LISTA DE ELEM
Cdigo
BAI0001
EAN0001
EQGA003
MAAR0016
Descripcin
COMPACTADOR BAILARINA
ANDAMIO METALICO DE 2 X 2
REVOLVEDORA MIPSA-KOHLER 1 SACO
ARMADURA SOLDADA CASTILLO ARMEX 15X15-4
Costo
$46.13
$50.00
$66.00
$19.00
MAAR0017
MAGU0010
MALA0180
MALA0190
MARM0018
AGUA
ALAMBRE RECOCIDO No. 18
ALAMBRON LISO DEL No.2, DIAM. 1/4"(6MM.)
ARMADURA SOLDADA CASTILLO ARMEX 15X25-4
M3
KG
TON
MT
$12.00
$13.00
$12,000.00
$20.00
MBAR0009
MCEM0010
MCEM0050
MCEM0060
MCLA0021
MCOM0010
MDUE0001
MEZ0002
MEZ0005
MEZ0011
MHIL0001
MIMP0001
$13,000.00
$1,440.00
$1,680.00
$2,120.00
$22.00
$20.00
$0.00
$1,194.54
$1,056.96
$1,194.54
$0.00
$0.00
No.
1
2
3
4
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
$19.20
$0.00
MMAD0044
MMAD0045
MMAD0047
MMAD0049
MMAL0050
$0.00
$0.00
$0.00
$0.00
$16.56
MMAL0080
$16.56
MMAL0090
$16.56
$0.00
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MANO DE OBRA.
MANO DE OBRA.
MANO DE OBRA.
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MMOR0060
MOMM01
MOMM30
MOMM32
MPET0040
MPET0170
MPGP0001
MPIN0001
MPIN0060
MPIN0069
MPIS0240
MRES0051
MSEL0001
MORTERO TOLTECA
PEON
OFICIAL ALBANIL
OFICIAL PINTOR
ARENA P/CONCRETOS
GRAVA P/CONCRETOS 3/4"
PEGAPISO GRIS MARCA PERDURA STONE
PINTURA ESMALTE
PINTURA COLOR BLANCA BERLINTE
SELLADOR VINILICO
PISO VITROMEX BCO. 2 AMERICAS 33X33 CM
YESO DE RESANADOR
SELLADOR PASA AISLAFLEX SELLO
TON
JOR
JOR
JOR
M3
M3
SACO
CUB
CUB
LT
M2
KG
LT
$1,440.00
$218.91
$365.98
$365.98
$150.00
$150.00
$0.00
$1,500.00
$1,053.00
$0.00
$96.52
$1.13
$0.00
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
EQ. Y HERRAMIENTA
MATERIALES
MTAB0070
MTAB0090
MVAR0009
MVAR0012
MVAR0013
MVAR0014
MVAR0015
MVAR0016
MVAR0017
PUR0001
VAGA001
MPETO200
$3,000.00
$5,000.00
$13,000.00
$13,000.00
$13,000.00
$13,000.00
$13,000.00
$13,000.00
$13,000.00
$0.00
$45.00
$
32.00
* Al seleccionar la celda de
"SELECCIN" B5, Se muestra la
cejilla del FILTRO, para verificar el
tipo de elemento constructivo.
Descripcin Corta.
DEMOLICIONES
DEM0001
DEMOLICION A
M3
DEM0002
DEMOLICION M3
DEM0004
DEMOLICION D
M3
DEM0009
DEMOLICION A
M2
DEM0010
DEMOLICION A
M2
DEM0014
DEMOLICION M3
DEM0020
DEMOLICION A
M2
DEM0022
DEMOLICION A
Unidad
DEM0028
DEMOLICION A
M2
DEM0029
DEMOLICION A
M2
DEM0043
DEMOLICION D
M2
PRELIMINARES
LTZ0001
LIMPIEZA DELM2
EXC0001
EXCAVACIN A
M3
LTZ0005
TRAZO Y NIV M2
CIMENTACIN
CIM0001
CIMENTACIONM3
RELL01CC
RELLENO EN M3
RELL01CM
RELLENO DE M3
CASTILLOS Y COLUMNAS
CAST001V
CASTILLO CON
M
CAST002V
CASTILLO CON
M
CAST003V
CASTILLO CON
M
CAST004V
CASTILLO CON
M
CAST005V
CASTILLO CON
M
CAST010V
CASTILLO CON
M
CAST006V
CASTILLO CON
M
CAST007V
CASTILLO CON
M
CAST008V
CASTILLO CON
M
CAST009V
CASTILLO CON
M
DALA002A
DALA003A
DALA004A
DALA005A
DALA006A
DALA007A
DALA008A
DALA009A
FIRMES
PLA05-100
PLANTILLA DEM2
PIS05-100
FIRME DE CON
M2
PIS05-150
FIRME DE CON
M2
PIS08-150
FIRME DE CON
M2
PIS08-200
FIRME DE CON
M2
PIS10-150
FIRME DE CON
M2
PIS10-200
FIRME DE CON
M2
PIS15-150
FIRME DE CON
M2
PIS15-200
FIRME DE CON
M2
MUROS
MURLAD7
MURO DE TABIM2
MURLAD14
MURO DE TABIM2
MURLAD28
MURO DE TABIM2
MURTAB10
MURO DE TABIM2
MURTAB14
MURO DE TABIM2
MURTAB28
MURO DE TABIM2
MURTABI1
MURTABE1
MURTABI2
MUROS ESPECIALES
MURO LAMBRN DE TABLAROCA TIPO INTERIOR
MURO LAMBRN DE TABLAROCA TIPO INTEMPERI
MURO DE TABLAROCA A 2 CARAS TIPO INTERIO
MURO DE PREM
M2
M2
M2
MURTABE2
MURMIXID
MURMIXED
MURMIXIE
MURDUR2
PLATAB001
PLAPOLI001
DETTAB001
DETTAB002
MDURINT
ENTREPISOS Y CUBIERTAS
LOSA10-200 LOSA TECHO 10 CM, VAR. #3, FC=200
LOSA10-250 LOSA TECHO 10 CM, VAR. #3, FC=250
M2
M2
M2
M2
M2
M2
M2
M2
ML
M2
LOSA DE 10 CM2
LOSA DE 10 CM2
HERRERA Y CANCELERA
PTA0001
SUMINISTRO Y
PZA
VENT0001
SUMINISTRO Y
PZA
ACABADOS
PIS0080
SUMINISTRO M2
PIN0001
SUMINISTRO M2
PIN0002
SUMINISTRO M2
IMP0001
SUMINISTRO Y
M2
APL0025
EMBOQUILLADO
M
APL0022
APLANADO ENM2
PSO0001
ACABADO ESC
M2
PSO0002
ACABADO PULM2
MEZ0003
MEZ0004
MEZ0005
MEZ0006
MEZ0007
MEZ0009
MEZ0010
MEZ0011
MEZ0012
MEZ0013
MEZ0014
FCO100M
CONCRETO F'C
M3
FCO100R
CONCRETO F'C
M3
FCO150M
CONCRETO FC
M3
FCO150R
CONCRETO FC
M3
FCO200M
CONCRETO F'M3
FCO200R
CONCRETO F'M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
FCO250M
CONCRETO F'M3
FCO250R
CONCRETO F'M3
ACARREOS
ACR0009
ACARREO EN M3
C
ACR0012
ACARREO EN M3
ACR0013
ACARREO EN M3
ACR0037
ACR0082A
ACARREO A MA
MIL
M3
HABILITADO YTON
AREF2.5
HABILITADO YTON
AREF3
HABILITADO YTON
AREF4
HABILITADO YTON
AREF5
HABILITADO YTON
AREF6
HABILITADO YTON
AREF8
HABILITADO YTON
AREF10
HABILITADO YTON
AREF12
HABILITADO YTON
MAL66-6/6
HAB.ARM. DE M2
MAL66-8/8
HAB.ARM. DE M2
HAB.ARM. MAM2
ARM15X15
SUMINISTRO M
ARM15X20
SUMINISTRO Y
M
ARM15X25
SUMINISTRO Y
M
CUAD001
CUAD005
CUAD040
CUAD060
CUADRILLAS
CUADRILLA 001(1 PEON)
CUADRILLA 005(5 PEONES)
CUADRILLA 040(1ALBANIL+1PEON)
CUADRILLA 060 (1 PINTOR)
JOR
JOR
JOR
JOR
CIMBRAS
CFZAP
CIMBRA Y DE M2
CDADO
CIMBRA Y DE M2
CCADE
CIMBRA Y DE M2
CCAST
CIMBRA Y DESM2
CIMBRA Y DESM2
CIMBRA Y DESM2
VACIADOS
VDACAS150 VAC. DALA Y CAST, FC=150, RN. AGR. 3/4"
VACIADO DE CM3
VACIADO DE CM3
VACIADO DE CM3
VCL200
VACIADO DE CM3
VCL250
VACIADO DE CM3
VZTL150
VACIADO DE CM3
VZTL200
VACIADO DE CM3
VZTL250
VACIADO DE CM3
VCOL150
VACIADO DE CM3
VCOL200
VACIADO DE CM3
VCOL250
VACIADO DE CM3
VACIADO DE CM3
VACIADO DE CM3
VLOSA150
VACIADO DE CM3
VLOSA200
VACIADO DE CM3
VLOSA250
VACIADO DE CM3
VCIM100R
VACIADO DE CM3
VCIM150R
VACIADO DE CM3
VCIM200R
VACIADO DE CM3
VCIM250R
VACIADO DE CM3
Rend.
unidad
1.50 M3/JOR
0.60 M3/JOR
5.50 M3/JOR
12.50 M2/JOR
6.50 M2/JOR
0.65 M3/JOR
16.67 M2/JOR
7.52 Unidad/JOR
25.00 M2/JOR
19.00 M2/JOR
22.22 M2/JOR
27.03 M2/JOR
2.78 M3/JOR
100.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
CUADRILLA 001 (1 PEON)
CUADRILLA 001 (1 PEON)
2.75 M3/JOR
4.35 M3/JOR
4.35 M3/JOR
10.84 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
10.84 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
10.84 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
9.79 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
9.79 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
9.64 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
9.79 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
8.74 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
8.74 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
8.74 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
12.76 M/JOR
12.76 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
12.76 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
12.12 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
12.12 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
12.12 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
11.48 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
11.48 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
11.48 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
20.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
12.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
12.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
12.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
10.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
6.49 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
10.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
10.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
10.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
5.00 M/JOR
2.50 PZA/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
2.50 PZA/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
CUADRILLA 060 (1 PINTOR)
CUADRILLA 060 (1 PINTOR)
12.00 M2/JOR
20.00 M2/JOR
21.45 M2/JOR
30.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
26.71 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
9.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
45.45 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
30.00 M2/JOR
1.59 M3/JOR
15.02 M3/JOR
1.59 M3/JOR
15.02 M3/JOR
1.59 M3/JOR
15.02 M3/JOR
1.50 M3/JOR
15.00 M3/JOR
13.33 M3/JOR
5.25 M3/JOR
5.50 M3/JOR
4,347.83 MIL/JOR
0.10 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
0.12 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
0.14 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
0.16 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
0.17 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
0.18 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
0.22 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
0.25 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
0.28 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
82.10 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
84.03 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
98.04 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
120.05 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
120.05 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
120.05 M/JOR
7.97 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
7.97 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
14.01 M2/JOR
14.01 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
6.95 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
6.65 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
1.33 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
1.33 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
1.33 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
2.50 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
2.50 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
3.10 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
3.10 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
3.10 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
3.10 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
3.10 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
2.50 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
2.50 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
2.50 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON)
3.24 M3/JOR
MEZ0003
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS
TON
0.00
0.433630
$2,120.00
$919.30
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.208030
$150.00
$181.20
MAGU0010
AGUA
M3
0.00
0.321600
$12.00
$3.86
Subtotal: MATERIALES
$1,104.36
Costo directo
$1,104.36
INDIRECTO
0.1
$110.44
UTILIDADES
0.15
$165.65
COSTO TOTAL
MEZ0004
$1,380.45
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS
TON
0.00
0.361633
$2,120.00
$766.66
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.234700
$150.00
$185.21
MAGU0010
AGUA
M3
0.00
0.314000
$12.00
$3.77
Subtotal: MATERIALES
$955.63
Costo directo
$955.63
INDIRECTO
0.1
$95.56
UTILIDADES
0.15
$143.35
COSTO TOTAL
MEZ0005
$1,194.54
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS
TON
0.00
0.307455
$2,120.00
$651.80
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.266880
$150.00
$190.03
MAGU0010
AGUA
M3
0.00
0.310800
$12.00
$3.73
Subtotal: MATERIALES
$845.57
Costo directo
$845.57
INDIRECTO
0.1
$84.56
UTILIDADES
0.15
$126.83
COSTO TOTAL
MEZ0006
Cdigo
MATERIALES
$1,056.96
M3
Unidad
Rend.
