CONTROL DE OBRA MEDIANTE CURVA "S"

MES
DICIEMBRE
ENERO
FEBRERO
MARZO
GG (10%)
UT (10%)
ST
IGV (18%)
TOTAL
FR
C

(Aprobado)
PROGRAMADO
123934.17
203448.78
397481.41
85148.97
810013.33
81001.333
81001.333
972015.996
174962.87928
1146978.87528
1
1146978.87528

PROG. ACUM.
123934.17
327382.95
724864.36
810013.33

% ACUM
15.30%
40.42%
89.49%
100.00%

(Valorizado)
EJECUTADO
101251.66625
289579.765475
228666.763059
190515.135216

120.00%

100.00%

80.00%

% Avance Acumulado

60.00%

40.00%

20.00%

0.00%
DICIEMBRE

DE OBRA MEDIANTE CURVA "S"


EJEC. ACUM.
101251.66625
390831.431725
619498.194784
810013.33

% EJEC. ACUM.
12.50%
48.25%
76.48%
100.00%

EJEC. - PROG.
-2.80%
7.83%
-13.01%
0.00%

% ATRAZO
-2.80%

% ADELANTO
7.83%

-13.01%
0.00%

CONTROL
RETRAZO
ADELANTO
RETRAZO
FINAL

Curva "S"
120.00%

100.00%

80.00%

Acumulado

60.00%

40.00%

20.00%

0.00%
DICIEMBRE

ENERO
PROGRAMADO

FEBRERO
EJECUTADO

MARZO

OBRA
CONTRATISTA
LUGAR

: EJEMPLO DEL CURSO


: GMPV
: HUARAZ - ANCASH

REA GEOGRFICA : 2
COEFICIENTE DE REAJUSTE
SIMB

I. U.

47

MANO DE OBRA INC. LEYES SOCIALES

0.447

72

TUVERIA PVC PARA AGUA

0.210

VAC

78
5
21

VALVULA DE FIERRO FUNDIDO NACIONAL


AGREGADO GRUESO
CEMENTO PORTLAND TIPO I

0.071

VF

32
37
49

FLETE TERRESTRE
HERRAMIENTA MANUAL
MAQUINARIA Y EQUIPO IMPORTADO

GU

39

INDICE GENERAL DE LOS PRECIOS AL CONSUMIDOR

COEFICIENTE K

DESCRIPCION

COEF.

0.087

0.185

USTE
%

BASE

INCID

Apr-12

Adelanto

COEFICIENTE DE REAJUSTE
Dec-12

Jan-13

Feb-13

Mar-13

100%

448.25
0.447

470.79
0.469

470.79
0.469

471.44
0.470

471.44
0.470

471.44
0.470

100%

343.28
0.210

352.28
0.216

352.28
0.216

350.98
0.215

353.50
0.216

358.85
0.220

45.070%
35.211%
19.718%

452.06
215.76
339.420
0.071

451.82
217.47
339.42
0.071

451.82
217.47
339.42
0.071

450.88
216.65
339.42
0.071

452.47
216.88
339.42
0.071

453.40
216.91
339.42
0.071

28.736%
34.483%
36.782%

445.65
286.44
233.54
0.087

451.30
290.48
225.80
0.087

451.30
290.48
225.80
0.087

451.30
287.49
224.22
0.086

451.30
280.95
227.27
0.086

455.86
290.56
228.85
0.087

100%

377.15
0.185
1.000

381.32
0.187
1.030

381.32
0.187
1.030

381.76
0.187
1.029

381.42
0.187
1.030

384.88
0.189
1.037

OBRA

: EJEMPLO DEL CURSO

CONTRATISTA

: GMPV

LUGAR

: HUARAZ - ANCASH

CALCULO DE REAJUSTES
FORMULA :

R= V * (K -1)
DONDE :
R : Reajuste de la Valorizacin mensual
V : Monto de la Valorizacin mensual
FR : Factor de reajuste obtenido por aplicacin de Frmula Polinmica
Valorizacin
N

Periodo

Val 01

Jan-13
Feb-13
Mar-13
Apr-13

Val 02
Val 03
Val 04

Monto
Valorizado
(V)

Factor de Reajuste
Valorizacin
Programada
FR
(Vp)

S/.

101,251.67 S/.

123,934.17

1.030

S/.

289,579.77 S/.

203,448.78

1.029

S/.

228,666.76 S/.

397,481.41

1.030

S/.

190,515.14 S/.

85,148.97

1.037

810,013.33

JUSTES

Reajustes
Definitivo

Programado

Reconocido

R = V * (FR-1)

R = Vp * (FR-1)

( Rn )

S/.

3,037.55 S/.

3,718.03 S/.

3,037.55 RETRAZO

S/.

8,397.81 S/.

