OBRA

ENTIDAD
CONTRATISTA

: REHABILITACIN Y MEJORAMIENT
: MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA
: CONSORCIO LOS CHANCAS
PRESUPUESTO

Item
100

Descripcion

Und.

Metrado

P.Unit. S/.

TRABAJOS PRELIMINARES

101.A

MOVILIZACION Y DESMOVILICACION DE EQUIPOS

gb

1.00

93,542.07

102.A

TRAZO Y REPLANTEO

km

1.55

1,481.71

103.A

MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL

gb

1.00

61,136.48

107.A

ACCESOS A CANTERAS DE PLANTAS Y FUENTE DE AGUA

km

0.10

26,937.75

200

MOVIMIENTO DE TIERRAS

201.B

DESBROCE Y LIMPIEZA EN ZONAS NO ROCOSAS

ha

0.62

2,684.97

202.B

DEMOLICION DE ESTRUCTURAS

m3

168.08

143.91

205.A

EXCAVACION EN MATERIAL SUELTO

m3

8,852.39

3.01

205.B

EXCAVACION EN ROCA SUELTA

m3

809.17

13.78

205.C

EXCAVACION EN ROCA FIJA

m3

1,965.14

26.72

205.E

PERFILADO Y COMPACTADO EN ZONA DE CORTE

m2

13,433.65

1.89

m3

945.68

6.87

m3

1,702.41

39.99

m2

11,349.40

84.23

210.A

CONFORMACION DE TERRAPLENES

300

SUB BASE Y BASE

303.A

SUB BASE GRANULAR

500

PAVIMENTO DE CONCRETO HIDRAULICO

501

LOSAS DE CONCRETO HIDRAULICO

OBRA
ENTIDAD
CONTRATISTA

: REHABILITACIN Y MEJORAMIENT
: MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA
: CONSORCIO LOS CHANCAS
PRESUPUESTO

Item

Descripcion

Und.

Metrado

P.Unit. S/.

503.A

JUNTA LONGITUDINAL DE CONSTRUCCION

1,586.00

14.15

503.B

JUNTA TRANSVERSAL DE CONTRACCION

2,601.37

34.20

503.C

JUNTA DE DILATACION

179.67

34.72

503.D

JUNTA DE AISLAMIENTO

3,295.20

15.60

600

OBRAS DE ARTE Y DRENAJE

601.A

EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS

m3

2,416.91

18.54

603.A

ENCAUSAMIENTO PARA ALCANTARILLAS

m3

10.80

4.51

605.A

RELLENOS PARA ESTRUCTURAS

m3

677.77

29.14

605.C

RELLENO PARA SUELO REFORZADO

m3

0.00

9.29

610.D1

CONCRETO CLASE D (F'C=210KG/CM2)

m3

360.70

325.79

610.E

CONCRETO CLASE E (F'C=175KG/CM2)

m3

0.00

296.93

610.F

CONCRETO CLASE F (F'C=140KG/CM2)

m3

25.80

268.20

612.A

ENCOFRADO Y DESENCPFRADO

m2

2,395.85

50.92

615

ACERO DE REFUERZO FY=4200KG/M2

kg

28,968.17

4.55

624.A

TUBO DE PVC-SAP, D=10 "

7.25

82.03

635.B

CUNETA TRIANGULAR

2,815.92

51.12

635.B1

CUNETA SEMICIRCULAR

300.38

102.98

OBRA

: REHABILITACIN Y MEJORAMIENT

ENTIDAD
CONTRATISTA

: MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA


: CONSORCIO LOS CHANCAS
PRESUPUESTO

Item

Descripcion

Und.

Metrado

P.Unit. S/.

638.A

SARDINEL PERALTADO

0.00

741.00

638.C

SARDINEL DE VEREDA

4,164.42

57.55

645.A

VEREDAS DE ADOQUINES

m2

0.00

70.91

650.G

GEOTEXTIL NO TEJIDO CLASE 1

m2

0.00

5.38

660.A

GAVION TIPO CAJA

m3

1,874.50

160.32

661.A

ELEMENTO MURO DE SUELO REFORZADO

m3

0.00

179.91

669.A

ESFERAS DE CONCRETO PREFABRICADO

0.00

547.61

670.A

REJILLA METALICA

28.00

146.69

671.A

TAPA DE CONCRETO

48.00

105.95

673.A

REVESTIMIENTO CON GRANITO PULIDO E=1CM

m2

0.00

88.63

673.B

REVESTIMIENTO CON GRANITO LAVADO E=1CM

m2

0.00

83.06

695.A

NIVELACION DE BUZONES

32.00

1,036.08

700

TRANSPORTE

700.A

TRANSPORTE DE MATERIAL GRANULAR PARA D < =1KM

m3-km

1,498.12

5.13

700.B

TRANSPORTE DE MATERIAL GRANULAR PARA D > 1KM

m3-km

18,752.00

0.87

700.E

TRANSPORTE DE DESECHOS Y EXCED. A DME PARA D < =1KM

m3-km

10,339.90

5.56

700.F

TRANSPORTE DE DESECHOS Y EXCED. A DME PARA D > 1KM

m3-km

92,704.82

0.95

OBRA

: REHABILITACIN Y MEJORAMIENT

ENTIDAD
CONTRATISTA

: MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA


: CONSORCIO LOS CHANCAS
PRESUPUESTO

Item

Descripcion

Und.

Metrado

P.Unit. S/.

700.J

TRANSPORTE DE PIEDRA PARA GAVIONES D < =1KM

m3-km

2,635.16

6.58

700.K

TRANSPORTE DE PIEDRA PARA GAVIONES D > 1KM

m3-km

29,769.10

1.12

800

SENALIZACION Y SEGURIADAD VIAL

801.B

SEALES PREVENTIVAS 0.75m x 0.75 m

41.00

346.46

802.B

SEALES REGLAMENTARIAS 1.20mX0.80m

12.00

435.63

803.B

SEALES INF. DE SERVICIOS AUXILIARES 0.75mX0.60m

6.00

280.49

803.C

SEALES INFORMATIVAS

m2

7.42

531.29

804.A2

POSTE DE SOPORTE DE SENALES DE FIERRO

72.00

145.75

804.B1

ESTRUCTURA DE SOPORTE DE SENALES TIPO E-1

3.00

1,635.62

805.A

POSTE DELINIADOR

59.00

130.73

805.B

TACHA RETROREFLECTIVA

561.00

13.73

806.A

TACHON

36.00

62.73

810.A

MARCAS EN EL PAVIMENTO TIPO I

1,054.92

11.75

830.A

POSTE DE KILOMETRAJE

2.00

125.86

840.A

PINTADO DE PARAPETOS DE MUROS Y ALCANTARILLAS

1,094.18

55.06

855.A

GIBAS O RESALTO TRAPEZOIDAL

28.80

1,132.53

855.B

GIBAS O RESALTO CIRCULAR

14.40

825.41

m2
u
m2

OBRA

: REHABILITACIN Y MEJORAMIENT

ENTIDAD
CONTRATISTA

: MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA


: CONSORCIO LOS CHANCAS
PRESUPUESTO

Item
900
900.A

Descripcion

Und.

Metrado

P.Unit. S/.

PROTECCION AMBIENTAL
PROGRAMA DE CIERRE DE OBRA

901.B1

RETIRO Y ALMACENAMIENTO DE CAPA SUPERFICIAL DE DME

m2

3,492.09

1.62

901.B2

COLOCACION DE CAPA SUPERFICIAL DE DME

m2

3,492.09

1.62

906.A

ACONDICIONAMIENTO DE DESECHOS Y EXCEDENTE

m3

10,476.26

1.83

907.A1

READECUACION AMBIENTAL DE CANTERA DE RIO

m2

7,130.32

1.04

m2

1.80

531.29

1.00

1,635.62

m3

10,695.48

2.54

910

SUBPROGRAMA DE SEALIZACION AMBIENTAL

911.A

SEAL INFORMATIVA AMBIENTAL

912.A

ESTRUCTURA DE SOPORTE DE SEALES TIPO E-1

960
965.A
970

COMPENSACION DE AREAS AUXILIARES


PAGO POR EXTRACCION DE MATERIALES D CANTERA DE RIO
PROGRAMA DE MONITOREO AMBIENTAL

970.A

MONITOREO DE LA CALIDAD DE AGUA

pto

4.00

900.00

970.B

MONITOREO DE LA CALIDAD DE AIRE

pto

10.00

900.00

970.C

MONITOREO DE NIVEL DE PRESION DE RUIDOS

pto

10.00

90.00

ADICIONAL DE OBRA N01

OBRA

: REHABILITACIN Y MEJORAMIENT

ENTIDAD
CONTRATISTA

: MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA


: CONSORCIO LOS CHANCAS
PRESUPUESTO

Item
01
01.01
02
02.01
02.01.01

Descripcion

Und.

