Labour Contractor Scope

Earth work Excavation & Foundation Trenches of soil


Basement filling
Column Structure
Main Building Brick wall
R.C.C work: Roof, columns, Plinth and roof beams
Ring rod for column
Double mat in concrete slab
Plinth level: Ground level____ & roof height___
Plastering of wall thickness??
Staircase head room
Staircase
Sunshades
R.C. lofts
Wardrobe per room
Lentil level roof
Inner roof border cornice
Staircase
All Sunshade work
Ground Floor filling work
Balcony
All wooden frame fixing
Electrical box fixing
Elevation & Front Elevation
Roof tank
Roof muddy
Overhead Tank
Putty Works: Interiors areas
Putty Works:Exterior front Elevation Areas
Granite Slabs fixing-Kitchen areas
Handrail Fixing - Staircase Areas and upper living Cut-Off Areas
Barbendering
Masonry & centering work
Curing and Other Civil works
Cleaning and maintaining the site and beside buildings

@ Rs.290/Sq.foot
(Car Park area @
Rs.200/Sq.foot)

Additional Works with extra LABOUR


Compound Wall height??
R.C.C underground Sump
Parapet wall at terrace floor (Rate for Ground floor only), free of
cost If the construction goes first floor
underground Septic Tank & Drainage
Weathering course over terrace

Rs.120/- per Running foot


Rs.07/- per litre
Rs.60/-per running foot
Rs.05/- per litre
Rs.40/- per square foot

Tools & Equipment under Labour Contracor Scope


Survey Poles
Mixer Machine rent
Column boxes
Centering materials
Scaffoldings and all masonry tools
Vibrator Machine
& not limited to this if anything extra