Summer Training Report on:


Total Zinc Loss in Jarosite Cake
At

HINDUSTAN ZINC LIMITED, DEBARI, UDAIPUR

SUBMITTED BY:
ANKUR KULDEEP(12112012)

HZL Training Report

ACKNOWLEDGEMENT
I take great pleasure in thanking Hindustan Zinc Limited, Debari Zinc Smelter for
providing me with an opportunity to do my industrial training. In this esteemed
organization, I express my gratefulness to Mr. Mahesh Todkar, Unit Head of
Debari Zinc Smelter. The immediate gratitude goes to Mr. Nikhil Sharma, Head of
HR Department, Officer HR for providing the necessary arrangements required
during the training. I express my heartfelt thanks to department heads of Safety
Department, Roasting Department, Leaching & Purification Department,
Electrolysis Department, Mechanical Department and Electrical Department for
providing the introduction of each and every department.

I express my heartfelt thanks to Mr. A. K. Singh, The Plant Manager of Leaching


Department, Mr. Vijay Rana, Associate Manager Leaching Department for
assigning me the right project and all the necessary information and guidance to
work with it. I am also grateful to Mr. DebashishSahuand Mr. Shashi Prakash
Singh, Engineer (Leaching Department) for providing me with valuable
information during the project completion. I take honor and pride in thanking
each and every staff member for being friendly and co-operating with me in my
project activities.

Finally, I wish to add that I am indebted to god &my parents foreverything good
that has happened to me.

ANKUR KULDEEP
12112012

Page 2 of 42

HZL Training Report

PREFACE
Practical training is a way to implement theoretical knowledge topractical use to
become a successful engineer. It is necessary to havea sound practical knowledge
because it is only way by which one canPractical training is a way to implement
theoretical knowledge topractical use to become a successful engineer. It is
necessary to havea sound practical knowledge because it is only way by which
one can acquire proficiency & skill to work successfully different industries.
It is proven fact that bookish knowledge is not sufficient because things are not as
ideal in practical field as they should be.
Hindustan Zinc Ltd. is one of the best examples to understand theproduction
process & productivity in particular of Zinc.
This report is an attempt made to study the overall productionsystem & related
action of Zinc Smelter, Debari a unit a HZL. It isengaged in production of high
grade zinc metal & other by productsviz. Cd, sulphuric acid etc. since 1968 by
adopting HydroMetallurgical technology.

ANKUR KULDEEP
12112012

Page 3 of 42

HZL Training Report

ABSTRACT
In this report firstly, the introduction of Hindustan Zinc Limited and Debari Zinc
Smelter is given. The second section of this report includes the introduction of
every department of this plant. Detailed information about the leaching
department of this unit is given in this report.
In the last section of this report project details are given. This project includes the
continuously monitoring of some parameter of RTP (Residual Treatment Plant)
and HBF (Horizontal Belt Filter) sections of leaching.
To reduce the total zinc losses in jarosite cake some graphs are drawn between
these noted parameters and zinc losses. Conclusions are drawn from these graphs
about the ranges of running parameters in which the zinc losses in jarosite cake
will be minimum. These parameter ranges of the running conditions can be used
as reference in the operation of these sections of the leaching.

Page 4 of 42

HZL Training Report

TABLE OF CONTENTS

TOPIC

Company profile
Introduction to Zinc
Plant induction program
Safety department
Roaster and Acid plant
Leaching and Purification department
1. Neutral leaching
2. Acid leaching
3. RTP & HBF
4. Purification
Electrolysis department
Melting & Casting
Project details
o Introduction to the project
o Noted down parameters of RTP section
o Noted down parameters of HBF section
o Conclusions and recommendation

PAGE NO.
6
10
13
13
15
17
21
23
25
29
31
33
35
35
37
40

Page 5 of 42

HZL Training Report

COMPANY PROFILE
VEDANTA
Vedanta is an LSE-listed diversified FTSE 100 metals and mining company, and
Indias largest non-ferrous metals and mining company based on revenues.
Its business is principally located in India, one of the fastest growing large
economies in the world.
In addition, they have additional assets and operations in Zambia and Australia.
They are primarily engaged in copper, zinc, aluminum and iron businesses, and
are also developing a commercial power generation business.
Founder of this recognition is Mr. Anil Agarwal, who is chairman of this group,
a simple person without any special degree in management field but have a great
experience in this field and a sharp sight of the future conditions and
requirement.
Vision:
Be the worlds largest and most admired Zn-Pb and Ag company.
Mission:
Enhance stakeholder value through exploration, innovation, operational
excellence and sustainability.
Be a globally lowest cost Zn producer.
Maintain market leadership and customer delights.