Metrado

P.Unit. S/.

TRABAJOS PROVISIONALES
ALMACEN PARA OBRA

mes

2.00

750.00

RED DE AGUA POTABLE Y RED DE ALCANTARILLADO


RED DE DISTRIBUCION
TRABAJOS PRELIMINARES

02.01.01.01

TRAZO Y REPLANTEO INICIAL DE OBRA

KM

1.26

1,481.71

02.01.01.02

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROV. EN

und

10.00

35.00

02.01.01.03

CINTA PLASTICA P/SEAL DE PELIGRO, LIMITE DE OBRA

GLB

1.00

400.01

m3

567.37

42.41

02.01.02

MOVIMIENTO DE TIERRAS

02.01.02.01

EXCAVACION MANUAL - TERRENO COMPACTADO P/TUB. DE AGUA POTABL

02.01.02.02

REFINE Y NIVELACION ZANJA TERR.NORMAL

1,260.83

2.14

02.01.02.03

PREPARACION Y COLOCACION DE CAMA DE APOYO E=0.15 M

1,260.83

12.47

02.01.02.04

PRIMER RELLENO H=0.30M MATERIAL DE PRESAMO - ARENA

1,260.83

42.27

02.01.02.05

SEGUNDO RELLENO CON MATERIAL PROPIO SELECCIONADO CADA H=0.2

2,521.66

18.25

02.01.02.06

ELIMINACION DE MATERIAL EXCEDENTE, DIST. PROM. 6.0 KM, CARGUIO

M3

340.42

27.62

1,513.00

20.07

02.01.03
02.01.03.01

SUMINISTRO E INSTALACION DE TUBERIAS


TUBERIA UF PVC ISO 4422 DN=110MM C-10.0

OBRA
ENTIDAD
CONTRATISTA

: REHABILITACIN Y MEJORAMIENT
: MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA
: CONSORCIO LOS CHANCAS
PRESUPUESTO

Item
02.01.03.02
02.01.04

Descripcion
PRUEBA HIDRAULICA+DESINFECCION TUB. PVC

Und.
m

Metrado

P.Unit. S/.

1,260.83

3.02

SUMINISTRO E INSTALACION DE ACCESORIOS

02.01.04.01

TEE DE PVC PARA RED DE AGUA POTABLE DE 110MM

und

12.00

67.49

02.01.04.02

UNION FLEXIBLE TIPO DRESSER DE DN=110mm

und

17.00

1,108.20

02.01.04.03

CODO DE PVC PARA RED AGUA POTABLE DE 110MM*22.5

und

34.00

45.79

02.01.04.04

REDUCCIONES PVC-SAP 160MM A 110MM

und

1.00

117.74

02.01.04.05

REDUCCION DE DN=110 mm a 90 mm"

und

1.00

88.51

02.01.04.06

TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 110MM

und

2.00

37.89

und

8.00

1,136.52

KM

0.05

1,481.71

m3

10.35

42.41

02.01.05
02.01.05.01
02.01.06
02.01.06.01
02.01.06.01.01
02.01.06.02

VALVULA CONTROL
VALVULA CONTROL DE 110MM
VALVULA DE AIRE
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO INICIAL DE OBRA
MOVIMIENTO DE TIERRAS

02.01.06.02.01

EXCAVACION MANUAL - TERRENO COMPACTADO

02.01.06.02.02

RELLENO Y COMPACTADO CON MATERIAL PROPIO

16.20

17.86

02.01.06.02.03

ELIMINACION DE MATERIAL EXCEDENTE, DIST. PROM. 6.0 KM, CARGUI

M3

12.42

27.62

OBRA
ENTIDAD
CONTRATISTA

: REHABILITACIN Y MEJORAMIENT
: MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA
: CONSORCIO LOS CHANCAS
PRESUPUESTO

Item
02.01.06.03

Descripcion

Und.

Metrado

P.Unit. S/.

OBRAS DE CONCRETO SIMPLE

02.01.06.03.01

SOLADO DE E=2" CONCRETO FC=100KG/CM2

m2

1.95

55.06

02.01.06.03.02

CONCRETO CLASE F ( fc = 140Kg/Cm2)

m3

0.39

268.20

02.01.06.03.03

ENCOFRADO Y DESENCOFRADO

m2

1.12

50.92

02.01.06.04

OBRAS DE CONCRETO ARMADO

02.01.06.04.01

ENCOFRADO Y DESENCOFRADO

m2

12.60

50.92

02.01.06.04.02

CONCRETO CLASE E ( fc = 175Kg/Cm2)

m3

3.09

296.93

02.01.06.04.03

ACERO FY= 4200 KG/CM2

kg

145.00

4.55

m2

5.40

20.95

und

1.00

1,307.42

und

1.00

850.00

02.01.06.05
02.01.06.05.01
02.01.06.06
02.01.06.06.01
02.01.06.07
02.01.06.07.01
02.02

REVOQUES Y ENLUCIDOS
TARRAJEO EN INTERIOR Y EXTERIOR 1:5 e=1.5 cm
ACCESORIOS
VALVULA DE AIRE DE 110 MM
DEMOLICION DE ESTRUCTURA EXISTENTE
DEMOLICION Y ELIMINACION DE ESTRUCTURA DE VALVULA DE AIRE
CONEXIONES DOMICILIARIAS - AGUA POTABLE

02.02.01

EXCAVACION MANUAL - TERRENO COMPACTADO P/TUB. DE AGUA POTABLE

m3

806.52

42.41

02.02.02

CONEXIONES DOMICILIARIAS DE AGUA

und

223.00

195.40

OBRA
ENTIDAD
CONTRATISTA

: REHABILITACIN Y MEJORAMIENT
: MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA
: CONSORCIO LOS CHANCAS
PRESUPUESTO

Item

Descripcion

Und.

Metrado

P.Unit. S/.

02.02.03

PRIMER RELLENO H=0.30M MATERIAL DE PRESAMO - ARENA

1,335.00

42.27

02.02.04

SEGUNDO RELLENO CON MATERIAL PROPIO SELECCIONADO CADA H=0.20

3,116.00

18.25

0.03

2.56

m3

3.42

42.41

ML

35.00

11.55

35.00

2.14

35.00

12.47

02.03
02.03.01
02.03.01.01
02.03.02
02.03.02.01
02.03.02.01.01
02.03.02.02
02.03.02.02.01
02.03.02.03
02.03.02.03.01
02.03.02.04
02.03.02.04.01
02.03.02.05

RED DE ALCANTARILLADO
OBRAS PROVISIONALES
TRAZO Y REPLANTEO INICIAL DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION PARA BUZONES
EXCAVACION MANUAL EN T/COMPACTADO. P/BUZONES DE 1.00M-2.00
EXCAVACION PARA ZANJAS
EXCV. C/MAQUINARIA DE ZANJA PARA TUB. DN=160MM - 250MM H=1
REFINE, NIVEL. Y FONDOS P/TUB. PVC
REFINE Y NIVELACION ZANJA TERR.NORMAL
PREPARACION CAMA DE APOYO P/FONDOS TUB.PVC H=0.10M
PREPARACION Y COLOCACION DE CAMA DE APOYO E=0.15 M
RELLENO DE ZANJA

02.03.02.05.01

PRIMER RELLENO H=0.30M MATERIAL DE PRESAMO - ARENA

35.00

42.27

02.03.02.05.02

SEGUNDO RELLENO CON MATERIAL PROPIO SELECCIONADO CADA H=0

70.00

18.25

OBRA
ENTIDAD
CONTRATISTA

: REHABILITACIN Y MEJORAMIENT
: MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA
: CONSORCIO LOS CHANCAS
PRESUPUESTO

Item
02.03.02.06
02.03.02.06.01
02.03.02.07

Descripcion

Und.

Metrado

P.Unit. S/.

