Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Sirva la presente para hacerle llegar nuestra cotizacin por el sgte. SERVICIO:
"MODERNIZACION, REEMPLAZO DEL CENTRO DE MOTORES Y EQUIPOS DE LA SUBESTACION ELECTRICA DE CASA DE BOMBA N 6 - REFINERIA TALARA"
ITEM
1
DESCRIPCIN
UNIDAD
CANTIDAD
PRECIO
UNITARIO US $
ACTIVIDADES PRELIMINARES
1.1
GLB
1.00
12,000.00
12,000.00
1.2
GLB
1.00
14,000.00
14,000.00
1.3
GLB
1.00
4,300.00
4,300.00
1.4
GLB
1.00
5,580.00
5,580.00
1.5
GLB
1.00
3,800.00
3,800.00
2
2.1
OBRAS CIVILES
SOBREEXCAVACIONES POR CALZADURA
m3
1055.16
6.50
6,858.54
2.1.1
2.1.2
m3
1160.68
15.29
17,746.80
2.1.3
m3
1055.16
22.00
23,213.52
2.1.4
ENTIBADO EN EXCAVACIONES
m2
503.36
18.40
9,261.82
2.1.5
BOMBEO DE SOBREEXCAVACIONES
GLB
1.00
2,035.00
2,035.00
2.2
2.2.1
2.2.2
2.2.3
2.2.4
CALZADURA
EXCAVACION DE MATERIAL PROPIO (C/EQUIPO)
ELIMINACION DE MATERIAL EXCEDENTE CONTAMINADO
RELLENO ESTRUCTURAL COMPACTADO
CONCRETO CICLOPEO FC=100KG/CM2 + 30% PM.
m3
m3
m3
m3
262.63
134.61
140.25
122.38
6.50
15.29
22.00
111.05
1,707.10
2,058.19
3,085.50
13,590.30
2.3
2.3.1
2.3.2
2.3.3
ESTRUCTURA CIMENTACION
EXCAVACION DE MATERIAL PROPIO (C/EQUIPO)
ELIMINACION DE MATERIAL EXCEDENTE NO CONTAMINADO
RELLENO CON MATERIAL DE PRESTAMO
m3
m3
m3
522.00
176.04
361.96
6.50
14.85
23.50
3,393.00
2,614.19
8,506.06
2.4
2.4.1
2.4.2
m3
m3
6.86
7.54
17.29
14.85
118.61
111.97
2.5
2.5.1
2.5.2
m3
m3
6.86
7.54
17.29
14.85
118.61
111.97
2.6
2.6.1
2.6.2
2.6.3
m3
m3
m3
230.69
67.91
168.95
17.29
14.85
23.50
3,988.63
1,008.46
3,970.33
2.7
2.8
2.8.1
2.8.2
2.8.3
INTERFERENCIAS ENTERRADAS
ENRROCADO PARA DEPRIMIR NAPA FREATICA
EXCAVACION DE MATERIAL PROPIO (C/EQUIPO)
ELIMINACION DE MATERIAL EXCEDENTE CONTAMINADO
ENRROCADO
m3
m3
m3
67.97
74.76
67.97
6.50
15.29
18.00
441.81
1,143.08
1,223.46
SALA ELECTRICA
CONCRETO SIMPLE
LOSA DE PISO, CANALETAS Y BUZONES
CONCRETO Fc=210 kg/cm2
m3
9.87
180.00
1,776.60
3
3.1
3.1.1
3.1.1.1
3.1.1.2
3.1.2
ENCOFRADO Y DESENCOFRADO
m2
16.45
18.00
296.10
FALSO PISO
3.1.2.1
m2
65.78
30.35
1,996.42
3.1.2.2
26.70
7.15
190.91
3.1.3
3.1.3.1
m3
15.65
111.05
1,737.93
3.1.4
3.1.4.1
3.1.4.2
VEREDA DE ACCESO
CONCRETO Fc=210 kg/cm2
ENCOFRADO Y DESENCOFRADO
m3
m2
4.01
17.19
180.00
18.00
721.80
309.42
3.2
3.2.1
3.2.1.1
3.2.1.2
3.2.1.3
CONCRETO ARMADO
CIMENTACION
CONCRETO Fc=210 kg/cm2
ENCOFRADO Y DESENCOFRADO EN CIMENTACION
ACERO CORRUGADO Fy=4200 kg/cm2 GRADO 60
m3
m2
kg
