MUNICIPALIDAD DISTRITAL DE LAYO

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO

DESCRIPCION

UNIDAD
MEDIDA

TOTAL
SALIDA

PRESIO

CEMENTO PORTLAND TIPO IP x 42.5 KG

10

25.00

BAO TURCO DE GRANITO

23.00

TUBERIA PVC SAL DE 4"

19.00

TUBERIA PVC SAL DE 2"

10.00

CODO PVC SAL DE 4" DE 90

5.00

CODO PVC SAL DE 4" DE 45

5.00

YEE PVC SAL DE 4"

5.00

YEE PVC SAL DE 4"x2"x4"

5.00

CODO PVC SAL DE 2" DE 45

2.00

10

CODO PVC SAL DE 2" DE 90

16

2.00

11

YEE PVC SAL DE 2"

2.00

12

TUBERIA PVC SAP DE 1/2" C/R C-10

12.00

13

LLAVE PVC DE PASO DE 1/2" C/R

17.00

14

LLAVE DE BRONCE DE 1/2" TIPO JARDINERO.

20.00

15

CODO PVC SAP DE 1/2" C/R.

0.80

16

CODO FG DE 1/2"

10

2.50

17

TEE PVC SAP DE 1/2" C/R.

1.00

18

SUMIDERO DE BRONCE DE 2"

4.00

19

CINTA TEFLON

20

PEGAMENTO OATEY PARA TUBERIA PVC

0.25

30.00

21

CLAVO DE MADERA DE 4"

820

5.00

22

CLAVO DE MADERA DE 3"

310

5.00

23

CLAVO DE CALAMINA

10

7.50

24

ALAMBRE NEGRO N 16

25

ABRASADERA DE 2" PARA RED DE AGUA

15.00

26

REDUCCION PVC SAP 3/4" - 1/2

2.00

27

CINTA AISLANTE

4.00

28

TOMACORRIENTE DOBLES

4.50

29

INTERRUPTOR

3.50

30

LAMPARAS FLUORECENTE 40W INC/ EQ. RECTANGULAR

23.00

31

CANDADO

19.50

32

TEE PVC SAL DE 4"x2"x4" .

6.00

33

TEE PVC DE SAL DE 2".

0.00

34

ROLLISO DE EUCALIPTO DE 4"X4mts.

0.00

35

ROLLISO DE EUCALIPTO DE 4"X6mts.

0.00

36

LISTONES DE MADERA CORRIENTE 2"x3"x10.

0.00

37

TABLAS DE MADERA CORRIENTE DE 1 1/2" x 8" x 10.

0.00

38

CAJAS RECTANGULARESL PVC SEL

0.00

39

CAJAS OCTAGONALES PVC SEL

0.00

40

CODO PVC SEL DE 3/4"

0.00

41

CODO PVC SEL DE 1"

0.00

42

TUBERIA PVC SEL DE 3/4"

0.00

43

TUBERIA PVC SEL DE 1"

0.00

44

ALAMBRE NEGRO N 8

0.00

45

ALAMBRE GALVANIZADO N 18.

0.00

520

1.00

5.00

MUNICIPALIDAD DISTRITAL DE LAYO


OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO

DESCRIPCION

46

CLAVO DE MADERA 1"

47

CLAVO DE MADERA DE 2"

48

UNIDAD
MEDIDA

TOTAL
SALIDA

PRESIO

0.5

CLAVO DE 2 1/2

49

CLAVO DE MADERA DE 5"

50

FIERRO CORRUGADO DE 3/4"

51

FIERRO CORRUGADO DE 5/8"

52

FIERRO CORRUGADO DE 1/2"

53

FIERRO CORRUGADO DE 3/8"

54

FIERRO CORRUGADO DE 1/4"

55

PALAS TRAMONTINA

56

GUANTES DE CUERO

17

57

GUANTES DE JEBE

9.50

58

CASCO DE COLOR BLANCO

25.00

59

CASCO DE COLOR ROJO

10.00

60

CASCO DE COLOR AZUL

10.00

61

COMBOS DE 6 LBS

37.00

62

HOJA DE SIERRA SANFLEX

5.00

63

BOSTAS DE JEBE

36.00

64

ARPILLERA

670.00

65

CARRETILLAS ( BUGUI) TRUPER

190.00

66

WINCHAS DE 5MTS

19.00

67

WINCHA DE 50 MTS

60.00

68

DISCOS DE MADERA DE 7 1/4"

21.00

69

DISCOS DE FIERRO DE 7 1/4"

12.00

70

CASCO DE COLOR NARANJA

15

10.00

71

BARRETA DE 1"x1.5 M.

70.00

72

PETROLEO

651

12.00

32.00
9.00

FECHA : ENERO-2010
TOTAL
250.00
92.00
114.00
70.00
25.00
40.00
20.00
25.00
14.00
32.00
4.00
84.00
34.00
120.00
7.20
25.00
6.00
24.00
9.00
7.50
4,100.00
1,550.00
75.00
2,600.00
30.00
2.00
8.00
22.50
28.00
161.00
19.50
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

FECHA : ENERO-2010
TOTAL
153.00
100.00
30.00
185.00
25.00
180.00
1,340.00
95.00
60.00
42.00
12.00
150.00
7,812.00
19,794.70

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO ENERO 2010
OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO
N

DESCRIPCION

CEMENTO PORTLAND TIPO IP x 42.5 KG

UND

BLS

Correspondiente

: ENERO 2010

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

SALDO

0.00

BAO TURCO DE GRANITO

UND

0.00

TUBERIA PVC SAL DE 4"

UND

0.00

TUBERIA PVC SAL DE 2"

UND

0.00

CODO PVC SAL DE 4" DE 90

UND

0.00

CODO PVC SAL DE 4" DE 45

UND

0.00

YEE PVC SAL DE 4"

UND

0.00

YEE PVC SAL DE 4"x2"x4"

UND

0.00

CODO PVC SAL DE 2" DE 45

UND

0.00

10

CODO PVC SAL DE 2" DE 90

UND

0.00

11

YEE PVC SAL DE 2"

UND

0.00

12

TUBERIA PVC SAP DE 1/2" C/R C-10

UND

0.00

13

LLAVE PVC DE PASO DE 1/2" C/R

UND

0.00

14

LLAVE DE BRONCE DE 1/2" TIPO JARDINERO.

UND

0.00

15

CODO PVC SAP DE 1/2" C/R.

UND

0.00

16

CODO FG DE 1/2"

UND

0.00

17

TEE PVC SAP DE 1/2" C/R.

UND

0.00

18

SUMIDERO DE BRONCE DE 2"

UND

0.00

19

CINTA TEFLON

UND

0.00

20

PEGAMENTO OATEY PARA TUBERIA PVC

GLN

0.00

21

CLAVO DE MADERA DE 4"

KLS

0.00

22

CLAVO DE MADERA DE 3"

KLS

0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10
7
4
4
4
4

6
6
4

1
1

4
4

4
2

2
4

1
1

4
5
5

9
9

2
1

12
1

2
2
4
4
2

1
1

2
2

6
6
8

8
6

6
6

6
2

2
5

2
2

0.25
0.25
20

20
10

1
4.5

1.5

0.5

10

0.5

0.5

1.5

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO ENERO 2010
OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO
N

DESCRIPCION

UND

Correspondiente

: ENERO 2010

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

SALDO

23

CLAVO DE CALAMINA

KLS

0.00

24

ALAMBRE NEGRO N 16

KLS

0.00

25

ABRASADERA DE 2" PARA RED DE AGUA

UND

0.00

26

REDUCCION PVC SAP 3/4" - 1/2

UND

0.00

27

CINTA AISLANTE

UND

0.00

28

TOMACORRIENTE DOBLES

UND

0.00

29

INTERRUPTOR

UND

0.00

30

LAMPARAS FLUORECENTE DE 40W INCLUYE EQUIPO


RECTANGULAR

UND

0.00

31

CANDADO

UND

0.00

32

TEE PVC SAL DE 4"x2"x4" .

UND

0.00

33

TEE PVC DE SAL DE 2".

UND

0.00

34

ROLLISO DE EUCALIPTO DE 4"X4mts.

UND

0.00

35

ROLLISO DE EUCALIPTO DE 4"X6mts.

UND

0.00

36

LISTONES DE MADERA CORRIENTE 2"x3"x10.

UND

0.00

37

TABLAS DE MADERA CORRIENTE DE 1 1/2" x 8" x 10.

UND

0.00

38

CAJAS RECTANGULARESL PVC SEL

UND

0.00

39

CAJAS OCTAGONALES PVC SEL

UND

0.00

40

CODO PVC SEL DE 3/4"

UND

0.00

41

CODO PVC SEL DE 1"

UND

0.00

42

TUBERIA PVC SEL DE 3/4"

UND

0.00

43

TUBERIA PVC SEL DE 1"

UND

0.00

44

ALAMBRE NEGRO N 8

KLS

0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10
10
20
20
2
1
1
2
2
5
1

8
7
1
1
1

1
2

2
2
155
30
205
400
200
200
648
50
800
100

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO ENERO 2010
OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO
N

DESCRIPCION

UND

Correspondiente

: ENERO 2010

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

SALDO

45

ALAMBRE GALVANIZADO N 18.

KLS

0.00

46

CLAVO DE MADERA 1"

KLS

0.00

47

CLAVO DE MADERA DE 2"

KLS

0.00

48

CLAVO DE 2 1/2

KLS

0.00

49

CLAVO DE MADERA DE 5"

KLS

0.00

50

FIERRO CORRUGADO DE 3/4"

VLLS

0.00

51

FIERRO CORRUGADO DE 5/8"

VLLS

0.00

52

FIERRO CORRUGADO DE 1/2"

VLLS

0.00

53

FIERRO CORRUGADO DE 3/8"

VLLS

0.00

54

FIERRO CORRUGADO DE 1/4"

VLLS

0.00

55

PALAS TRAMONTINA

UND

0.00

56

GUANTES DE CUERO

PAR

0.00

57

GUANTES DE JEBE

PAR

0.00

58

CASCO DE COLOR BLANCO

UND

0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

0.5
0.5
2
2

406

354

1050

50

696

2496
570

HERRAMIENTAS Y EQUIPOS DE SEGURIDAD

59

CASCO DE COLOR ROJO

UND

0.00

60

CASCO DE COLOR AZUL

UND

0.00

61

COMBOS DE 6 LBS

UND

0.00

62

HOJA DE SIERRA SANFLEX

UND

0.00

63

BOSTAS DE JEBE

PAR

0.00

64

ARPILLERA

ROLLO

0.00

65

CARRETILLAS ( BUGUI) TRUPER

UND

0.00

66

WINCHAS DE 5MTS

UND

0.00

67

WINCHA DE 50 MTS

UND

0.00

68

DISCOS DE MADERA DE 7 1/4"

UND

0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

5
20

80
3

10

20

4
80

5
4
20
3
26

6
4

30
2
15

4
1

5
1

1
1

1
20
20
3

2
1
25
1

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO ENERO 2010
OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO
N

DESCRIPCION

UND

SALDO

69

DISCOS DE FIERRO DE 7 1/4"

UND

0.00

70

CASCO DE COLOR NARANJA

UND

0.00

71

BARRETA DE 1"x1.5 M.

UND

0.00

Correspondiente
V
1

S
2

D
3

L
4

M
5

M
6

J
7

V
8

S
9

D
10

E
S
E
S
E
S

L
11

M
12

M
13

J
14

V
15

S
16

D
17

L
18

M
19

M
20

J
21

V
22

S
23

D
24

L
25

: ENERO 2010
M
26

M
27

J
28

50
1
30
15
4

COMBUSTIBLE Y LUBRICANTES
72

PETROLEO

GLNS.

0.00

73

GASOLINA

GLNS.

0.00

E
S
E
S

214
20

1200
52

22

65

55

32

50

130

29

30

31

TOTAL DE ENTRADA

TOTAL ACUMULADO

TOTAL DE SALIDA

TOTAL ACUMULADO

10.00

10.00

10.00

10.00

4.00

4.00

4.00

4.00

6.00

6.00

6.00

6.00

8.00

8.00

7.00

7.00

6.00

6.00

5.00

5.00

8.00

8.00

8.00

8.00

4.00

4.00

4.00

4.00

5.00

5.00

5.00

5.00

7.00

7.00

SALDO ACT.

0.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
5.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
3.00
0.00
800
5
300
4.5

793.00
295.50

7.00

7.00

21.00

21.00

16.00

16.00

2.00

2.00

2.00

2.00

7.00

7.00

7.00

7.00

2.00

2.00

2.00

2.00

6.00

6.00

6.00

6.00

11.00

11.00

9.00

9.00

10.00

10.00

10.00

10.00

6.00

6.00

6.00

6.00

6.00

6.00

6.00

6.00

9.00

9.00

6.00

6.00

0.25

0.25

0.25

0.25

825.00

825.00

32.00

32.00

314.50

314.50

19.00

19.00

TOTAL DE ENTRADA

TOTAL ACUMULADO

TOTAL DE SALIDA

TOTAL ACUMULADO

10.00

10.00

SALDO ACT.

29

30

31
0.00

500

500.00
1.00
1.00
0.00
2.00
4.00
3.00
0.00
0.00
0.00
155.00
30.00
205.00
400.00
200.00
200.00
648.00
50.00
800.00
100.00

1500

1492.00

10.00

10.00

520.00

520.00

20.00

20.00

2.00

2.00

1.00

1.00

1.00

1.00

0.00

0.00

2.00

2.00

2.00

2.00

5.00

5.00

3.00

3.00

8.00

8.00

4.00

4.00

7.00

7.00

4.00

4.00

1.00

1.00

1.00

1.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

155.00

155.00

0.00

0.00

30.00

30.00

0.00

0.00

205.00

205.00

0.00

0.00

400.00

400.00

0.00

0.00

200.00

200.00

0.00

0.00

200.00

200.00

0.00

0.00

648.00

648.00

0.00

0.00

50.00

50.00

0.00

0.00

800.00

800.00

0.00

0.00

100.00

100.00

0.00

0.00

1500.00

1500.00

8.00

8.00

TOTAL DE ENTRADA

TOTAL ACUMULADO

TOTAL DE SALIDA

TOTAL ACUMULADO

60.00

60.00

SALDO ACT.

29
60
10
60
0.5

30

31

60.00
10.00
59.50
0.00

100

100.00
760.00
1100.00
700.00
2496.00
570.00

5.00
83.00
100.00
1.00
17.00
30.00
1.00
25.00
15.00
0.00
20.00
15.00
1.00
23.00

0.00

0.00

10.00

10.00

0.00

0.00

60.50

60.50

1.00

1.00

2.00

2.00

2.00

2.00

100.00

100.00

0.00

0.00

760.00

760.00

0.00

0.00

1100.00

1100.00

0.00

0.00

700.00

700.00

0.00

0.00

2496.00

2496.00

0.00

0.00

570.00

570.00

0.00

0.00

5.00

5.00

0.00

0.00

100.00

100.00

17.00

17.00

100.00

100.00

0.00

0.00

5.00

5.00

4.00

4.00

20.00

20.00

3.00

3.00

30.00

30.00

0.00

0.00

6.00

6.00

5.00

5.00

30.00

30.00

5.00

5.00

20.00

20.00

5.00

5.00

2.00

2.00

2.00

2.00

20.00

20.00

0.00

0.00

20.00

20.00

5.00

5.00

2.00

2.00

1.00

1.00

25.00

25.00

2.00

2.00

V
29

S
30

D
31

49.00
15.00
4.00

135

90

TOTAL DE ENTRADA

TOTAL ACUMULADO

TOTAL DE SALIDA

TOTAL ACUMULADO

50.00

50.00

SALDO ACT.

763.00
0.00

1.00

1.00

30.00

30.00

15.00

15.00

4.00

4.00

0.00

0.00

1414.00

1414.00

651.00

651.00

0.00

0.00

0.00

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO FEBRERO 2010
: ING. ABRAHAM LINARES APARICIO

JEFE DE OBRAS
RESIDENTE DE OBRA

: ARQ. RONAL CALVO DIAZ

Obra : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

SALDO MES
ANTERIO

CEMENTO PORTLAND TIPO IP x 42.5 KG

BLS

0.00

BAO TURCO DE GRANITO

UND

0.00

TUBERIA PVC SAL DE 4"

UND

0.00

TUBERIA PVC SAL DE 2"

UND

1.00

CODO PVC SAL DE 4" DE 90

UND

1.00

CODO PVC SAL DE 4" DE 45

UND

0.00

YEE PVC SAL DE 4"

UND

0.00

YEE PVC SAL DE 4"x2"x4"

UND

0.00

CODO PVC SAL DE 2" DE 45

UND

0.00

10 CODO PVC SAL DE 2" DE 90

UND

5.00

11 YEE PVC SAL DE 2"

UND

0.00

12 TUBERIA PVC SAP DE 1/2" C/R C-10

UND

0.00

13 LLAVE PVC DE PASO DE 1/2" C/R

UND

0.00

14 LLAVE DE BRONCE DE 1/2" TIPO JARDINERO.

UND

0.00

15 CODO PVC SAP DE 1/2" C/R.

UND

2.00

16 CODO FG DE 1/2"

UND

0.00

17 TEE PVC SAP DE 1/2" C/R.

UND

0.00

18 SUMIDERO DE BRONCE DE 2"

UND

0.00

19 CINTA TEFLON

UND

3.00

20 PEGAMENTO OATEY PARA TUBERIA PVC

GLN

0.00

21 CLAVO DE MADERA DE 4"

KLS

793.00

22 CLAVO DE MADERA DE 3"

KLS

295.50

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

Corresponde : FEBRERO 2010

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

745

1
1

0.5

SALDO ACT.

TOTAL ENTRAD

745.00

745.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

777.50

0.00

288.50

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO FEBRERO 2010
: ING. ABRAHAM LINARES APARICIO

JEFE DE OBRAS

: ARQ. RONAL CALVO DIAZ

RESIDENTE DE OBRA

Obra : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

SALDO MES
ANTERIO

23 CLAVO DE CALAMINA

KLS

0.00

24 ALAMBRE NEGRO N 16

KLS

500.00

25 ABRASADERA DE 2" PARA RED DE AGUA

UND

1.00

26 REDUCCION PVC SAP 3/4" - 1/2

UND

1.00

27 CINTA AISLANTE

UND

0.00

28 TOMACORRIENTE DOBLES

UND

2.00

29 INTERRUPTOR

UND

4.00

30 RECTANGULAR

UND

3.00

31 CANDADO

UND

0.00

32 TEE PVC SAL DE 4"x2"x4" .

UND

0.00

33 TEE PVC DE SAL DE 2".

UND

0.00

34 ROLLISO DE EUCALIPTO DE 4"X4mts.

UND

155.00

35 ROLLISO DE EUCALIPTO DE 4"X6mts.

UND

30.00

36 LISTONES DE MADERA CORRIENTE 2"x3"x10.

UND

205.00

37 TABLAS DE MADERA CORRIENTE DE 1 1/2" x 8" x 10.

UND

400.00

38 CAJAS RECTANGULARESL PVC SEL

UND

200.00

39 CAJAS OCTAGONALES PVC SEL

UND

200.00

40 CODO PVC SEL DE 3/4"

UND

648.00

41 CODO PVC SEL DE 1"

UND

50.00

42 TUBERIA PVC SEL DE 3/4"

UND

800.00

43 TUBERIA PVC SEL DE 1"

UND

100.00

44 ALAMBRE NEGRO N 8

KLS

1492.00

LAMPARAS FLUORECENTE DE 40W INCLUYE EQUIPO

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

Corresponde : FEBRERO 2010

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

2
2

1
1

132

3
4

SALDO ACT.

TOTAL ENTRAD

0.00

0.00

500.00

0.00

1.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

287.00

132.00

30.00

0.00

202.00

0.00

396.00

0.00

200.00

0.00

200.00

0.00

648.00

0.00

50.00

0.00

800.00

0.00

100.00

0.00

1486.00

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO FEBRERO 2010
: ING. ABRAHAM LINARES APARICIO

JEFE DE OBRAS

: ARQ. RONAL CALVO DIAZ

RESIDENTE DE OBRA

Obra : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

SALDO MES
ANTERIO

45 ALAMBRE GALVANIZADO N 18.

KLS

60.00

46 CLAVO DE MADERA 1"

KLS

10.00

47 CLAVO DE MADERA DE 2"

KLS

59.50

48 CLAVO DE 2 1/2

KLS

0.00

49 CLAVO DE MADERA DE 5"

KLS

100.00

50 PLASTICO GRUESO DE DOBLE ANCHO 1.5M X 100 MTS.


51

PLASTICO GRUESO DE DOBLE ANCHO 2.00 M X


100MTS.
PLASTICO GRUESO DE DOBLE ANCHO 5.00 M X

52 100MTS.

MTS.
MTS.
MTS.

0.00
0.00
0.00

53 BALDE DE 5 GLNS. TRANSPARENTE

UND

0.00

54 FIERRO CORRUGADO DE 3/4"

VLLS

760.00

55 FIERRO CORRUGADO DE 5/8"

VLLS

1100.00

56 FIERRO CORRUGADO DE 1/2"

VLLS

700.00

57 FIERRO CORRUGADO DE 3/8"

VLLS

2496.00

58 FIERRO CORRUGADO DE 1/4"

VLLS

570.00

Corresponde : FEBRERO 2010

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

2
1

1
1
2
2
1
1

SALDO ACT.

TOTAL ENTRAD

60.00

0.00

10.00

0.00

59.50

0.00

0.00

0.00

100.00

0.00

0.00

2.00

0.00

1.00

0.00

2.00

0.00

1.00

760.00

0.00

1100.00

0.00

700.00

0.00

2496.00

0.00

570.00

0.00

10.00

15.00

79.00

0.00

99.00

0.00

0.00

0.00

16.00

0.00

30.00

0.00

0.00

0.00

24.00

0.00

HERRAMIENTAS Y EQUIPOS DE SEGURIDAD


59 PALAS TRAMONTINA

UND

5.00

60 GUANTES DE CUERO

PAR

83.00

61 GUANTES DE JEBE

PAR

100.00

62 CASCO DE COLOR BLANCO

UND

1.00

63 CASCO DE COLOR ROJO

UND

17.00

64 CASCO DE COLOR AZUL

UND

30.00

65 COMBOS DE 6 LBS

UND

1.00

66 HOJA DE SIERRA SANFLEX

UND

25.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E

15
1

4
2

2
1

1
1
1

66 HOJA DE SIERRA SANFLEX

UND

25.00

24.00

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO FEBRERO 2010
: ING. ABRAHAM LINARES APARICIO

JEFE DE OBRAS

: ARQ. RONAL CALVO DIAZ

RESIDENTE DE OBRA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO MES
ANTERIO

PAR

15.00

ROLLO

0.00

69 CARRETILLAS ( BUGUI) TRUPER

UND

20.00

70 WINCHAS DE 5MTS

UND

15.00

71 WINCHA DE 50 MTS

UND

1.00

72 DISCOS DE MADERA DE 7 1/4"

UND

23.00

73 DISCOS DE FIERRO DE 7 1/4"

UND

49.00

74 CASCO DE COLOR NARANJA

UND

15.00

DESCRIPCION

67 BOSTAS DE JEBE
68 ARPILLERA

75 BARRETA DE 1"x1.5 M.
76 SILICONA
77 YESO

UND
UND

4.00
0.00

QQ

0.00

UND

0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

Corresponde : FEBRERO 2010

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

6
3

1
1
1
10

SALDO ACT.

TOTAL ENTRAD

0.00

0.00

0.00

0.00

13.00

0.00

15.00

0.00

1.00

0.00

23.00

0.00

49.00

0.00

15.00

0.00

6.00

6.00

0.00

1.00

10.00

10.00

0.00

10.00

0.00

1.00

0.00

1.00

0.00

2.00

3.00

3.00

1.00

1.00

3.00

4.00

0.00

8.00

0.00

1.00

0.00

1.00

BIENES DE GUARDIANIA Y COCINA


78 FRAZADA CORRIENTE
79 BALON DE GAS

UND

0.00

80 CONCINA A GAS

UND

0.00

81 COMPUTADORA (CPU, TECLADO, MONITRO, MAUSE)

EQ.

0.00

82 CARTUCHO TINTA NEGRA N 40 CANON

UND

0.00

E
S
E
S
E
S

10
2

1
1
1
1

UTILES DE ESCRITORIO

83 CARTUCHO TINTA COLOR N 41 CANON

UND

0.00

84 PAPEL BOND A4 X 75 GS.

MILL.

0.00

85 ARCHIVADORES T/OFICIO
86 ENGRAPADOR
87 PERFORADOR

UND
UND
UND

0.00
0.00
0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S

2
2
3
.

1
4
1
8
8
1
1
1
1

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO FEBRERO 2010
: ING. ABRAHAM LINARES APARICIO

JEFE DE OBRAS
RESIDENTE DE OBRA

: ARQ. RONAL CALVO DIAZ

Obra : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO MES
ANTERIO

88 RESALTADOR

UND

0.00

89 PEGAMENTO EN BARRA UHU

UND

0.00

DESCRIPCION

90 CUADERNO # 200 HOJAS ANILLADO

UND

0.00

91 CINTA MASKING DE 2"

UND

0.00

92 CORRECTOR

UND

0.00

93 CUTER

UND

0.00

94 LAPICERO TINTA LIQUIDA

UND

0.00

95 PLUMON INDELEBLE

UND

0.00

96 POS -IT
97 PORTA MINAS
98 MINAS RECARGABLES 0.5 HB
99 PIZARRA ACRILICA DE 2X1.2
100 PLUMON DE PIZARRA ACRILICA

PAQ.
UND
UND
UND
UND

0.00
0.00
0.00
0.00
0.00

101 MOTA PARA PIZARRA ACRILICA

UND

0.00

102 FRANELA

MTS.

0.00

103 PETROLEO

GLNS.

763.00

104 GASOLINA

GLNS.

0.00

Corresponde : FEBRERO 2010

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

4
4
2
10
5
5
1
4
1
2
1
6
3
4
4
5
1
3
1
5
2
1
1
7
2
1
1
1
1

SALDO ACT.

TOTAL ENTRAD

0.00

4.00

2.00

2.00

5.00

10.00

4.00

5.00

3.00

4.00

1.00

2.00

3.00

6.00

0.00

4.00

4.00

5.00

2.00

3.00

3.00

5.00

0.00

1.00

5.00

7.00

0.00

1.00

0.00

1.00

26.00

777.00

5.00

15.00

COMBUSTIBLE Y LUBRICANTES
E
S
E
S

95
25 130 30

105

95

10

90 20

45
5
2

82

25

80

70

25

40

85 130 85

35

95

45 100 67

55

85 130 85
10

35

75

60 100 57

TOTAL ACUMULADO
TOTAL SALIDA
TOTAL ACUMULADO

0.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
5.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
15.50
7.00

755.00
10.00
4.00
4.00
6.00
6.00
8.00
8.00
6.00
6.00
8.00
8.00
4.00
4.00
5.00
5.00
7.00
7.00
21.00
21.00
2.00
2.00
7.00
7.00
2.00
2.00
6.00
6.00
11.00
9.00
10.00
10.00
6.00
6.00
6.00
6.00
9.00
9.00
0.25
0.25
825.00
47.50
314.50
26.00

TOTAL ACUMULADO
TOTAL SALIDA
TOTAL ACUMULADO

0.00
0.00
0.00
0.00
0.00
2.00
3.00
1.00
0.00
0.00
0.00
0.00
0.00
3.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00

10.00
10.00
520.00
20.00
2.00
1.00
1.00
0.00
2.00
2.00
5.00
5.00
8.00
7.00
7.00
5.00
1.00
1.00
2.00
2.00
2.00
2.00
287.00
0.00
30.00
0.00
205.00
3.00
400.00
0.00
200.00
0.00
200.00
0.00
648.00
0.00
50.00
0.00
800.00
0.00
100.00
0.00
1500.00
8.00

TOTAL ACUMULADO
TOTAL SALIDA
TOTAL ACUMULADO

0.00
0.00
0.00
0.00
0.00
2.00
1.00
2.00
1.00
0.00
0.00
0.00
0.00
0.00

10.00
4.00
1.00
1.00
1.00
0.00
1.00
1.00

60.00
0.00
10.00
0.00
60.50
1.00
2.00
2.00
100.00
0.00
2.00
2.00
1.00
1.00
2.00
2.00
1.00
1.00
760.00
0.00
1100.00
0.00
700.00
0.00
2496.00
0.00
570.00
0.00

20.00
0.00
100.00
17.00
100.00
0.00
5.00
4.00
20.00
3.00
30.00
0.00
6.00
6.00
30.00

1.00

5.00

TOTAL ACUMULADO
TOTAL SALIDA
TOTAL ACUMULADO

15.00
0.00
7.00
0.00
0.00
0.00
0.00
0.00
4.00
1.00
0.00

10.00
1.00
1.00

2.00
0.00
0.00
1.00
8.00
1.00
1.00

20.00
5.00
2.00
2.00
20.00
7.00
20.00
5.00
2.00
1.00
25.00
2.00
50.00
1.00
30.00
15.00
10.00
4.00
1.00
1.00
10.00
0.00

10.00
10.00
1.00
1.00
1.00
1.00

2.00
2.00
3.00
0.00
1.00
0.00
4.00
1.00
8.00
8.00
1.00
1.00
1.00
1.00

TOTAL ACUMULADO
TOTAL SALIDA
TOTAL ACUMULADO

4.00
0.00
5.00
1.00
1.00
1.00
3.00
4.00
1.00
1.00
2.00
1.00
2.00
1.00
1.00

1514.00
10.00

4.00
4.00
2.00
0.00
10.00
5.00
5.00
1.00
4.00
1.00
2.00
1.00
6.00
3.00
4.00
4.00
5.00
1.00
3.00
1.00
5.00
2.00
1.00
1.00
7.00
2.00
1.00
1.00
1.00
1.00

2191.00
2165.00
15.00
10.00

MUNICIPALIDAD DISTRITAL DE LAYO


TOTAL STOCK EN ALMACEN AL: 31 DE MARZO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

ESP.
GASTOS

FECHA: MARZO - 2010

O/C. N

SALDO DE ALMACEN ACTUAL


CANT.

CEMENTO PORTLAND TIPO IP x 42.5 KG

BLS

739.00

BAO TURCO DE GRANITO

UND

71

0.00

TUBERIA PVC SAL DE 4"

UND

68

0.00

TUBERIA PVC SAL DE 2"

UND

68

0.00

CODO PVC SAL DE 4" DE 90

UND

68

0.00

CODO PVC SAL DE 4" DE 45

UND

68

0.00

YEE PVC SAL DE 4"

UND

68

0.00

YEE PVC SAL DE 4"x2"x4"

UND

69

0.00

CODO PVC SAL DE 2" DE 45

UND

71

0.00

10

CODO PVC SAL DE 2" DE 90

UND

71

0.00

11

YEE PVC SAL DE 2"

UND

71

0.00

12

TUBERIA PVC SAP DE 1/2" C/R C-10

UND

68

0.00

13

LLAVE PVC DE PASO DE 1/2" C/R

UND

71

0.00

14

LLAVE DE BRONCE DE 1/2" TIPO JARDINERO.

UND

72

0.00

15

CODO PVC SAP DE 1/2" C/R.

UND

72

2.00

16

CODO FG DE 1/2"

UND

72

0.00

17

TEE PVC SAP DE 1/2" C/R.

UND

72

0.00

18

SUMIDERO DE BRONCE DE 2"

UND

72

0.00

19

CINTA TEFLON

UND

72

0.00

20

PEGAMENTO OATEY PARA TUBERIA PVC

GLN

72

0.00

21

CLAVO DE MADERA DE 4"

KLS

757.00

22

CLAVO DE MADERA DE 3"

KLS

283.00

23

CLAVO DE CALAMINA

KLS

72

0.00

24

ALAMBRE NEGRO N 16

KLS

72

397.50

25

ABRASADERA DE 2" PARA RED DE AGUA

UND

68

1.00

26

REDUCCION PVC SAP 3/4" - 1/2

UND

69

1.00

27

CANDADO

UND

70

1.00

28

TEE PVC SAL DE 4"x2"x4" .

UND

69

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


TOTAL STOCK EN ALMACEN AL: 31 DE MARZO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

ESP.
GASTOS

O/C. N

FECHA: MARZO - 2010


SALDO DE ALMACEN ACTUAL
CANT.

29

TEE PVC DE SAL DE 2".

UND

0.00

30

CODO PVC SEL DE 3/4"

UND

648.00

31

CODO PVC SEL DE 1"

UND

50.00

32

TUBERIA PVC SEL DE 3/4"

UND

800.00

33

TUBERIA PVC SEL DE 1"

UND

100.00

34

ALAMBRE NEGRO N 8

KLS

1,471.00

35

ALAMBRE GALVANIZADO N 18.

KLS

60.00

36

CLAVO DE MADERA 1"

KLS

10.00

37

CLAVO DE MADERA DE 2"

KLS

57.00

38

CLAVO DE 2 1/2

KLS

0.00

39

CLAVO DE MADERA DE 5"

KLS

99.25

40

PLASTICO GRUESO DE DOBLE ANCHO 1.50 M

ROLL

146

0.00

41

PLASTICO GRUESO DE DOBLE ANCHO 2.00M

ROLL

146

0.00

42

PLASTICO GRUESO DE DOBLE ANCHO 5.00 M

ROLL

146

0.00

43

BALDE DE 5 GLNS. TRANSPARENTE

UND

49

MASILLA PLASTICA 0.470 LTS.

KLS.

300

25.00

50

LIJAR DE FIERRO N 80 ABRALIP

UND.

300

100.00

51

LIJAR DE FIERRO N 100 ABRALIP

UND.

300

100.00

52

CLAVO DE JUNQUILLO 1"

KLS.

300

10.00

53

CLAVO DE 3/4" TRIPLEY

KLS.

301

15.00

54

THINNER ACRILICO

GLNS

302

10.00

55

LACA PIROXILINA CPP

GLNS

300

20.00

56

AMOLADORA CROW DE 9"

GLNS

300

2.00

57

DISCO DE CONCRETO DE 9" CRUPS

UND

300

4.00

58

SELLOCORT 325X350 MM

KLS.

0.00

59

SUPERCITO 325 X 350

KLS.

18.00

60

REGLA DE ALUMINIO X 6 MTS.

UND

4.00

0.00

TOTAL STOCK

MUNICIPALIDAD DISTRITAL DE LAYO


TOTAL STOCK EN ALMACEN AL: 31 DE MARZO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

ESP.
GASTOS

O/C. N

FECHA: MARZO - 2010


SALDO DE ALMACEN ACTUAL
CANT.

ROLLISO DE EUCALIPTO DE 4"X4mts.