ELIMINACION DE MATERIAL EXCEDENTE


ELIMINACION DE MATERIAL EXCEDENTE, DIST. PROM. 6.0 KM, CARGUI

M3

18.48

27.62

SUMINISTRO E INSTALACION DE TUBERIAS

02.03.02.07.01

SUMINISTRO E INSTALACION DE TUBERIA PVC NORMA ISO 4435 DN=

35.00

26.69

02.03.02.07.02

ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4435

35.00

0.65

35.00

2.79

02.03.02.08
02.03.02.08.01
02.03.02.09

PRUEBA HIDRAULICA
PRUEBA HIDRAULICA - PARA RED DE ALCANTARILLADO
CONSTRUCCION DE BUZONES

02.03.02.09.01

SOLADO 4" PARA BUZONES (MEZCLA 1:12 CEMENTO:HORMIGON)

M2

1.01

83.85

02.03.02.09.02

CONST. DE BUZON ESTANDAR TIPO I FC=210KG/CM2, H=1.01M - 2.0

m3

2.12

325.79

02.03.02.09.03

DADOS DE CONCRETO F'C = 140 KG/CM2

m3

0.50

268.20

02.03.02.10

CONEXIONES DOMICILIARIAS

02.03.02.10.01

DEMOLICION Y ELIMINACION DE CAJA DE REGISTRO DE DESAGUE

und

223.00

47.20

02.03.02.10.02

CONEX. DOMICILIARIA (CAJA DE DESAGUE)

UND

223.00

165.37

02.03.02.10.03

RELLENO Y COMP.MAT.PROPIO EN ZANJAS

m3

642.24

16.39

und

3.00

50.00

02.03.03
02.03.03.01

VARIOS
PRUEBA DE CALIDAD DE CONCRETO (COMPRESION)

OBRA

: REHABILITACIN Y MEJORAMIENT

ENTIDAD
CONTRATISTA

: MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA


: CONSORCIO LOS CHANCAS
PRESUPUESTO

Item
03

Descripcion

Und.

Metrado

P.Unit. S/.

VEREDA DE CONCRETO E=0.10

03.01

CONCRETO FC=175 KG/CM2 - PARA VEREDA - e=0.10 m

m3

569.44

296.93

03.02

ENCOFRADO Y DESENCOFRADO PARA VEREDA

m2

360.00

50.92

03.03

ACABADO Y BRUADO DE VEREDAS

m2

5,694.42

31.50

03.04

JUNTAS ASFALTICAS E=1" - VEREDAS

1,350.00

10.13

03.05

CURADO DE CONCRETO DE VEREDAS

m2

5,694.42

1.26

04

NIVELACION DE INSTALACIONES DOMICILIARIAS

04.01

CONEX. DOMICILIARIA ( CAJA DE AGUA )

und

69.00

98.36

04.02

CONEX. DOMICILIARIA (CAJA DE DESAGUE)

UND

69.00

165.37

04.03

DEMOLICION Y ELIMINACION DE CAJA DE REGISTRO DE DESAGUE

und

69.00

47.20

KM

0.01

1,481.71

05
05.01
05.01.01
05.02

MUROS DE ALBAILERIA PARA VIVIENDA


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO INICIAL DE OBRA
MOVIMIENTO DE TIERRAS

05.02.01

EXCAVACION MANUAL DE ZANJA PARA CIMIENTOS HASTA 1.00 MT TERRE

m3

5.88

42.41

05.02.02

EXCAVACION PARA ZAPATAS DE 0.80m x 0.80m x 1.20m

m3

6.14

42.41

05.02.03

RELLENO COMPACTADO C/EQUIPO MAT/PROPIO

m3

3.82

23.59

OBRA
ENTIDAD
CONTRATISTA

: REHABILITACIN Y MEJORAMIENT
: MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA
: CONSORCIO LOS CHANCAS
PRESUPUESTO

Item

Descripcion

Und.

Metrado

P.Unit. S/.

05.02.04

ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES

m3

2.75

15.60

05.02.05

ELIMINACION DE MATERIAL EXCEDENTE, DIST. PROM. 6.0 KM, CARGUIO C/

M3

2.75

27.62

05.03

CONCRETO SIMPLE

05.03.01

CIMIENTOS CORRIDOS M. C-H 1:10 + 30 % P.G. 6"

m3

2.94

220.09

05.03.02

ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORRIDOS

m2

13.08

50.92

05.03.03

SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.

m3

1.09

299.05

05.03.04

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO

m2

8.72

50.92

05.04
05.04.01

CONCRETO ARMADO
ZAPATAS

05.04.01.01

ZAPATAS - CONCRETO F'C=210 KG/CM2

m3

2.30

325.79

05.04.01.02

ZAPATA - ENCOFRADO Y DEDESENCOFRADO

m2

11.52

50.92

05.04.01.03

ACERO FY= 4200 KG/CM2

kg

42.82

4.55

05.04.02

COLUMNAS

05.04.02.01

CONCRETO F'C=210 KG/CM2 EN COLUMNAS

m3

1.01

325.79

05.04.02.02

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

4.05

50.92

05.04.02.03

ACERO FY= 4200 KG/CM2

kg

55.68

4.55

05.04.03

VIGAS

OBRA

: REHABILITACIN Y MEJORAMIENT

ENTIDAD
CONTRATISTA

: MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA


: CONSORCIO LOS CHANCAS
PRESUPUESTO

Item

Descripcion

Und.

Metrado

P.Unit. S/.

05.04.03.01

VIGAS - CONCRETO F'C=210 KG/CM2

m3

0.68

325.79

05.04.03.02

ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

2.73

50.92

05.04.03.03

ACERO FY= 4200 KG/CM2

kg

70.29

4.55

m2

20.67

206.78

05.04.04
05.04.04.01

MUROS Y TABIQUES DE ALBAILERIA


MURO DE CABEZA LADRILLO SOLIDO DE ARCILLA

COSTO DIRECTO
GASTOS GENERALES(15%)
UTILIDADES (10%)
SUB TOTAL
FACTOR DE RELACION
I.G.V. (18%)
TOTAL

% AVANCE
% AVANCE ACUMULADO

Fr

1.00000

RESUMEN DE CALENDARIO REPROGRAMADO VALORIZADO DE OBRA

TACIN Y MEJORAMIENTO DE LA CARRETERA HUANCAVELICA LIRCAY, TRAMO I KM 0+000 KM 1+550 (AV. LOS CHANCAS), MULTIDISTRIT

SUPUESTO
Presup.

Parcial(S/.)

mes 01
Julio

mes 02
Agosto

mes 03
Septiembre

mes 04
Octubre

24-31/07/2014

01-31/08/2014

01-30/09/2014

01-31/10/2014

159,668.98

159,668.98

2296.65

30172.62

17327.29

20628.16

93,542.07

93,542.07

0.00

23385.52

7483.37

9354.21

2,296.65

2,296.65

2296.65

0.00

0.00

0.00

61,136.48

61,136.48

0.00

6113.65

9170.47

11004.57

2,693.78

2,693.78

0.00

673.45

673.45

269.38

148,044.08

148,044.08

0.00

35,144.19

34,753.04

6,549.26

1,664.68

1,664.68

0.00

249.70

621.47

0.00

24,188.39

24,188.39

0.00

6047.10

5067.47

725.65

26,645.69

26,645.69

0.00

11990.56

1332.28

0.00

11,150.36

11,150.36

0.00

3902.63

3687.42

0.00

52,508.54

52,508.54

0.00

7876.28

13127.14

5250.85

25,389.60

25,389.60

0.00

5077.92

5077.92

507.79

6,496.82

6,496.82

0.00

0.00

5839.34

64.97

68,079.38

68,079.38

0.00

13,615.88

0.00

1,361.59

68,079.38

68,079.38

0.00

13615.88

0.00

1361.59

1,125,011.97

1,125,011.97

0.00

0.00

0.00

0.00

955,959.96

955,959.96

0.00

0.00

0.00

0.00

RESUMEN DE CALENDARIO REPROGRAMADO VALORIZADO DE OBRA

TACIN Y MEJORAMIENTO DE LA CARRETERA HUANCAVELICA LIRCAY, TRAMO I KM 0+000 KM 1+550 (AV. LOS CHANCAS), MULTIDISTRIT

SUPUESTO
Parcial(S/.)

