PRESUPUESTO

PRESUSPUE
STO:
CONSTRUCCION DE CERCO PERIMETRICO EN LA I.E ANTONIO RAYMONDI-DISTRITO DE CASMA
CLIENTE:

MUNICIPALIDAD DISTRITAL DE CASMA

LUGAR:

ANCASH - CASMA- CASMA

ITEM

DESCRIPCION

UND

CANTIDAD

PU

SUB
TOTAL

OBRAS PROVISIONALES

1.1

CARTEL DE OBRA DE 7.20 X 6.00M

1.00

757.18

1.2

CASETA PARA GUARDIANIA Y ALMACEN

2,500.00

757.18
2,500.00
3,257.18

LIMPIEZA DE TERRENO - Manual

m2

346.51

2.47

2.2

TRAZO, NIVELES Y REPLANTEO

m2

207.91

0.64

SUB TOTAL
EXCAVACIN DE ZANJAS PARA CIMIENTOS

m3

150.10

25.01

ELIMINACIN DE MATERIAL EXCEDENTE -Distancia 5.00 km

m3

195.12

1.25

SUB TOTAL

4.1.1
4.2

243.90

CIMIENTOS
CONCRETO CICLPEO FC = 140 KG/CM2 + 70 % PG.

m3

150.1

438.10 65,758.81

SOBRECIMIENTOS
CONCRETO CICLPEO FC=140KG/CM2 + 30% PM

m3

14.31

372.10

ENCOFRADO Y DESENCOFRADO - SOBRECIMIENTO

m2

190.80

31.09

SUB TOTAL

5,324.75
5,931.97
77,015.53

COLUMNAS
CONCRETO f'c = 175Kg/Cm2

m3

32.43

341.05 11,060.25

5.1.2

ENCOFRADO Y DESENCOFRADO - Columnas

m2

324

66.95 21,691.80

5.1.3

ACERO GRADO60 - Columnas


SUB TOTAL

Kg

1146.74

6.1

3.83

7.1

4,392.01
37,144.07

37,144.07

ALBAILERIA
MURO DE SOGA - Ladrillo KK ARTESANAL

m2

699.50

42.13 29,469.94

SUB TOTAL
7

77015.533

CONCRETO ARMADO

5.1.1

3,997.90

CIMIENTO CORRIDO

4.2.2

5.1

988.94

3,754.00
3,997.90

4.2.1

133.06

MOVIMIENTO DE TIERRAS

3.2
4

855.88
988.94

3.1

4.1

3,257.18

OBRAS PRELIMINARES

2.1

TOTAL

29,469.94

29,469.94

CARPINTERA DE METLICA
PORTON DE FERRO 3.00 X 2.50 M

Und

2.00 1,500.00

SUB TOTAL
8

FLETE TERRESTRE

8.1

FLETE TERRESTRE

3,000.00
3,000.00

Kg

150,218.96

SUB TOTAL

0.08 12,017.52
12,017.52

TOTAL

ITEM

RESUMEN PARTIDAS

3,000.00

12,017.52
166,891.07

SUB TOTAL

TOTAL

1.00

OBRAS PROVISIONALES

2.00

OBRAS PRELIMINARES

3.00 MOVIMIENTO DE TIERRAS

3,257.18
988.94
3,997.90

4.00 CIMIENTO CORRIDO

77,015.53

5.00 CONCRETO ARMADO

37,144.07

6.00 ALBAILERIA

29,469.94

7.00 CARPINTERIA METALICA


8.00 FLETE TERRESTRE

3,000.00
12,017.52

COSTO DIRECTO DE OBRA

S/.

166,891.07

GASTOS GENERALES (10 % CD)

S/.

16,689.11

UTILIDAD(10 %)

S/.

16,689.11

SUB TOTAL

S/.

200,269.29

IGV(18%)

S/.

36,048.47

TOTAL COSTOS DE INFRAESTRUCTURA

S/.

236,317.76