Está en la página 1de 29

VALORIZACIN ADICIONAL DE OBRA N03 - PINTURA

(PERIODO 15.02.13 AL 21.02.2013)


VALORIZACION N03
OBRA

CONTRATISTA:

MODALIDAD:

:
:

2/1/2013
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

PINTURA

1.08.00

PINTURA RETOQUE EXTERIORES

1.08.01

PINTURA

1.08.00

PINTURA RETOQUE DUCTOS INTERIORES

1.08.01

PINTURA

1.08.00

PINTURA VARIOS INTERIORES

1.08.01

PINTURA

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Metrado

Monto de
Valorizacin
Total

% Por Ejecutar

M2

1,200.00

3.00

3,600.00

700.00

2,100.00

350.00

1,050.00

1,050.00

3,150.00

87.50%

150.00

450.00

12.50%

M2

1,500.00

3.00

4,500.00

700.00

2,100.00

350.00

1,050.00

1,050.00

3,150.00

70.00%

450.00

1,350.00

30.00%

M2

2,000.00

2.50

5,000.00

960.00

2,400.00

458.95

1,147.37

1,418.95

3,547.37

70.95%

581.05

1,452.64

29.05%

4,700.00
SUB-TOTAL
IGV 18%

TOTAL

13,100.00

6,600.00

3,247.37

9,847.37

3,252.64

0.72

2,358.00

1,188.00

584.53

1,772.53

585.47

0.07

15,458.00

7,788.00

3,831.89

3,838.11

24.83%

11,619.89
NUEVOS SOLES

75.17%

VALORIZACIN ADICIONAL DE OBRA N02 - PINTURA


(PERIODO 15.02.13 AL 21.02.2013)
VALORIZACION N02
OBRA

CONTRATISTA:

MODALIDAD:

:
:

2/22/2013
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

PINTURA

1.08.00

PINTURA RETOQUE EXTERIORES

1.08.01

PINTURA

1.08.00

PINTURA RETOQUE DUCTOS INTERIORES

1.08.01

PINTURA

1.08.00

PINTURA VARIOS INTERIORES

1.08.01

PINTURA

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Metrado

Monto de
Valorizacin
Total

% Por Ejecutar

M2

1,200.00

3.00

3,600.00

350.00

1,050.00

350.00

1,050.00

700.00

2,100.00

58.33%

500.00

1,500.00

41.67%

M2

1,500.00

3.00

4,500.00

350.00

1,050.00

350.00

1,050.00

700.00

2,100.00

46.67%

800.00

2,400.00

53.33%

M2

2,000.00

2.50

5,000.00

480.00

1,200.00

480.00

1,200.00

960.00

2,400.00

48.00%

1,040.00

2,600.00

52.00%

4,700.00
SUB-TOTAL
IGV 18%

TOTAL

13,100.00

3,300.00

3,300.00

6,600.00

6,500.00

1.47

2,358.00

594.00

594.00

1,188.00

1,170.00

0.15

15,458.00

3,894.00

3,894.00

7,670.00

49.62%

7,788.00
NUEVOS SOLES

50.38%

VALORIZACIN ADICIONAL DE OBRA N01 - PINTURA


(PERIODO 08.02.13 AL 14.02.2013)
VALORIZACION N01
OBRA

CONTRATISTA:

MODALIDAD:

:
:

2/14/2013
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

PINTURA

1.08.00

PINTURA RETOQUE EXTERIORES

1.08.01

PINTURA

1.08.00

PINTURA RETOQUE DUCTOS INTERIORES

1.08.01

PINTURA

1.08.00

PINTURA VARIOS INTERIORES

1.08.01

PINTURA

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Metrado

Monto de
Valorizacin
Total

% Por Ejecutar

M2

1,200.00

3.00

3,600.00

350.00

1,050.00

350.00

1,050.00

29.17%

850.00

2,550.00

70.83%

M2

1,500.00

3.00

4,500.00

350.00

1,050.00

350.00

1,050.00

23.33%

1,150.00

3,450.00

76.67%

M2

2,000.00

2.50

5,000.00

480.00

1,200.00

600.00

1,200.00

24.00%

1,400.00

3,500.00

70.00%

13,100.00

0.00

3,300.00

3,300.00

9,500.00

2.18

2,358.00

0.00

594.00

594.00

1,710.00

0.22

15,458.00

0.00

3,894.00

11,210.00

72.52%

4,700.00
SUB-TOTAL
IGV 18%

TOTAL

3,894.00
NUEVOS SOLES

25.19%

VALORIZACIN DE OBRA N23 - PINTURA


(PERIODO 01.02.13 AL 07.02.2013)
VALORIZACION N23
OBRA

CONTRATISTA:

MODALIDAD:

:
:

2/7/2013
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

PINTURA

1.04.00

SOTANO 2

1.04.01

SOTANO 2

1.06.00

SOTANO 1

1.06.01

SOTANO 1

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.08.00

PINTURA 1

1.08.01

PINTURA 1

1.08.00

PINTURA EXTERIORES

1.08.01

PINTURA EXTERIORES

1.08.00

PINTURA VECINOS

1.08.01

PINTURA EXTERIORES

1.08.00

PINTURA RETOQUE

1.08.01

PINTURA RETOQUE - DESPUES DE COLOCACION DE PUERTAS Y PISOS

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Monto de
Valorizacin
Total

Metrado

% Por Ejecutar

M2

550.00

5.00

2,750.00

550.00

2,750.00

550.00

2,750.00

100.00%

0.00%

M2

550.00

5.00

2,750.00

550.00

2,750.00

550.00

2,750.00

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,100.00

6.00

6,600.00

1,065.00

6,390.00

35.00

210.00

1,100.00

6,600.00

100.00%

0.00%

M2

1,523.00

8.00

12,184.00

1,500.00

12,000.00

23.00

184.00

1,523.00

12,184.00

100.00%

0.00%

M2

2,000.00

6.00

12,000.00

1,923.00

11,538.00

77.00

462.00

2,000.00

12,000.00

100.00%

0.00%

M2

8,000.00

2.00

16,000.00

6,800.00

13,600.00

1,200.00

2,400.00

8,000.00

16,000.00

100.00%

0.00%

17,473.92
SUB-TOTAL

81,389.52

78,133.52

3,256.00

81,389.52

0.00

0.00

IGV 18%

14,650.11

14,064.03

586.08

14,650.11

0.00

0.00

TOTAL

96,039.63

92,197.55

3,842.08

0.00

0.00%

96,039.63
NUEVOS SOLES

100.00%

VALORIZACIN DE OBRA N22 - PINTURA


(PERIODO 25.01.13 AL 31.01.2013)
VALORIZACION N22
OBRA

CONTRATISTA:

MODALIDAD:

:
:

1/31/2013
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

PINTURA

1.04.00

SOTANO 2

1.04.01

SOTANO 2

1.06.00

SOTANO 1

1.06.01

SOTANO 1

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.08.00

PINTURA 1

1.08.01

PINTURA 1

1.08.00

PINTURA EXTERIORES

1.08.01

PINTURA EXTERIORES

1.08.00

PINTURA VECINOS

1.08.01

PINTURA EXTERIORES

1.08.00

PINTURA RETOQUE

1.08.01

PINTURA RETOQUE - DESPUES DE COLOCACION DE PUERTAS Y PISOS

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Monto de
Valorizacin
Total

Metrado

% Por Ejecutar

M2

550.00

5.00

2,750.00

550.00

2,750.00

550.00

2,750.00

100.00%

0.00%

M2

550.00

5.00

2,750.00

550.00

2,750.00

550.00

2,750.00

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,100.00

6.00

6,600.00

1,065.00

6,390.00

1,065.00

6,390.00

96.82%

35.00

210.00

3.18%

M2

1,523.00

8.00

12,184.00

1,500.00

12,000.00

1,500.00

12,000.00

98.49%

23.00

184.00

1.51%

M2

2,000.00

6.00

12,000.00

1,923.00

11,538.00

1,923.00

11,538.00

96.15%

77.00

462.00

3.85%

M2

8,000.00

2.00

16,000.00

5,200.00

10,400.00

6,800.00

13,600.00

85.00%

1,200.00

2,400.00

15.00%

1,600.00

3,200.00

17,473.92
SUB-TOTAL

81,389.52

74,933.52

3,200.00

78,133.52

3,256.00

0.24

IGV 18%

14,650.11

13,488.03

576.00

14,064.03

586.08

0.02

TOTAL

96,039.63

88,421.55

3,776.00

3,842.08

4.00%

92,197.55
NUEVOS SOLES

96.00%

VALORIZACIN DE OBRA N21 - PINTURA


(PERIODO 18.01.13 AL 24.01.2013)
VALORIZACION N21
OBRA

CONTRATISTA:

MODALIDAD:

:
:

1/21/2013
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

PINTURA

1.04.00

SOTANO 2

1.04.01

SOTANO 2

1.06.00

SOTANO 1

1.06.01

SOTANO 1

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.08.00

PINTURA 1

1.08.01

PINTURA 1

1.08.00

PINTURA EXTERIORES

1.08.01

PINTURA EXTERIORES

1.08.00

PINTURA VECINOS

1.08.01

PINTURA EXTERIORES

1.08.00

PINTURA RETOQUE

1.08.01

PINTURA RETOQUE - DESPUES DE COLOCACION DE PUERTAS Y PISOS

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Monto de
Valorizacin
Total

Metrado

% Por Ejecutar

M2

550.00

5.00

2,750.00

550.00

2,750.00

550.00

2,750.00

100.00%

0.00%

M2

550.00

5.00

2,750.00

550.00

2,750.00

550.00

2,750.00

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,100.00

6.00

6,600.00

1,065.00

6,390.00

1,065.00

6,390.00

96.82%

35.00

210.00

3.18%

M2

1,523.00

8.00

12,184.00

1,500.00

12,000.00

1,500.00

12,000.00

98.49%

23.00

184.00

1.51%

M2

2,000.00

6.00

12,000.00

1,923.00

11,538.00

1,923.00

11,538.00

96.15%

77.00

462.00

3.85%

M2

8,000.00

2.00

16,000.00

3,600.00

7,200.00

5,200.00

10,400.00

65.00%

2,800.00

5,600.00

35.00%

1,600.00

3,200.00

17,473.92
SUB-TOTAL

81,389.52

71,733.52

3,200.00

74,933.52

6,456.00

0.44

IGV 18%

14,650.11

12,912.03

576.00

13,488.03

1,162.08

0.04

TOTAL

96,039.63

84,645.55

3,776.00

7,618.08

7.93%

88,421.55
NUEVOS SOLES

92.07%

VALORIZACIN DE OBRA N20 - PINTURA


(PERIODO 11.01.13 AL 17.01.2013)
VALORIZACION N20
OBRA

CONTRATISTA:

MODALIDAD:

:
:

1/17/2013
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

PINTURA

1.04.00

SOTANO 2

1.04.01

SOTANO 2

1.06.00

SOTANO 1

1.06.01

SOTANO 1

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.08.00

PINTURA 1

1.08.01

PINTURA 1

1.08.00

PINTURA EXTERIORES

1.08.01

PINTURA EXTERIORES

1.08.00

PINTURA VECINOS

1.08.01

PINTURA EXTERIORES

1.08.00

PINTURA RETOQUE

1.08.01

PINTURA RETOQUE - DESPUES DE COLOCACION DE PUERTAS Y PISOS

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Monto de
Valorizacin
Total

Metrado

% Por Ejecutar

M2

550.00

5.00

2,750.00

550.00

2,750.00

550.00

2,750.00

100.00%

0.00%

M2

550.00

5.00

2,750.00

550.00

2,750.00

550.00

2,750.00

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,100.00

6.00

6,600.00

1,065.00

6,390.00

1,065.00

6,390.00

96.82%

35.00

210.00

3.18%

M2

1,523.00

8.00

12,184.00

1,500.00

12,000.00

1,500.00

12,000.00

98.49%

23.00

184.00

1.51%

M2

2,000.00

6.00

12,000.00

1,923.00

11,538.00

1,923.00

11,538.00

96.15%

77.00

462.00

3.85%

M2

8,000.00

2.00

16,000.00

1,600.00

3,200.00

3,600.00

7,200.00

45.00%

4,400.00

8,800.00

55.00%

2,000.00

4,000.00

17,473.92
SUB-TOTAL

81,389.52

67,733.52

4,000.00

71,733.52

9,656.00

0.64

IGV 18%

14,650.11

12,192.03

720.00

12,912.03

1,738.08

0.06

TOTAL

96,039.63

79,925.55

4,720.00

11,394.08

11.86%

84,645.55
NUEVOS SOLES

88.14%

VALORIZACIN DE OBRA N19 - PINTURA


(PERIODO 04.01.13 AL 10.01.2013)
VALORIZACION N19
OBRA

CONTRATISTA:

MODALIDAD:

:
:

1/10/2013
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

PINTURA

1.04.00

SOTANO 2

1.04.01

SOTANO 2

1.06.00

SOTANO 1

1.06.01

SOTANO 1

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.08.00

PINTURA 1

1.08.01

PINTURA 1

1.08.00

PINTURA EXTERIORES

1.08.01

PINTURA EXTERIORES

1.08.00

PINTURA VECINOS

1.08.01

PINTURA EXTERIORES

1.08.00

PINTURA RETOQUE

1.08.01

PINTURA RETOQUE - DESPUES DE COLOCACION DE PUERTAS Y PISOS

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Avance Actual

Monto de
Valorizacin Total

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Monto de
Valorizacin
Total

Metrado

% Por Ejecutar

M2

550.00

5.00

2,750.00

550.00

2,750.00

550.00

2,750.00

100.00%

0.00%

M2

550.00

5.00

2,750.00

550.00

2,750.00

550.00

2,750.00

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,100.00

6.00

6,600.00

1,065.00

6,390.00

1,065.00

6,390.00

96.82%

35.00

210.00

3.18%

M2

1,523.00

8.00

12,184.00

1,500.00

12,000.00

1,500.00

12,000.00

98.49%

23.00

184.00

1.51%

M2

2,000.00

6.00

12,000.00

1,923.00

11,538.00

1,923.00

11,538.00

96.15%

77.00

462.00

3.85%

M2

8,000.00

2.00

16,000.00

1,600.00

3,200.00

20.00%

6,400.00

12,800.00

80.00%

1,600.00

3,200.00

17,473.92
SUB-TOTAL

81,389.52

64,533.52

3,200.00

67,733.52

13,656.00

0.89

IGV 18%

14,650.11

11,616.03

576.00

12,192.03

2,458.08

0.09

TOTAL

96,039.63

76,149.55

3,776.00

16,114.08

16.78%

79,925.55
NUEVOS SOLES

83.22%

VALORIZACIN DE OBRA N18 - PINTURA


(PERIODO 28.12.12 AL 03.01.2013)
VALORIZACION N18
OBRA

CONTRATISTA:

MODALIDAD:

:
:

1/3/2013
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

PINTURA

1.04.00

SOTANO 2

1.04.01

SOTANO 2

1.06.00

SOTANO 1

1.06.01

SOTANO 1

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.08.00

PINTURA 1

1.08.01

PINTURA 1

1.08.00

PINTURA EXTERIORES

1.08.01

PINTURA EXTERIORES

1.08.00

PINTURA VECINOS

1.08.01

PINTURA EXTERIORES

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Monto de
Valorizacin
Total

Metrado

% Por Ejecutar

M2

550.00

5.00

2,750.00

550.00

2,750.00

550.00

2,750.00

100.00%

0.00%

M2

550.00

5.00

2,750.00

550.00

2,750.00

550.00

2,750.00

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,100.00

6.00

6,600.00

1,065.00

6,390.00

1,065.00

6,390.00

96.82%

35.00

210.00

3.18%

M2

1,523.00

8.00

12,184.00

1,500.00

12,000.00

1,500.00

12,000.00

98.49%

23.00

184.00

1.51%

M2

2,000.00

6.00

12,000.00

1,398.00

8,388.00

1,923.00

11,538.00

96.15%

77.00

462.00

3.85%

525.00

3,150.00

9,473.92
SUB-TOTAL

59,889.52

61,383.52

3,150.00

64,533.52

856.00

0.09

IGV 18%

10,780.11

11,049.03

567.00

11,616.03

154.08

0.01

TOTAL

70,669.63

72,432.55

3,717.00

1,010.08

1.43%

76,149.55
NUEVOS SOLES

107.75%

VALORIZACIN DE OBRA N17 - PINTURA


(PERIODO 21.12.12 AL 27.12.2012)
VALORIZACION N17
OBRA

CONTRATISTA:

MODALIDAD:

:
:

12/27/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

PINTURA

1.04.00

SOTANO 2

1.04.01

SOTANO 2

1.06.00

SOTANO 1

1.06.01

SOTANO 1

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.08.00

PINTURA 1

1.08.01

PINTURA 1

1.08.00

PINTURA EXTERIORES

1.08.01

PINTURA EXTERIORES

1.08.00

PINTURA VECINOS

1.08.01

PINTURA EXTERIORES

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Monto de
Valorizacin
Total

Metrado

% Por Ejecutar

M2

550.00

5.00

2,750.00

450.00

2,250.00

100.00

500.00

550.00

2,750.00

100.00%

0.00%

M2

550.00

5.00

2,750.00

500.00

2,500.00

50.00

250.00

550.00

2,750.00

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,100.00

6.00

6,600.00

1,065.00

6,390.00

1,065.00

6,390.00

96.82%

35.00

210.00

3.18%

M2

1,523.00

8.00

12,184.00

1,500.00

12,000.00

1,500.00

12,000.00

98.49%

23.00

184.00

1.51%

M2

2,000.00

6.00

12,000.00

808.00

4,848.00

1,398.00

8,388.00

69.90%

602.00

3,612.00

30.10%

590.00

3,540.00

9,473.92
SUB-TOTAL

59,889.52

57,093.52

4,290.00

61,383.52

4,006.00

0.35

IGV 18%

10,780.11

10,276.83

772.20

11,049.03

721.08

0.03

TOTAL

70,669.63

67,370.35

5,062.20

4,727.08

6.69%

72,432.55
NUEVOS SOLES

102.49%

VALORIZACIN DE OBRA N16 - PINTURA


(PERIODO 14.12.12 AL 20.12.2012)
VALORIZACION N16
OBRA

CONTRATISTA:

MODALIDAD:

:
:

12/20/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

PINTURA

1.04.00

SOTANO 2

1.04.01

SOTANO 2

1.06.00

SOTANO 1

1.06.01

SOTANO 1

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.08.00

PINTURA 1

1.08.01

PINTURA 1

1.08.00

PINTURA EXTERIORES

1.08.01

PINTURA EXTERIORES

1.08.00

PINTURA VECINOS

1.08.01

PINTURA EXTERIORES

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Monto de
Valorizacin
Total

Metrado

% Por Ejecutar

M2

550.00

5.00

2,750.00

350.00

1,750.00

100.00

500.00

450.00

2,250.00

81.82%

100.00

500.00

18.18%

M2

550.00

5.00

2,750.00

350.00

1,750.00

150.00

750.00

500.00

2,500.00

90.91%

50.00

250.00

9.09%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,100.00

6.00

6,600.00

1,035.00

6,210.00

30.00

180.00

1,065.00

6,390.00

96.82%

35.00

210.00

3.18%

M2

1,523.00

8.00

12,184.00

1,400.00

11,200.00

100.00

800.00

1,500.00

12,000.00

98.49%

23.00

184.00

1.51%

M2

2,000.00

6.00

12,000.00

458.00

2,748.00

350.00

2,100.00

808.00

4,848.00

40.40%

1,192.00

7,152.00

59.60%

9,473.92
SUB-TOTAL

59,889.52

52,763.52

4,330.00

57,093.52

8,296.00

0.92

IGV 18%

10,780.11

9,497.43

779.40

10,276.83

1,493.28

0.09

TOTAL

70,669.63

62,260.95

5,109.40

9,789.28

13.85%

67,370.35
NUEVOS SOLES

95.33%

VALORIZACIN DE OBRA N15 - PINTURA


(PERIODO 07.12.12 AL 13.12.2012)
VALORIZACION N15
OBRA

CONTRATISTA:

MODALIDAD:

:
:

12/13/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

PINTURA

1.04.00

SOTANO 2

1.04.01

SOTANO 2

1.06.00

SOTANO 1

1.06.01

SOTANO 1

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.08.00

PINTURA 1

1.08.01

PINTURA 1

1.08.00

PINTURA EXTERIORES

1.08.01

PINTURA EXTERIORES

1.08.00

PINTURA VECINOS

1.08.01

PINTURA EXTERIORES

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Monto de
Valorizacin
Total

Metrado

% Por Ejecutar

M2

550.00

5.00

2,750.00

200.00

1,000.00

150.00

750.00

350.00

1,750.00

63.64%

200.00

1,000.00

36.36%

M2

550.00

5.00

2,750.00

300.00

1,500.00

50.00

250.00

350.00

1,750.00

63.64%

200.00

1,000.00

36.36%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,100.00

6.00

6,600.00

1,025.00

6,150.00

10.00

60.00

1,035.00

6,210.00

94.09%

65.00

390.00

5.91%

M2

1,523.00

8.00

12,184.00

1,300.00

10,400.00

100.00

800.00

1,400.00

11,200.00

91.92%

123.00

984.00

8.08%

M2

1,000.00

6.00

6,000.00

180.00

1,080.00

278.00

1,668.00

458.00

2,748.00

45.80%

542.00

3,252.00

54.20%

8,473.92
SUB-TOTAL
IGV 18%

TOTAL

53,889.52

49,235.52

3,528.00

52,763.52

6,626.00

1.41

9,700.11

8,862.39

635.04

9,497.43

1,192.68

0.14

63,589.63

58,097.91

4,163.04

7,818.68

12.30%

62,260.95
NUEVOS SOLES

97.91%

VALORIZACIN DE OBRA N14 - PINTURA


(PERIODO 30.11.12 AL 06.12.2012)
VALORIZACION N14
OBRA

CONTRATISTA:

MODALIDAD:

:
:

12/6/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

CONTRAPISOS

1.04.00

SOTANO 2

1.04.01

SOTANO 2

1.06.00

SOTANO 1

1.06.01

SOTANO 1

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.08.00

PINTURA 1

1.08.01

PINTURA 1

1.08.00

PINTURA EXTERIORES

1.08.01

PINTURA EXTERIORES

1.08.00

PINTURA VECINOS

1.08.01

PINTURA EXTERIORES

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Avance Actual

Monto de
Valorizacin Total

Metrado

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Monto de
Valorizacin
Total

Metrado

% Por Ejecutar

M2

550.00

5.00

2,750.00

200.00

1,000.00

200.00

1,000.00

36.36%

350.00

1,750.00

63.64%

M2

550.00

5.00

2,750.00

300.00

1,500.00

300.00

1,500.00

54.55%

250.00

1,250.00

45.45%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,212.73

7,276.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,100.00

6.00

6,600.00

975.00

5,850.00

50.00

300.00

1,025.00

6,150.00

93.18%

75.00

450.00

6.82%

M2

1,523.00

8.00

12,184.00

1,200.00

9,600.00

100.00

800.00

1,300.00

10,400.00

85.36%

223.00

1,784.00

14.64%

M2

1,000.00

6.00

6,000.00

180.00

1,080.00

180.00

1,080.00

18.00%

820.00

4,920.00

82.00%

8,473.92
SUB-TOTAL
IGV 18%

TOTAL

53,889.52

44,555.52

4,680.00

49,235.52

10,154.00

2.13

9,700.11

8,019.99

842.40

8,862.39

1,827.72

0.21

63,589.63

52,575.51

5,522.40

11,981.72

18.84%

58,097.91
NUEVOS SOLES

91.36%

VALORIZACIN DE OBRA N13 - PINTURA


(PERIODO 23.11.12 AL 29.11.2012)
VALORIZACION N12
OBRA

CONTRATISTA:

MODALIDAD:

:
:

11/29/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

CONTRAPISOS

1.04.00

SOTANO 2

1.04.01

SOTANO 2

1.06.00

SOTANO 1

1.06.01

SOTANO 1

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.08.00

PINTURA 1

1.08.01

PINTURA 1

1.08.00

PINTURA EXTERIORES

1.08.01

PINTURA EXTERIORES

1.08.00

PINTURA VECINOS

1.08.01

PINTURA EXTERIORES

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Monto de
Valorizacin
Total

Metrado

% Por Ejecutar

M2

550.00

5.00

2,750.00

0.00%

550.00

2,750.00

100.00%

M2

550.00

5.00

2,750.00

0.00%

550.00

2,750.00

100.00%

M2

1,212.73

6.00

7,276.38

1,180.00

7,080.00

32.73

196.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,120.00

6,720.00

92.73

556.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,166.00

6,996.00

46.73

280.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,212.73

6.00

7,276.38

1,130.00

6,780.00

82.73

496.38

1,212.73

7,276.38

100.00%

0.00%

M2

1,100.00

6.00

6,600.00

975.00

5,850.00

975.00

5,850.00

88.64%

125.00

750.00

11.36%

M2

1,523.00

8.00

12,184.00

950.00

7,600.00

1,200.00

9,600.00

78.79%

323.00

2,584.00

21.21%

M2

1,000.00

6.00

6,000.00

0.00%

1,000.00

6,000.00

100.00%

250.00

2,000.00

8,473.92
SUB-TOTAL
IGV 18%

TOTAL

53,889.52

41,026.00

3,529.52

44,555.52

14,834.00

3.33

9,700.11

7,384.68

635.31

8,019.99

2,670.12

0.33

63,589.63

48,410.68

4,164.83

17,504.12

27.53%

52,575.51
NUEVOS SOLES

82.68%

VALORIZACIN DE OBRA N12 - PINTURA


(PERIODO 16.11.12 AL 22.11.2012)
VALORIZACION N12
OBRA

CONTRATISTA:

MODALIDAD:

:
:

11/22/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

CONTRAPISOS

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.08.00

PINTURA 1

1.08.01

PINTURA 1

1.08.00

PINTURA EXTERIORES

1.08.01

PINTURA EXTERIORES

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Metrado

Monto de
Valorizacin
Total

% Por Ejecutar

M2

1,212.73

6.00

7,276.38

1,180.00

7,080.00

1,180.00

7,080.00

97.30%

32.73

196.38

2.70%

M2

1,212.73

6.00

7,276.38

1,120.00

6,720.00

1,120.00

6,720.00

92.35%

92.73

556.38

7.65%

M2

1,212.73

6.00

7,276.38

1,166.00

6,996.00

1,166.00

6,996.00

96.15%

46.73

280.38

3.85%

M2

1,212.73

6.00

7,276.38

1,130.00

6,780.00

1,130.00

6,780.00

93.18%

82.73

496.38

6.82%

M2

1,100.00

6.00

6,600.00

450.00

2,700.00

975.00

5,850.00

88.64%

125.00

750.00

11.36%

M2

1,000.00

8.00

8,000.00

950.00

7,600.00

950.00

7,600.00

95.00%

50.00

400.00

5.00%

525.00

3,150.00

6,950.92
SUB-TOTAL
IGV 18%

TOTAL

43,705.52

37,876.00

3,150.00

41,026.00

2,679.52

0.37

7,866.99

6,817.68

567.00

7,384.68

482.31

0.04

51,572.51

44,693.68

3,717.00

3,161.83

6.13%

48,410.68
NUEVOS SOLES

93.87%

VALORIZACIN DE OBRA N11 - PINTURA


(PERIODO 09.11.12 AL 15.11.2012)
VALORIZACION N11
OBRA

CONTRATISTA:

MODALIDAD:

:
:

11/15/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

CONTRAPISOS

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.08.00

PINTURA 1

1.08.01

PINTURA 1

1.08.00

PINTURA EXTERIORES

1.08.01

PINTURA EXTERIORES

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Metrado

Monto de
Valorizacin
Total

% Por Ejecutar

M2

1,212.73

6.00

7,276.38

1,180.00

7,080.00

1,180.00

7,080.00

97.30%

32.73

196.38

2.70%

M2

1,212.73

6.00

7,276.38

1,120.00

6,720.00

1,120.00

6,720.00

92.35%

92.73

556.38

7.65%

M2

1,212.73

6.00

7,276.38

1,166.00

6,996.00

1,166.00

6,996.00

96.15%

46.73

280.38

3.85%

M2

1,212.73

6.00

7,276.38

1,130.00

6,780.00

1,130.00

6,780.00

93.18%

82.73

496.38

6.82%

M2

1,100.00

6.00

6,600.00

450.00

2,700.00

40.91%

650.00

3,900.00

59.09%

M2

1,000.00

8.00

8,000.00

950.00

7,600.00

95.00%

50.00

400.00

5.00%

950.00

7,600.00

450.00

2,700.00

6,950.92
SUB-TOTAL
IGV 18%

TOTAL

43,705.52

35,176.00

2,700.00

37,876.00

5,829.52

0.85

7,866.99

6,331.68

486.00

6,817.68

1,049.31

0.09

51,572.51

41,507.68

3,186.00

6,878.83

13.34%

44,693.68
NUEVOS SOLES

86.66%

VALORIZACIN DE OBRA N10 - PINTURA


(PERIODO 01.10.12 AL 08.11.2012)
VALORIZACION N10
OBRA

CONTRATISTA:

MODALIDAD:

:
:

11/8/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

CONTRAPISOS

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.08.00

PINTURA EXTERIORES

1.08.01

PINTURA EXTERIORES

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Metrado

Monto de
Valorizacin
Total

% Por Ejecutar

M2

1,212.73

6.00

7,276.38

1,160.00

6,960.00

20.00

120.00

1,180.00

7,080.00

97.30%

32.73

196.38

2.70%

M2

1,212.73

6.00

7,276.38

1,090.00

6,540.00

30.00

180.00

1,120.00

6,720.00

92.35%

92.73

556.38

7.65%

M2

1,212.73

6.00

7,276.38

1,146.00

6,876.00

20.00

120.00

1,166.00

6,996.00

96.15%

46.73

280.38

3.85%

M2

1,212.73

6.00

7,276.38

1,110.00

6,660.00

20.00

120.00

1,130.00

6,780.00

93.18%

82.73

496.38

6.82%

M2

1,000.00

8.00

8,000.00

750.00

6,000.00

200.00

1,600.00

950.00

7,600.00

95.00%

50.00

400.00

5.00%

5,850.92
SUB-TOTAL
IGV 18%

TOTAL

37,105.52

33,036.00

2,140.00

35,176.00

1,929.52

0.26

6,678.99

5,946.48

385.20

6,331.68

347.31

0.03

43,784.51

38,982.48

2,525.20

2,276.83

5.20%

41,507.68
NUEVOS SOLES

94.80%

VALORIZACIN DE OBRA N09 - PINTURA


(PERIODO 25.10.12 AL 31.10.2012)
VALORIZACION N09
OBRA

CONTRATISTA:

MODALIDAD:

:
:

10/31/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

CONTRAPISOS

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.08.00

PINTURA EXTERIORES

1.08.01

PINTURA EXTERIORES

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Metrado

Monto de
Valorizacin
Total

% Por Ejecutar

M2

1,212.73

6.00

7,276.38

1,080.00

6,480.00

80.00

480.00

1,160.00

6,960.00

95.65%

52.73

316.38

4.35%

M2

1,212.73

6.00

7,276.38

1,010.00

6,060.00

80.00

480.00

1,090.00

6,540.00

89.88%

122.73

736.38

10.12%

M2

1,212.73

6.00

7,276.38

1,066.00

6,396.00

80.00

480.00

1,146.00

6,876.00

94.50%

66.73

400.38

5.50%

M2

1,212.73

6.00

7,276.38

1,030.00

6,180.00

80.00

480.00

1,110.00

6,660.00

91.53%

102.73

616.38

8.47%

M2

1,000.00

8.00

8,000.00

500.00

4,000.00

250.00

2,000.00

750.00

6,000.00

75.00%

250.00

2,000.00

25.00%

5,850.92
SUB-TOTAL
IGV 18%

TOTAL

37,105.52

29,116.00

3,920.00

33,036.00

4,069.52

0.53

6,678.99

5,240.88

705.60

5,946.48

732.51

0.05

43,784.51

34,356.88

4,625.60

4,802.03

10.97%

38,982.48
NUEVOS SOLES

89.03%

VALORIZACIN DE OBRA N08 - PINTURA


(PERIODO 18.10.12 AL 24.10.2012)
VALORIZACION N08
OBRA

CONTRATISTA:

MODALIDAD:

:
:

10/24/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

CONTRAPISOS

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.08.00

PINTURA EXTERIORES

1.08.01

PINTURA EXTERIORES

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

M2

1,212.73

6.00

7,276.38

1,080.00

6,480.00

M2

1,212.73

6.00

7,276.38

960.00

5,760.00

50.00

M2

1,212.73

6.00

7,276.38

1,036.00

6,216.00

M2

1,212.73

6.00

7,276.38

1,000.00

6,000.00

M2

1,000.00

8.00

8,000.00

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Metrado

Monto de
Valorizacin
Total

% Por Ejecutar

1,080.00

6,480.00

89.06%

132.73

796.38

10.94%

300.00

1,010.00

6,060.00

83.28%

202.73

1,216.38

16.72%

30.00

180.00

1,066.00

6,396.00

87.90%

146.73

880.38

12.10%

30.00

180.00

1,030.00

6,180.00

84.93%

182.73

1,096.38

15.07%

500.00

4,000.00

500.00

4,000.00

50.00%

500.00

4,000.00

50.00%

5,850.92
SUB-TOTAL
IGV 18%

TOTAL

37,105.52

24,456.00

4,660.00

29,116.00

7,989.52

1.05

6,678.99

4,402.08

838.80

5,240.88

1,438.11

0.10

43,784.51

28,858.08

5,498.80

9,427.63

21.53%

34,356.88
NUEVOS SOLES

78.47%

VALORIZACIN DE OBRA N07 - PINTURA


(PERIODO 11.10.12 AL 17.10.2012)
VALORIZACION N06
OBRA

CONTRATISTA:

MODALIDAD:

:
:

10/10/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

CONTRAPISOS

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Metrado

Monto de
Valorizacin
Total

% Por Ejecutar

M2

1,212.73

6.00

7,276.38

830.00

4,980.00

250.00

1,500.00

1,080.00

6,480.00

89.06%

132.73

796.38

10.94%

M2

1,212.73

6.00

7,276.38

730.00

4,380.00

230.00

1,380.00

960.00

5,760.00

79.16%

252.73

1,516.38

20.84%

M2

1,212.73

6.00

7,276.38

810.00

4,860.00

226.00

1,356.00

1,036.00

6,216.00

85.43%

176.73

1,060.38

14.57%

M2

1,212.73

6.00

7,276.38

810.00

4,860.00

190.00

1,140.00

1,000.00

6,000.00

82.46%

212.73

1,276.38

17.54%

4,850.92
SUB-TOTAL
IGV 18%

TOTAL

29,105.52

19,080.00

5,376.00

24,456.00

4,649.52

0.64

5,238.99

3,434.40

967.68

4,402.08

836.91

0.06

34,344.51

22,514.40

6,343.68

5,486.43

15.97%

28,858.08
NUEVOS SOLES

84.03%

VALORIZACIN DE OBRA N06 - PINTURA


(PERIODO 04.10.12 AL 10.10.2012)
VALORIZACION N06
OBRA

CONTRATISTA:

MODALIDAD:

:
:

10/10/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

CONTRAPISOS

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Metrado

Monto de
Valorizacin
Total

% Por Ejecutar

M2

1,212.73

6.00

7,276.38

680.00

4,080.00

150.00

900.00

830.00

4,980.00

68.44%

382.73

2,296.38

31.56%

M2

1,212.73

6.00

7,276.38

630.00

3,780.00

100.00

600.00

730.00

4,380.00

60.19%

482.73

2,896.38

39.81%

M2

1,212.73

6.00

7,276.38

660.00

3,960.00

150.00

900.00

810.00

4,860.00

66.79%

402.73

2,416.38

33.21%

M2

1,212.73

6.00

7,276.38

660.00

3,960.00

150.00

900.00

810.00

4,860.00

66.79%

402.73

2,416.38

33.21%

4,850.92
SUB-TOTAL
IGV 18%

TOTAL

29,105.52

15,780.00

3,300.00

19,080.00

10,025.52

1.38

5,238.99

2,840.40

594.00

3,434.40

1,804.59

0.14

34,344.51

18,620.40

3,894.00

11,830.11

34.45%

22,514.40
NUEVOS SOLES

65.55%

VALORIZACIN DE OBRA N05 - PINTURA


(PERIODO 27.09.12 AL 03.10.2012)
VALORIZACION N05
OBRA

CONTRATISTA:

MODALIDAD:

:
:

10/3/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

CONTRAPISOS

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Metrado

Monto de
Valorizacin
Total

% Por Ejecutar

M2

1,212.73

6.00

7,276.38

530.00

3,180.00

150.00

900.00

680.00

4,080.00

56.07%

532.73

3,196.38

43.93%

M2

1,212.73

6.00

7,276.38

530.00

3,180.00

100.00

600.00

630.00

3,780.00

51.95%

582.73

3,496.38

48.05%

M2

1,212.73

6.00

7,276.38

510.00

3,060.00

150.00

900.00

660.00

3,960.00

54.42%

552.73

3,316.38

45.58%

M2

1,212.73

6.00

7,276.38

510.00

3,060.00

150.00

900.00

660.00

3,960.00

54.42%

552.73

3,316.38

45.58%

4,850.92
SUB-TOTAL
IGV 18%

TOTAL

29,105.52

12,480.00

3,300.00

15,780.00

13,325.52

1.83

5,238.99

2,246.40

594.00

2,840.40

2,398.59

0.18

34,344.51

14,726.40

3,894.00

15,724.11

45.78%

18,620.40
NUEVOS SOLES

54.22%

VALORIZACIN DE OBRA N04 - PINTURA


(PERIODO 20.09.12 AL 26.09.2012)
VALORIZACION N04
OBRA

CONTRATISTA:

MODALIDAD:

:
:

9/26/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

Partidas

1.00.00

CONTRAPISOS

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

A PRECIOS UNITARIOS

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Metrado

Avance Anterior

Costo
Parcial

Und.
Costo
Unitario S/.

