GERENCIA DE INFRAESTRUCTURA

INFORME MENSUAL DE OBRA Nro. 04


MES DE ABRIL 2014

"MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E PRIMA


50245 Y SECUNDARIO JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARAT
CONVENCION-CUSCO"

Residente de Obra
Inspector de Obra

: ING. MANUEL CARPIO GANDULIAS


: ING. JULIO CARBAJAL COILA
2014

DE INFRAESTRUCTURA

ENSUAL DE OBRA Nro. 04

ES DE ABRIL 2014

ESTRUCTURA EDUCATIVA DE LA I.E PRIMARIA N


AZA DE KORIBENI, DISTRITO DE ECHARATI- LA
NVENCION-CUSCO"

CIP: 106532
CIP: 29186

2014

UNIDAD OPERATIVA PALMA REAL

GERENCIA DE INFRAESTRUCTURA

INFORME MENSUAL DE OBRA N 04

MES DE ABRIL 2014


"MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E
PRIMARIA N 50245 Y SECUNDARIO JOSE PIO AZA DE KORIBENI,
DISTRITO DE ECHARATI- LA CONVENCION-CUSCO"

RESIDENTE DE OBRA: ING. MANUEL CARPIO


GANDULIAS.
INSPECTOR DE OBRA: ING. JULIO
CARBAJAL COILA

2014

UNIDAD OPERATIVA PALMA REAL

GERENCIA DE INFRAESTRUCTURA

INFORME MENSUAL DE OBRA N 04

MES DE ABRIL 2014


"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE NIVEL
PRIMARIO Y SECUNDARIO DE LA I.E. JOSE PIO DE AZA DE
CORIBENI, DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

RESIDENTE DE OBRA: ING. MANUEL CARPIO


GANDULIAS.
INSPECTOR DE OBRA: ING. JULIO
CARBAJAL COILA

RESIDENTE DE OBRA: ING. MANUEL CARPIO


GANDULIAS.
INSPECTOR DE OBRA: ING. JULIO
CARBAJAL COILA

2014

FORMATO No 01

CONTENIDO

INFORME MENSUAL
MES DE ABRIL 2014

"MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E PRIMARIA N 50245 Y SECUNDARIO JOSE PIO AZ


ECHARATI- LA CONVENCION-CUSCO"

RESIDENTE DE OBRA
: ING. MANUEL CARPIO GANDULIAS
Ubicacin :
Departamento : Cusco
Provincia : La Convencin
Distrito : Echarati
No
DESCRIPCION
1 Contenido
2 Informe Mensual
3 Valorizacin

4
5
6

8
9
10
11
12
13

3.1.
Resumen de las Valorizaciones
3.2.
Valorizacin Programada
3.3.
Valorizacin de Mayores Metrados
3.4.
Valorizacin de Partidas Nuevas
3.5.
Valorizacin de Deductivos
Hoja de Metrados
Cronograma de Avance de Obra Valorizado
Movimiento de Almacn Valorizado
6.1.
Resumen de los Movimiento de Almacn
6.2.
Movimiento de Almacn de Materiales Diarios
6.3.
Movimiento de Almacn de Materiales de perodos anteriores.
6.6.
Movimiento de Almacn de Materiales de Convenio
6.7.
Movimiento de Amacn de Materiales de Beneficiarios
Movimiento de Maquinaria Valorizada
7.1.
Resumen de Movimiento de Maquinaria
7.2.
Control Diario de Maquinaria
Auxiliar Estandar
Modificaciones del Proyecto
Registro Fotogrfico
Cuaderno de Obra (Copias)
Registro Digitalizado (disket/CD)
Anexos

P:Presentado

N : No presentado

FORMATO No 01

CONTENIDO

INFORME MENSUAL
MES DE ABRIL 2014

VA DE LA I.E PRIMARIA N 50245 Y SECUNDARIO JOSE PIO AZA DE KORIBENI, DISTRITO DE


CHARATI- LA CONVENCION-CUSCO"

AO:

SCRIPCION

2,014

FORMATO

CONTROL

F-1
F-2

P
P
P
P
P
P
P
X
P
P

F-3
F-31
F-32
F-33
F-34
F-4
F-5
F-6
F-61
F-62
F-65
F-66
F-7
F-71
F-72
F-8
F-11
F-12
F-13

X: No corresponde

P
P
P
X
X
P
P
P
P
X
P
P
X
X

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCUTURA
CORDINACION ZONAL PALMA REAL

DATOS GENERALES
UBICACIN

NO

DPTO

CUSCO

PROV

LA CONVENCION

DIST

ECHARATE

LOC.

KORIBENI

"MEJORAMIENTO DE LA INFRAESTRUTURA ED
KORIBENI, DISTRITO

PERFIL
RES. APROB.

CODIGO SNIP

R.A. N634-2

MONTO

MONTO

S/. 9,87

FECHA

FECHA

5/30

SEC. FUNC.

FUNCION

0160

22

SNIP N

PROGRAMA

SUB PROYECTO
0010

9002

AGENTE

ING. JORGE LUIS PUMAINCA CONDORI


ING. JULIO CARBAJAL COILA

ING. MANUEL CARPIO GANDULIAS

FECHA DE REINICIO:

6/4/2012

FECHA DE INICIO:

FECHA DE REINICIO:
FECHA DE REINICIO:

METAS

NIVEL PRIMARIO : 12 AULA COMUN, 02 SALA DE USO MULTIPLE, 01 AULA DE COMPUTO, 01 CABINA CONTROL Y DEPOSITO DE AULA DE COMPUTO, 01 AULA DE ARTE, 01 BIBLIOTE
CABINA DE CONTROL Y DEPOSITO AULA DE COMPUTO, 01 AULA DE ARTES, 01 AULA DE IDIOMA EXTRANJERO, 02 TALLERES, 01 BIBLIOTECA, 01 DEPOSITO DE LIBROS, 02 SS
PSICOLOGIA, ARCHIVO,01 LIMPIEZA, 01 GUARDIANIA Y PORTERIA, 30 VIVIENDA DOCENTE 06 VIVIENDA DE DOCENTES, 01 SS.HH. Y LAVANDERIA VIVIENDA DOCENTE. OTROS
MADERA,15 PIZARRA ACRILICA, 15 ESTANTE DE MADERA, 15 PUPITRE DOCENTE INCLUIDA SILLA, 35 SILLA UNIPERSONAL MADERA, 11, PUPITRE DOCENTE INCLUIDA SILLA, 21 CO

PROGRAMADO

MAYORES METRADOS

PARTIDAS NUEVAS

MES

VALORIZADO

TOTAL

INICIO
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12

ACUML

VALORIZADO

VALORIZADO

S/. 9,871,378.67

0
280,474.99
400,000.01
500,000.00
500,000.00
600,000.00
700,000.00

0
2.84%
4.05%
5.07%
5.07%
6.08%
7.09%

0
2.84%
6.89%
11.96%
17.02%
23.10%
30.19%

0.00
0.00
0.00
0.00
40,252.84
23,380.31
28,808.52

0.00%
0.00%
0.00%
0.00%
0.41%
0.24%
0.29%

0.00
0.00
22,167.28
37,283.19
45,002.43
49,812.15
7,346.63

Dec-12
Jan-13
Feb-13
Mar-13
Apr-13
May-13
Jun-13
Jul-13
Aug-13
Sep-13
Oct-13
Nov-13
Dec-13
Jan-14
Feb-14

800,000.00
191,731.30
1,086,515.77
964,701.52
1,014,137.23
1,340,502.06
1,189,820.32
303,495.47
0.00
0.00
0.00
0.00
0.00

82,936.29
8.10% 38.30%
1.94% 40.24% 169,590.74
31,021.59
11.01% 51.25%
9.77% 61.02% 215,143.88
10.27% 71.29%
46,224.77
13.58% 84.87%
30,388.29
12.05% 96.93%
53,220.12
3.07%
###
25,852.30
0.00%
###
52,219.80
0.00%
###
85,497.69
0.00%
###
0.00
0.00%
###
0.00
0.00%
###
0.00
0.00%
###
0.00
0.00
0.00%
###
0.00
58,910.94

0.84%
1.72%
0.31%
2.18%
0.47%
0.31%
0.54%
0.26%
0.53%
0.87%
0.00%
0.00%
0.00%
0.00%
0.60%

TOTAL

###

###

###

8.96%

1,590.98
0.00
0.00
17,121.71
0.00
3,220.99
0.00
1,274.76
1,477.63
0.00
0.00
0.00
0.00
0.00
0.00

###

1.2
1
0.8
Axis Title

0.6
0.4
0.2

0
INICIO 41064 41094 41125 41156 41186 41217 41247 41278 41309 41364 41368 4

FICHA TECNICA DE PROYECTO


NOMBRE DEL PROYECTO:

RUTURA EDUCATINA DE L AI.E PRIMARIA N50245 Y SECUNDARIA JOSE PIO DE AZA


NI, DISTRITO DE ECHARATI - LA CONVENCION - CUSCO "
EXPEDIENTE TECNICO
R.A. N634-2012-A-MDE/LC

RES. APROB./MODIFIC.

S/. 9,871,378.67

MONTO

5/30/2012

FECHA
CADENA FUNCIONAL
COMPONENTE

ACT. PROYECTO
5000936

META
001

FINALIDAD
25788

INFORMACION DE AGENTES
CARGO
Proyectista
Supervisor
Residente

PLAZO EJECUCION
FECHA DE PARALIZACION:

12/31/2012

1/12/2013

FECHA DE PARALIZACION:

12/21/2013

1/6/2014

FECHA DE PARALIZACION:

RTE, 01 BIBLIOTECA, 01 DEPOSITO DE LIBROS, 02 SS.HH. ALUMNOS 01 AULAS SS.HH. ALUMNOS DISCAPACITADOS, 01 SS.HH. ADULTOS, 01 COSINA. NIVEL SECUNDARIO: 08 AULA COMUN
E LIBROS, 02 SS.HH. ALUMNOS, 01 SS.HH. ALUMNOS DISCAPACITADOS, 01 SS.HH. ADULTOS, 01 COCINA. INFA. ESTRUC. COMPLEMENTARIA : 01 DIRECCION Y SUBDIRECCION, 01 ADMIN
OCENTE. OTROS COMPLEMENTARIOS: 02 PATIO, CANCHA POLIDEPORTIVA, 01 HUERTOS JARDINES, 01 OTRAS AREAS LIBRES, 01 CERCO PERIMETRICO E INGRESO. MOBILIARIO Y EQU
UIDA SILLA, 21 COMPUTADORA, 02 IMPRESORA LASER, 21 MODULO COMPUTADORA INCLUIDA SILLA, 01 EQUIPO AUDIOVISUAL TV+DVD. MOBILIARIO Y EQUIPO NIVEL SECUNDARIO: 200 MO

RESUMEN INFORME MENSUAL


AVANCE

AS NUEVAS
%

0.00%
0.00%
0.22%
0.38%
0.46%
0.50%
0.07%

F ISICO

DEDUCTIVOS
VALORIZADO

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

EJECUTADO EXP. ORIGINAL


VALORIZADO

0.00
53,839.21
22,649.89
12,385.99
26,278.98
109,022.53
97,469.28

EJECUTADO ACUM

0.00%
0.55%
0.23%
0.13%
0.27%
1.10%
0.99%

0.00
53,839.21
98,656.38
148,325.56
259,859.81
442,074.80
575,699.23

0.02%
0.00%
0.00%
0.17%
0.00%
0.03%
0.00%
0.01%
0.01%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.89%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.56%
0.04%
0.31%
0.84%
1.43%
2.41%
0.96%
1.77%
0.86%
1.40%
1.30%
0.93%
2.25%
1.27%
3.65%

715,334.88
889,355.48
950,565.56
1,265,549.24
1,452,940.22
1,724,455.87
1,872,697.64
2,074,938.13
2,213,693.94
2,436,908.24
2,565,613.15
2,657,862.80
2,879,787.76
3,005,004.98
3,424,543.63

### 19.59%

###

55,108.38
4,429.85
30,188.50
82,718.09
141,166.22
237,906.37
95,021.65
175,113.43
85,058.38
137,716.61
128,704.91
92,249.66
221,924.96
125,217.22
360,627.71

64 41368 41398 41429 41459 41490 41521 41551 41582 41612 41643 41674

0.00%

CURVA DE

70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%

A0: 2014
MES DE FEBRERO DEL 2014

UNIDAD EJECUTORA
COORDINACION ZONAL PALMA REAL
MODALIDAD

VARIACION VIABILIDAD

ADMINISTRACION DIRECTA

PLAZO EJECUCION
730

FTE
CANON SOBRE CANON
ESPECIALIDAD

COLEGIATURA

Ing. Civil
Ing. Civil

110648
29186

Ing. Civil

106532

TIEMPO DE EJECUCION

210.00

TIEMPO DE EJECUCION

343.00

RESOLUCION

3/30/2014

FECHA DE TERMINO REAL:

TIEMPO DE EJECUCION

0.00

TIEMPO DE EJECUCION

ESTRUCTURA DE PRESUPUESTO EXP. TEC.

9,871,378.67
8,276,948.93
920,060.23
420,363.64
70,863.00
183,142.87

MONTO DEL PROYECT.


Costo Directo

Gastos Generales 11.12%


ARIO: 08 AULA COMUN, 01 SALA DE USO MULTIPLE, 01 AULA DE COMPUTO, 01
Gastos de Inspeccin 4.57%
BDIRECCION, 01 ADMINISTRACION, 02 SALA DE PROFESORES, 01 TOPICO, 01
SO. MOBILIARIO Y EQUIPO NIVEL PRIMARIO: 300 CARPETA UNIPERSONAL DE Gastos de Liquidacin 0.86
L SECUNDARIO: 200 MOBILIARIO Y EQUIPO NIVEL SECUNDARIO, 14 MOBILIARIO
Expediente Tcnico 2.21%
Capacitacion Social

S/. 9,871,378.67

TOTAL S/.

AVANCE FINANCIERO

CUTADO ACUMUL.

AVANCE FINANCIERO EJECUTADO

0.00%
0.55%
1.00%
1.50%
2.63%
4.48%
5.83%

0.00%
0.55%
1.00%
1.50%
2.63%
4.48%
5.83%

MONTO

ACUMULADO

0.00
0.00
71,191.47
71,191.47
155,342.51 226,533.98
112,309.90 338,843.88
269,872.82 608,716.70
644,510.17
###
211,442.75
###

% ACUM.

0.00% 0.00%
0.72% 0.72%
1.57% 2.29%
1.14% 3.43%
2.73% 6.17%
6.53% 12.70%
2.14% 14.84%

294,325.83
0.00
213,852.22
407,920.51
273,402.25
723,920.37
318,990.07
254,387.06
602,606.25
271,003.06
314,778.68
342,879.92
173,384.72
90,674.54
288,817.03
0.00
0.00
0.00

7.25% 7.25%
9.01% 9.01%
9.63%
12.82%
14.72%
17.47%
18.97%
21.02%
22.43%
24.69%
25.99%
26.92%
29.17%
30.44%
34.69%

9.63%
12.82%
14.72%
17.47%
18.97%
21.02%
22.43%
24.69%
25.99%
26.92%
29.17%
30.44%
34.69%

###

TOTAL

6,035,612.13

CURVA DE AVANCE FISICO VS AVANCE FINANCIERO

Chart Title

EJECUTADO ACUMUL.

AVANCE FINANCIERO EJECUTADO

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.00
0.00
0.00

2.98%
0.00%
2.17%
4.13%
2.77%
7.33%
3.23%
2.58%
6.10%
2.75%
3.19%
3.47%
1.76%
0.92%
2.93%
0.00%
0.00%
0.00%
61.14%

17.82%
17.82%
19.99%
24.12%
26.89%
34.22%
37.45%
40.03%
46.13%
48.88%
52.07%
55.54%
57.30%
58.22%
61.14%
0.00%
0.00%
0.00%

MDE

"MEJORAMIENTO DE LA INFRAESTRUTURA EDUCATIVA

Obra:
Ubicacin:

PALMA REAL

UNIDAD OPERATIVA:

PALMA REAL

1. COSTOS Y TIEMPOS
PRESUP. ASIGNADO:
MARCO PRESUPUESTAL 2014:

1. VALORIZACIN
DESCRIPCION
COSTO DIRECTO
ELABORACION EXP. TEC.
GASTOS GENERALES
GASTOS GENERALES DE SUPERVISION DE OBRA
LIQUIDACION DE OBRA
MAYORES METRADOS
COSTO DIRECTO
ELABORACION EXP. TEC.
GASTOS GENERALES
GASTOS GENERALES DE SUPERVISION DE OBRA
LIQUIDACION DE OBRA
OBRAS NUEVAS
COSTO DIRECTO
ELABORACION EXP. TEC.
GASTOS GENERALES
GASTOS GENERALES DE SUPERVISION DE OBRA
LIQUIDACION DE OBRA
CAPACITACION SOCIAL
TOTAL
PARTIDAS NO EJECUTADAS

2. RECURSOS HUMANOS
DIRECCIN
DESCRIPCIN

INSPECTOR DE OBRA
RESIDENTE DE OBRA
ASISTENTE TECNICO
PROFECIONA I
TECNICO ADMINISTRATIVO I
AUXILIAR SECRETARIA I
AUXILIAR SECRETARIA II

3. MAQUINARIA

DESCRIPCIN
1. cargador frontal apoyo

HM
43.81

2. cargador frontal (alquilado)


3. volquetes SCANIA DE 15 M3
3. Volquete Scania 8m3

90
79.00

4. Volquete 2
5. Mini Cargador

65.7

6. Camioneta 4x4

141.00

7. camioneta STOU
8. Moto Lineal

8.15

4. EQUIPO
DESCRIPCIN

HM

1. Mescladora de concreto prestada


2. Mescladora de concreto propia 1

68.90

3. Mescladora de concreto propia 2

24.70

4. Generador

16.40

5. Sierra circular

18.00

6. Motosierra

24.50

7. Motor 18 hp
8. Vibradora de Concreto propia 1

19.60

9. Vibradora de Concreto propia 2


10. Cepilladora electrica

61.60

11. Compactadora 1tipo plancha

31.00

11. Compactadora 2 tipo canguro

5. ESTADO DE LA OBRA
Es una obra reiniciada en la gestin actual? (SI)
Es una obra en continuidad? ( SI )
Avance fsico al cambio de gestin:
Solicito ampliacin de calendario? ( No)
Hubo paralizacin? ( SI ) veces _1_ Das hbiles Perdidos 0 total 0 das por lluvias
Otros datos del estado de la obra:

6.DESCRIPCION DE METAS FISICAS


(Las mas importantes)
MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E PRIMARIO N50245 Y
SECUDARIO I.E. JOSE PIO DE LA AZA DE CORIBENI

ENTREGADO POR:
CARGO: Residente de Proyectos Especiales

INFORME MENSUAL FASE


INVERSIN-CONSTRUCCIN

FICHA TECNICA EJECUTIVA

RUTURA EDUCATIVA DE LA I.E PRIMARIA N 50245 Y SECUNDARIA JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATE CUSCO"

Dist: Echarati Prov: La convencin Dp


INSPECTOR DE OBRA:

S/. 9871,378.67

CRONOGRAMA PROGRAMADO:

S/. 9871,378.67

CRONOGRAMA EJECUTADO:

ING. JULIO CARBAJAL COILA

PLANIFICADO

EJECUTADO

(S/.)

(S/.)

8,276,948.93
183,142.87
920,060.23
420,363.64
70,863.00

302,378.96
33,612.25
15,357.00
6,690.70
2,588.81
49,395.61
5,490.78
2,508.67
422.90
1,092.97
62,852.86
1,390.74
6,986.68
3,192.12
538.11

9,871,378.67

494,499.16

TECNICO
N
1
1
1
1
0
3
0

DESCRIPCIN
MAESTRO DE OBRA
OPERADOR DE MAQ. LIVIANA
ALMACENERO
OPERADOR DE MAQ. PESADA
GUARDIAN

MODELO/CDIGO

DESCRIPCIN

DIAS

xmc 300

carguio de material exedente y agregados

scania

Eliminacion de Material, transporte de agregados y


cemento

16

scania

Eliminacion de Material, transporte de agregados y


cemento

14

CAT

movimineto de tierras y eliminacion de material


exedente

X2q 793

transporte de personal y materiales a obra

25

FZ 150 (apoyo)

traslado de personal tecnico

MODELO/CDIGO

DESCRIPCIN

DIAS

kolhler

mezclado de conccreto

15

kolhler

mezclado de conccreto

brijjstraton

alumbrado de campamento

alquilado

preparado de formas para encofrados

72

huqsvarna

picado de cuartoneria

10

honda

vibrado en los vaciados

honda

vibrado en los vaciados

alquilado

preparado de formas para encofrados caravista

18

honda

compactado de pisos y veredas

Causa (s) de la paralizacin:


Fecha (s) de paralizacin:
Fecha (s) de reinicio:
El marco presupuestal 2014 no es suficiente para finalizar la obra? (si/no): ____SI_____
Solicito ampliacin presupuestal? (NO) monto

7.OBSERVACIONES
(Dificultades encontradas en Obra)
1. FALTA DE PERSONAL TECNICO CALIFICADO, OPERARIOS,OFICIALES BAJOS RENDIMIENTOS DE AVANCE POR
CONTAR SOLO CON OBREROS DE LA ZONA CON BAJA CAPACITACION TECNICA EN CONSTRUCCION.
2. NO SE ATIENDE LOS REQUERIMIENTOS DE FIERRO Y MATERIALES ELECTRICOS.

ING. MANUEL CARPIO GANDULIAS


Residente de Obra

CIP/CAP:
FECHA DE ENTREGA:

106532

REVISION
FECHA: MARZO 2014

RITO DE ECHARATE - LA CONVENCION

SEC. FUNC.

0160-2014

: La convencin Dpto: Cusco

AL COILA

665 Dias
665 Dias

EJECUTADO

REAL (Oficina presupuestos)


%

(S/.)

3.65%

0.60%

0.76%

5.01%

OBRERO
N
1
1
1

DESCRIPCIN
OPERARIO I
OPERARIO II
OFICIAL

2
1

PEON
COCINERA

4. REPORTE DE INCIDENTES

N
5
8
8
25
1

no): ____SI_____

CAPAC.

DESCRIP.

3.5 m3
2m3
15 m3
8m3

0.3 m3

150cc

4. REPORTE DE INCIDENTES
CAPAC.

9P3
9P3
7000w
8HP

2HP
2HP
4HP

DESCRIP.

8.SUGERENCIAS Y RECOMENDACIONES

Se sugiere al rea logistica seguir atendiendo los requerimientos de MATERIALES


SOLICITADOS EN LOS REQUERIMIENTOS a la brevedad posible. Convocar a nivel
regional plazas para contratos de operarios y oficiales

FIRMA:

PALMA REAL 29 DE ABRIL DEL 2014

VALORIZACION FINANCIERA VS VALORIZACION EJECUTADA


INFORME MENSUAL DE OBRA Nro. 04
DEL 01 DE FEBRERO AL 28 FEBRERO DEL 2014

: ING. MANUEL CARPIO GANDULIAS

RESIDENTE DEL OBRA

VALORIZACIONES
25.00%
20.00%
15.00%
10.00%
5.00%
0.00%
0

26

57

88

118

149

179

Column N

210

240

270

Column Q

25.00%

20.00%

15.00%
Column N

Column Q

10.00%

5.00%

0.00%
0

TIEMPO EN DIAS

0
26
57
88
118
149
179
210
240
270

26

57

88

118

149

179

210

VALORIZACION FINANCIERA

MONTO MES

0
71191.47
157,442.51
112,309.90
260,167.62
511,424.39
355,803.26
336,720.66
0.00
221,052.22

MOMTO ACUM

0.00
71,191.47
228,633.98
340,943.88
601,111.50
1,112,535.89
1,468,339.15
1,805,059.81
1,805,059.81
2,026,112.03
9,871,378.67

240

270

VALORIZACION EJECUTADA
PORCENTAJE

0.00%
0.72%
2.32%
3.45%
6.09%
11.27%
14.87%
18.29%
18.29%
20.53%

MONTO MES

0.00
53,839.21
44,817.17
49,669.18
111,534.25
182,215.00
133,624.43
139,635.66
174,020.59
61,210.08

MOMTO ACUM

0.00
53,839.21
98,656.38
148,325.56
259,859.80
442,074.80
575,699.23
715,334.89
889,355.48
950,565.56

PORCENTAJE

0.00%
0.55%
1.00%
1.50%
2.63%
4.48%
5.83%
7.25%
9.01%
9.63%

FORMATO No 02

INFORME MENSUAL
DEL 01 DE ABRIL AL 25 DE ABRIL DEL 2014
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATI- LA CONVENCION-CUSCO"
A.-

GENERALIDADES.A.1 RESIDENTE DE OBRA.Especialidad


Nro. Colegiatura
Direccin

: ING. MANUEL CARPIO GANDULIAS


: ING. CIVIL
CIP: 106532
: PLAZA DE ARMAS DE PALMA REAL S/N

A.2. INSPECTOR DE OBRA.Especialidad


Nro. Colegiatura
Direccin

ING.JULIO
CARBAJAL COILA
: ING. CIVIL
CIP.29186
: PLAZA DE ARMAS DE PALMA REAL S/N

A.3 FECHA REPORTADA.-

MES DE ABRIL 2014

A.4 DATOS DEL PROYECTO.Unidad Ejecutora


Unidad Operativa
Secuencia Funcional
Funcin
Programa
Proy y/o Actividad
Meta
Finalidad
Obra
Fuente de Financiamiento
Modalidad de Ejecucin

: MUNICIPALIDAD DISTRITAL DE ECHARATE


: ZONAL PALMA REAL
160
: 022
: 9002
: 2083621
: 00001
: 25788
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATI- LA CONVENCION-CUSCO"
: CANON Y SOBRE CANON
: ADMINISTRACION DIRECTA

A.5 FINANCIERO.Presupuesto Base Exp.tec.


MDE
Presupuesto Asignado ao 2014
Presupuesto Ejecutado mes (del 01 al 25 de abril 2014)
Presupuesto Acumulado
Presupuesto Saldo
A.6 VALORIZACIONES.Valorizacion: DEL 01 AL 25 DE ABRIL DEL 2014
Valorizacin Mensual
Valorizacin Mayores Metrados
Valorizacin Partidas Nuevas
Valorizacin Acumulada del mes
Valorizacin Saldos
Valorizacion Acumulada: DEL 01 AL 25 DE ABRIL DEL 2014
Valorizacin Acumuladas Mes
Valoriz. Acumulada Mayores Metrados
Valoriz. Acumulada Partidas Nuevas
Valoriz. Acumulada Total

: S/.
: S/.
: S/.
: S/.
: S/.
: S/.

9,871,378.67
9,871,378.67
3,500,000.00
166,869.13
1,107,900.70
2,392,099.30

: S/.
: S/.
: S/.
: S/.

302,378.96
49,395.61
62,852.86
414,627.43
4,789,808.14

3.65%
0.60%
0.76%
5.01%
57.87%

: S/.
: S/.
: S/.
: S/.

2,434,747.65
548,826.97
503,566.18
3,487,140.79

29.42%
6.63%
6.08%
42.13%

A.7 CRONOGRAMA DE OBRA


Inicio
Programado
Ejecutado

:
:
:

A.8 UBICACIN
Lugar
Distrito
Provincia
Departamento

:COMUNIDAD NATIVA MISION KORIBENI


: ECHARATI
: LA CONVENCION
: CUSCO

06 DE ENERO 2014
845 DIAS
690 DIAS

B
B.1

ASPECTOS TECNICO
BREVE DESCRIPCION DE LA META ANUAL
"MEJORAMIENTO DE LA INFRAESTRUTURA EDUCATIVA DE LA I.E PRIMARIA N50245 Y SECUNDARIA JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATI- LA
CONVENCION-CUSCO"

La meta inicial del expediente tecnico es la construccion de 02 bloques vivienda de docentes,02 bloques de secundaria,03 bloques de primaria,02 canchas
multiples,02 duchas y vestidores,01 bloque taller de confeccion, 01 bloque taller de artesanias, 02 sala de computo, 01 bloque topico,psicologia y administracion,01
patio de honor, 01 bloque de sala de uso multiple, 01 bloque de biblioteca general, 01 guardiania y playa de estacionamiento.

B.2

DOCUMENTOS TECNICOS
DOCUMENTO

NUMERO

Resolucin de Aprobacion Expediente

FECHA

OBSERVACIONES

N634-2012-A-MDE/LC

Acta de Apertura de Cuaderno Obra

6/4/2012

Acta de Entrega de Terreno

6/4/2012

Acta de Inicio de Obra

6/4/2012

Acta de Paralizacin/Corte

12/31/2012

Acta de Reinicio de Obra

1/14/2013

Acta de Paralizacin/Corte

12/21/2013

Acta de Reinicio de Obra

1/6/2014

Acta de Entrega de Obra

B.3

RECURSOS UTILIZADOS
B.3.1

RECURSOS HUMANOS

CATEGORIA

MUNICIPALIDAD

AFECTOS

TOTAL DH

Residente de Obra

31

31.00

Inspector de Obra

31

31.00

Tecnico Administrativo II

0.00

Profesional I

0.00

Asistente tecnivo 2

31

93.00

Auxiliar o Secretaria

31

62.00

Responsabe de Personal

0.00

Almacenero de Obra

31

31.00

Topografo

31

31.00

Maestro de Obra

31

31.00

Operador de Maquinaria Pesada

31

31.00

Operador de Maquinaria Liviana

0.00

Chofer

31

31.00

Operario

13

31

465.00

Oficial (Obrero A promedio)

31

310.00

Peones (Obrero B promedio)

25

31

58

372

1860.00

ACUMULADO

SALDO

Total
B.3.2

ACUMULADO

713.00

PLANILLA DE TAREOS
DESCRIPCION

M. D. E.

PROGRAMADO

ANTERIOR

ACTUAL

3,493,400.48

2,636,733.12

42,285.95

2,679,019.07

814,381.41

3,493,400.48

2,636,733.12

42,285.95

2,679,019.07

814,381.41

CONVENIO
BENEFICIARIOS
TOTAL

COMENTARIO
El presente informe considera en la parte financiera el gasto hasta el 25 de abril del 2014, los prximos informes sern de 26 al 25 del mes siguiente

AVANCE FISICO

B.4

BREVE APRECIACION SOBRE LA VALORIZACION MENSUAL


1. FRENTE ESTRUCTURAS, se trabajo en las estructuras de concreto armado en los bloques de administracion, centro de computo primaria y secundaria.
2. ARQUITECTURA, trarrajeo de parapetos veredas y cemento pulido de parasoles, en los distintos bloques
3. COBERTURAS, colocado de estructura metalica para cobertura en el bloque primaria.
4. MAQUINARIA PESADA, traslado de materiales de construccion como agregados y cemento, tambien se realizo el cargio y elimincion de material exedente.
5, TALLERES Y MAESTRANZA, elaboracion de bloquetas huecas de concreto de 15 x 20 x40cm, taller de carpinteria, se continua con la elavoracion de
tablas y listones para los encofrados.
6. instalaciones electricas y sanitarias, paralelamente con los trabajos en arquitectura y estructuras, se esta instalando la tuberia electrica y de saneamiento
basico en los distintos bloques que lo requieran
B.4.1

VALORIZACION DE OBRA

B.4.2
DESCRIPCION

Expediente Tecnico

PROGRAMADO

ANTERIOR

8,276,948.93

ACTUAL

2,132,368.69

ACUMULADO

302,378.96

SALDO

2,434,747.65

Mayor Metrado

654,550.23

49,395.61

703,945.84

Partidas Nueva

600,570.63

62,852.86

663,423.48

Deductivos

8,276,948.93

TOTAL

###

3,387,489.54

414,627.43

3,802,116.97

4,474,831.96

MODIFICACIONES DE OBRA

B.4.3
Descripcin
S/.

Presupuesto

Mayor

Partidas

Base

Metrado

Nuevas

8,276,948.93

548,826.965
0%

Deductivo

Total
Modificacin

503,566.18

6.63%

1,052,393.14
6.08%

12.71%

MAYOR METRADO.Se ejecutaron mayores metrados en las estructuras del bloque de administracion, y en bloque de centro de computo.

PARTIDA NUEVA.eliminacion de material exedente, transporte de agregados y parasoles en bloque centro de computo, bruas

DEDUCTIVOS.se esta evaluando la nesecidad de deducir partidas y metrados que no seran ejecutados y que no corresponde a lo indicado en los planos.

AVANCE DEL CRONOGRAMA DE OBRA

B.4.4
PROGRAMADO

INICIADO

EJECUTADO

PARALIZADO

AMPLIACION

845

6/4/2012

690 DIAS

NO

SI

ESTADO

tramite documentario en echarati


Enel presente mes se presento el expediente de partidas nuevas y mayores metrados en el que se solicita la ampliacion de presupuesto y principalmente la reprogramacion de obra.

B.4.5

CONTROL DE CALIDAD

en campo, se tomaron muestras de slump test y testigos (briquetas )


ensayos de control de calidad del concreto, se realizo el ensayo de rumtura de briquetas de los distintos elementos estructurasles del bloque administracion.

C.

ASPECTO FINANCIERO
C.1.1
MOVIMIENTO DE ALMACEN VALORIZADA
DESCRIPCION

PERIODOS DE GESTION
2012

2013

PROGRAMADO

2014

4,814,297.23

TOTAL

COMENTARIO.el reporte valorizado que se tiene a la actualidad es segn a los costos


que se adquieren con relacin a los del expediente tcnico

C.1.2

EJECUCION DE METAS FINANCIERAS


DESCRIPCION

Municipalidad

PROGRAMADO

ANTERIOR

ACTUAL

9,871,378.67

6,772,424.06

166,869.13

Convenio
Beneficiarios
TOTAL

9,871,378.67

166,869.13

* En el tem de programado se consigna lo formulado en el expediente tcnico

COMENTARIO.las gastos financieros son exclusivamente realizados por la oficina de logistica por lo
que esta residencia solicita que se alcance cotizaciones para evitar sobrevaloraciones
en la adquisicion de materiales y servicios.

D.

ASPECTO ADMINISTRATIVO
Los reportes de gastos mensuales son elaborados a destiempo por el rea de
administracin, generando vacios en la informacin contable de la obra, no
permitiendo un seguimiento continuo a los gastos

E.

ASPECTO SOCIAL
Se viene laborando con personal de la zona en lo que respecta a la mano de obra
no calificada y teniendo mutua comunicacin con su junta directiva y poblacion
beneficiaria y Apafa.

F.

OBSERVACIONES Y RECOMENDACIONES
En este mes se ha Ejecutado partidas del expediente tecnico, partidas por mayores metrados y partidas nuevas

TOTAL

S/.

4,814,297.23

ACUMULADO

l expediente tecnico, partidas por mayores metrados y partidas nuevas

6,939,293.19

6,939,293.19
70.30%

MUNICIPALIDAD DISTRITAL DE ECHARATI


0

RESUMEN DE VALORIZACIONES DE OBRA N 03- 2014


OBRA:
"MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E PRIMARIA N 50245 Y SECUNDARIO JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATI- LA CONVENCION-CUSCO"
FECHA DE INICIO DE OBRA
:04/06/2012
INFORME MENSUAL:
ABRIL 2014

ITEM
1
2
3
4

VALORIZACIN
EXPEDIENTE TECNICO
MAYORES METRADOS
PARTIDAS NUEVAS
DEDUCTIVOS
COSTO TOTAL
GASTOS GENERALES (11.12%)
GASTOS DE SUPERVICION (4.57%)
GASTOS DE LIQUIDACION (0.86%)
ELABORACION EXPEDIENTE TECNICO (2.21%)
TOTAL PRESUPUESTO

PRESUPUESTO S/.
8,276,948.93
0.00
0.00
0.00
8,276,948.93
920060.23
420363.64
70863.00
183142.87
9,871,378.67

ANTERIOR
VALORIZADO S/.
2,132,368.69
499,431.35
440,713.32
0.00
3,072,513.36
341538.58
156044.57
26305.29
67985.07
3,664,386.85

%
25.76%
6.03%
5.32%
0.00%
37.12%

37.12%

AVANCES
ACTUAL
VALORIZADO S/.
302,378.96
49,395.61
62,852.86
0.00
414,627.43
46089.71
21057.80
3549.83
9174.40
494,499.16

%
3.65%
0.60%
0.76%
0.00%
5.01%

5.01%

ACUMULADO
VALORIZADO S/.
2,434,747.65
548,826.97
503,566.18
0.00
3,487,140.79
387628.29
177102.36
29855.11
77159.47
4,158,886.02

SALDO
%
29.42%
6.63%
6.08%
0.00%
42.13%

42.13%

VALORIZADO S/.
5,842,201.28
0.00
0.00
0.00
4,789,808.14
532431.94
243261.28
41007.89
105983.40
5,712,492.65

%
70.58%
0.00%
0.00%
0.00%
57.87%

57.87%

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item

Und.

Metrado

Precio Unitario

1 OBRAS DE CONCRETO ARMADO


1.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
CONSTRUCCIONES PROVICIONALES (OFICINA, ALMACEN Y GUARDIANIA)
CERCO PROVISIONAL DE OBRA
CARTEL DE IDENTIFICACION DE LA OBRA
INSTALACION PROVISIONAL DE AGUA
INSTALACION PROVISIONAL DE DESAGUE
INSTALACION PROVISIONAL SUMINISTRO TRIFASICO DE ENERGIA
ELECTRICA
DEMOLICION DE BLOQUE EXISTENTE DE ADOBE
1.02 BLOQUES PRIMARIA
OBRAS DE CONCRETO ARMADO (PABELLONES)
01.02.01
TRABAJOS PRELIMINARES
01.02.01.01
LIMPIEZA DE TERRENO MANUAL
01.02.01.01.01
TRAZO Y REPLANTEO DURANTE EL PROCESO
01.02.01.01.02
MOVIMIENTO DE TIERRAS
01.02.01.02
EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS)
01.02.01.02.01
EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS
01.02.01.02.02
EXCAVACIN PARA VIGAS DE CIMENTACIN
01.02.01.02.03
RELLENO CON MATERIAL PROPIO
01.02.01.02.04
NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA
01.02.01.02.05
ELIMINACION DE MATERIAL CON MAQUINA
01.02.01.02.06
OBRAS DE CONCRETO SIMPLE
01.02.01.03

01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
01.01.07

m2
GLB
GLB
GLB
GLB
GLB
m2

800.00
1.00
1.00
1.00
1.00
1.00
200.00

100.000
10,000.000
1,800.000
4,000.000
4,000.000
4,000.000
46.000

m2
m2

714.21
714.21

0.740
3.840

m3
m3
m3
m3
m2
m3

51.89
260.25
176.84
283.12
714.27
200.15

27.580
31.350
31.350
21.760
2.420
5.780

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.02.01.03.01
01.02.01.03.02
01.02.01.03.03
01.02.01.03.04
01.02.01.03.05
01.02.01.04
01.02.01.04.01
01.02.01.04.02
01.02.01.04.03
01.02.01.04.04
01.02.01.04.05
01.02.01.05
01.02.01.05.01
01.02.01.05.02
01.02.01.05.03
01.02.01.06
01.02.01.06.01
01.02.01.06.02
01.02.01.06.03
01.02.01.07
01.02.01.07.01
01.02.01.07.02

Und.
SOLADO C S 1:10 e= 10 cm
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G.
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m
CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS
CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4"
CONCRETO ARMADO
ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS
CONCRETO F'C= 210 KG/CM2 EN ZAPATAS
ACERO f'y = 4200 kg/cm, G 60 EN VIGAS DE CIMENTACION
ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2
COLUMNAS
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
COLUMNETAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO
CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2
VIGAS
CONCRETO EN VIGAS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE VIGAS

Metrado

Precio Unitario

m2
m3
m2
m3
m2

288.93
72.00
226.51
20.27
649.80

28.600
222.550
26.970
253.550
41.330

kg
m3
kg
m2
m3

104.10
573.97
3,236.82
148.13
23.09

6.050
432.510
6.030
32.810
445.210

kg
m2
m3

11,233.41

796.96
73.71

6.030
35.560
439.560

kg
m2
m3

835.32
79.56
5.97

6.660
20.550
450.850

m3
m2

95.21
921.54

483.080
48.850

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.02.01.07.03
01.02.01.08
01.02.01.08.01
01.02.01.08.02
01.02.01.08.03

Und.
ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
VIGAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO
CONCRETO EN VIGAS F'C= 210 KG/CM2

Metrado

Precio Unitario

kg

10,026.53

6.030

kg
m2
m3

731.31
61.96
4.65

6.660
20.550
518.910

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.02.01.09
01.02.01.09.01
01.02.01.09.02
01.02.01.09.03
01.02.01.09.04
01.02.01.10
01.02.01.10.01
01.02.01.10.02
01.02.01.10.03
01.02.01.11
01.02.01.11.01
01.02.01.11.02
01.02.01.11.03
01.02.01.11.04
01.02.01.11.05
01.02.01.11.06
01.02.01.12
01.02.01.13
01.02.01.14
01.02.01.15
01.03.01

Und.
LOSAS ALIGERADAS
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA
PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS
ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2
ESCALERAS
ACERO DE REFUERZO EN ESCALERAS Y RAMPAS Fy=4200 Kg/cm2
ENCOFRADO Y DESENCOFRADO EN ESCALERAS Y RAMPAS
CONCRETO EN ESCALERAS Y RAMPAS F'C= 210 KG/CM2
ESTRUCTURAS METALICAS Y COBERTURAS
CERCHA TIPO 01 (Longitud de 4.50)
CERCHA TIPO 02 (Longitud de 3.70)
CERCHA TIPO 03 (Longitud de 3.50)
TIJERAL DE METAL TIPO 01
COBERTURA CON PLANCHA ONDULINE
CUMBRERA ONDULINE
URINARIOS CORRIDOS EN BATERA DE BAOS
ACERO DE REFUERZO EN URINARIOS CORRIDOS
ENCOFRADO Y DESENCOFRADO DE URINARIOS CORRIDOS
CONCRETO EN GRADAS F'C= 210 KG/CM2 EN URINARIOS CORRIDOS
1.03 BLOQUES SECUNDARIA
OBRAS DE CONCRETO ARMADO (PABELLONES)

Metrado

Precio Unitario

m2
m2
kg
m3

606.78
606.78
7,397.00
93.37

36.900
14.090
6.660
492.450

kg
m2
m3

470.78
13.52
10.24

6.050
40.640
452.260

und
und
und
und
m2
ML

90.00
17.00
17.00
5.00
876.00
69.70

135.360
125.520
123.060
440.460
37.900
40.550

kg
m2
m3

10.40
3.60
0.18

6.050
40.640
452.260

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.03.01.01
01.03.01.01.01
01.03.01.01.02
01.03.01.02
01.03.01.02.01
01.03.01.02.02
01.03.01.02.03
01.03.01.02.04
01.03.01.02.05
01.03.01.02.06
01.03.01.03
01.03.01.03.01
01.03.01.03.02
01.03.01.03.03
01.03.01.03.04
01.03.01.03.05
01.03.01.04
01.03.01.04.01
01.03.01.04.02
01.03.01.04.03
01.03.01.04.04
01.03.01.04.05

Und.
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS)
EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS
EXCAVACIN PARA VIGAS DE CIMENTACIN
RELLENO CON MATERIAL PROPIO
NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA
ELIMINACION DE MATERIAL CON MAQUINA
OBRAS DE CONCRETO SIMPLE
SOLADO C S 1:10 e= 10 cm
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G.
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m
CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS
CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4"
CONCRETO ARMADO
ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS
CONCRETO F'C= 210 KG/CM2 EN ZAPATAS
ACERO f'y = 4200 kg/cm, G 60 EN VIGAS DE CIMENTACION
ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2

Metrado

Precio Unitario

m2
m2

482.45
482.45

0.740
3.840

m3
m3
m3
m3
m2
m3

2.92
180.78
121.09
146.98
482.45
286.15

27.580
31.350
31.350
21.760
2.420
5.780

m2
m3
m2
m3
m2

192.49
65.77
186.17
16.83
482.45

28.600
222.550
26.970
253.550
41.330

kg
m3
kg
m2
m3

1,326.96
85.78
2,217.41
128.46
16.06

6.050
432.510
6.030
32.810
445.210

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.03.01.05
01.03.01.05.01
01.03.01.05.02
01.03.01.05.03
01.03.01.06
01.03.01.06.01
01.03.01.06.02
01.03.01.06.03
01.03.01.07

Und.
COLUMNAS
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
COLUMNETAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO
CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2
VIGAS

Metrado

Precio Unitario

kg
m2
m3

7,729.35
366.99
51.65

6.030
35.560
439.560

kg
m2
m3

470.96
54.72
4.10

6.660
20.550
450.850

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item

01.03.01.07.01
01.03.01.07.02
01.03.01.07.03
01.03.01.08
01.03.01.08.01
01.03.01.08.02
01.03.01.08.03
01.03.01.09
01.03.01.09.01
01.03.01.09.02
01.03.01.09.03
01.03.01.09.04
01.03.01.10
01.03.01.10.01
01.03.01.10.02
01.03.01.10.03
01.03.01.11
01.03.01.11.01
01.03.01.11.02
01.03.01.11.03
01.03.01.11.04

Und.

