CANTIDAD
PESO
(Kg)
PARCIAL
(Kg)
CAMA BAJA
SEMITARYLER
(VIAJE)
(VIAJE)
EQUIPO PROPIO
1.00
1,000.00
1,000.00
3.00
10,308.00
30,924.00
3.00
1.00
18,585.00
18,585.00
1.00
1.00
8,000.00
8,000.00
1.00
1.00
2,100.00
2,100.00
2.10
1.00
160.00
160.00
0.16
2.00
2,000.00
4,000.00
4.00
CORTADORA DE ASFALTO
1.00
160.00
160.00
2.00
39,000.00
78,000.00
EQUIPO DE SOLDAR
1.00
200.00
200.00
1.00
10,000.00
10,000.00
1.00
ESPARCIDORA DE AGREGADOS
1.00
12,000.00
12,000.00
1.00
FRESADORA
1.00
20,000.00
20,000.00
1.00
3.00
2,000.00
6,000.00
1.00
1.00
1,500.00
1,500.00
1.50
1.00
135.00
135.00
0.14
1.00
2,200.00
2,200.00
2.20
1.00
295.00
295.00
MOTONIVELADORA 125 HP
1.00
11,515.00
11,515.00
1.00
MOTONIVELADORA 145-150 HP
1.00
13,540.00
13,540.00
1.00
1.00
12,000.00
12,000.00
1.00
1.00
38,400.00
38,400.00
4.00
1.00
9,000.00
9,000.00
1.00
1.00
5,500.00
5,500.00
1.00
2.00
8,800.00
17,600.00
1.00
1.00
11,100.00
11,100.00
1.00
1.00
800.00
800.00
0.80
RUTEADORA DE GOLPE
1.00
300.00
300.00
0.30
1.00
2,000.00
2,000.00
1.00
14,900.00
14,900.00
1.00
1.00
20,520.00
20,520.00
1.00
2.00
4,320.00
8,640.00
1.00
VIBRADOR DE 4 HP CAP.=1.50"
1.00
10.00
10.00
1.00
7,000.00
7,000.00
(1)
(2)
TRACTOR DE TIRO
DE 80 HP
(1
(1)
(1)
1.00
0.16
2.00
0.20
0.30
2.00
0.01
1.00
26.00
TOTAL
0.00
(1) Dos equipos por cama baja; (2) Tres equipos por camabaja
CANTIDAD
26.00
CAMA BAJA
PRECIO
HORAS
PARCIAL
TOTAL
HORA S/.
(IDA - VUELTA)
S/.
S/.
200.52
32.00
166,832.64
166,832.64
166,832.64
MOVILIZACION
166,832.64
DESMOVILIZACION
SEGUROS
5%
16,683.26
TOTAL MOVILIZACION+DESMOVILIZACION
350,348.54
14.86
CANTIDAD
HORAS
PARCIAL
TOTAL
S/.
S/.
HM
HORA S/.
(IDA - VUELTA)
1.00
1.00
52.44
30.40
1,594.18
2.00
162.58
30.40
9,884.86
1,800 GAL
116.63
30.40
3,545.55
4.00
56.12
25.00
5,612.00
VOLQUETE 6 x 4 330 HP 15 m3
6.00
190.18
30.40
34,688.83
55,325.42
SEGUROS
5%
2,766.27
40,000.00
30,000.00
20,000.00
2% SUBTOTAL
1,800.00
S/. 500,240.24