Cantidad
Costo
Importe
MCEM0060
TON
0.00
0.255440
$2,120.00
$541.53
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.353500
$150.00
$203.03
MAGU0010
AGUA
M3
0.00
0.302400
$12.00
$3.63
Subtotal: MATERIALES
$748.19
Costo directo
$748.19
INDIRECTO
0.1
$74.82
UTILIDADES
0.15
$112.23
COSTO TOTAL
MEZ0007
$935.23
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS
TON
0.00
0.215270
$2,120.00
$456.37
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.396300
$150.00
$209.45
MAGU0010
AGUA
M3
0.00
0.296400
$12.00
$3.56
Subtotal: MATERIALES
$669.37
Costo directo
$669.37
INDIRECTO
0.1
$66.94
UTILIDADES
0.15
$100.41
COSTO TOTAL
MEZ0009
$836.72
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MCEM0010 MORTERO HIDRAULICO
TON
0.00
0.429500
$1,440.00
$618.48
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.203700
$150.00
$180.56
MAGU0010
AGUA
M3
0.00
0.356400
$12.00
$4.28
Subtotal: MATERIALES
$803.31
Costo directo
$803.31
INDIRECTO
0.1
$80.33
UTILIDADES
0.15
$120.50
COSTO TOTAL
MEZ0010
$1,004.14
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MMOR0060 MORTERO TOLTECA
TON
0.00
0.341960
$1,440.00
$492.42
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.232597
$150.00
$184.89
MAGU0010
AGUA
M3
0.00
0.341000
$12.00
$4.09
Subtotal: MATERIALES
$681.40
Costo directo
0.1
$68.14
UTILIDADES
0.15
$102.21
COSTO TOTAL
MEZ0011
$681.40
INDIRECTO
$851.75
M3
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MMOR0060 MORTERO TOLTECA
TON
0.00
0.285300
$1,440.00
$410.83
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.264700
$150.00
$189.71
MAGU0010
AGUA
M3
0.00
0.346800
$12.00
$4.16
Subtotal: MATERIALES
$604.70
Costo directo
$604.70
INDIRECTO
0.1
UTILIDADES
0.15
$60.47
$90.70
COSTO TOTAL
MEZ0012
$755.87
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MMOR0060 MORTERO TOLTECA
TON
0.00
0.238900
$1,440.00
$344.02
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.286100
$150.00
$192.92
MAGU0010
AGUA
M3
0.00
0.344400
$12.00
$4.13
Subtotal: MATERIALES
$541.06
Costo directo
$541.06
INDIRECTO
0.1
$54.11
UTILIDADES
0.15
$81.16
COSTO TOTAL
MEZ0013
$676.33
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MMOR0060 MORTERO TOLTECA
TON
0.00
0.218300
$1,440.00
$314.35
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.296800
$150.00
$194.52
MAGU0010
AGUA
M3
0.00
0.338400
$12.00
$4.06
Subtotal: MATERIALES
$512.93
Costo directo
$512.93
INDIRECTO
0.1
$51.29
UTILIDADES
0.15
$76.94
COSTO TOTAL
MEZ0014
$641.17
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MMOR0060 MORTERO TOLTECA
TON
0.00
0.187400
$1,440.00
$269.86
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.318200
$150.00
$197.73
MAGU0010
AGUA
M3
0.00
0.332400
$12.00
$3.99
Subtotal: MATERIALES
$471.57
Costo directo
$471.57
INDIRECTO
0.1
UTILIDADES
0.15
COSTO TOTAL
$47.16
$70.74
$589.47
FCO100M
Anlisis: FCO100M
Unidad: M3
CONCRETO F'C=100 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA
POR MEDIOS MANUALES; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS
TON
0.00
0.275000
$2,120.00
$583.00
MPET0040
ARENA P/CONCRETOS
M3
0.00
0.544600
$150.00
$81.69
MPET0170
M3
0.00
0.659100
$150.00
$98.87
MAGU0010
AGUA
M3
0.00
0.260400
$12.00
$3.12
JOR
1.59
0.628931
$247.37
$155.58
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
Subtotal: MATERIALES
$766.68
$155.58
Costo directo
$922.26
INDIRECTO
0.1
$92.23
UTILIDADES
0.15
$138.34
COSTO TOTAL
FCO100R
$1,152.83
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS
TON
0.00
0.275000
$2,120.00
$583.00
MPET0040
ARENA P/CONCRETOS
M3
0.00
0.544600
$150.00
$81.69
MPET0170
M3
0.00
0.659100
$150.00
$98.87
MAGU0010
AGUA
M3
0.00
0.260400
$12.00
$3.12
SUBCONTRATOS
EQGA003
REVOLVEDORA MIPSA-KOHLER 1 SACO
HR
0.00
0.533330
$66.00
$35.20
MANO DE OBRA
CUAD005
CUADRILLA 005 (5 PEONES)
JOR
15.02
0.066578
$1,236.86
$82.35
Subtotal: MATERIALES
$766.68
$82.35
Subtotal: SUBCONTRATOS
$35.20
Costo directo
$884.23
INDIRECTO
0.1
$88.42
UTILIDADES
0.15
$132.63
COSTO TOTAL
FCO150M
Cdigo
$1,105.28
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS
TON
0.00
0.327500
$2,120.00
$694.30
MPET0040
ARENA P/CONCRETOS
M3
0.00
0.538200
$150.00
$80.73
MPET0170
M3
0.00
0.652700
$150.00
$97.91
JOR
1.59
0.628931
$247.37
$155.58
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
Subtotal: MATERIALES
$872.94
$155.58
Costo directo
$1,028.52
INDIRECTO
0.1
UTILIDADES
0.15
$102.85
$154.28
COSTO TOTAL
FCO150R
$1,285.64
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS
TON
0.00
0.327500
$2,120.00
$694.30
MPET0040
ARENA P/CONCRETOS
M3
0.00
0.538200
$150.00
$80.73
MPET0170
M3
0.00
0.652700
$150.00
$97.91
SUBCONTRATOS
EQGA003
REVOLVEDORA MIPSA-KOHLER 1 SACO
HR
0.00
0.533300
$66.00
$35.20
MANO DE OBRA
CUAD005
CUADRILLA 005 (5 PEONES)
JOR
15.02
0.066578
$1,236.86
$82.35
Subtotal: MATERIALES
$872.94
$82.35
Subtotal: SUBCONTRATOS
$35.20
Costo directo
$990.48
INDIRECTO
0.1
$99.05
UTILIDADES
0.15
$148.57
COSTO TOTAL
FCO200M
$1,238.10
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS
TON
0.00
0.369770
$2,120.00
$783.91
MPET0040
ARENA P/CONCRETOS
M3
0.00
0.532060
$150.00
$79.81
MPET0170
M3
0.00
0.645200
$150.00
$96.78
JOR
1.59
0.628931
$247.37
$155.58
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
Subtotal: MATERIALES
$960.50
$155.58
Costo directo
$1,116.08
INDIRECTO
0.1
$111.61
UTILIDADES
0.15
$167.41
COSTO TOTAL
FCO200R
Cdigo
$1,395.10
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS
TON
0.00
0.369770
$2,120.00
$783.91
MPET0040
M3
0.00
0.532060
$150.00
$79.81
ARENA P/CONCRETOS
MPET0170
M3
0.00
0.645200
$150.00
$96.78
SUBCONTRATOS
EQGA003
REVOLVEDORA MIPSA-KOHLER 1 SACO
HR
0.00
0.533330
$66.00
$35.20
MANO DE OBRA
CUAD005
CUADRILLA 005 (5 PEONES)
JOR
15.02
0.066578
$1,236.86
$82.35
Subtotal: MATERIALES
$960.50
$82.35
Subtotal: SUBCONTRATOS
$35.20
Costo directo
$1,078.05
INDIRECTO
0.1
UTILIDADES
0.15
$107.80
$161.71
COSTO TOTAL
FCO250M
$1,347.56
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS
TON
0.00
0.413000
$2,120.00
$875.56
MPET0040
ARENA P/CONCRETOS
M3
0.00
0.537100
$150.00
$80.57
MPET0170
M3
0.00
0.639800
$150.00
$95.97
JOR
1.50
0.666667
$247.37
$164.92
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
Subtotal: MATERIALES
$1,052.10
$164.92
Costo directo
$1,217.01
INDIRECTO
0.1
UTILIDADES
0.15
$121.70
$182.55
COSTO TOTAL
FCO250R
$1,521.26
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS
TON
0.00
0.413000
$2,120.00
$875.56
MPET0040
ARENA P/CONCRETOS
M3
0.00
0.537100
$150.00
$80.57
MPET0170
M3
0.00
0.639800
$150.00
$95.97
SUBCONTRATOS
EQGA003
REVOLVEDORA MIPSA-KOHLER 1 SACO
HR
0.00
0.533300
$66.00
$35.20
MANO DE OBRA
CUAD005
CUADRILLA 005 (5 PEONES)
JOR
15.00
0.066667
$1,236.86
$82.46
Subtotal: MATERIALES
$1,052.10
$82.46
Subtotal: SUBCONTRATOS
$35.20
Costo directo
$1,169.75
INDIRECTO
0.1
$116.98
UTILIDADES
0.15
$175.46
COSTO TOTAL
$1,462.19
ACR0009
Cdigo
Concepto
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
Unidad
JOR
Rend.
13.33
Cantidad
0.075019
Costo
$247.37
$18.56
$18.56
INDIRECTO
0.1
UTILIDADES
0.15
$1.86
$2.78
$23.20
Cdigo
Concepto
Unidad
JOR
Rend.
5.25
Cantidad
0.190476
Costo
$247.37
UTILIDADES
0.15
$7.07
$58.90
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
Unidad
JOR
Rend.
5.50
Cantidad
0.181818
Costo
$247.37
M3
Importe
$44.98
$44.98
Costo directo
$44.98
INDIRECTO
0.1
UTILIDADES
0.15
$4.50
$6.75
COSTO TOTAL
$56.22
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
Unidad
JOR
Rend.
4,347.83
Cantidad
0.000230
Costo
$247.37
MIL
Importe
$0.06
$0.06
Costo directo
$0.06
INDIRECTO
0.1
$0.01
UTILIDADES
0.15
$0.01
COSTO TOTAL
AREF2
$47.12
$4.71
COSTO TOTAL
Cdigo
Importe
$47.12
INDIRECTO
Cdigo
M3
$47.12
Costo directo
ACR0037
$18.56
Costo directo
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
ACR0013
Importe
COSTO TOTAL
ACR0012
M3
$0.07
TON
AREF2
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MALA0190 ALAMBRON LISO DEL No.2, DIAM. 1/4"(6MM.)
TON
0.00
MALA0180
KG
0.00
35.500000
$13.00
$461.50
JOR
0.10
10.000000
$660.93
$6,609.30
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
1.070000 $12,000.00
Subtotal: MATERIALES
$13,301.50
$6,609.30
Costo directo
$19,910.80
INDIRECTO
0.1
$1,991.08
UTILIDADES
0.15
$2,986.62
COSTO TOTAL
AREF2.5
$12,840.00
$24,888.50
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MBAR0009 VARILLA No.2.5 (5/16") FY=4200KG/CM2.
TON
0.00
MALA0180
KG
0.00
35.500000
$13.00
$461.50
JOR
0.12
8.333333
$660.93
$5,507.75
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
1.070000 -$13,000.00
Subtotal: MATERIALES
-$13,448.50
$5,507.75
Costo directo
-$7,940.75
INDIRECTO
0.1
-$794.07
UTILIDADES
0.15
-$1,191.11
COSTO TOTAL
AREF3
-$13,910.00
-$9,925.94
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MVAR0009 VARILLA No.3 (3/8") FY=4200 KG/CM2.
TON
0.00
MALA0180
KG
0.00
35.500000
$13.00
$461.50
JOR
0.14
7.142857
$660.93
$4,720.93
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
Subtotal: MATERIALES
$13,910.00
$14,371.50
$4,720.93
Costo directo
$19,092.43
INDIRECTO
0.1
UTILIDADES
0.15
COSTO TOTAL
1.070000 $13,000.00
$1,909.24
$2,863.86
$23,865.54
AREF4
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MVAR0012 VARILLA No.4 (1/2") FY=4200 KG/CM2
TON
0.00
MALA0180
KG
0.00
35.500000
$13.00
$461.50
JOR
0.16
6.250000
$660.93
$4,130.81
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
1.080000 $13,000.00
Subtotal: MATERIALES
$14,501.50
$4,130.81
Costo directo
$18,632.31
INDIRECTO
0.1
UTILIDADES
0.15
$1,863.23
$2,794.85
COSTO TOTAL
AREF5
$23,290.39
Cdigo
$14,040.00
Concepto
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MVAR0013 VARILLA No.5 (5/8") FY=4200 KG/CM2.
TON
0.00
MALA0180
KG
0.00
25.500000
$13.00
$331.50
JOR
0.17
5.882353
$660.93
$3,887.82
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
1.090000 $13,000.00
Subtotal: MATERIALES
$14,501.50
$3,887.82
Costo directo
$18,389.32
INDIRECTO
0.1
UTILIDADES
0.15
$1,838.93
$2,758.40
COSTO TOTAL
AREF6
$22,986.66
Cdigo
$14,170.00
Concepto
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MVAR0014 VARILLA No.6 (3/4") FY=4200 KG/CM2.