Presup.

mes 01
Julio

mes 02
Agosto

mes 03
Septiembre

mes 04
Octubre

24-31/07/2014

01-31/08/2014

01-30/09/2014

01-31/10/2014

22,441.90

22,441.90

0.00

0.00

0.00

0.00

88,966.85

88,966.85

0.00

0.00

0.00

0.00

6,238.14

6,238.14

0.00

0.00

0.00

0.00

51,405.12

51,405.12

0.00

0.00

0.00

0.00

1,200,849.67

2,100,981.12

0.00

145,113.33

148,885.66

96,580.84

44,809.51

97,734.72

0.00

8961.90

6721.43

2240.48

48.71

62.24

0.00

12.18

36.53

0.00

19,750.22

20,143.90

0.00

0.00

16999.01

0.00

0.00

29,547.50

0.00

0.00

0.00

0.00

117,512.45

125,842.90

0.00

5875.62

29378.11

11751.25

0.00

3,111.83

0.00

0.00

0.00

0.00

6,919.56

8,091.59

0.00

0.00

6422.04

0.00

121,996.68

131,106.27

0.00

30499.17

30499.17

12199.67

131,805.17

145,975.24

0.00

39541.55

19770.78

13180.52

594.72

594.72

0.00

118.94

0.00

0.00

143,949.83

143,949.83

0.00

0.00

0.00

0.00

30,933.13

30,933.13

0.00

0.00

0.00

0.00

RESUMEN DE CALENDARIO REPROGRAMADO VALORIZADO DE OBRA

TACIN Y MEJORAMIENTO DE LA CARRETERA HUANCAVELICA LIRCAY, TRAMO I KM 0+000 KM 1+550 (AV. LOS CHANCAS), MULTIDISTRIT

SUPUESTO
Parcial(S/.)

Presup.

mes 01
Julio

mes 02
Agosto

mes 03
Septiembre

mes 04
Octubre

24-31/07/2014

01-31/08/2014

01-30/09/2014

01-31/10/2014

0.00

120,071.64

0.00

0.00

0.00

0.00

239,662.37

239,662.37

0.00

0.00

11983.12

21569.61

0.00

403,791.32

0.00

0.00

0.00

0.00

0.00

5,595.20

0.00

0.00

0.00

0.00

300,519.84

300,519.84

0.00

60103.97

27075.47

30051.98

0.00

201,499.20

0.00

0.00

0.00

0.00

0.00

7,118.93

0.00

0.00

0.00

0.00

4,107.32

4,400.70

0.00

0.00

0.00

410.73

5,085.60

5,403.45

0.00

0.00

0.00

203.42

0.00

20,030.38

0.00

0.00

0.00

0.00

0.00

22,639.66

0.00

0.00

0.00

0.00

33,154.56

33,154.56

0.00

0.00

0.00

4973.18

220,239.77

220,715.98

0.00

28,020.19

38,485.54

15,599.04

7,685.36

7,685.36

0.00

0.00

7685.36

0.00

16,314.24

16,314.24

0.00

0.00

2447.14

2279.50

57,489.85

57,966.06

0.00

16097.16

8623.48

2874.49

88,069.58

88,069.58

0.00

6164.87

8806.96

4403.48

RESUMEN DE CALENDARIO REPROGRAMADO VALORIZADO DE OBRA

TACIN Y MEJORAMIENTO DE LA CARRETERA HUANCAVELICA LIRCAY, TRAMO I KM 0+000 KM 1+550 (AV. LOS CHANCAS), MULTIDISTRIT

SUPUESTO
Presup.

Parcial(S/.)

mes 01
Julio

mes 02
Agosto

mes 03
Septiembre

mes 04
Octubre

24-31/07/2014

01-31/08/2014

01-30/09/2014

01-31/10/2014

17,339.35

17,339.35

0.00

1820.63

5921.39

1040.36

33,341.39

33,341.39

0.00

3937.53

5001.21

5001.21

175,527.61

175,527.61

0.00

0.00

0.00

0.00

14,204.86

14,204.86

0.00

0.00

0.00

0.00

5,227.56

5,227.56

0.00

0.00

0.00

0.00

1,682.94

1,682.94

0.00

0.00

0.00

0.00

3,942.17

3,942.17

0.00

0.00

0.00

0.00

10,494.00

10,494.00

0.00

0.00

0.00

0.00

4,906.86

4,906.86

0.00

0.00

0.00

0.00

7,713.07

7,713.07

0.00

0.00

0.00

0.00

7,702.53

7,702.53

0.00

0.00

0.00

0.00

2,258.28

2,258.28

0.00

0.00

0.00

0.00

12,395.31

12,395.31

0.00

0.00

0.00

0.00

251.72

251.72

0.00

0.00

0.00

0.00

60,245.55

60,245.55

0.00

0.00

0.00

0.00

32,616.86

32,616.86

0.00

0.00

0.00

0.00

11,885.90

11,885.90

0.00

0.00

0.00

0.00

RESUMEN DE CALENDARIO REPROGRAMADO VALORIZADO DE OBRA

TACIN Y MEJORAMIENTO DE LA CARRETERA HUANCAVELICA LIRCAY, TRAMO I KM 0+000 KM 1+550 (AV. LOS CHANCAS), MULTIDISTRIT

SUPUESTO
Presup.

Parcial(S/.)

mes 01
Julio

mes 02
Agosto

mes 03
Septiembre

mes 04
Octubre

24-31/07/2014

01-31/08/2014

01-30/09/2014

01-31/10/2014

81,159.93

81,159.93

37,901.47

37,901.47

0.00

622.29

3,704.33

3,224.43

5,657.19

5,657.19

0.00

622.29

3704.33

0.00

5,657.19

5,657.19

0.00

0.00

0.00

565.72

19,171.56

19,171.56

0.00

0.00

0.00

1917.16

7,415.53

7,415.53

0.00

0.00

0.00

741.55

2591.94

2591.94

259.19

956.32

956.32

0.00

0.00

0.00

95.63

1,635.62

1,635.62

0.00

0.00

0.00

163.56

27,166.52

27,166.52

0.00

2,444.99

2,716.65

12,224.88

27,166.52

27,166.52

0.00

2444.99

2716.65

12224.88

13500

13500

922.5

1350

3,600.00

3,600.00

0.00

234.00

0.00

360.00

9,000.00

9,000.00

0.00

585.00

0.00

900.00

900.00

900.00

0.00

103.50

0.00

90.00

RESUMEN DE CALENDARIO REPROGRAMADO VALORIZADO DE OBRA

TACIN Y MEJORAMIENTO DE LA CARRETERA HUANCAVELICA LIRCAY, TRAMO I KM 0+000 KM 1+550 (AV. LOS CHANCAS), MULTIDISTRIT

SUPUESTO
Presup.
1500

Parcial(S/.)
0.00

mes 01
Julio

mes 02
Agosto

mes 03
Septiembre

mes 04
Octubre

24-31/07/2014

01-31/08/2014

01-30/09/2014

01-31/10/2014

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,866.95

0.00

0.00

0.00

0.00

350.00

0.00

0.00

0.00

0.00

400.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

24,062.16

0.00

0.00

0.00

0.00

2,698.18

0.00

0.00

0.00

0.00

15,722.55

0.00

0.00

0.00

0.00

53,295.28

0.00

0.00

0.00

0.00

46,020.30

0.00

0.00

0.00

0.00

9,402.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,500.00

2616.96

151,200.87

34,173.62
30,365.91

0.00

0.00

0.00

RESUMEN DE CALENDARIO REPROGRAMADO VALORIZADO DE OBRA

TACIN Y MEJORAMIENTO DE LA CARRETERA HUANCAVELICA LIRCAY, TRAMO I KM 0+000 KM 1+550 (AV. LOS CHANCAS), MULTIDISTRIT

SUPUESTO
Parcial(S/.)

Presup.
3,807.71

mes 01
Julio

mes 02
Agosto

mes 03
Septiembre

mes 04
Octubre

24-31/07/2014

01-31/08/2014

01-30/09/2014

01-31/10/2014

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

809.88

0.00

0.00

0.00

0.00

18,839.40

0.00

0.00

0.00

0.00

1,556.86

0.00

0.00

0.00

0.00

117.74

0.00

0.00

0.00

0.00

88.51

0.00

0.00

0.00

0.00

75.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

438.94

0.00

0.00

0.00

0.00

289.33

0.00

0.00

0.00

0.00

343.04

0.00

0.00

0.00

0.00

21,488.17

9,092.16

0.00

0.00

9,092.16

74.09

0.00

74.09
1,071.31

0.00

RESUMEN DE CALENDARIO REPROGRAMADO VALORIZADO DE OBRA

TACIN Y MEJORAMIENTO DE LA CARRETERA HUANCAVELICA LIRCAY, TRAMO I KM 0+000 KM 1+550 (AV. LOS CHANCAS), MULTIDISTRIT

SUPUESTO
Parcial(S/.)