HINDUSTAN ZINC LIMITED


Hindustan Zinc Limited was incorporated from the erstwhile Metal Corporation of
India on 10 January 1966 as a Public Sector Undertaking. In April 2002, Sterlite
Opportunities and Ventures Limited (SOVL) made an open offer for acquisition of
shares of the company; consequent to the disinvestment of Government of
India's (GOI) stake of 26% including management control to SOVL and acquired
additional 20% of shares from public, pursuant to the SEBI Regulations 1997. In
Page 6 of 42

HZL Training Report

August 2003, SOVL acquired additional shares to the extent of 18.92% of the paid
up capital from GOI in exercise of "call option" clause in the share holder's
agreement between GOI and SOVL. With the above additional acquisition, SOVL's
stake in the company has gone up to 64.92%. Thus GOI's stake in the company
now stands at 29.54%. Hindustan Zinc Ltd. operates smelters using
Roast Leach Electro-Winning (RLE)
Hydrometallurgical (Debari, Vizag and Chanderiya Smelters)
ISP pyrometallurgical (Chanderiya Lead Zinc Smelter) and
Ausmelt (Chanderiya Lead Smelter) process routes.
Operations:
Mining: HZL operates the worlds 3rd largest open-pit mines. Worlds largest
Zinc mines in RampuraAgucha, Rajasthan. Worlds lowest cost Zn producer.
Smelting: operates Zn &Pb smelters and refineries at
Chanderiya(Chittorgarh), Debari(Udaipur) and Dariba(Rajsamand).

Page 7 of 42

HZL Training Report

`ZINC SMELTER, DEBARI-UDAIPUR


Location ==14 km from Udaipur, Rajasthan, India
Hydrometallurgical Zinc Smelter== Commissioned in 1968 Roast Leach Electro
wining Technology with conversion process gone through aeries of
debottlenecking 88,000 tons per annum of Zinc.
Captive Power Generation==29 MW DG Captive Power Plant Commissioned in
2003.
Certifications==BEST4 Certified Integrated Systems ISO9001:2000, ISO
14001:2004, OHSAS18001:1999, SA 8000:2001
Covered Area (Ha) ==22.65
Total Plant Area (Ha)== 126
Products Range:
(a) High Grade Zinc (HG)(25 kgs) & Jumbo (600 kgs)
(b) Cadmium== Pencils (150 gms)
(c) Sulphuric acid== +98% concentrated
India Technology: Roast Leach Electro-winning (RLE) Technology
Awards & Recognitions:
(a) International Safety Award: 2006 by British Safety Council, UK
(b) ROSPA Gold Award for prevention of accidents.

Operating Capacity (Per Year):


Zn: 88,000 MT
Acid: 130,000 MT
Cd: 250 MT
Zinc dust: 360 MT
Raw Material Supplies:
(a) Zawar Mines
(b) Agucha Mines
(c) RajpuraDariba Mines
Page 8 of 42

HZL Training Report

(d) Product Buyers:


(a) Tata
(b) Bhel
(c) Steel Companies
Process Collaborators:
(a) Krebs Penorrova, FranceLeaching, purification ,electrolysis
(b) Lurgi, GMBH, and Germany Roaster and gas cleaning
(c) Auto Kumpa Finland RTP ,Wartsila plant
(d) I.S.C.,ALLOY,U.K.Zinc dust plant, Allen power plant

Page 9 of 42

HZL Training Report

ZINC
Introduction:
Properties of Zinc (metallic) at 293K:
Density ==7140 Kg/m3
Melting point == 693K
Specific latent heat of fusion == 10 J/Kg
Specific heat capacity == 385 J/Kg/K
Linear expansivity == 31/K
Thermal conductivity == 111W/m/K
Electric sensitivity == 5.9 ohm-meter
Temp. coefficient of resistance == 40/K
Tensile strength == 150MPa
Elongation == 50%
Youngs modulus == 110 GPa
Poissons ratio == 0.25

Zinc Smelting:
Zinc smelting is the process of recovering and refining zinc metal out of zinccontaining feed material such as zinc-containing concentrates or zinc oxides.This
is the process of converting zinc concentrates (ores that contain zinc) into pure
zinc. The most common zinc concentrate processed is zinc sulfide, which is
obtainedby concentrating sphalerite using the froth flotation method. Secondary
(recycled) zinc material, such as zinc oxide, is also processed with the zinc sulfide.
Approximately 30% of all zinc produced is from recycled sources.
The vast majority of zinc smelting plants in the western world use the electrolytic
process also called the Roast-Leach-Electro winning (RLE) process.
Application of Zinc:
About 13 million tons of zinc is produced annually worldwide. Around 58% of the
amount is used for galvanizing to protect steel from corrosion. Approximately
14% is used the production of zinc die casting alloys. Nearly 9% of the zinc is also
utilized for oxides and chemicals and about 10% is used in Brass semis and
castings.

Page 10 of 42

HZL Training Report

Galvanizing:
Zinc is one of the best forms of protection against corrosion and is used
extensively in building, construction, infrastructure, household appliances,
automobiles, steel furniture, and more. Galvanizing accounts for around 58% of
global zinc usage.
Zinc Oxide:
The most widely used zinc compound, zinc oxide is used in the vulcanization of
rubber, as well as in ceramics, paints, animal feed, pharmaceuticals, and several
other products and processes. A special grade of zinc oxide has long been used in
photocopiers. 9% of global zinc usage is in this segment.
Die Castings:
Zinc is an ideal material for die casting and is extensively used in hardware,
electrical equipments, automotive and electronic components. 14% of zinc used
in the word is through Die Castings.
Alloys:
Zinc is extensively used in making alloys, especially brass, which is an alloy of
copper and zinc. Alloy accounts for around 10% of global zinc usage.
Rolled Zinc:
Zinc sheets are used extensively in the building industry for roofing, flashing and
weathering applications. These are also used in graphic art to make plates and
blocks, as well as battery callouts and coinage.