UND

287.00

ROLLISO DE EUCALIPTO DE 4"X6mts.

UND

27.00

LISTONES DE MADERA CORRIENTE 2"x3"x10.

UND

186.00

TABLAS DE MADERA CORRIENTE DE 1 1/2" x 8" x 10.

UND

394.00

ROLLIZO DE EUCALIPTO 3X4

UND

0.00

ROLLIZO DE EUCALIPTO 4X3

UND.

0.00

TRIPLEY

PLCH

300

70.00
TOTAL STOCK

MUNICIPALIDAD DISTRITAL DE LAYO


TOTAL STOCK EN ALMACEN AL: 31 DE MARZO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

ESP.
GASTOS

O/C. N

FECHA: MARZO - 2010


SALDO DE ALMACEN ACTUAL
CANT.

FIERRO CORRUGADO DE 3/4"

VLLS

368.00

FIERRO CORRUGADO DE 5/8"

VLLS

800.00

FIERRO CORRUGADO DE 1/2"

VLLS

644.00

FIERRO CORRUGADO DE 3/8"

VLLS

1,418.00

FIERRO CORRUGADO DE 1/4"

VLLS

570.00
TOTAL STOCK

MUNICIPALIDAD DISTRITAL DE LAYO


TOTAL STOCK EN ALMACEN AL: 31 DE MARZO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

ESP.
GASTOS

FECHA: MARZO - 2010

O/C. N

SALDO DE ALMACEN ACTUAL


CANT.

PALAS TRAMONTINA

UND

65

13.00

GUANTES DE CUERO

PAR

64

65.00

GUANTES DE JEBE

PAR

64

97.00

CASCO DE COLOR BLANCO

UND

65

0.00

CASCO DE COLOR ROJO

UND

65

13.00

CASCO DE COLOR AZUL

UND

64

30.00

COMBOS DE 6 LBS

UND

65

0.00

HOJA DE SIERRA SANFLEX

UND

65

71.00

BOSTAS DE JEBE

PAR

64

0.00

ROLLO

65

0.00

10

ARPILLERA

11

CARRETILLAS ( BUGUI) TRUPER

UND

64

2.00

12

WINCHAS DE 5MTS

UND

64

11.00

13

WINCHA DE 50 MTS

UND

64

1.00

14

DISCOS DE MADERA DE 7 1/4"

UND

64

18.00

15

DISCOS DE FIERRO DE 7 1/4"

UND

64

34.00

16

CASCO DE COLOR NARANJA

UND

64

2.00

17

BARRETA DE 1"x1.5 M.

UND

64

6.00

18

PICOS

UND

20.00

19

ROPA DE AGUA CASACA Y PANTALON

UND

12.00

20

PILAS BARTA Y PANASONIC

PAR

21

CORDEL NAILON

UND

0.00

22

ARNES DE SEGURIDAD

UND

10.00

23

COMBO DE 20 LBS.

UND

3.00

24

DISCO DE MADERA DIAMANTADO 12"

UND

7.00

25

TIRALINEA METALICO

UND

7.00

70

9.00

MUNICIPALIDAD DISTRITAL DE LAYO


TOTAL STOCK EN ALMACEN AL: 31 DE MARZO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

ESP.
GASTOS

O/C. N

FECHA: MARZO - 2010


SALDO DE ALMACEN ACTUAL
CANT.

26

MANGUERA TRANSPARENTE 3/8"

MTS.

25.00

27

MANGUERA TRANSPARENTE 1/2"

MTS.

25.00

28

NIVEL DE MANO STANLEY

UND

2.00

29

PLOMADAS CILINDRICAS DE 500 GRS

UND

0.00

30

LENTES DE PROTECCION TRANSPARENTE

UND

21.00

31

MARTILLO TRAMONTINA

UND

2.00

32

RECOGEDOR DE BASURA

UND

4.00

33

REFLECTOR PHILIPIS 400W

UND

34

DISCO DE FIERRRO DE 9"

UND

10.00

35

SOGA COLOR ROJO

MTS.

0.00

36

PALAS RECTAS TRAMONTINAS

UND

4.00

37

MANGUERA DE 1" REFORZADA

ROLLO

2.00

300

3.00

TOTAL STOCK

MUNICIPALIDAD DISTRITAL DE LAYO


TOTAL STOCK EN ALMACEN AL: 31 DE MARZO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

ESP.
GASTOS

FECHA: MARZO - 2010

O/C. N

SALDO DE ALMACEN ACTUAL


CANT.

TERMOMAGNETICOS DE 40 AMPERIOS

UND

2.00

FOCOS DE 100 WTS

UND

22.00

SOQUET DE LOZA

UND

21.00

CINTA AISLANTE DE 3 M

UND

3.00

TERMOMAGNETICO DE 30 AMPERIOS

UND

6.00

CABLE INDECO UNIPOLARES AMARILLO Y BLANCO

RLLO

0.00

CONDUCTOR ELECTRICO N 08 TWS

MTS

30.00

CONDUCTOR ELECTRICO NLT 1X2 N 12

MTS

300.00

TOMA CORRIENTE MULTIPLE SOBREPONER

UND

10.00

10

INTERRUPTOR 60A ATORNILLABLE

UND

3.00

11

INTERRUPTOR 40 A ATORNILLABLE

UND

5.00

12

CONDUCTOR ELECTRICO NLT 1X2 N 14

MTS

200.00

13

CABLE MILLIZO 2X12 INDECO

RLLS

0.00

14

CAJA DE PASO 6X6X2 METALICO GALV.

UND.

300

10.00

15

TOMACORRIENTE DOBLES

UND

69

0.00

16

INTERRUPTOR

UND

69

1.00

17

LAMPARAS FLUORECENTE DE 40W INCLUYE EQUIPO RECTANGULAR

UND

69

2.00

18

CAJAS RECTANGULARESL PVC SEL

UND

200.00

19

CAJAS OCTAGONALES PVC SEL

UND

200.00
TOTAL STOCK

MUNICIPALIDAD DISTRITAL DE LAYO


TOTAL STOCK EN ALMACEN AL: 31 DE MARZO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

ESP.
GASTOS

FECHA: MARZO - 2010

O/C. N

EQ.

SALDO DE ALMACEN ACTUAL


CANT.

COMPUTADORA (CPU, TECLADO, MONITRO, MAUSE)

0.00

CARTUCHO TINTA NEGRA N 40 CANON

UND

73

3.00

CARTUCHO TINTA COLOR N 41 CANON

UND

73

1.00

PAPEL BOND A4 X 75 GS.

MILL.

73

2.00

ARCHIVADORES T/OFICIO

UND

73

0.00

ENGRAPADOR

UND

73

0.00

PERFORADOR

UND

73

0.00

RESALTADOR

UND

73

0.00

PEGAMENTO EN BARRA UHU

UND

73

2.00

10

CUADERNO # 200 HOJAS ANILLADO

UND

73

5.00

11

CINTA MASKING DE 2"

UND

73

3.00

12

CORRECTOR

UND

74

2.00

13

CUTER

UND

74

0.00

14

LAPICERO TINTA LIQUIDA

UND

74

1.00

15

PLUMON INDELEBLE

UND

74

0.00

16

POS IT

PAQ.

74

3.00

17

PORTA MINAS

UND

74

1.00

18

MINAS RECARGABLES 0.5 HB

UND

74

2.00

19

PIZARRA ACRILICA DE 2X1.2

UND

74

0.00

20

PLUMON DE PIZARRA ACRILICA

UND

74

5.00

21

MOTA PARA PIZARRA ACRILICA

UND

74

0.00

22

FRANELA

MTS

74

0.00

23

IMPRESORA HP DISKIET F 2480 MULTIFUNCIONAL

EQ.

157

0.00

24

CUADERNO DE OBRA

UND

73

10.00

25

TONER HP LASER 53 A

UND

73

2.00
TOTAL STOCK

MUNICIPALIDAD DISTRITAL DE LAYO


TOTAL STOCK EN ALMACEN AL: 31 DE MARZO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

ESP.
GASTOS

O/C. N

SALDO DE ALMACEN ACTUAL


CANT.

PETROLEO

GLNS.

56

0.00

GASOLINA

GLNS.

56

0.00
TOTAL STOCK

L DE LAYO

1 DE MARZO
FECHA: MARZO - 2010

LDO DE ALMACEN ACTUAL


OBSERVACIONES
TOTAL

0.00

NO TIENE O/C

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.60
0.00
0.00
0.00
0.00
0.00
0.00

NO TIENE O/C

0.00

NO TIENE O/C

0.00
1,987.50
15.00
2.00
19.50
0.00

L DE LAYO

1 DE MARZO
FECHA: MARZO - 2010

LDO DE ALMACEN ACTUAL


OBSERVACIONES
TOTAL

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00
0.00
0.00
0.00

NO TIENE O/C.

220.00
200.00
200.00
100.00
195.00
190.00
960.00
510.00
160.00
0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

4,540.60

L DE LAYO

1 DE MARZO
FECHA: MARZO - 2010

LDO DE ALMACEN ACTUAL


OBSERVACIONES
TOTAL

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

2,100.00
2,100.00

L DE LAYO

1 DE MARZO
FECHA: MARZO - 2010

LDO DE ALMACEN ACTUAL


OBSERVACIONES
TOTAL

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

L DE LAYO

1 DE MARZO
FECHA: MARZO - 2010

LDO DE ALMACEN ACTUAL


OBSERVACIONES
TOTAL

416.00
585.00
921.50
0.00
130.00
300.00
0.00
355.00
0.00
0.00
380.00
209.00
60.00
378.00
408.00
20.00
420.00
0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

22.50
0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

L DE LAYO

1 DE MARZO
FECHA: MARZO - 2010

LDO DE ALMACEN ACTUAL


OBSERVACIONES
TOTAL

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

1,140.00
0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

5,745.00

L DE LAYO

1 DE MARZO
FECHA: MARZO - 2010

LDO DE ALMACEN ACTUAL


OBSERVACIONES
TOTAL

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

150.00

NO TIENE O/C.

0.00

NO TIENE O/C.

3.50

NO TIENE O/C.

46.00

NO TIENE O/C.

0.00

NO TIENE O/C.

0.00

NO TIENE O/C.

199.50

L DE LAYO

1 DE MARZO
FECHA: MARZO - 2010

LDO DE ALMACEN ACTUAL


OBSERVACIONES
TOTAL

0.00
234.00
80.00
56.00
0.00
0.00
0.00
0.00
18.00
55.00
24.00
8.00
0.00
4.00
0.00
58.50
4.00
3.00
0.00
15.00
0.00
0.00
0.00
285.00
670.00
1,514.50

NO TIENE O/C.

L DE LAYO

1 DE MARZO

LDO DE ALMACEN ACTUAL


OBSERVACIONES
TOTAL

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N

DESCRIPCION

UND

SALDO

CEMENTO PORTLAND TIPO IP x 42.5 KG

BLS

745.00

BAO TURCO DE GRANITO

UND

0.00

TUBERIA PVC SAL DE 4"

UND

0.00

TUBERIA PVC SAL DE 2"

UND

0.00

CODO PVC SAL DE 4" DE 90

UND

0.00

CODO PVC SAL DE 4" DE 45

UND

0.00

YEE PVC SAL DE 4"

UND

0.00

YEE PVC SAL DE 4"x2"x4"

UND

0.00

CODO PVC SAL DE 2" DE 45

UND

0.00

10

CODO PVC SAL DE 2" DE 90

UND

0.00

11

YEE PVC SAL DE 2"

UND

0.00

12

TUBERIA PVC SAP DE 1/2" C/R C-10

UND

0.00

13

LLAVE PVC DE PASO DE 1/2" C/R

UND

0.00

14

LLAVE DE BRONCE DE 1/2" TIPO JARDINERO.

UND

0.00

15

CODO PVC SAP DE 1/2" C/R.

UND

2.00

16

CODO FG DE 1/2"

UND

0.00

17

TEE PVC SAP DE 1/2" C/R.

UND

0.00

18

SUMIDERO DE BRONCE DE 2"

UND

0.00

19

CINTA TEFLON

UND

0.00

20

PEGAMENTO OATEY PARA TUBERIA PVC

GLN

0.00

21

CLAVO DE MADERA DE 4"

KLS

777.50

22

CLAVO DE MADERA DE 3"

KLS

288.50

23

CLAVO DE CALAMINA

KLS

0.00

24

ALAMBRE NEGRO N 16

KLS

500.00

25

ABRASADERA DE 2" PARA RED DE AGUA

UND

1.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

739.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

757.00

0.00

20.50

283.00

0.00

5.50

0.00

0.00

0.00

397.50

0.00

102.50

1.00

0.00

0.00

TOTAL ACUMULADO

755.00
16.00
4.00
4.00
6.00
6.00
8.00
8.00
6.00
6.00
8.00
8.00
4.00
4.00
5.00
5.00
7.00
7.00
21.00
21.00
2.00
2.00
7.00
7.00
2.00
2.00
6.00
6.00
11.00
9.00
10.00
10.00
6.00
6.00
6.00
6.00
9.00
9.00
0.25
0.25
825.00
68.00
314.50
31.50
10.00
10.00
520.00
122.50
2.00
1.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N

DESCRIPCION

UND

SALDO

26

REDUCCION PVC SAP 3/4" - 1/2

UND

1.00

27

CANDADO

UND

0.00

28

TEE PVC SAL DE 4"x2"x4" .

UND

0.00

29

TEE PVC DE SAL DE 2".

UND

0.00

30

CODO PVC SEL DE 3/4"

UND

648.00

31

CODO PVC SEL DE 1"

UND

50.00

32

TUBERIA PVC SEL DE 3/4"

UND

800.00

33

TUBERIA PVC SEL DE 1"

UND

100.00

34

ALAMBRE NEGRO N 8

KLS

1486.00

35

ALAMBRE GALVANIZADO N 18.

KLS

60.00

36

CLAVO DE MADERA 1"

KLS

10.00

37

CLAVO DE MADERA DE 2"

KLS

59.50

38

CLAVO DE 2 1/2

KLS

0.00

39

CLAVO DE MADERA DE 5"

KLS

100.00

40

PLASTICO GRUESO DE DOBLE ANCHO 1.50 M

ROLL

0.00

41

PLASTICO GRUESO DE DOBLE ANCHO 2.00M

ROLL

0.00

42

PLASTICO GRUESO DE DOBLE ANCHO 5.00 M

ROLL

0.00

43

BALDE DE 5 GLNS. TRANSPARENTE

UND

0.00

49

MASILLA PLASTICA 0.470 LTS.

KLS.

0.00

50

LIJAR DE FIERRO N 80 ABRALIP

UND.

0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

1.00

0.00

0.00

1.00

7.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

648.00

0.00

0.00

50.00

0.00

0.00

800.00

0.00

0.00

100.00

0.00

0.00

1471.00

0.00

15.00

60.00

0.00

0.00

10.00

0.00

0.00

57.00

0.00

2.50

0.00

0.00

0.00

99.25

0.00

0.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.00

25.00

0.00

100.00

100.00

0.00

1.00
0.00
8.00
7.00
2.00
2.00
2.00
2.00
648.00
0.00
50.00
0.00
800.00
0.00
100.00
0.00
1500.00
23.00
60.00
0.00
10.00
0.00
60.50
3.50
2.00
2.00
100.00
0.75
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
25.00
0.00
100.00
0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N

DESCRIPCION

UND

SALDO

51

LIJAR DE FIERRO N 100 ABRALIP

UND.

0.00

52

CLAVO DE JUNQUILLO 1"

KLS.

0.00

53

CLAVO DE 3/4" TRIPLEY

KLS.

0.00

54

THINNER ACRILICO

GLNS

0.00

55

LACA PIROXILINA CPP

GLNS

0.00

56

AMOLADORA CROW DE 9"

GLNS

0.00

57

DISCO DE CONCRETO DE 9" CRUPS

UND

0.00

58

SELLOCORT 325X350 MM

KLS.

0.00

59

SUPERCITO 325 X 350

KLS.

0.00

60

REGLA DE ALUMINIO X 6 MTS.

UND

0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

100.00

100.00

0.00

10.00

10.00

0.00

15.00

15.00

0.00

10.00

10.00

0.00

20.00

20.00

0.00

0.00

2.00

2.00

4.00

6.00

2.00

0.00

20.00

20.00

18.00

40.00

22.00

4.00

5.00

1.00

100.00
0.00
10.00
0.00
15.00
0.00
10.00
0.00
20.00
0.00
2.00
2.00
6.00
2.00
20.00
20.00
40.00
22.00
5.00
1.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N
1

DESCRIPCION

ROLLISO DE EUCALIPTO DE 4"X4mts.

UND

SALDO

UND

287.00

ROLLISO DE EUCALIPTO DE 4"X6mts.

UND

30.00

LISTONES DE MADERA CORRIENTE 2"x3"x10.

UND

202.00

TABLAS DE MADERA CORRIENTE DE 1 1/2" x 8" x 10.

UND

396.00

ROLLIZO DE EUCALIPTO 3X4

UND

0.00

ROLLIZO DE EUCALIPTO 4X3

UND.

0.00

TRIPLEY

PLCH

0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

287.00

0.00

0.00

TOTAL ACUMULADO

27.00

0.00

3.00

186.00

0.00

16.00

394.00

0.00

2.00

0.00

10.00

10.00

0.00

18.00

18.00

70.00

70.00

0.00

287.00
0.00
30.00
3.00
205.00
19.00
400.00
2.00
10.00
10.00
18.00
18.00
70.00
0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N
1

DESCRIPCION

FIERRO CORRUGADO DE 3/4"

UND

SALDO

VLLS

760.00

FIERRO CORRUGADO DE 5/8"

VLLS

1100.00

FIERRO CORRUGADO DE 1/2"

VLLS

700.00

FIERRO CORRUGADO DE 3/8"

VLLS

2496.00

FIERRO CORRUGADO DE 1/4"

VLLS

570.00

E
S
E
S
E
S
E
S
E
S
E
S

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

368.00

0.00

392.00

TOTAL ACUMULADO

800.00

0.00

300.00

644.00

0.00

56.00

1418.00

0.00

1,078.00

570.00

0.00

0.00

760.00
392.00
1100.00
300.00
700.00
56.00
2496.00
1078.00
570.00
0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N
1

DESCRIPCION

PALAS TRAMONTINA

UND

SALDO

UND

10.00

GUANTES DE CUERO

PAR

79.00

GUANTES DE JEBE

PAR

99.00

CASCO DE COLOR BLANCO

UND

0.00

CASCO DE COLOR ROJO

UND

16.00

CASCO DE COLOR AZUL

UND

30.00

COMBOS DE 6 LBS

UND

0.00

HOJA DE SIERRA SANFLEX

UND

24.00

BOSTAS DE JEBE

PAR

0.00

ROLLO

0.00

10

ARPILLERA

11

CARRETILLAS ( BUGUI) TRUPER

UND

13.00

12

WINCHAS DE 5MTS

UND

15.00

13

WINCHA DE 50 MTS

UND

1.00

14

DISCOS DE MADERA DE 7 1/4"

UND

23.00

15

DISCOS DE FIERRO DE 7 1/4"

UND

49.00

16

CASCO DE COLOR NARANJA

UND

15.00

17

BARRETA DE 1"x1.5 M.

UND

6.00

18

PICOS

UND

0.00

19

ROPA DE AGUA CASACA Y PANTALON

UND

0.00

20

PILAS BARTA Y PANASONIC

PAR

0.00

21

CORDEL NAILON

UND

0.00

22

ARNES DE SEGURIDAD

UND

0.00

23

COMBO DE 20 LBS.

UND

0.00

24

DISCO DE MADERA DIAMANTADO 12"

UND

0.00

25

TIRALINEA METALICO

UND

0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

13.00

20.00

17.00

TOTAL ACUMULADO

65.00

0.00

14.00

97.00

0.00

2.00

0.00

0.00

0.00

13.00

0.00

3.00

30.00

0.00

0.00

0.00

0.00

0.00

71.00

50.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

11.00

11.00

0.00

4.00

1.00

0.00

0.00

18.00

0.00

5.00

34.00

0.00

15.00

2.00

0.00

13.00

6.00

0.00

0.00

20.00

40.00

20.00

0.00

26.00

26.00

9.00

12.00

3.00

0.00

5.00

5.00

10.00

10.00

0.00

0.00

5.00

5.00

7.00

7.00

0.00

7.00

7.00

0.00

40.00
17.00
100.00
31.00
100.00
2.00
5.00
4.00
20.00
6.00
30.00
0.00
6.00
6.00
80.00
8.00
20.00
5.00
2.00
2.00
20.00
18.00
20.00
9.00
2.00
1.00
25.00
7.00
50.00
16.00
30.00
28.00
10.00
4.00
40.00
20.00
26.00
26.00
12.00
3.00
5.00
5.00
10.00
0.00
5.00
5.00
7.00
0.00
7.00
0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N

DESCRIPCION

UND

SALDO

26

MANGUERA TRANSPARENTE 3/8"

MTS.

0.00

27

MANGUERA TRANSPARENTE 1/2"

MTS.

0.00

28

NIVEL DE MANO STANLEY

UND

0.00

29

PLOMADAS CILINDRICAS DE 500 GRS

UND

0.00

30

LENTES DE PROTECCION TRANSPARENTE

UND

0.00

31

MARTILLO TRAMONTINA

UND

0.00

32

RECOGEDOR DE BASURA

UND

0.00

33

REFLECTOR PHILIPIS 400W

UND

0.00

34

DISCO DE FIERRRO DE 9"

UND

0.00

35

SOGA COLOR ROJO

MTS.

0.00

36

PALAS RECTAS TRAMONTINAS

UND

0.00

37

MANGUERA DE 1" REFORZADA

ROLLO

0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

25.00

25.00

0.00

25.00

25.00

0.00

2.00

3.00

1.00

0.00

2.00

2.00

21.00

30.00

9.00

2.00

5.00

3.00

4.00

4.00

0.00

3.00

3.00

0.00

10.00

10.00

0.00

0.00

100.00

100.00

4.00

4.00

0.00

2.00

2.00

0.00

25.00
0.00
25.00
0.00
3.00
1.00
2.00
2.00
30.00
9.00
5.00
3.00
4.00
0.00
3.00
0.00
10.00
0.00
100.00
100.00
4.00
0.00
2.00
0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N

DESCRIPCION

UND

SALDO

TERMOMAGNETICOS DE 40 AMPERIOS

UND

0.00

FOCOS DE 100 WTS

UND

0.00

SOQUET DE LOZA

UND

0.00

CINTA AISLANTE DE 3 M

UND

0.00

TERMOMAGNETICO DE 30 AMPERIOS

UND

0.00

CABLE INDECO UNIPOLARES AMARILLO Y BLANCO

RLLO

0.00

CONDUCTOR ELECTRICO N 08 TWS

MTS

0.00

CONDUCTOR ELECTRICO NLT 1X2 N 12

MTS

0.00

TOMA CORRIENTE MULTIPLE SOBREPONER

UND

0.00

10

INTERRUPTOR 60A ATORNILLABLE

UND

0.00

11

INTERRUPTOR 40 A ATORNILLABLE

UND

0.00

12

CONDUCTOR ELECTRICO NLT 1X2 N 14

MTS

0.00

13

CABLE MILLIZO 2X12 INDECO

RLLS

0.00

14

CAJA DE PASO 6X6X2 METALICO GALV.

UND.

0.00

15

TOMACORRIENTE DOBLES

UND

0.00

16

INTERRUPTOR

UND

1.00

17

LAMPARAS FLUORECENTE DE 40W INCLUYE EQUIPO


RECTANGULAR

UND

2.00

18

CAJAS RECTANGULARESL PVC SEL

UND

200.00

19

CAJAS OCTAGONALES PVC SEL

UND

200.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

2.00

2.00

0.00

22.00

25.00

3.00

21.00

25.00

4.00

3.00

3.00

0.00

6.00

6.00

0.00

0.00

2.00

2.00

30.00

30.00

0.00

300.00

300.00

0.00

10.00

10.00

0.00

3.00

3.00

0.00

5.00

6.00

1.00

200.00

200.00

0.00

0.00

2.00

2.00

10.00

10.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

2.00

0.00

0.00

200.00

0.00

0.00

200.00

0.00

0.00

2.00
0.00
25.00
3.00
25.00
4.00
5.00
2.00
6.00
0.00
2.00
2.00
30.00
0.00
300.00
0.00
10.00
0.00
3.00
0.00
6.00
1.00
200.00
0.00
2.00
2.00
10.00
0.00
5.00
5.00
8.00
7.00
7.00
5.00
200.00
0.00
200.00
0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N

DESCRIPCION

UND

SALDO

EQ.

0.00

COMPUTADORA (CPU, TECLADO, MONITRO, MAUSE)

CARTUCHO TINTA NEGRA N 40 CANON

UND

3.00

CARTUCHO TINTA COLOR N 41 CANON

UND

1.00

PAPEL BOND A4 X 75 GS.

MILL.

3.00

ARCHIVADORES T/OFICIO

UND

0.00

ENGRAPADOR

UND

0.00

PERFORADOR

UND

0.00

RESALTADOR

UND

0.00

PEGAMENTO EN BARRA UHU

UND

2.00

10

CUADERNO # 200 HOJAS ANILLADO

UND

5.00

11

CINTA MASKING DE 2"

UND

4.00

12

CORRECTOR

UND

3.00

13

CUTER

UND

1.00

14

LAPICERO TINTA LIQUIDA

UND

3.00

15

PLUMON INDELEBLE

UND

0.00

16

POS IT

PAQ.

4.00

17

PORTA MINAS

UND

2.00

18

MINAS RECARGABLES 0.5 HB

UND

3.00

19

PIZARRA ACRILICA DE 2X1.2

UND

0.00

20

PLUMON DE PIZARRA ACRILICA

UND

5.00

21

MOTA PARA PIZARRA ACRILICA

UND

0.00

22

FRANELA

MTS

0.00

23

IMPRESORA HP DISKIET F 2480 MULTIFUNCIONAL

EQ.

0.00

24

CUADERNO DE OBRA

UND

0.00

25

TONER HP LASER 53 A

UND

0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

0.00

0.00

0.00

3.00

0.00

0.00

1.00

0.00

0.00

2.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

5.00

0.00

0.00

3.00

0.00

1.00

2.00

0.00

1.00

0.00

0.00

1.00

1.00

0.00

2.00

0.00

0.00

0.00

3.00

0.00

1.00

1.00

0.00

1.00

2.00

0.00

1.00

0.00

0.00

0.00

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

1.00

10.00

10.00

0.00

2.00

2.00

0.00

TOTAL ACUMULADO

2.00
2.00
3.00
0.00
1.00
0.00
4.00
2.00
8.00
8.00
1.00
1.00
1.00
1.00
4.00
4.00
2.00
0.00
10.00
5.00
5.00
2.00
4.00
2.00
2.00
2.00
6.00
5.00
4.00
4.00
5.00
2.00
3.00
2.00
5.00
3.00
1.00
1.00
7.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
10.00
0.00
2.00
0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N

UND

SALDO

PETROLEO

GLNS.

26.00

GASOLINA

GLNS.

5.00

DESCRIPCION

E
S
E
S
E
S

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

0.00

929.00

955.00

0.00

11.00

16.00

TOTAL ACUMULADO

3120.00
3120.00
26.00
26.00

FECHA: MARZO - 2010

ESP.

O/C. N

GASTOS

SALDO ANTERIOR
CANT.

P.UNITA.

745.00

INGRESO
TOTAL

CANT.

0.00

0.00

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

0.00

6.00

0.00

71

0.00

23.00

0.00

0.00

23.00

0.00

0.00

23.00

68

0.00

18.00

0.00

0.00

18.00

0.00

0.00

18.00

68

0.00

9.00

0.00

0.00

9.00

0.00

0.00

9.00

68

0.00

4.50

0.00

0.00

4.50

0.00

0.00

4.50

68

0.00

4.50

0.00

0.00

4.50

0.00

0.00

4.50

68

0.00

8.00

0.00

0.00

8.00

0.00

0.00

8.00

69

0.00

6.00

0.00

0.00

6.00

0.00

0.00

6.00

71

0.00

2.00

0.00

0.00

2.00

0.00

0.00

2.00

71

0.00

2.00

0.00

0.00

2.00

0.00

0.00

2.00

71

0.00

2.00

0.00

0.00

2.00

0.00

0.00

2.00

68

0.00

12.00

0.00

0.00

12.00

0.00

0.00

12.00

71

0.00

17.00

0.00

0.00

17.00

0.00

0.00

17.00

72

0.00

20.00

0.00

0.00

20.00

0.00

0.00

20.00

72

2.00

0.80

1.60

0.00

0.80

0.00

0.00

0.80

72

0.00

2.00

0.00

0.00

2.00

0.00

0.00

2.00

72

0.00

1.00

0.00

0.00

1.00

0.00

0.00

1.00

72

0.00

4.00

0.00

0.00

4.00

0.00

0.00

4.00

72

0.00

1.00

0.00

0.00

1.00

0.00

0.00

1.00

72

0.00

30.00

0.00

0.00

30.00

0.00

0.00

30.00

777.50

0.00

0.00

0.00

20.50

288.50

0.00

0.00

0.00

5.50

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

72

0.00

7.50

0.00

0.00

7.50

0.00

0.00

7.50

72

500.00

5.00

2,500.00

0.00

5.00

0.00

102.50

5.00

68

1.00

15.00

15.00

0.00

15.00

0.00

0.00

15.00

0.00
512.50
0.00

CANT.

TOTAL

OBSERVACIONES

739.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

1.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

757.00

0.00

NO TIENE O/C

283.00

0.00

NO TIENE O/C

0.00

0.00

397.50

1,987.50

1.00

15.00

NO TIENE O/C

2,516.60

0.00

512.50

2,002.50

ESP.

O/C. N

GASTOS

SALDO ANTERIOR
CANT.

69

1.00

70

0.00

69

0.00

P.UNITA.

2.00

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

2.00

0.00

2.00

0.00

0.00

2.00

0.00

7.00

19.50

136.50

6.00

19.50

0.00

0.00

6.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

648.00

0.00

0.00

0.00

0.00

50.00

0.00

0.00

0.00

0.00

800.00

0.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

0.00

1,486.00

0.00

0.00

0.00

15.00

60.00

0.00

0.00

0.00

0.00

10.00

0.00

0.00

0.00

0.00

59.50

0.00

0.00

0.00

2.50

0.00

0.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

0.75

6.00

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
117.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

146

0.00

550.00

0.00

0.00

550.00

0.00

0.00

550.00

146

0.00

600.00

0.00

0.00

600.00

0.00

0.00

600.00

146

0.00

650.00

0.00

0.00

650.00

0.00

0.00

650.00

0.00

0.00

0.00

0.00

0.00

300

0.00

0.00

25.00

8.80

220.00

0.00

8.80

300

0.00

0.00

100.00

2.00

200.00

0.00

2.00

0.00
0.00
0.00
0.00
0.00
0.00

CANT.

TOTAL

OBSERVACIONES

1.00

2.00

1.00

19.50

0.00

0.00

0.00

0.00

NO TIENE O/C.

648.00

0.00

NO TIENE O/C.

50.00

0.00

NO TIENE O/C.

800.00

0.00

NO TIENE O/C.

100.00

0.00

NO TIENE O/C.

1,471.00

0.00

NO TIENE O/C.

60.00

0.00

NO TIENE O/C.

10.00

0.00

NO TIENE O/C.

57.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

99.25

0.00

NO TIENE O/C.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.00

220.00

100.00

200.00

NO TIENE O/C.

FECHA: MARZO - 2010

ESP.

O/C. N

GASTOS

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

300

0.00

0.00

100.00

2.00

200.00

0.00

2.00

300

0.00

0.00

10.00

10.00

100.00

0.00

10.00

301

0.00

0.00

15.00

13.00

195.00

0.00

13.00

302

0.00

0.00

10.00

19.00

190.00

0.00

19.00

300

0.00

0.00

20.00

48.00

960.00

0.00

48.00

300

0.00

0.00

2.00

255.00

510.00

0.00

255.00

300

0.00

0.00

6.00

40.00

240.00

2.00

40.00

0.00

0.00

20.00

0.00

20.00

0.00

0.00

40.00

0.00

22.00

0.00

0.00

5.00

0.00

1.00

2.00

2,951.50

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
80.00
0.00
0.00
0.00
197.00

CANT.

TOTAL

OBSERVACIONES

100.00

200.00

10.00

100.00

15.00

195.00

10.00

190.00

20.00

960.00

2.00

510.00

4.00

160.00

0.00

0.00

NO TIENE O/C.

18.00

0.00

NO TIENE O/C.

4.00

0.00

NO TIENE O/C.

2,536.50

2.00

ESP.

O/C. N

GASTOS

300

SALDO ANTERIOR
CANT.

P.UNITA.

197.00

2,951.50

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

287.00

0.00

0.00

0.00

0.00

30.00

0.00

0.00

0.00

3.00

202.00

0.00

0.00

0.00

16.00

396.00

0.00

0.00

0.00

2.00

0.00

0.00

10.00

0.00

10.00

0.00

0.00

18.00

0.00

18.00

0.00

0.00

70.00

2,100.00

0.00

0.00

30.00

2,536.50

2,100.00

P.UNITA.

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
30.00

0.00
0.00

CANT.

TOTAL

OBSERVACIONES

287.00

0.00

NO TIENE O/C.

27.00

0.00

NO TIENE O/C.

186.00

0.00

NO TIENE O/C.

394.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

70.00

2,100.00
2,100.00

ESP.
GASTOS

O/C. N

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

760.00

0.00

0.00

0.00

392.00

1,100.00

0.00

0.00

0.00

300.00

700.00

0.00

0.00

0.00

56.00

2,496.00

0.00

0.00

0.00

1,078.00

570.00

0.00

0.00

0.00

0.00

0.00

0.00

P.UNITA.

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
0.00
0.00
0.00
0.00
0.00

CANT.

TOTAL

OBSERVACIONES

368.00

0.00

NO TIENE O/C.

800.00

0.00

NO TIENE O/C.

644.00

0.00

NO TIENE O/C.

1,418.00

0.00

NO TIENE O/C.

570.00

0.00

NO TIENE O/C.

0.00

ESP.

