Localizacion y Replanteo
DURMIENTE ORDINARIO 4 MT
PLANCHON ORDINARIO 3 MT
VARA DE CLAVO
PUNTILLA DE 2" C.C
HILO POLIPROPILENO
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO DE TOPOGRAFIA
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

m2
ML
ML
ML
LBR
ML
...
% (M+MO)
...
MES
...

Letrinas en Mamposteria
RECEBO
CONCRETO COMUN DE 2500 PSI DI
SANITARIO ACUACER BLANCO
GANCHO ETERNIT
TEJA No.4 A.C.
TUBO DE GRES DE 4"X1 MTS AA
BISAGRA ACERO DE 3"
PORTACANDADO DE 3"
TABLA CHAPA ORDINARIO 0.30X3 M
VARA BASE PROM.= 7 cm (CLAVO)
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

und
M3
M3
UND
UND
UND
UND
UND
UND
ML
UND
LBR
...
% (M+MO)
...
% (M+MO)
...

Valla de identificacion
DURMIENTE ORDINARIO 3 MT
EXCAVACION MANUAL M.O.
DADOS CONCRETO SIMPLE 2000
RELLENO EN RECEBO COMPACTADO
VALLA LICENCIA DE CONSTRUCCION
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA

und
UND
M3
M3
M3
UND
...
% (M+MO)
...
% (M+MO)
...

1 de 448

...
HR

...
HR

...
HR

0.0200
0.0200
0.0200
0.0200
0.2000
3.0%
0.0003

0.05

0.10
0.10
1.00
8.00
4.00
10.00
3.00
1.00
14.00
5.00
1.20
0.25%
0.12%

6.93

2.0000
0.0240
0.0300
0.0240
1.0000
0.04%
0.01%

1.03

. . MATERIAL

UNIDAD

CANTIDAD

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

1.2.5
01A090
20H700
28A812

1.3.1
08M075
08E160
22G070
25I060
25I120

Extendida y Afirmado en Rajon para Via Provisional Acceso


Mixers
RAJON
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRO-COMPACTADOR
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Provisional Telefono
ALAMBRE TWTF/ATT 2X22
CAJA GALVANIZADA 5800 RECTAN.
TOMA SOBREPONER TELEFONO
VARA BASE PROM.= 7 cm (CLAVO)
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA EE Electricos
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

glb
ML
UND
UND
UND
...
% (M+MO)
...
% (M+MO)
...

20H701

20H700
20H701

1.3.3
13A050
13A070
13A180
13A185
13A220
13C160
13C265

...
HR

und
UND
UND
ML
UND
ML
...
% (M+MO)
...
% (M+MO)
...

M3
...
% (M+MO)
...
DD
...

Provisional Agua
LLAVE S/CROM.JAR.R:60404 C/R
VALVULA/REGISTRO RW 1/2"
REPISA ORDINARIO 3 MT
CODO 45 PVCP 1/2"
TUBO PVCP RDE 13.5 1/2" (6ML)
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB Instalaciones
SUBTOTAL MANO DE OBRA
ACOMETIDA DE 1" EN PISO
MEDIDOR DE 1" (suministro e instlacion)
DERECHOS DE CONEXIN
TOTAL UNITARIO

20H700

1.3.2
13A090
13E161
13P367
22G100

m3

Provisional Energia
ALAMBRE TW 12
ALAMBRE TW 8
CABLE THW 1/0
CABLE THW 2/0
CABLE AISLADO No. 4 THHN-THWN
INTERRUPTOR SENCILLO AVE 400
TOMA SENCILLA AVE 606

2 de 448

...
HR

1.30
0.3%
0.03

0.52

1.5000
1.5000
1.5000
7.5000
83.0000
1.31%
0.60%

29.91

UND
UND

...
HR

glb
ML
ML
ML
ML
ML
UND
UND

100.0000
5.0000
5.0000
2.0000
1.31%
0.60%

7.96

960.00
320.00
0.00
12.00
12.00

. . MATERIAL

UNIDAD

13E126
13E131
13E136
13G060
13G160
13P335
13P369
25A030
25A031
13M011
13P100

UND
UND
UND
UND
UND
UND
UND
UND
UND
ML
UND
...
% (M+MO)
...
% (M+MO)
...

20H700
20H701

CAJA GALVANIZADA 2400 CUADRA.


CAJA GALVANIZADA 5800 RECTAN.
CAJA GALVANIZADA OCTAGONAL
CAJA LUMINEX CTI-4 CIRCUITOS
INTER.ENCH.1X30 HQP/QPX -1030
ROSETA PORCELANA
TOMA DE 20 AMP. CODELCA
TUBO PVC CONDUIT 1/2" (3ML)
TUBO PVC CONDUIT 3/4" (3ML)
TUBO 3" CONDUIT
TRANSOFRMADOR TRIFASICO 45 KVA
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA EE Electricos
SUBTOTAL MANO DE OBRA
DERECHOS DE CONEXIN
SUBTOTAL OTROS
TOTAL UNITARIO

...
HR

CANTIDAD
12.00
1.00
12.00
2.00
8.00
12.00
8.00
25.00
25.00
0.00

1.37%
0.60%

26.96

M2

Solicitud de Servicio Temporal (TPO) de Acueducto y ejecucin


de la Obra respectiva para conexin en andn (sin importar el
tipo) de 1 1/2" - 2". La tramitologa contempla el diligenciamiento
de formularios, cronograma de actividades, planos actualizados y
georeferenciados, levantamiento de redes en caso de ser
necesario, memorias de clculo, autorizaciones de las entidades
competentes en caso de estar en sectores patrimoniales o
aledaos, especificaciones tcnicas, registros fotogrficos, y
dems documentos relacionados. La ejecucin de Obra
contempla la excavacin, tubera, accesorios, conexin a la red
principal y a red interna, recuperacin del espacio pblico (andn
del mismo tipo intervenido) y retiro y disposicin de escombros, y
porcentaje respectivo de los costos de Revisin de diseos por la
empresa de acueducto y costos de la Interventora por parte de la
empresa de acueducto. Incluye las correcciones de los
documentos y anexos hasta el momento en que el Servicio
Temporal (TPO) sea aprobado por parte de la empresa de
acueducto. NO incluye medidor ni registro de usuario (bola)
1.3.4
08M075

20H700

20H701

( No Aplica )
SUBTOTAL MATERIALES
( No Aplica )
SUBTOTAL HERRAMIENTAS
( No Aplica )
SUBTOTAL EQUIPO
( No Aplica )
SUBTOTAL TRANSPORTE
( No Aplica )
SUBTOTAL MANO DE OBRA
DERECHOS DE CONEXIN ACUEDUCTO
DERECHOS DE CONEXIN
TOTAL UNITARIO

3 de 448

und
UND
...
% (M+MO)
...
% (M+MO)
...
...
HR
UND

1.00

. . MATERIAL

UNIDAD

CANTIDAD

Solicitud de Servicio Temporal (TPO) de Alcantarillado (A. Negras


y A. Lluvias) y ejecucin de la Obra respectiva para conexin en
andn (sin importar el tipo) de 6" - 8" en tubera de alcantarillado
corrugada PVC. La tramitologa contempla el diligenciamiento de
formularios, cronograma de actividades, planos actualizados y
georeferenciados, levantamiento de redes en caso de ser
necesario, memorias de clculo, autorizaciones de las entidades
competentes en caso de estar en sectores patrimoniales o
aledaos, especificaciones tcnicas, registros fotogrficos,
plizas respectivas solicitadas por el la empresa de acueductoy
acordes a la ejecucin de la obra, y dems documentos
relacionados. La ejecucin de Obra contempla la excavacin,
tubera, accesorios, conexin a la red principal, recuperacin del
espacio pblico (andn del mismo tipo intervenido) y retiro y
disposicin de escombros, y porcentaje respectivo de los costos
de Revisin de diseos por la la empresa de acueductoy costos
de la Interventora por parte de la EAAB. Incluye las correcciones
de los documentos y anexos hasta el momento en que el Servicio
Temporal (TPO) sea aprobado por parte de la EAAB. NO incluye
cajas de inspeccin
1.3.5
08M075

20H700

20H701

1.3.6
08M075

( No Aplica )
SUBTOTAL MATERIALES
( No Aplica )
SUBTOTAL HERRAMIENTAS
( No Aplica )
SUBTOTAL EQUIPO
( No Aplica )
SUBTOTAL TRANSPORTE
( No Aplica )
SUBTOTAL MANO DE OBRA
DERECHOS DE CONEXIN ALCANTARILLADO
DERECHOS DE CONEXIN
TOTAL UNITARIO

Solicitud de Provisional de Obra de Energa con cargas menores


a 34 kW y ejecucin de la Obra respectiva. La tramitologa
contempla el diligenciamiento de formularios, cronograma de
actividades,
planos
actualizados
y
georeferenciados,
autorizaciones de las entidades competentes en caso de estar en
sectores patrimoniales o aledaos, especificaciones tcnicas,
registros fotogrficos, y dems documentos relacionados. La
ejecucin de Obra contempla el cableado, accesorios, conexin a
la red principal, suministro e instalacin del medidor provisional, y
complementarios. Incluye las adecuacines necesarias en obra y
las correciones de los documentos y anexos hasta el momento
en que la Provisional de Obra sea aprobado por parte de la
enpresa de energa.
-

20H700

20H701

( No Aplica )
SUBTOTAL MATERIALES
( No Aplica )
SUBTOTAL HERRAMIENTAS
( No Aplica )
SUBTOTAL EQUIPO
( No Aplica )
SUBTOTAL TRANSPORTE
( No Aplica )
SUBTOTAL MANO DE OBRA
DERECHOS DE CONEXIN ENERGIA
DERECHOS DE CONEXIN
TOTAL UNITARIO

4 de 448

und
UND
...
% (M+MO)
...
% (M+MO)
...
...
HR
UND

1.00

und
UND
...
% (M+MO)
...
% (M+MO)
...
...
HR
UND

1.00

. . MATERIAL

1.3.7
08M075

Solicitud de Lnea Telefnica con servicio de Internet Banda


Ancha y ejecucin de la Obra respectiva. La tramitologa
contempla el diligenciamiento de formularios, planos actualizados
y georeferenciados en caso de ser necesarios, autorizaciones de
las entidades competentes en caso de estar en sectores
patrimoniales o aledaos, y dems documentos relacionados. La
ejecucin de Obra contempla el cableado, accesorios, conexin a
la red principal, y complementarios. Incluye las adecuacines
necesarias en obra y las correciones de los documentos y
anexos hasta el momento en que la Linea Telefnica sea
aprobado e instalada
-

20H700

20H701

1.5.2

20H700

20H701
28A800

28A802

1.5.2

20H700

20H701
28A800

28A802

1.5.4

UNIDAD

( No Aplica )
SUBTOTAL MATERIALES
( No Aplica )
SUBTOTAL HERRAMIENTAS
( No Aplica )
SUBTOTAL EQUIPO
( No Aplica )
SUBTOTAL TRANSPORTE
( No Aplica )
SUBTOTAL MANO DE OBRA
DERECHOS DE CONEXIN TELEFONO
DERECHOS DE CONEXIN
TOTAL UNITARIO

Demolicin Integral Cerramiento Existente (Inlcuye demolicion


cimieneto, mamposteria, carpinterias, etc.) Incluye cargue,
transporte y botada de material.)
(no aplica)
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
Equipo Traciego y Transporte Vertical/Horizontal Obra
COMPRESOR DE 2 MARTILLOS
SUBTOTAL EQUIPO
VOLQUETA (6M3)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA DEMOLICION
MANO DE OBRA CUADRILLA AA CARGUE
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Demolicion Integral Placa de Contrapiso e=10cm en Concreto


Reforzado (incluye cargue y retiro)
(no aplica)
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
Equipo Traciego y Transporte Vertical/Horizontal Obra
COMPRESOR DE 2 MARTILLOS
SUBTOTAL EQUIPO
VOLQUETA (6M3)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA DEMOLICION
MANO DE OBRA CUADRILLA AA CARGUE
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Demolicion Integral Via en Concreto espesor e<=20 cm


(incluye cargue y retiro)
(no aplica)

5 de 448

CANTIDAD

und
UND
...
% (M+MO)
...
% (M+MO)
...
...
HR
UND

1.00

m2

...
% (MO)
...
% (MO)
HR
...
VJE
...
HR
HR

3%
1%
0.50
0.049
0.93
0.05

M2
...
% (MO)
...
% (MO)
HR
...
VJE
...
HR
HR

M2

3%
1%
0.44
0.022
0.68
0.05

. . MATERIAL

20H700
20H701
28A800
28A802

UNIDAD

SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
- COMPRESOR DE 2 MARTILLOS
SUBTOTAL EQUIPO
- VOLQUETA (6M3)
SUBTOTAL TRANSPORTE
- MANO DE OBRA CUADRILLA AA DEMOLICION
- MANO DE OBRA CUADRILLA AA CARGUE
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Demoliciones en Concreto Reforzado de Cimientos y Estructuras


Enterradas Aisladas (Incluye cargue y retiro)

1.5.5

20H700

20H701
28A800

28A802

(no aplica)
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
Equipo Traciego y Transporte Vertical/Horizontal Obra
COMPRESOR DE 2 MARTILLOS
SUBTOTAL EQUIPO
VOLQUETA (6M3)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA DEMOLICION
MANO DE OBRA CUADRILLA AA CARGUE
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

...
% (MO)
...
% (MO)
HR
...
VJE
...
HR
HR

CANTIDAD

3%
1%
0.44
0.022
0.68
0.05

M3
...
% (MO)
...
% (MO)
HR
...
VJE
...
HR
HR

2%
2%
3.75
0.217
7.66
0.48

CIMENTACION
PILOTES PREEXCAVADOS

2.1.1
-

20H700

Pilotes Preexcavados de D=45 cm ( 1136 x 11+1m) Incluye:


Excavacin, Fundida, Localizacin, Prehuecos, Agua de
Carrotanques, Retiro de lodos y Descabece de pilotes de 45 cm
de diametro y L= 1,00 m de longitud
Bentonita (50kg)
Suministro Agua
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
Grua p/excavacin Pinguelly 45Tn. 18m.
Cuchara Clamshell Bachy 7.5Tn.
Trepano de cruz
Bomba de membrana PDM
Bomba para agua
Tanque para lodo bentonitico 24m3
Mezclador para bentonita
Conjunto tuberia para vaciado
Vigas E-810 x 12m
Motosoldadora Hobarta 400A
Sacavueltas E-116
Equipo de laboratorio
SUBTOTAL EQUIPO
(no aplica)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Palonero
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

6 de 448

ml
dd
m3
...
% (M+MO)
...
dd
dd
dd
dd
dd
dd
dd
dd
dd
dd
dd
dd
...
...
HR

0.1824
1.0000
0.0200
0.0231
0.0231
0.0231
0.0231
0.0231
0.0231
0.0231
0.0231
0.0231
0.0231
0.0231
0.0231

0.4880

. . MATERIAL

2.1.2
04C010
24A060

20H701

Suministro y Manejo Acero de Refuerzo PDR-60 f'y=4.200


kg/cm2 (420Mpa) Pilotes
HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y Manejo
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

2.1.3
02A051

UNIDAD

Suministro Concreto para Fundida


Pilotes D = 45 cm
f'c=3.500 psi ( 1136 x 11 + 1 ml ) (expansion 25 %)
CONCRETO TREMIE 3500 pasi
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
(no aplica)
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
(no aplica)
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

CANTIDAD

kg
KGR
KGR
...
...
% (M+MO)
...

1.05
0.03

2.0%

...
HR

0.02

m3
M3
...

1.00

...
...
...

EXCAVACIONES
2.2.1

20H700
28A202
28A200

2.2.2

20H700
28A202
28A200

Excavacion Mecanica a Niv. +2.40 Explanacin ( incluye retiro,


cargue y transporte fuera de la obra )
(no aplica)
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
RETROEXCAVADORA
SUBTOTAL EQUIPO
VOLQUETA
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA 1 Ayudante
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Excavacion Mecanica a Niv. +2.40


para Conformacin
Subbase ( incluye retiro, cargue y transporte fuera de la obra )
(no aplica)
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
RETROEXCAVADORA
SUBTOTAL EQUIPO
VOLQUETA
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA 1 Ayudante
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

7 de 448

m3
...
% (MO)
...
HR
...
VJE
...
HR

2.0%
0.0580
0.1667
0.0609

m3
...
% (MO)
...
HR
...
VJE
...
HR

2.0%
0.0580
0.1667
0.0609

. . MATERIAL

2.2.3

20H700
28A202
28A200

2.2.4

20H700
20H701
28A200

2.2.5

20H700
20H701
28A200

2.2.6

20H700
20H701
28A200

UNIDAD

Excavacion Mecanica Tanques de Agua ( incluye retiro,


cargue y transporte fuera de la obra )
(no aplica)
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
RETROEXCAVADORA
SUBTOTAL EQUIPO
VOLQUETA
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA 1 Ayudante
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Excavacion
Manual
Dados
( incluye retiro, cargue y
transporte fuera de la obra )
(No aplica)
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
VOLQUETA
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Excavacion
MANO DE OBRA CUADRILLA AA Retiro y Cargue
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Excavacion Manual Zapata Corrida (Incluye retiro, cargue y


transporte fuera de la obra)
(No aplica)
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
VOLQUETA
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Excavacion
MANO DE OBRA CUADRILLA AA Retiro y Cargue
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Excavacion
Manual
Vigas Cimentacion
( incluye retiro,
cargue y transporte fuera de la obra)
(No aplica)
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
VOLQUETA
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Excavacion
MANO DE OBRA CUADRILLA AA Retiro y Cargue
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

8 de 448

CANTIDAD

m3
...
% (MO)
...
HR
...
VJE
...
HR

2.0%
0.0580
0.1667
0.0609

m3
...
% (MO)
...
% (MO)
...
VJE
...
HR
HR

2.0%
1.0%
0.1667
1.25
0.45

m3
...
% (MO)
...
% (MO)
...
VJE
...
HR
HR

2.0%
1.0%
0.1667
1.25
0.45

m3
...
% (MO)
...
% (MO)
...
VJE
...
HR
HR

2.0%
1.0%
0.1667
1.25
0.45

. . MATERIAL

2.2.7

20H700
20H701
28A200

2.2.8

20H700
20H701
28A200

UNIDAD

Excavacion Manual Pozos Eyectores (Incluye retiro, cargue y


transporte fuera de la obra )
(No aplica)
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
VOLQUETA
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Excavacion
MANO DE OBRA CUADRILLA AA Retiro y Cargue
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Excavacion Manual Foso Ascensores


( incluye retiro,
cargue y transporte fuera de la obra)
(No aplica)
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
VOLQUETA
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Excavacion
MANO DE OBRA CUADRILLA AA Retiro y Cargue
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

CANTIDAD

m3
...
% (MO)
...
% (MO)
...
VJE
...
HR
HR

2.0%
1.0%
0.1667
2.40
0.87

m3
...
% (MO)
...
% (MO)
...
VJE
...
HR
HR

2.0%
1.0%
0.1667
2.40
0.87

PERFILADA y PROTECCION
2.3.1

20H700
20H701

2.3.2

20H700
20H701

Perfilada Manual Fondo Excavacion


(No aplica)
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(No aplica)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Excavacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Perfilada Manual Paredes Dados


(No aplica)
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(No aplica)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Excavacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

9 de 448

m2
...
% (MO)
...
% (MO)
...
...
HR

1.8%
1.0%

0.23

m2
...
% (MO)
...
% (MO)
...
...
HR

1.8%
1.0%

0.23

. . MATERIAL

UNIDAD

Perfilada Manual Paredes Zapata

2.3.3

(No aplica)
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(No aplica)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Excavacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

20H700
20H701

Perfilada Manual Paredes Vigas Cimentacion

2.3.4

(No aplica)
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(No aplica)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Excavacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

20H700
20H701

2.3.5

Perfilada Manual Taludes Interiores


(No aplica)
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(No aplica)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Excavacion
SUBTOTAL MANO DE OBRA

20H700
20H701

CANTIDAD

m2
...
% (MO)
...
% (MO)
...
...
HR

1.8%
1.0%

0.23

m2
...
% (MO)
...
% (MO)
...
...
HR

1.8%
1.0%

0.23

m2
...
% (MO)
...
% (MO)
...
...
HR

2.0%
1.0%

0.23

TOTAL UNITARIO

2.3.6
01D010
03A015
04I300

Paete Proteccion Paredes Vigas y Dados


-

20H700
20H701

2.3.7
01D010

ARENA DE PENA
CEMENTO GRIS PORTLAND (50 kls)
MALLA ELECTROSOLDADA
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Excavacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

m2
M3
BTO
KG
...
% (M+MO)
...
% (M+MO)
...
...
HR

Paete Proteccion Taludes Interiores

m2

ARENA DE PENA

M3

10 de 448

0.0232
0.1450
0.71
1.3%
0.6%

0.52

0.0232

. . MATERIAL

UNIDAD

03A015
04I300

BTO
KG
...
% (M+MO)
...
% (M+MO)
...

20H700
20H701

CEMENTO GRIS PORTLAND (50 kls)


MALLA ELECTROSOLDADA
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Excavacion
SUBTOTAL MANO DE OBRA

...
HR

CANTIDAD
0.1450
0.71
1.3%
0.6%

0.52

TOTAL UNITARIO

RELLENOS
2.4.1

20H700
28A812

2.4.2
01A090
20H700
28A811
28A812

Rellenos en Material Local Compactado


(No aplica)
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRO-COMPACTADOR Tipo Rana
SUBTOTAL EQUIPO
(No aplica)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Excavacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Relleno en Material Granular de Subbase INV 320 -7 en


capas de 30 cm para Nivelacion Terreno a Niv. +9.80. Incluye
: Suministro, Extendida, Nivelacion, Humedecimiento y
compactacion
BASE GRANULAR B-200
SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
MOTONIVELADORA
VIBRO-COMPACTADOR
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Base Granular Recebo B-400. Incluye Suministro, Extendida,


Nivelacin, Humedecimieto y Compatacion, para pisos en
concreto, gramoquin, funtes de agua, bordillos, jardines

2.4.3
01A090
20H700
28A811
28A812

BASE GRANULAR B-400


SUBTOTAL MATERIALES
- HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
MOTONIVELADORA
VIBRO-COMPACTADOR
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

11 de 448

m3
...
% (M+MO)
...
DD
...
...
HR

2.0%
0.05

0.86

m3
M3
...
% (M+MO)
...
DD
HR
...
...
HR

1.30
0.0%
0.0823985
0.0823985

0.1045526

m3
M3
...
% (M+MO)
...
DD
HR
...
...
HR

1.30
0.0%
0.0823985
0.0823985

0.1045526

. . MATERIAL

UNIDAD

CANTIDAD

CONCRETOS CIMENTACION

2.5.1
02A010
02A030

20H600

50F120

2.5.2
02A010
02A035
22G121
24C075

20H600

28A816
50F120

2.5.3
02A010
02A035
22G121
24C075

20H600

28A816
50F120

2.5.4
02A010
02A035
22G121
24C075

20H600

Concreto pobre e=5cm f'c=2.500 psi


BOMBEO
D
CONCRETO COMUN DE 2500 PSI
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Cimentacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

m2
M3
M3
...
% ( MO )
...
MES/M3
...

Dados en concreto reforzado f'c=4.000 psi2


BOMBEO
D
CONCRETO COMUN DE 4000 PSI DI
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ALQUILER TORRE GRUA
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Cimentacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

m3
M3
M3
M3
LBR
...
% (M+MO)
...
HR
MES/M3
...

Zapata Corrida en concreto reforzado f'c=4.000 psi


BOMBEO
D
CONCRETO COMUN DE 4000 PSI DI
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Cimentacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

m3
M3
M3
M3
LBR
...
% (M+MO)
...
HR
MES/M3
...

Vigas Cimentacion en concreto reforzado f'c=4.000 psi


BOMBEO
D
CONCRETO COMUN DE 4000 PSI DI
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS

m3
M3
M3
M3
LBR
...
% (M+MO)
...

12 de 448

...
HR

...
HR

...
HR

0.0525
0.0525
0.6%
0.0001

0.30

1.05
1.05
6.30
0.33
0.2%
1.04
0.0011

10.51

1.05
1.05
6.30
0.33
0.2%
1.04
0.0011

10.51

1.05
1.05
6.30
0.33
0.2%

. . MATERIAL
28A816
50F120

*
*
*

2.5.5
02A010
02A035
04U005
21D300
21B121
21B122
21B1223
22G121
24C075
21B135

20H600

28A816
50B225
50D150
50D500
50F100
50F120

*
*
*

2.5.6
02A010
02A035
04U005
21D300
21B121
21B122
21B1223
22G121
24C075
21B135

20H600

28A816
50B225
50D150
50D500
50F100
50F120

UNIDAD

VIBRADOR A GASOLINA
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Cimentacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

HR
MES/M3
...
...
HR

Muro de Contencionen concreto reforzado f'c=4.000 psi


BOMBEO
D
CONCRETO COMUN DE 4000 PSI DI
DISTANCIADOR P/COLUMNA 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
Cinta PVC A-15
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
FORCLAMPS METALICO C/TORNILLO
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Cimentacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

m3
I M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
ML
...
% (M+MO)
...
HR
MES
SEM
DIA
DIA
MES/M3
...

Tanques de Agua en concreto reforzado f'c=4.000 psi (son 4 )


BOMBEO
D
CONCRETO COMUN DE 4000 PSI DI
DISTANCIADOR P/COLUMNA 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
Cinta PVC A-15
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
FORCLAMPS METALICO C/TORNILLO
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Cimentacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

m3
I M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
ML
...
% (M+MO)
...
HR
MES
SEM
DIA
DIA
MES/M3
...

13 de 448

...
HR

...
HR

CANTIDAD
1.04
0.0011

10.51

1.05
1.05
30.0000
0.6822
0.38
0.13
0.22
6.3000
0.8000
1.0500
0.1%
0.4300
0.2000
5.0000
2.0000
0.2000
0.0011

19.65

1.05
1.05
30.0000
0.6822
0.38
0.13
0.22
6.3000
0.8000
1.0500
0.1%
0.4300
0.2000
5.0000
2.0000
0.2000
0.0011

19.65

. . MATERIAL

*
*
*

2.5.8
02A010
02A035
04U005
21D300
21B121
21B122
21B1223
22G121
24C075
21B135

20H600

28A816
50B225
50D150
50D500
50F100
50F120

*
*
*

2.5.9
02A010
02A035
04U005
21D300
21B121
21B122
21B1223
22G121
24C075
21B135

20H600

28A816
50B225
50D150
50D500
50F100
50F120

2.5.10
02A010
02A035
21D300
22G120

20H600

UNIDAD

Pozos Eyectores y Trampa de Grasas en concreto reforzado


f'c=3000 psi
BOMBEO
D
CONCRETO COMUN DE 4000 PSI DI
DISTANCIADOR P/COLUMNA 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
Cinta PVC A-15
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
FORCLAMPS METALICO C/TORNILLO
ALQUILER TORRE GRUA
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Cimentacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Fosos Ascensores en concreto reforzado f'c=3000 psi


BOMBEO
D
CONCRETO COMUN DE 4000 PSI DI
DISTANCIADOR P/COLUMNA 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
Cinta PVC A-15
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
FORCLAMPS METALICO C/TORNILLO
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Cimentacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Placa de Contrapiso Maciza e=10 cm en concreto f'c=3000
psi. Niv. -3.20
BOMBEO
DI
CONCRETO COMUN DE 4000 PSI DI
POLIETILENO C-4(1KG=10.66 M2)
MADERA ORDINARIA
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES

14 de 448

m3
I M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
ML
...
% (M+MO)
...
HR
MES
SEM
DIA
DIA
MES/M3
...
...
HR

m3
I M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
ML
...
% (M+MO)
...
HR
MES
SEM
DIA
DIA
MES/M3
...
...
HR

CANTIDAD

1.05
1.05
30.0000
0.6822
0.38
0.13
0.22
6.3000
0.8000
1.0500
0.1%
0.4300
0.2000
5.0000
2.0000
0.2000
0.0011

19.65

1.05
1.05
30.0000
0.6822
0.38
0.13
0.22
6.3000
0.8000
1.0500
0.1%
0.4300
0.2000
5.0000
2.0000
0.2000
0.0011

19.65

m2
M3
M3
KGR
M3
...
% (M+MO)

0.11
0.11
0.11
0.11
0.2%

. . MATERIAL

28A816
50F120

UNIDAD

SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Cimentacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acabado Esmaltado y Endurecido (Solado S-3) sobre placa de


contrapiso en concreto para Areas de Servicio y Cuartos
Tcnicos Niv+2.40 que lo requieren. Incluye : Retardante de
Evaporacion de agua Tipo Sikaflim (0.06 kg/m2) + Curador Tipo
Antisol
Blanco para Tortas en Concreto ( 0.3 kg/m2 ) +
Endurecedor Sikaflor - 3 Quarz Top (5 kg/m2)

2.5.11

...
HR
MES/M3
...
...
HR

CANTIDAD

0.4147
0.0001

0.64

m2

Esmaltado
20H600

20H601

HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
ALLANADORA ALLEN
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Retardante de Evaporacion de agua
Tipo Sikaflim (0.06 kg/m2)

21B140
20H600
20H701

21B140
20H600
20H701

21B140

20H701

...
HR

KGR
...
% (M+MO)
...
% (M+MO)
...

ANTISOL BLANCO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Endurecedor Sikaflor - 3 Quarz Top
(5 kg/m2)

KGR
...
% (M+MO)
...
% (M+MO)
...

SIKAFLOR - 3 QUARZ TOP

1.4%
0.0234

0.17

KGR

SIKAFLIM
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Curador Tipo Antisol Blanco para
Tortas en Concreto ( 0.3 kg/m2 )
-

...
HR

0.06
0.5%
0.5%

0.0011

KGR

...
HR

0.30
0.5%
0.5%

0.006

KGR
KGR

SUBTOTAL MATERIALES
20H600

% (M+MO)
...
DD
...

5.00

...

HERRAMIENTAS MENORES

% (M+MO)

SUBTOTAL HERRAMIENTAS

...

- Equipo Traciego y Transporte Vertical/Horizontal Obra

15 de 448

% (M+MO)

0.5%
0.5%

. . MATERIAL

UNIDAD

SUBTOTAL EQUIPO

CANTIDAD

...

(El valor de los insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

MANO DE OBRA CUADRILLA AA Albaileria

HR

0.10

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

LOSAS DE CONTRAPISO EN CONCRETO HIDRAULICO


Losa de Concreto MR43
e=15 cm
para Area de
Estacionamiento Niv. +2.40. Incluye : suministro, formaleteado,
colocacion y acabado

2.6.1
02A010
02A035
21D300

20H600

28A816
22G120
50F120

2.6.2
02A010
02A035
21D300

20H600

28A816
22G120
50F120

2.6.3
02A010
02A035
21D300

20H600

28A816
22G120

BOMBEO
DI
CONCRETO MR43 f'c=4.500 psi (31.5Mpa)
POLIETILENO C-4(1KG=10.66 M2)
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
REGLA VIBRAORIA Briss Straton 8HP
TEXTURIZADO PAVIMENTO CONCRETO
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Cimentacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Losa de Concreto MR43 e=18 cm para Acceso Vehicular


Niv. +2.40. Incluye : suministro, formaleteado, colocacion y
acabado
BOMBEO
DI
CONCRETO MR43 f'c=4.500 psi (31.5Mpa)
POLIETILENO C-4(1KG=10.66 M2)
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
REGLA VIBRAORIA Briss Straton 8HP
TEXTURIZADO PAVIMENTO CONCRETO
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Cimentacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Losa de Concreto MR43 e=18 cm para Area de Descarga


y
Abastecimiento
Niv. +2.40.
Incluye
:
suministro,
formaleteado, colocacion y acabado estriado
BOMBEO
DI
CONCRETO MR43 f'c=4.500 psi (31.5Mpa)
POLIETILENO C-4(1KG=10.66 M2)
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
REGLA VIBRAORIA Briss Straton 8HP
TEXTURIZADO PAVIMENTO CONCRETO

16 de 448

m3
M3
M3
KGR
...
% (M+MO)
...
DIA
DIA
MES/M3
...
...
HR

1.00
1.00
0.11
0.2%
0.15
2.71
0.00

7.18

m3
M3
M3
KGR
...
% (M+MO)
...
DIA
DIA
MES/M3
...
...
HR

1.00
1.00
0.11
0.2%
0.15
2.71
0.00

7.18

m3
M3
M3
KGR
...
% (M+MO)
...
DIA
DIA

1.00
1.00
0.11
0.2%
0.15
2.71

. . MATERIAL
50F120

2.6.4
02A035
02A035

20H600

28A816

ALQUILER TORRE GRUA ( 2 unidades )


SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Cimentacion
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Costo Adicional concreto MR43 por adicion de Fibra Metalica


Re 3 48% (65/60) (20 kg/me) + Microfibra
FRIBRA METALICA Re 3 48%
MICROFIBRA
SUBTOTAL MATERIALES
No Aplica
SUBTOTAL HERRAMIENTAS
No Aplica
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
No Aplica
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Dilatacion Cortada con Disco de 25 mm de profundidad y 3 mm


de ancho

2.6.5

20H600

UNIDAD

( No Aplica )
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
CORTADORA DE CONCRETO
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria

MES/M3
...
...
HR

CANTIDAD
0.00

7.18

m3
M3
M3
...
% (M+MO)
...
DIA
...
...
HR

1.00
1.00
0.0%
0.00

0.00

ML

...
% (M+MO)
...
DD
...

2.0%
0.05

...
HR

0.17

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

Suministro y Aplicacin Sello Fondo de Junta con una Capa de


Sika Road 3/8 ( 1 m/m )

2.6.6
21B140
20H600
20H701

SIKA ROAD 3/8


SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

Suministro y Aplicacin Sello Junta Dilatacion con Sellante


Epoxico Semirigido Tipo Sikadur - 51 SL (91.7 gr/m junta de
25mm x 3 mm),

2.6.7
21B140

SIKADUR 51 SL

ML
...
% (M+MO)
...
% (M+MO)
...
...
HR

1.00
0.5%
0.5%

0.03

ML
KGR

SUBTOTAL MATERIALES
20H600

ML

0.18

...

HERRAMIENTAS MENORES

% (M+MO)

17 de 448

0.5%

. . MATERIAL

UNIDAD

SUBTOTAL HERRAMIENTAS

...

- Equipo Traciego y Transporte Vertical/Horizontal Obra

20H701

CANTIDAD

% (M+MO)

SUBTOTAL EQUIPO

0.5%

...

(El valor de los insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

MANO DE OBRA CUADRILLA AA Albaileria

HR

0.05

kg
KGR
KGR
...

1.05
0.03

...
% (M+MO)
...

2.0%

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

REFUERZO CIMENTACION
2.7.1
04C010
24A060

20H701

2.7.2
04C010
24A060

20H701

2.7.3
04C010
24A060

20H701

2.7.4
04C010

Acero PDR-60 Dados


HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acero PDR-60 Zapatas Corridas


HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acero PDR-60 Vigas Cimentacion


HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acero PDR-60 Muros de Contencion


HIERRO FIGURADO DE 60000 PSI

18 de 448

...
Manejo
HR

0.02

kg
KGR
KGR
...

1.05
0.03

...
% (M+MO)
...

2.0%

...
Manejo
HR

0.02

kg
KGR
KGR
...

1.05
0.03

...
% (M+MO)
...

2.0%

...
Manejo
HR

0.02

kg
KGR

1.05

. . MATERIAL
24A060

20H701

2.7.5
04C010
24A060

20H701

2.7.6
04C010
24A060

20H701

2.7.7
04C010
24A060

20H701

2.7.8
04C010
24A060

UNIDAD

ALAMBRE NEGRO #18 (KG=111.11M)


SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acero PDR-60 Tanques de Agua


HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acero PDR-60 Tanque Combustible


HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acero PDR-60 Pozos Eyectores


HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acero PDR-60 Foso Ascensor


HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)

19 de 448

KGR
...
...
% (M+MO)
...

CANTIDAD
0.03

2.0%

...
Manejo
HR

0.02

kg
KGR
KGR
...

1.05
0.03

...
% (M+MO)
...

2.0%

...
Manejo
HR

0.02

kg
KGR
KGR
...

1.05
0.03

...
% (M+MO)
...

2.0%

...
Manejo
HR

0.02

kg
KGR
KGR
...

1.05
0.03

...
% (M+MO)
...

2.0%

...
Manejo
HR

0.02

kg
KGR
KGR

1.05
0.03

. . MATERIAL

SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

20H701

2.7.9
04I300
24A060

20H701

UNIDAD

CANTIDAD

...
...
% (M+MO)
...

2.0%

...
Manejo

Malla Electrosoldada
f'y=5.000 kg/cm2 (500 Mpa)
M.3.78
Placa Cimentacion
MALLA ELECTROSOLDADA
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y Manejo
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

HR

0.02

kg
KG
KGR
...
...
% (M+MO)
...

1.05
0.03

2.0%

...
HR

0.02

ESTRUCTURA EN CONCRETO
ELEMENTOS VERTICALES EN CONCRETO
3.1.1

*
*
*
*
*

02A045
02A045
02A045
04U005
21D300
21B121
21B122
21B1223
22G121
24C075

20H600

28A816
50B225
50D150
50D500
50F100
50F110
50F120

Columnas Circulares
en concreto reforzado
f'c=5000 psi
CONCRETO COMUN DE 5000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/COLUMNA 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
MORDAZA-PLATINA 3"X1/4X0.75 MT
FORMALETA Metalica para Elementos Circulares
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

20 de 448

a la vista

m3
M3
M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
...
% (M+MO)
...
HR
MES
SEM
DIA
DIA
M2/M3
MES/M3
...
...
HR

1.05
1.05
1.05
30.00
0.68
0.38
0.13
0.22
2.94
3.60
0.1%
1.6000
0.5600
5.0000
100.0000
35.0000
1.0000
0.0012

19.65

. . MATERIAL

3.1.2

*
*
*
*
*

02A045
02A047
02A048
04U005
21D300
21B121
21B122
21B1223
22G121
24C075

20H600

28A816
50B225
50D150
50D500
50F100
50F110
50F120

3.1.3

*
*
*
*
*

02A045
02A047
02A048
04U005
21D300
21B121
21B122
21B1223
22G121
24C075

20H600

28A816
50B225
50D150
50D500
50F100
50F110
50F120

3.1.4
02A045
02A047

UNIDAD

Columnas Rectangulares en concreto reforzado a la vista


f'c=5000 psi
CONCRETO COMUN DE 5000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/COLUMNA 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
MORDAZA-PLATINA 3"X1/4X0.75 MT
FORMALETA Madera Liston Machimbrado
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Pantallas Estructurales Interiores en concreto


la vista f'c=5000 psi (Muros HD01, HD02)
CONCRETO COMUN DE 5000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/COLUMNA 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
MORDAZA-PLATINA 3"X1/4X0.75 MT
FORMALETA Madera Liston Machimbrado
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

reforzado a

Pantallas Estructurales Fachada en concreto


la vista f'c=5000 psi (Muros HD01, HD02)
CONCRETO COMUN DE 5000 PSI DI
SOBRECOSTO GRAVILLA FINA

reforzado a

21 de 448

CANTIDAD

m3
M3
M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
...
% (M+MO)
...
HR
MES
SEM
DIA
DIA
M2/M3
MES/M3
...
...
HR

1.05
1.05
1.05
30.00
0.68
0.38
0.13
0.22
2.94
3.60
0.1%
1.6000
0.5600
5.0000
100.0000
35.0000
1.0000
0.0012

15.11

m3
M3
M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
...
% (M+MO)
...
HR
MES
SEM
DIA
DIA
M2/M3
MES/M3
...
...
HR

1.05
1.05
1.05
30.00
0.68
0.38
0.13
0.22
2.94
3.60
0.1%
1.6000
0.5600
5.0000
100.0000
35.0000
1.0000
0.0012

15.11

m3
M3
M3

1.05
1.05

*
*
*
*
*

. . MATERIAL

UNIDAD

02A048
04U005
21D300
21B121
21B122
21B1223
22G121
24C075

20H600

28A816
50B225
50D150
50D500
50F100
50F110
50F120

M3
UND
KGR
KGR
KGR
KGR
M3
LBR
...
% (M+MO)
...
HR
MES
SEM
DIA
DIA
M2/M3
MES/M3
...

SOBRECOSTO FLUIDO
DISTANCIADOR P/COLUMNA 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
MORDAZA-PLATINA 3"X1/4X0.75 MT
FORMALETA Madera Liston Machimbrado
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

...
HR

CANTIDAD
1.05
30.00
0.68
0.38
0.13
0.22
2.94
3.60
0.1%
1.6000
0.5600
5.0000
100.0000
35.0000
1.0000
0.0012

15.11

VIGAS AEREAS
3.2.1

*
*
*
*

02A045
02A045
02A045
04U005
21D300
21B121
21B122
21B1223
22G121
24C075

20H600

28A816
50F100
50F110
50F110
50F120

3.2.2
02A045
02A045
02A045
04U005
21D300
21B121
21B122

Vigas Aereas Descolgadas


Placa 2o Nivel, en concreto
reforzado a la vista f'c=5000 psi. Niv. +6.10
CONCRETO COMUN DE 5000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/COLUMNA 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
FORCLAMPS
FORMALETA Madera Liston Machimbrado
FORMALETA Entrepiso (Camilla+Cercha+Parales)
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Vigas Aereas Descolgadas Placa 3o Piso,


reforzado a la vista f'c=5000 psi. Niv. +9.85
CONCRETO COMUN DE 5000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/COLUMNA 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL

22 de 448

en

concreto

m3
M3
M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
...
% (M+MO)
...
HR
DIA
M2/M3
M2/MES
MES/M3
...
...
HR

1.05
1.05
1.05
30.00
0.68
0.38
0.13
0.22
2.94
3.60
0.1%
1.6000
35.0000
0.7500
6.5127
0.0012

15.72

m3
M3
M3
M3
UND
KGR
KGR
KGR

1.05
1.05
1.05
30.00
0.68
0.38
0.13

*
*
*
*

. . MATERIAL

UNIDAD

21B1223
22G121
24C075

20H600

28A816
50F100
50F110
50F110
50F120

KGR
M3
LBR
...
% (M+MO)
...
HR
DIA
M2/M3
M2/MES
MES/M3
...

3.2.3

*
*
*
*

02A045
02A045
02A045
04U005
21D300
21B121
21B122
21B1223
22G121
24C075

20H600

28A816
50F100
50F110
50F110
50F120

3.2.4

*
*

02A045
02A045
02A045
04U005
21D300
21B121
21B122
21B1223
22G121
24C075

20H600

28A816
50F100
50F110

EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
FORCLAMPS
FORMALETA Madera Liston Machimbrado
FORMALETA Entrepiso (Camilla+Cercha+Parales)
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Vigas Aereas Descolgadas Placa Cubierta, en


reforzado a la vista f'c=5000 psi. Niv. +16.20
CONCRETO COMUN DE 5000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/COLUMNA 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
FORCLAMPS
FORMALETA Madera Liston Machimbrado
FORMALETA Entrepiso (Camilla+Cercha+Parales)
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

...
HR

concreto

Vigas Aereas
Cubierta, en concreto reforzado a la vista
f'c=5000 psi. Niv. +18.60
CONCRETO COMUN DE 5000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/COLUMNA 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
FORCLAMPS
FORMALETA Madera Liston Machimbrado

23 de 448

CANTIDAD
0.22
2.94
3.60
0.1%
1.6000
35.0000
0.7500
6.5127
0.0012

15.72

m3
M3
M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
...
% (M+MO)
...
HR
DIA
M2/M3
M2/MES
MES/M3
...
...
HR

1.05
1.05
1.05
30.00
0.68
0.38
0.13
0.22
2.94
3.60
0.1%
1.6000
35.0000
0.7500
6.5127
0.0012

15.72

m3
M3
M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
...
% (M+MO)
...
HR
DIA
M2/M3

1.05
1.05
1.05
30.00
0.68
0.38
0.13
0.22
2.94
3.60
0.1%
1.6000
35.0000
0.7500

. . MATERIAL
*
*

50F110
50F120

UNIDAD

FORMALETA Entrepiso (Camilla+Cercha+Parales)


ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

M2/MES
MES/M3
...
...
HR

CANTIDAD
6.5127
0.0012

15.72

PLACAS EN CONCRETO
3.3.1

*
*

02A010
02A035
02A035
02A035
04U010
21D120
22G010
22G120
24C075

20H600

28A816
50F110
50F120

3.3.2

*
*

02A010
02A035
02A035
02A035
04U010
21D120
22G010
22G120
24C075

20H600

28A816
50F110
50F120

Placa Maciza h=25 cm en concreto reforzado a la vista


f' c=4000 psi. 2o Nivel - Niv. +6.10
BOMBEO
DI
CONCRETO COMUN DE 4000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/PLACAS 35mm
DESENCOFRANTE
BOCEL 1/2 LUNA 15mm C/MACHO
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
FORMALETA Entrepiso (Camilla+Cercha+Parales)
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Placa Maciza h=25 cm en concreto reforzado a la vista f'


c=4000 psi, sobre vigas areas descolgadas, 3o Nivel - Niv.
+9.85 para Area Pabellon Ferial
BOMBEO
DI
CONCRETO COMUN DE 4000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/PLACAS 35mm
DESENCOFRANTE
BOCEL 1/2 LUNA 15mm C/MACHO
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
FORMALETA Entrepiso (Camilla+Cercha+Parales)
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

24 de 448

m2
M3
M3
M3
M3
UND
KGR
ML
M3
LBR
...
% (M+MO)
...
HR
M2/MES
MES/M3
...
...
HR

0.2625
0.2625
0.2625
0.2625
6.0000
0.1200
0.9000
2.0000
0.6000
0.14%
1.0368
8.4845
0.0005

2.41

m2
M3
M3
M3
M3
UND
KGR
ML
M3
LBR
...
% (M+MO)
...
HR
M2/MES
MES/M3
...
...
HR

0.2625
0.2625
0.2625
0.2625
6.0000
0.1200
0.9000
2.0000
0.6000
0.14%
1.0368
8.4845
0.0005

2.41

. . MATERIAL

3.3.3

*
*

02A010
02A035
02A035
02A035
04U010
21D120
22G010
22G120
24C075

20H600

28A816
50F110
50F120

02A010
02A045
02A045
02A045
04U010
21D120
22G010
22G120
24C075

20H600

28A816
28A816
50F110
50F120

reforzado

BOMBEO
DI
CONCRETO COMUN DE 4000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/PLACAS 35mm
DESENCOFRANTE
BOCEL 1/2 LUNA 15mm C/MACHO
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
CASETON DE ICOPOR RECUPERABLE
FORMALETA Entrepiso (Camilla+Cercha+Parales)
ALQUILER TORRE GRUA
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Placa Maciza h=25 cm en concreto reforzado a la vista f'


c=4000 psi, sobre vigas areas descolgadas, Cubierta - Niv.
+16.20

3.3.5
02A010
02A035
02A035
02A035
04U010
21D120
22G010
22G120
24C075

Placa Maciza h=35 cm en concreto reforzado a la vista f'


c=4000 psi, sobre vigas areas descolgadas, 3o Nivel - Niv.
+9.85 para Area Calle de Servicio
BOMBEO
DI
CONCRETO COMUN DE 4000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/PLACAS 35mm
DESENCOFRANTE
BOCEL 1/2 LUNA 15mm C/MACHO
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
FORMALETA Entrepiso (Camilla+Cercha+Parales)
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Placa Reticular Celulado h=60 cm


en concreto
a la vista f' c=4000 psi, Cubierta
Niv. +16.20

3.3.4

*
*

UNIDAD

BOMBEO
DI
CONCRETO COMUN DE 4000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/PLACAS 35mm
DESENCOFRANTE
BOCEL 1/2 LUNA 15mm C/MACHO
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES

25 de 448

CANTIDAD

m2
M3
M3
M3
M3
UND
KGR
ML
M3
LBR
...
% (M+MO)
...
HR
M2/MES
MES/M3
...
...
HR

0.3675
0.3675
0.3675
0.3675
8.4000
0.1680
1.2600
2.8000
0.8400
0.14%
1.4515
11.8782
0.0007

3.3778

m2
M3
M3
M3
M3
UND
KGR
ML
M3
LBR
...
% (M+MO)
...
HR
M3/M3
M2/MES
MES/M3
...
...
HR

0.29
0.29
0.29
0.29
3.0000
0.06
0.4500
1.0000
0.3000
0.14%
0.6221
0.2300
8.9971
0.0003

3.73

m2
M3
M3
M3
M3
UND
KGR
ML
M3
LBR
...

0.2625
0.2625
0.2625
0.2625
6.0000
0.1200
0.9000
2.0000
0.6000

*
*

. . MATERIAL

UNIDAD

20H600

28A816
50F110
50F120

% (M+MO)
...
HR
M2/MES
MES/M3
...

HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
FORMALETA Entrepiso (Camilla+Cercha+Parales)
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acabado Esmaltado y Endurecido (Solado S-3) sobre placas


aereas en concreto
para Areas de Servicio y Cuartos
Tcnicos Niv+6.10, Niv.+9.85 y Niv.+1.20 que lo requiere.
Incluye : Retardante de Evaporacion de agua Tipo Sikaflim
(0.06 kg/m2) + Curador Tipo Antisol Blanco para Tortas en
Concreto ( 0.3 kg/m2 ) + Endurecedor Sikaflor - 3 Quarz Top (5
kg/m2)

3.3.6

...
HR

CANTIDAD
0.14%
1.0368
8.4845
0.0005

2.41

m2

Esmaltado
20H600

20H601

HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
ALLANADORA ALLEN
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Retardante de Evaporacion de agua
Tipo Sikaflim (0.06 kg/m2)

21B140
20H600
20H701

21B140
20H600
20H701

21B140

...
HR

KGR
...
% (M+MO)
...
% (M+MO)
...

ANTISOL BLANCO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Endurecedor Sikaflor - 3 Quarz Top
(5 kg/m2)

KGR
...
% (M+MO)
...
% (M+MO)
...

SIKAFLOR - 3 QUARZ TOP

1.4%
0.0234

0.17

KGR

SIKAFLIM
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Curador Tipo Antisol Blanco para
Tortas en Concreto ( 0.3 kg/m2 )
-

...
HR

0.06
0.5%
0.5%

0.0011

KGR

...
HR

0.30
0.5%
0.5%

0.006

KGR
KGR

SUBTOTAL MATERIALES
20H600

% (M+MO)
...
DD
...

5.00

...

HERRAMIENTAS MENORES

% (M+MO)

SUBTOTAL HERRAMIENTAS

...

26 de 448

0.5%

. . MATERIAL

UNIDAD

- Equipo Traciego y Transporte Vertical/Horizontal Obra

20H701

SUBTOTAL EQUIPO

% (M+MO)

CANTIDAD

0.5%

...

(El valor de los insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

MANO DE OBRA CUADRILLA AA Albaileria

HR

0.10

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

Acabado Esmaltado y Endurecido sobre placa en concreto


(Solado S-3) Area Pabellon Ferial Niv.+9.85 que lo requiere.
Incluye : Retardante de Evaporacion de agua Tipo Sikaflim
(0.06 kg/m2) + Curador Tipo Antisol Blanco para Tortas en
Concreto ( 0.3 kg/m2 ) + Endurecedor Sikaflor - 1 Metal Top (7
kg/m2)

3.3.7

m2

Esmaltado
20H600

20H601

HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
ALLANADORA ALLEN
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Retardante de Evaporacion de agua
Tipo Sikaflim (0.06 kg/m2)

21B140
20H600
20H701

21B140
20H600
20H701

21B140

20H701

...
HR

KGR
...
% (M+MO)
...
% (M+MO)
...

ANTISOL BLANCO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Endurecedor Sikaflor - 3 Quarz Top
(5 kg/m2)

KGR
...
% (M+MO)
...
% (M+MO)
...

SIKAFLOR - 1 METAL TOP

1.4%
0.0234

0.17

KGR

SIKAFLIM
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Curador Tipo Antisol Blanco para
Tortas en Concreto ( 0.3 kg/m2 )
-

...
HR

0.06
0.5%
0.5%

0.0011

KGR

...
HR

0.30
0.5%
0.5%

0.006

KGR
KGR

SUBTOTAL MATERIALES
20H600

% (M+MO)
...
DD
...

7.00

...

HERRAMIENTAS MENORES

% (M+MO)

SUBTOTAL HERRAMIENTAS

...

- Equipo Traciego y Transporte Vertical/Horizontal Obra

27 de 448

% (M+MO)

0.5%
0.5%

. . MATERIAL

UNIDAD

SUBTOTAL EQUIPO

CANTIDAD

...

(El valor de los insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

MANO DE OBRA CUADRILLA AA Albaileria

HR

0.14

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

Acabado Estriado y Endurecido (Solado S-3) sobre placas


aereas en concreto para Area Calle de Servicio y Area de
Descarga, Niv.+9.85 que lo requieren. Incluye : Retardante
de Evaporacion de agua Tipo Sikaflim (0.06 kg/m2) + Curador
Tipo Antisol Blanco para Tortas en Concreto ( 0.3 kg/m2 ) +
Endurecedor Sikaflor - 1 Metal Top (7 kg/m2)

3.3.8

m2

Esmaltado
20H600

20H601

HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
ALLANADORA ALLEN
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Retardante de Evaporacion de agua
Tipo Sikaflim (0.06 kg/m2)

21B140
20H600
20H701

21B140
20H600
20H701

21B140

20H701

...
HR

KGR
...
% (M+MO)
...
% (M+MO)
...

ANTISOL BLANCO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Endurecedor Sikaflor - 3 Quarz Top
(5 kg/m2)

KGR
...
% (M+MO)
...
% (M+MO)
...

SIKAFLOR - 1 METAL TOP

1.4%
0.0234

0.17

KGR

SIKAFLIM
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Curador Tipo Antisol Blanco para
Tortas en Concreto ( 0.3 kg/m2 )
-

...
HR

0.06
0.5%
0.5%

0.0011

KGR

...
HR

0.30
0.5%
0.5%

0.006

KGR
KGR

SUBTOTAL MATERIALES
20H600

% (M+MO)
...
DD
...

7.00

...

HERRAMIENTAS MENORES

% (M+MO)

SUBTOTAL HERRAMIENTAS

...

- Equipo Traciego y Transporte Vertical/Horizontal Obra


SUBTOTAL EQUIPO

% (M+MO)
...

28 de 448

0.5%
0.5%

. . MATERIAL

UNIDAD

CANTIDAD

(El valor de los insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

MANO DE OBRA CUADRILLA AA Albaileria

HR

0.14

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

ELEMENTOS VARIOS EN CONCRETO


3.4.1

*
*
*
*

02A010
02A035
02A045
02A045
04U010
21D300
21B121
21B122
21B1223
22G121
24C075

20H600

28A816
50B225
50D150
50D500
50D400
50F120

3.4.2

*
*
*
*

02A010
02A035
02A045
02A045
04U010
21D300
21B121
21B122
21B1223
22G121
24C075

20H600

28A816
50B225
50D150
50D500
50D400
50F120

Escalera
Aerea No.1
Nucleo F1 - N1
en concreto
reforzado a la vista f'c=4000 psi. Niv. +2.40 a +9.85
BOMBEO
DI
CONCRETO COMUN DE 4000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/PLACAS 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
CERCHA METALICA 3.00 MTS
ALQUILER TORRE GRUA
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Escalera
Aerea No.2 Hall Recepcion F1 - P28 Oficinas
Camara de Comercio, en concreto reforzado a la vista f'c=4000
psi Punto Fijo Principal Niv. +2.40 a +6.10
BOMBEO
DI
CONCRETO COMUN DE 4000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/PLACAS 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
CERCHA METALICA 3.00 MTS
ALQUILER TORRE GRUA

29 de 448

m3
M3
M3
M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
...
% (M+MO)
...
HR
MES
SEM
DIA
UND
MES/M3
...
...
HR

1.05
1.05
1.05
1.05
12.00
0.68
0.38
0.13
0.22
2.94
3.60
0.12%
1.6000
0.5600
5.0000
100.0000
33.0000
0.0010

19.65

m3
M3
M3
M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
...
% (M+MO)
...
HR
MES
SEM
DIA
UND
MES/M3

1.05
1.05
1.05
1.05
12.00
0.68
0.38
0.13
0.22
2.94
3.60
0.12%
1.6000
0.5600
5.0000
100.0000
33.0000
0.0010

. . MATERIAL

UNIDAD

SUBTOTAL FORMALETA y EQUIPOS


(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

3.4.3

*
*
*
*

02A010
02A035
02A045
02A045
04U010
21D300
21B121
21B122
21B1223
22G121
24C075

20H600

28A816
50B225
50D150
50D500
50D400
50F120

3.4.4

*
*
*
*

02A010
02A035
02A045
02A045
04U010
21D300
21B121
21B122
21B1223
22G121
24C075

20H600

28A816
50B225
50D150
50D500
50D400
50F120

Escalera
Aerea No.3 Hall Recepcion F1-A02 Oficinas
Camara de Comercio
en concreto reforzado a la vista
f'c=4000 psi. Niv. +2.40 a +6.10
BOMBEO
DI
CONCRETO COMUN DE 4000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/PLACAS 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
CERCHA METALICA 3.00 MTS
ALQUILER TORRE GRUA
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Escalera
Aerea No.4 Nucleo F1 - N6
en concreto
reforzado a la vista f'c=4000 psi. Niv. +2.40 a +16.20
BOMBEO
DI
CONCRETO COMUN DE 4000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/PLACAS 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
CERCHA METALICA 3.00 MTS
ALQUILER TORRE GRUA
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura

30 de 448

CANTIDAD

...
...
HR

19.65

m3
M3
M3
M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
...
% (M+MO)
...
HR
MES
SEM
DIA
UND
MES/M3
...
...
HR

1.05
1.05
1.05
1.05
12.00
0.68
0.38
0.13
0.22
2.94
3.60
0.12%
1.6000
0.5600
5.0000
100.0000
33.0000
0.0010

19.65

m3
M3
M3
M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
...
% (M+MO)
...
HR
MES
SEM
DIA
UND
MES/M3
...
...
HR

1.05
1.05
1.05
1.05
12.00
0.68
0.38
0.13
0.22
2.94
3.60
0.12%
1.6000
0.5600
5.0000
100.0000
33.0000
0.0010

19.65

. . MATERIAL

UNIDAD

CANTIDAD

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

3.4.5

*
*
*
*

02A010
02A035
02A045
02A045
04U010
21D300
21B121
21B122
21B1223
22G121
24C075

20H600

28A816
50B225
50D150
50D500
50D400
50F120

3.4.6

*
*
*
*

02A010
02A035
02A045
02A045
04U010
21D300
21B121
21B122
21B1223
22G121
24C075

20H600

28A816
50B225
50D150
50D500
50D400
50F120

Escalera
Aerea No.5 Nucleo F1 - N7
en concreto
reforzado a la vista f'c=4000 psi. Niv. +2.40 a +9.85
BOMBEO
DI
CONCRETO COMUN DE 4000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/PLACAS 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
CERCHA METALICA 3.00 MTS
ALQUILER TORRE GRUA
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Escalera
Aerea No.6 Nucleo F1 - N5
en concreto
reforzado a la vista f'c=4000 psi. Niv. +2.40 a +9.85
BOMBEO
DI
CONCRETO COMUN DE 4000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/PLACAS 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
CERCHA METALICA 3.00 MTS
ALQUILER TORRE GRUA
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

31 de 448

m3
M3
M3
M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
...
% (M+MO)
...
HR
MES
SEM
DIA
UND
MES/M3
...
...
HR

1.05
1.05
1.05
1.05
12.00
0.68
0.38
0.13
0.22
2.94
3.60
0.12%
1.6000
0.5600
5.0000
100.0000
33.0000
0.0010

19.65

m3
M3
M3
M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
...
% (M+MO)
...
HR
MES
SEM
DIA
UND
MES/M3
...
...
HR

1.05
1.05
1.05
1.05
12.00
0.68
0.38
0.13
0.22
2.94
3.60
0.12%
1.6000
0.5600
5.0000
100.0000
33.0000
0.0010

19.65

. . MATERIAL

3.4.7

*
*
*
*

02A010
02A035
02A045
02A045
04U010
21D300
21B121
21B122
21B1223
22G121
24C075

20H600

28A816
50B225
50D150
50D500
50D400
50F120

3.4.8

*
*
*
*

02A010
02A035
02A045
02A045
04U010
21D300
21B121
21B122
21B1223
22G121
24C075

20H600

28A816
50B225
50D150
50D500
50D400
50F120

3.4.9
02A010
02A035

UNIDAD

Escalera
Aerea No.7 Nucleo F1 - N3
en concreto
reforzado a la vista f'c=4000 psi. Niv. +2.40 a +16.20
BOMBEO
DI
CONCRETO COMUN DE 4000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/PLACAS 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
CERCHA METALICA 3.00 MTS
ALQUILER TORRE GRUA
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Escalera
Aerea No.8 Nucleo F1 - N2
en concreto
reforzado a la vista f'c=4000 psi. Niv. +2.40 a +9.85
BOMBEO
DI
CONCRETO COMUN DE 4000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/PLACAS 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
CERCHA METALICA 3.00 MTS
ALQUILER TORRE GRUA
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Escalera Aerea No.9 Extrior Paseo Peatonal en concreto


reforzado a la vista f'c=4000 psi
Punto Fijo Principal Niv.
+2.40 a +9.85
BOMBEO
DI
CONCRETO COMUN DE 4000 PSI DI

32 de 448

CANTIDAD

m3
M3
M3
M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
...
% (M+MO)
...
HR
MES
SEM
DIA
UND
MES/M3
...
...
HR

1.05
1.05
1.05
1.05
12.00
0.68
0.38
0.13
0.22
2.94
3.60
0.12%
1.6000
0.5600
5.0000
100.0000
33.0000
0.0010

19.65

m3
M3
M3
M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
...
% (M+MO)
...
HR
MES
SEM
DIA
UND
MES/M3
...
...
HR

1.05
1.05
1.05
1.05
12.00
0.68
0.38
0.13
0.22
2.94
3.60
0.12%
1.6000
0.5600
5.0000
100.0000
33.0000
0.0010

19.65

m3
M3
M3

1.05
1.05

*
*
*
*

. . MATERIAL

UNIDAD

02A045
02A045
04U010
21D300
21B121
21B122
21B1223
22G121
24C075

20H600

28A816
50B225
50D150
50D500
50D400
50F120

M3
M3
UND
KGR
KGR
KGR
KGR
M3
LBR
...
% (M+MO)
...
HR
MES
SEM
DIA
UND
MES/M3
...

SOBRECOSTO GRAVILLA FINA


SOBRECOSTO FLUIDO
DISTANCIADOR P/PLACAS 35mm
POLIETILENO C-4(1KG=10.66 M2)
DESENCOFRANTE
CURASEL
EPOTOC
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
ANDAMIO TUBULAR SECCION
CAMILLA EN MADERA 0.70X1.40 MT
PARAL PLANO CON PASADOR
CERCHA METALICA 3.00 MTS
ALQUILER TORRE GRUA
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

...
HR

CANTIDAD
1.05
1.05
12.00
0.68
0.38
0.13
0.22
2.94
3.60
0.12%
1.6000
0.5600
5.0000
100.0000
33.0000
0.0010

19.65

REFUERZO ESTRUCTURA
3.5.1
04C010
24A060

20H701

3.5.2
04C010
24A060

20H701

3.5.3
04C010
24A060

Acero PDR-60 Columnas


HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acero PDR-60 Pantallas


HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acero PDR-60 Vigas Aereas 2o Nivel +6.10


HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES

33 de 448

kg
KGR
KGR
...

1.05
0.03

...
% (M+MO)
...

2.0%

...
Manejo
HR

0.02

kg
KGR
KGR
...

1.05
0.03

...
% (M+MO)
...

2.0%

...
Manejo
HR

0.02

kg
KGR
KGR
...

1.05
0.03

. . MATERIAL

(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

20H701

3.5.4
04C010
24A060

20H701

3.5.5
04C010
24A060

20H701

3.5.6
04C010
24A060

20H701

3.5.7
04C010
24A060

UNIDAD

Acero PDR-60 Vigas Aereas 3o Nivel +9.85


HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acero PDR-60 Vigas Aereas Cubierta +16.20


HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acero PDR-60 Vigas Aereas Cubierta +18.60


HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acero PDR-60 Placa h=25 cm


2o Nivel +6.10
HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)

34 de 448

...
% (M+MO)
...

