CRONOGRAMA VALORIZADO DE EJECUCIN DE OBRA

: "AMPLIACIN Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN LAS COMUNIDADES D


CANAS - CUSCO"

EXPEDIENTE TCNICO
COMPONENTES
01
01.01

TOTAL S/.
COMPONENTE 01: (SISTEMA DE AGUA POTABLE)
INSTALACIONES PROVISIONALES

1,355,993.09
7,484.80

SISTEMA DE AGUA POTABLE, ( 203 BENEF.) - C.C. SAUSAYA


01.02
01.02.01
01.02.02
01.02.03

CAPTACION DE LADERA (19 UND)


LINEA DE CONDUCCION, L=2753.71 m.l. , TUBERIA PVC-SAP
RESERVORIO CA DE 15 m3 - SUB SISTEMA: 02

01.02.04

74,470.29
91,047.97
12,227.21

RESERVORIO CA DE 3 m3 - SUB SISTEMA: 01

6,917.91

CASETA DE VALVULAS RESERVORIO DE 3 m3 - SUB SISTEMA:01

01.02.07.01
01.02.07.02
01.02.08

RESERVORIOS CON ROTOPLAS DE (600, 1100 Litros)


RESERVORIOS CON ROTOPLAS DE (600 Litros) - 15 UNID.
RESERVORIOS CON ROTOPLAS DE (1100 Litros) - 02 UNID.
PASES AEREOS (04 UND.)

50,882.17
7,260.52

14,894.06
20%
54,628.78
60%
6,113.61
50%

3,113.06
45%

01.02.08.02

PASE AEREO CON TUBERIA DE F G 1" DE 10 ML

11,284.81

CAMARA DISTRIBUIDORA DE CAUDALES (02 UND.)


RED DE DISTRIBUCION - ADUCCION (15,585.33 m.l.)
VALVULAS DE CONTROL (23 UND.)

6,113.61
50%
3,120.06
100%
3,804.85
55%
3,120.06
100%

10,176.43
20%
3,630.26
50%

25,441.09
50%
3,630.26
50%

2,686.45
15%
1,128.48
10%

15,223.24
85%
10,156.33
90%
2,975.53
70%
44,065.65
10%

29,194.50
17,909.69

01.02.11

22,341.09
30%

58,142.69

PASE AEREO CON TUBERIA DE F G 1" DE 30 ML

01.02.10

37,235.15
50%
36,419.19
40%

CRONOGRAMA DE EJECUCION
MES 04

7,484.80
100%

3,120.06

01.02.08.01

01.02.09

MES 03

3,120.06

01.02.06
01.02.07

MES 02

864,505.40

CASETA DE VALVULAS RESERVORIO DE 15 m3 - SUB SISTEMA:02

01.02.05

MES 01

4,250.76
440,656.48
3,530.96

CRONOGRAMA VALORIZADO DE EJECUCIN DE OBRA

: "AMPLIACIN Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN LAS COMUNIDADES D


CANAS - CUSCO"

EXPEDIENTE TCNICO
COMPONENTES

TOTAL S/.

01.02.12

VALVULAS DE PURGA (41 UND.)

01.02.13

INSTALACION PILETAS DOMICILIARIAS TIPO II - VIVIENDAS (203 UND)

01.02.14

DEMOLICION DE ESTRUCTURAS EXISTENTES

MES 01

MES 02

01.03.01
01.03.02
01.03.03

130,057.32
2,892.24

1,735.34
60%

CAPTACION DE LADERA (12 UND)


LINEA DE CONDUCCION, L=1,206.74 m.l. , TUBERIA PVC-SAP
RESERVORIO CA DE 8 m3 - SUB SISTEMA: 01

95,819.53
22,580.40
13,069.67

CASETA DE VALVULAS RESERVORIO DE 8 m3 - SUB SISTEMA:01


3,180.84
RESERVORIO CA DE 3 m3 - SUB SISTEMA: 03

6,917.91

CASETA DE VALVULAS RESERVORIO DE 3 m3 - SUB SISTEMA:03


01.03.06
01.03.07
01.03.07.01
01.03.08
01.03.08.01
01.03.09
01.03.10

1,156.90
40%

484,002.89

01.03.04
01.03.05

CRONOGRAMA DE EJECUCION
MES 04

4,876.95

SISTEMA DE AGUA POTABLE, ( 104 BENEF.) - C.C. TACOMAYO


01.03

MES 03

3,120.06
RESERVORIOS CON ROTOPLAS DE (600 Litros)
RESERVORIOS CON ROTOPLAS DE (600 Litros) - 09 UNID.
PASES AEREOS (01 UND.)
PASE AEREO CON TUBERIA DE F G 1" DE 20 ML
CAMARA DE REUNION (01 UND.)
RED DE DISTRIBUCION - ADUCCION, L=10,931.61 m.l., TUBERIA PVC-SAP

