101/3/22~

//

WPS/PQR

Flixborough,
UK(1974)

28
2

Seveso, Italy(1976)
25
Mexico city (1984)
LPGBLEVE 650
/6000
Bhopal, India(1984) 2000
/20000
Chernobyl(1986)
31 300

What happened in Bhopal?

1984
(LPG)

-(Bhopal)

(29CFR Part
1910.119)

(Methyl Isocyanate) 92

()

(1)
(2)PE
(3)

(1)
(2)

(1)
(2)
(3)

1.

3739

0.960 (25)

348mmHg (20)

1.97 (1 20)

1984
1984123Bhopal
40

7000
4

20

34


-1(1/3)

(2/3)

(3/3)

861213-(3)
()

LPG(
86.12.133)-2


(84.08.28)

-3

87.2.277:48LPG
8:30

9:30
12:00

448


87.02.27. 12:00

60150

75

2005 BP
2005
(BP Products North America Inc.)15
1705060

()

1976 -

1982 EEC-

1984 -

1992 -
(PSM)

()
14P S M
1992 OSHA
Process Safety Management
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.

1996 EPA
Risk Management Program
1.()
2.
3.
4.//

2005 BP




-


()

==?
Analysis
Hazard
Risk
Safety

Evaluation
Assessment
Management

()

8223
26

PSM?


8352 -17
?

()

()
()(83)

()
(86/6/18) -34

-
-
()
:1996.05 BS8800
()()
()
5() (
)

()
(88/6/30)3421
87-

Checklist &
What-if
5

()

(91/7/10)
:91/3/20

20
150
100

5000

1000

()

(94/6/10)
:

231

261

?
HazOpFMEA FTA
What-If Checklist

?
/

HCL- ? ?
HF- ? ?

()

()

500
(/)
:

150
1000

5000

()

(
27-1):

: 30-
: 45-

38


(85.6.19)







38







89

15

.
.
)

38


(101.3.9)

1.500m2
2.100m3
3.20

(28)

87.1.1

82.8.25

85.6.19

82.2.3

83.5.2

86.4.16

150

(26)

30

30

86.6.18

89.12.30

91.7.20

89.3.15

88.6.30

45

91.3.20

2827
150

1.
1000
2.5000

101.3.9

101.12.31

:

-



<1>





<2>


Preliminary Hazard Analysis

-//
//
()-
///

Checklist

-What-If

Hazard and Operability Studies

(Guidewords
)

Fault Tree Analysis

Failure Modes and Effects Analysis

82

7
Checklist7
-what If7
Preliminary Hazard Analysis9
Hazard and Operability Studies
21
Failure Modes and Effects
Analysis7
Fault Tree Analysis16
3
3
2

-()

?
:


-()

-
:

-()

-()

-()

-()

34

()

-

()




-

()

()

-
-