CANTIDAD

2.0%

...
Manejo
HR

0.02

kg
KGR
KGR
...

1.05
0.03

...
% (M+MO)
...

2.0%

...
Manejo
HR

0.02

kg
KGR
KGR
...

1.05
0.03

...
% (M+MO)
...

2.0%

...
Manejo
HR

0.02

kg
KGR
KGR
...

1.05
0.03

...
% (M+MO)
...

2.0%

...
Manejo
HR

0.02

kg
KGR
KGR
...

1.05
0.03

. . MATERIAL

SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

20H701

3.5.8
04C010
24A060

20H701

3.5.9
04C010
24A060

20H701

3.5.10
04C010
24A060

20H701

3.5.10
04C010
24A060

UNIDAD

Acero PDR-60 Placa h=25 cm


3o Nivel +9.85
HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acero PDR-60 Placa h=25 cm


Cubierta +16.20
HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acero PDR-60 Placa h=60 cm Cubierta +16.20


HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acero PDR-60 Escaleras


HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS

35 de 448

...
% (M+MO)
...

CANTIDAD

2.0%

...
Manejo
HR

0.02

kg
KGR
KGR
...

1.05
0.03

...
% (M+MO)
...

2.0%

...
Manejo
HR

0.02

kg
KGR
KGR
...

1.05
0.03

...
% (M+MO)
...

2.0%

...
Manejo
HR

0.02

kg
KGR
KGR
...

1.05
0.03

...
% (M+MO)
...

2.0%

...
Manejo
HR

0.02

kg
KGR
KGR
...

1.05
0.03

...

. . MATERIAL

UNIDAD

20H701

% (M+MO)
...

- Equipo Traciego y Transporte Vertical/Horizontal Obra


SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

CANTIDAD
2.0%

...
Manejo
HR

0.02

ESTRUCTURAS METALICAS
4.1.1
04M001
04M002
20H600
20H701

4.1.2
04M001
04M002
20H600
20H701

Suministro, Fabricacin, Montaje Estructura Metalica Cubierta


en Aluminio Extruido AW7020
ALUMINIO EXTRUIDO AW7020
TORNILLERIA y SOLDADURA
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Fabricacion
MANO DE OBRA CUADRILLA AA Montaje
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro, Fabricacin, Montaje Estructura Metalica Cajas 1


y 2 Acceso Principal Pabellon Ferial Niv. +2.40 y Niv.+9.85
en Aluminio Extruido AW7020
ALUMINIO EXTRUIDO AW7020
TORNILLERIA y SOLDADURA
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Fabricacion
MANO DE OBRA CUADRILLA AA Montaje
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro, Fabricacin, Montaje Estructura Metalica Cubierta


Garita Acceso Vehicular Niv. +? en Aluminio Extruido AW7020

4.1.3
04M001
04M002
20H600
20H701

ALUMINIO EXTRUIDO AW7020


TORNILLERIA y SOLDADURA
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Fabricacion
MANO DE OBRA CUADRILLA AA Montaje
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

36 de 448

kg
KG
KG
...
% (M+MO)
...
% (M+MO)
...
KG
...
HR / KG
HR / KG

1.0500
1.0500
2.0%
5.0%
1.0500
0.0902
0.0808

kg
KG
KG
...
% (M+MO)
...
% (M+MO)
...
KG
...
HR / KG
HR / KG

1.0500
1.0500
2.0%
5.0%
1.0500
0.0902
0.0808

kg
KG
KG
...
% (M+MO)
...
% (M+MO)
...
KG
...
HR / KG
HR / KG

1.0500
1.0500
2.0%
5.0%
1.0500
0.0902
0.0808

. . MATERIAL

4.1.4
04M001
04M002
04M003
04M004
04M005
04M005
20H600
20H701

4.2.1
04M001
04M002
04M003
04M004
04M005
04M005
20H600
20H701

4.2.2
04M001
04M002
04M003
04M004
04M005
04M005
20H600
20H701

UNIDAD

Suministro, Fabricacin, Montaje y Pintura Estructura Metalica


Cubierta Niv.+18.60 Zona de Abastecimiento, en perfiles
estructurales IPE 600, en Acero Galvanizado ASTM A-500
Grado C y A572, f'y=3510 (351 Mpa)
LAMINA ASTM A-36
SOLDADURA E-700X
TORNILLERIA SAE G-5
OCIGENO, ACETILENO, DISCOS
PINTURA
PROCESO GALVANIZADO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Fabricacion
MANO DE OBRA CUADRILLA AA Montaje
MANO DE OBRA CUADRILLA CC Pintura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro, Fabricacin, Montaje y Pintura Estructura Metalica


Pasarelas Tecnicas ( son 14 ) Niv.+23.30 , en perfiles
estructurales PT 220x70x4 mm y 40x40x2.5 mm, en Acero
Galvanizado ASTM A-36, f'y=250 Mpa
LAMINA ASTM A-36
SOLDADURA E-700X
TORNILLERIA SAE G-5
OCIGENO, ACETILENO, DISCOS
PINTURA
PROCESO GALVANIZADO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Fabricacion
MANO DE OBRA CUADRILLA AA Montaje
MANO DE OBRA CUADRILLA CC Pintura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro, Fabricacin, Montaje y Pintura Estructura Metalica


Soporte Revestimiento Fachada en Chapa de Aluminio , en
perfiles estructurales PT 50x50x2.5 mm, en Acero Galvanizado
ASTM A-36, f'y=250 Mpa
LAMINA ASTM A-36
SOLDADURA E-700X
TORNILLERIA SAE G-5
OCIGENO, ACETILENO, DISCOS
PINTURA
PROCESO GALVANIZADO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO

37 de 448

CANTIDAD

kg
KG
KG
KG
KG
KG
KG
...
% (M+MO)
...
% (M+MO)
...
KG
...
HR / KG
HR / KG
HR / KG

1.0463
0.0314
0.0209
1.1824
1.0463
1.0463
0.1%
0.9%
1.0000
0.0575
0.0515
0.0070

kg
KG
KG
KG
KG
KG
KG
...
% (M+MO)
...
% (M+MO)
...
KG
...
HR / KG
HR / KG
HR / KG

1.0463
0.0314
0.0209
1.1824
1.0463
1.0463
0.1%
0.9%
1.0000
0.0575
0.0515
0.0070

kg
KG
KG
KG
KG
KG
KG
...
% (M+MO)
...
% (M+MO)
...

1.0463
0.0314
0.0209
1.1824
1.0463
1.0463
0.1%
0.9%

. . MATERIAL

UNIDAD

TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Fabricacion
MANO DE OBRA CUADRILLA AA Montaje
MANO DE OBRA CUADRILLA CC Pintura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro, Fabricacin, Montaje Estructura Metalica Cubierta


Pergola Paseo Peatonal en Aluminio Extruido AW7020

4.3.1
04M001
04M002
20H600
20H701

ALUMINIO EXTRUIDO AW7020


TORNILLERIA y SOLDADURA
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Fabricacion
MANO DE OBRA CUADRILLA AA Montaje
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

KG
...
HR / KG
HR / KG
HR / KG

CANTIDAD
1.0000
0.0575
0.0515
0.0070

kg
KG
KG
...
% (M+MO)
...
% (M+MO)
...
KG
...
HR / KG
HR / KG

1.0500
1.0500
2.0%
5.0%
1.0500
0.0902
0.0808

TABIQUERIA y MAMPOSTERIA
TABIQUES EN PLACA CEMENTICIA
Muro D01 en Doble Placa Cementicia Azul : Superboard de
dos ( 2 ) cara vista en lamina de fibrocemento de 10mm con
estructura galvanizada base 9 cal.24 con paral cada 40 cm
encintada y rematada

9.1.1

- LAMINA SUPERBOAR 1.22x2.44 10 mm AZUL


- PERFILERIA PARAL/CANAL c/60cm
- TORNILLO AUTOPERFORANTE
- CORDON SELLANTE ELASTOMERICO
- VINILICO PREPARADO
-

9.1.2

FRESCASA 3.1/2"
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
MANO DE OBRA
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Muro D02 en Doble Placa Cementicia Verde : Superboard


de dos ( 2 ) cara vista en lamina de fibrocemento de 10mm con
estructura galvanizada base 9 cal.24 con paral cada 40 cm
encintada y rematada

M2
UND

0.71

ML

1.75

UND

6.00

ML

2.00

GLN

0.14

m2
...
%
...
...

1.00
5%

M2

- LAMINA SUPERBOAR 1.22x2.44 10 mm VERDE

UND

0.71

- PERFILERIA PARAL/CANAL c/60cm


- TORNILLO AUTOPERFORANTE

ML

1.75

UND

6.00

ML

2.00

GLN

0.14

- CORDON SELLANTE ELASTOMERICO


- VINILICO PREPARADO

38 de 448

. . MATERIAL

UNIDAD

FRESCASA 3.1/2"
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES

m2
...

1.00

5%

SUBTOTAL HERRAMIENTAS

...

MANO DE OBRA
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

...

Muro D03 en Doble Placa Cementicia Mixto : Superboard


de dos ( 2 ) cara vista en lamina de fibrocemento de 10mm con
estructura galvanizada base 9 cal.24 con paral cada 40 cm
encintada y rematada

9.1.3

UND

0.35

- LAMINA SUPERBOAR 1.22x2.44 10 mm AZUL

UND

0.35

ML

1.75

- TORNILLO AUTOPERFORANTE
- CORDON SELLANTE ELASTOMERICO

UND

6.00

ML

2.00

- VINILICO PREPARADO

GLN

0.14

FRESCASA 3.1/2"
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES

m2
...

1.00

5%

SUBTOTAL HERRAMIENTAS

...

MANO DE OBRA
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

...

Muro D04, D05 en Doble Placa Cementicia


Estructura esp. 22 o 36 cm : Superboard de
vista en lamina de fibrocemento de 10mm
galvanizada base 9 cal.24 con paral cada 40
rematada

9.1.4

Mixta y Doble
dos ( 2 ) cara
con estructura
cm encintada y

UND

0.35

- LAMINA SUPERBOAR 1.22x2.44 10 mm AZUL

UND

0.35

ML

3.51

UND

6.00

- CORDON SELLANTE ELASTOMERICO

ML

2.00

GLN

0.14

FRESCASA 3.1/2"
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES

m2
...

1.00

4%

SUBTOTAL HERRAMIENTAS

...

MANO DE OBRA
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

...

- VINILICO PREPARADO

9.1.5

M2

- LAMINA SUPERBOAR 1.22x2.44 10 mm VERDE


- PERFILERIA PARAL/CANAL c/60cm
- TORNILLO AUTOPERFORANTE

M2

- LAMINA SUPERBOAR 1.22x2.44 10 mm VERDE


- PERFILERIA PARAL/CANAL c/60cm

CANTIDAD

Muro
HD-01
en Placa Sencilla Cementicia Azul :
Superboard una ( 1 ) cara vista en lamina de fibrocemento de
10mm con estructura galvanizada base 9 cal.24 con paral cada
40 cm encintada y rematada

M2

- LAMINA SUPERBOAR 1.22x2.44 10 mm AZUL

UND

0.35

- PERFILERIA PARAL/CANAL c/60cm


- TORNILLO AUTOPERFORANTE

ML

1.75

UND

3.00

ML

1.00

GLN

0.07

- CORDON SELLANTE ELASTOMERICO


- VINILICO PREPARADO

39 de 448

. . MATERIAL

UNIDAD

FRESCASA 3.1/2"
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES

m2
...

1.00

5%

SUBTOTAL MATERIALES

...

MANO DE OBRA
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

...

Muro
HD-01
en Placa Sencilla Cementicia Azul :
Superboard una ( 1 ) cara vista en lamina de fibrocemento de
12 mm con estructura galvanizada base 9 cal.24 con paral cada
40 cm encintada, masillada y rematada, con acabado en pintura
de vinilo blanco.

9.1.6

- LAMINA SUPERBOAR 1.22x2.44 10 mm AZUL


- PERFILERIA PARAL/CANAL c/60cm
- TORNILLO AUTOPERFORANTE
- CORDON SELLANTE ELASTOMERICO
- VINILICO PREPARADO
-

9.1.7

CANTIDAD

M2

UND

0.35

ML

1.75

UND

3.00

ML

1.00

GLN

0.07

FRESCASA 3.1/2"
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES

m2
...

1.00

5%

SUBTOTAL MATERIALES

...

MANO DE OBRA
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

...

Dilatacion Plastica en Z

ML

- Dilatacion Plastica en Z
SUBTOTAL MATERIALES
NO APLICA
-

ml
...

1.00

0%

SUBTOTAL MATERIALES

...

NOP APLICA
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

...

MUROS EN BLOQUE DE CONCRETO


9.2.1
01D010
03A015
03C001
06M070
21B160

20H600

28A840

Muros en Bloque de Concreto de 19 cm de espesor, Tipo


Bloque de KREATO o INDURAL o equivalente, Color Gris liso
ARENA DE PENA
CEMENTO GRIS PORTLAND (50 kls)
CAL (10 kls)
BLOQUE CONCRETO 20 x 20 x 40 COLOR GRIS
TOXEMENT POLVO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
CORTADORA DE LADRILLO
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

40 de 448

m2
M3
BTO
BTO
UND
KGR
...
% (M+MO)
...
DD
...
...
HR

0.03
0.25
0.02
12.50
0.25
0.2%
0.02

0.84

. . MATERIAL

9.2.2
01D010
03A015
03C001
06M070
21B160

20H600

28A840

UNIDAD

Muros en Bloque de Concreto de 12 cm de espesor, Tipo


Bloque de KREATO o INDURAL o equivalente, Color Gris liso
ARENA DE PENA
CEMENTO GRIS PORTLAND (50 kls)
CAL (10 kls)
BLOQUE CONCRETO 15 x 2 0 x 40 COLOR GRIS
TOXEMENT POLVO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
CORTADORA DE LADRILLO
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

CANTIDAD

m2
M3
BTO
BTO
UND
KGR
...
% (M+MO)
...
DD
...
...
HR

0.03
0.25
0.02
12.50
0.25
0.2%
0.02

0.84

REFUERZO CONFINAMIENTO
9.3.1
04C011
24A060

20H701

9.3.2
04C010
24A060

20H701

Grafil 5mm
Grafil 5mm
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acero PDR-60
HIERRO FIGURADO DE 60000 PSI
ALAMBRE NEGRO #18 (KG=111.11M)
SUBTOTAL MATERIALES
(no aplica)
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

kg
KGR
KGR
...

1.05
0.03

...
% (M+MO)
...

2.0%

...
Manejo
HR

0.02

kg
KGR
KGR
...

1.05
0.03

...
% (M+MO)
...

2.0%

...
Manejo
HR

0.02

CONFINAMIENTO y BORDILLOS
9.4.5
02A035
04U005
04U010

20H600

22G120

Bordillos para Apoyo Ventaneria de 15 x 20 cm en concreto


reforzado a la vista f'c=3000 psi Niv.+2.40 / + 6.10 / + 9.85
CONCRETO COMUN DE 3000 PSI DI
DISTANCIADOR P/COLUMNA 35mm
DISTANCIADOR P/PLACAS 35mm
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
FORMALETA DE MADERA

41 de 448

ml
M3
UND
UND
...
% (M+MO)
...
M2/M3

0.0315
0.0315
0.0315
3.0%
0.0341

. . MATERIAL
28A816
50D500
50B225
50F030

9.4.2
02A035
04U005
04U010

20H600

22G120
28A816
50D500
50B225
50F030

9.4.3
02A035
04U005
04U010

20H600

22G120
28A816
50D500
50B225
50F030

9.4.4
02A035
04U005
04U010

20H600

22G120
28A816
50D500

UNIDAD
HR
DIA
MES
DD
...

VIBRADOR A GASOLINA
PARAL PLANO CON PASADOR
ANDAMIO TUBULAR SECCION
FORCLAMPS METALICO C/TORNILLO
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

...
HR

Bordillos para Arranque Mamposteria de 15 x 20 cm en


concreto reforzado a la vista f'c=3000 psi
CONCRETO COMUN DE 3000 PSI DI
DISTANCIADOR P/COLUMNA 35mm
DISTANCIADOR P/PLACAS 35mm
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
FORMALETA DE MADERA
VIBRADOR A GASOLINA
PARAL PLANO CON PASADOR
ANDAMIO TUBULAR SECCION
FORCLAMPS METALICO C/TORNILLO
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Viga sobre Muro o Dientel de 15 x 20 cm en concreto


reforzado a la vista f'c=3000 psi
CONCRETO COMUN DE 3000 PSI DI
DISTANCIADOR P/COLUMNA 35mm
DISTANCIADOR P/PLACAS 35mm
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
FORMALETA DE MADERA
VIBRADOR A GASOLINA
PARAL PLANO CON PASADOR
ANDAMIO TUBULAR SECCION
FORCLAMPS METALICO C/TORNILLO
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Bordillos Cubierta de seccion <= 45 x 15 cm en


reforzado f'c=3500 psi
CONCRETO COMUN DE 3000 PSI DI
DISTANCIADOR P/COLUMNA 35mm
DISTANCIADOR P/PLACAS 35mm
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
FORMALETA DE MADERA
VIBRADOR A GASOLINA
PARAL PLANO CON PASADOR

42 de 448

concreto

CANTIDAD
0.0148
2.0000
0.0133
0.1190

1.29

ml
M3
UND
UND
...
% (M+MO)
...
M2/M3
HR
DIA
MES
DD
...
...
HR

0.0315
0.0315
0.0315
3.0%
0.0341
0.0148
2.0000
0.0133
0.1190

1.29

ml
M3
UND
UND
...
% (M+MO)
...
M2/M3
HR
DIA
MES
DD
...
...
HR

0.0315
0.0315
0.0315
3.0%
0.0341
0.0148
2.0000
0.0133
0.1190

1.29

ml
M3
UND
UND
...
% (M+MO)
...
M2/M3
HR
DIA

0.0675
0.0675
0.0675
3.0%
0.0730
0.0317
4.2857

. . MATERIAL
50B225
50F030

9.4.5

*
*

02A010
02A035
02A035
02A035
04U010
21D120
22G010
22G120
24C075

20H600

28A816
50F110
50F120

9.4.6
02A110

20H600

9.4.7
01D010
03A015

20H600

UNIDAD
MES
DD
...

ANDAMIO TUBULAR SECCION


FORCLAMPS METALICO C/TORNILLO
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

...
HR

Tapas Macizas Ductos Cubierta de 25 cm de espesor en


concreto reforzado f'c=3.000 psi
BOMBEO
DI
CONCRETO COMUN DE 4000 PSI DI
SOBRECOSTO GRAVILLA FINA
SOBRECOSTO FLUIDO
DISTANCIADOR P/PLACAS 35mm
DESENCOFRANTE
BOCEL 1/2 LUNA 15mm C/MACHO
MADERA ORDINARIA
PUNTILLA DE 2" C.C
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
VIBRADOR A GASOLINA
FORMALETA Entrepiso (Camilla+Cercha+Parales)
ALQUILER TORRE GRUA ( 2 unidades )
SUBTOTAL FORMALETA y EQUIPOS
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Estructura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

0.0285
0.2550

2.77

m2
M3
M3
M3
M3
UND
KGR
ML
M3
LBR
...
% (M+MO)
...
HR
M2/MES
MES/M3
...
...
HR

Dovelas en grouting
GROUTING 3000 PSI
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
(no aplica)
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

ml
M3
...
% (M+MO)
...

Refuerzo horizontal muros


ARENA DE PENA
CEMENTO GRIS PORTLAND (50 kls)
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
(no aplica)
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA
AA
Trasiego y
Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

ml
M3
BTO
...
% (M+MO)
...

43 de 448

CANTIDAD

0.2625
0.2625
0.2625
0.2625
6.0000
0.1200
0.9000
2.0000
0.6000
0.14%
1.0368
8.7987
0.0005

2.41

0.0095
1.3%

...
...
HR

0.11

0.0033
0.0209
2.7%

...
...
Manejo
HR

0.07

. . MATERIAL

9.4.8

50F120

UNIDAD

Anclaje : Perforacion + Inyeccin epoxico 3/8" L = 14.29 cm


ANCLAJE HILTI HI HY 150 ( 1car = 330 mml)
SUBTOTAL MATERIALES
DISPENSADOR
SUBTOTAL HERRAMIENTAS
TALADO PERCUTOR
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

und
Car
...
Und
...
DIA
...
...
HR

CANTIDAD

0.0255
0.0006
0.04

0.16

CUBIERTAS
BASES PARA IMPERMEABILIZACIONES
Pendientado y Afinado con Mortero Impermeabilizado,
espesor promedio e=6 cm, llenado con mortero y/o material
aliviandado, sobre Cubiertas Niv. +9.85

10.1.1
01D030
03A015
20H600
20H600
20H701

ARENA LAVADA DE PEA


CEMENTO GRIS PORTLAND (50 kls)
TOXEMENT POLVO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Pendientado y Afinado con Mortero Impermeabilizado,


espesor promedio e=6 cm, llenado con mortero y/o material
aliviandado, sobre Cubiertas Niv.+16.20

10.1.2
01D030
03A015
20H600
20H600
20H701

10.1.4
01D030
03A015
20H600
20H600
20H701

m2
M3
BTO
KGR
...
% (M+MO)
...
% (M+MO)
...
...
HR

M3
BTO
KGR
...
% (M+MO)
...
% (M+MO)
...

Mediacaa con Mortero Impermeabilizado Cubiertas


ARENA LAVADA DE PEA
CEMENTO GRIS PORTLAND (50 kls)
TOXEMENT POLVO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO

ml
M3
BTO
KGR
...
% (M+MO)
...
% (M+MO)
...

44 de 448

1.3%
0.6%

0.72

m2

ARENA LAVADA DE PEA


CEMENTO GRIS PORTLAND (50 kls)
TOXEMENT POLVO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

0.0464
0.2900
0.2900

...
HR

0.0464
0.2900
0.2900
1.3%
0.6%

0.72

0.0140
0.0870
0.0870
1.3%
0.6%

. . MATERIAL

UNIDAD

(El valor de los insumos incluye el transporte)


SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

...
HR

CANTIDAD

0.41

CUBIERTA LIVIANA

10.2.1

20H600
20H701

Panel Metalico para Cubierta , tipo sandwich, inyectado en


linea continua con poliuretano expandido de alta densidad (38
kg/m3) , cara externa preimpermeabilizada con una membrana
flexible de poliolefina termoplastica TPO y cara interna en lamina
de acero galvanizada prepintada, Tipo TECHMET DRY de
Metecno o equivalente. para Cubierta Principal Niv.+23.85

m2

Panel Metalico para Cubierta , tipo sandwich, inyectado en


linea continua con poliuretano expandido de alta densidad (38
kg/m3) , cara externa preimpermeabilizada con una membrana
flexible de poliolefina termoplastica TPO y cara interna en lamina
de acero galvanizada prepintada, Tipo TECHMET DRY de
Metecno

M2

1.00

UND
UND
...
% (MO)
...
% (MO)
...

3.00
2.00

Tornillos Traxxx 3
Tornillo Graxx 1
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

10.2.2

20H701

2.3%

0.62

Panel Metalico para Cubierta , tipo sandwich, inyectado en


linea continua con poliuretano expandido de alta densidad (38
kg/m3) , cara externa preimpermeabilizada con una membrana
flexible de poliolefina termoplastica TPO y cara interna en lamina
de acero galvanizada prepintada, Tipo TECHMET DRY de
Metecno o equivalente. para Cubierta Zona de Abastecimiento
Niv.+18.60

m2

Panel Metalico para Cubierta , tipo sandwich, inyectado en


linea continua con poliuretano expandido de alta densidad (38
kg/m3) , cara externa preimpermeabilizada con una membrana
flexible de poliolefina termoplastica TPO y cara interna en lamina
de acero galvanizada prepintada, Tipo TECHMET DRY de
Metecno

M2

1.00

UND
UND
...
% (MO)
...
% (MO)
...

3.00
2.00

20H600

...
HR

3.0%

Tornillos Traxxx 3
Tornillo Graxx 1
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

45 de 448

...
HR

3.0%
2.3%

0.62

. . MATERIAL

10.2.3

20H600
20H701

10.2.4

20H600
20H701

10.2.5

20H600
20H701

UNIDAD

CANTIDAD

Panel Metalico para Cubierta ,tipo sandwich, inyectado en linea


continua con poliuretano expandido de alta densidad (38
kg/m3) , cara externa preimpermeabilizada con una membrana
flexible de poliolefina termoplastica TPO y cara interna en lamina
de acero galvanizada prepintada, Tipo TECHMET DRY de
Metecno o equivalente. para Cubierta Garita Acceso Vehicular
Niv.+?

m2

Panel Metalico para Cubierta , tipo sandwich, inyectado en


linea continua con poliuretano expandido de alta densidad (38
kg/m3) , cara externa preimpermeabilizada con una membrana
flexible de poliolefina termoplastica TPO y cara interna en lamina
de acero galvanizada prepintada, Tipo TECHMET DRY de
Metecno

M2

1.00

UND
UND
...
% (MO)
...
% (MO)
...

3.00
2.00

Tornillos Traxxx 3
Tornillo Graxx 1
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Remate Cubierta en Aluminio 0.6mm cal. 24 desarrollo 610


mm pintada color Citrus SW 6906
Remate Cubierta en Aluminio 0.6mm cal. 24 desarrollo 610
mm pintada color Citrus SW 6906
Tornillos Traxxx 3
Tornillo Graxx 1
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Remate Borde Cubierta en Aluminio 0.6mm cal. 24 desarrollo


1.25 m pintada color Citrus SW 6906
Remate Cubierta en Aluminio 0.6mm cal. 24 desarrollo 610
mm pintada color Citrus SW 6906
Tornillos Traxxx 3
Tornillo Graxx 1
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

46 de 448

...
HR

3.0%
2.3%

0.62

ml
ml

1.00

UND
UND
...
% (MO)
...
% (MO)
...

1.00
1.00

...
HR

3.0%
2.3%

0.44

ml
ml

1.00

UND
UND
...
% (MO)
...
% (MO)
...

2.00
2.00

...
HR

3.0%
2.3%

0.78

. . MATERIAL

10.2.6

20H600
20H701

10.2.7

20H600
20H701

10.2.8

20H600
20H701

UNIDAD

Panel de Aluminio Liso Software 50 de Hunter Douglas o


equivalente, Color Verde Limon HD 7044, para Cubierta
Paseo Peatonal
Panel de Aluminio Liso Software 50 de Hunter Douglas o
equivalente, Color Verde Limon HD 7044
Tornillos Traxxx 3
Tornillo Graxx 1
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Panel de Aluminio Perforado Software 50 de Hunter Douglas o


equivalente, Color Verde Limon HD 7044, para Cubierta
Paseo Peatonal
Panel de Aluminio Liso Software 50 de Hunter Douglas o
equivalente, Color Verde Limon HD 7044
Tornillos Traxxx 3
Tornillo Graxx 1
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Canal en Aluminio 0.6mm cal. 24 desarrollo 100 cm pintada


color Verde, para Cubierta Paseo Peatonal
Canal en Aluminio 0.6mm cal. 24 desarrollo 100 cm pintada
color Verde,
Tornillos Traxxx 3
Tornillo Graxx 1
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

m2
M2

1.00

UND
UND
...
% (MO)
...
% (MO)
...

3.00
2.00

...
HR

10.3.1

47 de 448

3.0%
2.3%

0.62

m2
M2

1.00

UND
UND
...
% (MO)
...
% (MO)
...

3.00
2.00

...
HR

3.0%
2.3%

0.62

ml
ml

1.00

UND
UND
...
% (MO)
...
% (MO)
...

2.00
2.00

...
HR

CUBIERTA LIVIANA
Subtrato Liviano de Base Mineral (800 kg/m3 en seco), Volumen
de Aire minimo : 10%, P.H. 6 a 8, Conducitvidad electrica maxima
: 2 microsiemens, Capacidad de retencion de agua : entre 35 6
65%, Contenido maximo de materia organica : 15%, Espesor de3
Subtato : de 3 a 8 cm, para Cubiertas Verdes Niv. +18.67, Niv.
+20.53, Niv.+22.42 y Niv.+24.28

CANTIDAD

m3

3.0%
2.3%

0.73

. . MATERIAL

20H600
20H701

10.3.2

20H600
20H701

10.3.3

20H600
20H701

10.3.9

20H600
20H701

UNIDAD

Subtrato Liviano de Base Mineral (800 kg/m3 en seco), Volumen


de Aire minimo : 10%, P.H. 6 a 8, Conducitvidad electrica maxima
: 2 microsiemens, Capacidad de retencion de agua : entre 35 6
65%, Contenido maximo de materia organica : 15%
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Cubierta CU2 : Cubierta Verde Extensiva con Cobertura


Vegetal en AE Aeonium (Aedonium spp), 8 plantulas por m2,
para Cubiertas Verdes Niv.+16.20
AE Aeonium (Aedonium spp), 8 plantulas por m2
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Cubierta CU2 : Cubierta Verde Extensiva con Cobertura


Vegetal en MF Mani Forrajero (Arachis), 12 plantulas por m2,
para Cubiertas Verdes Niv.+16.20
MF Mani Forrajero (Arachis), 12 plantulas por m2
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Cubierta CU2 : Cubierta Verde Extensiva con Cobertura


Vegetal en FIL Filodendros (Phylodendrum spp), 5 plantulas
por m2, para Cubiertas Verdes Niv.+9.85
FIL Filodendros (Phylodendrum spp), 5 plantulas por m2
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

48 de 448

m3

...
% (M+MO)
...
% (M+MO)
...
...
HR

CANTIDAD

1.00

1.4%
0.6%

0.65

m2
und
...
% (M+MO)
...
% (M+MO)
...
...
HR

8.00
1.4%
0.6%

0.84

m2
und
...
% (M+MO)
...
% (M+MO)
...
...
HR

12.00
1.4%
0.6%

0.84

m2
und
...
% (M+MO)
...
% (M+MO)
...
...
HR

5.00
1.4%
0.6%

0.84

. . MATERIAL

10.3.13

20H600
20H701

UNIDAD

Cubierta CU2 : Cubierta Verde Extensiva con Cobertura vegetal


Tipo CES Cesped, para Cubierta Verde Niv.+16.20
Grama
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Cubierta CU1 : Gravilla Lavada suelta y/o compactada de


colores claros, rojos y amarillos combinada con triturados de
marmol, triturados de madera y materiales vegetales,
extendidada sobre la superficie de la cubierta conformando
figuras precolombinas de colores, segun diseo paisajistico.
Incluye Suministro, Extendida y Conformacion.

10.3.14

20H600
20H701

10.3.15

20H600
20H701

10.3.16

20H600
20H701

Gravilla Lavada de 3/4"


Triturado de marmol
ARENA LAVADA DE PEA
CEMENTO GRIS PORTLAND (50 kls)
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro y Siembra de Arbol CLE Clemon (Thespesia


populnea) de h=1.50 m
Arbol CLE Clemon (Thespesia populnea) de h=1.50 m
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro y Siembra de Arbol OV Olivo (Capparis


adoratissima) de h=1.50 m
Arbol OV Olivo (Capparis adoratissima) de h=1.50 m
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

49 de 448

CANTIDAD

m2
m2
...
% (M+MO)
...
% (M+MO)
...
...
HR

1.05
1.4%
0.6%

0.21

m2

m3
m3
M3
BTO
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.04
0.03
0.0112
0.0695
1.4%
0.6%

0.08

m2
und
...
% (M+MO)
...
% (M+MO)
...
...
HR

1.00
1.4%
0.6%

0.24

m2
und
...
% (M+MO)
...
% (M+MO)
...
...
HR

1.00
1.4%
0.6%

0.24

. . MATERIAL

10.3.17

20H600
20H701

10.3.18

20H600
20H701

10.3.19

20H600
20H701

10.3.20

20H600
20H701

UNIDAD

Suministro y Siembra de Arbol UVP Uva de Playa (Coccoloba


uvifera) de h=1.50 m
Arbol UVP Uva de Playa (Coccoloba uvifera) de h=1.50 m
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro y Siembra de Arbol TR Trupillo (Prosoposis


juliflora) de h=1.50 m
Arbol TR Trupillo (Prosoposis juliflora) de h=1.50 m
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro y Siembra de Arbol GM Gomo (Cordia dentata)


de h=1.50 m
Arbol GM Gomo (Cordia dentata) de h=1.50 m
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro y Siembra de Arbol PAV Palo Verde (Parkisonaria


acueta) de h=1.50 m
Arbol PAV Palo Verde (Parkisonaria acueta) de h=1.50 m
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

PAETE

50 de 448

CANTIDAD

m2
und
...
% (M+MO)
...
% (M+MO)
...
...
HR

1.00
1.4%
0.6%

0.24

m2
und
...
% (M+MO)
...
% (M+MO)
...
...
HR

1.00
1.4%
0.6%

0.24

m2
und
...
% (M+MO)
...
% (M+MO)
...
...
HR

1.00
1.4%
0.6%

0.24

m2
und
...
% (M+MO)
...
% (M+MO)
...
...
HR

1.00
1.4%
0.6%

0.24

. . MATERIAL

11.1.1
01D010
03A015
20H600
20H701

11.1.2
01D010
03A015
21B160
20H600
20H701

11.1.3
01D010
03A015
21B160
20H600
20H701

11.1.4
01D010
03A015
20H600
20H701

UNIDAD

Paete P-1 : Paete Corriente sobre Muros Interiores con


mortero M.1:4 y espesor e=2 cm
ARENA DE PENA
CEMENTO GRIS PORTLAND (50 kls)
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Paete P-3 : Paete Impermeabilizado sobre Muros


Exteriores con mortero impermeabilizado M.1:4 y espesor e=2
cm
ARENA DE PENA
CEMENTO GRIS PORTLAND (50 kls)
TOXEMENT POLVO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Paete Impermeabilizado Tanques de Agua M.1:4 e= 2 cm


ARENA DE PENA
CEMENTO GRIS PORTLAND (50 kls)
TOXEMENT POLVO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

Paete
Vanos
Ventanas
y
Puertas con mortero
impermeabilizado M:1:4 y espesor e=2 cm
ARENA DE PENA
CEMENTO GRIS PORTLAND (50 kls)
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

51 de 448

m2
M3
BTO
...
% (M+MO)
...
% (M+MO)
...
...
HR

m2
M3
BTO
KGR
...
% (M+MO)
...
% (M+MO)
...
...
HR

m2
M3
BTO
KGR
...
% (M+MO)
...
% (M+MO)
...
...
HR

CANTIDAD

0.0239
0.1494
1.3%
0.6%

0.47

0.0239
0.1494
0.1124
1.3%
0.6%

0.47

0.0239
0.1494
0.1124
1.3%
0.6%

0.47

ml
M3
BTO
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.00
0.01
3.0%
2.0%

0.27

. . MATERIAL

11.1.5
01D010
03A015
20H600
20H701

UNIDAD

Panete Filos y Dilataciones con mortero M.1:4 y espesor


e=2cm
ARENA DE PENA
CEMENTO GRIS PORTLAND (50 kls)
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

ml
M3
BTO
...
% (M+MO)
...
% (M+MO)
...
...
HR

CANTIDAD

0.00
0.01
1.4%
0.6%

0.12

REVESTIMIENTOS

Revestimiento T - 9 : Enchape en Porcelanato color Gris de


45 x 90
cm
para
Muros
Baos Publicos, Baos
Discapacitados, Baos VIP, Baos Oficinas y Cambiaderos.
(Incluye pega, biselada, win de remate en aluminio y
emboquillada)

12.1.1

12C100
21D235
03B001
20H600
20H701

PORCELANATO GRIS 45 x 90 cm
STONMIX LATEX
STONMIX BOQUILLA
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - 10 : Enchape en Ceramica Blanca de 30 x


30 cm para Muros Baos de Servicio y Vestieres. (Incluye
pega, biselada, win de remate en aluminio y emboquillada)

12.1.2
03B001
12G053
21D235
20H600
20H701

CEMENTO BLANCO (40kg)


PARED CORONA ARITICA BLANCA 30x30 cm
PEGACOR BLANCO/PEGALIT
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

12.1.3
03B001

Revestimiento T - 10 : Enchape en Ceramica Blanca de 30 x


30 cm para Muros Cocina y Cuartos de Aseo. (Incluye pega,
biselada, win de remate en aluminio y emboquillada)
CEMENTO BLANCO (40kg)

52 de 448

m2

M2
KGR
BTO
...
% (M+MO)
...
% (M+MO)
...
...
HR

1.0500
2.0000
0.0300
1.4%
0.6%

1.64

ml
BTO
M2
KGR
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.0200
1.0500
4.0000
1.4%
0.6%

0.86

ml
BTO

0.0200

. . MATERIAL

UNIDAD

12G053
21D235

M2
KGR
...
% (M+MO)
...
% (M+MO)
...

20H600
20H701

12.2.1

PARED CORONA ARITICA BLANCA 30x30 cm


PEGACOR BLANCO/PEGALIT
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - 7 : Revestimiento en Corian , color Sun de


12 mm, sobre estructura de aluminio oculta, Muros Baos
Publicos, Baos VIP, Baos Oficinas, Cambiaderos y Foyer

12C150
CORIAN Ref. SUN
21D460
- LITOFLEX K-80 (pegante)
21D470
- LITOSTUCK X-24 (emboquille)
SUBTOTAL MATERIALES
20H600
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
20H701
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - 8 : Revestimiento en Corian , color Gris


Sun de 12 mm, sobre estructura de aluminio oculta, Muros
Foyer
12C150
CORIAN Ref. SUN
21D460
- LITOFLEX K-80 (pegante)
21D470
- LITOSTUCK X-24 (emboquille)
SUBTOTAL MATERIALES
20H600
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
20H701
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
12.2.2

Revestimiento T - 7 Mesones : Superficie de Acabado en


Corian color Sun de 12 mm, ancho a=60 cm con estructura de
12.2.3
soporte en aluminio, Mesones Lavamanos Baos Publicos,
Baos VIP, Baos Oficias y Cambiaderos
12C150
CORIAN Ref. SUN
04R10
ANGULO ALUMINIO de 2"
21D460
- LITOFLEX K-80 (pegante)
21D470
- LITOSTUCK X-24 (emboquille)
SUBTOTAL MATERIALES
20H600
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
20H701
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO

53 de 448

...
HR

CANTIDAD
1.0500
4.0000
1.4%
0.6%

0.86

ML
M2
KG
KG
...
% (M+MO)
...
% (M+MO)
...
...
HR

1.0500

2.0000
0.0300
1.4%
0.6%

1.64

ML
M2
KG
KG
...
% (M+MO)
...
% (M+MO)
...
...
HR

1.0500

2.0000
0.0300
1.4%
0.6%

1.64

ML
M2
kg
KG
KG
...
% (M+MO)
...
% (M+MO)
...

0.7350
2.0000
2.0000
0.0300
1.4%
0.6%

. . MATERIAL

UNIDAD

(El valor de los insumos incluye el transporte)


SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

...
HR

Revestimiento T - 7 Mesones : Superficie de Acabado en


Corian color Sun de 12 mm, ancho a=60 cm con estructura de
soporte en aluminio, Mesones Caf Oficinas
12C150
CORIAN Ref. SUN
04R10
ANGULO ALUMINIO de 2"
21D460
- LITOFLEX K-80 (pegante)
21D470
- LITOSTUCK X-24 (emboquille)
SUBTOTAL MATERIALES
20H600
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
20H701
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
12.2.4

12.3.1
04R111
04R111
04R111
21B125
20H600
20H701

Revestimiento T - 1 : Revestimiento en Cristal Doble 6 mm +


6mm color Tangerrine colocado sobre estructura de aluminio
oculta, Muros Fachada
VIDRIO LAMINADO 6 + 6 mm color Tangerine
- Angulo de aluminio de 1.1/2" x 1/8" con pintura
- Buje de Teflon squas Tipo VEA Ref. P1Q
SILICONA ESTRUCTURAL
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - 2 : Revestimiento en Bandeja de Madera


Aglomerado enchapada en madera natural Abedul o Maio
Tropical, colocado sobre estructura de aluminio oculta, Muros
Foyer

12.3.2

04R111
04R111
04R111
20H600
20H701

Bandeja de Madera Aglomerado enchapada


natural Abedul o Maio Tropical
- Angulo de aluminio de 1.1/2" x 1/8" con pintura
- Buje de Teflon squas Tipo VEA Ref. P1Q
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

54 de 448

en

CANTIDAD

4.4047

ML
M2
kg
KG
KG
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.7350
2.0000
2.0000
0.0300
1.4%
0.6%

4.4047

m2
M2
kg
und
M2
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.05
3.8430
2.0000
1.00
1.0%
1.8%
0.0%
0.62

m2

madera
M2
kg
und
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.05
3.8430
2.0000
1.0%
1.8%
0.0%
0.62

. . MATERIAL

Revestimiento T - 5 : Revestimiento en Bandeja Metalwall


Hounter Douglas o equivalente , terminacin 7262 color Gris
Mineral Brillo 15%, junta abierta 6 mm, colocado sobre
estructura de aluminio oculta, Muros Pabellon de
Exposiciones

12.3.3

04R111
04R111
04R111
20H600
20H701

12.3.4
04R111
04R111
04R111
20H600
20H701

12.3.4
04R111
04R111
04R111
20H600
20H701

UNIDAD

Bandeja Metalwall Hounter Douglas terminacin 7262 color


Gris Mineral Brillo 15%, junta abierta 6 mm
- Angulo de aluminio de 1.1/2" x 1/8" con pintura
- Buje de Teflon squas Tipo VEA Ref. P1Q
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

Revestimiento T - 13 : Revestimiento Exterior en Chapa de


Aluminio de 3000 x 1500 x 3 mm perforada, colocado sobre
estructura de aluminio oculta, Muros Fachada Exterior
Chapa de Aluminio de 3000 x 1500 x 3 mm perforada,
- Angulo de aluminio de 1.1/2" x 1/8" con pintura
- Buje de Teflon squas Tipo VEA Ref. P1Q
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - 13 : Revestimiento Exterior en Chapa de


Aluminio de 3000 x 1500 x 3 mm perforada, colocado sobre
estructura de aluminio oculta, Muros Fachada Exterior
Chapa de Aluminio de 3000 x 1500 x 3 mm perforada,
- Angulo de aluminio de 1.1/2" x 1/8" con pintura
- Buje de Teflon squas Tipo VEA Ref. P1Q
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

12.3.5
21D087

20H600

28A840

Revestimiento T - 14 : Revestimiento Acrilico sobre Muros


Exteriores, en Graniacryl o equivalente.
GRANYACRIL
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
EQUIPO MENOR
SUBTOTAL EQUIPO

55 de 448

CANTIDAD

m2

M2
kg
und
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.05
3.8430
2.0000
1.0%
1.8%
0.0%
0.62

m2
M2
kg
und
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.05
3.8430
2.0000
1.0%
1.8%
0.0%
0.62

m2
M2
kg
und
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.05
3.8430
2.0000
1.0%
1.8%
0.0%
0.62

m2
GLN
...
% (M+MO)
...
% (M+MO)
...

0.0700
1.0%
0.6%

. . MATERIAL

UNIDAD

(El valor de los insumos incluye el transporte)


SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA 1 Oficial
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - 16 : Revestimiento Bandejas de Aluminio


Exterior esp. 2.5 mm Tipo Hounter Douglas o equivalente ,
color 7320 Yema, pintura PDVF --2xl plus, colocado sobre
estructura de aluminio oculta, Caja de Acceso 1 y 2 Pabellon
Ferial

12.3.6

04R111
04R111
04R111
20H600
20H701

Bandejas de Aluminio Exterior esp. 2.5 mm Tipo Hounter


Douglas o equivalente , color 7320 Yema, pintura PDVF --2xl
plus,
- Angulo de aluminio de 1.1/2" x 1/8" con pintura
- Buje de Teflon squas Tipo VEA Ref. P1Q
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - ? : Revestimiento Curvo en Bandeja


Metalwall Hounter Douglas o equivalente , terminacin 7262
color Gris Mineral Brillo 15%, junta abierta 6 mm, colocado
sobre estructura de aluminio oculta, Tapaductos Columnas
Pabellon Exposiciones

12.3.7

04R111
04R111
04R111
20H600
20H701

Bandeja Metalwall Hounter Douglas terminacin 7262 color


Gris Mineral Brillo 15%, junta abierta 6 mm
- Angulo de aluminio de 1.1/2" x 1/8" con pintura
- Buje de Teflon squas Tipo VEA Ref. P1Q
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

Revestimiento T - ? : Revestimiento Zocalo Columnas Pabellon


Exposiciones Niv.+2.40 en Chapa Metalica de 1/8" color
Software SW7074 con aros de planchuela 3/6"x2" cada 20 cm.

12.3.8
04R111
04R111
04R111
04R111
20H600
20H701

Chapa Metalica de 1/8"


Aros de planchuela 3/6"x2"
- Angulo de aluminio de 1.1/2" x 1/8" con pintura
- Buje de Teflon squas Tipo VEA Ref. P1Q
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE

56 de 448

...
HR

CANTIDAD

0.31

m2

M2
kg
und
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.05
3.8430
2.0000
1.0%
1.8%
0.0%
0.62

m2

M2
kg
und
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.05
3.8430
2.0000
1.0%
1.8%
0.0%
0.62

m2
M2
UND
kg
und
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...

1.05
5.00
3.8430
2.0000
1.0%
1.8%
0.0%

. . MATERIAL

UNIDAD

MANO DE OBRA CUADRILLA DD Carpinteria


SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

HR

13.1.1

Afinado pisos con mortero M.1:3 e = 2 cm

m2

01D030

ARENA LAVADA DE PEA

03A015

CANTIDAD
0.62

SOLADOS
BASES

20H600
20H701

CEMENTO GRIS PORTLAND (50 kls)


SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

13.1.2

M3

0.0209

BTO
...
% (M+MO)
...
% (M+MO)
...

0.1307

...
HR

m2
M3

0.0294

BTO
...
% (M+MO)
...
% (M+MO)
...

0.1835

03A015

CEMENTO GRIS PORTLAND (50 kls)


SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Bordillo Duchas h=10 cm


ARENA DE PENA
CEMENTO GRIS PORTLAND (50 kls)
LADRILLO TOLETE MACIZO NATURAL 20x10x6
TOXEMENT POLVO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
CORTADORA DE LADRILLO
SUBTOTAL EQUIPO
MANO DE OBRA
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

ml
M3
BTO
UND
KGR
...
GLB
...
DD
...
...

Bordillo Pocetas de Aseo h=37 cm (maposteria+paete)


ARENA DE PENA
CEMENTO GRIS PORTLAND (50 kls)
LADRILLO TOLETE MACIZO NATURAL 20x10x6
TOXEMENT POLVO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS

ml
M3
BTO
UND
KGR
...
GLB
...

13.1.4
01D010
03A015
06M015
21B160

20H700

28A840

13.1.4
01D010
03A015
06M015
21B160

20H700

0.49

ARENA LAVADA DE PEA

20H701

0.6%

Pendientado Duchas con mortero impermeabilizado e=4 cm

01D030

20H600

1.4%

57 de 448

...
HR

1.4%
0.6%

0.6933

0.02
0.09
6.00
0.08
1.00
0.01

0.04
0.21
14.07
0.19
2.35

. . MATERIAL
28A840

UNIDAD
DD
...
...

CORTADORA DE LADRILLO
SUBTOTAL EQUIPO
MANO DE OBRA
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

CANTIDAD
0.01

SOLADOS
Solado S - 1 : Piso en Baldosa Matiz PHB fondo crema 60
x 60 Alfa. Incluye mortero 1:3, boquilla blanca, destronque (#36),
3 pulidas (#60,120,220) , para Foyer y Circulaciones Publico

12.2.1
01D030
03A015
03B001
06M104
20H600
20H701

ARENA LAVADA DE PEA


CEMENTO GRIS PORTLAND (50 kls)
STONMIX BOQUILLA
BALDOSA MATIZ PHB fondo crema 60x60 Alfa
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
PULIDA PISO
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 2 : Piso en Baldosa Matiz PHB fondo crema 60


x 60 Alfa Antideslizante. Incluye mortero 1:3, boquilla blanca,
destronque (#36), 3 pulidas (#60,120,220), para Accesos Foyer

12.2.2
01D030
03A015
03B001

06M104

20H600
20H701

13.2.5
12C120
20H600
20H701

ARENA LAVADA DE PEA


CEMENTO GRIS PORTLAND (50 kls)
STONMIX BOQUILLA
BALDOSA MATIZ PHB fondo crema 60x60 Alfa Antideslizante

SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
PULIDA PISO
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 5 : Piso en Madera Natural Multilaminada, Trafico


Pesado, terminado Abedul , para Auditorio
Piso en Madera Natural Multilaminada, Trafico Pesado,
terminado Abedul ,
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

58 de 448

m2
M3
BTO
KG
M2
...
% (M+MO)
...
% (M+MO)
...
M2
...
HR

0.0200
0.1254
0.2000
1.0500
1.4%
0.6%
1.0000
1.13

m2
M3
BTO
KG

0.0200
0.1254
0.2000

M2
...
% (M+MO)
...
% (M+MO)
...
M2
...
HR

1.0500
1.4%
0.6%
1.0000
1.13

m2
m2
...
% (M+MO)
...
% (M+MO)
...
...
HR

1.050
1.4%
0.6%

0.42

. . MATERIAL

13.2.6
12C120
20H600
20H701

Solado S - 8 : Piso en Alfombra de Rollo, Trafico Pesado,


para Oficinas Camara de Comercio
Alfombra de Rollo, Trafico Pesado
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 9 : Piso en Porcelanato color Gris de 45 x 90 cm


para Baos Publicos, Baos Discapacitados, Baos VIP, Baos
Oficinas y Cambiaderos. (Incluye pega y emboquillada)

13.2.7
12C100
21D235
03B001
20H600
20H701

13.2.8
03B001
12G053
21D235
20H600
20H701

PORCELANATO GRIS 45 x 90 cm para piso


STONMIX LATEX
STONMIX BOQUILLA
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 10 : Piso en Tableta de Gres Liso Tradicional


Sahara 22500377 30 x 30 Alfa o equivlaente Incluye pega y
emboquillada)
STONMIX BOQUILLA
TABLETA GRIS LISA SAHARA 30 x 30 ALFA
PEGACOR BLANCO/PEGALIT
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 11 : Piso en Tablon Porcelagres de 30 x 30 Alfa o


equivalente, para Duchas Vestieres.
Incluye pega y
emboquillada

13.2.9

03B001

12G053
21D235

20H600
20H701

UNIDAD

m2
m2
...
% (M+MO)
...
% (M+MO)
...
...
HR

TABLON PORCELAGRES 30 x 30 ALFA


PEGACOR BLANCO/PEGALIT
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO

59 de 448

1.050
1.4%
0.6%

0.42

m2
M2
KGR
BTO
...
% (M+MO)
...
% (M+MO)
...
...
HR

1.0500
2.0000
0.0300
1.4%
0.6%

1.64

ml
BTO
M2
KGR
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.2000
1.0500
4.0000
1.4%
0.6%

0.86

ml

BTO

STONMIX BOQUILLA

CANTIDAD

M2
KGR
...
% (M+MO)
...
% (M+MO)
...

0.2000
1.0500
4.0000
1.4%
0.6%

. . MATERIAL

UNIDAD

(El valor de los insumos incluye el transporte)


SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 12 : Piso en Loseta Liston en concreto Prepulida


40 x 40 Alfa o equivalente, para Espacio Publico Interior
Accesos y Paseo Peatonal. Incluye pega y emboquillada

13.2.10
03B001
12G053
21D235
20H600
20H701

13.2.11
03B001
12G053
21D235
20H600
20H701

13.2.12
03B001
12G053
21D235
20H600
20H701

STONMIX BOQUILLA
LOSETA LISTON PREPULID 40 x 40
PEGACOR BLANCO/PEGALIT
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 13 : Piso en Loseta Prefabricada en concreto


color AZUL sin Textura 40 x 40 Alfa o equivalente, para
Espacio Publico Interior Paseo Peatonal. Incluye pega y
emboquillada
STONMIX BOQUILLA
LOSETA PREFABRICADA CONCRETO AZUL 40 x 40
PEGACOR BLANCO/PEGALIT
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 14 : Piso en Loseta Prefabricada en concreto sin


Textura 40 x 40 Alfa o equivalente, para Espacio Publico
Interior Accesos y Paseo Peatonal. Incluye pega y
emboquillada
STONMIX BOQUILLA
LOSETA PREFABRICADA CONCRETO 40x40
PEGACOR BLANCO/PEGALIT
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

60 de 448

...
HR

CANTIDAD

0.86

ml
BTO
M2
KGR
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.2000
1.0500
4.0000
1.4%
0.6%

0.86

ml
BTO
M2
KGR
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.2000
1.0500
4.0000
1.4%
0.6%

0.86

ml
BTO
M2
KGR
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.2000
1.0500
4.0000
1.4%
0.6%

0.86

. . MATERIAL

Solado S - 15 : Piso Tecnico Elevado , conformado por un


sistema de soporte de altura regulable en aluminio y baldosas
removibles con un revestimiento antiesttico, para Oficinas
Camara de Comercio

13.2.13

12C120

20H600
20H701

Piso Tecnico Elevado , Incluye sistema de soporte de altura


regulable en aluminio y baldosas removibles con un
revestimiento antiesttico
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 16 : Capa de Rodadura para Estacionamientos :


Mezcla Densa en Caliente MDC-3 Asfalto 80-100, espesor e=6
cm. Iincluye Suministro, Extendida, Nivelacin y Compactacion

13.2.14

02A010

02A035

02A045

13.2.15
03B001
12G053
21D235
20H600
20H701

UNIDAD

Imprimacion con Asfalto Liquido MC-30. Incluye Suministro,


Barrido de Superficie y Riego
Riego de Liga con Emulsion Modificada con Polimero CRR-1m.
Incluye Suministro, Barrido de Superficie y Riego
Mezcla Densa en Caliente MDC-3 Asfalto 80-100, para Capa de
Rodadura.
Iincluye
Suministro, Extendida, Nivelacin y
Compactacion
TOTAL UNITARIO

Solado S - 17 : Piso en Adoqun de concreto coloreado de


10 x 20 Alfa o equivalente. Incluye pega y emboquillada
STONMIX BOQUILLA
TABLETA GRIS LISA SAHARA 30 x 30 ALFA
PEGACOR BLANCO/PEGALIT
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 18 : Piso en Sika Floor 21 Purcem 6mm sin


areando. Color Azul RAL 5015 o equivalente7

13.2.16
21B140

20H600

Sika Floor 21

m2
...
% (M+MO)
...
% (M+MO)
...
...
HR

1.000

1.4%
0.6%

6.30

m2

m2

1.0000

m2

1.0000

m3

0.0600

ml
BTO
M2
KGR
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.2000
1.0500
4.0000
1.4%
0.6%

0.86

m2
13.45

...

HERRAMIENTAS MENORES

% (M+MO)

SUBTOTAL HERRAMIENTAS
20H701

m2

KGR

SUBTOTAL MATERIALES

CANTIDAD

0.5%

...

- Equipo Traciego y Transporte Vertical/Horizontal Obra


SUBTOTAL EQUIPO

% (M+MO)

0.5%

...

(El valor de los insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

MANO DE OBRA CUADRILLA AA Albaileria

61 de 448

HR

0.28

. . MATERIAL

UNIDAD

CANTIDAD

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

Guardaescoba Z4 : en tableta de gres de altura h=7


cm

13.2.21
03B001
12G053
21D235
20H600
20H701

Guardaescoba Z6
altura h=10 cm

01D030
03A015
03B001

06M104

20H600
20H701

BTO
UND
KGR
...
% (M+MO)
...
% (M+MO)
...

STONMIX BOQUILLA
LOCETA ETRUSCA ALFA 7 x 25 cm
PEGACOR BLANCO/PEGALIT
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

13.2.22

...
HR

en granito idem Baldosa Matiz , de

ARENA LAVADA DE PEA


CEMENTO GRIS PORTLAND (50 kls)
STONMIX BOQUILLA
GUARDAESCOBA 1/2 CAABALDOSA
fondo crema 30x30 Alfa

MATIZ

0.1353
4.0000
0.2800
1.4%
0.6%

0.64

ml

M3
BTO
KG

0.0040
0.0251
0.0400

ML

1.0500

PHB

SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
PULIDA PISO
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

13.4.1

ml

...
% (M+MO)
...
% (M+MO)
...
ML
...
HR

1.4%
0.6%
0.2000
0.85

Carcamo con Tapa en Concreto f'c=3.000 psi, de Seccion


0.94 x 0.45 m, segn detalles especificos DE-800 D-020,D-021,
D-022 Laboratorios Niv. -5.65 Sotano

ML
M3

0.1470

M3

0.1470

02A010

BOMBEO

02A035

CONCRETO COMUN DE 3000 PSI DI

DI

22G120

MADERA ORDINARIA

M3

0.1470

21B140

SIKAFLOR - 1 METAL TOP

KGR

0.7000

21B140

ANTISOL BLANCO

KGR

0.7000

01D010

ARENA DE PENA

M3

0.0149

03A015

CEMENTO GRIS PORTLAND (50 kls)

BTO

0.0777

06K042

LADRILLO TOLETE MACIZO NATURAL 26x12.5x6

UND

18.5500

04M001

ANGULO 3"x5/16"

KG

6.3560

SUBTOTAL MATERIALES
20H600

HERRAMIENTAS MENORES

% (M+MO)

SUBTOTAL HERRAMIENTAS

...

- Equipo Traciego y Transporte Vertical/Horizontal Obra

20H701
28A816

...

VIBRADOR A GASOLINA

% (M+MO)
HR

SUBTOTAL EQUIPO

...

62 de 448

1.4%
0.3%
1.2192

. . MATERIAL

UNIDAD

CANTIDAD

(El valor de los insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

MANO DE OBRA CUADRILLA AA Albaileria

HR

2.21

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

13.4.2
21B101
21B102
06V128
20H600
20H600
20H701
28A816

13.4.3
01D010
03A015
06K042
02A010
02A035
22G120
04I300
20H600
20H701
20H601
28A816

Topellantas Prefabricados en concreto fc=3.000 psi de 15 x


23 x 50 cm
ANCLAJE HILTI HI HY 150 ( 1car = 330 mml)
DISPENSADOR
TOPELLANTAS 15x23x50cm
HERRAMIENTAS MENORES
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
VIBRADOR A GASOLINA
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Sobrepiso para conformacion de andenes y separadores
interiores Niv.+2.40 y Niv.9.85. Incluye : Bloque No.5
acostado + Malla Electrosoldada M.1.31 + Torta de Concreto
e=5 cm f'c=3.000 psi.
ARENA DE PENA
CEMENTO GRIS PORTLAND (50 kls)
BLOQUE No. 5
STA.FE
BOMBEO
DI
CONCRETO COMUN DE 3000 PSI DI
MADERA ORDINARIA
MALLA ELECTROSOLDADA
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
ALLANADORA ALLEN
VIBRADOR A GASOLINA
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

13.4.4
01D030
03A015
06V111

20H600

Sardinel Prefabricado A-10 (800x200x500mm) Suministro, Instalacion y Mortero 3 cm de 2000 PSI


ARENA LAVADA DE PEA
CEMENTO GRIS PORTLAND (50 kls)
SARDINEL PREFABRIADO A-10 (800x20x500mm)
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE

63 de 448

Incluye

ML
Car
Und
UND
GLB
...
% (M+MO)
...
% (M+MO)
HR
...
...
HR

0.0510
0.0020
1.00
5.00
1.4%
0.6%
0.14

0.75

m2
M3
BTO
UND
M3
M3
M3
KG
...
% (M+MO)
...
% (M+MO)
DD
HR
...
...
HR

0.01
0.06
9.51
0.0525
0.0525
0.0525
2.42
1.4%
0.6%
0.0234
0.0000

0.84

ML
M3
BTO
UND
...
% (M+MO)
...
...
...

0.0078
0.0522
1.25
2.0%

. . MATERIAL

UNIDAD

MANO DE OBRA CUADRILLA


Refuerzo
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

AA

Trasiego y

CANTIDAD

Manejo
HR

0.66

IMPERMEABILIZACION
14.1.1
21B100
20H600
20H701

Impermeabilizacin Muro de Contencin con Cemento marino


liquido, tipo toxement o similar.
CEMENTO MARINO DENSO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Sistema de Impermeabilizacion Compuesto por Geotextil SIKA


PP - 2500 + Membrana SIKAPLAN 12 R + 2a capa Geotextil
SIKA PP 2500, para Cubierta Niv. +9.85

14.2.1
20H600
20H701

GEOTEXTIL SIKA PP 2500


1.80 x 100
SIKAPLAN 12 R MEMBRANA 1.55 x 20
SIKPLAN PERFIL DE FONDO
SIKAPLAN PERFIL DE BORDE
ARANDELA FIJACION SIKAPLAN
KIT SOLDADURA SIKAPLAN
HERRAMIENTAS MENORES
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Sistema de Impermeabilizacion Compuesto por Geotextil SIKA


PP - 2500 + Membrana SIKAPLAN 12 R + 2a capa Geotextil
SIKA PP 2500, para Cubierta Transitable Niv.+16.20

14.2.2
20H600
20H701

GEOTEXTIL SIKA PP 2500


1.80 x 100
SIKAPLAN 12 R MEMBRANA 1.55 x 20
SIKPLAN PERFIL DE FONDO
SIKAPLAN PERFIL DE BORDE
ARANDELA FIJACION SIKAPLAN
KIT SOLDADURA SIKAPLAN
HERRAMIENTAS MENORES
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)

64 de 448

m2
KGR
...
% (M+MO)
...
% (M+MO)
...
...
HR

1.1000
1.4%
0.6%

0.41

m2
Rollo
Rollo
ML/M2
ML/M2
UND/M2
UND/M2
GLB/M2
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.0111
0.0323
0.2874
0.2874
1.0000
0.0003
4.42
1.4%
0.6%

0.73

m2
Rollo
Rollo
ML/M2
ML/M2
UND/M2
UND/M2
GLB/M2
...
% (M+MO)
...
% (M+MO)
...