TON
0.00
MALA0180
KG
0.00
25.500000
$13.00
$331.50
JOR
0.18
5.555556
$660.93
$3,671.83
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
Subtotal: MATERIALES
$14,300.00
$14,631.50
$3,671.83
Costo directo
$18,303.33
INDIRECTO
0.1
UTILIDADES
0.15
COSTO TOTAL
1.100000 $13,000.00
$1,830.33
$2,745.50
$22,879.17
AREF8
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MVAR0015 VARILLA No.8 (1") FY=4200 KG/CM2.
TON
0.00
MALA0180
KG
0.00
20.500000
$13.00
$266.50
JOR
0.22
4.545455
$660.93
$3,004.23
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
1.120500 $13,000.00
Subtotal: MATERIALES
$14,833.00
$3,004.23
Costo directo
$17,837.23
INDIRECTO
0.1
UTILIDADES
0.15
$1,783.72
$2,675.58
COSTO TOTAL
AREF10
$22,296.54
Cdigo
$14,566.50
Concepto
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MVAR0016 VARILLA No.10(11/4") FY=4200KG/CM2.
TON
0.00
MALA0180
KG
0.00
20.500000
$13.00
$266.50
JOR
0.25
4.000000
$660.93
$2,643.72
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
1.120500 $13,000.00
Subtotal: MATERIALES
$14,833.00
$2,643.72
Costo directo
$17,476.72
INDIRECTO
0.1
UTILIDADES
0.15
$1,747.67
$2,621.51
COSTO TOTAL
AREF12
$21,845.90
Cdigo
$14,566.50
Concepto
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MVAR0017 VARILLA NO.12(11/2") FY=4200KG/CM2.
TON
0.00
MALA0180
KG
0.00
20.500000
$13.00
$266.50
JOR
0.28
3.571429
$660.93
$2,360.47
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
Subtotal: MATERIALES
1.120500 $13,000.00
$14,566.50
$14,833.00
$2,360.47
Costo directo
$17,193.47
INDIRECTO
0.1
$1,719.35
UTILIDADES
0.15
$2,579.02
COSTO TOTAL
$21,491.83
Concepto
M2
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18
KG
0.00
0.107000
$13.00
$1.39
MMAL0080
M2
0.00
1.050000
$16.56
$17.39
82.10
0.012180
$660.93
$8.05
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
Subtotal: MATERIALES
$18.78
$8.05
Costo directo
$26.83
INDIRECTO
0.1
UTILIDADES
0.15
$2.68
$4.02
COSTO TOTAL
$33.54
Anlisis: MAL66-8/8
Unidad: M2
MAL66-8/8 HAB.ARM. DE MALLA ELECTROSOLDADA 6X6 8/8
Cdigo
Concepto
M2
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MMAL0090 MALLA ELECTROSOLDADA TECNOMALLA 6X6-8/8
M2
0.00
1.030000
$16.56
$17.06
MALA0180
KG
0.00
0.107000
$13.00
$1.39
JOR
84.03
0.011901
$660.93
$7.87
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
Subtotal: MATERIALES
$18.45
$7.87
Costo directo
$26.31
INDIRECTO
0.1
$2.63
UTILIDADES
0.15
$3.95
COSTO TOTAL
$32.89
Concepto
MATERIALES
MMAL0050 MALLA ELECTROSOLDADATECNOMALLA
MALA0180 10/10
ALAMBRE RECOCIDO No. 18
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
M2
Unidad
Rend.
Cantidad
Costo
Importe
6X6- M2
0.00
1.050000
$16.56
$17.39
KG
0.00
0.107000
$13.00
$1.39
JOR
98.04
0.010200
$660.93
$6.74
$18.78
Subtotal: MATERIALES
Subtotal: MANO DE OBRA
$6.74
Costo directo
$25.52
INDIRECTO
0.1
UTILIDADES
0.15
COSTO TOTAL
ARM15X15 SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO ARMEX 15X15-4 EN ESTRUCTURA,
INCLUYE DESPERDICIO; ALTURA HASTA 3.00M, ACARREO MATERIAL PRIMERA ESTACION =
20 M
$2.55
$3.83
$31.90
M
Concepto
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18
KG
0.00
0.007300
$13.00
$0.09
MAAR0016
MT
0.00
1.130000
$19.00
$21.47
120.05
0.008330
$660.93
$5.51
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
$21.56
Subtotal: MATERIALES
Subtotal: MANO DE OBRA
$5.51
Costo directo
$27.07
INDIRECTO
0.1
UTILIDADES
0.15
$2.71
$4.06
COSTO TOTAL
$33.84
Concepto
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18
KG
0.00
0.007300
$13.00
$0.09
MAAR0017
MT
0.00
1.130000
$19.20
$21.70
120.05
0.008330
$660.93
$5.51
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
$21.79
Subtotal: MATERIALES
Subtotal: MANO DE OBRA
$5.51
Costo directo
$27.30
INDIRECTO
0.1
UTILIDADES
0.15
$2.73
$4.09
COSTO TOTAL
$34.12
Concepto
Unidad
Rend.
Cantidad
Costo
M
Importe
MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18
KG
0.00
0.009300
$13.00
$0.12
MARM0018
MT
0.00
1.130000
$20.00
$22.60
120.05
0.008330
$660.93
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
$5.51
Costo directo
$28.23
INDIRECTO
0.1
UTILIDADES
0.15
$2.82
$4.23
COSTO TOTAL
CUAD001
$35.28
Cdigo
MANO DE OBRA
$5.51
$22.72
Subtotal: MATERIALES
Concepto
JOR
Unidad
Rend.
Cantidad
Costo
Importe
MOMM01
PEON
JOR
EQUIPO Y HERRAMIENTA
%MO001
MANDOS INTERMEDIOS Y HERRAMIENTA MENOR. %MO
1.00
1.000000
$218.91
$218.91
7.69
0.130000
$218.91
$28.46
$218.91
$28.46
Costo directo
$247.37
INDIRECTO
0.1
$24.74
UTILIDADES
0.15
$37.11
COSTO TOTAL
CUAD005
$309.22
Cdigo
Concepto
MANO DE OBRA
MOMM01
PEON
JOR
Unidad
JOR
EQUIPO Y HERRAMIENTA
%MO001
MANDOS INTERMEDIOS Y HERRAMIENTA MENOR. %MO
Rend.
Cantidad
Costo
0.20
5.000000
$218.91
$1,094.57
7.69
0.130000
$1,094.57
$142.29
$1,094.57
$142.29
Costo directo
CUAD40
Importe
$1,236.86
INDIRECTO
0.1
UTILIDADES
0.15
$123.69
$185.53
COSTO TOTAL
$1,546.08
JOR
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
Importe
MANO DE OBRA
MOMM30
OFICIAL ALBANIL
JOR
1.00
1.000000
$365.98
$365.98
MOMM01
JOR
1.00
1.000000
$218.91
$218.91
7.69
0.130000
$584.89
$76.04
PEON
EQUIPO Y HERRAMIENTA
%MO001
MANDOS INTERMEDIOS Y HERRAMIENTA MENOR. %MO
Subtotal: MANO DE OBRA
$584.89
$76.04
Costo directo
$660.93
INDIRECTO
0.1
UTILIDADES
0.15
$66.09
$99.14
COSTO TOTAL
CUAD060
$826.16
Cdigo
Concepto
MANO DE OBRA
MOMM32
OFICIAL PINTOR
JOR
Unidad
JOR
EQUIPO Y HERRAMIENTA
%MO001
MANDOS INTERMEDIOS Y HERRAMIENTA MENOR. %MO
Subtotal: MANO DE OBRA
Subtotal: EQUIPO Y HERRAMIENTA
Costo directo
Rend.
Cantidad
Costo
Importe
1.00
1.000000
$365.98
$365.98
7.69
0.130000
$365.98
$47.58
$365.98
$47.58
$413.56
INDIRECTO
0.1
UTILIDADES
0.15
$41.36
$62.03
COSTO TOTAL
CFZAP
$516.95
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M2
Importe
MATERIALES
MMAD0049 MADERA DUELA DE PINO DE 1a. EN CONTACTO
PT
0.00
2.400000
$0.00
$0.00
MMAD0044
PT
0.00
1.050000
$0.00
$0.00
MCLA0021
KG
0.00
0.420000
$22.00
$9.24
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
7.97
0.125471
$660.93
$82.93
MATERIALES
MCOM0010 DIESEL
LT
0.00
0.780000
$20.00
$15.60
Subtotal: MATERIALES
$24.84
$82.93
Costo directo
$107.77
COSTO DIRECTO
0.1
UTILIDADES
$10.78
0.15
$16.17
COSTO TOTAL
CDADO
$134.71
Cdigo
Concepto
Unidad
Rend.
Cantidad
MATERIALES
MMAD0049 MADERA DUELA DE PINO DE 1a. EN CONTACTO
PT
0.00
2.930000
MMAD0044
PT
0.00
MCLA0021
KG
0.00
MCOM0010 DIESEL
LT
MALA0180
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
Costo
Importe
$0.00
$0.00
2.940000
$0.00
$0.00
0.320000
$22.00
$7.04
0.00
1.100000
$20.00
$22.00
KG
0.00
0.057000
$13.00
$0.74
JOR
7.97
0.125471
$660.93
$82.93
Subtotal: MATERIALES
$29.78
$82.93
Costo directo
$112.71
INDIRECTO
0.1
$11.27
UTILIDADES
0.15
$16.91
COSTO TOTAL
CCADE
M2
$140.89
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M2
Importe
MATERIALES
MMAD0044 MADERA PINO DE 3a.EN TABLON DE 11/2"X12"
PT
0.00
4.110000
$0.00
$0.00
MCLA0021
KG
0.00
0.490000
$22.00
$10.78
MALA0180
KG
0.00
0.860000
$13.00
$11.18
LT
0.00
0.600000
$20.00
$12.00
MCOM0010 DIESEL
MMAD0045
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
PT
JOR
0.00
6.310000
$0.00
$0.00
14.01
0.071378
$660.93
$47.18
Subtotal: MATERIALES
$33.96
$47.18
Costo directo
$81.14
INDIRECTO
0.1
$8.11
UTILIDADES
0.15
$12.17
COSTO TOTAL
CCAST
$101.42
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M2
Importe
MATERIALES
MMAD0044 MADERA PINO DE 3a.EN TABLON DE 11/2"X12"
PT
0.00
3.660000
$0.00
$0.00
MCLA0021
KG
0.00
0.134000
$22.00
$2.95
MALA0180
KG
0.00
0.860000
$13.00
$11.18
MCOM0010 DIESEL
LT
0.00
0.600000
$20.00
$12.00
MMAD0045
PT
0.00
1.970000
$0.00
$0.00
14.01
0.071378
$660.93
$47.18
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
Subtotal: MATERIALES
$26.13
$47.18
Costo directo
$73.30
INDIRECTO
0.1
$7.33
UTILIDADES
0.15
$11.00
COSTO TOTAL
$91.63
Concepto
Unidad
Rend.
Cantidad
Costo
M2
Importe
MATERIALES
MMAD0049 MADERA DUELA DE PINO DE 1a. EN CONTACTO
PT
0.00
2.759200
$0.00
$0.00
MMAD0045
PT
0.00
2.485900
$0.00
$0.00
MMAD0047
PT
0.00
1.630000
$0.00
$0.00
MCLA0021
KG
0.00
0.306500
$22.00
$6.74
MALA0180
KG
0.00
0.240200
$13.00
$3.12
MCOM0010 DIESEL
LT
0.00
0.610000
$20.00
$12.20
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
6.95
0.143885
$660.93
$95.10
Subtotal: MATERIALES
$22.07
$95.10
Costo directo
$117.16
INDIRECTO
0.1
UTILIDADES
0.15
COSTO TOTAL
$11.72
$17.57
$146.45
CCOL50X50 CIMBRA Y DESCIMBRA ACABADO COMN, CON DUELA EN COLUMNAS DE 50 X 50 CM. HASTA
UNA ALTURA DE 3.50 M. INCLUYE: MATERIALES Y MANO DE OBRA.
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M2
Importe
MATERIALES
MMAD0049 MADERA DUELA DE PINO DE 1a. EN CONTACTO
PT
0.00
2.570000
$0.00
$0.00
MMAD0045
PT
0.00
1.480000
$0.00
$0.00
MMAD0047
PT
0.00
0.806500
$0.00
$0.00
MCLA0021
KG
0.00
0.306500
$22.00
$6.74
MALA0180
KG
0.00
0.240200
$13.00
$3.12
MCOM0010 DIESEL
LT
0.00
0.610000
$20.00
$12.20
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
6.65
0.150376
$660.93
$99.39
Subtotal: MATERIALES
$22.07
$99.39
Costo directo
$121.45
INDIRECTO
0.1
UTILIDADES
0.15
$12.15
$18.22
COSTO TOTAL
$151.82
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.030500
$12.00
$0.37
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
1.33
0.751880
$660.93
$496.94
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.670000
$45.00
$30.15
0.00
0.250500
$18.56
$4.65
0.00
1.030000
$990.48
$1,020.20
BASICOS
ACR0009
FCO150R
Subtotal: MATERIALES
$0.37
$496.94
Subtotal: BASICOS
$1,054.99
Costo directo
$1,552.30
INDIRECTO
0.1
UTILIDADES
0.15
COSTO TOTAL
VDACAS200 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA 1 SACO, EN DALAS Y
CASTILLOS DE SECCIN >0.02 M2, FC=200 KG/CM2, RESISTENCIA NORMAL, TAMAO
MXIMO DE AGREGADO 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y MANO DE OBRA.