O/C. N

GASTOS

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

65

10.00

32.00

320.00

20.00

32.00

640.00

17.00

32.00

64

79.00

9.00

711.00

0.00

9.00

0.00

14.00

9.00

64

99.00

9.50

940.50

0.00

9.50

0.00

2.00

9.50

65

0.00

25.00

0.00

0.00

25.00

0.00

0.00

25.00

65

16.00

10.00

160.00

0.00

10.00

0.00

3.00

10.00

64

30.00

10.00

300.00

0.00

10.00

0.00

0.00

10.00

65

0.00

37.00

0.00

0.00

37.00

0.00

0.00

37.00

65

24.00

5.00

120.00

50.00

5.00

250.00

3.00

5.00

64

0.00

36.00

0.00

0.00

36.00

0.00

0.00

36.00

65

0.00

670.00

0.00

0.00

670.00

0.00

0.00

670.00

64

13.00

190.00

2,470.00

0.00

190.00

0.00

11.00

190.00

64

15.00

19.00

285.00

0.00

19.00

0.00

4.00

19.00

64

1.00

60.00

60.00

0.00

60.00

0.00

0.00

60.00

64

23.00

21.00

483.00

0.00

21.00

0.00

5.00

21.00

64

49.00

12.00

588.00

0.00

12.00

0.00

15.00

12.00

64

15.00

10.00

150.00

0.00

10.00

0.00

13.00

10.00

64

6.00

70.00

420.00

0.00

70.00

0.00

0.00

70.00

0.00

0.00

40.00

0.00

20.00

0.00

0.00

26.00

0.00

14.00

0.00

0.00

12.00

30.00

3.00

0.00

0.00

5.00

0.00

5.00

0.00

0.00

10.00

0.00

0.00

0.00

0.00

5.00

0.00

2.00

0.00

0.00

7.00

0.00

0.00

0.00

0.00

7.00

0.00

0.00

70

2.50

SALDO DE ALMACEN ACTUAL


TOTAL

544.00
126.00
19.00
0.00
30.00
0.00
0.00
15.00
0.00
0.00
2,090.00
76.00
0.00
105.00
180.00
130.00
0.00
0.00
0.00

2.50

7.50
0.00
0.00
0.00
0.00
0.00

CANT.

TOTAL

OBSERVACIONES

13.00

416.00

65.00

585.00

97.00

921.50

0.00

0.00

13.00

130.00

30.00

300.00

0.00

0.00

71.00

355.00

0.00

0.00

0.00

0.00

2.00

380.00

11.00

209.00

1.00

60.00

18.00

378.00

34.00

408.00

2.00

20.00

6.00

420.00

20.00

0.00

NO TIENE O/C.

12.00

0.00

NO TIENE O/C.

9.00

22.50

0.00

0.00

NO TIENE O/C.

10.00

0.00

NO TIENE O/C.

3.00

0.00

NO TIENE O/C.

7.00

0.00

NO TIENE O/C.

7.00

0.00

NO TIENE O/C.

FECHA: MARZO - 2010

ESP.

O/C. N

GASTOS

300

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

0.00

0.00

25.00

0.00

0.00

0.00

0.00

25.00

0.00

0.00

0.00

0.00

3.00

0.00

1.00

0.00

0.00

2.00

0.00

2.00

0.00

0.00

30.00

0.00

9.00

0.00

0.00

5.00

0.00

3.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

3.00

1,140.00

0.00

0.00

0.00

10.00

0.00

0.00

0.00

0.00

100.00

0.00

100.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

#REF!

380.00

#REF!

P.UNITA.

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
380.00

0.00
0.00
0.00
0.00
0.00
#REF!

CANT.

TOTAL

OBSERVACIONES

25.00

0.00

NO TIENE O/C.

25.00

0.00

NO TIENE O/C.

2.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

21.00

0.00

NO TIENE O/C.

2.00

0.00

NO TIENE O/C.

4.00

0.00

NO TIENE O/C.

3.00

1,140.00

10.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

4.00

0.00

NO TIENE O/C.

2.00

0.00

NO TIENE O/C.

#REF!

ESP.
GASTOS

O/C. N

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

0.00

0.00

2.00

0.00

0.00

0.00

0.00

25.00

0.00

3.00

0.00

0.00

25.00

0.00

4.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

2.00

0.00

2.00

0.00

0.00

30.00

0.00

0.00

0.00

0.00

300.00

0.00

0.00

0.00

0.00

10.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

6.00

0.00

1.00

0.00

0.00

200.00

0.00

0.00

0.00

0.00

2.00

0.00

2.00

300

0.00

0.00

10.00

15.00

150.00

0.00

15.00

69

0.00

4.50

0.00

0.00

4.50

0.00

0.00

4.50

69

1.00

3.50

3.50

0.00

3.50

0.00

0.00

3.50

69

2.00

23.00

46.00

0.00

23.00

0.00

0.00

23.00

200.00

0.00

0.00

0.00

0.00

200.00

0.00

0.00

0.00

0.00

#REF!

#REF!

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF!

CANT.

TOTAL

OBSERVACIONES

2.00

0.00

NO TIENE O/C.

22.00

0.00

NO TIENE O/C.

21.00

0.00

NO TIENE O/C.

3.00

0.00

NO TIENE O/C.

6.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

30.00

0.00

NO TIENE O/C.

300.00

0.00

NO TIENE O/C.

10.00

0.00

NO TIENE O/C.

3.00

0.00

NO TIENE O/C.

5.00

0.00

NO TIENE O/C.

200.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

10.00

150.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

1.00

3.50

NO TIENE O/C.

2.00

46.00

NO TIENE O/C.

200.00

0.00

NO TIENE O/C.

200.00

0.00

NO TIENE O/C.

#REF!

ESP.

O/C. N

GASTOS

SALDO ANTERIOR
CANT.

P.UNITA.

0.00

INGRESO
TOTAL

CANT.

0.00

0.00

P.UNITA.

EGRESO
TOTAL

CANT.

0.00

0.00

P.UNITA.

SALDO DE ALMACEN ACTUAL


TOTAL

0.00

73

3.00

78.00

234.00

0.00

78.00

0.00

0.00

78.00

73

1.00

80.00

80.00

0.00

80.00

0.00

0.00

80.00

73

3.00

28.00

84.00

0.00

28.00

0.00

1.00

28.00

73

0.00

6.00

0.00

0.00

6.00

0.00

0.00

6.00

73

0.00

15.00

0.00

0.00

15.00

0.00

0.00

15.00

73

0.00

15.00

0.00

0.00

15.00

0.00

0.00

15.00

73

0.00

3.00

0.00

0.00

3.00

0.00

0.00

3.00

73

2.00

9.00

18.00

0.00

9.00

0.00

0.00

9.00

73

5.00

11.00

55.00

0.00

11.00

0.00

0.00

11.00

73

4.00

8.00

32.00

0.00

8.00

0.00

1.00

8.00

74

3.00

4.00

12.00

0.00

4.00

0.00

1.00

4.00

74

1.00

2.00

2.00

0.00

2.00

0.00

1.00

2.00

74

3.00

4.00

12.00

0.00

4.00

0.00

2.00

4.00

74

0.00

2.00

0.00

0.00

2.00

0.00

0.00

2.00

74

4.00

19.50

78.00

0.00

19.50

0.00

1.00

19.50

74

2.00

4.00

8.00

0.00

4.00

0.00

1.00

4.00

74

3.00

1.50

4.50

0.00

1.50

0.00

1.00

1.50

74

0.00

170.00

0.00

0.00

170.00

0.00

0.00

170.00

74

5.00

3.00

15.00

0.00

3.00

0.00

0.00

3.00

74

0.00

3.00

0.00

0.00

3.00

0.00

0.00

3.00

74

0.00

5.00

0.00

0.00

5.00

0.00

0.00

5.00

157

0.00

280.00

0.00

1.00

280.00

280.00

1.00

280.00

73

0.00

28.50

0.00

10.00

28.50

285.00

0.00

28.50

73

0.00

335.00

0.00

2.00

335.00

670.00

0.00

335.00

0.00
0.00
28.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
4.00
2.00
8.00
0.00
19.50
4.00
1.50
0.00
0.00
0.00
0.00
280.00
0.00
0.00

CANT.

TOTAL

0.00

0.00

3.00

234.00

1.00

80.00

2.00

56.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

18.00

5.00

55.00

3.00

24.00

2.00

8.00

0.00

0.00

1.00

4.00

0.00

0.00

3.00

58.50

1.00

4.00

2.00

3.00

0.00

0.00

5.00

15.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

285.00

2.00

670.00

OBSERVACIONES

NO TIENE O/C.

634.50

1,235.00

355.00

1,514.50

634.50

ESP.

O/C. N

GASTOS

SALDO ANTERIOR
CANT.

P.UNITA.

355.00

1,235.00

INGRESO
TOTAL

CANT.

P.UNITA.

1,514.50

EGRESO
TOTAL

CANT.

P.UNITA.

SALDO DE ALMACEN ACTUAL


TOTAL

CANT.

TOTAL

OBSERVACIONES

56

26.00

12.00

312.00

929.00

12.00

11,148.00

955.00

12.00

11,460.00

0.00

0.00

56

5.00

12.00

60.00

11.00

12.00

132.00

16.00

12.00

192.00

0.00

0.00

372.00

11,280.00

11,652.00

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N
1

DESCRIPCION

CEMENTO PORTLAND TIPO IP x 42.5 KG

UND
BLS

SALDO

739.00

BAO TURCO DE GRANITO

UND

0.00

TUBERIA PVC SAL DE 4"

UND

0.00

4
5
6
7
8
9

TUBERIA PVC SAL DE 2"

CODO PVC SAL DE 4" DE 90

CODO PVC SAL DE 4" DE 45

YEE PVC SAL DE 4"

YEE PVC SAL DE 4"x2"x4"

CODO PVC SAL DE 2" DE 45

UND
UND
UND
UND
UND
UND

0.00
0.00
0.00
0.00
0.00
0.00

10

CODO PVC SAL DE 2" DE 90

UND

0.00

11

YEE PVC SAL DE 2"

UND

0.00

12
13
14
15
16
17

TUBERIA PVC SAP DE 1/2" C/R C-10

LLAVE PVC DE PASO DE 1/2" C/R

LLAVE DE BRONCE DE 1/2" TIPO JARDINERO.

CODO PVC SAP DE 1/2" C/R.

CODO FG DE 1/2"

TEE PVC SAP DE 1/2" C/R.

UND
UND
UND
UND
UND
UND

0.00
0.00
0.00
2.00
0.00
0.00

18

SUMIDERO DE BRONCE DE 2"

UND

0.00

19

CINTA TEFLON

UND

0.00

20

PEGAMENTO OATEY PARA TUBERIA PVC

GLN

0.00

21

CLAVO DE MADERA DE 4"

KLS

757.00

22

CLAVO DE MADERA DE 3"

KLS

283.00

23
24
25

CLAVO DE CALAMINA

ALAMBRE NEGRO N 16

ABRASADERA DE 2" PARA RED DE AGUA

KLS
KLS
UND

0.00
397.50
1.00

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E

30

SALDO ACT.

703.00

1,786.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
2.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.5

1750.00

0.00

0.00

716.00

0.00

41.00

251.00

0.00

32.00

0.00
0.50
1.00

0.00

0.00

0.00

TOTAL ACUMULADO

ESP.

TOTAL ACUMULADO

GASTOS

TOTAL SALIDA

0.00

0.00

TOTAL ENTRADA

0.00

397.00

0.00

2505.00
1796.00
4.00
4.00
6.00
6.00
8.00
8.00
6.00
6.00
8.00
8.00
4.00
4.00
5.00
5.00
7.00
7.00
21.00
21.00
2.00
2.00
7.00
7.00
2.00
2.00
6.00
6.00
11.00
9.00
10.00
10.00
6.00
6.00
6.00
6.00
9.00
9.00
0.25
0.25

O/C. N

2.00

P.UNITA.

TOTAL

17,957.70

1,750.00

24.50

42,875.00

71

0.00

23.00

0.00

0.00

23.00

0.00

68

0.00

18.00

0.00

0.00

18.00

0.00

68

0.00

9.00

0.00

0.00

9.00

0.00

68

0.00

4.50

0.00

0.00

4.50

0.00

68

0.00

4.50

0.00

0.00

4.50

0.00

68

0.00

8.00

0.00

0.00

8.00

0.00

69

0.00

6.00

0.00

0.00

6.00

0.00

71

0.00

2.00

0.00

0.00

2.00

0.00

71

0.00

2.00

0.00

0.00

2.00

0.00

71

0.00

2.00

0.00

0.00

2.00

0.00

68

0.00

12.00

0.00

0.00

12.00

0.00

71

0.00

17.00

0.00

0.00

17.00

0.00

72

0.00

20.00

0.00

0.00

20.00

0.00

72

2.00

0.80

1.60

0.00

0.80

0.00

72

0.00

2.00

0.00

0.00

2.00

0.00

72

0.00

1.00

0.00

0.00

1.00

0.00

72

0.00

4.00

0.00

0.00

4.00

0.00

72

0.00

1.00

0.00

0.00

1.00

0.00

72

0.00

30.00

0.00

0.00

30.00

0.00

757.00

0.00

0.00

0.00

0.00

0.00

283.00

0.00

0.00

0.00

0.00

0.00

72

0.00

7.50

0.00

0.00

7.50

0.00

72

397.50

5.00

1,987.50

0.00

5.00

0.00

68

1.00

15.00

15.00

0.00

15.00

0.00

58.00

417.00

CANT.

24.30

314.50

10.00

INGRESO
TOTAL

739.00

88.50

520.00

P.UNITA.

383

825.00

10.00

SALDO ANTERIOR
CANT.

25

ABRASADERA DE 2" PARA RED DE AGUA

UND

1.00

1.00

0.00

0.00

1.00

68

1.00

15.00

15.00
19,961.80

0.00

15.00

0.00
42,875.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N
26
27
28
29
36
37

DESCRIPCION

REDUCCION PVC SAP 3/4" - 1/2

CANDADO

TEE PVC SAL DE 4"x2"x4" .

TEE PVC DE SAL DE 2".

CODO PVC SEL DE 3/4"

CODO PVC SEL DE 1"

UND
UND
UND
UND
UND
UND
UND

SALDO

1.00
1.00
0.00
0.00
648.00
50.00

38

TUBERIA PVC SEL DE 3/4"

UND

800.00

39

TUBERIA PVC SEL DE 1"

UND

100.00

40

ALAMBRE NEGRO N 8

KLS

1471.00

41

ALAMBRE GALVANIZADO N 18.

KLS

60.00

42

CLAVO DE MADERA 1"

KLS

10.00

43
44
45

CLAVO DE MADERA DE 2"

CLAVO DE 2 1/2

CLAVO DE MADERA DE 5"

KLS
KLS
KLS

57.00
0.00
99.25

47

PLASTICO GRUESO DE DOBLE ANCHO 1.50 M

ROLL

0.00

46

PLASTICO GRUESO DE DOBLE ANCHO 2.00M

ROLL

0.00

47

PLASTICO GRUESO DE DOBLE ANCHO 5.00 M

ROLL

0.00

48

BALDE DE 5 GLNS. TRANSPARENTE

UND

0.00

56

MASILLA PLASTICA 0.470 LTS.

KLS.

25.00

57
58
59

LIJAR DE FIERRO N 80 ABRALIP

LIJAR DE FIERRO N 100 ABRALIP

CLAVO DE JUNQUILLO 1"

60

CLAVO DE 3/4" TRIPLEY

61

THIER ACRILICO

UND.
UND.
KLS.

100.00
100.00
10.00

KLS.

15.00

GLNS

10.00

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

30

SALDO ACT.

1.00
1.00
0.00
0.00
648.00
50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

55.50

60.00

0.00

0.00

10.00

0.00

0.00

56.50
0.00
99.25

0.00

0.00

0.00

0.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.00

0.00

0.00

98.00
99.00
9.50

0.00

0.00

0.00

TOTAL ACUMULADO

ESP.

TOTAL ACUMULADO

GASTOS

TOTAL SALIDA

800.00

1415.50

TOTAL ENTRADA

2.00

1.00

0.50

15.00

0.00

0.00

10.00

0.00

0.00

1.00
0.00
1.00
1.00
2.00
2.00

O/C. N

2.00

0.00

70

1.00

0.00

0.00

0.00

19.50

0.00

69

0.00

6.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

648.00

0.00

0.00

0.00

0.00

0.00

50.00

0.00

0.00

0.00

0.00

0.00

800.00

0.00

0.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

0.00

0.00

1,471.00

0.00

0.00

0.00

0.00

0.00

60.00

0.00

0.00

0.00

0.00

0.00

10.00

0.00

0.00

0.00

0.00

0.00

57.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

99.25

0.00

0.00

0.00

0.00

0.00

146

0.00

550.00

0.00

0.00

550.00

0.00

146

0.00

600.00

0.00

0.00

600.00

0.00

146

0.00

650.00

0.00

0.00

650.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

300

25.00

8.80

220.00

0.00

0.00

0.00

300

100.00

2.00

200.00

0.00

0.00

0.00

300

100.00

2.00

200.00

0.00

0.00

0.00

300

10.00

10.00

100.00

0.00

0.00

0.00

300

15.00

13.00

195.00

0.00

0.00

0.00

300

10.00

19.00

190.00

0.00

19.00

0.00

0.00
800.00
0.00
100.00
0.00
1500.00
63.50
60.00
0.00
10.00
0.00
60.50
1.50
2.00
2.00
100.00
0.00

1.00
1.00
1.00
25.00
0.00
100.00
2.00
100.00
1.00
10.00
0.50
15.00
0.00
10.00
0.00

TOTAL

0.00

0.00

1.00

P.UNITA.

2.00

50.00

1.00

CANT.

2.00

2.00

1.00

INGRESO
TOTAL

1.00

648.00

2.00

P.UNITA.

69

2.00

2.00

SALDO ANTERIOR
CANT.

62

LACA PIROXILINA CPP

GLNS

20.00

E
S

20.00

0.00

0.00

20.00
0.00

300

20.00

48.00

960.00

0.00

48.00

0.00

63
64
65
66
66
66
66
66

AMOLADORA CROW DE 9"

DISCO DE CONCRETO DE 9" CRUPS


SELLOCORT 325X350 MM
SUPERCITO 325 X 350
COLA TEKNO PAR MADERA
PERNO 1/2" X 2" CON SU TUERCA
TEKNOPOR 2.4X1.20X2"
PLATINA DE 1/2" X 2" e=1/8

GLNS
UND
KLS.
KLS.
GLNS
UND.
PLCH.

0.00
4.00
0.00
18.00
0.00
0.00
0.00
0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

0.00
1

3.00
0.00
0.00
4.00
650.00

27.00
3.00

0.00

0.00
0.00
0.00
4.00
650.00
42.00
3.00

0.00

1.00
0.00
18.00
0.00
0.00
15.00
0.00

2.00
2.00
6.00
3.00
20.00
20.00
40.00
40.00
4.00
0.00
650.00
0.00
42.00
15.00
3.00
0.00

300

0.00

255.00

0.00

0.00

255.00

0.00

300

4.00

40.00

160.00

0.00

40.00

0.00

278

0.00

15.00

0.00

0.00

15.00

0.00

278

18.00

15.00

270.00

0.00

15.00

0.00

0.00

0.00

0.00

4.00

0.00

0.00

650.00

0.00

0.00

5.00

0.00

0.00

0.00

0.00

0.00

42.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

2,307.00

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N
1

DESCRIPCION

ROLLISO DE EUCALIPTO DE 4"X4mts.

UND
UND

SALDO

287.00

ROLLISO DE EUCALIPTO DE 4"X6mts.

UND

27.00

LISTONES DE MADERA CORRIENTE 2"x3"x10.

UND

186.00

4
5
6
7
7

TABLAS DE MADERA CORRIENTE DE 1 1/2" x 8" x 10.


ROLLIZO DE EUCALIPTO 3X4
ROLLIZO DE EUCALIPTO 4X3

TRIPLEY

TRIPLEY DE 18 MM

UND
UND
UND.
PLCH
PLCH

394.00
0.00
0.00
70.00
0.00

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

30

SALDO ACT.

287.00

0.00

0.00

0.00

0.00

0.00

0.00

186.00

0.00
0.00
62.00
2.00

0.00
0.00
2.00

0.00

2.00

TOTAL ACUMULADO

ESP.

TOTAL ACUMULADO

GASTOS

TOTAL SALIDA

27.00

67.00

TOTAL ENTRADA

327.00
0.00
2.00

8.00

0.00

O/C. N

287.00

P.UNITA.

TOTAL

0.00

0.00

0.00

27.00

0.00

0.00

0.00

0.00

0.00

186.00

0.00

0.00

0.00

0.00

0.00

394.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

300

62.00

30.00

1,860.00

0.00

30.00

0.00

300

0.00

0.00

0.00

2.00

0.00

0.00

189.00
400.00
327.00
0.00
0.00
2.00
2.00

0.00

CANT.

0.00

205.00

2.00

INGRESO
TOTAL

0.00

0.00

8.00

P.UNITA.

287.00

0.00
30.00

70.00

SALDO ANTERIOR
CANT.

1,860.00

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N
1

DESCRIPCION

FIERRO CORRUGADO DE 3/4"

UND
VLLS

SALDO

368.00

FIERRO CORRUGADO DE 5/8"

VLLS

800.00

FIERRO CORRUGADO DE 1/2"

VLLS

644.00

4
5

FIERRO CORRUGADO DE 3/8"

FIERRO CORRUGADO DE 1/4"

VLLS
VLLS

1418.00
570.00

S
E
S
E
S
E
S
E
S
E
S

30

SALDO ACT.

0.00

30
10

TOTAL ENTRADA

0.00

368.00

670.00

0.00

130.00

644.00

0.00

0.00

352.00
548.00

0.00

0.00

TOTAL ACUMULADO

ESP.

TOTAL ACUMULADO

GASTOS

TOTAL SALIDA

1,066.00

22.00

760.00
368.00
1100.00
130.00
700.00
0.00
2496.00
1066.00
570.00
22.00

O/C. N

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

TOTAL

368.00

0.00

0.00

0.00

0.00

0.00

800.00

0.00

0.00

0.00

0.00

0.00

644.00

0.00

0.00

0.00

0.00

0.00

1,418.00

0.00

0.00

0.00

0.00

0.00

570.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N
1
2
3

DESCRIPCION

PALAS TRAMONTINA

GUANTES DE CUERO

GUANTES DE JEBE

UND
UND
PAR
PAR

SALDO

16.00
65.00
97.00

CASCO DE COLOR BLANCO

UND

0.00

CASCO DE COLOR ROJO

UND

13.00

CASCO DE COLOR AZUL

UND

30.00

COMBOS DE 6 LBS

UND

0.00

HOJA DE SIERRA SANFLEX

UND

71.00

9
10
11
12
13
14

BOSTAS DE JEBE

ARPILLERA

CARRETILLAS ( BUGUI) TRUPER

WINCHAS DE 5MTS

WINCHA DE 50 MTS

DISCOS DE MADERA DE 7 1/4"

PAR
ROLLO
UND
UND
UND
UND

0.00
0.00
2.00
11.00
1.00
18.00

15

DISCOS DE FIERRO DE 7 1/4"

UND

34.00

16

CASCO DE COLOR NARANJA

UND

2.00

17
18
19
20
21
22
23

BARRETA DE 1"x1.5 M.

PICOS

ROPA DE AGUA CASACA Y PANTALON

PILAS BARTA Y PANASONIC

CORDEL NAILON

ARNES DE SEGURIDAD

COMBO DE 20 LBS.

UND
UND
UND
PAR
UND
UND
UND

6.00
20.00
0.00
9.00
0.00
10.00
0.00

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

30

SALDO ACT.

2.00
1

7.00
86.00

TOTAL ENTRADA

0.00

0.00

0.00

14.00

58.00

11.00

0.00

0.00

0.00

8.00

0.00

5.00

9.00

0.00

21.00

0.00

0.00

0.00

70.00

0.00

1.00

0.00
0.00
0.00
8.00
0.00
15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

3.00

1.00

3.00

27.00

0.00

7.00

0.00

0.00

2.00

4.00
0.00
0.00
7.00
4.00
9.00
0.00

0.00

0.00

0.00

0.00

10.00

0.00

0.00

TOTAL ACUMULADO

ESP.

TOTAL ACUMULADO

GASTOS

TOTAL SALIDA

2.00

20.00

0.00

2.00

6.00

1.00

0.00

40.00
14.00
100.00
89.00
100.00
11.00
5.00
4.00
20.00
8.00
30.00
21.00
6.00
6.00
80.00
9.00
20.00
5.00
2.00
2.00
20.00
20.00
20.00
8.00
2.00
2.00
25.00
5.00
50.00
8.00
30.00
17.00
10.00
6.00
40.00
40.00

O/C. N

2.00

6.00
10.00
1.00
5.00
5.00

INGRESO
TOTAL

CANT.

P.UNITA.

TOTAL

16.00

30.00

480.00

0.00

30.00

0.00

64

65.00

9.00

585.00

0.00

9.00

0.00

64

97.00

9.50

921.50

0.00

9.50

0.00

65

0.00

25.00

0.00

0.00

25.00

0.00

65

13.00

10.00

130.00

0.00

10.00

0.00

64

30.00

10.00

300.00

0.00

10.00

0.00

65

0.00

37.00

0.00

0.00

37.00

0.00

289

71.00

4.50

319.50

0.00

4.50

0.00

64

0.00

36.00

0.00

0.00

36.00

0.00

65

0.00

670.00

0.00

0.00

670.00

0.00

64

2.00

190.00

380.00

0.00

190.00

0.00

64

11.00

19.00

209.00

0.00

19.00

0.00

64

1.00

60.00

60.00

0.00

60.00

0.00

64

18.00

21.00

378.00

0.00

21.00

0.00

64

34.00

12.00

408.00

0.00

12.00

0.00

64

2.00

10.00

20.00

0.00

10.00

0.00

64

6.00

70.00

420.00

0.00

70.00

0.00

301

20.00

30.00

600.00

0.00

30.00

0.00

0.00

0.00

0.00

26.00

0.00

0.00

70

9.00

0.00

0.00

12.00

2.50

30.00

289

0.00

15.00

0.00

10.00

15.00

150.00

289

10.00

98.00

980.00

0.00

98.00

0.00

289

0.00

90.00

0.00

0.00

0.00

0.00

26.00

10.00

P.UNITA.

65

26.00

9.00

SALDO ANTERIOR
CANT.

24

DISCO DE MADERA DIAMANTADO 12"

UND

7.00

E
S

6.00

0.00

1.00

7.00
1.00

289

7.00

45.00

315.00

0.00

45.00

0.00

25
26
27
28
30
31
32

TIRALINEA PLASTIFICADO

MANGUERA TRANSPARENTE 3/8"

MANGUERA TRANSPARENTE 1/2"

NIVEL DE MANO STANLEY

PLOMADAS CILINDRICAS DE 500 GRS

LENTES DE PROTECCION TRANSPARENTE

MARTILLO TRAMONTINA

UND
MTS.
MTS.
UND
UND
UND
UND

7.00
25.00
25.00
2.00
0.00
21.00
2.00

33

RECOGEDOR DE BASURA

UND

4.00

35

DISCO DE FIERRO DE 9"

UND

10.00

36
37
38
39
40
41

SOGA COLOR ROJO

PALAS RECTAS TRAMONTINAS

MANGUERA DE 1" REFORZADA

CORREA PARA MESCLADORA TOYOPOWER A73

WINCHA STANLEY X 30MTS

ESCUADRA METALICA DE 0.60CM STANLEY

MTS.
UND
ROLLO
UND
UND
UND

0.00
4.00
2.00
0.00
0.00
0.00

41

PLOMADA DE I KILO CILINDRICA

UND

0.00

66

REGLA DE ALUMINIO X 6 MTS.

UND

4.00

66
66
66
66

ESCOBILLONES DE ACERO
PLOMADA DE I KILO CONICA
DADOS MILIMETRADOS
ESCOBA HUDE

UND
UND
JGO.
UND

0.00
0.00
0.00
0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

5.00
25.00
0.00
0.00
0.00
9.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.00

2.00

0.00

12.00

2.00

0.00

0.00

10.00

0.00

0.00

1.00
0.00
0.00
0.00
2.00

0.00

0.00

0.00

2.00

1.00

4.00

0.00

3.00

2.00

2.00

1.00

2.00

0.00

2.00

2.00

2.00

0.00

2.00

42.00
1.00
1.00

0.00

2.00

4.00

0.00

0.00

11.00

50.00
2.00
1.00
15.00

8.00
1.00
0.00
4.00

7.00
2.00
25.00
0.00
25.00
25.00
3.00
3.00
2.00
2.00
30.00
21.00
5.00
5.00
4.00
0.00

289

7.00

12.00

84.00

0.00

12.00

0.00

289

25.00

1.20

30.00

0.00

1.20

0.00

289

25.00

1.80

45.00

0.00

1.80

0.00

289

2.00

50.00

100.00

0.00

50.00

0.00

289

0.00

20.00

0.00

0.00

20.00

0.00

289

21.00

8.00

168.00

0.00

8.00

0.00

289

2.00

25.00

50.00

0.00

25.00

0.00

289

4.00

10.00

40.00

0.00

10.00

0.00

10.00

0.00

0.00

10.00

0.00

0.00

301

100.00

2.50

250.00

0.00

0.00

0.00

301

4.00

30.00

120.00

0.00

30.00

0.00

289

2.00

320.00

640.00

0.00

320.00

0.00

351

2.00

33.00

66.00

0.00

33.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

3.00

98.00

294.00

0.00

98.00

0.00

0.00

0.00

0.00

50.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

10.00
0.00
100.00
100.00
4.00
3.00
2.00
2.00
2.00
2.00
1.00
1.00
4.00
2.00
2.00
2.00
5.00
3.00
50.00
8.00
2.00
1.00
1.00
0.00
15.00
4.00

289

8,099.00

180.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N
1
2
3
4
5

DESCRIPCION

TERMOMAGNETICOS DE 40 AMPERIOS

FOCOS DE 100 WTS

SOQUET DE LOZA

CINTA AISLANTE DE 3 M

TERMOMAGNETICO DE 30 AMPERIOS

UND
UND
UND
UND
UND
UND

SALDO

2.00
22.00
21.00
3.00
6.00

CABLE INDECO UNIPOLARES AMARILLO Y BLANCO

RLLO

0.00

CONDUCTOR ELECTRICO N 08 TWS

MTS

30.00

8
9
10
11
12
13

CONDUCTOR ELECTRICO NLT 1X2 N 12

TOMA CORRIENTE MULTIPLE SOBREPONER

INTERRUPTOR 60A ATORNILLABLE

INTERRUPTOR 40 A ATORNILLABLE

CONDUCTOR ELECTRICO NLT 1X2 N 14

CABLE MILLIZO 2X12 INDECO

MTS
UND
UND
UND
MTS
RLLS

300.00
10.00
3.00
5.00
200.00
0.00

14

CAJA DE PASO 6X6X2 METALICO GALV.

UND.

10.00

16

TOMACORRIENTE DOBLES

UND

0.00

17
18
19

INTERRUPTOR
LAMPARAS FLUORECENTE DE 40W INCLUYE EQUIPO
RECTANGULAR
CAJAS RECTANGULARESL PVC SEL

UND
UND
UND

1.00
2.00
200.00

20

CAJAS OCTAGONALES PVC SEL

UND

200.00

21

REFLECTOR PHILIPIS 400W

UND

3.00

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E

30

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

SALDO ACT.

2.00
22.00
3

18.00
0.00
3.00

3
5

0.00

0.00

0.00

0.00

0.00

0.00

3.00

3.00

3.00

0.00

0.00

0.00

0.00

30.00

4.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100.00

6.00

3.00

5.00

200.00

0.00

10.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
200.00

0.00

0.00

0.00

TOTAL ACUMULADO

ESP.

TOTAL ACUMULADO

GASTOS

TOTAL SALIDA

0.00

200.00
2

TOTAL ENTRADA

1.00

2.00

0.00

200.00

0.00

0.00

0.00

0.00

3.00

O/C. N

2.00

0.00
21.00
3.00
5.00
5.00
6.00
3.00

0.00

301

22.00

2.00

44.00

0.00

2.00

0.00

301

21.00

2.50

52.50

0.00

0.00

2.50

301

3.00

3.00

9.00

0.00

3.00

0.00

301

6.00

40.00

240.00

0.00

40.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

30.00

0.00

0.00

0.00

0.00

0.00

300.00

0.00

0.00

0.00

0.00

0.00

10.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

3.00

0.00

0.00

5.00

0.00

0.00

0.00

0.00

0.00

200.00

0.00

0.00

0.00

0.00

0.00

301

0.00

160.00

0.00

0.00

160.00

0.00

300

10.00

15.00

150.00

0.00

15.00

0.00

69

0.00

4.50

0.00

0.00

4.50

0.00

69

1.00

3.50

3.50

0.00

3.50

0.00

69

2.00

23.00

46.00

0.00

23.00

0.00

200.00

0.00

0.00

0.00

0.00

0.00

200.00

0.00

0.00

0.00

0.00

0.00

3.00

380.00

1,140.00

0.00

0.00

0.00

30.00

100.00
10.00
6.00
3.00
3.00
5.00
5.00
200.00
200.00

5.00
5.00
8.00
7.00
7.00
5.00
200.00
0.00
200.00
0.00
3.00
3.00

TOTAL

0.00

300.00

0.00

P.UNITA.

0.00

30.00

0.00

CANT.

0.00

0.00

10.00

INGRESO
TOTAL

0.00

0.00

0.00

P.UNITA.

2.00

0.00
22.00

SALDO ANTERIOR
CANT.

300

1,685.00

2.50

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N
1
2
3

DESCRIPCION

COMPUTADORA (CPU, TECLADO, MONITRO, MAUSE)

CARTUCHO TINTA NEGRA N 40 CANON

CARTUCHO TINTA COLOR N 41 CANON

UND
EQ.
UND
UND

SALDO

0.00
3.00
1.00

PAPEL BOND A4 X 75 GS.

MILL.

2.00

ARCHIVADORES T/OFICIO

UND

0.00

ENGRAPADOR

UND

0.00

PERFORADOR

UND

0.00

RESALTADOR

UND

0.00

9
10
11

PEGAMENTO EN BARRA UHU

CUADERNO # 200 HOJAS ANILLADO

CINTA MASKING DE 2"

UND
UND
UND

2.00
5.00
3.00

12

CORRECTOR

UND

2.00

13

CUTER

UND

0.00

14

LAPICERO TINTA LIQUIDA

UND

1.00

15

PLUMON INDELEBLE

UND

0.00

16

POS IT

PAQ.

3.00

17
18
19
20
21
22

PORTA MINAS

MINAS RECARGABLES 0.5 HB

PIZARRA ACRILICA DE 2X1.2

PLUMON DE PIZARRA ACRILICA

MOTA PARA PIZARRA ACRILICA

FRANELA

UND
UND
UND
UND
UND
MTS

1.00
2.00
0.00
5.00
0.00
0.00

22

IMPRESORA HP DISKIET F 2480 MULTIFUNCIONAL

EQ.

