Pres 001
Pres 001
Pgina
S10
Presupuesto
Lugar
0102021
AGENCIA NUEVA
INSTALACIONES ELECTRICAS
001
BANCO DE CREDITO DEL PERU
LIMA - LIMA-LIMA - SAN MARTIN DE PORRES
Item
Descripcin
01
Presupuesto
Subpresupuesto
Cliente
01.01
02
Costo al
Und.
Metrado
Precio S/.
03/11/2014
Parcial S/.
63.48
und
1.00
63.48
63.48
163.80
17,526.60
29,856.77
02.01
PTO
107.00
02.02
PTO
41.00
80.48
3,299.68
02.03
PTO
12.00
163.80
1,965.60
02.04
PTO
13.00
71.28
926.64
02.05
PTO
4.00
74.28
297.12
02.06
PTO
3.00
76.28
228.84
02.07
PTO
18.00
85.48
1,538.64
02.08
PTO
2.00
89.27
178.54
02.09
PTO
33.00
70.07
2,312.31
02.10
PTO
4.00
100.38
401.52
02.11
und
33.00
30.31
1,000.23
02.12
und
1.00
41.91
41.91
02.13
und
1.00
58.71
58.71
02.14
und
1.00
80.43
80.43
03
ALIMENTADORES
10,162.09
03.01
24.20
127.86
03.02
4.50
84.23
379.04
03.03
23.70
71.63
1,697.63
03.04
19.70
61.74
1,216.28
03.05
6.20
66.37
411.49
03.06
43.40
41.60
1,805.44
03.07
2.10
74.60
156.66
03.08
9.00
17.75
159.75
03.09
21.40
24.11
515.95
03.10
2.30
21.94
50.46
03.11
24.20
27.90
675.18
3,094.21
04
TABLEROS
04.01
TG-TN: - Int. Term.: 1-3x160A, 1-3x80A, 1-3x63A, 1-2x30A, 5-2x20A - I.D. 5-2x25A
30mA. 1 C.E. GABINETE 30 POLOS
und
1.00
1,983.19
1,983.19
04.02
TPT: Int. Term.: 2-3x40A, 1-3x30A, TRANSF AISLAMIENTO FACTOR K-13 220/380V
GABINETE 9 POLOS
und
1.00
1,693.35
1,693.35
13,296.15
04.03
TTP: Int. Term.: 1-3x40A, 9-1x20A - I.D. 8-2x25A 30mA. GABINETE 18 POLOS
und
1.00
1,793.29
1,793.29
04.04
TCA: Int. Term.: 1-3x30A, 4-1x20A - I.D. 4-2x25A 30mA. GABINETE 12 POLOS
und
1.00
1,181.72
1,181.72
04.05
TE: Int. Term.: 2-3x63A, 1-3x40A, 2-3x20A, 9-2x20A - I.D. 8-2x25A 30mA. 2 C.E.
GABINETE 42 POLOS
und
1.00
2,154.46
2,154.46
04.06
TAA: Int. Term.: 1-3x80A, 2-3x40A, 2-3x30A, 3-2x20A - 7 C.E., 6 TEMP. GABINETE 30
POLOS
und
1.00
2,105.14
2,105.14
1,135.56
04.07
und
1.00
1,135.56
04.08
und
1.00
1,249.44
05
ARTEFACTOS DE ILUMINACIN
05.01
1,249.44
24,407.30
UND
9.00
176.38
1,587.42
05.02
UND
9.00
186.45
1,678.05
05.03
UND
20.00
146.60
2,932.00
05.04
UND
22.00
161.96
3,563.12
UND
21.00
155.36
3,262.56
05.05
05.06
UND
30.00
166.93
5,007.90
05.07
UND
16.00
167.25
2,676.00
05.08
LUMINARIA TIPO SPOT RECESADO FIJO CON LAMPARA LED PAR 38 DE 13W
PARA EMPOTRAR FCR
UND
14.00
173.38
2,427.32
05.09
UND
5.00
172.26
861.30
Pgina
S10
Presupuesto
Lugar
0102021
AGENCIA NUEVA
INSTALACIONES ELECTRICAS
001
BANCO DE CREDITO DEL PERU
LIMA - LIMA-LIMA - SAN MARTIN DE PORRES
Item
Descripcin
Und.
05.10
UND
1.00
206.65
UND
1.00
204.98
Presupuesto
Subpresupuesto
Cliente
05.11
06
06.01
07
07.01
Costo al
Metrado
Precio S/.
03/11/2014
Parcial S/.
206.65
204.98
3,646.68
und
3.00
1,215.56
3,646.68
GLB
1.00
4,000.00
4,000.00
VARIOS
4,000.00
PRUEBAS ELECTRICAS
COSTO DIRECTO
GASTOS GENERALES (7%)
UTILIDAD (8%)
85,432.47
5,980.27
6,834.60
==================
SUB TOTAL
I.G.V. (18%)
98,247.34
17,684.52
==================
VALOR REFERENCIAL
SON :
115,931.86