Presup.
269.00

mes 02
Agosto

mes 03
Septiembre

mes 04
Octubre

24-31/07/2014

01-31/08/2014

01-30/09/2014

01-31/10/2014

0.00

0.00

0.00

0.00

107.37

0.00

0.00

0.00

0.00

104.60

0.00

0.00

0.00

0.00

57.03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

641.59

0.00

0.00

0.00

0.00

917.51

0.00

0.00

0.00

0.00

659.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

34,204.51

0.00

0.00

0.00

0.00

43,574.20

0.00

0.00

0.00

0.00

2,218.85

113.13

0.00

mes 01
Julio

0.00

0.00

113.13
1,307.42

0.00

1,307.42
850.00

0.00

850.00
191,076.16

0.00

RESUMEN DE CALENDARIO REPROGRAMADO VALORIZADO DE OBRA

TACIN Y MEJORAMIENTO DE LA CARRETERA HUANCAVELICA LIRCAY, TRAMO I KM 0+000 KM 1+550 (AV. LOS CHANCAS), MULTIDISTRIT

SUPUESTO
Parcial(S/.)

Presup.

mes 01
Julio

mes 02
Agosto

mes 03
Septiembre

mes 04
Octubre

24-31/07/2014

01-31/08/2014

01-30/09/2014

01-31/10/2014

56,430.45

0.00

0.00

0.00

0.00

56,867.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,479.45

0.00

0.00

0.00

0.00

1,277.50

0.00

0.00

0.00

0.00

0.08

0.00

0.08

145.04

0.00

145.04
404.25

0.00

404.25
74.90

0.00

74.90
436.45

0.00

436.45
2,756.95

0.00

RESUMEN DE CALENDARIO REPROGRAMADO VALORIZADO DE OBRA

TACIN Y MEJORAMIENTO DE LA CARRETERA HUANCAVELICA LIRCAY, TRAMO I KM 0+000 KM 1+550 (AV. LOS CHANCAS), MULTIDISTRIT

SUPUESTO
Parcial(S/.)

Presup.
510.42

0.00

mes 01
Julio

mes 02
Agosto

mes 03
Septiembre

mes 04
Octubre

24-31/07/2014

01-31/08/2014

01-30/09/2014

01-31/10/2014

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

934.15

0.00

0.00

0.00

0.00

22.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

84.69

0.00

0.00

0.00

0.00

690.67

0.00

0.00

0.00

0.00

134.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10,525.60

0.00

0.00

0.00

0.00

36,877.51

0.00

0.00

0.00

0.00

10,526.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

510.42
956.90

97.65

0.00

0.00

97.65
909.46

57,929.42

150.00
150.00

0.00

0.00

0.00

RESUMEN DE CALENDARIO REPROGRAMADO VALORIZADO DE OBRA

TACIN Y MEJORAMIENTO DE LA CARRETERA HUANCAVELICA LIRCAY, TRAMO I KM 0+000 KM 1+550 (AV. LOS CHANCAS), MULTIDISTRIT

SUPUESTO
Parcial(S/.)

Presup.
387,639.72

mes 02
Agosto

mes 03
Septiembre

mes 04
Octubre

24-31/07/2014

01-31/08/2014

01-30/09/2014

01-31/10/2014

0.00

0.00

0.00

0.00

169,083.82

0.00

0.00

0.00

0.00

18,331.20

0.00

0.00

0.00

0.00

179,374.23

0.00

0.00

0.00

0.00

13,675.50

0.00

0.00

0.00

0.00

7,174.97

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6,786.84

0.00

0.00

0.00

0.00

11,410.53

0.00

0.00

0.00

0.00

3,256.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

249.37

0.00

0.00

0.00

0.00

260.40

0.00

0.00

0.00

0.00

90.11

0.00

0.00

0.00

0.00

21,454.17

14.82

0.00

mes 01
Julio

0.00

0.00

14.82
718.74

0.00

RESUMEN DE CALENDARIO REPROGRAMADO VALORIZADO DE OBRA

TACIN Y MEJORAMIENTO DE LA CARRETERA HUANCAVELICA LIRCAY, TRAMO I KM 0+000 KM 1+550 (AV. LOS CHANCAS), MULTIDISTRIT

SUPUESTO
Parcial(S/.)

Presup.

mes 01
Julio

mes 02
Agosto

mes 03
Septiembre

mes 04
Octubre

24-31/07/2014

01-31/08/2014

01-30/09/2014

01-31/10/2014

42.90

0.00

0.00

0.00

0.00

75.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

647.06

0.00

0.00

0.00

0.00

666.03

0.00

0.00

0.00

0.00

325.96

0.00

0.00

0.00

0.00

444.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

749.32

0.00

0.00

0.00

0.00

586.60

0.00

0.00

0.00

0.00

194.83

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

329.05

0.00

0.00

0.00

0.00

206.23

0.00

0.00

0.00

0.00

253.34

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,083.07

1,530.75

788.62

680.37

0.00

0.00

0.00

0.00

RESUMEN DE CALENDARIO REPROGRAMADO VALORIZADO DE OBRA

TACIN Y MEJORAMIENTO DE LA CARRETERA HUANCAVELICA LIRCAY, TRAMO I KM 0+000 KM 1+550 (AV. LOS CHANCAS), MULTIDISTRIT

SUPUESTO
Presup.

Parcial(S/.)