0.0111
0.0323
0.2874
0.2874
1.0000
0.0003
4.42
1.4%
0.6%

. . MATERIAL

UNIDAD

SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Sistema de Impermeabilizacion Compuesto por Geotextil SIKA


PP - 2500 + Membrana SIKAPLAN 12 R + 2a capa Geotextil
SIKA PP 2500, para Cubierta Niv. +18.60

14.2.3
20H600
20H701

GEOTEXTIL SIKA PP 2500


1.80 x 100
SIKAPLAN 12 R MEMBRANA 1.55 x 20
SIKPLAN PERFIL DE FONDO
SIKAPLAN PERFIL DE BORDE
ARANDELA FIJACION SIKAPLAN
KIT SOLDADURA SIKAPLAN
HERRAMIENTAS MENORES
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Sistema de Impermeabilizacion Compuesto por Geotextil SIKA


PP - 2500 + Membrana SIKAPLAN 12 R + 2a capa Geotextil
SIKA PP 2500, sobre Cubierta Metalica Principal Niv. +23.85

14.2.4
20H600
20H701

GEOTEXTIL SIKA PP 2500


1.80 x 100
SIKAPLAN 12 R MEMBRANA 1.55 x 20
SIKPLAN PERFIL DE FONDO
SIKAPLAN PERFIL DE BORDE
ARANDELA FIJACION SIKAPLAN
KIT SOLDADURA SIKAPLAN
HERRAMIENTAS MENORES
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Sistema de Impermeabilizacion Compuesto por Geotextil SIKA


PP - 1800 + Membrana SIKAPLAN 12 NTR + LAMINA SIKA
DRENAJE 32 t, para Cubierta Verde Niv. +16.20

14.3.1

GEOTEXTIL SIKA PP 1800


1.80 x 100
SIKAPLAN 12 NTR MEMBRANA 1.55 x 20
SIKA DRENAJE 32t LAMINA
SIKPLAN PERFIL DE FONDO
SIKAPLAN PERFIL DE BORDE
ARANDELA FIJACION SIKAPLAN
KIT SOLDADURA SIKAPLAN
HERRAMIENTAS MENORES

65 de 448

...
HR

CANTIDAD

0.73

m2
Rollo
Rollo
ML/M2
ML/M2
UND/M2
UND/M2
GLB/M2
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.0111
0.0323
0.2874
0.2874
1.0000
0.0003
4.42
1.4%
0.6%

0.73

m2
Rollo
Rollo
ML/M2
ML/M2
UND/M2
UND/M2
GLB/M2
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.0111
0.0323
0.2874
0.2874
1.0000
0.0003
4.42
1.4%
0.6%

0.73

m2

Rollo
Rollo
M2
ML/M2
ML/M2
UND/M2
UND/M2
GLB/M2

0.0056
0.0323
1.0000
0.2874
0.2874
1.0000
0.0003
4.42

. . MATERIAL

20H600

20H701

UNIDAD

SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Sistema de Impermeabilizacion Compuesto por : Geotextil SIKA


PP - 1800 + Membrana SIKAPLAN 12 NTR + SIKAPLAN
12NT, para Tanques de Agua

14.4.1
20H600
20H701

GEOTEXTIL SIKA PP 1800


1.80 x 100
SIKAPLAN 12 NTR MEMBRANA 1.55 x 20
SIKAPLAN 12 NT MEMBRANA 1.55 x 1
SIKPLAN PERFIL DE FONDO
SIKAPLAN PERFIL DE BORDE
ARANDELA FIJACION SIKAPLAN
KIT SOLDADURA SIKAPLAN
HERRAMIENTAS MENORES
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Sistema de Impermeabilizacion Compuesto por Geotextil SIKA


PP - 1800 + Membrana SIKAPLAN 15 PR , para Fosos y
Pozos

14.4.2
20H600
20H701

GEOTEXTIL SIKA PP 1800


1.80 x 100
SIKAPLAN 15 NTR MEMBRANA 1.55 x 20
SIKAPLAN 15 NT MEMBRANA 1.55 x 1
SIKPLAN PERFIL DE FONDO
SIKAPLAN PERFIL DE BORDE
ARANDELA FIJACION SIKAPLAN
KIT SOLDADURA SIKAPLAN
HERRAMIENTAS MENORES
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA Albaileria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

CIELORRASOS

66 de 448

...
% (M+MO)
...
% (M+MO)
...
...
HR

CANTIDAD

1.4%
0.6%

0.71

m2
Rollo
Rollo
Rollo
ML/M2
ML/M2
UND/M2
UND/M2
GLB/M2
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.0056
0.0323
0.6452
0.2874
0.2874
1.0000
0.0003
4.41
1.4%
0.6%

0.67

m2
Rollo
Rollo
Rollo
ML/M2
ML/M2
UND/M2
UND/M2
GLB/M2
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.0056
0.0323
0.6452
0.2874
0.2874
1.0000
0.0003
4.41
1.4%
0.6%

0.67

. . MATERIAL

UNIDAD

Cielorraso Falso CR - 1 : en Placa Plana Cementicia


Simple, Tipo Superboard o equivalente, espesor e=6 mm, con
acabado en Estuco Plastico + Pintura Latex color blanco

17.1.1

20H600
20H701

LAMINA SUPERBOARD 1.22x2.44 6 mm


PERFILERIA PARAL/CANAL c/60cm
TORNILLO AUTOPERFORANTE
CORDON SELLANTE ELASTOMERICO
ESTUCO PLASTICO
VINILO BLANCO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Cielorraso Falso CR - 2 : en Placa Plana Cementicia


Doble, Tipo Superboard o equivalente, espesor e=12 mm, con
acabado en Estuco Plastico + Pintura Latex color blanco

17.1.2

20H600
20H701

LAMINA SUPERBOARD 1.22x2.44 12 mm


PERFILERIA PARAL/CANAL c/60cm
TORNILLO AUTOPERFORANTE
CORDON SELLANTE ELASTOMERICO
ESTUCO PLASTICO
VINILO BLANCO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Cielorraso Falso CR - 16 : en Placa Plana Cementicia


Simple, Tipo Superboard o equivalente, espesor e=6 mm, con
acabado en Estuco Plastico + Pintura Latex color blanco, con
aislamiento acustico en fibra de vidrio con velo negro esp.3",
para cuarto grupo electrogeno

17.1.3

20H600
20H701

LAMINA SUPERBOARD 1.22x2.44 6 mm


PERFILERIA PARAL/CANAL c/60cm
TORNILLO AUTOPERFORANTE
CORDON SELLANTE ELASTOMERICO
ESTUCO PLASTICO
VINILO BLANCO
AISLANTE ACUSTIVO BACK THEATHER 1"
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)

67 de 448

CANTIDAD

m2

UND
ML
UND
ML
M2
GLN
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.39
1.72
6.00
2.00
1.0500
0.0700
1.5%
0.6%

0.6801

m2

UND
ML
UND
ML
M2
GLN
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.39
2.58
9.00
2.00
1.0500
0.0700
1.5%
0.6%

1.11

m2

UND
ML
UND
ML
M2
GLN
M2
...
% (M+MO)
...
% (M+MO)
...

0.39
1.72
6.00
2.00
1.0500
0.0700
1.0500
1.6%
0.6%

. . MATERIAL

UNIDAD

SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Cielorraso Falso CR - 7 : en Panel Curvo de Lamina de


Aluminio
Microperforada ,
color
Goldfinch SW 6905,
suspendido con sistema de perfileria oculta tipo Hunter Douglas
o equivalente. Pabellon de Exposiciones

17.1.4

04R111
04R111
04R111
20H600
20H701

17.1.5
04R111
04R111
04R111
20H600
20H701

Panel Curvo de Lamina de Aluminio Microperforada , color


Goldfinch SW 6905
- Angulo de aluminio de 1.1/2" x 1/8" con pintura
- Buje de Teflon squas Tipo VEA Ref. P1Q
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

Cielorraso Falso CR - 8 : en Panel custico de Aluminio colort


Software SW7074, suspendido con sistema de perfileria oculta.
Recinto Ampliacion Ferial
Panel custico de Aluminio colort Software SW7074
- Angulo de aluminio de 1.1/2" x 1/8" con pintura
- Buje de Teflon squas Tipo VEA Ref. P1Q
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

...
HR

CANTIDAD

0.6801

m2

M2
kg
und
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.05
3.8430
2.0000
0.7%
0.0%
0.0%
1.11

m2
M2
kg
und
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.05
3.8430
2.0000
0.8%
0.0%
0.0%
1.11

VENTANERIA
VENTANAS EXTERIORES
Ventana AE01a - V1 + V5
1.62 x 15.20 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-4 +
Ch 3/16" o equivalente. Fachada Paseo Peatonal. (Son 4 Und)

18.1.1

Perfileria Sistema NS254 + Ch 3/16" Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
-

20H600

68 de 448

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...

2.0%

. . MATERIAL

UNIDAD

20H701

% (M+MO)
...
% (M+MO)
...
HR

- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE01b - V1 + V5
1.62 x 12.78 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-4 +
Ch 3/16" o equivalente. Fachada Paseo Peatonal (Son 8 Und)

18.1.2

Perfileria Sistema NS254 + Ch 3/16" Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

Ventana AE01c - V1 + V5
1.62 x 15.20 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-4 +
Ch 3/16" o equivalente. Fachada Paseo Peatonal (Son 2 Und)

18.1.3

Perfileria Sistema NS254 + Ch 3/16" Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

18.1.4

3.0%
1.0%
3.6448

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

Ventana AE01d - V1 + V5
1.62 x 12.78 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-4 + Ch
3/16" o equivalente. Fachada Via 40 (Son 2 Und)

m2

Perfileria Sistema NS254 + Ch 3/16" Aluminio Duranar Arcadia


Silver

M2

69 de 448

CANTIDAD

2.0%
3.0%
1.0%
3.6448

1.0000

. . MATERIAL

20H600
20H701

UNIDAD

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +


- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 12b - V1
3.24 x 14.15 m
Vidrio Solarban
60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12
mm + Incoloro 6mm HS. Sistema NS25-5 + Ch 1/16" o
equivalente. Fachada Via 40 (Son 1 Und)

18.1.5

Perfileria Sistema NS25-5 + Ch 1/16" Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

18.1.6

20H600
20H701

Puerta Pivotante AE 12b - V1


2.44 x 2.45 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Fachada Via 40 (Son 1 Und)
- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS
+ Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

70 de 448

M2
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

CANTIDAD

1.0000

2.0%
3.0%
1.0%
3.6448

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

und
M2

5.9780

M2

5.9780

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
21.7887

. . MATERIAL

UNIDAD

Ventana AE 13b - V1 + V5
4.86 x 7.75 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS.Sistema NS25-6 + Ch
1/8" o equivalente. Fachada Paseo Peatonal (Son 2 Und)

18.1.7

Perfileria Sistema NS25-6 + Ch 1/8" Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS
- + Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

Ventana AE 14b - V1 + V5
3.24 x 7.75 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-6 +
Ch 1/8" o equivalente.
Fachada Paseo Peatonal (Son 2 Und)

18.1.8

Perfileria Sistema NS25-6 + Ch 1/8" Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

Ventana AE 15a - V1 + V5
0.76 x 15.20 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-4 +
Ch 1/16" o equivalente. Fachada Via 40 (Son 3 Und)

18.1.9

Perfileria Sistema NS25-4 + Ch 1/16"Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
-

20H600
20H701

71 de 448

CANTIDAD

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

. . MATERIAL

UNIDAD

CANTIDAD

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

Ventana AE 15b - V1 + V5
0.50 x 7.50 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-4 o
equivalente. Fachada Via 40 (Son 1 Und)

18.1.10

20H600
20H701

- Perfileria Sistema NS25-4 Aluminio Duranar Arcadia Silver


Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS
- + Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 17a - V1
14.60 x 4.74 m
Vidrio Solarban
60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12
mm + Incoloro 6mm HS. Sistema NS25-6 + Ch 1/16" o
equivalente. Acceso (Son 2 Und)

18.1.11

Perfileria Sistema NS25-6 + Ch 1/16" Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS
+ Separador 12 mm + Incoloro 6mm HS
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

18.1.12

20H600
20H701

Puerta Pivotante AE 17a - V1


2.44 x 2.45 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Fachada Paseo Peatonal (Son 4 Und)
- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS
+ Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA

72 de 448

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

und

M2

5.9780

M2

5.9780

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
21.7887

. . MATERIAL

UNIDAD

CANTIDAD

TOTAL UNITARIO

Ventana AE 17b - V1
14.60 x 6.99 m
Vidrio Solarban
60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12
mm + Incoloro 6mm HS. Sistema NS25-6 + Ch 1/4" o
equivalente. Acceso (Son 1 Und)

18.1.13

Perfileria Sistema NS25-6 + Ch 1/16" Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

18.1.14

20H600
20H701

18.1.15

20H600
20H701

Puerta Pivotante AE 17b - V1


2.40 x 2.45 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Fachada Paseo Peatonal (Son 4 Und)
- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 18 - V1 + V5
15.12 x 2.88 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-6 o
equivalente. Fachada Paseo Peatonal (Son 2 Und)
- Perfileria Sistema NS25-6 Aluminio Duranar Arcadia Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

73 de 448

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

und

M2

5.9780

M2

5.9780

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
21.7887

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

. . MATERIAL

18.1.16

20H600
20H701

18.1.17

20H600
20H701

18.1.18

20H600
20H701

UNIDAD

Ventana AE 19a - V1 + V5
1.62 x 7.75 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-6 o
equivalente. Fachada Paseo Peatonal (Son 1 Und)
- Perfileria Sistema NS25-6 Aluminio Duranar Arcadia Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 19b - V1 + V5
1.62 x 7.75 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-6 o
equivalente. Fachada Paseo (Son 1 Und)
- Perfileria Sistema NS25-6 Aluminio Duranar Arcadia Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta Pivotante AE 19b - V1


1.20 x 2.45 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Fachada Paseo Peatonal (Son 1 Und)
- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

74 de 448

CANTIDAD

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

und

M2

2.9400

M2

2.9400

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
0.0000

. . MATERIAL

18.1.19

20H600
20H701

UNIDAD

Ventana AE 21b - V1
1.70 x 6.70 m
Vidrio Solarban
60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12
mm + Incoloro 6mm HS. Sistema NS25-6 o equivalente. Paseo
Peatonal (Son 1 Und)
- Perfileria Sistema NS25-6 Aluminio Duranar Arcadia Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 22b - V1
7.49 x 6.70 m
Vidrio Solarban
60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12
mm + Incoloro 6mm HS. Sistema NS25-6 + Ch 1/4" Plaza
Comidas (Son 1 Und)

18.1.20

Perfileria Sistema NS25-6 + Ch 1/4" Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

18.1.21

20H600
20H701

Puerta Pivotante AE 22b - V1


2.40 x 2.15 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Fachada Paseo Peatonal (Son 1 Und)
- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

75 de 448

CANTIDAD

m2
M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

und

M2

5.9780

M2

5.9780

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
21.7887

. . MATERIAL

18.1.22

20H600
20H701

UNIDAD

Ventana AE 26 - V6
0.81 x 2.70 m
Vidrio Solarban 60VT
II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12 mm +
Traslucido 6mm HS. Sistema NS25-2 o equivalente. Plaza
Comidas (Son 15 Und)
- Perfileria Sistema NS25-2 Aluminio Duranar Arcadia Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS
+ Separador 12 mm + Traslucido 6mm HS
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 27b - V4 + V1
17.41 x 6.70 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm HS +
Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-6 +
Ch 1/8". Patio Expancion (Son 1Und)

18.1.23

Perfileria Sistema NS25-6 + Ch 1/8" Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm
- HS + Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban
60VT II 6mm HS#2 + PVB Opaco + Gris 4mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

Ventana AE 30d - V1 + V4
9.04 x 6.70 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-6 +
Ch 1/8". Patio Expansin (Son 1 Und)

18.1.26

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS
- + Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

76 de 448

CANTIDAD

m2
M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

. . MATERIAL

UNIDAD

Ventana AE 30d - V1 + V4
9.04 x 6.70 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-6 +
Ch 1/8". Patio Expansin (Son 1 Und)

18.1.26

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS
- + Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

Puerta Pivotante AE 30d - V1


2.40 x 2.45 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Patio Expansion (Son 2 Und)

18.1.27

20H600
20H701

- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver


Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Ventana AE 30e - V1 + V4
9.04 x 6.70 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-6 +
Ch 1/8". Patio Expansion (Son 1 Und)

18.1.28

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS
- + Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

77 de 448

CANTIDAD

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

und

M2

5.9780

M2

5.9780

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
21.7887

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

. . MATERIAL

UNIDAD

Ventana AE 31 - V1 + V5
3.24 x 7.75 m
Vidrio Solarban
60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12
mm + Incoloro 6mm HS + Vidrio Solarban 60VT II 6mm HS#2 +
PVB Opaco + Gris 4mm HS. Sistema NS25-6 + Ch 1/8".
Fachada Paseo (Son 1 Und)

18.1.29

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

Puerta Pivotante AE 31 - V1
1.62 x 2.45 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Fachada Paseo Pdeatonal (Son 1 Und)

18.1.30

20H600
20H701

- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver


Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 32 - V1
4.86 x 6.60 m
Vidrio Solarban
60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12
mm + Incoloro 6mm HS. Sistema NS25-6 + Ch 1/8".
(Son
1 Und)

18.1.31

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

78 de 448

CANTIDAD

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

und

M2

3.9690

M2

3.9690

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
14.4663

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

. . MATERIAL

UNIDAD

Ventana AE 33 - V1 + V5
6.48 x 7.75 m
Vidrio Solarban
60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12
mm + Incoloro 6mm HS + Vidrio Solarban 60VT II 6mm HS#2 +
PVB Opaco + Gris 4mm HS.
Sistema NS25-6 + Ch 1/8".
Fachada Paseo (Son 1 Und)

18.1.32

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II
6mm HS#2 + PVB Opaco + Gris 4mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

CANTIDAD

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

REJILLAS en ALUMINIO

18.2.1

20H600
20H701

18.2.2

20H600
20H701

Rejilla AE 60
7.20 x 0.90
Marco y Premarco en Perfiles
de alenacion de aluminio. Pao Fijo de Ventilacion de celosia a
45 con perfiles de aleneacion de aluminio, terminacion
anodizado natural. En el interior de las rejas se colocara un
mosquito de malla de aluminio. Sistema 3x1.1/2 + ES-ALN325. Servicios
- Perfileria Sistema 3x1.1/2 + ES-ALN-325
- Malla Mosquietero en Aluminio
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Rejilla AE 61
3.24 x 1.00
Marco y Premarco en Perfiles
de alenacion de aluminio. Pao Fijo de Ventilacion de celosia a
45 con perfiles de aleneacion de aluminio, terminacion
anodizado natural. En el interior de las rejas se colocara un
mosquito de malla de aluminio. Sistema 3x1.1/2 + ES-ALN-325.
Sala Maquinas
- Perfileria Sistema 3x1.1/2 + ES-ALN-325
- Malla Mosquietero en Aluminio
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION

79 de 448

und

M2
M2
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

6.29
6.29
1.0%
2.0%
1.0%
9.61

und

M2
M2
...
% (M+MO)
...
% (M+MO)

3.05
3.05
1.0%
2.0%

. . MATERIAL

UNIDAD

SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

18.2.3

20H600
20H701

18.2.4

20H600
20H701

18.2.5

20H600
20H701

Rejilla AE 62b
6.51 x 2.05
Marco y Premarco en Perfiles
de alenacion de aluminio. Pao Fijo de Ventilacion de celosia a
45 con perfiles de aleneacion de aluminio, terminacion
anodizado natural. En el interior de las rejas se colocara un
mosquito de malla de aluminio. Sistema 3x1.1/2 + ES-ALN-325.
Sala Maquinas
- Perfileria Sistema 3x1.1/2 + ES-ALN-325
- Malla Mosquietero en Aluminio
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Rejilla AE 63b
6.52 x 2.05
Marco y Premarco en Perfiles
de alenacion de aluminio. Pao Fijo de Ventilacion de celosia a
45 con perfiles de aleneacion de aluminio, terminacion
anodizado natural. En el interior de las rejas se colocara un
mosquito de malla de aluminio. Sistema 3x1.1/2 + ES-ALN-325.
Sala Maquinas
- Perfileria Sistema 3x1.1/2 + ES-ALN-325
- Malla Mosquietero en Aluminio
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Rejilla AE 64b 31.62 x 2.05


Marco y Premarco en Perfiles
de alenacion de aluminio. Pao Fijo de Ventilacion de celosia a
45 con perfiles de aleneacion de aluminio, terminacion
anodizado natural. En el interior de las rejas se colocara un
mosquito de malla de aluminio. Sistema 3x1.1/2 + ES-ALN-325.
Sala Maquinas
- Perfileria Sistema 3x1.1/2 + ES-ALN-325
- Malla Mosquietero en Aluminio
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria

80 de 448

...
% (M+MO)
...
HR

CANTIDAD

1.0%
4.65

und

M2
M2
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

12.16
12.16
1.0%
2.0%
1.0%
18.56

und

M2
M2
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

12.16
12.16
1.0%
2.0%
1.0%
18.57

und

M2
M2
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

53.49
53.49
1.0%
2.0%
1.0%
81.68

. . MATERIAL

UNIDAD

CANTIDAD

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

Rejilla AE 66
4.05 x 1.81
Marco y Premarco en Perfiles
de alenacion de aluminio. Pao Fijo de Ventilacion de celosia a
45 con perfiles de aleneacion de aluminio, terminacion
anodizado natural. En el interior de las rejas se colocara un
mosquito de malla de aluminio. Sistema 3x1.1/2 + ES-ALN-325.
Grupo electrogeno

18.2.6

20H600
20H701

- Perfileria Sistema 3x1.1/2 + ES-ALN-325


- Malla Mosquietero en Aluminio
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Rejilla AE 72
17.40 x 1.03
Marco y Premarco en Perfiles
de alenacion de aluminio. Pao Fijo de Ventilacion de celosia a
45 con perfiles de aleneacion de aluminio, terminacion
anodizado natural. En el interior de las rejas se colocara un
mosquito de malla de aluminio. Sistema 3x1.1/2 + ES-ALN-325.
Ventilacion Baos Interiores

18.2.7

20H600
20H701

- Perfileria Sistema 3x1.1/2 + ES-ALN-325


- Malla Mosquietero en Aluminio
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

und

M2
M2
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

6.43
6.43
1.0%
2.0%
1.0%
9.82

und

M2
M2
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

16.71
16.71
1.0%
2.0%
1.0%
25.51

VENTANAS INTERIORES
Ventana AI 1a - V3
14.60 x 4.67 m
Vidrio Solarban
60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm HS + Separador
12 mm + Incoloro 6mm HS. Acceso Foyer Nivel 3 (Son 2 Und)

18.3.1

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm
HS + Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
-

20H600
20H701

81 de 448

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

. . MATERIAL

UNIDAD

CANTIDAD

TOTAL UNITARIO
Puerta Pivotante AI 1a - V3
2.40 x 2.45 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Acceso Foyer Nivel 3. (Son 4 Und)

18.3.2

20H600
20H701

- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver


Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AI 1b - V3
14.60 x 6.70 m
Vidrio Solarban
60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm HS + Separador
12 mm + Incoloro 6mm HS. Acceso Foyer Nivel 1 (Son 1 und)

18.3.3

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm
HS + Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

18.3.4

20H600
20H701

Puerta Pivotante AI 1b - V3
2.40 x 2.45 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Acceso Foyer Nivel 1. (Son 4 Und)
- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

82 de 448

und

M2

5.9780

M2

5.9780

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
21.7887

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

und

M2

5.9780

M2

5.9780

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
21.7887

. . MATERIAL

UNIDAD

Ventana AI 10 - V3
3.24 x 1.00 m
Vidrio Solarban 60VT
II 6mm HS#2 + PVB 0.03 + Incoloro 4mm HS + Separador 12 mm
+ Incoloro 6mm HS. Cabina de Cobro Nivel 1
(Son 1 und)

18.3.5

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm
HS + Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

Ventana AI 11 - V3
16.40 x 6.00 m
Vidrio Solarban
60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm HS + Separador
12 mm + Incoloro 6mm HS. Acceso Bar Nivel 3 (Son 1 und)

18.3.6

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm
HS + Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

20H600
20H701

18.3.7

20H600
20H701

Puerta Pivotante AI 11 - V3
2.40 x 2.45 m
Vidrio
Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Acceso Bar Nivel 3. (Son 2 Und)
- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

83 de 448

CANTIDAD

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

m2

M2

1.0000

M2

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
3.6448

und

M2

5.9780

M2

5.9780

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0%
3.0%
1.0%
21.7887

. . MATERIAL

UNIDAD

CANTIDAD

CARPINTERIA METALICA
PUERTAS EXTERIORES CORTAFUEGO RF60
Marco y Premarco en
Chapa Galvanizada BWG No.22 galvanizado en caliente po
imersion. Terminacion imprimacion electrostatica. Las uniones
con pared deberan ser selladas con sellador a base de silicona
transparente. Hoja Batiente de chapa galvanizada BWG No.22
electrosoldada.
Panel sandwich 40mm de espesor. Doble
contacto. Relleno : aislante termico homologado segun ensayo.
Chapa de acero mas chapa de zinc en ambos lado de la chapa.
Guardapie de aluminio fijado con tornillo de acero galvanizado.
Rejilla de Ventilacion Superior minimo 1.20m . Bisagras : 3 piezas
galvanizadas ajustables por jamba. Superficie mate croamdo.
Terminacion 1 : imprimacion electrostatica (ambos lados). Burlete
de Neopreno en todo el perimetro.

19.1.1 a 19.1.7

04R050
04R052
04R053
23A001

20H600
20H701

19.1.1

LAMINA COLD ROLLED Cal.14 1x2m


BISAGRA PLANA 1"
SOLDADURA 1/8 Ref.6013
ANTICORROSIVO
AISLANTE T TERMICO
SELLO HERMETICO
SELLO CONTRA HUMOS
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta CE 01
1.26 x 2.45 m
Marco y Premarco en
Chapa Galvanizada BWG No.22 galvanizado en caliente po
imersion. Terminacion imprimacion electrostatica. Hoja Batiente
categoria RF60
de
chapa galvanizada BWG No.22
electrosoldada.
Panel sandwich 40mm de espesor. Doble
contacto. Relleno : aislante termico homologado segun ensayo.
Chapa de acero mas chapa de zinc en ambos lado de la chapa.
Guardapie de aluminio fijado con tornillo de acero galvanizado
- Puerta CE 01

1.26 x 2.45 m

M2

UND
UND
KG
GLN
M2
ML
ML
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.02
1.17
0.73
0.07
1.00
1.00
1.00
2.0%
3.0%
1.0%
12.59

M2

M2

3.09

TOTAL UNITARIO

19.1.3

Puerta CE 03a
1.62 x 2.45 m
Marco y Premarco en
Chapa Galvanizada BWG No.22 galvanizado en caliente po
imersion. Terminacion imprimacion electrostatica. Hoja Batiente
categoria RF60
de
chapa galvanizada BWG No.22
electrosoldada.
Panel sandwich 40mm de espesor. Doble
contacto. Relleno : aislante termico homologado segun ensayo.
Chapa de acero mas chapa de zinc en ambos lado de la chapa.
Guardapie de aluminio fijado con tornillo de acero galvanizado.
Rejilla de Ventilacion
- Puerta CE 03a

1.62 x 2.45 m

TOTAL UNITARIO

84 de 448

M2

M2

3.97

. . MATERIAL

19.1.4

UNIDAD

Puerta CE 03b
1.62 x 2.45 m
Marco y Premarco en
Chapa Galvanizada BWG No.22 galvanizado en caliente po
imersion. Terminacion imprimacion electrostatica. Hoja Batiente
categoria RF60
de
chapa galvanizada BWG No.22
electrosoldada.
Panel sandwich 40mm de espesor. Doble
contacto. Relleno : aislante termico homologado segun ensayo.
Chapa de acero mas chapa de zinc en ambos lado de la chapa.
Guardapie de aluminio fijado con tornillo de acero galvanizado.
Rejilla de Ventilacion
- Puerta CE 03b

1.62 x 2.45 m

CANTIDAD

M2

M2

3.97

TOTAL UNITARIO

19.1.5

Puerta CE 04
1.86 x 2.45 m
Marco y Premarco en
Chapa Galvanizada BWG No.22 galvanizado en caliente po
imersion. Terminacion imprimacion electrostatica. Hoja Batiente
categoria RF60
de
chapa galvanizada BWG No.22
electrosoldada.
Panel sandwich 40mm de espesor. Doble
contacto. Relleno : aislante termico homologado segun ensayo.
Chapa de acero mas chapa de zinc en ambos lado de la chapa.
Guardapie de aluminio fijado con tornillo de acero galvanizado
- Puerta CE 04

1.86 x 2.45 m

M2

M2

4.56

TOTAL UNITARIO

19.1.8

Puerta CE 06
2.06 x 2.45 m
PORTON ENROLLABLE
RF60 en 1 hoja en lamas metalicas de chaoa galvanizada a 2
caras de 1mm de epesor. Relleno ignifugo segn ensayo y 63
mm de espesor total. Guias metalicas en "U" con sitema de
anclaje a pared. Cartelas laterales metalicas con rodamientos
para sujetar ehe de hoja sin muelles dimensionados. Activacion
mediante motor segun proveedor. La puerta abre y cierra
electricamente, al saltar la seal de incendio, cierra
automaticamente con velocidad constante
- Puerta CE 06

2.06 x 2.45 m

M2

M2

5.05

TOTAL UNITARIO

19.1.9

Puerta CE 07
1.86 x 2.10 m
Marco y Premarco en
Chapa Galvanizada BWG No.22 galvanizado en caliente po
imersion. Terminacion imprimacion electrostatica. Hoja Batiente
categoria RF60
de
chapa galvanizada BWG No.22
electrosoldada.
Panel sandwich 40mm de espesor. Doble
contacto. Relleno : aislante termico homologado segun ensayo.
Chapa de acero mas chapa de zinc en ambos lado de la chapa.
Guardapie de aluminio fijado con tornillo de acero galvanizado.
- Puerta CE 07

1.86 x 2.10 m

TOTAL UNITARIO

85 de 448

M2

M2

3.91

. . MATERIAL

19.2.1 a

19.2.24
04R050
04R052
04R053
23A001
23A001
23A001
20H600
20H701

19.2.1

UNIDAD

PUERTAS INTERIORES
Marco y Premarco en Chapa Galvanizada
BWG No.22 galvanizado en caliente po imersion. Terminacion
imprimacion electrostatica. Las uniones con pared deberan ser
selladas con sellador a base de silicona transparente. Hoja
Batiente de chapa galvanizada BWG No.22 electrosoldada.
Panel sandwich 40mm de espesor. Doble contacto. Relleno :
aislante termico homologado segun ensayo. Chapa de acero mas
chapa de zinc en ambos lado de la chapa. Guardapie de
aluminio fijado con tornillo de acero galvanizado. Rejilla de
Ventilacion Superior minimo 1.20m . Bisagras : 3 piezas
galvanizadas ajustables por jamba. Superficie mate croamdo.
Terminacion 1 : imprimacion electrostatica (ambos lados). Burlete
de Neopreno en todo el perimetro.
-

LAMINA COLD ROLLED Cal.18 1x2m


BISAGRA PLANA 1"
SOLDADURA 1/8 Ref.6013
PROCESO GALVANIZADO
ANTICORROSIVO
PINTURA ELECTROSTATICA
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta

C 01

1.86 x 2.10

- Puerta

C 01

1.86 x 2.10

Pasillos de Escape

CANTIDAD

M2

UND
UND
KG
UND
GLN
M2
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.45
1.43
0.88
2.45
0.07
1.90
2.0%
3.0%
1.0%
2.74

M2
M2

3.91

TOTAL UNITARIO

19.2.2

Puerta
C 02a
1.86 x 2.10
Manten.
- Puerta C 02a 1.86 x 2.10

Depositos, UTA, AA,

M2
M2

3.91

TOTAL UNITARIO

19.2.3

Puerta

C 03a

1.86 x 2.10

- Puerta

C 03a

1.86 x 2.10

Nivel 1

M2
M2

3.91

TOTAL UNITARIO

19.2.4

Puerta

C 03b

1.86 x 2.10

- Puerta

C 03b

1.86 x 2.10

Nivel 1

M2
M2

3.91

TOTAL UNITARIO

19.2.5

Puerta

C 03c

0.96 x 2.10

- Puerta

C 03c

0.96 x 2.10

Nivel 1

M2
M2

TOTAL UNITARIO

19.2.6

Puerta
C 04
de Rack

1.41 x 2.10

86 de 448

Cuarto electrico, Salas

M2

2.02

. . MATERIAL

- Puerta

UNIDAD

C 04

1.41 x 2.10

M2

CANTIDAD

2.96

TOTAL UNITARIO

19.2.7

Puerta

C 05

1.86 x 2.10

- Puerta

C 05

1.86 x 2.10

Acceso Cocina

M2
M2

3.91

TOTAL UNITARIO

19.2.8

Puerta

C 06

1.86 x 2.10

- Puerta

C 06

1.86 x 2.10

Cocina

M2
M2

3.91

TOTAL UNITARIO

19.2.9

Puerta

C 07

0.96 x 2.10

- Puerta

C 07

0.96 x 2.10

Cocina

M2
M2

2.02

TOTAL UNITARIO

Puerta
Cocina
- Puerta

19.2.10

C 08

0.96 x 2.10

C 08

0.96 x 2.10

Lavado, Vajillas, Deposito

M2
M2

2.02

TOTAL UNITARIO

19.2.11

Puerta

C 10

1.26 x 2.10

- Puerta

C 10

1.26 x 2.10

Salia Nucleo Escalera

M2
M2

2.65

TOTAL UNITARIO

Puerta
C 13
0.76 x 2.10
Camerinos, Control
0.76 x 2.10
- Puerta C 13

19.2.12

Deposito, Bao

M2
M2

1.60

TOTAL UNITARIO

Puerta
C 14
Servicio
- Puerta C 14

19.2.13

0.96 x 2.10

Baos Discapacitados,

0.96 x 2.10

M2
M2

2.02

TOTAL UNITARIO

19.3.1 a

19.3.8
04M001
04M002
04M003
04M004

CORTINAS ENRROLLABLES
Marco y Premarco en Perfiles de alenacion de aluminio. Hoja
Batiente bastidor de perfiles de aleacion de aluminio, terminado
anodizado natural, con tablero ciego compuesto por dos chapas
de aluminio espe. 1.25 mm CORTINA ENROLLABLE con perfiles
de aluminio de extrusion . Guas metalicas de seguridad de
80x60 cm. Perfil de aleacion de aluminio. Accionamiento : moor
semiblindado con alimentacion trifasica. Acople al eje de la
cortina mediant enganaje y contramarcha. Freno magnetico.
Eventual accionamiento manual.

M2

LAMINA ASTM A-36


SOLDADURA E-700X
TORNILLERIA SAE G-5
OCIGENO, ACETILENO, DISCOS

KG
KG
KG
KG

87 de 448

36.559
1.097
0.731
41.312

. . MATERIAL

UNIDAD

23A001
04M005

KG
KG
...
% (M+MO)
...
% (M+MO)
...
KG
...

36.559
36.687

m2

1.0000

HR / KG
HR / KG
HR / KG

2.116
1.895
0.259

20H600
20H701

- PROCESO GALVANIZADO
PINTURA
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
Sistema Automatico Apertura Puertas Industriales Saheco SF1000
MANO DE OBRA CUADRILLA AA Fabricacion
MANO DE OBRA CUADRILLA AA Montaje
MANO DE OBRA CUADRILLA AA Pintura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
-

19.3.1

Puerta C 25a

4.95 x 4.20 m

- Puerta C 25a

4.95 x 4.20 m

CORTINA ENROLLABLE

CANTIDAD

0.1%
0.9%
34.940

M2
M2

20.79

TOTAL UNITARIO

19.3.2

Puerta C 25b

6.21 x 4.20 m

- Puerta C 25b

6.21 x 4.20 m

CORTINA ENROLLABLE

M2
M2

26.08

TOTAL UNITARIO

19.3.3

Puerta C 25c

3.53 x 3.95 m

CORTINA ENROLLABLE

M2

- Puerta C 25c

3.53 x 3.95 m

Estacionamiento VIP

M2

13.94

TOTAL UNITARIO

Baranda B I1 Vacio Foyer y Oficinas , de altura h=1.05 m, en


en cristal templado de 8mm rrecto, anclado a viga metlica con
bujes en acero inoxidable y con pasamanos en acero inoxidable
mate de 1.1/2 y 3mm de espesor, anclado al vidrio mediante
cuello en varilla maciza de 5/8 y escudo de fijacin circular de
1.1/2x1.5 en acero inoxidable, segun detalles especificos

19.5.4

04R200
04R200
04R200
20H700
20H600
20H701

Perfil tubular en acero inoxidable 1.1/2"


Platina 1.1/2" x 1/4" acero inoxidable
Vidrio Templado de 8 mm
Anclajes y Herrajes
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

88 de 448

ML

ml
ml
m2
%
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.50
1.50
1.05
5%
2.0%
3.0%
1.0%
4.94

. . MATERIAL

19.5.4
04R200
04R200
04R200
20H700
20H600
20H701

19.5.5
04R200
04R200
04R200
20H700
20H600
20H701

19.5.4

20H600
20H701

19.6.1

UNIDAD

Baranda B 2 , para Escaleras Nucleos, de altura h=1.05 m,


con parales y tensores en platina de acero de 1.1/2" x 3/8" y
pasamanos en tuberia metalica de 1.1/2", pintado al horno
color mate RAL ?, con acabado de poliuretano catalizado con
propiedades ignfugas, Incluye Anclaje en lamina Calibre 10
doblada, embedida en placa y fijada con tornillos bristol de 1/4",
segun
detalles
Perfil tubular
enespecificos
acero inoxidable 1.1/2"
Guaya en Acero
Platina 1.1/2" x 1/4" acero inoxidable
Anclajes y Herrajes
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Baranda B 2 , para Vacios Espacio Publico, de altura h=1.05
m, con parales y tensores en platina de acero de 1.1/2" x 3/8"
y pasamanos en tuberia metalica de 1.1/2", pintado al horno
color mate RAL ?, con acabado de poliuretano catalizado con
propiedades ignfugas, Incluye Anclaje en lamina Calibre 10
doblada, embedida en placa y fijada con tornillos bristol de 1/4",
segun
detalles
Perfil tubular
enespecificos
acero inoxidable 1.1/2"
Guaya en Acero
Platina 1.1/2" x 1/4" acero inoxidable
Anclajes y Herrajes
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Baranda B E1 , para Zona Abastecimiento, de altura h=1.05 m,
con parales en platina de acero de 1.1/2" x 3/8" y pasamanos
en tuberia metalica de 1.1/2", pintado al horno color mate
RAL ?, con acabado de poliuretano catalizado con propiedades
ignfugas, Incluye Anclaje
en lamina Calibre 10 doblada,
embedida en placa y fijada con tornillos bristol de 1/4", segun
detalles
especificos
Perfil tubular
en acero inoxidable 1.1/2"
Platina 1.1/2" x 1/4" acero inoxidable
SOLDADURA 1/8 Ref.6013
ANTICORROSIVO
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta Sanitario de acero inoxidable, linea institucional sokoda o


similar, de 0.57x1.60 m, con cerrojo y gancho de ropa
LAMINA ACERO INOXIDABLE 1.22x2.44 cal. 18
ANCLAJES, SOLDADURA, ACETILENO, ETC.

89 de 448

CANTIDAD

ML
ml
ml
ml
%
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.00
2.91
1.00
5%
2.0%
3.0%
1.0%
2.75

ML
ml
ml
ml
%
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.00
2.91
1.00
5%
2.0%
3.0%
1.0%
2.75

ML
ml
ml
KG
GLN
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.00
3.00
0.45
0.03
2.0%
3.0%
1.0%
2.75

M2
UND
GLB

0.55
2.41

. . MATERIAL

UNIDAD

HERRAJES
Espuma Roff Insulation 1.20x0.60x3/4
Frescasa 2.5"
SUBTOTAL MATERIALES
Porcentaje Contrato

19.6.2

19.6.3

19.6.4

Tabique Mayor de acero inoxidable anclado a pared, linea


institucional sokoda o similar, de 1.40x1.60 m, instalado con
anclajes tipo sokoda
LAMINA ACERO INOXIDABLE 1.22x2.44 cal. 18
ANCLAJES, SOLDADURA, ACETILENO, ETC.
HERRAJES
Espuma Roff Insulation 1.20x0.60x3/4
Frescasa 2.5"
SUBTOTAL MATERIALES
Porcentaje Contrato

Tabique Lateral de acero inoxidable anclado a pared, linea


institucional sokoda o similar, de 0.86x1.60 m, instalado con
anclajes tipo sokoda
LAMINA ACERO INOXIDABLE 1.22x2.44 cal. 18
ANCLAJES, SOLDADURA, ACETILENO, ETC.
HERRAJES
Espuma Roff Insulation 1.20x0.60x3/4
Frescasa 2.5"
SUBTOTAL MATERIALES
Porcentaje Contrato

Tabique Central de acero inoxidable con apoyo a piso, linea


institucional sokoda o similar, de 0.26x1.80 m, instalado con
anclajes tipo sokoda
LAMINA ACERO INOXIDABLE 1.22x2.44 cal. 18
ANCLAJES, SOLDADURA, ACETILENO, ETC.
HERRAJES
Espuma Roff Insulation 1.20x0.60x3/4
Frescasa 2.5"
Porcentaje Contrato

19.6.5

Tabique Extremo de acero inoxidable anclado a muro, linea


institucional sokoda o similar, de 0.125x1.60 m, instalado con
anclajes tipo sokoda
LAMINA ACERO INOXIDABLE 1.22x2.44 cal. 18
ANCLAJES, SOLDADURA, ACETILENO, ETC.
HERRAJES
Espuma Roff Insulation 1.20x0.60x3/4
Frescasa 2.5"
Porcentaje Contrato

19.6.6

Division Orinal de acero inoxidable anclado a muro, linea


institucional sokoda o similar, de 0.46x1.48 m, instalado con
anclajes tipo sokoda
LAMINA ACERO INOXIDABLE 1.22x2.44 cal. 18
ANCLAJES, SOLDADURA, ACETILENO, ETC.
HERRAJES
Espuma Roff Insulation 1.20x0.60x3/4
Frescasa 2.5"

90 de 448

CANTIDAD

GLN
GLN
GLN

0.48
1.02
0.02

45%

M2
UND
GLB
GLN
GLN
GLN

1.70
7.49
1.50
3.18
0.08

45%

M2
UND
GLB
GLN
GLN
GLN

0.99
4.38
0.88
1.86
0.04

45%

M2
UND
GLB
GLN
GLN
GLN

0.57
2.52
0.50
1.07
0.03

45%

M2
UND
GLB
GLN
GLN
GLN

0.33
1.46
0.29
0.62
0.01

45%

M2
UND
GLB
GLN
GLN
GLN

0.43
1.90
0.38
0.81
0.02

. . MATERIAL

19.6.7
19.6.9

04R111
04R112
21B125
21B130
20H600
20H701

UNIDAD

Porcentaje Contrato

Divisones DUCHAS BAOS


Divisones y Puertas en Vidrio Templado 3 mm o Vidrio
Laminado (3+3 mm), con chapetas en acero inoxidable para
divisiones y con bisagra para puerta de vaiven en aluminio
anodizado negro, tipo Casma Ref. 51000/620 o equivalente

m2

VIDRIO TEMPLADO 6 mm INCOLORO


CHAPETAS SOPORTE DE VIDRIO
SILICONA ESTRUCTURAL
SAND BLASTING
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta Ducha de 0.90x2.00 m, sujetada a muro con bisagras


sencillas en acero inoxidable,, Tipo P5P1 de VEA y Cia., o
equivalente

19.6.7

- Puerta Ducha

de 0.90x2.00 m,

M2
UND
M2
M2
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

CANTIDAD

45%

1.05
4.00
1.00
1.00
2.0%
3.0%
1.0%
3.40

M2
M2

1.80

TOTAL UNITARIO

Puerta Ducha en Vidrio Laminado Blanco de 3+3 mm, de


0.70x2.00 m, sujetada a muro con bisagras sencillas en acero
inoxidable,, Tipo P5P1 de VEA y Cia., o equivalente

19.6.8

- Puerta Ducha

de 0.70x2.00 m,

M2
M2

1.40

TOTAL UNITARIO

Tabique Central Divisones Duchas en Vidrio Laminado Blanco


de 3+3 mm, de (1..20+0.20) x 2.00 m, adherida a miro con
silicona estructural, Tipo VEA y Cia, o equivalente

19.6.9

- Puerta Ducha

de (1.20 + 0.20) x 2.00 m,

M2
M2

2.80

TOTAL UNITARIO

CARPINTERIA MADERA
PUERTAS EN MADERA
Hojas en madera entamborada con alma de tablex, 2 laminas de
20.1.1 a 20.1. 9mm, mas refuerzo de 18mm, con acabado en lamina de alta
presion e=0.7 mm Tipo 2163 MT de Formica o equivalente, y con
bisagra de pivote, segun detalle especifico
-

Lamina Tablex 1.53x2.44x9mm


Lamina Formica Tangelo 1.22x2.44
PIEZA CEDRO CAQUETA
PEGANTE COLBON MADERA
BIZAGRA DE PIVOTE
TORNILLO PARA MADERA 8x2

91 de 448

M2

und
und
UND
GN
UND
UND

0.6911
0.8667
0.3931
0.1912
0.3333
7.5751

. . MATERIAL

20H600
20H701

20.2.1

20H600
20H701

20.2.2

20H600
20H701

20.2.3

UNIDAD

- PUNTILLA 1" SIN CABEZA


SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro, Instalacion y Acabado de Columnas Tipo 1


Fachada en Madera Laminada de seccion 0,25 x 0.60 x 15.80
m, con acabado en Majestic Plus resistente a rayos UV. La
madera sera : inmunizada al vacio, a la vista, sin beta blanca
(albura), sin medula, con nudos vivos y muertos sanos, fisuras <5
mm. Inlcuye Mano de Obra, Tornilleria, Herrajes y Transporte
- COLUMNAS MADERA LAMINADA 0.25x.0.60x15.80 m
- MAGESTIC PLUD
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro, Instalacion y Acabado de Columnas Tipo 2


Fachada en Madera Laminada de seccion 0,20 x 0.60 x 6.33
m, con acabado en Majestic Plus resistente a rayos UV. La
madera sera : inmunizada al vacio, a la vista, sin beta blanca
(albura), sin medula, con nudos vivos y muertos sanos, fisuras <5
mm. Inlcuye Mano de Obra, Tornilleria, Herrajes y Transporte
- COLUMNAS MADERA LAMINADA 0.25x.0.60x6.33 m
- MAGESTIC PLUD
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro, Instalacion y Acabado de Columnas Tipo 3


Fachada en Madera Laminada de seccion 0,20 x 0.60 x 11.92
m, con acabado en Majestic Plus resistente a rayos UV. La
madera sera : inmunizada al vacio, a la vista, sin beta blanca
(albura), sin medula, con nudos vivos y muertos sanos, fisuras <5
mm. Inlcuye Mano de Obra, Tornilleria, Herrajes y Transporte
- COLUMNAS MADERA LAMINADA 0.25x.0.60x11.92 m
- MAGESTIC PLUD

92 de 448

LIB
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

CANTIDAD
0.2580
2.0%
3.0%
1.0%
3.03

Und

M3
Gln/M3
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.3700
2.3700
2.0%
3.0%
1.0%
96.96

Und

M3
Gln/M3
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

0.9495
0.9495
2.0%
3.0%
1.0%
38.85

Und

M3
Gln/M3

1.7880
1.7880

. . MATERIAL

20H600

20H701

SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro, Instalacion y Acabado de Columnas Tipo 4


Fachada en Madera Laminada de seccion 0,20 x 0.60 x 11.92
m, con acabado en Majestic Plus resistente a rayos UV. La
madera sera : inmunizada al vacio, a la vista, sin beta blanca
(albura), sin medula, con nudos vivos y muertos sanos, fisuras <5
mm. Inlcuye Mano de Obra, Tornilleria, Herrajes y Transporte

20.2.4

20H600
20H701

- COLUMNAS MADERA LAMINADA 0.25x.0.60x11.92 m


- MAGESTIC PLUD
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

20.3.1

20H600
20H701

20.3.2

UNIDAD

MUEBLES DE MADERA
Muebles de Piso, en madera de aglomerado
tipo MDF de 2mm y listones de cedro, con acabado en triplex de
madera roble mallado natural
Mueble M - 01
L = 6.75
Recepcion Niv. -5.65
TRIPLEX PERILLO 2.44x1.22 4mm
LAMINA TABLEX 1.53x2.44x9mm
PIEZA CEDRO CAQUETA
PEGANTE COLBON MADERA
BIZAGRA COBRIZADA 3"
TORNILLO PARA MADERA 8x2
PUNTILLA 1" SIN CABEZA
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

MUEBLES DE MADERA
Muebles de Piso, en madera de aglomerado
tipo MDF de 2mm y listones de cedro, con acabado en triplex de
madera roble mallado natural
Mueble M - 02
L = 4.90
Recepcion Niv. +0.00
- TRIPLEX PERILLO 2.44x1.22 4mm
- LAMINA TABLEX 1.53x2.44x9mm
- PIEZA CEDRO CAQUETA

93 de 448

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

CANTIDAD

2.0%
3.0%
1.0%
73.15

Und

M3
Gln/M3
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

und
UND
UND
UND
GN
UND
UND
LIB
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

und
UND
UND
UND

1.7880
1.7880
2.0%
3.0%
1.0%
73.15

18.74
14.94
8.50
4.13
42.51
163.81
5.58
2.0%
3.0%
1.0%
61.10

13.60
10.85
6.17

. . MATERIAL

UNIDAD

20H600
20H701

PEGANTE COLBON MADERA


BIZAGRA COBRIZADA 3"
TORNILLO PARA MADERA 8x2
PUNTILLA 1" SIN CABEZA
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Mueble M - 03

L = 7.12

Recepcion Niv. +14.00

20H701

TRIPLEX PERILLO 2.44x1.22 4mm


LAMINA TABLEX 1.53x2.44x9mm
PIEZA CEDRO CAQUETA
PEGANTE COLBON MADERA
BIZAGRA COBRIZADA 3"
TORNILLO PARA MADERA 8x2
PUNTILLA 1" SIN CABEZA
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

20.3.4

20H600
20H701

3.00
30.86
118.91
4.05
2.0%
3.0%
1.0%
44.35

MUEBLES DE MADERA
Muebles de Piso, en madera de aglomerado
tipo MDF de 2mm y listones de cedro, con acabado en triplex de
madera roble mallado natural

20.3.3

20H600

GN
UND
UND
LIB
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

CANTIDAD

MUEBLES DE MADERA
Muebles de Piso, en madera de aglomerado
tipo MDF de 2mm y listones de cedro, con acabado en triplex de
madera roble mallado natural
Mueble M - 04
L = 2.64
Piso+Gabinete Cocineta Niv.
+14.00
TRIPLEX PERILLO 2.44x1.22 4mm
LAMINA TABLEX 1.53x2.44x9mm
PIEZA CEDRO CAQUETA
PEGANTE COLBON MADERA
BIZAGRA COBRIZADA 3"
TORNILLO PARA MADERA 8x2
PUNTILLA 1" SIN CABEZA
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

94 de 448

und
UND
UND
UND
GN
UND
UND
LIB
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

19.77
15.76
8.97
4.36
44.84
172.79
5.88
2.0%
3.0%
1.0%
64.45

und
UND
UND
UND
GN
UND
UND
LIB
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

9.07
7.23
4.11
2.00
20.57
79.27
2.70
2.0%
3.0%
1.0%
29.57

. . MATERIAL

20.3.5

20H600
20H701

20.4.1

20H600
20H701

20.4.2

20H600
20H701

UNIDAD

MUEBLES DE MADERA
Muebles de Piso, en madera de aglomerado
tipo MDF de 2mm y listones de cedro, con acabado en triplex de
madera roble mallado natural
Mueble M - 05
L = 4.68
Piso+Gabinete Cocineta Niv.
+19.25
TRIPLEX PERILLO 2.44x1.22 4mm
LAMINA TABLEX 1.53x2.44x9mm
PIEZA CEDRO CAQUETA
PEGANTE COLBON MADERA
BIZAGRA COBRIZADA 3"
TORNILLO PARA MADERA 8x2
PUNTILLA 1" SIN CABEZA
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta - Ventana LPV - 43 de 25.31 x 2.62 m Graderia


Cubierta : Estructura Metalica Soporte + Listones de Madera
segn detalle especifico
Listones de Madera Teka de 0.04x0.04x1.50 m
MAGESTIC PLUD
- Estructura Metalica de Soporte
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Banca Ducha Vestieres


: Estructura Metalica Soporte +
Listones de Madera segn detalle especifico
Listones de Madera Teka de 0.04x0.04x1.50 m
MAGESTIC PLUD
- Estructura Metalica de Soporte
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- EQUIPO FABRICACION
SUBTOTAL EQUIPO
TRANSPORTE
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA DD Carpinteria
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

95 de 448

CANTIDAD

und
UND
UND
UND
GN
UND
UND
LIB
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

16.08
12.82
7.29
3.55
36.46
140.52
4.79
2.0%
3.0%
1.0%
52.41

Und
UND
GLN
kg
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

21.00
0.0674
19.8947
2.0%
3.0%
1.0%
2.64

Und
UND
GLN
kg
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

8.40
0.0270
7.9579
2.0%
3.0%
1.0%
1.06

. . MATERIAL

UNIDAD

CANTIDAD

PORCELANA SANITARIA
21.1.1
12A101

21.1.2
21.1.2

21.1.3
12A103

21.1.4
12A103

21.1.5
12A104

Taza de Colgar a Muro CORONA ERIE 1.28 Entrada Posterior


Ref.030111001
Taza de Colgar a Muro CORONA ERIE 1.28 Entrada Posterior
Ref.030111001
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.3)
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Taza de Colgar a Muro CORONA ERIE 1.28 Entrada Posterior


para Minusvalidos
Taza de Colgar a Muro CORONA ERIE 1.28 Entrada Posterior
para Minusvalidos
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.3)
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

und
UND
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

UND
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

m2
UND
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
...

Orinal CORONA GOTTA Ref. 042111001


Orinal CORONA GOTTA Ref. 042111001
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.2)
TOTAL UNITARIO

m2
UND
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
...

96 de 448

1.06

und

Orinal CORONA GOTTA Entrada Posterior Ref. 043101001


Orinal CORONA GOTTA Entrada Posterior Ref. 043101001
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.2)
TOTAL UNITARIO

Lavamanos de Sobreponer CORONA MANANTIAL DUO Ref.


74110031
Suministro e Instalacion de Lavamanos de Sobreponer
CORONA MANANTIAL DUO Ref. 74110031, CON DESAGUE
Ref.931100001 y SIFON Ref. 93130001

1.0000

1.0000

1.06

1.0000

1.0000

m2
UND

1.0000

. . MATERIAL

UNIDAD

MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.6)
TOTAL UNITARIO

21.1.6
12A106

Lavamanos de Sobreponer en Acero Inoxidable


TRAMONTINA Ref. 43-AA-94108
LAVAPLATOS DE EMPOTRAR DE 60x40 cm EN ACERO
INOXIDABLE MARCA SOCODA
CON DESAGUE y SIFON
PARA LAVAPLATOS Ref.
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.5)
TOTAL UNITARIO

21.1.7
12A105

Lavamanos para Minusvalidos de colgar color blanco, marca ?


Ref. Aquajet A&A o equivalente, con desague y sifon.
LAVAMANOS PARA MINUSVALDIOS DE COLGAR COLOR
BLANCO MARCA HANDICAP Ref. Gr-01291 A&A
CON
DESAGUE Ref.931100001 y SIFON Ref. 93130001
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.5)
TOTAL UNITARIO

CANTIDAD

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
...

m2
UND

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
...

m2
UND

1.0000

...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
...

GRIFERIAS
21.2.1
12A118

21.2.2

Valvula de Sensor para Sanitario marca TOTO Ref. 5AA-TET


2LN-32-22 o equivalente, de igual calidad o superior
Fluxometro de Sensor para Sanitario marca Toto
Ref. 5AATET2LN-32 o equivalente, de igual calidad o superior
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.3)
TOTAL UNITARIO

Griferia Kit Valvula Descarga Alta Presion para Sanitario con


juego accesorios de conexin y boton de accionamiento
antivandalico, marca DOCOL Ref. 4-AA-1701510B

97 de 448

und
und
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...

und

1.0000

. . MATERIAL

12A117

21.2.3

12A119

UNIDAD

Griferia Kit Valvula Descarga Alta Presion para Sanitario con


juego accesorios de conexin y boton de accionamiento
antivandalico, marca DOCOL Ref. 4-AA-1701510B
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.3)
TOTAL UNITARIO

Griferia Kit Valvula Descarga Alta Presion para Sanitario


Minusvalidos, con juego de accesorios de conexin, boton de
accionamiento tipo palanca, marca ? Ref. PRESMMATIC
BENEFIT CHROME
Grifera para Sanitario Discapacitados, compuesta por:
Vlvula Antivandlica para sanitario, alta presin, Ref.
01021500, tipo Docol o equivalente, de igual calidad o superior.
Boton de accionamiento con palanca para discapacitados, para
vlvula de alta descarga, antivandlico, metlico cromado, Ref.
00184906, tipo Docol o equivalente, de igual calidad o superior.
Accesorios para sanitario de conexin posterior, Ref. 4-AATCDIC, tipo Docol o equivalente, de igual calidad o superior.

MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.3)
TOTAL UNITARIO

21.2.4
12A115

21.2.5
12A115

Valvula de Sensor para Orinal marca TOTO Ref. 5AA TEU


2LN-SS o equivalente, de igual calidad o superior
Valvula de Sensor para Orinal marca TOTO Ref. 5AA TEU
2LN-SS
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.2)
TOTAL UNITARIO

Valvula de Sensor para Orinal marca TOTO Ref. 5AA TEU


2LN-SS o equivalente, de igual calidad o superior
Valvula de Sensor para Orinal marca TOTO Ref. 5AA TEU
2LN-SS
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE

98 de 448

und

CANTIDAD

1.0000

% (M+MO)
...
% (M+MO)
...
% (M+MO)
...

und

und

1.0000

% (M+MO)
...
% (M+MO)
...
% (M+MO)
...

und
und

1.0000

% (M+MO)
...
% (M+MO)
...
% (M+MO)
...

und
und
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...

1.0000

. . MATERIAL

UNIDAD

CANTIDAD

MANO DE OBRA (se paga por el item 6.18.2)


TOTAL UNITARIO

21.2.6

12A117

21.2.7
12A116

21.2.8

12A122

Griferia Kit Valvula para Orinal, con juego de accesorios de


conexin y boton de accionamiento antivandalico, marca DOCOL
Ref. 4-AA-17015106 o equivalente
Griferia Kit Valvula para Orinal, con juego de accesorios de
conexin y boton de accionamiento antivandalico, marca DOCOL
Ref. 4-AA-17015106
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.3)
TOTAL UNITARIO

Griferia de Sensor para Lavamanos marca TOTO Ref. 5AATEL 5 CC10-CP o equivalente, de igual calidad o superior
Griferia de Sensor para Lavamanos marca TOTO Ref. 5AATEL 5 CC10-CP
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.6)
TOTAL UNITARIO

Griferia Antivandalica de Meson para Lavamanos Tipo Push


Cromada Metalica Ref. 91-AA-D02
Grifera para lavamanos, push antivandlica de mesa, en acero
inoxidable, Ref. 00108304, tipo Docol o equivalente, de igual
calidad o superior.
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.6)
TOTAL UNITARIO

21.2.9
12A116

Griferia de Sensor para Lavamanos Minusvalidos marca


TOTO Ref. 5AA-TEL 5 CC10-CP o equivalente, de igual calidad
o superior
Griferia de Sensor para Lavamanos Minusvalidos marca
TOTO Ref. 5AA-TEL 5 CC10-CP
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.6)

99 de 448

und

und

1.0000

% (M+MO)
...
% (M+MO)
...
% (M+MO)
...

und
und

1.0000

% (M+MO)
...
% (M+MO)
...
% (M+MO)
...

und

und

1.0000

% (M+MO)
...
% (M+MO)
...
% (M+MO)
...

und
und
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...

1.0000

. . MATERIAL

UNIDAD

CANTIDAD

TOTAL UNITARIO

21.2.10

Griferia Antivandalica para Ducha Tipo Push Cromada Metalica


Ref. DOCOL 171256406 con Poma Ref. DOCOL 171201106

und

12A116

Griferia Antivandalica para Ducha Tipo Push Cromada Metalica


Ref. DOCOL 171256406 con Poma Ref. DOCOL 171201106

und

MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.6)
TOTAL UNITARIO

Llave Terminales manguera para pocetas de aseo, Ref. BL9977-11, color Cromo-Blister , tipo Gricol o equivalente, de igual
calidad o superior

21.2.11

Llave Terminales manguera para pocetas de aseo y


vertederos de laboratorio, Ref. BL-9977-11, color Cromo-Blister ,
tipo Gricol o equivalente, de igual calidad o superior
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
MANO DE OBRA (se paga por el item 6.18.8)
TOTAL UNITARIO

12A121

1.0000

% (M+MO)
...
% (M+MO)
...
% (M+MO)
...

und

und

1.0000

% (M+MO)
...
% (M+MO)
...
% (M+MO)
...

ACCESORIOS
Dispensador para Papel Higienico, de sobreponer en la pared,
en acero inoxidable satinado 304, para rollo 200/400 m,
importado Ref. AA-8AA-845 o equivalente.

21.3.1

12A107

21.3.2

Dispensador para Papel Higienico, de sobreponer en la pared,


en acero inoxidable satinado 304, para rollo 200/400 m,
importado Ref. AA-8AA-845
CHAZO PLASTICO 1/4" ESTRIADO
TORNILLO 1.1/2"X11/4
HERRAMIENTAS MENORES
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

Dispensador de Jabon , para montar sobre la pared, Tipo


Manos Libres, carcasa en acero inoxidable satindo 304,
capacidad de 0.8 lit., alimentado por 6 pilas alcalinas de 1.5V,
importado Ref. AA-1-AA-RSD

100 de 448

und

UND

1.0000

UND
UND
GLB
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0000
2.0000
1.0000

und

0.32

. . MATERIAL

12A109

21.3.5
12A108

Caneca de sobreponer en la pared o divisin metlica, en acero


inoxidable satindo 304, con soportes para bolsa plastica,
capacidad de 14.5 lit., Nacional, Ref. 9-AA-330
CHAZO PLASTICO 1/4" ESTRIADO
TORNILLO 1.1/2"X11/4
HERRAMIENTAS MENORES
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

Gabinete para Toallas de papel, de sobreponer en la pared, en


acero inoxidable satinado 304, capacidad de 300 toalal toallas o
2 paquetes, con llave, importado Ref. Bobrick 3-AA-210B
o
equivalente

21.3.4

12A108

Dispensador de Jabon , para montar sobre la pared, Tipo


Manos Libres, carcasa en acero inoxidable satindo 304,
capacidad de 0.8 lit., alimentado por 6 pilas alcalinas de 1.5V,
importado Ref. AA-1-AA-RSD
CHAZO PLASTICO 1/4" ESTRIADO
TORNILLO 1.1/2"X11/4
HERRAMIENTAS MENORES
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

Caneca de sobreponer en la pared o divisin metlica, en acero


inoxidable satindo 304, con soportes para bolsa plastica,
capacidad de 14.5 lit., Nacional, Ref. 9-AA-330

21.3.3

12A108

UNIDAD

Dispensador de Toallas de papel, en acero inoxidable, para


montar sobre la pared, Tipo Bobrick Classic B-262 o
equivalente
CHAZO PLASTICO 1/4" ESTRIADO
TORNILLO 1.1/2"X11/4
HERRAMIENTAS MENORES
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

Percha en acero inoxidable Bobrick


Percha en acero inoxidable Bobrick
CHAZO PLASTICO 1/4" ESTRIADO
TORNILLO 1.1/2"X11/4
HERRAMIENTAS MENORES
MATERIALES

101 de 448

CANTIDAD

UND

1.0000

UND
UND
GLB
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0000
2.0000
1.0000

0.32

m2

UND

1.0000

UND
UND
GLB
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0000
2.0000
1.0000

0.32

m2

UND

1.0000

UND
UND
GLB
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

2.0000
2.0000
1.0000

m2
UND
UND
UND
GLB
...

0.32

1.0000
1.0000
1.0000
1.0000

. . MATERIAL

UNIDAD

NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

21.3.6
12A110

21.3.7
12A110

Barra de Seguridad Fija 60 cm para discapacitados en


acero inoxidable Ref. ?
Barra de Seguridad Fija 60 cm para discapacitados en
acero inoxidable Ref. ?
CHAZO PLASTICO 1/4" ESTRIADO
TORNILLO 1.1/2"X11/4
HERRAMIENTAS MENORES
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

Secador de Manos, carcasa en acero inoxidable satinado 304,


calibre 1.2mm, motor sin escobillas, sensor ajustable de 10 a 30
cm, indicador led de color, de salida de aie, importado, Ref. AA1-AA-1800SRA o equivlaente

21.3.8

12A112

Barra de Seguridad Abatible para Discapacitados en acero


inoxidable Ref. ?
Barra de Seguridad Abatible para Discapacitados en acero
inoxidable Ref. ?
CHAZO PLASTICO 1/4" ESTRIADO
TORNILLO 1.1/2"X11/4
HERRAMIENTAS MENORES
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

Secador de Manos, carcasa en acero inoxidable satinado 304,


calibre 1.2mm, motor sin escobillas, sensor ajustable de 10 a 30
cm, indicador led de color, de salida de aie, importado, Ref. AA1-AA-1800SRA
CHAZO PLASTICO 1/4" ESTRIADO
TORNILLO 1.1/2"X11/4
HERRAMIENTAS MENORES
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial

102 de 448

% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

CANTIDAD

0.32

Jgo
Jgo

1.0000

UND
UND
GLB
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

4.0000
4.0000
2.0000

0.32

Jgo
Jgo

1.0000

UND
UND
GLB
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

4.0000
4.0000
2.0000

0.32

Jgo

Jgo

1.0000

UND
UND
GLB
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

4.0000
4.0000
2.0000

0.32

. . MATERIAL

UNIDAD

CANTIDAD

TOTAL UNITARIO

21.4.1
12A111

Espejo Cristal Biselado de 5 mm colocado sobre marco de


madera , para baos Wc. h=1.00
Espejo Cristal Biselado de 5 mm colocado sobre marco de
madera , para baos Wc. h=1.00
CINTA DOBLE FAZ
SILICONA
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

und
M2

1.0000

ROLL
CART
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

0.1333
0.1500

1.00

REJILLAS
21.5.1
03B001
17B600
21D235

21.5.2
03B001
17B610
21D235

Rejillas para Desague en aluminio de


8x16cmx2", de Colrejillas o equivalente
CEMENTO BLANCO (40kg)
REJILLA ALUMINIO 3x2"
PEGACOR BLANCO/PEGALIT
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

8 x 16", Tipo TA-

Taparegistro plastico
CEMENTO BLANCO (40kg)
Taparregistro en Acero Inoxidable con cerradura
PEGACOR BLANCO/PEGALIT
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

und
BTO
UND
KGR
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

und
BTO
UND
KGR
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

0.0025
1.0000
0.2000

0.35

0.0025
1.0000
0.2000

0.35

CERRADUIRAS
22.1.1
19C230
27A650

Cerraduras Cilndricas de Manija, para puertas Baos privados,


color cromado mate, Ref. Jupiter A40S, tipo Schlage o similar
Cerraduras P-0? Schlage Jupiter A40S de oficina
CINTA DE ENMASCARAR 1" (CREPE
MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO

103 de 448

und
UND
RLL
...
% (M+MO)
...
% (M+MO)
...