$155.23
$232.84
$1,940.37
M3
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.030500
$12.00
$0.37
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
1.33
0.751880
$660.93
$496.94
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.670000
$45.00
$30.15
0.00
0.250500
$18.56
$4.65
0.00
1.030000
$1,078.05
$1,110.39
BASICOS
ACR0009
FCO200R
Subtotal: MATERIALES
$0.37
$496.94
Subtotal: BASICOS
$1,145.19
Costo directo
$1,642.50
INDIRECTO
0.1
UTILIDADES
0.15
$164.25
$246.37
COSTO TOTAL
$2,053.12
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.030500
$12.00
$0.37
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
1.33
0.751880
$660.93
$496.94
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.670000
$45.00
$30.15
0.00
0.250500
$18.56
$4.65
0.00
1.030000
$1,169.75
$1,204.84
BASICOS
ACR0009
FCO200R
Subtotal: MATERIALES
$0.37
$496.94
Subtotal: BASICOS
$1,239.64
Costo directo
$1,736.95
INDIRECTO
0.1
$173.69
UTILIDADES
0.15
$260.54
COSTO TOTAL
VCL200
$2,171.18
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.030500
$12.00
$0.37
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
2.50
0.400000
$660.93
$264.37
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.670000
$45.00
$30.15
0.00
0.250500
$18.56
$4.65
0.00
1.030000
$1,078.05
$1,110.39
BASICOS
ACR0009
FCO200R
Subtotal: MATERIALES
$0.37
$264.37
Subtotal: BASICOS
$1,145.19
Costo directo
$1,409.93
INDIRECTO
0.1
UTILIDADES
0.15
$140.99
$211.49
COSTO TOTAL
VCL250
$1,762.41
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.030500
$12.00
$0.37
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
2.50
0.400000
$660.93
$264.37
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.670000
$45.00
$30.15
0.00
0.250500
$18.56
$4.65
0.00
1.030000
$1,169.75
$1,204.84
BASICOS
ACR0009
FCO250R
Subtotal: MATERIALES
$0.37
$264.37
Subtotal: BASICOS
$1,239.64
Costo directo
$1,504.38
INDIRECTO
0.1
UTILIDADES
0.15
$150.44
$225.66
COSTO TOTAL
VZTL150
$1,880.47
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.025500
$12.00
$0.31
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
3.24
0.308642
$660.93
$203.99
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.670000
$45.00
$30.15
0.00
0.250500
$18.56
$4.65
0.00
1.030000
$990.48
$1,020.20
BASICOS
ACR0009
FCO150R
Subtotal: MATERIALES
$0.31
$203.99
Subtotal: BASICOS
$1,054.99
Costo directo
$1,259.29
INDIRECTO
0.1
UTILIDADES
0.15
$125.93
$188.89
COSTO TOTAL
VZTL200
$1,574.11
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.025500
$12.00
$0.31
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
3.24
0.308642
$660.93
$203.99
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.670000
$45.00
$30.15
0.00
0.250500
$18.56
$4.65
BASICOS
ACR0009
FCO200R
0.00
1.030000
$1,078.05
$1,110.39
Subtotal: MATERIALES
$0.31
$203.99
Subtotal: BASICOS
$1,145.19
Costo directo
$1,349.49
INDIRECTO
0.1
UTILIDADES
0.15
$134.95
$202.42
COSTO TOTAL
VZTL250
$1,686.86
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.025500
$12.00
$0.31
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
3.24
0.308642
$660.93
$203.99
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.670000
$45.00
$30.15
0.00
0.250500
$18.56
$4.65
0.00
1.030000
$1,169.75
$1,204.84
BASICOS
ACR0009
FCO250R
Subtotal: MATERIALES
$0.31
$203.99
Subtotal: BASICOS
$1,239.64
Costo directo
$1,443.94
INDIRECTO
0.1
UTILIDADES
0.15
$144.39
$216.59
COSTO TOTAL
VCOL150
$1,804.92
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.025500
$12.00
$0.31
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
3.10
0.322581
$660.93
$213.20
SUBCONTRATOS
VAGA001
BASICOS
ACR0009
FCO150R
HR
0.00
0.510000
$45.00
$22.95
0.00
0.250500
$18.56
$4.65
0.00
1.030000
$990.48
$1,020.20
Subtotal: MATERIALES
$0.31
$213.20
Subtotal: BASICOS
$1,047.79
Costo directo
$1,261.30
INDIRECTO
0.1
UTILIDADES
0.15
$126.13
$189.20
COSTO TOTAL
VCOL200
$1,576.63
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.025500
$12.00
$0.31
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
3.10
0.322581
$660.93
$213.20
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.510000
$45.00
$22.95
0.00
0.250500
$18.56
$4.65
0.00
1.030000
$1,078.05
$1,110.39
BASICOS
ACR0009
FCO200R
Subtotal: MATERIALES
$0.31
$213.20
Subtotal: BASICOS
$1,137.99
Costo directo
$1,351.50
INDIRECTO
0.1
UTILIDADES
0.15
$135.15
$202.72
COSTO TOTAL
VCOL250
Cdigo
$1,689.37
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.025500
$12.00
$0.31
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
3.10
0.322581
$660.93
$213.20
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.510000
$45.00
$22.95
0.00
0.250500
$18.56
$4.65
0.00
1.030000
$1,169.75
$1,204.84
BASICOS
ACR0009
FCO250R
Subtotal: MATERIALES
$0.31
$213.20
Subtotal: BASICOS
$1,232.44
Costo directo
$1,445.95
INDIRECTO
0.1
UTILIDADES
0.15
$144.60
$216.89
COSTO TOTAL
$1,807.44
Anlisis: VTRABE200
Unidad: M3
VTRABE200 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN TRABES
AISLADAS DE SUPERESTRUCTURA, FC=200 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE:
VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL,
MATERIALES Y MANO DE OBRA.
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.025500
$12.00
$0.31
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
3.10
0.322581
$660.93
$213.20
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.510000
$45.00
$22.95
0.00
0.250500
$18.56
$4.65
0.00
1.030000
$1,078.05
$1,110.39
BASICOS
ACR0009
FCO200R
Subtotal: MATERIALES
$0.31
$213.20
Subtotal: BASICOS
$1,137.99
Costo directo
$1,351.50
INDIRECTO
0.1
UTILIDADES
0.15
COSTO TOTAL
$135.15
$202.72
$1,689.37
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.025500
$12.00
$0.31
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
3.10
0.322581
$660.93
$213.20
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.510000
$45.00
$22.95
0.00
0.250500
$18.56
$4.65
0.00
1.030000
$1,169.75
$1,204.84
BASICOS
ACR0009
FCO250R
Subtotal: MATERIALES
$0.31
$213.20
Subtotal: BASICOS
$1,232.44
Costo directo
$1,445.95
INDIRECTO
0.1
UTILIDADES
0.15
$144.60
$216.89
COSTO TOTAL
$1,807.44
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.025500
$12.00
$0.31
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
2.50
0.400000
$660.93
$264.37
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.510000
$45.00
$22.95
0.00
0.250500
$18.56
$4.65
0.00
1.030000
$990.48
$1,020.20
BASICOS
ACR0009
FCO150R
Subtotal: MATERIALES
Subtotal: MANO DE OBRA
$0.31
$264.37
Subtotal: BASICOS
$1,047.79
Costo directo
$1,312.47
INDIRECTO
0.1
UTILIDADES
0.15
$131.25
$196.87
COSTO TOTAL
$1,640.59
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.025500
$12.00
$0.31
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
2.50
0.400000
$660.93
$264.37
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.510000
$45.00
$22.95
0.00
0.250500
$18.56
$4.65
0.00
1.030000
$1,078.05
$1,110.39
BASICOS
ACR0009
FCO200R
Subtotal: MATERIALES
$0.31
$264.37
Subtotal: BASICOS
$1,137.99
Costo directo
$1,402.67
INDIRECTO
0.1
UTILIDADES
0.15
$140.27
$210.40
COSTO TOTAL
$1,753.33
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.025500
$12.00
$0.31
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
2.50
0.400000
$660.93
$264.37
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.510000
$45.00
$22.95
0.00
0.250500
$18.56
$4.65
BASICOS
ACR0009
FCO250R
0.00
1.030000
$1,169.75
$1,204.84
Subtotal: MATERIALES
$0.31
$264.37
Subtotal: BASICOS
$1,232.44
Costo directo
$1,497.12
INDIRECTO
0.1
UTILIDADES
0.15
$149.71
$224.57
COSTO TOTAL
$1,871.40
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.030500
$12.00
$0.37
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
3.24
0.308642
$660.93
$203.99
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.670000
$45.00
$30.15
0.00
1.030000
$884.23
$910.75
0.00
0.250500
$18.56
$4.65
BASICOS
FCO100R
ACR0009
Subtotal: MATERIALES
$0.37
$203.99
Subtotal: BASICOS
$945.55
Costo directo
$1,149.91
INDIRECTO
0.1
$114.99
UTILIDADES
0.15
$172.49
COSTO TOTAL
$1,437.39
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.030500
$12.00
$0.37
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
3.24
0.308642
$660.93
$203.99
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.670000
$45.00
$30.15
BASICOS
FCO150R
0.00
1.030000
$990.48
$1,020.20
ACR0009
0.00
0.250500
$18.56
$4.65
Subtotal: MATERIALES
$0.37
$203.99
Subtotal: BASICOS
$1,054.99
Costo directo
$1,259.35
INDIRECTO
0.1
$125.94
UTILIDADES
0.15
$188.90
COSTO TOTAL
$1,574.19
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.030500
$12.00
$0.37
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
3.24
0.308642
$660.93
$203.99
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
HR
0.00
0.670000
$45.00
$30.15
0.00
1.030000
$1,078.05
$1,110.39
0.00
0.250500
$18.56
$4.65
BASICOS
FCO200R
ACR0009
Subtotal: MATERIALES
$0.37
$203.99
Subtotal: BASICOS
$1,145.19
Costo directo
$1,349.55
INDIRECTO
0.1
$134.95
UTILIDADES
0.15
$202.43
COSTO TOTAL
$1,686.93
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010 AGUA
M3
0.00
0.030500
$12.00
$0.37
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
3.24
0.308642
$660.93
$203.99
SUBCONTRATOS
VAGA001
VIBRADOR PARA CONCRETO DYNAPAC INC.OP.
BASICOS
FCO250R
ACR0009
HR
0.00
0.670000
$45.00
$30.15
0.00
1.030000
$1,169.75
$1,204.84
0.00
0.250500
$18.56
$4.65
Subtotal: MATERIALES
$0.37
$203.99
Subtotal: BASICOS
$1,239.64
Costo directo
$1,444.00
INDIRECTO
0.1
UTILIDADES
0.15
COSTO TOTAL
$144.40
$216.60
$1,805.00
Cdigo
Concepto
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
1.50
0.666667
Costo
$247.37
$164.92
$164.92
INDIRECTO
0.1
UTILIDADES
0.15
$16.49
$24.74
COSTO TOTAL
$206.14
m3
Cdigo
Concepto
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
0.60
1.666667
Costo
$247.37
Importe
$412.29
$412.29
Costo directo
DEM0004
Importe
$164.92
Costo directo
DEM0002
m3
$412.29
INDIRECTO
0.1
$41.23
UTILIDADES
0.15
$61.84
COSTO TOTAL
$515.36
m3
Cdigo
Concepto
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
Costo
Importe
JOR
5.50
0.181818
$247.37
$44.98
0.00
0.181810
$50.00
$9.09
BASICOS
CYA0001B
$44.98
Subtotal: BASICOS
$9.09
Costo directo
$54.07
INDIRECTO
0.1
UTILIDADES
0.15
$5.41
$8.11
COSTO TOTAL
DEM0009
Cdigo
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
BASICOS
$67.58
JOR
12.50
0.080000
$247.37
m2
Importe
$19.79
CYA0001B
0.00
0.080000
$50.00
$19.79
Subtotal: BASICOS
$4.00
Costo directo
$23.79
INDIRECTO
0.1
UTILIDADES
0.15
$2.38
$3.57
COSTO TOTAL
DEM0010
$29.74
Cdigo
$4.00
Concepto
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
Costo
M2
Importe
JOR
6.50
0.153846
$247.37
$38.06
0.00
0.076920
$50.00
$3.85
BASICOS
CYA0001B
$38.06
Subtotal: BASICOS
$3.85
Costo directo
$41.90
INDIRECTO
0.1
UTILIDADES
0.15
$4.19
$6.29
COSTO TOTAL
DEM0014
$52.38
Cdigo
Concepto
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
Costo
M3
Importe
JOR
0.65
1.538462
$247.37
$380.57
0.00
1.530000
$50.00
$76.50
BASICOS
CYA0001B
$380.57
Subtotal: BASICOS
$76.50
Costo directo
DEM0020
Cdigo
$457.07
INDIRECTO
0.1
UTILIDADES
0.15
$45.71
$68.56
COSTO TOTAL
$571.34
M2
Concepto
Costo
Importe
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
JOR
16.67
0.059988
$247.37
$14.84
Costo directo
$14.84
INDIRECTO
0.1
UTILIDADES
0.15
$1.48
$2.23
COSTO TOTAL
DEM0022
$18.55
Cdigo
Concepto
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
7.52
0.132979
Costo
$247.37
Importe
$32.90
$32.90
INDIRECTO
0.1
$3.29
UTILIDADES
0.15
$4.93
COSTO TOTAL
Cdigo
M2
$32.90
Costo directo
DEM0028
$14.84
$41.12
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
M2
Importe
JOR
25.00
0.040000
$247.37
$9.89
0.00
0.040000
$50.00
$2.00
BASICOS
CYA0001B
$9.89
Subtotal: BASICOS
$2.00
Costo directo
$11.89
INDIRECTO
0.1
UTILIDADES
0.15
$1.19
$1.78
COSTO TOTAL
DEM0029
$14.87
DEMOLICION A MANO DE FALSO PLAFON DE YESO, SIN INCLUIR ACARREOS, HASTA 2.50 M
DE ALTURA.