mes 01
Julio

mes 02
Agosto

mes 03
Septiembre

mes 04
Octubre

24-31/07/2014

01-31/08/2014

01-30/09/2014

01-31/10/2014

221.54

0.00

0.00

0.00

0.00

139.01

0.00

0.00

0.00

0.00

319.82

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4,274.14

0.00

4,274.14

4,079,189.05

4,079,189.05

2,296.65

256,055.99

245,872.51

157,777.39

611,878.36

611,878.36

344.50

38,408.40

36,880.88

23,666.61

407,918.91

407,918.91

229.67

25,605.60

24,587.25

15,777.74

5,098,986.32

5,098,986.32

2,870.82

320,069.99

307,340.64

197,221.74

2,870.82000

320,069.99000

307,340.64000

197,221.74000

917,817.54

917,817.54

516.75

57,612.60

55,321.32

35,499.91

6,016,803.86

6,016,803.86

3,387.57

377,682.59

362,661.96

232,721.65

0.056%
0.056%

6.277%
6.333%

6.027%
12.361%

3.873%
16.234%

256,055.99

245,872.51

157,777.39
245,872.51

ZADO DE OBRA

ANCAS), MULTIDISTRITAL MULTIPROVINCIAL HUANCAVELICA

mes 05
Noviembre

mes 06
Diciembre

mes 07
Junio

mes 08
Julio

mes 09
Agosto

mes 10
Setiembre

01-30/11/2014

01-26/12/2014

15-30/06/2015

01-31/07/2015

01-31/08/2015

01-30/0/2015

9820.26

12411.03

4388.55

7868.62

3093.57

8430.99

6547.94

9354.21

2806.26

4677.10

1870.84

2182.65

0.00

0.00

0.00

0.00

0.00

0.00

3056.82

3056.82

1528.41

3056.83

1222.73

6113.65

215.50

0.00

53.88

134.69

0.00

134.69

7,077.36

18,845.66

3,405.07

8,827.84

5,303.23

4,703.05

83.23

166.47

0.00

83.23

66.59

44.39

1209.42

3628.26

604.71

2189.05

483.77

443.45

1332.28

2664.57

666.14

1332.28

1065.83

577.32

557.52

557.52

186.77

1003.53

334.51

120.83

2625.43

10501.71

1312.71

2625.43

1575.26

2625.43

1269.48

1327.13

634.74

1269.48

1777.27

761.69

0.00

0.00

0.00

324.84

0.00

129.94

0.00

0.00

0.00

0.00

2,042.38

6,807.94

0.00

0.00

0.00

0.00

2042.38

6807.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ZADO DE OBRA

ANCAS), MULTIDISTRITAL MULTIPROVINCIAL HUANCAVELICA

mes 05
Noviembre

mes 06
Diciembre

mes 07
Junio

mes 08
Julio

mes 09
Agosto

mes 10
Setiembre

01-30/11/2014

01-26/12/2014

15-30/06/2015

01-31/07/2015

01-31/08/2015

01-30/0/2015

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

66,463.39

90,912.36

43,386.68

145,300.15

10,316.75

69,626.36

2240.48

6721.43

0.00

2240.48

1568.33

1194.92

0.00

0.00

0.00

0.00

0.00

0.00

987.51

987.51

0.00

776.19

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2350.25

17626.87

11751.25

17626.85

3525.37

2350.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

497.52

0.00

0.00

6099.83

12199.67

0.00

0.00

2439.94

6099.83

6590.26

0.00

0.00

6590.26

2636.10

10544.41

29.74

29.74

0.00

29.74

23.79

148.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3093.31

ZADO DE OBRA

ANCAS), MULTIDISTRITAL MULTIPROVINCIAL HUANCAVELICA

mes 05
Noviembre

mes 06
Diciembre

mes 07
Junio

mes 08
Julio

mes 09
Agosto

mes 10
Setiembre

01-30/11/2014

01-26/12/2014

15-30/06/2015

01-31/07/2015

01-31/08/2015

01-30/0/2015

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

31635.43

36308.85

0.00

38345.98

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

48083.17

51689.41

0.00

77504.07

0.00

6010.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

82.15

0.00

0.00

410.73

123.22

821.46

0.00

0.00

0.00

0.00

0.00

1017.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1657.73

0.00

3315.46

0.00

0.00

25,968.05

29,468.32

2,581.34

36,665.25

1,765.63

9,445.13

0.00

0.00

0.00

0.00

0.00

0.00

571.00

2447.14

163.14

2773.42

167.71

734.13

6611.33

2874.49

656.81

8623.48

1068.16

2299.59

13650.78

13210.44

1761.39

15852.52

0.00

4469.92

ZADO DE OBRA

ANCAS), MULTIDISTRITAL MULTIPROVINCIAL HUANCAVELICA

mes 05
Noviembre

mes 06
Diciembre

mes 07
Junio

mes 08
Julio

mes 09
Agosto

mes 10
Setiembre

01-30/11/2014

01-26/12/2014

15-30/06/2015

01-31/07/2015

01-31/08/2015

01-30/0/2015

3467.87

2600.90

0.00

2080.72

73.68

333.78

1667.07

8335.35

0.00

7335.11

456.08

1607.71

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ZADO DE OBRA

ANCAS), MULTIDISTRITAL MULTIPROVINCIAL HUANCAVELICA

mes 05
Noviembre

mes 06
Diciembre

mes 07
Junio

mes 08
Julio

mes 09
Agosto

mes 10
Setiembre

01-30/11/2014

01-26/12/2014

15-30/06/2015

01-31/07/2015

01-31/08/2015

01-30/0/2015

339.43

2,177.94

0.00

2,576.82

649.00

1,698.19

339.43

565.72

0.00

113.14

56.57

85.99

0.00

282.86

0.00

282.86

113.14

282.86

0.00

958.58

0.00

1587.58

479.29

958.58

0.00

370.78

0.00

593.24

0.00

370.76

129.6

0.01

0.00

47.82

0.00

0.00

0.00

0.01

0.00

81.78

0.00

0.00

0.00

0.00

2,756.25

2,716.64

0.00

2,948.65

0.00

271.77

2756.25

2716.64

0.00

2948.65

0.00

271.77

2025

2700

1890

270

675

540.00

720.00

0.00

504.00

72.00

180.00

1350.00

1800.00

0.00

1260.00

180.00

450.00

135.00

180.00

0.00

126.00

18.00

45.00

ZADO DE OBRA

ANCAS), MULTIDISTRITAL MULTIPROVINCIAL HUANCAVELICA

mes 05
Noviembre

mes 06
Diciembre

mes 07
Junio

mes 08
Julio

mes 09
Agosto

mes 10
Setiembre

01-30/11/2014

01-26/12/2014

15-30/06/2015

01-31/07/2015

01-31/08/2015

01-30/0/2015

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ZADO DE OBRA

ANCAS), MULTIDISTRITAL MULTIPROVINCIAL HUANCAVELICA

mes 05
Noviembre

mes 06
Diciembre

mes 07
Junio

mes 08
Julio

mes 09
Agosto

mes 10
Setiembre

01-30/11/2014

01-26/12/2014

15-30/06/2015

01-31/07/2015

01-31/08/2015

01-30/0/2015

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ZADO DE OBRA

ANCAS), MULTIDISTRITAL MULTIPROVINCIAL HUANCAVELICA

mes 05
Noviembre

mes 06
Diciembre

mes 07
Junio

mes 08
Julio

mes 09
Agosto

mes 10
Setiembre

01-30/11/2014

01-26/12/2014

15-30/06/2015

01-31/07/2015

01-31/08/2015

01-30/0/2015

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ZADO DE OBRA

ANCAS), MULTIDISTRITAL MULTIPROVINCIAL HUANCAVELICA

mes 05
Noviembre

mes 06
Diciembre

mes 07
Junio

mes 08
Julio

mes 09
Agosto

mes 10
Setiembre

01-30/11/2014

01-26/12/2014

15-30/06/2015

01-31/07/2015

01-31/08/2015

01-30/0/2015

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ZADO DE OBRA

ANCAS), MULTIDISTRITAL MULTIPROVINCIAL HUANCAVELICA

mes 05
Noviembre

mes 06
Diciembre

mes 07
Junio

mes 08
Julio

mes 09
Agosto

mes 10
Setiembre

01-30/11/2014

01-26/12/2014

15-30/06/2015

01-31/07/2015

01-31/08/2015

01-30/0/2015

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ZADO DE OBRA

ANCAS), MULTIDISTRITAL MULTIPROVINCIAL HUANCAVELICA

mes 05
Noviembre

mes 06
Diciembre

mes 07
Junio

mes 08
Julio

mes 09
Agosto

mes 10
Setiembre

01-30/11/2014

01-26/12/2014

15-30/06/2015

01-31/07/2015

01-31/08/2015

01-30/0/2015

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ZADO DE OBRA

ANCAS), MULTIDISTRITAL MULTIPROVINCIAL HUANCAVELICA

mes 05
Noviembre

mes 06
Diciembre

mes 07
Junio

mes 08
Julio

mes 09
Agosto

mes 10
Setiembre

01-30/11/2014

01-26/12/2014

15-30/06/2015

01-31/07/2015