Page 11 of 42

HZL Training Report

ZINC SMELTER DEBARI HAS FOLLOWING MAIN PLANTS:


General Process Overview: The electrolytic zinc smelting process can be divided
into a number of generic sequential process steps, as presented in the general
flow sheet set out below.

Figure 1: Zinc Smelter, Debari

In Summary, the Process Sequence is:


Step 1: Receipt of feed materials (concentrates and secondary feed materials such
as zinc oxides) and storage.
Step 2: Roasting: an oxidation stage removing sulphur from the sulphide feed
materials, resulting in so-called calcine.
Page 12 of 42

HZL Training Report

Step 3: Leaching transforms the zinc contained in the calcine into a solution such
as zinc sulphate, using diluted sulphuric acid.
Step 4: Purification: removing impurities that could affect the quality of the
electrolysis process (such as cadmium, copper, cobalt or nickel) from the leach
solution.
Step 5: Electrolysis or electro-winning: zinc metal extraction from the purified
solution by means of electrolysis leaving a zinc metal deposit (zinc cathodes).
Step 6: Melting and casting: melting of the zinc cathodes typically using electrical
induction furnaces and casting the molten zinc into ingots.
Additional steps can be added to the process transforming the pure zinc (typically
99.995% pure zinc known as Special High Grade (SHG) into various types of alloys
or other marketable products.

PLANT INDUCTION PROGRAME:


Plant induction program includes the introduction of the whole plant includes the
visit of the safety department, roaster and acid department, leaching and
purification department, zinc electrolysis department, mechanical department,
electrical department, instrumentation department, maintenance department.

SAFETY DEPARTMENT:
Various safety instructions were given to us on the first day of training, which was
supported by video of the plant.
The following instructions are given:

Personal safety is must.


Shoes and helmet are must in the plant.
No person less than 18 years of age is allowed in the plant.
Distance must be maintained from the conveyor belt and loose clothes
should not wear.
Page 13 of 42

HZL Training Report

In the roaster and acid plant H2S gas is converted to sulphuric acid. In case
of leakage of gas move against the wind and cover mouth with wet cloth.
While going near to these acid storage tanks, acid proof suits and goggles
must be used.
Eye and body washers are provided at different places of the plant.
Mobile phones and watches are prohibited in electrolysis unit area.
Zinc ingots are formed which are around 400oC, cooled by air cooling for
around 8 hours, so it has not to be touched.
Safety score card and physical condition tour audit have been implemented
to assess the safety performance. Safety score card is a point based system
which mainly assess lead indicators like safety training, near misses
reporting, personal protective equipments(PPE) compliance, analysis
mechanism etc., to monitor the safety status of the unit on monthly basis.
Physical condition tour is a field audit giving thrust to substandard
condition in areas of general work place condition, facilities, material
handling, equipment health, hazard control, emergency system and PPE
compliance.
Foe continuous improvement in our safety performance, we conduct
internal and external safety audits that assess the functionality, adequacy
and adherence of safety management system across all our operations, to
further improve and make a benchmark performance year after year. The
journey of continuous improvement continues.

Page 14 of 42

HZL Training Report

ROASTER AND ACID PLANT:


Roasting is a process of oxidizing zinc sulfide concentrates at high
temperatures into an impure zinc oxide, called "Zinc Calcine". This is a
metallurgical process involving gas-solids reactions at elevated temperatures.
A common example is the process in which sulfide ores are converted to
oxides, prior to smelting. Roasting differs from calcinations, which merely
involves decomposition at elevated temperatures.
At this unit, three roasters are used for roasting of zinc sulphide to calcine.
Roasters are mainly furnaces which are maintained at temperature of around
950oC. These furnaces are fluidized type in which fluidized bed is made and air
is passed from bottom for oxidation. These furnaces are autogenously, so only
to start the reaction or to obtain required temperature, fuel is required. A
typical sulfide roasting chemical reaction takes thefollowing form:

S
2ZnS

+
+

SO2
CuS

+
+

O2

SO2

3O2

2ZnO

O2
1.5 O2

SO3
CuO

SO2

Page 15 of 42

HZL Training Report

PROCESS FLOW DIAGRAM FOR ROASTER PLANT:

Figure 2:Roaster Plant

Page 16 of 42

HZL Training Report

ACID PLANT
Gases coming out of the hot gas precipitator in roaster unit have 7%-8% SO2 and
at 330oC. In this section SO2 gas at temperature of around 330oC is passed
through scrubbing tower, which has sedimentation tank and SO2 stripper and wet
gases precipitator, the gas obtained at temperature of 55oC. SO2 gas has the
moisture. The SO2 gas is first dried in a drying tower with H2SO4.