Cdigo
Concepto
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
Costo
M2
Importe
JOR
19.00
0.052632
$247.37
$13.02
0.00
0.052630
$50.00
$2.63
BASICOS
CYA0001B
$13.02
$2.63
Costo directo
$15.65
INDIRECTO
0.1
$1.57
UTILIDADES
0.15
$2.35
COSTO TOTAL
DEM0043
$19.56
Cdigo
Concepto
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
22.22
0.045005
Costo
$247.37
$11.13
$11.13
INDIRECTO
0.1
UTILIDADES
0.15
$1.11
$1.67
$13.92
LIMPIEZA DEL TERRENO PLANO A MANO, INCLUYE: APILE DEL MATERIAL EN EL LUGAR Y
ACARREO DEL MISMO A 1a. ESTACIN DE 20 M.
Concepto
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
27.03
0.036996
Costo
$247.37
M2
Importe
$9.15
$9.15
Costo directo
$9.15
INDIRECTO
0.1
UTILIDADES
0.15
$0.92
$1.37
COSTO TOTAL
$11.44
EXCAVACIN A MANO DE CEPAS PARA CIMENTACIN, EN SUELO TIPO II, HASTA UNA
ALTURA DE CEPA DE 2.00 M. NO INCLUYE ACARREO.
Cdigo
Concepto
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
2.78
0.359712
Costo
$247.37
M3
Importe
$88.98
$88.98
Costo directo
LTZ0005
$11.13
Costo directo
Cdigo
EXC0001
Importe
COSTO TOTAL
LTZ0001
M2
$88.98
INDIRECTO
0.1
$8.90
UTILIDADES
0.15
$13.35
COSTO TOTAL
$111.23
TRAZO Y NIVELACIN POR MEDIOS MANUALES DEL TERRENO PLANO, PARA DESPLANTE
DE ESTRUCTURAS, ESTABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS.
INCLUYE:MATERIALES Y MANO DE OBRA.
M2
Cdigo
Concepto
Costo
Importe
MATERIALES
MMAD0045
PT
0.00
0.027000
$0.00
$0.00
MCEM0050
CALHIDRA
TON
0.00
0.000250 $1,680.00
$0.42
MDUE0001
PT
0.00
0.018000
$0.00
$0.00
ML
0.00
0.350000
$0.00
$0.00
MHIL0001
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
100.00
0.010000
$660.93
Subtotal: MATERIALES
$0.42
$6.61
Costo directo
$7.03
INDIRECTO
0.1
$0.70
UTILIDADES
0.15
$1.05
COSTO TOTAL
CIM0001
$6.61
$8.79
CIMENTACION DE MANPOSTERIA DE PIEDRA BRAZA ASENTADA CON MEZCLA MORTERO ARENA EN PROPORCION 1:5, SEC. 60,30 X 80 CM. INCLUYE ACARREO DE MATERIAL A 1
ESTACION A 20 M. DE DISTANCIA HORIZONTAL.
Cdigo
Concepto
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
Costo
M3
Importe
JOR
2.75
0.363636
$660.93
$240.34
M3
0.00
0.325500
$604.70
$196.83
0.00
1.200000
$32.00
$38.40
BASICOS
MEZ0002
SUBCONTRATOS
ACR0082A
ACARREO EN CAMION A PRIMER KILOMETRO, MEDIDO M3
EN BANCO ABUNDAMIENTO 1.22, INCLUYE CARGA A
MANO MATERIAL SUELTO.
Subtotal: MANO DE OBRA
$240.34
Subtotal: BASICOS
$196.83
Subtotal: SUBCONTRATOS
$38.40
Costo directo
$475.57
INDIRECTO
0.1
UTILIDADES
0.15
$47.56
$71.34
COSTO TOTAL
$594.46
Concepto
Costo
M3
Importe
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
JOR
4.35
0.229885
$247.37
$56.87
SUBCONTRATOS
BAI0001
COMPACTADOR BAILARINA
HR
0.00
0.300000
$46.13
$13.84
$56.87
Costo directo
$70.71
INDIRECTO
0.1
$7.07
UTILIDADES
0.15
$10.61
COSTO TOTAL
$88.38
Concepto
MANO DE OBRA
CUAD001
CUADRILLA 001 (1 PEON)
4.35
0.229885
Costo
$247.37
M3
Importe
$56.87
$56.87
Costo directo
$56.87
INDIRECTO
0.1
UTILIDADES
0.15
$5.69
$8.53
COSTO TOTAL
$71.08
CAST001V CASTILLO CON SECCION DE 15X15 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM,
CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.077000
$13.00
$1.00
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
10.84
0.092251
$660.93
$60.97
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.092251
$50.00
$4.61
AREF3
0.00
0.002340 $19,092.43
$44.68
AREF2
0.00
0.001000 $19,910.80
$19.91
CCAST
0.00
0.300000
$73.30
$21.99
VDACAS150
0.00
0.022500 $1,552.30
$34.93
BASICOS
Subtotal: MATERIALES
$1.00
$60.97
Subtotal: BASICOS
$126.12
Costo directo
$188.09
INDIRECTO
0.1
UTILIDADES
0.15
$18.81
$28.21
COSTO TOTAL
$235.11
CAST002V CASTILLO CON SECCION DE 15X15 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM,
CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
SUBCONTRATOS
KG
0.00
0.077000
$13.00
$1.00
JOR
10.84
0.092251
$660.93
$60.97
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.092251
$50.00
$4.61
AREF3
0.00
0.002340 $19,092.43
$44.68
AREF2
0.00
0.001000 $19,910.80
$19.91
CCAST
0.00
0.300000
$73.30
$21.99
VDACAS200
0.00
0.022500 $1,642.50
$36.96
BASICOS
Subtotal: MATERIALES
$1.00
$60.97
Subtotal: BASICOS
$128.15
Costo directo
$190.12
INDIRECTO
0.1
$19.01
UTILIDADES
0.15
$28.52
COSTO TOTAL
$237.65
CAST003V CASTILLO CON SECCION DE 15X15 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM,
CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.077000
$13.00
$1.00
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
10.84
0.092251
$660.93
$60.97
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.092251
$50.00
$4.61
AREF3
0.00
0.002340 $19,092.43
$44.68
AREF2
0.00
0.001000 $19,910.80
$19.91
CCAST
0.00
0.300000
$21.99
BASICOS
$73.30
VDACAS250
0.00
0.022500 $1,736.95
Subtotal: MATERIALES
$1.00
$60.97
Subtotal: BASICOS
$130.27
Costo directo
$192.24
INDIRECTO
0.1
UTILIDADES
0.15
$19.22
$28.84
COSTO TOTAL
$240.31
CAST004V CASTILLO CON SECCION DE 15X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM,
CON CIMBRA COMN 2 CARAS.
Cdigo
$39.08
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$13.00
$1.69
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
9.79
0.102145
$660.93
$67.51
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.102145
$50.00
$5.11
AREF3
0.00
0.002520 $19,092.43
$48.11
AREF2
0.00
0.001680 $19,910.80
$33.45
CCAST
0.00
0.350000
$73.30
$25.66
VDACAS150
0.00
0.030000 $1,552.30
$46.57
BASICOS
Subtotal: MATERIALES
$1.69
$67.51
Subtotal: BASICOS
$158.90
Costo directo
$228.10
INDIRECTO
0.1
UTILIDADES
0.15
COSTO TOTAL
$22.81
$34.21
$285.12
CAST005V CASTILLO CON SECCION DE 15X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM,
CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$13.00
$1.69
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
9.79
0.102145
$660.93
$67.51
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.102145
$50.00
$5.11
AREF3
0.00
0.002520 $19,092.43
$48.11
AREF2
0.00
0.001680 $19,910.80
$33.45
CCAST
0.00
0.350000
$73.30
$25.66
VDACAS200
0.00
0.030000 $1,642.50
$49.27
BASICOS
Subtotal: MATERIALES
$1.69
$67.51
Subtotal: BASICOS
$161.60
Costo directo
$230.80
INDIRECTO
0.1
UTILIDADES
0.15
$23.08
$34.62
COSTO TOTAL
$288.50
CAST010V CASTILLO CON SECCION DE 15X30 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM,
CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$13.00
$1.69
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
9.64
0.103734
$660.93
$68.56
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.103734
$50.00
$5.19
0.00
0.002300 $19,092.43
$43.91
BASICOS
AREF3
AREF2
0.00
0.001300 $19,910.80
$25.88
CCAST
0.00
0.600000
$73.30
$43.98
VDACAS250
0.00
0.046350 $1,736.95
$80.51
Subtotal: MATERIALES
$1.69
$68.56
Subtotal: BASICOS
$199.47
Costo directo
$269.72
INDIRECTO
0.1
$26.97
UTILIDADES
0.15
$40.46
COSTO TOTAL
CSAT006V
$337.16
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$13.00
$1.69
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
9.79
0.102145
$660.93
$67.51
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.102145
$50.00
$5.11
AREF3
0.00
0.002520 $19,092.43
$48.11
AREF2
0.00
0.001680 $19,910.80
$33.45
CCAST
0.00
0.350000
$73.30
$25.66
VDACAS250
0.00
0.030000 $1,736.95
$52.11
BASICOS
Subtotal: MATERIALES
Subtotal: MANO DE OBRA
$1.69
$67.51
Subtotal: BASICOS
$164.44
Costo directo
$233.64
INDIRECTO
0.15
UTILIDADES
0.1
$35.05
$23.36
COSTO TOTAL
$292.04
CAST007V CASTILLO CON SECCION DE 20X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM,
CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$13.00
$1.69
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
8.74
0.114416
$660.93
$75.62
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.114416
$50.00
$5.72
AREF3
0.00
0.002520 $19,092.43
$48.11
AREF2
0.00
0.001800 $19,910.80
$35.84
CCAST
0.00
0.400000
$73.30
$29.32
VDACAS150
0.00
0.040000 $1,552.30
$62.09
BASICOS
Subtotal: MATERIALES
$1.69
$75.62
Subtotal: BASICOS
$181.09
Costo directo
$258.40
INDIRECTO
0.15
UTILIDADES
0.1
$38.76
$25.84
COSTO TOTAL
$323.00
CAST008V CASTILLO CON SECCION DE 20X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM,
CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
SUBCONTRATOS
KG
0.00
0.130000
$2.52
$0.33
JOR
8.74
0.114416
$655.40
$74.99
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.114416
$0.00
$0.00
AREF3
0.00
0.002520 $6,278.58
$15.82
AREF2
0.00
0.001800 $8,783.46
$15.81
CCAST
0.00
0.400000
$65.92
$26.37
VDACAS200
0.00
0.040000
$773.81
$30.95
BASICOS
Subtotal: MATERIALES
$0.33
$74.99
Subtotal: BASICOS
$88.95
Costo directo
$164.27
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$164.27
CAST009V CASTILLO CON SECCION DE 20X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM,
CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
8.74
0.114416
$655.40
$74.99
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.114416
$0.00
$0.00
AREF3
0.00
0.002520 $6,278.58
$15.82
AREF2
0.00
0.001800 $8,783.46
$15.81
CCAST
0.00
0.400000
$26.37
BASICOS
$65.92
VDACAS250
0.00
0.040000
$773.81
Subtotal: MATERIALES
$30.95
$0.33
$74.99
Subtotal: BASICOS
$88.95
Costo directo
$164.27
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$164.27
DALA001A DALA CON SECCION DE 15X15 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X15-4, CON CIMBRA COMN 2
CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
MARM0018
MT
0.00
1.030000
$4.65
$4.79
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
12.76
0.078370
$655.40
$51.36
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.078370
$0.00
$0.00
BASICOS
CCADE
0.00
0.300000
$80.65
$24.20
VDACAS150
0.00
0.022500
$759.21
$17.08
Subtotal: MATERIALES
$5.12
$51.36
Subtotal: BASICOS
$41.28
Costo directo
$97.76
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$97.76
DALA002A DALA CON SECCION DE 15X15 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X15-4, CON CIMBRA COMN 2
CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
MANO DE OBRA
KG
0.00
0.130000
$2.52
$0.33
CUAD040
JOR
12.76
0.078370
$655.40
$51.36
PZA
0.00
0.078370
$0.00
$0.00
MT
0.00
1.030000
$4.65
$4.79
CCADE
0.00
0.300000
$80.65
$24.20
VDACAS200
0.00
0.022500
$773.81
$17.41
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
MATERIALES
MARM0018
BASICOS
Subtotal: MATERIALES
$5.12
$51.36
Subtotal: BASICOS
$41.61
Costo directo
$98.09
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$98.09
DALA003A DALA CON SECCION DE 15X15 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X15-4, CON CIMBRA COMN 2
CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
12.76
0.078370
$655.40
$51.36
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.078370
$0.00
$0.00
MT
0.00
1.030000
$4.65
$4.79
CCADE
0.00
0.300000
$80.65
$24.20
VDACAS250
0.00
0.022500
$773.81
$17.41
MATERIALES
MARM0018
BASICOS
Subtotal: MATERIALES
$5.12
$51.36
Subtotal: BASICOS
$41.61
Costo directo
$98.09
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$98.09
DALA004A DALA CON SECCION DE 15X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2
CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
12.12
0.082508
$655.40
$54.08
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.082508
$0.00
$0.00
MT
0.00
1.030000
$4.65
$4.79
CCADE
0.00
0.350000
$80.65
$28.23
VDACAS150
0.00
0.030000
$759.21
$22.78
MATERIALES
MARM0018
BASICOS
Subtotal: MATERIALES
$5.12
$54.08
Subtotal: BASICOS
$51.01
Costo directo
$110.21
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$110.21
DALA005A DALA CON SECCION DE 15X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2
CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
12.12
0.082508
$655.40
$54.08
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.082508
$0.00
$0.00
MT
0.00
1.030000
$4.65
$4.79
0.00
0.350000
$80.65
$28.23
MATERIALES
MARM0018
BASICOS
CCADE
VDACAS200
0.00
0.030000
$773.81
Subtotal: MATERIALES
$23.21
$5.12
$54.08
Subtotal: BASICOS
$51.44
Costo directo
$110.64
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$110.64
DALA006A DALA CON SECCION DE 15X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2
CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
12.12
0.082508
$655.40
$54.08
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.082508
$0.00
$0.00
MT
0.00
1.030000
$4.65
$4.79
CCADE
0.00
0.350000
$80.65
$28.23
VDACAS250
0.00
0.030000
$773.81
$23.21
MATERIALES
MARM0018
BASICOS
Subtotal: MATERIALES
$5.12
$54.08
Subtotal: BASICOS
$51.44
Costo directo
$110.64
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$110.64
DALA007A DALA CON SECCION DE 20X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2
CARAS.