1.00
0.10
2%

. . MATERIAL

UNIDAD

NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO
22.1.2
19C230
27A650

22.1.3
19C230
27A650

22.1.4
19C230
27A650

22.1.5
19C010
27A650

Cerraduras Cilndricas de Manija, para puertas Oficinas, color


cromado mate, Ref. Jupiter A50PD, tipo Schlage o similar
Cerraduras P-0? Schlage Jupiter A50PD de oficina
CINTA DE ENMASCARAR 1" (CREPE
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

Cerraduras Cilndricas de Manija, de Paso, color cromado


mate, Ref. Jupiter A10S, tipo Schlage o similar
Cerraduras P-0? Schlage Jupiter A10S de Paso
CINTA DE ENMASCARAR 1" (CREPE
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

Cerrojos de seguridad dobless, para puertas Cuartos tecnicos y


depositos, color cromado mate, Ref. B262PX, tipo Schlage o
similar
CERROJO SCHALAGE B262 PX DORA
CINTA DE ENMASCARAR 1" (CREPE
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

Cerradura Antipnico Horizontal, color cromado mate, Ref. 7300,


tipo Schlage o similar
MANIJA ANTIPANICO
CERRADURA EXT.ANTIP. 0707718
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

104 de 448

% (M+MO)
...
HR

CANTIDAD

1.02

und
UND
RLL
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.00
0.10
2%

1.02

und
UND
RLL
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.00
0.10
2%

1.02

und
UND
RLL
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.0000
0.1000
2%

1.02

und
UND
UND
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.00
1.00
2%

6.75

. . MATERIAL

22.2.1
17A278

22.2.2
19C230
27A650

Topes para puertas


TOPE DE RESORTE
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

Bisagra de piso Puerta de Vaiven


-

22.2.3
19C230
27A650

UNIDAD

Bisagra de piso Puerta de Vaiven


CINTA DE ENMASCARAR 1" (CREPE
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

und
UND
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

CANTIDAD

1.0000
2%

0.31

und
UND
RLL
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

Cierrapuerta Horizontal No.2 Tipo Dorma o equivalente

und

Cierrapuerta Horizontal No.2 Tipo Dorma o equivalente


CINTA DE ENMASCARAR 1" (CREPE
MATERIALES
NO APLICA
SUBTOTAL HERRAMIENTAS
NO APLICA
SUBTOTAL EQUIPO
NO APLICA
SUBTOTAL TRANSPORTE
Cuadrilla AA (Albaileria) 1 Oficial
TOTAL UNITARIO

UND
RLL
...
% (M+MO)
...
% (M+MO)
...
% (M+MO)
...
HR

1.0000
0.1000
2%

1.02

1.0000
0.1000
0%

1.02

PINTURA
Pintura P -1 : Latex (Vinilo) sobre superficie de Tabiqueria
Interior, Z10 Satinado, colores segn planos de detalle

23.1.1
23A135
27A650
27A805
20H600
20H701

VINILICO PREPARADO
CINTA DE ENMASCARAR 1" (CREPE)
LIJA PARA AGUA # 80
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA CC Pintura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

105 de 448

m2
GLN
RLL
PLG
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.0700
0.0200
0.0200
3.8%
2.0%

0.1405

. . MATERIAL

23.1.2
23A135
27A650
27A805
20H600
20H701

23.1.3
23A135
27A650
27A805
20H600
20H701

23.1.4
23A135
23A136
27A650
27A805
20H600
20H701

23.2.1
23A009
23A076
23A084
23G050
27A805
20H600
20H701

UNIDAD

Pintura P - 2 : Latex (Vinilo) sobre superficie de Tabiqueria


Interior, Z10 Mate, colores segn planos de detalle
VINILICO PREPARADO
CINTA DE ENMASCARAR 1" (CREPE)
LIJA PARA AGUA # 80
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA CC Pintura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Pintura P - 3 : Latex (Vinilo) bajo superficie de Cielorraso


Cementicio, color blanco
VINILICO PREPARADO
CINTA DE ENMASCARAR 1" (CREPE)
LIJA PARA AGUA # 80
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA CC Pintura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Pintura P - 6 : Base de Recinas Epoxicas Acrilicas (Epoxico)


sobre supereficie de muros en bloque paetados, colores segn
planos de dedetalle
PINTURA EPOXICA ICO
CATALIZADOR EPOXICO
CINTA DE ENMASCARAR 1" (CREPE)
LIJA PARA AGUA # 80
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA CC Pintura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Pintura Puertas Metalicas, rejillas y cerramiento con limpieza


mecanica SSPCP-SP3, base epoxica atoxica, con acabadado en
pintura epoxica Pintucoat color negro mate RAL 9005
BASE CREMA SOLAC 6071360
LACA ACRILICA ESPECIAL
MASILLA ACRILICA SOLAC 6072311
THINNER 2103
LIJA PARA AGUA # 80
MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra

106 de 448

CANTIDAD

m2
GLN
RLL
PLG
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.0700
0.0200
0.0200
3.8%
2.0%

0.1405

m2
GLN
RLL
PLG
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.0700
0.0200
0.0200
2.0%
1.9%

0.1405

m2
GLN
GLN
RLL
PLG
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.0700
0.0420
0.0200
0.0200
1.5%
1.0%

0.1405

m2
GLN
GLN
GLN
GLN
PLG
...
% (M+MO)
...
% (M+MO)

0.07
0.06
0.02
0.03
0.11
1.3%
0.6%

. . MATERIAL

UNIDAD
...

SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA CC Pintura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

23.2.2
23A009
23A076
23A084
23G050
27A805
20H600
20H701

23C110
23C112
23G050
27A650
20H600
20H701

Pintura P - 5 :

20H600
20H701

23.3.3

Pintura Trafico demarcacion Columnas

Pintura P - 5 :

Pintura Trafico demarcacion Parqueaderos

Pintura Trafico numeracion

107 de 448

...
HR

1.3%
0.6%

0.2259

0.0511
0.0511
0.1206
0.0511
0.0%
0.0%

0.1144

m2

...
HR

Parqueos y

0.04
0.03
0.01
0.02
0.06

m2

GLN
GLN
GLN
RLL
...
% (M+MO)
...
% (M+MO)
...

TRAFICO AMARILLO 659/13712


TRAFICO BLANCO 653/13713
THINNER 2103
CINTA DE ENMASCARAR 1" (CREPE)
SUBTOTAL HERRAMIENTAS
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA CC Pintura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Pintura P - 5 :
Columnas

GLN
GLN
GLN
GLN
PLG
...
% (M+MO)
...
% (M+MO)
...

...
HR

0.3949

Ml

GLN
GLN
GLN
RLL
...
% (M+MO)
...
% (M+MO)
...

TRAFICO AMARILLO 659/13712


TRAFICO BLANCO 653/13713
THINNER 2103
CINTA DE ENMASCARAR 1" (CREPE)
SUBTOTAL HERRAMIENTAS
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA CC Pintura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

23.3.2
23C110
23C112
23G050
27A650

...
HR

Pintura P - 4 : Pintura Barandas Metalicas Tubulares, con


limpieza mecanica SSPCP-SP3, base epoxica atoxica, con
acabadado en pintura epoxica Pintucoat en colores RAL 6905
y 7074
BASE CREMA SOLAC 6071360
LACA ACRILICA ESPECIAL
MASILLA ACRILICA SOLAC 6072311
THINNER 2103
LIJA PARA AGUA # 80
MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA CC Pintura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

23.3.1

CANTIDAD

m2

0.0089
0.0089
0.0210
0.0089
0.0%
0.0%

0.0564

. . MATERIAL

UNIDAD

23C110
23C112
23G050
27A650

GLN
GLN
GLN
RLL
...
% (M+MO)
...
% (M+MO)
...

20H600
20H701

TRAFICO AMARILLO 659/13712


TRAFICO BLANCO 653/13713
THINNER 2103
CINTA DE ENMASCARAR 1" (CREPE)
SUBTOTAL HERRAMIENTAS
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
- Equipo Traciego y Transporte Vertical/Horizontal Obra
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA CC Pintura
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

...
HR

CANTIDAD
0.0089
0.0089
0.0210
0.0089
0.0%
0.0%

0.0564

EQUIPOS ESPECIALES
Escaleras
Mecanicas, capacidad 9000 pasajeros/hora,
inclinacion 35, velociad 30m/m, altura 4.04 m, tipo Mitsubishi o
equivalente

25.1.1

08M075

20H700

20H701

Ascensor Panoramico : 2 Paradas, Capacidad para 750 kg :


11 personas, Velocidad 60 m/m, Tipo Mitsubishi o equivalente

25.1.2

08M075

Ascensor Panoramico : 2 Paradas, Capacidad para 750 kg :


11 personas, Velocidad 60 m/m, Tipo Mitsubishi o equivalente

20H700

20H701

25.1.3
08M075
20H700
20H701

Escaleras
Mecanicas, capacidad 9000 pasajeros/hora,
inclinacion 35, velociad 30m/m, altura 4.04 m, tipo Mitsubishi o
equivalente
SUBTOTAL MATERIALES TODO COSTO
( No Aplica )
SUBTOTAL HERRAMIENTAS
( No Aplica )
SUBTOTAL EQUIPO
( No Aplica )
SUBTOTAL TRANSPORTE
( No Aplica )
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

SUBTOTAL MATERIALES TODO COSTO


( No Aplica )
SUBTOTAL HERRAMIENTAS
( No Aplica )
SUBTOTAL EQUIPO
( No Aplica )
SUBTOTAL TRANSPORTE
( No Aplica )
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Montacarga Capacidad 5,000kg : 4 Paradas, Velocidad


0,20m/seg, Tipo Mitusibishi o equivalente
Montacarga Capacidad 5,000kg : 4 Paradas, Velocidad
0,20m/seg, Tipo Mitusibishi o equivalente
SUBTOTAL MATERIALES TODO COSTO
- ( No Aplica )
SUBTOTAL HERRAMIENTAS
- ( No Aplica )
SUBTOTAL EQUIPO
- ( No Aplica )

108 de 448

und

UND
...
% (M+MO)
...
% (M+MO)
...

1.0000

...
HR

und

UND
...
% (M+MO)
...
% (M+MO)
...

1.0000

...
HR

und
UND
...
% (M+MO)
...
% (M+MO)
...

1.0000

. . MATERIAL

UNIDAD

CANTIDAD

...
HR

SUBTOTAL TRANSPORTE
- ( No Aplica )
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

ASEO y LIMPIEZA
26.1.1
20H600
21D100

20H600

28A840

26.1.2
21D087

20H600

28A840

26.2.1
20H600
21D100
27A711
27A725

20H600

28A840

Limpieza Superficies en Concreto : Columnas, Pantallas, Muros


y Elementos Arquitectonicos
HERRAMIENTAS MENORES
ACIDO MURIATICO (CLORHIDRICO)
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
EQUIPO MENOR
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA 1 Oficial
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Proteccion Concretos Fachada con Hidrofugo adicionado con


Pigmetos de Tonalidad Verde tipo "Concretal" de la Industria
KEIM o equivlaente
HIDROFUGO-R P/FACHADAS
PIGMENTO COLORANTE TIPO KEIM
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
EQUIPO MENOR
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA 1 Oficial
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Aseo Final para Entrega Edificio


HERRAMIENTAS MENORES
ACIDO MURIATICO (CLORHIDRICO)
ESCOBA NYLON
ESTOPA
SUBTOTAL MATERIALES
HERRAMIENTAS MENORES
SUBTOTAL HERRAMIENTAS
EQUIPO MENOR
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA 1 Oficial
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

109 de 448

m2
GLB
KGR
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.5000
0.5000
0.9%
0.6%

0.24

m2
KG
KG
...
% (M+MO)
...
% (M+MO)
...
...
HR

m2
GLB
KGR
UND
KGR
...
% (M+MO)
...
% (M+MO)
...
...
HR

0.1500
0.1500
1.0%
0.6%

0.24

1.0000
1.0000
0.0150
0.0150
0.9%
0.6%

0.34

UNITARIO

TOTAL

790.00
1,500.00
966.00
1,286.50
2.64
950.00
1,500,000.00

12,705.37

30,000.00
255,472.60
161,000.00
388.00
24,897.00
6,252.00
237.51
889.37
1,450.00
4,634.00
3,357.00
483,871.47
483,871.47

12,705.37

1,404.00
12,203.70
418,871.18
49,286.00
220,000.00
248,745.76
248,745.76

12,705.37

110 de 448

1,205.15
15.80
30.00
19.32
25.73
0.53
91.38 *
28.50
28.50 *
450.00
450.00 *
0.00 *
635.27
635.27 *
1,205.15 *

493,698.26
3,000.00
25,547.26
161,000.00
3,104.00
99,588.00
62,520.00
712.53
889.37
20,300.00
23,170.00
4,028.40
403,859.56 *
1,209.68
1,209.68 *
590.32
590.32 *
0.00 *
88,038.70
88,038.70 *
493,698.26 *

250,059.15
2,808.00
292.89
12,566.14
1,182.86
220,000.00
236,849.89 *
87.06
87.06 *
32.94
32.94 *
0.00 *
13,089.27

UNITARIO

TOTAL
13,089.27 *
250,059.15 *

42,087.92
31,200.00
31,200.00 *
110.00
110.00 *
4,176.00
4,176.00 *

24,000.00
37,200.00
139,200.00

0.00 *
6,601.92
6,601.92 *
42,087.92 *

12,705.37

533,612.02
17,250.00
29,754.00
1,449.00
2,028.83
55,142.71
105,624.54 *
6,872.11
6,872.11 *
3,141.59
3,141.59 *

11,500.00
19,836.00
966.00
270.51
664.37
523,598.32
523,598.32

0.00 *
417,973.78
417,973.78 *
0.00
0.00
0.00 *
533,612.02 *

13,975.91
281,164.00
353,028.00

283,114.13
29,000.00
1,725.00
12,975.00
9,268.00
52,968.00 *
3,642.75
3,642.75 *
1,666.83
1,666.83 *

290.00
345.00
2,595.00
4,634.00
277,804.55
277,804.55

0.00 *
224,836.55
224,836.55 *
283,114.13 *

28,242.52

705.00
1,867.00
15,942.00
23,545.00
7,231.00
3,600.00
557.20

2,472,684.27
676,800.00
597,440.00
0.00
0.00
0.00
43,200.00
6,686.40

111 de 448

UNITARIO
750.00
345.00
410.00
13,815.00
6,751.00
1,102.00
2,088.00
2,277.66
6,264.00
7,528.84
8,000,000.00
2,425,018.83
2,425,018.83

28,242.52
16,067,674.37

TOTAL
9,000.00
345.00
4,920.00
27,630.00
54,008.00
13,224.00
16,704.00
56,941.50
156,600.00
0.00
0.00
1,663,498.90 *
33,115.33
33,115.33 *
14,550.11
14,550.11 *
0.00 *
761,519.93
761,519.93 *
0.00
0.00 *
2,472,684.27 *

1,718,534.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

1,718,534.00

0.00 *
0.00
0.00 *
1,718,534.00
1,718,534.00 *
1,718,534.00 *

112 de 448

UNITARIO

TOTAL

1,531,552.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

1,531,552.00

0.00 *
0.00
0.00 *
1,531,552.00
1,531,552.00 *
1,531,552.00 *

1,038,896.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

1,038,896.00

0.00 *
0.00
0.00 *
1,038,896.00
1,038,896.00 *
1,038,896.00 *

113 de 448

UNITARIO

TOTAL

90,000.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

90,000.00

0.00 *
0.00
0.00 *
90,000.00
90,000.00 *
90,000.00 *

23,649.60

12,389.60
12,389.60
10,150.00
116,000.00
12,705.37
12,705.37

0.00 *
371.69
371.69 *
156.47
5,075.00
5,231.47 *
5,656.85
5,656.85 *
11,769.02
620.58
12,389.60 *
23,649.60 *

16,714.80

9,311.26
9,311.26
10,150.00
116,000.00
12,705.37
12,705.37

0.00 *
279.34
279.34 *
116.78
4,494.09
4,610.87 *
2,513.33
2,513.33 *
8,699.86
611.39
9,311.26 *
16,714.80 *

16,714.80

114 de 448

UNITARIO

TOTAL

9,311.26
9,311.26
10,150.00
116,000.00
12,705.37
12,705.37

0.00 *
279.34
279.34 *
116.78
4,494.09
4,610.87 *
2,513.33
2,513.33 *
8,699.86
611.39
9,311.26 *
16,714.80 *

170,611.98

103,469.15
103,469.15
10,150.00
116,000.00
12,705.37
12,705.37

19,778.90
25,000.00
34,808.43
1,039,240.29
1,039,240.29
48,466.20
48,466.20
48,466.20
48,466.20
48,466.20
48,466.20
48,466.20
48,466.20
48,466.20
48,454.84

12,705.37

115 de 448

0.00 *
2,069.38
2,069.38 *
1,891.77
38,048.35
39,940.12 *
25,133.33
25,133.33 *
97,355.21
6,113.94
103,469.15 *
170,611.98 *

94,745.98
3,608.21
25,000.00 *
28,608.21
696.17 *
696.17
24,019.85
24,019.85
1,120.19
1,120.19
1,120.19
1,120.19
1,120.19
1,120.19
1,120.19
1,120.19
1,120.19
1,119.93 *
59,241.39
*
0.00
6,200.22 *
6,200.22 *
94,745.98

UNITARIO

TOTAL

2,030.00
2,204.00

2,437.86

12,705.37

357,744.00

2,486.62
2,131.50
66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

357,744.00
357,744.00
357,744.00 *
0.00 *
0.00 *
0.00 *
0.00
0.00 *
357,744.00 *

23,771.02

306.81
104,400.00
104,400.00
5,036.07

0.00 *
6.14
6.14 *
6,058.25
6,058.25 *
17,399.83
17,399.83 *
306.81
306.81 *
23,771.02 *

23,771.02

306.81
104,400.00
104,400.00
5,036.07

116 de 448

0.00 *
6.14
6.14 *
6,058.25
6,058.25 *
17,399.83
17,399.83 *
306.81
306.81 *
23,771.02 *

UNITARIO

TOTAL

23,771.02

306.81
104,400.00
104,400.00
5,036.07

0.00 *
6.14
6.14 *
6,058.25
6,058.25 *
17,399.83
17,399.83 *
306.81
306.81 *
23,771.02 *

39,678.90

21,630.00
21,630.00
104,400.00
12,705.37
12,705.37

0.00 *
432.60
432.60 *
216.30
216.30 *
17,400.00
17,400.00 *
15,894.04
5,735.95
21,630.00 *
39,678.90 *

39,678.90

21,630.00
21,630.00
104,400.00
12,705.37
12,705.37

0.00 *
432.60
432.60 *
216.30
216.30 *
17,400.00
17,400.00 *
15,894.04
5,735.95
21,630.00 *
39,678.90 *

39,678.90

21,630.00
21,630.00
104,400.00
12,705.37
12,705.37

117 de 448

0.00 *
432.60
432.60 *
216.30
216.30 *
17,400.00
17,400.00 *
15,894.04
5,735.95
21,630.00 *
39,678.90 *

UNITARIO

TOTAL

60,230.69

41,583.19
41,583.19
104,400.00
12,705.37
12,705.37

0.00 *
831.66
831.66 *
415.83
415.83 *
17,400.00
17,400.00 *
30,555.95
11,027.24
41,583.19 *
60,230.69 *

60,230.69

41,583.19
41,583.19
104,400.00
12,705.37
12,705.37

0.00 *
831.66
831.66 *
415.83
415.83 *
17,400.00
17,400.00 *
30,555.95
11,027.24
41,583.19 *
60,230.69 *

2,957.06

2,875.52
2,875.52

12,705.37

0.00 *
52.78
52.78 *
28.76
28.76 *
0.00 *
2,875.52
2,875.52 *
2,957.06 *

2,957.06

2,875.52
2,875.52

12,705.37

118 de 448

0.00 *
52.78
52.78 *
28.76
28.76 *
0.00 *
2,875.52
2,875.52 *
2,957.06 *

UNITARIO

TOTAL

2,957.06

2,875.52
2,875.52

12,705.37

0.00 *
52.78
52.78 *
28.76
28.76 *
0.00 *
2,875.52
2,875.52 *
2,957.06 *

2,957.06

2,875.52
2,875.52

12,705.37

0.00 *
52.78
52.78 *
28.76
28.76 *
0.00 *
2,875.52
2,875.52 *
2,957.06 *

2,961.79

2,875.52
2,875.52

12,705.37

0.00 *
57.51
57.51 *
28.76
28.76 *
0.00 *
2,875.52
2,875.52 *
2,961.79 *

41,667.00
20,500.00
2,088.00
11,987.11
11,987.11

12,705.37

41,667.00

119 de 448

12,219.65
966.67
2,972.50
1,476.22
5,415.39 *
160.61
160.61 *
71.92
71.92 *
0.00 *
6,571.72
6,571.72 *
12,219.65 *

12,219.65
966.67

UNITARIO

TOTAL

20,500.00
2,088.00
11,987.11
11,987.11

12,705.37

2,972.50
1,476.22
5,415.39 *
160.61
160.61 *
71.92
71.92 *
0.00 *
6,571.72
6,571.72 *
12,219.65 *

12,623.50

10,954.41
29,000.00

12,705.37

18,328.46
1,277.29
128,774.00
90,644.00

12,216.70

20,559.23
1,277.29
128,774.00
90,644.00

12,216.70

120 de 448

0.00 *
219.09
219.09 *
1,450.00
1,450.00 *
0.00 *
10,954.41
10,954.41 *
12,623.50 *

43,184.00
23,827.00
23,827.00 *
0.00
0.00 *
10,610.78
7,468.93
18,079.71 *
0.00 *
1,277.29
1,277.29 *
43,184.00 *

46,084.00
26,727.00
26,727.00 *
0.00
0.00 *
10,610.78
7,468.93
18,079.71 *
0.00 *
1,277.29
1,277.29 *
46,084.00 *

UNITARIO

TOTAL

35,372.77
270,500.40
19,807.04
18,451,499.72

12,705.37

35,372.77
312,886.80
1,000.00
3,357.00
506,625.51
3,915.00
18,451,499.72

12,705.37

35,372.77
312,886.80
1,000.00
3,357.00
506,625.51
3,915.00
18,451,499.72

12,705.37

35,372.77
312,886.80
1,000.00
3,357.00
506,625.51

121 de 448

21,001.95
1,857.07
14,201.27
16,058.34 *
112.95
112.95 *
1,081.96
1,081.96 *
0.00 *
3,748.70
3,748.70 *
21,001.95 *

531,881.36
37,141.41
328,531.14
6,300.00
1,107.81
373,080.36 *
848.94
848.94 *
4,071.60
20,335.30
24,406.90 *
0.00 *
133,545.15
133,545.15 *
531,881.36 *

531,881.36
37,141.41
328,531.14
6,300.00
1,107.81
373,080.36 *
848.94
848.94 *
4,071.60
20,335.30
24,406.90 *
0.00 *
133,545.15
133,545.15 *
531,881.36 *

531,881.36
37,141.41
328,531.14
6,300.00
1,107.81
373,080.36 *
848.94
848.94 *

UNITARIO

TOTAL

3,915.00
18,451,499.72

12,705.37

35,372.77
312,886.80
290.00
3,942.00
12,604.00
5,462.00
44,660.00
1,000.00
3,357.00
18,792.00
670,633.70
3,915.00
17,400.00
365.00
140.00
87.00
18,451,499.72

12,705.37

35,372.77
312,886.80
290.00
3,942.00
12,604.00
5,462.00
44,660.00
1,000.00
3,357.00
18,792.00
670,633.70
3,915.00
17,400.00
365.00
140.00
87.00
18,451,499.72

12,705.37

122 de 448

4,071.60
20,335.30
24,406.90 *
0.00 *
133,545.15
133,545.15 *
531,881.36 *

698,938.82
37,141.41
328,531.14
8,700.00
2,689.39
4,789.52
691.49
9,758.21
6,300.00
2,685.60
19,731.60
421,018.36 *
853.19
853.19 *
1,683.45
3,480.00
1,825.00
280.00
17.40
20,166.09
27,451.94 *
0.00 *
249,615.33
249,615.33 *
698,938.82 *

698,938.82
37,141.41
328,531.14
8,700.00
2,689.39
4,789.52
691.49
9,758.21
6,300.00
2,685.60
19,731.60
421,018.36 *
853.19
853.19 *
1,683.45
3,480.00
1,825.00
280.00
17.40
20,166.09
27,451.94 *
0.00 *
249,615.33
249,615.33 *
698,938.82 *

UNITARIO

TOTAL

35,372.77
312,886.80
290.00
3,942.00
12,604.00
5,462.00
44,660.00
1,000.00
3,357.00
18,792.00
670,633.70
3,915.00
17,400.00
365.00
140.00
87.00
18,451,499.72

12,705.37

35,372.77
312,886.80
290.00
3,942.00
12,604.00
5,462.00
44,660.00
1,000.00
3,357.00
18,792.00
670,633.70
3,915.00
17,400.00
365.00
140.00
87.00
18,451,499.72

12,705.37

35,372.77
312,886.80
3,942.00
3,583.00
45,467.37

123 de 448

698,938.82
37,141.41
328,531.14
8,700.00
2,689.39
4,789.52
691.49
9,758.21
6,300.00
2,685.60
19,731.60
421,018.36 *
853.19
853.19 *
1,683.45
3,480.00
1,825.00
280.00
17.40
20,166.09
27,451.94 *
0.00 *
249,615.33
249,615.33 *
698,938.82 *

698,938.82
37,141.41
328,531.14
8,700.00
2,689.39
4,789.52
691.49
9,758.21
6,300.00
2,685.60
19,731.60
421,018.36 *
853.19
853.19 *
1,683.45
3,480.00
1,825.00
280.00
17.40
20,166.09
27,451.94 *
0.00 *
249,615.33
249,615.33 *
698,938.82 *

49,337.42
3,714.14
32,853.11
413.91
376.22
37,357.38 *
82.59

UNITARIO

TOTAL

3,915.00
18,451,499.72

12,705.37

82.59 *
1,623.55
2,163.91
3,787.46 *
0.00 *
8,109.99
8,109.99 *
49,337.42 *

19,373.20

2,053.20
61,000.00

12,008.85

28.74
28.74 *
1,424.80
1,424.80 *
0.00 *
2,053.20###
2,053.20 *
3,506.75 *
287.97

4,524.00
285.12
285.12

12,008.85

271.44
271.44 *
1.43
1.43 *
1.43
1.43 *
0.00 *
13.68
13.68 *
287.97 *
1,147.07

3,538.00
1,135.71
1,135.71

12,008.85

1,061.40
1,061.40 *
5.68
5.68 *
5.68
5.68 *
0.00 *
74.31
74.31 *
1,147.07 *
14,431.41

2,610.00

13,050.00
13,050.00 *

14,288.53

71.44
71.44 *

14,288.53

124 de 448

71.44

UNITARIO

TOTAL

71.44 *
0.00 *
12,008.85

1,238.53
1,238.53 *
14,431.41 *

430,051.00

463,755.24
35,372.77
325,832.40
3,942.00
452,821.28
30,360.00
2,052.00
18,451,499.72

12,705.37

35,372.77
325,832.40
413.91
361,619.08 *
822.52
822.52 *
4,554.00
5,557.44
0.00
10,111.44 *
0.00 *
91,202.20
91,202.20 *
463,755.24 *

463,755.24
35,372.77
325,832.40
3,942.00
452,821.28
30,360.00
2,052.00
18,451,499.72

12,705.37

35,372.77
325,832.40
413.91
361,619.08 *
822.52
822.52 *
4,554.00
5,557.44
0.00
10,111.44 *
0.00 *
91,202.20
91,202.20 *
463,755.24 *

463,755.24
35,372.77
325,832.40
3,942.00
452,821.28
30,360.00
2,052.00

125 de 448

35,372.77
325,832.40
413.91
361,619.08 *
822.52
822.52 *
4,554.00
5,557.44

UNITARIO

TOTAL

18,451,499.72

12,705.37

0.00
10,111.44 *
0.00 *
91,202.20
91,202.20 *
463,755.24 *

47,908.00
21,344.00
26,564.00
0.00
0.00

12,705.37

21,344.00
26,564.00
47,908.00 *
0.00
0.00 *
0.00
0.00 *
0.00 *
0.00
0.00 *
47,908.00 *

4,212.00

2,138.22

0.00
0.00 *
42.76
42.76 *

44,746.05

2,031.02
2,031.02 *

12,705.37

2,138.22

0.00 *
2,138.22 *
4,212.00 *

924.82
522.00
915.66
915.66

12,705.37

522.00
522.00 *
4.58
4.58 *
4.58
4.58 *
0.00 *
393.66
393.66 *
924.82 *

7,012.00
34,271.23

6,285.34
6,285.34 *

6,942.57

126 de 448

34.71

UNITARIO

TOTAL

34.71 *
6,942.57

34.71
34.71 *
0.00 *

12,705.37

657.23
657.23 *
7,012.00 *

2,030.00
2,204.00

2,437.86

12,705.37

2,030.00
2,204.00

2,437.86

12,705.37

2,030.00
2,204.00

2,437.86

12,705.37

2,030.00

127 de 448

2,486.62
2,131.50
66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50
66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50
66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50

UNITARIO

TOTAL

2,204.00

2,437.86

12,705.37

2,030.00
2,204.00

2,437.86

12,705.37

2,030.00
2,204.00

2,437.86

12,705.37

2,030.00
2,204.00

2,437.86

12,705.37

2,030.00
2,204.00

128 de 448

66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50
66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50
66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50
66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50
66.12

UNITARIO

TOTAL
2,197.62

2,437.86

12,705.37

2,088.00
2,204.00

2,498.76

12,705.37

0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,548.74
2,192.40
66.12
2,258.52
0.00 *
49.98
49.98 *
0.00
0.00 *
240.24
240.24 *
2,548.74 *

830,296.21
343,998.00
11,252.00
24,012.00
290.00
3,033.00
12,604.00
5,462.00
44,660.00
3,583.00
3,357.00
696,474.69
3,915.00
17,400.00
487.00
140.00
87.00
75,930.38
18,451,499.72

12,705.37

129 de 448

361,197.90
11,814.60
25,212.60
8,700.00
2,069.23
4,789.52
691.49
9,758.21
10,540.19
12,085.20
446,858.94 *
764.02
764.02 *
6,264.00
9,744.00
2,435.00
14,000.00
3,045.00
75,930.38
21,639.12
133,057.50 *
0.00
0.00 *
249,615.75
249,615.75
830,296.21 *

UNITARIO

TOTAL

343,998.00
11,252.00
24,012.00
290.00
3,033.00
12,604.00
5,462.00
44,660.00
3,583.00
3,357.00
638,871.06
3,915.00
17,400.00
487.00
140.00
87.00
69,207.23
18,451,499.72

12,705.37

343,998.00
11,252.00
24,012.00
290.00
3,033.00
12,604.00
5,462.00
44,660.00
3,583.00
3,357.00
638,871.06
3,915.00
17,400.00
487.00
140.00
87.00
69,207.23
18,451,499.72

12,705.37

343,998.00
11,252.00

130 de 448

765,960.59
361,197.90
11,814.60
25,212.60
8,700.00
2,069.23
4,789.52
691.49
9,758.21
10,540.19
12,085.20
446,858.94 *
755.17
755.17 *
6,264.00
9,744.00
2,435.00
14,000.00
3,045.00
69,207.23
21,639.12
126,334.35 *
0.00
0.00 *
192,012.12
192,012.12
765,960.59 *

765,960.59
361,197.90
11,814.60
25,212.60
8,700.00
2,069.23
4,789.52
691.49
9,758.21
10,540.19
12,085.20
446,858.94 *
755.17
755.17 *
6,264.00
9,744.00
2,435.00
14,000.00
3,045.00
69,207.23
21,639.12
126,334.35 *
0.00
0.00 *
192,012.12
192,012.12
765,960.59 *

765,960.59
361,197.90
11,814.60

UNITARIO

TOTAL

24,012.00
290.00
3,033.00
12,604.00
5,462.00
44,660.00
3,583.00
3,357.00
638,871.06
3,915.00
17,400.00
487.00
140.00
87.00
69,207.23
18,451,499.72

12,705.37

343,998.00
11,252.00
24,012.00
290.00
3,033.00
12,604.00
5,462.00
44,660.00
3,583.00
3,357.00
646,551.54
3,915.00
87.00
69,207.23
7,000.00
18,451,499.72

12,705.37

343,998.00
11,252.00
24,012.00
290.00
3,033.00
12,604.00
5,462.00

131 de 448

25,212.60
8,700.00
2,069.23
4,789.52
691.49
9,758.21
10,540.19
12,085.20
446,858.94 *
755.17
755.17 *
6,264.00
9,744.00
2,435.00
14,000.00
3,045.00
69,207.23
21,639.12
126,334.35 *
0.00
0.00 *
192,012.12
192,012.12
765,960.59 *

775,724.08
361,197.90
11,814.60
25,212.60
8,700.00
2,069.23
4,789.52
691.49
9,758.21
10,540.19
12,085.20
446,858.94 *
730.09
730.09 *
6,264.00
3,045.00
51,905.43
45,588.90
21,639.12
128,442.44 *
0.00
0.00 *
199,692.60
199,692.60
775,724.08 *

775,724.08
361,197.90
11,814.60
25,212.60
8,700.00
2,069.23
4,789.52
691.49

UNITARIO

TOTAL

44,660.00
3,583.00
3,357.00
646,551.54
3,915.00
87.00
69,207.23
7,000.00
18,451,499.72

12,705.37

343,998.00
11,252.00
24,012.00
290.00
3,033.00
12,604.00
5,462.00
44,660.00
3,583.00
3,357.00
646,551.54
3,915.00
87.00
69,207.23
7,000.00
18,451,499.72

12,705.37

343,998.00
11,252.00
24,012.00
290.00
3,033.00
12,604.00
5,462.00
44,660.00
3,583.00
3,357.00
646,551.54
3,915.00
87.00
69,207.23

132 de 448

9,758.21
10,540.19
12,085.20
446,858.94 *
730.09
730.09 *
6,264.00
3,045.00
51,905.43
45,588.90
21,639.12
128,442.44 *
0.00
0.00 *
199,692.60
199,692.60
775,724.08 *

775,724.08
361,197.90
11,814.60
25,212.60
8,700.00
2,069.23
4,789.52
691.49
9,758.21
10,540.19
12,085.20
446,858.94 *
730.09
730.09 *
6,264.00
3,045.00
51,905.43
45,588.90
21,639.12
128,442.44 *
0.00
0.00 *
199,692.60
199,692.60
775,724.08 *

775,724.08
361,197.90
11,814.60
25,212.60
8,700.00
2,069.23
4,789.52
691.49
9,758.21
10,540.19
12,085.20
446,858.94 *
730.09
730.09 *
6,264.00
3,045.00
51,905.43

UNITARIO

TOTAL

7,000.00
18,451,499.72

12,705.37

45,588.90
21,639.12
128,442.44 *
0.00
0.00 *
199,692.60
199,692.60
775,724.08 *

218,205.15
35,372.77
312,886.80
11,252.00
24,012.00
360.00
12,604.00
1,500.00
3,583.00
3,357.00
145,531.87
3,915.00
7,000.00
18,451,499.72

12,705.37

9,285.35
82,132.79
2,953.65
6,303.15
2,160.00
1,512.48
1,350.00
7,166.00
2,014.20
114,877.62 *
206.91
206.91 *
4,058.88
59,391.19
9,016.30
72,466.37 *
0.00
0.00 *
30,654.25
30,654.25
218,205.15 *

218,205.15
35,372.77
312,886.80
11,252.00
24,012.00
360.00
12,604.00
1,500.00
3,583.00
3,357.00
145,531.87
3,915.00
7,000.00
18,451,499.72

12,705.37

133 de 448

9,285.35
82,132.79
2,953.65
6,303.15
2,160.00
1,512.48
1,350.00
7,166.00
2,014.20
114,877.62 *
206.91
206.91 *
4,058.88
59,391.19
9,016.30
72,466.37 *
0.00
0.00 *
30,654.25
30,654.25
218,205.15 *

UNITARIO

TOTAL

305,487.20
35,372.77
312,886.80
11,252.00
24,012.00
360.00
12,604.00
1,500.00
3,583.00
3,357.00
203,744.61
3,915.00
7,000.00
18,451,499.72

12,705.37

35,372.77
347,652.00
11,252.00
24,012.00
360.00
12,604.00
1,500.00
3,583.00
3,357.00
177,467.35
3,915.00
150,000.00
7,000.00
18,451,499.72

12,705.37

12,999.49
114,985.90
4,135.11
8,824.41
3,024.00
2,117.47
1,890.00
10,032.40
2,819.88
160,828.66 *
289.68
289.68 *
5,682.43
83,147.67
12,622.82
101,452.91 *
0.00
0.00 *
42,915.95
42,915.95
305,487.20 *

283,864.64
10,399.60
102,209.69
3,308.09
7,059.53
1,080.00
756.24
675.00
3,583.00
1,007.10
130,078.24 *
241.79
241.79 *
2,435.33
34,500.00
62,979.39
6,240.79
106,155.51 *
0.00
0.00 *
47,389.11
47,389.11
283,864.64 *

218,205.15
35,372.77
312,886.80
11,252.00
24,012.00
360.00
12,604.00
1,500.00
3,583.00
3,357.00

134 de 448

9,285.35
82,132.79
2,953.65
6,303.15
2,160.00
1,512.48
1,350.00
7,166.00
2,014.20
114,877.62 *

UNITARIO

TOTAL

145,531.87
3,915.00
7,000.00
18,451,499.72

12,705.37

206.91
206.91 *
4,058.88
59,391.19
9,016.30
72,466.37 *
0.00
0.00 *
30,654.25
30,654.25
218,205.15 *

19,373.20

2,053.20
61,000.00

12,008.85

28.74
28.74 *
1,424.80
1,424.80 *
0.00 *
2,053.20###
2,053.20 *
3,506.75 *
287.97

4,524.00
285.12
285.12

12,008.85

271.44
271.44 *
1.43
1.43 *
1.43
1.43 *
0.00 *
13.68
13.68 *
287.97 *
1,147.07

3,538.00
1,135.71
1,135.71

12,008.85

1,061.40
1,061.40 *
5.68
5.68 *
5.68
5.68 *
0.00 *
74.31
74.31 *
1,147.07 *
14,431.41

2,610.00

13,050.00
13,050.00 *

14,288.53

71.44
71.44 *

135 de 448

UNITARIO

TOTAL

14,288.53

71.44
71.44 *
0.00 *

12,008.85

1,238.53
1,238.53 *
14,431.41 *

29,492.40

2,053.20
61,000.00

12,008.85

28.74
28.74 *
1,424.80
1,424.80 *
0.00 *
2,053.20###
2,053.20 *
3,506.75 *
287.97

4,524.00
285.12
285.12

12,008.85

271.44
271.44 *
1.43
1.43 *
1.43
1.43 *
0.00 *
13.68
13.68 *
287.97 *
1,147.07

3,538.00
1,135.71
1,135.71

12,008.85

1,061.40
1,061.40 *
5.68
5.68 *
5.68
5.68 *
0.00 *
74.31
74.31 *
1,147.07 *
24,550.61

3,224.80

22,573.60
22,573.60 *

24,307.54

121.54
121.54 *

24,307.54

136 de 448

121.54

UNITARIO

TOTAL

121.54 *
0.00 *
12,008.85

1,733.94
1,733.94 *
24,550.61 *

29,492.40

2,053.20
61,000.00

12,008.85

28.74
28.74 *
1,424.80
1,424.80 *
0.00 *
2,053.20###
2,053.20 *
3,506.75 *
287.97

4,524.00
285.12
285.12

12,008.85

271.44
271.44 *
1.43
1.43 *
1.43
1.43 *
0.00 *
13.68
13.68 *
287.97 *
1,147.07

3,538.00
1,135.71
1,135.71

12,008.85

1,061.40
1,061.40 *
5.68
5.68 *
5.68
5.68 *
0.00 *
74.31
74.31 *
1,147.07 *
24,550.61

3,224.80

22,573.60
22,573.60 *

24,307.54

121.54
121.54 *

24,307.54

121.54
121.54 *

137 de 448

UNITARIO

TOTAL

0.00 *
12,008.85

1,733.94
1,733.94 *
24,550.61 *

35,372.77
312,886.80
11,252.00
24,012.00
360.00
3,033.00
12,604.00
5,462.00
44,660.00
3,583.00
3,357.00
696,569.35
3,915.00
17,400.00
487.00
140.00
140.00
18,451,499.72

12,705.37

35,372.77
312,886.80
11,252.00
24,012.00
360.00
3,033.00
12,604.00
5,462.00
44,660.00
3,583.00
3,357.00
696,569.35
3,915.00
17,400.00
487.00
140.00
140.00
18,451,499.72

138 de 448

753,117.19
37,141.41
328,531.14
11,814.60
25,212.60
4,320.00
2,069.23
4,789.52
691.49
9,758.21
10,540.19
12,085.20
446,953.59 *
806.71
806.71 *
6,264.00
9,744.00
2,435.00
14,000.00
4,620.00
18,678.13
55,741.13 *
0.00
0.00 *
249,615.75
249,615.75
753,117.19 *

753,117.19
37,141.41
328,531.14
11,814.60
25,212.60
4,320.00
2,069.23
4,789.52
691.49
9,758.21
10,540.19
12,085.20
446,953.59 *
806.71
806.71 *
6,264.00
9,744.00
2,435.00
14,000.00
4,620.00
18,678.13

UNITARIO

TOTAL

12,705.37

35,372.77
312,886.80
11,252.00
24,012.00
360.00
3,033.00
12,604.00
5,462.00
44,660.00
3,583.00
3,357.00
696,569.35
3,915.00
17,400.00
487.00
140.00
140.00
18,451,499.72

12,705.37

35,372.77
312,886.80
11,252.00
24,012.00
360.00
3,033.00
12,604.00
5,462.00
44,660.00
3,583.00
3,357.00
696,569.35
3,915.00
17,400.00
487.00
140.00
140.00
18,451,499.72

12,705.37

139 de 448

55,741.13 *
0.00
0.00 *
249,615.75
249,615.75
753,117.19 *

753,117.19
37,141.41
328,531.14
11,814.60
25,212.60
4,320.00
2,069.23
4,789.52
691.49
9,758.21
10,540.19
12,085.20
446,953.59 *
806.71
806.71 *
6,264.00
9,744.00
2,435.00
14,000.00
4,620.00
18,678.13
55,741.13 *
0.00
0.00 *
249,615.75
249,615.75
753,117.19 *

753,117.19
37,141.41
328,531.14
11,814.60
25,212.60
4,320.00
2,069.23
4,789.52
691.49
9,758.21
10,540.19
12,085.20
446,953.59 *
806.71
806.71 *
6,264.00
9,744.00
2,435.00
14,000.00
4,620.00
18,678.13
55,741.13 *
0.00
0.00 *
249,615.75

UNITARIO

TOTAL
249,615.75
753,117.19 *

35,372.77
312,886.80
11,252.00
24,012.00
360.00
3,033.00
12,604.00
5,462.00
44,660.00
3,583.00
3,357.00
696,569.35
3,915.00
17,400.00
487.00
140.00
140.00
18,451,499.72

12,705.37

35,372.77
312,886.80
11,252.00
24,012.00
360.00
3,033.00
12,604.00
5,462.00
44,660.00
3,583.00
3,357.00
696,569.35
3,915.00
17,400.00
487.00
140.00
140.00
18,451,499.72

12,705.37

140 de 448

753,117.19
37,141.41
328,531.14
11,814.60
25,212.60
4,320.00
2,069.23
4,789.52
691.49
9,758.21
10,540.19
12,085.20
446,953.59 *
806.71
806.71 *
6,264.00
9,744.00
2,435.00
14,000.00
4,620.00
18,678.13
55,741.13 *
0.00
0.00 *
249,615.75
249,615.75
753,117.19 *

753,117.19
37,141.41
328,531.14
11,814.60
25,212.60
4,320.00
2,069.23
4,789.52
691.49
9,758.21
10,540.19
12,085.20
446,953.59 *
806.71
806.71 *
6,264.00
9,744.00
2,435.00
14,000.00
4,620.00
18,678.13
55,741.13 *
0.00
0.00 *
249,615.75
249,615.75
753,117.19 *

UNITARIO

TOTAL

35,372.77
312,886.80
11,252.00
24,012.00
360.00
3,033.00
12,604.00
5,462.00
44,660.00
3,583.00
3,357.00
696,569.35
3,915.00
17,400.00
487.00
140.00
140.00
18,451,499.72

12,705.37

35,372.77
312,886.80
11,252.00
24,012.00
360.00
3,033.00
12,604.00
5,462.00
44,660.00
3,583.00
3,357.00
696,569.35
3,915.00
17,400.00
487.00
140.00
140.00
18,451,499.72

12,705.37

35,372.77
312,886.80

141 de 448

753,117.19
37,141.41
328,531.14
11,814.60
25,212.60
4,320.00
2,069.23
4,789.52
691.49
9,758.21
10,540.19
12,085.20
446,953.59 *
806.71
806.71 *
6,264.00
9,744.00
2,435.00
14,000.00
4,620.00
18,678.13
55,741.13 *
0.00
0.00 *
249,615.75
249,615.75
753,117.19 *

753,117.19
37,141.41
328,531.14
11,814.60
25,212.60
4,320.00
2,069.23
4,789.52
691.49
9,758.21
10,540.19
12,085.20
446,953.59 *
806.71
806.71 *
6,264.00
9,744.00
2,435.00
14,000.00
4,620.00
18,678.13
55,741.13 *
0.00
0.00 *
249,615.75
249,615.75
753,117.19 *

753,117.19
37,141.41
328,531.14

UNITARIO

TOTAL

11,252.00
24,012.00
360.00
3,033.00
12,604.00
5,462.00
44,660.00
3,583.00
3,357.00
696,569.35
3,915.00
17,400.00
487.00
140.00
140.00
18,451,499.72

12,705.37

2,030.00
2,204.00

2,437.86

12,705.37

2,030.00
2,204.00

2,437.86

12,705.37

2,030.00
2,204.00

142 de 448

11,814.60
25,212.60
4,320.00
2,069.23
4,789.52
691.49
9,758.21
10,540.19
12,085.20
446,953.59 *
806.71
806.71 *
6,264.00
9,744.00
2,435.00
14,000.00
4,620.00
18,678.13
55,741.13 *
0.00
0.00 *
249,615.75
249,615.75
753,117.19 *

2,486.62
2,131.50
66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50
66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50
66.12
2,197.62

UNITARIO

TOTAL

2,437.86

12,705.37

2,030.00
2,204.00

2,437.86

12,705.37

2,030.00
2,204.00

2,437.86

12,705.37

2,030.00
2,204.00

2,437.86

12,705.37

2,030.00
2,204.00

143 de 448

0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50
66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50
66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50
66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50
66.12
2,197.62

UNITARIO

TOTAL

2,437.86

12,705.37

2,030.00
2,204.00

2,437.86

12,705.37

2,030.00
2,204.00

2,437.86

12,705.37

2,030.00
2,204.00

2,437.86

12,705.37

2,030.00
2,204.00

0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50
66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50
66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50
66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

2,486.62
2,131.50
66.12
2,197.62
0.00 *

144 de 448

UNITARIO

TOTAL

2,437.86

48.76
48.76 *
0.00
0.00 *

12,705.37

240.24
240.24 *
2,486.62 *

7,600.00
2,791.54
13,105.00
13,105.00
216.91
12,827.54
12,827.54

7,600.00
2,791.54
13,105.00
13,105.00
216.91
12,827.54
12,827.54

7,600.00
2,791.54
13,105.00
13,105.00
216.91
12,827.54
12,827.54

145 de 448

14,250.00
7,980.00
2,931.11
10,911.00
262.10
262.00 *
655.25
655.00 *
227.75
228.00 *
1,157.23
1,036.30
2,194.00 *
14,250.00 *

14,250.00
7,980.00
2,931.11
10,911.00
262.10
262.00 *
655.25
655.00 *
227.75
228.00 *
1,157.23
1,036.30
2,194.00 *
14,250.00 *

14,250.00
7,980.00
2,931.11
10,911.00
262.10
262.00 *
655.25
655.00 *
227.75
228.00 *
1,157.23
1,036.30
2,194.00 *
14,250.00 *

UNITARIO

TOTAL

4,255.54
4,952.03
5,627.31
181.81
422.75
950.00
7,941.00
7,941.00
216.91
12,827.54
12,827.54
23,422.28

4,255.54
4,952.03
5,627.31
181.81
422.75
950.00
7,941.00
7,941.00
216.91
12,827.54
12,827.54
23,422.28

4,255.54
4,952.03
5,627.31
181.81
422.75
950.00
7,941.00
7,941.00

146 de 448

8,241.00
4,452.77
155.45
117.76
214.96
442.34
994.03
6,377.00
8.67
9.00 *
73.63
74.00 *
216.91
217.00 *
738.10
660.97
164.75
1,564.00 *
8,241.00 *

8,241.00
4,452.77
155.45
117.76
214.96
442.34
994.03
6,377.00
8.67
9.00 *
73.63
74.00 *
216.91
217.00 *
738.10
660.97
164.75
1,564.00 *
8,241.00 *

8,241.00
4,452.77
155.45
117.76
214.96
442.34
994.03
6,377.00
8.67
9.00 *
73.63
74.00 *

UNITARIO

TOTAL

216.91
12,827.54
12,827.54
23,422.28

7,600.00
2,791.54
13,105.00
13,105.00
216.91
12,827.54
12,827.54

216.91
217.00 *
738.10
660.97
164.75
1,564.00 *
8,241.00 *

14,250.00
7,980.00
2,931.11
10,911.00
262.10
262.00 *
655.25
655.00 *
227.75
228.00 *
1,157.23
1,036.30
2,194.00 *
14,250.00 *

92,971.75
58,563.95

41,287.59

7,615.04

13,356.78

377.94

2,267.67

2,323.26

4,646.51

43,503.63

6,090.51

9,302.88

9,302.88
76,951.93
762.85
762.85 *
15,256.97
15,256.97 *
92,971.75 *

15,256.97

106,720.52
78,065.75

55,036.35

7,615.04

13,356.78

377.94

2,267.67

2,323.26

4,646.51

43,503.63

6,090.51

147 de 448

UNITARIO

TOTAL

9,302.88

9,302.88
90,700.70

15,256.97

762.85
762.85 *
15,256.97
15,256.97 *
106,720.52 *

99,846.13
78,065.75

27,518.18

58,563.95

20,643.79

7,615.04

13,356.78

377.94

2,267.67

2,323.26

4,646.51

43,503.63

6,090.51

9,302.88

9,302.88
83,826.31

15,256.97

762.85
762.85 *
15,256.97
15,256.97 *
99,846.13 *

115,612.01
78,065.75

27,518.18

58,563.95

20,643.79

7,615.04

26,713.56

377.94

2,267.67

2,323.26

4,646.51

43,503.63

6,090.51

9,302.88

9,302.88
97,183.09

17,666.07

762.85
762.85 *
17,666.07
17,666.07 *
115,612.01 *

60,229.81
58,563.95

20,643.79

7,615.04

13,356.78

377.94

1,133.83

2,323.26

2,323.26

43,503.63

3,045.25

148 de 448

UNITARIO

TOTAL

9,302.88

9,302.88
49,805.79

9,927.64

496.38
496.38
9,927.64
9,927.64 *
60,229.81 *

60,229.81
58,563.95

20,643.79

7,615.04

13,356.78

377.94

1,133.83

2,323.26

2,323.26

43,503.63

3,045.25

9,302.88

9,302.88
49,805.79

9,927.64

496.38
496.38
9,927.64
9,927.64 *
60,229.81 *

5,184.20
5,184.20

5,184.20
5,184.20

0.00

0.00
0.00
0.00
0.00 *
5,184.20 *

41,667.00
20,500.00
3,500.00
2,511.90
8,071.00
51,860.80
13,800.00

12,705.37

149 de 448

50,966.37
1,271.68
5,166.00
52.50
31,398.80
2,033.89
39,922.87 *
120.00
120.00 *
276.00
276.00 *
0.00 *
10,647.51
10,647.51 *
50,966.37 *

UNITARIO

TOTAL

41,667.00
20,500.00
3,500.00
1,913.40
8,071.00
51,860.80
13,800.00

12,705.37

2,088.00
2,204.00

2,498.76

12,705.37

2,030.00
2,204.00

2,437.86

12,705.37

43,485.12
1,271.68
5,166.00
52.50
23,917.55
2,033.89
32,441.62 *
120.00
120.00 *
276.00
276.00 *
0.00 *
10,647.51
10,647.51 *
43,485.12 *

2,548.74
2,192.40
66.12
2,258.52
0.00 *
49.98
49.98 *
0.00
0.00 *
240.24
240.24 *
2,548.74 *

2,486.62
2,131.50
66.12
2,197.62
0.00 *
48.76
48.76 *
0.00
0.00 *
240.24
240.24 *
2,486.62 *

28,730.82
297,617.70
290.00
360.00
25,819.62
56,000.00

150 de 448

9,374.96
9.14
11.34
9,395.43
781.31
781.31 *
1,907.12

UNITARIO

TOTAL

2,938.00
50.00
5,800.00
18.00

12,705.37

43.48
100.00
77.14
2.14
2,129.89 *
0.00
0.00 *
16,424.19
16,424.19 *
28,730.82 *

28,730.82
297,617.70
290.00
360.00
25,819.62
56,000.00
2,938.00
50.00
5,800.00
18.00

12,705.37

9,374.96
9.14
11.34
9,395.43
781.31
781.31 *
1,907.12
43.48
100.00
77.14
2.14
2,129.89 *
0.00
0.00 *
16,424.19
16,424.19 *
28,730.82 *

28,730.82
297,617.70
290.00
360.00
25,819.62
56,000.00
2,938.00
50.00
5,800.00
18.00

12,705.37

9,374.96
9.14
11.34
9,395.43
781.31
781.31 *
1,907.12
43.48
100.00
77.14
2.14
2,129.89 *
0.00
0.00 *
16,424.19
16,424.19 *
28,730.82 *

61,566.04
297,617.70
290.00
360.00
55,327.76
56,000.00
2,938.00
50.00

151 de 448

20,089.19
19.58
24.30
20,133.07
1,674.23
1,674.23 *
4,086.69
93.18
214.29

UNITARIO

TOTAL

5,800.00
18.00

12,705.37

35,372.77
297,617.70
10,689.40
22,811.40
360.00
12,604.00
1,500.00
3,583.00
3,357.00
141,060.89
3,915.00
7,000.00
18,451,499.72

12,705.37

341,950.60
4,627.73

12,705.37

41,667.00
20,500.00
1,413.48

12,705.37

152 de 448

165.30
4.59
4,564.04 *
0.00
0.00 *
35,194.69
35,194.69 *
61,566.04 *

215,927.18
9,285.35
78,124.65
2,805.97
5,987.99
2,160.00
1,512.48
1,350.00
7,166.00
2,014.20
110,406.64 *
200.56
200.56 *
4,058.88
61,590.56
9,016.30
74,665.74 *
0.00
0.00 *
30,654.25
30,654.25
215,927.18 *

4,687.73
3,231.43
3,231.43 *
60.00
60.00 *
0.00 *
0.00
0.00 *
1,396.30
1,396.30 *
4,687.73 *

1,452.00
138.54
428.45
566.99
38.48
38.48 *
0.00
0.00 *
0.00
0.00 *
846.49
846.49 *
1,452.00 *

UNITARIO

TOTAL

58,900.91
496,076.59
17,400.00

12,705.37

41,667.00
20,500.00
3,679.00
18,126.65
18,126.65

12,705.37

41,667.00
20,500.00
3,679.00
18,126.65
18,126.65

12,705.37

41,667.00
20,500.00
3,679.00
7,870.99
7,870.99

153 de 448

4,480.56
1,502.57
1,502.57 *
284.56###
284.56 *
651.90
651.90 *
0.00 *
2,041.53
2,041.53 *
4,480.56 *

18,479.12
1,933.35
5,945.00
1,066.91
8,945.26 *
243.71
243.71 *
108.76
108.76 *
0.00 *
9,181.39
9,181.39 *
18,479.12 *

18,479.12
1,933.35
5,945.00
1,066.91
8,945.26 *
243.71
243.71 *
108.76
108.76 *
0.00 *
9,181.39
9,181.39 *
18,479.12 *

8,022.73
583.34
1,783.50
320.07
2,686.91 *
104.51
104.51 *
47.23
47.23 *

UNITARIO

TOTAL

12,705.37

193,244.35

209.00
302.00
7,900.20
7,900.20

12,705.37

0.00 *
5,184.07
5,184.07 *
8,022.73 *
8,022.73

193,244.35

627.00
604.00
194,475.35 *
237.01
237.01 *
178.54
178.54 *
0.00 *
7,900.20
7,900.20 *
202,791.10 *

202,791.10

193,244.35

209.00
302.00
7,900.20
7,900.20

12,705.37

154 de 448

193,244.35

627.00
604.00
194,475.35 *
237.01
237.01 *
178.54
178.54 *
0.00 *
7,900.20
7,900.20 *
202,791.10 *

UNITARIO

TOTAL

202,791.10

193,244.35

209.00
302.00
7,900.20
7,900.20

12,705.37

193,244.35

627.00
604.00
194,475.35 *
237.01
237.01 *
178.54
178.54 *
0.00 *
7,900.20
7,900.20 *
202,791.10 *

50,144.80
43,811.97
209.00
302.00
5,530.90
5,530.90

12,705.37

43,811.97
209.00
302.00
44,322.97 *
165.93
165.93 *
125.00
125.00 *
0.00 *
5,530.90
5,530.90 *
50,144.80 *

101,297.18
89,880.49
209.00
302.00
9,875.25
9,875.25

12,705.37

155 de 448

89,880.49
418.00
604.00
90,902.49 *
296.26
296.26 *
223.18
223.18 *
0.00 *
9,875.25
9,875.25 *
101,297.18 *

UNITARIO

TOTAL

120,502.75
110,956.00
209.00
302.00
7,900.20
7,900.20

12,705.37

126,195.90
209.00
302.00
7,900.20
7,900.20

12,705.37

72,849.62
209.00
302.00
9,218.17
9,218.17

12,705.37

110,956.00
627.00
604.00
112,187.00 *
237.01
237.01 *
178.54
178.54 *
0.00 *
7,900.20
7,900.20 *
120,502.75 *

126,195.90
627.00
604.00
127,426.90 *
237.01
237.01 *
178.54
178.54 *
0.00 *
7,900.20
7,900.20 *
135,742.65 *

72,849.62
418.00
604.00
73,871.62 *
276.55
276.55 *
208.33
208.33 *
0.00 *
9,218.17
9,218.17 *
83,574.67 *

55,339.58

156 de 448

UNITARIO

TOTAL

45,946.00

53,807.46
53,807.46

12,705.37

11,765.80
104,833.33
104,833.33

12,705.37

4,760.53
67,833.33
67,833.33

12,705.37

13,891.94
80,166.67
80,166.67

12,705.37

157 de 448

45,946.00

45,946.00 *
753.30
753.30 *
322.84
322.84 *
0.00 *
8,317.43
8,317.43 *
55,339.58 *

106,930.00
94,126.37
94,126.37 *
1,467.67
1,467.67 *
629.00
629.00 *
0.00 *
10,706.96
10,706.96 *
106,930.00 *

69,190.00
57,126.37
57,126.37 *
949.67
949.67 *
407.00
407.00 *
0.00 *
10,706.96
10,706.96 *
69,190.00 *

81,770.00
69,459.71
69,459.71 *
1,122.33
1,122.33 *
481.00
481.00 *
0.00 *
10,706.96
10,706.96 *
81,770.00 *

UNITARIO

TOTAL

6,909.95
9,866.67
9,866.67

12,705.37

63,000.00
94,133.66
41,667.00
20,500.00
8,304.71
8,304.71

12,705.37

126,513.00
129,500.00
129,500.00

12,705.37

101,846.33
104,833.33
104,833.33

12,705.37

158 de 448

10,064.00
7,255.45
7,255.45 *
138.13
138.13 *
59.20
59.20 *
0.00 *
2,611.22
2,611.22 *
10,064.00 *

8,470.80
2,520.00
2,824.01
465.82
1,424.18
7,234.01 *
116.27
116.27 *
49.83
49.83 *
0.00 *
1,070.70
1,070.70 *
8,470.80 *

132,090.00
126,513.00
126,513.00 *
1,813.00
1,813.00 *
777.00
777.00 *
0.00 *
2,987.00
2,987.00 *
132,090.00 *

106,930.00
101,846.33
101,846.33 *
1,467.67
1,467.67 *
629.00
629.00 *
0.00 *
2,987.00
2,987.00 *
106,930.00 *

UNITARIO

TOTAL

64,846.33
67,833.33
67,833.33

12,705.37

89,513.00
92,500.00
92,500.00

12,705.37

101,846.33
104,833.33
104,833.33

12,705.37

101,846.33
104,833.33
104,833.33

12,705.37

159 de 448

69,190.00
64,846.33
64,846.33 *
949.67
949.67 *
407.00
407.00 *
0.00 *
2,987.00
2,987.00 *
69,190.00 *

94,350.00
89,513.00
89,513.00 *
1,295.00
1,295.00 *
555.00
555.00 *
0.00 *
2,987.00
2,987.00 *
94,350.00 *

106,930.00
101,846.33
101,846.33 *
1,467.67
1,467.67 *
629.00
629.00 *
0.00 *
2,987.00
2,987.00 *
106,930.00 *

106,930.00
101,846.33
101,846.33 *
1,467.67
1,467.67 *
629.00
629.00 *
0.00 *
2,987.00
2,987.00 *
106,930.00 *

UNITARIO

TOTAL

41,667.00
20,500.00
10,063.46
10,063.46

12,705.37

41,667.00
20,500.00
3,679.00
10,476.91
10,476.91

12,705.37

41,667.00
20,500.00
3,679.00
10,476.91
10,476.91

12,705.37

41,667.00
20,500.00
3,155.14
3,155.14

12,008.85

160 de 448

10,258.14
996.12
3,063.05
4,059.17 *
134.31
134.31 *
60.38
60.38 *
0.00 *
6,004.28
6,004.28 *
10,258.14 *

10,679.87
996.12
3,063.05
413.46
4,472.63 *
140.10
140.10 *
62.86
62.86 *
0.00 *
6,004.28
6,004.28 *
10,679.87 *

10,679.87
996.12
3,063.05
413.46
4,472.63 *
140.10
140.10 *
62.86
62.86 *
0.00 *
6,004.28
6,004.28 *
10,679.87 *

96.67
297.25
393.92 *
94.65
94.65 *
63.10
63.10 *
0.00 *
3,281.35
3,281.35 *
3,833.03 *

UNITARIO

TOTAL

41,667.00
20,500.00
1,767.25
1,767.25

12,705.37

80,576.87
2,660.00
3,400.00
110,863.44
110,863.44

12,705.37

32,917.00
49,896.27
1,000.00
68,018.56
68,018.56

12,705.37

32,917.00

161 de 448

1,802.60
48.33
148.63
196.96 *
24.74
24.74 *
10.60
10.60 *
0.00 *
1,570.29
1,570.29 *
1,802.60 *