LEACHING AND PURIFICATION SECTION


Leaching is a widely used extractive metallurgy technique which converts metals
into soluble salts in aqueous media. Compared to pyrometallurgical operations,
leaching is easier to perform and much less harmful, because no gaseous
pollution occurs. The only drawback of leaching is its lower efficiency caused by
the low temperatures of the operation, which dramatically affect chemical
reaction rates. All process activities related with Neutral leaching, Weak acid
Leaching, Jarosite precipitation, Horizontal Belt Filter, Magnesium removal and
Jarosite Operations (Effluent Treatment Plant).
Products
NOF

Major Parameters to be
Controlled

Range

Zinc (gpl)

130-150

pH

4.8-5.1

Fe+2 (ppm)

<= 5

Ni (ppm)

<10

T/Zn in jarosite

< 3.0 %

Under flow of 07 thickener

Page 17 of 42

HZL Training Report

Definitions:
Calcine Bin: Intermediate Storage Bin for storing Calcine
NL:

Neutral Leaching

Flocculent: Chemical used to enhance solid liquid separation


MnO2 Slurry: Slurry obtained after anode cleaning in Cell House
Fe+2: Ferrous ion
Fe+3: Ferric ion
AL:

Acid leaching

RTP: Residue Treatment Plant


HBF: Horizontal Belt Filter
U/F: Underflow of thickener
O/F: Overflow of Thickener
PPE: Personal Protection Equipment
RC:

Ready for calcine

Pachuka: The tank/reactor in which solution and slurries are taken to carry out
the reaction and it is equipped with motor and agitator system.
pH Analyzer: This is the online pH measuring instrument which measures the
reduction / oxidation potential in terms of redox value.
Classifier: Its a rubber-lined screw, mounted inside a semi cylindrical horizontal
vessel & main screw having adjustable shaft angle.
Thickener: Its a cylindrical tank with conical bottom provided with four centrally
Mounted rake arms (2 big & 2 small) to push the solid settled, to the center
towards the bottom cone, provided with rake lifting arrangement of 600 / 900
cubic meter capacity.
Diaphragm Pumps: These are the motor driven pumps to draw underflow of door
thickeners.
Page 18 of 42

HZL Training Report

ODS Pumps: These are the compressed air driven diaphragm pumps to draw
underflow from door thickeners.
AOF Tank: Acid leaching Overflow tank
COF Tank:

Conversion Overflow tank

LEACHING

NEUTRAL
LEACHING

ACID
LEACHING

RTP

PURIFICATION

Figure 3: Types of Leaching

Page 19 of 42

HZL Training Report

CALCINE
SPENT
O/F

NL1
U/F

PUR

O/F

NL2
U/F

CELL HOUSE

U/F

O/F

PN

RTP
O/F
RECYCLE

U/F

HBF

ETP (EFFLUENT TREATMENT PLANT)


Figure 4: General Process Flow Diagram-Leaching
NL1: NEUTRAL LEACHING
PUR: PURIFICATION SECTION

NL2: ACID LEACHING

PN: NEUTRALIZATION SECTION

HBF: HORIZONTAL BELT FILTER

Page 20 of 42

HZL Training Report

NEUTRAL LEACHING:
The first neutral leaching step is the most important section of the leaching plant,
because approx 70% of the total dissolved Zn is dissolved in this leaching step.
The main target is to leach the zinc oxide from the calcine and oxidize the ferrous
iron to the ferric state. In addition to being an important zinc leaching step, the
neutral leaching step is also an important purification step. Impurities like Fe, As,
Sb, and Ge are precipitated in the last tanks of neutral leaching.
Neutral leaching consists of the following main process equipment:

One 35 MT capacity calcine hopper

Seven 680 MT calcine storage silos

Three screw conveyors, and five reddler conveyors

One Classifier and ball mill

Nine 45 m leaching reactors and first reactor is called Ready for calcine

Two 16 m diameter thickeners

Two 70 m thickener overflow tanks.

Calcine conveying: Calcine from roaster plant 1 & 2 is taken through bucket
elevator no. 10, and No. 15/16 (max capacity 20 ton each), respectively. In case of
breakdown of any of the two bucket elevators, calcine from both the roasters can
be taken through single bucket elevator. When calcine hopper is full which is
shown by high-level indication in DCS control room, calcine is diverted to storage
silos(0 to 6) through reddler conveyors(11 & 15/21) to any of the seven silos
depending on level of calcine present in each of them. In case of shortage calcine
is withdrawn through reddler / retake conveyors (9 & 15/23) from any of the
seven silos depending upon level of calcine.
NEUTRAL LEACHING:
The ready for calcine (RC) and remaining leaching pachukas are all covered and
equipped with agitators, and stacks. Pachukas (N-3 to N-7) are equipped with
injectors for oxygen gas. Except RC tank and the eight leaching pachukas are
arranged in a cascade and are interconnected with an overflow launder, so that
the solution fed to the first tank flows by gravity to all the tanks and to the
Page 21 of 42

HZL Training Report

classifier without pumps. Also, the launder system enables the bypass of any
single Pachuka.