28,745.86
30%

67,073.67
70%
22,580.40
100%
13,069.67
100%
2,862.76
90%
6,917.91
100%
3,120.06
100%

318.08
10%

55,753.74
55,753.74

44,602.99
80%

11,150.75
20%

7,383.22
7,383.22
1,048.47
198,460.11

01.03.11

VALVULAS DE CONTROL (19 UND.)

2,916.88

01.03.12

VALVULAS DE PURGA (26 UND.)

3,092.70

7,383.22
100%
1,048.47
100%
128,999.07
65%

CRONOGRAMA VALORIZADO DE EJECUCIN DE OBRA


EXPEDIENTE TCNICO
COMPONENTES

TOTAL S/.

01.03.13

INSTALACION PILETAS DOMICILIARIAS TIPO II - VIVIENDAS (104 UND)

01.03.14

DEMOLICION DE ESTRUCTURAS EXISTENTES

02
02.01

: "AMPLIACIN Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN LAS COMUNIDADES D


CANAS - CUSCO"

COMPONENTE
02: (SISTEMA DE
DE EXCRETAS,
ELIMINACION
DEBENEF.)
EXCRETAS)
SISTEMA DE ELIMINACION
(203
- C.C. SAUSAYA

MES 01

MES 02

MES 03

CRONOGRAMA DE EJECUCION
MES 04

68,731.20
1,928.16
100%

1,928.16
2,245,362.24
1,362,616.27

02.01.01

LETRINAS CON ARRASTRE HIDRAULICO ESTANDAR - VIVIENDAS (203 UND.)

834,291.04

02.01.02

POZO DE ABSORCION PARA PILETAS DOMICILIARIAS (203 UND.)

02.01.03

BIODIGESTORES (203 UND.)

333,359.77

02.01.04

CAJA DE LODOS (203 UND.)

55,072.48

02.01.05

POZO DE PERCOLACION (203 UND.)

62,050.99

83,429.10
10%

333,716.42
40%

40,949.41
10%

245,696.43
60%

270.00
20%

270.00
20%

77,841.99

SISTEMA DE ELIMINACION DE EXCRETAS, (104 BENEF.) - C.C. TACOMAYO


02.02

680,580.49

02.02.01

LETRINAS CON ARRASTRE HIDRAULICO ESTANDAR - VIVIENDAS (104 UND.)

02.02.02

POZO DE ABSORCION PARA PILETAS DOMICILIARIAS (104 UND.)

02.02.03

BIODIGESTORES (104 UND.)

170,785.00

02.02.04

CAJA DE LODOS (104 UND.)

28,631.98

02.02.05

POZO DE PERCOLACION (104 UND.)

31,789.82

ENSAYOS DE CONTROL DE CALIDAD

1,350.00

02.03
02.03.01
02.04

409,494.05
39,879.64

PRUEBAS ROTURA BRIQUETAS DE CONCRETO

1,350.00

PLAN DE SEGURIDAD Y CONTINGENCIA EN OBRA

19,000.00

270.00
20%

CRONOGRAMA VALORIZADO DE EJECUCIN DE OBRA


EXPEDIENTE TCNICO
COMPONENTES

TOTAL S/.

02.04.01

EQUIPOS DE PROTECCION PERSONAL-EPP

02.04.02

Recursos para respuestas ante emergencias en seguridad y Salud durante el trabajo

02.05

: "AMPLIACIN Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN LAS COMUNIDADES D


CANAS - CUSCO"

FLETE TRANSPORTE TERRESTRE

12,500.00
6,500.00

TRANSPORTE DE MATERIALES-SAP

74,355.83

02.05.02

TRANSPORTE DE MATERIALES-SAL

102,159.65

02.06.01
03
03.01
03.01.01

MITIGACION DEL IMPACTO AMBIENTAL


CHARLAS DE SENSIBILIZACION
COMPONENTE 03
PROMOCION, CAPACITACION Y EDUCACION SANITARIA
PROMOCION, CAPACITACION Y EDUCACION SANITARIA

COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (8.5%)
COSTO PARCIAL
I.G.V. (18%)
COSTO EJECUCION DE OBRA
SUPERVISION
COSTO TOTAL
PORCENTAJE DE AVANCE MENSUAL

MES 02

MES 03

CRONOGRAMA DE EJECUCION
MES 04

12,500.00
100%
6,500.00
100%

176,515.48

02.05.01

02.06

MES 01

59,484.66
80%

5,300.00
5,300.00
49,417.50
49,417.50
49,417.50

S/.3,650,772.83
S/.365,077.28
S/.310,315.69
S/.4,326,165.80
S/.778,709.84
S/.5,104,875.65
S/.165,000.00
S/.5,269,875.65
100.00%

77,571.75
S/.7,757.17
S/.6,593.60
S/.91,922.52
S/.16,546.05
S/.108,468.57
S/.20,625.00
S/.129,093.57

163,578.40
S/.16,357.84
S/.13,904.16
S/.193,840.41
S/.34,891.27
S/.228,731.68
S/.20,625.00
S/.249,356.68

302,639.75
S/.30,263.98
S/.25,724.38
S/.358,628.11
S/.64,553.06
S/.423,181.17
S/.20,625.00
S/.443,806.17

899,491.45
S/.89,949.14
S/.76,456.77
S/.1,065,897.36
S/.191,861.53
S/.1,257,758.89
S/.20,625.00
S/.1,278,383.89

2.45%

4.73%

8.42%

24.26%

ORIZADO DE EJECUCIN DE OBRA

EJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN LAS COMUNIDADES DE SAUSAYA Y TACOMAYO, DEL DISTRITO DE CHECCA - PROVINCIA DE
CRONOGRAMA DE EJECUCION DE OBRA
MES 05

MES 06

15,264.65
30%

1,275.23
30%
264,393.89
60%

132,196.94
30%
3,530.96
100%

MES 07

MES 08

ORIZADO DE EJECUCIN DE OBRA

EJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN LAS COMUNIDADES DE SAUSAYA Y TACOMAYO, DEL DISTRITO DE CHECCA - PROVINCIA DE
CRONOGRAMA DE EJECUCION DE OBRA
MES 05

6,502.87
5%

69,461.04
35%
2,916.88
100%
3,092.70

MES 06

MES 07

MES 08

4,876.95
100%
52,022.93
40%

52,022.93
40%

19,508.60
15%

ORIZADO DE EJECUCIN DE OBRA

EJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN LAS COMUNIDADES DE SAUSAYA Y TACOMAYO, DEL DISTRITO DE CHECCA - PROVINCIA DE
CRONOGRAMA DE EJECUCION DE OBRA
MES 05
100%
34,365.60
50%

333,716.42
40%

122,848.22
30%
11,963.89
30%
42,696.25
25%

270.00
20%

MES 06

MES 07

MES 08

38,921.00
50%
200,015.86
60%
44,057.98
80%
43,435.69
70%

33,335.98
10%
11,014.50
20%
18,615.30
30%

34,365.60
50%

83,429.10
10%
38,921.00
50%
100,007.93
30%

27,915.75
70%
128,088.75
75%
10,021.19
35%
9,536.95
30%

270.00
20%

18,610.79
65%
22,252.87
70%

ORIZADO DE EJECUCIN DE OBRA

EJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN LAS COMUNIDADES DE SAUSAYA Y TACOMAYO, DEL DISTRITO DE CHECCA - PROVINCIA DE
CRONOGRAMA DE EJECUCION DE OBRA
MES 05

