Main
Feeder
Testing
Main Distribution
Panel
PROJECT:
Board (Rating)
Wire Size
LOCATION:
Test Point
Instrument
Used
DATE
REQUESTED:
Test Date
ET
Control No.:
IRT Weather
Condition
SCOPE OF WORKS:
Cable
_____________________
_____________________
Line to ground
_____________________
_____________________
_____________________
:
:
:
:
:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS FOR CONSTRUCTION DRAWINGS AND TECHNICAL
SPECIFICATIONS.
Line to Ground
Reading
in M
Complied
YES
NO
Set -1
L1 - G
L2 - G
L3 - G
Testing
Main Distribution
Panel
Board (Rating)
Wire Size
Test Point
Instrument Used
Test Date
Weather Condition
Line to Line
Remarks
(Pass/ Fail)
Recommendation
Remarks
(Pass/ Fail)
Recommendation
_____________________
_____________________
Line
_____________________
_____________________
_____________________
Reading
in M
Complied
YES
NO
Set -1
L1 L2
L2 L3
L3 L1
CONDUCTED BY:
_____________________
Contractor
CONFIRMED BY:
_____________________
QC Engineer
INSPECTED BY:
_______________________
DPWH-Inspector
APPROVED BY:
B-14
____________________________
DPWH- ProjectElectrical Engineer
DISTRIBUTION:
Contractor
QC Engineer
Inspector
Project Engineer
B-14