Figure 5: Neutral Leaching


Neutral leaching input consists of calcine, spent electrolyte from cell house with
approx 180 gpl free H2SO4, ball mill slurry, conversion and acid overflows,
oxidizing agent MnO2.The pH in the first leaching pachuka is 1.8 to 2.0 which goes
to pH 4.7 to 4.8 in the last leaching pachuka so as to take formation of iron
hydroxide from ferric ions and to form complex compounds.
The basic chemical reactions in the neutral leaching process are:
ZnO

+ H2SO4

ZnSO4+ H2O

CuO + H2SO4

CuSO4 +H2O

Page 22 of 42

HZL Training Report

CdO + H2SO4

CdSO4 + H2O

PbO + H2SO4

PbSO4 + H2O

In addition to the reactions above, MnO2 reacts in the first leaching Pachuca's
2 FeSO4 +2 H2SO4 + MnO2

Fe2(SO4)3+ MnSO4 +2 H2O

Where as in the last leaching pachukas oxygen is reacting and iron hydroxide is
precipitating
2 FeSO4 +2 H2SO4 + O2 +ZnO

Fe2(SO4)3 +Zn SO4 +2 H2O

Fe2(SO4)3 + 3 ZnO+3H2O

2 Fe(OH)3 +3 ZnSO4

4 Fe(OH)3 + Sb/As/Al/Ge-complex

Fe-OH-Sb-As-Al-Ge-complex

Analysis of Mn, Mg, F-, Zn, Co, Ni, Cu, Cd, As, Ge, Sb & Fe++ are done in the
control lab.

ACID LEACHING:
The main task of the acid leaching step is to dissolve the remaining zinc oxide,
which was not dissolved during Neutral leaching, and to reach a zinc oxide
leaching efficiency of more than 97 %. All leaching tanks are covered and
equipped with agitators, indirect steam heating elements and stacks. The steam
heating elements are to maintain a temperature of about 80C in the leaching
tanks. The four leaching pachukas are arranged in a cascade and are
interconnected by an overflow launder, which enables the bypass of any single
tank. The solution, fed into the first tank, flows by gravity through all the leaching
tanks, the thickener and the overflow tank.
Underflow slurry from neutral thickeners (01 & 02) and neutralization thickener
(04) is withdrawn with help of diaphragm pumps and ODS pumps. Underflow is
discharged to acid leaching launder, mixed with spent electrolyte and it flows to
A4 pachuka. A4 pachuka outlet pH is maintained at 1.5 to 2.5.

Page 23 of 42

HZL Training Report

After solid liquid separation the solid is separated by rake movement and is
withdrawn by diaphragm pumps. 03 thickener underflow goes to RTP and
overflow collected in a tank called AOF tank and sent to Neutralization.
ZnO +

H2SO4

ZnSO4 +H2O

MeO +

H2SO4

MeSO4 + H2O (Me = Cu, Cd etc.)

NEUTRALIZATION:
Neutralization is used to remove the impurities Sb, As, Al and Ge by neutralizing
the over flows from Acid leaching thickener and Jarosite precipitation thickeners
with calcine before sending it to Neutral leaching.
A1 pachuka outlet pH is so maintained such that A3 pachuka outlet pH of 3.7 to
4.0 is achieved. The slurry then flows to 200 m3 rector and is then pumped to
screw classifier. The pH of 200 m3 outlet is measured at regular interval and is
kept 4.7 to 4.9. The coarse particles are separated out and go to the ball mill and
the solution along with fine solids goes to 06 thickener where flocculent diluted in
water is added for solid liquid separation. Clear neutralization overflow is
collected in 223 tank and is pumped to neutral leaching.
The main reactions in Neutralization step are:
ZnO + H2SO4

ZnSO4

H2O

MeO + H2SO4

MeSO4

H2O

Fe2(SO4)3 + 3 ZnO + 3 H2O 2


4 Fe(OH)3 + H-O-Me-complex

(Me = Cu, Cd, Pb...)

Fe(OH)3+3 ZnSO4
Fe-O-H-Me-complex (Me = Sb/As/Al/Ge)

Page 24 of 42

HZL Training Report

Figure 6: Acid and Neutralization Section

RESIDUAL TREATEMENT PLANT:


Objective of Residue Treatment section is to break ferrite Zinc and precipitation of Jarosite
using Ammonium or Sodium Sulphate, Sulphuric acid and high temperature to remove
impurities and recovering Zinc.
Products

COF

Major Parameters to be
Controlled

Range & Alarm levels

Acidity

15-25 gpl

Page 25 of 42

HZL Training Report

(Conversion over flow)

Thickener Underflow

Fe+2

0.5-2.5gpl

Fe+3

1.0-2.5 gpl

T/Zn in jarosite

< 2.7 %

The conversion process main function is to simultaneously leach the zinc ferrite and
precipitate the iron as Ammonium or sodium jarosite. The conversion process
comprises the following main equipment:
Five 300 m conversion reactors (R-26, R-27, R-28, R-29 and R-30)

Two 18 m diameter thickeners

Two 70 m thickener overflow tank

One 20 m condensate tank

Two (NH4)2SO4 / Na2SO4 preparation tank

The temperature of all reactors is kept at 95oC-100oC. Ammonium or sodium sulphate diluted
with condensate water is added at R-26 outlet for formation of Jarosite. The separation
thickener 08 overflow is collected in the over flow tank COF (Tailing as storage), from where it is
then pumped to the beginning of the neutralization. Further, the thickener 07 underflow is
pumped directly from the thickener underflow cone is pumped with thickener underflow
pumps directly to the feeding boxes of the horizontal vacuum belt filter in operation. The
addition of concentrated acid is done from the conc. acid tank. The condensates from the
conversion reactors and the heat exchangers of the hot purification plant are collected into the
condensate tank. The hot condensate collected in this tank will be used mainly as wash water
on the jarosite vacuum belt filters to reduce the zinc content in the final jarosite cake moisture.
The formation of jarosite will occur as shown in the following reaction3 Fe2(SO4)3 + 12 H2O + Na2SO42

Na[Fe3(SO4)2(OH)6] + 6 H2SO4

Page 26 of 42

HZL Training Report

Figure 7: RTP and HBF section

Parameters to be maintained are:

Temperature of reactors 90-100oC


Acidity in R-26 reactor =30-35gpl
Acidity in conversion overflow=15-25gpl

Page 27 of 42

HZL Training Report

HORIZONTAL BELT FILTER:

Figure 8: Horizontal Belt Filter


In this section the jarosite and leach residue slurry is filtered and washed on horizontal vacuum
belt filters to maximize water-soluble zinc recovery. This section comprises of the following
main equipment:

Two vacuum belt filter units (one is stand by)

One cake slurry re pulping tank.