113,080.71
84,605.72
5,320.00
102.00
90,027.72 *
1,552.09
1,552.09 *
665.18
665.18 *
0.00 *
20,835.72
20,835.72 *
113,080.71 *

69,378.93
658.34
52,391.09
4,000.00
57,049.43 *
952.26
952.26 *
408.11
408.11 *
0.00 *
10,969.13
10,969.13 *
69,378.93 *

69,378.93
658.34

UNITARIO

TOTAL

49,896.27
1,000.00
68,018.56
68,018.56

12,705.37

324,816.63
2,846.20
3,638.00
367,694.72
367,694.72

12,705.37

324,816.63
2,846.20
3,638.00
367,694.72
367,694.72

12,705.37

324,816.63
6,292.81
2,846.20
3,638.00
313,091.00
313,091.00

162 de 448

52,391.09
4,000.00
57,049.43 *
952.26
952.26 *
408.11
408.11 *
0.00 *
10,969.13
10,969.13 *
69,378.93 *

375,048.62
341,057.46
5,692.40
109.14
346,859.00 *
5,147.73
5,147.73 *
2,206.17
2,206.17 *
0.00 *
20,835.72
20,835.72 *
375,048.62 *

375,048.62
341,057.46
5,692.40
109.14
346,859.00 *
5,147.73
5,147.73 *
2,206.17
2,206.17 *
0.00 *
20,835.72
20,835.72 *
375,048.62 *

319,352.82
238,740.22
12,585.61
5,692.40
109.14
257,127.37 *
4,383.27
4,383.27 *
1,878.55
1,878.55 *

UNITARIO

TOTAL

12,705.37

324,816.63
6,292.81
2,846.20
3,638.00
313,091.00
313,091.00

12,705.37

204,469.06
6,403.33
13,573.46
25,615.82
306,475.44
306,475.44
306,475.44
23,276.80

0.00 *
55,963.63
55,963.63 *
319,352.82 *

319,352.82
238,740.22
12,585.61
5,692.40
109.14
257,127.37 *
4,383.27
4,383.27 *
1,878.55
1,878.55 *
0.00 *
55,963.63
55,963.63 *
319,352.82 *

314,948.61
214,692.51
24,608.00
27,146.92
25,615.82
292,063.25 *
3,064.75
3,064.75 *
5,408.42
5,408.42 *
0.00
0.00 *
14,412.19
14,412.19 *
314,948.61 *

275,888.41
192,665.70
6,403.33
13,573.46
268,466.09
268,466.09
268,466.09
23,276.80

163 de 448

202,298.98
24,608.00
27,146.92
254,053.90 *
2,684.66
2,684.66 *
4,737.66
4,737.66 *
0.00
0.00 *
14,412.19
14,412.19 *
275,888.41 *

UNITARIO

TOTAL

194,663.41
117,389.72
6,403.33
13,573.46
189,426.31
189,426.31
189,426.31
23,276.80

263,979.78
6,403.33
13,573.46
343,345.88
343,345.88
343,345.88
23,276.80

263,979.78
6,403.33
13,573.46
343,345.88
343,345.88
343,345.88
23,276.80

67,025.00
6,971.13
6,971.13

164 de 448

123,259.20
24,608.00
27,146.92
175,014.12 *
1,894.26
1,894.26 *
3,342.83
3,342.83 *
0.00
0.00 *
14,412.19
14,412.19 *
194,663.41 *

352,838.41
277,178.77
24,608.00
27,146.92
328,933.69 *
3,433.46
3,433.46 *
6,059.07
6,059.07 *
0.00
0.00 *
14,412.19
14,412.19 *
352,838.41 *

352,838.41
277,178.77
24,608.00
27,146.92
328,933.69 *
3,433.46
3,433.46 *
6,059.07
6,059.07 *
0.00
0.00 *
14,412.19
14,412.19 *
352,838.41 *

7,082.67
4,691.75
4,691.75
69.71
69.71 *
41.83
41.83 *

UNITARIO

TOTAL

7,467.86

0.00
0.00 *
2,279.38
2,279.38 *
7,082.67 *

305,364.75

219,983.15
6,403.33
13,573.46
297,149.42
297,149.42
297,149.42
23,276.80

230,982.31
24,608.00
27,146.92
282,737.23 *
2,971.49
2,971.49 *
5,243.84
5,243.84 *
0.00
0.00 *
14,412.19
14,412.19 *
305,364.75 *

194,663.41
117,389.72
6,403.33
13,573.46
189,426.31
189,426.31
189,426.31
23,276.80

62,833.33
21,760.26
6,403.33
13,573.46
240,943.39
240,943.39
240,943.39

165 de 448

123,259.20
24,608.00
27,146.92
175,014.12 *
1,894.26
1,894.26 *
3,342.83
3,342.83 *
0.00
0.00 *
14,412.19
14,412.19 *
194,663.41 *

247,604.78
65,975.00
108,801.28
24,608.00
27,146.92
226,531.20 *
2,409.43
2,409.43 *
4,251.96
4,251.96 *
0.00
0.00 *

UNITARIO

TOTAL

23,276.80

14,412.19
14,412.19 *
247,604.78 *

9,951.87
41,667.00

871.58

20,500.00

2,680.09
3,551.67 *
87.85
87.85 *
37.65
37.65 *

6,274.70
6,274.70

12,705.37

0.00 *
6,274.70
6,274.70 *
9,951.87 *

13,970.52
41,667.00

1,223.53

20,500.00

3,762.34
4,985.87 *
123.32
123.32 *
52.85
52.85 *

8,808.48
8,808.48

12,705.37

41,667.00
20,500.00
346.00
8,071.00
200.00
13,800.00

41,667.00
20,500.00
346.00
8,071.00
200.00

166 de 448

0.00 *
8,808.48
8,808.48 *
13,970.52 *

658.31
1,805.79
2,076.00
645.39
5,185.48 *
200.00
200.00 *
70.66
70.66 *
14,025.22
14,025.22 *
19,481.36 *

1,544.01
4,235.34
4,869.10
1,513.72
12,162.17 *
200.00
200.00 *

UNITARIO

TOTAL

13,800.00

41,667.00
20,500.00
3,400.00
48,616.16
69,511.84
69,511.84
13,450.88
12,705.37

41,667.00
20,500.00
3,400.00
51,217.35
72,243.09
72,243.09
13,450.88
12,705.37

70.66
70.66 *
33,259.25
33,259.25 *
45,692.08 *
45,692.08

84,352.95
833.34
2,570.70
680.00
51,046.97
55,131.01 *
973.17
973.17 *
417.07
417.07 *
13,450.88
13,450.88 *
14,380.83
14,380.83 *
84,352.95 *

87,138.83
833.34
2,570.70
680.00
53,778.22
57,862.26 *
1,011.40
1,011.40 *
433.46
433.46 *
13,450.88
13,450.88 *
14,380.83
14,380.83 *
87,138.83 *

120,000.00
107,006.72
117,647.06
117,647.06

12,705.37

167 de 448

112,357.06
112,357.06 *
1,647.06
1,647.06 *
705.88
705.88 *
0.00 *
5,290.00
5,290.00 *
120,000.00 *

UNITARIO

TOTAL

69,658.45
78,431.37
78,431.37

12,705.37

90,015.39
2,660.00
3,400.00
120,773.88
120,773.88

12,705.37

3,400.00
27,169.75
1,000.00
44,177.37
44,177.37

12,705.37

3,400.00
27,169.75
1,000.00
44,177.37
44,177.37

168 de 448

73,141.37
73,141.37 *
1,098.04
1,098.04 *
470.59
470.59 *
0.00 *
5,290.00
5,290.00 *
80,000.00 *

123,189.36
94,516.16
5,320.00
102.00
99,938.16 *
1,690.83
1,690.83 *
724.64
724.64 *
0.00 *
20,835.72
20,835.72 *
123,189.36 *

45,060.92
680.00
28,528.24
4,000.00
33,208.24 *
618.48
618.48 *
265.06
265.06 *
0.00 *
10,969.13
10,969.13 *
45,060.92 *

45,060.92
680.00
28,528.24
4,000.00
33,208.24 *
618.48
618.48 *
265.06
265.06 *

UNITARIO

TOTAL

12,705.37

3,400.00
42,744.15
1,000.00
60,530.49
60,530.49

12,705.37

3,400.00
61,363.82
1,000.00
80,081.14
80,081.14

12,705.37

3,400.00
42,744.15
1,000.00
60,530.49
60,530.49

12,705.37

169 de 448

0.00 *
10,969.13
10,969.13 *
45,060.92 *

61,741.10
680.00
44,881.35
4,000.00
49,561.35 *
847.43
847.43 *
363.18
363.18 *
0.00 *
10,969.13
10,969.13 *
61,741.10 *

81,682.77
680.00
64,432.01
4,000.00
69,112.01 *
1,121.14
1,121.14 *
480.49
480.49 *
0.00 *
10,969.13
10,969.13 *
81,682.77 *

61,741.10
680.00
44,881.35
4,000.00
49,561.35 *
847.43
847.43 *
363.18
363.18 *
0.00 *
10,969.13
10,969.13 *
61,741.10 *

UNITARIO

TOTAL

406,000.00
318,039.22

398,039.22
398,039.22

12,705.37

318,039.22
318,039.22 *
5,572.55
5,572.55 *
2,388.24
2,388.24 *
0.00 *
80,000.00
80,000.00 *
406,000.00 *

36,937.38

2,054.00

2,054.00

1,723.00

1,723.00

552,673.00

33,160.38
36,937.38 *

3,400.00
43,669.26
1,000.00
61,501.85
61,501.85

12,705.37

62,731.89
680.00
45,852.72
4,000.00
50,532.72 *
861.03
861.03 *
369.01
369.01 *
0.00 *
10,969.13
10,969.13 *
62,731.89 *

51,617.10
3,552.00

47,774.40
47,774.40 *

51,106.04

255.53
255.53 *

51,106.04

255.53
255.53 *
0.00 *

12,008.85

170 de 448

3,331.64

UNITARIO

TOTAL

3,331.64 *
51,617.10 *

3,400.00
2,407.15
1,000.00
18,519.43
18,519.43

12,705.37

18,889.82
460.00
9,628.60
280.00
10,368.60 *
259.27
259.27 *
111.12
111.12 *
0.00 *
8,150.83
8,150.83 *
18,889.82 *

56,293.66

41,667.00
20,500.00
3,400.00

166.67
514.14
136.00

39,000.00

40,950.00

52,552.43
52,552.43
13,450.88
12,705.37

41,766.81 *
735.73
735.73 *
315.31
315.31 *

2,690.18
2,690.18 *
10,785.62
10,785.62 *
56,293.66 *

124,466.52
35,372.77

5,199.80

281,984.40

41,451.71

3,583.00

526.70

3,224.80

2,257.36

3,538.00

2,476.60

41,667.00

621.69

20,500.00

1,593.07

340.11

6,309.10

4,479.52

28,471.82
88,907.84 *

117,681.20

1,647.54
1,647.54 *

117,681.20

364.55

3,915.00

4,773.24
5,137.79 *

171 de 448

UNITARIO

TOTAL

0.00 *
13,029.61
28,773.35

28,773.35
28,773.35 *
124,466.52 *

58,900.91
496,076.59
26,196.04
120.00
40,336.04
40,336.04
3,915.00

12,705.37

3,005.15
1,012.75
26,196.04
600.00
30,813.94 *
564.70
564.70 *
242.02
549.67
791.68 *
0.00 *
9,522.10
9,522.10 *
41,692.42 *

47,480.56
41,667.00
20,500.00
982.00
35,372.77
313,316.00
3,583.00
2,088.00
45,161.71
45,161.71
61,000.00
3,915.00

12,705.37

41,667.00
20,500.00
37,592.00
8,018.53

468.75
1,153.13
9,341.63
1,857.07
16,449.09
188.11
5,059.22
34,517.00 *
623.08
623.08 *
270.97
1,424.80
0.00
1,695.77 *
0.00 *
10,644.71
10,644.71 *
47,480.56 *

327.00
1,070.10
46,990.00
48,387.10
160.37
160.37 *
0.00 *
0.00
0.00 *

172 de 448

UNITARIO

TOTAL

12,216.70

8,236.00
14,258.30
14,258.30

12,705.37

801,071.29
817,328.79
2,817.22
2,939.71
540.06
2,666,897.06
115.19
47,391.03
47,391.03

12,008.85

801,071.29
817,328.79
2,817.22
2,939.71
540.06
2,666,897.06
115.19
47,391.03
47,391.03

173 de 448

8,018.53
8,018.53 *
56,566.00 *

14,537.76
9,059.60
9,059.60 *
193.92
193.92 *
85.55
85.55 *
0.00 *
5,198.70
5,198.70 *
14,537.76 *

48,338.85
8,900.79
26,365.44
809.67
844.87
540.06
703.74
508.77
38,673.34 *
663.47
663.47 *
284.35
284.35 *
0.00 *
8,717.69
8,717.69 *
48,338.85 *

48,338.85
8,900.79
26,365.44
809.67
844.87
540.06
703.74
508.77
38,673.34 *
663.47
663.47 *
284.35
284.35 *

UNITARIO

TOTAL

12,008.85

801,071.29
817,328.79
2,817.22
2,939.71
540.06
2,666,897.06
115.19
47,391.03
47,391.03

12,008.85

801,071.29
817,328.79
2,817.22
2,939.71
540.06
2,666,897.06
115.19
47,391.03
47,391.03

12,008.85

474,346.56
1,255,884.75
1,632.34
2,811.85
2,934.10
539.03
2,661,808.83
114.97

174 de 448

0.00 *
8,717.69
8,717.69 *
48,338.85 *

48,338.85
8,900.79
26,365.44
809.67
844.87
540.06
703.74
508.77
38,673.34 *
663.47
663.47 *
284.35
284.35 *
0.00 *
8,717.69
8,717.69 *
48,338.85 *

48,338.85
8,900.79
26,365.44
809.67
844.87
540.06
703.74
508.77
38,673.34 *
663.47
663.47 *
284.35
284.35 *
0.00 *
8,717.69
8,717.69 *
48,338.85 *

57,820.02
2,635.26
40,512.41
1,632.34
808.13
843.26
539.03
702.39
507.80

UNITARIO

TOTAL

56,686.29
56,686.29

12,008.85

472,723.09
1,251,586.45
54,826.13
2,802.22
2,924.06
537.19
2,652,698.71
114.58
89,781.82
89,781.82

12,008.85

472,723.09
1,063,625.81
46,592.46
2,802.22
2,924.06
537.19
2,652,698.71
114.58
78,406.53
78,406.53

12,008.85

175 de 448

48,180.61 *
793.61
793.61 *
340.12
340.12 *
0.00 *
8,505.68
8,505.68 *
57,820.02 *

91,577.46
2,626.24
40,373.76
35,371.70
805.36
840.37
537.19
699.99
505.63
81,760.23 *
1,256.95
1,256.95 *
538.69
538.69 *
0.00 *
8,021.59
8,021.59 *
91,577.46 *

79,974.66
2,626.24
34,310.51
30,059.65
805.36
840.37
537.19
699.99
505.63
70,384.94 *
1,097.69
1,097.69 *
470.44
470.44 *
0.00 *
8,021.59
8,021.59 *
79,974.66 *

UNITARIO

TOTAL

17,962.64
6,368.78
316.09
1,943.04
1,450.00
41,860.00
44,658.55
44,658.55

24,207.87

39,185.14
6,368.78
316.09
1,943.04
1,450.00
41,860.00
69,812.91
69,812.91

24,207.87

17,962.64
6,368.78
316.09
1,943.04
1,450.00
41,860.00
13,357.90
58,684.35
58,684.35

176 de 448

7,005.43
10,954.30
1,896.55
3,886.08
1,522.50
2,930.20
28,195.05 *
687.88
687.88 *
267.95
267.95 *
0.00 *
16,463.50
16,463.50 *
45,614.38 *

15,282.20
16,431.45
2,844.82###
3,886.08
1,522.50
2,930.20
42,897.25 *
1,072.72
1,072.72 *
418.88
418.88 *
0.00 *
26,915.66
26,915.66 *
71,304.50 *

7,005.43
10,954.30
1,896.55
3,886.08
1,522.50
2,930.20
14,025.80
42,220.85 *
915.40
915.40 *
352.11
352.11 *

UNITARIO

TOTAL

24,207.87

0.00 *
16,463.50
16,463.50 *
59,951.86 *
59,951.86

216,590.85
129,932.08
6,403.33
13,573.46
215,099.26
215,099.26
215,099.26
24,207.87

105,503.51
6,403.33
13,573.46
189,449.26
189,449.26
189,449.26
24,207.87

136,428.68
24,608.00
27,146.92
188,183.60 *
1,491.59
1,491.59 *
0.00
0.00 *
0.00
0.00 *
26,915.66
26,915.66 *
216,590.85 *

190,940.85
110,778.68
24,608.00
27,146.92
162,533.60 *
1,491.59
1,491.59 *
0.00
0.00 *
0.00
0.00 *
26,915.66
26,915.66 *
190,940.85 *
190,940.85

751,357.00

372,564.06

372,564.06

281,057.09

281,057.09

292,452.83

653,621.15
5,849.06
5,849.06 *

177 de 448

UNITARIO

TOTAL

292,452.83
292,452.83
22,000.75

8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
751,357.00 *
751,357.00

756,068.00

375,249.33

375,249.33

283,082.82

283,082.82

292,452.83
292,452.83
292,452.83
22,000.75

658,332.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
756,068.00 *
756,068.00

763,202.00

379,315.71

379,315.71

286,150.44

286,150.44

292,452.83
292,452.83
292,452.83
22,000.75

665,466.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
763,202.00 *
763,202.00

763,103.00

379,259.28

178 de 448

379,259.28

UNITARIO

TOTAL

286,107.87

286,107.87
665,367.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
763,103.00 *
763,103.00

292,452.83
292,452.83
292,452.83
22,000.75

722,622.00

356,185.11

356,185.11

268,701.04

268,701.04
624,886.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
722,622.00 *
722,622.00

292,452.83
292,452.83
292,452.83
22,000.75

6,262,857.00
549,780.34

3,286,586.89

414,746.57

2,479,355.02

292,452.83
292,452.83
292,452.83
22,000.75

5,765,941.91
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
479,367.92
479,367.92 *
6,262,857.00 *
6,262,857.00
0.00
#DIV/0!
#DIV/0!

179 de 448

UNITARIO

TOTAL

746,384.00

369,729.45

369,729.45

278,918.70

278,918.70

292,452.83
292,452.83
292,452.83
22,000.75

648,648.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
746,384.00 *
746,384.00

763,825.00

379,670.82

379,670.82

286,418.33

286,418.33

292,452.83
292,452.83
292,452.83
22,000.75

666,089.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
763,825.00 *
763,825.00

868,969.00

439,602.90

439,602.90

331,630.25

331,630.25

292,452.83
292,452.83
292,452.83
22,000.75

180 de 448

771,233.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68

UNITARIO

TOTAL
80,188.68 *
868,969.00 *
868,969.00

929,337.00

474,012.66

474,012.66

357,588.49

357,588.49
831,601.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
929,337.00 *
929,337.00

292,452.83
292,452.83
292,452.83
22,000.75

621,999.00

298,830.00

298,830.00

225,433.15

225,433.15
524,263.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
621,999.00 *
621,999.00

292,452.83
292,452.83
292,452.83
22,000.75

6,222,199.00

545,903.62

3,263,411.83

411,822.03

2,461,872.08

292,452.83
292,452.83
292,452.83
22,000.75

5,725,283.91
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
479,367.92
479,367.92 *

181 de 448

UNITARIO

TOTAL
6,222,199.00 *
6,222,199.00

711,729.00

349,976.10

349,976.10

264,017.05

264,017.05
613,993.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
711,729.00 *
711,729.00

292,452.83
292,452.83
292,452.83
22,000.75

6,222,199.00

545,903.62

3,263,411.83

411,822.03

2,461,872.08

292,452.83
292,452.83
292,452.83
22,000.75

5,725,283.91
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
479,367.92
479,367.92 *
6,222,199.00 *
6,222,199.00

757,082.00

375,827.31

375,827.31

283,518.84

283,518.84

292,452.83
292,452.83
292,452.83
22,000.75

182 de 448

659,346.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
757,082.00 *

UNITARIO

TOTAL
757,082.00

757,082.00

375,827.31

375,827.31

283,518.84

283,518.84
659,346.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
757,082.00 *
757,082.00

292,452.83
292,452.83
292,452.83
22,000.75

682,933.00

333,562.38

333,562.38

251,634.77

251,634.77
585,197.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
682,933.00 *
682,933.00

292,452.83
292,452.83
292,452.83
22,000.75

3,556,722.28

686,166.60

2,017,329.81

517,634.46

1,521,845.30

292,452.83
292,452.83
292,452.83
22,000.75

3,539,175.11
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
0.00
0.00 *
3,556,722.28 *

183 de 448

UNITARIO

TOTAL
3,792,477.00

747,263.00
370,230.48

370,230.48

279,296.67

279,296.67
649,527.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
747,263.00 *
747,263.00

292,452.83
292,452.83
292,452.83
22,000.75

748,376.00

370,864.89

370,864.89

279,775.26

279,775.26
650,640.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
748,376.00 *
748,376.00

292,452.83
292,452.83
292,452.83
22,000.75

6,222,199.00

545,903.62

3,263,411.83

411,822.03

2,461,872.08

292,452.83
292,452.83
292,452.83
22,000.75

5,725,283.91
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
479,367.92
479,367.92 *
6,222,199.00 *

184 de 448

UNITARIO

TOTAL

768,929.00
382,580.10

382,580.10

288,613.05

288,613.05

292,452.83
292,452.83
292,452.83
22,000.75

671,193.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
768,929.00 *
768,929.00

719,111.00

354,183.84

354,183.84

267,191.31

267,191.31

292,452.83
292,452.83
292,452.83
22,000.75

621,375.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
719,111.00 *
719,111.00

662,813.00

322,093.98

322,093.98

242,983.17

242,983.17

292,452.83
292,452.83
292,452.83
22,000.75

185 de 448

565,077.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
662,813.00 *

UNITARIO

TOTAL

662,813.00

322,093.98

322,093.98

242,983.17

242,983.17
565,077.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
662,813.00 *

292,452.83
292,452.83
292,452.83
22,000.75

6,222,199.00

545,903.62

3,263,411.83

411,822.03

2,461,872.08

292,452.83
292,452.83
292,452.83
22,000.75

5,725,283.91
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
479,367.92
479,367.92 *
6,222,199.00 *

746,245.00

369,650.22

369,650.22

278,858.93

278,858.93

292,452.83
292,452.83
292,452.83
22,000.75

186 de 448

648,509.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
746,245.00 *

UNITARIO

TOTAL

699,378.00

342,936.03

342,936.03

258,706.12

258,706.12
601,642.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
699,378.00 *

292,452.83
292,452.83
292,452.83
22,000.75

6,117,269.00

830,291.81

3,295,428.19

626,360.49

2,486,024.77

292,452.83
292,452.83
292,452.83
22,000.75

5,781,452.96
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
318,268.87
318,268.87 *
6,117,269.00 *
6,117,269.00
0.00
#DIV/0!
#DIV/0!

746,591.00

369,847.44

369,847.44

279,007.71

279,007.71

292,452.83
292,452.83
292,452.83
22,000.75

187 de 448

648,855.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
746,591.00 *
746,591.00
0.00

UNITARIO

TOTAL
0.00
0.00

447,874.00

199,578.75

199,578.75

150,559.40

150,559.40
350,138.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
447,874.00 *
447,874.00
0.00
0.00
0.00

292,452.83
292,452.83
292,452.83
22,000.75

2,353,147.00

286,000.00
40,000.00
2,262,641.35
2,262,641.35
2,262,641.35
22,000.75

1,799,561.22
251,686.88
2,051,248.11
22,626.41
22,626.41 *
45,252.83
45,252.83 *
22,626.41
22,626.41 *
211,393.24
211,393.24 *
2,353,147.00 *

1,138,785.00

286,000.00
40,000.00
1,094,985.58
1,094,985.58

188 de 448

870,881.98
121,801.68
992,683.66
10,949.86
10,949.86 *
21,899.71

UNITARIO

1,094,985.58
22,000.75

TOTAL
21,899.71 *
10,949.86
10,949.86 *
102,301.92
102,301.92 *
1,138,785.00 *

4,545,800.00

286,000.00
40,000.00
4,370,961.54
4,370,961.54
4,370,961.54
22,000.75

3,476,385.20
486,207.72
3,962,592.92
43,709.62
43,709.62 *
87,419.23
87,419.23 *
43,709.62
43,709.62 *
408,368.62
408,368.62 *
4,545,800.00 *

4,547,606.00

286,000.00
40,000.00
4,372,698.08
4,372,698.08
4,372,698.08
22,000.75

3,477,766.33
486,400.89
3,964,167.22
43,726.98
43,726.98 *
87,453.96
87,453.96 *
43,726.98
43,726.98 *
408,530.86
408,530.86 *
4,547,606.00 *

20,004,033.00

286,000.00
40,000.00
19,234,647.12
19,234,647.12
19,234,647.12
22,000.75

15,298,016.69
2,139,582.75
17,437,599.45
192,346.47
192,346.47 *
384,692.94
384,692.94 *
192,346.47
192,346.47 *
1,797,047.67

189 de 448

UNITARIO

TOTAL
1,797,047.67 *
20,004,033.00 *

2,406,018.00

286,000.00
40,000.00
2,313,478.85
2,313,478.85
2,313,478.85
22,000.75

1,839,994.14
257,341.84
2,097,335.98
23,134.79
23,134.79 *
46,269.58
46,269.58 *
23,134.79
23,134.79 *
216,142.87
216,142.87 *
2,406,018.00 *

6,247,859.00

286,000.00
40,000.00
6,007,556.73
6,007,556.73
6,007,556.73
22,000.75

4,778,029.07
668,255.81
5,446,284.89
60,075.57
60,075.57 *
120,151.13
120,151.13 *
60,075.57
60,075.57 *
561,271.84
561,271.84 *
6,247,859.00 *

711,729.00

349,976.10

349,976.10

264,017.05

264,017.05

292,452.83
292,452.83
292,452.83
22,000.75

190 de 448

613,993.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *

UNITARIO

TOTAL
711,729.00 *

6,222,199.00

545,903.62

3,263,411.83

411,822.03

2,461,872.08

292,452.83
292,452.83
292,452.83
22,000.75

5,725,283.91
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
479,367.92
479,367.92 *
6,222,199.00 *

711,729.00

349,976.10

349,976.10

264,017.05

264,017.05
613,993.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
711,729.00 *
711,729.00
0.00
0.00
0.00

292,452.83
292,452.83
292,452.83
22,000.75

6,222,199.00

545,903.62

3,263,411.83

411,822.03

2,461,872.08

292,452.83
292,452.83
292,452.83
22,000.75

5,725,283.91
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
479,367.92
479,367.92 *
6,222,199.00 *

191 de 448

UNITARIO

TOTAL

734,484.00

362,946.45

362,946.45

273,801.70

273,801.70
636,748.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
734,484.00 *

292,452.83
292,452.83
292,452.83
22,000.75

711,729.00

349,976.10

349,976.10

264,017.05

264,017.05
613,993.15
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
80,188.68
80,188.68 *
711,729.00 *
711,729.00
0.00
0.00
0.00

292,452.83
292,452.83
292,452.83
22,000.75

6,222,199.00

545,903.62

3,263,411.83

411,822.03

2,461,872.08

292,452.83
292,452.83
292,452.83
22,000.75

5,725,283.91
5,849.06
5,849.06 *
8,773.58
8,773.58 *
2,924.53
2,924.53 *
479,367.92
479,367.92 *
6,222,199.00 *

192 de 448

UNITARIO

98,020.00
2,135.42
5,763.54
26,627.08
212,710.36
177,616.88
177,616.88
1,079,012.82
1,079,012.82
1,079,012.82
24,207.87

1,143,753.48

TOTAL

1,143,753.59
197,770.37
2,506.87
4,194.98
1,863.90
212,710.36
177,616.88
177,616.88
774,280.23 *
21,580.26
21,580.26 *
32,370.38
32,370.38 *
10,790.13
10,790.13 *
304,732.59
304,732.59 *
1,143,753.59 *
1,143,753.59

3,530,767.00
3,530,767.00 *

1,143,753.59

4,539,558.00
4,539,558.00 *

193 de 448

UNITARIO

1,143,753.59

TOTAL

4,539,558.00
4,539,558.00 *

1,143,753.79

5,212,086.00
5,212,086.00 *

1,143,753.72

5,772,525.00
5,772,525.00 *

1,143,864.57

4,467,935.00
4,467,935.00 *

194 de 448

UNITARIO

TOTAL

332,793.10
153,887.34
3,042.97
5,092.09
47,843.52
1,770.70
36,010.00
247,646.62 *
6,279.12
6,279.12 *
9,418.67
9,418.67 *
3,139.56
3,139.56 *
66,309.14
66,309.14 *
332,793.10 *

62,833.33
2,135.42
5,763.54
19,520.00
26,627.08
18,952.63
313,955.76
313,955.76
313,955.76
24,207.87

332,793.14

1,299,890.00
1,299,890.00 *

332,793.14

1,299,890.00
1,299,890.00 *

332,793.14

1,299,890.00
1,299,890.00 *

332,793.14

1,299,890.00
1,299,890.00 *

332,793.15

670,911.00
670,911.00 *

195 de 448

UNITARIO

TOTAL

335,153.33

992,389.00
992,389.00 *

332,793.14

1,299,890.00
1,299,890.00 *

332,793.14

1,299,890.00
1,299,890.00 *

332,793.15

670,911.00
670,911.00 *

332,793.15

670,911.00
670,911.00 *

332,792.89

880,570.00
880,570.00 *

332,792.61

531,137.00
531,137.00 *

332,793.15

670,911.00
670,911.00 *

4,255.54
5,212.66
5,923.48
191.37

196 de 448

392,965.61
155,578.87
5,717.11
4,331.14
7,906.00

UNITARIO

TOTAL

1,000.00
445.00

36,559.11
16,325.62
226,417.86
307.05
307.05 *
2,607.39
2,607.39 *
7,250.27
7,250.27 *

281,194.18
281,194.18
207.51
101,606.73

101,606.73

*
25,853.57
23,151.87
5,770.89
54,776.32 *
392,965.61 *

12,216.70
12,216.70
22,306.93

392,965.61

8,169,755.00
8,169,755.00 *

392,965.61

10,249,329.00
10,249,329.00 *

392,965.61

5,479,316.00
5,479,316.00 *

50,715.56
23,582.73
135,047.62
111,447.44
371,933.96
371,933.96
371,933.96
22,880.78

197 de 448

394,250.00
76,073.34
35,374.10
141,800.00
5,572.37
258,819.81 *
7,438.68
7,438.68 *
11,158.02
11,158.02 *
3,719.34
3,719.34 *
113,114.15
113,114.15 *
394,250.00 *
394,250.00

UNITARIO

TOTAL

50,715.56
27,893.25
23,582.73
155,416.74
226,117.92
226,117.92
226,117.92
22,880.78

50,715.56
27,893.25
23,582.73
155,416.74
226,117.92
226,117.92
226,117.92
22,880.78

30,801.48
16,940.63
5,533.00
25,562.00
147,895.28
147,895.28
147,895.28
22,880.78

327,294.00
7,925.21

198 de 448

239,685.00
50,715.56
81,118.44
23,582.73
7,770.84
163,187.58 *
4,522.36
4,522.36 *
6,783.54
6,783.54 *
2,261.18
2,261.18 *
62,930.35
62,930.35 *
239,685.00 *

239,685.00
50,715.56
81,118.44
23,582.73
7,770.84
163,187.58 *
4,522.36
4,522.36 *
6,783.54
6,783.54 *
2,261.18
2,261.18 *
62,930.35
62,930.35 *
239,685.00 *

156,769.00
30,801.48
50,821.89
2,479.39
862.17
84,964.93 *
2,957.91
2,957.91 *
4,436.86
4,436.86 *
1,478.95
1,478.95 *
62,930.35
62,930.35 *
156,769.00 *

178,820.38
19,108.65

UNITARIO

TOTAL

81,700.00
11,130.20
85,500.00

39,397.72
11,405.41
2,067.83
250,800.00
112,860.00
363,660.00 *

250,800.00

327,294.00
7,925.21
81,700.00
11,130.20
85,500.00
778,872.24

555,335.86
59,342.88
122,351.65
35,420.09
6,421.76
778,872.24
350,492.51
1,129,364.75 *

327,294.00
7,925.21
81,700.00
11,130.20
85,500.00
456,000.00

327,294.00
7,925.21
81,700.00
11,130.20
85,500.00
261,761.03

327,294.00
7,925.21
81,700.00
11,130.20
85,500.00
152,000.00

327,294.00
7,925.21
81,700.00
11,130.20
85,500.00

199 de 448

325,127.97
34,742.99
71,632.22
20,737.11
3,759.70
456,000.00
205,200.00
661,200.00 *

186,635.60
19,943.78
41,119.57
11,903.88
2,158.21
261,761.03
117,792.47
379,553.50 *

108,375.99
11,581.00
23,877.41
6,912.37
1,253.23
152,000.00
68,400.00
220,400.00 *

140,888.79
15,055.30
31,040.63
8,986.08
1,629.20

UNITARIO

TOTAL
197,600.00
88,920.00
286,520.00 *

197,600.00

375,382.22
127,707.13
78,558.00
37,063.64
36,049.04
279,377.81 *
7,082.68
7,082.68 *
10,624.03
10,624.03 *
3,541.34
3,541.34 *
74,756.36
74,756.36 *
375,382.22 *

121,625.84
19,639.50
37,063.64
36,049.04
354,134.17
354,134.17
354,134.17
22,000.75

375,382.22

675,688.00
675,688.00 *

375,382.14

525,535.00
525,535.00 *

375,382.14

1,051,070.00
1,051,070.00 *

66,628.00
106,995.16
79,900.00
31,850.00
33,872.00
26.60

200 de 448

273,663.85
46,043.67
92,728.17
31,410.29
6,089.64
11,290.67
201.50

UNITARIO

TOTAL

3,759.00

969.77
188,733.69 *
5,163.47
5,163.47 *
7,745.20
7,745.20 *
2,581.73
2,581.73 *
69,439.75
69,439.75 *
273,663.85 *

258,173.45
258,173.45
258,173.45
22,880.78

2,518,438.03
77,889.84
8,371,832.72
8,371,832.72
8,371,832.72
22,880.78

2,518,438.03
77,889.84
3,354,031.72
3,354,031.72
3,354,031.72
22,880.78

2,518,438.03
77,889.84

8,874,142.68
5,968,698.14
184,598.91
6,153,297.05 *
167,436.65
167,436.65 *
251,154.98
251,154.98 *
83,718.33
83,718.33 *
2,218,535.67
2,218,535.67 *
8,874,142.68 *

3,555,273.62
2,391,256.91
73,956.40
2,465,213.31 *
67,080.63
67,080.63 *
100,620.95
100,620.95 *
33,540.32
33,540.32 *
888,818.40
888,818.40 *
3,555,273.62 *

6,694,922.83
4,502,967.20
139,267.03

201 de 448

UNITARIO

6,315,964.94
6,315,964.94
6,315,964.94
22,880.78

2,518,438.03
77,889.84
6,315,964.94
6,315,964.94
6,315,964.94
22,880.78

TOTAL
4,642,234.23 *
126,319.30
126,319.30 *
189,478.95
189,478.95 *
63,159.65
63,159.65 *
1,673,730.71
1,673,730.71 *
6,694,922.83 *

6,694,922.83
4,502,967.20
139,267.03
4,642,234.23 *
126,319.30
126,319.30 *
189,478.95
189,478.95 *
63,159.65
63,159.65 *
1,673,730.71
1,673,730.71 *
6,694,922.83 *

5,592,125.25
106,995.16
66,628.00
79,900.00
31,850.00
950.00
26.60
3,759.00
5,275,589.86
5,275,589.86
5,275,589.86
22,880.78

2,005,232.41
995,687.19
679,242.63
131,687.45
40,380.51
4,357.33
20,971.03
3,877,558.55 *
105,511.80
105,511.80 *
158,267.70
158,267.70 *
52,755.90
52,755.90 *
1,398,031.31
1,398,031.31 *
5,592,125.25 *

4,059,468.70
106,995.16
66,628.00
79,900.00

1,455,650.19
722,795.15
493,079.83

202 de 448

UNITARIO
31,850.00
950.00
26.60
3,759.00
3,829,687.45
3,829,687.45
3,829,687.45
22,880.78

TOTAL
95,595.33
29,313.26
3,163.10
15,223.42
2,814,820.28 *
76,593.75
76,593.75 *
114,890.62
114,890.62 *
38,296.87
38,296.87 *
1,014,867.18
1,014,867.18 *
4,059,468.70 *

5,898,656.56

106,995.16
66,628.00
79,900.00
31,850.00
950.00
26.60
3,759.00
5,564,770.34
5,564,770.34
5,564,770.34
22,880.78

2,115,148.85
1,050,265.60
716,475.18
138,905.87
42,593.96
4,596.18
22,120.55
4,090,106.20 *
111,295.41
111,295.41 *
166,943.11
166,943.11 *
55,647.70
55,647.70 *
1,474,664.14
1,474,664.14 *
5,898,656.56 *

2,706,000.00
106,995.16
66,628.00
79,900.00
31,850.00
950.00
26.60
3,759.00
2,552,830.19
2,552,830.19
2,552,830.19
22,880.78

970,321.42
481,807.79
328,681.93
63,722.86
19,539.91
2,108.49
10,147.77
1,876,330.19 *
51,056.60
51,056.60 *
76,584.91
76,584.91 *
25,528.30
25,528.30 *
676,500.00
676,500.00 *
2,706,000.00 *

203 de 448

UNITARIO

TOTAL

4,797,000.00
106,995.16
66,628.00
79,900.00
31,850.00
950.00
26.60
3,759.00
4,525,471.70
4,525,471.70
4,525,471.70
22,880.78

1,720,115.24
854,113.82
582,663.43
112,963.26
34,638.94
3,737.78
17,989.23
3,326,221.70 *
90,509.43
90,509.43 *
135,764.15
135,764.15 *
45,254.72
45,254.72 *
1,199,250.00
1,199,250.00 *
4,797,000.00 *

8,747.27
115,000.08
7,489.27
400,943.40
400,943.40
400,943.40
22,880.78

8,747.27
115,000.08
7,489.27
160,377.36
160,377.36
160,377.36
22,880.78

204 de 448

425,000.00
183,692.76
7,752.60
148,996.94
340,442.30 *
8,018.87
8,018.87 *
12,028.30
12,028.30 *
4,009.43
4,009.43 *
60,501.10
60,501.10 *
425,000.00 *

170,000.00
73,477.10
3,101.04
59,598.78
136,176.92 *
3,207.55
3,207.55 *
4,811.32
4,811.32 *
1,603.77
1,603.77 *
24,200.44
24,200.44 *
170,000.00 *

UNITARIO

TOTAL

410,900.00
410,900.00

410,900.00
410,900.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
410,900.00 *

410,900.00
410,900.00

410,900.00
410,900.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
410,900.00 *

368,900.00

332,900.00

368,900.00
368,900.00
368,900.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
368,900.00 *

332,900.00
332,900.00
332,900.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
332,900.00 *

159,900.00
159,900.00

205 de 448

159,900.00

UNITARIO

TOTAL
159,900.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
159,900.00 *

86,084.00
86,084.00

86,084.00
86,084.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
86,084.00 *

195,904.00

195,904.00
195,904.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
195,904.00 *

936,000.00
936,000.00

936,000.00
936,000.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
936,000.00 *

169,453.00

206 de 448

UNITARIO

TOTAL

169,453.00

169,453.00
169,453.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
169,453.00 *

458,413.00

458,413.00

458,413.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
458,413.00 *

998,000.00
998,000.00

998,000.00
998,000.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
998,000.00 *

998,000.00
998,000.00

998,000.00
998,000.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

207 de 448

UNITARIO

TOTAL
0.00
998,000.00 *

182,770.00

182,770.00

182,770.00
182,770.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
182,770.00 *

936,000.00
936,000.00

936,000.00
936,000.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
936,000.00 *

97,997.00

97,997.00
97,997.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
97,997.00 *

936,000.00
936,000.00

936,000.00
936,000.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00

208 de 448

UNITARIO

TOTAL
936,000.00 *

182,770.00

182,770.00

182,770.00
182,770.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
182,770.00 *

27,060.00

27,060.00

27,060.00
27,060.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
27,060.00 *

146,236.16

142,150.00
800.00
63.00
120.00

7,058.47

142,150.00
1,600.00
126.00
120.00
143,996.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
2,240.16
146,236.16 *

126,472.09

209 de 448

UNITARIO

TOTAL

122,256.00
800.00
63.00
120.00

7,467.86

122,256.00
1,600.00
126.00
120.00
124,102.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
2,370.09
126,472.09 *

174,216.09

170,000.00
800.00
63.00
120.00

7,467.86

170,000.00
1,600.00
126.00
120.00
171,846.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
2,370.09
174,216.09 *

111,041.09

106,825.00
800.00
63.00
120.00

7,467.86

26,116.84
800.00
63.00
120.00

210 de 448

106,825.00
1,600.00
126.00
120.00
108,671.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
2,370.09
111,041.09 *

29,469.93
26,116.84
800.00
63.00
120.00
27,099.84

UNITARIO

TOTAL

7,467.86

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
2,370.09
29,469.93 *

247,402.09
241,340.00
800.00
63.00
120.00

7,467.86

241,340.00
3,200.00
252.00
240.00
245,032.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
2,370.09
247,402.09 *

149,370.09
143,308.00
800.00
63.00
120.00

7,467.86

143,308.00
3,200.00
252.00
240.00
147,000.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
2,370.09
149,370.09 *

586,878.09

580,816.00
800.00
63.00
120.00

7,467.86

211 de 448

580,816.00
3,200.00
252.00
240.00
584,508.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
2,370.09

UNITARIO

TOTAL
586,878.09 *

115,409.39
103,359.87
5,000.00
26,100.00

7,467.86

103,359.87
666.67
3,915.00
107,941.53
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
7,467.86
115,409.39 *

4,420.49
32,917.00
1,550.00
1,000.00

7,467.86

32,917.00
24,165.48
1,000.00

7,467.86

37,900.00
6,500.00
46,192.78

212 de 448

82.29
1,550.00
200.00
1,832.29
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
2,588.20
4,420.49 *

27,035.97
82.29
24,165.48
200.00
24,447.77
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
2,588.20
27,035.97 *

47,116.64
37,900.00
650.00
38,550.00
923.86
923.86 *
0.00
0.00 *

UNITARIO

TOTAL
0.00
0.00 *
7,642.78
47,116.64 *

7,467.86

59,356.64
49,900.00
650.00
50,550.00
1,163.86
1,163.86 *
0.00
0.00 *
0.00
0.00 *
7,642.78
59,356.64 *

49,900.00
6,500.00
58,192.78

7,467.86

49,156.64
39,900.00
650.00
40,550.00
963.86
963.86 *
0.00
0.00 *
0.00
0.00 *
7,642.78
49,156.64 *

39,900.00
6,500.00
48,192.78

7,467.86

67,516.64
57,900.00
650.00
58,550.00
1,323.86
1,323.86 *
0.00
0.00 *
0.00
0.00 *
7,642.78
67,516.64 *

57,900.00
6,500.00
66,192.78

7,467.86

954,900.00
136,000.00
1,164,784.17

7,467.86

1,188,079.85
954,900.00
159,440.00
1,114,340.00
23,295.68
23,295.68 *
0.00
0.00 *
0.00
0.00 *
50,444.17
1,188,079.85 *

213 de 448

UNITARIO

TOTAL

1,942.81
4,259.42

7,467.86

55,900.00
6,500.00
64,192.78

7,467.86

144,194.00
6,500.00
152,486.78

7,467.86

41,860.00
6,500.00
870.00
6,336.15
6,336.15

23,199.21

214 de 448

4,344.61
1,942.81
1,942.81
85.19
85.19 *
0.00
0.00 *
0.00
0.00 *
2,316.61
4,344.61 *

65,476.64
55,900.00
650.00
56,550.00
1,283.86
1,283.86 *
0.00
0.00 *
0.00
0.00 *
7,642.78
65,476.64 *

152,486.78
144,194.00
650.00
144,844.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
7,642.78
152,486.78 *

6,700.60
2,930.20
130.00
17.40
3,077.60 *
237.73
237.73 *
126.72
126.72 *
0.00 *
3,258.55
3,258.55 *
6,700.60 *

UNITARIO

TOTAL

41,860.00
6,500.00
870.00
6,336.15
6,336.15

23,199.21

41,860.00
6,500.00
870.00
6,336.15
6,336.15

23,199.21

103,100.00
97,728.00
6,500.00
870.00
14,727.52
14,727.52

23,199.21

58,320.00
66,664.00
49,560.00
10,700.00
928.00
18,590.86
18,590.86

215 de 448

6,700.60
2,930.20
130.00
17.40
3,077.60 *
237.73
237.73 *
126.72
126.72 *
0.00 *
3,258.55
3,258.55 *
6,700.60 *

6,583.12
2,930.20
130.00
17.40
3,077.60 *
126.72
126.72 *
120.25
120.25 *
0.00 *
3,258.55
3,258.55 *
6,583.12 *

15,091.98
7,217.00
4,104.58
130.00
17.40
11,468.98 *
217.18
217.18 *
147.28
147.28 *
0.00 *
3,258.55
3,258.55 *
15,091.98 *

18,952.63
4,216.54
3,999.84
793.45
321.20
97.50
9,428.52
250.23
250.23 *
111.55

UNITARIO

TOTAL
111.55 *

23,199.21

0.00 *
9,162.34
9,162.34 *
18,952.63 *
18,952.63
10,629.33

58,320.00
66,664.00
49,560.00
10,700.00
928.00
10,426.54
10,426.54

23,199.21

79,045.00
79,045.00
10,700.00
6,500.00
12,360.38
12,360.38

23,199.21

79,045.00
79,045.00
10,700.00
6,500.00
2,998.27
2,998.27

23,199.21

2,319.09
2,199.91
436.40
176.66
53.63
5,185.69
140.23
140.23 *
62.56
62.56 *
0.00 *
5,240.86
5,240.86 *
10,629.33 *

12,360.38
4,041.94
4,041.94
1,290.48
332.38
9,706.75 *
0.00
0.00 *
0.00
0.00 *
0.00 *
2,653.63
2,653.63 *
12,360.38 *

2,998.27
703.22
703.22
224.52
57.83
1,688.79 *
0.00
0.00 *
0.00
0.00 *
0.00 *
1,309.48
1,309.48 *
2,998.27 *

2,998.27

216 de 448

UNITARIO

TOTAL

79,045.00
79,045.00
10,700.00
6,500.00

703.22
703.22
224.52
57.83
1,688.79 *
0.00
0.00 *
0.00
0.00 *

2,998.27
2,998.27

0.00 *
1,309.48
1,309.48 *
2,998.27 *

23,199.21

143,919,376.87

143,919,376.87

143,919,376.87
143,919,376.87 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
143,919,376.87 *

127,782,885.60

127,782,885.60

127,782,885.60
127,782,885.60 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
127,782,885.60 *

180,000,000.00
180,000,000.00

180,000,000.00
180,000,000.00 *
0.00
0.00 *
0.00
0.00 *
0.00

217 de 448

UNITARIO

TOTAL
0.00 *
0.00
0.00 *
180,000,000.00 *

1,994.16
120.00
275.00
1,964.28
1,964.28

7,467.86

14,558.00
4,400.00
4,610.48
4,610.48

7,467.86

120.00
275.00
656.25
4,050.00
2,982.10
2,982.10

7,467.86

218 de 448

60.00
137.50
197.50
18.09
18.09 *
11.79
11.79 *
0.00
0.00 *
1,766.78
1,766.78 *
1,994.16 *

4,682.69
2,183.70
660.00
2,843.70
44.56
44.56 *
27.66
27.66 *
0.00
0.00 *
1,766.78
1,766.78 *
4,682.69 *

3,027.61
120.00
275.00
9.84
60.75
465.59
27.61
27.61 *
17.89
17.89 *
0.00
0.00 *
2,516.51
2,516.51 *
3,027.61 *

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

INSTALACIONES HIDROSANITARIAS
DESAGUES, CLOACALES, SECUNDARIOS y VENTILACIONES
6.1.1

Caeria PVCS Soldable 6" inc.acc. en tierra

6.1.1 a
25K159
25K164
25K080
25K110

20H600

Tubera PVCS 6". Incluye suministro, regata y resane, instalacin


y uniones para el correcto tendido de la tubera
Tubera PVCS 6" PAVCO
Unin PVCS 6" PAVCO
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA

m
m
un
un
un
...
% (MAT+MO)
...

1.050
0.144
0.040
0.040

20,316.67
17,166.84
24,578.36
50,993.60

2%

44,209.08

0.813

21,413.54

1.000
0.040
0.040

43,900.00
24,578.36
50,993.60

2%

58,501.91

0.542

21,413.54

1.050
0.112
0.020
0.020

9,483.33
2,500.00
24,578.36
50,993.60

2%

17,720.21

0.279

21,413.54

...
...
HR

Redondeo a entero ms cercano


TOTAL UNITARIO
.

6.1.1 b

Accesorios PVCS 6" (se excluyen las uniones)

25K054
25K080
25K110

- Codo 90 PVCS CxC 6"


- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
- Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
- Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
- MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

20H600

6.1.2

Caeria PVCS Soldable 4" inc.acc. en tierra

6.1.2 a
25K158
25K163
25K080
25K110

20H600

Tubera PVCS 4". Incluye suministro, regata y resane, instalacin


y uniones para el correcto tendido de la tubera
Tubera PVCS 4" PAVCO
Unin PVCS 4" PAVCO
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)

un
un
un
un
...
% (MAT+MO)
...
...
...
HR

m
m
un
un
un
...
% (MAT+MO)
...
...
...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.1.2 b
25K053
25K080
25K110

20H600

6.1.3

Caeria PVCS Soldable 4" inc.acc. vert./susp.

6.1.3 a
25K158
25K163
25K080
25K110

20H600

6.1.3 b
25K053
25K080
25K110

20H600

6.1.4

Accesorios PVCS 4" (se excluyen las uniones)


Codo 90 PVCS CxC 4"
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Tubera PVCS 4". Incluye suministro, regata y resane, instalacin


y uniones para el correcto tendido de la tubera
Tubera PVCS 4" PAVCO
Unin PVCS 4" PAVCO
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
Accesorios PVCS 4" (se excluyen las uniones)
Codo 90 PVCS CxC 4"
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Caeria PVCS Soldable 4" inc.acc. p/ventilacin

un
un
un
un
...
% (MAT+MO)
...

1.000
0.020
0.020

4,300.00
24,578.36
50,993.60

2%

7,304.18

0.070

21,413.54

1.050
0.112
0.020
0.020

9,483.33
2,500.00
24,578.36
50,993.60

2%

17,720.21

0.279

21,413.54

1.000
0.020
0.020

4,300.00
24,578.36
50,993.60

2%

7,304.18

0.070

21,413.54

...
...
HR

m
m
un
un
un
...
% (MAT+MO)
...
...
...
HR

un
un
un
un
...
% (MAT+MO)
...
...
...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
.

6.1.4 a
25K158
25K163
25K080
25K110

20H600

6.1.4 b
25K053
25K080
25K110

20H600

6.1.5

Accesorios PVCS 4" (se excluyen las uniones)


Codo 90 PVCS CxC 4"
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Caeria PVCS Soldable 3" inc.acc. en tierra

6.1.5 a
25K157
25K162
25K080
25K110

20H600

Tubera PVCS 4". Incluye suministro, regata y resane, instalacin


y uniones para el correcto tendido de la tubera
Tubera PVCL 4" PAVCO
Unin PVCS 4" PAVCO
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.1.5 b
25K052
25K080
25K110

20H600

Tubera PVCL 3". Incluye suministro, regata y resane, instalacin


y uniones para el correcto tendido de la tubera
Tubera PVCS 3" PAVCO
Unin PVCS 3" PAVCO
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
Accesorios PVCS 3" (se excluyen las uniones)
Codo 90 PVCS CxC 3"
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)

UNIDAD

CANTIDAD

UNITARIO

m
m
un
un
un
...
% (MAT+MO)
...

1.050
0.112
0.020
0.020

6,742.65
2,500.00
24,578.36
50,993.60

2%

14,034.47

0.24

21,413.54

1.000
0.020
0.020

4,300.00
24,578.36
50,993.60

2%

7,102.68

0.060

21,413.54

1.050
0.063
0.013
0.013

6,650.00
1,500.00
24,578.36
50,993.60

2%

12,602.97

0.212

21,413.54

1.000
0.010
0.010

2,500.00
24,578.36
50,993.60

2%

4,392.09

...
...
HR

un
un
un
un
...
% (MAT+MO)
...
...
...
HR

m
m
un
un
un
...
% (MAT+MO)
...
...
...
HR

un
un
un
un
...
% (MAT+MO)
...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

6.1.7

Caeria PVCS Soldable 3" inc.acc. vert./susp.

6.1.7 a
25K157
25K162
25K080
25K110

20H600

6.1.5 b
25K052
25K080
25K110

20H600

6.1.8

SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Tubera PVCL 3". Incluye suministro, regata y resane, instalacin


y uniones para el correcto tendido de la tubera
Tubera PVCS 3" PAVCO
Unin PVCS 3" PAVCO
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
Accesorios PVCS 3" (se excluyen las uniones)
Codo 90 PVCS CxC 3"
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Caeria PVCS Soldable 3" inc.acc. p/ventilacin

6.1.8 a
25K157
25K162
25K080
25K110

20H600

Tubera PVCL 3". Incluye suministro, regata y resane, instalacin


y uniones para el correcto tendido de la tubera
Tubera PVCL 3" PAVCO
Unin PVCS 3" PAVCO
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)

UNIDAD

CANTIDAD

UNITARIO

...
...
HR

0.053

21,413.54

1.050
0.063
0.013
0.013

6,650.00
1,500.00
24,578.36
50,993.60

2%

12,602.97

0.212

21,413.54

1.000
0.010
0.010

2,500.00
24,578.36
50,993.60

2%

4,392.09

0.053

21,413.54

1.000
0.063
0.010
0.010

3,817.10
1,500.00
24,578.36
50,993.60

2%

8,623.03

0.185

21,413.54

m
m
un
un
un
...
% (MAT+MO)
...
...
...
HR

un
un
un
un
...
% (MAT+MO)
...
...
...
HR

m
m
un
un
un
...
% (MAT+MO)
...
...
...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.1.8 b
25K052
25K080
25K110

20H600

6.1.9

Caeria PVCS Soldable 2" inc.acc. descargas artefactos

6.1.9 a
218pa14
218pa83
218xx230
218xx231

501a.1

6.1.9 b
218pa84 218xx230 218xx231 501a.1

Accesorios PVCS 3" (se excluyen las uniones)


Codo 90 PVCS CxC 3"
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.1.10
-

Tubera PVCS 2". Incluye suministro, regata y resane, instalacin


y uniones para el correcto tendido de la tubera
Tubera PVCS 2" PAVCO
Unin PVCS 2" PAVCO
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
Accesorios PVCS 2" (se excluyen las uniones)
Codo 90 PVCS CxC 2" PAVCO
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

un
un
un
un
...
% (MAT+MO)
...

1.000
0.010
0.010

2,500.00
24,578.36
50,993.60

2%

4,269.52

0.047

21,413.54

1.050
0.127
0.001
0.001

4,650.00
900.00
24,578.36
50,993.60

2%

9,052.50

0.184

21,413.54

1.000
0.001
0.001

1,300.00
24,578.36
50,993.60

2%

2,399.07

0.046

21,413.54

1.000
1.000
1.000

11,204.67
6,957.22
9,483.33

...
...
HR

m
m
un
un
un
...
% (MAT+MO)
...
...
...
HR

un
un
un
un
...
% (MAT+MO)
...
...
...
HR

Tapa Inspeccion en pared 4"

un

Sifn 135 PVCS 4" PAVCO


Codo 45 PVCS CxC 4" PAVCO
Tubera PVCS 4" PAVCO

un
un
m

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
-

6.1.11

Camara inspeccin 30x30 con reja des. piso

01D200

02A030

02B010
01D010
04C010
06Q010
22G044
22G082

04P015
04P100

Tapa de Prueba 4" PAVCO


Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.1.12
01D200

02A030

02B010
01D010
04C010
06Q010
22G044
22G082

UNIDAD
un
un
un
...
% (MAT+MO)
...

CANTIDAD

UNITARIO

1.000
0.040
0.040

9,851.00
24,578.36
50,993.60

2%

66,715.18

1.223

21,413.54

0.126

31,700.00

0.263

270,500.40

0.745
0.119
1.301
136.981
2.614
2.614

18,620.32
41,667.00
2,227.20
350.00
5,500.00
5,163.00

2%

272,038.89

0.217

286,603.15

0.217

234,493.51

4.646

21,413.54

...
...
HR

un

Recebo B-200
m3
Concreto grava comn de planta f'c=2500 psi (175kg/cm2)
m3
CEMEX
Cemento gris Portland tipo 1 ARGOS - empaque 50 kg
un
Arena de pea - sin tamizar
m3
Acero figurado 60.000 psi CODIACERO
kg
Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h)
un
Listn ordinario 5x3 cm x 3,00 m
un
Tabla burra ordinaria 20x3 cm
un
SUBTOTAL MATERIALES
...
Herramienta menor. INDICE GENERAL
% (MAT+MO)
SUBTOTAL HERRAMIENTAS
...
(No Aplica)
SUBTOTAL EQUIPOS
...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
...
Marco metlico en ngulo 2" con anclajes laterales. Incluye
m2
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta
m2
en obra
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
HR
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Camara inspeccin 30x30 con tapa ciega recinto ferial

un

Recebo B-200
Concreto grava comn de planta f'c=2500 psi (175kg/cm2)
CEMEX
Cemento gris Portland tipo 1 ARGOS - empaque 50 kg
Arena de pea - sin tamizar
Acero figurado 60.000 psi CODIACERO
Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h)
Listn ordinario 5x3 cm x 3,00 m
Tabla burra ordinaria 20x3 cm
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE

m3

0.126

31,700.00

m3

0.263

270,500.40

0.745
0.119
1.301
136.981
2.614
2.614

18,620.32
41,667.00
2,227.20
350.00
5,500.00
5,163.00

2%

272,038.89

un
m3
kg
un
un
un
...
% (MAT+MO)
...
...
...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
04P015
04P100

6.1.13

Camara inspeccin 60x60 con tapa ciega (aguas negras)

01D200

02A030

02B010
01D010
04C010
06Q010
22G044
22G082

04P015
04P100

6.1.14
01D200

02A030

02B010
01D010
04C010
06Q010
22G044
22G082

04P015

Marco metlico en ngulo 2" con anclajes laterales. Incluye


materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta
en obra
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

UNIDAD

CANTIDAD

UNITARIO

m2

0.217

286,603.15

m2

0.217

234,493.51

HR

4.646

21,413.54

0.235

31,700.00

0.492

270,500.40

1.398
0.223
2.440
256.840
4.901
4.901

18,620.32
41,667.00
2,227.20
350.00
5,500.00
5,163.00

2%

510,073.71

0.406

286,603.15

0.406

234,493.51

0.000
8.712

21,413.54

un

Recebo B-200
m3
Concreto grava comn de planta f'c=2500 psi (175kg/cm2)
m3
CEMEX
Cemento gris Portland tipo 1 ARGOS - empaque 50 kg
un
Arena de pea - sin tamizar
m3
Acero figurado 60.000 psi CODIACERO
kg
Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h)
un
Listn ordinario 5x3 cm x 3,00 m
un
Tabla burra ordinaria 20x3 cm
un
SUBTOTAL MATERIALES
...
Herramienta menor. INDICE GENERAL
% (MAT+MO)
SUBTOTAL HERRAMIENTAS
...
(No Aplica)
SUBTOTAL EQUIPOS
...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
...
Marco metlico en ngulo 2" con anclajes laterales. Incluye
m2
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta
m2
en obra
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
HR
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Camara inspeccin 30x30 con tapa ciega (aguas negras)

un

Recebo B-200
Concreto grava comn de planta f'c=2500 psi (175kg/cm2)
CEMEX
Cemento gris Portland tipo 1 ARGOS - empaque 50 kg
Arena de pea - sin tamizar
Acero figurado 60.000 psi CODIACERO
Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h)
Listn ordinario 5x3 cm x 3,00 m
Tabla burra ordinaria 20x3 cm
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
Marco metlico en ngulo 2" con anclajes laterales. Incluye
materiales, fabricacin y puesta en obra

m3

0.126

31,700.00

m3

0.263

270,500.40

0.745
0.119
1.301
136.981
2.614
2.614

18,620.32
41,667.00
2,227.20
350.00
5,500.00
5,163.00

2%

272,038.89

0.217

286,603.15

un
m3
kg
un
un
un
...
% (MAT+MO)
...
...
...
m2

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
Tapa metlica en platina 2" con refuerzo interno en varilla
corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta
en obra
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

04P100

6.1.15

Camara inspeccion 6" con sifon

25K055
25K054
25K159
25k056
25K080
25K110

Sifon PVCS 6"


Codo 45 PVCS CxC 6"
Tubera PVCS 6" PAVCO
Tapa de Prueba 6" PAVCO
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
- Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
- MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

20H600

6.1.16

Camara inspeccion 4" con sifon

25K080
25K110

20H600

6.1.17

Sifn 135 PVCS 4" PAVCO


Codo 45 PVCS CxC 4" PAVCO
Tubera PVCS 4" PAVCO
Tapa de Prueba 4" PAVCO
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Sifon de piso 3" con reja

25K080
25K110

20H600

Sifn 135 PVCS 3" PAVCO


Codo 45 PVCS CxC 3" PAVCO
Tubera PVCS 3" PAVCO
Tapa de Prueba 3" PAVCO
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)

UNIDAD

CANTIDAD

UNITARIO

m2

0.217

234,493.51

HR

4.646

21,413.54

1.000
1.000
1.050
1.000
0.080
0.080

30,521.76
21,291.50
20,316.67
20,347.84
24,578.36
50,993.60

2%

128,558.94

1.355

21,413.54

1.000
1.000
1.000
1.000
0.040
0.040

11,204.67
6,957.22
9,483.33
9,851.00
24,578.36
50,993.60

2%

65,257.34

1.155

21,413.54

1.000
1.000
1.050
1.000
0.040
0.040

6,863.00
4,609.80
6,650.00
4,575.00
24,578.36
50,993.60

2%

50,791.42

un
un
un
m
un
un
un
...
% (MAT+MO)
...
...
...
HR

un
un
un
m
un
un
un
...
% (MAT+MO)
...
...
...
HR

un
un
un
m
un
un
un
...
% (MAT+MO)
...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

6.1.18

25K080
25K110
20H600

Sifon de piso 2" con reja


-

6.1.19

6.1.19 a

Sifn 180 PVCS 2" PAVCO


Codo 90 PVCS CxC 2" PAVCO
Tubera PVCS 2" PAVCO
Tapa de Prueba 2" PAVCO
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Caeria Bombeo Cloacal 4" inc.acc.

218pa9
218pa67
218xx230
218xx231

501a.1

SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Tubera PVCP RDE 21 - 4". Incluye suministro, regata y resane,


instalacin y uniones para el correcto tendido de la tubera
Tubera PVCP RDE 21 - 4" PAVCO
Unin PVCP 4" PAVCO
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.1.19 b

Accesorios PVCP 4" (se excluyen las uniones)

218pa68 218xx230 218xx231 -

Codo 90 PVCP 4" PAVCO


Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)

501a.1

UNIDAD

CANTIDAD

UNITARIO

...
...
HR

1.155

21,413.54

1.000
1.000
1.000
1.000
0.037
0.037

2,564.06
1,300.00
4,650.00
1,710.00
24,578.36
50,993.60

2%

42,280.03

1.366

21,413.54

1.050
0.167
0.020
0.020

30,020.80
21,708.70
24,578.36
50,993.60

2%

42,351.18

0.266

21,413.54

1.000
0.020
0.020

40,012.58
24,578.36
50,993.60

2%

42,947.15

0.066

21,413.54

un
un
un
m
un
un
un
...
% (MAT+MO)
...
...
...
HR

ml

m
m
un
un
un
...
% (MAT+MO)
...
...
...
HR

un
un
un
un
...
% (MAT+MO)
...
...
...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.1.20

6.1.20 a

Caeria Bombeo Cloacal 3" inc.acc.