96.50
29.30
6326.13
180.00
18.00
2.40
17,370.00
527.40
15,182.71
3.2.2
3.2.2.1
3.2.2.2
3.2.2.3
SOBRECIMIENTO
CONCRETO Fc=210 kg/cm2
ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO
ACERO CORRUGADO Fy=4200 kg/cm2 GRADO 60
m3
m2
kg
23.62
189.85
1787.86
180.00
18.00
2.40
4,251.60
3,417.30
4,290.86
3.2.3
3.2.3.1
3.2.3.2
3.2.3.3
CANALETA ELECTRICA
CONCRETO Fc=210 kg/cm2
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO Fy=4200 kg/cm2 GRADO 60
m3
m2
kg
36.94
219.00
4693.72
180.00
18.00
2.40
6,649.20
3,942.00
11,264.93
3.2.4
3.2.4.1
3.2.4.2
3.2.4.3
COLUMNAS
CONCRETO Fc=210 kg/cm2
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO Fy=4200 kg/cm2 GRADO 60
m3
m2
kg
11.53
147.32
1623.10
180.00
18.00
2.40
2,075.40
2,651.76
3,895.44
3.2.5
3.2.5.1
3.2.5.2
3.2.5.3
m3
m2
kg
3.37
31.16
263.41
180.00
18.00
2.40
606.60
560.88
632.18
3.2.6
BUZON RECOLECTOR
3.2.6.1
3.2.6.2
3.2.6.3
m3
m2
kg
2.90
25.84
222.10
180.00
18.00
2.40
522.00
465.12
533.04
3.2.7
3.2.7.1
3.2.7.2
3.2.7.3
VIGAS
CONCRETO Fc=210 kg/cm2
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO Fy=4200 kg/cm2
m3
m2
kg
13.53
134.23
1509.75
180.00
18.00
2.40
2,435.40
2,416.14
3,623.40
3.2.8
3.2.8.1
3.2.8.2
VENTANAS
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO Fy=4200 kg/cm2
m2
kg
8.10
117.01
18.00
2.40
145.80
280.82
3.2.9
3.2.9.1
3.2.9.2
m2
kg
11.41
373.87
18.00
2.40
205.38
897.29
3.2.10
3.2.10.1
3.2.10.2
3.2.10.3
DINTELES
CONCRETO Fc=210 kg/cm2
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO Fy=4200 kg/cm2
m3
m2
kg
0.60
5.40
51.51
180.00
18.00
2.40
108.00
97.20
123.62
3.2.11
3.2.11.1
3.2.11.2
3.2.11.3
3.2.11.4
m3
m2
kg
Und
15.05
147.84
989.42
1643.00
180.00
18.00
2.40
0.65
2,709.00
2,661.12
2,374.61
1,067.95
MUROS Y ACABADOS
ALBAILERIA
MUROS DE ALBAILERIA
ACERO CORRUGADO Fy=4200 kg/cm2 GRADO 60
m2
kg
147.52
182.38
35.50
2.40
5,236.96
437.71
m2
347.38
13.00
4,515.94
m2
m2
35.08
36.54
12.74
15.60
446.92
570.02
4
4.1
4.1.1
4.1.2
4.2
4.2.1
4.3
4.3.1
4.3.2
4.3.3
4.3.4
4.3.5
4.3.6
VIGAS
DINTELES
LOSA ALIGERADA (TECHO)
ALBAILERIA
m2
m2
m2
m2
90.36
4.80
147.84
295.03
15.60
15.60
13.65
12.74
1,409.62
74.88
2,018.02
3,758.68
4.4
4.4.1
4.4.2
4.4.3
4.4.4
4.4.5
4.4.6
m2
m2
m2
m2
m2
m2
35.08
85.26
90.36
4.80
147.84
295.03
5.20
5.20
5.20
5.20
5.20
5.20
182.42
443.35
469.87
24.96
768.77
1,534.16
4.5
4.5.1
DRENAJE PLUVIAL
TUBERIAS Y ACCESORIOS
GLB
1.00
2,800.00
2,800.00
4.5.2
m2