CONCRETO EN VIGAS F'C= 210 KG/CM2


ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
VIGAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO
CONCRETO EN VIGAS F'C= 210 KG/CM2
LOSAS ALIGERADAS
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA
PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS
ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2
ESCALERAS
ACERO DE REFUERZO EN ESCALERAS Y RAMPAS Fy=4200 Kg/cm2
ENCOFRADO Y DESENCOFRADO EN ESCALERAS Y RAMPAS
CONCRETO EN ESCALERAS Y RAMPAS F'C= 210 KG/CM2
ESTRUCTURAS METALICAS Y COBERTURAS
CERCHA TIPO 01 (Longitud de 4.50)
CERCHA TIPO 04 (Longitud de 3.20)
TIJERAL DE METAL TIPO 02
CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm

Metrado

Precio Unitario

m3
m2
kg

64.99
623.76
6,195.13

483.080
48.850
6.030

kg
m2
m3

502.70
38.62
3.26

6.660
20.550
518.910

m2
m2
kg
m3

232.29
232.29
2,408.43
61.15

36.90
14.090
6.660
492.450

kg
m2
m3

235.39
65.76
5.12

und
und
und
ML

86.00
25.00
5.00
33.60

6.050
40.640
452.260
40,725.530
135.360
119.370
339.550
19.120

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item

Und.
COBERTURA CON PLANCHA ONDULINE
CUMBRERA ONDULINE
URINARIOS CORRIDOS EN BATERA DE BAOS
ACERO DE REFUERZO EN URINARIOS CORRIDOS
ENCOFRADO Y DESENCOFRADO DE URINARIOS CORRIDOS
CONCRETO EN GRADAS F'C= 210 KG/CM2 EN URINARIOS CORRIDOS

01.03.01.11.05
01.03.01.11.06
01.03.01.12
01.03.01.12.01
01.03.01.12.02
01.03.01.12.03
1.04
01.04.01
01.04.01.01
01.04.01.01.01
01.04.01.01.02
01.04.01.02
01.04.01.02.01
01.04.01.02.02
01.04.01.02.03
01.04.01.02.04
01.04.01.02.05
01.04.01.03
01.04.01.03.01
01.04.01.03.02
01.04.01.03.03
01.04.01.03.04

Metrado

Precio Unitario

m2
ML

575.40
48.15

37.900
40.550

kg
m2
m3

10.40
3.60
0.18

6.050
40.640
452.260

m2
m2

162.76
162.76

0.740
3.840

m3
m3
m3
m2
m3

55.43
65.62
100.07
162.76
41.97

27.580
31.350
21.760
2.420
5.780

m2
m3
m2
m3

60.46
18.00
51.42
3.86

28.600
222.550
26.970
253.550

SALA DE CMPUTO PRIMARIA Y SECUNDARIA

OBRAS DE CONCRETO ARMADO (PABELLONES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS)
EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS
RELLENO CON MATERIAL PROPIO
NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA
ELIMINACION DE MATERIAL CON MAQUINA
OBRAS DE CONCRETO SIMPLE
SOLADO C S 1:10 e= 10 cm
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G.
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m
CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.04.01.03.05
01.04.01.04
01.04.01.04.01
01.04.01.04.02
01.04.01.04.03
01.04.01.04.04
01.04.01.04.05

Und.
CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4"
CONCRETO ARMADO
ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS
CONCRETO F'C= 210 KG/CM2 EN ZAPATAS
ACERO f'y = 4200 kg/cm, G 60 EN VIGAS DE CIMENTACION
ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2

Metrado

Precio Unitario

m2

88.20

41.330

kg
m3
kg
m2
m3

544.07
26.25
594.03
33.44
4.18

6.050
432.510
6.030
32.810
445.210

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.04.01.05
01.04.01.05.01
01.04.01.05.02
01.04.01.05.03
01.04.01.06
01.04.01.06.01
01.04.01.06.02
01.04.01.06.03
01.04.01.07
01.04.01.07.01
01.04.01.07.02
01.04.01.07.03
01.04.01.08
01.04.01.08.01
01.04.01.08.02
01.04.01.08.03
01.04.01.09
01.04.01.09.01
01.04.01.09.02
01.04.01.09.03
01.04.01.09.04
01.04.01.10

Und.
COLUMNAS
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
COLUMNETAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO
CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2
VIGAS
CONCRETO EN VIGAS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
VIGAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO
CONCRETO EN VIGAS F'C= 210 KG/CM2
LOSAS ALIGERADAS
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA
PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS
ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2
ESCALERAS

Metrado

Precio Unitario

kg
m2
m3

2,455.04
228.90
22.11

6.030
35.560
439.560

kg
m2
m3

281.42
26.94
2.02

6.660
20.550
450.850

m3
m2
kg

23.63
218.21
2,251.76

483.080
48.850
6.030

kg
m2
m3

90.60
7.66
0.57

6.660
20.550
518.910

m2
m2
kg
m3

109.26
109.26
587.27
11.79

36.900
14.090
6.660
492.450

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
ACERO DE REFUERZO EN ESCALERAS Y RAMPAS Fy=4200 Kg/cm2
ENCOFRADO Y DESENCOFRADO EN ESCALERAS Y RAMPAS
CONCRETO EN ESCALERAS Y RAMPAS F'C= 210 KG/CM2
ESTRUCTURAS METALICAS Y COBERTURAS
TIJERAL DE METAL TIPO 05
TIJERAL DE METAL TIPO 07
TIJERAL DE METAL TIPO 08
RETICULA DE METAL TIPO 01
CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm
COBERTURA CON PLANCHA ONDULINE
CUMBRERA ONDULINE
1.05 SALN DE USO MLTIPLE
OBRAS DE CONCRETO ARMADO (PABELLONES)
01.05.01
TRABAJOS PRELIMINARES
01.05.01.01
LIMPIEZA DE TERRENO MANUAL
01.05.01.01.01
TRAZO Y REPLANTEO DURANTE EL PROCESO
01.05.01.01.02
MOVIMIENTO DE TIERRAS
01.05.01.02
EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS)
01.05.01.02.01
EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS
01.05.01.02.02
RELLENO CON MATERIAL PROPIO
01.05.01.02.03
NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA
01.05.01.02.04
ELIMINACION DE MATERIAL CON MAQUINA
01.05.01.02.05

01.04.01.10.01
01.04.01.10.02
01.04.01.10.03
01.04.01.11
01.04.01.11.01
01.04.01.11.02
01.04.01.11.03
01.04.01.11.04
01.04.01.11.05
01.04.01.11.06
01.04.01.11.07

Und.

Metrado

Precio Unitario

kg
m2
m3

252.52
25.15
4.56

6.050
40.640
452.260

und
und
und
und
ML
m2
ML

16.00
14.00
7.00
2.00
695.40
371.92
39.90
61,215.00

375.660
219.060
360.230
697.750
19.120
37.900
40.550

m2
m2

266.00
266.00

0.740
3.840

m3
m3
m3
m2
m3

38.32
77.55
73.61
266.00
54.93

27.580
31.350
21.760
2.420
5.780

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.05.01.03
01.05.01.03.01
01.05.01.03.02
01.05.01.03.03
01.05.01.03.04
01.05.01.03.05

Und.
OBRAS DE CONCRETO SIMPLE
SOLADO C S 1:10 e= 10 cm
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G.
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m
CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS
CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4"

m2
m3
m2
m3
m2

Metrado

76.32
23.12
66.07
4.95
266.00

Precio Unitario

28.600
222.550
26.970
253.550
41.330

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.05.01.04
01.05.01.04.01
01.05.01.04.02
01.05.01.04.03
01.05.01.04.04
01.05.01.04.05
01.05.01.05
01.05.01.05.01
01.05.01.05.02
01.05.01.05.03
01.05.01.06
01.05.01.06.01
01.05.01.06.02
01.05.01.06.03
01.05.01.07
01.05.01.07.01
01.05.01.07.02
01.05.01.07.03
01.05.01.08
01.05.01.08.01
01.05.01.08.02
01.05.01.08.03

Und.
CONCRETO ARMADO
ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS
CONCRETO F'C= 210 KG/CM2 EN ZAPATAS
ACERO f'y = 4200 kg/cm, G 60 EN VIGAS DE CIMENTACION
ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2
COLUMNAS
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
COLUMNETAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO
CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2
VIGAS
CONCRETO EN VIGAS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
VIGAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO
CONCRETO EN VIGAS F'C= 210 KG/CM2

Metrado

Precio Unitario

kg
m3
kg
m2
m3

595.74
31.02
599.71
39.39
4.92

6.050
432.510
6.030
32.810
445.210

kg
m2
m3

1,751.17
170.80
15.44

6.030
35.560
439.560

kg
m2
m3

353.94
33.70
2.53

6.660
20.550
450.850

m3
m2
kg

10.06
88.84
668.57

483.080
48.850
6.030

kg
m2
m3

148.73
11.75
0.88

6.660
20.550
518.910

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
ESTRUCTURAS METALICAS Y COBERTURAS
TIJERAL DE METAL TIPO 13
TIJERAL DE METAL TIPO 14
TIJERAL DE METAL TIPO 15
TIJERAL DE METAL TIPO 16
RETICULA DE METAL TIPO 01
CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm
PLATINAS DE SUJECION DE CORREAS METALICAS
COBERTURA CON PLANCHA ONDULINE
CUMBRERA ONDULINE
1.06 TPICO, SICOLOGA Y ADMINISTRACIN
OBRAS DE CONCRETO ARMADO (PABELLONES)
01.06.01
TRABAJOS PRELIMINARES
01.06.01.01
LIMPIEZA DE TERRENO MANUAL
01.06.01.01.01
TRAZO Y REPLANTEO DURANTE EL PROCESO
01.06.01.01.02
MOVIMIENTO DE TIERRAS
01.06.01.02
EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS)
01.06.01.02.01
EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS
01.06.01.02.02
RELLENO CON MATERIAL PROPIO
01.06.01.02.03
NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA
01.06.01.02.04
ELIMINACION DE MATERIAL CON MAQUINA
01.06.01.02.05
OBRAS DE CONCRETO SIMPLE
01.06.01.03

01.05.01.09
01.05.01.09.01
01.05.01.09.02
01.05.01.09.03
01.05.01.09.04
01.05.01.09.05
01.05.01.09.06
01.05.01.09.07
01.05.01.09.08
01.05.01.09.09

Und.

Metrado

Precio Unitario

und
und
und
und
und
ML
ML
m2
ML

2.00
6.00
1.00
2.00
2.00
680.00
640.20
357.02
9.40

554.530
788.890
1,254.300
1,203.780
1,032.140
19.120
12.420
37.900
40.550

m2
m2

136.35
136.35

0.740
3.840

m3
m3
m3
m2
m3

52.32
40.32
51.62
136.35
52.32

27.580
31.350
21.760
2.420
5.780

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.06.01.03.01
01.06.01.03.02
01.06.01.03.03
01.06.01.03.04
01.06.01.03.05
01.06.01.04
01.06.01.04.01
01.06.01.04.02
01.06.01.04.03
01.06.01.04.04

Und.
SOLADO C S 1:10 e= 10 cm
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G.
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m
CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS
CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4"
CONCRETO ARMADO
ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS
CONCRETO F'C= 210 KG/CM2 EN ZAPATAS
ACERO f'y = 4200 kg/cm, G 60 EN VIGAS DE CIMENTACION
ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION

Metrado

Precio Unitario

m2
m3
m2
m3
m2

36.78
31.35
92.24
8.20
107.77

28.600
222.550
26.970
253.550
41.330

kg
m3
kg
m2

312.88
16.13
479.16
15.84

6.050
432.510
6.030
32.810

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.06.01.04.05
01.06.01.05
01.06.01.05.01
01.06.01.05.02
01.06.01.05.03
01.06.01.06
01.06.01.06.01
01.06.01.06.02
01.06.01.06.03
01.06.01.07
01.06.01.07.01
01.06.01.07.02
01.06.01.07.03
01.06.01.08
01.06.01.08.01
01.06.01.08.02
01.06.01.08.03
01.06.01.09
01.06.01.09.01
01.06.01.09.02
01.06.01.09.03
01.06.01.09.04

Und.
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2
COLUMNAS
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
COLUMNETAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO
CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2
VIGAS
CONCRETO EN VIGAS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
VIGAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO
CONCRETO EN VIGAS F'C= 210 KG/CM2
LOSAS ALIGERADAS
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA
PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS
ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2

Metrado

Precio Unitario

m3

3.96

445.210

kg
m2
m3

1,658.25
134.04
12.06

6.030
35.560
439.560

kg
m2
m3

580.34
109.75
4.12

6.660
20.550
450.850

m3
m2
kg

19.65
180.14
1,538.87

483.080
48.850
6.030

kg
m2
m3

264.20
31.32
1.57

6.660
20.550
518.910

m2
m2
kg
m3

88.07
88.07
626.57
11.45

36.900
14.090
6.660
492.450

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
ESCALERAS
ACERO DE REFUERZO EN ESCALERAS Y RAMPAS Fy=4200 Kg/cm2
ENCOFRADO Y DESENCOFRADO EN ESCALERAS Y RAMPAS
CONCRETO EN ESCALERAS Y RAMPAS F'C= 210 KG/CM2
ESTRUCTURAS METALICAS Y COBERTURAS
TIJERAL DE METAL TIPO 05
TIJERAL DE METAL TIPO 08
RETICULA DE METAL TIPO 01
CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm
COBERTURA CON PLANCHA ONDULINE
CUMBRERA ONDULINE
1.07 TALLER DE CONFECCIN, ARTESANIAS E IDIOMAS
OBRAS DE CONCRETO ARMADO (PABELLONES)
01.07.01
TRABAJOS PRELIMINARES
01.07.01.01
LIMPIEZA DE TERRENO MANUAL
01.07.01.01.01
TRAZO Y REPLANTEO DURANTE EL PROCESO
01.07.01.01.02
MOVIMIENTO DE TIERRAS
01.07.01.02
EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS)
01.07.01.02.01
EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS
01.07.01.02.02
RELLENO CON MATERIAL PROPIO
01.07.01.02.03
NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA
01.07.01.02.04
ELIMINACION DE MATERIAL CON MAQUINA
01.07.01.02.05

01.06.01.10
01.06.01.10.01
01.06.01.10.02
01.06.01.10.03
01.06.01.11
01.06.01.11.01
01.06.01.11.02
01.06.01.11.03
01.06.01.11.04
01.06.01.11.05
01.06.01.11.06

Und.

Metrado

Precio Unitario

kg
m2
m3

102.86
17.06
2.47

6.050
40.640
452.260

und
und
und
ML
m2
ML

14.00
12.00
1.00
335.80
189.63
14.70

375.660
360.230
697.750
19.120
37.900
40.550

m2
m2

189.52
189.52

0.740
3.840

m3
m3
m3
m2
m3

45.24
59.90
77.53
139.52
51.98

27.580
31.350
21.760
2.420
5.780

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.07.01.03
01.07.01.03.01
01.07.01.03.02
01.07.01.03.03
01.07.01.03.04
01.07.01.03.05

Und.
OBRAS DE CONCRETO SIMPLE
SOLADO C S 1:10 e= 10 cm
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G.
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m
CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS
CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4"

m2
m3
m2
m3
m2

Metrado

53.39
15.48
44.24
3.94
84.00

Precio Unitario

28.600
222.550
26.970
253.550
41.330

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.07.01.04
01.07.01.04.01
01.07.01.04.02
01.07.01.04.03
01.07.01.04.04
01.07.01.04.05
01.07.01.05
01.07.01.05.01
01.07.01.05.02
01.07.01.05.03
01.07.01.06
01.07.01.06.01
01.07.01.06.02
01.07.01.06.03
01.07.01.07
01.07.01.07.01
01.07.01.07.02
01.07.01.07.03
01.07.01.08
01.07.01.08.01
01.07.01.08.02
01.07.01.08.03

Und.
CONCRETO ARMADO
ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS
CONCRETO F'C= 210 KG/CM2 EN ZAPATAS
ACERO f'y = 4200 kg/cm, G 60 EN VIGAS DE CIMENTACION
ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2
COLUMNAS
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
COLUMNETAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO
CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2
VIGAS
CONCRETO EN VIGAS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
VIGAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO
CONCRETO EN VIGAS F'C= 210 KG/CM2

Metrado

Precio Unitario

kg
m3
kg
m2
m3

494.16
23.96
566.42
22.15
3.77

6.050
432.510
6.030
32.810
445.210

kg
m2
m3

2,204.41
206.36
19.05

6.030
35.56
439.56

kg
m2
m3

365.30
33.69
2.53

6.66
20.55
450.85

m3
m2
kg

22.97
179.71
1,915.39

483.08
48.85
6.03

kg
m2
m3

76.47
6.45
0.48

6.66
20.55
518.91

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
LOSAS ALIGERADAS
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA
PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS
ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2
ESCALERAS
ACERO DE REFUERZO EN ESCALERAS Y RAMPAS Fy=4200 Kg/cm2
ENCOFRADO Y DESENCOFRADO EN ESCALERAS Y RAMPAS
CONCRETO EN ESCALERAS Y RAMPAS F'C= 210 KG/CM2
ESTRUCTURAS METALICAS Y COBERTURAS
TIJERAL DE METAL TIPO 05
TIJERAL DE METAL TIPO 06
TIJERAL DE METAL TIPO 08
CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm
COBERTURA CON PLANCHA ONDULINE
CUMBRERA ONDULINE
1.08 BIBLIOTECA GENERAL
OBRAS DE CONCRETO ARMADO (PABELLONES)
01.08.01
TRABAJOS PRELIMINARES
01.08.01.01
LIMPIEZA DE TERRENO MANUAL
01.08.01.01.01
TRAZO Y REPLANTEO DURANTE EL PROCESO
01.08.01.01.02
MOVIMIENTO DE TIERRAS
01.08.01.02

01.07.01.09
01.07.01.09.01
01.07.01.09.02
01.07.01.09.03
01.07.01.09.04
01.07.01.10
01.07.01.10.01
01.07.01.10.02
01.07.01.10.03
01.07.01.11
01.07.01.11.01
01.07.01.11.02
01.07.01.11.03
01.07.01.11.04
01.07.01.11.05
01.07.01.11.06

Und.

Metrado

Precio Unitario

m2
m2
kg
m3

90.76
90.76
572.11
8.96

36.90
14.09
6.66
492.45

kg
m2
m3

252.52
25.15
4.56

6.05
40.64
452.26

und
und
und
ML
m2
ML

14.00
12.00
6.00
622.40
272.87
35.10

375.660
324.510
360.230
19.120
37.900
40.550

m2
m2

190.72
190.72

0.740
3.840

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.08.01.02.01
01.08.01.02.02
01.08.01.02.03
01.08.01.02.04
01.08.01.02.05

Und.
EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS)
EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS
RELLENO CON MATERIAL PROPIO
NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA
ELIMINACION DE MATERIAL CON MAQUINA

m3
m3
m3
m2
m3

Metrado
75.86
57.12
72.82
190.72
78.21

Precio Unitario
27.580
31.350
21.760
2.420
5.780

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.08.01.03
01.08.01.03.01
01.08.01.03.02
01.08.01.03.03
01.08.01.03.04
01.08.01.03.05
01.08.01.04
01.08.01.04.01
01.08.01.04.02
01.08.01.04.03
01.08.01.04.04
01.08.01.04.05
01.08.01.05
01.08.01.05.01
01.08.01.05.02
01.08.01.05.03
01.08.01.06
01.08.01.06.01
01.08.01.06.02
01.08.01.06.03
01.08.01.07
01.08.01.07.01

Und.
OBRAS DE CONCRETO SIMPLE
SOLADO C S 1:10 e= 10 cm
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G.
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m
CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS
CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4"
CONCRETO ARMADO
ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS
CONCRETO F'C= 210 KG/CM2 EN ZAPATAS
ACERO f'y = 4200 kg/cm, G 60 EN VIGAS DE CIMENTACION
ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2
COLUMNAS
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
COLUMNETAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO
CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2
VIGAS
CONCRETO EN VIGAS F'C= 210 KG/CM2

Metrado

Precio Unitario

m2
m3
m2
m3
m2

53.71
44.68
131.50
11.98
150.83

28.600
222.550
26.970
253.550
41.330

kg
m3
kg
m2
m3

443.25
22.85
1,185.00
25.00
6.25

6.050
432.510
6.030
32.810
445.210

kg
m2
m3

2,064.22
197.20
18.49

6.030
35.560
439.560

kg
m2
m3

266.04
51.30
1.92

6.660
20.550
450.850

m3

25.62

483.080

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.08.01.07.02
01.08.01.07.03
01.08.01.08
01.08.01.08.01
01.08.01.08.02
01.08.01.08.03
01.08.01.09
01.08.01.09.01
01.08.01.09.02
01.08.01.09.03
01.08.01.09.04
01.08.01.10
01.08.01.10.01
01.08.01.10.02
01.08.01.10.03
01.08.01.11
01.08.01.11.01
01.08.01.11.02
01.08.01.11.03
01.08.01.11.04
01.08.01.11.05

Und.
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
VIGAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO
CONCRETO EN VIGAS F'C= 210 KG/CM2
LOSAS ALIGERADAS
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA
PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS
ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2
ESCALERAS
ACERO DE REFUERZO EN ESCALERAS Y RAMPAS Fy=4200 Kg/cm2
ENCOFRADO Y DESENCOFRADO EN ESCALERAS Y RAMPAS
CONCRETO EN ESCALERAS Y RAMPAS F'C= 210 KG/CM2
ESTRUCTURAS METALICAS Y COBERTURAS
TIJERAL DE METAL TIPO 03
TIJERAL DE METAL TIPO 04
CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm
COBERTURA CON PLANCHA ONDULINE
CUMBRERA ONDULINE
1.09 DUCHAS + VESTIDORES (PRIMARIA Y SECUNDARIA) + GUARDIANIA

Metrado

Precio Unitario

m2
kg

243.98
2,250.23

48.850
6.030

kg
m2
m3

127.76
15.51
0.78

6.660
20.550
518.910

m2
m2
kg
m3

87.30
87.30
621.98
11.35

36.900
14.090
6.660
492.450

kg
m2
m3

159.40
21.96
3.42

6.050
40.640
452.260

und
und
ML
m2
ML

13.00
7.00
500.70
272.87
23.15

440.460
209.340
19.120
37.900
40.550

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.09.01
01.09.01.01
01.09.01.01.01
01.09.01.01.02
01.09.01.02
01.09.01.02.01
01.09.01.02.02
01.09.01.02.03
01.09.01.02.04
01.09.01.02.05

Und.
OBRAS DE CONCRETO ARMADO (PABELLONES)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS)
EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS
RELLENO CON MATERIAL PROPIO
NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA
ELIMINACION DE MATERIAL CON MAQUINA

Metrado

Precio Unitario

m2
m2

69.84
69.84

0.740
3.840

m3
m3
m3
m2
m3

11.41
21.60
12.96
18.96
26.07

27.580
31.350
21.760
2.420
5.780

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.09.01.03
01.09.01.03.01
01.09.01.03.02
01.09.01.03.03
01.09.01.03.04
01.09.01.03.05
01.09.01.04
01.09.01.04.01
01.09.01.04.02
01.09.01.05
01.09.01.05.01
01.09.01.05.02
01.09.01.05.03
01.09.01.06
01.09.01.06.01
01.09.01.06.02
01.09.01.06.03
01.09.01.07
01.09.01.07.01
01.09.01.07.02
01.09.01.07.03
01.09.01.08

Und.
OBRAS DE CONCRETO SIMPLE
SOLADO C S 1:10 e= 10 cm
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G.
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m
CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS
CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4"
CONCRETO ARMADO
ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS
CONCRETO F'C= 210 KG/CM2 EN ZAPATAS
COLUMNAS
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
COLUMNETAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO
CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2
VIGAS
CONCRETO EN VIGAS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
VIGAS DE CONFINAMIENTO

Metrado

Precio Unitario

m2
m3
m2
m3
m2

14.40
28.85
82.42
6.18
69.84

28.600
222.550
26.970
253.550
41.330

kg
m3

152.92
8.64

6.050
432.510

kg
m2
m3

425.93
44.60
2.98

6.030
35.560
439.560

kg
m2
m3

191.76
16.92
1.27

6.660
20.550
450.850

m3
m2
kg

3.98
177.25
452.79

483.080
48.850
6.030

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.09.01.08.01
01.09.01.08.02
01.09.01.08.03
01.09.01.09
01.09.01.09.01
01.09.01.09.02
01.09.01.09.03
01.09.01.09.04
01.09.01.09.05
01.09.01.09.06
01.10.01
01.10.01.01
01.10.01.01.01
01.10.01.01.02
01.10.01.02
01.10.01.02.01
01.10.01.02.02
01.10.01.02.03
01.10.01.02.04
01.10.01.02.05
01.10.01.03

Und.
ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO
CONCRETO EN VIGAS F'C= 210 KG/CM2
ESTRUCTURAS METALICAS Y COBERTURAS
TIJERAL DE METAL TIPO 09
TIJERAL DE METAL TIPO 10
TIJERAL DE METAL TIPO 11
CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm
COBERTURA CON PLANCHA ONDULINE
CUMBRERA ONDULINE
1.1 VIVIENDA DE DOCENTES
OBRAS DE CONCRETO ARMADO (PABELLONES)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS)
EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS
RELLENO CON MATERIAL PROPIO
NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA
ELIMINACION DE MATERIAL CON MAQUINA
OBRAS DE CONCRETO SIMPLE

Metrado

Precio Unitario

kg
m2
m3

66.97
5.94
0.45

6.660
20.550
518.910

und
und
und
ML
m2
ML

3.00
10.00
10.00
341.40
179.07
25.50

632.860
298.980
251.190
19.120
37.900
40.550

m2
m2

158.88
158.88

0.740
3.840

m3
m3
m3
m2
m3

42.86
50.40
84.23
158.88
11.74

27.58
31.35
21.760
2.42
5.780

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.10.01.03.01
01.10.01.03.02
01.10.01.03.03
01.10.01.03.04
01.10.01.03.05

Und.
SOLADO C S 1:10 e= 10 cm
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G.
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m
CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS
CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4"

m2
m3
m2
m3
m2

Metrado
48.94
31.30
89.43
6.71
158.88

Precio Unitario
28.60
222.550
26.970
253.550
41.330

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.10.01.04
01.10.01.04.01
01.10.01.04.02
01.10.01.04.03
01.10.01.04.04
01.10.01.04.05
01.10.01.05
01.10.01.05.01
01.10.01.05.02
01.10.01.05.03
01.10.01.06
01.10.01.06.01
01.10.01.06.02
01.10.01.06.03
01.10.01.07
01.10.01.07.01
01.10.01.07.02
01.10.01.07.03
01.10.01.08
01.10.01.08.01
01.10.01.08.02
01.10.01.08.03

Und.
CONCRETO ARMADO
ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS
CONCRETO F'C= 210 KG/CM2 EN ZAPATAS
ACERO f'y = 4200 kg/cm, G 60 EN VIGAS DE CIMENTACION
ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2
COLUMNAS
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
COLUMNETAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO
CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2
VIGAS
CONCRETO EN VIGAS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
VIGAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO
CONCRETO EN VIGAS F'C= 210 KG/CM2

Metrado

Precio Unitario

kg
m3
kg
m2
m3

488.88
20.16
701.29
43.20
5.40

6.05
432.510
6.03
32.810
445.210

kg
m2
m3

1,708.39
92.20
14.69

6.03
35.560
439.560

kg
m2
m3

521.41
44.54
3.34

6.660
20.550
450.850

m3
m2
kg

12.74
122.82
1,787.84

483.080
48.850
6.030

kg
m2
m3

159.79
5.67
0.43

6.660
20.550
518.910

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.10.01.09
01.10.01.09.01
01.10.01.09.02
01.10.01.09.03
01.10.01.09.04
01.10.01.10
01.10.01.10.01
01.10.01.10.02
01.10.01.10.03
01.10.01.11
01.10.01.11.01
01.10.01.11.02
01.10.01.11.03
01.10.01.11.04
01.11.01
01.11.01.01
01.11.01.02
01.11.01.03
01.11.02
01.11.02.01
01.11.02.02

Und.
LOSAS ALIGERADAS
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA
PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS
ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2
ESCALERAS
ACERO DE REFUERZO EN ESCALERAS Y RAMPAS Fy=4200 Kg/cm2
ENCOFRADO Y DESENCOFRADO EN ESCALERAS Y RAMPAS
CONCRETO EN ESCALERAS Y RAMPAS F'C= 210 KG/CM2
ESTRUCTURAS METALICAS Y COBERTURAS
TIJERAL DE METAL TIPO 12
CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm
COBERTURA CON PLANCHA ONDULINE
CUMBRERA ONDULINE
1.11 TANQUE ELEVADO Y CISTERNA
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO DURANTE EL PROCESO
COLOCACIN DE NIVELES DURANTE LA OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
RELLENO Y COMPACTADO CON MATERIAL PROPIO

Metrado

Precio Unitario

m2
m2
kg
m3

169.01
169.01
634.05
14.13

36.900
14.090
6.660
492.450

kg
m2
m3

135.53
18.61
2.50

6.050
40.640
452.260

und
ML
m2
ML

27.00
1,032.00
550.14
51.90

455.890
19.120
37.900
40.550

m2
m2
m2

24.00
24.00
24.00

0.740
3.840
3.840

m3
m3

34.70
1.80

31.960
17.090

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.11.02.03
01.11.02.04
01.11.02.05
01.11.02.06
01.11.03
01.11.03.01

Und.
ACARREO INTERNO, MATERIAL PROVENIENTE DE EXCAVACION
ELIMINACION DE MATERIAL CARGUIO MANUAL VOLQUETE DE 6 M3
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO O PISO CON
PISN
RELLENO CON AFIRMADO e=4"(100% DE COMPACTACIN)
OBRAS DE CONCRETO SIMPLE
SOLADO C S 1:10 e= 10 cm

Metrado

Precio Unitario

m3
m3
m2
m3

34.70
34.70
25.25
1.80

17.580
8.080
40.930
34.860

m2

44.70

28.600

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.11.04
01.11.04.01
01.11.04.01.01
01.11.04.01.02
01.11.04.01.03
01.11.04.02
01.11.04.02.01
01.11.04.02.02
01.11.04.02.03
01.11.04.03
01.11.04.03.01
01.11.04.03.02
01.11.04.03.03
01.11.04.04
01.11.04.04.01
01.11.04.04.02
01.11.04.04.03
01.11.04.05
01.11.04.05.01
01.11.04.05.02
01.11.04.05.03
01.11.04.06

Und.
CONCRETO ARMADO
PLATEA DE CIMENTACIN
CONCRETO F'C= 210 KG/CM2 EN PLATEA DE CIMENTACIN
ENCOFRADO Y DESENCOFRADO EN PLATEA DE CIMENTACIN
ACERO f'y = 4200 kg/cm2, G 60 EN PLATEA DE CIMENTACIN
PLACAS DE CONCRETO ARMADO PARA TANQUE CISTERNA
CONCRETO F'C= 210 KG/CM2 PARA PLACA DE TANQUE CISTERNA
ENCOFRADO DESENCOFRADO PARA PLACA DE TANQUE CISTERNA
ACERO f'y = 4200 kg/cm2, G 60 EN PLACA PARA TANQUE CISTERNA
LOSA MACIZA
CONCRETO F'C= 210 KG/CM2 EN LOSA MACIZA
ENCOFRADO Y DESENCOFADO EN LOSA MACISA
ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS MACIZAS
COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
VIGAS
CONCRETO EN VIGAS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
CUBA DE CONCRETO

Metrado

Precio Unitario

m3
m2
kg

12.96
11.28
666.80

432.510
43.600
6.050

m3
m2
kg

6.05
60.48
871.16

151.690
23.220
1.810

m3
m2
kg

3.53
49.26
276.65

387.560
35.100
6.660

m3
m2
kg

4.31
86.27
563.06

439.560
35.560
6.030

m3
m2
kg

2.40
36.00
2,769.18

483.080
48.850
6.030

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
CONCRETO F'C= 210 KG/CM2 EN CUBA
ENCOFRADO Y DESENCOFRADO EN CUBA
ACERO f'y = 4200 kg/cm2, G 60 EN CUBA
MUROS DE BLOQUES HUECOS DE CONCRETO
MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M
TARRAJEO
TARRAJEO CON IMPERMEABILZANTE
TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA
1.12 PRUEBAS DE LABORATORIO
ROTURA DE BRIQUETAS
01.12.01
ESTUDIO DE SUELOS PARA VERIFICACION DE CAPACIDAD PORTANTE
01.12.02
DISEO DE MEZCLAS DE CONCRETO
01.12.03
1 ARQUITECTURA
1.01 BLOQUES PRIMARIA
MUROS Y TABIQUES DE ALBAILERIA
01.01.01
MUROS DE LADRILLO CORRIENTE DE ARCILLA (A MAQUINA O
01.01.01.01
ARTESANALMENTE)
MURO DE LADRILLO ARTESANAL CABEZA
01.01.01.01.01
MUROS DE BLOQUES HUECOS DE CONCRETO
01.01.01.02
MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M
01.01.01.02.01
REVOQUES Y REVESTIMIENTOS
01.01.02
REVOQUES Y REVESTIMIENTOS
01.01.02.01
TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
01.01.02.01.01

01.11.04.06.01
01.11.04.06.02
01.11.04.06.03
01.11.04.07
01.11.04.07.01
01.11.05
01.11.05.01
01.11.05.02

Und.

Metrado

Precio Unitario

m3
m2
kg

10.90
99.30
446.24

387.560
29.520
5.950

m2

14.52

49.740

m2
m2

74.28
137.98

22.350
14.520

und
und
und

50.00
1.00
1.00

30.000
2,000.000
1,350.000

m2

351.92

169.880

m2

476.65

49.740

m2

1,099.07

10.280

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.01.02.01.02
01.01.02.01.03
01.01.02.01.04
01.01.02.01.05
01.01.02.02
01.01.02.02.01

Und.
TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA
TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA
TARRAJEO EN PARAPETOS
VESTIDURA DE DERRAMES
VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA

Metrado

Precio Unitario

m2
m2
m2
m2

695.62
570.83
893.82
299.21

11.330
10.810
10.310
13.570

516.40

9.070

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.01.02.03
01.01.02.03.01
01.01.02.04
01.01.02.04.01
01.01.02.05
01.01.02.05.01
01.01.03
01.01.03.01
01.01.03.01.01
01.01.03.02
01.01.03.02.01
01.01.04
01.01.04.01
01.01.04.01.01
01.01.04.02
01.01.04.02.01
01.01.04.03
01.01.04.03.01
01.01.04.04
01.01.04.04.01
01.01.04.05
01.01.04.05.01

Und.
BRUAS
BRUADO DE 1/2"
GRADAS
REVESTIMIENTO DE GRADAS DE ESCALERA
REVESTIMIENTO DE DESCANSOS
REVESTIMIENTO DE DESCANSOS
CIELORRASOS
CIELORRASO CON YESO
CIELORRASOS CON YESO
CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO
CIELORRASO CON BALDOSA ACSTICA
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 35MM.
PISOS
PISO CERAMICO COLOR DE 0.40 x0.40 m
PISOS DE CONCRETO
PISO DE CEMENTO PULIDO DE 2
VEREDAS
VEREDA DE CONCRETO 4 F'C= 175 KG/CM2.
JUNTAS DE DILATACIN
JUNTAS ASFALTICAS E=1"

Metrado

Precio Unitario

1,709.00

4.470

m2

77.01

10.510

m2

26.01

22.500

m2

673.59

24.970

m2

590.96

147.210

m2

94.10

30.890

m2

94.10

44.390

m2

968.20

30.730

m2

470.75

91.750

ML

44.81

3.960

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.01.04.06
01.01.04.06.01
01.01.05
01.01.05.01
01.01.05.01.01
01.01.06
01.01.06.01
01.01.06.01.01
01.01.06.01.02
01.01.06.01.03
01.01.07
01.01.07.01
01.01.07.01.01
01.01.07.01.02
01.01.07.01.03
01.01.08
01.01.08.01
01.01.08.02
01.01.09
01.01.09.01
01.01.09.01.01
01.01.09.01.02

Und.
CEMENTO PULIDO EN PARASOLES
CEMENTO PULIDO EN PARASOLES
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO 0.20X0.30 cm H= 1.60 m
CARPINTERIA DE MADERA
PUERTAS
PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO
PUERTA DE MADERA PREFABRICADA PARA SSHH
DIVISION DE MELAMINA PARA BAOS
CARPINTERIA METALICA Y HERRERIA
BARANDAS METALICAS
TUBO NEGRO REDONDO 2" DE DIAMETRO e=2 mm
TUBO DE 1 1/2" e=2 mm CURVO
TUBO REDONDO DE 3/4" e=2 mm
CERRADURAS
CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES
BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA
VIDRIOS, CRISTALES Y SIMILARES
ESPEJOS Y VIDRIO
ESPEJO DE 0.50 mx 0.80m
VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS

Metrado

Precio Unitario

m2

82.63

30.730

m2

122.55

75.540

m2
m2
m2

51.24
21.06
55.80

149.970
117.630
117.170

ML
ML
ML

116.20
533.80
67.60

49.670
45.480
43.890

und
pza

16.00
64.00

92.170
12.660

und
m2

22.00
242.36

27.750
217.920

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.01.09.02
01.01.09.02.01
01.01.10
01.01.10.01
01.01.10.01.01
01.01.10.01.02
01.01.10.01.03
01.01.10.01.04

Und.
MALLA MOSQUITERO N16 COLOR VERDE
MALLA MOSQUITERO N 16 COLOR VERDE
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES
PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES
PINTURA EN CIELORRASO
PINTURA EN COLUMNAS

Metrado

Precio Unitario

m2

125.30

28.640

m2
m2
m2
m2

1,099.07
695.62
590.96
570.83

9.740
9.950
12.270
12.270

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
PINTURA EN VIGAS
PINTURA EN PARAPETOS
PINTURA DE PUERTAS
PINTURA EN PUERTAS C/BARNIZ 2 MANOS
PINTURA DE ESTRUCTURAS METALICAS
PINTURA EN TUBO NEGRO REDONDO DE 2" DE DIMETRO e=2mm BARANDAS
PINTURA EN TUBO DE 1/2" e=2mm CURVO - BARANDAS
PINTURA EN TUBO DE 3/4" e=2mm - BARANDAS
JUNTAS DE CONSTRUCCIN
JUNTAS DE CONSTRUCCIN
1.02 BLOQUES SECUNDARIA
MUROS Y TABIQUES DE ALBAILERIA
01.02.01
MUROS DE LADRILLO CORRIENTE DE ARCILLA (A MAQUINA O
01.02.01.01
ARTESANALMENTE)
MURO DE LADRILLO ARTESANAL CABEZA
01.02.01.01.01
MUROS DE BLOQUES HUECOS DE CONCRETO
01.02.01.02
MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M
01.02.01.02.01
REVOQUES Y REVESTIMIENTOS
01.02.02
REVOQUES Y REVESTIMIENTOS
01.02.02.01
TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
01.02.02.01.01
TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA
01.02.02.01.02
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA
01.02.02.01.03
TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA
01.02.02.01.04

01.01.10.01.05
01.01.10.01.06
01.01.10.02
01.01.10.02.01
01.01.10.03
01.01.10.03.01
01.01.10.03.02
01.01.10.03.03
01.01.10.04
01.01.10.04.01

Und.

Metrado

Precio Unitario

m2
m2

919.02
257.81

12.270
12.270

m2

100.80

12.710

ML
ML
ML

116.20
533.80
67.60

7.970
7.970
7.970

6.80

20.560

m2

233.84

169.880

m2

400.55

49.740

m2
m2
m2
m2

852.63
455.12
358.28
57.35

10.280
11.330
10.810
10.310

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.02.02.01.05
01.02.02.02
01.02.02.02.01
01.02.02.03
01.02.02.03.01
01.02.02.04
01.02.02.04.01
01.02.02.05
01.02.02.05.01
01.02.03
01.02.03.01
01.02.03.01.01
01.02.03.02
01.02.03.02.01
01.02.04
01.02.04.01
01.02.04.01.01
01.02.04.02
01.02.04.02.01
01.02.04.03
01.02.04.03.01
01.02.04.04

Und.
TARRAJEO EN PARAPETOS
VESTIDURA DE DERRAMES
VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA
BRUAS
BRUADO DE 1/2"
GRADAS
REVESTIMIENTO DE GRADAS DE ESCALERA
REVESTIMIENTO DE DESCANSOS
REVESTIMIENTO DE DESCANSOS
CIELORRASOS
CIELORRASO CON YESO
CIELORRASOS CON YESO
CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO
CIELORRASO CON BALDOSA ACSTICA
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 35MM. EN SERVICIOS HIGIENICOS
PISOS
PISO CERAMICO COLOR DE 0.40 x0.40 m
PISOS DE CONCRETO
PISO DE CEMENTO PULIDO DE 2
VEREDAS

Metrado

Precio Unitario

m2

211.67

13.570

518.00

9.070

1,143.40

4.470

m2

32.47

10.510

m2

26.01

22.500

m2

447.24

24.970

m2

389.74

147.210

m2

87.70

30.890

m2

87.70

44.390

m2

650.30

30.730

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.02.04.04.01
01.02.04.05
01.02.04.05.01
01.02.04.06
01.02.04.06.01
01.02.05
01.02.05.01
01.02.05.01.01

Und.
VEREDA DE CONCRETO 4 F'C= 175 KG/CM2.
JUNTAS DE DILATACIN
JUNTAS ASFALTICAS E=1"
CEMENTO PULIDO EN PARASOLES
CEMENTO PULIDO EN PARASOLES
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO 0.20X0.30 cm H= 1.60 m

Metrado

Precio Unitario

m2

323.59

91.750

ML

31.67

3.960

m2

62.10

30.730

m2

124.20

75.540

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.02.06
01.02.06.01
01.02.06.01.01
01.02.06.01.02
01.02.06.01.03
01.02.07
01.02.07.01
01.02.07.01.01
01.02.07.01.02
01.02.07.01.03
01.02.08
01.02.08.01
01.02.08.02
01.02.09
01.02.09.01
01.02.09.01.01
01.02.09.01.02
01.02.09.02
01.02.09.02.01
01.02.10
01.02.10.01
01.02.10.01.01

Und.
CARPINTERIA DE MADERA
PUERTAS
PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO
PUERTA DE MADERA PREFABRICADA PARA SSHH
DIVISION DE MELAMINA PARA BAOS
CARPINTERIA METALICA Y HERRERIA
BARANDAS METALICAS
TUBO NEGRO REDONDO 2" DE DIAMETRO e=2 mm
TUBO DE 1 1/2" e=2 mm CURVO
TUBO REDONDO DE 3/4" e=2 mm
CERRADURAS
CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES
BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA
VIDRIOS, CRISTALES Y SIMILARES
ESPEJOS Y VIDRIO
ESPEJO DE 0.50 mx 0.80m
VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS
MALLA MOSQUITERO N16 COLOR VERDE
MALLA MOSQUITERO N 16 COLOR VERDE
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES

Metrado

Precio Unitario

m2
m2
m2

37.82
16.38
43.40

149.970
117.630
117.170

ML
ML
ML

84.30
407.60
42.90

49.670
45.480
43.890

und
pza

12.00
48.00

92.170
12.660

und
m2

9.00
166.64

27.750
217.920

m2

89.56

28.640

m2

852.63

9.740

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES
PINTURA EN CIELORRASO
PINTURA EN COLUMNAS
PINTURA EN VIGAS
PINTURA EN PARAPETOS
PINTURA DE PUERTAS
PINTURA EN PUERTAS C/BARNIZ 2 MANOS
PINTURA DE ESTRUCTURAS METALICAS
PINTURA EN TUBO NEGRO REDONDO DE 2" DE DIMETRO e=2mm BARANDAS
PINTURA EN TUBO DE 1/2" e=2mm CURVO - BARANDAS
PINTURA EN TUBO DE 3/4" e=2mm - BARANDAS
JUNTAS DE CONSTRUCCIN
JUNTAS DE CONSTRUCCIN
1.03 SALA DE CMPUTO PRIMARIA Y SECUNDARIA
MUROS DE LADRILLO CORRIENTE DE ARCILLA (A MAQUINA O
01.03.01
ARTESANALMENTE)
MUROS DE BLOQUES HUECOS DE CONCRETO
01.03.01.01
MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M
01.03.01.01.01
REVOQUES Y REVESTIMIENTOS
01.03.02
REVOQUES Y REVESTIMIENTOS
01.03.02.01
TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
01.03.02.01.01
TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA
01.03.02.01.02
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA
01.03.02.01.03

01.02.10.01.02
01.02.10.01.03
01.02.10.01.04
01.02.10.01.05
01.02.10.01.06
01.02.10.02
01.02.10.02.01
01.02.10.03
01.02.10.03.01
01.02.10.03.02
01.02.10.03.03
01.02.10.04
01.02.10.04.01

Und.

Metrado

Precio Unitario

m2
m2
m2
m2
m2

455.12
389.74
358.28
572.35
182.57

9.950
12.270
12.270
12.270
12.270

m2

74.40

12.710

ML
ML
ML

84.30
407.60
42.90

7.970
7.970
7.970

6.80

20.560

m2

411.13

49.740

m2
m2
m2

489.29
298.79
260.77

10.280
11.330
10.810

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.03.02.01.04
01.03.02.01.05
01.03.02.02
01.03.02.02.01
01.03.02.03
01.03.02.03.01
01.03.02.04
01.03.02.04.01

Und.
TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA
TARRAJEO EN PARAPETOS
VESTIDURA DE DERRAMES
VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA
BRUAS
BRUADO DE 1/2"
GRADAS
REVESTIMIENTO DE GRADAS DE ESCALERA

Metrado

Precio Unitario

m2
m2

268.80
57.78

10.310
13.570

238.60

9.070

660.20

4.470

m2

31.71

10.510

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.03.02.05
01.03.02.05.01
01.03.03
01.03.03.01
01.03.03.01.01
01.03.03.02
01.03.03.02.01
01.03.04
01.03.04.01
01.03.04.01.01
01.03.04.02
01.03.04.02.01
01.03.04.03
01.03.04.03.01
01.03.04.04
01.03.04.04.01
01.03.05
01.03.05.01
01.03.05.01.01
01.03.06
01.03.06.01
01.03.06.01.01

Und.
REVESTIMIENTO DE DESCANSOS
REVESTIMIENTO DE DESCANSOS
CIELORRASOS
CIELORRASO CON YESO
CIELORRASOS CON YESO
CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO
CIELORRASO CON BALDOSA ACSTICA
PISOS Y PAVIMENTOS
PISOS DE CONCRETO
PISO DE CEMENTO PULIDO DE 2
VEREDAS
VEREDA DE CONCRETO 4 F'C= 175 KG/CM2.
JUNTAS DE DILATACIN
JUNTAS ASFALTICAS E=1"
CEMENTO PULIDO EN PARASOLES
CEMENTO PULIDO EN PARASOLES
CARPINTERIA DE MADERA
PUERTAS
PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO
CARPINTERIA METALICA Y HERRERIA
BARANDAS METALICAS
TUBO NEGRO REDONDO 2" DE DIAMETRO e=2 mm

Metrado

Precio Unitario

m2

59.80

22.500

m2

169.86

24.970

m2

241.20

147.210

m2

351.64

30.730

m2

180.53

91.750

ML

27.63

3.960

m2

23.94

30.730

m2

70.90

149.970

ML

47.33

49.670

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.03.06.01.02
01.03.07
01.03.07.01
01.03.07.02
01.03.08
01.03.08.01
01.03.08.01.01
01.03.08.02
01.03.08.02.01
01.03.09
01.03.09.01
01.03.09.01.01
01.03.09.01.02
01.03.09.01.03
01.03.09.01.04
01.03.09.01.05
01.03.09.01.06
01.03.09.02
01.03.09.02.01
01.03.09.03
01.03.09.03.01
01.03.09.03.02

Und.
TUBO DE 1 1/2" e=2 mm CURVO
CERRADURAS
CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES
BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA
VIDRIOS, CRISTALES Y SIMILARES
VIDRIOS, CRISTALES Y SIMILARES
VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS
MALLA MOSQUITERO N16 COLOR VERDE
MALLA MOSQUITERO N 16 COLOR VERDE
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES
PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES
PINTURA EN CIELORRASO
PINTURA EN COLUMNAS
PINTURA EN VIGAS
PINTURA EN PARAPETOS
PINTURA DE PUERTAS
PINTURA EN PUERTAS C/BARNIZ 2 MANOS
PINTURA DE ESTRUCTURAS METALICAS
PINTURA EN TUBO NEGRO REDONDO DE 2" DE DIMETRO e=2mm BARANDAS
PINTURA EN TUBO DE 1 1/2" DE DIAMETRO BARANDAS

Metrado

Precio Unitario

ML

166.38

45.480

und
pza

12.00
48.00

92.170
12.660

m2

93.19

217.920

m2

9.44

28.640

m2
m2
m2
m2
m2
m2

489.29
289.79
145.92
260.77
268.80
51.06

9.740
9.950
12.270
12.270
12.270
12.270

m2

70.90

12.710

ML
ML

47.33
166.38

7.970
5.820

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.03.10
01.03.10.01
01.03.10.02
01.03.10.03

Und.
POSTES DE MADERA ROLLIZO DE 6"-8" EN GALERA
BASE DE CONCRETO ARMADO fc=175 kg/cm2 PARA POSTES DE MADERA
ROLLIZO
DEREFUERZO
6"-8"
ACERO DE
F'y = 4200 kg/cm2 EN BASES DE CONCRETO
COLOCACION DE POSTES DE MADERA ROLLIZO DE 6"-8" DE 6M. DE
LONGITUD

m3
kg
und

Metrado

1.58
52.17
14.00

Precio Unitario

427.240
1.180
72.320

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item

Und.