6.1.20 b

Accesorios PVCP 3" (se excluyen las uniones)


-

Tubera PVCP RDE 21 - 3". Incluye suministro, regata y resane,


instalacin y uniones para el correcto tendido de la tubera
Tubera PVCP RDE 21 - 3" PAVCO
Unin PVCP 3" PAVCO
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.1.21
-

Codo 90 PVCP 3" PAVCO


Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

ml

m
m
un
un
un
...
% (MAT+MO)
...

1.050
0.167
0.010
0.010

16,650.00
9,398.00
24,578.36
50,993.60

2%

24,321.41

0.211

21,413.54

1.000
0.010
0.010

19,580.00
24,578.36
50,993.60

2%

21,464.15

0.053

21,413.54

...
...
HR

un
un
un
un
...
% (MAT+MO)
...
...
...
HR

Valvula Esferica Bombeo Cloacal 3"

un

Adaptador macho PVCP 3" PAVCO


Vlvula registro tipo paso directo / cortina / compuerta en bronce
Ref.206A RED WHITE, tipo pesado 200 psi 3"
Cinta tefln - rollo
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

un

2.000

10,883.58

un

1.000

291,361.76

un
un
un
...
% (MAT+MO)
...

0.298
0.011
0.011

500.00
24,578.36
50,993.60

2%

343,129.11

1.355

21,413.54

...
...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
.

6.1.22
-

6.1.23

UNIDAD

CANTIDAD

UNITARIO

Valvula Retencion Bombeo Cloacal 3"

un

Adaptador macho PVCP 3" PAVCO


Vlvula cheque tipo cortina / horizontal en bronce Ref. HICC
HELBERT 150 psi 3", sello metlico
Cinta tefln - rollo
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

un

2.000

10,883.58

un

1.000

510,427.45

un
un
un
...
% (MAT+MO)
...

0.307
0.011
0.011

500.00
24,578.36
50,993.60

2%

562,223.90

1.355

21,413.54

1.000

14,634,560.00

Equipo de 2 bombas sumergidas inc.tablero pozo cloacal N 3

...
...
HR

un

Suministro de equipo de bombeo eyector no.3 para aguas


residuales, incluye dos (2) motobombas, con una caudal de 7.19
lit/seg, cabeza dinamica de 8 m y de 5 hp de potencia. incluye
arrancadores y tablero de control, segn especificaciones. NO
incluye montaje

(No Aplica)
SUBTOTAL MATERIALES

...

(No Aplica)
SUBTOTAL HERRAMIENTAS

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Sucontrato para suministro de Equipo Eyector segn


especificaciones

glb

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.1.24

Equipo de 2 bombas sumergidas inc.tablero pozo cloacal N 4

un

Suministro de equipo de bombeo eyector no.4 para aguas


residuales, incluye dos (2) motobombas, con una caudal de 7.19
lit/seg, cabeza dinamica de 8 m y de 5 hp de potencia. incluye
arrancadores y tablero de control, segn especificaciones. NO
incluye montaje
(No Aplica)
SUBTOTAL MATERIALES

...

(No Aplica)
SUBTOTAL HERRAMIENTAS

...

(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)

...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

SUBTOTAL TRANSPORTE

...

Sucontrato para suministro de Equipo Eyector segn


especificaciones

glb

CANTIDAD

UNITARIO

1.000

14,634,560.00

1.000

14,634,560.00

1.000

158,953.00

2%

195,590.06

1.711

21,413.54

0.242
0.484

107,328.33
7,170.92

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.1.25

Equipo de 2 bombas sumergidas inc.tablero pozo cloacal N 5

un

Suministro de equipo de bombeo eyector no.5 para aguas


residuales, incluye dos (2) motobombas, con una caudal de 7.19
lit/seg, cabeza dinamica de 8 m y de 5 hp de potencia. incluye
arrancadores y tablero de control, segn especificaciones. NO
incluye montaje

(No Aplica)
SUBTOTAL MATERIALES

...

(No Aplica)
SUBTOTAL HERRAMIENTAS

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Sucontrato para suministro de Equipo Eyector segn


especificaciones

glb

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.2.1

Caeria PVC Estructural Tipo Fort 20" inc.acc. en tierra

6.2.1 a
-

6.2.2 b
-

Tubera para alcantarillado de pared estructural 500 mm PVC,


doble extrusin, pared interior lisa y exterior corrugada, sistema
de unin mecnico, campana espigo con hidrosello de caucho.
Incluye suministro e instalacin
Tubera Novafort 500 mm S8 PAVCO
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
Accesorios para tubera alcantarillado corrugada PVC 500 mm.
Incluye Hidrosellos en caucho para ambos extremos
Unin Novafort 500 mm PAVCO
Hidrosello Novafort 500 mm S8 PAVCO

ml

m
m
...
% (MAT+MO)
...
...
...
HR

un
un
un

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

6.2.2

6.2.2 a
-

6.2.2 b
-

6.2.3

SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

...
% (MAT+MO)
...

Caeria PVC Estructural Tipo Fort 16" inc.acc. en tierra

ml

Tubera para alcantarillado de pared estructural 400 mm PVC,


doble extrusin, pared interior lisa y exterior corrugada, sistema
de unin mecnico, campana espigo con hidrosello de caucho.
Incluye suministro e instalacin
Tubera Novafort 400 mm S8 PAVCO
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
Accesorios para tubera alcantarillado corrugada PVC 400 mm.
Incluye Hidrosellos en caucho para ambos extremos
Unin Novafort 400 mm PAVCO
Hidrosello Novafort 400 mm S8 PAVCO
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Caeria PVC Estructural Tipo Fort 14" inc.acc. en tierra

6.2.3 a
-

UNIDAD

Tubera para alcantarillado de pared estructural 355 mm PVC,


doble extrusin, pared interior lisa y exterior corrugada, sistema
de unin mecnico, campana espigo con hidrosello de caucho.
Incluye suministro e instalacin
Tubera Novafort 355 mm S8 PAVCO
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)

CANTIDAD

UNITARIO

2%

33,500.84

0.190

21,413.54

1.000

97,405.00

2%

128,546.50

1.454

21,413.54

0.167
0.333

58,443.00
5,937.81

2%

15,179.94

0.162

21,413.54

1.050

69,378.00

2%

103,988.40

...
...
HR

m
m
...
% (MAT+MO)
...
...
...
HR

un
un
un
...
% (MAT+MO)
...
...
...
HR

ml

m
m
...
% (MAT+MO)
...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

6.2.3 b
-

6.2.4

6.2.2 b
-

6.2.5

Accesorios para tubera alcantarillado corrugada PVC 355 mm.


Incluye Hidrosellos en caucho para ambos extremos
Unin Novafort 355 mm PAVCO
Hidrosello Novafort 355 mm S8 PAVCO
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Caeria PVC Estructural Tipo Fort 12" inc.acc. en tierra

6.2.2 a

SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Tubera para alcantarillado de pared estructural 315 mm PVC,


doble extrusin, pared interior lisa y exterior corrugada, sistema
de unin mecnico, campana espigo con hidrosello de caucho.
Incluye suministro e instalacin
Tubera Novafort 315 mm S8 PAVCO
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
Accesorios para tubera alcantarillado corrugada PVC 315 mm.
Incluye Hidrosellos en caucho para ambos extremos
Unin Novafort 315 mm PAVCO
Hidrosello Novafort 315 mm S8 PAVCO
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Caeria PVC Estructural Tipo Fort 10" inc.acc. en tierra

UNIDAD

CANTIDAD

UNITARIO

...
...
HR

1.454

21,413.54

0.205
0.409

46,483.26
4,856.46

2%

14,965.40

0.162

21,413.54

1.000

60,085.00

2%

85,463.59

1.185

21,413.54

0.167
0.333

32,908.55
3,004.25

2%

9,306.34

0.132

21,413.54

un
un
un
...
% (MAT+MO)
...
...
...
HR

ml

m
m
...
% (MAT+MO)
...
...
...
HR

un
un
un
...
% (MAT+MO)
...
...
...
HR

ml

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

6.2.5 a
-

6.2.5 b
-

6.2.6

Accesorios para tubera alcantarillado corrugada PVC 250 mm.


Incluye Hidrosellos en caucho para ambos extremos
Unin Novafort 250 mm PAVCO
Hidrosello Novafort 250 mm S8 PAVCO
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Caeria PVC Estructural Tipo Fort 8" inc.acc. en tierra

6.2.6 a
-

Tubera para alcantarillado de pared estructural 250 mm PVC,


doble extrusin, pared interior lisa y exterior corrugada, sistema
de unin mecnico, campana espigo con hidrosello de caucho.
Incluye suministro e instalacin
Tubera Novafort 250 mm S8 PAVCO
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.2.6 b
-

Tubera para alcantarillado de pared estructural 200 mm PVC,


doble extrusin, pared interior lisa y exterior corrugada, sistema
de unin mecnico, campana espigo con hidrosello de caucho.
Incluye suministro e instalacin
Tubera Novafort 200 mm S8 PAVCO
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
Accesorios para tubera alcantarillado corrugada PVC 200 mm.
Incluye Hidrosellos en caucho para ambos extremos
Unin Novafort 200 mm PAVCO
Hidrosello Novafort 200 mm S8 PAVCO
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS

UNIDAD

CANTIDAD

UNITARIO

m
m
...
% (MAT+MO)
...

1.000

42,515.00

2%

67,893.59

1.185

21,413.54

0.242
0.484

28,707.00
1,918.00

2%

10,691.79

0.132

21,413.54

1.000

26,382.82

2%

43,794.11

0.813

21,413.54

0.167
0.333

10,553.13
422.13

2%

3,640.69

...
...
HR

un
un
un
...
% (MAT+MO)
...
...
...
HR

ml

m
m
...
% (MAT+MO)
...
...
...
HR

un
un
un
...
% (MAT+MO)
...
...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.2.7

Caeria PVC Estructural Tipo Fort 6" inc.acc. en tierra

Tubera para alcantarillado de pared estructural 200 mm PVC,


doble extrusin, pared interior lisa y exterior corrugada, sistema
de unin mecnico, campana espigo con hidrosello de caucho.
Incluye suministro e instalacin
Tubera Novafort 150 mm S8 PAVCO
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.2.7 a
-

6.2.7 b

Caeria PVC Estructural Tipo Fort 6" inc.acc. en tierra


Unin Novafort 150 mm PAVCO
Hidrosello Novafort 150 mm S8 PAVCO
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.2.8

Caeria PVCS Soldable 6" inc.acc. en tierra

6.2.8 a
25K159
25K164
25K080
25K110

20H600

Tubera PVCS 6". Incluye suministro, regata y resane, instalacin


y uniones para el correcto tendido de la tubera
Tubera PVCS 6" PAVCO
Unin PVCS 6" PAVCO
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA

UNIDAD

...
HR

CANTIDAD

UNITARIO

0.081

21,413.54

1.000

19,005.00

2%

36,115.08

0.799

21,413.54

0.167
0.333

3,801.00
760.20

2%

2,597.91

0.080

21,413.54

1.050
0.144
0.040
0.040

20,316.67
17,166.84
24,578.36
50,993.60

2%

44,209.08

0.813

21,413.54

ml

m
m
...
% (MAT+MO)
...
...
...
HR

un
un
un
...
% (MAT+MO)
...
...
...
HR

m
m
un
un
un
...
% (MAT+MO)
...
...
...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Redondeo a entero ms cercano


TOTAL UNITARIO
.

6.2.8 b

Accesorios PVCS 6" (se excluyen las uniones)

25K054
25K080
25K110

- Codo 90 PVCS CxC 6"


- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
- Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
- Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
- MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

20H600

6.2.9

Caeria PVCS Soldable 4" inc.acc. en tierra

6.2.9 a
25K158
25K163
25K080
25K110

20H600

6.2.9 b
25K053
25K080
25K110

20H600

6.2.10
-

Tubera PVCS 4". Incluye suministro, regata y resane, instalacin


y uniones para el correcto tendido de la tubera
Tubera PVCS 4" PAVCO
Unin PVCS 4" PAVCO
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
Accesorios PVCS 4" (se excluyen las uniones)
Codo 90 PVCS CxC 4"
Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal
Soldadura lquida para tubera PVC 760 g = 1/4 gal
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

un
un
un
un
...
% (MAT+MO)
...

1.000
0.040
0.040

43,900.00
24,578.36
50,993.60

2%

58,501.91

0.542

21,413.54

1.050
0.112
0.020
0.020

9,483.33
2,500.00
24,578.36
50,993.60

2%

17,720.21

0.279

21,413.54

1.000
0.020
0.020

4,300.00
24,578.36
50,993.60

2%

7,304.18

0.070

21,413.54

1.000

211,358.82

...
...
HR

m
m
un
un
un
...
% (MAT+MO)
...
...
...
HR

un
un
un
un
...
% (MAT+MO)
...
...
...
HR

Tragante 6" inc. reja

un

Tragante 6" en bronce incluye rejilla

m3

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
-

Concreto grava comn de planta f'c=3000 psi (280kg/cm2)


CEMEX
Epotoc 1-1 TOXEMENT, adhesivo epxico para pega de concreto
nuevo a concreto viejo o endurecido
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

UNIDAD

CANTIDAD

UNITARIO

m3

0.063

281,984.00

kg

0.011

43,900.00

2%

250,921.90

0.995

21,413.54

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.2.11
-

Tragante con tapa 6" inc. reja en canaletas

un

Tragante 6" en bronce incluye rejilla

m3

1.000

211,358.82

m3

0.063

281,984.00

kg

0.011

43,900.00

2%

250,921.90

0.995

21,413.54

Concreto grava comn de planta f'c=3000 psi (280kg/cm2)


CEMEX
Epotoc 1-1 TOXEMENT, adhesivo epxico para pega de concreto
nuevo a concreto viejo o endurecido
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.2.12
01D200

02A030

02B010
01D010
04C010
06Q010
22G044
22G082

04P015

Camara inspeccin 60x60 con tapa ciega (aguas negras)

un

Recebo B-200
Concreto grava comn de planta f'c=2500 psi (175kg/cm2)
CEMEX
Cemento gris Portland tipo 1 ARGOS - empaque 50 kg
Arena de pea - sin tamizar
Acero figurado 60.000 psi CODIACERO
Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h)
Listn ordinario 5x3 cm x 3,00 m
Tabla burra ordinaria 20x3 cm
SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
Marco metlico en ngulo 2" con anclajes laterales. Incluye
materiales, fabricacin y puesta en obra

m3

0.235

31,700.00

m3

0.492

270,500.40

1.398
0.223
2.440
256.840
4.901
4.901

18,620.32
41,667.00
2,227.20
350.00
5,500.00
5,163.00

2%

510,073.71

0.406

286,603.15

un
m3
kg
un
un
un
...
% (MAT+MO)
...
...
...
m2

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

04P100

6.2.13

Camara inspeccin 30x30 con tapa ciega (aguas negras)

01D200

02A030

02B010
01D010
04C010
06Q010
22G044
22G082

04P015
04P100

6.2.14
-

02A030

02B010
01D010
04C010
06Q010
22G044
22G082

04P100

CANTIDAD

UNITARIO

m2

0.406

234,493.51

HR

0.000
8.712

21,413.54

0.126

31,700.00

0.263

270,500.40

0.745
0.119
1.301
136.981
2.614
2.614

18,620.32
41,667.00
2,227.20
350.00
5,500.00
5,163.00

2%

272,038.89

0.217

286,603.15

0.217

234,493.51

4.646

21,413.54

0.177

31,700.00

0.369

270,500.40

1.048
0.167
1.830
192.630
3.676
3.676

18,620.32
41,667.00
2,227.20
350.00
5,500.00
5,163.00

2%

382,555.81

0.305

286,603.15

0.305

234,493.51

un

Recebo B-200
m3
Concreto grava comn de planta f'c=2500 psi (175kg/cm2)
m3
CEMEX
Cemento gris Portland tipo 1 ARGOS - empaque 50 kg
un
Arena de pea - sin tamizar
m3
Acero figurado 60.000 psi CODIACERO
kg
Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h)
un
Listn ordinario 5x3 cm x 3,00 m
un
Tabla burra ordinaria 20x3 cm
un
SUBTOTAL MATERIALES
...
Herramienta menor. INDICE GENERAL
% (MAT+MO)
SUBTOTAL HERRAMIENTAS
...
(No Aplica)
SUBTOTAL EQUIPOS
...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
...
Marco metlico en ngulo 2" con anclajes laterales. Incluye
m2
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta
m2
en obra
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
HR
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Camara inspeccin 45x40 con reja

01D200

04P015

Tapa metlica en platina 2" con refuerzo interno en varilla


corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta
en obra
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

UNIDAD

un

Recebo B-200
m3
Concreto grava comn de planta f'c=2500 psi (175kg/cm2)
m3
CEMEX
Cemento gris Portland tipo 1 ARGOS - empaque 50 kg
un
Arena de pea - sin tamizar
m3
Acero figurado 60.000 psi CODIACERO
kg
Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h)
un
Listn ordinario 5x3 cm x 3,00 m
un
Tabla burra ordinaria 20x3 cm
un
SUBTOTAL MATERIALES
...
Herramienta menor. INDICE GENERAL
% (MAT+MO)
SUBTOTAL HERRAMIENTAS
...
(No Aplica)
SUBTOTAL EQUIPOS
...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
...
Marco metlico en ngulo 2" con anclajes laterales. Incluye
m2
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta
m2
en obra
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
-

6.2.15

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Caeria Bombeo Pluvial 14" inc.acc. en tierra

UNIDAD
HR

CANTIDAD
6.534

UNITARIO
21,413.54

Tubera PVCP RDE 21 - 14" PAVCO

1.000

110,169.61

Unin PVCP 14" PAVCO

un

0.167

458,419.50

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.050

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.050

50,993.60

SUBTOTAL MATERIALES

...
2%

221,645.76

1.454

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.2.16

Valvula Retencion Bombeo Pluvial Due-Check 14"

un

Adaptador macho PVCP 14" PAVCO

un

2.000

72,017.08

Vlvula Retencion Due-Check 150 psi 14", sello metlico

un

1.000

3,664,698.77

Cinta tefln - rollo

un

2.109

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.076

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.076

50,993.60

SUBTOTAL MATERIALES

...
2%

4,077,711.73

12.245

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.2.17

Bombas sumergidas inc.tablero pozo pluvial

un

Suministro de equipo de bombeo eyector no.? para aguas lluvias,


incluye una (1) bomba, con una caudal de 7.19 lit/seg, cabeza
dinamica de 8 m y de 5 hp de potencia. incluye arrancadores y
tablero de control, segn especificaciones. NO incluye montaje
(No Aplica)
SUBTOTAL MATERIALES

...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

(No Aplica)
SUBTOTAL HERRAMIENTAS

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Sucontrato para suministro de Equipo Eyector segn


especificaciones

glb

1.000

7,317,280.00

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

REDES DE AGUA FRIA

6.3.1

Caeria Hierro Galvanizado 6" inc.acc. (Colectores)

6.3.1 a

Tubera Acero Carbn (AC) SCH-40 con costura 6". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

Tubera Acero Carbn SCH-40 6"

1.050

170,520.00

Vaselina x tarro

un

0.010

5,000.00

SUBTOTAL MATERIALES

...
2%

193,715.02

0.010

200,000.00

0.683

21,413.54

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 6" (se excluyen las


uniones). NO incluye los acoples laterales

un

Codo 90 Hierro dctil ranurado HD 6"

un

0.516

46,382.61

Tee Hierro dctil ranurado HD 6"

un

0.129

77,962.25

Vaselina x tarro

un

0.034

5,000.00

SUBTOTAL MATERIALES

...
2%

38,740.47

0.213

21,413.54

6.3.1 b

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.2

Caeria Hierro Galvanizado 3" inc.acc. (Colectores)

6.3.2 a

Tubera Acero Carbn (AC) SCH-40 con costura 3". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

Tubera Acero Carbn SCH-40 3"

1.050

84,629.09

Vaselina x tarro

un

0.006

5,000.00

SUBTOTAL MATERIALES

...
2%

103,281.89

0.006

200,000.00

0.672

21,413.54

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 3" (se excluyen las


uniones). NO incluye los acoples laterales

un

Codo 90 Hierro dctil ranurado HD 3"

un

0.800

22,540.43

Tee Hierro dctil ranurado HD 3"

un

0.200

29,273.29

Vaselina x tarro

un

0.053

5,000.00

SUBTOTAL MATERIALES

...
2%

31,326.96

0.335

21,413.54

6.3.2 b

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.3

Caeria PVC Presion RDE 21 4" inc.acc.

6.3.3 a

Tubera PVCP RDE 21 - 4". Incluye suministro, regata y resane,


instalacin y uniones para el correcto tendido de la tubera

218pa9

Tubera PVCP RDE 21 - 4" PAVCO

1.050

30,020.80

218pa67

Unin PVCP 4" PAVCO

un

0.167

21,708.70

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.006

24,578.36

218xx231 -

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.006

50,993.60

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
SUBTOTAL MATERIALES
501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

UNIDAD

CANTIDAD

UNITARIO

...
% (MAT+MO)

2%

43,115.36

0.351

21,413.54

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.3.3 b
218pa68

un

Codo 90 PVCP 4" PAVCO

un

0.818

40,012.58

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.027

24,578.36

218xx231 -

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.027

50,993.60

SUBTOTAL MATERIALES

...
2%

42,182.16

0.347

21,413.54

501a.1

Accesorios PVCP 4" (se excluyen las uniones)

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.4

Caeria PVC Presion RDE 21 3" inc.acc.

6.3.4 a

Tubera PVCP RDE 21 - 3". Incluye suministro, regata y resane,


instalacin y uniones para el correcto tendido de la tubera

218pa8

Tubera PVCP RDE 21 - 3" PAVCO

1.050

16,650.00

218pa64

Unin PVCP 3" PAVCO

un

0.167

20,900.00

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.004

24,578.36

218xx231 -

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.004

50,993.60

SUBTOTAL MATERIALES

...
2%

26,673.39

0.252

21,413.54

501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.3.4 b

Accesorios PVCP 3" (se excluyen las uniones)

un

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
218pa65

UNIDAD

CANTIDAD

UNITARIO

Codo 90 PVCP 3" PAVCO

un

0.806

20,900.00

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.018

24,578.36

218xx231 -

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.018

50,993.60

2%

19,112.05

0.043

21,413.54

SUBTOTAL MATERIALES
501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.5

Caeria PVC Presion RDE 21 2" inc.acc.

6.3.13

Tubera PVCP RDE 21 - 2,1/2". Incluye suministro, regata y


resane, instalacin y uniones para el correcto tendido de la
tubera

218pa7

Tubera PVCP RDE 21 - 2,1/2" PAVCO

1.050

13,316.67

218pa61

Unin PVCP 2,1/2" PAVCO

un

0.167

8,900.00

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.003

24,578.36

218xx231 -

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.003

50,993.60

SUBTOTAL MATERIALES

...
2%

21,541.35

0.273

21,413.54

501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.3.14

Accesorios PVCP 2,1/2" (se excluyen las uniones)

un

Codo 90 PVCP 2,1/2" PAVCO

un

0.795

17,900.00

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.012

24,578.36

218xx231 -

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.012

50,993.60

SUBTOTAL MATERIALES

...
2%

16,932.50

0.084

21,413.54

218pa62

501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

TOTAL UNITARIO

6.3.6

Caeria PVC Presion RDE 21 2" inc.acc.

6.3.6 a

Tubera PVCP RDE 21 - 2". Incluye suministro, regata y resane,


instalacin y uniones para el correcto tendido de la tubera

218pa6

Tubera PVCP RDE 21 - 2" PAVCO

1.050

218pa58

Unin PVCP 2" PAVCO

un

0.167

2,300.00

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.002

24,578.36

218xx231 -

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.002

50,993.60

2%

14,920.88

0.329

21,413.54

SUBTOTAL MATERIALES
501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

6,983.33

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.3.6 b
218pa59

un

Codo 90 PVCP 2" PAVCO

un

0.611

5,900.00

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.007

24,578.36

218xx231 -

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.007

50,993.60

SUBTOTAL MATERIALES

...
2%

4,495.91

0.018

21,413.54

5,316.67

501a.1

Accesorios PVCP 2" (se excluyen las uniones)

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.7

Caeria PVC Presion RDE 21 1" inc.acc.

6.3.9

Tubera PVCP RDE 21 - 1,1/2". Incluye suministro, regata y


resane, instalacin y uniones para el correcto tendido de la
tubera

218pa5

Tubera PVCP RDE 21 - 1,1/2" PAVCO

1.050

218pa55

Unin PVCP 1,1/2" PAVCO

un

0.167

1,300.00

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.002

24,578.36

218xx231 -

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.002

50,993.60

SUBTOTAL MATERIALES

...
2%

11,239.42

501a.1

Herramienta menor. INDICE GENERAL

% (MAT+MO)

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
SUBTOTAL HERRAMIENTAS

UNIDAD

CANTIDAD

UNITARIO

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

0.247

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.3.10

Accesorios PVCP 1,1/2" (se excluyen las uniones)

un

Codo 90 PVCP 1,1/2" PAVCO

un

0.564

3,500.00

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.005

24,578.36

218xx231 -

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.005

50,993.60

SUBTOTAL MATERIALES

...
2%

2,778.53

0.020

21,413.54

218pa56

501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.8

Caeria PVC Presion RDE 21 1" inc.acc.

6.3.8 a

Tubera PVCP RDE 21 - 1,1/4". Incluye suministro, regata y


resane, instalacin y uniones para el correcto tendido de la
tubera

218pa4

Tubera PVCP RDE 21 - 1,1/4" PAVCO

1.050

4,316.67

218pa52

Unin PVCP 1,1/4" PAVCO

un

0.167

1,000.00

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.001

24,578.36

218xx231 -

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.001

50,993.60

SUBTOTAL MATERIALES

...
2%

9,754.79

0.233

21,413.54

501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.3.9 b
218pa53

218xx230 -

Accesorios PVCP 1,1/4" (se excluyen las uniones)

un

Codo 90 PVCP 1,1/4" PAVCO

un

0.453

1,900.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.004

24,578.36

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
218xx231 501a.1

UNIDAD

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

SUBTOTAL MATERIALES

...

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)

CANTIDAD

UNITARIO

0.004

50,993.60

2%

1,668.76

0.025

21,413.54

3,316.67

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.9

Caeria PVC Presion RDE 21 1" inc.acc.

6.3.9 a

Tubera PVCP RDE 13,5 - 1". Incluye suministro, regata y resane,


instalacin y uniones para el correcto tendido de la tubera

Tubera PVCP RDE 13,5 - 1" PAVCO

1.050

Unin PVCP 1" PAVCO

un

0.167

600.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.001

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.001

50,993.60

2%

6,137.17

0.116

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

Accesorios PVCP 1" (se excluyen las uniones)

un

Codo 90 PVCP 1" PAVCO

un

0.421

800.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.003

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.003

50,993.60

SUBTOTAL MATERIALES

...
2%

791.17

0.011

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

6.3.10

Caeria PVC Presion RDE 11 " inc.acc.

6.3.10 a

Tubera PVCP RDE 11 - 3/4". Incluye suministro, regata y resane,


instalacin y uniones para el correcto tendido de la tubera

Tubera PVCP RDE 11 - 3/4" PAVCO

1.050

Unin PVCP 3/4" PAVCO

un

0.167

400.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.004

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.004

50,993.60

2%

5,339.01

0.116

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

2,394.00

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.3.10 b

Accesorios PVCP 3/4" (se excluyen las uniones)

un

Codo 90 PVCP 3/4" PAVCO

un

1.000

634.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.005

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.005

50,993.60

SUBTOTAL MATERIALES

...
2%

1,243.56

0.011

21,413.54

1,920.39

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.11

Caeria PVC Presion RDE 9 " inc.acc.

6.3.11 a

Tubera PVCP RDE 9 - 1/2". Incluye suministro, regata y resane,


instalacin y uniones para el correcto tendido de la tubera

218pa1

Tubera PVCP RDE 9 - 1/2" PAVCO

1.050

218pa43

Unin PVCP 1/2" PAVCO

un

0.167

200.00

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.004

24,578.36

218xx231 -

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.004

50,993.60

SUBTOTAL MATERIALES

...
2%

4,831.00

501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

0.116

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.3.11 b
218pa44

Accesorios PVCP 1/2" (se excluyen las uniones)

un

Codo 90 PVCP 1/2" PAVCO

un

1.000

200.00

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.005

24,578.36

218xx231 -

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.005

50,993.60

2%

809.56

0.011

21,413.54

SUBTOTAL MATERIALES
501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.12

Valvula mariposa 6"

Adaptador macho PVCP 6" PAVCO

un

2.000

27,169.98

Valvula mariposa 6"

un

1.000

936,717.65

Cinta tefln - rollo

un

0.782

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.028

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.028

50,993.60

SUBTOTAL MATERIALES

...
2%

1,071,327.12

3.631

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.13

Valvula esferica 4"

Adaptador macho PVCP 4" PAVCO

un

2.000

20,019.74

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 4"

un

1.000

707,505.88

Cinta tefln - rollo

un

0.576

500.00

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.021

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.021

50,993.60

SUBTOTAL MATERIALES

...
2%

806,690.63

2.676

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.14

Valvula esferica 3"

Adaptador macho PVCP 3" PAVCO

un

2.000

10,883.58

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 3"

un

1.000

290,781.37

Cinta tefln - rollo

un

0.298

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.011

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.011

50,993.60

SUBTOTAL MATERIALES

...
2%

343,129.21

1.383

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.15

Valvula esferica 2"

Adaptador macho PVCP 2,1/2" PAVCO

un

2.000

7,198.50

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 2,1/2"

un

1.000

218,697.06

Cinta tefln - rollo

un

0.225

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.008

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.008

50,993.60

2%

256,191.31

1.044

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.16

Valvula esferica 2"

Adaptador macho PVCP 2"

un

2.000

2,478.25

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 2"

un

1.000

123,038.24

Cinta tefln - rollo

un

0.152

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.006

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.006

50,993.60

SUBTOTAL MATERIALES

...
2%

143,611.32

0.706

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.17

Valvula esferica 1"

Adaptador macho PVCP 1,1/2"

un

2.000

1,734.50

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 1,1/2"

un

1.000

77,314.71

Cinta tefln - rollo

un

0.225

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.007

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.007

50,993.60

2%

95,547.87

0.660

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.18

Valvula esferica 1"

Adaptador macho PVCP 1,1/4"

un

2.000

1,479.35

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 1,1/4"

un

1.000

63,031.37

Cinta tefln - rollo

un

0.180

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.005

24,578.36

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
-

UNIDAD

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

SUBTOTAL MATERIALES

...

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)

CANTIDAD

UNITARIO

0.005

50,993.60

2%

75,498.19

0.423

21,413.54

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.19

Valvula esferica 1"

Adaptador macho PVCP 1"

un

2.000

702.12

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 1"

un

1.000

47,168.63

Cinta tefln - rollo

un

0.155

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.004

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.004

50,993.60

2%

53,847.94

0.230

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.20

Valvula esferica "

Adaptador macho PVCP 3/4"

un

2.000

334.78

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 3/4"

un

1.000

34,968.63

Cinta tefln - rollo

un

0.510

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.008

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.008

50,993.60

SUBTOTAL MATERIALES

...
2%

41,458.96

0.230

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Redondeo a entero ms cercano


TOTAL UNITARIO

6.3.21

Valvula esferica "

Adaptador macho PVCP 1/2"

un

2.000

183.67

Vlvula cheque tipo hidro / vertical / universal en bronce Ref.


HFVC HELBERT 150 psi 1/2"

un

1.000

29,150.00

Cinta tefln - rollo

un

0.679

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.009

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.009

50,993.60

2%

35,465.96

0.230

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.22

Junta antivibratoria con fuelle acero inoxidable 6"

un

Junta antivibratoria con fuelle acero inoxidable 6"

un

1.000

396,689.22

Vaselina x tarro

un

0.012

5,000.00

SUBTOTAL MATERIALES

...
2%

450,327.96

2.502

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.23

Junta antivibratoria con fuelle acero inoxidable 3"

un

Junta antivibratoria con fuelle acero inoxidable 3"

un

1.000

259,648.04

Vaselina x tarro

un

0.011

5,000.00

2%

311,274.99

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

UNIDAD
HR

CANTIDAD

UNITARIO

2.408

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.24

Valvula de Retencion Horizontal 3"

218pa462 -

Adaptador macho PVCP 3" PAVCO

un

2.000

10,883.58

221he27

Vlvula cheque tipo cortina / horizontal en bronce Ref. HICC


HELBERT 150 psi 3", sello metlico

un

1.000

373,905.88

218xx280 -

Cinta tefln - rollo

un

0.307

500.00

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.011

24,578.36

218xx231 -

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.011

50,993.60

SUBTOTAL MATERIALES

...
2%

426,282.83

1.383

21,413.54

501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.25

Valvula a flotante a presion inc. boya de cobre 3"

218pa462 -

Adaptador macho PVCP 3" PAVCO

un

2.000

10,883.58

221he27

Valvula a flotante a presion inc. boya de cobre 3"

un

1.000

257,751.96

218xx280 -

Cinta tefln - rollo

un

0.307

500.00

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.011

24,578.36

218xx231 -

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.011

50,993.60

SUBTOTAL MATERIALES

...
2%

310,128.91

1.383

21,413.54

501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.26

Canilla de servicio 13 c/pico manga

un

Pnto AF mexcladro lavaplatos/lavamanos/vertederos PVCP 1/2"

un

Codo 90 PVCP 1/2" PAVCO

un

3.000

200.00

Tee PVCP 1/2" PAVCO

un

1.000

300.00

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Tapn soldado PVCP 1/2" PAVCO

un

1.000

168.90

Adaptador macho PVCP 1/2"

un

1.000

183.67

Tapn roscado PVCP 1/2" PAVCO

un

1.000

234.78

Tubera PVCP RDE 9 - 1/2" PAVCO

3.000

1,316.67

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.051

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.051

50,993.60

2%

36,552.39

1.272

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

Montaje Mezcladro Lavaplatos c/ acople fleximetalico

un

Acople fleximetal

un

1.000

5,500.00

Cinta tefln - rollo

un

0.241

500.00

Sikaflex 1-A SIKA, masilla elstica sellante y adhesiva con base


en poliuretano - cartucho 305 cc.

un

0.048

21,500.00

Mezclador Lavaplatos Monocontrol (Canilla)

un

1.000

340,344.12

SUBTOTAL MATERIALES

...
2%

365,025.83

0.842

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.27

Bomba Pozo Semisurgente

un

Suministro de equipo de bombeo agua lluvias tratadas. Incluye


(9) nueve bombas centrifugas con un caudal de 5.4 lit/seg,
cabeza dinamica de 52 m y de 15 hp de potencia, un
hidroneumatico de 200 lit. de capacidad y presion de 500 psi.,
incluye arrancadores y tablero de control, segn
especificaciones. NO incluye montaje
(No Aplica)
SUBTOTAL MATERIALES

...

(No Aplica)
SUBTOTAL HERRAMIENTAS

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
-

Sucontrato para suministro de Equipo Eyector segn


especificaciones

UNIDAD
glb

CANTIDAD

UNITARIO

1.000

43,905,200.00

1.000

49,757,200.00

1.000

14,634,560.00

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Equipo Presurizador de velocidad variable bombas completo con


tablero, tanque pulmon, valvulas, etc.

6.3.28

un

Suministro de equipo de bombeo suministro agua potable.


Incluye seis (6) bombas centrifugas con un caudal de 7.29
lit/seg, cabeza dinamica de 51 m y de 15 hp de potencia, un
hidroneumatico de 500lit. de capacidad y presion de 150 psi.,
incluye arrancadores y tablero de control, segn
especificaciones. NO incluye montaje

(No Aplica)
SUBTOTAL MATERIALES

...

(No Aplica)
SUBTOTAL HERRAMIENTAS

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Sucontrato para suministro de Equipo Eyector segn


especificaciones

glb

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Equipo de 2 bombas centrifugas con tablero, (Torres


Enfriamiento)

6.3.29

un

Suministro de equipo de bombeo para medidores nuevos y


usados. Incluye dos (3) bombas centrifugas con un caudal de 12
lit/seg, cabeza dinamica de 118 m y de 17 hp de potencia, un
hidroneumatico de 200 lit. de capacidad y presion de 150 psi.,
incluye arrancadores y tablero de control, segn
especificaciones. NO incluye montaje

(No Aplica)
SUBTOTAL MATERIALES

...

(No Aplica)
SUBTOTAL HERRAMIENTAS

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Sucontrato para suministro de Equipo Eyector segn


especificaciones

glb

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

REDES DE AGUA CALIENTE CPVC

6.4.1

Caeria CPVC Presion RDE 21 1" inc.acc.y aislacin

6.4.1 a

Tubera CPVC 1,1/4". Incluye suministro, regata y resane,


instalacin y uniones para el correcto tendido de la tubera

Tubera CPVC 1,1/4" PAVCO

1.050

Unin CPVC 1,1/4" PAVCO

un

0.167

2,350.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.002

24,578.36

Soldadura lquida para tubera CPVC 760 g = 1/4 gal

un

0.002

48,900.00

SUBTOTAL MATERIALES

...
2%

24,108.31

0.277

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)

16,800.00

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.4.1 b

Accesorios CPVC 1" (se excluyen las uniones)

un

Codo 90 CPVC 1" PAVCO

un

0.807

6,500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.006

24,578.36

Soldadura lquida para tubera CPVC 760 g = 1/4 gal

un

0.006

48,900.00

2%

9,685.13

0.185

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.4.2

Caeria CPVC Presion RDE 21 1" inc.acc.y aislacin

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
.

Tubera CPVC 1". Incluye suministro, regata y resane, instalacin


y uniones para el correcto tendido de la tubera

6.4.2 a

UNIDAD

CANTIDAD

UNITARIO

Tubera CPVC 1" PAVCO

1.050

Unin CPVC 1" PAVCO

un

0.167

1,312.19

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.001

24,578.36

Soldadura lquida para tubera CPVC 760 g = 1/4 gal

un

0.001

48,900.00

SUBTOTAL MATERIALES

...
2%

12,961.07

0.175

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)

8,488.42

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.5.2 b

Accesorios CPVC 1" (se excluyen las uniones)

un

Codo 90 CPVC 1" PAVCO

un

0.816

3,620.13

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.006

24,578.36

Soldadura lquida para tubera CPVC 760 g = 1/4 gal

un

0.006

48,900.00

2%

5,609.97

0.104

21,413.54

5,017.70

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.4.3

Caeria CPVC Presion RDE 11 " inc.acc.y aislacin

6.4.3 a

Tubera CPVC 3/4". Incluye suministro, regata y resane,


instalacin y uniones para el correcto tendido de la tubera

218pa11

Tubera CPVC 3/4" PAVCO

1.050

218pa73

Unin CPVC 3/4" PAVCO

un

0.167

700.00

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.001

24,578.36

218xx232 -

Soldadura lquida para tubera CPVC 760 g = 1/4 gal

un

0.001

48,900.00

2%

8,894.51

0.160

21,413.54

SUBTOTAL MATERIALES
501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.4.3 b

Accesorios CPVC 3/4" (se excluyen las uniones)

un

Codo 90 CPVC 3/4" PAVCO

un

0.608

1,200.00

218xx230 -

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.003

24,578.36

218xx232 -

Soldadura lquida para tubera CPVC 760 g = 1/4 gal

un

0.003

48,900.00

SUBTOTAL MATERIALES

...
2%

1,276.38

0.015

21,413.54

3,053.12

218pa74

501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.4.4

Caeria CPVC Presion RDE 9 " inc.acc.y aislacin

6.4.4 a

Tubera CPVC 1/2". Incluye suministro, regata y resane,


instalacin y uniones para el correcto tendido de la tubera

Tubera CPVC 1/2" PAVCO

1.050

Unin CPVC 1/2" PAVCO

un

0.167

400.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.001

24,578.36

Soldadura lquida para tubera CPVC 760 g = 1/4 gal

un

0.001

48,900.00

SUBTOTAL MATERIALES

...
2%

6,477.52

0.146

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.4.4 b

Accesorios CPVC 1/2" (se excluyen las uniones)

un

Codo 90 CPVC 1/2" PAVCO

un

0.686

550.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.003

24,578.36

Soldadura lquida para tubera CPVC 760 g = 1/4 gal

un

0.003

48,900.00

2%

986.48

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

0.019

21,413.54

1.000
2.00
2.00

96,845.74
209.00
302.00

2%

115,279.04

0.813

21,413.54

1.000
2.00
2.00

46,940.54
209.00
302.00

2%

59,570.82

0.542

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.4.5
.

6.1.1 a

Caeria Chapa 6" inc.acc. p/ventilacin


Ducto Extraccion en Lamina 6"
- Ducto Extraccion en Lamina 6"
Tornillos Traxxx 3
Tornillo Graxx 1
SUBTOTAL MATERIALES
- Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
- MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA

m
m
m
UND
UND
...
% (MAT+MO)
...
...
...
HR

Redondeo a entero ms cercano


TOTAL UNITARIO

6.1.1 b

Conector para ducto extraccion en lamina 6


-

6.4.6

- Conector para ducto extraccion en lamina 6


Tornillos Traxxx 3
Tornillo Graxx 1
SUBTOTAL MATERIALES
- Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE
- MANO DE OBRA CUADRILLA BB (incl. prestaciones)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

un
un
UND
UND
...
% (MAT+MO)
...
...
...
HR

Valvula esferica "

Adaptador macho PVCP 3/4"

un

2.000

334.78

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 3/4"

un

1.000

34,968.63

Cinta tefln - rollo

un

0.510

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.008

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.008

50,993.60

SUBTOTAL MATERIALES

...
2%

41,458.96

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS
(No Aplica)

% (MAT+MO)
...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
SUBTOTAL EQUIPOS

UNIDAD

CANTIDAD

UNITARIO

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

0.230

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.4.7

Valvula esferica "

Adaptador macho PVCP 1/2"

un

2.000

183.67

Vlvula cheque tipo hidro / vertical / universal en bronce Ref.


HFVC HELBERT 150 psi 1/2"

un

1.000

29,150.00

Cinta tefln - rollo

un

0.679

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.009

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.009

50,993.60

SUBTOTAL MATERIALES

...
2%

35,465.96

0.230

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.4.8

Valvula de Retencion Horizontal "

Adaptador macho PVCP 3/4"

un

2.000

334.78

Vlvula Chequetipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 3/4"

un

1.000

33,484.31

Cinta tefln - rollo

un

0.510

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.008

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.008

50,993.60

SUBTOTAL MATERIALES

...
2%

39,974.65

0.230

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
.

6.4.9

Termotanque a gas de 500 litros

UNIDAD

CANTIDAD

UNITARIO

un

(No Aplica)
SUBTOTAL MATERIALES

...

(No Aplica)
SUBTOTAL HERRAMIENTAS

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Sucontrato para suministro de Equipo Eyector segn


especificaciones

glb

1.000

5,225,000.00

1.000

1,045,000.00

1.000

7,315,000.00

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.4.10

Termotanque elctrico de 85 litros

un

(No Aplica)
SUBTOTAL MATERIALES

...

(No Aplica)
SUBTOTAL HERRAMIENTAS

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Sucontrato para suministro de Equipo Eyector segn


especificaciones

glb

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.4.11

Bomba Recirculadora de agua caliente

un

(No Aplica)
SUBTOTAL MATERIALES

...

(No Aplica)
SUBTOTAL HERRAMIENTAS

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Sucontrato para suministro de Equipo Eyector segn


especificaciones

glb

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

SALIDAS SANITARIAS PVCS (PARAL VERTICAL HASTA RAMAL HORIZONTAL MAS CERCANO).

6.5.1

Salida PVCS sanitario de 4"

un

Codo 90 PVCS CxC 4"

un

3.000

Tubera PVCS 4" PAVCO

1.000

9,483.33

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.084

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.084

50,993.60

Tapa de Prueba 4" PAVCO

un

1.137

1,200.00

SUBTOTAL MATERIALES

...
2%

58,885.35

1.344

21,413.54

1,300.00

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)

4,300.00

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.5.2

Salida PVCS lavamanos de 2"

un

Codo 90 PVCS CxC 2" PAVCO

un

3.000

Tubera PVCS 2" PAVCO

1.248

4,650.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.061

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.061

50,993.60

Tapa de Prueba 2" PAVCO

un

1.085

500.00

SUBTOTAL MATERIALES

...
2%

40,757.82

1.210

21,413.54

1.000

5,172.67

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.5.3
-

Salida PVCS duchas de 3"

un

Sifn 135 PVCS 3" PAVCO

un

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Codo 45 PVCS CxC 3" PAVCO

un

1.355

Tubera PVCS 3" PAVCO

1.084

6,650.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.076

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.000

50,993.60

Tapa de Prueba 3" PAVCO

un

1.355

600.00

SUBTOTAL MATERIALES

...
2%

48,603.37

1.314

21,413.54

1,300.00

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)

3,985.76

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.5.4

Salida PVCS lavaplatos de 2"

un

Codo 90 PVCS CxC 2" PAVCO

un

3.000

Tubera PVCS 2" PAVCO

1.248

4,650.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.061

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.061

50,993.60

Tapa de Prueba 2" PAVCO

un

1.085

500.00

SUBTOTAL MATERIALES

...
2%

40,757.82

1.210

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.5.5

Salida PVCS poceta de aseo de 2"

un

Codo 90 PVCS CxC 2" PAVCO

un

3.000

1,300.00

Tubera PVCS 2" PAVCO

1.248

4,650.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.061

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.061

50,993.60

Tapa de Prueba 2" PAVCO

un

1.085

500.00

2%

40,757.82

1.210

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.5.6

Salida PVCS orinal de 3"

un

Sifn 135 PVCS 3" PAVCO

un

1.000

5,172.67

Codo 45 PVCS CxC 3" PAVCO

un

1.355

3,985.76

Tubera PVCS 3" PAVCO

1.084

6,650.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.076

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.000

50,993.60

Tapa de Prueba 3" PAVCO

un

1.355

600.00

SUBTOTAL MATERIALES

...
2%

48,603.37

1.314

21,413.54

1.000

20,555.88

2%

46,889.11

0.082

20,000.00

1.230

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.5.7
-

Suministro e instalacion brida sanitarios de 4"

un

Brida Sanitaria PVC 4" para instalacin de sanitarios, incluye


empaques de caucho y chazos, tornilleria y complementarios

un

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

SALIDAS SANITARIAS PVCS (PARAL VERTICAL HASTA RAMAL HORIZONTAL MAS CERCANO).

6.6.1

Pnto AF sanitarios de fluxometro 1 1/4" PVCP 1/2"

un

Codo 90 PVCP 1,1/4" PAVCO

un

2.250

1,900.00

Tee PVCP 1,1/4" PAVCO

un

1.000

3,700.00

Tapn soldado PVCP 1,1/4" PAVCO

un

1.000

1,389.22

Adaptador macho PVCP 1,1/4"

un

1.000

1,479.35

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Tapn roscado PVCP 1,1/4" PAVCO

un

1.000

Tubera PVCP RDE 21 - 1,1/4" PAVCO

2.000

4,316.67

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.041

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.041

50,993.60

SUBTOTAL MATERIALES

...
2%

51,511.12

1.272

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)

1,735.36

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.6.2

Punto AF lavamanos PVCP 1/2"

un

Codo 90 PVCP 1/2" PAVCO

un

3.000

200.00

Tee PVCP 1/2" PAVCO

un

1.000

300.00

Tapn soldado PVCP 1/2" PAVCO

un

1.000

168.90

Adaptador macho PVCP 1/2"

un

1.000

183.67

Tapn roscado PVCP 1/2" PAVCO

un

1.000

234.78

Tubera PVCP RDE 9 - 1/2" PAVCO

3.000

1,316.67

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.046

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.046

50,993.60

2%

36,164.70

1.272

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.6.3

Pnto AF ducha PVCP 1/2"

un

Codo 90 PVCP 1/2" PAVCO

un

2.000

200.00

Tee PVCP 1/2" PAVCO

un

1.000

300.00

Tapn soldado PVCP 1/2" PAVCO

un

1.000

168.90

Adaptador macho PVCP 1/2"

un

1.000

183.67

Tapn roscado PVCP 1/2" PAVCO

un

1.000

234.78

Tubera PVCP RDE 9 - 1/2" PAVCO

3.000

1,316.67

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.036

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.036

50,993.60

SUBTOTAL MATERIALES

...
0.020

36,164.70

Herramienta menor. INDICE GENERAL

% (MAT+MO)

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
SUBTOTAL HERRAMIENTAS

UNIDAD

CANTIDAD

UNITARIO

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

1.272

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.6.4

Pnto AF lavaplatos PVCP 1/2"

un

Codo 90 PVCP 1/2" PAVCO

un

3.000

200.00

Tee PVCP 1/2" PAVCO

un

1.000

300.00

Tapn soldado PVCP 1/2" PAVCO

un

1.000

168.90

Adaptador macho PVCP 1/2"

un

1.000

183.67

Tapn roscado PVCP 1/2" PAVCO

un

1.000

234.78

Tubera PVCP RDE 9 - 1/2" PAVCO

3.000

1,316.67

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.046

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.046

50,993.60

SUBTOTAL MATERIALES

...
2%

36,164.70

1.272

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.6.5

Pnto AF orinal PVCP 3/4"

un

Codo 90 PVCP 1/2" PAVCO

un

4.217

200.00

Tee PVCP 1/2" PAVCO

un

1.406

300.00

Tapn soldado PVCP 1/2" PAVCO

un

1.406

168.90

Adaptador macho PVCP 1/2"

un

1.406

183.67

Tapn roscado PVCP 1/2" PAVCO

un

1.406

234.78

Tubera PVCP RDE 9 - 1/2" PAVCO

4.217

1,316.67

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.041

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.041

50,993.60

2%

39,195.19

1.330

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.6.6

Pnto AF llaves mangera PVCP 1/2"

un

Codo 90 PVCP 1/2" PAVCO

un

3.000

200.00

Tee PVCP 1/2" PAVCO

un

1.000

300.00

Tapn soldado PVCP 1/2" PAVCO

un

1.000

168.90

Adaptador macho PVCP 1/2"

un

1.000

183.67

Tapn roscado PVCP 1/2" PAVCO

un

1.000

234.78

Tubera PVCP RDE 9 - 1/2" PAVCO

3.000

1,316.67

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.051

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.051

50,993.60

SUBTOTAL MATERIALES

...
2%

36,552.39

1.272

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.6.7

Pnto AF neveras PVCP 1/2"

un

Codo 90 PVCP 1/2" PAVCO

un

3.000

200.00

Tee PVCP 1/2" PAVCO

un

1.000

300.00

Tapn soldado PVCP 1/2" PAVCO

un

1.000

168.90

Adaptador macho PVCP 1/2"

un

1.000

183.67

Tapn roscado PVCP 1/2" PAVCO

un

1.000

234.78

Tubera PVCP RDE 9 - 1/2" PAVCO

3.000

1,316.67

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.046

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.046

50,993.60

SUBTOTAL MATERIALES

...
2%

36,164.70

1.272

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
.

6.6.8

UNIDAD

CANTIDAD

UNITARIO

Pnto AF poceta aseo PVCP 1/2"

un

Codo 90 PVCP 1/2" PAVCO

un

3.000

200.00

Tee PVCP 1/2" PAVCO

un

1.000

300.00

Tapn soldado PVCP 1/2" PAVCO

un

1.000

168.90

Adaptador macho PVCP 1/2"

un

1.000

183.67

Tapn roscado PVCP 1/2" PAVCO

un

1.000

234.78

Tubera PVCP RDE 9 - 1/2" PAVCO

3.000

1,316.67

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.051

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.051

50,993.60

2%

36,552.39

1.272

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

PUNTOS HIDRAULICOS DE AGUA CALIENTE CPVC (paral correspondiente al tramo vertical). PARAL DE TECHO h max=2.00m.

6.7.1

PUNTO AC DUCHAS CPVC 1/2"

un

Codo 90 CPVC 1/2" PAVCO

un

3.000

550.00

Tee CPVC 1/2" PAVCO

un

1.000

700.00

Tapn soldado CPVC 1/2" PAVCO

un

1.000

637.54

Adaptador macho CPVC 1/2" PAVCO

un

1.000

731.26

Tapn roscado PVCP 1/2" PAVCO

un

1.000

234.78

Tubera CPVC 1/2" PAVCO

2.000

3,053.12

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.039

24,578.36

Soldadura lquida para tubera CPVC 760 g = 1/4 gal

un

0.039

48,900.00

SUBTOTAL MATERIALES

...
2%

40,145.26

1.272

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.7.2

PUNTO AC LAVAPLATOS CPVC 1/2"

un

Codo 90 CPVC 1/2" PAVCO

un

3.000

550.00

Tee CPVC 1/2" PAVCO

un

1.000

700.00

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Tapn soldado CPVC 1/2" PAVCO

un

1.000

637.54

Adaptador macho CPVC 1/2" PAVCO

un

1.000

731.26

Tapn roscado PVCP 1/2" PAVCO

un

1.000

234.78

Tubera CPVC 1/2" PAVCO

2.000

3,053.12

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.039

24,578.36

Soldadura lquida para tubera CPVC 760 g = 1/4 gal

un

0.039

48,900.00

2%

40,145.26

1.272

21,413.54

5,500.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

M.O. MONTAJE, CONEXION DE APARATOS Y EQUIPOS


.

6.8.1

Montaje sanitarios de tanque acople feximetal

un

Acople fleximetal

un

1.000

Cinta tefln - rollo

un

0.278

500.00

Cemento blanco - empaque 40 kg ARGOS

un

0.049

36,900.00

SUBTOTAL MATERIALES

...
2%

25,974.73

0.865

21,413.54

2%

16,805.35

0.785

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.8.2

Montaje vlvula antivandalica para fluxmetro

un

(No Aplica)
SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

TOTAL UNITARIO

6.8.3

Montaje de Aditamento de Duchas

un

(No Aplica)
SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)

2%

18,976.47

0.89

21,413.54

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.8.4

Montaje de mezclador duchas

un

Arena lavada de pea / de pozo

m3

0.021

41,125.00

Cemento gris Portland tipo 1 ARGOS - empaque 50 kg

un

0.174

18,620.32

SUBTOTAL MATERIALES

...
2%

28,349.48

1.172

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.8.5

Montaje lavaplatos acople fleximetalico

un

Acople fleximetal

un

1.000

5,500.00

Cinta tefln - rollo

un

0.241

500.00

Sikaflex 1-A SIKA, masilla elstica sellante y adhesiva con base


en poliuretano - cartucho 305 cc.

un

0.048

21,500.00

2%

23,633.09

0.841

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

6.8.6

UNIDAD

CANTIDAD

UNITARIO

Montaje lavamanos acople fleximetalico

un

Acople fleximetal

un

1.000

5,500.00

Cinta tefln - rollo

un

0.241

500.00

Sikaflex 1-A SIKA, masilla elstica sellante y adhesiva con base


en poliuretano - cartucho 305 cc.

un

0.048

21,500.00

2%

23,645.93

0.842

21,413.54

0.190

500.00

2%

12,049.98

0.558

21,413.54

2%

154,200.00

7.201

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.8.7
-

Conexin llave manguera

un

Cinta tefln - rollo

un

SUBTOTAL MATERIALES

...

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.8.8

Montaje tanque de agua caliente central

un

(No Aplica)
SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


-

SUBTOTAL TRANSPORTE

...

Subcontrato para montaje de equipos hidrosanitarios

glb

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

6.8.9

Montaje bomba sistema de agua caliente central

UNIDAD

CANTIDAD

UNITARIO

un

(No Aplica)
SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)

2%

338,572.55

15.811

21,413.54

2%

1,554,228.43

1.000

1,554,228.43

2%

203,738.24

1.000

203,738.24

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


-

SUBTOTAL TRANSPORTE

...

Subcontrato para montaje de equipos hidrosanitarios

glb

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.8.10

Montaje equipo de presin

un

(No Aplica)
SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


-

SUBTOTAL TRANSPORTE

...

Subcontrato para montaje de equipos hidrosanitarios

glb

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.8.11

Montaje bombas eyectoras

un

(No Aplica)
SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


-

SUBTOTAL TRANSPORTE

...

Subcontrato para montaje de equipos hidrosanitarios

glb

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

6.8.12

UNIDAD

CANTIDAD

UNITARIO

Montaje y suministro cajilla 1 medidor sin tapa

un

Cajilla para medidor de acueducto 1/2"-3/4" FIBRIT Ref. CIMA


530 38x53x30 cm (a x l x h). NO incluye marco ni tapa

un

1.000

59,400.00

Arena de pea - sin tamizar

m3

0.025

41,667.00

Cemento gris Portland tipo 1 ARGOS - empaque 50 kg

un

0.183

18,620.32

Toxement polvo TOXEMENT, impermeabilizante integral para


hormign y mortero - empaque x 25 kg

un

0.007

88,900.00

Cal - empaque 10 kg

un

0.025

3,500.00

SUBTOTAL MATERIALES

...
2%

96,875.49

0.164

228,395.39

2%

19,209.80

0.897

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


-

SUBTOTAL TRANSPORTE

...

Subcontrato para montaje de equipos hidrosanitarios

glb

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.17.14

Montaje de medidores agua fria

un

Montaje de medidores agua fria


SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

Montaje de medidores agua fria


SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

ABRAZADERAS
.

6.9.1

Abrazaderas tipo pera 1/2"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.082

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

SUBTOTAL MATERIALES

...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
-

Herramienta menor. INDICE GENERAL

UNIDAD
% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

CANTIDAD

UNITARIO

2%

2,587.96

0.002

20,000.00

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.200

1,000.00

HR

0.018

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.9.2

Abrazaderas tipo pera 3/4"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.088

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

2%

2,634.06

0.002

20,000.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.242

1,000.00

HR

0.019

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.9.3

Abrazaderas tipo pera 1"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.113

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

2%

2,934.21

0.003

20,000.00

0.312

1,000.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

UNIDAD
HR

CANTIDAD

UNITARIO

0.026

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.9.4

Abrazaderas tipo pera 1.1/4"

un

212xx27

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

241fi21

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.150

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

SUBTOTAL MATERIALES

...
2%

3,363.02

0.004

20,000.00

241xx23

501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

108a.5

% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

310a.17

SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.412

1,000.00

HR

0.036

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.9.5

Abrazaderas tipo pera 1.1/2"

un

212xx27

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

241fi21

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.156

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

SUBTOTAL MATERIALES

...
2%

3,434.04

0.004

20,000.00

241xx23

501a.1

108a.5

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

310a.17

SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.429

1,000.00

HR

0.037

21,413.54

0.003

139,084.00

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.9.6
-

Abrazaderas tipo pera 2"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.174

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

2%

3,648.30

0.004

20,000.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.479

1,000.00

HR

0.042

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.9.7

Abrazaderas tipo pera 2.1/2"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.186

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

2%

3,792.14

0.005

20,000.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.512

1,000.00

HR

0.046

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.9.8

Abrazaderas tipo pera 3"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.223

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

2%

4,219.48

0.006

20,000.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.612

1,000.00

HR

0.055

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.9.9

Abrazaderas tipo pera 4"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.259

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

2%

4,649.57

0.006

20,000.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.713

1,000.00

HR

0.066

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.9.10

Abrazaderas tipo pera 6"

un

212xx27

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

241fi21

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.308

5,900.00

241xx23

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

501a.1

2%

5,221.47

0.008

20,000.00

SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
108a.5

...
% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

310a.17

SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.846

1,000.00

HR

0.079

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

PINTURA PARA TUBERIAS COLGANTES

6.10.1
-

Pintura esmalte tuberas colgantes .=1/2". Incluye preparacin


de la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
proteccin y decoracin en interiores
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

m
gal

0.006

44,900.00

2%

1,559.82

0.060

21,413.54

0.007

44,900.00

2%

1,835.63

0.071

21,413.54

0.008

44,900.00

2%

2,159.48

0.083

21,413.54

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.10.2
-

Pintura esmalte tuberas colgantes .=3/4". Incluye preparacin


de la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
proteccin y decoracin en interiores
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

m
gal
...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.10.3
-

Pintura esmalte tuberas colgantes .=1". Incluye preparacin de


la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
proteccin y decoracin en interiores
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

m
gal
...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

6.10.4
-

Pintura esmalte tuberas colgantes .=1,1/4". Incluye preparacin


de la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
proteccin y decoracin en interiores
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

UNIDAD

CANTIDAD

UNITARIO

m
gal

0.010

44,900.00

2%

2,541.20

0.098

21,413.54

0.012

44,900.00

2%

2,988.76

0.115

21,413.54

0.014

44,900.00

2%

3,516.95

0.135

21,413.54

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.10.5
-

Pintura esmalte tuberas colgantes .=1,1/2". Incluye preparacin


de la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
proteccin y decoracin en interiores
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

m
gal
...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.10.6
-

Pintura esmalte tuberas colgantes .=2". Incluye preparacin de


la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
proteccin y decoracin en interiores
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

m
gal
...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
.

6.10.7
-

Pintura esmalte tuberas colgantes .=2,1/2". Incluye preparacin


de la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
proteccin y decoracin en interiores
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

UNIDAD

CANTIDAD

UNITARIO

m
gal

0.016

44,900.00

2%

4,138.01

0.159

21,413.54

0.019

44,900.00

2%

4,867.41

0.187

21,413.54

0.022

44,900.00

2%

5,727.47

0.220

21,413.54

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.10.8
-

Pintura esmalte tuberas colgantes .=3". Incluye preparacin de


la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
proteccin y decoracin en interiores
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

m
gal
...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.10.9
-

Pintura esmalte tuberas colgantes .=4". Incluye preparacin de


la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
proteccin y decoracin en interiores
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

m
gal
...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

OBRAS COMPLEMENTARIAS

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
.

6.11.1

Lavado de tanques

UNIDAD

CANTIDAD

UNITARIO

un

(No Aplica)
SUBTOTAL MATERIALES

...

(No Aplica)
SUBTOTAL HERRAMIENTAS

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Subcontrato para lavado y desinfeccin de tanque de reserva de


agua potable. Incluye entrega de certificado del trabajo realizado

glb

1.000

845,204.00

1.000

359,041.00

2%

152,418.63

1.092

200,000.00

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.11.2

Desinfeccin del sistema de agua potable

un

(No Aplica)
SUBTOTAL MATERIALES

...

(No Aplica)
SUBTOTAL HERRAMIENTAS

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Subcontrato para desinfeccin de la red de agua potable. Incluye


entrega de certificado del trabajo realizado

glb

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.11.3

Prueba de presin

un

Ejecucin de la totalidad de las pruebas de presin para


garantizar y certificar la totalidad de las redes de suministro de
agua ejecutadas

(No Aplica)
SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL

...
% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Flauta de presin en tubera y accesorios de cobre, con


manometro de gliserina debidamente calibrado y certificado

un

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

UNIDAD

CANTIDAD

UNITARIO

...
HR

7.118

21,413.54

2%

238,594.12

11.142

21,413.54

2%

161,482.35

7.541

21,413.54

1.00

5,216.00

2.0%

6,450.98

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.11.4

Prueba de flujo

un

Ejecucin de la totalidad de las pruebas de desages para


garantizar y certificar la totalidad de las redes de desages de
aguas residuales y aguas lluvias ejecutadas

un

(No Aplica)
SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.11.5

Prueba de estanqueidad por bajante

un

Ejecucin de la totalidad de las pruebas de estanquedad para


garantizar y certificar la totalidad de las redes de desages de
aguas residuales y aguas lluvias ejecutadas

un

(No Aplica)
SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.11.6
21B160

20H700

Malla plstica proteccin de ductos

M2

Malla Plastica

M2

SUBTOTAL MATERIALES

...

- HERRAMIENTAS MENORES

% (M+MO)

SUBTOTAL HERRAMIENTAS
-

...

(No Aplica)
SUBTOTAL EQUIPO
(El valor de los insumos incluye el transporte)

...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
SUBTOTAL TRANSPORTE
MANO DE OBRA CUADRILLA AA

UNIDAD

CANTIDAD

UNITARIO

...
HR

0.06

21,413.54

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

INSTALACION A GAS
.

6.12.1

Caeria Hierro Galvanizado Sch.40 1" inc.acc.