177.41
15.00
2,661.15
4.6
OTROS-VARIOS
4.6.1
GLB
1.00
4,510.00
4,510.00
4.6.2
4.6.3
4.6.4
4.6.5
Und
GLB
Und
Und
2.00
1.00
14.00
8.00
308.00
450.00
120.00
275.00
616.00
450.00
1,680.00
2,200.00
5
5.1
5.1.1
5.1.2
ZONA DE TRANSFORMADORES
PISO
PISO DE GRAVA
SOLADO DE CONCRETO Fc=100 kg/cm2
m2
m3
29.92
1.15
4.94
111.05
147.80
127.71
5.2
5.2.1
5.2.1.1
5.2.1.2
5.2.1.3
CONCRETO ARMADO
CIMENTACIONES PARA CASETA DE TRANSFORMADORES
CONCRETO Fc=210 kg/cm2
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO Fy=4200 kg/cm2 GRADO 60
m3
m2
kg
79.78
377.88
6851.20
190.50
24.70
2.64
15,198.09
9,333.64
18,087.17
5.2.2
5.2.2.1
5.2.2.2
CIMENTACIONES DE TRANSFORMADORES
CONCRETO Fc=210 kg/cm2
ENCOFRADO Y DESENCOFRADO
m3
m2
16.38
59.36
190.50
24.70
3,120.39
1,466.19
5.2.2.3
kg
957.64
6
6.1
6.1.1
6.1.2
ESTRUCTURAS METALICAS
ESTRUCTURAS LIVIANAS (W<30 lb/pie) - TECHOS
PROVISION Y FABRICACION DE ESTRUCTURA LIVIANA
MONTAJE DE ESTRUCTURA LIVIANA
ton
ton
6.2
6.2.1
6.2.2
6.3
6.3.1
6.4
6.5
6.5.1
6.5.2
6.5.3
PERNOS
6.5.4.1
6.6
0.43
0.43
2,800.00
495.00
1,204.00
212.85
ton
ton
0.02
0.02
3,800.00
1,500.00
76.00
30.00
ton
0.04
2,500.00
100.00
m2
19.29
38.00
733.02
ton
ton
0.45
0.45
2,800.00
495.00
1,260.00
222.75
ton
0.05
2,500.00
125.00
m2
48.85
38.00
1,856.30
ton
ton
0.03
0.03
3,800.00
495.00
114.00
14.85
PINTADO INDUSTRIAL
PINTADO INDUSTRIAL, INCLUYE ARENADO A METAL BLANCO SSPC-SP-5, PINTURA BASE
ANTICORROSIVA EPOXICA CON SIN ORGANICO 4 MILL Y PINTADO ESMALTE EPOXICO POLIAMIDA
4 MILLS (TALLER)
6.5.4
2,528.17
PERNOS
6.4.1
6.5.3.1
2.64
PINTADO INDUSTRIAL
PINTADO INDUSTRIAL, INCLUYE ARENADO A METAL BLANCO SSPC-SP-5, PINTURA BASE
ANTICORROSIVA EPOXICA CON SIN ORGANICO 4 MILL Y PINTADO ESMALTE EPOXICO POLIAMIDA
4 MILLS (TALLER)
6.6.1
6.6.2
6.6.3
PERNOS
6.6.3.1
6.6.4
6.6.5
6.6.5.1
6.6.6.1
6.6.7
0.03
2,500.00
75.00
m2
1.56
38.00
59.28
m2
94.04
28.00
2,633.12
Und
2.00
2,500.00
5,000.00
PINTADO INDUSTRIAL
6.6.4.1
6.6.6
ton
CARPINTERIA METALICA
PORTON METALICO DE DOS HOJAS 2.60 X 3.00 Y DOS PANELES FIJOS DE 1.3 X 3.00, DE TUBO
STD 2" Y MALLA GALVANIZADA # 8, DE COCADA" (VER PLANO:170837-004-2-PL-004-1)
PUERTAS
6.6.7.1
SUMINISTRO E INSTALACION DE PUERTA METALICA DE DOBLE HOJA TIPO P1 2.00 X 3.00 (VER
PLANO: 170837-004-2-PL-003-5)
Und.
1.00
1,375.00
1,375.00
6.6.7.2
SUMINISTRO E INSTALACION DE PUERTA METALICA DE UNA HOJA TIPO P2 1.20 X 2.10 (VER
PLANO: 170837-004-2-PL-003-2)
Und.
