Pre Supuesto
Pre Supuesto
PRESUSPUE
STO:
CONSTRUCCION DE CERCO PERIMETRICO EN LA I.E ANTONIO RAYMONDI-DISTRITO DE CASMA
CLIENTE:
LUGAR:
ITEM
DESCRIPCION
UND
CANTIDAD
PU
SUB
TOTAL
OBRAS PROVISIONALES
1.1
1.00
757.18
1.2
2,500.00
757.18
2,500.00
3,257.18
m2
346.51
2.47
2.2
m2
207.91
0.64
SUB TOTAL
EXCAVACIN DE ZANJAS PARA CIMIENTOS
m3
150.10
25.01
m3
195.12
1.25
SUB TOTAL
4.1.1
4.2
243.90
CIMIENTOS
CONCRETO CICLPEO FC = 140 KG/CM2 + 70 % PG.
m3
150.1
438.10 65,758.81
SOBRECIMIENTOS
CONCRETO CICLPEO FC=140KG/CM2 + 30% PM
m3
14.31
372.10
m2
190.80
31.09
SUB TOTAL
5,324.75
5,931.97
77,015.53
COLUMNAS
CONCRETO f'c = 175Kg/Cm2
m3
32.43
341.05 11,060.25
5.1.2
m2
324
66.95 21,691.80
5.1.3
Kg
1146.74
6.1
3.83
7.1
4,392.01
37,144.07
37,144.07
ALBAILERIA
MURO DE SOGA - Ladrillo KK ARTESANAL
m2
699.50
42.13 29,469.94
SUB TOTAL
7
77015.533
CONCRETO ARMADO
5.1.1
3,997.90
CIMIENTO CORRIDO
4.2.2
5.1
988.94
3,754.00
3,997.90
4.2.1
133.06
MOVIMIENTO DE TIERRAS
3.2
4
855.88
988.94
3.1
4.1
3,257.18
OBRAS PRELIMINARES
2.1
TOTAL
29,469.94
29,469.94
CARPINTERA DE METLICA
PORTON DE FERRO 3.00 X 2.50 M
Und
2.00 1,500.00
SUB TOTAL
8
FLETE TERRESTRE
8.1
FLETE TERRESTRE
3,000.00
3,000.00
Kg
150,218.96
SUB TOTAL
0.08 12,017.52
12,017.52
TOTAL
ITEM
RESUMEN PARTIDAS
3,000.00
12,017.52
166,891.07
SUB TOTAL
TOTAL
1.00
OBRAS PROVISIONALES
2.00
OBRAS PRELIMINARES
3,257.18
988.94
3,997.90
77,015.53
37,144.07
6.00 ALBAILERIA
29,469.94
3,000.00
12,017.52
S/.
166,891.07
S/.
16,689.11
UTILIDAD(10 %)
S/.
16,689.11
SUB TOTAL
S/.
200,269.29
IGV(18%)
S/.
36,048.47
S/.
236,317.76