0.00

23

CUADERNO DE OBRA

UND

10.00

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E

30

SALDO ACT.

0.00
0.00
1
1

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

3.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

3.00

0.00

0.00

1.00
0.00

1.00

0.00

1.00
1

0.00

3.00

2.00

3.00

0.00

0.00

0.00

2.00

0.00

3.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

TOTAL ACUMULADO

ESP.

TOTAL ACUMULADO

GASTOS

TOTAL SALIDA

0.00

0.00

TOTAL ENTRADA

0.00

1.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

8.00

0.00

2.00

O/C. N

2.00

3.00
1.00
1.00
4.00
3.00
8.00
8.00
1.00
1.00
1.00
1.00
4.00
4.00
2.00
2.00
10.00
8.00
5.00
1.00
4.00
3.00
2.00
2.00
6.00
4.00
4.00
4.00
5.00
1.00
3.00
1.00
5.00
3.00
1.00
1.00
7.00
4.00
1.00
1.00
1.00
1.00
0.00
0.00
10.00

P.UNITA.

0.00

2.00
3.00

SALDO ANTERIOR
CANT.

INGRESO
TOTAL

CANT.

0.00

0.00

P.UNITA.

TOTAL

0.00

73

3.00

78.00

234.00

0.00

78.00

0.00

73

1.00

80.00

80.00

0.00

80.00

0.00

73

2.00

28.00

56.00

0.00

28.00

0.00

73

0.00

6.00

0.00

0.00

6.00

0.00

73

0.00

15.00

0.00

0.00

15.00

0.00

73

0.00

15.00

0.00

0.00

15.00

0.00

73

0.00

3.00

0.00

0.00

3.00

0.00

73

2.00

9.00

18.00

0.00

9.00

0.00

73

5.00

11.00

55.00

0.00

11.00

0.00

73

3.00

8.00

24.00

0.00

8.00

0.00

74

2.00

4.00

8.00

0.00

4.00

0.00

74

0.00

2.00

0.00

0.00

2.00

0.00

74

1.00

4.00

4.00

0.00

4.00

0.00

74

0.00

2.00

0.00

0.00

2.00

0.00

74

3.00

19.50

58.50

0.00

19.50

0.00

74

1.00

4.00

4.00

0.00

4.00

0.00

74

2.00

1.50

3.00

0.00

1.50

0.00

74

0.00

170.00

0.00

0.00

170.00

0.00

74

5.00

3.00

15.00

0.00

3.00

0.00

74

0.00

3.00

0.00

0.00

3.00

0.00

74

0.00

5.00

0.00

0.00

5.00

0.00

157

0.00

280.00

0.00

0.00

280.00

0.00

73

10.00

28.50

285.00

0.00

28.50

0.00

23

CUADERNO DE OBRA

UND

10.00

8.00

0.00

2.00

2.00

73

10.00

28.50

285.00

0.00

28.50

0.00

24

TONER HP LASER 53 A

25

TALONARIO DE PARTE DIARIO MOVIMIENTO DE


MATERIAL

26
27
27
27

TALONARIO BINCARD DE ALMACEN

BINCAR

NOTA ENTRADA DE ALMACEN

NOTA DE SALIDA DE ALMACEN

UND
UND
UND
%
%
%

2.00
8.00
8.00
2.00
2.00
2.00

E
S
E
S
E
S
E
S
E
S
E
S

0.00
8.00
8.00
0.00
12.00
12.00

0.00

0.00

0.00

0.00

10.00

10.00

2.00

0.00

0.00

2.00

0.00

0.00

2.00
2.00
8.00
0.00
8.00
0.00
2.00
2.00
12.00
0.00
12.00
0.00

73

2.00

335.00

670.00

0.00

335.00

0.00

73

8.00

335.00

2,680.00

0.00

335.00

0.00

73

8.00

335.00

2,680.00

0.00

335.00

0.00

73

2.00

335.00

670.00

0.00

335.00

0.00

73

2.00

335.00

670.00

10.00

335.00

3,350.00

73

2.00

335.00

670.00

2.00

335.00

670.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N
1
2

DESCRIPCION

HORMIGON

PIEDRA GRANDE

UND
M3
M3

SALDO

0.00
0.00

S
E
S
E
S

30

SALDO ACT.

206.00
28.00

TOTAL ENTRADA

510.00

60.00

TOTAL ACUMULADO

ESP.

TOTAL ACUMULADO

GASTOS

TOTAL SALIDA

304.00

32.00

510.00
304.00
60.00
32.00

O/C. N

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

TOTAL

0.00

0.00

0.00

510.00

0.00

0.00

0.00

0.00

0.00

60.00

0.00

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


N
1
2
3
4

GLNS.

PETROLEO

GLNS.

GASOLINA

LTS

ACEITE MULTIGRADO DE 30

KLS

GRASA GRUESA

ACEITE MOVIL SUPER 1000 20W-50

GRASA H-3 VISTONE

UND

DESCRIPCION

FILTROS DE AIRE PARA COMPACTADORA AF2E28

SALDO

0.00
0.00
0.00
0.00

GLNS.

0.00

KLS

0.00

UND

0.00

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

30
40

SALDO ACT.

100.00
49.00
2.00
0.00

TOTAL ENTRADA

980.00

96.25

4.00

2.00

880.00

47.25

2.00

2.00

15.00

15.00

0.00

9.00

10.00

1.00

2.00

2.00

TOTAL ACUMULADO

ESP.

TOTAL ACUMULADO

GASTOS

TOTAL SALIDA

0.00

3171.00
3045.00
122.25
73.25
4.00
2.00
2.00
2.00
15.00
0.00
10.00
1.00
2.00
0.00

O/C. N

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

TOTAL

56

0.00

0.00

0.00

980.00

0.00

0.00

56

0.00

0.00

0.00

96.25

0.00

0.00

351

0.00

0.00

0.00

4.00

31.25

125.00

351

0.00

0.00

0.00

2.00

25.00

50.00

56

0.00

0.00

0.00

15.00

0.00

0.00

56

0.00

0.00

0.00

10.00

0.00

0.00

56

0.00

0.00

0.00

2.00

0.00

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MER


BIENES DE CONSUMO

DESCRIPCION

UND

SALDO

AZUCAR

KLS.

0.00

ARROZ

KLS.

0.00

3
4
3

KLS.

FIDEO

GLNS.

ACEITE

KLS.

ARINA

0.00
0.00
0.00

CALDOS MAGUI

PAQ.

0.00

SAL

KLS.

0.00

AYUDIN

DESCRIPCION

UND.

0.00

UND

SALDO

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

30
3
8
6

SALDO ACT.

23.50

26.50

7.00

50.00

43.00

20.00

20.00

30

40.00

1.00

20.00

TOTAL ACUMULADO

ESP.

TOTAL ACUMULADO

GASTOS

TOTAL SALIDA

50.00

0.00

TOTAL ENTRADA

20.00

1.00

0.00

0.00

1.00

1.00

4.00

10.00

6.00

3.00

5.00

2.00

SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

50.00
26.50
50.00
43.00
40.00
20.00
1.00
1.00
20.00
0.00
1.00
1.00
10.00
6.00
5.00
2.00

TOTAL ACUMULADO

ESP.

TOTAL ACUMULADO

GASTOS

O/C. N

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

TOTAL

B/V. 119

0.00

0.00

0.00

50.00

2.90

145.00

B/V. 119

0.00

0.00

0.00

50.00

1.80

90.00

B/V. 119

0.00

0.00

0.00

40.00

3.00

120.00

B/V. 119

0.00

0.00

0.00

5.00

30.00

150.00

B/V. 119

0.00

0.00

0.00

20.00

2.00

40.00

B/V. 119

0.00

0.00

0.00

1.00

12.00

12.00

B/V. 119

0.00

0.00

0.00

10.00

1.00

10.00

B/V. 119

0.00

0.00

0.00

5.00

3.00

15.00

O/C. N

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

TOTAL

0.00

JABON LIQUIDO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

N
1

DESCRIPCION

AUGUSTO PAUCARA CHECCORI

UND
VLLS

SALDO

368.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL ACUMULADO

ESP.

S
E
S

30

TOTAL ACUMULADO

GASTOS

17.00

17.00

17.00

0.00

0.00

O/C. N

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SALDO ANTERIOR
CANT.

368.00

P.UNITA.

0.00

INGRESO
TOTAL

0.00

CANT.

0.00

P.UNITA.

0.00

TOTAL

0.00

FECHA: ABRIL - 2010

EGRESO
CANT.

P.UNITA.

1,786.00

24.30

0.00

23.00

0.00

18.00

0.00

9.00

0.00

4.50

0.00

4.50

0.00

8.00

0.00

6.00

0.00

2.00

0.00

2.00

0.00

2.00

0.00

12.00

0.00

17.00

0.00

20.00

0.00

0.80

0.00

2.00

0.00

1.00

0.00

4.00

0.00

1.00

0.00

30.00

41.00

0.00

32.00

0.00

0.00

7.50

397.00

5.00

0.00

15.00

SALDO DE ALMACEN ACTUAL


TOTAL

43,399.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,985.00
0.00

CANT.

TOTAL

OBSERVACIONES

703.00

17,082.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

1.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

716.00

0.00

NO TIENE O/C

251.00

0.00

NO TIENE O/C

0.00

0.00

0.50

2.50

1.00

15.00

0.00

15.00

0.00
45,384.80

1.00

15.00
17,102.00

FECHA: ABRIL - 2010

EGRESO
CANT.

P.UNITA.

0.00

2.00

6.00

19.50

0.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

55.50

0.00

0.00

0.00

0.00

0.00

0.50

0.00

0.00

0.00

0.75

0.00

0.00

550.00

0.00

600.00

0.00

650.00

0.00

0.00

0.00

0.00

2.00

2.00

1.00

2.00

0.50

10.00

0.00

13.00

0.00

19.00

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
117.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
2.00
5.00
0.00
0.00

CANT.

TOTAL

OBSERVACIONES

1.00

2.00

-5.00

-97.50

0.00

0.00

0.00

0.00

NO TIENE O/C.

648.00

0.00

NO TIENE O/C.

50.00

0.00

NO TIENE O/C.

800.00

0.00

NO TIENE O/C.

100.00

0.00

NO TIENE O/C.

1,415.50

0.00

NO TIENE O/C.

60.00

0.00

NO TIENE O/C.

10.00

0.00

NO TIENE O/C.

56.50

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

98.50

0.00

NO TIENE O/C.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.00

0.00

98.00

196.00

99.00

198.00

9.50

95.00

15.00

195.00

10.00

190.00

NO TIENE O/C.

0.00

48.00

0.00

20.00

960.00

0.00

255.00

1.00

40.00

0.00

0.00

18.00

15.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

0.00

0.00
40.00
0.00
270.00
0.00
0.00
0.00
0.00
438.00

0.00

0.00

3.00

120.00

0.00

0.00

0.00

0.00

4.00

0.00

NO TIENE O/C.

655.00

0.00

NO TIENE O/C.

27.00

0.00

NO TIENE O/C.

3.00

0.00

NO TIENE O/C.

1,858.50

FECHA: ABRIL - 2010


EGRESO
CANT.

P.UNITA.

0.00

0.00

0.00

0.00

186.00

0.00

327.00

0.00

0.00

0.00

2.00

0.00

8.00

30.00

0.00

0.00

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
240.00
0.00
240.00

CANT.

TOTAL

OBSERVACIONES

287.00

0.00

NO TIENE O/C.

27.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

67.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

62.00

1,860.00

2.00

0.00
1,860.00

NO TIENE O/C.

FECHA: ABRIL - 2010

EGRESO
CANT.

P.UNITA.

368.00

0.00

130.00

0.00

56.00

0.00

1,066.00

0.00

22.00

0.00

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
0.00
0.00
0.00
0.00
0.00

CANT.

OBSERVACIONES

TOTAL

0.00

0.00

NO TIENE O/C.

670.00

0.00

NO TIENE O/C.

588.00

0.00

NO TIENE O/C.

352.00

0.00

NO TIENE O/C.

548.00

0.00

NO TIENE O/C.

0.00

FECHA: ABRIL - 2010

EGRESO
CANT.

P.UNITA.

14.00

30.00

58.00

9.00

11.00

9.50

0.00

25.00

5.00

10.00

21.00

10.00

0.00

37.00

1.00

4.50

0.00

36.00

0.00

670.00

2.00

190.00

3.00

19.00

1.00

60.00

3.00

21.00

7.00

12.00

2.00

10.00

2.00

70.00

20.00

30.00

0.00

0.00

2.00

2.50

6.00

15.00

1.00

98.00

0.00

0.00

SALDO DE ALMACEN ACTUAL


TOTAL

420.00
522.00
104.50
0.00
50.00
210.00
0.00
4.50
0.00
0.00
380.00
57.00
60.00
63.00
84.00
20.00
140.00
600.00
0.00
5.00
90.00
98.00
0.00

CANT.

TOTAL

2.00

60.00

7.00

63.00

86.00

817.00

0.00

0.00

8.00

80.00

9.00

90.00

0.00

0.00

70.00

315.00

0.00

0.00

0.00

0.00

0.00

0.00

8.00

152.00

0.00

0.00

15.00

315.00

27.00

324.00

0.00

0.00

4.00

280.00

0.00

0.00

26.00

0.00

19.00

47.50

4.00

60.00

9.00

882.00

0.00

0.00

OBSERVACIONES

1.00

45.00

45.00

6.00

270.00

2.00

12.00

0.00

1.20

25.00

1.80

2.00

50.00

0.00

20.00

12.00

8.00

2.00

25.00

0.00

10.00

0.00

0.00

0.00

0.00

3.00

30.00

2.00

320.00

2.00

33.00

1.00

0.00

2.00

0.00

2.00

0.00

2.00

98.00

8.00

0.00

1.00

0.00

0.00

0.00

4.00

0.00

24.00
0.00
45.00
100.00
0.00
96.00
50.00
0.00
0.00
0.00
90.00
640.00
66.00
0.00
0.00
0.00
196.00
0.00
0.00
0.00
0.00
3,771.00

5.00

60.00

25.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

9.00

72.00

0.00

0.00

4.00

40.00

20.00

0.00

100.00

0.00

1.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

NO TIENE O/C.

2.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

1.00

98.00

42.00

0.00

NO TIENE O/C.

1.00

0.00

NO TIENE O/C.

1.00

0.00

NO TIENE O/C.

11.00

0.00

NO TIENE O/C.

3,987.50

NO TIENE O/C.

NO TIENE O/C.

FECHA: ABRIL - 2010


EGRESO
CANT.

P.UNITA.

0.00

0.00

0.00

2.00

3.00

2.50

3.00

3.00

3.00

40.00

0.00

0.00

30.00

0.00

100.00

0.00

6.00

0.00

3.00

0.00

5.00

0.00

200.00

0.00

0.00

160.00

0.00

15.00

0.00

4.50

1.00

3.50

2.00

23.00

0.00

0.00

0.00

0.00

3.00

380.00

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
0.00
7.50
9.00
120.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.50
46.00
0.00
0.00
1,140.00
1,326.00

CANT.

TOTAL

OBSERVACIONES

2.00

0.00

25.00

50.00

18.00

45.00

0.00

0.00

3.00

120.00

0.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

200.00

0.00

NO TIENE O/C.

4.00

0.00

NO TIENE O/C.

3.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

0.00

0.00

10.00

150.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

0.00

NO TIENE O/C.

200.00

0.00

NO TIENE O/C.

0.00

0.00
365.00

NO TIENE O/C.

FECHA: ABRIL - 2010


EGRESO
CANT.

P.UNITA.

0.00

SALDO DE ALMACEN ACTUAL


TOTAL

0.00

3.00

78.00

1.00

80.00

2.00

28.00

0.00

6.00

0.00

15.00

0.00

15.00

0.00

3.00

2.00

9.00

3.00

11.00

0.00

8.00

2.00

4.00

0.00

2.00

1.00

4.00

0.00

2.00

0.00

19.50

0.00

4.00

1.00

1.50

0.00

170.00

2.00

3.00

0.00

3.00

0.00

5.00

0.00

280.00

2.00

28.50

234.00
80.00
56.00
0.00
0.00
0.00
0.00
18.00
33.00
0.00
8.00
0.00
4.00
0.00
0.00
0.00
1.50
0.00
6.00
0.00
0.00
0.00
57.00

CANT.

TOTAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

22.00

3.00

24.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

58.50

1.00

4.00

1.00

1.50

0.00

0.00

3.00

9.00

0.00

0.00

0.00

0.00

0.00

0.00

8.00

228.00

OBSERVACIONES

NO TIENE O/C.

2.00

28.50

57.00

8.00

228.00

2.00

335.00

0.00

335.00

0.00

335.00

2.00

335.00

0.00

335.00

0.00

335.00

670.00
0.00
0.00
670.00
0.00
0.00

0.00

0.00

8.00

2,680.00

8.00

2,680.00

0.00

0.00

12.00

4,020.00

4.00

1,340.00

FECHA: ABRIL - 2010

EGRESO
CANT.

P.UNITA.

SALDO DE ALMACEN ACTUAL


TOTAL

CANT.

TOTAL

304.00

0.00

0.00

206.00

0.00

32.00

0.00

0.00

28.00

0.00

OBSERVACIONES

FECHA: ABRIL - 2010

EGRESO
CANT.

P.UNITA.

SALDO DE ALMACEN ACTUAL


TOTAL

CANT.

TOTAL

880.00

0.00

0.00

0.00

0.00

47.50

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

OBSERVACIONES

FECHA: ABRIL - 2010

EGRESO
CANT.

P.UNITA.

SALDO DE ALMACEN ACTUAL


TOTAL

CANT.

TOTAL

26.50

0.00

0.00

23.50

0.00

43.00

0.00

0.00

7.00

0.00

20.00

0.00

0.00

20.00

0.00

5.00

0.00

0.00

0.00

0.00

20.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

6.00

0.00

0.00

4.00

0.00

2.00

0.00

0.00

3.00

0.00

EGRESO
CANT.

P.UNITA.

OBSERVACIONES

SALDO DE ALMACEN ACTUAL


TOTAL

CANT.

TOTAL

OBSERVACIONES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

EGRESO
CANT.

368.00

P.UNITA.

0.00

SALDO DE ALMACEN ACTUAL


TOTAL

0.00

CANT.

0.00

TOTAL

0.00

OBSERVACIONES

NO TIENE O/C.

MUNICIPALIDAD DISTRITAL DE LAYO


MATERIALES EXISTENTES EN ALMACEN
RESIDENTE DE OBRA:

AL: 17 DE Mayo-2010

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO

DESCRIPCION

UND

SALDO ACTUAL
ALMACEN.

CEMENTO PORTLAND TIPO IP x 42.5 KG

BLS

332.00

CODO PVC SAP DE 1/2" C/R.

UND

2.00

CINTA TEFLON

UND

10.00

CLAVO DE MADERA DE 4"

KLS

656.75

CLAVO DE MADERA DE 3"

KLS

182.50

ALAMBRE NEGRO N 16

KLS

359.50

ABRASADERA DE 2" PARA RED DE AGUA

UND

1.00

REDUCCION PVC SAP 3/4" - 1/2

UND

1.00

CANDADO

UND

1.00

10

CODO PVC SEL DE 3/4"

UND

648.00

11

CODO PVC SEL DE 1"

UND

50.00

12

TUBERIA PVC SEL DE 3/4"

UND

800.00

13

TUBERIA PVC SEL DE 1"

UND

100.00

14

ALAMBRE NEGRO N 8

KLS

1334.50

15

ALAMBRE GALVANIZADO N 18.

KLS

60.00

16

CLAVO DE MADERA 1"

KLS

9.75

17

CLAVO DE MADERA DE 2"

KLS

54.00

18

CLAVO DE MADERA DE 5"

KLS

98.25

MUNICIPALIDAD DISTRITAL DE LAYO


MATERIALES EXISTENTES EN ALMACEN
RESIDENTE DE OBRA:

AL: 17 DE Mayo-2010

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO

DESCRIPCION

UND

SALDO ACTUAL
ALMACEN.

19

MASILLA PLASTICA 0.470 LTS.

KLS.

25.00

20

LIJAR DE FIERRO N 80 ABRALIP

UND.

98.00

21

LIJAR DE FIERRO N 100 ABRALIP

UND.

99.00

22

CLAVO DE JUNQUILLO 1"

KLS.

9.50

23

CLAVO DE 3/4" TRIPLEY

KLS.

15.00

24

THIER ACRILICO

GLNS

10.00

25

LACA PIROXILINA CPP

GLNS

20.00

26

DISCO DE CONCRETO DE 9" CRUPS

UND

3.00

27

COLA TEKNO PAR MADERA

GLNS

4.00

28

PERNO 1/2" X 2" CON SU TUERCA

UND.

650.00

29

TEKNOPOR 2.4X1.20X2"

PLCH.

23.00

30

PLATINA DE 1/2" X 2" e=1/8

UND.

3.00

31

TUBO DE PLASTISUR PVC-SWS-150-32 6" NARANJA CON


ANILLO

UND.

20.00

32

PEGAMENTO OATEY

GLNS

3.00

33

CODO 6"X45 SAL

UND.

7.00

34

LLAVE DE BOLA PVC 1/2"

UND.

5.00

35

ADEX INSTANTANIO

UND.

1.00

36

TUBO SAL PESADO 6"

UND.

25.00

37

ADITIVOS ANTIHELADISOS

CLDS.

6.00

38

PLASTICO VIRGEN TRANSPARENTE GRUESA

MTS.

300.00

39

TUBOS DE 1/2" CLASE 10

UND.

14.00

40

ROLLISO DE EUCALIPTO DE 4"X4mts.

UND

287.00

MUNICIPALIDAD DISTRITAL DE LAYO


MATERIALES EXISTENTES EN ALMACEN
RESIDENTE DE OBRA:

AL: 17 DE Mayo-2010

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO

DESCRIPCION

UND

SALDO ACTUAL
ALMACEN.

41

ROLLISO DE EUCALIPTO DE 4"X6mts.

UND

27.00

42

LISTONES DE MADERA CORRIENTE 2"x3"x10.

UND

470.00

43

TABLAS DE MADERA CORRIENTE DE 1 1/2" x 8" x 10.

UND

145.00

44

TRIPLEY

PLCH

62.00

45

TRIPLEY DE 18 MM

PLCH

2.00

46

FIERRO CORRUGADO DE 3/4"

VLLS

1.00

47

FIERRO CORRUGADO DE 5/8"

VLLS

260.00

48

FIERRO CORRUGADO DE 1/2"

VLLS

644.00

49

FIERRO CORRUGADO DE 3/8"

VLLS

-64.00

50

FIERRO CORRUGADO DE 1/4"

VLLS

548.00

51

PALAS TRAMONTINA

UND

1.00

52

GUANTES DE CUERO

PAR

66.00

53

GUANTES DE JEBE

PAR

85.00

54

CASCO DE COLOR ROJO

UND

7.00

55

CASCO DE COLOR AZUL

UND

8.00

56

HOJA DE SIERRA SANFLEX

UND

69.00

57

BOSTAS DE JEBE

PAR

30.00

58

WINCHAS DE 5MTS

UND

7.00

59

DISCOS DE MADERA DE 7 1/4"

UND

15.00

60

DISCOS DE FIERRO DE 7 1/4"

UND

23.00

61

BARRETA DE 1"x1.5 M.

UND

4.00

62

PILAS BARTA Y PANASONIC

PAR

7.00

63

CORDEL NAILON

UND

4.00

64

ARNES DE SEGURIDAD

UND

9.00

64

ARNES DE SEGURIDAD

UND

9.00

MUNICIPALIDAD DISTRITAL DE LAYO


MATERIALES EXISTENTES EN ALMACEN
RESIDENTE DE OBRA:

AL: 17 DE Mayo-2010

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO

DESCRIPCION

UND

SALDO ACTUAL
ALMACEN.

65

DISCO DE MADERA DIAMANTADO 12"

UND

6.00

66

TIRALINEA PLASTIFICADO

UND

5.00

67

MANGUERA TRANSPARENTE 3/8"

MTS.

25.00

68

LENTES DE PROTECCION TRANSPARENTE

UND

7.00

69

RECOGEDOR DE BASURA

UND

4.00

70

DISCO DE FIERRO DE 9"

UND

10.00

71

PALAS RECTAS TRAMONTINAS

UND

1.00

72

CORREA PARA MESCLADORA TOYOPOWER A73

UND

2.00

73

ESCUADRA METALICA DE 0.60CM STANLEY

UND

2.00

74

REGLA DE ALUMINIO X 6 MTS.

UND

2.00

75

ESCOBILLONES DE ACERO

UND

42.00

76

PLOMADA DE I KILO CONICA

UND

1.00

77

DADOS MILIMETRADOS

JGO.

1.00

78

ESCOBA HUDE

UND

9.00

79

BALDES VACIOS

UND

96.00

80

BROCAS DE 1/2" DE FIERRO

UND

5.00

81

BROCA DE 3/8" DE FIERRO

UND

4.00

82

BROCA DE 1/4" DE FIERRO

UND

5.00

83

CUCHILLA GARLOPA

UND

6.00

84

LLANTAS DE REPUESTO DE CARRETILLA TRUPER

UND

20.00

85

TALADRO CROW

UND

1.00

86

WINCHA DE 60 MTS. STANLEY

UND

1.00

87

INFLADOR PARA LLANTAS

UND

1.00

88

PARCHE Y LIQUIDO

CAJ.

1.00

MUNICIPALIDAD DISTRITAL DE LAYO


MATERIALES EXISTENTES EN ALMACEN
RESIDENTE DE OBRA:

AL: 17 DE Mayo-2010

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO

DESCRIPCION

UND

SALDO ACTUAL
ALMACEN.

89

TERMOMAGNETICOS DE 40 AMPERIOS

UND

2.00

90

FOCOS DE 100 WTS

UND

22.00

91

SOQUET DE LOZA

UND

18.00

92

TERMOMAGNETICO DE 30 AMPERIOS

UND

3.00

93

CONDUCTOR ELECTRICO NLT 1X2 N 12

MTS

200.00

94

TOMA CORRIENTE MULTIPLE SOBREPONER

UND

4.00

95

CAJA DE PASO 6X6X2 METALICO GALV.

UND.

10.00

96

CAJAS RECTANGULARESL PVC SEL

UND

200.00

97

CAJAS OCTAGONALES PVC SEL

UND

200.00

98

CUADERNO # 200 HOJAS ANILLADO

UND

2.00

99

CINTA MASKING DE 2"

UND

3.00

100

CORRECTOR

UND

0.00

101

POS IT

PAQ.

3.00

102

PLUMON DE PIZARRA ACRILICA

UND

3.00

103

CUADERNO DE OBRA

UND

8.00

104

TALONARIO DE PARTE DIARIO MOVIMIENTO DE MATERIAL

UND

8.00

105

TALONARIO BINCARD DE ALMACEN

UND

8.00

106

NOTA ENTRADA DE ALMACEN

UND

2.00

107

NOTA DE SALIDA DE ALMACEN

UND

2.00

108

HORMIGON

M3

202.00

109

PIEDRA GRANDE

M3

28.00

110

PIEDRA CHANCADA 1/2 - 3/4

M3

15.00

111

PETROLEO

GLNS.

92.00

MUNICIPALIDAD DISTRITAL DE LAYO


MATERIALES EXISTENTES EN ALMACEN
RESIDENTE DE OBRA:

AL: 17 DE Mayo-2010

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO

DESCRIPCION

UND

SALDO ACTUAL
ALMACEN.

GLNS.

23.50

LTS

1.00

GLNS.

15.00

112

GASOLINA

113

ACEITE MULTIGRADO DE 30

114

ACEITE MOVIL SUPER 1000 20W-50

115

GRASA H-3 VISTONE

KLS

8.00

116

AZUCAR

KLS.

30.50

117

ARROZ

KLS.

63.00

118

FIDEO

KLS.

6.00

119

ARINA

KLS.

16.00

120

SAL YODADA

KLS.

20.00

121

AYUDIN

UND.

2.00

122

MORON DE CEBADA

KLS.

16.00

123

BALANZA POR 20 KLS.

UND.

1.00

124

BOTAS DE JEBE CON PUNTA DE ACERO

PAR.

14.00

125

PIEDRA ESMIRIL 7

UND.

3.00

126

CIZALLA 900 MM

UND.

2.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL D


N

DESCRIPCION

UND

SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

CEMENTO PORTLAND TIPO IP x 42.5 KG

BLS

671.00

1434.00

1,466.00

BAO TURCO DE GRANITO

UND

0.00

0.00

0.00

TUBERIA PVC SAL DE 4"

UND

0.00

0.00

0.00

TUBERIA PVC SAL DE 2"

UND

0.00

0.00

0.00

CODO PVC SAL DE 4" DE 90

UND

0.00

0.00

0.00

CODO PVC SAL DE 4" DE 45

UND

0.00

0.00

0.00

YEE PVC SAL DE 4"

UND

0.00

0.00

0.00

YEE PVC SAL DE 4"x2"x4"

UND

0.00

0.00

0.00

CODO PVC SAL DE 2" DE 45

UND

0.00

0.00

0.00

10

CODO PVC SAL DE 2" DE 90

UND

0.00

0.00

0.00

11

YEE PVC SAL DE 2"

UND

0.00

0.00

0.00

12

TUBERIA PVC SAP DE 1/2" C/R C-10

UND

0.00

0.00

0.00

13

LLAVE PVC DE PASO DE 1/2" C/R

UND

0.00

0.00

0.00

14

LLAVE DE BRONCE DE 1/2" TIPO JARDINERO.

UND

0.00

0.00

0.00

15

CODO PVC SAP DE 1/2" C/R.

UND

2.00

0.00

0.00

16

CODO FG DE 1/2"

UND

0.00

0.00

0.00

17

TEE PVC SAP DE 1/2" C/R.

UND

0.00

0.00

0.00

18

SUMIDERO DE BRONCE DE 2"

UND

0.00

0.00

0.00

19

CINTA TEFLON

UND

10.00

10.00

0.00

20

CLAVO DE MADERA DE 4"

KLS

597.75

0.00

118.25

21

CLAVO DE MADERA DE 3"

KLS

96.50

0.00

154.50

22

CLAVO DE CALAMINA

KLS

0.00

0.00

0.00

23

ALAMBRE NEGRO N 16

KLS

314.50

565.00

251.00

24

ABRASADERA DE 2" PARA RED DE AGUA

UND

1.00

0.00

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL D


N

DESCRIPCION

UND

SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

25

REDUCCION PVC SAP 3/4" - 1/2

UND

1.00

0.00

0.00

26

CANDADO

UND

1.00

0.00

0.00

27

TEE PVC SAL DE 4"x2"x4" .

UND

0.00

0.00

0.00

28

TEE PVC DE SAL DE 2".

UND

0.00

0.00

0.00

29

CODO PVC SEL DE 3/4"

UND

648.00

0.00

0.00

30

CODO PVC SEL DE 1"

UND

50.00

0.00

0.00

31

TUBERIA PVC SEL DE 3/4"

UND

800.00

0.00

0.00

32

TUBERIA PVC SEL DE 1"

UND

100.00

0.00

0.00

33

ALAMBRE NEGRO N 8

KLS

1174.50

0.00

241.00

34

ALAMBRE GALVANIZADO N 18.

KLS

60.00

0.00

0.00

35

CLAVO DE MADERA 1"

KLS

6.75

0.00

3.25

36

CLAVO DE MADERA DE 2"

KLS

51.00

0.00

5.50

37

CLAVO DE 2 1/2

KLS

0.00

0.00

0.00

38

CLAVO DE MADERA DE 5"

KLS

94.75

0.00

4.50

39

PLASTICO GRUESO DE DOBLE ANCHO 1.50 M

ROLL

0.00

0.00

0.00

40

PLASTICO GRUESO DE DOBLE ANCHO 2.00M

ROLL

0.00

0.00

0.00

41

PLASTICO GRUESO DE DOBLE ANCHO 5.00 M

ROLL

0.00

0.00

0.00

42

BALDE DE 5 GLNS. TRANSPARENTE

UND

0.00

0.00

0.00

48

MASILLA PLASTICA 0.470 LTS.

KLS.

25.00

0.00

0.00

49

LIJAR DE FIERRO N 80 ABRALIP

UND.

94.00

0.00

4.00

50

LIJAR DE FIERRO N 100 ABRALIP

UND.

99.00

0.00

0.00

51

CLAVO DE JUNQUILLO 1"

KLS.

9.50

0.00

0.00

52

CLAVO DE 3/4" TRIPLEY

KLS.

15.00

0.00

0.00

53

THIER ACRILICO

GLNS

10.00

0.00

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL D


N

DESCRIPCION

UND

SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

54

LACA PIROXILINA CPP

GLNS

20.00

0.00

0.00

55

AMOLADORA CROW DE 9"

GLNS

0.00

0.00

0.00

56

DISCO DE CONCRETO DE 9" CRUPS

UND

3.00

0.00

0.00

57

SELLOCORT 325X350 MM

KLS.

0.00

0.00

0.00

58

SUPERCITO 325 X 350

KLS.

0.00

0.00

0.00

59

COLA TEKNO PAR MADERA

GLNS

4.00

0.00

0.00

60

PERNO 1/2" X 2" CON SU TUERCA

UND.

650.00

0.00

0.00

61

TEKNOPOR 2.4X1.20X2"

PLCH.

13.00

0.00

14.00

62

PLATINA DE 1/2" X 2" e=1/8

UND.

3.00

0.00

0.00

63

TUBO DE PLASTISUR PVC-SWS-150-32 6" NARANJA


CON ANILLO

UND.

20.00

20.00

0.00

64

PEGAMENTO OATEY

GLNS

3.00

3.00

0.00

65

CODO 6"X45 SAL

UND.

7.00

7.00

0.00

66

LLAVE DE BOLA PVC 1/2"

UND.

5.00

5.00

0.00

67

ADEX INSTANTANIO

UND.

1.00

1.00

0.00

68

TUBO SAL PESADO 6"

UND.

0.00

25.00

25.00

69

ADITIVOS ANTIHELADISOS

CLDS.

6.00

6.00

0.00

70

PLASTICO VIRGEN TRANSPARENTE GRUESA

MTS.

300.00

300.00

0.00

71

TUBOS DE 1/2" CLASE 10

UND.

0.00

17.00

17.00

72

ROLLISO DE EUCALIPTO DE 4"X4mts.

UND

287.00

0.00

0.00

73

ROLLISO DE EUCALIPTO DE 4"X6mts.

UND

27.00

0.00

0.00

74

LISTONES DE MADERA CORRIENTE 2"x3"x10.

UND

570.00

1150.00

580.00

75

TABLAS DE MADERA CORRIENTE DE 1 1/2" x 8" x 10.