MES 06

MES 07

81,727.72
80%

20,431.93
20%

MES 08

14,871.17
20%

5,300.00
100%

49,417.50
100%

923,638.79
S/.92,363.88
S/.78,509.30
S/.1,094,511.97
S/.197,012.15
S/.1,291,524.12
S/.20,625.00
S/.1,312,149.12

706,911.77
S/.70,691.18
S/.60,087.50
S/.837,690.45
S/.150,784.28
S/.988,474.73
S/.20,625.00
S/.1,009,099.73

439,749.05
S/.43,974.91
S/.37,378.67
S/.521,102.63
S/.93,798.47
S/.614,901.10
S/.20,625.00
S/.635,526.10

137,191.87
S/.13,719.19
S/.11,661.31
S/.162,572.36
S/.29,263.03
S/.191,835.39
S/.20,625.00
S/.212,460.39

24.90%

19.15%

12.06%

4.03%

RESUMEN DEL PRESUPUESTO DE LA INVERSIN DEL PROYECTO

DESCRIPCIN DE COMPONENTES
C1:INFRAESTRUCTURA BASICA Y ADMINISTRATIVA

Estructura
Arquitectura
Instalaciones Sanitarias
Instalaciones Electricas
C2: INFRAESTRUCTURA COMPLEMENTARIAS
Patio de Honor
Veredas, Accesos comunes
Tanque Cisterna y Tanque Elevado
Sardineles
Podio y Asta de Bandera
Cerco Perimetrico
C3: EQUIPAMIENTO Y MOBILIARIO
sicin y Dotacin de Mobiliario y Equipamiento Educativo
C4: MITIGACIN DE IMPACTOS
ondicionamiento de Areas Verdes y Mitigacin de Impactos
COSTO DIRECTO
GASTOS GENERALES (12.30%)
GASTOS DE SUPERVISION (3.50%)
GASTOS ELAB. EXPEDIENTE TECNICO (2.10%)
GASTOS DE LIQUIDACIN DE OBRAS (0.70%)
GASTOS DE EVALUACION DE EXPEDIENTE TECNICO (0.40%)
PRESUPUESTO TOTAL

DE LA INVERSIN DEL PROYECTO


INVERSIN S/.
S/. 949,174.51
S/. 407,320.59
S/. 461,974.68
S/. 33,377.18
S/. 46,502.06
S/. 670,225.54
S/. 203,343.85
S/. 166,615.93
S/. 30,138.37
S/. 14,686.77
S/. 4,749.63
S/. 250,690.99
S/. 106,800.00
S/. 106,800.00
S/. 20,080.12
S/. 20,080.12
S/. 1,746,280.17
S/. 214,792.46
S/. 61,119.81
S/. 36,671.88
S/. 12,223.96
S/. 6,985.12
S/. 2,078,073.40

RESUMEN DEL PRESUPUESTO DE LA INVERSIN DEL PROYECTO

DESCRIPCIN DE COMPONENTES
C1:INFRAESTRUCTURA BASICA Y ADMINISTRATIVA

Estructura
Arquitectura
Instalaciones Sanitarias
Instalaciones Electricas

C2: INFRAESTRUCTURA COMPLEMENTARIAS

Patio de Honor
Veredas, Accesos comunes
Tanque Cisterna y Tanque Elevado
Sardineles
Podio y Asta de Bandera
Cerco Perimetrico

C3: EQUIPAMIENTO Y MOBILIARIO


Adquisicin y Dotacin de Mobiliario y Equipamiento Educativo
C4: MITIGACIN DE IMPACTOS
Acondicionamiento de Areas Verdes y Mitigacin de Impactos
COSTO DIRECTO
GASTOS GENERALES (12.30%)
GASTOS DE SUPERVISION (3.50%)
GASTOS ELAB. EXPEDIENTE TECNICO (2.50%)
GASTOS DE LIQUIDACIN DE OBRAS (0.70%)
PRESUPUESTO TOTAL

UMEN DEL PRESUPUESTO DE LA INVERSIN DEL PROYECTO

INVERSIN S/.
S/. 949,174.51
S/. 407,320.59
S/. 461,974.68
S/. 33,377.18
S/. 46,502.06
S/. 670,225.54

S/. 203,343.85
S/. 166,615.93
S/. 30,138.37
S/. 14,686.77
S/. 4,749.63
S/. 250,690.99
S/. 106,800.00
S/. 106,800.00
S/. 20,080.12
S/. 20,080.12
S/. 1,746,280.17
214,792.46
61,119.81
36,671.88
12,223.96
6,985.12
S/. 2,078,073.40

4,322.22
320,326.87
3,903.09

759.92

5,277.67

11,878.27

2,174.22

291,123.21

3,118.34

1,463.82

628.33

50,748.37

424,381.43
3,903.09

5,389.48

12,678.84

2,174.22

337,845.68

6,184.43

2,001.76

555.14

53,648.79

1,043,994.28
443,432.23
317,740.12

5,658.95

92,023.29

16,760.75

4,546.31

6,702.81

536,950.72
389,735.95

5,658.95

109,019.90

19,973.70

7,219.75

5,342.47

34,111.33

25,000.00

4,500.00

281465.52

15000
5.33%