Metrado

Precio Unitario

1.04 SALON DE USO MULTIPLE


01.04.01
01.04.01.01
01.04.01.01.01
01.04.01.02
01.04.01.02.01
01.04.01.02.02
01.04.01.02.03
01.04.01.02.04
01.04.01.02.05
01.04.01.03
01.04.01.03.01
01.04.01.04
01.04.01.04.01
01.04.02
01.04.02.01
01.04.02.01.01
01.04.03
01.04.03.01
01.04.03.01.01
01.04.03.02
01.04.03.02.01

MUROS Y TABIQUES DE ALBAILERIA


MUROS DE BLOQUES HUECOS DE CONCRETO
MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M
REVOQUES Y REVESTIMIENTOS
TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA
TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA
TARRAJEO EN PARAPETOS
VESTIDURA DE DERRAMES
VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA
BRUAS
BRUADO DE 1/2"
CIELORRASOS
CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO
CIELORRASO CON BALDOSA ACSTICA
PISOS Y PAVIMENTOS
PISOS DE CONCRETO
PISO DE CEMENTO PULIDO DE 2
VEREDAS
VEREDA DE CONCRETO 4 F'C= 175 KG/CM2.

m2

253.07

49.740

m2
m2
m2
m2
m2

247.99
252.06
87.40
75.99
54.00

10.280
11.330
10.810
10.310
13.570

67.50

9.070

308.20

4.470

m2

216.08

147.210

m2

216.08

30.730

m2

98.31

91.750

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.04.03.02.02
01.04.04
01.04.04.01
01.04.04.01.01
01.04.04.02
01.04.04.02.01
01.04.04.02.02
01.04.04.02.03
01.04.04.02.04
01.04.04.02.05
01.04.04.03
01.04.04.03.01
01.04.04.03.02
01.04.04.03.03
01.04.05
01.04.05.01
01.04.05.01.01
01.04.05.01.02
01.04.06
01.04.06.01
01.04.06.01.01
01.04.06.02

Und.
CEMENTO PULIDO EN PARASOLES
CARPINTERIA DE MADERA
PUERTAS
PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO
ESCENARIO SALA DE USO MULTIPLE
CONCRETO CICLOPEO FC=140 KG/CM2 + 30 % PM.
RELLENO CON MATERIAL PROPIO
VIGAS DE MADERA DE 2"x4"x12
CONTRAPISO DE 2"
ENTABLADO DE MADERA
GRADAS
ENCOFRADO Y DESENCOFRADO DE GRADAS
CONCRETO F'C=175kg/cm2+25% PM
REVESTIMIENTO DE GRADAS DE ESCALERA
CARPINTERIA METALICA Y HERRERIA
CERRADURAS
CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES
BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA
VIDRIOS, CRISTALES Y SIMILARES
ESPEJOS Y VIDRIO
VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS
MALLA DE ALAMBRE GALVANIZADO

Metrado

Precio Unitario

m2

330.86

30.730

m2

15.58

149.970

m3
m3
p2
m2
m2

23.52
137.24
67.50
38.55
38.55

165.860
36.860
32.040
30.710
36.600

m2
m3
m2

3.70
1.56
15.62

35.560
264.800
10.510

und
pza

5.00
20.00

92.170
12.660

m2

20.16

217.920

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.04.06.02.01
01.04.06.03
01.04.06.03.01
01.04.07
01.04.07.01
01.04.07.01.01
01.04.07.01.02
01.04.07.01.03

Und.
MALLADE ALAMBRE GALVANIZADO DE 3/4"
MALLA MOSQUITERO N16 COLOR VERDE
MALLA MOSQUITERO N 16 COLOR VERDE
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES
PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES
PINTURA EN COLUMNAS

Metrado

Precio Unitario

m2

38.24

18.510

m2

5.12

28.640

m2
m2
m2

247.99
226.83
87.40

9.740
9.950
12.270

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
PINTURA EN VIGAS
PINTURA EN PARAPETOS
PINTURA DE PUERTAS
PINTURA EN PUERTAS C/BARNIZ 2 MANOS
1.05 TALLER DE CONFECCIN, ARTESANIAS E IDIOMAS
MUROS Y TABIQUES DE ALBAILERIA
01.05.01
MUROS DE BLOQUES HUECOS DE CONCRETO
01.05.01.01
MURO DE LADRILLO ARTESANAL CABEZA
01.05.01.01.01
MUROS DE LADRILLO CORRIENTE DE ARCILLA (A MAQUINA O
01.05.01.02
ARTESANALMENTE)
MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M
01.05.01.02.01
REVOQUES Y REVESTIMIENTOS
01.05.02
REVOQUES Y REVESTIMIENTOS
01.05.02.01
TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
01.05.02.01.01
TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA
01.05.02.01.02
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA
01.05.02.01.03
TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA
01.05.02.01.04
TARRAJEO EN PARAPETOS
01.05.02.01.05
VESTIDURA DE DERRAMES
01.05.02.02
VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA
01.05.02.02.01
BRUAS
01.05.02.03
BRUADO DE 1/2"
01.05.02.03.01
GRADAS
01.05.02.04

01.04.07.01.04
01.04.07.01.05
01.04.07.02
01.04.07.02.01

Und.

Metrado

Precio Unitario

m2
m2

75.99
54.00

12.270
12.270

m2

31.16

12.710

m2

109.25

169.880

m2

411.13

49.740

m2
m2
m2
m2
m2

391.95
323.66
133.88
255.57
57.78

10.280
11.330
10.810
10.310
13.570

154.60

9.070

573.80

4.470

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.05.02.04.01
01.05.02.05
01.05.02.05.01
01.05.03
01.05.03.01
01.05.03.01.01
01.05.03.02
01.05.03.02.01
01.05.04
01.05.04.01
01.05.04.01.01
01.05.04.02
01.05.04.02.01
01.05.04.03
01.05.04.03.01
01.05.04.04
01.05.04.04.01
01.05.05
01.05.05.01
01.05.05.01.01
01.05.06
01.05.06.01

Und.
REVESTIMIENTO DE GRADAS DE ESCALERA
REVESTIMIENTO DE DESCANSOS
REVESTIMIENTO DE DESCANSOS
CIELORRASOS
CIELORRASO CON YESO
CIELORRASOS CON YESO
CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO
CIELORRASO CON BALDOSA ACSTICA
PISOS Y PAVIMENTOS
PISOS DE CONCRETO
PISO DE CEMENTO PULIDO DE 2
VEREDAS
VEREDA DE CONCRETO 4 F'C= 175 KG/CM2.
JUNTAS DE DILATACIN
JUNTAS ASFALTICAS E=1"
CEMENTO PULIDO EN PARASOLES
CEMENTO PULIDO EN PARASOLES
CARPINTERIA DE MADERA
PUERTAS
PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO
CARPINTERIA METALICA Y HERRERIA
BARANDAS METALICAS

Metrado

Precio Unitario

m2

31.71

10.510

m2

53.40

22.500

m2

169.86

24.970

m2

214.21

147.210

m2

310.90

30.730

m2

146.09

91.750

ML

27.63

3.960

m2

28.56

30.730

m2

28.56

149.970

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.05.06.01.01
01.05.06.01.02
01.05.07
01.05.07.01
01.05.07.02
01.05.08
01.05.08.01
01.05.08.01.01

Und.
TUBO NEGRO REDONDO 2" DE DIAMETRO e=2 mm
TUBO DE 1 1/2" e=2 mm CURVO
CERRADURAS
CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES
BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA
VIDRIOS, CRISTALES Y SIMILARES
ESPEJOS Y VIDRIO
VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS

Metrado

Precio Unitario

ML
ML

53.37
176.22

49.670
45.480

und
pza

12.00
48.00

92.170
12.660

m2

93.19

217.920

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.05.08.02
01.05.08.02.01
01.05.08.03
01.05.08.03.01
01.05.09
01.05.09.01
01.05.09.01.01
01.05.09.01.02
01.05.09.01.03
01.05.09.01.04
01.05.09.01.05
01.05.09.01.06
01.05.09.02
01.05.09.02.01
01.05.09.03
01.05.09.03.01
01.05.09.03.02
01.05.10
01.05.10.01
01.05.10.02
01.05.10.03

Und.
MALLA MOSQUITERO N16 COLOR VERDE
MALLA MOSQUITERO N 16 COLOR VERDE
MALLA DE ALAMBRE GALVANIZADO
MALLADE ALAMBRE GALVANIZADO DE 3/4"
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES
PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES
PINTURA EN CIELORRASO
PINTURA EN COLUMNAS
PINTURA EN VIGAS
PINTURA EN PARAPETOS
PINTURA DE PUERTAS
PINTURA EN PUERTAS C/BARNIZ 2 MANOS
PINTURA DE ESTRUCTURAS METALICAS
PINTURA EN TUBO NEGRO REDONDO DE 2" DE DIMETRO e=2mm BARANDAS
PINTURA EN TUBO DE 1/2" e=2mm CURVO - BARANDAS
POSTES DE MADERA ROLLIZO DE 6"-8" EN GALERA
BASE DE CONCRETO ARMADO fc=175 kg/cm2 PARA POSTES DE MADERA
ROLLIZO
DEREFUERZO
6"-8"
ACERO DE
F'y = 4200 kg/cm2 EN BASES DE CONCRETO
COLOCACION DE POSTES DE MADERA ROLLIZO DE 6"-8" DE 6M. DE
TPICO, SICOLOGA Y ADMINISTRACIN
1.06 LONGITUD

Metrado

Precio Unitario

m2

9.44

28.640

m2

6.45

26.820

m2
m2
m2
m2
m2
m2

391.95
323.66
136.62
439.90
255.57
48.84

9.740
9.950
12.270
12.270
12.270
12.270

m2

57.12

12.710

ML
ML

53.37
176.22

7.970
7.970

m3
kg
und

1.35
44.71
12.00

427.240
1.180
72.320

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.06.01
01.06.01.01
01.06.01.01.01
01.06.02
01.06.02.01
01.06.02.01.01
01.06.02.01.02
01.06.02.01.03
01.06.02.01.04
01.06.02.01.05
01.06.02.02
01.06.02.02.01
01.06.02.03
01.06.02.03.01
01.06.02.04
01.06.02.04.01
01.06.02.05
01.06.02.05.01
01.06.03
01.06.03.01
01.06.03.01.01
01.06.03.02

Und.
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO CORRIENTE DE ARCILLA (A MAQUINA O
ARTESANALMENTE)
MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M
REVOQUES Y REVESTIMIENTOS
REVOQUES Y REVESTIMIENTOS
TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA
TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA
TARRAJEO EN PARAPETOS
VESTIDURA DE DERRAMES
VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA
BRUAS
BRUADO DE 1/2"
GRADAS
REVESTIMIENTO DE GRADAS DE ESCALERA
REVESTIMIENTO DE DESCANSOS
REVESTIMIENTO DE DESCANSOS
CIELORRASOS
CIELORRASO CON YESO
CIELORRASOS CON YESO
CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO

Metrado

Precio Unitario

m2

331.43

49.740

m2
m2
m2
m2
m2

511.13
150.61
86.21
124.11
31.61

10.280
11.330
10.810
10.310
13.570

163.30

9.070

227.30

4.470

m2

15.86

10.510

m2

7.02

22.500

m2

13.53

24.970

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.06.03.02.01
01.06.04
01.06.04.01
01.06.04.01.01

Und.
CIELORRASO CON BALDOSA ACSTICA
PISOS Y PAVIMENTOS
PISOS DE CONCRETO
PISO DE CEMENTO PULIDO DE 2

Metrado

Precio Unitario

m2

149.54

147.210

m2

204.17

30.730

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.06.04.02
01.06.04.02.01
01.06.04.03
01.06.04.03.01
01.06.04.04
01.06.04.04.01
01.06.05
01.06.05.01
01.06.05.01.01
01.06.06
01.06.06.01
01.06.06.01.01
01.06.07
01.06.07.01
01.06.07.02
01.06.08
01.06.08.01
01.06.08.01.01
01.06.08.02
01.06.08.02.01
01.06.08.02.02
01.06.08.03

Und.
VEREDAS
VEREDA DE CONCRETO 4 F'C= 175 KG/CM2.
JUNTAS DE DILATACIN
JUNTAS ASFALTICAS E=1"
CEMENTO PULIDO EN PARASOLES
CEMENTO PULIDO EN PARASOLES
CARPINTERIA DE MADERA
PUERTAS
PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO
CARPINTERIA METALICA Y HERRERIA
BARANDAS METALICAS
TUBO NEGRO REDONDO 2" DE DIAMETRO e=2 mm
CERRADURAS
CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES
BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA
VIDRIOS, CRISTALES Y SIMILARES
ESPEJOS Y VIDRIO
VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS
ESTRUCTURA DE POLICARBONATO COMPACTO
ESTRUCTURA METALICA DE TUBO RECTANGULAR DE 60x40mm e=2mm
POLICARBONATO COMPACTO DE 3mm DE ESPESOR
MALLA MOSQUITERO N16 COLOR VERDE

Metrado

Precio Unitario

m2

105.16

91.750

ML

14.36

3.960

m2

13.50

30.730

m2

30.86

149.970

ML

29.95

49.670

und
pza

12.00
48.00

92.170
12.660

m2

3.00

217.920

ML
m2

60.76
18.53

27.320
72.220

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
MALLA MOSQUITERO N 16 COLOR VERDE
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES
PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES
PINTURA EN CIELORRASO
PINTURA EN COLUMNAS
PINTURA EN VIGAS
PINTURA EN PARAPETOS
PINTURA DE PUERTAS
PINTURA EN PUERTAS C/BARNIZ 2 MANOS
PINTURA DE ESTRUCTURAS METALICAS
PINTURA EN TUBO NEGRO REDONDO DE 2" DE DIMETRO e=2mm BARANDAS
POSTES DE MADERA ROLLIZO DE 6"-8" EN GALERA
BASE DE CONCRETO ARMADO fc=175 kg/cm2 PARA POSTES DE MADERA
ROLLIZO
DEREFUERZO
6"-8"
ACERO DE
F'y = 4200 kg/cm2 EN BASES DE CONCRETO
COLOCACION DE POSTES DE MADERA ROLLIZO DE 6"-8" DE 6M. DE
BIBLIOTECA GENERAL
1.07 LONGITUD
MUROS Y TABIQUES DE ALBAILERIA
01.07.01
MUROS DE BLOQUES HUECOS DE CONCRETO
01.07.01.01
MURO DE LADRILLO ARTESANAL CABEZA
01.07.01.01.01
MUROS DE LADRILLO CORRIENTE DE ARCILLA (A MAQUINA O
01.07.01.02
ARTESANALMENTE)

01.06.08.03.01
01.06.09
01.06.09.01
01.06.09.01.01
01.06.09.01.02
01.06.09.01.03
01.06.09.01.04
01.06.09.01.05
01.06.09.01.06
01.06.09.02
01.06.09.02.01
01.06.09.03
01.06.09.03.01
01.06.10
01.06.10.01
01.06.10.02
01.06.10.03

Und.

Metrado

Precio Unitario

m2

8.64

28.640

m2
m2
m2
m2
m2
m2

511.13
150.61
90.38
86.21
124.11
31.61

9.740
9.950
12.270
12.270
12.270
12.270

m2

61.71

12.710

ML

29.95

7.970

m3
kg
und

0.41
26.08
7.00

427.240
1.180
72.320

m2

61.68

169.880

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.07.01.02.01
01.07.02
01.07.02.01
01.07.02.01.01
01.07.02.01.02
01.07.02.01.03
01.07.02.01.04
01.07.02.01.05

Und.
MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M
REVOQUES Y REVESTIMIENTOS
REVOQUES Y REVESTIMIENTOS
TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA
TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA
TARRAJEO EN PARAPETOS

Metrado

Precio Unitario

m2

178.00

49.740

m2
m2
m2
m2
m2

262.36
195.60
133.88
178.33
65.58

10.280
11.330
10.810
10.310
13.570

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.07.02.02
01.07.02.02.01
01.07.02.03
01.07.02.03.01
01.07.02.04
01.07.02.04.01
01.07.02.05
01.07.02.05.01
01.07.03
01.07.03.01
01.07.03.01.01
01.07.03.02
01.07.03.02.01
01.07.04
01.07.04.01
01.07.04.01.01
01.07.04.02
01.07.04.02.01
01.07.04.03
01.07.04.03.01
01.07.04.04
01.07.04.04.01

Und.
VESTIDURA DE DERRAMES
VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA
BRUAS
BRUADO DE 1/2"
GRADAS
REVESTIMIENTO DE GRADAS DE ESCALERA
REVESTIMIENTO DE DESCANSOS
REVESTIMIENTO DE DESCANSOS
CIELORRASOS
CIELORRASO CON YESO
CIELORRASOS CON YESO
CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO
CIELORRASO CON BALDOSA ACSTICA
PISOS Y PAVIMENTOS
PISOS DE CONCRETO
PISO DE CEMENTO PULIDO DE 2
VEREDAS
VEREDA DE CONCRETO 4 F'C= 175 KG/CM2.
JUNTAS DE DILATACIN
JUNTAS ASFALTICAS E=1"
CEMENTO PULIDO EN PARASOLES
CEMENTO PULIDO EN PARASOLES

Metrado

Precio Unitario

105.40

9.070

401.34

4.470

m2

24.92

10.510

m2

11.04

22.500

m2

87.30

24.970

m2

211.36

147.210

m2

248.60

30.730

m2

75.61

91.750

ML

29.33

3.960

m2

12.68

30.730

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.07.05
01.07.05.01
01.07.05.01.01
01.07.06
01.07.06.01
01.07.06.01.01
01.07.06.01.02
01.07.07
01.07.07.01
01.07.07.02
01.07.08
01.07.08.01
01.07.08.01.01
01.07.08.02
01.07.08.02.01
01.07.09
01.07.09.01
01.07.09.01.01
01.07.09.01.02
01.07.09.01.03
01.07.09.01.04
01.07.09.01.05

Und.
CARPINTERIA DE MADERA
PUERTAS
PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO
CARPINTERIA METALICA Y HERRERIA
BARANDAS METALICAS
TUBO NEGRO REDONDO 2" DE DIAMETRO e=2 mm
TUBO DE 1 1/2" e=2 mm CURVO
CERRADURAS
CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES
BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA
VIDRIOS, CRISTALES Y SIMILARES
ESPEJOS Y VIDRIO
VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS
MALLA MOSQUITERO N16 COLOR VERDE
MALLA MOSQUITERO N 16 COLOR VERDE
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES
PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES
PINTURA EN CIELORRASO
PINTURA EN COLUMNAS
PINTURA EN VIGAS

Metrado

Precio Unitario

m2

12.66

149.970

ML
ML

32.20
114.60

49.670
45.480

und
pza

4.00
16.00

92.170
12.660

m2

57.53

217.920

m2

7.68

28.640

m2
m2
m2
m2
m2

262.36
195.60
87.30
133.88
178.33

9.740
9.950
12.270
12.270
12.270

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.07.09.01.06
01.07.09.02
01.07.09.02.01
01.07.09.03
01.07.09.03.01
01.07.09.03.02

Und.
PINTURA EN PARAPETOS
PINTURA DE PUERTAS
PINTURA EN PUERTAS C/BARNIZ 2 MANOS
PINTURA DE ESTRUCTURAS METALICAS
PINTURA EN TUBO NEGRO REDONDO DE 2" DE DIMETRO e=2mm BARANDAS
PINTURA EN TUBO DE 1/2" e=2mm CURVO - BARANDAS

Metrado

Precio Unitario

m2

61.47

12.270

m2

25.32

12.710

ML
ML

32.20
114.60

7.970
7.970

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
POSTES DE MADERA ROLLIZO DE 6"-8" EN GALERA
BASE DE CONCRETO ARMADO fc=175 kg/cm2 PARA POSTES DE MADERA
ROLLIZO
DEREFUERZO
6"-8"
ACERO DE
F'y = 4200 kg/cm2 EN BASES DE CONCRETO
COLOCACION DE POSTES DE MADERA ROLLIZO DE 6"-8" DE 6M. DE
DUCHAS Y VESTIDORES (PRIMARIA Y SECUNDARIA)
1.08 LONGITUD
MUROS Y TABIQUES DE ALBAILERIA
01.08.01
MUROS DE BLOQUES HUECOS DE CONCRETO
01.08.01.01
MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M
01.08.01.01.01
REVOQUES Y REVESTIMIENTOS
01.08.02
TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
01.08.02.01
TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA
01.08.02.02
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA
01.08.02.03
TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA
01.08.02.04
TARRAJEO EN PARAPETOS
01.08.02.05
VESTIDURA DE DERRAMES
01.08.03
VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA
01.08.03.01
BRUAS
01.08.04
BRUADO DE 1/2"
01.08.04.01
CIELORRASOS
01.08.05
CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO
01.08.05.01
CIELORRASO CON BALDOSA ACSTICA
01.08.05.01.01
CONTRAPISOS
01.08.05.02

01.07.10
01.07.10.01
01.07.10.02
01.07.10.03

Und.

Metrado

Precio Unitario

m3
kg
und

0.79
26.08
7.00

427.240
1.180
72.320

m2

234.42

49.740

m2
m2
m2
m2
m2

343.13
148.29
34.14
53.38
25.61

10.280
11.330
10.810
10.310
13.570

195.80

9.070

245.60

4.470

m2

133.85

147.210

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.08.05.02.01
01.08.05.03
01.08.05.03.01
01.08.05.04
01.08.05.04.01
01.08.05.05
01.08.05.05.01
01.08.05.06
01.08.05.06.01
01.08.06
01.08.06.01
01.08.06.01.01
01.08.07
01.08.07.01
01.08.07.01.01
01.08.07.01.02
01.08.08
01.08.08.01
01.08.08.01.01
01.08.08.01.02
01.08.09
01.08.09.01

Und.
CONTRAPISO DE 35MM. EN SERVICIOS HIGIENICOS
PISOS
PISO CERAMICO COLOR DE 0.40 x0.40 m
PISOS DE CONCRETO
PISO DE CEMENTO PULIDO DE 2
VEREDAS
VEREDA DE CONCRETO 4 F'C= 175 KG/CM2.
JUNTAS DE DILATACIN
JUNTAS ASFALTICAS E=1"
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO 0.20X0.30 cm H= 1.60 m
CARPINTERIA DE MADERA
PUERTAS
PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO
PUERTA DE MADERA PREFABRICADA PARA SSHH
CARPINTERIA METALICA Y HERRERIA
CERRADURAS
CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES
BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA
VIDRIOS, CRISTALES Y SIMILARES
ESPEJOS Y VIDRIO

Metrado

Precio Unitario

m2

68.72

30.890

m2

68.72

44.390

m2

10.80

30.730

m2

18.54

91.750

ML

281.19

3.960

m2

219.73

75.540

m2
m2

11.50
28.08

149.970
117.630

und
pza

4.00
16.00

92.170
12.660

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.08.09.01.01
01.08.09.02
01.08.09.02.01

Und.
VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS
MALLA MOSQUITERO N16 COLOR VERDE
MALLA MOSQUITERO N 16 COLOR VERDE

Metrado

Precio Unitario

m2

32.90

217.920

m2

4.24

28.640

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES
PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES
PINTURA EN COLUMNAS
PINTURA EN VIGAS
PINTURA DE PUERTAS
PINTURA EN PUERTAS C/BARNIZ 2 MANOS
1.09 VIVIENDA DE DOCENTES
MUROS Y TABIQUES DE ALBAILERIA
01.09.01
MUROS DE BLOQUES HUECOS DE CONCRETO
01.09.01.01
MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M
01.09.01.01.01
REVOQUES Y REVESTIMIENTOS
01.09.02
REVOQUES Y REVESTIMIENTOS
01.09.02.01
TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
01.09.02.01.01
TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA
01.09.02.01.02
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA
01.09.02.01.03
TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA
01.09.02.01.04
TARRAJEO EN PARAPETOS
01.09.02.01.05
VESTIDURA DE DERRAMES
01.09.02.02
VESTIDURA EN SUPERFICIE DE DERRAMES CON CEMENTO ARENA
01.09.02.02.01
BRUAS
01.09.02.03

01.08.10
01.08.10.01
01.08.10.01.01
01.08.10.01.02
01.08.10.01.03
01.08.10.01.04
01.08.10.02
01.08.10.02.01

Und.

Metrado

Precio Unitario

m2
m2
m2
m2

343.13
148.29
34.14
53.38

9.740
9.950
12.270
12.270

m2

25.61

12.710

m2

1,194.28

49.740

m2
m2
m2
m2
m2

1,975.03
539.86
291.38
498.95
186.84

10.280
11.330
10.810
10.310
13.570

694.90

9.070

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.09.02.03.01
01.09.02.04
01.09.02.04.01
01.09.02.05
01.09.02.05.01
01.09.03
01.09.03.01
01.09.03.01.01
01.09.03.02
01.09.03.02.01
01.09.04
01.09.04.01
01.09.04.01.01
01.09.04.02
01.09.04.02.01
01.09.04.03
01.09.04.03.01
01.09.04.04
01.09.04.04.01
01.09.04.05
01.09.04.05.01
01.09.04.06

Und.
BRUADO DE 1/2"
GRADAS
REVESTIMIENTO DE GRADAS DE ESCALERA
REVESTIMIENTO DE DESCANSOS
REVESTIMIENTO DE DESCANSOS
CIELORRASOS
CIELORRASO CON YESO
CIELORRASOS CON YESO
CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO
CIELORRASO CON BALDOSA ACSTICA
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 35MM. EN SERVICIOS HIGIENICOS
PISOS
PISO CERAMICO COLOR DE 0.40 x0.40 m
PISOS DE CONCRETO
PISO DE CEMENTO PULIDO DE 2
VEREDAS
VEREDA DE CONCRETO 4 F'C= 175 KG/CM2.
JUNTAS DE DILATACIN
JUNTAS ASFALTICAS E=1"
CEMENTO PULIDO EN PARASOLES

Metrado

Precio Unitario

948.60

4.470

m2

146.02

10.510

m2

13.00

22.500

m2

331.16

24.970

m2

415.53

147.210

m2

91.50

30.890

m2

915.00

44.390

m2

590.94

30.730

m2

205.89

91.750

ML

73.35

3.960

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.09.04.06.01
01.09.05
01.09.05.01
01.09.05.01.01

Und.
CEMENTO PULIDO EN PARASOLES
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO 0.20X0.30 cm H= 1.60 m

Metrado

Precio Unitario

m2

91.08

30.730

m2

313.80

75.540

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.09.06
01.09.06.01
01.09.06.01.01
01.09.07
01.09.07.01
01.09.07.01.01
01.09.07.01.02
01.09.07.02
01.09.07.02.01
01.09.07.02.02
01.09.08
01.09.08.01
01.09.08.01.01
01.09.08.01.02
01.09.08.02
01.09.08.02.01
01.09.09
01.09.09.01
01.09.09.01.01
01.09.09.01.02
01.09.09.01.03
01.09.09.01.04

Und.
CARPINTERIA DE MADERA
PUERTAS
PUERTA DE MADERA TABLEROS REBAJADOS DE 4.5 cm DE AGUANO
CARPINTERIA METALICA Y HERRERIA
BARANDAS METALICAS
TUBO NEGRO REDONDO 2" DE DIAMETRO e=2 mm
TUBO DE 1 1/2" e=2 mm CURVO
CERRADURAS
CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES
BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA
VIDRIOS, CRISTALES Y SIMILARES
ESPEJOS Y VIDRIO
ESPEJO DE 0.50 mx 0.80m
VIDRIO TEMPLADO DE 6 mm C/SISTEMA CORREDIZO EN VENTANAS
MALLA MOSQUITERO N16 COLOR VERDE
MALLA MOSQUITERO N 16 COLOR VERDE
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES
PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES
PINTURA EN CIELORRASO
PINTURA EN COLUMNAS

Metrado

Precio Unitario

m2

163.52

149.970

ML
ML

94.89
89.28

49.670
45.480

und
pza

66.00
264.00

92.170
12.660

und
m2

30.00
160.43

27.750
217.920

m2

44.40

28.640

m2
m2
m2
m2

1,975.03
539.86
331.16
291.38

9.740
9.950
12.270
12.270

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.09.09.01.05
01.09.09.01.06
01.09.09.02
01.09.09.02.01
01.09.09.03
01.09.09.03.01
01.09.09.03.02
01.10.01
01.10.02
01.11.01
01.11.01.01
01.11.01.02
01.11.01.03
01.11.01.04
01.11.02
01.11.03
01.12.01
01.12.02
01.12.03

Und.
PINTURA EN VIGAS
PINTURA EN PARAPETOS
PINTURA DE PUERTAS
PINTURA EN PUERTAS C/BARNIZ 2 MANOS
PINTURA DE ESTRUCTURAS METALICAS
PINTURA EN TUBO NEGRO REDONDO DE 2" DE DIMETRO e=2mm BARANDAS
PINTURA EN TUBO DE 1/2" e=2mm CURVO - BARANDAS
1.1 LIMPIEZA PERMANENTE DE OBRA
LIMPIEZA PERMANENTE DE OBRA
LIMPIEZA FINAL DE LA OBRA
1.11 OTROS
MESAS DE CONCRETO PARA BAOS, LABORATORIO Y COCINA
ACERO DE REFUERZO F'y = 4200 kg/cm2 EN MESAS DE TRABAJO
ENCOFRADO Y DESENCOFRADO EN MESAS DE TRABAJO
CONCRETO Fc=175 Kg/cm2 EN MESAS DE TRABAJO
CERAMICO 0.20 X 0.30 m. P/REVESTIMIENTO DE MESAS DE TRABAJO
URINARIOS CORRIDOS EN BATERA DE BAOS
CERAMICO 0.20 X 0.30 m. P/REVESTIMIENTO DE MESAS DE TRABAJO
1.12 PINTURA DE ESTRUCTURAS METALICAS
PINTURA EN TUBO RECTANGULAR DE 100x50mm
PINTURA EN TUBO DE 3" e=2.00mm
PINTURA EN TUBO DE 2" e=2.00mm

Metrado

Precio Unitario

m2
m2

498.95
186.84

12.270
12.270

m2

327.05

12.710

ML
ML

94.89
89.28

7.970
7.970

m2
m2

3,574.40
3,574.40

0.380
0.380

kg
m2
m3
m2

689.01
101.87
13.11
50.25

5.700
25.850
242.090
73.320

m2

7.20

73.320

ML
ML
ML

2,412.30
91.35
251.40

8.400
6.400
6.400

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.12.04
01.12.05
01.14.01
01.14.01.01
01.14.01.02

Und.
PINTURA EN TUBO DE 3/4" e=1.8mm
PINTURA EN PLANCHA METALICA DE e=1/4" (0.20X0.20 m)
1.14 OTRAS AREAS LIBRES
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO

Metrado

Precio Unitario

ML
m2

132.80
80.16

6.400
5.290

m2
m2

1,103.90
1,103.90

0.380
3.580

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.14.01.04
01.14.01.04.01
01.14.01.04.02
01.14.01.04.03
01.14.01.05
01.14.01.05.01
01.14.01.05.02
01.14.01.06
01.14.01.06.01
01.14.01.06.02
01.13.01
01.13.01.01
01.13.01.02
01.13.01.03

Und.
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
NIVELACION INTERIOR Y APISONADO CON COMPACTADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA
GRADAS
CONCRETO F'C=175kg/cm2+25% PM
ENCOFRADO Y DESENCOFRADO DE GRADAS
PISO DE CONCRETO
ENCOFRADO Y DESENCOFRADO
PISO DE CONCRETO F'C=175 kg/cm2 e=10cm
1.13 HUERTOS Y JARDINES
MOVIMIENTO DE TIERRAS
MOVIMIENTO DE TIERRAS
TIERRA TRATADA
SEMBRIO DE GRAS

Metrado

Precio Unitario

m3
m2
m3

220.78
1,103.90
220.78

27.040
2.460
8.390

m3
m2

27.59
110.16

264.800
35.560

m2
m2

221.76
891.29

28.550
40.470

m2
m2
m2

30,809.99
4,478.58
76,772.43

7.180
5.320
7.880

m2

1,889.25

3.580

m3
m2

382.50
1,889.25

27.040
2.460

1.15 PATIO, CANCHAS POLIDEPORTIVAS


01.15.01
01.15.01.01
01.15.02
01.15.02.01
01.15.02.02

TRABAJOS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
NIVELACION INTERIOR Y APISONADO CON COMPACTADO MANUAL

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.15.02.03
01.15.02.04
01.15.02.04.01
01.15.02.04.02
01.15.02.05
01.15.02.05.01
01.15.02.05.02
01.15.02.06
01.15.02.06.01
01.15.02.06.02
01.15.02.07
01.15.02.07.01
01.15.02.08
01.15.02.08.01
01.15.02.09
01.15.02.09.01
01.15.02.10
01.15.02.10.01
01.15.02.10.02
01.15.02.10.03
01.15.02.10.04
01.15.02.10.05

Und.
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA
PISO DE CONCRETO CANCHAS Y PATIO DE HONOR
ENCOFRADO Y DESENCOFRADO CANCHAS Y PATIO DE HONOR
PISO DE CONCRETO F'C=175 kg/cm2 e=10cm
SARDINEL
ENCOFRADO Y DESENCOF. P/ SARDINEL
CONCRETO F'C=175 kg/cm" PARA SARDINELES
CARPINTERIA METALICA
COLOCACION PARA MODULO MULTIDEPORTIVO BASKET Y FULBITO
COLOCACION DE PARANTE DE MODULO VOLEY INCLUYE MALLA
DEPORTIVA
PINTURA
PINTURA ESMALTE SINTETICO CANCHAS DEPORTIVAS DE 0.10 m
OTROS
JUNTAS ASFALTICAS E=1"
GRADERIAS DE CONCRETO CICLOPEO
TRAZO, NIVELES Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA
ENCOFRADO Y DESENCOFRADO DE GRADAS
CONCRETO F'C=175kg/cm2+25% PM
REVESTIMIENTO DE GRADAS DE ESCALERA

Metrado

Precio Unitario

m3

496.02

8.390

m2
m2

499.20
1,868.25

9.620
40.470

m2
m3

20.60
6.51

29.960
422.600

und
und

1.00
1.00

5,000.000
1,060.000

632.00

5.820

ML

1,092.90

5.830

m2

314.00

3.580

m3
m3
m2
m3
m2

92.05
92.05
259.75
89.90
494.20

27.040
8.390
35.560
264.800
10.510

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.15.02.10.06
01.16.01
01.16.01.01
01.16.01.02
01.16.01.03

Und.
JUNTAS ASFALTICAS E=1"
ML
CARPINTERIA
METALICA
1.16
ESTRUCTURA METALICA PARA ATRIO
PIES DERECHOS DE TUBO DE 100mm x 100mm, e=2.5mm
ML
ANCLAJE CON PLANCHA METALICA DE e=1/4" (0.20X0.20 m)
und
VIGA DE ACERO PARA LA ARMADURA DEL TECHO DE TUBO RECTANGULAR ML
DE 100x50mm e=2.5mm

Metrado

Precio Unitario

25.70

5.830

12.90
5.00
16.00

57.060
37.460
33.840

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
01.16.01.04
01.16.01.05
01.16.02
01.16.02.01
01.16.02.02
01.16.02.03
01.16.02.04

02.01.01
02.01.02
02.02.01
02.03.01
02.03.01.01
02.03.01.02
02.03.01.03
02.03.02
02.03.02.01
02.03.02.02
02.03.03

Und.
CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm
COBERTURA CON PLANCHA ONDULINE
POSTE DE IZAMIENTO DE LA BANDERA
ENCOFRADO Y DESENCOFRADO
CONCRETO F'C=175kg/cm2+25% PM
TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA
POSTE DE IZAMIENTO DE LA BANDERA
2 ESTRUCTURA TENSIONADA
2.01 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA
2.02 OBRAS DE CONCRETO SIMPLE
SOLADO PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO-HORMIGON
2.03 OBRAS DE CONCRETO ARMADO
DADOS DE CONCRETO
DADOS DE CONCRETO F'C=210 kg/cm2
ENCOFRADO Y DESENCOFRADO
ACERO f'y=4200 kg/cm2 G 60
ZAPATAS
CONCRETO EN ZAPATAS F'C= 210 KG/CM2
ACERO f'y=4200 kg/cm2 G 60
COLUMNAS

Metrado

Precio Unitario

ML
m2

28.00
27.65

20.980
37.900

m2
m3
m2
und

3.92
0.88
3.92
2.00

28.550
264.800
11.330
369.780

m3
m3

43.01
43.01

27.040
17.580

m2

24.96

44.400

m3
m2
kg

18.00
9.48
305.20

441.790
28.550
5.970

m3
kg

8.64
823.28

451.900
5.970

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
02.03.03.01
02.03.03.02
02.03.03.03

03.06.01
03.06.02
03.06.03
03.06.04

04.01.01
04.01.02
04.02.01
04.02.02
04.02.03

Und.
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
ACERO f'y=4200 kg/cm2 G 60
3 ESTRUCTURA METALICA ARCO DE SOPORTE
3.01 TUBOS PRINCIPALES DE DE 4" DE DIAMETRO e=3mm
3.02 TUBOS DE UNION DE 2" DE DIAMETRO e=3mm
3.03 PLANCHA DE ACERO DE DE 1x 1m DE 3/4"
3.04 FIERRO CORRUGADO DE 5/8"
3.05 TENSIONADA DE MALLA MEDIA PARA COBERTURA
3.06 PINTURA
PINTURA EN TUBOS DE 4"x5/32"
PINTURA EN TUBOS DE 2"x 3mm
PINTURA EN PLANCHA DE 1x 1m DE 3/4"
PINTURA EN PLANCHA DE 0.3 m DE 1/4"
4 CERCO PERIMETRICO
4.01 OBRAS PROVISIONALES
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO
4.02 MOVIMIENTO DE TIERRAS
NIVELACION INTERIOR Y APISONADO CON COMPACTADO MANUAL
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA

Metrado

Precio Unitario

m3
m2
kg

3.78
51.30
823.28

460.070
36.940
5.970

ML
ML
m2
kg
m2

118.20
132.75
2.00
55.18
343.28

87.040
45.040
333.290
5.970
84.000

ML
ML
m2
m2

118.20
132.75
2.00
0.84

23.070
18.070
39.940
39.940

m2
m2

705.04
705.04

0.380
3.580

m2
m3
m3

705.04
95.20
95.20

2.460
27.040
8.390

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item

Und.

Metrado

Precio Unitario

4.03 OBRAS DE CONCRETO SIMPLE


04.03.01
04.03.01.01
04.03.01.02
04.03.01.03
04.03.02
04.03.02.01
04.03.02.02

CIMIENTOS CORRIDOS
CONCRETO F'C=175kg/cm2+25% PM
ENCOFRADO Y DESENCOF. CIMIENTO
SOLADO PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO-HORMIGON
SOBRECIMIENTOS
CONCRETO F'C = 175 KG/CM2
ENCOFRADO Y DESENCOF. SOBRECIMIENTO

m3
m2
m2

25.54
20.83
32.08

264.800
37.320
44.400

m3
m2

102.63
1,026.27

303.670
25.710

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
04.03.03
04.03.03.01
04.03.03.02
04.04.01
04.04.01.01
04.04.01.02
04.04.02
04.04.02.01
04.04.02.02
04.04.02.03
04.04.03
04.04.03.01
04.04.03.02
04.04.03.03
04.04.04
04.04.04.01
04.04.04.02
04.04.04.03
04.05.01
04.05.01.01

Und.
DADOS DE CONCRETO
CONCRETO F'C = 175 KG/CM2
ENCOFRADO Y DESENCOFRADO
4.04 OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
ACERO f'y=4200 kg/cm2 G 60
VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CIMENTACION
ACERO f'y=4200 kg/cm2 G 60
COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
ACERO f'y=4200 kg/cm2 G 60
VIGAS
CONCRETO EN VIGAS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
ACERO f'y=4200 kg/cm2 G 60
4.05 ESTRUCTURAS METALICAS
ESTRUCTURA METALICA PARA CUBIERTA
PARES METALICOS DE 100mm x 50mm e=2mm

Metrado

Precio Unitario

m3
m2

0.16
2.19

303.670
28.550

m3
kg

10.37
279.58

460.070
5.970

m3
m2
kg

1.46
7.60
166.49

452.310
23.690
5.970

m3
m2
kg

9.49
173.42
1,329.79

460.070
36.940
5.970

m3
m2
kg

6.05
82.33
1,006.29

498.310
72.030
5.970

ML

23.40

39.090

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
04.05.01.02
04.05.01.03
04.05.01.04
04.05.02
04.05.02.01
04.06.01
04.06.01.01
04.06.02
04.06.02.01
04.06.02.02
04.06.02.03
04.06.03
04.06.03.01
04.06.04
04.06.04.01
04.07.01
04.07.01.01
04.07.01.02
04.07.02
04.07.02.01

Und.
TUBO NEGRO REDONDO DE 2" e=2mm
CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm
PLANCHA METALICA DE 1/4" (0.20x0.20m)
COBERTURAS
COBERTURA CON PLANCHA ONDULINE
4.06 MUROS Y TABIQUES DE ALBAILERIA
MUROS Y TABIQUES DE ALBAILERIA
MURO DE BLOQUE HUECO DE CONCRETO E=15 CM. MEZCLA 1:5
REVOQUES Y REVESTIMIENTOS
TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA
TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA
CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO
CIELORRASO CON BALDOSA ACSTICA
ZOCALOS Y CONTRAZOCALOS
ZOCALO DE CEMENTO PULIDO MEZCLA CEMENTO-ARENA
4.07 CARPINTERIA METALICA Y HERRERIA
PUERTAS DE FIERRO
PUERTA P-01
PUERTA P-02
CERCO DE MALLA OLIMPICA
TUBO GALVANIZADO DE 3" DE DIAMETRO e=2mm

Metrado

Precio Unitario

ML
ML
und

6.10
93.75
0.56

40.250
20.980
61.710

m2

51.44

37.900

m2

119.40

53.170

m2
m2
m2

238.80
86.24
90.94

11.330
13.460
9.740

m2

39.77

147.210

m2

576.01

25.820

und
und

2.00
1.00

1,065.490
1,003.690

pza

125.40

194.700

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
04.07.02.02
04.07.02.03
04.07.02.04
04.07.03
04.07.03.01
04.08.01

Und.
MALLA OLIMPICA N 10 CON COCADA DE 2 1/2"X2 1/2" DE F G
NGULO DE 1 1/2" X 1 1/2" X 1/8"
ALAMBRE GALVANIZADO CON PUAS
ELEMENTOS METALICOS ESPECIALES
CELOSIA METALICA DE ANGULO DE 3/4" X 1/8
4.08 CERRAJERIA
PICAPORTE HECHIZO DE ACERO DE 1/2"

Metrado

Precio Unitario

m2
ML
ML

597.52
1,508.70
1,886.25

49.210
16.930
2.670

ML

331.80

31.600

und

2.00

35.640

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item

Und.