1.00
685.00
685.00
6.6.8
OTROS
6.6.8.1
6.6.8.2
6.7
6.7.1
Und
Und
1.00
1.00
480.00
600.00
480.00
600.00
ZANJAS ELECTRICAS
ZANJA PARA PUESTA A TIERRA
6.7.1.1
m3
67.20
18.70
1,256.64
6.7.1.2
Und
160.00
63.80
10,208.00
6.7.1.3
m3
67.20
19.25
1,293.60
6.7.2
6.7.2.1
1000.00
20.90
20,900.00
6.7.2.2
6.7.2.3
6.7.2.4
m3
m
m3
91.20
200.00
48.00
15.00
30.00
180.00
1,368.00
6,000.00
8,640.00
6.7.3
6.7.3.1
90.77
38.50
3,494.65
6.7.3.2
m3
14.52
180.00
2,613.60
7
7.1
OBRAS ELECTRICAS
SUMINISTRO E INSTALACION DE EQUIPOS ELECTRICOS EN SUBESTACION ELECTRICA
7.1.1
Und
2.00
1,500.00
3,000.00
7.1.2
GLB
1.00
450.00
450.00
7.1.3
Und
2.00
650.00
1,300.00
7.1.4
Und
1.00
680.00
680.00
7.1.5
Und
1.00
4,800.00
4,800.00
7.1.6
Und
1.00
4,800.00
4,800.00
7.1.7
Und
1.00
120.00
120.00
7.1.8
Und
1.00
120.00
120.00
7.1.9
Und
1.00
750.00
750.00
7.1.10
Und
1.00
180.00
180.00
7.1.11
Und
1.00
120.00
120.00
7.2
7.2.1
Und
2.00
2,300.00
4,600.00
7.2.2
Und
1.00
1,200.00
1,200.00
7.2.3
Und
2.00
650.00
1,300.00
7.3
7.3.1
7.3.1.1
SUMINISTRO E INSTALACION DE CABLE DE COBRE DE MEDIA TENSION UNIPOLAR 3-1 X 120 MM2,
8.71/15KV, CABLEADO DEL TIPO N2XSKY
2800.00
13.60
38,080.00
7.3.1.2
SUMINISTRO E INSTALACION DE CABLE DE COBRE DE MEDIA TENSION UNIPOLAR 3-1 X 240 MM2,
3.6/6KV, CABLEADO DEL TIPO N2XSKY
388.00
15.70
6,091.60
7.3.1.3
500.00
10.60
5,300.00
7.3.1.4
278.00
8.60
2,390.80
7.3.1.5
58.00
7.50
435.00
7.3.2
7.3.2.1
165.00
16.50
2,722.50
7.3.2.2
25.00
10.30
257.50
7.3.2.3
35.00
7.50
262.50
15.00
6.40
96.00
115.00
5.70
655.50
7.3.2.4
7.3.2.5
7.3.2.6
75.00
4.20
315.00
7.3.2.7
SUMINISTRO E INSTALACION DE CABLE MULTICONDUCTOR DEL TIPO N2XY, 10C X 2.5 MM2,
CONDUCTORES DE COBRE ELECTROLITICO RECOCIDO
240.00
3.50
840.00
7.3.2.8
75.00
3.10
232.50
7.3.2.9
700.00
3.20
2,240.00
7.3.3
7.3.3.1
KIT
8.00
850.00
6,800.00
7.3.3.2
KIT
8.00
850.00
6,800.00
7.3.3.3
KIT
4.00
850.00
3,400.00
7.3.3.4
KIT
8.00
850.00
6,800.00
7.3.3.5
SUMINISTRO E INSTALACION DE EMPALMES PARA CABLES M.T. DEL TIPO AUTOCONTRAIBLE (DEL
TIPO NKY A N2XSY DE 70mm2)
GLB
1.00
820.00
820.00
7.3.3.6
SUMINISTRO E INSTALACION DE EMPALMES PARA CABLES M.T. DEL TIPO AUTOCONTRAIBLE (DEL
TIPO NKY A N2XSY DE 35mm2)
GLB
1.00
820.00
820.00
7.3.3.7
GLB
1.00
750.00
750.00
7.4
7.4.1
Und
19.00
60.00
1,140.00
7.4.2
SUMINISTRO E INSTALACION DE LUMINARIA PARA ADOSAR TIPO WALLPACK APTO PARA AREAS
CLASE 1 DIV. 2 (10003594) (10003592
Und
2.00
550.00
1,100.00
7.4.3
Und
2.00
140.00