01-31/08/2015

01-30/0/2015

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ZADO DE OBRA

ANCAS), MULTIDISTRITAL MULTIPROVINCIAL HUANCAVELICA

mes 05
Noviembre

mes 06
Diciembre

mes 07
Junio

mes 08
Julio

mes 09
Agosto

mes 10
Setiembre

01-30/11/2014

01-26/12/2014

15-30/06/2015

01-31/07/2015

01-31/08/2015

01-30/0/2015

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

114,449.74

159,361.55

53,761.64

206,077.33

23,440.56

101,658.44

17,167.46

23,904.23

8,064.25

30,911.60

3,516.08

15,248.77

11,444.97

15,936.16

5,376.16

20,607.73

2,344.06

10,165.84

143,062.17

199,201.94

67,202.05

257,596.66

29,300.70

127,073.05

143,062.17000

199,201.94000

67,202.05000

257,596.66000

29,300.70000

127,073.05000

25,751.18

35,856.35

12,096.37

46,367.40

5,274.13

22,873.15

168,813.35

235,058.29

79,298.42

303,964.06

34,574.83

149,946.20

2.806%
19.040%

3.907%
22.947%

1.318%
24.265%

5.052%
29.317%

0.575%
29.891%

2.492%
32.383%

114,449.74

159,361.55

53,761.64

206,077.33

23,440.56

101,658.44

mes 11
Octubre

mes 12
Noviembre

mes 13
Diciembre

mes 14
Enero

mes 15
Febrero

01-31/10/2015

01-30/11/2015

01-30/11/2015

01-30/11/2016

01-30/11/2017

10871.54

7868.61

6592.00

5656.58

5656.58

4677.10

4677.10

4677.10

3741.68

3741.68

0.00

0.00

0.00

0.00

0.00

6113.65

3056.82

1834.09

1834.09

1834.09

80.79

134.69

80.81

80.81

80.81

16,561.97

4,703.91

1,438.67

507.79

0.00

166.48

83.23

99.88

0.00

0.00

3789.51

0.00

0.00

0.00

0.00

3996.95

1687.47

0.00

0.00

0.00

576.61

0.00

0.00

0.00

0.00

2887.97

2100.33

0.00

0.00

0.00

5077.92

761.68

1338.79

507.79

0.00

66.53

71.20

0.00

0.00

0.00

3,403.97

2,042.38

14,977.46

13,615.88

10,211.90

3403.97

2042.38

14977.46

13615.88

10211.90

19,119.20

22,500.24

168,751.80

281,253.00

393,754.19

19119.20

19119.20

143393.99

238989.99

334585.99

mes 11
Octubre

mes 12
Noviembre

mes 13
Diciembre

mes 14
Enero

mes 15
Febrero

01-31/10/2015

01-30/11/2015

01-30/11/2015

01-30/11/2016

01-30/11/2017

0.00

448.84

3366.29

5610.48

7854.67

0.00

1779.34

13345.03

22241.71

31138.39

0.00

124.76

935.72

1559.54

2183.35

0.00

1028.10

7710.77

12851.28

17991.79

88,379.47

90,371.29

91,826.33

58,984.73

54,700.93

11874.52

1045.54

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15276.62

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4879.87

12199.67

4879.86

0.00

0.00

13180.52

6590.26

13180.51

0.00

0.00

59.46

154.63

0.00

0.00

0.00

2879.00

7197.49

35987.46

43184.95

54700.93

1546.66

4639.96

10826.60

10826.60

0.00

mes 11
Octubre

mes 12
Noviembre

mes 13
Diciembre

mes 14
Enero

mes 15
Febrero

01-31/10/2015

01-30/11/2015

01-30/11/2015

01-30/11/2016

01-30/11/2017

0.00

0.00

0.00

0.00

0.00

35949.36

47932.47

15937.55

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

821.45

1437.56

0.00

0.00

0.00

254.28

2542.80

1067.98

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1657.73

6630.91

9946.37

4973.18

0.00

8,621.94

6,474.94

7,518.78

9,625.48

0.00

0.00

0.00

0.00

0.00

0.00

1631.42

652.57

815.71

1631.36

0.00

2587.04

2299.59

2299.59

574.64

0.00

4403.48

3522.78

4403.48

7419.48

0.00

mes 11
Octubre

mes 12
Noviembre

mes 13
Diciembre

mes 14
Enero

mes 15
Febrero

01-31/10/2015

01-30/11/2015

01-30/11/2015

01-30/11/2016

01-30/11/2017

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

87,763.83

0.00

0.00

0.00

0.00

7102.43

0.00

0.00

0.00

0.00

2613.78

0.00

0.00

0.00

0.00

841.47

0.00

0.00

0.00

0.00

1971.09

0.00

0.00

0.00

0.00

5247.00

0.00

0.00

0.00

0.00

2453.43

0.00

0.00

0.00

0.00

3856.54

0.00

0.00

0.00

0.00

3851.27

0.00

0.00

0.00

0.00

1129.14

0.00

0.00

0.00

0.00

6197.66

0.00

0.00

0.00

0.00

125.86

0.00

0.00

0.00

0.00

30122.78

0.00

0.00

0.00

0.00

16308.43

0.00

0.00

0.00

0.00

5942.95

mes 11
Octubre

mes 12
Noviembre

mes 13
Diciembre

mes 14
Enero

mes 15
Febrero

01-31/10/2015

01-30/11/2015

01-30/11/2015

01-30/11/2016

01-30/11/2017

0.00

0.00

0.00

0.00

1,725.36

4,129.59

8,626.79

5,769.99

2,657.31

113.14

56.58

0.00

0.00

0.00

282.86

1414.30

1980.02

452.57

0.00

958.58

1917.16

4792.89

3834.31

1767.43

370.78

741.55

1853.88

1483.11

889.88

129.6

259.19

518.38

518.38

388.79

47.82

95.63

191.26

191.26

143.45

81.78

163.56

327.12

327.12

245.34

271.67

815.02

0.00

0.00

0.00

271.67

815.02

0.00

0.00

0.00

270

270

657

1053

675

72.00

72.00

180.00

288.00

180.00

180.00

180.00

450.00

720.00

450.00

18.00

18.00

27.00

45.00

45.00

mes 11
Octubre

mes 12
Noviembre

mes 13
Diciembre

mes 14
Enero

mes 15
Febrero

01-31/10/2015

01-30/11/2015

01-30/11/2015

01-30/11/2016

01-30/11/2017

750.00

750.00

0.00

0.00

0.00

750.00

750.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2329.46

287.51

0.00

0.00

0.00

1866.95

0.00

0.00

0.00

0.00

262.50

87.50

0.00

0.00

0.00

200.01

200.01

0.00

0.00

0.00

113400.66

37800.23

0.00

0.00

0.00

18046.62

6015.54

0.00

0.00

0.00

2023.64

674.55

0.00

0.00

0.00

11791.91

3930.64

0.00

0.00

0.00

39971.46

13323.82

0.00

0.00

0.00

34515.23

11505.08

0.00

0.00

0.00

7051.80

2350.60

0.00

0.00

0.00

25630.21

8543.41

0.00

0.00

0.00

22774.43

7591.48

0.00

0.00

0.00

mes 11
Octubre

mes 12
Noviembre

mes 13
Diciembre

mes 14
Enero

mes 15
Febrero

01-31/10/2015

01-30/11/2015

01-30/11/2015

01-30/11/2016

01-30/11/2017

2855.78

951.93

0.00

0.00

0.00

16116.14

5372.06

0.00

0.00

0.00

607.41

202.47

0.00

0.00

0.00

14129.55

4709.85

0.00

0.00

0.00

1167.65

389.22

0.00

0.00

0.00

88.31

29.44

0.00

0.00

0.00

66.38

22.13

0.00

0.00

0.00

56.84

18.95

0.00

0.00

0.00

6819.12

2273.04

0.00

0.00

0.00

6819.12

2273.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

37.05

37.05

0.00

0.00

0.00

37.05

37.05

0.00

0.00

0.00

535.66

535.66

0.00

0.00

0.00

219.47

219.47

0.00

0.00

0.00

144.67

144.67

0.00

0.00

0.00

171.52

171.52

0.00

0.00

0.00

mes 11
Octubre

mes 12
Noviembre

mes 13
Diciembre

mes 14
Enero

mes 15
Febrero

01-31/10/2015

01-30/11/2015

01-30/11/2015

01-30/11/2016

01-30/11/2017

134.51

134.51

0.00

0.00

0.00

53.69

53.69

0.00

0.00

0.00

52.30

52.30

0.00

0.00

0.00

28.52

28.52

0.00

0.00

0.00

1109.44

1109.44

0.00

0.00

0.00

320.80

320.80

0.00

0.00

0.00

458.76

458.76

0.00

0.00

0.00

329.88

329.88

0.00

0.00

0.00

0.00

113.13

0.00

0.00

0.00

0.00

113.13

0.00

0.00

0.00

0.00

1307.42

0.00

0.00

0.00

0.00

1307.42

0.00

0.00

0.00

340.00

510.00

0.00

0.00

0.00

340.00

510.00

0.00

0.00

0.00

85984.27

105091.89

0.00

0.00

0.00

15392.03

18812.48

0.00

0.00

0.00

19608.39

23965.81

0.00

0.00

0.00

mes 11
Octubre

mes 12
Noviembre

mes 13
Diciembre

mes 14
Enero

mes 15
Febrero

01-31/10/2015

01-30/11/2015

01-30/11/2015