Metrado

Precio Unitario

4.09 PINTURA
04.09.01
04.09.01.01
04.09.02
04.09.02.01
04.09.02.02
04.09.02.03
04.09.02.04
04.09.02.05

05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.01.08
05.01.09
05.01.10

PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES


PINTURA LATEX PREMIUN SATINADO EN MUROS INTERIORES
PINTURA DE ESTRUCTURAS METALICAS
PINTURA EN CELOSIA METALICA DE ANGULO 3/4" X 1/8
PINTURA EN ANGULAR DE 1 1/2" X 1 1/2" X 1/8"
PINTURA EN TUBO NEGRO REDONDO DE 2" DE DIMETRO e=2mm BARANDAS
PINTURA EN TUBO DE 1"x2"
PINTURA EN TUBO CUADRADO DE 1"X1"
5 MOBILIARIO Y EQUIPO
5.01 MOBILIARIO Y EQUIPO PRIMARIA
CARPETAS UNIPERSONALES
PIZARRAS ACRILICAS DE 1.20x4.80 m
ESTANTE DE MADERA
PUPITRE DOCENTE INCLUIDA SILLA
SILLA UNIPERSONAL MADERA
MESA PEDAGOGICA MADERA INCLUIDA 8 SILLAS
MODULO COMPUTADORA INCLUIDA SILLA
COMPUTADORA
IMPRESORA LASER
EQUIPO AUDIOVISUAL TV+DVD
5.02 MOBILIARIO Y EQUIPO SECUNDARIA

m2

455.75

9.740

ML
ML
ML
ML
ML

331.80
1,508.70
20.60
97.84
16.40

7.890
7.620
7.970
8.280
8.280

und
und
und
und
und
und
und
und
und
und

300.00
15.00
15.00
15.00
35.00
11.00
21.00
21.00
2.00
1.00

220.000
1,100.000
370.000
710.000
45.000
2,120.000
280.000
2,500.000
700.000
1,238.000

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
CARPETAS UNIPERSONALES
PIZARRAS ACRILICAS DE 1.20x4.80 m
ESTANTE DE MADERA
PUPITRE DOCENTE INCLUIDA SILLA
SILLA UNIPERSONAL MADERA
COMPUTADORA
MODULO COMPUTADORA INCLUIDA SILLA
EQUIPO AUDIOVISUAL TV+DVD
5.03 MOBILIARIO Y EQUIPO SALN DE USO MLTIPLE
COCINA
05.03.01
MESA PEDAGOGICA MADERA INCLUIDA 8 SILLAS
05.03.01.01
IMPRESORA LASER
05.03.01.02
COCINA A GAS DE 4 HORNILLAS
05.03.01.03
SALN DE USO MLTIPLE
05.03.02
PROYECTOR MULTIMEDIA
05.03.02.01
ECRAN ENRROLLABLE (3.00 x 2.50 m)
05.03.02.02
ESTRUCTURA METLICA PARA PROYECTOR (Tipo Rack)
05.03.02.03
7 INSTALACIONES SANITARIAS
7.01 BLOQUES PRIMARIA
SISTEMA DE AGUA FRIA
07.01.01
TRABAJOS PRELIMINARES
07.01.01.01
TRAZO, NIVELES Y REPLANTEO
07.01.01.01.01

05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.02.06
05.02.07
05.02.08

Und.

Metrado

Precio Unitario

und
und
und
und
und
und
und
und

200.00
14.00
14.00
14.00
35.00
21.00
21.00
1.00

220.000
1,100.000
370.000
710.000
45.000
2,500.000
280.000
1,238.000

und
und
und

21.00
2.00
2.00

2,120.000
700.000
1,640.000

und
und
und

1.00
1.00
1.00

3,500.000
2,900.000
550.000

74.40

3.610

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.01.01.02
07.01.01.02.01
07.01.01.02.02
07.01.01.02.03
07.01.01.02.04
07.01.01.02.05

Und.
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
m
REFINE Y NIVELACION DE FONDOS DE ZANJA
m
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m
e=10cm
RELLENO Y COMPACTADO CON MATERIAL PROPIO
m
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
m3
DE 30 m

Metrado

45.60
45.60
45.60
45.60
5.34

Precio Unitario

28.120
1.800
1.850
17.090
58.590

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.01.01.03
07.01.01.03.01
07.01.01.03.02
07.01.01.03.03
07.01.01.04
07.01.01.04.01
07.01.01.04.02
07.01.01.04.03
07.01.01.05
07.01.01.05.01
07.01.01.05.02
07.01.01.05.03
07.01.01.06
07.01.01.06.01
07.01.01.06.02
07.01.01.06.03
07.01.01.06.04
07.01.01.06.05
07.01.01.07
07.01.01.07.01
07.01.01.07.02
07.01.01.07.03

Und.
REDES DE DISTRIBUCION DE AGUA
TUBERIA PVC SAP DE 1" C-10 C/R
TUBERIA PVC SAP DE 1/2" C-10 C/R
PRUEBA HIDRAULICA Y DESINFECCION
VALVULAS
VALVULA DE BOLA PVC CON ROSCA 1"
VALVULA DE BOLA PVC CON ROSCA DE 1/2"
GRIFO TIPO FLUXOMETRO PARA OVALIN DE 1/2"
REDES DE ALIMENTACION DE AGUA
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - LAVATORIO
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - INODORO
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - URINARIO CORRIDO DE
CONCRETO
ACCESORIOS
REDUCCION PVC SAP 1 1/2" a 1"
CODO PVC U.R. SAP DE 1" X 90
CODO PVC U.R. SAP DE 1/2" X 90
TEE PVC SAP DE 1" UR
TEE PVC SAP 1/2" UR
SUMINISTRO E INSTALACION DE APARATOS SANITARIOS
LAVATORIO BLANCO OVALIN
INODORO COLOR BLANCO
JABONERA DE LOZA

Metrado

Precio Unitario

m
m
m

8.00
66.40
74.40

23.800
19.990
3.140

pza
pza
und

1.00
16.00
22.00

39.230
33.800
42.050

pto
pto
pto

22.00
18.00
2.00

39.700
34.990
34.990

und
und
und
und
pza

5.00
1.00
58.00
4.00
32.00

5.090
6.170
6.170
8.400
15.980

pza
und
und

22.00
18.00
22.00

50.000
210.000
22.000

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.01.01.07.04
07.01.01.08
07.01.01.08.01
07.01.01.08.02
07.01.01.08.03
07.01.01.08.04
07.01.02
07.01.02.01
07.01.02.01.01
07.01.02.01.02
07.01.02.01.03
07.01.02.02
07.01.02.02.01
07.01.02.02.02
07.01.02.03
07.01.02.03.01
07.01.02.03.02
07.01.02.04
07.01.02.04.01
07.01.02.05
07.01.02.05.01
07.01.02.05.02

Und.
PAPELERA DE LOZA
SUMINISTRO DE ACCESORIOS SANITARIOS
INSTALACION DE LAVATORIO BLANCO OVALIN
INSTALACION DE URINARIO COLOR BLANCO
INSTALACION DE JABONERA DE LOZA
INSTALACION DE PAPELERA DE LOZA
DESAGUE Y VENTILACION
MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION DE FONDOS DE ZANJA
REDES DE DERIVACION
TUBERIA PVC SAL DE 2"
TUBERIA PVC SAL 4"
SALIDA DE DESAGUE
SALIDA DESAGUE PVC SAL DE 4"
SALIDA DESAGUE PVC SAL DE 2"
SALIDAS DE VENTILACION
SALIDA PARA VENTILACION PVC SAL DE 2"
ACCESORIOS DE DESAGUE
YEE PVC SAL 4"
YEE PVC SAL DE 4" a 2"

Metrado

Precio Unitario

und

18.00

22.000

und
und
und
und

22.00
18.00
22.00
18.00

9.160
9.160
6.170
6.170

m
m
m

95.50
47.75
47.75

3.610
28.120
1.800

m
m

25.35
22.40

18.410
12.360

pto
pto

18.00
22.00

80.820
76.620

pto

2.00

74.820

pza
und

18.00
12.00

20.080
19.100

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.01.02.05.03
07.01.02.05.04
07.01.02.05.05
07.01.02.05.06
07.01.02.05.07

Und.
YEE PVC SAL 2"
CODO PVC SAL DE 2" X 45
CODO PVC SAL DE 4" X 45
CODO PVC SAL DE 2" X 90
CODO PVC SAL 4" X 90

pza
und
und
und
pza

Metrado
14.00
18.00
6.00
36.00
4.00

Precio Unitario
17.080
16.720
18.820
16.200
20.330

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.01.02.05.08
07.01.02.05.09
07.01.02.05.10
07.01.02.05.11
07.01.02.05.12
07.01.02.05.13
07.01.02.06
07.01.02.06.01
07.01.03
07.01.03.01
07.01.03.01.01
07.01.03.01.02
07.01.03.01.03
07.01.03.01.04
07.01.03.01.05
07.01.03.02
07.01.03.02.01
07.01.03.02.02
07.01.03.02.03
07.01.03.03
07.01.03.03.01
07.01.03.03.02

Und.
TEE PVC SAL DE 2"
TEE PVC SAL DE 4"
SUMIDERO DE BRONCE 2"
REGISTROS DE BRONCE DE 2"
REGISTROS DE BRONCE DE 4"
SOMBRERO PARA VENTILACION DE PVC DE 2"
CAMARAS DE INSPECCION
CAJA DE REGISTRO DE DESAGUE 12" X 24"
SISTEMA DE DRENAJE PLUVIAL
MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION DE FONDOS DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
DE
m RECOLECCION
RED30DE
TUBERIA PVC SAL 6"
TUBERIA PVC SAL 8"
TUBERIA PVC SAL DE 10"
OBRAS DE CONCRETO SIMPLE
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2

Metrado

Precio Unitario

und
und
und
und
und
und

18.00
18.00
10.00
6.00
2.00
2.00

13.650
18.580
59.010
27.330
37.760
13.180

und

1.00

308.520

m
m
m
m
m3

180.36
179.87
180.36
121.30
55.51

3.610
28.120
1.800
17.090
58.590

m
m
m

9.10
13.35
32.10

40.080
46.280
52.480

m2
m3

87.61
18.18

29.740
407.670

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2
ACERO DE REFUERZO F'y = 4200 kg/cm2
ACCESORIOS
TUBERIA PVC SAP DE 4"
CODO PVC SAP DE 4" X 45
CODO PVC SAP DE 4" X 90
ABRAZADERA DE FIJACIN DE FG DE 4"
SUMIDERO DE BRONCE DE 4"
7.02 BLOQUES SECUNDARIA
SISTEMA DE AGUA FRIA
07.02.01
TRABAJOS PRELIMINARES
07.02.01.01
TRAZO, NIVELES Y REPLANTEO
07.02.01.01.01
MOVIMIENTO DE TIERRAS
07.02.01.02
EXCAVACION MANUAL DE ZANJAS
07.02.01.02.01
REFINE Y NIVELACION DE FONDOS DE ZANJA
07.02.01.02.02
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
07.02.01.02.03
e=10cm
RELLENO Y COMPACTADO CON MATERIAL PROPIO
07.02.01.02.04
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
07.02.01.02.05
DE
30 mDE DISTRIBUCION DE AGUA
REDES
07.02.01.03
TUBERIA PVC SAP DE 1" C-10 C/R
07.02.01.03.01

07.01.03.04
07.01.03.04.01
07.01.03.04.02
07.01.03.04.03
07.01.03.05
07.01.03.05.01
07.01.03.05.02
07.01.03.05.03
07.01.03.05.04
07.01.03.05.05

Und.

Metrado

Precio Unitario

m2
m3
kg

54.46
2.90
182.40

29.740
407.670
5.820

m
und
und
pza
und

118.50
45.00
30.00
60.00
15.00

184.400
7.560
7.560
14.540
71.140

46.30

3.610

m
m
m
m
m3

27.80
27.80
27.80
27.80
3.26

28.120
1.800
1.850
17.090
58.590

6.30

23.800

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.02.01.03.02
07.02.01.03.03
07.02.01.04
07.02.01.04.01
07.02.01.04.02
07.02.01.04.03

Und.
TUBERIA PVC SAP DE 1/2" C-10 C/R
PRUEBA HIDRAULICA Y DESINFECCION
VALVULAS
VALVULA DE BOLA PVC CON ROSCA 1"
VALVULA DE BOLA PVC CON ROSCA DE 1/2"
GRIFO TIPO FLUXOMETRO PARA OVALIN DE 1/2"

Metrado

Precio Unitario

m
m

40.00
46.30

19.990
3.140

pza
pza
und

1.00
16.00
18.00

39.230
33.800
42.050

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.02.01.05
07.02.01.05.01
07.02.01.05.02
07.02.01.05.03
07.02.01.06
07.02.01.06.01
07.02.01.06.02
07.02.01.06.03
07.02.01.06.04
07.02.01.06.05
07.02.01.07
07.02.01.07.01
07.02.01.07.02
07.02.01.07.03
07.02.01.07.04
07.02.01.08
07.02.01.08.01
07.02.01.08.02
07.02.01.08.03
07.02.01.08.04
07.02.02
07.02.02.01

Und.
REDES DE ALIMENTACION DE AGUA
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - LAVATORIO
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - INODORO
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - URINARIO CORRIDO DE
CONCRETO
ACCESORIOS
REDUCCION PVC SAP 1 1/2" a 1"
CODO PVC U.R. SAP DE 1" X 90
CODO PVC U.R. SAP DE 1/2" X 90
TEE PVC SAP DE 1" UR
TEE PVC SAP 1/2" UR
SUMINISTRO E INSTALACION DE APARATOS SANITARIOS
LAVATORIO BLANCO OVALIN
INODORO COLOR BLANCO
JABONERA DE LOZA
PAPELERA DE LOZA
SUMINISTRO DE ACCESORIOS SANITARIOS
INSTALACION DE LAVATORIO BLANCO OVALIN
INSTALACION DE URINARIO COLOR BLANCO
INSTALACION DE JABONERA DE LOZA
INSTALACION DE PAPELERA DE LOZA
DESAGUE Y VENTILACION
MOVIMIENTO DE TIERRAS

Metrado

Precio Unitario

pto
pto
pto

18.00
14.00
2.00

39.700
34.990
34.990

und
und
und
und
pza

4.00
1.00
54.00
2.00
28.00

5.090
6.170
6.170
8.400
15.980

pza
und
und
und

18.00
14.00
18.00
14.00

50.000
210.000
22.000
22.000

und
und
und
und

18.00
14.00
18.00
14.00

9.160
9.160
6.170
6.170

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.02.02.01.01
07.02.02.01.02
07.02.02.01.03
07.02.02.02
07.02.02.02.01
07.02.02.02.02
07.02.02.03
07.02.02.03.01
07.02.02.03.02
07.02.02.04
07.02.02.04.01
07.02.02.05
07.02.02.05.01
07.02.02.05.02
07.02.02.05.03
07.02.02.05.04
07.02.02.05.05
07.02.02.05.06
07.02.02.05.07
07.02.02.05.08
07.02.02.05.09
07.02.02.05.10

Und.
TRAZO, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION DE FONDOS DE ZANJA
REDES DE DERIVACION
TUBERIA PVC SAL DE 2"
TUBERIA PVC SAL 4"
SALIDA DE DESAGUE
SALIDA DESAGUE PVC SAL DE 4"
SALIDA DESAGUE PVC SAL DE 2"
SALIDAS DE VENTILACION
SALIDA PARA VENTILACION PVC SAL DE 2"
ACCESORIOS DE DESAGUE
YEE PVC SAL 4"
YEE PVC SAL DE 4" a 2"
YEE PVC SAL 2"
CODO PVC SAL DE 2" X 45
CODO PVC SAL DE 4" X 45
CODO PVC SAL DE 2" X 90
CODO PVC SAL 4" X 90
TEE PVC SAL DE 2"
TEE PVC SAL DE 4"
SUMIDERO DE BRONCE 2"

Metrado

Precio Unitario

m
m
m

91.50
45.75
45.75

3.610
28.120
1.800

m
m

48.70
42.80

18.410
12.360

pto
pto

14.00
18.00

80.820
76.620

pto

4.00

74.820

pza
und
pza
und
und
und
pza
und
und
und

14.00
22.00
8.00
16.00
6.00
28.00
4.00
18.00
18.00
14.00

20.080
19.100
17.080
16.720
18.820
16.200
20.330
13.650
18.580
59.010

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.02.02.05.11
07.02.02.05.12
07.02.02.05.13
07.02.02.06
07.02.02.06.01

Und.
REGISTROS DE BRONCE DE 2"
REGISTROS DE BRONCE DE 4"
SOMBRERO PARA VENTILACION DE PVC DE 2"
CAMARAS DE INSPECCION
CAJA DE REGISTRO DE DESAGUE 12" X 24"

Metrado

Precio Unitario

und
und
und

6.00
2.00
4.00

27.330
37.760
13.180

und

2.00

308.520

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.02.03
07.02.03.01
07.02.03.01.01
07.02.03.01.02
07.02.03.01.03
07.02.03.01.04
07.02.03.01.05
07.02.03.02
07.02.03.02.01
07.02.03.02.02
07.02.03.03
07.02.03.03.01
07.02.03.03.02
07.02.03.04
07.02.03.04.01
07.02.03.04.02
07.02.03.04.03
07.02.03.05
07.02.03.05.01
07.02.03.05.02
07.02.03.05.03
07.02.03.05.04

Und.
SISTEMA DE DRENAJE PLUVIAL
MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION DE FONDOS DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
DE
m RECOLECCION
RED30DE
TUBERIA PVC SAL 6"
TUBERIA PVC SAL 8"
OBRAS DE CONCRETO SIMPLE
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2
ACERO DE REFUERZO F'y = 4200 kg/cm2
ACCESORIOS
TUBERIA PVC SAP DE 4"
CODO PVC SAP DE 4" X 45
CODO PVC SAP DE 4" X 90
ABRAZADERA DE FIJACIN DE FG DE 4"

Metrado

Precio Unitario

m
m
m
m
m3

110.88
109.83
110.48
67.21
37.21

3.610
28.120
1.800
17.090
58.590

m
m

23.20
13.80

40.080
46.280

m2
m3

71.82
13.17

29.740
407.670

m2
m3
kg

20.68
147.00
971.52

29.740
407.670
5.820

m
und
und
pza

63.20
24.00
6.00
32.00

184.400
7.560
7.560
14.540

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item

Und.

SUMIDERO DE BRONCE DE 4"


und
SALA
DE
CMPUTO
PRIMARIA
Y
SECUNDARIA
7.03
SISTEMA DE AGUA FRIA
07.03.01
TRABAJOS PRELIMINARES
07.03.01.01
TRAZO, NIVELES Y REPLANTEO
07.03.01.01.01
m
MOVIMIENTO
DE
TIERRAS
07.03.01.02
EXCAVACION MANUAL DE ZANJAS
07.03.01.02.01
m
REFINE Y NIVELACION DE FONDOS DE ZANJA
07.03.01.02.02
m
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m
07.03.01.02.03
e=10cm
RELLENO Y COMPACTADO CON MATERIAL PROPIO
07.03.01.02.04
m
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
07.03.01.02.05
m3
DE
30 mDE DISTRIBUCION DE AGUA
REDES
07.03.01.03
TUBERIA PVC SAP DE 1" C-10 C/R
07.03.01.03.01
m
TUBERIA
PVC
SAP
DE
1/2"
C-10
C/R
07.03.01.03.02
m
PRUEBA HIDRAULICA Y DESINFECCION
07.03.01.03.03
m
VALVULAS
07.03.01.04
VALVULA DE BOLA PVC CON ROSCA 1"
07.03.01.04.01
pza
VALVULA
DE
BOLA
PVC
CON
ROSCA
DE
1/2"
07.03.01.04.02
pza
GRIFO TIPO FLUXOMETRO PARA OVALIN DE 1/2"
07.03.01.04.03
und
LLAVE PARA DUCHA DE DISCO CERAMICODE 1/2"
07.03.01.04.04
und
REDES DE ALIMENTACION DE AGUA
07.03.01.05
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - LAVATORIO
07.03.01.05.01
pto

07.02.03.05.05

Metrado

Precio Unitario

8.00

71.140

65.10

3.610

12.70
12.70
12.70
12.70
1.48

28.120
1.800
1.850
17.090
58.590

12.70
52.40
65.10

23.800
19.990
3.140

2.00
4.00
17.00
17.00

39.230
33.800
42.050
49.050

17.00

39.700

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.03.01.05.02
07.03.01.06
07.03.01.06.01
07.03.01.06.02
07.03.01.06.03
07.03.01.06.04

Und.
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2"- DUCHAS
ACCESORIOS
REDUCCION PVC SAP 1 1/2" a 1"
CODO PVC U.R. SAP DE 1" X 90
CODO PVC U.R. SAP DE 1/2" X 90
TEE PVC SAP 1/2" UR

Metrado

Precio Unitario

pto

1.00

34.990

und
und
und
pza

2.00
10.00
18.00
9.00

5.090
6.170
6.170
15.980

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.03.01.07
07.03.01.07.01
07.03.01.07.02
07.03.01.07.03
07.03.01.08
07.03.01.08.01
07.03.01.08.02
07.03.01.08.03
07.03.02
07.03.02.01
07.03.02.01.01
07.03.02.01.02
07.03.02.01.03
07.03.02.02
07.03.02.02.01
07.03.02.03
07.03.02.03.01
07.03.02.04
07.03.02.04.01
07.03.02.04.02
07.03.02.04.03
07.03.02.04.04

Und.
SUMINISTRO E INSTALACION DE APARATOS SANITARIOS
LAVATORIO BLANCO OVALIN
DUCHA CROMADA CON CABEZA GIRATORIA
JABONERA DE LOZA
SUMINISTRO DE ACCESORIOS SANITARIOS
INSTALACION DE LAVATORIO BLANCO OVALIN
INSTALACION DE DUCHA CROMADA CON CABEZA GIRATORIA
INSTALACION DE JABONERA DE LOZA
DESAGUE Y VENTILACION
MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION DE FONDOS DE ZANJA
REDES DE DERIVACION
TUBERIA PVC SAL DE 2"
SALIDA DE DESAGUE
SALIDA DESAGUE PVC SAL DE 2"
ACCESORIOS DE DESAGUE
YEE PVC SAL 2"
CODO PVC SAL DE 2" X 90
CODO PVC SAL 4" X 90
TEE PVC SAL DE 2"

Metrado

Precio Unitario

pza
und
und

17.00
17.00
17.00

50.000
37.200
22.000

und
und
und

17.00
17.00
17.00

9.160
11.920
6.170

m
m
m

39.60
39.60
39.60

3.610
28.120
1.800

39.60

18.410

pto

17.00

76.620

pza
und
pza
und

16.00
5.00
1.00
4.00

17.080
16.200
20.330
13.650

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.03.02.04.05
07.03.02.04.06
07.03.02.04.07
07.03.02.05
07.03.02.05.01
07.03.03
07.03.03.01
07.03.03.01.01
07.03.03.01.02
07.03.03.01.03
07.03.03.01.04
07.03.03.01.05
07.03.03.02
07.03.03.02.01
07.03.03.02.02
07.03.03.03
07.03.03.03.01
07.03.03.03.02
07.03.03.04
07.03.03.04.01
07.03.03.04.02
07.03.03.04.03

Und.
TEE PVC SAL DE 4"
SUMIDERO DE BRONCE 2"
REGISTROS DE BRONCE DE 2"
CAMARAS DE INSPECCION
CAJA DE REGISTRO DE DESAGUE 12" X 24"
SISTEMA DE DRENAJE PLUVIAL
MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION DE FONDOS DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
DE
m RECOLECCION
RED30DE
TUBERIA PVC SAL 6"
TUBERIA PVC SAL 8"
OBRAS DE CONCRETO SIMPLE
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2
ACERO DE REFUERZO F'y = 4200 kg/cm2

Metrado

Precio Unitario

und
und
und

4.00
2.00
1.00

18.580
59.010
27.330

und

2.00

308.520

m
m
m
m
m3

76.25
76.42
108.43
65.80
17.04

3.610
28.120
1.800
17.090
58.590

m
m

4.10
30.50

40.080
46.280

m2
m3

22.28
6.28

29.740
407.670

m2
m3
kg

8.16
0.56
17.71

29.740
407.670
5.820

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.03.03.05
07.03.03.05.01
07.03.03.05.02
07.03.03.05.03
07.03.03.05.04
07.03.03.05.05

Und.
ACCESORIOS
TUBERIA PVC SAP DE 4"
CODO PVC SAP DE 4" X 45
CODO PVC SAP DE 4" X 90
ABRAZADERA DE FIJACIN DE FG DE 4"
SUMIDERO DE BRONCE DE 4"

m
und
und
pza
und

Metrado

31.60
12.00
8.00
16.00
8.00

Precio Unitario

184.400
7.560
7.560
14.540
71.140

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item

Und.

Metrado

Precio Unitario

7.04 SALN DE USO MLTIPLE


07.04.01
07.04.01.01
07.04.01.01.01
07.04.01.02
07.04.01.02.01
07.04.01.02.02
07.04.01.02.03
07.04.01.02.04
07.04.01.02.05
07.04.01.03
07.04.01.03.01
07.04.01.03.02
07.04.01.03.03
07.04.01.04
07.04.01.04.01
07.04.01.04.02
07.04.01.04.03
07.04.01.05
07.04.01.05.01
07.04.01.06
07.04.01.06.01

SISTEMA DE AGUA FRIA


MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO
m
TRABAJOS PRELIMINARES
EXCAVACION MANUAL DE ZANJAS
m
REFINE Y NIVELACION DE FONDOS DE ZANJA
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m
e=10cm
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
DE
30 mDE DISTRIBUCION DE AGUA
REDES
TUBERIA PVC SAP DE 1" C-10 C/R
TUBERIA PVC SAP DE 1/2" C-10 C/R
PRUEBA HIDRAULICA Y DESINFECCION
VALVULAS
VALVULA DE BOLA PVC CON ROSCA 1"
VALVULA DE BOLA PVC CON ROSCA DE 1/2"
GRIFO TIPO FLUXOMETRO PARA OVALIN DE 1/2"
REDES DE ALIMENTACION DE AGUA
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - LAVATORIO
ACCESORIOS
REDUCCION PVC SAP 1 1/2" a 1"

8.20

3.610

8.20
8.20
8.20
8.20
2.38

28.120
1.800
1.850
17.090
58.590

m
m
m

1.20
7.00
8.00

23.800
19.990
3.140

p
zp
a
zu
a
n
d
p

1.00
1.00
4.00

39.230
33.800
42.050

t
o
u

2.00

39.700

n
d

1.00

5.090

m
m
m
3

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.04.01.06.02
07.04.01.06.03
07.04.01.06.04
07.04.01.07
07.04.01.07.01
07.04.01.07.02
07.04.01.08
07.04.01.08.01
07.04.01.08.02
07.04.02
07.04.02.01
07.04.02.01.01
07.04.02.01.02
07.04.02.01.03
07.04.02.02
07.04.02.02.01
07.04.02.03
07.04.02.03.01
07.04.02.04
07.04.02.04.01
07.04.02.04.02
07.04.02.04.03

Und.
CODO PVC U.R. SAP DE 1" X 90
CODO 1/2" X 45UR
TEE PVC SAP 1/2" UR
SUMINISTRO E INSTALACION DE APARATOS SANITARIOS
LAVATORIO BLANCO OVALIN
JABONERA DE LOZA
SUMINISTRO DE ACCESORIOS SANITARIOS
INSTALACION DE LAVATORIO BLANCO OVALIN
INSTALACION DE JABONERA DE LOZA
DESAGUE Y VENTILACION
MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION DE FONDOS DE ZANJA
REDES DE DERIVACION
TUBERIA PVC SAL DE 2"
SALIDA DE DESAGUE
SALIDA DESAGUE PVC SAL DE 2"
ACCESORIOS DE DESAGUE
YEE PVC SAL DE 4" a 2"
YEE PVC SAL 2"
CODO PVC SAL DE 2" X 90

Metrado
u
n
u
d
n
p
zd
a
p

Precio Unitario

9.00
1.00
6.00

6.170
5.060
15.980

zu
a
n
d
u

2.00
2.00

50.000
22.000

n
u
d
n
d

2.00
2.00

9.160
6.170

m
m
m

21.05
21.05
21.05

3.610
28.120
1.800

5.05

18.410

p
t
o
u

2.00

76.620

1.00
14.00
1.00

19.100
17.080
16.200

n
p
d
zu
a
n
d

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.04.02.04.04
07.04.02.04.05
07.04.02.05
07.04.02.05.01

Und.
SUMIDERO DE BRONCE 2"
REGISTROS DE BRONCE DE 2"
CAMARAS DE INSPECCION
CAJA DE REGISTRO DE DESAGUE 12" X 24"

Metrado
u
n
u
d
n
d
u
n
d

Precio Unitario

2.00
2.00

59.010
27.330

1.00

308.520

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.04.03
07.04.03.01
07.04.03.01.01
07.04.03.01.02
07.04.03.01.03
07.04.03.01.04
07.04.03.01.05
07.04.03.02
07.04.03.02.01
07.04.03.03
07.04.03.03.01
07.04.03.03.02
07.04.03.03.03
07.04.03.04
07.04.03.04.01
07.04.03.04.02
07.04.03.04.03
07.04.03.04.04
07.04.03.04.05
07.05.01
07.05.01.01

Und.
SISTEMA DE DRENAJE PLUVIAL
MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION DE FONDOS DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
DE
m RECOLECCION
RED30DE
TUBERIA PVC SAL 8"
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2
ACERO DE REFUERZO F'y = 4200 kg/cm2
ACCESORIOS
TUBERIA PVC SAP DE 4"
CODO PVC SAP DE 4" X 45
CODO PVC SAP DE 4" X 90
ABRAZADERA DE FIJACIN DE FG DE 4"
SUMIDERO DE BRONCE DE 4"
7.05 TPICO, SICOLOGA Y ADMINISTRACIN
SISTEMA DE AGUA FRIA
TRABAJOS PRELIMINARES

kg
m
und
und
pza
und

Metrado

Precio Unitario

m
m
m
m
m
3

38.18
37.99
36.74
79.20
5.44

3.610
28.120
1.800
17.090
58.590

34.30

46.280

20.38
0.43
64.94

29.740
407.670
5.820

47.40
18.00
12.00
24.00
6.00

184.400
7.560
7.560
14.540
71.140

m
2
m
3

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.05.01.01.01
07.05.01.02
07.05.01.02.01
07.05.01.02.02
07.05.01.02.03
07.05.01.02.04
07.05.01.02.05
07.05.01.03
07.05.01.03.01
07.05.01.03.02
07.05.01.03.03
07.05.01.04
07.05.01.04.01
07.05.01.04.02
07.05.01.04.03
07.05.01.04.04
07.05.01.05
07.05.01.05.01
07.05.01.05.02
07.05.01.06
07.05.01.06.01
07.05.01.06.02

Und.
TRAZO, NIVELES Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION DE FONDOS DE ZANJA
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
e=10cm
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
DE
30 mDE DISTRIBUCION DE AGUA
REDES
TUBERIA PVC SAP DE 1" C-10 C/R
TUBERIA PVC SAP DE 1/2" C-10 C/R
PRUEBA HIDRAULICA Y DESINFECCION
VALVULAS
VALVULA DE BOLA PVC CON ROSCA 1"
VALVULA DE BOLA PVC CON ROSCA DE 1/2"
GRIFO TIPO FLUXOMETRO PARA OVALIN DE 1/2"
LLAVE CON GRIFO PARA LAVADERO DE ACERO INOXIDABLE DE 1/2"
REDES DE ALIMENTACION DE AGUA
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - LAVATORIO
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - INODORO
ACCESORIOS
REDUCCION PVC SAP 1 1/2" a 1"
CODO PVC U.R. SAP DE 1" X 90

Metrado

Precio Unitario

21.68

3.610

m
m
m
m
m3

16.10
16.10
16.10
16.10
1.88

28.120
1.800
1.850
17.090
58.590

m
m
m

9.10
12.58
21.68

23.800
19.990
3.140

pza
pza
und
und

1.00
4.00
3.00
1.00

39.230
33.800
42.050
53.950

pto
pto

4.00
3.00

39.700
34.990

und
und

2.00
2.00

5.090
6.170

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.05.01.06.03
07.05.01.06.04
07.05.01.06.05
07.05.01.07
07.05.01.07.01
07.05.01.07.02
07.05.01.07.03

Und.
CODO PVC U.R. SAP DE 1/2" X 90
TEE PVC SAP DE 1" UR
TEE PVC SAP 1/2" UR
SUMINISTRO E INSTALACION DE APARATOS SANITARIOS
LAVATORIO BLANCO OVALIN
LAVADERO DE ACERO INOXIDABLE 1 POZA 18"x20" C/ACCESORIOS
INODORO COLOR BLANCO

Metrado

Precio Unitario

und
und
pza

10.00
2.00
6.00

6.170
8.400
15.980

pza
pza
und

3.00
1.00
2.00

50.000
355.560
210.000

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.05.01.07.04
07.05.01.07.05
07.05.01.08
07.05.01.08.01
07.05.01.08.02
07.05.01.08.03
07.05.01.08.04
07.05.01.08.05
07.05.02
07.05.02.01
07.05.02.01.01
07.05.02.01.02
07.05.02.01.03
07.05.02.02
07.05.02.02.01
07.05.02.03
07.05.02.03.01
07.05.02.03.02
07.05.02.04
07.05.02.04.01
07.05.02.05
07.05.02.05.01

Und.
JABONERA DE LOZA
PAPELERA DE LOZA
SUMINISTRO DE ACCESORIOS SANITARIOS
INSTALACION DE LAVATORIO BLANCO OVALIN
INSTALACION DE LAVADERO DE ACERO INOXIDABLE DE 01 POZA
INSTALACION DE INODORO COLOR BLANCO
INSTALACION DE JABONERA DE LOZA
INSTALACION DE PAPELERA DE LOZA
DESAGUE Y VENTILACION
MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION DE FONDOS DE ZANJA
REDES DE DERIVACION
TUBERIA PVC SAL DE 2"
SALIDA DE DESAGUE
SALIDA DESAGUE PVC SAL DE 4"
SALIDA DESAGUE PVC SAL DE 2"
SALIDAS DE VENTILACION
SALIDA PARA VENTILACION PVC SAL DE 2"
ACCESORIOS DE DESAGUE
YEE PVC SAL DE 4" a 2"

Metrado

Precio Unitario

und
und

3.00
2.00

22.000
22.000

und
und
und
und
und

3.00
1.00
2.00
3.00
2.00

9.160
9.160
9.160
6.170
6.170

m
m
m

104.75
21.05
21.05

3.610
28.120
1.800

72.10

18.410

pto
pto

3.00
2.00

80.820
76.620

pto

1.00

74.820

und

5.00

19.100

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.05.02.05.02
07.05.02.05.03
07.05.02.05.04
07.05.02.05.05
07.05.02.05.06
07.05.02.05.07
07.05.02.05.08
07.05.02.05.09
07.05.02.06
07.05.02.06.01
07.05.03
07.05.03.01
07.05.03.01.01
07.05.03.01.02
07.05.03.01.03
07.05.03.01.04
07.05.03.01.05
07.05.03.02
07.05.03.02.01
07.05.03.02.02
07.05.03.03
07.05.03.03.01

Und.
YEE PVC SAL 2"
CODO PVC SAL DE 2" X 45
CODO PVC SAL DE 2" X 90
CODO PVC SAL 4" X 90
TEE PVC SAL DE 4"
SUMIDERO DE BRONCE 2"
REGISTROS DE BRONCE DE 4"
SOMBRERO PARA VENTILACION DE PVC DE 2"
CAMARAS DE INSPECCION
CAJA DE REGISTRO DE DESAGUE 12" X 24"
SISTEMA DE DRENAJE PLUVIAL
MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION DE FONDOS DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
DE
30 mDE CONCRETO SIMPLE
OBRAS
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOF. DE CANALES

Metrado

Precio Unitario

pza
und
und
pza
und
und
und
und

1.00
3.00
53.00
2.00
4.00
3.00
2.00
1.00

17.080
16.720
16.200
20.330
18.580
59.010
37.760
13.180

und

2.00

308.520

m
m
m
m
m3

60.50
30.25
30.25
30.25
9.83

3.610
28.120
1.800
17.090
58.590

m2
m3

21.18
4.39

29.740
407.670

m2

0.90

29.740

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.05.03.03.02
07.05.03.03.03
07.05.03.04
07.05.03.04.01
07.05.03.04.02

Und.
CONCRETO F'C=175 kg/cm2
ACERO DE REFUERZO F'y = 4200 kg/cm2
ACCESORIOS
TUBERIA PVC SAP DE 4"
CODO PVC SAP DE 4" X 45

Metrado

Precio Unitario

m3
kg

0.05
4.08

407.670
5.820

m
und

15.80
6.00

184.400
7.560

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
CODO PVC SAP DE 4" X 90
ABRAZADERA DE FIJACIN DE FG DE 4"
SUMIDERO DE BRONCE DE 4"
7.06 TALLER DE CONFECCIN, ARTESANIAS E IDIOMAS
SISTEMA DE DRENAJE PLUVIAL
07.06.01
MOVIMIENTO DE TIERRAS
07.06.01.01
TRAZO, NIVELES Y REPLANTEO
07.06.01.01.01
EXCAVACION MANUAL DE ZANJAS
07.06.01.01.02
REFINE Y NIVELACION DE FONDOS DE ZANJA
07.06.01.01.03
RELLENO Y COMPACTADO CON MATERIAL PROPIO
07.06.01.01.04
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
07.06.01.01.05
DE
m RECOLECCION
RED30DE
07.06.01.02
TUBERIA PVC SAL 8"
07.06.01.02.01
OBRAS DE CONCRETO SIMPLE
07.06.01.03
ENCOFRADO Y DESENCOF. DE CANALES
07.06.01.03.01
CONCRETO F'C=175 kg/cm2
07.06.01.03.02
OBRAS DE CONCRETO ARMADO
07.06.01.04
ENCOFRADO Y DESENCOF. DE CANALES
07.06.01.04.01
CONCRETO F'C=175 kg/cm2
07.06.01.04.02
ACERO DE REFUERZO F'y = 4200 kg/cm2
07.06.01.04.03
ACCESORIOS
07.06.01.05
TUBERIA PVC SAP DE 4"
07.06.01.05.01

07.05.03.04.03
07.05.03.04.04
07.05.03.04.05

Und.

Metrado

Precio Unitario

und
pza
und

4.00
8.00
2.00

7.560
14.540
71.140

m
m
m
m
m3

51.69
51.62
51.69
41.20
12.37

3.610
28.120
1.800
17.090
58.590

18.20

46.280

m2
m3

16.03
4.52

29.740
407.670

m2
m3
kg

8.61
0.58
47.40

29.740
407.670
5.820

38.50

184.400

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
CODO PVC SAP DE 4" X 45
CODO PVC SAP DE 4" X 90
ABRAZADERA DE FIJACIN DE FG DE 4"
SUMIDERO DE BRONCE DE 4"
7.07 BIBLIOTECA GENERAL
SISTEMA DE DRENAJE PLUVIAL
07.07.01
MOVIMIENTO DE TIERRAS
07.07.01.01
TRAZO, NIVELES Y REPLANTEO
07.07.01.01.01
EXCAVACION MANUAL DE ZANJAS
07.07.01.01.02
REFINE Y NIVELACION DE FONDOS DE ZANJA
07.07.01.01.03
RELLENO Y COMPACTADO CON MATERIAL PROPIO
07.07.01.01.04
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
07.07.01.01.05
DE
m RECOLECCION
RED30DE
07.07.01.02
TUBERIA PVC SAL 8"
07.07.01.02.01
OBRAS DE CONCRETO ARMADO
07.07.01.03
ENCOFRADO Y DESENCOF. DE CANALES
07.07.01.03.01
CONCRETO F'C=175 kg/cm2
07.07.01.03.02
ACERO DE REFUERZO F'y = 4200 kg/cm2
07.07.01.03.03
ACCESORIOS
07.07.01.04
TUBERIA PVC SAP DE 4"
07.07.01.04.01
CODO PVC SAP DE 4" X 45
07.07.01.04.02
CODO PVC SAP DE 4" X 90
07.07.01.04.03

07.06.01.05.02
07.06.01.05.03
07.06.01.05.04
07.06.01.05.05

Und.

Metrado

Precio Unitario

und
und
pza
und

15.00
10.00
20.00
5.00

7.560
7.560
14.540
71.140

m
m
m
m
m3

24.64
23.52
23.64
61.30
3.33

3.610
28.120
1.800
17.090
58.590

21.20

46.280

m2
m3
kg

13.12
0.91
48.00

29.740
407.670
5.820

m
und
und

31.60
12.00
8.00

184.400
7.560
7.560

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
ABRAZADERA DE FIJACIN DE FG DE 4"
SUMIDERO DE BRONCE DE 4"
7.08 DUCHAS Y VESTIDORES (PRIMARIA Y SECUNDARIA)
SISTEMA DE AGUA FRIA
07.08.01
TRABAJOS PRELIMINARES
07.08.01.01
TRAZO, NIVELES Y REPLANTEO
07.08.01.01.01

07.07.01.04.04
07.07.01.04.05

Und.

Metrado

Precio Unitario

pza
und

6.00
4.00

14.540
71.140

70.30

3.610

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.08.01.02
07.08.01.02.01
07.08.01.02.02
07.08.01.02.03
07.08.01.02.04
07.08.01.02.05
07.08.01.03
07.08.01.03.01
07.08.01.03.02
07.08.01.03.03
07.08.01.04
07.08.01.04.01
07.08.01.04.02
07.08.01.04.03
07.08.01.04.04
07.08.01.05
07.08.01.05.01
07.08.01.05.02
07.08.01.05.03
07.08.01.06
07.08.01.06.01
07.08.01.06.02

Und.
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION DE FONDOS DE ZANJA
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
e=10cm
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
DE
30 mDE DISTRIBUCION DE AGUA
REDES
TUBERIA PVC SAP DE 1" C-10 C/R
TUBERIA PVC SAP DE 1/2" C-10 C/R
PRUEBA HIDRAULICA Y DESINFECCION
VALVULAS
VALVULA DE BOLA PVC CON ROSCA 1"
VALVULA DE BOLA PVC CON ROSCA DE 1/2"
GRIFO TIPO FLUXOMETRO PARA OVALIN DE 1/2"
LLAVE PARA DUCHA DE DISCO CERAMICODE 1/2"
REDES DE ALIMENTACION DE AGUA
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - LAVATORIO
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - INODORO
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - URINARIO CORRIDO DE
CONCRETO
ACCESORIOS
REDUCCION PVC SAP 1 1/2" a 1"
CODO PVC U.R. SAP DE 1" X 90

Metrado

Precio Unitario

m
m
m
m
m3

45.90
45.90
45.90
45.90
5.36

28.120
1.800
1.850
17.090
58.590

m
m
m

20.40
49.90
70.30

23.800
19.990
3.140

pza
pza
und
und

3.00
5.00
1.00
12.00

39.230
33.800
42.050
49.050

pto
pto
pto

1.00
1.00
13.00

39.700
34.990
34.990

und
und

25.00
5.00

5.090
6.170

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.08.01.06.03
07.08.01.06.04
07.08.01.06.05
07.08.01.07
07.08.01.07.01
07.08.01.07.02
07.08.01.07.03
07.08.01.07.04
07.08.01.07.05
07.08.01.08
07.08.01.08.01
07.08.01.08.02
07.08.01.08.03
07.08.01.08.04
07.08.01.08.05
07.08.02
07.08.02.01
07.08.02.01.01
07.08.02.01.02
07.08.02.01.03
07.08.02.02
07.08.02.02.01

Und.
CODO PVC U.R. SAP DE 1/2" X 90
TEE PVC SAP DE 1" UR
TEE PVC SAP 1/2" UR
SUMINISTRO E INSTALACION DE APARATOS SANITARIOS
LAVATORIO BLANCO OVALIN
INODORO COLOR BLANCO
DUCHA CROMADA CON CABEZA GIRATORIA
JABONERA DE LOZA
PAPELERA DE LOZA
SUMINISTRO DE ACCESORIOS SANITARIOS
INSTALACION DE LAVATORIO BLANCO OVALIN
INSTALACION DE DUCHA CROMADA CON CABEZA GIRATORIA
INSTALACION DE URINARIO COLOR BLANCO
INSTALACION DE JABONERA DE LOZA
INSTALACION DE PAPELERA DE LOZA
DESAGUE Y VENTILACION
MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION DE FONDOS DE ZANJA
REDES DE DERIVACION
TUBERIA PVC SAL DE 2"

Metrado

Precio Unitario

und
und
pza

13.00
4.00
10.00

6.170
8.400
15.980

pza
und
und
und
und

1.00
1.00
12.00
1.00
1.00

50.000
210.000
37.200
22.000
22.000

und
und
und
und
und

1.00
1.00
1.00
1.00
1.00

9.160
11.920
9.160
6.170
6.170

m
m
m

66.10
66.10
66.10

3.610
28.120
1.800

46.55

18.410

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.08.02.02.02
07.08.02.03
07.08.02.03.01
07.08.02.03.02
07.08.02.04
07.08.02.04.01

Und.
TUBERIA PVC SAL 4"
SALIDA DE DESAGUE
SALIDA DESAGUE PVC SAL DE 4"
SALIDA DESAGUE PVC SAL DE 2"
SALIDAS DE VENTILACION
SALIDA PARA VENTILACION PVC SAL DE 2"

Metrado

Precio Unitario

19.55

12.360

pto
pto

1.00
1.00

80.820
76.620

pto

1.00

74.820

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.08.02.05
07.08.02.05.01
07.08.02.05.02
07.08.02.05.03
07.08.02.05.04
07.08.02.05.05
07.08.02.05.06
07.08.02.05.07
07.08.02.05.08
07.08.02.06
07.08.02.06.01
07.08.03
07.08.03.01
07.08.03.01.01
07.08.03.01.02
07.08.03.01.03
07.08.03.01.04
07.08.03.01.05
07.08.03.02
07.08.03.02.01
07.08.03.02.02
07.08.03.03

Und.
ACCESORIOS DE DESAGUE
YEE PVC SAL DE 4" a 2"
CODO PVC SAL DE 2" X 45
CODO PVC SAL DE 2" X 90
TEE PVC SAL DE 4"
SUMIDERO DE BRONCE 2"
REGISTROS DE BRONCE DE 2"
REGISTROS DE BRONCE DE 4"
SOMBRERO PARA VENTILACION DE PVC DE 2"
CAMARAS DE INSPECCION
CAJA DE REGISTRO DE DESAGUE 12" X 24"
SISTEMA DE DRENAJE PLUVIAL
MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION DE FONDOS DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
DE
m RECOLECCION
RED30DE
TUBERIA PVC SAL 6"
TUBERIA PVC SAL DE 10"
OBRAS DE CONCRETO SIMPLE

Metrado

Precio Unitario

und
und
und
und
und
und
und
und

22.00
5.00
2.00
1.00
21.00
4.00
1.00
1.00

19.100
16.720
16.200
18.580
59.010
27.330
37.760
13.180

und

5.00

308.520

m
m
m
m
m3

134.92
134.70
202.14
95.07
19.54

3.610
28.120
1.800
17.090
58.590

m
m

24.69
38.72

40.080
52.480

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item

Und.