S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Metrado

Monto de
Valorizacin
Total

% Por Ejecutar

M2

1,212.73

6.00

7,276.38

380.00

2,280.00

150.00

900.00

530.00

3,180.00

43.70%

682.73

4,096.38

56.30%

M2

1,212.73

6.00

7,276.38

380.00

2,280.00

150.00

900.00

530.00

3,180.00

43.70%

682.73

4,096.38

56.30%

M2

1,212.73

6.00

7,276.38

360.00

2,160.00

150.00

900.00

510.00

3,060.00

42.05%

702.73

4,216.38

57.95%

M2

1,212.73

6.00

7,276.38

360.00

2,160.00

150.00

900.00

510.00

3,060.00

42.05%

702.73

4,216.38

57.95%

4,850.92
SUB-TOTAL
IGV 18%

TOTAL

29,105.52

8,880.00

3,600.00

12,480.00

16,625.52

2.28

5,238.99

1,598.40

648.00

2,246.40

2,992.59

0.23

34,344.51

10,478.40

4,248.00

19,618.11

57.12%

14,726.40
NUEVOS SOLES

42.88%

VALORIZACIN DE OBRA N03 - PINTURA


(PERIODO 13.09.12 AL 19.09.2012)
VALORIZACION N03
OBRA

CONTRATISTA:
:
:

Partidas

1.00.00

CONTRAPISOS

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

A PRECIOS UNITARIOS

9/19/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

MODALIDAD:

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Und.
Metrado

Costo
Unitario S/.

Avance Anterior

Costo
Parcial
S.

Metrado

Avance Actual

Monto de
Valorizacin Total

IGV 18%

TOTAL

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Metrado

Monto de
Valorizacin
Total

% Por Ejecutar

M2

1,212.73

6.00

7,276.38

280.00

1,680.00

100.00

600.00

380.00

2,280.00

31.33%

832.73

4,996.38

68.67%

M2

1,212.73

6.00

7,276.38

280.00

1,680.00

100.00

600.00

380.00

2,280.00

31.33%

832.73

4,996.38

68.67%

M2

1,212.73

6.00

7,276.38

180.00

1,080.00

180.00

1,080.00

360.00

2,160.00

29.69%

852.73

5,116.38

70.31%

M2

1,212.73

6.00

7,276.38

180.00

1,080.00

180.00

1,080.00

360.00

2,160.00

29.69%

852.73

5,116.38

70.31%

4,850.92
SUB-TOTAL

Metrado

Avance Acumulado

Monto de
Valorizacin Total

560.00
29,105.52

5,520.00

3,360.00

8,880.00

20,225.52

2.78

5,238.99

993.60

604.80

1,598.40

3,640.59

0.28

34,344.51

6,513.60

3,964.80

23,866.11

69.49%

10,478.40
NUEVOS SOLES

30.51%

VALORIZACIN DE OBRA N02 - PINTURA


(PERIODO 06.09.12 AL 12.09.2012)
VALORIZACION N02
OBRA

CONTRATISTA:
:
:

Partidas

1.00.00

CONTRAPISOS

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.06.00

PINTURA 6

1.06.01

PINTURA 6

1.07.00

PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

A PRECIOS UNITARIOS

9/12/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

MODALIDAD:

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Und.
Metrado

Costo
Unitario S/.

Avance Anterior

Costo
Parcial
S.

Avance Actual

Monto de
Valorizacin Total

Metrado

Metrado

Avance Acumulado

Monto de
Valorizacin Total

Metrado

Monto de
Valorizacin
Total

Saldo por Ejecutar


% Ejecutado

Metrado

Monto de
Valorizacin
Total

% Por Ejecutar

M2

1,212.73

6.00

7,276.38

180.00

1,080.00

100.00

600.00

280.00

1,680.00

23.09%

932.73

5,596.38

76.91%

M2

1,212.73

6.00

7,276.38

180.00

1,080.00

100.00

600.00

280.00

1,680.00

23.09%

932.73

5,596.38

76.91%

M2

1,212.73

6.00

7,276.38

180.00

1,080.00

180.00

1,080.00

14.84%

1,032.73

6,196.38

85.16%

M2

1,212.73

6.00

7,276.38

180.00

1,080.00

180.00

1,080.00

14.84%

1,032.73

6,196.38

85.16%

4,850.92
SUB-TOTAL
IGV 18%

TOTAL

29,105.52

2,160.00

3,360.00

5,520.00

23,585.52

3.24

5,238.99

388.80

604.80

993.60

4,245.39

0.32

34,344.51

2,548.80

3,964.80

27,830.91

81.03%

6,513.60
NUEVOS SOLES

18.97%

VALORIZACIN DE OBRA N01 - PINTURA


(PERIODO 30.08.12 AL 05.09.2012)
VALORIZACION N01
OBRA

CONTRATISTA:
:
:

Partidas

1.00.00

CONTRAPISOS

1.04.00

PINTURA 4

1.04.01

PINTURA 4

1.05.00

PINTURA 5

A PRECIOS UNITARIOS

9/5/2012
MRFH / JSVH

PROPUESTA CONTRACTUAL
tem

MODALIDAD:

BAEZ CONSUL SAC

FECHA
RESIDENTE

RESIDENCIAL MALLKI

Und.
Metrado

Costo
Unitario S/.

Avance Anterior

Costo
Parcial
S.