UND

600.00

1212.00

679.00

76

ROLLIZO DE EUCALIPTO 3X4

UND

0.00

0.00

0.00

77

ROLLIZO DE EUCALIPTO 4X3

UND.

0.00

0.00

0.00

78

TRIPLEY

PLCH

52.00

0.00

10.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL D


N

DESCRIPCION

UND

SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

79

TRIPLEY DE 18 MM

PLCH

2.00

0.00

0.00

80

MADERA TRIANGULAR DE 1"X1"X1"X10M

UND.

20.00

40.00

20.00

81

FIERRO CORRUGADO DE 3/4"

VLLS

1.00

250.00

249.00

82

FIERRO CORRUGADO DE 5/8"

VLLS

230.00

0.00

440.00

83

FIERRO CORRUGADO DE 1/2"

VLLS

642.00

0.00

2.00

84

FIERRO CORRUGADO DE 3/8"

VLLS

0.00

79.00

431.00

85

FIERRO CORRUGADO DE 1/4"

VLLS

528.00

0.00

20.00

86

PALAS TRAMONTINA

UND

1.00

0.00

0.00

87

GUANTES DE CUERO

PAR

59.00

70.00

18.00

88

GUANTES DE JEBE

PAR

76.00

0.00

10.00

89

CASCO DE COLOR BLANCO

UND

0.00

0.00

0.00

90

CASCO DE COLOR ROJO

UND

7.00

0.00

1.00

91

CASCO DE COLOR AZUL

UND

5.00

0.00

4.00

92

COMBOS DE 6 LBS

UND

0.00

0.00

0.00

93

HOJA DE SIERRA SANFLEX

UND

66.00

0.00

4.00

94

BOSTAS DE JEBE

PAR

30.00

30.00

0.00

95

ARPILLERA

ROLLO

0.00

0.00

0.00

96

CARRETILLAS ( BUGUI) TRUPER

UND

0.00

0.00

0.00

97

WINCHAS DE 5MTS

UND

2.00

0.00

6.00

98

WINCHA DE 50 MTS

UND

0.00

0.00

0.00

99

DISCOS DE MADERA DE 7 1/4"

UND

11.00

0.00

4.00

100

DISCOS DE FIERRO DE 7 1/4"

UND

21.00

0.00

6.00

101

CASCO DE COLOR NARANJA

UND

0.00

0.00

0.00

102

BARRETA DE 1"x1.5 M.

UND

0.00

0.00

4.00

103

PICOS

UND

0.00

0.00

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL D


N

DESCRIPCION

UND

SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

104

ROPA DE AGUA CASACA Y PANTALON

UND

0.00

0.00

0.00

105

PILAS BARTA Y PANASONIC

PAR

7.00

0.00

0.00

106

CORDEL NAILON

UND

4.00

0.00

0.00

107

ARNES DE SEGURIDAD

UND

9.00

0.00

0.00

108

COMBO DE 20 LBS.

UND

0.00

0.00

0.00

109

DISCO DE MADERA DIAMANTADO 12"

UND

6.00

0.00

0.00

110

TIRALINEA PLASTIFICADO

UND

3.00

0.00

2.00

111

MANGUERA TRANSPARENTE 3/8"

MTS.

25.00

0.00

0.00

112

MANGUERA TRANSPARENTE 1/2"

MTS.

0.00

0.00

0.00

113

NIVEL DE MANO STANLEY

UND

0.00

0.00

0.00

114

PLOMADAS CILINDRICAS DE 500 GRS

UND

0.00

0.00

0.00

115

LENTES DE PROTECCION TRANSPARENTE

UND

0.00

0.00

9.00

116

MARTILLO TRAMONTINA

UND

0.00

0.00

0.00

117

RECOGEDOR DE BASURA

UND

4.00

0.00

0.00

118

DISCO DE FIERRO DE 9"

UND

10.00

0.00

0.00

119

SOGA COLOR ROJO

MTS.

0.00

0.00

0.00

120

PALAS RECTAS TRAMONTINAS

UND

1.00

0.00

0.00

121

MANGUERA DE 1" REFORZADA

ROLLO

0.00

0.00

0.00

122

CORREA PARA MESCLADORA TOYOPOWER A73

UND

2.00

4.00

2.00

123

WINCHA STANLEY X 30MTS

UND

0.00

0.00

0.00

124

ESCUADRA METALICA DE 0.60CM STANLEY

UND

2.00

0.00

0.00

125

PLOMADA DE I KILO CILINDRICA

UND

0.00

0.00

0.00

126

REGLA DE ALUMINIO X 6 MTS.

UND

1.00

0.00

1.00

127

ESCOBILLONES DE ACERO

UND

42.00

0.00

0.00

128

PLOMADA DE I KILO CONICA

UND

1.00

0.00

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL D


N

DESCRIPCION

UND

SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

129

DADOS MILIMETRADOS

JGO.

1.00

0.00

0.00

130

ESCOBA HUDE

UND

8.00

0.00

3.00

131

BALDES VACIOS

UND

73.00

100.00

27.00

132

BROCAS DE 1/2" DE FIERRO

UND

4.00

5.00

1.00

133

BROCA DE 3/8" DE FIERRO

UND

4.00

5.00

1.00

134

BROCA DE 1/4" DE FIERRO

UND

5.00

5.00

0.00

135

CUCHILLA GARLOPA

UND

6.00

6.00

0.00

136

LLANTAS DE REPUESTO DE CARRETILLA TRUPER

UND

20.00

20.00

0.00

137

TALADRO CROW

UND

1.00

2.00

1.00

138

LINTERNA GRANDE CON A CTE. 700WAS

UND

0.00

1.00

1.00

139

WINCHA DE 60 MTS. STANLEY

UND

1.00

1.00

0.00

140

INFLADOR PARA LLANTAS

UND

1.00

1.00

0.00

141

PARCHE Y LIQUIDO

CAJ.

1.00

1.00

0.00

142

PIEDRA ESMIRIL 7

UND

3.00

3.00

0.00

143

CIZALLA 750 A 900 MM

UND

0.00

2.00

2.00

144

BOTAS DE JEBE CON PUNTA DE ACERO

UND

14.00

14.00

0.00

145

BALANSA DE 20 KLS.

UND

1.00

1.00

0.00

146

MOTOR KOULER PARA MESCLADORA

UND

0.00

1.00

1.00

147

TERMOMAGNETICOS DE 40 AMPERIOS

UND

2.00

0.00

0.00

148

FOCOS DE 100 WTS

UND

22.00

0.00

0.00

149

SOQUET DE LOZA

UND

18.00

0.00

0.00

150

CINTA AISLANTE DE 3 M

UND

0.00

0.00

0.00

151

TERMOMAGNETICO DE 30 AMPERIOS

UND

3.00

0.00

0.00

152

CABLE INDECO UNIPOLARES AMARILLO Y BLANCO

RLLO

0.00

0.00

0.00

153

CONDUCTOR ELECTRICO N 08 TWS

MTS

0.00

0.00

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL D


N

DESCRIPCION

UND

SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

154

CONDUCTOR ELECTRICO NLT 1X2 N 12

MTS

200.00

0.00

0.00

155

TOMA CORRIENTE MULTIPLE SOBREPONER

UND

4.00

0.00

0.00

156

INTERRUPTOR 60A ATORNILLABLE

UND

0.00

0.00

0.00

157

INTERRUPTOR 40 A ATORNILLABLE

UND

0.00

0.00

0.00

158

CONDUCTOR ELECTRICO NLT 1X2 N 14

MTS

0.00

0.00

0.00

159

CABLE MILLIZO 2X12 INDECO

RLLS

0.00

0.00

0.00

160

CAJA DE PASO 6X6X2 METALICO GALV.

UND.

10.00

0.00

0.00

161

TOMACORRIENTE DOBLES

UND

0.00

0.00

0.00

162

INTERRUPTOR

UND

0.00

0.00

0.00

163

LAMPARAS FLUORECENTE DE 40W INCLUYE EQUIPO


RECTANGULAR

UND

0.00

0.00

0.00

164

CAJAS RECTANGULARESL PVC SEL

UND

200.00

0.00

0.00

165

CAJAS OCTAGONALES PVC SEL

UND

200.00

0.00

0.00

166

REFLECTOR PHILIPIS 400W

UND

0.00

0.00

0.00

167

COMPUTADORA (CPU, TECLADO, MONITRO, MAUSE)

EQ.

0.00

0.00

0.00

168

CARTUCHO TINTA NEGRA N 40 CANON

UND

0.00

0.00

0.00

169

CARTUCHO TINTA COLOR N 41 CANON

UND

0.00

0.00

0.00

170

PAPEL BOND A4 X 75 GS.

MILL.

4.00

4.00

0.00

171

ARCHIVADORES T/OFICIO

UND

0.00

0.00

0.00

172

ENGRAPADOR

UND

0.00

0.00

0.00

173

PERFORADOR

UND

0.00

0.00

0.00

174

RESALTADOR

UND

10.00

10.00

0.00

175

PEGAMENTO EN BARRA UHU

UND

0.00

0.00

0.00

176

CUADERNO # 200 HOJAS ANILLADO

UND

12.00

10.00

0.00

177

CINTA MASKING DE 2"

UND

3.00

0.00

0.00

178

CORRECTOR

UND

10.00

10.00

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL D


N

DESCRIPCION

UND

SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

179

CUTER

UND

1.00

1.00

0.00

180

LAPICERO TINTA LIQUIDA

UND

0.00

0.00

0.00

181

PLUMON INDELEBLE

UND

0.00

0.00

0.00

182

POS IT

PAQ.

3.00

0.00

0.00

183

PORTA MINAS

UND

5.00

5.00

1.00

184

MINAS RECARGABLES 0.5 HB

UND

0.00

0.00

1.00

185

PIZARRA ACRILICA DE 2X1.2

UND

0.00

0.00

0.00

186

PLUMON DE PIZARRA ACRILICA

UND

3.00

0.00

0.00

187

MOTA PARA PIZARRA ACRILICA

UND

0.00

0.00

0.00

188

FRANELA

MTS

0.00

0.00

0.00

189

IMPRESORA HP DISKIET F 2480 MULTIFUNCIONAL

EQ.

0.00

0.00

0.00

190

CUADERNO DE OBRA

UND

8.00

0.00

0.00

191

TONER HP LASER 53 A

UND

0.00

0.00

0.00

192

TALONARIO DE PARTE DIARIO MOVIMIENTO DE


MATERIAL

UND

8.00

0.00

0.00

193

TALONARIO BINCARD DE ALMACEN

UND

8.00

0.00

0.00

194

BINCAR

0.00

0.00

0.00

195

NOTA ENTRADA DE ALMACEN

UND

2.00

0.00

10.00

196

NOTA DE SALIDA DE ALMACEN

UND

2.00

0.00

10.00

197

LAPIZ BICOLOR

CAJ.

1.00

1.00

0.00

198

TIZAS DE COLOR

CAJ.

3.00

3.00

0.00

199

LAPICERO FABER CASTELL X 50 UND.

CAJ.

1.00

1.00

0.00

200

MEMORIA USB KINSTONG 4 GB

UND

3.00

3.00

0.00

201

SELLOS TIPO LAPICERO

UND

2.00

2.00

0.00

202

ESPIRAL # 12

UND

6.00

6.00

0.00

203

ESPIRAL # 18

UND

6.00

6.00

0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL D


N

DESCRIPCION

UND

SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

204

MICA PARA ANILLADO

UND

12.00

12.00

0.00

205

HORMIGON

M3

275.00

98.00

29.00

206

PIEDRA GRANDE

M3

28.00

0.00

0.00

207

PIEDRA CHANCADA 1/2 - 3/4

M3

30.00

30.00

0.00

208

PETROLEO

GLNS.

52.00

240.00

288.00

209

GASOLINA

GLNS.

2.50

0.00

46.50

210

ACEITE MULTIGRADO DE 30

LTS

1.00

0.00

1.00

211

GRASA GRUESA

KLS

0.00

0.00

0.00

212

ACEITE MOVIL SUPER 1000 20W-50

GLNS.

15.00

0.00

0.00

213

GRASA H-3 VISTONE

KLS

8.00

0.00

1.00

214

FILTROS DE AIRE PARA COMPACTADORA AF2E28

UND

0.00

0.00

2.00

215

AZUCAR

KLS.

49.50

105.00

79.00

216

ARROZ

KLS.

10.00

100.00

97.00

217

FIDEO

KLS.

9.00

40.00

51.00

218

ACEITE DE COCINA

GLNS.

-1.00

2.00

3.00

219

ARINA

KLS.

13.00

0.00

7.00

220

CALDOS MAGUI

PAQ.

0.00

0.00

0.00

221

SAL YODADA

KLS.

17.00

20.00

7.00

222

AYUDIN

UND.

1.00

0.00

2.00

223

MORON DE CEBADA

KLS.

4.00

20.00

16.00

TAL DE LAYO

CEN DIARIO

TOTAL ACUMULADO
TOTAL ACUMULADO

3939.00
3262.00
4.00
4.00
6.00
6.00
8.00
8.00
6.00
6.00
8.00
8.00
4.00
4.00
5.00
5.00
7.00
7.00
21.00
21.00
2.00
2.00
7.00
7.00
2.00
2.00
6.00
6.00
11.00
9.00
10.00
10.00
6.00
6.00
6.00
6.00
19.00
9.00
825.00
165.75
314.50
180.50
10.00
10.00
1085.00
271.00
2.00
1.00

TAL DE LAYO

CEN DIARIO

TOTAL ACUMULADO
TOTAL ACUMULADO

1.00
0.00
1.00
1.00
2.00
2.00
2.00
2.00
648.00
0.00
50.00
0.00
800.00
0.00
100.00
0.00
1500.00
249.00
60.00
0.00
10.00
4.25
60.50
6.50
2.00
2.00
100.00
4.50
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
25.00
0.00
98.00
4.00
99.00
0.00
9.50
0.00
15.00
0.00
10.00
0.00

TAL DE LAYO

CEN DIARIO

TOTAL ACUMULADO
TOTAL ACUMULADO

20.00
0.00
2.00
2.00
6.00
2.00
20.00
20.00
40.00
22.00
4.00
0.00
650.00
0.00
27.00
14.00
3.00
0.00
20.00
0.00
3.00
0.00
7.00
0.00
5.00
0.00
1.00
0.00
25.00
25.00
6.00
0.00
300.00
0.00
17.00
17.00
287.00
0.00
30.00
0.00
1355.00
583.00
1612.00
679.00
0.00
0.00
0.00
0.00
62.00
10.00

TAL DE LAYO

CEN DIARIO

TOTAL ACUMULADO
TOTAL ACUMULADO

2.00
0.00
40.00
20.00
1010.00
249.00
1100.00
440.00
700.00
2.00
2575.00
431.00
570.00
20.00
40.00
0.00
170.00
107.00
100.00
10.00
5.00
4.00
20.00
4.00
30.00
4.00
6.00
6.00
80.00
12.00
50.00
5.00
2.00
2.00
20.00
18.00
20.00
11.00
2.00
1.00
25.00
6.00
50.00
7.00
30.00
15.00
10.00
10.00
40.00
20.00

TAL DE LAYO

CEN DIARIO

TOTAL ACUMULADO
TOTAL ACUMULADO

26.00
26.00
7.00
0.00
4.00
0.00
9.00
0.00
5.00
5.00
6.00
0.00
5.00
2.00
25.00
0.00
0.00
0.00
3.00
3.00
2.00
2.00
30.00
18.00
5.00
3.00
4.00
0.00
10.00
0.00
100.00
100.00
1.00
0.00
0.00
0.00
4.00
2.00
0.00
0.00
2.00
0.00
0.00
0.00
5.00
4.00
42.00
0.00
1.00
0.00

TAL DE LAYO

CEN DIARIO

TOTAL ACUMULADO
TOTAL ACUMULADO

1.00
0.00
11.00
3.00
100.00
27.00
5.00
1.00
5.00
1.00
5.00
0.00
6.00
0.00
20.00
0.00
2.00
1.00
1.00
1.00
1.00
0.00
1.00
0.00
1.00
0.00
3.00
0.00
2.00
2.00
14.00
0.00
1.00
0.00
1.00
1.00
2.00
0.00
22.00
0.00
18.00
0.00
5.00
2.00
3.00
0.00
0.00
0.00
0.00
0.00

TAL DE LAYO

CEN DIARIO

TOTAL ACUMULADO
TOTAL ACUMULADO

200.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
0.00
5.00
5.00
8.00
7.00
7.00
5.00
200.00
0.00
200.00
0.00
0.00
0.00
2.00
2.00
3.00
0.00
1.00
#REF!
8.00
1.00
8.00
8.00
1.00
1.00
1.00
1.00
14.00
4.00
2.00
0.00
20.00
5.00
5.00
1.00
14.00
1.00

TAL DE LAYO

CEN DIARIO

TOTAL ACUMULADO
TOTAL ACUMULADO

3.00
2.00
6.00
3.00
4.00
4.00
5.00
1.00
8.00
2.00
5.00
3.00
1.00
1.00
7.00
2.00
1.00
1.00
1.00
1.00
0.00
0.00
8.00
0.00
0.00
0.00
8.00
0.00
8.00
0.00
0.00
0.00
12.00
10.00
12.00
10.00
1.00
0.00
3.00
0.00
1.00
0.00
3.00
0.00
2.00
0.00
6.00
0.00
6.00
0.00

TAL DE LAYO

CEN DIARIO

TOTAL ACUMULADO
TOTAL ACUMULADO

12.00
0.00
608.00
333.00
60.00
32.00
30.00
0.00
2431.00
2453.00
122.25
119.75
4.00
3.00
2.00
2.00
15.00
0.00
10.00
2.00
2.00
2.00
105.00
79.00
100.00
97.00
40.00
51.00
3.00
4.00
20.00
7.00
1.00
1.00
20.00
7.00
5.00
4.00
20.00
16.00

MUNICIPALIDAD D

MOVIMIENTO D
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

SALDO

CEMENTO PORTLAND TIPO IP x 42.5 KG

BLS

703.00

BAO TURCO DE GRANITO

UND

0.00

TUBERIA PVC SAL DE 4"

UND

0.00

TUBERIA PVC SAL DE 2"

UND

0.00

CODO PVC SAL DE 4" DE 90

UND

0.00

CODO PVC SAL DE 4" DE 45

UND

0.00

YEE PVC SAL DE 4"

UND

0.00

YEE PVC SAL DE 4"x2"x4"

UND

0.00

CODO PVC SAL DE 2" DE 45

UND

0.00

10

CODO PVC SAL DE 2" DE 90

UND

0.00

11

YEE PVC SAL DE 2"

UND

0.00

12

TUBERIA PVC SAP DE 1/2" C/R C-10

UND

0.00

13

LLAVE PVC DE PASO DE 1/2" C/R

UND

0.00

14

LLAVE DE BRONCE DE 1/2" TIPO JARDINERO.

UND

0.00

15

CODO PVC SAP DE 1/2" C/R.

UND

2.00

16

CODO FG DE 1/2"

UND

0.00

17

TEE PVC SAP DE 1/2" C/R.

UND

0.00

18

SUMIDERO DE BRONCE DE 2"

UND

0.00

19

CINTA TEFLON

UND

0.00

21

CLAVO DE MADERA DE 4"

KLS

716.00

22

CLAVO DE MADERA DE 3"

KLS

251.00

23

CLAVO DE CALAMINA

KLS

0.00

24

ALAMBRE NEGRO N 16

KLS

0.50

25

ABRASADERA DE 2" PARA RED DE AGUA

UND

1.00

Correspondiente

: MAYO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

113

132

84

91

96

135

350
46

20

35

84

364
126 100

20

73

90

70

84

10

11

10

10

0.25

10

0.50

11

11

12

27

20

10

65
5

20

12

10

12

20

20

20

500
5

17

20

50.0

5.0

MUNICIPALIDAD D

MOVIMIENTO D
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

SALDO

26

REDUCCION PVC SAP 3/4" - 1/2

UND

1.00

27

CANDADO

UND

1.00

28

TEE PVC SAL DE 4"x2"x4" .

UND

0.00

29

TEE PVC DE SAL DE 2".

UND

0.00

36

CODO PVC SEL DE 3/4"

UND

648.00

37

CODO PVC SEL DE 1"

UND

50.00

38

TUBERIA PVC SEL DE 3/4"

UND

800.00

39

TUBERIA PVC SEL DE 1"

UND

100.00

40

ALAMBRE NEGRO N 8

KLS

1415.50

41

ALAMBRE GALVANIZADO N 18.

KLS

60.00

42

CLAVO DE MADERA 1"

KLS

10.00

43

CLAVO DE MADERA DE 2"

KLS

56.50

44

CLAVO DE 2 1/2

KLS

0.00

45

CLAVO DE MADERA DE 5"

KLS

99.25

47

PLASTICO GRUESO DE DOBLE ANCHO 1.50 M

ROLL

0.00

46

PLASTICO GRUESO DE DOBLE ANCHO 2.00M

ROLL

0.00

47

PLASTICO GRUESO DE DOBLE ANCHO 5.00 M

ROLL

0.00

48

BALDE DE 5 GLNS. TRANSPARENTE

UND

0.00

56

MASILLA PLASTICA 0.470 LTS.

KLS.

25.00

57

LIJAR DE FIERRO N 80 ABRALIP

UND.

98.00

58

LIJAR DE FIERRO N 100 ABRALIP

UND.

99.00

59

CLAVO DE JUNQUILLO 1"

KLS.

9.50

60

CLAVO DE 3/4" TRIPLEY

KLS.

15.00

61

THIER ACRILICO

GLNS

10.00

62

LACA PIROXILINA CPP

GLNS

20.00

Correspondiente

: MAYO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

10

15

10

10

15

12

21

20

10

0.25

21

20

20

2.5

1
1

10

0.5

62

LACA PIROXILINA CPP

GLNS

20.00

63

AMOLADORA CROW DE 9"

GLNS

0.00

64

DISCO DE CONCRETO DE 9" CRUPS

UND

3.00

65

SELLOCORT 325X350 MM

KLS.

0.00

66

SUPERCITO 325 X 350

KLS.

0.00

67

COLA TEKNO PAR MADERA

GLNS

4.00

68

PERNO 1/2" X 2" CON SU TUERCA

UND.

650.00

69

TEKNOPOR 2.4X1.20X2"

PLCH.

27.00

70

PLATINA DE 1/2" X 2" e=1/8

UND.

3.00

71

TUBO DE PLASTISUR PVC-SWS-150-32 6" NARANJA


CON ANILLO

UND.

0.00

72

PEGAMENTO OATEY

GLNS

0.00

73

CODO 6"X45 SAL

UND.

0.00

74

LLAVE DE BOLA PVC 1/2"

UND.

0.00

75

ADEX INSTANTANIO

UND.

0.00

76

TUBO SAL PESADO 6"

UND.

0.00

77

ADITIVOS ANTIHELADISOS

CLDS.

0.00

78

PLASTICO VIRGEN TRANSPARENTE GRUESA

MTS.

0.00

79

TUBOS DE 1/2" CLASE 10

UND.

0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

18
2

7
5
1
25
10
6
300
17
1

15

MUNICIPALIDAD D

MOVIMIENTO D
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

SALDO

ROLLISO DE EUCALIPTO DE 4"X4mts.

UND

287.00

ROLLISO DE EUCALIPTO DE 4"X6mts.

UND

27.00

LISTONES DE MADERA CORRIENTE 2"x3"x10.

UND

0.00

TABLAS DE MADERA CORRIENTE DE 1 1/2" x 8" x 10.

UND

67.00

ROLLIZO DE EUCALIPTO 3X4

UND

0.00

ROLLIZO DE EUCALIPTO 4X3

UND.

0.00

TRIPLEY

PLCH

62.00

TRIPLEY DE 18 MM

PLCH

2.00

MADERA TRIANGULAR DE 1"X1"X1"X10M

UND.

0.00

Correspondiente

: MAYO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

55

87

61

59

200
2
300

620
24

11

20

20

20

230

100
58

10

43

100
20 119

50

26

59

12

50

80 119

16

462

350
62

58

20

80

40

MUNICIPALIDAD D

MOVIMIENTO D
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

SALDO

FIERRO CORRUGADO DE 3/4"

VLLS

0.00

FIERRO CORRUGADO DE 5/8"

VLLS

670.00

FIERRO CORRUGADO DE 1/2"

VLLS

644.00

FIERRO CORRUGADO DE 3/8"

VLLS

352.00

FIERRO CORRUGADO DE 1/4"

VLLS

548.00

Correspondiente

: MAYO -2010

S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

250
218
30

30

160

150

20

30

50

79
30

20

60

20 170

115

15

0
20

MUNICIPALIDAD D

MOVIMIENTO D
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

SALDO

PALAS TRAMONTINA

UND

1.00

GUANTES DE CUERO

PAR

7.00

GUANTES DE JEBE

PAR

86.00

CASCO DE COLOR BLANCO

UND

0.00

CASCO DE COLOR ROJO

UND

8.00

CASCO DE COLOR AZUL

UND

9.00

COMBOS DE 6 LBS

UND

0.00

HOJA DE SIERRA SANFLEX

UND

70.00

BOSTAS DE JEBE

PAR

0.00

ROLLO

0.00

10

ARPILLERA

11

CARRETILLAS ( BUGUI) TRUPER

UND

0.00

12

WINCHAS DE 5MTS

UND

8.00

13

WINCHA DE 50 MTS

UND

0.00

14

DISCOS DE MADERA DE 7 1/4"

UND

15.00

15

DISCOS DE FIERRO DE 7 1/4"

UND

27.00

16

CASCO DE COLOR NARANJA

UND

0.00

17

BARRETA DE 1"x1.5 M.

UND

4.00

18

PICOS

UND

0.00

19

ROPA DE AGUA CASACA Y PANTALON

UND

0.00

20

PILAS BARTA Y PANASONIC

PAR

7.00

21

CORDEL NAILON

UND

4.00

22

ARNES DE SEGURIDAD

UND

9.00

23

COMBO DE 20 LBS.

UND

0.00

24

DISCO DE MADERA DIAMANTADO 12"

UND

6.00

Correspondiente

: MAYO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

70
2

1
1

30

1
1

24

DISCO DE MADERA DIAMANTADO 12"

UND

6.00

25

TIRALINEA PLASTIFICADO

UND

5.00

26

MANGUERA TRANSPARENTE 3/8"

MTS.

25.00

27

MANGUERA TRANSPARENTE 1/2"

MTS.

0.00

28

NIVEL DE MANO STANLEY

UND

0.00

30

PLOMADAS CILINDRICAS DE 500 GRS

UND

0.00

31

LENTES DE PROTECCION TRANSPARENTE

UND

9.00

32

MARTILLO TRAMONTINA

UND

0.00

33

RECOGEDOR DE BASURA

UND

4.00

35

DISCO DE FIERRO DE 9"

UND

10.00

36

SOGA COLOR ROJO

MTS.

0.00

37

PALAS RECTAS TRAMONTINAS

UND

1.00

38

MANGUERA DE 1" REFORZADA

ROLLO

0.00

39

CORREA PARA MESCLADORA TOYOPOWER A73

UND

0.00

40

WINCHA STANLEY X 30MTS

UND

0.00

41

ESCUADRA METALICA DE 0.60CM STANLEY

UND

2.00

42

PLOMADA DE I KILO CILINDRICA

UND

0.00

43

REGLA DE ALUMINIO X 6 MTS.

UND

2.00

44

ESCOBILLONES DE ACERO

UND

42.00

45

PLOMADA DE I KILO CONICA

UND

1.00

46

DADOS MILIMETRADOS

JGO.

1.00

47

ESCOBA HUDE

UND

11.00

48

BALDES VACIOS

UND

0.00

49

BROCAS DE 1/2" DE FIERRO

UND

0.00

50

BROCA DE 3/8" DE FIERRO

UND

0.00

51

BROCA DE 1/4" DE FIERRO

UND

0.00

52

CUCHILLA GARLOPA

UND

0.00

53

LLANTAS DE REPUESTO DE CARRETILLA TRUPER

UND

0.00

54

TALADRO CROW

UND

0.00

55

LINTERNA GRANDE CON A CTE. 700WAS

UND

0.00

56

WINCHA DE 60 MTS. STANLEY

UND

0.00

57

INFLADOR PARA LLANTAS

UND

0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

4
2

1
80

19

24

5
1
5
1
5
6
10

10
1
1
1
1
1

1
1

58

PARCHE Y LIQUIDO

CAJ.

0.00

59

PIEDRA ESMIRIL 7

UND

0.00

60

CIZALLA 750 A 900 MM

UND

0.00

61

BOTAS DE JEBE CON PUNTA DE ACERO

UND

0.00

62

BALANSA DE 20 KLS.

UND

0.00

63

MOTOR KOULER PARA MESCLADORA

UND

0.00

E
S
E
S
E
S
E
S
E
S
E
S

1
3
2
14
1
1
1

MUNICIPALIDAD D

MOVIMIENTO D
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

SALDO

TERMOMAGNETICOS DE 40 AMPERIOS

UND

2.00

FOCOS DE 100 WTS

UND

22.00

SOQUET DE LOZA

UND

18.00

CINTA AISLANTE DE 3 M

UND

0.00

TERMOMAGNETICO DE 30 AMPERIOS

UND

3.00

CABLE INDECO UNIPOLARES AMARILLO Y BLANCO

RLLO

0.00

CONDUCTOR ELECTRICO N 08 TWS

MTS

0.00

CONDUCTOR ELECTRICO NLT 1X2 N 12

MTS

200.00

TOMA CORRIENTE MULTIPLE SOBREPONER

UND

4.00

10

INTERRUPTOR 60A ATORNILLABLE

UND

0.00

11

INTERRUPTOR 40 A ATORNILLABLE

UND

0.00

12

CONDUCTOR ELECTRICO NLT 1X2 N 14

MTS

0.00

13

CABLE MILLIZO 2X12 INDECO

RLLS

0.00

14

CAJA DE PASO 6X6X2 METALICO GALV.

UND.

10.00

16

TOMACORRIENTE DOBLES

UND

0.00

17

INTERRUPTOR

UND

0.00

18

LAMPARAS FLUORECENTE DE 40W INCLUYE EQUIPO


RECTANGULAR

UND

0.00

19

CAJAS RECTANGULARESL PVC SEL

UND

200.00

20

CAJAS OCTAGONALES PVC SEL

UND

200.00

21

REFLECTOR PHILIPIS 400W

UND

0.00

Correspondiente

: MAYO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

MUNICIPALIDAD D

MOVIMIENTO D
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

SALDO

EQ.

0.00

COMPUTADORA (CPU, TECLADO, MONITRO, MAUSE)

CARTUCHO TINTA NEGRA N 40 CANON

UND

0.00

CARTUCHO TINTA COLOR N 41 CANON

UND

0.00

PAPEL BOND A4 X 75 GS.

MILL.

0.00

ARCHIVADORES T/OFICIO

UND

0.00

ENGRAPADOR

UND

0.00

PERFORADOR

UND

0.00

RESALTADOR

UND

0.00

PEGAMENTO EN BARRA UHU

UND

0.00

10

CUADERNO # 200 HOJAS ANILLADO

UND

2.00

11

CINTA MASKING DE 2"

UND

3.00

12

CORRECTOR

UND

0.00

13

CUTER

UND

0.00

14

LAPICERO TINTA LIQUIDA

UND

0.00

15

PLUMON INDELEBLE

UND

0.00

16

POS IT

PAQ.

3.00

17

PORTA MINAS

UND

1.00

18

MINAS RECARGABLES 0.5 HB

UND

1.00

19

PIZARRA ACRILICA DE 2X1.2

UND

0.00

20

PLUMON DE PIZARRA ACRILICA

UND

3.00

21

MOTA PARA PIZARRA ACRILICA

UND

0.00

22

FRANELA

MTS

0.00

22

IMPRESORA HP DISKIET F 2480 MULTIFUNCIONAL

EQ.

0.00

23

CUADERNO DE OBRA

UND

8.00

Correspondiente

: MAYO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

10

10

10
1

5
1
1

24

TONER HP LASER 53 A

UND

0.00

25

TALONARIO DE PARTE DIARIO MOVIMIENTO DE


MATERIAL

UND

8.00

26

TALONARIO BINCARD DE ALMACEN

UND

8.00

27

BINCAR

0.00

28

NOTA ENTRADA DE ALMACEN

UND

12.00

29

NOTA DE SALIDA DE ALMACEN

UND

12.00

30

LAPIZ BICOLOR

CAJ.

0.00

31

TIZAS DE COLOR

CAJ.

0.00

32

LAPICERO FABER CASTELL X 50 UND.

CAJ.

0.00

33

MEMORIA USB KINSTONG 4 GB

UND

0.00

34

SELLOS TIPO LAPICERO

UND

0.00

35

ESPIRAL # 12

UND

0.00

36

ESPIRAL # 18

UND

0.00

37

MICA PARA ANILLADO

UND

0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10
10
1
3
1
3
2
6
6
12

MUNICIPALIDAD D

MOVIMIENTO DE
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

SALDO

HORMIGON

M3

206.00

PIEDRA GRANDE

M3

28.00

PIEDRA CHANCADA 1/2 - 3/4

M3

0.00

ARENA FINA

M3

0.00

Correspondiente

: MAYO -2010

S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

40
4

10

11

7.3

10

40
7

8.9

15

13

15
0.6

0.7

0.4

0.5

18

MUNICIPALIDAD D

MOVIMIENTO DE
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

SALDO

PETROLEO

GLNS.

100.00

GASOLINA

GLNS.

49.00

ACEITE MULTIGRADO DE 30

LTS

2.00

GRASA GRUESA

KLS

0.00

ACEITE MOVIL SUPER 1000 20W-50

GLNS.

15.00

GRASA H-3 VISTONE

KLS

9.00

FILTROS DE AIRE PARA COMPACTADORA AF2E28

UND

2.00

Correspondiente

: MAYO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

15

25

10

20

25

13

1.5

0.5

15

25

10

15

25

10

7.5

1.5

15

10

18

12

0.5

0.5

25

20

35

15

10

27

24

38

15

1.5

1.5

1.5

1
2

MUNICIPALIDAD D

MOVIMIENTO DE
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO

Correspondiente

: MAYO -2010

BIENES DE CONSUMO

DESCRIPCION

UND

SALDO

AZUCAR

KLS.

23.50

ARROZ

KLS.

7.00

FIDEO

KLS.

20.00

GLNS.

0.00

ARINA

KLS.

20.00

CALDOS MAGUI

PAQ.

0.00

SAL YODADA

KLS.

4.00

AYUDIN

UND.

3.00

MORON DE CEBADA

KLS.