01-30/11/2016

01-30/11/2017

25393.70

31036.75

0.00

0.00

0.00

25590.15

31276.85

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.04

0.04

0.00

0.00

0.00

0.04

0.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

72.52

72.52

0.00

0.00

0.00

72.52

72.52

0.00

0.00

0.00

202.13

202.13

0.00

0.00

0.00

202.13

202.13

0.00

0.00

0.00

37.45

37.45

0.00

0.00

0.00

37.45

37.45

0.00

0.00

0.00

218.23

218.23

0.00

0.00

0.00

218.23

218.23

0.00

0.00

0.00

1378.48

1378.48

0.00

0.00

0.00

739.73

739.73

0.00

0.00

0.00

638.75

638.75

0.00

0.00

0.00

mes 11
Octubre

mes 12
Noviembre

mes 13
Diciembre

mes 14
Enero

mes 15
Febrero

01-31/10/2015

01-30/11/2015

01-30/11/2015

01-30/11/2016

01-30/11/2017

255.21

255.21

0.00

0.00

0.00

255.21

255.21

0.00

0.00

0.00

478.46

478.46

0.00

0.00

0.00

467.08

467.08

0.00

0.00

0.00

11.38

11.38

0.00

0.00

0.00

0.00

97.65

0.00

0.00

0.00

0.00

97.65

0.00

0.00

0.00

0.00

909.46

0.00

0.00

0.00

0.00

84.69

0.00

0.00

0.00

0.00

690.67

0.00

0.00

0.00

0.00

134.10

0.00

0.00

0.00

28964.72

28964.72

0.00

0.00

0.00

5262.80

5262.80

0.00

0.00

0.00

18438.76

18438.76

0.00

0.00

0.00

5263.16

5263.16

0.00

0.00

0.00

0.00

150.00

0.00

0.00

0.00

0.00

150.00

0.00

0.00

0.00

mes 11
Octubre

mes 12
Noviembre

mes 13
Diciembre

mes 14
Enero

mes 15
Febrero

01-31/10/2015

01-30/11/2015

01-30/11/2015

01-30/11/2016

01-30/11/2017

96909.94

290729.80

0.00

0.00

0.00

42270.96

126812.87

0.00

0.00

0.00

4582.80

13748.40

0.00

0.00

0.00

44843.56

134530.67

0.00

0.00

0.00

3418.88

10256.63

0.00

0.00

0.00

1793.74

5381.23

0.00

0.00

0.00

7508.96

13945.21

0.00

0.00

0.00

2375.39

4411.45

0.00

0.00

0.00

3993.69

7416.84

0.00

0.00

0.00

1139.88

2116.92

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14.82

0.00

0.00

0.00

0.00

14.82

0.00

0.00

0.00

0.00

718.74

0.00

0.00

0.00

0.00

249.37

0.00

0.00

0.00

0.00

260.40

0.00

0.00

0.00

0.00

90.11

0.00

0.00

0.00

mes 11
Octubre

mes 12
Noviembre

mes 13
Diciembre

mes 14
Enero

mes 15
Febrero

01-31/10/2015

01-30/11/2015

01-30/11/2015

01-30/11/2016

01-30/11/2017

0.00

42.90

0.00

0.00

0.00

0.00

75.96

0.00

0.00

0.00

0.00

2083.07

0.00

0.00

0.00

0.00

647.06

0.00

0.00

0.00

0.00

666.03

0.00

0.00

0.00

0.00

325.96

0.00

0.00

0.00

0.00

444.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1530.75

0.00

0.00

0.00

0.00

749.32

0.00

0.00

0.00

0.00

586.60

0.00

0.00

0.00

0.00

194.83

0.00

0.00

0.00

0.00

788.62

0.00

0.00

0.00

0.00

329.05

0.00

0.00

0.00

0.00

206.23

0.00

0.00

0.00

0.00

253.34

0.00

0.00

0.00

0.00

680.37

0.00

0.00

0.00

mes 11
Octubre

mes 12
Noviembre

mes 13
Diciembre

mes 14
Enero

mes 15
Febrero

01-31/10/2015

01-30/11/2015

01-30/11/2015

01-30/11/2016

01-30/11/2017

0.00

221.54

0.00

0.00

0.00

0.00

139.01

0.00

0.00

0.00

0.00

319.82

0.00

0.00

0.00

0.00

4274.14

0.00

0.00

0.00

0.00

4274.14

0.00

0.00

0.00

149,354.72

139,435.17

300,907.21

376,984.83

555,808.53

22,403.21

20,915.28

45,136.08

56,547.72

83,371.28

14,935.47

13,943.52

30,090.72

37,698.48

55,580.85

186,693.40

174,293.97

376,134.01

471,231.03

694,760.66

186,693.40000

174,293.97000

376,134.01000

471,231.03000

694,760.66000

33,604.81

31,372.91

67,704.12

84,821.59

125,056.92

220,298.21

205,666.88

443,838.13

556,052.62

819,817.58

13.203%
45.586%

15.955%
61.541%

7.377%
68.918%

9.242%
78.159%

13.625%
91.785%

149,354.72
389,212.66
538,567.38

139,435.17
511,395.22
650,830.39

300,907.21

376,984.83

555,808.53

mes 16
Marzo
01-30/11/2018

6585.90
4365.31
0.00
2139.78
80.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
239,633.56
200751.59

mes 16
Marzo
01-30/11/2018

5161.64
20462.38
1434.77
11823.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

mes 16
Marzo
01-30/11/2018

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

mes 16
Marzo
01-30/11/2018

0.00
0.00
87,763.78
7102.43
2613.78
841.47
1971.08
5247.00
2453.43
3856.53
3851.26
1129.14
6197.65
125.86
30122.77
16308.43
5942.95

mes 16
Marzo
01-30/11/2018

0.00
0.00
0.00
0.00
0.00
0.00
388.8
143.44
245.36
0.00
0.00
742.5
198.00
495.00
49.50

mes 16
Marzo
01-30/11/2018

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

mes 16
Marzo
01-30/11/2018

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

mes 16
Marzo
01-30/11/2018

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

mes 16
Marzo
01-30/11/2018

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

mes 16
Marzo
01-30/11/2018

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

mes 16
Marzo
01-30/11/2018

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

mes 16
Marzo
01-30/11/2018

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

mes 16
Marzo
01-30/11/2018

0.00
0.00
0.00
0.00
0.00

335,114.54
50,267.18
33,511.46
418,893.18
418,893.18000
75,400.77
494,293.95

8.215%
100.000%

335,114.54

mes 01

mes 02

mes 03

mes 04

3,387.57

377,682.59

362,661.96

233,050.59

0.056%
0.056%

6.277%
6.333%

6.027%
12.361%

3.873%
16.234%

CRONOGRAMA REPROGRAMADO
FECHA
mes 01
mes 02
mes 03
mes 04
mes 05
mes 06
mes 07
mes 08
mes 09
mes 10
mes 11
mes 12
mes 13
mes 14
mes 15
mes 16

Julio
24-31/07/2014
Agosto
01-31/08/2014
Septiembre
01-30/09/2014
Octubre
01-31/10/2014
Noviembre
01-30/11/2014
Diciembre
01-26/12/2014
Junio
15-30/06/2015
Julio
01-31/07/2015
Agosto
01-31/08/2015
Setiembre
01-30/09/2015
Octubre
01-31/10/2015
Noviembre
01-30/11/2015
Diciembre
01-31/12/2015
Enero
01-31/01/2016
Febrero
01-29/02/2016
Marzo

PROGRAMADO ECONOMICO
PARCIAL
3,387.57
377,682.59
362,661.96
233,050.59
168,813.35
235,058.29
79,298.42
303,964.06
34,574.83
149,946.20
794,386.89
959,976.83
443,838.13
556,052.62
819,817.58
494,293.95

mes 16

01-29/03/2016
TOTAL

494,293.95
S/. 6,016,803.86

mes 05

mes 06

mes 07

mes 08

mes 09

168,813.35

235,058.29

79,298.42

303,964.06

34,574.83

2.806%
19.040%

3.907%
22.947%

1.318%
24.265%

5.052%
29.317%

0.575%
29.891%

RAMA REPROGRAMADO

GRAMADO ECONOMICO
ACUMULADO

PROGRAMADO FISICO
PARCIAL
ACUMULADO

3,387.57

0.056%

0.06%

381,070.16

6.277%

6.333%

743,732.12

6.027%

12.361%

976,782.71

3.873%

16.234%

1,145,596.06

2.806%

19.040%

1,380,654.35

3.907%

22.947%

1,459,952.77

1.318%

24.265%

1,763,916.83

5.052%

29.317%

1,798,491.66

0.575%

29.891%

1,948,437.86

2.492%

32.383%

2,742,824.75

13.203%

45.586%

3,702,801.58

15.955%

61.541%

4,146,639.71

7.377%

68.918%

4,702,692.33

9.242%

78.159%

5,522,509.91

13.625%

91.785%

6,016,803.86

8.215%

100.000%

6,016,803.86
S/. 6,016,803.86

8.215%
100.00%

100.000%

mes 10

mes 11

mes 12

mes 13

mes 14

mes 15

149,946.20

794,386.89

959,976.83

443,838.13

556,052.62

819,817.58

2.492%
32.383%

13.203%
45.586%

15.955%
61.541%

7.377%
68.918%

9.242%
78.159%

13.625%
91.785%

mes 16
494,293.95

8.215%
100.000%