Product

Major parameter to be
controlled
T/Zn % (Total Zinc)

Range

W.S. Zn%(Water Soluble Zinc)

<0.2

<2.7

HBF cake

Page 28 of 42

HZL Training Report

Process:
The jarosite cake separated on polypropylene filter cloth, repulped with ETP water and
pumped to ETP via HBF slurry tank. Speed of the belt, input slurry flow to HBF & wash water
quantity is controlled by the concerned C/H in the HBF control room. Vacuum pipes are
connected beneath the mother belt and filter water is used for the vacuum sealing purpose.
Mother liquor (collected in the feed zone and drying zone) and wash filtrate (collected in the
washing zone and dry zone) are collected via vacuum pipes and pumped to 07 thickener
launder. To minimize the soluble zinc content in the final jarosite, the jarosite cake is washed on
HBF by counter current arranged washing step. The cake sample & slurry sample are collected
at the beginning of the shift and sent to Control Lab. For analyzing water soluble zinc &
moisture. Filter water is used for belt and cloth washing.

Parameters to be maintained:

Vacuum at HBF==220-260 mm Hg
pH of HBF Cake> 4.5(otherwise the complex formed will dissociate back into impurities)
HBF feed inlet density =1.40-1.42 g/cm3
Sample checking of water soluble zinc, feed slurry, mother liquor and wash liquor solid.

Purification:
The neutral solution contains several impurities like copper, cadmium, cobalt and nickel. Beside
these major impurities also small amounts of arsenic and antimony can be analyzed in the
solution. Before the solution can be sent to the electro winning these impurities have to be
removed in the purification plant.The main reagent in the purification plant is the Zinc dust. The
basic reaction is that of cementation of those metals, whose positions in the electromotive
series for sulphates are below that of Zinc.The purification of the neutral solution will be carried
out in three steps:
1. Pre filtration (cold filtration) of neutral over flow
2. Hot purification for removing of copper, cadmium , cobalt and nickel as major
impurities
3. Second step or polishing step to ensure top quality of purified solution.

Page 29 of 42

HZL Training Report

In pre-filtration step suspended solids present in NOF tank are removed. Main impurities are
removed in hot purification. This process is based on antimony purification process. In this
process solution is passed through a spiral heat exchanger so that its temperature becomes 8082o C. This solution is passedthrough a reactor cascade and another reagent Zn dust is added.
To improve thereactivity of Zinc dust potassium antimony tartrate (PAT) is added. For removing
organic impurities charcoal solution is also fed. Reactor outlet is passed through a cascade of
filter press where impurities are removed as Cu-CdCake. Cu-Cd cake is sent to the Cd plant for
further purification. Filtrate is processed in polishing step. Here the solution is again passed
through Reactor and filter press cascade and remaining amount of Cd which may be slipped
during hot purification is also removed.After polishing step solution is almost pure solution of
zinc sulphate containing small amount of gypsum which is removed in gypsum removal plant.

Page 30 of 42

HZL Training Report

Figure 9: Purification Section

The impurities levels are reduced to Cu traces, Cd= 1ppm, Co= 0.3ppm, Ni= 0.1ppm and Sb=
0.01ppm.the purified solution at a temperature of 60-65oC and at flow rate of 80-85 m3/hr is
supplied to cell house through a door thickener where gypsum and suspended basic zinc salts
are separated. Cake from purification section conveyed through screw conveyors to Cadmium
plant.

ZINC ELECTROLYSIS:

Figure 10: Zinc Electrodes


Zinc is extracted from the purified zinc sulfate solution by electro winning, which is a specialized
form of electrolysis. The process works by passing an electric current through the solution in a
series of cells. This causes the zinc to deposits on the cathodes (aluminum sheets) and oxygen
to form at the anodes. Sulfuric acid is also formed in the process and reused in the leaching
Page 31 of 42

HZL Training Report

process. Every 24 to 48 hours, each cell is shut down, the zinc-coated cathodes are removed
and rinsed, and the zinc is mechanically stripped from the aluminum plates.
At cathode:
Zn2+

2e-

Zn

O2 +

2e-

At anode:
O2

Overall cell reaction is :


ZnSO4 + H2O

Zn + H2SO4 + O2

Electrolytic zinc smelters contain as many as several hundred cells. A portion of the electrical
energy is converted into heat, which increases the temperature of the electrolyte. Electrolytic
cells operate at temperature ranges from 30 to 35C(86 to 95F) and at atmospheric pressure. A
portion of the electrolyte is continuously circulated through the cooling towers both to cool and
concentrate the electrolyte through evaporation of water. The cooled and concentrated
electrolyte is then recycled to the cells. This process accounts for approximately 1/3 of all the
energy usage when smelting zinc. The electrolysis phase uses large amounts of electrical energy
and is responsible for the high proportion of the energy-cost in the overall smelting process
(typically about one third of total plant cash costs). Hence, cell houseproductivity (and electrical
current and energy efficiency in particular) is acrucial driver in overall plant efficiency. Debari
runs some of the industrys largest and most efficient cell houses.