ENCOFRADO Y DESENCOF. DE CANALES


m2
CONCRETO F'C=175 kg/cm2
m3
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOF. DE CANALES
m2
CONCRETO F'C=175 kg/cm2
m3
ACERO DE REFUERZO F'y = 4200 kg/cm2
kg
ACCESORIOS
TUBERIA PVC SAP DE 4"
m
CODO PVC SAP DE 4" X 45
und
CODO PVC SAP DE 4" X 90
und
ABRAZADERA DE FIJACIN DE FG DE 4"
pza
SUMIDERO DE BRONCE DE 4"
und
CANALETA DE PLANCHA DE FGALVANIZADO e=3/16 INCLUYE ACCESORIOS
ML
DE
FIJACION
VIVIENDA
DE
DOCENTES
7.09
SISTEMA DE AGUA FRIA
07.09.01
TRABAJOS PRELIMINARES
07.09.01.01
TRAZO, NIVELES Y REPLANTEO
07.09.01.01.01
m
MOVIMIENTO
DE
TIERRAS
07.09.01.02
EXCAVACION MANUAL DE ZANJAS
07.09.01.02.01
m
REFINE Y NIVELACION DE FONDOS DE ZANJA
07.09.01.02.02
m
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m
07.09.01.02.03
e=10cm
RELLENO Y COMPACTADO CON MATERIAL PROPIO
07.09.01.02.04
m

07.08.03.03.01
07.08.03.03.02
07.08.03.04
07.08.03.04.01
07.08.03.04.02
07.08.03.04.03
07.08.03.05
07.08.03.05.01
07.08.03.05.02
07.08.03.05.03
07.08.03.05.04
07.08.03.05.05
07.08.03.05.06

Metrado

Precio Unitario

17.69
5.64

29.740
407.670

26.04
1.36
98.16

29.740
407.670
5.820

45.70
18.00
12.00
2.00
6.00
24.30

184.400
7.560
7.560
14.540
71.140
69.960

218.70

3.610

125.50
125.50
125.50
125.50

28.120
1.800
1.850
17.090

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.09.01.02.05
07.09.01.03
07.09.01.03.01
07.09.01.03.02
07.09.01.03.03

Und.
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
DE
30 mDE DISTRIBUCION DE AGUA
REDES
TUBERIA PVC SAP DE 1" C-10 C/R
TUBERIA PVC SAP DE 1/2" C-10 C/R
PRUEBA HIDRAULICA Y DESINFECCION

Metrado

Precio Unitario

m3

14.68

58.590

m
m
m

68.10
150.70
218.80

23.800
19.990
3.140

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.09.01.04
07.09.01.04.01
07.09.01.04.02
07.09.01.04.03
07.09.01.04.04
07.09.01.05
07.09.01.05.01
07.09.01.05.02
07.09.01.05.03
07.09.01.06
07.09.01.06.01
07.09.01.06.02
07.09.01.06.03
07.09.01.06.04
07.09.01.07
07.09.01.07.01
07.09.01.07.02
07.09.01.07.03
07.09.01.07.04
07.09.01.07.05
07.09.01.07.06
07.09.01.07.07

Und.
VALVULAS
VALVULA DE BOLA PVC CON ROSCA 1"
VALVULA DE BOLA PVC CON ROSCA DE 1/2"
GRIFO TIPO FLUXOMETRO PARA OVALIN DE 1/2"
LLAVE PARA DUCHA DE DISCO CERAMICODE 1/2"
REDES DE ALIMENTACION DE AGUA
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - LAVATORIO
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - INODORO
SALIDA DE AGUA FRIA CON TUB. PVC SAP DE 1/2" - URINARIO CORRIDO DE
CONCRETO
ACCESORIOS
REDUCCION PVC SAP 1 1/2" a 1"
CODO PVC U.R. SAP DE 1" X 90
TEE PVC SAP DE 1" UR
TEE PVC SAP 1/2" UR
SUMINISTRO E INSTALACION DE APARATOS SANITARIOS
LAVATORIO BLANCO OVALIN
INODORO COLOR BLANCO
LAVADERO DE ACERO INOXIDABLE 1 POZA 18"x20" C/ACCESORIOS
LAVADERO DE GRANITO C/POZA 21"x25
DUCHA CROMADA CON CABEZA GIRATORIA
JABONERA DE LOZA
PAPELERA DE LOZA

Metrado

Precio Unitario

pza
pza
und
und

3.00
43.00
30.00
30.00

39.230
33.800
42.050
49.050

pto
pto
pto

44.00
30.00
30.00

39.700
34.990
34.990

und
und
und
pza

15.00
56.00
15.00
56.00

5.090
6.170
8.400
15.980

und
und
pza
und
und
und
und

30.00
30.00
6.00
8.00
30.00
30.00
30.00

50.000
210.000
355.560
180.000
37.200
22.000
22.000

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.09.01.08
07.09.01.08.01
07.09.01.08.02
07.09.01.08.03
07.09.01.08.04
07.09.01.08.05
07.09.01.08.06
07.09.01.08.07
07.09.02
07.09.02.01
07.09.02.01.01
07.09.02.01.02
07.09.02.01.03
07.09.02.02
07.09.02.02.01
07.09.02.02.02
07.09.02.03
07.09.02.03.01
07.09.02.03.02
07.09.02.04
07.09.02.04.01
07.09.02.05

Und.
SUMINISTRO DE ACCESORIOS SANITARIOS
INSTALACION DE LAVATORIO BLANCO OVALIN
INSTALACION DE INODORO COLOR BLANCO
INSTALACION DE LAVADERO DE ACERO INOXIDABLE DE 01 POZA
INSTALACION DE LAVADERO DE GRANITO C/POZA 21"x25"
INSTALACION DE DUCHA CROMADA CON CABEZA GIRATORIA
INSTALACION DE JABONERA DE LOZA
INSTALACION DE PAPELERA DE LOZA
DESAGUE Y VENTILACION
MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO
REFINE Y NIVELACION DE FONDOS DE ZANJA
EXCAVACION MANUAL DE ZANJAS
REDES DE DERIVACION
TUBERIA PVC SAL DE 2"
TUBERIA PVC SAL 4"
SALIDA DE DESAGUE
SALIDA DESAGUE PVC SAL DE 4"
SALIDA DESAGUE PVC SAL DE 2"
SALIDAS DE VENTILACION
SALIDA PARA VENTILACION PVC SAL DE 2"
ACCESORIOS DE DESAGUE

Metrado

Precio Unitario

und
und
und
und
und
und
und

30.00
30.00
6.00
8.00
30.00
30.00
30.00

9.160
9.160
9.160
11.920
11.920
6.170
6.170

m
m
m

422.87
211.45
211.45

3.610
1.800
28.120

m
m

198.80
224.07

18.410
12.360

pto
pto

30.00
45.00

80.820
76.620

pto

18.00

74.820

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.09.02.05.01
07.09.02.05.02
07.09.02.05.03
07.09.02.05.04
07.09.02.05.05
07.09.02.05.06
07.09.02.05.07

Und.
YEE PVC SAL DE 4" a 2"
YEE PVC SAL 2"
CODO PVC SAL DE 2" X 45
CODO PVC SAL DE 2" X 90
CODO PVC SAL 4" X 90
TEE PVC SAL DE 2"
TEE PVC SAL DE 4"

und
pza
und
und
pza
und
und

Metrado
60.00
18.00
45.00
182.00
24.00
112.00
80.00

Precio Unitario
19.100
17.080
16.720
16.200
20.330
13.650
18.580

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.09.02.05.08
07.09.02.05.09
07.09.02.05.10
07.09.02.05.11
07.09.02.06
07.09.02.06.01
07.09.03
07.09.03.01
07.09.03.01.01
07.09.03.01.02
07.09.03.01.03
07.09.03.01.04
07.09.03.01.05
07.09.03.02
07.09.03.02.01
07.09.03.03
07.09.03.03.01
07.09.03.03.02
07.09.03.04
07.09.03.04.01
07.09.03.04.02
07.09.03.04.03

Und.
SUMIDERO DE BRONCE 2"
REGISTROS DE BRONCE DE 2"
REGISTROS DE BRONCE DE 4"
SOMBRERO PARA VENTILACION DE PVC DE 2"
CAMARAS DE INSPECCION
CAJA DE REGISTRO DE DESAGUE 12" X 24"
SISTEMA DE DRENAJE PLUVIAL
MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION DE FONDOS DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
DE
m RECOLECCION
RED30DE
TUBERIA PVC SAL 6"
OBRAS DE CONCRETO SIMPLE
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2
ACERO DE REFUERZO F'y = 4200 kg/cm2

Metrado

Precio Unitario

und
und
und
und

68.00
2.00
30.00
18.00

59.010
27.330
37.760
13.180

und

21.00

308.520

m
m
m
m
m3

81.04
44.07
19.18
121.30
32.90

3.610
28.120
1.800
17.090
58.590

48.65

40.080

m2
m3

45.59
13.78

29.740
407.670

m2
m3
kg

29.50
2.72
121.92

29.740
407.670
5.820

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
07.09.03.05
07.09.03.05.01
07.09.03.05.02
07.09.03.05.03
07.09.03.05.04
07.09.03.05.05
07.09.03.05.06

08.01.01
08.01.01.01
08.01.02
08.01.02.01
08.01.02.02
08.01.02.03
08.01.02.04
08.01.02.05
08.01.03
08.01.03.01
08.01.03.02
08.01.03.03
08.01.03.04

Und.
ACCESORIOS
TUBERIA PVC SAP DE 4"
m
CODO PVC SAP DE 4" X 45
und
CODO PVC SAP DE 4" X 90
und
ABRAZADERA DE FIJACIN DE FG DE 4"
pza
SUMIDERO DE BRONCE DE 4"
und
PRUEBA HIDRAULICA Y DESINFECCION (BLOQUES )
m
8 INSTALACIONES SANITARIAS EN EXTERIORES
8.01 SISTEMA DE AGUA FRIA
TRABAJOS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO
m
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
m
REFINE Y NIVELACION DE FONDOS DE ZANJA
m
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m
e=10cm
RELLENO Y COMPACTADO CON MATERIAL PROPIO
m
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
m3
DE
30 mDE DISTRIBUCION DE AGUA
REDES
TUBERIA PVC SAP DE 1" C-10 C/R
m
TUBERIA PVC SAP DE 3/4" C-10 C/R
m
TUBERIA PVC SAP DE 1 1/4" C-10 C/R
m
TUBERIA PVC SAP DE 1/2" C-10 C/R
m

Metrado

Precio Unitario

86.90
33.00
22.00
44.00
11.00
641.37

184.400
7.560
7.560
14.540
71.140
3.140

465.84

3.610

465.84
465.84
465.84
465.84
20.96

28.120
1.800
1.850
17.090
58.590

43.70
42.31
5.00
22.50

23.800
18.050
23.600
19.990

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
08.01.04
08.01.04.01
08.01.04.02
08.01.04.03
08.01.04.04
08.01.04.05

Und.
VALVULAS
PRUEBA HIDRAULICA Y DESINFECCION
VALVULA DE BOLA PVC CON ROSCA 1 1/4"
VALVULA DE BOLA PVC CON ROSCA 1 1/2"
VALVULA DE BOLA PVC CON ROSCA 3/4"
VALVULA DE BOLA PVC CON ROSCA 1"

m
pza
pza
pza
pza

Metrado

465.84
17.00
2.00
17.00
4.00

Precio Unitario

3.140
39.130
35.130
26.130
39.230

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
08.01.05
08.01.05.01
08.01.05.02
08.01.05.03
08.01.05.04
08.01.05.05
08.01.05.06
08.01.05.07
08.01.05.08
08.01.05.09
08.01.05.10
08.01.05.11
08.01.05.12
08.01.05.13
08.02.01
08.02.01.01
08.02.01.02
08.02.01.03
08.02.01.04
08.02.01.05
08.02.02

Und.
ACCESORIOS
REDUCCION PVC SAP 1 1/2" a 1"
REDUCCION PVC SAL 2"-1 1/2"
REDUCCION PVC SAP 3/4" a 1/2"
REDUCCION PVC SAP 1" a 3/4"
CODO PVC U.R. SAP DE 1" X 90
CODO PVC SAP DE 1" X 45
CODO PVC U.R. SAP DE 3/4" X 90
CODO PVC U.R. SAP DE 1/2" X 90
TEE PVC SAP 1 1/2"
VALVULA CHECK PVC U.R. SAP DE 1 1/2"
TEE PVC SAP 1"
TEE PVC SAP 3/4"
TEE PVC SAP 1/2"
8.02 DESAGUE Y VENTILACION
MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
DE
30 mY NIVELACION DE FONDOS DE ZANJA
REFINE
TUBERIA PVC SAL 4"
REDES DE DERIVACION

Metrado

Precio Unitario

und
pza
und
und
und
und
und
und
pza
und
pza
pza
pza

3.00
2.00
2.00
4.00
3.00
1.00
1.00
13.00
3.00
2.00
3.00
1.00
4.00

5.090
5.870
4.170
5.590
6.170
4.070
6.170
6.170
14.940
59.300
14.440
14.440
14.830

m
m
m3
m
m

627.36
627.36
56.00
627.36
154.93

3.610
28.120
58.590
1.800
12.360

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
08.02.02.01
08.02.02.02
08.02.02.03
08.02.03
08.02.03.01
08.02.03.02
08.02.04
08.02.04.01
08.02.05
08.02.05.01
08.02.06
08.02.06.01
08.02.06.02
08.02.06.03
08.02.06.04
08.02.06.05
08.02.06.06
08.03.01
08.03.01.01
08.03.01.02
08.03.01.03

Und.
TUBERIA PVC SAL 8"
TUBERIA PVC SAL 6"
PRUEBA HIDRAULICA Y DESINFECCION
SALIDA DE DESAGUE
SALIDA DESAGUE PVC SAL DE 4"
SALIDA DESAGUE PVC SAL DE 2"
SALIDAS DE VENTILACION
SALIDA PARA VENTILACION PVC SAL DE 2"
ACCESORIOS DE DESAGUE
YEE PVC SAL 6" x45
BUZN
TRAZO, NIVELES Y REPLANTEO
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
DE
30 m
ENCOFRADO
Y DESENCOFADO
CONCRETO F'C=175 kg/cm2
ACERO DE REFUERZO F'y = 4200 kg/cm2
TAPA METLICA
8.03 SISTEMA DE DRENAJE PLUVIAL
MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION DE FONDOS DE ZANJA

Metrado

Precio Unitario

m
m
m

148.79
323.64
627.36

46.280
40.080
3.140

pto
pto

1.00
1.00

80.820
76.620

pto

1.00

74.820

pza

2.00

22.080

m
m3
m2
m3
kg
und

35.28
45.86
148.95
33.77
689.14
14.00

3.610
58.590
29.740
407.670
5.820
337.800

m
m
m

116.16
65.25
132.80

3.610
28.120
1.800

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
08.03.01.04
08.03.01.05
08.03.02
08.03.02.01
08.03.02.02

Und.
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO
DE
m RECOLECCION
RED30DE
TUBERIA PVC SAL 6"
TUBERIA PVC SAL DE 10"

Metrado

Precio Unitario

m
m3

30.59
43.08

17.090
58.590

m
m

29.20
49.60

40.080
52.480

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
08.03.03
08.03.03.01
08.03.03.02
08.03.04
08.03.04.01
08.03.04.02
08.03.04.03
08.03.05
08.03.05.01
08.04.01
08.04.02
08.04.03
08.04.04
08.04.05
08.04.06
08.04.07
08.04.08
08.04.09
08.04.10
08.04.11
08.04.12

Und.
OBRAS DE CONCRETO SIMPLE
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2
ACERO DE REFUERZO F'y = 4200 kg/cm2
ACCESORIOS
REJILLA METALICA DE 2.0x0.40mx1/2" EN CANAL DE EVACUACION DE
ACCESORIOS PARA TANQUE ELEVADO Y CISTERNA
8.04 0.30x0.25
ESCALERA DE GATO METALICA (INCLUYE COLOCACIN)
PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES
PINTURA ANTICORROSIVA Y ACABADO CON ESMALTE SINTTICO A DOS
MANOS
EN ESTERUCTURA
METLICA
TAPA METLICA
DE 0.60 x0.60
m
PUERTA METLICA DE 0.60m x 1.20m DOS HOJAS INCLUYE BISAGRAS Y
CERRADURAS
VENTANA DE FIERRO C/PERFIL DE 1/8" + HOJA BASTIDOR DE 3/4"
TUBERIA DE FG DE 1"
TUBERIA DE FG DE 1 1/2"
TUBERIA DE FG DE 2"
SUMINISTRO E INSTALACIN DE ACCESORIOS PARA TANQUE ELEVADO
SUMINISTRO E INSTALACIN DE ACCESORIOS PARA TANQUE CISTERNA
SUMINISTRO Y COLOCACIN DE HIPOCLORINADOR

Metrado

Precio Unitario

m2
m3

48.80
18.91

29.740
407.670

m2
m3
kg

33.20
3.66
175.44

29.740
407.670
5.820

ML

122.00

12.950

GLB
m2
m2
und
und
und
m
m
und
GLB
GLB
und

1.00
182.80
7.50
2.00
1.00
2.00
14.00
12.00
2.00
1.00
1.00
1.00

1,600.000
9.950
7.720
337.800
887.800
87.800
12.240
12.240
159.240
1,700.000
1,500.000
300.000

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
08.04.13

09.01.01
09.01.01.01
09.01.01.02
09.01.01.03
09.01.01.04
09.01.01.05
09.01.01.06
09.01.01.07
09.01.01.08
09.01.02
09.01.02.01
09.01.02.02
09.01.02.03
09.01.02.04
09.01.02.05
09.01.02.06
09.01.02.07
09.01.02.08
09.01.02.09

Und.
PRUEBA HIDRAULICA Y DESINFECCION
9 INSTALACIONES ELECTRICAS
9.01 BLOQUES PRIMARIA
SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y
CAJAS
PASE
SALIDA DE
PARA
CENTROS DE LUZ EN TECHO
SALIDA DE VENTILADOR PARA MONTAJE SUSPENDIDO
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE
SALIDA PARA INTERRUPTOR UNIPOLAR TRIPLE
SALIDA PARA CONTROL DE VELOCIDAD DE VENTILADORES
SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T.
SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA
TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y
MEDIDORES
DE ENERGIA
TABLERO GENERAL
TG-1 (36 POLOS RIEL DIN)
TABLERO DE DISTRIBUCION TD-P1 (24 POLOS RIEL DIN)
TABLERO DE DISTRIBUCION TD-P2 (24 POLOS RIEL DIN)
ALIMENTADOR TG-1
ALIMENTADOR TD-P1
ALIMENTADOR TD-P2
MEDIDOR DE ENERGIA (SUMINISTRO TRIFSICO PROVICIONAL)
CAJA METALICA CUADRADA DE PASE DE 300X300X100 mm.
CAJA METALICA CUADRADA DE PASE DE 200X200X80 mm.

GLB

Metrado

Precio Unitario

1.00

255.710

pto
pto
pto
pto
pto
pto
pto
pto

142.00
72.00
4.00
12.00
16.00
72.00
46.00
14.00

71.580
92.130
57.730
67.130
77.930
65.080
122.980
88.930

EQ
EQ
EQ
m
m
m
GLB
pto
pto

1.00
1.00
1.00
70.00
25.00
40.00
1.00
3.00
3.00

1,818.820
1,287.140
925.140
115.270
83.670
43.720
1,285.160
59.570
55.570

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
09.01.03
09.01.03.01
09.01.03.02
09.01.03.03
09.01.03.04

Und.
ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS
ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A
MOD.
AHR-2X36
P/MONTAJE SUSPENDIDO
ARTEFACTO
FLUORESCENTE
LINEAL HERMETICO DOBLE SIIMILARE A
MOD.
AHR-1X36
P/MONTAJE
SUSPENDIDO
ARTEFACTO DE RESPALDO AUTONOMO TIPO LUZ DE EMERGENCIA
VENTILADOR TIPO SUSPENDIDO SIMILAR A MOD. F-5600H DE PANASONIC

EQ
EQ
EQ
EQ

Metrado

72.00
70.00
14.00
72.00

Precio Unitario

230.520
208.520
104.390
113.470

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
09.01.04
09.01.04.01
09.02.01
09.02.01.01
09.02.01.02
09.02.01.03
09.02.01.04
09.02.01.05
09.02.01.06
09.02.01.07
09.02.02
09.02.02.01
09.02.02.02
09.02.02.03
09.02.02.04
09.02.02.05
09.02.02.06
09.02.03
09.02.03.01
09.02.03.02
09.02.03.03

Und.
SISTEMA DE PROTECCION TIPO POZO DE PUESTA A TIERRA
POZO DE PUESTA A TIERRA
9.02 BLOQUES SECUNDARIA
SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y
CAJAS
PASE
SALIDA DE
PARA
CENTROS DE LUZ EN TECHO
SALIDA DE VENTILADOR PARA MONTAJE SUSPENDIDO
SALIDA PARA INTERRUPTOR UNIPOLAR TRIPLE
SALIDA PARA INTERRUPTOR DE COMMUTACION SIMPLE
SALIDA PARA CONTROL DE VELOCIDAD DE VENTILADORES
SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T.
SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA
TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y
MEDIDORES
ENERGIA TD-S1 (24 POLOS RIEL DIN)
TABLERO DE DE
DISTRIBUCION
TABLERO DE DISTRIBUCION TD-S2 (24 POLOS RIEL DIN)
ALIMENTADOR TD-S1
ALIMENTADOR TD-S2
CAJA METALICA CUADRADA DE PASE DE 300X300X100 mm.
CAJA METALICA CUADRADA DE PASE DE 200X200X80 mm.
ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS
ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A
MOD.
AHR-2X36
P/MONTAJE SUSPENDIDO
ARTEFACTO
FLUORESCENTE
LINEAL HERMETICO DOBLE SIIMILARE A
MOD.
AHR-1X36
SUSPENDIDO
ARTEFACTO DE P/MONTAJE
RESPALDO AUTONOMO
TIPO LUZ DE EMERGENCIA

Metrado

Precio Unitario

und

1.00

1,132.630

pto
pto
pto
pto
pto
pto
pto

96.00
48.00
8.00
10.00
48.00
33.00
9.00

71.580
92.130
77.930
145.070
65.080
122.980
88.930

EQ
EQ
m
m
pto
pto

1.00
1.00
20.00
28.00
2.00
2.00

1,011.140
925.140
43.720
43.720
59.570
55.570

EQ
EQ
EQ

48.00
48.00
9.00

230.520
208.520
104.390

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
09.02.03.04
09.03.01
09.03.01.01
09.03.01.02
09.03.01.03
09.03.01.04
09.03.01.05
09.03.01.06
09.03.01.07
09.03.01.08
09.03.01.09
09.03.01.10
09.03.02
09.03.02.01
09.03.02.02
09.03.02.03
09.03.02.04
09.03.03
09.03.03.01
09.03.03.02
09.03.03.03

Und.
VENTILADOR TIPO SUSPENDIDO SIMILAR A MOD. F-5600H DE PANASONIC
9.03 SALA DE CMPUTO PRIMARIA Y SECUNDARIA
SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y
CAJAS
PASE
SALIDA DE
PARA
CENTROS DE LUZ EN TECHO
SALIDA DE VENTILADOR PARA MONTAJE SUSPENDIDO
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE
SALIDA PARA INTERRUPTOR UNIPOLAR TRIPLE
SALIDA PARA INTERRUPTOR DE COMMUTACION SIMPLE
SALIDA PARA CONTROL DE VELOCIDAD DE VENTILADORES
SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T.
SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. P/EMPOTRAR EN
PISO
SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA
TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y
MEDIDORES
ENERGIA ELCTRICA TD-L1 Y TD-L2 (18P RIEL DIN)
TABLERO DE DE
DISTRIBUCIN
ALIMENTADOR TD-L1 Y TD-L2
CAJA METALICA CUADRADA DE PASE DE 300X300X100 mm.
CAJA METALICA CUADRADA DE PASE DE 200X200X80 mm.
ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS
ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A
MOD.
AHR-2X36
P/MONTAJE SUSPENDIDO
ARTEFACTO
FLUORESCENTE
LINEAL HERMETICO DOBLE SIIMILARE A
MOD.
AHR-1X36
SUSPENDIDO
ARTEFACTO DE P/MONTAJE
RESPALDO AUTONOMO
TIPO LUZ DE EMERGENCIA

Metrado

Precio Unitario

EQ

48.00

113.470

pto
pto
pto
pto
pto
pto
pto
pto
pto
pto

62.00
20.00
12.00
2.00
2.00
4.00
20.00
24.00
46.00
3.00

71.580
92.130
57.730
67.130
105.910
144.490
65.080
122.980
125.990
88.930

EQ
m
pto
pto

2.00
60.00
2.00
2.00

929.140
43.720
59.570
55.570

EQ
EQ
EQ

32.00
28.00
3.00

230.520
208.520
104.390

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
09.03.03.04
09.03.03.05
09.03.04
09.03.04.01

Und.
SOCKET E-27 PARA EMPOTRAR
VENTILADOR TIPO SUSPENDIDO SIMILAR A MOD. F-5600H DE PANASONIC
SISTEMA DE PROTECCION TIPO POZO DE PUESTA A TIERRA
POZO DE PUESTA A TIERRA

Metrado

Precio Unitario

EQ
EQ

2.00
20.00

204.970
113.470

und

2.00

1,132.630

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
09.03.05
09.03.05.01
09.03.05.02
09.03.05.03
09.03.05.04
09.03.06
09.03.06.01
09.04.01
09.04.01.01
09.04.01.02
09.04.01.03
09.04.01.04
09.04.01.05
09.04.01.06
09.04.01.07
09.04.01.08
09.04.02
09.04.02.01
09.04.02.02
09.04.03
09.04.03.01

Und.
INSTALACIONES ELECTRICAS DE SEAL DEBIL
SALIDA PARA PLACA DOBLE DE RED DE DATA P/EMPOTRAR EN PISO
SALIDA SIMPLE PARA RED DE DATA
SALIDA PARA PARA SERVIDOR DE DATA
CAJA DE PASE CUADRADA DE 200X200X80 mm.
INSTALACION DE GAS PARA LABORATORIO
INSTALACION DE GAS PARA LABORATIO
9.04 SALN DE USO MLTIPLE
SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y
CAJAS
PASE
SALIDA DE
PARA
CENTROS DE LUZ EN TECHO
SALIDA PARA CENTROS DE LUZ EN PARED
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE
SALIDA PARA EXTRACTOR DE AIRE
SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T.
SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. PARA PROYECTOR
MULTIMEDIA
EN TECHO
SALIDA DE TOMACORRIENTE
SIMPLE P/LUZ DE EMERGENCIA
TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y
MEDIDORES
ENERGIA ELCTRICA TD-SM (18P RIEL DIN)
TABLERO DE DE
DISTRIBUCIN
ALIMENTADOR TD-SM
ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS
ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A
MOD. AHR-2X36 P/MONTAJE SUSPENDIDO

Metrado

Precio Unitario

pto
pto
EQ
pto

30.00
2.00
2.00
2.00

105.160
89.930
1,980.120
61.640

GLB

1.00

5,500.000

pto
pto
pto
pto
pto
pto
pto
pto

23.00
2.00
8.00
3.00
2.00
15.00
1.00
5.00

71.580
70.780
57.730
67.130
64.660
122.980
296.580
88.930

EQ
m

1.00
40.00

812.140
27.230

EQ

2.00

230.520

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
09.04.03.02
09.04.03.03
09.04.03.04
09.04.03.05
09.04.03.06
09.04.03.07
09.04.03.08
09.04.04
09.04.04.01
09.04.04.02
09.05.01
09.05.01.01
09.05.01.02
09.05.01.03
09.05.01.04
09.05.01.05
09.05.01.06
09.05.01.07
09.05.01.08
09.05.01.09
09.05.01.10

Und.
ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A
MOD.
AHR-1X36
P/MONTAJE
SUSPENDIDO
ARTEFACTO
REFLECTOR
TIPO
CAMPANA INDUSTRIAL 250 W SIMILAR A
MOD.
MER-H
DE
JOSFEL
ARTEFACTO DE ILUMINACIN TIPO SUSPENDIDO SIIMILAR A MOD. MS-70W
ARTEFACTO DE ILUMINACIN TIPO BRAQUET SIIMILAR A MOD. APL-60W
ARTEFACTO DE RESPALDO AUTONOMO TIPO LUZ DE EMERGENCIA
SOCKET E-27 PARA EMPOTRAR
EXTRACTOR DE AIRE TIPO AXIAL
INSTALACIONES ELECTRICAS DE SEAL DEBIL
SALIDA SIMPLE PARA RED DE DATA EN TECHO PARA PROYECTOR
MULTIMEDIA
SALIDA SIMPLE PARA RED DE DATA
9.05 TPICO, SICOLOGA Y ADMINISTRACIN
SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y
CAJAS
PASE
SALIDA DE
PARA
CENTROS DE LUZ EN TECHO
SALIDA DE VENTILADOR PARA MONTAJE SUSPENDIDO
SALIDA PARA TIMBRE TIPO PESADO O CHICHARRA
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE
SALIDA PARA INTERRUPTOR DE COMMUTACION SIMPLE
SALIDA PARA CONTROL DE VELOCIDAD DE VENTILADORES
SALIDA PARA PULSADOR DE TIMBRE
SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T.
SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA

Metrado

Precio Unitario

EQ
EQ
EQ
EQ
EQ
EQ
EQ

4.00
6.00
7.00
2.00
5.00
4.00
2.00

208.520
334.810
131.020
160.020
104.390
204.970
164.130

pto
pto

1.00
1.00

133.110
89.930

pto
pto
pto
pto
pto
pto
pto
pto
pto
pto

31.00
9.00
1.00
14.00
2.00
2.00
9.00
1.00
28.00
4.00

71.580
92.130
117.020
57.730
67.130
145.070
65.080
92.110
122.980
88.930

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
09.05.02
09.05.02.01
09.05.02.02
09.05.02.03
09.05.02.04
09.05.02.05

Und.
TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y
MEDIDORES
ENERGIA TD - A1 (36 POLOS RIEL DIN)
TABLERO DE DE
DISTRIBUCION
TABLERO DE DISTRIBUCIN ELCTRICA TD-A2 Y TD-AS (18P RIEL DIN)
ALIMENTADOR TD-A1
ALIMENTADOR TD-A2 Y TD-AS
CAJA METALICA CUADRADA DE PASE DE 300X300X100 mm.

EQ
EQ
m
m
pto

Metrado

1.00
1.00
40.00
10.00
1.00

Precio Unitario

1,548.820
850.140
83.670
43.720
59.570

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
09.05.03
09.05.03.01
09.05.03.02
09.05.03.03
09.05.03.04
09.05.03.05
09.06.01
09.06.01.01
09.06.01.02
09.06.01.03
09.06.01.04
09.06.01.05
09.06.01.06
09.06.01.07
09.06.01.08
09.06.02
09.06.02.01
09.06.02.02
09.06.02.03
09.06.02.04
09.06.02.05

Und.
ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS
ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A
MOD.
AHR-2X36
P/MONTAJE SUSPENDIDO
ARTEFACTO
FLUORESCENTE
LINEAL HERMETICO DOBLE SIIMILARE A
MOD.
AHR-1X36
P/MONTAJE
SUSPENDIDO
ARTEFACTO DE RESPALDO AUTONOMO TIPO LUZ DE EMERGENCIA
SOCKET E-27 PARA EMPOTRAR
VENTILADOR TIPO SUSPENDIDO SIMILAR A MOD. F-5600H DE PANASONIC
9.06 TALLER DE CONFECCIN, ARTESANIAS E IDIOMAS
SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y
CAJAS
PASE
SALIDA DE
PARA
CENTROS DE LUZ EN TECHO
SALIDA DE VENTILADOR PARA MONTAJE SUSPENDIDO
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE
SALIDA PARA INTERRUPTOR DE COMMUTACION SIMPLE
SALIDA PARA CONTROL DE VELOCIDAD DE VENTILADORES
SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T.
SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA
TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y
MEDIDORES
DE ENERGIA
TABLERO GENERAL
TG- 2 (36 POLOS RIEL DIN)
TABLERO DE DISTRIBUCIN ELCTRICA TD-A2 Y TD-AS (18P RIEL DIN)
ALIMENTADOR TG-2
ALIMENTADOR TD-A2 Y TD-AS
CAJA METALICA CUADRADA DE PASE DE 300X300X100 mm.

Metrado

Precio Unitario

EQ
EQ
EQ
EQ
EQ

17.00
11.00
4.00
3.00
9.00

230.520
208.520
104.390
204.970
113.470

pto
pto
pto
pto
pto
pto
pto
pto

56.00
16.00
6.00
4.00
4.00
16.00
32.00
6.00

71.580
92.130
57.730
67.130
145.070
65.080
122.980
88.930

EQ
EQ
m
m
pto

1.00
1.00
145.00
5.00
1.00

1,445.820
850.140
155.270
43.720
59.570

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
09.06.03
09.06.03.01
09.06.03.02
09.06.03.03
09.06.03.04
09.06.04
09.06.04.01
09.07.01
09.07.01.01
09.07.01.02
09.07.01.03
09.07.01.04
09.07.01.05
09.07.01.06
09.07.01.07
09.07.01.08
09.07.01.09
09.07.02
09.07.02.01
09.07.02.02
09.07.02.03

Und.
ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS
ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A
MOD.
AHR-2X36
P/MONTAJE SUSPENDIDO
ARTEFACTO
FLUORESCENTE
LINEAL HERMETICO DOBLE SIIMILARE A
MOD.
AHR-1X36
P/MONTAJE
SUSPENDIDO
ARTEFACTO DE RESPALDO AUTONOMO TIPO LUZ DE EMERGENCIA
VENTILADOR TIPO SUSPENDIDO SIMILAR A MOD. F-5600H DE PANASONIC
SISTEMA DE PROTECCION TIPO POZO DE PUESTA A TIERRA
POZO DE PUESTA A TIERRA
9.07 BIBLIOTECA GENERAL
SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y
CAJAS
PASE
SALIDA DE
PARA
CENTROS DE LUZ EN TECHO
SALIDA DE VENTILADOR PARA MONTAJE SUSPENDIDO
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE
SALIDA PARA INTERRUPTOR UNIPOLAR TRIPLE
SALIDA PARA INTERRUPTOR DE COMMUTACION SIMPLE
SALIDA PARA CONTROL DE VELOCIDAD DE VENTILADORES
SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T.
SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA
TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y
MEDIDORES
ENERGIA TD-BI (24 POLOS RIEL DIN)
TABLERO DE DE
DISTRIBUCION
ALIMENTADOR TD-BI
CAJA METALICA CUADRADA DE PASE DE 200X200X80 mm.

Metrado

Precio Unitario

EQ
EQ
EQ
EQ

32.00
24.00
6.00
16.00

230.520
208.520
104.390
113.470

und

1.00

1,132.630

pto
pto
pto
pto
pto
pto
pto
pto
pto

32.00
13.00
3.00
4.00
1.00
2.00
13.00
16.00
4.00

71.580
92.130
57.730
67.130
77.930
145.070
65.080
122.980
88.930

EQ
m
pto

1.00
28.00
1.00

956.140
43.720
55.570

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
09.07.03
09.07.03.01
09.07.03.02
09.07.03.03
09.07.03.04

Und.
ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS
ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A
MOD.
AHR-2X36
P/MONTAJE SUSPENDIDO
ARTEFACTO
FLUORESCENTE
LINEAL HERMETICO DOBLE SIIMILARE A
MOD.
AHR-1X36
P/MONTAJE
SUSPENDIDO
ARTEFACTO DE RESPALDO AUTONOMO TIPO LUZ DE EMERGENCIA
VENTILADOR TIPO SUSPENDIDO SIMILAR A MOD. F-5600H DE PANASONIC

EQ
EQ
EQ
EQ

Metrado

20.00
12.00
4.00
13.00

Precio Unitario

230.520
208.520
104.390
113.470

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item

Und.

Metrado

Precio Unitario

9.08 DUCHAS Y VESTIDORES (PRIMARIA Y SECUNDARIA)


09.08.01
09.08.01.01
09.08.01.02
09.08.01.03
09.08.01.04
09.08.01.05
09.08.01.06
09.08.01.07
09.08.01.08
09.08.01.09
09.08.01.10
09.08.02
09.08.02.01
09.08.02.02
09.08.02.03
09.08.02.04
09.08.02.05
09.08.02.06
09.08.02.07
09.08.03
09.08.03.01

SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y


CAJAS
PASE
SALIDA DE
PARA
CENTROS DE LUZ EN TECHO
SALIDA PARA CENTROS DE LUZ EN PARED
SALIDA DE VENTILADOR PARA MONTAJE SUSPENDIDO
SALIDA PARA TIMBRE TIPO PESADO O CHICHARRA
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE
SALIDA PARA CONTROL DE VELOCIDAD DE VENTILADORES
SALIDA PARA PULSADOR DE TIMBRE
SALIDA PARA EXTRACTOR DE AIRE
SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T.
TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y
MEDIDORES
ENERGIA ELCTRICA TD-DU1 (12P RIEL DIN)
TABLERO DE DE
DISTRIBUCIN
TABLERO DE DISTRIBUCIN ELCTRICA TD-DU2 (12P RIEL DIN)
TABLERO DE DISTRIBUCIN ELCTRICA TD-GU (8P RIEL DIN)
ALIMENTADOR TD-DU1
ALIMENTADOR TD-DU2
ALIMENTADOR TD-GU
CAJA METALICA CUADRADA DE PASE DE 200X200X80 mm.
ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS
ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A
MOD. AHR-1X36 P/MONTAJE SUSPENDIDO

pto
pto
pto
pto
pto
pto
pto
pto
pto
pto

21.00
1.00
1.00
1.00
1.00
9.00
1.00
1.00
1.00
9.00

71.580
70.780
92.130
117.020
57.730
67.130
65.080
92.110
64.660
122.980

EQ
EQ
EQ
m
m
m
pto

1.00
1.00
1.00
20.00
20.00
42.00
2.00

512.790
474.790
472.720
27.230
27.230
27.230
55.570

EQ

12.00

208.520

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
09.08.03.02
09.08.03.03
09.08.03.04
09.08.03.05
09.09.01
09.09.01.01
09.09.01.02
09.09.01.03
09.09.01.04
09.09.01.05
09.09.01.06
09.09.01.07
09.09.01.08
09.09.02
09.09.02.01
09.09.02.02
09.09.02.03
09.09.02.04
09.09.02.05
09.09.02.06
09.09.02.07

Und.
ARTEFACTO DE ILUMINACIN TIPO BRAQUET SIIMILAR A MOD. APL-60W
SOCKET E-27 PARA EMPOTRAR
EXTRACTOR DE AIRE TIPO AXIAL
VENTILADOR TIPO SUSPENDIDO SIMILAR A MOD. F-5600H DE PANASONIC
9.09 VIVIENDA DE DOCENTES
SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y
CAJAS
PASE
SALIDA DE
PARA
CENTROS DE LUZ EN TECHO
SALIDA PARA CENTROS DE LUZ EN PARED
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE
SALIDA PARA INTERRUPTOR DE COMMUTACION SIMPLE
SALIDA PARA EXTRACTOR DE AIRE
SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T.
SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA
TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y
MEDIDORES
DE ENERGIA
TABLERO GENERAL
TG-3 (36 POLOS RIEL DIN)
TABLERO DE DISTRIBUCIN ELCTRICA TD-VA2 , TD-VB2 Y TD-VC2 (18P
RIEL
DIN) DE DISTRIBUCIN ELCTRICA TD-VB1 , TD-VC1 (18P RIEL DIN)
TABLERO
ALIMENTADOR TG-3
ALIMENTADOR TD-VA2 , TD-VB2 Y TD-VC2
ALIMENTADOR TD-VB1 Y TD-VC1
CAJA METALICA CUADRADA DE PASE DE 300X300X100 mm.

Metrado

Precio Unitario

EQ
EQ
EQ
EQ

1.00
9.00
1.00
1.00

160.020
204.970
164.130
113.470

pto
pto
pto
pto
pto
pto
pto
pto

96.00
36.00
36.00
36.00
18.00
30.00
117.00
15.00

71.580
70.780
57.730
67.130
145.070
64.660
122.980
88.930

EQ
EQ
EQ
m
m
m
pto

1.00
3.00
2.00
38.00
30.00
66.00
3.00

1,450.820
812.140
881.140
63.270
43.720
43.720
59.570

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
09.09.03
09.09.03.01
09.09.03.02
09.09.03.03
09.09.03.04
09.09.03.05
09.09.03.06

Und.
ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS
ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A
MOD.
AHR-2X36
P/MONTAJE SUSPENDIDO
ARTEFACTO
FLUORESCENTE
LINEAL HERMETICO DOBLE SIIMILARE A
MOD.
AHR-1X36
P/MONTAJE
SUSPENDIDO
ARTEFACTO DE ILUMINACIN TIPO BRAQUET SIIMILAR A MOD. APL-60W
ARTEFACTO DE RESPALDO AUTONOMO TIPO LUZ DE EMERGENCIA
SOCKET E-27 PARA EMPOTRAR
EXTRACTOR DE AIRE TIPO AXIAL

EQ
EQ
EQ
EQ
EQ
EQ

Metrado

12.00
24.00
36.00
15.00
60.00
30.00

Precio Unitario

230.520
208.520
160.020
104.390
204.970
164.130

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item

Und.

Metrado

Precio Unitario

9.1 ILUMINACIN EN EXTERIORES


09.10.01
09.10.01.01
09.10.01.02
09.10.01.03
09.10.01.04
09.10.02
09.10.02.01
09.10.02.02
09.11.01
09.11.01.01
09.11.01.02
09.11.01.03
09.11.01.04
09.11.02
09.11.02.01
09.11.02.02
09.11.02.03
09.11.02.04
09.11.03
09.11.03.01

SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y


CAJAS
PASE
SALIDA DE
PARA
ALUMBRADO EN EXTERIORES
SALIDA PARA ALUMBRADO DE LOSA DEPORTIVA
SALIDA PARA ALUMBRADO PATIO DE HONOR
IZAJE Y CIMENTACION DE POSTE DE C.A.C. 12/200
ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS
ARTEFACTO TIPO REFLECTOR ASIMETRICO 250W SIIMILARE A MOD.
CONTEMPO
P/MONTAJE
SUSPENDIDO
ARTEFACTO 3DE
ILUMINACIN
TIPO FAROLA SIIMILAR A MOD. JP-250
TANQUE
ELEVADO
Y
CISTERNA
9.11
SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y
CAJAS
PASE
SALIDA DE
PARA
CENTROS DE LUZ EN TECHO
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T.
SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA
TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y
MEDIDORES
ENERGIA ELCTRICA TD-BO (8P RIEL DIN)
TABLERO DE DE
DISTRIBUCIN
TABLERO DE CONTROL DE BOMBAS TC-BO
ALIMENTADOR TD-BO
CAJA METALICA CUADRADA DE PASE DE 100X100X75 mm.
ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS
ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A
MOD. AHR-1X36 P/MONTAJE SUSPENDIDO

pto
pto
pto
pto

33.00
16.00
6.00
8.00

118.870
308.630
156.800
1,547.490

EQ
EQ

22.00
33.00

375.260
383.020

pto
pto
pto
pto

1.00
1.00
1.00
1.00

71.580
57.730
122.980
88.930

EQ
EQ
m
pto

1.00
1.00
18.00
3.00

509.520
6,660.000
29.380
60.980

EQ

1.00

208.520

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item
09.11.03.02
09.12.01

10.01.01
10.01.02
10.02.01
10.02.02
10.03.01
10.03.02
10.04.01
10.04.02

Und.
ARTEFACTO DE RESPALDO AUTONOMO TIPO LUZ DE EMERGENCIA
9.12 SISTEMA DE MEDIA TENSIN
SUB-ESTACIN ELCTRICA DE 75 KVA (Incluye elaboracin de Expediente
MITIGACIN DE IMPACTO AMBIENTAL
10 Tcnico)
10.01 MANEJO DE RESIDUOS SLIDOS
EXCAVACIN DE HOYOS PARA RELLENO PROVISIONAL (4.00x4.00x1.80m)
CLAUSURA DE RELLENO PROVISIONAL
10.02 EQUIPAMIENTO PROVISIONAL PARA MANEJO DE RESIDUOS SLIDOS
TACHO CON TAPA RGIDA (CONTENEDOR DE RESIDUOS SLIDOS DE 110
Lt.)
BOLSAS DE POLIETILENO CONTENCIN Y DEPSITO (DE 110x 90cm)
10.03 REHABILITACIN DE REAS DEGRADADAS
REHABILITACIN DE REA DE CAMPAMPAMENTO
REHABILITACIN DE REA DE PREPARADO DE MATERIAL
10.04 CONTROL DE CALIDAD DEL AIRE
AGUA PARA RIEGO
LONA PARA CUBRIR TRASLADO DE MATERIALES
11 CLCULO DE TRANSPORTE DE MATERIALES
11.01 CLCULO DETRANSPORTE DE MATERIALES

Metrado

Precio Unitario

EQ

1.00

104.390

GLB

1.00

58,000.000

m3
m3

28.80
28.80

28.210
28.210

und
mll

12.00
1.00

88.500
250.000

m2
m2

200.00
200.00

28.780
28.780

m3
m2

6.00
100.00

110.550
15.300

kg

1.00

815,570.490

COSTO DIRECTO
GASTOS GENERALES
GASTOS DE SUPERVICION

MUNICIP

GE
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA

OBRA

FECHA DE INICIO DE OBRA


CORRESPONDIENTE AL MES DE

04 DE JUNIO DEL 2012


ABRIL - 2014

EJECUCION DE OBRA
DESCRIPCION

Item

Und.