Metrado

Avance Actual

Monto de
Valorizacin Total

Metrado

7,276.38

100.00%

14.84%

1,032.73

6,196.38

85.16%

0.00%

1,212.73

7,276.38

100.00%

0.00%

1,212.73

7,276.38

100.00%

0.00%

1,212.73

7,276.38

100.00%

0.00%

1,212.73

7,276.38

100.00%

10,437.30

0.00%

1,739.55

10,437.30

100.00%

SUB-TOTAL

61,371.96

0.00

2,160.00

2,160.00

59,211.96

7.70

IGV 18%

11,046.95

0.00

388.80

388.80

10,658.15

0.77

TOTAL

72,418.91

0.00

2,548.80

69,870.11

96.48%

PINTURA 6
PINTURA 7

1.07.01

PINTURA 7

1.08.00

PINTURA 8

1.08.01

PINTURA 8

1.09.00

PINTURA 9

1.03.01

PINTURA 9

1.09.01

PINTURA 10

1.03.02

PINTURA 9

1.10.00

PINTURA EXTERIORES

1.04.01

EXTERIORES

M2

1,212.73

6.00

7,276.38

M2

1,212.73

6.00

7,276.38

M2

1,212.73

6.00

7,276.38

M2

1,212.73

6.00

7,276.38

M2

1,212.73

6.00

7,276.38

M2

1,212.73

6.00

7,276.38

M2

1,739.55

6.00

180.00

1,080.00

180.00

180.00

1,080.00

% Por Ejecutar

1,212.73

1.06.01

7,276.38

Monto de
Valorizacin
Total

0.00%

1.07.00

6.00

Metrado

85.16%

PINTURA 6

1,212.73

% Ejecutado

6,196.38

PINTURA 5

M2

Saldo por Ejecutar

1,032.73

1.05.01

1,080.00

Metrado

Monto de
Valorizacin
Total

14.84%

1.06.00

180.00

Avance Acumulado

Monto de
Valorizacin Total

1,080.00

10,228.66

2,548.80
NUEVOS SOLES

3.52%

RESUMEN DE VALORIZACION PINTURA ADICIONAL N03


OBRA
:
CONTRATISTA
:
PERIODO VALORIZADO
:
FECHA CONTRATO
:
MONTO CONTRATO
:

RESIDENCIAL MALLKI
BAEZ CONSUL SAC
DEL 23.02.13 AL 01.03.13
8/13/2012
S/.

NUEVOS SOLES

DESCRIPCION

MONTO

COSTO DIRECTO TOTAL

S/.

3247.37

IGV 18%

S/.

584.53

VALORIZACION NETA

S/.

3831.89

RETENCION POR FIEL CUMPLIMIENTO 5%

S/.

191.59

TOTAL A PAGAR

S/.

3640.30

MONTO A CANCELAR CHEQUE

S/.

3640.30

A NOMBRE DE :

BAEZ CONSUL SAC

NUEVOS SOLES

PAGOS EFECTUADOS
OBRA
:
CONTRATISTA
:
PERIODO VALORIZADO
:
FECHA CONTRATO
:
MONTO CONTRATO

RESIDENCIAL MALLKI
BAEZ CONSUL SAC
DEL 23.02.13 al 01.03.13
8/13/2101
S/.

FECHA

VALORIZACION

05.09.12
12.09.12
19.09.12
26.09.12
03.10.12
10.10.12
17.10.12
24.10.12
31.10.12
08.11.12
15.11.12
22.11.12
29.11.12
06.12.12
13.12.12
20.12.12
27.12.12
03.01.13
10.01.13
17.01.13
24.01.13
31.01.13
07.02.13
14.02.13
21.02.13
01.03.13

VALORIZACION N01
VALORIZACION N02
VALORIZACION N03
VALORIZACION N04
VALORIZACION N05
VALORIZACION N06
VALORIZACION N07
VALORIZACION N08
VALORIZACION N09
VALORIZACION N10
VALORIZACION N11
VALORIZACION N12
VALORIZACION N13
VALORIZACION N14
VALORIZACION N15
VALORIZACION N16
VALORIZACION N17
VALORIZACION N18
VALORIZACION N19
VALORIZACION N20
VALORIZACION N21
VALORIZACION N22
VALORIZACION N23
ADICIONAL N01
ADICIONAL N02
ADICIONAL N03
PAGOS TOTALES

A NOMBRE DE :

BAEZ CONSUL SAC

NUEVOS SOLES

COSTO DIRECTO

IGV 18%

2160.00
3360.00
3360.00
3600.00
3300.00
3300.00
5376.00
4660.00
3920.00
2140.00
2700.00
3150.00
3529.52
4680.00
3528.00
4330.00
4290.00
3150.00
3200.00
4000.00
3200.00
3200.00
3256.00
3300.00
3300.00
3247.37

388.80
604.80
604.80
648.00
594.00
594.00
967.68
838.80
705.60
385.20
486.00
567.00
635.31
842.40
635.04
779.40
772.20
567.00
576.00
720.00
576.00
576.00
586.08
594.00
594.00
584.53

VALORIZACION
NETA
2548.80
3964.80
3964.80
4248.00
3894.00
3894.00
6343.68
5498.80
4625.60
2525.20
3186.00
3717.00
4164.83
5522.40
4163.04
5109.40
5062.20
3717.00
3776.00
4720.00
3776.00
3776.00
3842.08
3894.00
3894.00
3831.89

91,236.89

16,422.64

107,659.52

RETENCION
5%
127.44
198.24
198.24
212.40
194.70
194.70
317.18
274.94
231.28
126.26
159.30
185.85
208.24
276.12
208.15
255.47
253.11
185.85
188.80
236.00
188.80
188.80
192.10
194.70
194.70
191.59
5,382.98

TOTAL
2421.36
3766.56
3766.56
4035.60
3699.30
3699.30
6026.50
5223.86
4394.32
2398.94
3026.70
3531.15
3956.59
5246.28
3954.89
4853.93
4809.09
3531.15
3587.20
4484.00
3587.20
3587.20
3649.98
3699.30
3699.30
3640.30
102,276.55

RESUMEN DE VALORIZACION
1.-

AVANCE EJECUTADO
S/.
2250.03
2774.97

VALORZACION N01
VALORZACION N02
2.-

IMPUESTO IGV 18% (1)


S/.
405.01
499.49

VALORZACION N01
VALORZACION N02
3.-

SUB - TOTAL (1+2)


S/.
2655.04
3274.46

VALORZACION N01
VALORZACION N02
4.-

RETENCIONES (5% (3))


S/.
132.75
163.72

VALORZACION N01
VALORZACION N02
5.-

PAGOS (2) - (3)

TOTAL S/.

S/.
2522.29
3110.74
5633.03

TOTAL S/.

S/.
132.75
163.72
296.48

VALORZACION N01
VALORZACION N02

6.-

DEVOLUCIONES (4)
VALORZACION N01
VALORZACION N02

TOTAL PRESUPUESTO (5+6) S/.

5929.50

También podría gustarte