6.12.1 a

Tubera Acero Galvanizado (AG) SCH-40 1". Incluye suministro,


regata y resane, instalacin y uniones para el correcto tendido de
la tubera

Tubera Acero galvanizado SCH-40 1" COLMENA

1.030

16,046.67

Unin Acero galvanizado 1" MECH

un

0.153

1,542.80

Cinta tefln - rollo

un

0.151

500.00

Sellador ETERNA - botella

un

0.028

8,250.00

SUBTOTAL MATERIALES

...
2%

23,687.67

0.005

200,000.00

0.386

17,116.00

2,088.00

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.12.1 b

Accesorio Acero Galvanizado (AG) 1" (se excluyen las uniones)

un

Codo 90 Acero galvanizado 1" MECH

un

0.504

Cinta tefln - rollo

un

0.046

500.00

Sellador ETERNA - botella

un

0.019

8,250.00

2%

2,254.78

0.048

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.2

Caeria Hierro Galvanizado 4" inc.acc.

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Tubera Acero Carbn (AC) SCH-40 con costura 4". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

Tubera Acero Carbn SCH-40 4"

1.050

95,816.00

Vaselina x tarro

un

0.006

5,000.00

SUBTOTAL MATERIALES

...
2%

112,140.16

0.006

200,000.00

0.672

17,116.00

6.12.2 a

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 4" (se excluyen las


uniones). NO incluye los acoples laterales

un

Codo 90 Hierro dctil ranurado HD 4"

un

0.535

23,513.03

Tee Hierro dctil ranurado HD 4"

un

0.134

36,520.23

Vaselina x tarro

un

0.036

5,000.00

SUBTOTAL MATERIALES

...
2%

22,419.29

0.224

21,413.54

6.12.2. b

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.3

Caeria Hierro Galvanizado 3" inc.acc. (Colectores)

6.12.3 a

Tubera Acero Carbn (AC) SCH-40 con costura 3". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

Tubera Acero Carbn SCH-40 3"

1.050

63,558.86

Vaselina x tarro

un

0.005

5,000.00

2%

77,567.64

0.005

200,000.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL

...
% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

UNIDAD
HR

CANTIDAD

UNITARIO

0.505

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 3" (se excluyen las


uniones). NO incluye los acoples laterales

un

Codo 90 Hierro dctil ranurado HD 3"

un

0.800

16,928.51

Tee Hierro dctil ranurado HD 3"

un

0.200

21,985.08

Vaselina x tarro

un

0.040

5,000.00

SUBTOTAL MATERIALES

...
2%

23,527.44

0.252

21,413.54

6.12.3 b

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.12. 4

Caeria Hierro Galvanizado 2" inc.acc.

6.12.4 a

Tubera Acero Carbn (AC) SCH-40 con costura 2,1/2". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

Tubera Acero Carbn SCH-40 2,1/2"

1.050

45,639.70

Vaselina x tarro

un

0.004

5,000.00

SUBTOTAL MATERIALES

...
2%

57,692.66

0.004

200,000.00

0.455

21,413.54

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 2,1/2" (se excluyen las
uniones)

un

Codo 90 Acero roscado 150 libras H/N 2,1/2"

un

0.336

6,814.64

Tee Acero roscado 150 libras H/N 2,1/2"

un

0.336

8,793.08

Cinta tefln - rollo

un

0.127

500.00

Sellador ETERNA - botella

un

0.025

8,250.00

SUBTOTAL MATERIALES

...
2%

9,687.27

6.12.4 b

Herramienta menor. INDICE GENERAL

% (MAT+MO)

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
SUBTOTAL HERRAMIENTAS

UNIDAD

CANTIDAD

UNITARIO

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

0.195

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.5

Caeria Hierro Galvanizado 2" inc.acc.

6.12.5 a

Tubera Acero Carbn (AC) SCH-40 con costura 2". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

218xx400 -

Tubera Acero Carbn SCH-40 2"

1.050

32,944.00

240xx1

Vaselina x tarro

un

0.002

5,000.00

SUBTOTAL MATERIALES

...
2%

39,414.98

0.002

200,000.00

0.225

21,413.54

501a.1

108a.6

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 2" (se excluyen las
uniones)

un

Codo 90 Acero roscado 150 libras H/N 2"

un

0.364

5,958.14

Tee Acero roscado 150 libras H/N 2"

un

0.364

7,687.92

218xx280 -

Cinta tefln - rollo

un

0.121

500.00

218et281

Sellador ETERNA - botella

un

0.024

8,250.00

SUBTOTAL MATERIALES

...
2%

9,191.93

0.185

21,413.54

6.12.5 b

501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

0.823

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

6.12.6

Caeria Hierro Galvanizado 1" inc.acc.

6.38.5

Tubera Acero Carbn (AC) SCH-40 con costura 1,1/2". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

CANTIDAD

UNITARIO

218xx399 -

Tubera Acero Carbn SCH-40 1,1/2"

1.050

24,708.00

240xx1

Vaselina x tarro

un

0.001

5,000.00

501a.1

2%

29,415.49

0.001

200,000.00

0.162

21,413.54

SUBTOTAL MATERIALES

108a.6

Herramienta menor. INDICE GENERAL

...
% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 1,1/2" (se excluyen las
uniones)

un

Codo 90 Acero roscado 150 libras H/N 1,1/2"

un

0.224

5,265.56

Tee Acero roscado 150 libras H/N 1,1/2"

un

0.224

6,794.27

218xx280 -

Cinta tefln - rollo

un

0.066

500.00

218et281

Sellador ETERNA - botella

un

0.013

8,250.00

SUBTOTAL MATERIALES

...
2%

4,123.73

0.060

21,413.54

6.38.6

501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.7

Valvula esferica 4"

Adaptador macho PVCP 4" PAVCO

un

2.000

20,019.74

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 4"

un

1.000

707,505.88

Cinta tefln - rollo

un

0.576

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.021

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.021

50,993.60

2%

806,690.63

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

2.676

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.8

Valvula esferica 3"

Adaptador macho PVCP 3" PAVCO

un

2.000

10,883.58

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 3"

un

1.000

290,781.37

Cinta tefln - rollo

un

0.298

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.011

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.011

50,993.60

SUBTOTAL MATERIALES

...
2%

343,129.21

1.383

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.9

Valvula esferica 2"

Adaptador macho PVCP 2,1/2" PAVCO

un

2.000

7,198.50

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 2,1/2"

un

1.000

218,697.06

Cinta tefln - rollo

un

0.225

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.008

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.008

50,993.60

2%

256,191.31

1.044

21,413.54

2.000

2,478.25

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.10
-

Valvula esferica 2"

Adaptador macho PVCP 2"

un

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 2"

un

1.000

Cinta tefln - rollo

un

0.152

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.006

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.006

50,993.60

2%

143,611.32

0.706

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

123,038.24

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.11

Valvula esferica 1"

Adaptador macho PVCP 1,1/2"

un

2.000

1,734.50

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 1,1/2"

un

1.000

77,314.71

Cinta tefln - rollo

un

0.225

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.007

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.007

50,993.60

SUBTOTAL MATERIALES

...
2%

95,547.87

0.660

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.12

Valvula esferica 1"

Adaptador macho PVCP 1"

un

2.000

702.12

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 1"

un

1.000

47,168.63

Cinta tefln - rollo

un

0.155

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.004

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.004

50,993.60

SUBTOTAL MATERIALES

...
2%

53,847.94

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)

...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

UNIDAD

CANTIDAD

UNITARIO

...
HR

0.230

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.13

Valvula Shut-Off 3"

Adaptador macho PVCP 3" PAVCO

un

2.000

10,883.58

Valvula Shut-Off 3"

un

1.000

267,112.75

Cinta tefln - rollo

un

0.298

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.011

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.011

50,993.60

SUBTOTAL MATERIALES

...
2%

319,460.59

1.383

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.14

Valvula Shut-Off 2"

Adaptador macho PVCP 2,1/2" PAVCO

un

2.000

7,198.50

Valvula Shut-Off 2"

un

1.000

255,888.24

Cinta tefln - rollo

un

0.225

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.008

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.008

50,993.60

2%

293,382.49

1.044

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.15

Valvula Shut-Off 2"

Adaptador macho PVCP 2"

un

2.000

2,478.25

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 2"

un

1.000

245,626.47

Cinta tefln - rollo

un

0.152

500.00

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.006

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.006

50,993.60

SUBTOTAL MATERIALES

...
2%

266,199.56

0.706

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.13.1

Abrazaderas tipo pera 1"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.113

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

2%

2,934.21

0.003

20,000.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.312

1,000.00

HR

0.026

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.13.2

Abrazaderas tipo pera 1.1/2"

un

212xx27

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

241fi21

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.156

5,900.00

241xx23

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

501a.1

2%

3,434.04

0.004

20,000.00

0.429

1,000.00

SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
108a.5

...
% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

310a.17

SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

UNIDAD
HR

CANTIDAD

UNITARIO

0.037

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.13.3

Abrazaderas tipo pera 2"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.174

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

SUBTOTAL MATERIALES

...
2%

3,648.30

0.004

20,000.00

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.479

1,000.00

HR

0.042

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.13.4

Abrazaderas tipo pera 2.1/2"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.186

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

SUBTOTAL MATERIALES

...
2%

3,792.14

0.005

20,000.00

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.512

1,000.00

HR

0.046

21,413.54

0.003

139,084.00

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.13.5
-

Abrazaderas tipo pera 3"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.223

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

2%

4,219.48

0.006

20,000.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.612

1,000.00

HR

0.055

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.9.6

Abrazaderas tipo pera 4"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.259

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

2%

4,649.57

0.006

20,000.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.713

1,000.00

HR

0.066

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.14.1

Punto de gas en acero galvanizado

un

Tubera Acero galvanizado SCH-40 1/2" COLMENA

0.900

7,926.67

Unin Acero galvanizado 1/2" MECH

un

1.000

649.60

Codo 90 Acero galvanizado 1/2" MECH

un

2.000

858.40

Tapn hembra Acero galvanizado 1/2"

un

1.000

910.00

Cinta tefln - rollo

un

0.534

500.00

Sellador ETERNA - botella

un

0.107

8,250.00

SUBTOTAL MATERIALES

...
2%

30,820.64

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

CANTIDAD

UNITARIO

0.024

200,000.00

0.899

21,413.54

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.14.2

Conexin aparatos

un

Manguera de conexin flexible L.=100 cm, conectores de acero


recubiertos con nitrilo

un

1.000

21,900.00

Cinta tefln - rollo

un

0.839

500.00

Sellador ETERNA - botella

un

0.159

8,250.00

SUBTOTAL MATERIALES

...
2%

51,918.77

1.321

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

RED DE INCENDIO

6.15.1

Caeria HN Sch.40 p/soldar 6" inc.acc.

6.15.1 a

Tubera Acero Carbn (AC) SCH-40 con costura 6". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

Tubera Acero Carbn SCH-40 6"

1.050

170,520.00

Vaselina x tarro

un

0.010

5,000.00

SUBTOTAL MATERIALES

...
2%

193,715.02

0.010

200,000.00

0.683

21,413.54

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 6" (se excluyen las


uniones). NO incluye los acoples laterales

un

Codo 90 Hierro dctil ranurado HD 6"

un

0.516

46,382.61

Tee Hierro dctil ranurado HD 6"

un

0.129

77,962.25

Vaselina x tarro

un

0.034

5,000.00

SUBTOTAL MATERIALES

...
2%

38,740.47

0.213

21,413.54

6.15.1 b

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.2

Caeria HN Sch.40 p/soldar 4" inc.acc.

6.15.2 a

Tubera Acero Carbn (AC) SCH-40 con costura 4". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

Tubera Acero Carbn SCH-40 4"

1.050

95,816.00

Vaselina x tarro

un

0.006

5,000.00

SUBTOTAL MATERIALES

...
2%

112,140.16

0.006

200,000.00

0.672

17,116.00

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 4" (se excluyen las


uniones). NO incluye los acoples laterales

un

Codo 90 Hierro dctil ranurado HD 4"

un

0.535

23,513.03

Tee Hierro dctil ranurado HD 4"

un

0.134

36,520.23

Vaselina x tarro

un

0.036

5,000.00

SUBTOTAL MATERIALES

...
2%

22,419.29

6.15.2 b

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

UNIDAD
HR

CANTIDAD

UNITARIO

0.224

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.3

Caeria HN Sch.40 p/soldar 3" inc.acc.

6.15.3 a

Tubera Acero Carbn (AC) SCH-40 con costura 3". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

Tubera Acero Carbn SCH-40 3"

1.050

63,558.86

Vaselina x tarro

un

0.005

5,000.00

2%

77,567.64

0.005

200,000.00

0.505

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL

...
% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 3" (se excluyen las


uniones). NO incluye los acoples laterales

un

Codo 90 Hierro dctil ranurado HD 3"

un

0.800

16,928.51

Tee Hierro dctil ranurado HD 3"

un

0.200

21,985.08

Vaselina x tarro

un

0.040

5,000.00

SUBTOTAL MATERIALES

...
2%

23,527.44

0.252

21,413.54

6.15.3 b

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.4

Caeria HN Sch.40 p/soldar 2" inc.acc.

6.15.4 a

Tubera Acero Carbn (AC) SCH-40 con costura 2,1/2". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

Tubera Acero Carbn SCH-40 2,1/2"

1.050

45,639.70

Vaselina x tarro

un

0.004

5,000.00

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL

UNIDAD

CANTIDAD

UNITARIO

...
% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

2%

57,692.66

0.004

200,000.00

0.455

21,413.54

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 2,1/2" (se excluyen las
uniones)

un

Codo 90 Acero roscado 150 libras H/N 2,1/2"

un

0.336

6,814.64

Tee Acero roscado 150 libras H/N 2,1/2"

un

0.336

8,793.08

Cinta tefln - rollo

un

0.127

500.00

Sellador ETERNA - botella

un

0.025

8,250.00

SUBTOTAL MATERIALES

...
2%

9,687.27

0.195

21,413.54

6.15.4 b

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.5

Caeria HN Sch.40 p/soldar 2" inc.acc.

6.15.5 a

Tubera Acero Carbn (AC) SCH-40 con costura 2". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

Tubera Acero Carbn SCH-40 2"

1.050

32,944.00

Vaselina x tarro

un

0.002

5,000.00

SUBTOTAL MATERIALES

...
2%

39,414.98

0.002

200,000.00

0.225

21,413.54

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 2" (se excluyen las
uniones)

un

Codo 90 Acero roscado 150 libras H/N 2"

un

0.364

5,958.14

Tee Acero roscado 150 libras H/N 2"

un

0.364

7,687.92

Cinta tefln - rollo

un

0.121

500.00

Sellador ETERNA - botella

un

0.024

8,250.00

2%

9,191.93

0.185

21,413.54

6.15.5 b

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano

0.823

TOTAL UNITARIO

6.15.7

Valvula esclusa 4"

Adaptador macho PVCP 4" PAVCO

un

2.000

20,019.74

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 4"

un

1.000

793,588.24

Cinta tefln - rollo

un

0.576

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.021

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.021

50,993.60

SUBTOTAL MATERIALES

...
2%

892,772.98

2.676

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.8

Valvula esferica 3"

Adaptador macho PVCP 3" PAVCO

un

2.000

10,883.58

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 3"

un

1.000

290,781.37

Cinta tefln - rollo

un

0.298

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.011

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.011

50,993.60

SUBTOTAL MATERIALES

...
2%

343,129.21

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

1.383

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.9

Valvula esferica 2"

Adaptador macho PVCP 2"

un

2.000

2,478.25

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 2"

un

1.000

123,038.24

Cinta tefln - rollo

un

0.152

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.006

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.006

50,993.60

SUBTOTAL MATERIALES

...
2%

143,611.32

0.706

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.10

Valvula retencion 6" bridada

Adaptador macho PVCP 6" PAVCO

un

2.000

27,169.98

Valvula retencion 6" bridada

un

1.000

1,077,025.43

Cinta tefln - rollo

un

0.782

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.028

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.028

50,993.60

SUBTOTAL MATERIALES

...
2%

1,211,634.90

3.631

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.11

Valvula retencion 2" bridada

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Adaptador macho PVCP 2"

un

2.000

2,478.25

Valvula retencion 2" bridada

un

1.000

621,590.20

Cinta tefln - rollo

un

0.152

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.006

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.006

50,993.60

SUBTOTAL MATERIALES

...
2%

642,163.28

0.706

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.12

Boca Incendio Completa 1"

Adaptador macho PVCP 1,3/4"

un

2.000

1,734.50

Boca Incendio Completa 1"

un

1.000

388,556.86

Cinta tefln - rollo

un

0.225

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.007

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.007

50,993.60

SUBTOTAL MATERIALES

...
2%

406,790.03

0.660

21,413.54

1.000

1,209,691.18

2%

1,271,924.40

2.906

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.13

Boca Impulsion Doble Completa inc.marco y tapa

un

210pr1

Conjunto Siamesa de pared tipo Placa 4"X2,1/2"X2,1/2" Bronce


PRODESEG, rosca NPT, niples con tuerca giratoria, tapas macho
2,1/2" rosca NH, placa "INYECCION COLUMNA", todo el
conjunto en bronce acabado brillante

un

SUBTOTAL MATERIALES

...

501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Redondeo a entero ms cercano


TOTAL UNITARIO

INSTALACION DE ROCIADORES
.

6.16.1

Caeria HN Sch.40 p/soldar 4" inc.acc.

6.16.1 a

Tubera Acero Carbn (AC) SCH-40 con costura 4". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

Tubera Acero Carbn SCH-40 4"

1.050

95,816.00

Vaselina x tarro

un

0.006

5,000.00

2%

112,140.16

0.006

200,000.00

0.672

17,116.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL

...
% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 4" (se excluyen las


uniones). NO incluye los acoples laterales

un

Codo 90 Hierro dctil ranurado HD 4"

un

0.535

23,513.03

Tee Hierro dctil ranurado HD 4"

un

0.134

36,520.23

Vaselina x tarro

un

0.036

5,000.00

SUBTOTAL MATERIALES

...
2%

22,419.29

0.224

21,413.54

6.16.1 b

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.16.2

Caeria HN Sch.40 p/soldar 3" inc.acc.

6.16.2 a

Tubera Acero Carbn (AC) SCH-40 con costura 3". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

Tubera Acero Carbn SCH-40 3"

1.050

63,558.86

Vaselina x tarro

un

0.005

5,000.00

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL

UNIDAD

CANTIDAD

UNITARIO

...
% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

2%

77,567.64

0.005

200,000.00

0.505

21,413.54

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 3" (se excluyen las


uniones). NO incluye los acoples laterales

un

Codo 90 Hierro dctil ranurado HD 3"

un

0.800

16,928.51

Tee Hierro dctil ranurado HD 3"

un

0.200

21,985.08

Vaselina x tarro

un

0.040

5,000.00

2%

23,527.44

0.252

21,413.54

6.16.2 b

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.16. 3

Caeria HN Sch.40 p/soldar 2" inc.acc.

6.16.3 a

Tubera Acero Carbn (AC) SCH-40 con costura 2,1/2". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

Tubera Acero Carbn SCH-40 2,1/2"

1.050

45,639.70

Vaselina x tarro

un

0.004

5,000.00

2%

57,692.66

0.004

200,000.00

0.455

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL

...
% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Accesorio H/N acero roscado 150 lbs 2,1/2" (se excluyen las
uniones)

un

Codo 90 Acero roscado 150 libras H/N 2,1/2"

un

0.336

6,814.64

Tee Acero roscado 150 libras H/N 2,1/2"

un

0.336

8,793.08

Cinta tefln - rollo

un

0.127

500.00

Sellador ETERNA - botella

un

0.025

8,250.00

SUBTOTAL MATERIALES

...
2%

9,687.27

0.195

21,413.54

6.16.3 b

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.16. 4

Caeria HN Sch.40 p/soldar 2" inc.acc.

6.16.4 a

Tubera Acero Carbn (AC) SCH-40 con costura 2". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

Tubera Acero Carbn SCH-40 2"

1.050

32,944.00

Vaselina x tarro

un

0.002

5,000.00

SUBTOTAL MATERIALES

...
2%

39,414.98

0.002

200,000.00

0.225

21,413.54

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 2" (se excluyen las
uniones)

un

Codo 90 Acero roscado 150 libras H/N 2"

un

0.364

5,958.14

Tee Acero roscado 150 libras H/N 2"

un

0.364

7,687.92

Cinta tefln - rollo

un

0.121

500.00

Sellador ETERNA - botella

un

0.024

8,250.00

SUBTOTAL MATERIALES

...
2%

9,191.93

6.16.4 b

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

0.185

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano

0.823

TOTAL UNITARIO

6.16.5

Caeria Hierro Galvanizado 1" inc.acc.

6.16.5 a

Tubera Acero Carbn (AC) SCH-40 con costura 1,1/2". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

218xx399 -

Tubera Acero Carbn SCH-40 1,1/2"

1.050

24,708.00

240xx1

Vaselina x tarro

un

0.001

5,000.00

SUBTOTAL MATERIALES

...
2%

29,415.49

0.001

200,000.00

0.162

21,413.54

501a.1

108a.6

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 1,1/2" (se excluyen las
uniones)

un

Codo 90 Acero roscado 150 libras H/N 1,1/2"

un

0.224

5,265.56

Tee Acero roscado 150 libras H/N 1,1/2"

un

0.224

6,794.27

218xx280 -

Cinta tefln - rollo

un

0.066

500.00

218et281

Sellador ETERNA - botella

un

0.013

8,250.00

SUBTOTAL MATERIALES

...
2%

4,123.73

0.060

21,413.54

6.16.5 b

501a.1

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.16.6

Caeria HN Sch.40 p/soldar 1" inc.acc.

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Tubera Acero Carbn (AC) SCH-40 con costura 1,1/4". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

Tubera Acero Carbn SCH-40 1,1/4"

1.050

21,720.82

Vaselina x tarro

un

0.001

5,000.00

SUBTOTAL MATERIALES

...
2%

26,278.51

0.001

200,000.00

0.162

21,413.54

6.16.6 a

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 1,1/4" (se excluyen las
uniones)

un

Codo 90 Acero roscado 150 libras H/N 1,1/4"

un

0.500

3,596.00

Tee Acero roscado 150 libras H/N 1,1/4"

un

0.500

4,640.00

Cinta tefln - rollo

un

0.066

500.00

Sellador ETERNA - botella

un

0.013

8,250.00

2%

5,535.03

0.060

21,413.54

6.16.6 B

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.16.7

Caeria Hierro Galvanizado Sch.40 1" inc.acc.

6.16.7 a

Tubera Acero Galvanizado (AG) SCH-40 1". Incluye suministro,


regata y resane, instalacin y uniones para el correcto tendido de
la tubera

Tubera Acero galvanizado SCH-40 1" COLMENA

1.030

16,046.67

Unin Acero galvanizado 1" MECH

un

0.153

1,542.80

Cinta tefln - rollo

un

0.151

500.00

Sellador ETERNA - botella

un

0.028

8,250.00

SUBTOTAL MATERIALES

...
2%

20,496.39

0.005

200,000.00

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
SUBTOTAL EQUIPOS

UNIDAD

CANTIDAD

UNITARIO

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

0.160

21,413.54

2,088.00

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.216.7 b

Accesorio Acero Galvanizado (AG) 1" (se excluyen las uniones)

un

Codo 90 Acero galvanizado 1" MECH

un

0.504

Cinta tefln - rollo

un

0.046

500.00

Sellador ETERNA - botella

un

0.019

8,250.00

SUBTOTAL MATERIALES

...
2%

2,254.78

0.048

21,413.54

1.000

20,661.00

1.000

5,000.00

2%

7,307.74

0.550

51.00

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.16.8

6.44.2

Rociador Pendent 68C

Suministro de rociador tipo Pendent K=5,6 (Cobertura Normal


Temperatura) 1/2", acabado cromado. NO INCLUYE MONTAJE
Rociador tipo Pendent K=5,6 (Cobertura Normal Temperatura)
1/2", acabado cromado
SUBTOTAL MATERIALES

un
un
...

(No Aplica)
SUBTOTAL HERRAMIENTAS

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.44.3
501a.1

105xx2

Suministro e instalacin de Escudo cromado para rociador 1/2"

un

Escudo para rociador 1/2", acabado cromado

un

SUBTOTAL MATERIALES

...

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Andamio tubular seccin completa, incluyendo los dos laterales y


correspondiente cruceta

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

UNIDAD

CANTIDAD

UNITARIO

...
HR

0.108

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Montaje de rociador tipo Pendent K=5,6 (Cobertura Normal


Temperatura) 1/2", acabado cromado. NO INCLUYE
SUMINISTRO

un

218xx280 -

Cinta tefln - rollo

un

0.147

500.00

218et281

Sellador ETERNA - botella

un

0.037

8,250.00

501a.1

2%

6,799.67

0.916

51.00

0.300

21,413.54

6.44.4

SUBTOTAL MATERIALES

105xx2

Herramienta menor. INDICE GENERAL

...
% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Andamio tubular seccin completa, incluyendo los dos laterales y


correspondiente cruceta

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.17.1

Abrazaderas tipo pera 1"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.113

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

2%

2,934.21

0.003

20,000.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.312

1,000.00

HR

0.026

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.17.2

Abrazaderas tipo pera 1.1/2"

un

212xx27

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

241fi21

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.156

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

SUBTOTAL MATERIALES

...

241xx23

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
501a.1

108a.5

Herramienta menor. INDICE GENERAL

UNIDAD
% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

CANTIDAD

UNITARIO

2%

3,434.04

0.004

20,000.00

(El valor de la totalidad de insumos incluye el transporte)

310a.17

SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.429

1,000.00

HR

0.037

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.17.3

Abrazaderas tipo pera 2"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.174

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

SUBTOTAL MATERIALES

...
2%

3,648.30

0.004

20,000.00

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.479

1,000.00

HR

0.042

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.17.4

Abrazaderas tipo pera 2.1/2"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.186

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

SUBTOTAL MATERIALES

...
2%

3,792.14

0.005

20,000.00

0.512

1,000.00

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

UNIDAD
HR

CANTIDAD

UNITARIO

0.046

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.17.5

Abrazaderas tipo pera 3"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.223

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

SUBTOTAL MATERIALES

...
2%

4,219.48

0.006

20,000.00

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.612

1,000.00

HR

0.055

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.17.6

Abrazaderas tipo pera 4"

un

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

0.003

139,084.00

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.259

5,900.00

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

SUBTOTAL MATERIALES

...
2%

4,649.57

0.006

20,000.00

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.713

1,000.00

HR

0.066

21,413.54

0.003

139,084.00

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.17.7

Abrazaderas tipo pera 6"

un

212xx27

Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16


(1,50mm) - 34,90 kg/un

un

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
241fi21

UNIDAD

CANTIDAD

UNITARIO

Varilla roscada / esparrago 1/2" L=100 cm FIXSER

un

0.308

5,900.00

241xx23

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


RT incluido

un

1.000

1,300.00

501a.1

2%

5,221.47

0.008

20,000.00

SUBTOTAL MATERIALES
Herramienta menor. INDICE GENERAL
SUBTOTAL HERRAMIENTAS
108a.5

...
% (MAT+MO)
...

Rotomartillo. Incluye juego de brocas y accesorios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

310a.17

SUBTOTAL TRANSPORTE

...

Corte de lmina galvanizada y figurado para abrazaderas.


INDICE GENERAL

glb

0.846

1,000.00

HR

0.079

21,413.54

0.008

44,900.00

2%

2,159.48

0.083

21,413.54

0.010

44,900.00

2%

2,541.20

0.098

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.18.1
-

Pintura esmalte tuberas colgantes .=1". Incluye preparacin de


la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
proteccin y decoracin en interiores
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

m
gal
...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.18.2
-

Pintura esmalte tuberas colgantes .=1,1/4". Incluye preparacin


de la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
proteccin y decoracin en interiores
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

m
gal
...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
.

6.18.3
-

Pintura esmalte tuberas colgantes .=1,1/2". Incluye preparacin


de la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
proteccin y decoracin en interiores
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

UNIDAD

CANTIDAD

UNITARIO

m
gal

0.012

44,900.00

2%

2,988.76

0.115

21,413.54

0.014

44,900.00

2%

3,516.95

0.135

21,413.54

0.016

44,900.00

2%

4,138.01

0.159

21,413.54

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.18.4
-

Pintura esmalte tuberas colgantes .=2". Incluye preparacin de


la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
proteccin y decoracin en interiores
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

m
gal
...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.18.5
-

Pintura esmalte tuberas colgantes .=2,1/2". Incluye preparacin


de la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
proteccin y decoracin en interiores
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

m
gal
...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.18.6

Pintura esmalte tuberas colgantes .=4". Incluye preparacin de


la superficie

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
-

Esmalte base aceite, brillante Ref. Domestico PINTUCO,


proteccin y decoracin en interiores
SUBTOTAL MATERIALES

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

UNIDAD
gal

CANTIDAD

UNITARIO

0.022

44,900.00

2%

5,727.47

0.220

21,413.54

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA AA (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

INSTALACION DE AIRE COMPRIMIDO

6.20.1

Caeria HN Sch.40 p/soldar 2" inc.acc.

6.20.1 a

Tubera Acero Carbn (AC) SCH-40 con costura 2". Incluye


suministro, regata y resane, instalacin, para el correcto tendido
de la tubera. NO incluye uniones (acople)

Tubera Acero Carbn SCH-40 2"

1.050

32,944.00

Vaselina x tarro

un

0.002

5,000.00

2%

39,414.98

0.002

200,000.00

0.225

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL

...
% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 2" (se excluyen las
uniones)

un

Codo 90 Acero roscado 150 libras H/N 2"

un

0.364

5,958.14

Tee Acero roscado 150 libras H/N 2"

un

0.364

7,687.92

Cinta tefln - rollo

un

0.121

500.00

Sellador ETERNA - botella

un

0.024

8,250.00

2%

9,191.93

0.185

21,413.54

6.20.1 b

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano

0.823

TOTAL UNITARIO

6.20.2

Caeria Hierro Galvanizado Sch.40 1" inc.acc.

6.20.2 a

Tubera Acero Galvanizado (AG) SCH-40 1". Incluye suministro,


regata y resane, instalacin y uniones para el correcto tendido de
la tubera

Tubera Acero galvanizado SCH-40 1" COLMENA

1.030

16,046.67

Unin Acero galvanizado 1" MECH

un

0.153

1,542.80

Cinta tefln - rollo

un

0.151

500.00

Sellador ETERNA - botella

un

0.028

8,250.00

2%

20,496.39

0.005

200,000.00

0.160

21,413.54

2,088.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL

...
% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO
.

6.20.2 b

Accesorio Acero Galvanizado (AG) 1" (se excluyen las uniones)

un

Codo 90 Acero galvanizado 1" MECH

un

0.504

Cinta tefln - rollo

un

0.046

500.00

Sellador ETERNA - botella

un

0.019

8,250.00

2%

2,254.78

0.048

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.20.3

Caeria Hierro Galvanizado " inc.acc.

6.20.4 a

Tubera Acero Galvanizado (AG) SCH-40 3/3". Incluye suministro,


regata y resane, instalacin y uniones para el correcto tendido de
la tubera

Tubera Acero galvanizado SCH-40 3/4" COLMENA

1.000

8,534.88

Unin Acero galvanizado 1/2" MECH

un

0.129

739.23

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Cinta tefln - rollo

un

0.109

500.00

Sellador ETERNA - botella

un

0.020

8,250.00

SUBTOTAL MATERIALES

...
2%

12,690.91

0.003

200,000.00

0.224

17,116.00

976.85

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.20.4 b

Accesorio Acero Galvanizado (AG) 3/4" (se excluyen las uniones)

un

Codo 90 Acero galvanizado 3/4" MECH

un

0.614

Cinta tefln - rollo

un

0.033

500.00

Sellador ETERNA - botella

un

0.023

8,250.00

SUBTOTAL MATERIALES

...
2%

1,150.07

0.020

17,116.00

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.20.4

Caeria Hierro Galvanizado " inc.acc.

6.20.4 a

Tubera Acero Galvanizado (AG) SCH-40 1/2". Incluye suministro,


regata y resane, instalacin y uniones para el correcto tendido de
la tubera

Tubera Acero galvanizado SCH-40 1/2" COLMENA

1.000

7,500.00

Unin Acero galvanizado 1/2" MECH

un

0.129

649.60

Cinta tefln - rollo

un

0.096

500.00

Sellador ETERNA - botella

un

0.018

8,250.00

SUBTOTAL MATERIALES

...
2%

11,152.09

0.002

200,000.00

0.197

17,116.00

Herramienta menor. INDICE GENERAL

% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Roscadora y/o Ranuradora para tubera de hierro y/o acero.


Incluye dados, armazn, montaje, operario, transporte,
relacionados y complementarios

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.20.4 b

Accesorio Acero Galvanizado (AG) 1/2" (se excluyen las uniones)

un

Codo 90 Acero galvanizado 1/2" MECH

un

0.614

858.40

Cinta tefln - rollo

un

0.029

500.00

Sellador ETERNA - botella

un

0.020

8,250.00

SUBTOTAL MATERIALES

...
2%

1,010.62

0.018

17,116.00

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.20.5

Valvula esferica 2"

Adaptador macho PVCP 2"

un

2.000

2,478.25

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 2"

un

1.000

123,038.24

Cinta tefln - rollo

un

0.152

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.006

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.006

50,993.60

2%

143,611.32

0.706

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.20.6

Valvula esferica 1"

Adaptador macho PVCP 1"

un

2.000

702.12

Vlvula registro tipo paso directo / cortina / compuerta en bronce


Ref.206A RED WHITE, tipo pesado 200 psi 1"

un

1.000

47,168.63

Cinta tefln - rollo

un

0.155

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.004

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.004

50,993.60

SUBTOTAL MATERIALES

...
2%

53,847.94

Herramienta menor. INDICE GENERAL

% (MAT+MO)

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
SUBTOTAL HERRAMIENTAS

UNIDAD

CANTIDAD

UNITARIO

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

0.230

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.20.7

Valvula esferica "

Adaptador macho PVCP 1/2"

un

2.000

183.67

Vlvula cheque tipo hidro / vertical / universal en bronce Ref.


HFVC HELBERT 150 psi 1/2"

un

1.000

29,150.00

Cinta tefln - rollo

un

0.679

500.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.009

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.009

50,993.60

2%

35,465.96

0.230

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

...
HR

IS DE PRECIOS UNITARIOS
TOTAL

104,765.00

45,093.00
21,332.50
2,471.66
973.62
2,020.01
26,797.78 *
884.18
884.18 *
0.00
0.00 *
0.00
0.00 *
17,411.30
17,411.30 *
-0.26 *
45,093.00 *
59,672.00
43,900.00
973.62
2,020.01
46,893.63 *
1,170.04
1,170.04 *
0.00
0.00 *
0.00
0.00 *
11,608.28
11,608.28 *
0.05 *
59,672.00 *

25,525.00

18,075.00
9,957.50
280.11
491.57
1,019.87
11,749.05 *
354.40
354.40 *
0.00
0.00 *
0.00
0.00 *
5,971.17

IS DE PRECIOS UNITARIOS
TOTAL
5,971.17 *
0.38 *
18,075.00 *
7,450.00
4,300.00
491.57
1,019.87
5,811.44 *
146.08
146.08 *
0.00
0.00 *
0.00
0.00 *
1,492.75
1,492.75 *
-0.27 *
7,450.00 *

25,525.00

18,075.00
9,957.50
280.11
491.57
1,019.87
11,749.05 *
354.40
354.40 *
0.00
0.00 *
0.00
0.00 *
5,971.17
5,971.17 *
0.38 *
18,075.00 *
7,450.00
4,300.00
491.57
1,019.87
5,811.44 *
146.08
146.08 *
0.00
0.00 *
0.00
0.00 *
1,492.75
1,492.75 *
-0.27 *
7,450.00 *

21,560.00

IS DE PRECIOS UNITARIOS
TOTAL
14,315.00
7,079.78
280.11
491.57
1,019.87
8,871.33 *
280.69
280.69 *
0.00
0.00 *
0.00
0.00 *
5,163.14
5,163.14 *
-0.16 *
14,315.00 *
7,245.00
4,300.00
491.57
1,019.87
5,811.44 *
142.05
142.05 *
0.00
0.00 *
0.00
0.00 *
1,291.24
1,291.24 *
0.27 *
7,245.00 *

17,335.00

12,855.00
6,982.50
94.06
319.03
661.90
8,057.48 *
252.06
252.06 *
0.00
0.00 *
0.00
0.00 *
4,545.49
4,545.49 *
-0.03 *
12,855.00 *
4,480.00
2,500.00
245.78
509.94
3,255.72 *
87.84
87.84 *
0.00

IS DE PRECIOS UNITARIOS
TOTAL
0.00 *
0.00
0.00 *
1,136.37
1,136.37 *
0.07 *
4,480.00 *

17,335.00

12,855.00
6,982.50
94.06
319.03
661.90
8,057.48 *
252.06
252.06 *
0.00
0.00 *
0.00
0.00 *
4,545.49
4,545.49 *
-0.03 *
12,855.00 *
4,480.00
2,500.00
245.78
509.94
3,255.72 *
87.84
87.84 *
0.00
0.00 *
0.00
0.00 *
1,136.37
1,136.37 *
0.07 *
4,480.00 *

13,150.00

8,795.00
3,817.10
94.06
245.78
509.94
4,666.88 *
172.46
172.46 *
0.00
0.00 *
0.00
0.00 *
3,956.15

IS DE PRECIOS UNITARIOS
TOTAL
3,956.15 *
-0.49 *
8,795.00 *
4,355.00
2,500.00
245.78
509.94
3,255.72 *
85.39
85.39 *
0.00
0.00 *
0.00
0.00 *
1,013.80
1,013.80 *
0.09 *
4,355.00 *

11,681.00

9,234.00
4,882.50
114.58
36.81
76.37
5,110.26 *
181.05
181.05 *
0.00
0.00 *
0.00
0.00 *
3,942.23
3,942.23 *
0.45 *
9,234.00 *
2,447.00
1,300.00
36.81
76.37
1,413.19 *
47.98
47.98 *
0.00
0.00 *
0.00
0.00 *
985.88
985.88 *
-0.05 *
2,447.00 *

68,049.00
11,204.67
6,957.22
9,483.33

IS DE PRECIOS UNITARIOS
TOTAL
9,851.00
983.13
2,039.74
40,519.10 *
1,334.30
1,334.30 *
0.00
0.00 *
0.00
0.00 *
26,196.08
26,196.08 *
-0.48 *
68,049.00 *

390,369.00
3,980.45
71,019.14
13,879.70
4,946.58
2,898.30
47,943.42
14,377.32
13,496.38
172,541.28 *
5,440.78
5,440.78 *
0.00
0.00 *
0.00
0.00 *
62,089.16
50,800.22
112,889.38 *
99,497.61
99,497.61 *
-0.05 *
390,369.00 *

390,369.00
3,980.45
71,019.14
13,879.70
4,946.58
2,898.30
47,943.42
14,377.32
13,496.38
172,541.28 *
5,440.78
5,440.78 *
0.00
0.00 *
0.00
0.00 *

IS DE PRECIOS UNITARIOS
TOTAL
62,089.16
50,800.22
112,889.38 *
99,497.61
99,497.61 *
-0.05 *
390,369.00 *

731,943.00
7,463.35
133,161.10
26,024.47
9,274.86
5,434.33
89,894.04
26,957.51
25,305.75
323,515.41 *
10,201.47
10,201.47 *
0.00
0.00 *
0.00
0.00 *
116,417.35
95,250.57
211,667.92 *
186,558.30
186,558.30 *
-0.10 *
731,943.00 *

390,369.00
3,980.45
71,019.14
13,879.70
4,946.58
2,898.30
47,943.42
14,377.32
13,496.38
172,541.28 *
5,440.78
5,440.78 *
0.00
0.00 *
0.00
0.00 *
62,089.16

IS DE PRECIOS UNITARIOS
TOTAL

50,800.22
112,889.38 *
99,497.61
99,497.61 *
-0.05 *
390,369.00 *

131,130.00
30,521.76
21,291.50
21,332.50
20,347.84
1,966.27
4,079.49
99,539.36 *
2,571.18
2,571.18 *
0.00
0.00 *
0.00
0.00 *
29,019.58
29,019.58 *
-0.12 *
131,130.00 *

66,562.00
11,204.67
6,957.22
9,483.33
9,851.00
983.13
2,039.74
40,519.10 *
1,305.15
1,305.15 *
0.00
0.00 *
0.00
0.00 *
24,738.24
24,738.24 *
-0.48 *
66,562.00 *

51,807.00
6,863.00
4,609.80
6,982.50
4,575.00
983.13
2,039.74
26,053.18 *
1,015.83
1,015.83 *
0.00

IS DE PRECIOS UNITARIOS
TOTAL
0.00 *
0.00
0.00 *
24,738.24
24,738.24 *
-0.25 *
51,807.00 *

43,126.00
2,564.06
1,300.00
4,650.00
1,710.00
912.91
1,894.04
13,031.01 *
845.60
845.60 *
0.00
0.00 *
0.00
0.00 *
29,249.02
29,249.02 *
0.37 *
43,126.00 *

87,004.00

43,198.00
31,521.84
3,625.35
491.57
1,019.87
36,658.63 *
847.02
847.02 *
0.00
0.00 *
0.00
0.00 *
5,692.55
5,692.55 *
-0.21 *
43,198.00 *

43,806.00
40,012.58
491.57
1,019.87
41,524.02 *
858.94
858.94 *
0.00
0.00 *
0.00
0.00 *
1,423.14

IS DE PRECIOS UNITARIOS
TOTAL
1,423.14 *
-0.10 *
43,806.00 *

46,701.00

24,808.00
17,482.50
1,569.47
245.78
509.94
19,807.69 *
486.43
486.43 *
0.00
0.00 *
0.00
0.00 *
4,513.73
4,513.73 *
0.16 *
24,808.00 *
21,893.00
19,580.00
245.78
509.94
20,335.72 *
429.28
429.28 *
0.00
0.00 *
0.00
0.00 *
1,128.43
1,128.43 *
-0.43 *
21,893.00 *

349,992.00
21,767.17
291,361.76
149.07
268.69
557.45
314,104.15 *
6,862.58
6,862.58 *
0.00
0.00 *
0.00
0.00 *
29,024.96
29,024.96 *
0.31 *
349,992.00 *

IS DE PRECIOS UNITARIOS
TOTAL
573,468.00
21,767.17
510,427.45
153.52
276.71
574.10
533,198.94 *
11,244.48
11,244.48 *
0.00
0.00 *
0.00
0.00 *
29,024.96
29,024.96 *
-0.38 *
573,468.00 *

14,634,560.00

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
14,634,560.00
14,634,560.00 *
0.00
0.00 *
0.00 *
14,634,560.00 *

14,634,560.00

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00

IS DE PRECIOS UNITARIOS
TOTAL
0.00 *
14,634,560.00
14,634,560.00 *
0.00
0.00 *
0.00 *
14,634,560.00 *

14,634,560.00

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
14,634,560.00
14,634,560.00 *
0.00
0.00 *
0.00 *
14,634,560.00 *

233,673.00

199,502.00
158,953.00
158,953.00 *
3,911.80
3,911.80 *
0.00
0.00 *
0.00
0.00 *
36,637.06
36,637.06 *
0.14 *
199,502.00 *
34,171.00
25,961.00
3,469.06

IS DE PRECIOS UNITARIOS
TOTAL
29,430.06 *
670.02
670.02 *
0.00
0.00 *
0.00
0.00 *
4,070.78
4,070.78 *
0.14 *
34,171.00 *

146,601.00

131,117.00
97,405.00
97,405.00 *
2,570.93
2,570.93 *
0.00
0.00 *
0.00
0.00 *
31,141.50
31,141.50 *
-0.43 *
131,117.00 *
15,484.00
9,740.50
1,979.27
11,719.77 *
303.60
303.60 *
0.00
0.00 *
0.00
0.00 *
3,460.17
3,460.17 *
0.47 *
15,484.00 *

121,333.00

106,068.00
72,846.90
72,846.90 *
2,079.77
2,079.77 *
0.00

IS DE PRECIOS UNITARIOS
TOTAL
0.00 *
0.00
0.00 *
31,141.50
31,141.50 *
-0.17 *
106,068.00 *
15,265.00
9,516.67
1,988.56
11,505.23 *
299.31
299.31 *
0.00
0.00 *
0.00
0.00 *
3,460.17
3,460.17 *
0.29 *
15,265.00 *

96,665.00

87,173.00
60,085.00
60,085.00 *
1,709.27
1,709.27 *
0.00
0.00 *
0.00
0.00 *
25,378.59
25,378.59 *
0.14 *
87,173.00 *
9,492.00
5,484.76
1,001.42
6,486.18 *
186.13
186.13 *
0.00
0.00 *
0.00
0.00 *
2,820.16
2,820.16 *
-0.47 *
9,492.00 *

80,157.00

IS DE PRECIOS UNITARIOS
TOTAL

69,251.00
42,515.00
42,515.00 *
1,357.87
1,357.87 *
0.00
0.00 *
0.00
0.00 *
25,378.59
25,378.59 *
-0.46 *
69,251.00 *
10,906.00
6,943.76
927.87
7,871.63 *
213.84
213.84 *
0.00
0.00 *
0.00
0.00 *
2,820.16
2,820.16 *
0.37 *
10,906.00 *

48,384.00

44,670.00
26,382.82
26,382.82 *
875.88
875.88 *
0.00
0.00 *
0.00
0.00 *
17,411.30
17,411.30 *
0.00 *
44,670.00 *
3,714.00
1,758.85
140.71
1,899.56 *
72.81
72.81 *
0.00
0.00 *

IS DE PRECIOS UNITARIOS
TOTAL
0.00
0.00 *
1,741.13
1,741.13 *
0.49 *
3,714.00 *

39,487.00

36,837.00
19,005.00
19,005.00 *
722.30
722.30 *
0.00
0.00 *
0.00
0.00 *
17,110.08
17,110.08 *
-0.38 *
36,837.00 *
2,650.00
633.50
253.40
886.90 *
51.96
51.96 *
0.00
0.00 *
0.00
0.00 *
1,711.01
1,711.01 *
0.13 *
2,650.00 *

104,765.00

45,093.00
21,332.50
2,471.66
973.62
2,020.01
26,797.78 *
884.18
884.18 *
0.00
0.00 *
0.00
0.00 *
17,411.30
17,411.30 *

IS DE PRECIOS UNITARIOS
TOTAL
-0.26 *
45,093.00 *
59,672.00
43,900.00
973.62
2,020.01
46,893.63 *
1,170.04
1,170.04 *
0.00
0.00 *
0.00
0.00 *
11,608.28
11,608.28 *
0.05 *
59,672.00 *

25,525.00

18,075.00
9,957.50
280.11
491.57
1,019.87
11,749.05 *
354.40
354.40 *
0.00
0.00 *
0.00
0.00 *
5,971.17
5,971.17 *
0.38 *
18,075.00 *
7,450.00
4,300.00
491.57
1,019.87
5,811.44 *
146.08
146.08 *
0.00
0.00 *
0.00
0.00 *
1,492.75
1,492.75 *
-0.27 *
7,450.00 *

255,940.00
211,358.82

IS DE PRECIOS UNITARIOS
TOTAL
17,764.99
496.90
229,620.72 *
5,018.44
5,018.44 *
0.00
0.00 *
0.00
0.00 *
21,301.19
21,301.19 *
-0.34 *
255,940.00 *

255,940.00
211,358.82
17,764.99
496.90
229,620.72 *
5,018.44
5,018.44 *
0.00
0.00 *
0.00
0.00 *
21,301.19
21,301.19 *
-0.34 *
255,940.00 *

731,943.00
7,463.35
133,161.10
26,024.47
9,274.86
5,434.33
89,894.04
26,957.51
25,305.75
323,515.41 *
10,201.47
10,201.47 *
0.00
0.00 *
0.00
0.00 *
116,417.35

IS DE PRECIOS UNITARIOS
TOTAL

95,250.57
211,667.92 *
186,558.30
186,558.30 *
-0.10 *
731,943.00 *

390,369.00
3,980.45
71,019.14
13,879.70
4,946.58
2,898.30
47,943.42
14,377.32
13,496.38
172,541.28 *
5,440.78
5,440.78 *
0.00
0.00 *
0.00
0.00 *
62,089.16
50,800.22
112,889.38 *
99,497.61
99,497.61 *
-0.05 *
390,369.00 *

548,958.00
5,597.52
99,870.96
19,518.38
6,956.15
4,075.75
67,420.62
20,218.16
18,979.34
242,636.89 *
7,651.12
7,651.12 *
0.00
0.00 *
0.00
0.00 *
87,313.13
71,438.02
158,751.15 *

IS DE PRECIOS UNITARIOS
TOTAL
139,918.92
139,918.92 *
-0.08 *
548,958.00 *

226,079.00
110,169.61
76,556.06
1,228.92
2,549.68
190,504.26 *
4,432.92
4,432.92 *
0.00
0.00 *
0.00
0.00 *
31,141.50
31,141.50 *
0.32 *
226,079.00 *

4,159,266.00
144,034.15
3,664,698.77
1,054.42
1,860.62
3,860.30
3,815,508.26 *
81,554.23
81,554.23 *
0.00
0.00 *
0.00
0.00 *
262,203.47
262,203.47 *
0.03 *
4,159,266.00 *

7,317,280.00

0.00
0.00 *

IS DE PRECIOS UNITARIOS
TOTAL
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
7,317,280.00
7,317,280.00 *
0.00
0.00 *
0.00 *
7,317,280.00 *

239,008.00

199,493.00
179,046.00
47.59
179,093.59 *
3,874.30
3,874.30 *
1,903.57
1,903.57 *
0.00
0.00 *
14,621.43
14,621.43 *
0.11 *
199,493.00 *

39,515.00
23,943.81
10,061.49
170.18
34,175.48 *
774.81
774.81 *
0.00
0.00 *
0.00
0.00 *
4,564.98

IS DE PRECIOS UNITARIOS
TOTAL
4,564.98 *
-0.27 *
39,515.00 *

138,550.00

106,597.00
88,860.54
31.22
88,891.77 *
2,065.64
2,065.64 *
1,248.97
1,248.97 *
0.00
0.00 *
14,390.13
14,390.13 *
0.50 *
106,597.00 *

31,953.00
18,032.35
5,854.66
267.39
24,154.40 *
626.54
626.54 *
0.00
0.00 *
0.00
0.00 *
7,172.56
7,172.56 *
-0.50 *
31,953.00 *

87,004.00

43,978.00
31,521.84
3,625.35
147.47
305.96

IS DE PRECIOS UNITARIOS
TOTAL
35,600.63 *
862.31
862.31 *
0.00
0.00 *
0.00
0.00 *
7,514.73
7,514.73 *
0.34 *
43,978.00 *
43,026.00
32,712.89
663.12
1,375.79
34,751.79 *
843.64
843.64 *
0.00
0.00 *
0.00
0.00 *
7,430.37
7,430.37 *
0.20 *
43,026.00 *

46,701.00

27,207.00
17,482.50
3,490.30
98.31
203.97
21,275.09 *
533.47
533.47 *
0.00
0.00 *
0.00
0.00 *
5,398.30
5,398.30 *
0.15 *
27,207.00 *
19,494.00

IS DE PRECIOS UNITARIOS
TOTAL
16,841.29
435.72
904.00
18,181.01 *
382.24
382.24 *
0.00
0.00 *
0.00
0.00 *
931.04
931.04 *
-0.30 *
19,494.00 *

39,243.00

21,972.00
13,982.50
1,486.30
73.74
152.98
15,695.52 *
430.83
430.83 *
0.00
0.00 *
0.00
0.00 *
5,845.83
5,845.83 *
-0.18 *
21,972.00 *
17,271.00
14,235.43
293.20
608.31
15,136.94 *
338.65
338.65 *
0.00
0.00 *
0.00
0.00 *
1,795.56
1,795.56 *
-0.15 *

IS DE PRECIOS UNITARIOS
TOTAL
17,271.00 *

19,805.00

15,219.00
7,332.50
384.10
49.16
101.99
7,867.74 *
298.42
298.42 *
0.00
0.00 *
0.00
0.00 *
7,053.14
7,053.14 *
-0.30 *
15,219.00 *
4,586.00
3,602.85
165.10
342.53
4,110.48 *
89.92
89.92 *
0.00
0.00 *
0.00
0.00 *
385.43
385.43 *
0.17 *
4,586.00 *

14,298.00

11,464.00
5,582.50
217.10
49.16
101.99
5,950.74 *
224.79

IS DE PRECIOS UNITARIOS
TOTAL
224.79 *
0.00
0.00 *
0.00
0.00 *
5,288.67
5,288.67 *
-0.21 *
11,464.00 *
2,834.00
1,974.72
124.81
258.94
2,358.46 *
55.57
55.57 *
0.00
0.00 *
0.00
0.00 *
420.08
420.08 *
-0.10 *
2,834.00 *

11,652.00

9,950.00
4,532.50
167.00
24.58
50.99
4,775.07 *
195.10
195.10 *
0.00
0.00 *
0.00
0.00 *
4,979.71
4,979.71 *
0.12 *
9,950.00 *
1,702.00
860.51
89.05

IS DE PRECIOS UNITARIOS
TOTAL
184.76
1,134.32 *
33.38
33.38 *
0.00
0.00 *
0.00
0.00 *
534.43
534.43 *
-0.13 *
1,702.00 *

7,067.00

6,260.00
3,482.50
100.20
24.58
50.99
3,658.27 *
122.74
122.74 *
0.00
0.00 *
0.00
0.00 *
2,478.89
2,478.89 *
0.09 *
6,260.00 *
807.00
336.78
72.43
150.27
559.47 *
15.82
15.82 *
0.00
0.00 *
0.00
0.00 *
231.70
231.70 *
0.00 *
807.00 *

IS DE PRECIOS UNITARIOS
TOTAL

6,714.00

5,446.00
2,513.70
66.80
90.94
188.68
2,860.12 *
106.78
106.78 *
0.00
0.00 *
0.00
0.00 *
2,478.89
2,478.89 *
0.21 *
5,446.00 *
1,268.00
634.00
122.89
254.97
1,011.86 *
24.87
24.87 *
0.00
0.00 *
0.00
0.00 *
231.70
231.70 *
-0.43 *
1,268.00 *

5,754.00

4,928.00
2,016.41
33.40
98.31
203.97
2,352.10 *
96.62
96.62 *

IS DE PRECIOS UNITARIOS
TOTAL
0.00
0.00 *
0.00
0.00 *
2,478.89
2,478.89 *
0.38 *
4,928.00 *
826.00
200.00
122.89
254.97
577.86 *
16.19
16.19 *
0.00
0.00 *
0.00
0.00 *
231.70
231.70 *
0.25 *
826.00 *

1,092,754.00
54,339.95
936,717.65
391.20
690.30
1,432.20
993,571.30 *
21,426.54
21,426.54 *
0.00
0.00 *
0.00
0.00 *
77,755.82
77,755.82 *
0.34 *
1,092,754.00 *

822,824.00
40,039.49
707,505.88
288.25

IS DE PRECIOS UNITARIOS
TOTAL
508.64
1,055.29
749,397.55 *
16,133.81
16,133.81 *
0.00
0.00 *
0.00
0.00 *
57,293.08
57,293.08 *
-0.44 *
822,824.00 *

349,992.00
21,767.17
290,781.37
149.07
268.69
557.45
313,523.75 *
6,862.58
6,862.58 *
0.00
0.00 *
0.00
0.00 *
29,605.46
29,605.46 *
0.20 *
349,992.00 *

261,315.00
14,396.99
218,697.06
112.59
202.94
421.04
233,830.62 *
5,123.83
5,123.83 *
0.00
0.00 *
0.00
0.00 *
22,360.69

IS DE PRECIOS UNITARIOS
TOTAL
22,360.69 *
-0.14 *
261,315.00 *

146,484.00
4,956.50
123,038.24
76.13
137.21
284.67
128,492.75 *
2,872.23
2,872.23 *
0.00
0.00 *
0.00
0.00 *
15,118.58
15,118.58 *
0.45 *
146,484.00 *

97,459.00
3,469.00
77,314.71
112.62
166.07
344.56
81,406.95 *
1,910.96
1,910.96 *
0.00
0.00 *
0.00
0.00 *
14,140.91
14,140.91 *
0.17 *
97,459.00 *

77,008.00
2,958.70
63,031.37
90.21
118.25

IS DE PRECIOS UNITARIOS
TOTAL
245.34
66,443.88 *
1,509.96
1,509.96 *
0.00
0.00 *
0.00
0.00 *
9,054.31
9,054.31 *
-0.16 *
77,008.00 *

54,925.00
1,404.24
47,168.63
77.51
88.90
184.45
48,923.73 *
1,076.96
1,076.96 *
0.00
0.00 *
0.00
0.00 *
4,924.21
4,924.21 *
0.10 *
54,925.00 *

42,288.00
669.56
34,968.63
254.77
208.73
433.06
36,534.74 *
829.18
829.18 *
0.00
0.00 *
0.00
0.00 *
4,924.21
4,924.21 *

IS DE PRECIOS UNITARIOS
TOTAL
-0.14 *
42,288.00 *

36,175.00
367.34
29,150.00
339.74
222.67
461.99
30,541.74 *
709.32
709.32 *
0.00
0.00 *
0.00
0.00 *
4,924.21
4,924.21 *
-0.28 *
36,175.00 *

459,335.00
396,689.22
58.69
396,747.91 *
9,006.56
9,006.56 *
0.00
0.00 *
0.00
0.00 *
53,580.05
53,580.05 *
0.48 *
459,335.00 *

317,500.00
259,648.04
56.49
259,704.53 *
6,225.50
6,225.50 *
0.00
0.00 *
0.00
0.00 *

IS DE PRECIOS UNITARIOS
TOTAL
51,570.46
51,570.46 *
-0.49 *
317,500.00 *

434,808.00
21,767.17
373,905.88
153.52
276.71
574.10
396,677.37 *
8,525.66
8,525.66 *
0.00
0.00 *
0.00
0.00 *
29,605.46
29,605.46 *
-0.49 *
434,808.00 *

316,331.00
21,767.17
257,751.96
153.52
276.71
574.10
280,523.45 *
6,202.58
6,202.58 *
0.00
0.00 *
0.00
0.00 *
29,605.46
29,605.46 *
-0.49 *
316,331.00 *

409,609.00
37,283.00
600.00
300.00

IS DE PRECIOS UNITARIOS
TOTAL
168.90
183.67
234.78
3,950.00
1,261.36
2,616.99
9,315.70 *
731.05
731.05 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
-0.43 *
37,283.00 *
372,326.00
5,500.00
120.44
1,035.79
340,344.12
347,000.34 *
7,300.52
7,300.52 *
0.00
0.00 *
0.00
0.00 *
18,025.49
18,025.49 *
-0.35 *
372,326.00 *

43,905,200.00

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

IS DE PRECIOS UNITARIOS
TOTAL
43,905,200.00
43,905,200.00 *
0.00
0.00 *
0.00 *
43,905,200.00 *

49,757,200.00

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
49,757,200.00
49,757,200.00 *
0.00
0.00 *
0.00 *
49,757,200.00 *

14,634,560.00

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
14,634,560.00
14,634,560.00 *

IS DE PRECIOS UNITARIOS
TOTAL
0.00
0.00 *
0.00 *
14,634,560.00 *

34,469.00

24,590.00
17,640.00
392.45
49.16
97.80
18,179.41 *
482.17
482.17 *
0.00
0.00 *
0.00
0.00 *
5,928.90
5,928.90 *
-0.47 *
24,590.00 *
9,879.00
5,245.34
158.67
315.69
5,719.71 *
193.70
193.70 *
0.00
0.00 *
0.00
0.00 *
3,965.43
3,965.43 *
0.17 *
9,879.00 *

18,942.00

IS DE PRECIOS UNITARIOS
TOTAL
13,220.00
8,912.84
219.14
24.58
48.90
9,205.45 *
259.22
259.22 *
0.00
0.00 *
0.00
0.00 *
3,755.62
3,755.62 *
-0.29 *
13,220.00 *
5,722.00
2,952.87
140.34
279.21
3,372.41 *
112.20
112.20 *
0.00
0.00 *
0.00
0.00 *
2,237.56
2,237.56 *
-0.17 *
5,722.00 *

10,374.00

9,072.00
5,268.58
116.90
24.58
48.90
5,458.96 *
177.89
177.89 *
0.00
0.00 *
0.00
0.00 *
3,435.55

IS DE PRECIOS UNITARIOS
TOTAL
3,435.55 *
-0.40 *
9,072.00 *
1,302.00
730.09
74.77
148.76
953.62 *
25.53
25.53 *
0.00
0.00 *
0.00
0.00 *
322.76
322.76 *
0.09 *
1,302.00 *

7,613.00

6,607.00
3,205.78
66.80
24.58
48.90
3,346.05 *
129.55
129.55 *
0.00
0.00 *
0.00
0.00 *
3,131.47
3,131.47 *
-0.07 *
6,607.00 *
1,006.00
377.42
67.46
134.22
579.11 *
19.73
19.73 *
0.00
0.00 *

IS DE PRECIOS UNITARIOS
TOTAL
0.00
0.00 *
407.36
407.36 *
-0.21 *
1,006.00 *

178,347.00
117,585.00
96,845.74
418.00
604.00
97,867.74 *
2,305.58
2,305.58 *
0.00
0.00 *
0.00
0.00 *
17,411.30
17,411.30 *
0.38 *
117,585.00 *

60,762.00
46,940.54
418.00
604.00
47,962.54 *
1,191.42
1,191.42 *
0.00
0.00 *
0.00
0.00 *
11,608.28
11,608.28 *
-0.23 *
60,762.00 *

42,288.00
669.56
34,968.63
254.77
208.73
433.06
36,534.74 *
829.18
829.18 *
0.00

IS DE PRECIOS UNITARIOS
TOTAL
0.00 *
0.00
0.00 *
4,924.21
4,924.21 *
-0.14 *
42,288.00 *

36,175.00
367.34
29,150.00
339.74
222.67
461.99
30,541.74 *
709.32
709.32 *
0.00
0.00 *
0.00
0.00 *
4,924.21
4,924.21 *
-0.28 *
36,175.00 *

40,774.00
669.56
33,484.31
254.77
208.73
433.06
35,050.43 *
799.49
799.49 *
0.00
0.00 *
0.00
0.00 *
4,924.21
4,924.21 *
-0.14 *
40,774.00 *

IS DE PRECIOS UNITARIOS
TOTAL
5,225,000.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
5,225,000.00
5,225,000.00 *
0.00
0.00 *
0.00 *
5,225,000.00 *

1,045,000.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
1,045,000.00
1,045,000.00 *
0.00
0.00 *
0.00 *
1,045,000.00 *

7,315,000.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
7,315,000.00

IS DE PRECIOS UNITARIOS
TOTAL
7,315,000.00 *
0.00
0.00 *
0.00 *
7,315,000.00 *

60,063.00
12,900.00
9,483.33
2,067.53
4,289.58
1,364.77
30,105.22 *
1,177.71
1,177.71 *
0.00
0.00 *
0.00
0.00 *
28,780.13
28,780.13 *
-0.05 *
60,063.00 *

41,573.00
3,900.00
5,802.27
1,493.59
3,098.80
542.58
14,837.24 *
815.16
815.16 *
0.00
0.00 *
0.00
0.00 *
25,920.59
25,920.59 *
0.02 *
41,573.00 *

49,575.00
5,172.67

IS DE PRECIOS UNITARIOS
TOTAL
5,399.41
7,206.87
1,864.56
0.00
812.80
20,456.31 *
972.07
972.07 *
0.00
0.00 *
0.00
0.00 *
28,147.06
28,147.06 *
-0.44 *
49,575.00 *

41,573.00
3,900.00
5,802.27
1,493.59
3,098.80
542.58
14,837.24 *
815.16
815.16 *
0.00
0.00 *
0.00
0.00 *
25,920.59
25,920.59 *
0.02 *
41,573.00 *
41,573.00
3,900.00
5,802.27
1,493.59
3,098.80
542.58
14,837.24 *
815.16
815.16 *
0.00
0.00 *
0.00
0.00 *
25,920.59

IS DE PRECIOS UNITARIOS
TOTAL
25,920.59 *
0.02 *
41,573.00 *

49,575.00
5,172.67
5,399.41
7,206.87
1,864.56
0.00
812.80
20,456.31 *
972.07
972.07 *
0.00
0.00 *
0.00
0.00 *
28,147.06
28,147.06 *
-0.44 *
49,575.00 *

