Testing Arrangements:
First Inspection:
Ensure Lube Oil In Cam Shaft Bearing & Check the free rotation of the
Engine with the help of Crank Over Tool
Maintain 100 to 110 PSI Pressure in Trolley Bellows
Fill Water & Lube Oil
Ensure Proper level of Lube Oil
Loose Cylinder test Valve & Rotate 2 Rounds the Engine for Blow out &
Close test Valve
Start the Engine for 10 min without load check for any unusual sound and
leakages
Now start the Load testing as per given schedule at different notches
4000 HP Engine
4500 HP Engine
RPM
BHP(AAR)
RPM
BHP(AAR)
Low Idle
200 +4
200
269 +4
300
270
259
25
343 +15
530
354
607
35
490 +15
1110
486
1148
568 +4
1440
572
1573
651 +15
1840
675
1916
25
730+4
2290
764
2960
25
820 +15
3680
863
3822
25
904 +4
4080
954
4500
80
Over
Load
Duration in
Minutes
10
60
Final inspection:
Checking of Scoring & Leakages:
TOP Deck
Air Box
After Cooler Core
Piston Top
Cylinder Liner Valve
Piston Cooling Tube
Cam Roller
Turbo Charger