Metrado

COSTO EXPEDIENTE TECNICO


COSTO LIQUIDACION
PRESUPUESTO TOTAL

Precio Unitario

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

2,494,281.07

113,000.00

80,000.00
10,000.00
1,800.00
4,000.00
4,000.00
4,000.00
9,200.00

800.00
1.00
1.00
1.00
1.00
1.00
200.00

80000.00
10000.00
1800.00
4000.00
4000.00
4000.00
9200.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

800.00
1.00
1.00
1.00
1.00
1.00
200.00

80000.00
10000.00
1800.00
4000.00
4000.00
4000.00
9200.00

714.21
714.21

528.52
2742.57

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

714.21
714.21

528.52
2742.57

51.89
260.25
176.84
283.12
714.27
200.15

1431.13
8158.84
5543.93
6160.69
1728.53
1156.87

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

51.89
260.25
176.84
283.12
714.27
200.15

1431.13
8158.84
5543.93
6160.69
1728.53
1156.87

860,913.99

860,913.99
3,271.09
528.52
2,742.57
24,179.99
1,431.13
8,158.84
5,543.93
6,160.69
1,728.53
1,156.87
62,391.66

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
8,263.40
16,023.60
6,108.97
5,139.46
26,856.23
283,535.64
629.81
248,247.76
19,518.02
4,860.15
10,279.90
128,477.33
67,737.46
28,339.90
32,399.97
9,889.76
5,563.23
1,634.96
2,691.57
151,471.26
45,994.05
45,017.23

Valorizacin Actual

Metrado
288.93
72.00
226.51
20.27
649.80

Costo
8263.40
16023.60
6108.97
5139.46
26856.23

%
100.00%
100.00%
100.00%
100.00%
100.00%

Metrado
0.00
0.00
0.00
0.00
0.00

104.10
107.43
3236.82
148.13
23.09

629.81
46464.55
19518.02
4860.15
10279.90

100.00%
18.72%
100.00%
100.00%
100.00%

11233.41

796.96
73.71

67737.46
28339.90
32399.97

835.32
79.56
5.97
95.21
921.54

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
288.93
72.00
226.51
20.27
649.80

Costo
8263.40
16023.60
6108.97
5139.46
26856.23

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

104.10
107.43
3236.82
148.13
23.09

629.81
46464.55
19518.02
4860.15
10279.90

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

11233.41
796.96
73.71

67737.46
28339.90
32399.97

5563.23
1634.96
2691.57

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

835.32
79.56
5.97

5563.23
1634.96
2691.57

45994.05
45017.23

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

95.21
921.54

45994.05
45017.23

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
60,459.98
8,556.73
4,870.52
1,273.28
2,412.93

Valorizacin Actual

10026.53

Costo
60459.98

%
100.00%

Metrado
0.00

731.31
61.96
4.65

4870.52
1273.28
2412.93

100.00%
100.00%
100.00%

0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
10026.53

0.00
0.00
0.00

0.00%
0.00%
0.00%

731.31
61.96
4.65

Costo
60459.98
4870.52
1273.28
2412.93

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
126,183.79
22,390.18
8,549.53
49,264.02
45,980.06
8,028.81
2,848.22
549.45
4,631.14
54,637.30
12,182.40
2,133.84
2,092.02
2,202.30
33,200.40
2,826.34
290.63
62.92
146.30
81.41
435,961.60

435,961.60

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

606.78
606.78
7397.00
93.37

22390.18
8549.53
49264.02
45980.06

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

606.78
606.78
7397.00
93.37

22390.18
8549.53
49264.02
45980.06

470.78
13.52
10.24

2848.22
549.45
4631.14

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

470.78
13.52
10.24

2848.22
549.45
4631.14

0.00
0.00
0.00
5.00
200.00
23.00

0.00
0.00
0.00
2202.30
7580.00
932.65

0.00%
0.00%
0.00%
100.00%
22.83%
33.00%

0.00
0.00
0.00
0.00
676.00
46.70

0.00
0.00
0.00
0.00
25620.40
1893.69

0.00%
0.00%
0.00%
0.00%
77.17%
67.00%

0.00
0.00
0.00
5.00
876.00
69.70

0.00
0.00
0.00
2202.30
33200.40
2826.34

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
2,209.62
357.01
1,852.61
15,563.91
80.53
5,667.45
3,796.17
3,198.28
1,167.53
1,653.95
49,370.23
5,505.21
14,637.11
5,021.00
4,267.25
19,939.66
69,864.64
8,028.11
37,100.71
13,370.98
4,214.77
7,150.07

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

482.45
482.45

357.01
1852.61

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

482.45
482.45

357.01
1852.61

2.92
180.78
121.09
146.98
482.45
286.15

80.53
5667.45
3796.17
3198.28
1167.53
1653.95

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

2.92
180.78
121.09
146.98
482.45
286.15

80.53
5667.45
3796.17
3198.28
1167.53
1653.95

192.49
65.77
186.17
16.83
482.45

5505.21
14637.11
5021.00
4267.25
19939.66

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

192.49
65.77
186.17
16.83
482.45

5505.21
14637.11
5021.00
4267.25
19939.66

1326.96
85.78
2217.41
128.46
16.06

8028.11
37100.71
13370.98
4214.77
7150.07

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

1326.96
85.78
2217.41
128.46
16.06

8028.11
37100.71
13370.98
4214.77
7150.07

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
82,361.41
46,607.98
13,050.16
22,703.27
6,109.58
3,136.59
1,124.50
1,848.49
99,222.68

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

7729.35
366.99
51.65

46607.98
13050.16
22703.27

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

7729.35
366.99
51.65

46607.98
13050.16
22703.27

470.96
54.72
4.10

3136.59
1124.50
1848.49

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

470.96
54.72
4.10

3136.59
1124.50
1848.49

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
31,395.37
30,470.68
37,356.63
5,833.27
3,347.98
793.64
1,691.65
57,997.93
8,571.50
3,272.97
16,040.14
30,113.32
6,412.17
1,424.11
2,672.49
2,315.57
40,725.53
11,640.96
2,984.25
1,697.75
642.43

Costo

Valorizacin Actual
%

64.99
623.76
6195.13

31395.37
30470.68
37356.63

100.00%
100.00%
100.00%

Metrado
0.00
0.00
0.00
0.00

502.70
38.62
3.26

3347.98
793.64
1691.65

100.00%
100.00%
100.00%

232.29
232.29
2408.43
61.15

8571.50
3272.97
16040.14
30113.32

235.39
65.76
5.12
86.00
25.00
5.00
20.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00

0.00%
0.00%
0.00%

64.99
623.76
6195.13

31395.37
30470.68
37356.63

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

502.70
38.62
3.26

3347.98
793.64
1691.65

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

232.29
232.29
2408.43
61.15

8571.50
3272.97
16040.14
30113.32

1424.11
2672.49
2315.57

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

235.39
65.76
5.12

1424.11
2672.49
2315.57

11640.96
2984.25
1697.75
382.40

100.00%
100.00%
100.00%
59.52%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

86.00
25.00
5.00
20.00

11640.96
2984.25
1697.75
382.40

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
21,807.66
1,952.48
290.63
62.92
146.30
81.41
174,691.50
174,691.50
745.44
120.44
625.00
6,399.94
1,528.76
2,057.19
2,177.52
393.88
242.59
11,745.87
1,729.16
4,005.90
1,386.80
978.70

Valorizacin Actual

Metrado
575.40
48.15

Costo
21807.66
1952.48

%
100.00%
100.00%

Metrado
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

162.76
162.76

120.44
625.00

22.62
65.62
0.00
0.00
41.97
60.46
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00

0.00%
0.00%

Metrado
575.40
48.15

Costo
21807.66
1952.48

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

162.76
162.76

120.44
625.00

623.86
2057.19
0.00
0.00
242.59

40.81%
100.00%
0.00%
0.00%
100.00%

32.81
0.00
0.00
0.00
0.00

904.90
0.00
0.00
0.00
0.00

59.19%
0.00%
0.00%
0.00%
0.00%

55.43
65.62
0.00
0.00
41.97

1528.76
2057.19
0.00
0.00
242.59

1729.16
0.00
0.00
0.00

100.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

60.46
0.00
0.00
0.00

1729.16
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
3,645.31
21,185.16
3,291.62
11,353.39
3,582.00
1,097.17
1,860.98

Metrado
0.00
544.07
16.20
594.03
21.30
2.94

Costo

Valorizacin Actual
%

0.00

0.00%

Metrado
0.00

3291.62
7006.66
3582.00
698.85
1308.92

100.00%
61.71%
100.00%
63.70%
70.33%

0.00
10.05
0.00
12.14
1.24

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

0.00
4346.73
0.00
398.31
552.06

0.00%
38.29%
0.00%
36.30%
29.67%

544.07
26.25
594.03
33.44
4.18

Costo
0.00
3291.62
11353.39
3582.00
1097.17
1860.98

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
32,662.24
14,803.89
8,139.68
9,718.67
3,338.60
1,874.26
553.62
910.72
35,652.85
11,415.18
10,659.56
13,578.11
1,056.59
603.40
157.41
295.78
15,288.37
4,031.69
1,539.47
3,911.22
5,805.99
4,612.16

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
72.00
6.74

0.00
2560.32
2962.63

0.00%
31.45%
30.48%

2455.04
132.90
9.76

14803.89
4725.92
4290.11

100.00%
58.06%
44.14%

2455.04
204.90
16.50

14803.89
7286.24
7252.74

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
55.50
307.00

0.00
2711.18
1851.21

0.00%
25.43%
13.63%

15.00
115.66
1494.00

7246.20
5649.99
9008.82

63.48%
53.00%
66.35%

15.00
171.16
1801.00

7246.20
8361.17
10860.03

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

109.26
72.96
587.27
11.79

4031.69
1028.01
3911.22
5805.99

100.00%
66.78%
100.00%
100.00%

109.26
72.96
587.27
11.79

4031.69
1028.01
3911.22
5805.99

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
1,527.75
1,022.10
2,062.31
42,004.28
6,010.56
3,066.84
2,521.61
1,395.50
13,296.05
14,095.77
1,617.95
141,711.77
141,711.77
1,218.28
196.84
1,021.44
6,051.03
1,056.87
2,431.19
1,601.75
643.72
317.50

Metrado
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

266.00
0.00

196.84
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00

Costo

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

100.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

266.00
0.00

196.84
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
21,358.87
2,182.75
5,145.36
1,781.91
1,255.07
10,993.78

0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00
0.00

Metrado
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00

Metrado
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

Costo
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
24,119.76
3,604.23
13,416.46
3,616.25
1,292.39
2,190.43
23,420.02
10,559.56
6,073.65
6,786.81
4,190.43
2,357.24
692.54
1,140.65
13,231.09
4,859.78
4,339.83
4,031.48
1,688.64
990.54
241.46
456.64

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
46,433.65
1,109.06
4,733.34
1,254.30
2,407.56
2,064.28
13,001.60
7,951.28
13,531.06
381.17
136,230.89
136,230.89
624.48
100.90
523.58
4,462.65
1,442.99
1,264.03
1,123.25
329.97
302.41
17,049.80

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

136.35
136.35

100.90
523.58

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

136.35
136.35

100.90
523.58

52.32
40.32
0.00
0.00
52.32

1442.99
1264.03
0.00
0.00
302.41

100.00%
100.00%
0.00%
0.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

52.32
40.32
0.00
0.00
52.32

1442.99
1264.03
0.00
0.00
302.41

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
1,051.91
6,976.94
2,487.71
2,079.11
4,454.13
14,041.38
1,892.92
6,976.39
2,889.33
519.71

Valorizacin Actual

Metrado
36.78
4.50
0.00
0.00
0.00

Costo
1051.91
1001.48
0.00
0.00
0.00

%
100.00%
14.35%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00

312.88
16.13
479.16
15.84

1892.92
6976.39
2889.33
519.71

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
36.78
4.50
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

312.88
16.13
479.16
15.84

Costo
1051.91
1001.48
0.00
0.00
0.00
1892.92
6976.39
2889.33
519.71

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
1,763.03
20,066.80
9,999.25
4,766.46
5,301.09
7,977.92
3,865.06
2,255.36
1,857.50
27,571.75
9,492.52
8,799.84
9,279.39
3,217.89
1,759.57
643.63
814.69
14,302.20
3,249.78
1,240.91
4,172.96
5,638.55

Valorizacin Actual

Metrado
3.96

Costo
1763.03

%
100.00%

Metrado
0.00

1658.25
134.04
12.06

9999.25
4766.46
5301.09

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

17.32
180.14
538.87

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
3.96

Costo
1763.03

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

1658.25
134.04
12.06

9999.25
4766.46
5301.09

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

8366.95
8799.84
3249.39

88.14%
100.00%
35.02%

2.33
0.00
1000.00

1125.58
0.00
6030.00

11.86%
0.00%
64.98%

19.65
180.14
1538.87

9492.52
8799.84
9279.39

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

88.07
88.07
626.57
11.45

3249.78
1240.91
4172.96
5638.55

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

88.07
88.07
626.57
11.45

3249.78
1240.91
4172.96
5638.55

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
2,432.70
622.30
693.32
1,117.08
24,483.32
5,259.24
4,322.76
697.75
6,420.50
7,186.98
596.09
154,156.77
154,156.77
868.00
140.24
727.76
5,450.72
1,247.72
1,877.87
1,687.05
337.64
300.44

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

189.52
189.52

140.24
727.76

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

189.52
189.52

140.24
727.76

30.05
41.12
0.00
0.00
51.98

828.78
1289.11
0.00
0.00
300.44

66.42%
68.65%
0.00%
0.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

30.05
41.12
0.00
0.00
51.98

828.78
1289.11
0.00
0.00
300.44

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
10,635.88
1,526.95
3,445.07
1,193.15
998.99
3,471.72

40.50
7.74
0.00
0.00
0.00

Costo
1158.30
1722.54
0.00
0.00
0.00

Valorizacin Actual
%
75.86%
50.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00

Metrado
0.00%
0.00%
0.00%
0.00%
0.00%

40.50
7.74
0.00
0.00
0.00

Costo
1158.30
1722.54
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
19,173.30
2,989.67
10,362.94
3,415.51
726.74
1,678.44
29,004.37
13,292.59
7,338.16
8,373.62
4,265.88
2,432.90
692.33
1,140.65
31,424.98
11,096.35
8,778.83
11,549.80
890.92
509.29
132.55
249.08

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

247.08
16.47
386.56
22.15
3.77

1494.83
7123.44
2330.96
726.74
1678.44

50.00%
68.74%
68.25%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

247.08
16.47
386.56
22.15
3.77

1494.83
7123.44
2330.96
726.74
1678.44

1353.00
136.59
13.35

8158.59
4857.14
5868.13

61.38%
66.19%
70.08%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

1353.00
136.59
13.35

8158.59
4857.14
5868.13

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

200.00
18.69
1.25

1332.00
384.08
563.56

54.75%
55.48%
49.41%

200.00
18.69
1.25

1332.00
384.08
563.56

22.97
179.00
1173.43

11096.35
8744.15
7075.78

100.00%
99.60%
61.26%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

22.97
179.00
1173.43

11096.35
8744.15
7075.78

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

76.47
3.25
0.24

509.29
66.79
124.54

100.00%
50.39%
50.00%

76.47
3.25
0.24

509.29
66.79
124.54

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
12,850.45
3,349.04
1,278.81
3,810.25
4,412.35
4,612.16
1,527.75
1,022.10
2,062.31
34,980.11
5,259.24
3,894.12
2,161.38
11,900.29
10,341.77
1,423.31
171,213.89
171,213.89
873.49
141.13
732.36
6,381.08

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

90.76
44.69
497.00
8.96

3349.04
629.68
3310.02
4412.35

100.00%
49.24%
86.87%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

90.76
44.69
497.00
8.96

3349.04
629.68
3310.02
4412.35

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

190.72
0.00

141.13
0.00

100.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

190.72
0.00

141.13
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
2,092.22
1,790.71
1,584.56
461.54
452.05

Metrado
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00

Costo
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
24,297.53
1,536.11
9,943.53
3,546.56
3,037.53
6,233.80
23,312.87
2,681.66
9,882.85
7,145.55
820.25
2,782.56
27,587.14
12,447.25
7,012.43
8,127.46
3,691.68
1,771.83
1,054.22
865.63
37,863.82
12,376.51

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
11,918.42
13,568.89
1,574.36
850.88
318.73
404.75
14,183.13
3,221.37
1,230.06
4,142.39
5,589.31
3,403.55
964.37
892.45
1,546.73
28,045.24
5,725.98
1,465.38
9,573.38
10,341.77
938.73
63,484.57

Metrado
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00

Costo

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
63,484.57
319.87
51.68
268.19
1,470.42
314.69
677.16
282.01
45.88
150.68

Costo

Valorizacin Actual
%

Metrado

69.84
0.00

51.68
0.00

100.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00

0.00%
0.00%

69.84
0.00

51.68
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
13,508.71
411.84
6,420.57
2,222.87
1,566.94
2,886.49
4,662.06
925.17
3,736.89
5,464.23
2,568.36
1,585.98
1,309.89
2,197.41
1,277.12
347.71
572.58
13,311.64
1,922.66
8,658.66
2,730.32
801.60

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
446.02
122.07
233.51
21,748.63
1,898.58
2,989.80
2,511.90
6,527.57
6,786.75
1,034.03
172,319.04
172,319.04
727.67
117.57
610.10
5,047.31
1,182.08
1,580.04
1,832.84
384.49
67.86
19,045.26

Metrado
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%

158.88
158.88

0.00
0.00
117.57
610.10

100.00%
100.00%

42.86
50.40
84.23
158.88
11.74

1182.08
1580.04
1832.84
384.49
67.86

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00

Costo

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

158.88
158.88

117.57
610.10

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

42.86
50.40
84.23
158.88
11.74

1182.08
1580.04
1832.84
384.49
67.86

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
1,399.68
6,965.82
2,411.93
1,701.32
6,566.51

Metrado
48.94
31.30
89.43
6.71
30.48

Costo
1399.68
6965.82
2411.93
1701.32
1259.74

Valorizacin Actual
%
100.00%
100.00%
100.00%
100.00%
19.18%

Metrado
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
48.94
31.30
89.43
6.71
30.48

Costo
1399.68
6965.82
2411.93
1701.32
1259.74

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
19,727.42
2,957.72
8,719.40
4,228.78
1,417.39
2,404.13
20,037.36
10,301.59
3,278.63
6,457.14
5,893.73
3,472.59
915.30
1,505.84
22,934.88
6,154.44
5,999.76
10,780.68
1,403.85
1,064.20
116.52
223.13

Costo

Valorizacin Actual
%

488.88
20.16
701.29
43.20
5.40

2957.72
8719.40
4228.78
1417.39
2404.13

100.00%
100.00%
100.00%
100.00%
100.00%

1708.39
92.20
14.69

10301.59
3278.63
6457.14
0.00
3472.59
915.30
1505.84
0.00
6154.44
5999.76
10780.68
0.00
1064.20
116.52
223.13

100.00%
100.00%
100.00%

521.41
44.54
3.34
12.74
122.82
1787.84
159.79
5.67
0.43

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

488.88
20.16
701.29
43.20
5.40

2957.72
8719.40
4228.78
1417.39
2404.13

0.00
0.00
0.00

0.00%
0.00%
0.00%

1708.39
92.20
14.69

10301.59
3278.63
6457.14

0.00
0.00
0.00

0.00%
0.00%
0.00%

521.41
44.54
3.34

3472.59
915.30
1505.84

0.00
0.00
0.00

0.00%
0.00%
0.00%

12.74
122.82
1787.84

6154.44
5999.76
10780.68

0.00
0.00
0.00

0.00%
0.00%
0.00%

159.79
5.67
0.43

1064.20
116.52
223.13

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
19,798.91
6,236.47
2,381.35
4,222.77
6,958.32
2,706.92
819.96
756.31
1,130.65
54,995.73
12,309.03
19,731.84
20,850.31
2,104.55
65,747.05
202.08
17.76
92.16
92.16
3,126.41
1,109.01
30.76

Costo

Valorizacin Actual
%

27.00
1032.00
550.14
51.90

0.00
6236.47
2381.35
4222.77
6958.32
0.00
819.96
756.31
1130.65
0.00
12309.03
19731.84
20850.31
2104.55

24.00
0.00
0.00

0.00
17.76
0.00
0.00

100.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

169.01
169.01
634.05
14.13
135.53
18.61
2.50

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

169.01
169.01
634.05
14.13

6236.47
2381.35
4222.77
6958.32

0.00
0.00
0.00

0.00%
0.00%
0.00%

135.53
18.61
2.50

819.96
756.31
1130.65

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

27.00
1032.00
550.14
51.90

12309.03
19731.84
20850.31
2104.55

0.00
0.00
0.00

0.00%
0.00%
0.00%

24.00
0.00
0.00

17.76
0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
610.03
280.38
1,033.48
62.75
1,278.42
1,278.42

Metrado
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00

0.00

0.00%

0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00

0.00

0.00%

0.00

Costo
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
57,476.51
10,131.28
5,605.33
491.81
4,034.14
3,898.87
917.72
1,404.35
1,576.80
4,939.61
1,368.09
1,729.03
1,842.49
8,357.51
1,894.50
3,067.76
3,395.25
19,616.15
1,159.39
1,758.60
16,698.16
9,810.87

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
4,224.40
2,931.34
2,655.13
722.22
722.22
3,663.63
1,660.16
2,003.47
4,850.000
1,500.00
2,000.00
1,350.00

Metrado
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

25.00
1.00
1.00

750.00
2000.00
1350.00

351.92

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00

Costo

0.00

0.00%

0.00

0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

50.00%
100.00%
100.00%

4.00
0.00
0.00

120.00
0.00
0.00

8.00%
0.00%
0.00%

29.00
1.00
1.00

870.00
2000.00
1350.00

59784.17

100.00%

0.00

0.00

0.00%

351.92

59784.17

476.65

23708.57

100.00%

0.00

0.00

0.00%

476.65

23708.57

1099.07

11298.44

100.00%

0.00

0.00

0.00%

1099.07

11298.44

0.00
0.00
0.00

3,131,400.57
494,129.47

83,492.74
59,784.17
59,784.17
23,708.57
23,708.57
52,343.63
38,626.04
11,298.44

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
7,881.37
6,170.67
9,215.28
4,060.28
4,683.75
4,683.75

Valorizacin Actual

Metrado
695.62
570.83
893.82
299.21

Costo
7881.37
6170.67
9215.28
4060.28

%
100.00%
100.00%
100.00%
100.00%

516.40

4683.75

100.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

Metrado
695.62
570.83
893.82
299.21

0.00

0.00%

516.40

Costo
7881.37
6170.67
9215.28
4060.28
4683.75

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
7,639.23
7,639.23
809.38
809.38
585.23
585.23
103,814.76
16,819.54
16,819.54
86,995.22
86,995.22
82,744.62
2,906.75
2,906.75
4,177.10
4,177.10
29,752.79
29,752.79
43,191.31
43,191.31
177.45
177.45

Costo

Valorizacin Actual
%

1709.00

7639.23

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

673.59

16819.54

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00

0.00%

1709.00

7639.23

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

673.59

16819.54

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

470.75

43191.31

100.00%

470.75

43191.31

0.00%

0.00

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
2,539.22
2,539.22
9,257.43
9,257.43
9,257.43
16,699.84
16,699.84
7,684.46
2,477.29
6,538.09
33,015.83
33,015.83
5,771.65
24,277.22
2,966.96
2,284.96
1,474.72
810.24
57,014.18
53,425.59
610.50
52,815.09

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

82.63

2539.22

100.00%

0.00

0.00

0.00%

82.63

2539.22

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
3,588.59
3,588.59
53,461.48
46,321.23
10,704.94
6,921.42
7,251.08
7,004.08

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
11,276.38
3,163.33
1,281.17
1,281.17
5,719.27
926.11
4,254.39
538.77
139.81
139.81

Metrado
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

233.84

Costo

Valorizacin Acumulada
%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00

Costo

0.00

0.00%

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

39724.74

100.00%

0.00

0.00%

233.84

39724.74

400.55

19923.36

100.00%

0.00
0.00
0.00

0.00

0.00%

400.55

19923.36

852.63
455.12
358.28
57.35

8765.04
5156.51
3873.01
591.28

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

852.63
455.12
358.28
57.35

8765.04
5156.51
3873.01
591.28

0.00
0.00

342,630.33

59,648.10
39,724.74
39,724.74
19,923.36
19,923.36
31,993.95
21,258.20
8,765.04
5,156.51
3,873.01
591.28

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
2,872.36
4,698.26
4,698.26
5,111.00
5,111.00
341.26
341.26
585.23
585.23
68,541.21
11,167.58
11,167.58
57,373.63
57,373.63
58,308.89
2,709.05
2,709.05
3,893.00
3,893.00
19,983.72
19,983.72
29,689.38

Valorizacin Actual

Valorizacin Acumulada

Metrado
150.00

Costo
2035.50

%
70.87%

Metrado
61.67

Costo
836.86

%
29.13%

Metrado
211.67

Costo
2872.36

429.20

3892.84

82.86%

88.80

805.42

17.14%

518.00

4698.26

1143.40

5111.00

100.00%

0.00

0.00

0.00%

1143.40

5111.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

447.24

11167.58

100.00%

0.00

0.00

0.00%

447.24

11167.58

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

400.00

12292.00

61.51%

0.00

0.00

0.00%

400.00

12292.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
29,689.38
125.41
125.41
1,908.33
1,908.33
9,382.07
9,382.07
9,382.07

Metrado
0.00

Costo

Valorizacin Actual
%

Valorizacin Acumulada

0.00

0.00%

Metrado
323.59

Costo
29689.38

%
100.00%

Metrado
323.59

Costo
29689.38

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

62.10

1908.33

100.00%

0.00

0.00

0.00%

62.10

1908.33

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
12,683.83
12,683.83
5,671.87
1,926.78
5,085.18
24,607.71
24,607.71
4,187.18
18,537.65
1,882.88
1,713.72
1,106.04
607.68
39,128.94
36,563.94
249.75
36,314.19
2,565.00
2,565.00
36,621.91
31,274.13
8,304.62

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
4,528.44
4,782.11
4,396.10
7,022.73
2,240.13
945.62
945.62
4,262.35
671.87
3,248.57
341.91
139.81
139.81

Metrado
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00

Costo

0.00

0.00

0.00%

0.00

0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
130.00

0.00
0.00
1405.30

0.00%
0.00%
49.85%

0.00
0.00
130.00

0.00
0.00
1405.30

0.00
0.00
0.00
0.00
0.00

173,398.54

20,449.61
20,449.61
20,449.61
21,583.47
14,789.51
5,029.90
3,385.29
2,818.92

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
2,771.33
784.07
2,164.10
2,164.10
2,951.09
2,951.09
333.27
333.27

Metrado
0.00
0.00

Costo

Valorizacin Actual
%

Valorizacin Acumulada

0.00
0.00

0.00%
0.00%

Metrado
100.00
0.00

Costo
1031.00
0.00

%
37.20%
0.00%

Metrado
100.00
0.00

Costo
1031.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
1,345.50
1,345.50
39,748.45
4,241.40
4,241.40
35,507.05
35,507.05
28,214.62
10,805.90
10,805.90
16,563.63
16,563.63
109.41
109.41
735.68
735.68
10,632.87
10,632.87
10,632.87
9,917.84
9,917.84
2,350.88

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
7,566.96
1,713.72
1,106.04
607.68
20,578.32
20,307.96
20,307.96
270.36
270.36
18,810.56
16,563.87
4,765.68
2,883.41
1,790.44
3,199.65
3,298.18
626.51
901.14
901.14
1,345.55
377.22
968.33

Metrado
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

Metrado
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

Costo

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
1,749.08
675.04
61.56
1,012.48

0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00

Metrado
0.00%
0.00%
0.00%

0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00

Metrado
0.00%
0.00%
0.00%

0.00
0.00
0.00

Costo
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
110,540.48
22,443.79
12,587.70
12,587.70
7,866.21
2,549.34
2,855.84
944.79
783.46
732.78
612.23
612.23
1,377.65
1,377.65
31,809.14
31,809.14
31,809.14
25,827.41
6,640.14
6,640.14
19,187.27
9,019.94

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
10,167.33
16,762.56
2,336.53
2,336.53
13,717.20
3,901.03
5,058.67
2,162.70
1,183.87
1,410.93
708.83
131.57
413.09
164.17
714.05
714.05
460.85
253.20
5,247.73
4,393.27
4,393.27
707.82

Metrado
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

Metrado
0.00

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

Costo

0.00

0.00

0.00%

0.00

0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
707.82
146.64
146.64
7,735.80
7,339.76
2,415.42
2,256.96
1,072.40

Metrado
0.00

Costo

%
0.00
0.00

0.00

0.00
0.00
0.00

Valorizacin Actual

0.00
0.00
0.00

0.00%

Metrado
0.00

0.00%

0.00%
0.00%
0.00%

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

Costo

0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
932.40
662.58
396.04
396.04
176,107.24
39,009.00
18,559.39
18,559.39
20,449.61
20,449.61
18,064.44
12,562.56
4,029.25
3,667.07
1,447.24
2,634.93
784.07
1,402.22
1,402.22
2,564.89
2,564.89
333.27

Metrado
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00

Costo

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

193.80

9639.61

47.14%

193.80

9639.61

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

30.00
0.00
66.94
127.79
0.00

308.40
0.00
723.62
1317.46
0.00

7.65%
0.00%
50.00%
50.00%
0.00%

30.00
0.00
66.94
127.79
0.00

308.40
0.00
723.62
1317.46
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
333.27
1,201.50
1,201.50
35,775.25
4,241.40
4,241.40
31,533.85
31,533.85
23,944.78
9,553.96
9,553.96
13,403.76
13,403.76
109.41
109.41
877.65
877.65
4,283.14
4,283.14
4,283.14
10,665.38
10,665.38

Metrado
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

Metrado
0.00

0.00

0.00

0.00%

0.00

0.00

0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

Costo

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
2,650.89
8,014.49
1,713.72
1,106.04
607.68
20,751.31
20,307.96
20,307.96

Metrado
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

Costo

Valorizacin Acumulada
%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00

Costo

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
270.36
270.36
172.99
172.99
20,402.85
17,847.02
3,817.59
3,220.42
1,676.33
5,397.57
3,135.84
599.27
726.00
726.00
1,829.83
425.36
1,404.47
1,497.37
576.77
52.76
867.84
91,672.78

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
16,485.33
16,485.33
16,485.33
12,423.08
9,601.28
5,254.42
1,706.41
931.93
1,279.57
428.95
1,481.13
1,481.13
1,016.03
1,016.03
166.69
166.69
157.95
157.95
22,351.62
337.84
337.84
22,013.78

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
86.21
124.11
0.00

0.00
0.00
931.93
1279.57
0.00

0.00%
0.00%
100.00%
100.00%
0.00%

0.00
0.00
86.21
124.11
0.00

0.00
0.00
931.93
1279.57
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
22,013.78
16,394.30
6,274.14
6,274.14

Metrado
0.00

0.00

Costo

Valorizacin Actual
%

0.00

0.00%

Metrado
0.00

0.00

0.00%

0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

0.00

0.00%

0.00

Costo
0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
9,648.43
9,648.43
56.87
56.87
414.86
414.86
4,628.07
4,628.07
4,628.07
1,487.62
1,487.62
1,487.62
1,713.72
1,106.04
607.68
3,899.41
653.76
653.76
2,998.20
1,659.96
1,338.24
247.45

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
247.45
11,577.45
10,554.42
4,978.41
1,498.57
1,108.96
1,057.80
1,522.83
387.85
784.33
784.33
238.70
238.70
712.18
175.17
30.77
506.24
114,620.17
19,331.92
10,478.20
10,478.20
8,853.72

Metrado
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

Metrado
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

Costo

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
8,853.72
12,349.23
9,088.95
2,697.06
2,216.15
1,447.24
1,838.58
889.92

Metrado
0.00

0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

Metrado
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

Costo
0.00

0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
955.98
955.98
1,793.99
1,793.99
261.91
261.91
248.40
248.40
33,294.19
2,179.88
2,179.88
31,114.31
31,114.31
15,082.51
7,639.48
7,639.48
6,937.22
6,937.22
116.15
116.15
389.66
389.66

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
1,898.62
1,898.62
1,898.62
6,811.38
6,811.38
1,599.37
5,212.01
571.24
368.68
202.56
12,756.90
12,536.94
12,536.94
219.96
219.96
11,649.65
10,157.84
2,555.39
1,946.22
1,071.17
1,642.71
2,188.11

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
754.24
321.82
321.82
1,169.99
256.63
913.36

Metrado
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

Metrado
0.00

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

Costo

0.00

0.00

0.00%

0.00

0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
874.53
337.52
30.77
506.24
84,737.27
11,660.05
11,660.05
11,660.05
6,474.44
3,527.38
1,680.13
369.05
550.35
347.53
1,775.91
1,775.91
1,097.83
1,097.83
28,023.74
19,704.06
19,704.06
2,122.76

Costo

Valorizacin Actual
%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
2,122.76
3,050.48
3,050.48
331.88
331.88
1,701.05
1,701.05
1,113.51
1,113.51
16,598.40
16,598.40
16,598.40
5,027.71
5,027.71
1,724.66
3,303.05
571.24
571.24
368.68
202.56
7,291.00
7,169.57

Metrado
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

Costo

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
7,169.57
121.43
121.43

Metrado
0.00
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

0.00

0.00%

Metrado
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

0.00

0.00%

0.00

Costo
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
6,216.95
5,891.45
3,342.09
1,475.49
418.90
654.97
325.50
325.50
411,822.78
59,403.49
59,403.49
59,403.49
49,619.48
37,249.33
20,303.31
6,116.61
3,149.82
5,144.17
2,535.42
6,302.74
6,302.74
4,240.24

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

1194.28

59403.49

100.00%

1975.03
539.86
291.38
498.95
186.84

20303.31
6116.61
3149.82
5144.17
2535.42

100.00%
100.00%
100.00%
100.00%
100.00%

694.90

6302.74

100.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

1194.28

59403.49

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

1975.03
539.86
291.38
498.95
186.84

20303.31
6116.61
3149.82
5144.17
2535.42

0.00

0.00%

694.90

6302.74

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
4,240.24
1,534.67
1,534.67
292.50
292.50
69,439.24
8,269.07
8,269.07
61,170.17
61,170.17
83,582.65
2,826.44
2,826.44
40,616.85
40,616.85
18,159.59
18,159.59
18,890.41
18,890.41
290.47
290.47
2,798.89

Valorizacin Actual

Metrado
948.60

Costo
4240.24

%
100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

331.16

8269.07

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

121.00

3718.33

20.48%

205.89

18890.41

100.00%

0.00

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
948.60

Costo
4240.24

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

331.16

8269.07

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

121.00

3718.33

0.00

0.00%

205.89

18890.41

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
2,798.89
23,704.45
23,704.45
23,704.45

Valorizacin Actual

Metrado
91.08

Costo
2798.89

%
100.00%

0.00

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
91.08

0.00

0.00%

0.00

Costo
2798.89

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
24,523.09
24,523.09
24,523.09
18,199.10
8,773.64
4,713.19
4,060.45
9,425.46
6,083.22
3,342.24
37,065.03
35,793.41
832.50
34,960.91
1,271.62
1,271.62
46,286.25
40,661.61
19,236.79
5,371.61
4,063.33
3,575.23

Costo

Valorizacin Actual
%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00

0.00%

0.00

0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
6,122.12
2,292.53
4,156.81
4,156.81
1,467.83
756.27
711.56
2,716.54
1,358.27
1,358.27
13,946.730
13,418.83
3,927.36
2,633.34
3,173.80
3,684.33
527.90
527.90
23,730.89
20,263.32
584.64
1,608.96

Metrado
0.00
0.00

Costo

Valorizacin Actual
%
0.00%
0.00%

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

3574.07
0.00

1358.15
0.00

99.99%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00%
0.00%
0.00%

0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.33
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00

Costo

0.00

0.00%

0.00

0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.13
0.00

0.01%
0.00%

3574.40
0.00

1358.27
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
849.92
424.05
68,534.14
68,534.14
419.48
3,951.96

Metrado
0.00
0.00

1103.90
275.98

Costo

Valorizacin Actual
%

0.00
0.00

0.00%
0.00%

0.00
419.48
988.01

100.00%
25.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00

0.00
0.00

0.00%
0.00%

1103.90
275.98

Costo
0.00
0.00

419.48
988.01

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
10,537.82
5,969.89
2,715.59
1,852.34
11,223.12
7,305.83
3,917.29
42,401.76
6,331.25
36,070.51
850,008.53
850,008.53
221,215.73
23,826.05
604,966.75

Costo

Valorizacin Actual
%

0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

30874.00
0.00
0.00

13.96%
0.00%
0.00%

4000.99
0.00
0.00

28,727.11
0.00
0.00

12.99%
0.00%
0.00%

8300.99
0.00
0.00

59601.11
0.00
0.00

850.15

3043.54

45.00%

0.00

0.00

0.00%

850.15

3043.54

0.00
0.00

0.00
0.00

0.00%
0.00%

130.00
0.00

3515.20
0.00

33.99%
0.00%

130.00
0.00

3515.20
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4300.00
0.00
0.00

6,763.52
10,342.80
4,647.56

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

168,575.58

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
4,161.61

Metrado
0.00

4,802.30
75,608.08

Costo

Valorizacin Actual
%

Valorizacin Acumulada

0.00

0.00%

Metrado
144.00

Costo
1208.16

%
29.03%

Metrado
144.00

Costo
1208.16

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

617.18
2,751.13

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

5,000.00
1,060.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

3,678.24

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

6,371.61

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

1,124.12

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

2,489.03
772.30
9,236.71
23,805.52
5,194.04

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
149.83
4,229.10
736.07
187.30
541.44

Metrado
0.00

0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

Costo
0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
587.44
1,047.94

Metrado
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00

0.00%
0.00%

111.92
233.02
44.41
739.56
30,440.70

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

1,162.99
756.12

0.00
0.00

0.00
0.00

0.00%
0.00%

1,108.22

0.00

0.00

0.00%

7,952.22
270.65
1,822.04

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

3,904.42
4,914.98

0.00
0.00

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00

Costo

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
1,739.06
1,895.02
4,914.98
51,337.80
10,288.13
5,979.06
666.58
329.42
28,835.52

Metrado
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

2,726.87
2,398.79
79.88
33.55
271,155.23

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

267.92
2,524.04

705.04
0.00

267.92
0.00

100.00%
0.00%

1,734.40
2,574.21
798.73

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00

Costo

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

705.04
0.00

267.92
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado

Costo

Valorizacin Actual
%

6,762.99
777.38
1,424.35

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

31,165.65
26,385.40

0.00
0.00

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado

Costo

Valorizacin Actual
%

48.59
62.52

0.00
0.00

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00
0.00

4,770.93
1,669.09

0.00
0.00

0.00
0.00

0.00%
0.00%

660.37
180.04
993.95

0.00
0.00
0.00

0.00
0.00
0.00

4,366.06
6,406.13
7,938.85

0.00
0.00
0.00

3,014.78
5,930.23
6,007.55

914.71

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
245.53
1,966.88
34.56

Metrado
0.00
0.00
0.00

1,949.58

Costo

Valorizacin Actual
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

0.00

0.00%

0.00
0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

6,348.50

0.00

0.00

0.00%

2,705.60
1,160.79
885.76

0.00
0.00
0.00

5,854.54

0.00

0.00
0.00
0.00
0.00
0.00

14,872.58

0.00

2,130.98
1,003.69
24,415.38

Metrado
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Costo
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
29,403.96
25,542.29
5,036.29

Metrado
0.00
0.00
0.00

10,484.88
71.28

Costo

Valorizacin Actual
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00

Costo

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado

Costo

Valorizacin Actual
%

4,439.01

0.00

0.00

0.00%

2,617.90
11,496.29
164.18
810.12
135.79
376,476.00
184,613.00
66,000.00
16,500.00
5,550.00
10,650.00
1,575.00
23,320.00
5,880.00
52,500.00
1,400.00
1,238.00
135,713.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
44,000.00
15,400.00
5,180.00
9,940.00
1,575.00
52,500.00
5,880.00
1,238.00
56,150.00
49,200.00
44,520.00
1,400.00
3,280.00
6,950.00
3,500.00
2,900.00
550.00
439,779.92
76,671.13
14,946.79
268.58
268.58

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

74.40

268.58

100.00%

0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00%

74.40

268.58

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
2,540.88
1,282.27
82.08
84.36
779.30
312.87

0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00

Metrado
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00

Metrado
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

Costo
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
1,751.36
190.40
1,327.34
233.62
1,505.13
39.23
540.80
925.10
1,573.20
873.40
629.82
69.98
934.44
25.45
6.17
357.86
33.60
511.36
5,760.00
1,100.00
3,780.00
484.00

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
396.00
613.20
201.52
164.88
135.74
111.06
9,459.81
1,773.44
344.76
1,342.73
85.95
743.55
466.69
276.86
3,140.40
1,454.76
1,685.64
149.64
149.64
3,344.26
361.44
229.20

Metrado
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00

95.50
0.00
0.00

344.76
0.00
0.00

100.00%
0.00%
0.00%

25.35
12.00

466.69
148.32

100.00%
53.57%

13.00
18.00

1050.66
1379.16

2.00
5.00
12.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

Costo

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

95.50
0.00
0.00

344.76
0.00
0.00

0.00
0.00

0.00%
0.00%

25.35
12.00

466.69
148.32

72.22%
81.82%

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

13.00
18.00

1050.66
1379.16

149.64

100.00%

0.00

0.00

0.00%

2.00

149.64

100.40
229.20

27.78%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

5.00
12.00

100.40
229.20

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
239.12
300.96
112.92
583.20
81.32

Metrado
13.00
17.00
2.00
28.00
4.00

Costo
222.04
284.24
37.64
453.60
81.32

Valorizacin Actual
%
92.86%
94.44%
33.33%
77.78%
100.00%

Metrado
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
13.00
17.00
2.00
28.00
4.00

Costo
222.04
284.24
37.64
453.60
81.32

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
245.70
334.44
590.10
163.98
75.52
26.36
308.52
308.52
52,264.53
11,359.04
651.10
5,057.94
324.65
2,073.02
3,252.33
2,667.18
364.73
617.84
1,684.61
10,016.96
2,605.52
7,411.44

Metrado
18.00
14.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual

245.70
260.12
0.00
0.00
0.00
0.00

%
100.00%
77.78%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
18.00
14.00
0.00
0.00
0.00
0.00

Costo

0.00

0.00%

0.00

0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

245.70
260.12
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
3,863.45
1,619.64
1,182.24
1,061.57
24,357.90
21,851.40
340.20
226.80
872.40
1,067.10
116,486.58
11,281.25
167.14
167.14
1,549.31
781.74
50.04
51.43
475.10
191.00
1,094.92
149.94

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

54.46
2.90
182.40

1619.64
1182.24
1061.57

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

54.46
2.90
182.40

1619.64
1182.24
1061.57

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
799.60
145.38
1,336.93
39.23
540.80
756.90

Metrado
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

Costo
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
1,274.44
714.60
489.86
69.98
823.95
20.36
6.17
333.18
16.80
447.44
4,544.00
900.00
2,940.00
396.00
308.00
490.56
164.88
128.24
111.06
86.38
10,003.52
1,699.16

Costo

Valorizacin Actual
%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
330.32
1,286.49
82.35
1,425.58
896.57
529.01
2,510.64
1,131.48
1,379.16
299.28
299.28
3,451.82
281.12
420.20
136.64
267.52
112.92
453.60
81.32
245.70
334.44
826.14

Metrado
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

13.00
18.00

1050.66
1379.16

92.86%
100.00%

2.00

149.64

50.00%

7.00
13.00
8.00
5.00
5.00
28.00
4.00
18.00
2.00
0.00

140.56
248.30
136.64
83.60
94.10
453.60
81.32
245.70
37.16
0.00

50.00%
59.09%
100.00%
31.25%
83.33%
100.00%
100.00%
100.00%
11.11%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00

Costo

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

13.00
18.00

1050.66
1379.16

0.00

0.00%

2.00

149.64

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

7.00
13.00
8.00
5.00
5.00
28.00
4.00
18.00
2.00
0.00

140.56
248.30
136.64
83.60
94.10
453.60
81.32
245.70
37.16
0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
163.98
75.52
52.72
617.04
617.04

Metrado
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00

0.00

0.00%

0.00

Costo
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
95,201.81
7,016.31
400.28
3,088.42
198.86
1,148.62
2,180.13
1,568.52
929.86
638.66
7,504.94
2,135.93
5,369.01
66,196.76
615.02
59,927.49
5,654.25
12,915.28
11,654.08
181.44
45.36
465.28

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

20.68
4.94
440.03

615.02
2013.89
2560.97

100.00%
3.36%
45.29%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

20.68
4.94
440.03

615.02
2013.89
2560.97

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
569.12
29,135.29
7,615.05
235.01
235.01
707.23
357.12
22.86
23.50
217.04
86.71
1,554.15
302.26
1,047.48
204.41
1,762.36
78.46
135.20
714.85
833.85
709.89
674.90

Metrado
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

Metrado
0.00

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

Costo

0.00

0.00

0.00%

0.00

0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
34.99
326.76
10.18
61.70
111.06
143.82

Metrado
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

Metrado
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

Costo
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
1,856.40
850.00
632.40
374.00
463.25
155.72
202.64
104.89
4,625.29
1,327.79
142.96
1,113.55
71.28
729.04
729.04
1,302.54
1,302.54
648.88
273.28
81.00
20.33
54.60

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
74.32
118.02
27.33
617.04
617.04
16,894.95
4,742.25
275.26
2,148.93
195.17
1,124.52
998.37
1,575.87
164.33
1,411.54
3,222.78
662.61
2,560.17
574.05
242.68
228.30
103.07

Metrado
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00

Costo

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
6,780.00
5,827.04
90.72
60.48
232.64
569.12

0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00

Metrado
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

Costo
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
18,562.20
1,420.15
29.60
29.60
540.09
230.58
14.76
15.17
140.14
139.44
193.61
28.56
139.93
25.12
241.23
39.23
33.80
168.20
79.40
79.40
161.56
5.09

Costo

Valorizacin Actual
%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
55.53
5.06
95.88
144.00
100.00
44.00
30.66
18.32
12.34
1,707.64
705.81
75.99
591.93
37.89
92.97
92.97
153.24
153.24
447.10
19.10
239.12
16.20

Metrado
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00

Costo

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
118.02
54.66
308.52
308.52

Metrado
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00

0.00%
0.00%

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00

0.00

0.00%

0.00

Costo
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
15,434.41
2,944.50
137.83
1,068.28
66.13
1,353.53
318.73
1,587.40
1,587.40
1,159.35
606.10
175.30
377.95
9,743.16
8,740.56
136.08
90.72
348.96
426.84
16,227.28
3,447.76
78.26