49,471.00
20,555.88
20,555.88 *
937.78
937.78 *
1,644.17
1,644.17 *
0.00
0.00 *
26,333.23
26,333.23 *
-0.07 *
49,471.00 *

52,541.00
4,275.00
3,700.00
1,389.22
1,479.35

IS DE PRECIOS UNITARIOS
TOTAL
1,735.36
8,633.33
995.92
2,066.26
24,274.44 *
1,030.22
1,030.22 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
-0.34 *
52,541.00 *

36,888.00
600.00
300.00
168.90
183.67
234.78
3,950.00
1,135.27
2,355.39
8,928.02 *
723.29
723.29 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
0.00 *
36,888.00 *

35,899.00
400.00
300.00
168.90
183.67
234.78
3,950.00
878.68
1,823.02
7,939.05 *
723.29

IS DE PRECIOS UNITARIOS
TOTAL
723.29 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
-0.02 *
35,899.00 *

36,888.00
600.00
300.00
168.90
183.67
234.78
3,950.00
1,135.27
2,355.39
8,928.02 *
723.29
723.29 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
0.00 *
36,888.00 *

39,979.00
843.31
421.65
237.39
258.15
329.99
5,551.78
1,000.59
2,075.95
10,718.81 *
783.90
783.90 *
0.00
0.00 *
0.00
0.00 *
28,476.38

IS DE PRECIOS UNITARIOS
TOTAL
28,476.38 *
-0.10 *
39,979.00 *

37,283.00
600.00
300.00
168.90
183.67
234.78
3,950.00
1,261.36
2,616.99
9,315.70 *
731.05
731.05 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
-0.43 *
37,283.00 *

36,888.00
600.00
300.00
168.90
183.67
234.78
3,950.00
1,135.27
2,355.39
8,928.02 *
723.29
723.29 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
0.00 *
36,888.00 *

IS DE PRECIOS UNITARIOS
TOTAL
37,283.00
600.00
300.00
168.90
183.67
234.78
3,950.00
1,261.36
2,616.99
9,315.70 *
731.05
731.05 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
-0.43 *
37,283.00 *

40,948.00
1,650.00
700.00
637.54
731.26
234.78
6,106.24
952.90
1,895.85
12,908.58 *
802.91
802.91 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
-0.17 *
40,948.00 *

40,948.00
1,650.00
700.00

IS DE PRECIOS UNITARIOS
TOTAL
637.54
731.26
234.78
6,106.24
952.90
1,895.85
12,908.58 *
802.91
802.91 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
-0.17 *
40,948.00 *

26,494.00
5,500.00
138.81
1,808.84
7,447.65 *
519.49
519.49 *
0.00
0.00 *
0.00
0.00 *
18,527.08
18,527.08 *
-0.22 *
26,494.00 *

17,141.00
0.00
0.00 *
336.11
336.11 *
0.00
0.00 *
0.00
0.00 *
16,805.35
16,805.35 *
-0.45 *

IS DE PRECIOS UNITARIOS
TOTAL
17,141.00 *

19,356.00
0.00
0.00 *
379.53
379.53 *
0.00
0.00 *
0.00
0.00 *
18,976.47
18,976.47 *
0.00 *
19,356.00 *

28,916.00
883.04
3,248.50
3,248.50 *
566.99
566.99 *
0.00
0.00 *
0.00
0.00 *
25,100.98
25,100.98 *
-0.47 *
28,916.00 *

24,106.00
5,500.00
120.34
1,034.97
5,620.34 *
472.66
472.66 *
0.00
0.00 *
0.00
0.00 *
18,012.75
18,012.75 *
0.25 *
24,106.00 *

IS DE PRECIOS UNITARIOS
TOTAL

24,119.00
5,500.00
120.44
1,035.79
5,620.44 *
472.92
472.92 *
0.00
0.00 *
0.00
0.00 *
18,025.49
18,025.49 *
0.15 *
24,119.00 *

12,291.00
95.08
95.08 *
241.00
241.00 *
0.00
0.00 *
0.00
0.00 *
11,954.90
11,954.90 *
0.02 *
12,291.00 *

157,284.00
0.00
0.00 *
3,084.00
3,084.00 *
0.00
0.00 *
0.00
0.00 *
154,200.00
154,200.00 *
0.00
0.00 *
0.00 *
157,284.00 *

IS DE PRECIOS UNITARIOS
TOTAL

345,344.00
0.00
0.00 *
6,771.45
6,771.45 *
0.00
0.00 *
0.00
0.00 *
338,572.55
338,572.55 *
0.00
0.00 *
0.00 *
345,344.00 *

1,585,313.00
0.00
0.00 *
31,084.57
31,084.57 *
0.00
0.00 *
0.00
0.00 *
1,554,228.43
1,554,228.43 *
0.00
0.00 *
0.00 *
1,585,313.00 *

207,813.00
0.00
0.00 *
4,074.76
4,074.76 *
0.00
0.00 *
0.00
0.00 *
203,738.24
203,738.24 *
0.00
0.00 *
0.00 *

IS DE PRECIOS UNITARIOS
TOTAL
207,813.00 *

98,813.00
59,400.00
1,046.82
3,402.24
609.13
87.93
59,400.00 *
1,937.51
1,937.51 *
0.00
0.00 *
0.00
0.00 *
37,475.49
37,475.49 *
0.00
0.00 *
0.00 *
98,813.00 *

19,594.00
0.00
0.00 *
384.20
384.20 *
0.00
0.00 *
0.00
0.00 *
19,209.80
19,209.80 *
0.00 *
19,594.00 *

2,881.00
417.25
483.46
1,300.00
2,200.71 *

IS DE PRECIOS UNITARIOS
TOTAL
51.76
51.76 *
40.97
40.97 *
0.00
0.00 *
200.00
200.00 *
387.25
387.25 *
0.30 *
2,881.00 *

2,973.00
417.25
518.77
1,300.00
2,236.02 *
52.68
52.68 *
43.96
43.96 *
0.00
0.00 *
241.80
241.80 *
398.04
398.04 *
0.50 *
2,973.00 *

3,361.00
417.25
668.92
1,300.00
2,386.17 *
58.68
58.68 *
56.69
56.69 *
0.00
0.00 *
311.78
311.78 *

IS DE PRECIOS UNITARIOS
TOTAL
548.04
548.04 *
-0.37 *
3,361.00 *

3,917.00
417.25
884.00
1,300.00
2,601.25 *
67.26
67.26 *
74.92
74.92 *
0.00
0.00 *
412.03
412.03 *
761.76
761.76 *
-0.23 *
3,917.00 *

4,009.00
417.25
919.73
1,300.00
2,636.98 *
68.68
68.68 *
77.94
77.94 *
0.00
0.00 *
428.69
428.69 *
797.06
797.06 *
-0.35 *
4,009.00 *

4,287.00
417.25

IS DE PRECIOS UNITARIOS
TOTAL
1,027.13
1,300.00
2,744.38 *
72.97
72.97 *
87.04
87.04 *
0.00
0.00 *
478.75
478.75 *
903.92
903.92 *
-0.06 *
4,287.00 *

4,474.00
417.25
1,099.40
1,300.00
2,816.65 *
75.84
75.84 *
93.17
93.17 *
0.00
0.00 *
512.43
512.43 *
975.49
975.49 *
0.42 *
4,474.00 *

5,028.00
417.25
1,313.99
1,300.00
3,031.25 *
84.39
84.39 *
111.36
111.36 *
0.00

IS DE PRECIOS UNITARIOS
TOTAL
0.00 *
612.46
612.46 *
1,188.24
1,188.24 *
0.32 *
5,028.00 *

5,585.00
417.25
1,529.37
1,300.00
3,246.63 *
92.99
92.99 *
129.61
129.61 *
0.00
0.00 *
712.84
712.84 *
1,402.94
1,402.94 *
-0.01 *
5,585.00 *

6,326.00
417.25
1,815.98
1,300.00
3,533.24 *
104.43
104.43 *
153.90
153.90 *
0.00
0.00 *
846.43
846.43 *
1,688.24
1,688.24 *
-0.23 *
6,326.00 *

IS DE PRECIOS UNITARIOS
TOTAL

1,285.29
1,591.00
274.53
274.53 *
31.20
31.20 *
0.00
0.00 *
0.00
0.00 *
1,285.29
1,285.29 *
-0.02 *
1,591.00 *

1,872.00
322.88
322.88 *
36.71
36.71 *
0.00
0.00 *
0.00
0.00 *
1,512.75
1,512.75 *
-0.34 *
1,872.00 *

2,203.00
380.07
380.07 *
43.19
43.19 *
0.00
0.00 *
0.00
0.00 *
1,779.41
1,779.41 *
0.33 *
2,203.00 *

IS DE PRECIOS UNITARIOS
TOTAL

2,592.00
447.08
447.08 *
50.82
50.82 *
0.00
0.00 *
0.00
0.00 *
2,094.12
2,094.12 *
-0.02 *
2,592.00 *

3,049.00
526.01
526.01 *
59.78
59.78 *
0.00
0.00 *
0.00
0.00 *
2,462.75
2,462.75 *
0.47 *
3,049.00 *

3,587.00
618.91
618.91 *
70.34
70.34 *
0.00
0.00 *
0.00
0.00 *
2,898.04
2,898.04 *
-0.29 *
3,587.00 *

IS DE PRECIOS UNITARIOS
TOTAL
4,221.00
728.21
728.21 *
82.76
82.76 *
0.00
0.00 *
0.00
0.00 *
3,409.80
3,409.80 *
0.23 *
4,221.00 *

4,965.00
856.63
856.63 *
97.35
97.35 *
0.00
0.00 *
0.00
0.00 *
4,010.78
4,010.78 *
0.24 *
4,965.00 *

5,842.00
1,007.86
1,007.86 *
114.55
114.55 *
0.00
0.00 *
0.00
0.00 *
4,719.61
4,719.61 *
-0.01 *
5,842.00 *

IS DE PRECIOS UNITARIOS
TOTAL
845,204.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
845,204.00

845,204.00 *
0.00
0.00 *
0.00 *
845,204.00 *

359,041.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
359,041.00
359,041.00 *
0.00
0.00 *
0.00 *
359,041.00 *

373,849.00

0.00
0.00 *
3,048.37
3,048.37 *
218,381.85
218,381.85 *
0.00

IS DE PRECIOS UNITARIOS
TOTAL
0.00 *
152,418.63
152,418.63 *
0.15 *
373,849.00 *

243,366.00

0.00
0.00 *
4,771.88
4,771.88 *
0.00
0.00 *
0.00
0.00 *
238,594.12
238,594.12 *
0.00 *
243,366.00 *

164,712.00

0.00
0.00 *
3,229.65
3,229.65 *
0.00
0.00 *
0.00
0.00 *
161,482.35
161,482.35 *
0.00 *
164,712.00 *

6,580.00
5,216.00
5,216.00 *
129.02
129.02 *
0.00
0.00 *

IS DE PRECIOS UNITARIOS
TOTAL
0.00 *
1,234.98
1,234.98 *
6,580.00 *

27,379.00

25,079.00
16,528.07
236.40
75.70
234.66
17,074.82 *
473.75
473.75 *
917.53
917.53 *
0.00
0.00 *
6,612.85
6,612.85 *
0.05 *
25,079.00 *
2,300.00
1,052.47
23.20
154.36
1,230.03 *
45.10
45.10 *
0.00
0.00 *
0.00
0.00 *
1,024.76
1,024.76 *
0.12 *
2,300.00 *

138,500.00

IS DE PRECIOS UNITARIOS
TOTAL

115,632.00
100,606.80
31.22
100,638.02 *
2,242.80
2,242.80 *
1,248.97
1,248.97 *
0.00
0.00 *
11,502.13
11,502.13 *
0.07 *
115,632.00 *

22,868.00
12,568.13
4,880.18
178.66
17,626.96 *
448.39
448.39 *
0.00
0.00 *
0.00
0.00 *
4,792.33
4,792.33 *
0.33 *
22,868.00 *

104,055.00

80,057.00
66,736.80
23.45
66,760.25 *
1,551.35
1,551.35 *
938.01
938.01 *
0.00
0.00 *

IS DE PRECIOS UNITARIOS
TOTAL
10,807.39
10,807.39 *
-0.01 *
80,057.00 *

23,998.00
13,542.81
4,397.02
200.82
18,140.64 *
470.55
470.55 *
0.00
0.00 *
0.00
0.00 *
5,386.80
5,386.80 *
0.01 *
23,998.00 *

69,610.00

59,729.00
47,921.68
22.05
47,943.74 *
1,153.85
1,153.85 *
882.17
882.17 *
0.00
0.00 *
9,748.92
9,748.92 *
0.33 *
59,729.00 *

9,881.00
2,286.90
2,950.84
63.60
209.87
5,511.20 *
193.75

IS DE PRECIOS UNITARIOS
TOTAL
193.75 *
0.00
0.00 *
0.00
0.00 *
4,176.08
4,176.08 *
-0.02 *
9,881.00 *

49,928.00

40,552.00
34,591.20
8.71
34,599.91 *
788.30
788.30 *
348.57
348.57 *
0.00
0.00 *
4,815.06
4,815.06 *
0.15 *
40,552.00 *

9,376.00
2,169.96
2,799.95
60.34
199.13
5,229.39 *
183.84
183.84 *
0.00
0.00 *
0.00
0.00 *
3,962.54
3,962.54 *
0.23 *
9,376.00 *

IS DE PRECIOS UNITARIOS
TOTAL
34,459.00

30,253.00
25,943.40
6.24
25,949.64 *
588.31
588.31 *
249.69
249.69 *
0.00
0.00 *
3,465.85
3,465.85 *
-0.49 *
30,253.00 *

4,206.00
1,181.80
1,524.90
32.86
108.45
2,848.02 *
82.47
82.47 *
0.00
0.00 *
0.00
0.00 *
1,275.71
1,275.71 *
-0.21 *
4,206.00 *

822,824.00
40,039.49
707,505.88
288.25
508.64
1,055.29
749,397.55 *
16,133.81
16,133.81 *
0.00
0.00 *

IS DE PRECIOS UNITARIOS
TOTAL
0.00
0.00 *
57,293.08
57,293.08 *
-0.44 *
822,824.00 *

349,992.00
21,767.17
290,781.37
149.07
268.69
557.45
313,523.75 *
6,862.58
6,862.58 *
0.00
0.00 *
0.00
0.00 *
29,605.46
29,605.46 *
0.20 *
349,992.00 *

261,315.00
14,396.99
218,697.06
112.59
202.94
421.04
233,830.62 *
5,123.83
5,123.83 *
0.00
0.00 *
0.00
0.00 *
22,360.69
22,360.69 *
-0.14 *
261,315.00 *

146,484.00
4,956.50

IS DE PRECIOS UNITARIOS
TOTAL
123,038.24
76.13
137.21
284.67
128,492.75 *
2,872.23
2,872.23 *
0.00
0.00 *
0.00
0.00 *
15,118.58
15,118.58 *
0.45 *
146,484.00 *

97,459.00
3,469.00
77,314.71
112.62
166.07
344.56
81,406.95 *
1,910.96
1,910.96 *
0.00
0.00 *
0.00
0.00 *
14,140.91
14,140.91 *
0.17 *
97,459.00 *

54,925.00
1,404.24
47,168.63
77.51
88.90
184.45
48,923.73 *
1,076.96
1,076.96 *
0.00
0.00 *
0.00

IS DE PRECIOS UNITARIOS
TOTAL
0.00 *
4,924.21
4,924.21 *
0.10 *
54,925.00 *

325,850.00
21,767.17
267,112.75
149.07
268.69
557.45
289,855.13 *
6,389.21
6,389.21 *
0.00
0.00 *
0.00
0.00 *
29,605.46
29,605.46 *
0.20 *
325,850.00 *

299,250.00
14,396.99
255,888.24
112.59
202.94
421.04
271,021.80 *
5,867.65
5,867.65 *
0.00
0.00 *
0.00
0.00 *
22,360.69
22,360.69 *
-0.14 *
299,250.00 *

271,524.00
4,956.50
245,626.47
76.13

IS DE PRECIOS UNITARIOS
TOTAL
137.21
284.67
251,080.98 *
5,323.99
5,323.99 *
0.00
0.00 *
0.00
0.00 *
15,118.58
15,118.58 *
0.45 *
271,524.00 *

3,361.00
417.25
668.92
1,300.00
2,386.17 *
58.68
58.68 *
56.69
56.69 *
0.00
0.00 *
311.78
311.78 *
548.04
548.04 *
-0.37 *
3,361.00 *

4,009.00
417.25
919.73
1,300.00
2,636.98 *
68.68
68.68 *
77.94
77.94 *
0.00
0.00 *
428.69
428.69 *

IS DE PRECIOS UNITARIOS
TOTAL
797.06
797.06 *
-0.35 *
4,009.00 *

4,287.00
417.25
1,027.13
1,300.00
2,744.38 *
72.97
72.97 *
87.04
87.04 *
0.00
0.00 *
478.75
478.75 *
903.92
903.92 *
-0.06 *
4,287.00 *

4,474.00
417.25
1,099.40
1,300.00
2,816.65 *
75.84
75.84 *
93.17
93.17 *
0.00
0.00 *
512.43
512.43 *
975.49
975.49 *
0.42 *
4,474.00 *

5,028.00
417.25

IS DE PRECIOS UNITARIOS
TOTAL
1,313.99
1,300.00
3,031.25 *
84.39
84.39 *
111.36
111.36 *
0.00
0.00 *
612.46
612.46 *
1,188.24
1,188.24 *
0.32 *
5,028.00 *

5,585.00
417.25
1,529.37
1,300.00
3,246.63 *
92.99
92.99 *
129.61
129.61 *
0.00
0.00 *
712.84
712.84 *
1,402.94
1,402.94 *
-0.01 *
5,585.00 *

36,217.00
7,134.00
649.60
1,716.80
910.00
267.25
881.91
11,559.56 *
616.41
616.41 *

IS DE PRECIOS UNITARIOS
TOTAL

4,780.00
4,780.00 *
0.00
0.00 *
19,261.08
19,261.08 *
-0.05 *
36,217.00 *

52,957.00
21,900.00
419.36
1,309.98
23,629.34 *
1,038.38
1,038.38 *
0.00
0.00 *
0.00
0.00 *
28,289.43
28,289.43 *
-0.15 *
52,957.00 *

239,008.00

199,493.00
179,046.00
47.59
179,093.59 *
3,874.30
3,874.30 *
1,903.57
1,903.57 *
0.00
0.00 *
14,621.43
14,621.43 *
0.11 *

IS DE PRECIOS UNITARIOS
TOTAL
199,493.00 *

39,515.00
23,943.81
10,061.49
170.18
34,175.48 *
774.81
774.81 *
0.00
0.00 *
0.00
0.00 *
4,564.98
4,564.98 *
-0.27 *
39,515.00 *

138,500.00

115,632.00
100,606.80
31.22
100,638.02 *
2,242.80
2,242.80 *
1,248.97
1,248.97 *
0.00
0.00 *
11,502.13
11,502.13 *
0.07 *
115,632.00 *

22,868.00
12,568.13
4,880.18
178.66
17,626.96 *
448.39
448.39 *
0.00
0.00 *
0.00
0.00 *

IS DE PRECIOS UNITARIOS
TOTAL
4,792.33
4,792.33 *
0.33 *
22,868.00 *

104,055.00

80,057.00
66,736.80
23.45
66,760.25 *
1,551.35
1,551.35 *
938.01
938.01 *
0.00
0.00 *
10,807.39
10,807.39 *
-0.01 *
80,057.00 *

23,998.00
13,542.81
4,397.02
200.82
18,140.64 *
470.55
470.55 *
0.00
0.00 *
0.00
0.00 *
5,386.80
5,386.80 *
0.01 *
23,998.00 *

69,610.00

59,729.00
47,921.68
22.05

IS DE PRECIOS UNITARIOS
TOTAL
47,943.74 *
1,153.85
1,153.85 *
882.17
882.17 *
0.00
0.00 *
9,748.92
9,748.92 *
0.33 *
59,729.00 *

9,881.00
2,286.90
2,950.84
63.60
209.87
5,511.20 *
193.75
193.75 *
0.00
0.00 *
0.00
0.00 *
4,176.08
4,176.08 *
-0.02 *
9,881.00 *

49,928.00

40,552.00
34,591.20
8.71
34,599.91 *
788.30
788.30 *
348.57
348.57 *
0.00
0.00 *
4,815.06
4,815.06 *
0.15 *

IS DE PRECIOS UNITARIOS
TOTAL
40,552.00 *

9,376.00
2,169.96
2,799.95
60.34
199.13
5,229.39 *
183.84
183.84 *
0.00
0.00 *
0.00
0.00 *
3,962.54
3,962.54 *
0.23 *
9,376.00 *

910,628.00
40,039.49
793,588.24
288.25
508.64
1,055.29
835,479.90 *
17,855.46
17,855.46 *
0.00
0.00 *
0.00
0.00 *
57,293.08
57,293.08 *
-0.44 *
910,628.00 *

349,992.00
21,767.17
290,781.37
149.07
268.69
557.45
313,523.75 *
6,862.58
6,862.58 *

IS DE PRECIOS UNITARIOS
TOTAL
0.00
0.00 *
0.00
0.00 *
29,605.46
29,605.46 *
0.20 *
349,992.00 *

146,484.00
4,956.50
123,038.24
76.13
137.21
284.67
128,492.75 *
2,872.23
2,872.23 *
0.00
0.00 *
0.00
0.00 *
15,118.58
15,118.58 *
0.45 *
146,484.00 *

1,235,868.00
54,339.95
1,077,025.43
391.20
690.30
1,432.20
1,133,879.08 *
24,232.70
24,232.70 *
0.00
0.00 *
0.00
0.00 *
77,755.82
77,755.82 *
0.40 *
1,235,868.00 *

655,007.00

IS DE PRECIOS UNITARIOS
TOTAL
4,956.50
621,590.20
76.13
137.21
284.67
627,044.71 *
12,843.27
12,843.27 *
0.00
0.00 *
0.00
0.00 *
15,118.58
15,118.58 *
0.45 *
655,007.00 *

414,926.00
3,469.00
388,556.86
112.62
166.07
344.56
392,649.11 *
8,135.80
8,135.80 *
0.00
0.00 *
0.00
0.00 *
14,140.91
14,140.91 *
0.17 *
414,926.00 *

1,297,363.00
1,209,691.18
1,209,691.18 *
25,438.49
25,438.49 *
0.00
0.00 *
0.00
0.00 *
62,233.22
62,233.22 *

IS DE PRECIOS UNITARIOS
TOTAL
0.12 *
1,297,363.00 *

138,500.00

115,632.00
100,606.80
31.22
100,638.02 *
2,242.80
2,242.80 *
1,248.97
1,248.97 *
0.00
0.00 *
11,502.13
11,502.13 *
0.07 *
115,632.00 *

22,868.00
12,568.13
4,880.18
178.66
17,626.96 *
448.39
448.39 *
0.00
0.00 *
0.00
0.00 *
4,792.33
4,792.33 *
0.33 *
22,868.00 *

104,055.00

80,057.00
66,736.80
23.45

IS DE PRECIOS UNITARIOS
TOTAL
66,760.25 *
1,551.35
1,551.35 *
938.01
938.01 *
0.00
0.00 *
10,807.39
10,807.39 *
-0.01 *
80,057.00 *

23,998.00
13,542.81
4,397.02
200.82
18,140.64 *
470.55
470.55 *
0.00
0.00 *
0.00
0.00 *
5,386.80
5,386.80 *
0.01 *
23,998.00 *

69,610.00

59,729.00
47,921.68
22.05
47,943.74 *
1,153.85
1,153.85 *
882.17
882.17 *
0.00
0.00 *
9,748.92
9,748.92 *
0.33 *
59,729.00 *

IS DE PRECIOS UNITARIOS
TOTAL

9,881.00
2,286.90
2,950.84
63.60
209.87
5,511.20 *
193.75
193.75 *
0.00
0.00 *
0.00
0.00 *
4,176.08
4,176.08 *
-0.02 *
9,881.00 *

49,928.00

40,552.00
34,591.20
8.71
34,599.91 *
788.30
788.30 *
348.57
348.57 *
0.00
0.00 *
4,815.06
4,815.06 *
0.15 *
40,552.00 *

9,376.00
2,169.96
2,799.95
60.34
199.13
5,229.39 *
183.84
183.84 *
0.00
0.00 *

IS DE PRECIOS UNITARIOS
TOTAL
0.00
0.00 *
3,962.54
3,962.54 *
0.23 *
9,376.00 *

34,459.00

30,253.00
25,943.40
6.24
25,949.64 *
588.31
588.31 *
249.69
249.69 *
0.00
0.00 *
3,465.85
3,465.85 *
-0.49 *
30,253.00 *

4,206.00
1,181.80
1,524.90
32.86
108.45
2,848.02 *
82.47
82.47 *
0.00
0.00 *
0.00
0.00 *
1,275.71
1,275.71 *
-0.21 *
4,206.00 *

32,682.00

IS DE PRECIOS UNITARIOS
TOTAL

27,036.00
22,806.86
5.80
22,812.66 *
525.57
525.57 *
231.99
231.99 *
0.00
0.00 *
3,465.85
3,465.85 *
-0.07 *
27,036.00 *

5,646.00
1,798.00
2,320.00
32.86
108.45
4,259.32 *
110.70
110.70 *
0.00
0.00 *
0.00
0.00 *
1,275.71
1,275.71 *
0.27 *
5,646.00 *

24,124.00

21,824.00
16,528.07
236.40
75.70
234.66
17,074.82 *
409.93
409.93 *
917.53

IS DE PRECIOS UNITARIOS
TOTAL
917.53 *
0.00
0.00 *
3,421.57
3,421.57 *
0.16 *
21,824.00 *
2,300.00
1,052.47
23.20
154.36
1,230.03 *
45.10
45.10 *
0.00
0.00 *
0.00
0.00 *
1,024.76
1,024.76 *
0.12 *
2,300.00 *

35,125.00

20,661.00
20,661.00
20,661.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00 *
20,661.00 *
7,482.00
5,000.00
5,000.00 *
146.15
146.15 *
28.04
28.04 *
0.00

IS DE PRECIOS UNITARIOS
TOTAL
0.00 *
2,307.74
2,307.74 *
0.07 *
7,482.00 *

6,982.00
73.29
302.32
375.61 *
135.99
135.99 *
46.72
46.72 *
0.00
0.00 *
6,424.06
6,424.06 *
-0.39 *
6,982.00 *

3,361.00
417.25
668.92
1,300.00
2,386.17 *
58.68
58.68 *
56.69
56.69 *
0.00
0.00 *
311.78
311.78 *
548.04
548.04 *
-0.37 *
3,361.00 *

4,009.00
417.25
919.73
1,300.00
2,636.98 *

IS DE PRECIOS UNITARIOS
TOTAL
68.68
68.68 *
77.94
77.94 *
0.00
0.00 *
428.69
428.69 *
797.06
797.06 *
-0.35 *
4,009.00 *

4,287.00
417.25
1,027.13
1,300.00
2,744.38 *
72.97
72.97 *
87.04
87.04 *
0.00
0.00 *
478.75
478.75 *
903.92
903.92 *
-0.06 *
4,287.00 *

4,474.00
417.25
1,099.40
1,300.00
2,816.65 *
75.84
75.84 *
93.17
93.17 *
0.00
0.00 *
512.43
512.43 *

IS DE PRECIOS UNITARIOS
TOTAL
975.49
975.49 *
0.42 *
4,474.00 *

5,028.00
417.25
1,313.99
1,300.00
3,031.25 *
84.39
84.39 *
111.36
111.36 *
0.00
0.00 *
612.46
612.46 *
1,188.24
1,188.24 *
0.32 *
5,028.00 *

5,585.00
417.25
1,529.37
1,300.00
3,246.63 *
92.99
92.99 *
129.61
129.61 *
0.00
0.00 *
712.84
712.84 *
1,402.94
1,402.94 *
-0.01 *
5,585.00 *

6,326.00
417.25

IS DE PRECIOS UNITARIOS
TOTAL
1,815.98
1,300.00
3,533.24 *
104.43
104.43 *
153.90
153.90 *
0.00
0.00 *
846.43
846.43 *
1,688.24
1,688.24 *
-0.23 *
6,326.00 *

2,203.00
380.07
380.07 *
43.19
43.19 *
0.00
0.00 *
0.00
0.00 *
1,779.41
1,779.41 *
0.33 *
2,203.00 *

2,592.00
447.08
447.08 *
50.82
50.82 *
0.00
0.00 *
0.00
0.00 *
2,094.12
2,094.12 *
-0.02 *
2,592.00 *

IS DE PRECIOS UNITARIOS
TOTAL
3,049.00
526.01
526.01 *
59.78
59.78 *
0.00
0.00 *
0.00
0.00 *
2,462.75
2,462.75 *
0.47 *
3,049.00 *

3,587.00
618.91
618.91 *
70.34
70.34 *
0.00
0.00 *
0.00
0.00 *
2,898.04
2,898.04 *
-0.29 *
3,587.00 *

4,221.00
728.21
728.21 *
82.76
82.76 *
0.00
0.00 *
0.00
0.00 *
3,409.80
3,409.80 *
0.23 *
4,221.00 *

5,842.00

IS DE PRECIOS UNITARIOS
TOTAL
1,007.86
1,007.86 *
114.55
114.55 *
0.00
0.00 *
0.00
0.00 *
4,719.61
4,719.61 *
-0.01 *
5,842.00 *

49,928.00

40,552.00
34,591.20
8.71
34,599.91 *
788.30
788.30 *
348.57
348.57 *
0.00
0.00 *
4,815.06
4,815.06 *
0.15 *
40,552.00 *

9,376.00
2,169.96
2,799.95
60.34
199.13
5,229.39 *
183.84
183.84 *
0.00
0.00 *
0.00
0.00 *
3,962.54

IS DE PRECIOS UNITARIOS
TOTAL
3,962.54 *
0.23 *
9,376.00 *

24,124.00

21,824.00
16,528.07
236.40
75.70
234.66
17,074.82 *
409.93
409.93 *
917.53
917.53 *
0.00
0.00 *
3,421.57
3,421.57 *
0.16 *
21,824.00 *
2,300.00
1,052.47
23.20
154.36
1,230.03 *
45.10
45.10 *
0.00
0.00 *
0.00
0.00 *
1,024.76
1,024.76 *
0.12 *
2,300.00 *

14,647.00

13,474.00
8,534.88
95.67

IS DE PRECIOS UNITARIOS
TOTAL
54.67
167.33
8,852.56 *
253.82
253.82 *
529.11
529.11 *
0.00
0.00 *
3,838.35
3,838.35 *
0.16 *
13,474.00 *

1,173.00
599.48
16.51
190.67
806.66 *
23.00
23.00 *
0.00
0.00 *
0.00
0.00 *
343.41
343.41 *
-0.07 *
1,173.00 *

12,871.00

11,840.00
7,500.00
84.07
48.05
147.04
7,779.15 *
223.04
223.04 *
464.95
464.95 *
0.00
0.00 *
3,372.94

IS DE PRECIOS UNITARIOS
TOTAL
3,372.94 *
-0.09 *
11,840.00 *

1,031.00
526.79
14.51
167.55
708.85 *
20.21
20.21 *
0.00
0.00 *
0.00
0.00 *
301.77
301.77 *
0.17 *
1,031.00 *

146,484.00
4,956.50
123,038.24
76.13
137.21
284.67
128,492.75 *
2,872.23
2,872.23 *
0.00
0.00 *
0.00
0.00 *
15,118.58
15,118.58 *
0.45 *
146,484.00 *

54,925.00
1,404.24
47,168.63
77.51
88.90
184.45
48,923.73 *
1,076.96

IS DE PRECIOS UNITARIOS
TOTAL
1,076.96 *
0.00
0.00 *
0.00
0.00 *
4,924.21
4,924.21 *
0.10 *
54,925.00 *

36,175.00
367.34
29,150.00
339.74
222.67
461.99
30,541.74 *
709.32
709.32 *
0.00
0.00 *
0.00
0.00 *
4,924.21
4,924.21 *
-0.28 *
36,175.00 *

PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA
EGOZCUE VIDAL + PASTORINO POZZOLO
EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO

DE OBRA

ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

INSTALACIONES ELECTRICAS
SISTEMA DE ENERGIA ININTERRUPTIBLE

7.7.1
-

501a.1

UPS 120KVA- 480-208/120

un

UPS 120KVA- 480-208/120

un

SUBTOTAL MATERIALES

...

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)

1.000

164,856,703.92

2%

167,895,190.03

141.896

21,413.54

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

CAERIAS, CAJAS, BANDEJAS

7.11.2

Caero MT 8 x 6"

ml

Canalizacin 8 tubos PVC corrugados doble pared TDP 6" bajo


calzada en concreto segn norma. Incluye excavacin (a.<=60cm
h.<=115cm), rellenos en capas con arena de pea (h.<=50cm) y
recebo B-600 (h.<=50cm), retiro y disposicin de escombros,
campanas en las cajas, uniones. NO incluye demolicin ni
rehabilitacin de la calzada

Arena lavada de pea / de pozo

m3

0.040

41,125.00

Recebo B-600

m3

0.120

26,680.00

Tubera Corrugada - Doble pared Tipo TDP 6" PAVCO

8.400

23,419.00

Unin para tubera TDP 6" PAVCO

un

2.667

9,798.00

Terminal campana para tubera TDP 6" PAVCO

un

2.667

10,701.00

SUBTOTAL MATERIALES

...
2%

406,685.69

Herramienta menor. INDICE GENERAL

% (MAT+MO)

PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA
EGOZCUE VIDAL + PASTORINO POZZOLO
EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO

DE OBRA

ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
SUBTOTAL HERRAMIENTAS
-

UNIDAD

CANTIDAD

UNITARIO

...

Vibro compactador tipo rana

SUBTOTAL EQUIPOS

...

0.113

22,000.00

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Excavacin manual en recebo compactado. Incluye M.O., H.M,


cargue, retiro, disposicin de escombros

m3

0.160

41,468.00

HR

7.026

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.3

Caero MT 6 x 6"

ml

Canalizacin 6 tubos PVC corrugados doble pared TDP 6" bajo


calzada en concreto segn norma. Incluye excavacin (a.<=60cm
h.<=115cm), rellenos en capas con arena de pea (h.<=50cm) y
recebo B-600 (h.<=50cm), retiro y disposicin de escombros,
campanas en las cajas, uniones. NO incluye demolicin ni
rehabilitacin de la calzada

Arena lavada de pea / de pozo

m3

0.031

41,125.00

Recebo B-600

m3

0.092

26,680.00

Tubera Corrugada - Doble pared Tipo TDP 6" PAVCO

6.436

23,419.00

Unin para tubera TDP 6" PAVCO

un

2.043

9,798.00

Terminal campana para tubera TDP 6" PAVCO

un

2.043

10,701.00

2%

311,611.15

0.087

22,000.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

Vibro compactador tipo rana

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Excavacin manual en recebo compactado. Incluye M.O., H.M,


cargue, retiro, disposicin de escombros

m3

0.123

41,468.00

HR

5.384

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA

PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA
EGOZCUE VIDAL + PASTORINO POZZOLO
EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO

DE OBRA

ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Redondeo a entero ms cercano


TOTAL UNITARIO

7.11.4

Caero MT 4 x 6"

ml

Canalizacin 4 tubos PVC corrugados doble pared TDP 6" bajo


calzada en concreto segn norma. Incluye excavacin (a.<=60cm
h.<=115cm), rellenos en capas con arena de pea (h.<=50cm) y
recebo B-600 (h.<=50cm), retiro y disposicin de escombros,
campanas en las cajas, uniones. NO incluye demolicin ni
rehabilitacin de la calzada

Arena lavada de pea / de pozo

m3

0.023

41,125.00

Recebo B-600

m3

0.068

26,680.00

Tubera Corrugada - Doble pared Tipo TDP 6" PAVCO

4.730

23,419.00

Unin para tubera TDP 6" PAVCO

un

1.502

9,798.00

Terminal campana para tubera TDP 6" PAVCO

un

1.502

10,701.00

2%

229,004.66

0.064

22,000.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

Vibro compactador tipo rana

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Excavacin manual en recebo compactado. Incluye M.O., H.M,


cargue, retiro, disposicin de escombros

m3

0.090

41,468.00

HR

3.956

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.5

Camara de pase 1,5x1,5x1,2

un

PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA
EGOZCUE VIDAL + PASTORINO POZZOLO
EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO

DE OBRA

ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Caja de inspeccin segn norma, medidas internas tiles


150x150x120cm (a x L x h). Incluye excavacin, relleno, retiro y
disposicin de escombros, marco y contramarco reforzado
metlico, tapas de concreto, paetado 1:3 impermeabilizado
interno completo

un

Recebo B-200

m3

0.225

31,700.00

Concreto grava comn de planta f'c=2500 psi (175kg/cm2)


CEMEX

m3

0.471

270,500.40

Cemento gris Portland tipo 1 ARGOS - empaque 50 kg

un

1.337

18,620.32

Arena de pea - sin tamizar

m3

0.213

41,667.00

Toxement polvo TOXEMENT, impermeabilizante integral para


hormign y mortero - empaque x 25 kg

un

0.053

88,900.00

Acero figurado 60.000 psi CODIACERO

kg

2.333

2,227.20

Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h)

un

294.740

350.00

Listn ordinario 5x3 cm x 3,00 m

un

4.687

5,500.00

Tabla burra ordinaria 20x3 cm

un

4.687

5,163.00

2%

473,925.00

m3

2.341

35,843.00

m2

1.003

144,877.41

m2

1.003

118,536.07

HR

6.659

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

Excavacin manual en material comn. Incluye M.O., H.M,


cargue, retiro, disposicin de escombros
Marco metlico en ngulo 2" con anclajes laterales. Incluye
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta
en obra

...

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.6

Camara de pase 1,2x1,2x1,2

un

PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA
EGOZCUE VIDAL + PASTORINO POZZOLO
EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO

DE OBRA

ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Caja de inspeccin segn norma, medidas internas tiles


150x150x120cm (a x L x h). Incluye excavacin, relleno, retiro y
disposicin de escombros, marco y contramarco reforzado
metlico, tapas de concreto, paetado 1:3 impermeabilizado
interno completo

un

Recebo B-200

m3

0.154

31,700.00

Concreto grava comn de planta f'c=2500 psi (175kg/cm2)


CEMEX

m3

0.322

270,500.40

Cemento gris Portland tipo 1 ARGOS - empaque 50 kg

un

0.913

18,620.32

Arena de pea - sin tamizar

m3

0.145

41,667.00

Toxement polvo TOXEMENT, impermeabilizante integral para


hormign y mortero - empaque x 25 kg

un

0.037

88,900.00

Acero figurado 60.000 psi CODIACERO

kg

1.595

2,227.20

Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h)

un

201.413

350.00

Listn ordinario 5x3 cm x 3,00 m

un

3.203

5,500.00

Tabla burra ordinaria 20x3 cm

un

3.203

5,163.00

2%

323,860.21

m3

1.600

35,843.00

m2

0.685

144,877.41

m2

0.685

118,536.07

HR

4.551

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

Excavacin manual en material comn. Incluye M.O., H.M,


cargue, retiro, disposicin de escombros
Marco metlico en ngulo 2" con anclajes laterales. Incluye
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta
en obra

...

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.7

Caero BT 4 x 4"

ml

PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA
EGOZCUE VIDAL + PASTORINO POZZOLO
EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO

DE OBRA

ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

UNIDAD

CANTIDAD

UNITARIO

Canalizacin 4 tubos PVC corrugados doble pared TDP 4" bajo


calzada en concreto segn norma. Incluye excavacin (a.<=60cm
h.<=115cm), rellenos en capas con arena de pea (h.<=50cm) y
recebo B-600 (h.<=50cm), retiro y disposicin de escombros,
campanas en las cajas, uniones. NO incluye demolicin ni
rehabilitacin de la calzada

Arena lavada de pea / de pozo

m3

0.023

41,125.00

Recebo B-600

m3

0.068

26,680.00

Tubera Corrugada - Doble pared Tipo TDP 4" PAVCO

4.730

11,851.04

Unin para tubera TDP 4" PAVCO

un

1.502

4,745.00

Terminal campana para tubera TDP 4" PAVCO

un

1.502

6,426.00

2%

160,281.19

0.064

22,000.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL

...
% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Vibro compactador tipo rana

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Excavacin manual en recebo compactado. Incluye M.O., H.M,


cargue, retiro, disposicin de escombros

m3

0.113

41,468.00

HR

3.956

21,413.54

5,539.95

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.8

Caero BT 2"

ml

Tubera Conduit PVC 2". Incluye regata y resane, suministro,


instalacin, accesorios (curvas, uniones, etc.), chazos, pernos,
relacionados y complementarios para su correcta puesta en
funcionamiento

Tubera CONDUIT PVC 2" PAVCO

1.000

Curva para tubera CONDUIT PVC 2" PAVCO

un

0.223

5,541.25

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.001

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.001

50,993.60

2%

9,338.24

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL

...
% (MAT+MO)

PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA
EGOZCUE VIDAL + PASTORINO POZZOLO
EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO

DE OBRA

ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
SUBTOTAL HERRAMIENTAS

UNIDAD

CANTIDAD

UNITARIO

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

0.117

21,413.54

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.9

Camara de pase BT 0,8x0,80x0,80

un

Caja de inspeccin segn norma, medidas internas tiles


80x80x80cm (a x L x h). Incluye excavacin, relleno, retiro y
disposicin de escombros, marco y contramarco reforzado
metlico, tapas de concreto, paetado 1:3 impermeabilizado
interno completo

un

Recebo B-200

m3

0.084

31,700.00

Concreto grava comn de planta f'c=2500 psi (175kg/cm2)


CEMEX

m3

0.176

270,500.40

Cemento gris Portland tipo 1 ARGOS - empaque 50 kg

un

0.499

18,620.32

Arena de pea - sin tamizar

m3

0.079

41,667.00

Toxement polvo TOXEMENT, impermeabilizante integral para


hormign y mortero - empaque x 25 kg

un

0.020

88,900.00

Acero figurado 60.000 psi CODIACERO

kg

0.871

2,227.20

Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h)

un

109.965

350.00

Listn ordinario 5x3 cm x 3,00 m

un

1.749

5,500.00

Tabla burra ordinaria 20x3 cm

un

1.749

5,163.00

SUBTOTAL MATERIALES

...
2%

176,816.83

0.873

35,843.00

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Excavacin manual en material comn. Incluye M.O., H.M,


cargue, retiro, disposicin de escombros

m3

PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA
EGOZCUE VIDAL + PASTORINO POZZOLO
EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO

DE OBRA

ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
-

Marco metlico en ngulo 2" con anclajes laterales. Incluye


materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta
en obra

UNIDAD

CANTIDAD

UNITARIO

m2

0.374

144,877.41

m2

0.374

118,536.07

HR

2.485

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.10

Caero CD 6 x 4"

ml

Canalizacin 6 tubos PVC corrugados doble pared TDP 4" bajo


calzada en concreto segn norma. Incluye excavacin (a.<=60cm
h.<=115cm), rellenos en capas con arena de pea (h.<=50cm) y
recebo B-600 (h.<=50cm), retiro y disposicin de escombros,
campanas en las cajas, uniones. NO incluye demolicin ni
rehabilitacin de la calzada

Arena lavada de pea / de pozo

m3

0.026

41,125.00

Recebo B-600

m3

0.079

26,680.00

Tubera Corrugada - Doble pared Tipo TDP 4" PAVCO

6.300

11,851.04

Unin para tubera TDP 4" PAVCO

un

1.766

4,745.00

Terminal campana para tubera TDP 4" PAVCO

un

1.766

6,426.00

SUBTOTAL MATERIALES

...
2%

188,551.60

0.075

22,000.00

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

Vibro compactador tipo rana

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Excavacin manual en recebo compactado. Incluye M.O., H.M,


cargue, retiro, disposicin de escombros

m3

0.132

41,468.00

HR

4.247

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA
EGOZCUE VIDAL + PASTORINO POZZOLO
EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO

DE OBRA

ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL

7.11.11

Caero CD 4 x 4"

UNIDAD

CANTIDAD

UNITARIO

ml

Canalizacin 4 tubos PVC corrugados doble pared TDP 4" bajo


calzada en concreto segn norma. Incluye excavacin (a.<=60cm
h.<=115cm), rellenos en capas con arena de pea (h.<=50cm) y
recebo B-600 (h.<=50cm), retiro y disposicin de escombros,
campanas en las cajas, uniones. NO incluye demolicin ni
rehabilitacin de la calzada

Arena lavada de pea / de pozo

m3

0.023

41,125.00

Recebo B-600

m3

0.068

26,680.00

Tubera Corrugada - Doble pared Tipo TDP 4" PAVCO

4.730

11,851.04

Unin para tubera TDP 4" PAVCO

un

1.502

4,745.00

Terminal campana para tubera TDP 4" PAVCO

un

1.502

6,426.00

2%

160,281.19

0.064

22,000.00

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL

...
% (MAT+MO)

SUBTOTAL HERRAMIENTAS

...

Vibro compactador tipo rana

SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)

SUBTOTAL TRANSPORTE

...

Excavacin manual en recebo compactado. Incluye M.O., H.M,


cargue, retiro, disposicin de escombros

m3

0.113

41,468.00

HR

3.956

21,413.54

5,539.95

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.12

Caero CD 2"

ml

Tubera Conduit PVC 2". Incluye regata y resane, suministro,


instalacin, accesorios (curvas, uniones, etc.), chazos, pernos,
relacionados y complementarios para su correcta puesta en
funcionamiento

Tubera CONDUIT PVC 2" PAVCO

1.000

Curva para tubera CONDUIT PVC 2" PAVCO

un

0.223

5,541.25

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.001

24,578.36

PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA
EGOZCUE VIDAL + PASTORINO POZZOLO
EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO

DE OBRA

ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
-

UNIDAD

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

SUBTOTAL MATERIALES

...

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)

CANTIDAD

UNITARIO

0.001

50,993.60

2%

9,338.24

0.117

21,413.54

...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)

...
HR

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.13

Camara de pase BT 0,8x0,80x0,80

un

Caja de inspeccin segn norma, medidas internas tiles


80x80x80cm (a x L x h). Incluye excavacin, relleno, retiro y
disposicin de escombros, marco y contramarco reforzado
metlico, tapas de concreto, paetado 1:3 impermeabilizado
interno completo

un

Recebo B-200

m3

0.084

31,700.00

Concreto grava comn de planta f'c=2500 psi (175kg/cm2)


CEMEX

m3

0.176

270,500.40

Cemento gris Portland tipo 1 ARGOS - empaque 50 kg

un

0.499

18,620.32

Arena de pea - sin tamizar

m3

0.079

41,667.00

Toxement polvo TOXEMENT, impermeabilizante integral para


hormign y mortero - empaque x 25 kg

un

0.020

88,900.00

Acero figurado 60.000 psi CODIACERO

kg

0.871

2,227.20

Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h)

un

109.965

350.00

Listn ordinario 5x3 cm x 3,00 m

un

1.749

5,500.00

Tabla burra ordinaria 20x3 cm

un

1.749

5,163.00

SUBTOTAL MATERIALES

...
2%

176,816.83

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS
(El valor de la totalidad de insumos incluye el transporte)

...

PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA
EGOZCUE VIDAL + PASTORINO POZZOLO
EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO

DE OBRA

ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
SUBTOTAL TRANSPORTE
-

Excavacin manual en material comn. Incluye M.O., H.M,


cargue, retiro, disposicin de escombros
Marco metlico en ngulo 2" con anclajes laterales. Incluye
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta
en obra

UNIDAD

CANTIDAD

UNITARIO

...
m3

0.873

35,843.00

m2

0.374

144,877.41

m2

0.374

118,536.07

HR

2.485

21,413.54

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.12

Caeria AIF 1/2"

un

Tubera Conduit PVC 1/2". Incluye regata y resane, suministro,


instalacin, accesorios (curvas, uniones, etc.), chazos, pernos,
relacionados y complementarios para su correcta puesta en
funcionamiento

.
-

Tubera CONDUIT PVC 1/2" PAVCO

1.050

1,150.00

Curva para tubera CONDUIT PVC 1/2" PAVCO

un

0.352

599.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.008

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.008

50,993.60

SUBTOTAL MATERIALES

...
2%

4,328.43

0.108

21,413.54

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

...
HR

PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA
EGOZCUE VIDAL + PASTORINO POZZOLO
EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO

DE OBRA

ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL
7.11.13

Caeria AIF 3/4"

UNIDAD

CANTIDAD

UNITARIO

un

Tubera Conduit PVC 3/4". Incluye regata y resane, suministro,


instalacin, accesorios (curvas, uniones, etc.), chazos, pernos,
relacionados y complementarios para su correcta puesta en
funcionamiento

.
-

Tubera CONDUIT PVC 3/4" PAVCO

1.050

Curva para tubera CONDUIT PVC 3/4" PAVCO

un

0.352

956.00

Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal

un

0.010

24,578.36

Soldadura lquida para tubera PVC 760 g = 1/4 gal

un

0.010

50,993.60

2%

6,183.33

0.138

21,413.54

SUBTOTAL MATERIALES
-

Herramienta menor. INDICE GENERAL


SUBTOTAL HERRAMIENTAS

2,030.00

...
% (MAT+MO)
...

(No Aplica)
SUBTOTAL EQUIPOS

...

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE
-

MANO DE OBRA CUADRILLA BB (incl. prestaciones)


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

...
HR

CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

171,253,094.00
164,856,703.92
164,856,703.92 *
3,357,903.80
3,357,903.80 *
0.00
0.00 *
0.00
0.00 *
3,038,486.11
3,038,486.11 *
0.17 *
171,253,094.00 *

423,939.00

1,645.00
3,201.60
196,719.60
26,127.35
28,535.29
256,228.83 *
8,133.71

CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL
8,133.71 *
2,484.26
2,484.26 *
0.00
0.00 *
6,634.88
6,634.88 *
150,456.86
150,456.86 *
0.45 *
423,939.00 *

324,831.00

1,260.43
2,453.13
150,730.71
20,019.32
21,864.34
196,327.93 *
6,232.22
6,232.22 *
1,903.49
1,903.49 *
0.00
0.00 *
5,083.78
5,083.78 *
115,283.22
115,283.22 *

CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL
0.35 *
324,831.00 *

238,720.00

926.30
1,802.82
110,772.78
14,712.31
16,068.22
144,282.43 *
4,580.09
4,580.09 *
1,398.89
1,398.89 *
0.00
0.00 *
3,736.10
3,736.10 *
84,722.24
84,722.24 *
0.26 *
238,720.00 *

831,493.00

CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

7,137.22
127,342.34
24,887.28
8,869.57
4,752.83
5,196.86
103,159.12
25,779.55
24,199.96
331,324.72 *
9,478.50
9,478.50 *
0.00
0.00 *
0.00
0.00 *
83,902.29
145,302.75
118,884.08
348,089.11 *
142,600.27
142,600.27 *
0.39 *
831,493.00 *

568,207.00

CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

4,877.27
87,020.35
17,006.91
6,061.09
3,247.88
3,551.31
70,494.56
17,616.65
16,537.23
226,413.24 *
6,477.20
6,477.20 *
0.00
0.00 *
0.00
0.00 *
57,335.26
99,293.73
81,240.33
237,869.32 *
97,446.97
97,446.97 *
0.27 *
568,207.00 *

169,556.00

CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

926.30
1,802.82
56,055.88
7,124.91
9,649.04
75,558.95 *
3,205.62
3,205.62 *
1,398.89
1,398.89 *
0.00
0.00 *
4,670.13
4,670.13 *
84,722.24
84,722.24 *
0.17 *
169,556.00 *

9,525.00

5,539.95
1,235.67
16.61
34.46
6,826.68 *
186.76

CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL
186.76 *
0.00
0.00 *
0.00
0.00 *
2,511.55
2,511.55 *
*
9,525.00 *

310,222.00

2,662.83
47,510.20
9,285.20
3,309.15
1,773.23
1,938.90
38,487.67
9,618.10
9,028.77
123,614.05 *
3,536.34
3,536.34 *
0.00
0.00 *
0.00
0.00 *
31,303.13

CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL
54,211.05
44,354.50
129,868.68 *
53,202.78
53,202.78 *
0.15 *
310,222.00 *

199,462.00

1,089.68
2,120.80
74,661.55
8,381.59
11,350.92
97,604.54 *
3,771.03
3,771.03 *
1,645.62
1,645.62 *
0.00
0.00 *
5,493.83
5,493.83 *
90,947.06
90,947.06 *
-0.09 *
199,462.00 *

CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

169,556.00

926.30
1,802.82
56,055.88
7,124.91
9,649.04
75,558.95 *
3,205.62
3,205.62 *
1,398.89
1,398.89 *
0.00
0.00 *
4,670.13
4,670.13 *
84,722.24
84,722.24 *
0.17 *
169,556.00 *

9,525.00

5,539.95
1,235.67
16.61

CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL
34.46
6,826.68 *
186.76
186.76 *
0.00
0.00 *
0.00
0.00 *
2,511.55
2,511.55 *
*
9,525.00 *

310,222.00

2,662.83
47,510.20
9,285.20
3,309.15
1,773.23
1,938.90
38,487.67
9,618.10
9,028.77
123,614.05 *
3,536.34
3,536.34 *
0.00
0.00 *
0.00

CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL
0.00 *
31,303.13
54,211.05
44,354.50
129,868.68 *
53,202.78
53,202.78 *
0.15 *
310,222.00 *

4,415.00

1,207.50
211.11
196.63
407.95
2,023.19 *
86.57
86.57 *
0.00
0.00 *
0.00
0.00 *
2,305.24
2,305.24 *
*
4,415.00 *

CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL
6,307.00

2,131.50
336.94
245.78
509.94
3,224.16 *
123.67
123.67 *
0.00
0.00 *
0.00
0.00 *
2,959.18
2,959.18 *
*
6,307.00 *

CALCULO DE CUADRILLAS
Clave

2012

Descripcin

O00050

Cuadrilla AA (Albaileria)

O00001
O00002

Ayudante
Oficial
Subtotal
Factor por Hora Efectiva

O00901

Unidad Cantidad Precio con


prestaciones
hora
jor
jor

0.125
0.125

24.6%

33,627.68
47,947.72

Total
O00051

Cuadrilla AA 1Of+2Ay (Albaile hora

O00001
O00002

Ayudante
Oficial
Subtotal
Factor por Hora Efectiva

O00901

jor
jor

0.250
0.125

24.6%

33,627.68
47,947.72

Total
O00050

Cuadrilla AA (Albaileria)

O00001
O00002

Ayudante
Oficial
Subtotal
Factor por Hora Efectiva

O00901

hora
jor
jor

0.125
0.000

24.6%

33,627.68
47,947.72

Total
O00050

Cuadrilla AA (Albaileria)

O00001
O00002

Ayudante
Oficial
Subtotal
Factor por Hora Efectiva

O00901

1 Of hora
jor
jor

0.000
0.125

24.6%

33,627.68
47,947.72

Total
O00052

Cuadrilla BB (Instalaciones)

O00004
O00005

Ayudante Instalaciones
Oficial Instalaciones
Subtotal 1
Incremento Oficio
Subtotal 2
Factor por Hora Efectiva

O00901

hora
jor
jor

0.125
0.125

10%

24.6%

33,627.68
47,947.72

Total
O00053

Cuadrilla CC (Pintura) (AA+15 hora

O00006
O00007
O00901

Ayudante Pinturas
Oficial Pinturas
Incremento Oficio
Subtotal 1
Incremento Oficio
Subtotal 2

jor
jor
%

0.125
0.125

15%

33,627.68
47,947.72

O00901

Factor por Hora Efectiva

24.6%

Total
O00054

Cuadrilla DD (Carpinteria) (A

O00006
O00007
O00901

Ayudante Pinturas
Oficial Pinturas
Incremento Oficio
Subtotal 1
Incremento Oficio
Subtotal 2
Factor por Hora Efectiva

O00901

hora
jor
jor
%

0.125
0.125

20%

24.6%

33,627.68
47,947.72

Total
O00055

Cuadrilla EE (Electricos) (AA

O00006
O00007
O00901

Ayudante Pinturas
Oficial Pinturas
Incremento Oficio
Subtotal 1
Incremento Oficio
Subtotal 2
Factor por Hora Efectiva

O00901

Total

hora
jor
jor
%

0.125
0.125

40%

24.6%

33,627.68
47,947.72

Total
prestaciones

4,203.46
5,993.46
10,196.92
2,508.44

12,705.37

8,406.92
5,993.46
14,400.38
3,542.49

18,565.72

4,203.46
0.00
4,203.46
1,034.05

5,237.51

0.00
5,993.46
5,993.46
1,474.39

7,467.86

4,203.46
5,993.46
10,196.92
1,019.69
11,216.62
2,759.29

21,413.54

4,203.46
5,993.46
10,196.92
16,190.39
2,428.56
18,618.95

4,580.26

23,199.21

4,203.46
5,993.46
10,196.92
16,190.39
3,238.08
19,428.47
4,779.40

24,207.87

4,203.46
5,993.46
10,196.92
16,190.39
6,476.16
22,666.55
5,575.97

28,242.52

SUELDOS Y PARAFISCALES PERS


ENERO DE 2012
AYUDANTE OBRA

SUELDO CON PRESTACIONES SOCIALES


DESCRIPCION
CESANTIAS
VACACIONES
PRIMA
INTERES DE CESANTIA
FONDO FORMACION PROFESIONAL DEL SENA
AUXILIO DE TRANSPORTE
SALUD, ENFERMEDAD GENERAL Y MUERTE
PENSION
RIESGOS PROFESIONALES
SUBSIDIO FAMILIAR
SENA
BIENESTAR FAMILIAR
DOTACION
EXAMEN MEDICO
TOTAL

VALOR CUADRILLA OF + AYUDANTE


VALOR CUADRILLA OF + AYUDANTE
VALOR CUADRILLA OF + AYUDANTE
VALOR CUADRILLA AY + AYUDANTE
VALOR CUADRILLA AY + AYUDANTE
VALOR CUADRILLA AY + AYUDANTE

Cuadro para saber cuales son las prestaciones sociales y


aportes de parafiscales discriminando el % de EPS Y
PENSION a cargo del patrono
DESCRIPCION
CESANTIAS
VACACIONES
PRIMA
INTERES DE CESANTIA
FONDO FORMACION PROFESIONAL DEL SENA
AUXILIO DE TRANSPORTE
SALUD, ENFERMEDAD GENERAL Y MUERTE

%
10.00000%
4.16667%
8.33333%
1.00000%
1.50000%
11.66448%
12.00000%
15.50000%
6.96000%
4.00000%
2.00000%
3.00000%
3.28000%
1.50000%
84.90448%

SUELDO MES
546,749.01
54,674.90
22,781.21
45,562.42
5,467.49
8,201.24
63,775.44
65,609.88
84,746.10
38,053.73
21,869.96
10,934.98
16,402.47
17,933.37
8,201.24
1,010,963.42

MES
DIA (Jornal)
HORA

1,010,963.42
33,698.78
4,212.35

MES
DIA
HORA
MES
DIA
HORA

2,452,436.24
81,747.87
10,218.48
2,021,926.84
67,397.56
8,424.70

%
PATRON
10.00000%
4.16667%
8.33333%
1.00000%
1.50000%
11.66448%
9.00000%

%
TRABAJADOR
0.00000%
0.00000%
0.00000%
0.00000%
0.00000%
0.00000%
3.00000%

PENSION
RIESGOS PROFESIONALES
SUBSIDIO FAMILIAR
SENA
BIENESTAR FAMILIAR
DOTACION
EXAMEN MEDICO
TOTAL

11.62500%
6.96000%
4.00000%
2.00000%
3.00000%
3.28000%
1.50000%
78.02948%
MES
DIA (jornal)
HORA

3.87500%
0.00000%
0.00000%
0.00000%
0.00000%
0.00000%
0.00000%
6.87500%
con prestaciones
con prestaciones
con prestaciones

S Y PARAFISCALES PERSONAL DE OBRA POR ADMINISTRACION

AYUDANTE OBRA

OFICIAL DE OBRA

1.100

SUELDO MES
779,577.00
77,957.70
32,482.37
64,964.75
7,795.77
11,693.66
90,933.62
93,549.24
120,834.44
54,258.56
31,183.08
15,591.54
23,387.31
25,570.13
11,693.66
1,441,472.82

EJERO DE OBRA

1.100

1,441,472.82
48,049.09
6,006.14

%
TOTAL
10.00000%
4.16667%
8.33333%
1.00000%
1.50000%
11.66448%
12.00000%

AYUDANTE OBRA
%
%
PATRON
TRABAJADOR
546,749.01
54,674.90
0.00
22,781.21
0.00
45,562.42
0.00
5,467.49
0.00
8,201.24
0.00
63,775.44
0.00
49,207.41
16,402.47

SUELDO MES
871,013.00
87,101.30
36,292.21
72,584.42
8,710.13
13,065.20
101,599.16
104,521.56
135,007.02
60,622.50
34,840.52
17,420.26
26,130.39
28,569.23
13,065.20
1,610,542.08

1.100

1,610,542.08
53,684.74
6,710.59

OFICIAL OBRA
%
%
PATRON
TRABAJADOR
779,577.00
77,957.70
0.00
32,482.37
0.00
64,964.75
0.00
7,795.77
0.00
11,693.66
0.00
90,933.62
0.00
70,161.93
23,387.31

15.50000%
6.96000%
4.00000%
2.00000%
3.00000%
3.28000%
1.50000%
84.90448%

63,559.57
38,053.73
21,869.96
10,934.98
16,402.47
17,933.37
8,201.24
426,625.42
973,374.43
32,445.81
4,055.73

21,186.52
0.00
0.00
0.00
0.00
0.00
0.00
37,588.99

90,625.83
54,258.56
31,183.08
15,591.54
23,387.31
25,570.13
11,693.66
608,299.90
1,387,876.90
46,262.56
5,782.82

30,208.61
0.00
0.00
0.00
0.00
0.00
0.00
53,595.92

CONTRAMAESTRO
SUELDO MES
1,135,090.00
113,509.00
47,295.42
94,590.83
11,350.90
17,026.35
132,402.37
136,210.80
175,938.95
79,002.26
45,403.60
22,701.80
34,052.70
37,230.95
17,026.35
2,098,832.29
2,098,832.29
69,961.08
8,745.13

MAESTRO DE OBRA

1.100

SUELDO MES
1,339,970.00
133,997.00
55,832.08
111,664.17
13,399.70
20,099.55
156,300.56
160,796.40
207,695.35
93,261.91
53,598.80
26,799.40
40,199.10
43,951.02
20,099.55
2,477,664.59

1.100

2,477,664.59
82,588.82
10,323.60

EJERO OBRA
CONTRAMAESTRO DE OBRA
MAESTRO DE OBRA
%
%
%
%
%
%
PATRON
TRABAJADOR
PATRON
TRABAJADOR
PATRON TRABAJADOR
871,013.00
1,135,090.00
1,339,970.00
87,101.30
0.00
113,509.00
0.00 133,997.00
0.00
36,292.21
0.00
47,295.42
0.00
55,832.08
0.00
72,584.42
0.00
94,590.83
0.00
111,664.17
0.00
8,710.13
0.00
11,350.90
0.00
13,399.70
0.00
13,065.20
0.00
17,026.35
0.00
20,099.55
0.00
101,599.16
0.00
132,402.37
0.00 156,300.56
0.00
78,391.17
26,130.39
102,158.10
34,052.70 120,597.30
40,199.10

101,255.26
60,622.50
34,840.52
17,420.26
26,130.39
28,569.23
13,065.20
679,646.93
1,550,659.93
51,688.66
6,461.08

33,751.75
0.00
0.00
0.00
0.00
0.00
0.00
59,882.14

131,954.21
79,002.26
45,403.60
22,701.80
34,052.70
37,230.95
17,026.35
885,704.85

43,984.74 155,771.51
0.00
93,261.91
0.00
53,598.80
0.00
26,799.40
0.00
40,199.10
0.00
43,951.02
0.00
20,099.55
78,037.44 1,045,571.65

2,020,794.85
67,359.83
8,419.98

2,385,541.65
79,518.06
9,939.76

51,923.84
0.00
0.00
0.00
0.00
0.00
0.00
92,122.94

RABAJADOR

También podría gustarte