5,900.01 S/.

8,397.81 ADELANTO

S/.

6,860.00 S/.

11,924.44 S/.

6,860.00 RETRAZO

S/.

7,049.06 S/.

3,150.51 S/.

7,049.06 FINAL

25,344.42

24,692.99

25,344.42

ADELANTADA

CALCULO DE DEDUCCION POR ADELANTO EN EFECTIVO


OBRA

: EJEMPLO DEL CURSO

CONTRATISTA

: GMPV

LUGAR

: HUARAZ - ANCASH

PRESUPUESTO BASE

: S/.

1,146,978.88 (INC. IGV)

PRESUPUESTO CONTRATADO

: S/.

1,146,978.88 (INC. IGV)

FACTOR DE RELACION

ADELANTO DIRECTO

: S/.

FECHA ADELANTO DIRECTO

1.000
229,395.78 (INC. IGV)
Dic. 2012

FORMULA:
VALORIZACIONES
N

FECHA

MONTO
VALORIZADO (V)

D = V * A * ((Kr/ Ka) - 1) / C

ADELANTO (A)

Jan-13

S/.

101,251.67 S/.

162,002.67

Feb-13

S/.

289,579.77 S/.

162,002.67

Mar-13

S/.

228,666.76 S/.

162,002.67

Apr-13

S/.

190,515.14 S/.

162,002.67

S/.

810,013.33

TOTAL

MONTO CONTRACTUAL
S/.

810,013.33

S/.

810,013.33

EN EFECTIVO

: S/.

810,013.33 (SIN IGV)

: S/.

810,013.33 (SIN IGV)

: S/.

162,002.67 (SIN IGV)

C
Kr

Ka

DEDUCCION (D)

1.030
1.030

S/.

1.029

S/.

1.030

S/.

1.037

S/.

258.95

S/.

202.72

-56.23
-

OBRA
CONTRATISTA
ING. RESIDENTE
SISTEMA DE EJECUCION
PRESUPUESTO BASE
PRESUPUESTO CONTRATADO
FACTOR DE RELACION
FECHA
ADELANTO DIRECTO

: EJEMPLO DEL CURSO


: GMPV
: ING. CIVIL
: A SUMA ALZADA
: S/.
1,146,978.88
: S/.
1,146,978.88
: 1.00000
9/30/2015
S/.
229,395.78 (+IGV)

CONTRATO PRINCIPAL
VALORIZACIONES
N

1
2
3
4

SUB TOTAL

Monto Contratado S/.

Reajuste Monto
Contratado

Monto Reajustado

Fondo de Garantia

MC

R.M.C

M.R

FG = 10% C

S/.
S/.
S/.
S/.

101,251.67
289,579.77
228,666.76
190,515.14

810,013.33

S/.
S/.
S/.
S/.

3,037.55
8,397.81
6,860.00
7,049.06

25,344.42

S/.
S/.
S/.
S/.

104,289.22
297,977.58
235,526.76
197,564.20

835,357.75

S/.
S/.
S/.
S/.

0.00

RESUMEN DE VALORIZACIONES TRAMITADAS Y PAGADAS

NUEVOS SOLES
NUEVOS SOLES

S/.

S/.
S/.

810,013.33
810,013.33

162,002.67 (sin IGV)


DEDUCCIONES (D)
AMORTIZACION

S/.
S/.
S/.
S/.

DEDUCCIONES

OTROS GASTOS

En Efectivo

Materiales

En Efectivo

Materiales

D1

D2

D3

D4

20,250.33
57,915.95
45,733.35
38,103.03

162,002.67

S/.
S/.
S/.
S/.

0.00

S/.
S/.
S/.
S/.

-56.23
258.95

S/.
S/.
S/.
S/.

Gastos de Licit. Y
Publ.

S/.
S/.
S/.
S/.

0.00

PAGADAS

MONTO CONTRATO
ADICIONALES
TOTAL

Monto Neto Pagado S/.

OTROS GASTOS
SUB TOTAL

Multas

Valorizacion Neta (VN)


En Efectivo

D
S/.
S/.
S/.
S/.

0.00

S/.
S/.
S/.
S/.

VN =MR-D
20,250.33
57,859.72
45,733.35
38,361.98

162,205.39

S/.
S/.
S/.
S/.

84,038.88
240,117.85
189,793.41
159,202.22

673,152.36

S/.
S/.
S/.
S/.

84,038.88
240,117.85
189,793.41
159,202.22

673,152.36

S/. 1,146,978.88
S/. 0.00
S/. 1,146,978.88

Monto Neto Pagado S/.

Comprobante de Pago

IGV= 18% VN

S/.
S/.
S/.
S/.

15,127.00
43,221.21
34,162.81
28,656.40

121,167.43
99,165.88

Fecha de
Cobro