Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Pre Liquidación
Pre Liquidación
85
100+820.00
MCA
1.00 x 1.00
CONCRETO
f'c=210 Kg/cm2
CCf'C=140kg/cm2+30%
ENCOFRADO Y
DESENCOFRADO
ACERO DE REFUERZO
f'y=4200kg/cm2
ALCANTARILLA TMC
= 36"
PINTURA ASFALTICA / ALC.
METALICAS
ZANJA DE DRENAJE
TRAMO N 4 :
504
505
506
507
508
509 509.A
510
511
512
518
520
523.A
524
540
m3
m3
m3
m3
m3
m3
m3
m2
KG
m
m2
m3
m2
m2
m
114.33
63.77
3.03
34.34
175.04
2,883.01
-
CCf'C=175kg/cm2+30%
CONCRETO
f'c=175 Kg/cm2
00.00
CONCRETO
f'c=100 Kg/cm2
PROGRESIVA
EXCAVACIN NO
CLASIFICADA PARA
ESTRUCTURAS
PRE LIQUIDACIN
UBICACIN
TRAMO N 4 :
PRE LIQUIDACIN
Sector del km. 51+000 al km.182+250
OBRAS DE ARTE Y DRENAJE
PARTIDA - 504 = EXCAVACIN NO CLASIFICADA PARA ESTRUCTURAS
MEMORIA DE CALCULO
ALC. No.
85
MCA
1.00 x 1.00
UBICACION
100+820.00
PLANTA Y PERFIL
V3
V1
V2
SBR=3946.274
PLANILLA DE CALCULO.
DESCRIPCIN
CANT.
VOLUMEN
[ m3 ]
AREA
[ m. ]
[ m. ]
[ m. ]
[ m ]
PARCIAL
ACUMULADO
CABEZAL ENTRADA
1
2.70
4.31
11.64
11.64
2.70
32.18
86.89
98.53
3.70
4.16
15.39
113.92
0.75
0.41
114.33
TOTAL
114.33
CUERPO
CABEZAL SALIDA
3
DENTELLON
4
0.55
2.50
0.30
TRAMO N 4 :
PRE LIQUIDACIN
Sector del km. 51+000 al km.182+250
OBRAS DE ARTE Y DRENAJE
PARTIDA - 505 = RELLENO PARA ESTRUCTURAS
MEMORIA DE CALCULO
ALC. No.
85.00
MCA
1.00 x 1.00
UBICACION
100+820.00
PLANTA Y PERFIL
V4
V1
V2
V3
V3
V1
V4
SBR=3946.274
PLANILLA DE CALCULO.
DESCRIPCIN
CANT.
AREA
[ m. ]
[ m. ]
[ m. ]
[ m ]
VOLUMEN
[ m3 ]
PARCIAL
ACUMULADO
2.89
3.47
3.47
1.15
-0.29
3.18
35.66
96.28
99.46
30.00
-45.00
54.46
1.46
1.75
56.21
3.57
7.85
64.06
1.15
-0.29
63.77
TOTAL
63.77
CABEZAL ENTRADA
1
Descuento
0.60
0.25
0.50
2.30
**
CUERPO
2
Descuento
2.70
1.50
1.50
20.00
CABEZAL SALIDA
3
Descuento
0.60
1.10
0.25
0.50
2.30
**
Contratista :
N85
Partida
Descripcin
Unid.
506
M3
M3
508
Km100+820
L=20.50 m
Area Media
Volumen
Parcial
Cant.
