NISSAN ALTIMA
MOTOR 2.5L QR25DE
TIMING CHAIN - CADENA DE TIEMPO
automecanico.comTIMING CHAIN
[QR25DE]
TIMING CHAIN PrP
Removal and Installation
‘SEC.110-1124120-1306195,
cat
Apply new engine ol to parts marked inilustation before installation.
EM-45TIMING CHAIN
[aR250E]
REMOVAL
‘Support the engine and transaxle assembly with sutabe tole
‘Remove the upper anc lower ol pan, and ol strainer, Refer to EM.23, "Removal ané Instaiaton”.
Remove the IVTC (intake valve timing contral) cover
Loosen bots inthe numerical order as shown
‘Remove the cover with suitable tool to cut the sealant
Pull chain guide between camshaft sprockets out through front
5, Setthe No.1 cylinder at TOC on the compression stroke withthe
following procecure:
Rotate the crankshaft puley clockwise and align the matng
marks to the timing indiator on te font cover.
b.Atthe same time, make sure that the mating marks on tne cam
‘shaft sprockets are lined up as shown,
‘+ fat ned up, rotate the crankshaft pulley one more tun to ine
Up the mating marks te the postions as shown,
6. Remove crankshaft puley with he following procedure:
1. Hold the crankshaft puley with a suitable tol, then loosen the
crankshaft pulley mounting bo, and pul the pulley out about 10
mm (0:38),
EM-46