Page 32 of 42

HZL Training Report

MELTING AND CASTING:

Cathode melting will be carried out in two identical electric induction furnaces.The furnaces will
have a guaranteed average melting rate of 22 tons per hour of zinc cathodes (maximum ~ 24
tones per hour). The melting rate is infinitely variable between 0% and 100% of the maximum
melting rate and is controlledby the automatic control system to match the rate that molten
metal is removed (pumped) from the furnace. Each furnace is equipped with a still well
equipped with one or more molten metal pumps. The pump delivers molten zinc to a launder
system feeding the casting machine. Each furnace feeds a single casting line. In addition,
provisionis made to pump molten zinc from one of the furnaces to the zinc dust production
plant.
In addition to cathode bundles, the furnace chutes are designed to receive metallic zinc from
the dross separation plant and metallic zinc skims from thecasting machines. This material is
fed to any chute (normally one dedicated chute) from fork lift transported to hoppers that have
been raised to the charging floor by the freight elevator (lift). The required amount of NH4Cl to
enhance the melting of this material is manually added to each hopper prior to dumping inthe
charge chute.

Page 33 of 42

HZL Training Report

When cathode zinc is melted, a layer of dross comprised mainly of zinc oxide entrained molten
zinc droplets is produced. This dross must be removed from the furnace once in every 24 hours
by manually skimming the dross from the surface of the bath in a process called drossing. This
process consists of opening one of the doors on the side of the furnace, manually spreading a
few kgs of NH4Cl onto the dross layer, manually agitating the dross layer with a steel rake and
finally using the rake to drag the dross through the open door of the furnace into a fork lift
bin. During the drossing process, the furnace is operated under conditions of increased
ventilation to contain the fumes and dust operated under conditions of increased ventilation to
contain the fumes and dust furnace dross are transported by lift truck to the dross cooling area,
to awaittreatment in the dross separation plant.

Page 34 of 42

HZL Training Report

PROJECT DETAILED
# To reduce the total zinc losses in jarosite cake.

Introduction:
In this project we have to reduce the total zinc losses in jarosite cake. The total zinc content in
jarosite is the combination of acid soluble and water soluble zinc. This jarosite is the complex
compound of iron {2Na[Fe3(SO4)2(OH)6]). Dried jarosite cake formation takes place in HBF
section, which takes input of jarosite slurry from the RTP section thickener underflow. This
jarosite slurry from RTP thickener fed to the HBF made of polypropylene. This slurry is washed
with the condensate flow and water soluble zinc is removed is by use of vacuum beneath the
belt filter. The resultant dried jarosite cake on the belt filter is send to the ETP(effluent
treatment plant) section.

Fig: jarosite cake thickener.


Page 35 of 42

HZL Training Report

To reduce the Zn content in jarosite we have to reduce the zinc content in thickener underflow
i.e. acid soluble zinc and also to decrease the water soluble zinc content in jarosite cake at HBF.
To achieve this some parameters like acidity, temperature, free NH4 and total Zn in thickener
underflow of RTP are studied continuously for 19 days, similarly the parameters water soluble
zinc, vacuum, feed rate, condensate flow of HBF are studied.
By use of these parameters and plotting the graph between total zinc loss in thickener
underflow and RTP parameter, we have selected optimum parameter range foe which the total
zinc in underflow will be less. And again in the same way, by plotting graph between water
soluble zinc and HBF parameters, we have selected the optimum parameter range for which
the water soluble zinc in jarosite cake will be less. By use of these graphs some inferences are
drawn for the total zinc losses and its affecting parameters that are detailed in conclusion
section of this report.

RTP SECTION:
It mainly deals with activities related with conversion reactors, door thickener, sodium sulphate
addition, steam lines and flocculent preparation operations. To break zinc ferrite and
precipitation of jarosite using sodium sulphate, sulphuric acid and high temperature to remove
impurities and recovering zinc. We have to reduce the total zinc content in jarosite, for this we
noted down the zinc content in jarosite with other running parameter like acidity of R-26 ,
temperature, free Na and total inlet flow. We plot down the of these parameters with zinc
content in jarosite and see how these parameters affects the content of zinc in jarosite.
Noted down parameters of RTP Section:

Date
12-Jun
13-Jun
14-Jun
15-Jun
16-Jun
17-Jun
18-Jun
19-Jun
20-Jun
21-Jun
22-Jun
23-Jun
24-Jun
25-Jun

Total Zn loss
%
3.05
3.18
3.32
3.88
3.46
3.02
2.86
2.7
3.02
3.3
2.66
3.02
3.2
3.08

Temperature(oc)
92.47
91.38
94.78
95.81
98.05
97.88
97.79
97.72
94.46
95.36
94.07
94.4
85.56
95.24

