Está en la página 1de 1

6F

6F

6F

6F

6F

6F

6F

(EL. 17.300 M)

(EL. 17.300 M)

(EL. 17.300 M)

(EL. 17.300 M)

(EL. 17.300 M)

(EL. 17.300 M)

(EL. 17.300 M)

2-18(EF)

3-18(EF)

5-14(EF)

3-18(EF)

2-18(EF)

2-18(EF)

3-18(EF)

5-14(EF)

12 @ 300 mm

3-18(EF)

3.200 m

12 @ 300 mm
3.200 m

12 @ 300 mm
3.200 m

12 @ 300 mm
3.200 m

12 @ 300 mm
3.200 m

12 @ 300 mm
3.200 m

3.200 m

12 @ 300 mm

2-18(EF)

2-18(EF)

5F

5F

5F

5F

5F

5F

5F

(EL. 14.100 M)

(EL. 14.100 M)

(EL. 14.100 M)

(EL. 14.100 M)

(EL. 14.100 M)

(EL. 14.100 M)

(EL. 14.100 M)

2-18(EF)

3-18(EF)

5-14(EF)

3-18(EF)

4
2-18(EF)

2-18(EF)

3-18(EF)

4
5-14(EF)

12 @ 300 mm

3-18(EF)

3.200 m

4
2-18(EF)

4F

4F

4F

4F

4F

4F

4F

(EL. 10.900 M)

(EL. 10.900 M)

(EL. 10.900 M)

(EL. 10.900 M)

(EL. 10.900 M)

(EL. 10.900 M)

2-18(EF)

3-18(EF)

5-14(EF)

3-18(EF)

3
2-18(EF)

2-18(EF)

3-18(EF)

3
5-14(EF)

12 @ 300 mm

3-18(EF)

3.200 m

3
2-18(EF)

3F

3F

3F

3F

3F

3F

3F

(EL. 7.700 M)

(EL. 7.700 M)

(EL. 7.700 M)

(EL. 7.700 M)

(EL. 7.700 M)

(EL. 7.700 M)

2-18(EF)

3-18(EF)

5-14(EF)

3-18(EF)

2-18(EF)

3-12(EF)

12 @ 100 mm
12 @ 300 mm

2
6-16(EF)

2-12(EF)

3-12(EF)

2F

2F

2F

2F

2F

2F

(EL. 4.500 M)

(EL. 4.500 M)

(EL. 4.500 M)

(EL. 4.500 M)

(EL. 4.500 M)

(EL. 4.500 M)

2-25(EF)

2-18(EF)

5-14(EF)

2-18(EF)

2-25(EF)

2-18(EF)

3-18(EF)

7-18(EF)

NO

DESCRIPTION

DATE

NEW DRAWING GENERATED

10/13/2014

12 @ 300 mm

3-18(EF)

4.500 m

2
3-18(EF)

12 @ 300 mm

4.500 m

12 @ 300 mm

4.500 m

12 @ 300 mm

4.500 m

4.500 m

4.500 m

4.500 m

12 @ 300 mm

2-12(EF)

2F

12 @ 300 mm

3-18(EF)

2-18(EF)

(EL. 4.500 M)

12 @ 300 mm

12 @ 300 mm
3.200 m

12 @ 300 mm

3.200 m

12 @ 100 mm
12 @ 300 mm

3.200 m

3.200 m

12 @ 300 mm
3.200 m

3.200 m

3.200 m

12 @ 300 mm

2-18(EF)

(EL. 7.700 M)

12 @ 300 mm

4
3-18(EF)

12 @ 300 mm
3.200 m

12 @ 300 mm
3.200 m

12 @ 300 mm
3.200 m

12 @ 300 mm
3.200 m

3.200 m

3.200 m

12 @ 300 mm

2-18(EF)

(EL. 10.900 M)

12 @ 300 mm

3-18(EF)

12 @ 300 mm
3.200 m

12 @ 300 mm
3.200 m

12 @ 300 mm
3.200 m

12 @ 300 mm
3.200 m

12 @ 300 mm
3.200 m

3.200 m

12 @ 300 mm

2-18(EF)

2-25(EF)

BASE

BASE

BASE

BASE

BASE

BASE

BASE

(EL. 0.000 M)

(EL. 0.000 M)

(EL. 0.000 M)

(EL. 0.000 M)

(EL. 0.000 M)

(EL. 0.000 M)

(EL. 0.000 M)

CW1 F1: Elevation

CW1 F2: Elevation

CW1 F3: Elevation

CW2 F1: Elevation

CW2 F2: Elevation

CW2 F3: Elevation

CW3 F1: Elevation

(Scale 1:50)

(Scale 1:50)

(Scale 1:50)

(Scale 1:50)

(Scale 1:50)

(Scale 1:50)

(Scale 1:50)

2-18(EF)

DRAWING

WALL
REINFORCEMENT
ELEVATIONS (1 OF 2)
STRUCTURE

PANGLAO BEACH,
BOHOL
PROJECT

EARTHQUAKE
ENGINEERING
CLIENT

SIR
CONSULTANT

I LOVE ASPHALT
PROJECT NUMBER
DATE
DESIGNED BY
CHECKED BY

SCALE

También podría gustarte