Largo
Ancho
Altura
1
1
1
1.75
20.25
1.50
2.50
0.05
0.05
0.05
1
1
1
1
1
2
2
2
2
1.75
1.50
1.00
1.50
0.40
1.25
0.40
1.00
1.40
1.50
0.25
1.00
0.25
0.25
0.25
0.25
0.075
0.075
0.25
2.04
0.25
2.04
0.70
2.04
0.40
0.075
0.075
0.66
0.77
-0.25
0.77
-0.07
1.28
-0.08
-0.01
-0.02
Losa
Pared
Piso
1
2
1
20.25
20.25
20.25
1.50
0.25
1.50
0.25
1.00
0.25
7.59
10.13
7.59
Losa
Ua
Aleros
Parapeto
Vereda
1
1
2
1
1
1
2
1
2
2.50
2.00
1.50
1.50
1.50
1.50
1.50
0.40
0.30
0.20
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.55
1.34
0.55
1.50
0.43
1.68
1.50
0.40
3.03
7.30
0.13
2.53
0.37
34.34
Cajatoma
3.05
Losa
Murete Frontal
Descontar vacio alcantarilla
Murete Posterior
Descontar abertura
Muretes Laterales
Descontar cunetas
Descontar apoyo de rejilla
SECCION A-A
Cuerpo Central
25.31
Cabezal de Salida
5.98
SECCION C-C
7.30
1.83
0.41
1.07
0.21
0.56
0.16
1.26
0.56
-0.08
M2
175.04
19.25
1
1
1
1.50
1.00
1.00
0.54
2.04
1.00
0.81
2.04
-1.00
1
1
2
1.50
1.00
0.40
2.29
2.04
0.70
3.44
2.04
-0.56
2
2
4
1.75
1.25
0.40
2.29
2.04
0.40
8.02
5.10
-0.64
1
2
2
20.50
20.25
20.00
1.00
1.50
20.50
40.50
60.00
4
2
1
2
1
2
2
2
2
1
1
1
2
1
2
2
2.00
Cuerpo
121.00
Techo
Muros (Interior)
Muros (Exterior)
Salida Cabezal Ala
Aleros
Tapas alero
Parapeto (exterior)
Parapeto (interior)
Tapas parapeto
Tapas lateral (exterior)
Tapas lateral (interior)
Fondo de vereda interior
Fondo de vereda exterior
Entrada cunetas
Losa de Alero
Descontar ingreso de Ala en entrada
Descontar ingreso de cunetas
C
SECCION B-B
ELEVACION FRONTAL
Subtotal
1.00
34.79
0.20
2.50
1.75
2.50
2.00
2.00
2.50
1.60
9.10
0.30
0.40
0.25
1.75
1.50
0.25
1.50
0.54
0.54
0.25
1.34
1.00
0.55
0.05
0.30
0.30
2.18
1.68
1.00
0.25
0.25
0.40
10.72
0.40
1.38
0.18
0.75
0.15
7.63
5.04
0.50
3.00
1.08
1.35
0.80
2.28
-0.15
-0.32
DESCRIPCION
B
A
1.00 L= 20.50m
LONGITUD
N85 Km100+820
N DE
N DE LONG.
BARRAS VECES TOTAL
PESO DE
ACERO KG/M
TOTAL
KG
Parapet1.50
1A
1.40
1/2 "
1.40
12.60
1.000
12.60
2.52
10
25.20
0.560
14.11
1/2 "
1.40
12.60
1.000
12.60
0.83
10
8.30
0.560
4.65
0.25
1.95
31.20
0.560
17.47
0.25
1.70
23.80
0.560
13.33
2.20
2.35
1.15
1.80
2
14
2
2
2
2
2
2
8.80
65.80
4.60
7.20
1.000
1.000
1.000
1.000
8.80
65.80
4.60
7.20
2.60
2.05
8
4
2
2
41.60
16.40
0.560
0.560
23.30
9.18
1.70
0.85
10
6
1
1
17.00
5.10
1.000
1.000
17.00
5.10
2.60
1.65
4
2
1
1
10.40
3.30
0.560
0.560
5.82
1.85
1.40
2.80
13.989
39.17
1.15
22
25.30
15.180
384.05
0.1
0.1
1B
0.63
0.70
0.2
2A
1.40
0.1
4D
0.1
2B
4C
4B
0.2
Losa
4B
1.65
4B
###
3/8 "
0.15
###
4B
4B
3B
4B
1.40
4A
4B
Var.
4C
4D
0.2
###
1/2 "
###
1/2 "
###
1/2 "
###
1/2 "
1A
5A
5B
2B
3/8 "
Muros laterales
Barra long. al eje de malla ambas caras
SECCION A-A
2A
###
0.15
###
4B
5B
5B
5A
5A
5A
5A
4A
0.10
Variable
###
3/8 "
1.7
3/8 "
1B
0.3
6B
6A
7A
6B
Var.
3C
0.2
1/2 "
###
1/2 "
0.15
3A
7A
7B
SECCION B-B
###
0.10
###
3/8 "
1.3
3/8 "
1.40
###
<
3"x 3"x
1.15
###
<
1"x 3"
Variable
0.3
3B
1A
Platina 1"x3"
6A
2B
1/2"
1B
Total kg
6A
7B
3C
3A
SECCION C-C
3B
646.63
N85
1.00
DESCRIPCION
CUERPO CENTRAL
CUERPO:
LONG.
20.50
ANCHO
1.50
ESPESOR
0.25
ancho
1
N DE
BARRAS
Km100+820
L= 20.50m
N DE
VECES
LONG.
TOTAL
PESO DE
ACERO KG/M
TOTAL
KG
alt.
x
RECUBRIM.