0.00

ACEITE DE COCINA

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

4.5

50
3.5

3.5

1.5

3.5

5.5

50

100
8

20

10
5

10

1
2

20
1

1
20
4

N
1

DESCRIPCION

JABON LIQUIDO

UND

SALDO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

CIPALIDAD DISTRITAL DE LAYO

OVIMIENTO DE ALMACEN DIARIO

30

31
720
65

3
4

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

671.00

1434.00

1,466.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

10.00

0.00

597.75

0.00

118.25

96.50

0.00

154.50

0.00

0.00

0.00

314.50

565.00

251.00

1.00

0.00

0.00

3939.00
3262.00
4.00
4.00
6.00
6.00
8.00
8.00
6.00
6.00
8.00
8.00
4.00
4.00
5.00
5.00
7.00
7.00
21.00
21.00
2.00
2.00
7.00
7.00
2.00
2.00
6.00
6.00
11.00
9.00
10.00
10.00
6.00
6.00
6.00
6.00
19.00
9.00
825.00
165.75
314.50
180.50
10.00
10.00
1085.00
271.00
2.00
1.00

CIPALIDAD DISTRITAL DE LAYO

OVIMIENTO DE ALMACEN DIARIO

30

31

25

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

1.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

648.00

0.00

0.00

50.00

0.00

0.00

800.00

0.00

0.00

100.00

0.00

0.00

1174.50

0.00

241.00

60.00

0.00

0.00

6.75

0.00

3.25

51.00

0.00

5.50

0.00

0.00

0.00

94.75

0.00

4.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.00

0.00

0.00

94.00

0.00

4.00

99.00

0.00

0.00

9.50

0.00

0.00

15.00

0.00

0.00

10.00

0.00

0.00

20.00

0.00

0.00

1.00
0.00
1.00
1.00
2.00
2.00
2.00
2.00
648.00
0.00
50.00
0.00
800.00
0.00
100.00
0.00
1500.00
249.00
60.00
0.00
10.00
3.25
60.50
6.50
2.00
2.00
100.00
4.50
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
25.00
0.00
98.00
4.00
99.00
0.00
9.50
0.00
15.00
0.00
10.00
0.00
20.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.00

0.00

0.00

650.00

0.00

0.00

13.00

0.00

14.00

3.00

0.00

0.00

20.00

20.00

0.00

3.00

3.00

0.00

7.00

7.00

0.00

5.00

5.00

0.00

1.00

1.00

0.00

0.00

25.00

25.00

6.00

6.00

0.00

300.00

300.00

0.00

0.00

17.00

17.00

2.00
2.00
6.00
2.00
20.00
20.00
40.00
22.00
4.00
0.00
650.00
0.00
27.00
14.00
3.00
0.00
20.00
0.00
3.00
0.00
7.00
0.00
5.00
0.00
1.00
0.00
25.00
25.00
6.00
0.00
300.00
0.00
17.00
17.00

CIPALIDAD DISTRITAL DE LAYO

OVIMIENTO DE ALMACEN DIARIO

30

31

20

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

287.00

0.00

0.00

TOTAL ACUMULADO

27.00

0.00

0.00

570.00

1150.00

580.00

600.00

1212.00

679.00

0.00

0.00

0.00

0.00

0.00

0.00

52.00

0.00

10.00

2.00

0.00

0.00

20.00

40.00

20.00

287.00
0.00
30.00
0.00
1355.00
583.00
1612.00
679.00
0.00
0.00
0.00
0.00
62.00
10.00
2.00
0.00
40.00
20.00

CIPALIDAD DISTRITAL DE LAYO

OVIMIENTO DE ALMACEN DIARIO

30

31

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

1.00

250.00

249.00

TOTAL ACUMULADO

230.00

0.00

440.00

642.00

0.00

2.00

0.00

79.00

431.00

528.00

0.00

20.00

1010.00
249.00
1100.00
440.00
700.00
2.00
2575.00
431.00
570.00
20.00

CIPALIDAD DISTRITAL DE LAYO

OVIMIENTO DE ALMACEN DIARIO

30

31

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

1.00

0.00

0.00

59.00

70.00

18.00

76.00

0.00

10.00

0.00

0.00

0.00

7.00

0.00

1.00

5.00

0.00

4.00

0.00

0.00

0.00

66.00

0.00

4.00

30.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

6.00

0.00

0.00

0.00

11.00

0.00

4.00

21.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

0.00

0.00

7.00

0.00

0.00

4.00

0.00

0.00

9.00

0.00

0.00

0.00

0.00

0.00

6.00

0.00

0.00

40.00
0.00
170.00
107.00
100.00
10.00
5.00
4.00
20.00
4.00
30.00
4.00
6.00
6.00
80.00
12.00
50.00
5.00
2.00
2.00
20.00
18.00
20.00
11.00
2.00
1.00
25.00
6.00
50.00
7.00
30.00
15.00
10.00
10.00
40.00
20.00
26.00
26.00
7.00
0.00
4.00
0.00
9.00
0.00
5.00
5.00
6.00

6.00

0.00

0.00

0.00

3.00

0.00

2.00

25.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.00

0.00

0.00

0.00

4.00

0.00

0.00

10.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

2.00

4.00

2.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

1.00

42.00

0.00

0.00

1.00

0.00

0.00

1.00

0.00

0.00

8.00

0.00

3.00

73.00

100.00

27.00

4.00

5.00

1.00

4.00

5.00

1.00

5.00

5.00

0.00

6.00

6.00

0.00

20.00

20.00

0.00

1.00

2.00

1.00

0.00

1.00

1.00

1.00

1.00

0.00

1.00

1.00

0.00

5.00
2.00
25.00
0.00
0.00
0.00
3.00
3.00
2.00
2.00
30.00
18.00
5.00
3.00
4.00
0.00
10.00
0.00
100.00
100.00
1.00
0.00
0.00
0.00
4.00
2.00
0.00
0.00
2.00
0.00
0.00
0.00
5.00
4.00
42.00
0.00
1.00
0.00
1.00
0.00
11.00
3.00
100.00
27.00
5.00
1.00
5.00
1.00
5.00
0.00
6.00
0.00
20.00
0.00
2.00
1.00
1.00
1.00
1.00
0.00
1.00
0.00

1.00

1.00

0.00

3.00

3.00

0.00

0.00

2.00

2.00

14.00

14.00

0.00

1.00

1.00

0.00

0.00

1.00

1.00

1.00
0.00
3.00
0.00
2.00
2.00
14.00
0.00
1.00
0.00
1.00
1.00

CIPALIDAD DISTRITAL DE LAYO

OVIMIENTO DE ALMACEN DIARIO

30

31

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

2.00

0.00

0.00

22.00

0.00

0.00

18.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

0.00

0.00

200.00

0.00

0.00

0.00

0.00

0.00

2.00
0.00
22.00
0.00
18.00
0.00
5.00
2.00
3.00
0.00
0.00
0.00
0.00
0.00
200.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
0.00
5.00
5.00
8.00
7.00
7.00
5.00
200.00
0.00
200.00
0.00
0.00
0.00

CIPALIDAD DISTRITAL DE LAYO

VIMIENTO DE ALMACEN DIARIO

30

31

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.00

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

10.00

0.00

0.00

0.00

0.00

12.00

10.00

0.00

3.00

0.00

0.00

10.00

10.00

0.00

1.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

5.00

5.00

1.00

0.00

0.00

1.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.00

0.00

0.00

2.00
2.00
3.00
0.00
1.00
0.00
8.00
1.00
8.00
8.00
1.00
1.00
1.00
1.00
14.00
4.00
2.00
0.00
20.00
5.00
5.00
1.00
14.00
1.00
3.00
2.00
6.00
3.00
4.00
4.00
5.00
1.00
8.00
2.00
5.00
3.00
1.00
1.00
7.00
2.00
1.00
1.00
1.00
1.00
0.00
0.00
8.00
0.00

0.00

0.00

0.00

8.00

0.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

10.00

2.00

0.00

10.00

1.00

1.00

0.00

3.00

3.00

0.00

1.00

1.00

0.00

3.00

3.00

0.00

2.00

2.00

0.00

6.00

6.00

0.00

6.00

6.00

0.00

12.00

12.00

0.00

0.00
0.00
8.00
0.00
8.00
0.00
0.00
0.00
12.00
10.00
12.00
10.00
1.00
0.00
3.00
0.00
1.00
0.00
3.00
0.00
2.00
0.00
6.00
0.00
6.00
0.00
12.00
0.00

CIPALIDAD DISTRITAL DE LAYO

VIMIENTO DE ALMACEN DIARIO

30

31
6.5

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

208.30

80.00

77.70

28.00

0.00

0.00

28.70

30.00

1.30

17.10

18.00

0.90

590.00
381.70
60.00
32.00
30.00
1.30
18.00
0.90

CIPALIDAD DISTRITAL DE LAYO

VIMIENTO DE ALMACEN DIARIO

30

31

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

52.00

240.00

288.00

2.50

0.00

46.50

1.00

0.00

1.00

0.00

0.00

0.00

15.00

0.00

0.00

8.00

0.00

1.00

0.00

0.00

2.00

TOTAL ACUMULADO

2431.00
2453.00
122.25
119.75
4.00
3.00
2.00
2.00
15.00
0.00
10.00
2.00
2.00
2.00

CIPALIDAD DISTRITAL DE LAYO

VIMIENTO DE ALMACEN DIARIO

30

31
5
5
2
1
3

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

49.50

105.00

79.00

10.00

100.00

97.00

9.00

40.00

51.00

-1.00

2.00

3.00

13.00

0.00

7.00

0.00

0.00

0.00

17.00

20.00

7.00

1.00

0.00

2.00

4.00

20.00

16.00

155.00
105.50
150.00
140.00
80.00
71.00
3.00
4.00
20.00
7.00
1.00
1.00
30.00
13.00
5.00
4.00
20.00
16.00

30

31

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

FECHA: ABRIL - 2010

ESP.

O/C. N

GASTOS

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

383

739.00

24.30

17,957.70

1,750.00

24.50

42,875.00

1,786.00

24.30

71

0.00

23.00

0.00

0.00

23.00

0.00

0.00

23.00

68

0.00

18.00

0.00

0.00

18.00

0.00

0.00

18.00

68

0.00

9.00

0.00

0.00

9.00

0.00

0.00

9.00

68

0.00

4.50

0.00

0.00

4.50

0.00

0.00

4.50

68

0.00

4.50

0.00

0.00

4.50

0.00

0.00

4.50

68

0.00

8.00

0.00

0.00

8.00

0.00

0.00

8.00

69

0.00

6.00

0.00

0.00

6.00

0.00

0.00

6.00

71

0.00

2.00

0.00

0.00

2.00

0.00

0.00

2.00

71

0.00

2.00

0.00

0.00

2.00

0.00

0.00

2.00

71

0.00

2.00

0.00

0.00

2.00

0.00

0.00

2.00

68

0.00

12.00

0.00

0.00

12.00

0.00

0.00

12.00

71

0.00

17.00

0.00

0.00

17.00

0.00

0.00

17.00

72

0.00

20.00

0.00

0.00

20.00

0.00

0.00

20.00

72

2.00

0.80

1.60

0.00

0.80

0.00

0.00

0.80

72

0.00

2.00

0.00

0.00

2.00

0.00

0.00

2.00

72

0.00

1.00

0.00

0.00

1.00

0.00

0.00

1.00

72

0.00

4.00

0.00

0.00

4.00

0.00

0.00

4.00

72

0.00

1.00

0.00

0.00

1.00

0.00

0.00

1.00

716.00

0.00

0.00

0.00

0.00

0.00

41.00

0.00

251.00

0.00

0.00

0.00

0.00

0.00

32.00

0.00

72

0.00

7.50

0.00

0.00

7.50

0.00

0.00

7.50

72

0.50

5.00

2.50

0.00

5.00

0.00

397.00

5.00

68

1.00

15.00

15.00

0.00

15.00

0.00

0.00

15.00

#REF!

#REF!

SALDO DE ALMACEN ACTUAL


TOTAL

43,399.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,985.00
0.00
#REF!

CANT.

TOTAL

OBSERVACIONES

703.00

17,082.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

1.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

675.00

0.00

NO TIENE O/C

219.00

0.00

NO TIENE O/C

0.00

0.00

-396.50

-1,982.50

1.00

15.00
#REF!

MNA

FECHA: ABRIL - 2010

ESP.

O/C. N

GASTOS

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

69

1.00

2.00

2.00

0.00

2.00

0.00

0.00

2.00

70

1.00

0.00

0.00

0.00

19.50

0.00

6.00

19.50

69

0.00

6.00

0.00

0.00

6.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

648.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

800.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,415.50

0.00

0.00

0.00

0.00

0.00

55.50

0.00

60.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

56.50

0.00

0.00

0.00

0.00

0.00

0.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

99.25

0.00

0.00

0.00

0.00

0.00

0.75

0.00

146

0.00

550.00

0.00

0.00

550.00

0.00

0.00

550.00

146

0.00

600.00

0.00

0.00

600.00

0.00

0.00

600.00

146

0.00

650.00

0.00

0.00

650.00

0.00

0.00

650.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

300

25.00

8.80

220.00

0.00

0.00

0.00

0.00

0.00

300

98.00

2.00

196.00

0.00

0.00

0.00

2.00

2.00

300

99.00

2.00

198.00

0.00

0.00

0.00

1.00

2.00

300

9.50

10.00

95.00

0.00

0.00

0.00

0.50

10.00

300

15.00

13.00

195.00

0.00

0.00

0.00

0.00

13.00

300

10.00

19.00

190.00

0.00

19.00

0.00

0.00

19.00

300

20.00

48.00

960.00

0.00

48.00

0.00

0.00

48.00

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
117.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
2.00
5.00
0.00
0.00
0.00

CANT.

TOTAL

OBSERVACIONES

1.00

2.00

-5.00

-97.50

0.00

0.00

0.00

0.00

NO TIENE O/C.

648.00

0.00

NO TIENE O/C.

50.00

0.00

NO TIENE O/C.

800.00

0.00

NO TIENE O/C.

100.00

0.00

NO TIENE O/C.

1,360.00

0.00

NO TIENE O/C.

60.00

0.00

NO TIENE O/C.

10.00

0.00

NO TIENE O/C.

56.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

98.50

0.00

NO TIENE O/C.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.00

0.00

96.00

192.00

98.00

196.00

9.00

90.00

15.00

195.00

10.00

190.00

20.00

960.00

NO TIENE O/C.

300

20.00

48.00

960.00

0.00

48.00

0.00

0.00

48.00

0.00

20.00

960.00

300

0.00

255.00

0.00

0.00

255.00

0.00

0.00

255.00

300

3.00

40.00

120.00

0.00

40.00

0.00

1.00

40.00

278

0.00

15.00

0.00

0.00

15.00

0.00

0.00

0.00

278

0.00

15.00

0.00

0.00

15.00

0.00

18.00

15.00

4.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

650.00

0.00

0.00

5.00

0.00

0.00

0.00

0.00

27.00

0.00

0.00

42.00

0.00

0.00

15.00

0.00

3.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

1,986.00

0.00

0.00
40.00
0.00
270.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
438.00

0.00

0.00

2.00

80.00

0.00

0.00

-18.00

-270.00

8.00

0.00

NO TIENE O/C.

655.00

0.00

NO TIENE O/C.

54.00

0.00

NO TIENE O/C.

6.00

0.00

NO TIENE O/C.

3.00

0.00

NO TIENE O/C.

3.00

0.00

NO TIENE O/C.

3.00

0.00

NO TIENE O/C.

3.00

0.00

NO TIENE O/C.

3.00

0.00

NO TIENE O/C.

3.00

0.00

NO TIENE O/C.

3.00

0.00

NO TIENE O/C.

3.00

0.00

NO TIENE O/C.

3.00

0.00

NO TIENE O/C.

1,537.50

FECHA: ABRIL - 2010


ESP.

O/C. N

GASTOS

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

287.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

27.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

186.00

0.00

67.00

0.00

0.00

0.00

0.00

0.00

327.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

2.00

0.00

300

62.00

30.00

1,860.00

0.00

30.00

0.00

8.00

30.00

300

2.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

300

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

1,860.00

0.00

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
240.00
0.00
0.00
240.00

CANT.

TOTAL

OBSERVACIONES

287.00

0.00

NO TIENE O/C.

27.00

0.00

NO TIENE O/C.

-186.00

0.00

NO TIENE O/C.

-260.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

62.00

1,860.00

4.00

0.00

NO TIENE O/C.

2.00

0.00

NO TIENE O/C.

1,860.00

FECHA: ABRIL - 2010

ESP.
GASTOS

O/C. N

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

0.00

0.00

0.00

0.00

0.00

0.00

368.00

0.00

670.00

0.00

0.00

0.00

0.00

0.00

130.00

0.00

644.00

0.00

0.00

0.00

0.00

0.00

56.00

0.00

352.00

0.00

0.00

0.00

0.00

0.00

1,066.00

0.00

548.00

0.00

0.00

0.00

0.00

0.00

22.00

0.00

0.00

0.00

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
0.00
0.00
0.00
0.00
0.00

CANT.

TOTAL

OBSERVACIONES

-368.00

0.00

NO TIENE O/C.

540.00

0.00

NO TIENE O/C.

588.00

0.00

NO TIENE O/C.

-714.00

0.00

NO TIENE O/C.

526.00

0.00

NO TIENE O/C.

0.00

FECHA: ABRIL - 2010

ESP.
GASTOS

O/C. N

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

65

1.00

30.00

30.00

0.00

30.00

0.00

14.00

30.00

64

7.00

9.00

63.00

0.00

9.00

0.00

58.00

9.00

64

86.00

9.50

817.00

0.00

9.50

0.00

11.00

9.50

65

0.00

25.00

0.00

0.00

25.00

0.00

0.00

25.00

65

8.00

10.00

80.00

0.00

10.00

0.00

5.00

10.00

64

9.00

10.00

90.00

0.00

10.00

0.00

21.00

10.00

65

0.00

37.00

0.00

0.00

37.00

0.00

0.00

37.00

289

70.00

4.50

315.00

0.00

4.50

0.00

1.00

4.50

64

0.00

36.00

0.00

0.00

36.00

0.00

0.00

36.00

65

0.00

670.00

0.00

0.00

670.00

0.00

0.00

670.00

64

0.00

190.00

0.00

0.00

190.00

0.00

2.00

190.00

64

8.00

19.00

152.00

0.00

19.00

0.00

3.00

19.00

64

0.00

60.00

0.00

0.00

60.00

0.00

1.00

60.00

64

15.00

21.00

315.00

0.00

21.00

0.00

3.00

21.00

64

27.00

12.00

324.00

0.00

12.00

0.00

7.00

12.00

64

0.00

10.00

0.00

0.00

10.00

0.00

2.00

10.00

64

4.00

70.00

280.00

0.00

70.00

0.00

2.00

70.00

301

20.00

30.00

600.00

0.00

30.00

0.00

20.00

30.00

0.00

0.00

0.00

26.00

0.00

0.00

0.00

0.00

70

7.00

0.00

0.00

12.00

2.50

30.00

2.00

2.50

289

0.00

15.00

0.00

10.00

15.00

150.00

6.00

15.00

289

9.00

98.00

882.00

0.00

98.00

0.00

1.00

98.00

289

0.00

90.00

0.00

0.00

0.00

0.00

0.00

0.00

289

6.00

45.00

270.00

0.00

45.00

0.00

1.00

45.00

SALDO DE ALMACEN ACTUAL


TOTAL

420.00
522.00
104.50
0.00
50.00
210.00
0.00
4.50
0.00
0.00
380.00
57.00
60.00
63.00
84.00
20.00
140.00
600.00
0.00
5.00
90.00
98.00
0.00
45.00

CANT.

TOTAL

-13.00

-390.00

-51.00

-459.00

75.00

712.50

0.00

0.00

3.00

30.00

-12.00

-120.00

0.00

0.00

69.00

310.50

0.00

0.00

0.00

0.00

-2.00

-380.00

5.00

95.00

-1.00

-60.00

12.00

252.00

20.00

240.00

-2.00

-20.00

2.00

140.00

0.00

0.00

26.00

0.00

17.00

42.50

4.00

60.00

8.00

784.00

0.00

0.00

5.00

225.00

OBSERVACIONES

289

6.00

45.00

270.00

0.00

45.00

0.00

1.00

45.00

45.00

5.00

225.00

289

5.00

12.00

60.00

0.00

12.00

0.00

2.00

12.00

289

25.00

1.20

30.00

0.00

1.20

0.00

0.00

1.20

289

0.00

1.80

0.00

0.00

1.80

0.00

25.00

1.80

289

0.00

50.00

0.00

0.00

50.00

0.00

2.00

50.00

289

0.00

20.00

0.00

0.00

20.00

0.00

0.00

20.00

289

9.00

8.00

72.00

0.00

8.00

0.00

12.00

8.00

289

0.00

25.00

0.00

0.00

25.00

0.00

2.00

25.00

289

4.00

10.00

40.00

0.00

10.00

0.00

0.00

10.00

10.00

0.00

0.00

10.00

0.00

0.00

0.00

0.00

301

100.00

2.50

250.00

0.00

0.00

0.00

0.00

0.00

301

1.00

30.00

30.00

0.00

30.00

0.00

3.00

30.00

289

0.00

320.00

0.00

0.00

320.00

0.00

2.00

320.00

351

2.00

33.00

66.00

0.00

33.00

0.00

2.00

33.00

0.00

0.00

0.00

1.00

0.00

0.00

1.00

0.00

2.00

0.00

0.00

4.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

2.00

0.00

3.00

98.00

294.00

0.00

98.00

0.00

2.00

98.00

42.00

0.00

0.00

50.00

0.00

0.00

8.00

0.00

1.00

0.00

0.00

2.00

0.00

0.00

1.00

0.00

1.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

11.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

289

24.00
0.00
45.00
100.00
0.00
96.00
50.00
0.00
0.00
0.00
90.00
640.00
66.00
0.00
0.00
0.00
196.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3.00

36.00

25.00

30.00

-25.00

0.00

-2.00

-100.00

0.00

0.00

-3.00

-24.00

-2.00

-50.00

4.00

40.00

20.00

0.00

100.00

0.00

-2.00

-60.00

-2.00

-640.00

0.00

0.00

0.00

0.00

NO TIENE O/C.

4.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

1.00

98.00

84.00

0.00

NO TIENE O/C.

2.00

0.00

NO TIENE O/C.

2.00

0.00

NO TIENE O/C.

22.00

0.00

NO TIENE O/C.

11.00

0.00

NO TIENE O/C.

11.00

0.00

NO TIENE O/C.

11.00

0.00

NO TIENE O/C.

11.00

0.00

NO TIENE O/C.

11.00

0.00

NO TIENE O/C.

11.00

0.00

NO TIENE O/C.

11.00

0.00

NO TIENE O/C.

11.00

0.00

NO TIENE O/C.

11.00

0.00

NO TIENE O/C.

11.00

0.00

NO TIENE O/C.

NO TIENE O/C.

NO TIENE O/C.

0.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

4.00

0.00

4,766.00

180.00

0.00
0.00
0.00
0.00
0.00
0.00
3,771.00

11.00

0.00

NO TIENE O/C.

11.00

0.00

NO TIENE O/C.

11.00

0.00

NO TIENE O/C.

11.00

0.00

NO TIENE O/C.

11.00

0.00

NO TIENE O/C.

11.00

0.00

NO TIENE O/C.

694.50

FECHA: ABRIL - 2010


ESP.
GASTOS

O/C. N

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

301

22.00

2.00

44.00

0.00

2.00

0.00

0.00

2.00

301

18.00

2.50

45.00

0.00

0.00

2.50

3.00

2.50

301

0.00

3.00

0.00

0.00

3.00

0.00

3.00

3.00

301

3.00

40.00

120.00

0.00

40.00

0.00

3.00

40.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

30.00

0.00

200.00

0.00

0.00

0.00

0.00

0.00

100.00

0.00

4.00

0.00

0.00

0.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

0.00

301

0.00

160.00

0.00

0.00

160.00

0.00

0.00

160.00

300

10.00

15.00

150.00

0.00

15.00

0.00

0.00

15.00

69

0.00

4.50

0.00

0.00

4.50

0.00

0.00

4.50

69

0.00

3.50

0.00

0.00

3.50

0.00

1.00

3.50

69

0.00

23.00

0.00

0.00

23.00

0.00

2.00

23.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

380.00

0.00

0.00

0.00

0.00

3.00

380.00

300

359.00

2.50

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
0.00
7.50
9.00
120.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.50
46.00
0.00
0.00
1,140.00
1,326.00

CANT.

TOTAL

OBSERVACIONES

2.00

0.00

25.00

50.00

15.00

37.50

-3.00

-9.00

0.00

0.00

0.00

0.00

NO TIENE O/C.

-30.00

0.00

NO TIENE O/C.

100.00

0.00

NO TIENE O/C.

-2.00

0.00

NO TIENE O/C.

0.00

0.00

NO TIENE O/C.

-5.00

0.00

NO TIENE O/C.

-200.00

0.00

NO TIENE O/C.

0.00

0.00

10.00

150.00

0.00

0.00

-1.00

-3.50

-2.00

-46.00

200.00

0.00

NO TIENE O/C.

200.00

0.00

NO TIENE O/C.

-3.00

-1,140.00
179.00

NO TIENE O/C.

FECHA: ABRIL - 2010


ESP.

O/C. N

GASTOS

SALDO ANTERIOR
CANT.

P.UNITA.

0.00

INGRESO
TOTAL

CANT.

0.00

0.00

P.UNITA.

EGRESO
TOTAL

CANT.

0.00

0.00

P.UNITA.

SALDO DE ALMACEN ACTUAL


TOTAL

0.00

73

0.00

78.00

0.00

0.00

78.00

0.00

3.00

78.00

73

0.00

80.00

0.00

0.00

80.00

0.00

1.00

80.00

73

0.00

28.00

0.00

0.00

28.00

0.00

2.00

28.00

73

0.00

6.00

0.00

0.00

6.00

0.00

0.00

6.00

73

0.00

15.00

0.00

0.00

15.00

0.00

0.00

15.00

73

0.00

15.00

0.00

0.00

15.00

0.00

0.00

15.00

73

0.00

3.00

0.00

0.00

3.00

0.00

0.00

3.00

73

0.00

9.00

0.00

0.00

9.00

0.00

2.00

9.00

73

2.00

11.00

22.00

0.00

11.00

0.00

3.00

11.00

73

3.00

8.00

24.00

0.00

8.00

0.00

0.00

8.00

74

0.00

4.00

0.00

0.00

4.00

0.00

2.00

4.00

74

0.00

2.00

0.00

0.00

2.00

0.00

0.00

2.00

74

0.00

4.00

0.00

0.00

4.00

0.00

1.00

4.00

74

0.00

2.00

0.00

0.00

2.00

0.00

0.00

2.00

74

3.00

19.50

58.50

0.00

19.50

0.00

0.00

19.50

74

1.00

4.00

4.00

0.00

4.00

0.00

0.00

4.00

74

1.00

1.50

1.50

0.00

1.50

0.00

1.00

1.50

74

0.00

170.00

0.00

0.00

170.00

0.00

0.00

170.00

74

3.00

3.00

9.00

0.00

3.00

0.00

2.00

3.00

74

0.00

3.00

0.00

0.00

3.00

0.00

0.00

3.00

74

0.00

5.00

0.00

0.00

5.00

0.00

0.00

5.00

157

0.00

280.00

0.00

0.00

280.00

0.00

0.00

280.00

73

8.00

28.50

228.00

0.00

28.50

0.00

2.00

28.50

234.00
80.00
56.00
0.00
0.00
0.00
0.00
18.00
33.00
0.00
8.00
0.00
4.00
0.00
0.00
0.00
1.50
0.00
6.00
0.00
0.00
0.00
57.00

CANT.

TOTAL

0.00

0.00

-3.00

-234.00

-1.00

-80.00

-2.00

-56.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

-2.00

-18.00

-1.00

-11.00

3.00

24.00

-2.00

-8.00

0.00

0.00

-1.00

-4.00

0.00

0.00

3.00

58.50

1.00

4.00

0.00

0.00

0.00

0.00

1.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

6.00

171.00

OBSERVACIONES

NO TIENE O/C.

73

0.00

335.00

0.00

0.00

335.00

0.00

2.00

335.00

73

8.00

335.00

2,680.00

0.00

335.00

0.00

0.00

335.00

73

8.00

335.00

2,680.00

0.00

335.00

0.00

0.00

335.00

73

0.00

335.00

0.00

0.00

335.00

0.00

2.00

335.00

73

12.00

335.00

4,020.00

10.00

335.00

3,350.00

0.00

335.00

73

12.00

335.00

4,020.00

2.00

335.00

670.00

0.00

335.00

73

0.00

335.00

0.00

2.00

335.00

670.00

0.00

335.00

73

0.00

335.00

0.00

2.00

335.00

670.00

0.00

335.00

73

0.00

335.00

0.00

2.00

335.00

670.00

0.00

335.00

73

0.00

335.00

0.00

2.00

335.00

670.00

0.00

335.00

73

0.00

335.00

0.00

2.00

335.00

670.00

0.00

335.00

73

0.00

335.00

0.00

2.00

335.00

670.00

0.00

335.00

73

0.00

335.00

0.00

2.00

335.00

670.00

0.00

335.00

73

0.00

335.00

0.00

2.00

335.00

670.00

0.00

335.00

670.00
0.00
0.00
670.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

-2.00

-670.00

8.00

2,680.00

8.00

2,680.00

-2.00

-670.00

22.00

7,370.00

14.00

4,690.00

2.00

670.00

2.00

670.00

2.00

670.00

2.00

670.00

2.00

670.00

2.00

670.00

2.00

670.00

2.00

670.00

FECHA: ABRIL - 2010

ESP.
GASTOS

O/C. N

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

SALDO DE ALMACEN ACTUAL


TOTAL

CANT.

TOTAL

206.00

0.00

0.00

510.00

0.00

0.00

304.00

0.00

0.00

412.00

0.00

28.00

0.00

0.00

60.00

0.00

0.00

32.00

0.00

0.00

56.00

0.00

0.00

0.00

0.00

60.00

0.00

0.00

32.00

0.00

0.00

28.00

0.00

0.00

0.00

0.00

60.00

0.00

0.00

32.00

0.00

0.00

28.00

0.00

OBSERVACIONES

FECHA: ABRIL - 2010

ESP.

O/C. N

GASTOS

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

SALDO DE ALMACEN ACTUAL


TOTAL

CANT.

TOTAL

56

100.00

0.00

0.00

980.00

0.00

0.00

880.00

0.00

0.00

0.00

0.00

56

49.00

0.00

0.00

96.25

0.00

0.00

47.50

0.00

0.00

0.00

0.00

351

2.00

0.00

0.00

4.00

31.25

125.00

2.00

0.00

0.00

0.00

0.00

351

0.00

0.00

0.00

2.00

25.00

50.00

2.00

0.00

0.00

0.00

0.00

56

15.00

0.00

0.00

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

56

9.00

0.00

0.00

10.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

56

2.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

OBSERVACIONES

FECHA: ABRIL - 2010

ESP.
GASTOS

O/C. N

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

SALDO DE ALMACEN ACTUAL


TOTAL

CANT.

TOTAL

23.50

0.00

0.00

50.00

0.00

0.00

26.50

0.00

0.00

47.00

0.00

7.00

0.00

0.00

50.00

0.00

0.00

43.00

0.00

0.00

14.00

0.00

20.00

0.00

0.00

40.00

0.00

0.00

20.00

0.00

0.00

40.00

0.00

0.00

0.00

0.00

5.00

0.00

0.00

5.00

0.00

0.00

0.00

0.00

20.00

0.00

0.00

20.00

0.00

0.00

20.00

0.00

0.00

20.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

4.00

0.00

0.00

10.00

0.00

0.00

6.00

0.00

0.00

8.00

0.00

3.00

0.00

0.00

5.00

0.00

0.00

2.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

5.00

0.00

0.00

2.00

0.00

0.00

3.00

0.00

OBSERVACIONES

ESP.
GASTOS

O/C. N

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

SALDO DE ALMACEN ACTUAL


TOTAL

CANT.

TOTAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

OBSERVACIONES

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

CEMENTO PORTLAND TIPO IP x 42.5 KG

BLS

671.00

BAO TURCO DE GRANITO

UND

0.00

TUBERIA PVC SAL DE 4"

UND

0.00

TUBERIA PVC SAL DE 2"

UND

0.00

CODO PVC SAL DE 4" DE 90

UND

0.00

CODO PVC SAL DE 4" DE 45

UND

0.00

YEE PVC SAL DE 4"

UND

0.00

YEE PVC SAL DE 4"x2"x4"

UND

0.00

CODO PVC SAL DE 2" DE 45

UND

0.00

CODO PVC SAL DE 2" DE 90

UND

0.00

YEE PVC SAL DE 2"

UND

0.00

TUBERIA PVC SAP DE 1/2" C/R C-10

UND

0.00

LLAVE PVC DE PASO DE 1/2" C/R

UND

0.00

LLAVE DE BRONCE DE 1/2" TIPO JARDINERO.

UND

0.00

CODO PVC SAP DE 1/2" C/R.

UND

2.00

CODO FG DE 1/2"

UND

0.00

TEE PVC SAP DE 1/2" C/R.

UND

0.00

SUMIDERO DE BRONCE DE 2"

UND

0.00

CINTA TEFLON

UND

10.00

CLAVO DE MADERA DE 4"

KLS

597.75

CLAVO DE MADERA DE 3"

KLS

96.50

CLAVO DE CALAMINA

KLS

0.00

ALAMBRE NEGRO N 16

KLS

314.50

ABRASADERA DE 2" PARA RED DE AGUA

UND

1.00

DESCRIPCION

Correspondiente

: JUNIO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

42

68

55

56

68

52

6.5

715
67

715

48

14

86

2.50

715

50

35

54

46

10

14.5

49

36

22

10

12

55

34

91

11

12

35

20

300
10

5.5

4.00

11 3.5

5 15.0

20

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

REDUCCION PVC SAP 3/4" - 1/2

UND

1.00

CANDADO

UND

1.00

TEE PVC SAL DE 4"x2"x4" .

UND

0.00

TEE PVC DE SAL DE 2".

UND

0.00

CODO PVC SEL DE 3/4"

UND

648.00

CODO PVC SEL DE 1"

UND

50.00

TUBERIA PVC SEL DE 3/4"

UND

800.00

TUBERIA PVC SEL DE 1"

UND

100.00

ALAMBRE NEGRO N 8

KLS

1174.50

ALAMBRE GALVANIZADO N 18.