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
78.26
896.80
452.73
28.98
29.79
275.15
110.15
536.13
216.58
251.47
68.08
354.53
39.23
135.20
126.15
53.95
263.77
158.80
104.97
196.90
10.18
12.34

Metrado
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

Costo

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
61.70
16.80
95.88
1,035.56
150.00
355.56
420.00

Metrado
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

Costo
0.00
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
66.00
44.00
85.81
27.48
9.16
18.32
18.51
12.34
4,824.94
1,007.97
378.15
591.93
37.89
1,327.36
1,327.36
395.70
242.46
153.24
74.82
74.82
1,402.05
95.50

Metrado
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

Costo

Valorizacin Acumulada
%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00

Costo

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
17.08
50.16
858.60
40.66
74.32
177.03
75.52
13.18
617.04
617.04
7,954.58
2,216.40
218.41
850.63
54.45
516.97
575.94
2,419.56
629.89
1,789.67
70.90
26.77

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

0.00

0.00

0.00%

0.00

0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

0.00%

0.90

26.77

100.00%

0.90

26.77

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
20.38
23.75
3,247.72
2,913.52
45.36

Metrado
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00

0.00%
0.00%

Metrado
0.05
4.08

0.00
0.00

0.00%
0.00%

0.00
0.00

Costo

Valorizacin Acumulada

20.38
23.75

%
100.00%
100.00%

Metrado
0.05
4.08

0.00
0.00

0.00%
0.00%

0.00
0.00

Costo
20.38
23.75
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
30.24
116.32
142.28
15,025.04
15,025.04
3,160.06
186.60
1,451.55
93.04
704.11
724.76
842.30
842.30
2,319.40
476.73
1,842.67
768.38
256.06
236.45
275.87
7,934.90
7,099.40

Metrado
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00

Costo

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
113.40
75.60
290.80
355.70
10,407.31
10,407.31
2,035.60
88.95
661.38
42.55
1,047.62
195.10
981.14
981.14
1,040.53
390.19
370.98
279.36
6,350.04
5,827.04
90.72
60.48

Metrado
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00

Costo

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
87.24
284.56
40,195.14
7,185.85
253.78
253.78

Metrado
0.00
0.00

0.00

Costo

Valorizacin Actual
%

0.00
0.00

0.00%
0.00%

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00

0.00

0.00%

0.00

Costo
0.00
0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
2,556.72
1,290.71
82.62
84.92
784.43
314.04
1,703.76
485.52
997.50
220.74
917.34
117.69
169.00
42.05
588.60
529.56
39.70
34.99
454.87
431.71
127.25
30.85

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
80.21
33.60
159.80
750.40
50.00
210.00
446.40
22.00
22.00
42.58
9.16
11.92
9.16
6.17
6.17
7,044.07
2,216.33
238.62
1,858.73
118.98
1,098.63
856.99

Metrado
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00

Costo

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
241.64
157.44
80.82
76.62
74.82
74.82

Metrado
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

Costo

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

0.00%

0.00

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
1,954.25
420.20
83.60
32.40
18.58
1,239.21
109.32
37.76
13.18
1,542.60
1,542.60
25,965.22
7,408.27
487.06
3,787.76
363.85
1,624.75
1,144.85
3,021.61
989.58
2,032.03
2,825.36

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
526.10
2,299.26
1,900.15
774.43
554.43
571.29
10,809.83
8,427.08
136.08
90.72
29.08
426.84
1,700.03
117,069.95
37,931.97
789.51
789.51
6,992.04
3,529.06
225.90
232.18
2,144.80

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

218.70
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
789.51
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

100.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00

Costo

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00%

218.70

789.51

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
860.10
5,320.30
1,620.78
3,012.49
687.03

Metrado
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

Costo
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
4,304.09
117.69
1,453.40
1,261.50
1,471.50
3,846.20
1,746.80
1,049.70
1,049.70
1,442.75
76.35
345.52
126.00
894.88
13,809.36
1,500.00
6,300.00
2,133.36
1,440.00
1,116.00
660.00
660.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
1,427.72
274.80
274.80
54.96
95.36
357.60
185.10
185.10
42,075.48
7,853.14
1,526.56
380.61
5,945.97
6,429.42
3,659.91
2,769.51
5,872.50
2,424.60
3,447.90
1,346.76
1,346.76
14,094.74

0.00
0.00
0.00
0.00
0.00
0.00
0.00

130.02
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

198.80
111.00

469.37
0.00
0.00
0.00
3659.91
1371.96

30.75%
0.00%
0.00%
100.00%
49.54%

30.00
45.00

2424.60
3447.90

100.00%
100.00%

18.00

1346.76

100.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

130.02
0.00
0.00

469.37
0.00
0.00

0.00
0.00

0.00%
0.00%

198.80
111.00

3659.91
1371.96

0.00
0.00

0.00%
0.00%

30.00
45.00

2424.60
3447.90

0.00

0.00%

18.00

1346.76

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
1,146.00
307.44
752.40
2,948.40
487.92
1,528.80
1,486.40

Metrado
60.00
18.00
18.00
48.00
24.00
66.00
45.00

Costo
1146.00
307.44
300.96
777.60
487.92
900.90
836.10

Valorizacin Actual
%
100.00%
100.00%
40.00%
26.37%
100.00%
58.93%
56.25%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
60.00
18.00
18.00
48.00
24.00
66.00
45.00

Costo
1146.00
307.44
300.96
777.60
487.92
900.90
836.10

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
4,012.68
54.66
1,132.80
237.24
6,478.92
6,478.92
37,062.50
5,566.95
292.55
1,239.25
34.52
2,073.02
1,927.61
1,949.89
1,949.89
6,973.54
1,355.85
5,617.69
2,695.76
877.33
1,108.86
709.57

Metrado
11.00
0.00
5.00
7.00

Costo

Valorizacin Actual

649.11
0.00
188.80
92.26

%
16.18%
0.00%
16.67%
38.89%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

29.50
2.72
121.92

877.33
1108.86
709.57

100.00%
100.00%
100.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

Metrado
11.00
0.00
5.00
7.00

Costo

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

29.50
2.72
121.92

877.33
1108.86
709.57

649.11
0.00
188.80
92.26

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
19,876.36
16,024.36
249.48
166.32
639.76
782.54
2,013.90
142,537.31
31,288.72
1,681.68
1,681.68
23,988.99
13,099.42
838.51
861.80
7,961.21
1,228.05
2,371.54
1,040.06
763.70
118.00
449.78

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
2,799.34
1,462.74
665.21
70.26
444.21
156.92

0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00

Metrado
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

Costo
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
447.17
15.27
11.74
8.34
22.36
18.51
4.07
6.17
80.21
44.82
118.60
43.32
14.44
59.32
78,086.25
26,231.35
2,264.77
17,641.36
3,281.04
1,129.25
1,914.93
21,827.40

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
6,886.00
12,971.49
1,969.91
157.44
80.82
76.62
74.82
74.82
44.16
44.16
29,751.08
127.36
2,686.94
4,429.77
13,767.02
4,010.79
4,729.20
23,554.15
5,540.05
419.34
1,834.83
239.04

Metrado
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00

Costo

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
522.78
2,524.06
3,773.35
1,170.34
2,603.01

Metrado
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

Costo
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
9,160.35
1,451.31
7,709.04
3,500.50
987.37
1,492.07
1,021.06
1,579.90
1,579.90
9,608.19
1,600.00
1,818.86
57.90
675.60
887.80
175.60
171.36
146.88
318.48
1,700.00
1,500.00
300.00

Costo

Valorizacin Actual
%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
255.71
507,327.64
90,197.84
30,668.94
10,164.36
6,633.36
230.92
805.56
1,246.88
4,685.76
5,657.08
1,245.02
17,571.13
1,818.82
1,287.14
925.14
8,068.90
2,091.75
1,748.80
1,285.16
178.71
166.71

Metrado
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

Metrado
0.00

90.00
28.00
0.00
0.00
0.00
0.00
8.00
2.00

6442.20
2579.64
0.00
0.00
0.00
0.00
983.84
177.86

63.38%
38.89%
0.00%
0.00%
0.00%
0.00%
17.39%
14.29%

1.00
1.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00

1818.82
1287.14
0.00
0.00
0.00
0.00
0.00
59.57
55.57

100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
33.33%
33.33%

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

Costo

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

90.00
28.00
0.00
0.00
0.00
0.00
8.00
2.00

6442.20
2579.64
0.00
0.00
0.00
0.00
983.84
177.86

0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
2.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
119.14
111.14

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
66.67%
66.67%

1.00
1.00
0.00
0.00
0.00
0.00
0.00
3.00
3.00

1818.82
1287.14
0.00
0.00
0.00
0.00
0.00
178.71
166.71

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
40,825.14
16,597.44
14,596.40
1,461.46
8,169.84

0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00

Metrado
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00

Metrado
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

Costo
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
1,132.63
1,132.63
53,075.72
21,350.61
6,871.68
4,422.24
623.44
1,450.70
3,123.84
4,058.34
800.37
4,265.12
1,011.14
925.14
874.40
1,224.16
119.14
111.14
27,459.99
11,064.96
10,008.96
939.51

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

47.00
16.00
0.00
0.00
0.00
9.00
2.00

3364.26
1474.08
0.00
0.00
0.00
1106.82
177.86

48.96%
33.33%
0.00%
0.00%
0.00%
27.27%
22.22%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

47.00
16.00
0.00
0.00
0.00
9.00
2.00

3364.26
1474.08
0.00
0.00
0.00
1106.82
177.86

1.00
0.00
0.00
0.00
2.00
1.00

1011.14
0.00
0.00
0.00
119.14
55.57

100.00%
0.00%
0.00%
0.00%
100.00%
50.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.00
0.00
0.00
0.00
2.00
1.00

1011.14
0.00
0.00
0.00
119.14
55.57

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
5,446.56
54,315.72
18,212.81
4,437.96
1,842.60
692.76
134.26
211.82
577.96
1,301.60
2,951.52
5,795.54
266.79
4,711.76
1,858.28
2,623.20
119.14
111.14
16,207.71
7,376.64
5,838.56
313.17

Metrado
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00

0.00%

Metrado
0.00

Costo

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
409.94
2,269.40
2,265.26
2,265.26

Metrado
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00

0.00%
0.00%

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00

0.00%
0.00%

Metrado
0.00
0.00

0.00

0.00%

0.00

Costo
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
7,418.18
3,154.80
179.86
3,960.24
123.28
5,500.00
5,500.00
13,502.01
5,166.38
1,646.34
141.56
461.84
201.39
129.32
1,844.70
296.58
444.65
1,901.34
812.14
1,089.20
6,211.25
461.04

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
834.08
2,008.86
917.14
320.04
521.95
819.88
328.26
223.04
133.11
89.93
23,383.57
8,874.78
2,218.98
829.17
117.02
808.22
134.26
290.14
585.72
92.11
3,443.44
355.72

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
6,242.53
1,548.82
850.14
3,346.80
437.20
59.57

0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00

Metrado
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

Costo
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
8,266.26
3,918.84
2,293.72
417.56
614.91
1,021.23
53,231.85
12,187.96
4,008.48
1,474.08
346.38
268.52
580.28
1,041.28
3,935.36
533.58
25,088.28
1,445.82
850.14
22,514.15
218.60
59.57

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
14,822.98
7,376.64
5,004.48
626.34
1,815.52
1,132.63
1,132.63
18,708.65
7,467.47
2,290.56
1,197.69
173.19
268.52
77.93
290.14
846.04
1,967.68
355.72
2,235.87
956.14
1,224.16
55.57

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
9,005.31
4,610.40
2,502.24
417.56
1,475.11

0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00

Metrado
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00

Metrado
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

Costo
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
12,362.57
3,773.68
1,503.18
70.78
92.13
117.02
57.73
604.17
65.08
92.11
64.66
1,106.82
3,804.30
512.79
474.79
472.72
544.60
544.60
1,143.66
111.14
4,784.59
2,502.24

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
160.02
1,844.73
164.13
113.47
78,937.39
34,188.39
6,871.68
2,548.08
2,078.28
2,416.68
2,611.26
1,939.80
14,388.66
1,333.95
12,429.61
1,450.82
2,436.42
1,762.28
2,404.26
1,311.60
2,885.52
178.71

Metrado
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00

20.00
0.00
5.00
7.00
1.00
5.00
20.00
0.00

1431.60
0.00
288.65
469.91
145.07
323.30
2459.60
0.00

20.83%
0.00%
13.89%
19.44%
5.56%
16.67%
17.09%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00

Costo

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

20.00
0.00
5.00
7.00
1.00
5.00
20.00
0.00

1431.60
0.00
288.65
469.91
145.07
323.30
2459.60
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
32,319.39
2,766.24
5,004.48
5,760.72
1,565.85
12,298.20
4,923.90

0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00
0.00
0.00

Metrado
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

Costo

Valorizacin Acumulada
%

0.00
0.00
0.00
0.00
0.00
0.00

Metrado
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

Costo
0.00
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
43,076.89
22,181.51
3,922.71
4,938.08
940.80
12,379.92
20,895.38
8,255.72
12,639.66
8,535.43
341.22
71.58
57.73
122.98
88.93
7,881.30
509.52
6,660.00
528.84
182.94
312.91
208.52

Costo

Valorizacin Actual
%

Metrado

Costo

Valorizacin Acumulada
%

Metrado

Costo

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
104.39
58,000.00
58,000.00
16,642.200
1,624.90
812.45
812.45
1,312.00
1,062.00
250.00
11,512.00
5,756.00
5,756.00
2,193.30
663.30
1,530.00
815,570.49
815,570.49

Metrado
0.00

Costo

Valorizacin Actual
%

0.00

0.00%

Metrado
0.00

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00%

Metrado
0.00

0.00

0.00

0.00%

0.00

0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.13

101,946.31

12.50%

0.09

72,993.56

8.95%

0.21

174939.87

302,378.96
33,612.25
15,357.00

3.65%

8,276,948.93

2132368.69

920,060.230
420,363.640

237032.71
108297.18

25.76%

Costo

Valorizacin Acumulada
%

Costo
0.00

2,434,747.65
270,644.96
123,654.19

MUNICIPALIDAD DISTRITAL
DE ECHARATI
0
GERENCIA DE INFRAESTRUCTURA

OSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior

Parcial
Metrado
183,142.873
70,863.000

Costo
47182.62
18256.25

9,871,378.67

2543137.45

Valorizacin Actual
%

25.76%

Metrado

Costo
6,690.70
2,588.81
360,627.71

Valorizacin Acumulada
%

Metrado

3.65%

Costo
53,873.32
20,845.06
2,903,765.17

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
100.00%
100.00%
100.00%
100.00%
100.00%

Metrado
0.00
0.00
0.00
0.00
0.00

100.00%
18.72%
100.00%
100.00%
100.00%

Costo

%
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
466.54
0.00
0.00
0.00

0.00
201,783.22
0.00
0.00
0.00

0.00%
81.28%
0.00%
0.00%
0.00%

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
100.00%
100.00%
100.00%
100.00%

Metrado
0.00
0.00
0.00
0.00

Costo

%
0.00

0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
100.00%
100.00%
100.00%

90.00
17.00
17.00
0.00
0.00
0.00

12,182.40
2,133.84
2,092.02
0.00
0.00
0.00

100.00%
100.00%
100.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

10.40
3.60
0.18

62.92
146.30
81.41

100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

100.00%
100.00%
100.00%
59.52%

0.00
0.00
0.00
13.60

0.00
0.00
0.00
260.03

0.00%
0.00%
0.00%
40.48%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
100.00%
100.00%

Metrado
0.00
0.00

0.00%
0.00%
0.00%

Costo

%
0.00
0.00

0.00%
0.00%

10.40
3.60
0.18

62.92
146.30
81.41

100.00%
100.00%
100.00%

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

100.00%
100.00%
0.00%
0.00%
100.00%

0.00
0.00
100.07
162.76
0.00

0.00
0.00
2,177.52
393.88
0.00

0.00%
0.00%
100.00%
100.00%
0.00%

100.00%
0.00%
0.00%
0.00%

0.00
18.00
51.42
3.86

0.00
4,005.90
1,386.80
978.70

0.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%

Metrado
88.20

Costo
3,645.31

%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

100.00%
89.52%
74.63%

0.00
24.00
5.61

0.00
853.44
2,465.93

0.00%
10.48%
25.37%

0.00%
0.00%
0.00%

281.42
26.94
2.02

1,874.26
553.62
910.72

100.00%
100.00%
100.00%

63.48%
78.44%
79.98%

8.63
47.05
450.76

4,168.98
2,298.39
2,718.08

36.52%
21.56%
20.02%

0.00%
0.00%
0.00%

90.60
7.66
0.57

603.40
157.41
295.78

100.00%
100.00%
100.00%

100.00%
66.78%
100.00%
100.00%

0.00
36.30
0.00
0.00

0.00
511.47
0.00
0.00

0.00%
33.22%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%

Metrado
252.52
25.15
4.56

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

16.00
14.00
7.00
2.00
695.40
371.92
39.90

100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Costo
1,527.75
1,022.10
2,062.31
6,010.56
3,066.84
2,521.61
1,395.50
13,296.05
14,095.77
1,617.95

%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
266.00

0.00
1,021.44

0.00%
100.00%

38.32
77.55
73.61
266.00
54.93

1,056.87
2,431.19
1,601.75
643.72
317.50

100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
76.32
23.12
66.07
4.95
266.00

Costo
2,182.75
5,145.36
1,781.91
1,255.07
10,993.78

%
100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%
0.00%
0.00%

595.74
31.02
599.71
39.39
4.92

3,604.23
13,416.46
3,616.25
1,292.39
2,190.43

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

1751.17
170.80
15.44

10,559.56
6,073.65
6,786.81

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

353.94
33.70
2.53

2,357.24
692.54
1,140.65

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

10.06
88.84
668.57

4,859.78
4,339.83
4,031.48

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

148.73
11.75
0.88

990.54
241.46
456.64

100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

2.00
6.00
1.00
2.00
2.00
680.00
640.20
357.02
9.40

1,109.06
4,733.34
1,254.30
2,407.56
2,064.28
13,001.60
7,951.28
13,531.06
381.17

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

100.00%
100.00%
0.00%
0.00%
100.00%

0.00
0.00
51.62
136.35
0.00

0.00
0.00
1,123.25
329.97
0.00

0.00%
0.00%
100.00%
100.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
100.00%
14.35%
0.00%
0.00%
0.00%

Metrado
0.00
26.85
92.24
8.20
107.77

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

Costo

0.00
5,975.47
2,487.71
2,079.11
4,454.13

0.00%
85.65%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
100.00%

Metrado
0.00

Costo

%
0.00

0.00%

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

580.34
109.75
4.12

3,865.06
2,255.36
1,857.50

100.00%
100.00%
100.00%

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

264.20
31.32
1.57

1,759.57
643.63
814.69

100.00%
100.00%
100.00%

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%

102.86
17.06
2.47

622.30
693.32
1,117.08

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

14.00
12.00
1.00
335.80
189.63
14.70

5,259.24
4,322.76
697.75
6,420.50
7,186.98
596.09

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

15.19
18.78
77.53
139.52
0.00

418.94
588.75
1,687.05
337.64
0.00

33.58%
31.35%
100.00%
100.00%
0.00%

100.00%
100.00%
66.42%
68.65%
0.00%
0.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
75.86%
50.00%
0.00%
0.00%
0.00%

Metrado
12.89
7.74
44.24
3.94
84.00

Costo
368.65
1,722.54
1,193.15
998.99
3,471.72

%
24.14%
50.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

50.00%
68.74%
68.25%
100.00%
100.00%

247.08
7.49
179.86
0.00
0.00

1,494.83
3,239.50
1,084.56
0.00
0.00

50.00%
31.26%
31.75%
0.00%
0.00%

61.38%
66.19%
70.08%

851.41
69.77
5.70

5,134.00
2,481.02
2,505.49

38.62%
33.81%
29.92%

54.75%
55.48%
49.41%

165.30
15.00
1.28

1,100.90
308.25
577.09

45.25%
44.52%
50.59%

100.00%
99.60%
61.26%

0.00
0.71
741.96

0.00
34.68
4,474.02

0.00%
0.40%
38.74%

100.00%
50.39%
50.00%

0.00
3.20
0.24

0.00
65.76
124.54

0.00%
49.61%
50.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

100.00%
49.24%
86.87%
100.00%

0.00
46.07
75.11
0.00

0.00
649.13
500.23
0.00

0.00%
50.76%
13.13%
0.00%

0.00%
0.00%
0.00%

252.52
25.15
4.56

1,527.75
1,022.10
2,062.31

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

14.00
12.00
6.00
622.40
272.87
35.10

5,259.24
3,894.12
2,161.38
11,900.29
10,341.77
1,423.31

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
190.72

0.00
732.36

0.00%
100.00%

100.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
75.86
57.12
72.82
190.72
78.21

Costo
2,092.22
1,790.71
1,584.56
461.54
452.05

%
100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%
0.00%
0.00%

53.71
44.68
131.50
11.98
150.83

1,536.11
9,943.53
3,546.56
3,037.53
6,233.80

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

443.25
22.85
1185.00
25.00
6.25

2,681.66
9,882.85
7,145.55
820.25
2,782.56

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

2064.22
197.20
18.49

12,447.25
7,012.43
8,127.46

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

266.04
51.30
1.92

1,771.83
1,054.22
865.63

100.00%
100.00%
100.00%

25.62

12,376.51

100.00%

0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%

Metrado
243.98
2250.23

Costo
11,918.42
13,568.89

%
100.00%
100.00%

0.00%
0.00%
0.00%

127.76
15.51
0.78

850.88
318.73
404.75

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%

87.30
87.30
621.98
11.35

3,221.37
1,230.06
4,142.39
5,589.31

100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

159.40
21.96
3.42

964.37
892.45
1,546.73

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

13.00
7.00
500.70
272.87
23.15

5,725.98
1,465.38
9,573.38
10,341.77
938.73

100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado

Costo

0.00
69.84

0.00
268.19

0.00%
100.00%

11.41
21.60
12.96
18.96
26.07

314.69
677.16
282.01
45.88
150.68

100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%
0.00%
0.00%

14.40
28.85
82.42
6.18
69.84

411.84
6,420.57
2,222.87
1,566.94
2,886.49

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%

152.92
8.64

925.17
3,736.89

100.00%
100.00%

0.00%
0.00%
0.00%

425.93
44.60
2.98

2,568.36
1,585.98
1,309.89

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

191.76
16.92
1.27

1,277.12
347.71
572.58

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

3.98
177.25
452.79

1,922.66
8,658.66
2,730.32

100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%

Metrado
66.97
5.94
0.45

Costo
446.02
122.07
233.51

%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

3.00
10.00
10.00
341.40
179.07
25.50

1,898.58
2,989.80
2,511.90
6,527.57
6,786.75
1,034.03

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
100.00%
100.00%
100.00%
100.00%
19.18%

Metrado
0.00
0.00
0.00
0.00
128.40

Costo
0.00
0.00
0.00
0.00
5,306.77

%
0.00%
0.00%
0.00%
0.00%
80.82%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

100.00%
0.00%
0.00%

0.00
24.00
24.00

0.00
92.16
92.16

0.00%
100.00%
100.00%

0.00%
0.00%

34.70
1.80

1,109.01
30.76

100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
34.70
34.70
25.25
1.80

Costo
610.03
280.38
1,033.48
62.75

%
100.00%
100.00%
100.00%
100.00%

44.70

1,278.42

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%

12.96
11.28
666.80

5,605.33
491.81
4,034.14

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

6.05
60.48
871.16

917.72
1,404.35
1,576.80

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

3.53
49.26
276.65

1,368.09
1,729.03
1,842.49

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

4.31
86.27
563.06

1,894.50
3,067.76
3,395.25

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

2.40
36.00
2769.18

1,159.39
1,758.60
16,698.16

100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%

Metrado
10.90
99.30
446.24

Costo
4,224.40
2,931.34
2,655.13

%
100.00%
100.00%
100.00%

14.52

722.22

100.00%

0.00%
0.00%

74.28
137.98

1,660.16
2,003.47

100.00%
100.00%

58.00%
100.00%
100.00%

21.00
0.00
0.00

630.00
0.00
0.00

42.00%
0.00%
0.00%

100.00%

0.00

0.00

0.00%

100.00%

0.00

0.00

0.00%

100.00%

0.00

0.00

0.00%

0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
100.00%
100.00%
100.00%
100.00%
100.00%

Metrado
0.00
0.00
0.00
0.00
0.00

Costo

%
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

100.00%

0.00

0.00

0.00%

0.00%

77.01

809.38

100.00%

0.00%

26.01

585.23

100.00%

100.00%

0.00

0.00

0.00%

0.00%

590.96

86,995.22

100.00%

0.00%

94.10

2,906.75

100.00%

0.00%

94.10

4,177.10

100.00%

0.00%

968.20

29,752.79

100.00%

100.00%

0.00

0.00

0.00%

0.00%

44.81

177.45

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

100.00%

0.00

0.00

0.00%

0.00%

122.55

9,257.43

100.00%

0.00%
0.00%
0.00%

51.24
21.06
55.80

7,684.46
2,477.29
6,538.09

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

116.20
533.80
67.60

5,771.65
24,277.22
2,966.96

100.00%
100.00%
100.00%

0.00%
0.00%

16.00
64.00

1,474.72
810.24

100.00%
100.00%

0.00%
0.00%

22.00
242.36

610.50
52,815.09

100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

0.00%
0.00%
0.00%
0.00%

Metrado

Costo

125.30

3,588.59

100.00%

1099.07
695.62
590.96
570.83

10,704.94
6,921.42
7,251.08
7,004.08

100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%

Metrado
919.02
257.81

Costo
11,276.38
3,163.33

%
100.00%
100.00%

0.00%

100.80

1,281.17

100.00%

0.00%
0.00%
0.00%

116.20
533.80
67.60

926.11
4,254.39
538.77

100.00%
100.00%
100.00%

0.00%

6.80

139.81

100.00%

100.00%

0.00

0.00

0.00%

100.00%

0.00

0.00

0.00%

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
100.00%

Metrado
0.00

100.00%

Costo

%
0.00

0.00%

0.00

0.00

0.00%

100.00%

0.00

0.00

0.00%

0.00%

32.47

341.26

100.00%

0.00%

26.01

585.23

100.00%

100.00%

0.00

0.00

0.00%

0.00%

389.74

57,373.63

100.00%

0.00%

87.70

2,709.05

100.00%

0.00%

87.70

3,893.00

100.00%

61.51%

250.30

7,691.72

38.49%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
100.00%

Metrado
0.00

0.00%

Costo

%
0.00

0.00%

31.67

125.41

100.00%

100.00%

0.00

0.00

0.00%

0.00%

124.20

9,382.07

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%

37.82
16.38
43.40

5,671.87
1,926.78
5,085.18

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

84.30
407.60
42.90

4,187.18
18,537.65
1,882.88

100.00%
100.00%
100.00%

0.00%
0.00%

12.00
48.00

1,106.04
607.68

100.00%
100.00%

0.00%
0.00%

9.00
166.64

249.75
36,314.19

100.00%
100.00%

0.00%

89.56

2,565.00

100.00%

0.00%

852.63

8,304.62

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
455.12
389.74
358.28
572.35
182.57

Costo
4,528.44
4,782.11
4,396.10
7,022.73
2,240.13

%
100.00%
100.00%
100.00%
100.00%
100.00%

74.40

945.62

100.00%

84.30
407.60
42.90

671.87
3,248.57
341.91

100.00%
100.00%
100.00%

0.00%

6.80

139.81

100.00%

0.00%

411.13

20,449.61

100.00%

0.00%
0.00%
49.85%

489.29
298.79
130.77

5,029.90
3,385.29
1,413.62

100.00%
100.00%
50.15%

0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
37.20%
0.00%

Metrado
168.80
57.78

Costo
1,740.33
784.07

%
62.80%
100.00%

0.00%

238.60

2,164.10

100.00%

0.00%

660.20

2,951.09

100.00%

0.00%

31.71

333.27

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%

59.80

1,345.50

100.00%

0.00%

169.86

4,241.40

100.00%

0.00%

241.20

35,507.05

100.00%

0.00%

351.64

10,805.90

100.00%

0.00%

180.53

16,563.63

100.00%

0.00%

27.63

109.41

100.00%

0.00%

23.94

735.68

100.00%

0.00%

70.90

10,632.87

100.00%

0.00%

47.33

2,350.88

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

Metrado
166.38

Costo
7,566.96

%
100.00%

0.00%
0.00%

12.00
48.00

1,106.04
607.68

100.00%
100.00%

0.00%

93.19

20,307.96

100.00%

0.00%

9.44

270.36

100.00%

489.29
289.79
145.92
260.77
268.80
51.06

4,765.68
2,883.41
1,790.44
3,199.65
3,298.18
626.51

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

70.90

901.14

100.00%

47.33
166.38

377.22
968.33

100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%

Metrado
1.58
52.17
14.00

Costo
675.04
61.56
1,012.48

%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%

253.07

12,587.70

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

247.99
252.06
87.40
75.99
54.00

2,549.34
2,855.84
944.79
783.46
732.78

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%

67.50

612.23

100.00%

0.00%

308.20

1,377.65

100.00%

0.00%

216.08

31,809.14

100.00%

0.00%

216.08

6,640.14

100.00%

0.00%

98.31

9,019.94

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

Metrado
330.86

Costo
10,167.33

%
100.00%

0.00%

15.58

2,336.53

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

23.52
137.24
67.50
38.55
38.55

3,901.03
5,058.67
2,162.70
1,183.87
1,410.93

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

3.70
1.56
15.62

131.57
413.09
164.17

100.00%
100.00%
100.00%

0.00%
0.00%

5.00
20.00

460.85
253.20

100.00%
100.00%

0.00%

20.16

4,393.27

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

Metrado
38.24

Costo
707.82

%
100.00%

0.00%

5.12

146.64

100.00%

247.99
226.83
87.40

2,415.42
2,256.96
1,072.40

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%

Metrado
75.99
54.00

Costo
932.40
662.58

%
100.00%
100.00%

0.00%

31.16

396.04

100.00%

0.00%

109.25

18,559.39

100.00%

47.14%

217.33

10,809.99

52.86%

7.65%
0.00%
50.00%
50.00%
0.00%

361.95
323.66
66.94
127.79
57.78

3,720.85
3,667.07
723.62
1,317.46
784.07

92.35%
100.00%
50.00%
50.00%
100.00%

0.00%

154.60

1,402.22

100.00%

0.00%

573.80

2,564.89

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

Metrado
31.71

Costo
333.27

%
100.00%

0.00%

53.40

1,201.50

100.00%

0.00%

169.86

4,241.40

100.00%

0.00%

214.21

31,533.85

100.00%

0.00%

310.90

9,553.96

100.00%

0.00%

146.09

13,403.76

100.00%

0.00%

27.63

109.41

100.00%

0.00%

28.56

877.65

100.00%

0.00%

28.56

4,283.14

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%

Metrado
53.37
176.22

Costo
2,650.89
8,014.49

%
100.00%
100.00%

0.00%
0.00%

12.00
48.00

1,106.04
607.68

100.00%
100.00%

0.00%

93.19

20,307.96

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%

9.44

270.36

100.00%

0.00%

6.45

172.99

100.00%

391.95
323.66
136.62
439.90
255.57
48.84

3,817.59
3,220.42
1,676.33
5,397.57
3,135.84
599.27

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

57.12

726.00

100.00%

0.00%
0.00%

53.37
176.22

425.36
1,404.47

100.00%
100.00%

0.00%
0.00%
0.00%

1.35
44.71
12.00

576.77
52.76
867.84

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%

331.43

16,485.33

100.00%

0.00%
0.00%
100.00%
100.00%
0.00%

511.13
150.61
0.00
0.00
31.61

5,254.42
1,706.41
0.00
0.00
428.95

100.00%
100.00%
0.00%
0.00%
100.00%

0.00%

163.30

1,481.13

100.00%

0.00%

227.30

1,016.03

100.00%

0.00%

15.86

166.69

100.00%

0.00%

7.02

157.95

100.00%

0.00%

13.53

337.84

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

Metrado
149.54

Costo
22,013.78

%
100.00%

0.00%

204.17

6,274.14

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%

105.16

9,648.43

100.00%

0.00%

14.36

56.87

100.00%

0.00%

13.50

414.86

100.00%

0.00%

30.86

4,628.07

100.00%

0.00%

29.95

1,487.62

100.00%

0.00%
0.00%

12.00
48.00

1,106.04
607.68

100.00%
100.00%

3.00

653.76

100.00%

60.76
18.53

1,659.96
1,338.24

100.00%
100.00%

0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

Metrado
8.64

Costo
247.45

%
100.00%

511.13
150.61
90.38
86.21
124.11
31.61

4,978.41
1,498.57
1,108.96
1,057.80
1,522.83
387.85

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%

61.71

784.33

100.00%

0.00%

29.95

238.70

100.00%

0.00%
0.00%
0.00%

0.41
26.08
7.00

175.17
30.77
506.24

100.00%
100.00%
100.00%

0.00%

61.68

10,478.20

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
178.00

Costo
8,853.72

%
100.00%

262.36
195.60
133.88
178.33
65.58

2,697.06
2,216.15
1,447.24
1,838.58
889.92

100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%

105.40

955.98

100.00%

0.00%

401.34

1,793.99

100.00%

0.00%

24.92

261.91

100.00%

0.00%

11.04

248.40

100.00%

0.00%

87.30

2,179.88

100.00%

0.00%

211.36

31,114.31

100.00%

0.00%

248.60

7,639.48

100.00%

0.00%

75.61

6,937.22

100.00%

0.00%

29.33

116.15

100.00%

0.00%

12.68

389.66

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

12.66

1,898.62

100.00%

0.00%
0.00%

32.20
114.60

1,599.37
5,212.01

100.00%
100.00%

0.00%
0.00%

4.00
16.00

368.68
202.56

100.00%
100.00%

0.00%

57.53

12,536.94

100.00%

0.00%

7.68

219.96

100.00%

262.36
195.60
87.30
133.88
178.33

2,555.39
1,946.22
1,071.17
1,642.71
2,188.11

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

Metrado
61.47

Costo
754.24

%
100.00%

0.00%

25.32

321.82

100.00%

32.20
114.60

256.63
913.36

100.00%
100.00%

0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.79
26.08
7.00

337.52
30.77
506.24

100.00%
100.00%
100.00%

0.00%

234.42

11,660.05

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

343.13
148.29
34.14
53.38
25.61

3,527.38
1,680.13
369.05
550.35
347.53

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%

195.80

1,775.91

100.00%

0.00%

245.60

1,097.83

100.00%

0.00%

133.85

19,704.06

100.00%

0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

Metrado
68.72

Costo
2,122.76

%
100.00%

0.00%

68.72

3,050.48

100.00%

0.00%

10.80

331.88

100.00%

0.00%

18.54

1,701.05

100.00%

0.00%

281.19

1,113.51

100.00%

0.00%

219.73

16,598.40

100.00%

0.00%
0.00%

11.50
28.08

1,724.66
3,303.05

100.00%
100.00%

0.00%
0.00%

4.00
16.00

368.68
202.56

100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

Metrado
32.90

Costo
7,169.57

%
100.00%

0.00%

4.24

121.43

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

343.13
148.29
34.14
53.38

3,342.09
1,475.49
418.90
654.97

100.00%
100.00%
100.00%
100.00%

0.00%

25.61

325.50

100.00%

100.00%

0.00

0.00

0.00%

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

100.00%

0.00

0.00

0.00%

0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
100.00%

Metrado
0.00

0.00%

Costo

%
0.00

0.00%

146.02

1,534.67

100.00%

0.00%

13.00

292.50

100.00%

100.00%

0.00

0.00

0.00%

0.00%

415.53

61,170.17

100.00%

0.00%

91.50

2,826.44

100.00%

0.00%

915.00

40,616.85

100.00%

20.48%

469.94

14,441.26

79.52%

100.00%

0.00

0.00

0.00%

0.00%

73.35

290.47

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
100.00%

Metrado
0.00

0.00%

313.80

Costo

%
0.00

0.00%

23,704.45

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

163.52

24,523.09

100.00%

0.00%
0.00%

94.89
89.28

4,713.19
4,060.45

100.00%
100.00%

0.00%
0.00%

66.00
264.00

6,083.22
3,342.24

100.00%
100.00%

0.00%
0.00%

30.00
160.43

832.50
34,960.91

100.00%
100.00%

44.40

1,271.62

100.00%

1975.03
539.86
331.16
291.38

19,236.79
5,371.61
4,063.33
3,575.23

100.00%
100.00%
100.00%
100.00%

0.00%

0.00%

0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
498.95
186.84

Costo
6,122.12
2,292.53

%
100.00%
100.00%

327.05

4,156.81

100.00%

94.89
89.28

756.27
711.56

100.00%
100.00%

0.00
3574.40

0.00
1,358.27

0.00%
100.00%

689.01
101.87
13.11
50.25

3,927.36
2,633.34
3,173.80
3,684.33

100.00%
100.00%
100.00%
100.00%

7.20

527.90

100.00%

2412.30
91.35
251.40

20,263.32
584.64
1,608.96

100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%

Metrado
132.80
80.16

Costo
849.92
424.05

%
100.00%
100.00%

100.00%
25.00%

0.00
827.92

0.00
2,963.95

0.00%
75.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%

220.78
1103.90
220.78

5,969.89
2,715.59
1,852.34

100.00%
100.00%
100.00%

0.00%
0.00%

27.59
110.16

7,305.83
3,917.29

100.00%
100.00%

0.00%
0.00%

221.76
891.29

6,331.25
36,070.51

100.00%
100.00%

26.94%
0.00%
0.00%

22509.00
4478.58
76772.43

161,614.62
23,826.05
604,966.75

73.06%
100.00%
100.00%

45.00%

1039.10

3,719.98

55.00%

33.99%
0.00%

252.50
1889.25

6,827.60
4,647.56

66.01%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
29.03%

Metrado
352.02

Costo
2,953.45

%
70.97%

0.00%
0.00%

499.20
1868.25

4,802.30
75,608.08

100.00%
100.00%

0.00%
0.00%

20.60
6.51

617.18
2,751.13

100.00%
100.00%

0.00%
0.00%

1.00
1.00

5,000.00
1,060.00

100.00%
100.00%

0.00%

632.00

3,678.24

100.00%

0.00%

1092.90

6,371.61

100.00%

0.00%

314.00

1,124.12

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

92.05
92.05
259.75
89.90
494.20

2,489.03
772.30
9,236.71
23,805.52
5,194.04

100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

0.00%
0.00%
0.00%

Metrado
25.70

Costo
149.83

%
100.00%

12.90
5.00
16.00

736.07
187.30
541.44

100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%

Metrado
28.00
27.65

Costo
587.44
1,047.94

%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%

3.92
0.88
3.92
2.00

111.92
233.02
44.41
739.56

100.00%
100.00%
100.00%
100.00%

0.00%
0.00%

43.01
43.01

1,162.99
756.12

100.00%
100.00%

0.00%

24.96

1,108.22

100.00%

0.00%
0.00%
0.00%

18.00
9.48
305.20

7,952.22
270.65
1,822.04

100.00%
100.00%
100.00%

0.00%
0.00%

8.64
823.28

3,904.42
4,914.98

100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%

Metrado
3.78
51.30
823.28

Costo
1,739.06
1,895.02
4,914.98

%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

118.20
132.75
2.00
55.18
343.28

10,288.13
5,979.06
666.58
329.42
28,835.52

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%

118.20
132.75
2.00
0.84

2,726.87
2,398.79
79.88
33.55

100.00%
100.00%
100.00%
100.00%

0.00
705.04

0.00
2,524.04

0.00%
100.00%

705.04
95.20
95.20

1,734.40
2,574.21
798.73

100.00%
100.00%
100.00%

100.00%
0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%

25.54
20.83
32.08

6,762.99
777.38
1,424.35

100.00%
100.00%
100.00%

0.00%
0.00%

102.63
1026.27

31,165.65
26,385.40

100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%

0.16
2.19

48.59
62.52

100.00%
100.00%

0.00%
0.00%

10.37
279.58

4,770.93
1,669.09

100.00%
100.00%

0.00%
0.00%
0.00%

1.46
7.60
166.49

660.37
180.04
993.95

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

9.49
173.42
1329.79

4,366.06
6,406.13
7,938.85

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

6.05
82.33
1006.29

3,014.78
5,930.23
6,007.55

100.00%
100.00%
100.00%

23.40

914.71

100.00%

0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%

Metrado
6.10
93.75
0.56

Costo
245.53
1,966.88
34.56

%
100.00%
100.00%
100.00%

0.00%

51.44

1,949.58

100.00%

0.00%

119.40

6,348.50

100.00%

0.00%
0.00%
0.00%

238.80
86.24
90.94

2,705.60
1,160.79
885.76

100.00%
100.00%
100.00%

0.00%

39.77

5,854.54

100.00%

0.00%

576.01

14,872.58

100.00%

2.00
1.00

2,130.98
1,003.69

100.00%
100.00%

125.40

24,415.38

100.00%

0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%

Metrado
597.52
1508.70
1886.25

Costo
29,403.96
25,542.29
5,036.29

%
100.00%
100.00%
100.00%

0.00%

331.80

10,484.88

100.00%

0.00%

2.00

71.28

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

455.75

4,439.01

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

331.80
1508.70
20.60
97.84
16.40

2,617.90
11,496.29
164.18
810.12
135.79

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

300.00
15.00
15.00
15.00
35.00
11.00
21.00
21.00
2.00
1.00

66,000.00
16,500.00
5,550.00
10,650.00
1,575.00
23,320.00
5,880.00
52,500.00
1,400.00
1,238.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
200.00
14.00
14.00
14.00
35.00
21.00
21.00
1.00

Costo
44,000.00
15,400.00
5,180.00
9,940.00
1,575.00
52,500.00
5,880.00
1,238.00

%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

21.00
2.00
2.00

44,520.00
1,400.00
3,280.00

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

1.00
1.00
1.00

3,500.00
2,900.00
550.00

100.00%
100.00%
100.00%

0.00

0.00

0.00%

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
45.60
45.60
45.60
45.60
5.34

Costo
1,282.27
82.08
84.36
779.30
312.87

%
100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%

8.00
66.40
74.40

190.40
1,327.34
233.62

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

1.00
16.00
22.00

39.23
540.80
925.10

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

22.00
18.00
2.00

873.40
629.82
69.98

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

5.00
1.00
58.00
4.00
32.00

25.45
6.17
357.86
33.60
511.36

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

22.00
18.00
22.00

1,100.00
3,780.00
484.00

100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

Metrado
18.00

Costo
396.00

%
100.00%

0.00%
0.00%
0.00%
0.00%

22.00
18.00
22.00
18.00

201.52
164.88
135.74
111.06

100.00%
100.00%
100.00%
100.00%

100.00%
0.00%
0.00%

0.00
47.75
47.75

0.00
1,342.73
85.95

0.00%
100.00%
100.00%

100.00%
53.57%

0.00
10.40

0.00
128.54

0.00%
46.43%

72.22%
81.82%

5.00
4.00

404.10
306.48

27.78%
18.18%

0.00

0.00

0.00%

13.00
0.00

261.04
0.00

72.22%
0.00%

100.00%
27.78%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
92.86%
94.44%
33.33%
77.78%
100.00%

Metrado
1.00
1.00
4.00
8.00
0.00

Costo
17.08
16.72
75.28
129.60
0.00

%
7.14%
5.56%
66.67%
22.22%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
100.00%
77.78%
0.00%
0.00%
0.00%
0.00%

Metrado
0.00
4.00
10.00
6.00
2.00
2.00

Costo

0.00
74.32
590.10
163.98
75.52
26.36

0.00%
22.22%
100.00%
100.00%
100.00%
100.00%

1.00

308.52

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

180.36
179.87
180.36
121.30
55.51

651.10
5,057.94
324.65
2,073.02
3,252.33

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

9.10
13.35
32.10

364.73
617.84
1,684.61

100.00%
100.00%
100.00%

0.00%
0.00%

87.61
18.18

2,605.52
7,411.44

100.00%
100.00%

0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

118.50
45.00
30.00
60.00
15.00

21,851.40
340.20
226.80
872.40
1,067.10

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%

46.30

167.14

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

27.80
27.80
27.80
27.80
3.26

781.74
50.04
51.43
475.10
191.00

100.00%
100.00%
100.00%
100.00%
100.00%

6.30

149.94

100.00%

0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%

Metrado
40.00
46.30

Costo
799.60
145.38

%
100.00%
100.00%

0.00%
0.00%
0.00%

1.00
16.00
18.00

39.23
540.80
756.90

100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%

18.00
14.00
2.00

714.60
489.86
69.98

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

4.00
1.00
54.00
2.00
28.00

20.36
6.17
333.18
16.80
447.44

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%

18.00
14.00
18.00
14.00

900.00
2,940.00
396.00
308.00

100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%

18.00
14.00
18.00
14.00

164.88
128.24
111.06
86.38

100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%

Metrado
91.50
45.75
45.75

Costo
330.32
1,286.49
82.35

%
100.00%
100.00%
100.00%

0.00%
0.00%

48.70
42.80

896.57
529.01

100.00%
100.00%

92.86%
100.00%

1.00
0.00

80.82
0.00

7.14%
0.00%

50.00%

2.00

149.64

50.00%

7.00
9.00
0.00
11.00
1.00
0.00
0.00
0.00
16.00
14.00

140.56
171.90
0.00
183.92
18.82
0.00
0.00
0.00
297.28
826.14

50.00%
40.91%
0.00%
68.75%
16.67%
0.00%
0.00%
0.00%
88.89%
100.00%

50.00%
59.09%
100.00%
31.25%
83.33%
100.00%
100.00%
100.00%
11.11%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%

