS EXTERIORES

3.00

1.10

1.00

CAPACIDAD :

M3
0

1/26/2016
SUB-TOTAL

TOTAL

5.06
4.05
5.06
1.01

5.06
4.05
5.06
2.94

UNID.

m2
m3
m2
m3

0.86

m3

0.72

m3

0.34
2.40
12.21

m3

2.40
24.22

9.61

4.40

m2
m2

2.40
242.14

m2

m2

242.14
5.90

kg

12.01

m2

ml

1.50
9.61
2.40
12.21

m2

15.63

m2

1.00
1.00
1.00
1.00
15.63

unid

3.42
1.00
1.00
1.00
1.00
12.21

m2
unid
glb
unid
m2

3.42
7.40

7.40

ml

1.88

1.88
1.50
0.88

m2

1.50
0.19

m3
m3

0.33

m3

0.21

m3

0.15
3.30

m3

8.26

m2

2.53

m2

1.43

m2

1.00
0.00

m2

51.84

kg

12.99

kg

5.64

kg

8.68

kg

13.61

kg

10.92
2.65

kg

5.83

1.50

m2

1.69
1.00

m2
m2

1.00

unid

3.30

3.30

m2

VOLUMEN

ALTURA

LADO INTER

3.00
4.00

1.25
1.25

1.55
1.80

5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
49.00
50.00
51.00
52.00
53.00
54.00
55.00
56.00
57.00
58.00
59.00

1.25
1.25
1.25
1.30
1.30
1.35
1.40
1.45
1.50
1.55
1.55
1.60
1.65
1.65
1.70
1.70
1.75
1.75
1.80
1.85
1.85
1.85
1.90
1.90
1.95
1.95
2.00
2.00
2.05
2.05
2.05
2.10
2.10
2.15
2.15
2.15
2.20
2.20
2.20
2.25
2.25
2.25
2.30
2.30
2.30
2.35
2.35
2.45
2.40
2.40
2.40
2.40
2.45
2.45
2.55

2.00
2.20
2.40
2.50
2.65
2.75
2.85
2.90
2.95
3.05
3.15
3.20
3.25
3.35
3.35
3.45
3.50
3.55
3.60
3.65
3.70
3.75
3.80
3.85
3.90
3.95
3.95
4.00
4.05
4.10
4.15
4.15
4.20
4.25
4.30
4.35
4.35
4.40
4.45
4.45
4.50
4.55
4.55
4.60
4.65
4.65
4.70
4.65
4.70
4.75
4.80
4.85
4.85
4.90
4.85

VOLUMEN ASUMIDO

3.00 M3
ALTURA

LADO

1.25

1.55

60.00

2.45

4.95

PLANILLA DE ARMADURA DE RESERVORIO DE 3 M3


ARMADURA LOSA DE TECHO

LONGITUD

LONG. POR EN ML.

VECES
1/4"

3/8"

1/2"

5/8"

1/2"

5/8"

1/2"

5/8"

1.81
0.07

3/8

1.95

18.00

35.10

3/8

1.17

6.00

7.02

3/8

0.57

28.00

15.96

3/8

3.00

1.00

3.00

LONGITUD

VECES

3/8

2.10

20.00

42.00

3/8

0.95

20.00

19.00

LONGITUD

VECES

3/8

2.00

24.00

48.00

3/8

7.30

9.00

65.70

1.03

0.07
0.50

0.07

0.10

0.7

0.7

ARMADURA LOSA DE FONDO

1/4"

3/8"

2.10

0.1

0.85

ARMADURA DE MURO

1/4"

3/8"

0.05

1.75

0.20

0.15

1.75

1.75

RESUMEN GENERAL

PESO POR / ML.

0.25

0.58

1.02

1.55

LONG. TOTAL POR

0.00

235.78

0.00

0.00

PESO TOTAL POR

0.00

136.75

0.00

0.00

26.00

0.00

0.00

NUMERO VARILLAS POR

PESO TOTAL

136.75 Kg