Cdigo
MATERIALES
Concepto
Costo
Importe
MALA0180
KG
0.00
0.130000
$2.52
$0.33
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
11.48
0.087108
$655.40
$57.09
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.087108
$0.00
$0.00
MT
0.00
1.030000
$4.65
$4.79
CCADE
0.00
0.400000
$80.65
$32.26
VDACAS150
0.00
0.040000
$759.21
$30.37
MATERIALES
MARM0018
BASICOS
Subtotal: MATERIALES
$5.12
$57.09
Subtotal: BASICOS
$62.63
Costo directo
$124.84
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$124.84
DALA008A DALA CON SECCION DE 20X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2
CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
11.48
0.087108
$655.40
$57.09
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.087108
$0.00
$0.00
MT
0.00
1.030000
$4.65
$4.79
CCADE
0.00
0.400000
$80.65
$32.26
VDACAS200
0.00
0.040000
$773.81
$30.95
MATERIALES
MARM0018
BASICOS
Subtotal: MATERIALES
Subtotal: MANO DE OBRA
$5.12
$57.09
Subtotal: BASICOS
$63.21
Costo directo
$125.42
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$125.42
DALA009A DALA CON SECCION DE 20X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2
CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
11.48
0.087108
$655.40
$57.09
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.087108
$0.00
$0.00
MT
0.00
1.030000
$4.65
$4.79
CCADE
0.00
0.400000
$80.65
$32.26
VDACAS250
0.00
0.040000
$773.81
$30.95
MATERIALES
MARM0018
BASICOS
Subtotal: MATERIALES
$5.12
$57.09
Subtotal: BASICOS
$63.21
Costo directo
$125.42
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$125.42
PLA05-100 PLANTILLA DE CONCRETO SIMPLE F`C =100 KG/CM2, RESISTENCIA NORMAL, DE 5 CM.
ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) INCLYE: MATERIALES Y MANO DE OBRA.
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MAGU0010
AGUA
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
M3
JOR
0.00
0.070500
$2.21
$0.16
20.00
0.050000
$655.40
$32.77
0.00
0.051500
$236.89
$12.20
BASICOS
FCO100R
Subtotal: MATERIALES
Subtotal: MANO DE OBRA
$0.16
$32.77
Subtotal: BASICOS
$12.20
Costo directo
$45.13
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
PIS05-100
$45.13
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MAGU0010
AGUA
M3
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
0.00
0.070500
$2.21
$0.16
15.00
0.066667
$655.40
$43.69
BASICOS
ACR0012
0.00
0.051500
$46.82
$2.41
FCO100R
0.00
0.051500
$236.89
$12.20
PSO0001
0.00
1.000000
$14.98
$14.98
M2
Subtotal: MATERIALES
$0.16
$43.69
Subtotal: BASICOS
$29.59
Costo directo
$73.44
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
PIS05-150
$73.44
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MAGU0010
AGUA
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
M3
JOR
0.00
0.070500
$2.21
$0.16
15.00
0.066667
$655.40
$43.69
BASICOS
ACR0012
0.00
0.051500
$46.82
$2.41
FCO150R
0.00
0.051500
$254.12
$13.09
PSO0001
0.00
1.000000
$14.98
$14.98
Subtotal: MATERIALES
M2
$0.16
$43.69
Subtotal: BASICOS
$30.48
Costo directo
$74.33
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
PIS08-150
$74.33
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MAGU0010
AGUA
M3
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
0.00
0.070500
$2.21
$0.16
15.00
0.066667
$655.40
$43.69
BASICOS
ACR0012
0.00
0.082400
$46.82
$3.86
FCO150R
0.00
0.082400
$254.12
$20.94
PSO0001
0.00
1.000000
$14.98
$14.98
M2
Subtotal: MATERIALES
$0.16
$43.69
Subtotal: BASICOS
$39.78
Costo directo
$83.63
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
PIS08-200
$83.63
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MAGU0010
AGUA
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
M3
JOR
0.00
0.070500
$2.21
$0.16
15.00
0.066667
$655.40
$43.69
BASICOS
ACR0012
0.00
0.084000
$46.82
$3.93
FCO200R
0.00
0.082400
$268.29
$22.11
PSO0001
M2
0.00
1.000000
$14.98
$14.98
Subtotal: MATERIALES
$0.16
$43.69
Subtotal: BASICOS
$41.02
Costo directo
$84.87
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
PIS10-150
$84.87
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MAGU0010
AGUA
M3
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
0.00
0.070500
$2.21
$0.16
15.00
0.066667
$655.40
$43.69
BASICOS
ACR0012
0.00
0.103000
$46.82
$4.82
FCO150R
0.00
0.103000
$254.12
$26.17
PSO0001
0.00
1.000000
$14.98
$14.98
M2
Subtotal: MATERIALES
$0.16
$43.69
Subtotal: BASICOS
$45.97
Costo directo
$89.82
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
PIS10-200
$89.82
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MAGU0010
AGUA
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
M3
JOR
0.00
0.070500
$2.21
$0.16
15.00
0.066667
$655.40
$43.69
BASICOS
ACR0012
0.00
0.103000
$46.82
$4.82
FCO200R
0.00
0.103000
$268.29
$27.63
PSO0001
0.00
1.000000
$14.98
$14.98
M2
Subtotal: MATERIALES
$0.16
$43.69
Subtotal: BASICOS
$47.43
Costo directo
$91.28
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
PIS15-150
$91.28
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MAGU0010
AGUA
M3
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
0.00
0.070500
$2.21
$0.16
12.00
0.083333
$655.40
$54.62
BASICOS
ACR0012
0.00
0.153000
$46.82
$7.16
FCO150R
0.00
0.153000
$254.12
$38.88
PSO0001
0.00
1.000000
$14.98
$14.98
M2
Subtotal: MATERIALES
$0.16
$54.62
Subtotal: BASICOS
$61.02
Costo directo
$115.80
INDIRECTO
$0.00
UTILIDADES
PIS15-200
$0.00
COSTO TOTAL
$115.80
M2
Cdigo
Concepto
Costo
Importe
MATERIALES
MAGU0010
AGUA
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
M3
JOR
0.00
0.070500
$2.21
$0.16
12.00
0.083333
$655.40
$54.62
BASICOS
ACR0012
0.00
0.153000
$46.82
$7.16
FCO200R
0.00
0.153000
$268.29
$41.05
PSO0001
M2
0.00
1.000000
$14.98
Subtotal: MATERIALES
$0.16
$54.62
Subtotal: BASICOS
$63.19
Costo directo
MURLAD7
$14.98
$117.97
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$117.97
M2
Cdigo
Concepto
Costo
Importe
MATERIALES
MTAB0070
MILL
0.00
0.031500 $1,800.00
MAGU0010
AGUA
M3
0.00
0.024000
$2.21
$0.05
$56.70
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
12.00
0.083333
$655.40
$54.62
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.083000
$0.00
$0.00
M3
0.00
0.011600
$355.96
$4.13
BASICOS
MEZ0011
$56.75
$54.62
Subtotal: BASICOS
$4.13
Costo directo
$115.50
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$115.50
MURLAD14 MURO DE TABIQUE ROJO RECOCIDO DE 71428 CM. DE 14 CM. DE ESP. ASENTADO CON
MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN HASTA UNA
ALTURA DE 3.5 M.
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MTAB0070
MAGU0010
MILL
0.00
0.048000 $1,800.00
AGUA
M3
0.00
0.048000
$2.21
$0.11
$86.40
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
10.00
0.100000
$655.40
$65.54
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.056625
$0.00
$0.00
M3
0.00
0.040000
$355.96
$14.24
BASICOS
MEZ0011
$86.51
$65.54
Subtotal: BASICOS
Costo directo
$14.24
$166.29
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$166.29
MURLAD28 MURO DE TABIQUE ROJO RECOCIDO DE 71428 CM. DE 28 CM. DE ESP. ASENTADO CON
MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN HASTA UNA
ALTURA DE 3.5 M.
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MTAB0070
MILL
0.00
0.086000 $1,800.00
MAGU0010
AGUA
M3
0.00
0.086000
$2.21
$154.80
$0.19
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
6.49
0.154083
$655.40
$100.99
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.056625
$0.00
$0.00
M3
0.00
0.055000
$355.96
$19.58
BASICOS
MEZ0011
$154.99
$100.93
Subtotal: BASICOS
$19.58
Costo directo
$275.50
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$275.50
Concepto
Costo
M2
Importe
MATERIALES
MTAB0090
MILL
0.00
0.024000 $1,280.10
$30.72
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
10.00
0.100000
$655.40
$65.54
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
1.000000
$0.00
$0.00
M3
0.00
0.018600
$355.96
$6.62
BASICOS
MEZ0011
$30.72
$65.54
Subtotal: BASICOS
$6.62
Costo directo
$102.88
INDIRECTO
$10.29
UTILIDADES
$10.29
COSTO TOTAL
MURTAB14 MURO DE TABICN DE CONCRETO LIGERO DE 101428 DE 14 CM. DE ESP. ASENTADO
CON MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN HASTA
UNA ALTURA DE 3.5 M.
$0.00
M2
Cdigo
Concepto
Costo
Importe
MATERIALES
MTAB0090
MILL
0.00
0.033000 $1,280.10
$42.24
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
10.00
0.100000
$655.40
$65.54
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
1.000000
$0.00
$0.00
M3
0.00
0.031800
$355.96
$11.32
BASICOS
MEZ0011
$42.24
$65.54
Subtotal: BASICOS
$11.32
Costo directo
$119.10
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$119.10
Concepto
Costo
M2
Importe
MATERIALES
MTAB0090
MILL
0.00
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
0.062000 $1,280.10
$79.37
JOR
10.00
0.100000
$655.40
$65.54
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
1.000000
$0.00
$0.00
M3
0.00
0.078100
$355.96
$27.80
BASICOS
MEZ0011
$79.37
$65.54
Subtotal: BASICOS
$27.80
Costo directo
$172.71
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$172.71
Concepto
Costo
Importe
MATERIALES
MTAB0070
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
MILL
0.00
0.006000 $1,800.00
JOR
5.00
0.200000
$655.40
$10.80
$131.08
APL0025
0.00
1.000000
$24.78
Subtotal: MATERIALES
$24.78
$10.80
$131.08
Subtotal: .