KLS

60.00

CLAVO DE MADERA 1"

KLS

6.75

CLAVO DE MADERA DE 2"

KLS

51.00

CLAVO DE 2 1/2

KLS

0.00

CLAVO DE MADERA DE 5"

KLS

94.75

PLASTICO GRUESO DE DOBLE ANCHO 1.50 M

ROLL

0.00

PLASTICO GRUESO DE DOBLE ANCHO 2.00M

ROLL

0.00

PLASTICO GRUESO DE DOBLE ANCHO 5.00 M

ROLL

0.00

BALDE DE 5 GLNS. TRANSPARENTE

UND

0.00

MASILLA PLASTICA 0.470 LTS.

KLS.

25.00

LIJAR DE FIERRO N 80 ABRALIP

UND.

94.00

LIJAR DE FIERRO N 100 ABRALIP

UND.

99.00

CLAVO DE JUNQUILLO 1"

KLS.

9.50

CLAVO DE 3/4" TRIPLEY

KLS.

15.00

THIER ACRILICO

GLNS

10.00

LACA PIROXILINA CPP

GLNS

20.00

DESCRIPCION

Correspondiente

: JUNIO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

25

45

50

45

95

70

50

45

105

30

0.25

85

15

70

1.00

80

50

1.25 0.25

31

0.5

10

10

0.5

0.5

0.25

0.25

1
0.5

0.5

0.25

0.75

LACA PIROXILINA CPP

GLNS

20.00

AMOLADORA CROW DE 9"

GLNS

0.00

DISCO DE CONCRETO DE 9" CRUPS

UND

3.00

SELLOCORT 325X350 MM

KLS.

0.00

SUPERCITO 325 X 350

KLS.

0.00

COLA TEKNO PAR MADERA

GLNS

4.00

PERNO 1/2" X 2" CON SU TUERCA

UND.

650.00

TEKNOPOR 2.4X1.20X2"

PLCH.

13.00

PLATINA DE 1/2" X 2" e=1/8

UND.

3.00

TUBO DE PLASTISUR PVC-SWS-150-32 6" NARANJA


CON ANILLO

UND.

20.00

PEGAMENTO OATEY

GLNS

3.00

CODO 6"X45 SAL

UND.

7.00

LLAVE DE BOLA PVC 1/2"

UND.

5.00

ADEX INSTANTANIO

UND.

1.00

TUBO SAL PESADO 6"

UND.

0.00

ADITIVOS ANTIHELADISOS

GLNS

330.00

PLASTICO VIRGEN TRANSPARENTE GRUESA

MTS.

300.00

TUBOS DE 1/2" CLASE 10

UND.

0.00

CLAVO DE 11/2

KLS.

0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

1
5

10

10

28

100
10
5
10
0.25

0.25

37
5

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

ROLLISO DE EUCALIPTO DE 4"X4mts.

UND

287.00

ROLLISO DE EUCALIPTO DE 4"X6mts.

UND

27.00

LISTONES DE MADERA CORRIENTE 2"x3"x10.

UND

570.00

TABLAS DE MADERA CORRIENTE DE 1 1/2" x 8" x 10.

UND

600.00

ROLLIZO DE EUCALIPTO 3X4

UND

0.00

ROLLIZO DE EUCALIPTO 4X3

UND.

0.00

TRIPLEY 4MM

PLCH

52.00

TRIPLEY DE 18 MM

PLCH

2.00

ROLLIZO DE EUCALIPTO 5X4

UND.

0.00

MADERA TRIANGULAR DE 1"X1"X1"X10M

UND.

20.00

DESCRIPCION

Correspondiente

: JUNIO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

49
5

50

40

62

11

35

30

77

14

26

76

80
129

27
90
73

36

15

10

15

50

30

10

110

13

10

9
10

50

17

12

20

55

3
40

1
40
100

87
187

20

200
21

10

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

FIERRO CORRUGADO DE 3/4"

VLLS

1.00

FIERRO CORRUGADO DE 5/8"

VLLS

230.00

FIERRO CORRUGADO DE 1/2"

VLLS

642.00

FIERRO CORRUGADO DE 3/8"

VLLS

0.00

FIERRO CORRUGADO DE 1/4"

VLLS

528.00

DESCRIPCION

Correspondiente

: JUNIO -2010

S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

48

102
48
70

10
520
100

100

100

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

PALAS TRAMONTINA

UND

1.00

GUANTES DE CUERO

PAR

59.00

GUANTES DE JEBE

PAR

76.00

CASCO DE COLOR BLANCO

UND

0.00

CASCO DE COLOR ROJO

UND

7.00

CASCO DE COLOR AZUL

UND

5.00

COMBOS DE 6 LBS

UND

0.00

HOJA DE SIERRA SANFLEX

UND

66.00

BOTAS DE JEBE

PAR

30.00

ROLLO

0.00

CARRETILLAS ( BUGUI) TRUPER

UND

0.00

WINCHAS DE 5MTS

UND

2.00

WINCHA DE 50 MTS

UND

0.00

DISCOS DE MADERA DE 7 1/4"

UND

11.00

DISCOS DE FIERRO DE 7 1/4"

UND

21.00

CASCO DE COLOR NARANJA

UND

0.00

BARRETA DE 1"x1.5 M.

UND

0.00

PICOS

UND

0.00

ROPA DE AGUA CASACA Y PANTALON

UND

0.00

PILAS BARTA Y PANASONIC

PAR

7.00

CORDEL NAILON

UND

4.00

ARNES DE SEGURIDAD

UND

9.00

COMBO DE 20 LBS.

UND

0.00

DISCO DE MADERA DIAMANTADO 12"

UND

6.00

DESCRIPCION

ARPILLERA

Correspondiente

: JUNIO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

1
3

4
1

1
1

6
6

15
3

1
1

DISCO DE MADERA DIAMANTADO 12"

UND

6.00

TIRALINEA PLASTIFICADO

UND

3.00

MANGUERA TRANSPARENTE 3/8"

MTS.

25.00

MANGUERA TRANSPARENTE 1/2"

MTS.

0.00

NIVEL DE MANO STANLEY

UND

0.00

PLOMADAS CILINDRICAS DE 500 GRS

UND

0.00

LENTES DE PROTECCION TRANSPARENTE

UND

0.00

MARTILLO TRAMONTINA

UND

0.00

RECOGEDOR DE BASURA

UND

4.00

DISCO DE FIERRO DE 9"

UND

10.00

SOGA COLOR ROJO

MTS.

0.00

PALAS RECTAS TRAMONTINAS

UND

1.00

MANGUERA DE 1" REFORZADA

ROLLO

0.00

CORREA PARA MESCLADORA TOYOPOWER A73

UND

2.00

WINCHA STANLEY X 30MTS

UND

0.00

ESCUADRA METALICA DE 0.60CM STANLEY

UND

2.00

PLOMADA DE I KILO CILINDRICA

UND

0.00

REGLA DE ALUMINIO X 6 MTS.

UND

1.00

ESCOBILLONES DE ACERO

UND

42.00

PLOMADA DE I KILO CONICA

UND

1.00

DADOS MILIMETRADOS

JGO.

1.00

ESCOBA HUDE

UND

8.00

BALDES VACIOS

UND

73.00

BROCAS DE 1/2" DE FIERRO

UND

4.00

BROCA DE 3/8" DE FIERRO

UND

4.00

BROCA DE 1/4" DE FIERRO

UND

5.00

CUCHILLA GARLOPA

UND

6.00

LLANTAS DE REPUESTO DE CARRETILLA TRUPER

UND

20.00

TALADRO CROW

UND

1.00

LINTERNA GRANDE CON A CTE. 700WAS

UND

0.00

WINCHA DE 60 MTS. STANLEY

UND

1.00

INFLADOR PARA LLANTAS

UND

1.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

23
11

6
7

4
1
100

5
5

10
1

PARCHE Y LIQUIDO

CAJ.

1.00

PIEDRA ESMIRIL 7

UND

3.00

CIZALLA 750 A 900 MM

UND

0.00

BOTAS DE JEBE CON PUNTA DE ACERO

UND

14.00

BALANSA DE 20 KLS.

UND

1.00

MOTOR KOULER PARA MESCLADORA

UND

0.00

CHALECOS DE SEGURIDAD VERDE

UND

0.00

PROTECCION DE BOCAS NASALES

UND

0.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

70
45

9
20

4
3

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

TERMOMAGNETICOS DE 40 AMPERIOS

UND

2.00

FOCOS DE 100 WTS

UND

22.00

SOQUET DE LOZA

UND

18.00

CINTA AISLANTE DE 3 M

UND

0.00

TERMOMAGNETICO DE 30 AMPERIOS

UND

3.00

CABLE INDECO UNIPOLARES AMARILLO Y BLANCO

RLLO

0.00

CONDUCTOR ELECTRICO N 08 TWS

MTS

0.00

CONDUCTOR ELECTRICO NLT 1X2 N 12

MTS

200.00

TOMA CORRIENTE MULTIPLE SOBREPONER

UND

4.00

INTERRUPTOR 60A ATORNILLABLE

UND

0.00

INTERRUPTOR 40 A ATORNILLABLE

UND

0.00

CONDUCTOR ELECTRICO NLT 1X2 N 14

MTS

0.00

CABLE MILLIZO 2X12 INDECO

RLLS

0.00

CAJA DE PASO 6X6X2 METALICO GALV.

UND.

10.00

TOMACORRIENTE DOBLES

UND

0.00

INTERRUPTOR

UND

0.00

LAMPARAS FLUORECENTE DE 40W INCLUYE EQUIPO


RECTANGULAR

UND

0.00

CAJAS RECTANGULARESL PVC SEL

UND

200.00

CAJAS OCTAGONALES PVC SEL

UND

200.00

REFLECTOR PHILIPIS 400W

UND

0.00

DESCRIPCION

Correspondiente

: JUNIO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

5
2

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

EQ.

0.00

CARTUCHO TINTA NEGRA N 40 CANON

UND

0.00

CARTUCHO TINTA COLOR N 41 CANON

UND

0.00

PAPEL BOND A4 X 75 GS.

MILL.

4.00

ARCHIVADORES T/OFICIO

UND

0.00

ENGRAPADOR

UND

0.00

PERFORADOR

UND

0.00

RESALTADOR

UND

10.00

PEGAMENTO EN BARRA UHU

UND

0.00

CUADERNO # 200 HOJAS ANILLADO

UND

12.00

CINTA MASKING DE 2"

UND

3.00

CORRECTOR

UND

10.00

CUTER

UND

1.00

LAPICERO TINTA LIQUIDA

UND

0.00

PLUMON INDELEBLE

UND

0.00

POS IT

PAQ.

3.00

PORTA MINAS

UND

5.00

MINAS RECARGABLES 0.5 HB

UND

0.00

PIZARRA ACRILICA DE 2X1.2

UND

0.00

PLUMON DE PIZARRA ACRILICA

UND

3.00

MOTA PARA PIZARRA ACRILICA

UND

0.00

FRANELA

MTS

0.00

IMPRESORA HP DISKIET F 2480 MULTIFUNCIONAL

EQ.

0.00

UND

8.00

DESCRIPCION

COMPUTADORA (CPU, TECLADO, MONITRO, MAUSE)

CUADERNO DE OBRA

Correspondiente

: JUNIO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

TONER HP LASER 53 A

UND

0.00

TALONARIO DE PARTE DIARIO MOVIMIENTO DE


MATERIAL

UND

8.00

TALONARIO BINCARD DE ALMACEN

UND

8.00

0.00

NOTA ENTRADA DE ALMACEN

UND

2.00

NOTA DE SALIDA DE ALMACEN

UND

2.00

LAPIZ BICOLOR

CAJ.

1.00

TIZAS DE COLOR

CAJ.

3.00

LAPICERO FABER CASTELL X 50 UND.

CAJ.

1.00

MEMORIA USB KINSTONG 4 GB

UND

3.00

SELLOS TIPO LAPICERO

UND

2.00

ESPIRAL # 12

UND

6.00

ESPIRAL # 18

UND

6.00

MICA PARA ANILLADO

UND

12.00

BINCAR

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

1
30
17

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

HORMIGON

M3

257.00

PIEDRA GRANDE

M3

28.00

PIEDRA CHANCADA 1/2 - 3/4

M3

30.00

DESCRIPCION

ARENA FINA

M3

18.00

PIEDRA GRANULADA

M3

18.00

Correspondiente

: JUNIO -2010

S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

5.9

1.5

12.6
1.036 0.688 1.324 1.028

1.652 1.868 1.764

1.76 1.824 1.588

1.112

1.86

1.6

22
1.554 1.032 1.986 1.542

2.478 2.802 2.646


22

1.64

0.64

0.316

0.3

0.96

0.474

0.45

11
2.64 2.736 2.382

1.668

2.79

2.4

2.46
11

10
30
20

8.75

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


DESCRIPCION

PETROLEO

UND

SALDO

GLNS.

52.00

GLNS.

2.50

ACEITE MULTIGRADO DE 30

LTS

1.00

GRASA GRUESA

KLS

0.00

GLNS.

15.00

GRASA H-3 VISTONE

KLS

8.00

FILTROS DE AIRE PARA COMPACTADORA AF2E28

UND

0.00

GASOLINA

ACEITE MOVIL SUPER 1000 20W-50

Correspondiente

: JUNIO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

10
2

14

30

72

45

72

100

5
2

1.5

1080

20

20

0.5

0.5

0.5

20

1.5

100

4.5

0.5

0.5

0.5

0.5

0.5

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO

Correspondiente

: JUNIO -2010

BIENES DE CONSUMO

UND

SALDO

AZUCAR

KLS.

49.50

ARROZ

KLS.

10.00

FIDEO

KLS.

9.00

DESCRIPCION

GLNS.

1.00

ARINA

KLS.

13.00

CALDOS MAGUI

PAQ.

0.00

SAL YODADA

KLS.

17.00

AYUDIN

UND.

1.00

MORON DE CEBADA

KLS.

4.00

ACEITE DE COCINA

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

50
4

3.5

50
4

100
8

40
5

10

5
30

10
4

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

1773.00

2145.00

1,043.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

0.00

0.00

453.25

0.00

144.50

292.00

300.00

104.50

0.00

0.00

0.00

204.00

0.00

110.50

1.00

0.00

0.00

4650.00
2839.00
4.00
4.00
6.00
6.00
8.00
8.00
6.00
6.00
8.00
8.00
4.00
4.00
5.00
5.00
7.00
7.00
21.00
21.00
2.00
2.00
7.00
7.00
2.00
2.00
6.00
6.00
11.00
9.00
10.00
10.00
6.00
6.00
6.00
6.00
9.00
9.00
825.00
192.00
614.50
130.50
10.00
10.00
520.00
130.50
2.00
1.00

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

1.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

648.00

0.00

0.00

50.00

0.00

0.00

800.00

0.00

0.00

100.00

0.00

0.00

258.50

0.00

916.00

60.00

0.00

0.00

0.00

0.00

6.75

46.00

0.00

5.00

0.00

0.00

0.00

52.75

0.00

42.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.00

0.00

0.00

87.00

0.00

7.00

98.00

0.00

1.00

7.50

0.00

2.00

15.00

0.00

0.00

4.00

0.00

6.00

10.00

0.00

10.00

1.00
0.00
1.00
1.00
2.00
2.00
2.00
2.00
648.00
0.00
50.00
0.00
800.00
0.00
100.00
0.00
1500.00
924.00
60.00
0.00
10.00
10.00
60.50
8.25
2.00
2.00
100.00
42.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
25.00
0.00
94.00
7.00
99.00
1.00
9.50
2.00
15.00
0.00
10.00
6.00
20.00

10.00

0.00

10.00

10.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

1.00

597.00

0.00

53.00

2.00

0.00

11.00

3.00

0.00

0.00

20.00

0.00

0.00

3.00

0.00

0.00

7.00

0.00

0.00

5.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

297.00

0.00

33.00

200.00

0.00

100.00

37.00

47.00

10.00

9.50

10.00

0.50

2.00
2.00
6.00
2.00
20.00
20.00
40.00
22.00
4.00
1.00
650.00
53.00
13.00
11.00
3.00
0.00
20.00
0.00
3.00
0.00
7.00
0.00
5.00
0.00
1.00
0.00
0.00
0.00
330.00
33.00
300.00
100.00
47.00
10.00
10.00
0.50

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

-139.00

129.00

555.00

0.00

0.00

27.00

311.00

90.00

349.00

423.00

9.00

186.00

0.00

0.00

0.00

0.00

0.00

0.00

14.00

0.00

38.00

82.00

80.00

0.00

TOTAL ACUMULADO

0.00

187.00

187.00

135.00

200.00

85.00

416.00
555.00
30.00
27.00
295.00
352.00
409.00
186.00
0.00
0.00
0.00
0.00
52.00
38.00
82.00
0.00
187.00
187.00
220.00
85.00

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

103.00

150.00

48.00

TOTAL ACUMULADO

160.00

0.00

70.00

627.00

0.00

15.00

220.00

520.00

300.00

528.00

0.00

0.00

910.00
48.00
1100.00
70.00
700.00
15.00
3016.00
300.00
570.00
0.00

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

1.00

0.00

0.00

34.00

0.00

25.00

65.00

0.00

11.00

0.00

0.00

0.00

7.00

0.00

0.00

1.00

0.00

4.00

0.00

0.00

0.00

56.00

0.00

10.00

11.00

0.00

19.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

8.00

0.00

3.00

19.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.00

0.00

0.00

4.00

0.00

0.00

15.00

21.00

15.00

0.00

0.00

0.00

6.00

0.00

0.00

40.00
0.00
100.00
114.00
100.00
11.00
5.00
4.00
20.00
3.00
30.00
4.00
6.00
6.00
80.00
18.00
20.00
24.00
2.00
2.00
20.00
18.00
20.00
5.00
2.00
1.00
25.00
5.00
50.00
3.00
30.00
15.00
10.00
6.00
40.00
20.00
26.00
26.00
7.00
0.00
4.00
0.00
30.00
15.00
5.00
5.00
6.00

6.00

0.00

0.00

0.00

3.00

0.00

0.00

25.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

29.00

28.00

0.00

0.00

0.00

0.00

0.00

4.00

9.00

0.00

1.00

100.00

100.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

41.00

0.00

1.00

1.00

0.00

0.00

1.00

0.00

0.00

3.00

0.00

5.00

68.00

0.00

5.00

4.00

0.00

0.00

11.00

10.00

3.00

5.00

0.00

0.00

6.00

0.00

0.00

20.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

1.00

0.00

0.00

3.00
0.00
25.00
0.00
0.00
0.00
3.00
3.00
2.00
2.00
59.00
37.00
5.00
3.00
4.00
4.00
10.00
1.00
100.00
100.00
1.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
5.00
3.00
42.00
1.00
1.00
0.00
1.00
0.00
8.00
5.00
73.00
5.00
4.00
0.00
14.00
3.00
5.00
0.00
6.00
0.00
20.00
0.00
1.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00

1.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

14.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

12.00

70.00

58.00

17.00

20.00

3.00

1.00
0.00
3.00
0.00
0.00
0.00
14.00
0.00
1.00
0.00
0.00
0.00
70.00
58.00
20.00
3.00

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

2.00

0.00

0.00

22.00

0.00

0.00

18.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

0.00

0.00

6.00

9.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

0.00

0.00

200.00

0.00

0.00

0.00

0.00

0.00

2.00
0.00
22.00
0.00
18.00
0.00
5.00
2.00
3.00
0.00
0.00
0.00
0.00
0.00
200.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
0.00
5.00
5.00
8.00
7.00
7.00
5.00
200.00
0.00
200.00
0.00
0.00
0.00

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

0.00

0.00

0.00

0.00

0.00

10.00

0.00

2.00

3.00

0.00

0.00

10.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.00

0.00

0.00

2.00
2.00
3.00
0.00
1.00
0.00
4.00
1.00
8.00
8.00
1.00
1.00
1.00
1.00
4.00
4.00
2.00
0.00
10.00
7.00
5.00
1.00
4.00
1.00
2.00
2.00
6.00
3.00
4.00
4.00
5.00
1.00
3.00
1.00
5.00
2.00
1.00
1.00
7.00
2.00
1.00
1.00
1.00
1.00
0.00
0.00
8.00
0.00

0.00

0.00

0.00

10.00

2.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

15.00

30.00

17.00

1.00

0.00

0.00

3.00

0.00

0.00

1.00

0.00

0.00

3.00

0.00

0.00

2.00

0.00

0.00

6.00

0.00

0.00

6.00

0.00

0.00

12.00

0.00

0.00

0.00
0.00
10.00
0.00
8.00
0.00
0.00
0.00
2.00
2.00
32.00
17.00
1.00
0.00
3.00
0.00
1.00
0.00
3.00
0.00
2.00
0.00
6.00
0.00
6.00
0.00
12.00
0.00

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

220.85

0.00

36.15

28.00

0.00

0.00

20.60

12.60

22.00

28.00

43.00

33.00

61.00

63.00

20.00

510.00
340.15
60.00
32.00
12.60
22.00
43.00
33.00
63.00
20.00

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

1166.50

1312.00

197.50

83.50

105.00

24.00

0.00

0.00

1.00

0.00

0.00

0.00

15.00

0.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

TOTAL ACUMULADO

3503.00
2362.50
227.25
97.25
4.00
3.00
2.00
2.00
15.00
0.00
10.00
1.00
2.00
0.00

TOTAL ACUMULADO
TOTAL ACUMULADO

74.00

100.00

75.50

27.00

100.00

83.00

10.00

50.00

49.00

3.00

3.00

1.00

13.00

0.00

0.00

0.00

0.00

0.00

12.00

0.00

5.00

6.00

5.00

0.00

11.00

40.00

33.00

255.00
181.00
250.00
223.00
130.00
120.00
6.00
5.00
20.00
7.00
1.00
1.00
30.00
18.00
10.00
4.00
60.00
49.00

ESP.

O/C. N

GASTOS

383
71
68
68
68
68
68
69
71
71
71
68
71
72
72
72
72
72
72

72
72
68

ESP.

O/C. N

GASTOS

69
70
69

146
146
146

300
300
300
300
300
300
300

300

300
300
278
278

ESP.

O/C. N

GASTOS

300
300

300

ESP.
GASTOS

O/C. N

ESP.
GASTOS

O/C. N
65
64
64
65
65
64
65
289
64
65
64
64
64
64
64
64
64
301

70
289
289
289
289

289

289
289
289
289
289
289
289
289

301
301
289
351

289

ESP.
GASTOS

O/C. N

301
301
301
301

301
300
69
69
69

300

ESP.

O/C. N

GASTOS

73
73
73
73
73
73
73
73
73
73
74
74
74
74
74
74
74
74
74
74
74
157
73

73
73
73
73
73
73
73
73
73
73
73
73
73
73

ESP.
GASTOS

O/C. N

ESP.

O/C. N

GASTOS

56
56
351
351
56
56
56

ESP.
GASTOS

O/C. N

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

CEMENTO PORTLAND TIPO IP x 42.5 KG

BLS

1773.00

BAO TURCO DE GRANITO

UND

0.00

TUBERIA PVC SAL DE 4"

UND

0.00

TUBERIA PVC SAL DE 2"

UND

0.00

CODO PVC SAL DE 4" DE 90

UND

0.00

CODO PVC SAL DE 4" DE 45

UND

0.00

YEE PVC SAL DE 4"

UND

0.00

YEE PVC SAL DE 4"x2"x4"

UND

0.00

CODO PVC SAL DE 2" DE 45

UND

0.00

CODO PVC SAL DE 2" DE 90

UND

0.00

YEE PVC SAL DE 2"

UND

0.00

TUBERIA PVC SAP DE 1/2" C/R C-10

UND

0.00

LLAVE PVC DE PASO DE 1/2" C/R

UND

0.00

LLAVE DE BRONCE DE 1/2" TIPO JARDINERO.

UND

0.00

CODO PVC SAP DE 1/2" C/R.

UND

2.00

CODO FG DE 1/2"

UND

0.00

TEE PVC SAP DE 1/2" C/R.

UND

0.00

SUMIDERO DE BRONCE DE 2"

UND

0.00

CINTA TEFLON

UND

10.00

CLAVO DE MADERA DE 4"

KLS

453.25

CLAVO DE MADERA DE 3"

KLS

292.00

CLAVO DE CALAMINA

KLS

0.00

ALAMBRE NEGRO N 16

KLS

204.00

ABRASADERA DE 2" PARA RED DE AGUA

UND

1.00

DESCRIPCION

Correspondiente

: JULIO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

REDUCCION PVC SAP 3/4" - 1/2

UND

1.00

CANDADO

UND

1.00

TEE PVC SAL DE 4"x2"x4" .

UND

0.00

TEE PVC DE SAL DE 2".

UND

0.00

CODO PVC SEL DE 3/4"

UND

648.00

CODO PVC SEL DE 1"

UND

50.00

TUBERIA PVC SEL DE 3/4"

UND

800.00

TUBERIA PVC SEL DE 1"

UND

100.00

ALAMBRE NEGRO N 8

KLS

258.50

ALAMBRE GALVANIZADO N 18.

KLS

60.00

CLAVO DE MADERA 1"

KLS

0.00

CLAVO DE MADERA DE 2"

KLS

46.00

CLAVO DE 2 1/2

KLS

0.00

CLAVO DE MADERA DE 5"

KLS

52.75

PLASTICO GRUESO DE DOBLE ANCHO 1.50 M

ROLL

0.00

PLASTICO GRUESO DE DOBLE ANCHO 2.00M

ROLL

0.00

PLASTICO GRUESO DE DOBLE ANCHO 5.00 M

ROLL

0.00

BALDE DE 5 GLNS. TRANSPARENTE

UND

0.00

MASILLA PLASTICA 0.470 LTS.

KLS.

25.00

LIJAR DE FIERRO N 80 ABRALIP

UND.

87.00

LIJAR DE FIERRO N 100 ABRALIP

UND.

98.00

CLAVO DE JUNQUILLO 1"

KLS.

7.50

CLAVO DE 3/4" TRIPLEY

KLS.

15.00

THIER ACRILICO

GLNS

4.00

LACA PIROXILINA CPP

GLNS

10.00

DESCRIPCION

Correspondiente

: JULIO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

LACA PIROXILINA CPP

GLNS

10.00

AMOLADORA CROW DE 9"

GLNS

0.00

DISCO DE CONCRETO DE 9" CRUPS

UND

3.00

SELLOCORT 325X350 MM

KLS.

0.00

SUPERCITO 325 X 350

KLS.

0.00

COLA TEKNO PAR MADERA

GLNS

3.00

PERNO 1/2" X 2" CON SU TUERCA

UND.

597.00

TEKNOPOR 2.4X1.20X2"

PLCH.

2.00

PLATINA DE 1/2" X 2" e=1/8

UND.

3.00

TUBO DE PLASTISUR PVC-SWS-150-32 6" NARANJA


CON ANILLO

UND.

20.00

PEGAMENTO OATEY

GLNS

3.00

CODO 6"X45 SAL

UND.

7.00

LLAVE DE BOLA PVC 1/2"

UND.

5.00

ADEX INSTANTANIO

UND.

1.00

TUBO SAL PESADO 6"

UND.

0.00

ADITIVOS ANTIHELADISOS

GLNS

297.00

PLASTICO VIRGEN TRANSPARENTE GRUESA

MTS.

200.00

TUBOS DE 1/2" CLASE 10

UND.

37.00

CLAVO DE 11/2

KLS.

9.50

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

ROLLISO DE EUCALIPTO DE 4"X4mts.

UND

139.00

ROLLISO DE EUCALIPTO DE 4"X6mts.

UND

0.00

LISTONES DE MADERA CORRIENTE 2"x3"x10.

UND

311.00

TABLAS DE MADERA CORRIENTE DE 1 1/2" x 8" x 10.

UND

423.00

ROLLIZO DE EUCALIPTO 3X4

UND

0.00

ROLLIZO DE EUCALIPTO 4X3

UND.

0.00

TRIPLEY 4MM

PLCH

14.00

TRIPLEY DE 18 MM

PLCH

82.00

ROLLIZO DE EUCALIPTO 5X4

UND.

0.00

MADERA TRIANGULAR DE 1"X1"X1"X10M

UND.

135.00

DESCRIPCION

Correspondiente

: JULIO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

FIERRO CORRUGADO DE 3/4"

VLLS

103.00

FIERRO CORRUGADO DE 5/8"

VLLS

160.00

FIERRO CORRUGADO DE 1/2"

VLLS

627.00

FIERRO CORRUGADO DE 3/8"

VLLS

220.00

FIERRO CORRUGADO DE 1/4"

VLLS

528.00

DESCRIPCION

Correspondiente

: JULIO -2010

S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

PALAS TRAMONTINA

UND

1.00

GUANTES DE CUERO

PAR

34.00

GUANTES DE JEBE

PAR

65.00

CASCO DE COLOR BLANCO

UND

0.00

CASCO DE COLOR ROJO

UND

7.00

CASCO DE COLOR AZUL

UND

1.00

COMBOS DE 6 LBS

UND

0.00

HOJA DE SIERRA SANFLEX

UND

56.00

BOTAS DE JEBE

PAR

11.00

ROLLO

0.00

CARRETILLAS ( BUGUI) TRUPER

UND

0.00

WINCHAS DE 5MTS

UND

2.00

WINCHA DE 50 MTS

UND

0.00

DISCOS DE MADERA DE 7 1/4"

UND

8.00

DISCOS DE FIERRO DE 7 1/4"

UND

19.00

CASCO DE COLOR NARANJA

UND

0.00

BARRETA DE 1"x1.5 M.

UND

0.00

PICOS

UND

0.00

ROPA DE AGUA CASACA Y PANTALON

UND

0.00

PILAS BARTA Y PANASONIC

PAR

7.00

CORDEL NAILON

UND

4.00

ARNES DE SEGURIDAD

UND

15.00

COMBO DE 20 LBS.

UND

0.00

DISCO DE MADERA DIAMANTADO 12"

UND

6.00

DESCRIPCION

ARPILLERA

Correspondiente

: JULIO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

DISCO DE MADERA DIAMANTADO 12"

UND

6.00

TIRALINEA PLASTIFICADO

UND

3.00

MANGUERA TRANSPARENTE 3/8"

MTS.

25.00

MANGUERA TRANSPARENTE 1/2"

MTS.

0.00

NIVEL DE MANO STANLEY

UND

0.00

PLOMADAS CILINDRICAS DE 500 GRS

UND

0.00

LENTES DE PROTECCION TRANSPARENTE

UND

1.00

MARTILLO TRAMONTINA

UND

0.00

RECOGEDOR DE BASURA

UND

0.00

DISCO DE FIERRO DE 9"

UND

9.00

SOGA COLOR ROJO

MTS.

100.00

PALAS RECTAS TRAMONTINAS

UND

1.00

MANGUERA DE 1" REFORZADA

ROLLO

0.00

CORREA PARA MESCLADORA TOYOPOWER A73

UND

2.00

WINCHA STANLEY X 30MTS

UND

0.00

ESCUADRA METALICA DE 0.60CM STANLEY

UND

2.00

PLOMADA DE I KILO CILINDRICA

UND

0.00

REGLA DE ALUMINIO X 6 MTS.

UND

1.00

ESCOBILLONES DE ACERO

UND

41.00

PLOMADA DE I KILO CONICA

UND

1.00

DADOS MILIMETRADOS

JGO.

1.00

ESCOBA HUDE

UND

3.00

BALDES VACIOS

UND

68.00

BROCAS DE 1/2" DE FIERRO

UND

4.00

BROCA DE 3/8" DE FIERRO

UND

11.00

BROCA DE 1/4" DE FIERRO

UND

5.00

CUCHILLA GARLOPA

UND

6.00

LLANTAS DE REPUESTO DE CARRETILLA TRUPER

UND

20.00

TALADRO CROW

UND

1.00

LINTERNA GRANDE CON A CTE. 700WAS

UND

0.00

WINCHA DE 60 MTS. STANLEY

UND

1.00

INFLADOR PARA LLANTAS

UND

1.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

PARCHE Y LIQUIDO

CAJ.

1.00

PIEDRA ESMIRIL 7

UND

3.00

CIZALLA 750 A 900 MM

UND

0.00

BOTAS DE JEBE CON PUNTA DE ACERO

UND

14.00

BALANSA DE 20 KLS.

UND

1.00

MOTOR KOULER PARA MESCLADORA

UND

0.00

CHALECOS DE SEGURIDAD VERDE

UND

12.00

PROTECCION DE BOCAS NASALES

UND

17.00

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

TERMOMAGNETICOS DE 40 AMPERIOS

UND

2.00

FOCOS DE 100 WTS

UND

22.00

SOQUET DE LOZA

UND

18.00

CINTA AISLANTE DE 3 M

UND

0.00

TERMOMAGNETICO DE 30 AMPERIOS

UND

3.00

CABLE INDECO UNIPOLARES AMARILLO Y BLANCO

RLLO

0.00

CONDUCTOR ELECTRICO N 08 TWS

MTS

0.00

CONDUCTOR ELECTRICO NLT 1X2 N 12

MTS

200.00

TOMA CORRIENTE MULTIPLE SOBREPONER

UND

4.00

INTERRUPTOR 60A ATORNILLABLE

UND

0.00

INTERRUPTOR 40 A ATORNILLABLE

UND

0.00

CONDUCTOR ELECTRICO NLT 1X2 N 14

MTS

0.00

CABLE MILLIZO 2X12 INDECO

RLLS

0.00

CAJA DE PASO 6X6X2 METALICO GALV.

UND.

10.00

TOMACORRIENTE DOBLES

UND

6.00

INTERRUPTOR

UND

0.00

LAMPARAS FLUORECENTE DE 40W INCLUYE EQUIPO


RECTANGULAR

UND

0.00

CAJAS RECTANGULARESL PVC SEL

UND

200.00

CAJAS OCTAGONALES PVC SEL

UND

200.00

REFLECTOR PHILIPIS 400W

UND

0.00

DESCRIPCION

Correspondiente

: JULIO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

EQ.

0.00

CARTUCHO TINTA NEGRA N 40 CANON

UND

0.00

CARTUCHO TINTA COLOR N 41 CANON

UND

0.00

PAPEL BOND A4 X 75 GS.

MILL.

4.00

ARCHIVADORES T/OFICIO

UND

0.00

ENGRAPADOR

UND

0.00

PERFORADOR

UND

0.00

RESALTADOR

UND

10.00

PEGAMENTO EN BARRA UHU

UND

0.00

CUADERNO # 200 HOJAS ANILLADO

UND

10.00

CINTA MASKING DE 2"

UND

3.00

CORRECTOR

UND

10.00

CUTER

UND

1.00

LAPICERO TINTA LIQUIDA

UND

0.00

PLUMON INDELEBLE

UND

0.00

POS IT

PAQ.