0.05
1
ALT
1.5
LOSA - PISO
barra transversal-inferior (1)
0.15
1.40
0.15
1/2 " @
0.25
1.70
83
141.10
1.000
141.10
0.15
1/2 " @
0.25
1.70
83
141.10
1.000
141.10
1/2 " @
0.25
5.20
83
431.60
1.000
431.60
1/2 " @
0.25
1.70
83
282.20
1.000
282.20
1/2 " @
0.25
1.70
83
141.10
1.000
141.10
3/8 " @
0.30
20.80
249.60
0.560
139.78
3/8 " @
0.30
20.80
249.60
0.560
139.78
20.90
334.40
1.000
334.40
MARCO:
1.00
LONGITUD
1.40
1.4
1.4
0.5
0.5
0.15
1.4
0.15
0.15
LOSA - TECHO
barra transversal-inferior
0.15
(5)
1.40
0.15
(6)
20.80
SECCION C-C
(7)
20.80
9
DETALLE INGRESO CUNETA
8
MARCO:
LONG.
ANCHO
1.75
1.50
ESPESOR
0.25
ancho
1
1/2 "
alt.
1.68
RECUBRIM.
ALT
0.05
2.18
LOSA - PISO
barra transversal-inferior (1)
0.15
1.40
0.15
1/2 " @
0.25
1.70
13.60
1.000
13.60
0.15
1/2 " @
0.25
1.70
13.60
1.000
13.60
1/2 " @
0.25
6.56
52.48
1.000
52.48
1/2 " @
0.25
2.38
38.08
1.000
38.08
1/2 " @
0.25
1.70
13.60
1.000
13.60
3/8 " @
0.30
1.65
46.20
0.560
25.87
0.30
0.15
1.40
1.4
2.08
2.08
0.5
0.5
0.15
2.08
0.15
0.15
LOSA - TECHO
barra transversal-inferior
0.15
(5)
1.40
0.15
(6)
1.65
(7)
3/8 " @
1.65
52.80
0.560
29.57
1/2 "
1.65
26.40
1.000
26.40
1/2 "
0.45
-14.40
1.000
1.65
1.65
-14.40
1949.86
N85 Km100+820
1.00
DESCRIPCION
L= 20.50m
LONGITUD
N DE
BARRAS
N DE
VECES
LONG.
TOTAL
PESO DE
ACERO KG/M
TOTAL
KG
Parape2.50
5A
2.40
3/8 "
2.40
9.60
0.560
5.38
1.50
17
25.50
0.560
14.28
2.35
2.70
8
22
1
1
18.80
59.40
0.560
0.560
10.53
33.26
3.40
18
61.20
0.560
34.27
0.11
5B
0.47
0.17
6A
variable
###
3/8 "
###
3/8 "
3A
3/8 "
8A
1/2 "
1.00
15
30.00
1.000
30.00
7.39
6B
A
C
PLANTA DE LOSA
0.15
3.40
###
1.00
7A
2.20
3/8 "
2.20
13.20
0.560
7B
2.60
3/8 "
2.60
10.40
0.560
5.82
3/8 "
3.40
27.20
0.560
15.23
0.7
2.80
14
39.20
0.560
21.95
1.48
1.57
1.66
1.74
1.83
1.91
2.00
2.08
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2.96
3.14
3.32
3.48
3.66
3.82
4.00
4.16
0.560
0.560
0.560
0.560
0.560
0.560
0.560
0.560
1.66
1.76
1.86
1.95
2.05
2.14
2.24
2.33
1.48
1.57
1.66
1.74
1.83
1.91
2.00
2.08
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2.96
3.14
3.32
3.48
3.66
3.82
4.00
4.16
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
2.96
3.14
3.32
3.48
3.66
3.82
4.00
4.16
2
2
2
2
11.04
6.48
0.560
0.560
6.18
3.63
9.36
4A
3.40
0.5
0.2
0.5
4B
0.7
0.2
3/8 "
2B
3/8 "
2C
3/8
2A
2D
0.10
3/8 "
2E
3/8 "
2F
###
3/8 "
2G
###
3/8 "
3/8 "
1/2 "
2B
1/2 "
2C
1/2
2H
Variable
0.20
2D
DETALLE 1
ELEVACION DE ALA (Cabezal de salida)
LOSA DE ALA
0.10
1/2 "
2E
1/2 "
2F
Variable
###
1/2 "
2G
###
1/2 "
1/2 "
###
3/8 "
###
3/8 "
2.76
1.62
2.34
2H
0.20
0.60
1A
1B
variabl
e
1C
Vereda9A
###
3/8 "
0.10 ###
3/8 "
2.40
3/8 "
2.65
2.40
2
8
2
2
2
1
42.40
4.80
0.560
0.560
0.560
5.24
23.74
2.69
4.00
10
40.00
0.560
22.40
2
###
9B
0.75
0.55
Total kg
SECCION B-B
286.52