$24.78
Costo directo
$166.66
INDIRECTO
$16.67
UTILIDADES
$16.67
COSTO TOTAL
$0.00
LOSA10-200 LOSA DE 10 CM. DE PERALTE EN TECHO DE CUBIERTA, FABRICADA CON CONCRETO F`c =
200 KG/CM2 AGREGADO MAXIMO 3/4" INCLUYE CIMBRA ,DESCIMBRA, KG. DE ACERO DE
REFUERZO X M3 DE CONCRETO, MATERIALES MANO DE OBRA Y EQUIPO
Cdigo
Concepto
Costo
M2
Importe
BASICOS
VLOSA200
0.00
0.103000
$543.18
$55.95
AREF3
0.00
0.022330 $6,278.58
$140.20
CLOSA
0.00
1.000000
$62.40
Subtotal: BASICOS
$196.15
Subtotal: .
$62.40
Costo directo
$258.55
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$258.55
LOSA10-250 LOSA DE 10 CM. DE PERALTE EN TECHO DE CUBIERTA, FABRICADA CON CONCRETO F`c =
250 KG/CM2 AGREGADO MAXIMO 3/4" INCLUYE CIMBRA ,DESCIMBRA, KG. DE ACERO DE
REFUERZO X M3 DE CONCRETO, MATERIALES MANO DE OBRA Y EQUIPO
Cdigo
$62.40
Concepto
Costo
M2
Importe
BASICOS
VLOSA250
0.00
0.103000
$558.87
$57.56
AREF3
0.00
0.022330 $6,278.58
CLOSA
0.00
1.000000
$62.40
Subtotal: BASICOS
$62.40
Costo directo
$260.16
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$260.16
Cdigo
$62.40
$197.76
Subtotal: .
PTA0001
$140.20
Concepto
Costo
PZA
Importe
SUBCONTRATOS
PUR0001
PUERTA METALICA 0.70 X 2.10
PZA
0.00
1.000000
$0.00
$0.00
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
2.50
0.400000
$655.40
$262.16
0.00
1.000000
$24.78
$24.78
APL0025
$262.16
Subtotal: .
$24.78
Costo directo
$286.94
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
VENT0001
$286.94
Cdigo
Concepto
Costo
PZA
Importe
SUBCONTRATOS
PUR0001
PUERTA METALICA 0.70 X 2.10
PZA
0.00
1.000000
$0.00
$0.00
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
2.50
0.400000
$655.40
$262.16
0.00
1.000000
$24.78
$24.78
APL0025
$262.16
$24.78
$286.94
INDIRECTO
$0.00
UTILIDADES
$0.00
PIS0080
COSTO TOTAL
$286.94
M2
Cdigo
Concepto
Costo
Importe
MATERIALES
MPIS0240
M2
0.00
1.030000
$96.52
$99.42
MPGP0001
SACO
0.00
0.330000
$40.87
$13.49
MJUNT0001
0.00
0.135500
$37.39
$5.07
12.00
0.083333
$655.40
$54.62
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
JOR
Subtotal: MATERIALES
$117.98
$54.62
Costo directo
PIN0001
$172.60
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$172.60
M2
Cdigo
Concepto
Costo
Importe
MATERIALES
MPIN0069
SELLADOR VINILICO
LT
0.00
0.002762
$473.91
$1.31
MPIN0060
CUB
0.00
0.009209
$668.69
$6.16
MRES0051
YESO DE RESANADOR
KG
0.00
0.082500
$0.00
$0.00
MANO DE OBRA
CUAD060
CUADRILLA 060 (1 PINTOR)
JOR
20.00
0.050000
$327.70
$16.39
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.050000
$0.00
$0.00
Subtotal: MATERIALES
$7.47
$16.39
Costo directo
$23.86
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
PIN0002
$23.86
Cdigo
Concepto
Costo
M2
Importe
MANO DE OBRA
CUAD060
CUADRILLA 060 (1 PINTOR)
JOR
21.45
0.046620
$327.70
$15.28
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.050000
$0.00
$0.00
CUB
0.00
0.009734 $1,089.56
$10.61
MATERIALES
MPIN0001
PINTURA ESMALTE
Subtotal: MATERIALES
$10.61
$15.28
Costo directo
$25.89
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
IMP0001
$25.89
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MIMP0001
LT
0.00
1.000000
$0.00
$0.00
MSEL0001
LT
0.00
0.250000
$0.00
$0.00
MMEM0001
MEMBRANA DE FIBRA
IMPERMEABILIZACIN
PARA M2
0.00
1.000000
$0.00
$0.00
30.00
0.033333
$655.40
$21.85
DE
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
APL0025
POLIESTER#5
JOR
$21.85
Costo directo
$21.85
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$21.85
Cdigo
Concepto
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
Costo
Importe
26.71
0.037439
$655.40
$24.54
0.00
0.001440
$165.89
$0.24
BASICOS
MEZ0005
M3
$24.54
Subtotal: BASICOS
$0.24
Costo directo
$24.78
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
APL0022
Cdigo
$24.78
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
Costo
M2
Importe
JOR
9.00
0.111111
$655.40
$72.82
M3
0.00
0.032500
$355.96
$11.57
PZA
0.00
1.000000
$0.00
$0.00
BASICOS
MEZ0011
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
$72.82
Subtotal: BASICOS
$11.57
Costo directo
$84.39
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
PSO0001
$84.39
Cdigo
Concepto
M2
Unidad Rend. Cantidad
Costo
Importe
MATERIALES
MCEM0060
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
TON
0.00
0.001600
$350.00
$0.56
JOR
45.45
0.022002
$655.40
$14.42
Subtotal: MATERIALES
$0.56
$14.42
Costo directo
$14.98
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
PSO0002
$14.98
Cdigo
Concepto
M2
Unidad Rend. Cantidad
Costo
Importe
MATERIALES
MCEM0060
MANO DE OBRA
CUAD040
CUADRILLA 040 (1ALBANIL+1PEON)
TON
0.00
0.032000
$350.00
$11.20
JOR
30.00
0.033333
$655.40
$21.85
Subtotal: MATERIALES
$11.20
$21.85
Costo directo
$33.05
INDIRECTO
$0.00
UTILIDADES
COSTO TOTAL
$0.00
$33.05
CLCULO DE PIE TABLN PARA CIMBRA DE FRONTERAS DE ZAPATAS CON CONTRATRABE (DADO) SUPERIOR.
MEDIDA ZAPATA
SECCIN CIMBRADA DE DADO
LC
1.20
0.50
PERALTE DE ZAPATA
ALTURA DE DADO
0.30 M
0.80 M
FACTOR DE DESPERDICIO
PROFUNDIDAD DE ESTACA
HOLGURA YUGO 1 EXTREMO
SEPARACIN YUGO
20.00 %
0.15 M
0.05 M
0.50
LC
LL
2
2
2
2
LL
1.20 M
0.50 M
LC = LADO CORTO
LL = LADO LARGO
PT = PIE TABLN
FC = FACTOR DE CONTACTO
FD = FACTOR DE DESPERDICIO
FU = FACTOR DE USOS
MADERA
FU
5
5
5
DUELA
DUELA
BARROTE
5
5
5
DATOS CALCULADOS
MEDIDA PULG.
CANT.
PT/M2
TOTAL
TOTAL
PZAS
MTS. PZAS" MTS."
ESP. ANCHO
PT
FC PT 1/FC FD=0.2 FU (PT/M2/USO) (PT/PZA/USO)
1
12
1.2
2
1.20 15.75 1.44 10.94 13.13 5
2.63
3.78
1
12
1.2
2
3
2
4
12
0.45 11.81 1.44 8.20 9.84 5
1.97
2.84
2
2
1
1
2
20
20
4
0.80
0.80
2
2
3
0.80
17.50 1.60
10.94 13.13 5
2.63
1.26
3.42
22.42 1.60
14.01 16.81 5
3.36
5.38
CLCULO DE PIE TABLN PARA CIMBRA DE UN CASTILLO, COLUMNA, TRABE, DALA O CADENA
LC
0.50
0.80 M
SECCIN
ALTURA O LONG. CIMBRADA
FACTOR DE DESPERDICIO
HOLGURA YUGO 1 EXTREMO
SEPARACIN YUGO
LL
0.50 M
LC = LADO CORTO
LL = LADO LARGO
PT = PIE TABLN
20.00 %
0.05 M
0.50
LC
LL
2
2
CARAS CIMBRADAS
FC = FACTOR DE CONTACTO
FD = FACTOR DE DESPERDICIO
FU = FACTOR DE USOS
ELEMENTO CONSTRUCTIVO
Elemento Horizontal
MADERA
DUELA
DUELA
BARROTE
POLN
BARROTE
FU
5
5
5
10
3
DATOS CALCULADOS
MEDIDA PULG.
CANT.
PT/M2
TOTAL
TOTAL
PZAS
MTS. PZAS" MTS."
ESP. ANCHO
PT
FC PT 1/FC FD=0.2 FU (PT/M2/USO) (PT/PZA/USO)
1
1
2
4
2
4
4
4
4
4
1.00
1.00
2.70
0.40
10
10
3
4
4
1.00
21.88 2.00
10.94 13.13 5
2.63
4.20
3.42
2.70
0.40
22.42 2.00
47.25 2.00
3.50 2.00
11.21 13.45 5
23.63 28.35 10
1.75 2.10 3
2.69
2.84
0.70
8.85
4.30
4.54
1.12
14.16
ANALISIS DEL FACTOR DE LA MANO DE OBRA (FACTOR SALARIO REAL) PARA EL ESTADO DE COLIMA, MXICO.
TEXTO AZUL= CELDAS CAMBIABLES
TEXTO NEGRO = CELDAS CON FRMULAS
Datos
AO
3 S.M.G.D.F (3 SALARIOS MNIMOS GRAVABLE DEL DISTRITO FEDERAL.)S.M.G.D.F.
Salario Nominal. Salario que se le paga directamente al trabajador
INFONAVIT
Salario Integrado. Salario real, que le cuesta el trabajador al contratista.
2011
58.00
5%
DIAS NO TRABAJADOS AL AO
g) Domingos
h)Das festivos por ley
i)Das por costumbre
j)Das Sindicato
k) Vacaciones
l)Permisos y Enfermedad
m)Condiciones Climatolgicas
n)Horas inactivas por arrastre
o)Das no trabajados por guardia
DAS PAGADOS AL AO
54.00 Das Calendario
7.00 b) Aguinaldo por Ley
c)Prima Vacacional
33% por ley
d)Prima Dominical 0.25% por ley
10.00 e)Horas extra al ao (especifique) por ley en das
f)Prestaciones por Contrato de trabajo
g)Das por terminacin de obra al ao (CFE)