3.00

PORTA MINAS

UND

5.00

MINAS RECARGABLES 0.5 HB

UND

0.00

PIZARRA ACRILICA DE 2X1.2

UND

0.00

PLUMON DE PIZARRA ACRILICA

UND

3.00

MOTA PARA PIZARRA ACRILICA

UND

0.00

FRANELA

MTS

0.00

IMPRESORA HP DISKIET F 2480 MULTIFUNCIONAL

EQ.

0.00

UND

8.00

DESCRIPCION

COMPUTADORA (CPU, TECLADO, MONITRO, MAUSE)

CUADERNO DE OBRA

Correspondiente

: JULIO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

TONER HP LASER 53 A

UND

0.00

TALONARIO DE PARTE DIARIO MOVIMIENTO DE


MATERIAL

UND

10.00

TALONARIO BINCARD DE ALMACEN

UND

8.00

0.00

NOTA ENTRADA DE ALMACEN

UND

0.00

NOTA DE SALIDA DE ALMACEN

UND

15.00

LAPIZ BICOLOR

CAJ.

1.00

TIZAS DE COLOR

CAJ.

3.00

LAPICERO FABER CASTELL X 50 UND.

CAJ.

1.00

MEMORIA USB KINSTONG 4 GB

UND

3.00

SELLOS TIPO LAPICERO

UND

2.00

ESPIRAL # 12

UND

6.00

ESPIRAL # 18

UND

6.00

MICA PARA ANILLADO

UND

12.00

BINCAR

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

HORMIGON

M3

251.50

PIEDRA GRANDE

M3

28.00

PIEDRA CHANCADA 1/2 - 3/4

M3

32.10

ARENA FINA

M3

50.00

PIEDRA GRANULADA

M3

61.00

DESCRIPCION

Correspondiente

: JULIO -2010

S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


UND

SALDO

PETROLEO

GLNS.

1166.50

GASOLINA

GLNS.

83.50

ACEITE MULTIGRADO DE 30

LTS

0.00

GRASA GRUESA

KLS

0.00

GLNS.

15.00

GRASA H-3 VISTONE

KLS

8.00

FILTROS DE AIRE PARA COMPACTADORA AF2E28

UND

0.00

DESCRIPCION

ACEITE MOVIL SUPER 1000 20W-50

Correspondiente

: JULIO -2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO
JEFE DE OBRA: ING. ABRAHAM LINARES
RESIDENTE DE OBRA: ABEL DUEAS CUSIHUALLPA

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO

Correspondiente

: JULIO -2010

BIENES DE CONSUMO

UND

SALDO

AZUCAR

KLS.

74.00

ARROZ

KLS.

27.00

FIDEO

KLS.

10.00

GLNS.

3.00

ARINA

KLS.

13.00

CALDOS MAGUI

PAQ.

0.00

SAL YODADA

KLS.

12.00

AYUDIN

UND.

6.00

MORON DE CEBADA

KLS.

11.00

DESCRIPCION

ACEITE DE COCINA

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

1773.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

0.00

0.00

453.25

0.00

0.00

292.00

0.00

0.00

0.00

0.00

0.00

204.00

0.00

0.00

1.00

0.00

0.00

2505.00
1796.00
4.00
4.00
6.00
6.00
8.00
8.00
6.00
6.00
8.00
8.00
4.00
4.00
5.00
5.00
7.00
7.00
21.00
21.00
2.00
2.00
7.00
7.00
2.00
2.00
6.00
6.00
11.00
9.00
10.00
10.00
6.00
6.00
6.00
6.00
9.00
9.00
825.00
47.50
314.50
26.00
10.00
10.00
520.00
20.00
2.00
1.00

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

1.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

648.00

0.00

0.00

50.00

0.00

0.00

800.00

0.00

0.00

100.00

0.00

0.00

258.50

0.00

0.00

60.00

0.00

0.00

0.00

0.00

0.00

46.00

0.00

0.00

0.00

0.00

0.00

52.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.00

0.00

0.00

87.00

0.00

0.00

98.00

0.00

0.00

7.50

0.00

0.00

15.00

0.00

0.00

4.00

0.00

0.00

10.00

0.00

0.00

1.00
0.00
1.00
1.00
2.00
2.00
2.00
2.00
648.00
0.00
50.00
0.00
800.00
0.00
100.00
0.00
1500.00
8.00
60.00
0.00
10.00
3.25
60.50
3.25
2.00
2.00
100.00
0.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
25.00
0.00
87.00
0.00
98.00
0.00
7.50
0.00
15.00
0.00
4.00
0.00
10.00

10.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

597.00

0.00

0.00

2.00

0.00

0.00

3.00

0.00

0.00

20.00

0.00

0.00

3.00

0.00

0.00

7.00

0.00

0.00

5.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

297.00

0.00

0.00

200.00

0.00

0.00

37.00

0.00

0.00

9.50

0.00

0.00

2.00
2.00
6.00
2.00
20.00
20.00
40.00
22.00
3.00
0.00
597.00
0.00
2.00
0.00
3.00
0.00
20.00
0.00
3.00
0.00
7.00
0.00
5.00
0.00
1.00
0.00
0.00
0.00
297.00
0.00
200.00
0.00
37.00
0.00
9.50
0.00

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

139.00

0.00

0.00

TOTAL ACUMULADO

0.00

0.00

0.00

311.00

0.00

0.00

423.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14.00

0.00

0.00

82.00

0.00

0.00

0.00

0.00

0.00

135.00

0.00

0.00

287.00
0.00
30.00
0.00
205.00
3.00
400.00
0.00
0.00
0.00
0.00
0.00
14.00
0.00
82.00
0.00
0.00
0.00
135.00
0.00

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

103.00

0.00

0.00

TOTAL ACUMULADO

160.00

0.00

0.00

627.00

0.00

0.00

220.00

0.00

0.00

528.00

0.00

0.00

760.00
0.00
1100.00
0.00
700.00
0.00
2496.00
0.00
570.00
0.00

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

1.00

0.00

0.00

34.00

0.00

0.00

65.00

0.00

0.00

0.00

0.00

0.00

7.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

56.00

0.00

0.00

11.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

8.00

0.00

0.00

19.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.00

0.00

0.00

4.00

0.00

0.00

15.00

0.00

0.00

0.00

0.00

0.00

6.00

0.00

0.00

40.00
0.00
100.00
89.00
100.00
0.00
5.00
4.00
20.00
3.00
30.00
0.00
6.00
6.00
80.00
8.00
20.00
5.00
2.00
2.00
20.00
18.00
20.00
5.00
2.00
1.00
25.00
2.00
50.00
1.00
30.00
15.00
10.00
6.00
40.00
20.00
26.00
26.00
7.00
0.00
4.00
0.00
15.00
0.00
5.00
5.00
6.00

6.00

0.00

0.00

0.00

3.00

0.00

0.00

25.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.00

0.00

0.00

100.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

41.00

0.00

0.00

1.00

0.00

0.00

1.00

0.00

0.00

3.00

0.00

0.00

68.00

0.00

0.00

4.00

0.00

0.00

11.00

0.00

0.00

5.00

0.00

0.00

6.00

0.00

0.00

20.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

1.00

0.00

0.00

3.00
0.00
25.00
0.00
0.00
0.00
3.00
3.00
2.00
2.00
30.00
9.00
5.00
3.00
0.00
0.00
9.00
0.00
100.00
100.00
1.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
5.00
3.00
41.00
0.00
1.00
0.00
1.00
0.00
3.00
0.00
68.00
0.00
4.00
0.00
11.00
0.00
5.00
0.00
6.00
0.00
20.00
0.00
1.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00

1.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

14.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

12.00

0.00

0.00

17.00

0.00

0.00

1.00
0.00
3.00
0.00
0.00
0.00
14.00
0.00
1.00
0.00
0.00
0.00
12.00
0.00
17.00
0.00

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

2.00

0.00

0.00

22.00

0.00

0.00

18.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

0.00

0.00

200.00

0.00

0.00

0.00

0.00

0.00

2.00
0.00
22.00
0.00
18.00
0.00
5.00
2.00
3.00
0.00
0.00
0.00
0.00
0.00
200.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
0.00
5.00
5.00
8.00
7.00
7.00
5.00
200.00
0.00
200.00
0.00
0.00
0.00

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

0.00

0.00

0.00

0.00

0.00

10.00

0.00

0.00

3.00

0.00

0.00

10.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.00

0.00

0.00

2.00
2.00
3.00
0.00
1.00
0.00
4.00
1.00
8.00
8.00
1.00
1.00
1.00
1.00
4.00
4.00
2.00
0.00
10.00
5.00
5.00
1.00
4.00
1.00
2.00
2.00
6.00
3.00
4.00
4.00
5.00
1.00
3.00
1.00
5.00
2.00
1.00
1.00
7.00
2.00
1.00
1.00
1.00
1.00
0.00
0.00
8.00
0.00

0.00

0.00

0.00

10.00

0.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

1.00

0.00

0.00

3.00

0.00

0.00

1.00

0.00

0.00

3.00

0.00

0.00

2.00

0.00

0.00

6.00

0.00

0.00

6.00

0.00

0.00

12.00

0.00

0.00

0.00
0.00
10.00
0.00
8.00
0.00
0.00
0.00
0.00
0.00
15.00
0.00
1.00
0.00
3.00
0.00
1.00
0.00
3.00
0.00
2.00
0.00
6.00
0.00
6.00
0.00
12.00
0.00

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA
TOTAL ACUMULADO

251.50

0.00

0.00

28.00

0.00

0.00

32.10

0.00

0.00

50.00

0.00

0.00

61.00

0.00

0.00

510.00
304.00
60.00
32.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

1166.50

0.00

0.00

83.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

TOTAL ACUMULADO

2191.00
2165.00
122.25
73.25
4.00
2.00
2.00
2.00
15.00
0.00
10.00
1.00
2.00
0.00

TOTAL ACUMULADO
TOTAL ACUMULADO

74.00

0.00

0.00

27.00

0.00

0.00

10.00

0.00

0.00

3.00

0.00

0.00

13.00

0.00

0.00

0.00

0.00

0.00

12.00

0.00

0.00

6.00

0.00

0.00

11.00

0.00

0.00

255.00
181.00
250.00
223.00
130.00
120.00
6.00
5.00
20.00
7.00
1.00
1.00
30.00
18.00
10.00
4.00
60.00
49.00

ESP.

O/C. N

GASTOS

383
71
68
68
68
68
68
69
71
71
71
68
71
72
72
72
72
72
72

72
72
68

ESP.

O/C. N

GASTOS

69
70
69

146
146
146

300
300
300
300
300
300
300

300

300
300
278
278

ESP.

O/C. N

GASTOS

300
300

300

ESP.
GASTOS

O/C. N

ESP.
GASTOS

O/C. N
65
64
64
65
65
64
65
289
64
65
64
64
64
64
64
64
64
301

70
289
289
289
289

289

289
289
289
289
289
289
289
289

301
301
289
351

289

ESP.
GASTOS

O/C. N

301
301
301
301

301
300
69
69
69

300

ESP.

O/C. N

GASTOS

73
73
73
73
73
73
73
73
73
73
74
74
74
74
74
74
74
74
74
74
74
157
73

73
73
73
73
73
73
73
73
73
73
73
73
73
73

ESP.
GASTOS

O/C. N

ESP.

O/C. N

GASTOS

56
56
351
351
56
56
56

ESP.
GASTOS

O/C. N

MUNICIPALIDAD DISTRITAL DE LAYO


FECHA : ENERO-2010
OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO

DESCRIPCION

UNIDAD
MEDIDA

TOTAL
ENTRADA

PRESIO
UNITARIO

CEMENTO PORTLAND TIPO IP x 42.5 KG

BLS

10

25.00

BAO TURCO DE GRANITO

UND

23.00

TUBERIA PVC SAL DE 4"

UND

19.00

TUBERIA PVC SAL DE 2"

UND

10.00

CODO PVC SAL DE 4" DE 90

UND

5.00

CODO PVC SAL DE 4" DE 45

UND

5.00

YEE PVC SAL DE 4"

UND

5.00

YEE PVC SAL DE 4"x2"x4"

UND

5.00

CODO PVC SAL DE 2" DE 45

UND

2.00

10

CODO PVC SAL DE 2" DE 90

UND

21

2.00

11

YEE PVC SAL DE 2"

UND

2.00

12

TUBERIA PVC SAP DE 1/2" C/R C-10

UND

12.00

13

LLAVE PVC DE PASO DE 1/2" C/R

UND

17.00

14

LLAVE DE BRONCE DE 1/2" TIPO JARDINERO.

UND

20.00

15

CODO PVC SAP DE 1/2" C/R.

UND

11

0.80

16

CODO FG DE 1/2"

UND

10

2.50

17

TEE PVC SAP DE 1/2" C/R.

UND

1.00

18

SUMIDERO DE BRONCE DE 2"

UND

4.00

19

CINTA TEFLON

UND

1.00

20

PEGAMENTO OATEY PARA TUBERIA PVC

GLN

0.25

30.00

21

CLAVO DE MADERA DE 4"

KLS

820

5.00

22

CLAVO DE MADERA DE 3"

KLS

10

5.00

23

CLAVO DE CALAMINA

KLS

10

7.50

24

ALAMBRE NEGRO N 16

KLS

520

25

ABRASADERA DE 2" PARA RED DE AGUA

UND

15.00

26

REDUCCION PVC SAP 3/4" - 1/2

UND

2.00

27

CINTA AISLANTE

UND

4.00

28

TOMACORRIENTE DOBLES

UND

4.50

29

INTERRUPTOR

UND

3.50

30

LAMPARAS FLUORECENTE DE 40W INCLUYE EQUIPO RECTANGULAR

UND

23.00

31

CANDADO

UND

19.50

32

TEE PVC SAL DE 4"x2"x4" .

UND

6.00

33

TEE PVC DE SAL DE 2".

UND

34

ROLLISO DE EUCALIPTO DE 4"X4mts.

UND

155

35

ROLLISO DE EUCALIPTO DE 4"X6mts.

UND

30

36

LISTONES DE MADERA CORRIENTE 2"x3"x10.

UND

205

37

TABLAS DE MADERA CORRIENTE DE 1 1/2" x 8" x 10.

UND

400

38

CAJAS RECTANGULARESL PVC SEL

UND

200

39

CAJAS OCTAGONALES PVC SEL

UND

200

40

CODO PVC SEL DE 3/4"

UND

648

41

CODO PVC SEL DE 1"

UND

50

42

TUBERIA PVC SEL DE 3/4"

UND

800

43

TUBERIA PVC SEL DE 1"

UND

100

44

ALAMBRE NEGRO N 8

KLS

1500

45

ALAMBRE GALVANIZADO N 18.

KLS

60

5.00

MUNICIPALIDAD DISTRITAL DE LAYO


FECHA : ENERO-2010
OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO

DESCRIPCION

UNIDAD
MEDIDA

TOTAL
ENTRADA

P.U

46

CLAVO DE MADERA 1"

KLS

10

0.00

47

CLAVO DE MADERA DE 2"

KLS

60

0.00

48

CLAVO DE 2 1/2

KLS

0.00

49

CLAVO DE MADERA DE 5"

KLS

100

0.00

50

FIERRO CORRUGADO DE 3/4"

VLLS

760

0.00

51

FIERRO CORRUGADO DE 5/8"

VLLS

1100

0.00

52

FIERRO CORRUGADO DE 1/2"

UND

700

0.00

53

FIERRO CORRUGADO DE 3/8"

PAR

2496

0.00

54

FIERRO CORRUGADO DE 1/4"

PAR

570

0.00

55

PALAS TRAMONTINA

UND

56

GUANTES DE CUERO

UND

100

57

GUANTES DE JEBE

UND

100

58

CASCO DE COLOR BLANCO

UND

25.00

59

CASCO DE COLOR ROJO

UND

20

10.00

60

CASCO DE COLOR AZUL

61

COMBOS DE 6 LBS

62
63

32.00
9.00
9.50

PAR

30

10.00

ROLLO

37.00

HOJA DE SIERRA SANFLEX

UND

30

5.00

BOSTAS DE JEBE

UND

20

36.00

64

ARPILLERA

UND

670.00

65

CARRETILLAS ( BUGUI) TRUPER

UND

20

190.00

66

WINCHAS DE 5MTS

UND

20

19.00

67

WINCHA DE 50 MTS

UND

60.00

68

DISCOS DE MADERA DE 7 1/4"

UND

25

21.00

69

DISCOS DE FIERRO DE 7 1/4"

UND

50

12.00

70

CASCO DE COLOR NARANJA

UND

30

10.00

71

BARRETA DE 1"x1.5 M.

UND

70.00

72

PETROLEO

GLNS.

1414

12.00

MUNICIPALIDAD DISTRITAL DE LAYO


FECHA : FEBRERO-2010
OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO

CEMENTO PORTLAND TIPO IP x 42.5 KG

BLS

TOTAL
INGRESOS
745

BAO TURCO DE GRANITO

UND

0.00

TUBERIA PVC SAL DE 4"

UND

0.00

TUBERIA PVC SAL DE 2"

UND

0.00

CODO PVC SAL DE 4" DE 90

UND

0.00

CODO PVC SAL DE 4" DE 45

UND

0.00

YEE PVC SAL DE 4"

UND

0.00

YEE PVC SAL DE 4"x2"x4"

UND

0.00

CODO PVC SAL DE 2" DE 45

UND

0.00

10

CODO PVC SAL DE 2" DE 90

UND

0.00

11

YEE PVC SAL DE 2"

UND

0.00

12

TUBERIA PVC SAP DE 1/2" C/R C-10

UND

0.00

13

LLAVE PVC DE PASO DE 1/2" C/R

UND

0.00

14

LLAVE DE BRONCE DE 1/2" TIPO JARDINERO.

UND

0.00

15

CODO PVC SAP DE 1/2" C/R.

UND

0.00

16

CODO FG DE 1/2"

UND

0.00

17

TEE PVC SAP DE 1/2" C/R.

UND

0.00

18

SUMIDERO DE BRONCE DE 2"

UND

0.00

19

CINTA TEFLON

UND

0.00

20

PEGAMENTO OATEY PARA TUBERIA PVC

GLN

0.00

21

CLAVO DE MADERA DE 4"

KLS

0.00

22

CLAVO DE MADERA DE 3"

KLS

0.00

23

CLAVO DE CALAMINA

KLS

0.00

24

ALAMBRE NEGRO N 16

KLS

0.00

25

ABRASADERA DE 2" PARA RED DE AGUA

UND

0.00

26

REDUCCION PVC SAP 3/4" - 1/2

UND

0.00

27

CINTA AISLANTE

UND

0.00

28

TOMACORRIENTE DOBLES

UND

0.00

29

INTERRUPTOR

UND

0.00

30

LAMPARAS FLUOR INCL EQ RECTANGULAR

UND

0.00

31

CANDADO

UND

0.00

32

TEE PVC SAL DE 4"x2"x4" .

UND

0.00

33

TEE PVC DE SAL DE 2".

UND

0.00

34

ROLLISO DE EUCALIPTO DE 4"X4mts.

UND

132

0.00

35

ROLLISO DE EUCALIPTO DE 4"X6mts.

UND

0.00

36

LISTONES DE MADERA CORRIENTE 2"x3"x10.

UND

0.00

37

TABLAS MADERA CORRIENTE 1 1/2" x 8" x 10.

UND

0.00

38

CAJAS RECTANGULARESL PVC SEL

UND

39

CAJAS OCTAGONALES PVC SEL

UND

40

CODO PVC SEL DE 3/4"

UND

41

CODO PVC SEL DE 1"

UND

42

TUBERIA PVC SEL DE 3/4"

UND

43

TUBERIA PVC SEL DE 1"

UND

44

ALAMBRE NEGRO N 8

KLS

45

ALAMBRE GALVANIZADO N 18.

KLS

46

CLAVO DE MADERA 1"

KLS

DESCRIPCION

UNIDAD
MEDIDA

P.U
22.00

MUNICIPALIDAD DISTRITAL DE LAYO


FECHA : FEBRERO-2010
OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO

46

CLAVO DE MADERA DE 2"

KLS

TOTAL
INGRESOS
0

47

CLAVO DE 2 1/2

KLS

48

CLAVO DE MADERA DE 5"

KLS

49

PLASTICO GRUESO DE DOBLE ANCHO 1.5M

MTS.

200

50

PLASTICO GRUESO DE DOBLE ANCHO 2.00 M

MTS.

300

51

BALDE DE 5 GLNS. TRANSPARENTE

UND

52

FIERRO CORRUGADO DE 3/4"

VLLS

53

FIERRO CORRUGADO DE 5/8"

VLLS

54

FIERRO CORRUGADO DE 1/2"

VLLS

55

FIERRO CORRUGADO DE 3/8"

VLLS

0.00

56

FIERRO CORRUGADO DE 1/4"

VLLS

57

PALAS TRAMONTINA

UND

15

58

GUANTES DE CUERO

PAR

0.00

59

GUANTES DE JEBE

PAR

0.00

60

CASCO DE COLOR BLANCO

UND

0.00

61

CASCO DE COLOR ROJO

UND

62

CASCO DE COLOR AZUL

UND

63

COMBOS DE 6 LBS

UND

64

HOJA DE SIERRA SANFLEX

UND

65

BOSTAS DE JEBE

PAR

66

ARPILLERA

ROLLO

67

CARRETILLAS ( BUGUI) TRUPER

UND

190

68

WINCHAS DE 5MTS

UND

69

WINCHA DE 50 MTS

UND

70

DISCOS DE MADERA DE 7 1/4"

UND

71

DISCOS DE FIERRO DE 7 1/4"

UND

72

CASCO DE COLOR NARANJA

UND

73

BARRETA DE 1"x1.5 M.

UND

74

SILICONA

UND

75

YESO

QQ

10

76

FRAZADA CORRIENTE

UND

10

77

BALON DE GAS

UND

78

CONCINA A GAS

UND

79

COMPUTADORA (CPU, TECLADO, MONITRO, MAUSE)

EQ.

0.00

80

CARTUCHO TINTA NEGRA N 40 CANON

UND

0.00

81

CARTUCHO TINTA COLOR N 41 CANON

UND

0.00

82

PAPEL BOND A4 X 75 GS.

MILL.

0.00

83

ARCHIVADORES T/OFICIO

UND

0.00

84

ENGRAPADOR

UND

0.00

85

PERFORADOR

UND

87

RESALTADOR

UND

88

PEGAMENTO EN BARRA UHU

UND

DESCRIPCION

UNIDAD
MEDIDA

P.U
0

0.00
32.00

MUNICIPALIDAD DISTRITAL DE LAYO


FECHA : FEBRERO-2010
OBRA: CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO

89

CUADERNO # 200 HOJAS ANILLADO

UND

TOTAL
INGRESOS
10

90

CINTA MASKING DE 2"

UND

91

CORRECTOR

UND

92

CUTER

UND

93

LAPICERO TINTA LIQUIDA

UND

94

PLUMON INDELEBLE

UND

95

POS IT

PAQ.

96

PORTA MINAS

UND

97

MINAS RECARGABLES 0.5 HB

UND

98

PIZARRA ACRILICA DE 2X1.2

UND

99

PLUMON DE PIZARRA ACRILICA

UND

100 MOTA PARA PIZARRA ACRILICA

UND

101 PETROLEO

GLNS.

777

102 GASOLINA

GLNS.

15

DESCRIPCION

UNIDAD
MEDIDA

P.U
0

FECHA : ENERO-2010

TOTAL
250.00
92.00
114.00
80.00
30.00
40.00
20.00
25.00
14.00
42.00
4.00
84.00
34.00
120.00
8.80
25.00
6.00
24.00
9.00
7.50
4,100.00
50.00
75.00
2,600.00
30.00
2.00
8.00
22.50
28.00
161.00
19.50
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

FECHA : ENERO-2010

TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
160.00
900.00
950.00
125.00
200.00
300.00
111.00
150.00
720.00
1,340.00
3,800.00
380.00
120.00
525.00
600.00
300.00
280.00
16,968.00
36,066.30

FECHA : FEBRERO-2010

PRECIO SUB
TOTAL
16,390.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

FECHA : FEBRERO-2010

TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
480.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

FECHA : FEBRERO-2010

TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO

JEFE DE OBRA: ING. ABRAHAM LINARES

- CAJA CHICA

RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRU
N

DESCRIPCION

UND

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO

EGRESO

TOTAL

CANT.

P.UNITA.

TOTAL

CANT.

P.UNITA.

0.00

1.00

10.00

10.00

1.00

10.00

MANGUERA DE GAS

UND

0.00

CARTEL DE OBRA 2.5X3.75

UND

0.00

0.00

1.00

216.00

216.00

1.00

216.00

TEROCAL AFRICANO X 1/4

UND

0.00

0.00

1.00

3.50

3.50

1.00

3.50

PINTURA ESMALTE BLANCO PATO

GLN.

0.00

0.00

1.00

38.00

38.00

1.00

38.00

THINER

GLN.

0.00

0.00

1.00

18.00

18.00

1.00

18.00

ESPATULA

UND

0.00

0.00

1.00

4.00

4.00

1.00

4.00

CLAVO DE TRIPLEY 1"

KLS.

0.00

0.00

1.00

9.00

9.00

1.00

9.00

LIJAR

UND

0.00

0.00

3.00

1.50

4.50

3.00

1.50

COLA CINTETICA

UND

0.00

0.00

1.00

6.50

6.50

1.00

6.50

10

TEROCAL AFRICANO X 1/8

UND

0.00

0.00

7.00

1.50

10.50

7.00

1.50

11

BROCHA 4"

UND

0.00

0.00

1.00

4.00

4.00

1.00

4.00

12

MANGUERA DE GAS REFORZADO

UND

0.00

0.00

1.00

10.50

10.50

1.00

10.50

13

CLAVO DE 7"

kls.

0.00

0.00

3.00

9.00

27.00

0.00

9.00

14

YESO

QQ.

10.00

40.00

0.00

4.00

0.00

3.00

4.00

15

TRIPLEY

PLCH.

0.00

0.00

4.00

28.00

112.00

4.00

28.00

16

TINTA PARA RECARGAR CARTUCHO NEGRO

UND

0.00

0.00

2.00

10.00

20.00

2.00

10.00

17

TINTA PARA RECARGAR CARTUCHO COLOR

UND

0.00

0.00

3.00

10.00

30.00

3.00

10.00

18

OLLA

UND

0.00

0.00

1.00

21.00

21.00

1.00

21.00

19

TETERA ALUMINIO

UND

0.00

0.00

1.00

15.00

15.00

1.00

15.00

20

ESCOBA

UND

0.00

0.00

1.00

10.00

10.00

1.00

10.00

21

RECOGEDOR

UND

0.00

0.00

1.00

6.00

6.00

1.00

6.00

22

ROLLIZO DE 6X8 SARANDA

UND

0.00

0.00

4.00

0.00

0.00

4.00

0.00

4.00

TOTAL

10.00
216.00
3.50
38.00
18.00
4.00
9.00
4.50
6.50
10.50
4.00
10.50
0.00
12.00
112.00
20.00
30.00
21.00
15.00
10.00
6.00
0.00

22

ROLLIZO DE 6X8 SARANDA

UND

0.00

0.00
40.00

4.00

0.00

0.00
575.50

4.00

0.00

0.00
560.50

FECHA: MARZO - 2010

SALDO DE ALMACEN ACTUAL


CANT.

TOTAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

27.00

7.00

28.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

OBSERVACIONES

0.00

0.00
55.00

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO

- CAJA CHICA

JEFE DE OBRA: ING. ABRAHAM LINARES


RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

SALDO

AZUCAR

KLS.

0.00

ACEITE DE 30 MONOGRADO X 1/4 DE GALON

UND

0.00

JORA PARA CHICHA

KLS.

0.00

DETERGENTE ACE OPAL

UND

0.00

ARINA VICTORIA

KLS.

0.00

OCRE ROJO

KLS.

0.00

PINTURA PATO CPP ESMALATE

GLNS

0.00

LAPIZ ROJO

UND

0.00

UND

0.00

10 ACEITE CIL

LTS

0.00

13

kls.

1.00

14 YESO

QQ.

5.00

11 HUAYPE

UND

0.00

12 CUADERNO DE 100 HOJAS #

UND

0.00

13 CINTA AISLANTE

UND

0.00

14 CARNER DE RED

CAJ

0.00

15 COLORES PEQUEOS LAYCONSA

UND

0.00

16

UND

0.00

17

UND

0.00

18

SET.

0.00

19

0.00

20

UND

0.00

21

CAJ

0.00

22

UND

0.00

23

UND

0.00

23

KLS.

0.00

Correspondiente

: ABRIL 2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

4
1
1
14.5
1

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

5.00

0.00

0.00

0.00

0.00

0.00

2.00

4.00

2.00

1.00

1.00

0.00

0.00

14.50

0.00

1.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

TOTAL ACUMULADO

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
3.00
5.00
0.00
0.00
0.00
4.00
2.00
3.00
3.00
14.50
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

FECHA: FEBRERO - 2010

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

0.00

50.00

0.00

1.00

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

0.00

10.00

18.00

216.00

0.00

0.00

3.50

0.00

0.00

38.00

0.00

0.00

18.00

0.00

0.00

4.00

0.00

0.00

9.00

0.00

0.00

1.50

0.00

0.00

6.50

0.00

0.00

1.50

0.00

0.00

9.00

0.00

0.00

4.00

18.00

0.00

20.00

0.00

4.00

0.00

26.00

0.00

10.50

0.00

3.00

0.00

9.00

0.00

7.50

0.00

4.00

0.00

5.00

0.00

28.00

0.00

135.00

0.00

10.00

0.00

9.00

0.00

10.00

0.00

3.00

0.00

21.00

0.00

9.50

0.00

15.00

0.00

12.00

0.00

10.00

0.00

3.00

0.00

6.00

0.00

10.00

0.00

0.00

0.00

35.00

0.00

0.00

0.00

7.00

0.00

0.00

0.00

18.00

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CANT.

TOTAL

50.00

500.00

1.00

216.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
716.00

OBSERVACIONES

MUNICIPALIDAD DISTRITAL DE LAYO


MOVIMIENTO DE ALMACEN DIARIO

- CAJA CHICA

JEFE DE OBRA: ING. ABRAHAM LINARES


RESIDENTE DE OBRA: ARQ. RONAL CALVO DIAZ

OBRA : CONSTRUCCION DE MERCADO CENTRAL EN EL DISTRITO DE LAYO


N

DESCRIPCION

UND

SALDO

AZUCAR

KLS.

0.00

ACEITE DE 30 MONOGRADO X 1/4 DE GALON

UND

0.00

JORA PARA CHICHA

KLS.

0.00

DETERGENTE ACE OPAL

UND

0.00

ARINA VICTORIA

KLS.

0.00

KLS.

0.00

PINTURA PATO CPP ESMALATE

GLNS

0.00

LAPIZ ROJO

UND

0.00

OCRE ROJO

7
8

UND

0.00

10 ACEITE CIL

LTS

0.00

13 CLAVO DE 7"

kls.

1.00

14 YESO

QQ.

5.00

11 CARPETA PAPEL CARBON

UND

0.00

FAJA DE 1.45 M PARA RETROESCABADORA

12 PLUMON INDELEBLE

UND

0.00

13 TINTA PARA TAMPON

UND

0.00

14 LAPIZ STABILO ROJO

CAJ

0.00

15 LIBRO DE ACTAS X 50 HJS.

UND

0.00

16 CALCULADORA CASIO

UND

0.00

17 CUTER ARTI

UND

0.00

18 CUCHILLA DE CUTER
19 FOLDER FAY CON FASTENER

SET.

0.00

0.00

20 CORRECTOR

UND

0.00

21 TIZA

CAJ

0.00

22 PINTURA SPRAY NEGRO

UND

0.00

23 GAS

UND

0.00

23 HUAYPE

KLS.

0.00

Correspondiente

: ABRIL 2010

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

50
5

1
1
16

50

23
10
2
1
3

1
2

2
2
1
1
1
5
2

1
1
2
2
1
3

2
1
1
1
1
1
3
3
1
0.25
3
1
1
1
1
10

TOTAL ACUMULADO
SALDO ACT.

TOTAL ENTRADA

TOTAL SALIDA

0.00

50.00

50.00

0.00

1.00

1.00

TOTAL ACUMULADO

24.00

89.00

65.00

0.00

2.00

2.00

0.00

5.00

5.00

1.00

2.00

1.00

0.00

1.00

1.00

0.00

5.00

5.00

0.00

1.00

1.00

0.00

2.00

2.00

0.00

0.00

1.00

0.00

0.00

5.00

1.00

1.00

0.00

1.00

1.00

0.00

1.00

1.00

0.00

0.00

1.00

0.00

1.00

1.00

0.00

3.00

3.00

0.00

3.00

3.00

0.00

1.00

1.00

0.00

0.25

0.25

0.00

3.00

3.00

0.00

1.00

1.00

0.00

1.00

1.00

0.00

0.00

1.00

1.00

10.00

10.00

0.00

50.00
50.00
1.00
1.00
89.00
65.00
2.00
2.00
5.00
5.00
2.00
1.00
1.00
1.00
5.00
5.00
1.00
1.00
2.00
2.00
3.00
3.00
5.00
5.00
1.00
0.00
1.00
0.00
3.00
3.00
1.00
0.00
1.00
0.00
3.00
0.00
3.00
0.00
1.00
0.00
0.25
0.00
3.00
0.00
1.00
0.00
1.00
0.00
1.00
1.00
10.00
0.00

FECHA: FEBRERO - 2010

SALDO ANTERIOR
CANT.

P.UNITA.

INGRESO
TOTAL

CANT.

0.00

50.00

0.00

1.00

P.UNITA.

EGRESO
TOTAL

CANT.

P.UNITA.

0.00

10.00

18.00

216.00

0.00

0.00

3.50

0.00

0.00

38.00

0.00

0.00

18.00

0.00

0.00

4.00

0.00

0.00

9.00

0.00

0.00

1.50

0.00

0.00

6.50

0.00

0.00

1.50

0.00

0.00

9.00

0.00

0.00

4.00

18.00

0.00

20.00

0.00

4.00

0.00

26.00

0.00

10.50

0.00

3.00

0.00

9.00

0.00

7.50

0.00

4.00

0.00

5.00

0.00

28.00

0.00

135.00

0.00

10.00

0.00

9.00

0.00

10.00

0.00

3.00

0.00

21.00

0.00

9.50

0.00

15.00

0.00

12.00

0.00

10.00

0.00

3.00

0.00

6.00

0.00

10.00

0.00

0.00

0.00

35.00

0.00

0.00

0.00

7.00

0.00

0.00

0.00

18.00

SALDO DE ALMACEN ACTUAL


TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CANT.

TOTAL

50.00

500.00

1.00

216.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
716.00