FACULTAD DE INGENIERA

DPTO. DE VAS - LAB, MECNICA DE SUELOS Y PAVIMENTOS


ENSAYO GRANULOMTRICO POR TAMIZADO

U.L.A.
OBRA:

Construccin de carreteras la Ranchera

SITUACIN: Lagunillas estado Mrida.


PERFORACIN:

CALICATA N
Desing. del

VA SECA

GRUESA

FINA

MEDIA

GRUESA

FINA

GRAVA

PIEDRA O
CANTOS

ARENA

TAMIZADO CON FRACCIN MENOR Q' P.T.M.

TAMIZADO USANDO EL P.T.M.

Tamiz US

PROGRESIVA:
C3M1

N LABORATORIO:

A
A
Peso Retenido gr,
Peso Retenido gr,
REAL

4
3
2 1/ 2
2
1 1/ 2
1
3/ 4
1/ 2
3/ 8
1/ 4

0
0.00
0.00
0.00
0.00
2314.70
1436.00
2171.20
1094.10
0.00

N 4

2460.10

N 8

9098.90

N 10
N 16
N 20
N 30
N 40

B%
Pasante

6+825,000
1

% Mas Grueso

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

2460.10

13.24

13.24

0.00

0.00

0.00

13.24

0.00

0.00

0.00

13.24

0.00

0.00

0.00

13.24

N 50
N 60

0.00

0.00

13.24

N 80
N 100
N 200
P N 200

0.00
0.00
0.00

0.00
0.00
0.00

13.24
13.24
13.24

0.00
0

CARACTERSTICAS DE MUESTRA ENSAYADA

VA HMEDA

AVIMENTOS

% Mas Fino

PESO TOTAL DE LA MUESTRA


(P.T.M.)

18575
100.00
100.00
100.00
100.00
100.00
100.00
100.00
86.76
86.76
86.76
86.76
86.76
86.76
86.76
86.76

gr,

% Pasante

ANLISIS GRANULOMTRICO

100

10

0.1

0.01 (mm)

ABERTURA DE TAMICES
Tamao o numero
del tamiz
3
2 1/2
2
1 1/2
1
3/4
3/8
N4
N10
N20
N40
N60
N100
N200

milimetros
76.2
63.5
50.8
38.1
25.4
19.1
9.53
4.76
2
0.84
0.42
0.25
0.149
0.074

pulgadas
3
2.5
2
1.5
1
0.75
0.375
0.187
0.0787
0.0331
0.0165
0.0098
0.0059
0.0029

Pasante
100.00
100.00
100.00
100.00
100.00
100.00
100.00
86.76
86.76
86.76
86.76
86.76
86.76
86.76

Abertura mm No de Malla

Porcentaje que pasa

50.8
2"
38.1
1 1/2"
25.4
1"
19.1
3/4"
12.7
1/2"
9.52
3/8"
4.76
No.4
Pasa No.4
Total

Porcentaje % Retenido Porcentaje


Peso
retenido(gr) retenido(%) acumulado que pasa(%)
0
0
0
100
0
0
0
100
2314.7
12.46
12.46
87.54
1436
7.73
20.19
79.81
2171.2
11.69
31.88
68.12
1094.1
5.89
37.77
62.23
2460.1
13.24
51.02
48.98
9098.9
48.98
100
0
18575

100
90
80
70
60
50
40
30
20
10
0
0.1

10
Abertura de la malla (mm)

100

0
0.1

10
Abertura de la malla (mm)

100

También podría gustarte