Acidity
31
37.3
35.5
36.5
37.5
38.6
37.7
36
34
38.3
35.1
35.8
34.6
35.5

Total Flow
Rate
15.85
13.33
15.88
15.15
11.81
14.47
15.52
14.37
14.13
14.84
15.29
14.09
15.65
15.04

Free Na
0.35
0.76
0.62
2
1.36
1
0.71
1.35
1.13
1.05
0.95
1.08
1.15
0.69
Page 36 of 42

HZL Training Report


26-Jun
27-Jun
28-Jun
29-Jun
30-Jun

3.02
2.88
2.6
2.86
2.9

96.5
94.52
98.08
94.3
97.72

36.3
35.8
34.9
34.3
35.3

15.64
14.43
14.59
13.59
13.28

0.72
0.39
1.13
1.84
1.44

4.5
4
Total Zn Loss %

3.5
3
2.5
2
1.5
1
0.5
0

Total Flow Rate

4.5
4

Total Zn Loss %

3.5
3
2.5
2
1.5
1
0.5
0
0.35 0.76 0.62

1.36

0.71 1.35 1.13 1.05 0.95 1.08 1.15 0.69 0.72 0.39 1.13 1.84 1.44
Free Na

Page 37 of 42

HZL Training Report

4.5
4
Total Zn loss %

3.5
3
2.5
2
1.5
1
0.5
0

Temperature(oC)

4.5
4

Total Zn Loss %

3.5
3
2.5
2
1.5
1
0.5
0
31 37.3 35.5 36.5 37.5 38.6 37.7 36

34 38.3 35.1 35.8 34.6 35.5 36.3 35.8 34.9 34.3 35.3
Acidity

Page 38 of 42

HZL Training Report

HBF SECTION:
It mainly deals with activities related with jarosite slurry, vacuum pump, pH analyzer and water
spray nozzle operations. The jarosite and leach residual slurry is filtered and washed on
horizontal vacuum belt filter to maximize water soluble zinc recovery. We have to reduce the
water soluble zinc content in jarosite with other running parameters like feed rate of jarosite
slurry, vacuum and condensate flow. We plot down the graph of these parameters with water
soluble zinc content in jarosite and see how these parameters affects:

Date

Water
Soluble Zinc

Feed
Rate(m3/hr)

Vacuum(mm
of Hg)

Condensate
Flow(m2/hr)

0.1

B.L.T.(Before
Lime
Treatment)

12-Jun

0.1

25.5

253.75

12

1.87

13-Jun

0.1

24

236.25

12

1.13

14-Jun

0.1

26

242.5

12.06

0.84

15-Jun

0.1

26

241.81

13

0.65

16-Jun

0.1

26

220

13

0.78

17-Jun

0.1

25.42

211.42

13

0.48

18-Jun

0.11

26

235.83

13

2.26

19-Jun

0.27

26

240

12

1.19

20-Jun

0.1

24

247.5

12.5

1.21

21-Jun

0.1

24

253.12

12.68

1.54

22-Jun

0.11

24.08

266.08

12.13

1.89

23-Jun

0.27

25.87

256.66

12.79

2.08

24-Jun

0.4

23.33

253.33

12

1.64

25-Jun

0.15

25.56

258.69

12.3

1.01

26-Jun

0.1

24.33

259.16

12

2.13

27-Jun

0.1

27

241.25

12

0.95

28-Jun

0.33

26

240

12

0.4

29-Jun

0.1

27

240

12

0.53

25.5

250

12

1.92

30-Jun

Page 39 of 42

HZL Training Report

Water Soluble Zinc


0.45
0.4

Water Soluble Zinc

0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
1.87 1.13 0.84 0.65 0.78 0.48 2.26 1.19 1.21 1.54 1.89 2.08 1.64 1.01 2.13 0.95 0.4 0.53 1.92
B.L.T.(Before Lime Treatment)

Water Soluble Zinc


0.45
0.4

Water Soluble Zinc

0.35
0.3
0.25
0.2
0.15

0.1
0.05
0

Feed Rate(m3/hr)

Page 40 of 42

HZL Training Report

Water Soluble Zinc


0.45

0.4

Water Soluble Zinc

0.35
0.3
0.25

0.2
0.15
0.1
0.05
0

Condensate Flow(m3/hr)

Water Soluble Zinc


0.45
0.4

Water Soluble Zinc

0.35
0.3
0.25
0.2
0.15
0.1
0.05

Vacuum(mm of Hg)

Page 41 of 42

HZL Training Report

CONCLUSIONS AND RECOMMENDATION:


IN RTP SECTION WE OBSERVED1. As the temperature in reactors increases, the acid soluble zinc in the jarosite slurry
decreases.
2. As the acidity of reactors increases, the acid soluble zinc in the jarosite slurry decreases.
3. As the free Na increases, the acid soluble zinc in the jarosite slurry decreases.

4. As the total flow rate decreases, the acid soluble zinc in the jarosite slurry decreases.
IN HBF SECTION WE OBSERVED1. As the total slurry input decreases, the water soluble zinc in the jarosite cake decreases.
2. As the condensate flow increases the water soluble zinc in the jarosite cake decreases.
3. As the cake thickness decreases the water soluble zinc in the jarosite cake decreases.

Page 42 of 42