PERFIL ESTRATIGRAFICO DEL SUELO

PROYECTO :

PERFORACION :

UBICACIN :

COTAS :

PROF.

FECHA :

OCTUBRE DEL 2011

REFERENCIA : NIVEL FONDO DEL ESTANQUE

NIVEL FREATICO :

SUPERFICIE :

PROFUNDIDAD :

SIMBOLO

+/- 0.00 m.

SUCS

C - 1

--0.85

m.

MUESTRA

DESCRIPCION

(m.)

ESPESOR

M-1

0.15

M-1

0.25

M-1

0.45

ARENA LIMOSA, COLOR MARRON OSCURO

SM

CONSISTENCIA SEMICOMPACTA,
NO PLASTICO, LIGERAMENTE HUMEDA

0.30

ARENA MAL GRADUADA , COLOR MARRON

SP

CLARO, MEDIANAMENTE DENSA, NO PLASTICA,


LIGERAMENTE HUMEDA, CON POCOS FINOS
CON PRESENCIA DE ALGUNAS GRAVAS.

SP

0.60

ARENA ARCILLOSA, DENSA COLOR MARRON OSCURO,


PLSTICA,

CON

PRESENCIA

DE

GRAVAS

INCRUSTACIONES DE CANTOS RODADOS, VERIFICADO


EN CAMPO PARA DETERMINAR EL TIPO DE SUELO
EN LA SIGUIENTE CAPA.

0.80

1.00

DIMENSIONADO DEL RESERVORIO


PRESA O MURO DE CONTENSION

PROYECTO :
DATOS :
B
T
hz
H
D
M
N

=
=
=
=
=
=
=

1.20
0.20
0.45
1.60
1.80
0.30
0.70

PREDIMENSIONADO DE PRESA O MURO DE CONTENSION

m.
m.
m.
m.
m.
m.
m.

NIVEL DE AGUA

RELLENO

hz
M

N
B

c
a
s

PRESION ADMISIBLE DEL TERRENO :

=
=
=
=
t =

COEFICIENTE DE FRICCION :

PESO ESPECIFICO DEL CONCRETO :


PESO ESPECIFICO DEL AGUA :
PESO ESPECIFICO SUELO :
ANGULO DE FRICCION :

2.40
1.00
1.65

Tn/m3
Tn/m3
Tn/m3

31
1.75

Kg/cm2

0.68

1 CONDICION : CON RELLENO Y SIN AGUA (VACIO)

1.80

EA
d

x
0.30

0.20

0.45
0.70

1.20
P
P1
P2
P3
TOTAL

Ka = Tan2 (45 - / 2) =
EA = 1/2 Ka * s * Hp^2 =
Mv = EA * d/3 =

PESOS (Tn)
1.30
0.86
0.89
3.05
N

BRAZO GIRO (m)


0.600
0.800
1.050

P*x
0.78
0.69
0.93
2.4
Mr

0.077
0.322 Tn
0.242 Tn - m

VERIFICACION AL DESLIZAMIENTO Y AL VOLTEO :

FSD = Hr / EA = f * N / EA =

6.44

>

1.50

O.K.!

FSV = Mr / Mv =

9.92

>

1.75

O.K.!

VERIFICACION DE PRESIONES EN EL TERRENO :

Xo = (Mr - Mv) / N =

0.71 m

e = B/2 - Xo =

-0.11 m

<

q1 = N * (1 + 6 * e / B) =

1.37 Tn/m2

<

17.5 Tn/m2

q2 = N * (1 - 6 * e / B) =

4.73 Tn/m2

<

17.5 Tn/m2

q1

<

B/6 =

0.2 m

O.K.!

O.K.!

2 CONDICION : CON RELLENO Y CON AGUA (LLENO)


NIVEL DE AGUA

y
1.80

Pp = PRESION
PASIVA

EA

1.60

(SE DESPRECIA)

x
0.30

0.45

0.20

0.70

1.20
P
P1
P2
P3
P4
TOTAL

PESOS (Tn)
1.30
0.86
0.89
1.12
4.17
N

BRAZO GIRO (m)


0.600
0.800
1.050
0.350

P*x
0.78
0.69
0.93
0.39
2.79
Mr

VERIFICACION AL DESLIZAMIENTO Y AL VOLTEO :

FSD = Hr / EA = f * N / EA =
FSV = Mr / Mv =

8.81

>

1.50

O.K.!

11.53

>

1.75

O.K.!

VERIFICACION DE PRESIONES EN EL TERRENO :

Xo = (Mr - Mv) / N =
e = B/2 - Xo =

0.61 m
-0.01 m

<

B/6 =

q1 = N * (1 + 6 * e / B) =

3.96 Tn/m2

<

17.5 Tn/m2

q2 = N * (1 - 6 * e / B) =

4.38 Tn/m2

<

17.5 Tn/m2

q1

<

0.2 m

O.K.!

O.K.!