280.00
7.5
7.5.1
Pto
21.00
32.00
672.00
7.5.2
Pto
8.00
32.00
256.00
7.5.3
Und
6.00
32.00
192.00
7.6
7.6.1
260.00
3.80
988.00
7.6.2
120.00
3.50
420.00
7.6.3
10.00
3.20
32.00
7.6.4
Und
4.00
280.00
1,120.00
7.6.5
GLB
1.00
400.00
400.00
GLB
1.00
6,500.00
6,500.00
8
8.1
8.1.1
9
9.1
TRABAJOS MECANICOS
SUMINISTRO E INSTALACION DE EQUIPOS MECANICOS
SUMINISTRO E INSTALACION DE SISTEMA INTEGRAL DE CLIMATIZACION (HVAC) Y
PRESURIZACION
9.1.1
GLB
1.00
26,800.00
26,800.00
9.1.2
GLB
1.00
4,200.00
4,200.00
9.2
9.2.1
GLB
1.00
1,800.00
1,800.00
9.2.2
GLB
1.00
2,200.00
2,200.00
9.2.3
GLB
1.00
3,500.00
3,500.00
9.2.4
GLB
1.00
4,500.00
4,500.00
10
10.1
GLB
1.00
10.2
GLB
1.00
COSTO DIRECTO
GASTOS GENERALES (3 ) %
UTILIDAD (3) %
SUB TOTAL
I.G.V. 18%
TOTAL PRESUPUESTO
0.00
7,000.00
7,000.00
583,078.42
17,492.35
17,492.35
618,063.12
111,251.36
729,314.48
6 - REFINERIA TALARA"
TOTAL US$
12,000.00
14,000.00
4,300.00
5,580.00
3,800.00
6,858.54
17,746.80
23,213.52
9,261.82
2,035.00
1,707.10
2,058.19
3,085.50
13,590.30
3,393.00
2,614.19
8,506.06
118.61
111.97
118.61
111.97
3,988.63
1,008.46
3,970.33
441.81
1,143.08
1,223.46
1,776.60
296.10
1,996.42
190.91
1,737.93
721.80
309.42
17,370.00
527.40
15,182.71
4,251.60
3,417.30
4,290.86
6,649.20
3,942.00
11,264.93
2,075.40
2,651.76
3,895.44
606.60
560.88
632.18
522.00
465.12
533.04
2,435.40
2,416.14
3,623.40
145.80
280.82
205.38
897.29
108.00
97.20
123.62
2,709.00
2,661.12
2,374.61
1,067.95
5,236.96
437.71
4,515.94
446.92
570.02
1,409.62
74.88
2,018.02
3,758.68
182.42
443.35
469.87
24.96
768.77
1,534.16
2,800.00
2,661.15
4,510.00
616.00
450.00
1,680.00
2,200.00
147.80
127.71
15,198.09
9,333.64
18,087.17
3,120.39
1,466.19
2,528.17
1,204.00
212.85
76.00
30.00
100.00
733.02
1,260.00
222.75
125.00
1,856.30
114.00
14.85
75.00
59.28
2,633.12
5,000.00
1,375.00
685.00
480.00
600.00
1,256.64
10,208.00
1,293.60
20,900.00
1,368.00
6,000.00
8,640.00
3,494.65
2,613.60
3,000.00
450.00
1,300.00
680.00
4,800.00
4,800.00
120.00
120.00
750.00
180.00
120.00
4,600.00
1,200.00
1,300.00
38,080.00
6,091.60
5,300.00
2,390.80
435.00
2,722.50
257.50
262.50
96.00
655.50
315.00
840.00
232.50
2,240.00
6,800.00
6,800.00
3,400.00
6,800.00
820.00
820.00
750.00
1,140.00
1,100.00
280.00
672.00
256.00
192.00
988.00
420.00
32.00
1,120.00
400.00
6,500.00
26,800.00
4,200.00
1,800.00
2,200.00
3,500.00
4,500.00
0.00
7,000.00
583,078.42
17,492.35
17,492.35
618,063.12
111,251.36
729,314.48