TOTAL Y1 (DIAS)=
TOTAL X1 (DIAS)=
2.375 %
4.275 %
7.590 %
1.000 %
1.425 %
0.950 %
418.00
1.4218 Suma en % de prestaciones del IMSS
17.62 %
CATEGORA
DIARIO
NOMINAL
1 CABO
2 ALBAIL
220.00
3 CARPINTERO
200.00
4 PINTOR
5 PLOMERO
200.00
6 ELECTRICISTA
7 PEON
8 AYUDANTE EN GRAL.
9 HERRERO
10 CHOFER
200.00
200.00
200.00
115.00
83.44
200.00
150.00
$130.00
$150.00
$150.00
$200.00
3 S.M.G.D.F.
EN DINERO
RIESGO
TRABAJO
SALARIO
FSR
INTEGRADO
Y RETIRO
12.96 12.96 -
0.78
0.78
2.09
1.90
3.14
2.85
16.70
15.18
5.23
4.75
9.41
8.55
2.20
2.00
11.00
10.00
1.8221
1.8299
400.86
365.98
0.78
0.78
0.78
1.90
1.90
1.90
2.85
2.85
2.85
15.18
15.18
15.18
4.75
4.75
4.75
8.55
8.55
8.55
2.00
2.00
2.00
10.00
10.00
10.00
1.8299
1.8299
1.8299
365.98
365.98
365.98
12.96 12.96
12.96
12.96 12.96
12.96
12.96
12.96
12.96 -
0.78
0.78
0.78
1.90
1.09
0.79
1.90
1.43
1.24
1.43
1.43
1.90
2.85
1.64
1.19
2.85
2.14
1.85
2.14
2.14
2.85
15.18
8.73
6.33
15.18
11.39
9.87
11.39
11.39
15.18
4.75
2.73
1.98
4.75
3.56
3.09
3.56
3.56
4.75
8.55
4.92
3.57
8.55
6.41
5.56
6.41
6.41
8.55
2.00
1.15
0.83
2.00
1.50
1.30
1.50
1.50
2.00
10.00
5.75
4.17
10.00
7.50
6.50
7.50
7.50
10.00
1.8299
1.9036
1.9642
1.8299
1.8662
1.8851
1.8662
1.8662
1.8299
365.98
218.91
163.89
365.98
279.93
245.06
279.93
279.93
365.98
A5 CONTADOR
A6 ADMINISTRADOR
A7
$200.00
$600.00
12.96 12.96 -
0.78
0.78
-
1.90
5.70
-
2.85
8.55
-
15.18
45.54
-
CATEGORA
PRESTACIONES EN %
DIARIO
CUOTA
NOMINAL
FIJA
-
IMSS
SALARIO
INFONAVIT
FSR
INTEGRADO
1 CABO
2 ALBAIL
220.00
5.89
17.62
5.00
1.8271
401.96
200.00
6.48
17.62
5.00
1.8355
367.10
3 CARPINTERO
200.00
6.48
17.62
5.00
1.8355
367.10
4 PINTOR
5 PLOMERO
200.00
6.48
17.62
5.00
1.8355
367.10
200.00
6.48
17.62
5.00
1.8355
367.10
6 ELECTRICISTA
200.00
6.48
17.62
5.00
1.8355
367.10
7 PEON
115.00
11.27
17.62
5.00
1.9036
218.91
8 AYUDANTE EN GRAL.
83.44
15.54
17.62
5.00
1.9642
163.89
9 HERRERO
200.00
6.48
17.62
5.00
1.8355
367.10
150.00
8.64
17.62
5.00
1.8662
279.93
10 CHOFER
A1 SECRETARIA
$130.00
9.97
17.62
5.00
1.8851
245.06
A2 DIBUJANTE
$150.00
8.64
17.62
5.00
1.8662
279.93
A3 BODEGUERO
$150.00
8.64
17.62
5.00
1.8662
279.93
A4 SUPERVISOR
$200.00
6.48
17.62
5.00
1.8355
367.10
A5 CONTADOR
$200.00
6.48
17.62
5.00
1.8355
367.10
A6 ADMINISTRADOR
$600.00
2.16
17.62
5.00
1.7741
1,064.46
A7
4.75
14.25
-
8.55
25.65
-
2.00
6.00
-
10.00
30.00
-
1.8299
1.7722
-
365.98
1,063.32
-
ANIEXO 29
Gasolina
Diesel
$120,000.00
Otro
10.00 Lt
20.00 Lt/Hr.
$12,000.00
$107,910.00
$36,000.00
30
%Vm
14,600.00 Horas
1.00
18.00
30.00 Horas
$40.00 Lt
50.00 Horas
8.00 Horas
2,920.00 Horas
$70.00
9.00 %
$80.00
5.00 %
$90.00
2.00 Lt
100.00 Horas
$10.00 Lt
I CARGOS FIJOS
I.1 Depreciacin
D= (Vm-Vr)/Ve
4.93
I.2 Inversin
443.56
I.3 Seguros
221.78
I.4 Mantenimiento
Mn= Ko x D
24.63
(1) SUMA CARGOS FIJOS =
694.89
II. CONSUMOS
II.1 Combustibles
CO= Gh x Pc
20.00
II.3 Lubricantes
Lb= (Ah+Ga) x Pa
1,200.00
II.4 Llantas
N= Pn/Vn
240.00
Ae= Ppe/Vpe
0.90
(2) SUMA CONSUMOS =
1,460.90
III. OPERACIN
CATEGORAS
CANTIDAD
SALARIO REAL
OPERADOR 001
$10.00
10
$0.00
$0.00
$0.00
$0.00
(Po)=
III.1 OPERACIN
IMPORTE
0
$10.00
Po=Sr/Ht
PROGRAMA MONTOS MENSUALES DE UTILIZACIN DE PERSONAL TCNICO, ADMINISTRATIVO Y DE SERVICIOS ENCARGADOS DE LA DIRECCIN,
SUPERVISIN Y ADMINISTRACIN DE LOS TRAAJOS
* Aqu, se muestra un ejemplo sencillo y comn del desglose y factor de Indirectos
MONTO DE LA OBRA ACTUAL (C. D.)
MONTO DE CONTRATOS VIGENTES (AO)
PERIODICIDAD
Fecha de Inicio:
Fecha de terminacin:
Duracin en Dias:
$71,740.80
$400,000.00
SEMANAL
6/1/2005
6/20/2005
20.00
SEM1
2005
7
SEM2
2005
7
Factor
1.0000
1.0000
1.0000
1.0000
0.5714
SEM1
SEM2
Salario
4
0.0000
0.0000
0.0000
0.0000
0.0000
Importe
-
Total
Cant. Categora
SUPERINTENDENTE
RESIDENTE GENERAL
1
AUXILIAR DE RESIDENTE
ing. De seguridad industrial
control de calidad
Salario
$431.02
Importe
1,970.38
-
431.02
-
431.02
-
431.02
-
431.02
-
246.30
-
TECNICO SUPERVISOR B
tecnico 7
tecnico 8
Total
1,970.38
1.3- PERSONAL ADMINISTRATIVO
Cant. Categora
1
Salario
ADMINISTRADOR DE OBRA
AUXILIAR CONTABLE
auxiliar a
auxiliar b
auxiliar c
$417.01
Total
Importe
1,906.33
-
417.01
-
417.01
-
417.01
-
417.01
-
238.29
-
328.97
-
328.97
-
328.97
-
328.97
-
187.98
-
1,906.33
1.4.- PERSONAL DE SERVICIO
Cant. Categora
BODEGUERO
VELADOR
CHOFER
1
chofer 2
chofer 3
Salario
$328.97
Importe
1,503.86
-
Total
1,503.86
No.
I.-
II.-
$71,740.80
CONCEPTO
III.-
###
PERIODICIDAD SEMANAL
1.0000 $
$
$
$
$
$
4,000.00
-
2.7465
2.6572
2.0962
$
$
$
$
1,970.38
1,906.33
1,503.86
$
$
0.5000 $
0.8000 $
$
0.6000 $
358.70
573.93
430.44
SERVICIOS
3.1
3.2
3.3
$
$
$
$
$
$
IV.-
$
$
$
$
$
$
$
$
V.-
GASTOS OFICINA
5.1 Papelera y tiles de escritorio
5.2 Correos, telfonos, fax, radio, telgrafos
5.3 Situacin de fondos
5.4 Copias y duplicados
5.5 Luz, gas y otros consumos
5.6 Gastos de concurso
$
$
$
$
$
$
$
$
VI.SEGUROS Y FIANZAS
6.1 Primas por Seguro
6.2 Primas por Fianzas
0.5000 $
0.7000 $
$
0.2000 $
1.0000 $
$
$
$
2,000.00
2,800.00
800.00
4,000.00
-
CAPACITACIN Y ADIESTRAMIENTO
7.1 Consultores,Asesores,Servicio y Laboratorios
7.2 Estudios e Investigacin
7.3 Capacitacin
0.2000 $
$
1.0000 $
800.00
4,000.00
$
$
$
$
$
1.0000 $
$
5.6000 $
4,000.00
22,400.00
$
$
$
$
$
INDIRECTO TOTAL %
9.4000
6,743.65
15.00
PERIODICIDAD
5.81 %
7.50 %
1.69 %
DIARIA
SEMANAL
QUINCENAL
15.00 %
TOTAL DE INDIRECTOS
INDIRECTOS DE CAMPO EN EL DESGLOSE DE IND.
PERSONAL DIRECTIVO
PERSONAL TCNICO
MENSUAL
7.50 % =
36.62 %
PERSONAL ADMINISTRATIVO
PERSONAL DE SERVICIO
TOTAL
35.43 %
27.95 %
100.00 %
2.75
2.66
2.10
7.50 %
$71,740.80
4.5714
1,970.36
1,906.33
1,503.87
PERSONAL DIRECTIVO
PERSONAL TCNICO
PERSONAL ADMINISTRATIVO
PERSONAL DE SERVICIO
5,380.56
SALARIO TOTAL DEL PERSONAL
431.02
417.01
328.97
PERSONAL DIRECTIVO
PERSONAL TCNICO
PERSONAL ADMINISTRATIVO
PERSONAL DE SERVICIO
$
$
83.00
Salario
35.00 $
TOTAL
35.00
$
$
20.00 $
8.00 $
40.00
8.00
83.00
CLAVE
CONCEPTO
FRMULA
CD
%CI
%FIN
CU
CI
CF
I.-INDIRECTO
II.-FINANCIAMIENTO
CI=CD %CI
CF=CD %FIN
IMPORTE
71,740.80
15.00
3.00
8.47
8,465.41
10,761.12
2,152.22
10.00
CARGOS ADICIONALES
CLAVE
CONCEPTO
CD
MOG
%SAR
%INF
FRMULA
IMPORTE
71,740.80
2,210.94
2.00
5.00
CSAR=(MOG)*%SAR
CINF=(MOG)*%INFONAVIT
44.22
110.55
DE CSEC=CD 0.005
358.70
SUBTOTAL
TOTAL DE CARGOS ADICIONALES
513.47
0.72
CEM.
(KG/CM2)
ARE
(SACO) (BOTE)
GRAV.
AGUA
VOL.
(BOTE)
(BOTE)
(M3)
CONCRETO FC
(KG/CM2)
7.50
8.00
3.00
0.175
5.50
6.50
2.50
0.151
4.00
6.00
2.00
0.133
3.50
5.00
1.75
0.120
2.50
4.50
1.25
0.103
FUENTE: BIMSA
3%
10%
10%
30%
5%
pulg.
mm.
Kg/m.
mm2
0.0143
pulg. 2
No.
pulg.
mm.
Kg/m.
mm2
pulg. 2
(M2)
ALAMBRE #18
(7/8")
22.2
3.034
387
0.6
TRR 71428 CM. DE 7CM. ESP. (CAPUCHINO), MORTERO CON JUNTAS DE 1.5 CM.
2.5
(1/4")
6.35
0.251
ALAMBRN
(1")
25.4
3.975
507
0.79
TRR 71428 CM. DE 14CM. ESP. (A SOGA), MORTERO CON JUNTAS DE 1.5 CM.
(3/8")
9.5
0.557
71
0.11
(1 1/8")
28.6
5.033
642
0.99
TRR 71428 CM. DE 28CM. ESP. (A TIZN), MORTERO CON JUNTAS DE 1.5 CM.
(1/2")
12.7
0.996
127
0.2
10
(1 1/4")
31.8
6.225
794
1.23
TABICN 101428 CM. DE 10CM. ESP. (CAPUCHINO), MORT CON JUNTAS DE 1.5 C
(5/8")
15.9
1.56
199
0.31
11
(1 3/8")
34.9
7.503
957
1.48
TABICN 101428 CM. DE 14CM. ESP. (A SOGA), MORT. CON JUNTAS DE 1.5 CM.
(3/4")
19.1
2.25
287
0.44
12
(1 1/2")
38.1
8.938
1140
1.77
TABICN 101428 CM. DE 28CM. ESP. (A TIZN), MORT. CON JUNTAS DE 1.5 CM.
MORT.
ARE
AGUA
VOL.
MEZCLA
(BOTE)
(BOTE)
(BOTE)
(M3)
MORTERO-ARENA
4.00
3.00
0.095
5.00
2.50
0.110
6.00
2.00
0.127
7.00
1.75
0.146
8.00
1.25
0.168
3%
3%
10%
30%
MORTERO-ARENA
LOSA Y COL.
DETALLE
NERVADURA
pulg.
(7/8")
14
30
13
90
70
(1")
15
34
10
14
100
75
85
LOSA Y COL.
FC=150 FC=200
(1/4")
40
25
60
40
(3/8")
13
40
30
60
45
(1/2")
17
10
50
40
75
60
(1 1/8")
17
38
11
15
115
(5/8")
10
21
11
65
50
95
70
(1 1/4")
19
43
13
16
125
95
(3/4")
11
26
12
75
60
115
85
(1 1/2")
23
51
15
18
150
115
CEM.
ARE
GRAV.
AGUA
(TON)
(M3)
(M3)
(M3)
(M3)
0.2750
0.5446
0.6591
0.2604
1.000
0.3275
0.5382
0.6527
0.2532
1.000
0.3697
0.5320
0.6452
0.2424
1.000
0.4130
0.5371
0.6396
0.2340
1.000
3%
10%
10%
30%
5%
AGUA
RECOCIDO Y TABICN)
VOL.
LAD.
MEZ.
PZAS.
(M3)
(M3)
24
0.0166
0.024
48
0.0397
0.048
86
0.0987
0.086
24
0.0186
0.024
33
0.0318
0.033
62
0.0781
0.062
MORT.
ARE
AGUA
VOL.
(TON)
(M3)
(M3)
(M3)
0.3000
1.1500
0.2900
1.00
0.2600
1.2000
0.2850
1.00
0.2250
1.2400
0.2800
1.00
0.1950
1.2700
0.2750
1.00
0.1700
1.2900
0.2700
1.00
3%
3%
10%
30%
2)
ENA
N Y COLOC.
DETALLE
NERVADURA
FC=150 FC=200
135
100
150
115
170
130
190
145
230
170