Metrado
6.00
2.00
4.00

Costo
163.98
75.52
52.72

%
100.00%
100.00%
100.00%

2.00

617.04

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%
0.00%
0.00%

110.88
109.83
110.48
67.21
37.21

400.28
3,088.42
198.86
1,148.62
2,180.13

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%

23.20
13.80

929.86
638.66

100.00%
100.00%

0.00%
0.00%

71.82
13.17

2,135.93
5,369.01

100.00%
100.00%

100.00%
3.36%
45.29%

0.00
142.06
531.49

0.00
57,913.60
3,093.27

0.00%
96.64%
54.71%

0.00%
0.00%
0.00%
0.00%

63.20
24.00
6.00
32.00

11,654.08
181.44
45.36
465.28

100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

Metrado
8.00

Costo
569.12

%
100.00%

0.00%

65.10

235.01

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

12.70
12.70
12.70
12.70
1.48

357.12
22.86
23.50
217.04
86.71

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

12.70
52.40
65.10

302.26
1,047.48
204.41

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%

2.00
4.00
17.00
17.00

78.46
135.20
714.85
833.85

100.00%
100.00%
100.00%
100.00%

0.00%

17.00

674.90

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
1.00

Costo
34.99

%
100.00%

2.00
10.00
18.00
9.00

10.18
61.70
111.06
143.82

100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%

17.00
17.00
17.00

850.00
632.40
374.00

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

17.00
17.00
17.00

155.72
202.64
104.89

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

39.60
39.60
39.60

142.96
1,113.55
71.28

100.00%
100.00%
100.00%

0.00%

39.60

729.04

100.00%

0.00%

17.00

1,302.54

100.00%

0.00%
0.00%
0.00%
0.00%

16.00
5.00
1.00
4.00

273.28
81.00
20.33
54.60

100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%

Metrado
4.00
2.00
1.00

Costo
74.32
118.02
27.33

%
100.00%
100.00%
100.00%

2.00

617.04

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

76.25
76.42
108.43
65.80
17.04

275.26
2,148.93
195.17
1,124.52
998.37

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%

4.10
30.50

164.33
1,411.54

100.00%
100.00%

0.00%
0.00%

22.28
6.28

662.61
2,560.17

100.00%
100.00%

0.00%
0.00%
0.00%

8.16
0.56
17.71

242.68
228.30
103.07

100.00%
100.00%
100.00%

0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
31.60
12.00
8.00
16.00
8.00

Costo
5,827.04
90.72
60.48
232.64
569.12

%
100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%

8.20

29.60

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

8.20
8.20
8.20
8.20
2.38

230.58
14.76
15.17
140.14
139.44

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

1.20
7.00
8.00

28.56
139.93
25.12

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

1.00
1.00
4.00

39.23
33.80
168.20

100.00%
100.00%
100.00%

0.00%

2.00

79.40

100.00%

0.00%

1.00

5.09

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%

Metrado
9.00
1.00
6.00

Costo
55.53
5.06
95.88

%
100.00%
100.00%
100.00%

0.00%
0.00%

2.00
2.00

100.00
44.00

100.00%
100.00%

0.00%
0.00%

2.00
2.00

18.32
12.34

100.00%
100.00%

0.00%
0.00%
0.00%

21.05
21.05
21.05

75.99
591.93
37.89

100.00%
100.00%
100.00%

0.00%

5.05

92.97

100.00%

0.00%

2.00

153.24

100.00%

1.00
14.00
1.00

19.10
239.12
16.20

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%

Metrado
2.00
2.00

Costo
118.02
54.66

%
100.00%
100.00%

1.00

308.52

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%
0.00%
0.00%

38.18
37.99
36.74
79.20
5.44

137.83
1,068.28
66.13
1,353.53
318.73

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%

34.30

1,587.40

100.00%

0.00%
0.00%
0.00%

20.38
0.43
64.94

606.10
175.30
377.95

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

47.40
18.00
12.00
24.00
6.00

8,740.56
136.08
90.72
348.96
426.84

100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

Metrado
21.68

Costo
78.26

%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

16.10
16.10
16.10
16.10
1.88

452.73
28.98
29.79
275.15
110.15

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

9.10
12.58
21.68

216.58
251.47
68.08

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%

1.00
4.00
3.00
1.00

39.23
135.20
126.15
53.95

100.00%
100.00%
100.00%
100.00%

0.00%
0.00%

4.00
3.00

158.80
104.97

100.00%
100.00%

0.00%
0.00%

2.00
2.00

10.18
12.34

100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%

Metrado
10.00
2.00
6.00

Costo
61.70
16.80
95.88

%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

3.00
1.00
2.00

150.00
355.56
420.00

100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%

Metrado
3.00
2.00

Costo
66.00
44.00

%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

3.00
1.00
2.00
3.00
2.00

27.48
9.16
18.32
18.51
12.34

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

104.75
21.05
21.05

378.15
591.93
37.89

100.00%
100.00%
100.00%

72.10

1,327.36

100.00%

0.00%
0.00%

3.00
2.00

242.46
153.24

100.00%
100.00%

0.00%

1.00

74.82

100.00%

0.00%

5.00

95.50

100.00%

0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
1.00
3.00
53.00
2.00
4.00
3.00
2.00
1.00

Costo
17.08
50.16
858.60
40.66
74.32
177.03
75.52
13.18

%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

2.00

617.04

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

60.50
30.25
30.25
30.25
9.83

218.41
850.63
54.45
516.97
575.94

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%

21.18
4.39

629.89
1,789.67

100.00%
100.00%

0.00

0.00

0.00%

0.00%

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
100.00%
100.00%

Metrado
0.00
0.00

0.00%
0.00%

15.80
6.00

Costo

%
0.00
0.00

0.00%
0.00%

2,913.52
45.36

100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%

Metrado
4.00
8.00
2.00

Costo
30.24
116.32
142.28

%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

51.69
51.62
51.69
41.20
12.37

186.60
1,451.55
93.04
704.11
724.76

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%

18.20

842.30

100.00%

0.00%
0.00%

16.03
4.52

476.73
1,842.67

100.00%
100.00%

0.00%
0.00%
0.00%

8.61
0.58
47.40

256.06
236.45
275.87

100.00%
100.00%
100.00%

0.00%

38.50

7,099.40

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%

Metrado
15.00
10.00
20.00
5.00

Costo
113.40
75.60
290.80
355.70

%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

24.64
23.52
23.64
61.30
3.33

88.95
661.38
42.55
1,047.62
195.10

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%

21.20

981.14

100.00%

0.00%
0.00%
0.00%

13.12
0.91
48.00

390.19
370.98
279.36

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

31.60
12.00
8.00

5,827.04
90.72
60.48

100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%

0.00%

Metrado
6.00
4.00

Costo
87.24
284.56

%
100.00%
100.00%

70.30

253.78

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%
0.00%
0.00%

45.90
45.90
45.90
45.90
5.36

1,290.71
82.62
84.92
784.43
314.04

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

20.40
49.90
70.30

485.52
997.50
220.74

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%

3.00
5.00
1.00
12.00

117.69
169.00
42.05
588.60

100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

1.00
1.00
13.00

39.70
34.99
454.87

100.00%
100.00%
100.00%

0.00%
0.00%

25.00
5.00

127.25
30.85

100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%

Metrado
13.00
4.00
10.00

Costo
80.21
33.60
159.80

%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

1.00
1.00
12.00
1.00
1.00

50.00
210.00
446.40
22.00
22.00

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

1.00
1.00
1.00
1.00
1.00

9.16
11.92
9.16
6.17
6.17

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

66.10
66.10
66.10

238.62
1,858.73
118.98

100.00%
100.00%
100.00%

0.00%

46.55

856.99

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

Metrado
19.55

Costo
241.64

%
100.00%

0.00%
0.00%

1.00
1.00

80.82
76.62

100.00%
100.00%

0.00%

1.00

74.82

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

22.00
5.00
2.00
1.00
21.00
4.00
1.00
1.00

420.20
83.60
32.40
18.58
1,239.21
109.32
37.76
13.18

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

5.00

1,542.60

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

134.92
134.70
202.14
95.07
19.54

487.06
3,787.76
363.85
1,624.75
1,144.85

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%

24.69
38.72

989.58
2,032.03

100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%

Metrado
17.69
5.64

Costo
526.10
2,299.26

%
100.00%
100.00%

0.00%
0.00%
0.00%

26.04
1.36
98.16

774.43
554.43
571.29

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

45.70
18.00
12.00
2.00
6.00
24.30

8,427.08
136.08
90.72
29.08
426.84
1,700.03

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00

0.00

0.00%

125.50
125.50
125.50
125.50

3,529.06
225.90
232.18
2,144.80

100.00%
100.00%
100.00%
100.00%

100.00%
0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%

Metrado
14.68

Costo
860.10

%
100.00%

68.10
150.70
218.80

1,620.78
3,012.49
687.03

100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%
0.00%

3.00
43.00
30.00
30.00

117.69
1,453.40
1,261.50
1,471.50

100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

44.00
30.00
30.00

1,746.80
1,049.70
1,049.70

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%

15.00
56.00
15.00
56.00

76.35
345.52
126.00
894.88

100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

30.00
30.00
6.00
8.00
30.00
30.00
30.00

1,500.00
6,300.00
2,133.36
1,440.00
1,116.00
660.00
660.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

30.00
30.00
6.00
8.00
30.00
30.00
30.00

274.80
274.80
54.96
95.36
357.60
185.10
185.10

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

30.75%
0.00%
0.00%

292.85
211.45
211.45

1,057.19
380.61
5,945.97

69.25%
100.00%
100.00%

100.00%
49.54%

0.00
113.07

0.00
1,397.55

0.00%
50.46%

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

100.00%

0.00

0.00

0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
100.00%
100.00%
40.00%
26.37%
100.00%
58.93%
56.25%

Metrado
0.00
0.00
27.00
134.00
0.00
46.00
35.00

Costo
0.00
0.00
451.44
2,170.80
0.00
627.90
650.30

%
0.00%
0.00%
60.00%
73.63%
0.00%
41.07%
43.75%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
16.18%
0.00%
16.67%
38.89%

Metrado
57.00
2.00
25.00
11.00

Costo
3,363.57
54.66
944.00
144.98

%
83.82%
100.00%
83.33%
61.11%

21.00

6,478.92

100.00%

81.04
44.07
19.18
121.30
32.90

292.55
1,239.25
34.52
2,073.02
1,927.61

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%

48.65

1,949.89

100.00%

0.00%
0.00%

45.59
13.78

1,355.85
5,617.69

100.00%
100.00%

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

86.90
33.00
22.00
44.00
11.00
641.37

16,024.36
249.48
166.32
639.76
782.54
2,013.90

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%

465.84

1,681.68

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

465.84
465.84
465.84
465.84
20.96

13,099.42
838.51
861.80
7,961.21
1,228.05

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%

43.70
42.31
5.00
22.50

1,040.06
763.70
118.00
449.78

100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
465.84
17.00
2.00
17.00
4.00

Costo
1,462.74
665.21
70.26
444.21
156.92

%
100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

3.00
2.00
2.00
4.00
3.00
1.00
1.00
13.00
3.00
2.00
3.00
1.00
4.00

15.27
11.74
8.34
22.36
18.51
4.07
6.17
80.21
44.82
118.60
43.32
14.44
59.32

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

627.36
627.36
56.00
627.36
154.93

2,264.77
17,641.36
3,281.04
1,129.25
1,914.93

100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%

Metrado
148.79
323.64
627.36

Costo
6,886.00
12,971.49
1,969.91

%
100.00%
100.00%
100.00%

0.00%
0.00%

1.00
1.00

80.82
76.62

100.00%
100.00%

0.00%

1.00

74.82

100.00%

0.00%

2.00

44.16

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

35.28
45.86
148.95
33.77
689.14
14.00

127.36
2,686.94
4,429.77
13,767.02
4,010.79
4,729.20

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

116.16
65.25
132.80

419.34
1,834.83
239.04

100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%

Metrado
30.59
43.08

Costo
522.78
2,524.06

%
100.00%
100.00%

0.00%
0.00%

29.20
49.60

1,170.34
2,603.01

100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%

48.80
18.91

1,451.31
7,709.04

100.00%
100.00%

0.00%
0.00%
0.00%

33.20
3.66
175.44

987.37
1,492.07
1,021.06

100.00%
100.00%
100.00%

0.00%

122.00

1,579.90

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.00
182.80
7.50
2.00
1.00
2.00
14.00
12.00
2.00
1.00
1.00
1.00

1,600.00
1,818.86
57.90
675.60
887.80
175.60
171.36
146.88
318.48
1,700.00
1,500.00
300.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

Metrado
1.00

Costo
255.71

%
100.00%

63.38%
38.89%
0.00%
0.00%
0.00%
0.00%
17.39%
14.29%

52.00
44.00
4.00
12.00
16.00
72.00
38.00
12.00

3,722.16
4,053.72
230.92
805.56
1,246.88
4,685.76
4,673.24
1,067.16

36.62%
61.11%
100.00%
100.00%
100.00%
100.00%
82.61%
85.71%

100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%

0.00
0.00
1.00
70.00
25.00
40.00
1.00
0.00
0.00

0.00
0.00
925.14
8,068.90
2,091.75
1,748.80
1,285.16
0.00
0.00

0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%

Metrado
72.00
70.00
14.00
72.00

Costo
16,597.44
14,596.40
1,461.46
8,169.84

%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

1.00

1,132.63

100.00%

48.96%
33.33%
0.00%
0.00%
0.00%
27.27%
22.22%

49.00
32.00
8.00
10.00
48.00
24.00
7.00

3,507.42
2,948.16
623.44
1,450.70
3,123.84
2,951.52
622.51

51.04%
66.67%
100.00%
100.00%
100.00%
72.73%
77.78%

100.00%
0.00%
0.00%
0.00%
100.00%
50.00%

0.00
1.00
20.00
28.00
0.00
1.00

0.00
925.14
874.40
1,224.16
0.00
55.57

0.00%
100.00%
100.00%
100.00%
0.00%
50.00%

0.00%
0.00%
0.00%

48.00
48.00
9.00

11,064.96
10,008.96
939.51

100.00%
100.00%
100.00%

0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

Metrado
48.00

Costo
5,446.56

%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

62.00
20.00
12.00
2.00
2.00
4.00
20.00
24.00
46.00
3.00

4,437.96
1,842.60
692.76
134.26
211.82
577.96
1,301.60
2,951.52
5,795.54
266.79

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%

2.00
60.00
2.00
2.00

1,858.28
2,623.20
119.14
111.14

100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

32.00
28.00
3.00

7,376.64
5,838.56
313.17

100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%

Metrado
2.00
20.00

Costo
409.94
2,269.40

%
100.00%
100.00%

2.00

2,265.26

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

30.00
2.00
2.00
2.00

3,154.80
179.86
3,960.24
123.28

100.00%
100.00%
100.00%
100.00%

1.00

5,500.00

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

23.00
2.00
8.00
3.00
2.00
15.00
1.00
5.00

1,646.34
141.56
461.84
201.39
129.32
1,844.70
296.58
444.65

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%

1.00
40.00

812.14
1,089.20

100.00%
100.00%

2.00

461.04

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
4.00
6.00
7.00
2.00
5.00
4.00
2.00

Costo
834.08
2,008.86
917.14
320.04
521.95
819.88
328.26

%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%

1.00
1.00

133.11
89.93

100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

31.00
9.00
1.00
14.00
2.00
2.00
9.00
1.00
28.00
4.00

2,218.98
829.17
117.02
808.22
134.26
290.14
585.72
92.11
3,443.44
355.72

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
1.00
1.00
40.00
10.00
1.00

Costo
1,548.82
850.14
3,346.80
437.20
59.57

%
100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%
0.00%
0.00%

17.00
11.00
4.00
3.00
9.00

3,918.84
2,293.72
417.56
614.91
1,021.23

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

56.00
16.00
6.00
4.00
4.00
16.00
32.00
6.00

4,008.48
1,474.08
346.38
268.52
580.28
1,041.28
3,935.36
533.58

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

1.00
1.00
145.00
5.00
1.00

1,445.82
850.14
22,514.15
218.60
59.57

100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

32.00
24.00
6.00
16.00

7,376.64
5,004.48
626.34
1,815.52

100.00%
100.00%
100.00%
100.00%

1.00

1,132.63

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

32.00
13.00
3.00
4.00
1.00
2.00
13.00
16.00
4.00

2,290.56
1,197.69
173.19
268.52
77.93
290.14
846.04
1,967.68
355.72

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

1.00
28.00
1.00

956.14
1,224.16
55.57

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%

Metrado
20.00
12.00
4.00
13.00

Costo
4,610.40
2,502.24
417.56
1,475.11

%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

21.00
1.00
1.00
1.00
1.00
9.00
1.00
1.00
1.00
9.00

1,503.18
70.78
92.13
117.02
57.73
604.17
65.08
92.11
64.66
1,106.82

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.00
1.00
1.00
20.00
20.00
42.00
2.00

512.79
474.79
472.72
544.60
544.60
1,143.66
111.14

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%

12.00

2,502.24

100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%

Metrado
1.00
9.00
1.00
1.00

Costo
160.02
1,844.73
164.13
113.47

%
100.00%
100.00%
100.00%
100.00%

20.83%
0.00%
13.89%
19.44%
5.56%
16.67%
17.09%
0.00%

76.00
36.00
31.00
29.00
17.00
25.00
97.00
15.00

5,440.08
2,548.08
1,789.63
1,946.77
2,466.19
1,616.50
11,929.06
1,333.95

79.17%
100.00%
86.11%
80.56%
94.44%
83.33%
82.91%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.00
3.00
2.00
38.00
30.00
66.00
3.00

1,450.82
2,436.42
1,762.28
2,404.26
1,311.60
2,885.52
178.71

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Metrado
12.00
24.00
36.00
15.00
60.00
30.00

Costo
2,766.24
5,004.48
5,760.72
1,565.85
12,298.20
4,923.90

%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

Metrado

Costo

0.00%
0.00%
0.00%
0.00%

33.00
16.00
6.00
8.00

3,922.71
4,938.08
940.80
12,379.92

100.00%
100.00%
100.00%
100.00%

0.00%
0.00%

22.00
33.00

8,255.72
12,639.66

100.00%
100.00%

0.00%
0.00%
0.00%
0.00%

1.00
1.00
1.00
1.00

71.58
57.73
122.98
88.93

100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%

1.00
1.00
18.00
3.00

509.52
6,660.00
528.84
182.94

100.00%
100.00%
100.00%
100.00%

1.00

208.52

100.00%

0.00%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%
0.00%

Metrado
1.00

Costo
104.39

%
100.00%

0.00%

1.00

58,000.00

100.00%

0.00%
0.00%

28.80
28.80

812.45
812.45

100.00%
100.00%

0.00%
0.00%

12.00
1.00

1,062.00
250.00

100.00%
100.00%

0.00%
0.00%

200.00
200.00

5,756.00
5,756.00

100.00%
100.00%

0.00%
0.00%

6.00
100.00

663.30
1,530.00

100.00%
100.00%

0.79

640,630.62

78.55%

21.45%
29.42%

5,842,201.17

649,415.26
296,709.45

70.58%

ONVENCION-CUSCO"

Valorizacin Acumulada

Saldo por Valorizar


%

29.42%

Metrado

Costo
129,269.56
50,017.94
6,967,613.37

70.58%

MUNIC

VAL
OBRA

"MEJORAMIENTO DE LOS SERV

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJECUCION DE O
Item

DESCRIPCION
1
1.02

01.02.01.04
01.02.01.04.01
01.02.01.04.04
01.02.01.05
01.02.01.05.01
01.02.01.05.02
01.02.01.05.03
01.02.01.07
01.02.01.07.01
01.02.01.07.02
01.02.01.07.03
01.02.01.11
01.02.01.11.04
01.02.01.11.05
01.02.01.11.06

OBRAS DE CONCRETO ARMADO


BLOQUES PRIMARIA
CONCRETO ARMADO
ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS
ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION
COLUMNAS
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
VIGAS
CONCRETO EN VIGAS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
ESTRUCTURAS METALICAS Y COBERTURAS
TIJERAL DE METAL TIPO 01
COBERTURA CON PLANCHA ONDULINE
CUMBRERA ONDULINE

Und.

Metrado

Precio
Unitario

kg
m2

1946.17
40.07

6.05
32.81

kg
m2
m3

640.20
12.42
1.86

6.03
35.56
439.56

m3
m2
kg

9.42
18.62
3056.07

483.08
48.85
6.03

und
m2
ML

30.00
54.00
13.90

440.46
37.90
40.55

1.03
01.03.01.02
01.03.01.02.01
01.03.01.02.04
01.03.01.02
01.03.01.03.01
01.03.01.04
01.03.01.04.04
01.03.01.04.05
01.03.01.05
01.03.01.05.02
01.03.01.05.03
01.03.01.07
01.03.01.07.01
01.03.01.07.02
01.03.01.07.03
01.03.01.09
01.03.01.09.01
01.03.01.09.02
01.03.01.09.03
01.03.01.09.04
01.03.01.11
01.03.01.11.03
01.03.01.11.05
01.03.01.11.06
1.1
01.10.01.01
01.10.01.01.01
01.10.01.01.02
01.10.01.02
01.10.01.02.01
01.10.01.02.02
01.10.01.02.03

BLOQUES SECUNDARIA
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS)
RELLENO CON MATERIAL PROPIO
OBRAS DE CONCRETO SIMPLE
SOLADO C S 1:10 e= 10 cm
CONCRETO ARMADO
ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2
COLUMNAS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
VIGAS
CONCRETO EN VIGAS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
LOSAS ALIGERADAS
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA
PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS
ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2
ESTRUCTURAS METALICAS Y COBERTURAS
TIJERAL DE METAL TIPO 02
COBERTURA CON PLANCHA ONDULINE
CUMBRERA ONDULINE
VIVIENDA DE DOCENTES
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS)
EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS
RELLENO CON MATERIAL PROPIO

m3

m3

130.30
48.72

27.58
21.76

m2

43.22

28.60

m2
m3

55.50
6.94

m2
m3

201.08
3.77

35.56
439.560

m3
m2
kg

23.27
11.86
4453.97

483.080
48.850
6.030

M2
m2
kg
m3

393.76
165.60
1649.78
36.37

36.90
14.090
6.660
492.450

und
m2
ML

19.00
14.06
2.65

339.55
37.90
40.55

m2
m2

285.65
285.65

0.74
3.84

m3
m3
m3

104.56
80.64
101.44

32.81
445.21

27.58
31.35
21.76

01.10.01.02.04
01.10.01.02.05

NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA


ELIMINACION DE MATERIAL CON MAQUINA

m2

m3

285.65

159.18

2.42
5.78

01.10.01.03
01.10.01.03.01
01.10.01.03.02
01.10.01.03.03
01.10.01.03.04

OBRAS DE CONCRETO SIMPLE


SOLADO C S 1:10 e= 10 cm
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G.
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m
CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS
CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4"

01.10.01.04
01.10.01.04.01
01.10.01.04.02
01.10.01.04.03
01.10.01.04.04
01.10.01.04.05
01.10.01.05
01.10.01.05.01
01.10.01.05.02
01.10.01.05.03
01.10.01.06
01.10.01.06.01
01.10.01.06.02
01.10.01.06.03
01.10.01.07
01.10.01.07.01
01.10.01.07.02
01.10.01.07.03
01.10.01.08
01.10.01.08.01
01.10.01.08.02
01.10.01.08.03
01.10.01.09
01.10.01.09.01
01.10.01.09.02
01.10.01.09.03
01.10.01.09.04
01.10.01.10

CONCRETO ARMADO
ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS
CONCRETO F'C= 210 KG/CM2 EN ZAPATAS
ACERO f'y = 4200 kg/cm, G 60 EN VIGAS DE CIMENTACION
ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2
COLUMNAS
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
COLUMNETAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO
CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2
VIGAS
CONCRETO EN VIGAS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
VIGAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO
CONCRETO EN VIGAS F'C= 210 KG/CM2
LOSAS ALIJERADAS
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA
PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS
ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIJERADA F'C = 210 KG/CM2
ESCALERAS

m2
m3
m2
m3
m2

121.69
49.05
225.980
34.400
285.650

28.60
222.55
26.970
253.550
41.330

kg
m3
kg
m2
m3

866.48
41.66
1,607.85
114.01
14.27

6.05
432.51
6.03
32.81
445.21

kg
m2
m3

2,987.29
277.52
24.27

6.03
35.56
439.56

kg
m2
m3

1,603.870
150.680
11.790

6.660
20.550
450.850

m3
m2
kg

28.46
214.97
7,015.92

483.080
48.85
6.03

kg
m2
m3

359.490
72.960
5.450

6.660
20.550
518.910

m2
m2
kg
m3

371.620
219.600
1,735.660
38.38

36.900
14.090
6.660
439.56

01.10.01.10.01
01.10.01.10.02
01.10.01.10.03

ACERO EN ESCALERAS FY= 4200 KG/CM2 GRADO 60


ENCOFRADO Y DESENCOFRADO EN ESCALERAS Y RAMPAS
CONCRETO EN ESCALERAS Y RAMPAS F'C= 210 KG/CM2
1.06

01.06.01
01.06.01.02
01.06.01.02.02
01.06.01.02.04
01.06.01.02.05
01.06.01.03
01.06.01.03.01
01.06.01.04
01.06.01.04.02
01.06.01.04.04
01.06.01.04.05
01.06.01.06
01.06.01.06.01
01.06.01.06.03
01.06.01.07
01.06.01.07.01
01.06.01.07.02
01.06.01.07.03
01.06.01.08
01.06.01.08.01
01.06.01.08.02
01.06.01.08.03
01.06.01.09
01.06.01.09.02
01.06.01.09.03
01.06.01.10
01.06.01.10.01

TPICO, SICOLOGA Y ADMINISTRACIN


OBRAS DE CONCRETO ARMADO (PABELLONES)
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS
NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA
ELIMINACION DE MATERIAL CON MAQUINA
OBRAS DE CONCRETO SIMPLE
SOLADO C S 1:10 e= 10 cm
CONCRETO ARMADO
CONCRETO F'C= 210 KG/CM2 EN ZAPATAS
ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2
COLUMNETAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS DE CONFINAMIENTO
CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2
VIGAS
CONCRETO EN VIGAS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
VIGAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO
CONCRETO EN VIGAS F'C= 210 KG/CM2
LOSAS ALIGERADAS
PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS
ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS ALIGERADAS
ESCALERAS
ACERO DE REFUERZO EN ESCALERAS Y RAMPAS Fy=4200 Kg/cm2

KG
m2
m3

276.46
18.39
2.50

35.56
40.64
452.26

m3
m2
m3

2.88
2.53
38.40

31.35
2.42
5.78

m2

25.90

28.60

m3
m2
m3

2.69
31.68
3.17

432.51
32.81
445.21

kg
m3

31.11
3.20

6.66
450.85

m3
m2
kg

2.58
35.99
761.02

483.08
48.85
6.03

kg
m2
m3

31.55
22.12
0.75

6.66
20.55
518.91

m2
kg

9.04
273.16

14.09
6.66

kg

29.94

6.05

1.07
01.07.01
01.07.01.01
01.07.01.01.01
01.07.01.01.02
01.07.01.02
01.07.01.02.01
01.07.01.02.02
01.07.01.02.03
01.07.01.02.04
01.07.01.02.05
01.07.01.03
01.07.01.03.01
01.07.01.03.02
01.07.01.03.03
01.07.01.03.04
01.07.01.03.05
01.07.01.04
01.07.01.04.01
01.07.01.04.02
01.07.01.04.03
01.07.01.04.04
01.07.01.04.05
01.07.01.05
01.07.01.05.01
01.07.01.05.02
01.07.01.05.03
01.07.01.06
01.07.01.06.01
01.07.01.06.02
01.07.01.06.03
01.07.01.07
01.07.01.07.01
01.07.01.07.02

TALLER DE CONFECCIN, ARTESANIAS E IDIOMAS


OBRAS DE CONCRETO ARMADO (PABELLONES)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS)
EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS
RELLENO CON MATERIAL PROPIO
NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA
ELIMINACION DE MATERIAL CON MAQUINA
OBRAS DE CONCRETO SIMPLE
SOLADO C S 1:10 e= 10 cm
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G.
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m
CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS
CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4"
CONCRETO ARMADO
ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS
CONCRETO F'C= 210 KG/CM2 EN ZAPATAS
ACERO f'y = 4200 kg/cm, G 60 EN VIGAS DE CIMENTACION
ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2
COLUMNAS
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
COLUMNETAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO
CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2
VIGAS
CONCRETO EN VIGAS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE VIGAS

m2
m2

25.28
57.40

0.740
3.840

m3
m3
m3
m2
m3

30.05
41.17
41.80
139.52
38.18

27.580
31.350
21.760
2.420
5.780

m2
m3
m2
m3
m2

40.90
15.49
44.24
3.93
84.00

28.600
222.550
26.970
253.550
41.330

kg
m3
kg
m2
m3

299.07
16.47
386.56
22.15
3.78

6.050
432.510
6.030
32.810
445.210

kg
m2
m3

1235.23
79.29
11.89

6.030
35.560
439.560

kg
m2
m3

622.38
33.69
2.33

6.660
20.550
450.850

m3
m2

22.97
179.72

483.080
48.850

01.07.01.07.03
01.07.01.08
01.07.01.08.01
01.07.01.08.02
01.07.01.08.03
01.07.01.09
01.07.01.09.01
01.07.01.09.02
01.07.01.09.03
01.07.01.09.04
01.07.01.11
01.07.01.11.03
01.07.01.11.04
01.07.01.11.05

ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS


VIGAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO
CONCRETO EN VIGAS F'C= 210 KG/CM2
LOSAS ALIGERADAS
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA
PLASTOFORMO DE 0.30X0.20X3 m PARA LOSAS ALIGERADAS
ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2
ESTRUCTURAS METALICAS Y COBERTURAS
TIJERAL DE METAL TIPO 08
CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm
COBERTURA CON PLANCHA ONDULINE
1.04

01.04.01
01.04.01.01
01.04.01.01.01
01.04.01.01.02
01.04.01.02
01.04.01.02.01
01.04.01.02.02
01.04.01.02.03
01.04.01.02.04
01.04.01.02.05
01.04.01.03
01.04.01.03.01
01.04.01.03.02
01.04.01.03.03
01.04.01.03.04
01.04.01.03.05
01.04.01.04
01.04.01.04.01

SALA DE CMPUTO PRIMARIA Y SECUNDARIA


OBRAS DE CONCRETO ARMADO (PABELLONES)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMIENTOS CORRIDOS (H=0.60 METROS)
EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS HASTA 1.50 METROS
RELLENO CON MATERIAL PROPIO
NIVELACION INTERIOR Y APISONADO CON COMPACTADORA VIBRATORIA
ELIMINACION DE MATERIAL CON MAQUINA
OBRAS DE CONCRETO SIMPLE
SOLADO C S 1:10 e= 10 cm
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G.
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m
CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS
CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E= 4"
CONCRETO ARMADO
ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS

kg

1173.60

6.030

kg
m2
m3

205.30
6.81
0.49

6.660
20.550
518.910

m2
m2
kg
m3

90.77
44.69
497.00
22.39

36.900
14.090
6.660
492.450

und
ML
m2

6.00
264.22
82.92

360.230
19.120
37.900

m2
m2

119.07
119.07

0.74
3.84

m3
m3
m3
m2
m3

35.04
51.34
50.6728
119.07
15.18

27.58
31.35
21.76
2.42
5.78

m2
m3
m2
m3
m2

38.68
17.9905
32.391
3.467125
88.2

28.60
222.55
26.97
253.55
41.33

kg

208.34

6.05

01.04.01.04.02
01.04.01.04.03
01.04.01.04.04
01.04.01.04.05
01.04.01.05
01.04.01.05.01
01.04.01.05.03
01.04.01.06
01.04.01.06.01
01.04.01.06.02
01.04.01.06.03
01.04.01.07
01.04.01.07.01
01.04.01.07.02
01.04.01.07.03
01.04.01.08
01.04.01.08.01
01.04.01.08.02
01.04.01.08.03
01.04.01.09
01.04.01.09.01
01.04.01.09.03
01.04.01.09.04
01.04.01.11
01.04.01.11.05
01.04.01.11.06
1.1
01.10.01
01.10.02
1
1.01
01.01.03
01.01.03.01

CONCRETO F'C= 210 KG/CM2 EN ZAPATAS


ACERO f'y = 4200 kg/cm, G 60 EN VIGAS DE CIMENTACION
ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2
COLUMNAS
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
COLUMNETAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS DE CONFINAMIENTO
CONCRETO EN COLUMNETA DE CONFINAMIENTO F'C = 210 KG/CM2
VIGAS
CONCRETO EN VIGAS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
VIGAS DE CONFINAMIENTO
ACERO f'y = 4200 kg/cm2, EN VIGAS DE CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO
CONCRETO EN VIGAS F'C= 210 KG/CM2
LOSAS ALIGERADAS
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA
ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2
ESTRUCTURAS METALICAS Y COBERTURAS
CORREA METALICA DE TUBO RECTANGULAR DE 40x60mm e=2.0mm
COBERTURA CON PLANCHA ONDULINE
LIMPIEZA PERMANENTE DE OBRA
LIMPIEZA PERMANENTE DE OBRA
LIMPIEZA FINAL DE LA OBRA
ARQUITECTURA
BLOQUES PRIMARIA
CIELORRASOS
CIELORRASO CON YESO

m3
kg
m2
m3

16.20
419.56
24.6
2.92

432.51
6.03
32.81
445.21

kg
m3

1369.00
10.806

6.03
439.56

kg
m2
m3

387.59
4.98
2.021

6.66
20.55
450.85

m3
m2
kg

14.9248
139.294
1411.96404

483.08
48.85
6.03

kg
m2
m3

90.61
7.7
0.6

6.66
20.55
518.91

m2
kg
m3

51.54
237.70
19.29

36.90
6.66
492.45

ML
m2

16.18
30.51

19.12
37.90

m2
m2

22485.60
9455.60

0.38
0.38

01.01.03.01.01
01.01.03.02
01.01.03.02.01
01.01.04
01.01.04.01
01.01.04.01.01

CIELORRASOS CON YESO


CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO
CIELORRASO CON BALDOSA ACSTICA
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 35MM. EN SERVICIOS HIGIENICOS, AUTAS Y PASADISO Y SEG. NIVEL
1.02
BLOQUES SECUNDARIA
01.02.03
CIELORRASOS
01.02.03.02
CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO
01.02.03.02.01
CIELORRASO CON BALDOSA ACSTICA
01.02.04
PISOS Y PAVIMENTOS
01.02.04.01
CONTRAPISOS
01.02.04.01.01
CONTRAPISO DE 35MM. EN SERVICIOS HIGIENICOS, AULAS Y PASADISO SEG NIVEL
1.03
SALA DE CMPUTO PRIMARIA Y SECUNDARIA
01.03.03.02
CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO
01.03.03.02.01
CIELORRASO CON BALDOSA ACSTICA

m2

26.41

24.97

m2

207.98

147.21

m2

1370.80

30.89

m2

126.21

147.21

m2

630.30

30.89

m2

26.20

147.21

1.04
01.05.03.02
01.05.03.02.01
1.06
01.06.03
01.06.03.01
01.06.03.01.01
01.06.03.02
01.06.03.02.01
01.09.03
01.09.03.01
01.09.03.01.01
01.09.03.02
01.09.03.02.01

SALON DE USO MULTIPLE


CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO
CIELORRASO CON BALDOSA ACSTICA
TPICO, SICOLOGA Y ADMINISTRACIN
CIELORRASOS
CIELORRASO CON YESO
CIELORRASOS CON YESO
CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO
CIELORRASO CON BALDOSA ACSTICA
1.09
VIVIENDA DE DOCENTES
CIELORRASOS
CIELORRASO CON YESO
CIELORRASOS CON YESO
CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO
CIELORRASO CON BALDOSA ACSTICA

32.79

147.21

m2

122.82

24.97

m2

5.30

147.21

m2

88.45

24.97

m2

57.27

147.21

13.65

12.360

m2
m3
kg

294.41
17.33
2055.23

29.74
407.67
5.82

m2
kg

230.54
516.76

m2
m3

53.58
5.87

7
7.01
07.01.02.02.01
07.01.03.04
07.01.03.04.01
07.01.03.04.02
07.01.03.04.03
07.02.03
07.02.03.04
07.02.03.04.01
07.02.03.04.03
07.03.03
07.03.03.04
07.03.03.04.01
07.03.03.04.02

INSTALACIONES SANITARIAS
BLOQUES PRIMARIA
TUBERIA PVC SAL DE 2"
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2
ACERO DE REFUERZO F'y = 4200 kg/cm2
7.02
BLOQUES SECUNDARIA
SISTEMA DE DRENAJE PLUVIAL
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOF. DE CANALES
ACERO DE REFUERZO F'y = 4200 kg/cm2
7.03
SALA DE CMPUTO PRIMARIA Y SECUNDARIA
SISTEMA DE DRENAJE PLUVIAL
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2

m2

29.74
5.82

29.74
407.67

07.03.03.04.03
07.04.03
07.04.03.03
07.04.03.03.01
07.04.03.03.02
07.04.03.03.03
07.05.03
07.05.03.03
07.05.03.03.01
07.05.03.03.02
07.05.03.03.03
07.06.01
07.06.01.04
07.06.01.04.01
07.06.01.04.02
07.06.01.04.03
07.07.01
07.07.01.03
07.07.01.03.01
07.07.01.03.02
07.07.01.03.03

ACERO DE REFUERZO F'y = 4200 kg/cm2


7.04
SALN DE USO MLTIPLE
SISTEMA DE DRENAJE PLUVIAL
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2
ACERO DE REFUERZO F'y = 4200 kg/cm2
7.05
TPICO, SICOLOGA Y ADMINISTRACIN
SISTEMA DE DRENAJE PLUVIAL
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2
ACERO DE REFUERZO F'y = 4200 kg/cm2
7.06
TALLER DE CONFECCIN, ARTESANIAS E IDIOMAS
SISTEMA DE DRENAJE PLUVIAL
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2
ACERO DE REFUERZO F'y = 4200 kg/cm2
7.07
BIBLIOTECA GENERAL
SISTEMA DE DRENAJE PLUVIAL
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOF. DE CANALES
CONCRETO F'C=175 kg/cm2
ACERO DE REFUERZO F'y = 4200 kg/cm2

kg

414.05

5.82

m2
m3
kg

35.24
5.75
455.06

29.74
407.67
5.82

m2
m3
kg

34.72
2.49
256.48

29.74
407.67
5.82

m2
m3
kg

21.11
3.67
348.29

29.74
407.67
5.82

m2
m3
kg

61.73
5.63
512.40

29.74
407.67
5.82

7.09
07.09.02
07.09.02.02
07.09.02.02.01
07.09.02.02.02
07.09.02.03
07.09.02.03.01
07.09.02.03.02
07.09.02.04
07.09.02.04.01
07.09.02.05
07.09.02.05.01
07.09.02.05.02
07.09.02.05.05

VIVIENDA DE DOCENTES
DESAGUE Y VENTILACION
REDES DE DERIVACION
TUBERIA PVC SAL DE 2"
TUBERIA PVC SAL 4"
SALIDA DE DESAGUE
SALIDA DESAGUE PVC SAL DE 4"
SALIDA DESAGUE PVC SAL DE 2"
SALIDAS DE VENTILACION
SALIDA PARA VENTILACION PVC SAL DE 2"
ACCESORIOS DE DESAGUE
YEE PVC SAL DE 4" a 2"
YEE PVC SAL 2"
CODO PVC SAL 4" X 90

COSTO DIRECTO
GASTOS GENERALES
GASTOS DE SUPERVICION
COSTO LIQUIDACION
ELABORACION EXPEDIENTE TECNICO
PRESUPUESTO TOTAL

m
m

54.00
24.00

18.41
12.360

pto
pto

35.00
50.00

80.820
76.620

pto

17.00

74.820

und
pza
pza

35.00
77.00
36.00

19.100
17.080
20.330

MUNICIPALIDAD DISTRITAL DE ECHARATI


GERENCIA DE INFRAESTRUCTURA
VALORIZACION POR MAYORES METRADOS

LOS SERVICIOS EDUCATIVOS DE LA I.E JOSE PIO AZA DE KORIBENI, DEL DISTRITO DE ECHARATI-LA CONV

CION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Parcial

Metrado

Costo

Valorizacin Actual

Metrado

11774.33
1314.70

1946.17
40.07

11774.33
1314.70

100%
100%

3860.39
441.51
817.58

640.20
12.42
1.86

3860.39
441.51
817.58

100%
100%
100%

4550.61
909.59
18428.10

9.42
18.62
3056.07

4550.61
909.59
18428.10

100%
100%
100%

13213.80
2046.60
563.65

30.00
0.00
0.00

13213.80
0.00
0.00

100%
0%
0%

Costo

54.00
13.90

Valorizacin A

Metrado

0%
0%

1946.17
40.07

0%
0%
0%

640.20
12.42
1.86

0%
0%
0%

9.42
18.62
3056.07

2,046.60
563.65

0%
100%
100%

30.00
54.00
13.90

3593.67
1060.15

130.30
48.72

3593.67
1060.15

100.00%
100%

0.0%
0%

130.30
48.72

1236.09

43.22

1236.09

100.00%

0.0%

43.22

1820.96
3089.76

55.50
6.94

1820.96
3089.76

100%
100%

0%
0%

55.50
6.94

7150.40
1657.14

201.08
3.77

7150.40
1657.14

100.00%
100.00%

0.0%
0.0%

201.08
3.77

11241.27
579.36
26857.44

23.270
11.860
4,453.970

11241.27
579.36
26857.44

100.00%
100.00%
100.00%

0.0%
0.0%
0.00%

23.27
11.86
4,453.97

14529.74
2333.30
10987.53
17910.41

393.760
165.600
1,649.780
36.370

14529.74
2333.30
10987.53
17910.41

100.00%
100.00%
100.00%
100.00%

0.0%
0.0%
0.0%
0.0%

393.76
165.60
1,649.78
36.37

6451.45
532.87
107.46

19.00
14.06
2.65

6451.45
532.87
107.46

100%
100%
100%

0%
0%
0%

19.00
14.06
2.65

211.38
1096.90

285.65
285.65

211.38
1096.90

100%
100%

0%
0%

285.65
285.65

104.56
80.64
101.44

2883.76
2528.06
2207.27

100.00%
100.00%
100.00%

0.0%
0.0%
0.0%

2,883.76
2,528.06
2,207.27

104.56
80.64
101.44

691.27
920.06

285.65
159.18

691.27
920.06

100.00%
100.00%

0%
0%

285.65
159.18

3,480.33
10,916.08
6,094.68
8,722.12
11,805.91

121.69
49.05
225.98
34.400
-

3480.33
10916.08
6094.68
8722.12
0.00

100.00%
100.00%
100.00%
100.00%
0.00%

0.0%
0.0%
0.00%
0.00%
0.00%

121.69
49.05
225.98
34.40
0.00

5,242.20
18,018.37
9,695.34
3,740.67
6,353.15

866.48
41.66
1,607.85
114.01
14.27

5242.20
18018.37
9695.34
3740.67
6353.15

100.00%
100.00%
100.00%
100.00%
100.00%

0.0%
0.0%
0.0%
0.0%
0.0%

866.48
41.66
1,607.85
114.01
14.27

18,013.36
9,868.61
10,668.12

2,987.29
277.52
24.27

18013.36
9868.61
10668.12

100.00%
100.00%
100.00%

0.0%
0.0%
0.0%

2,987.29
277.52
24.27

10,681.77
3,096.47
5,315.52

1,603.870
150.680
11.790

10681.77
3096.47
5315.52

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%

1603.87
150.68
11.79

13,748.46
10,501.28
42,306.00

28.46
214.97
7,015.92

13748.46
10501.28
42306.00

100.00%
100.00%
100.00%

0.00%
0.0%
0.0%

28.46
214.97
7015.92

2,394.20
1,499.33
2,828.06

359.490
72.96
5.45

2394.20
1499.33
2828.06

100.00%
100.00%
100.00%

0.00%
0.0%
0.0%

359.49
72.96
5.45

13,712.78
3,094.16
11,559.50
16,870.31

371.620
219.60
1735.66
38.38

13712.78
3094.16
11559.50
16870.31

100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.0%

371.62
219.60
1735.66
38.38

9,830.92
747.37
1,130.65

276.46
18.39
2.50

9830.92
747.37
1130.65

100.00%
100.00%
100.00%

0.0%
0.0%
0.0%

90.29
6.11
221.95

2.88
-

90.29
0.00
0.00

100.00%
0.00%
0.00%

0.0%
0.0%
0.0%

2.88
-

740.74

25.90

740.74

100.00%

0.0%

25.90

1,161.72
1,039.42
1,410.43

2.69
31.68
3.17

1161.72
1039.42
1410.43

100.00%
100.00%
100.00%

0.0%
0.0%
0.0%

2.69
31.68
3.17

0.0%
0.0%

207.17
1,441.28

0.00
0.00

0.00%
0.00%

1,246.93
1,758.21
4,588.95

0.00
0.00
0.00

0.00%
0.00%
0.00%

210.13
454.52
390.37

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.0%
0.0%
0.0%

127.37
1819.25

100.00%
100.00%

0.0%
0.0%

0.00

0.00%

0.0%

127.37
1,819.26
181.16

9.04
273.16
-

2.58
35.99
761.02

1,246.35
1,758.11
4,588.95

100.0%
100.0%
100.0%

276.46
18.39
2.50

2.58
35.99
761.02
9.04
273.16
-

18.71
220.42

25.28
-

18.71
0.00

100.00%
0.00%

0.0%
0.0%

25.28
-

828.72
1,290.68
909.65
337.64
220.68

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.0%
0.0%
0.0%
0.0%
0.0%

1,169.74
3,446.70
1,193.10
996.67
3,471.72

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.0%
0.0%
0.0%
0.0%
0.0%

1,809.36
7,122.57
2,330.95
726.87
1,682.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.0%
0.0%
0.0%
0.0%
0.0%

7,448.44
2,819.69
5,227.25

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.0%
0.0%
0.0%

4,145.05
692.33
1,050.48

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.0%
0.0%
0.0%

11,096.35
8,779.22

0.00
0.00

0.00%
0.00%

0.0%
0.0%

7,076.83

0.00

0.00%

0.0%

1,367.31
139.95
252.97

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.0%
0.0%
0.0%

3,349.34
629.68
3,310.03
11,026.61

6.67

0.00
0.00
0.00
3284.64

0.00%
0.00%
0.00%
29.79%

0.0%
0.0%
0.0%
0.0%

6.67

2,161.38
5,051.89
3,142.67

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.0%
0.0%
0.0%

88.11
457.23

0.00
0.00

0.00%
0.00%

119.07
119.07

88.11
457.23

100.0%
100.0%

119.07
119.07

966.31
1,609.51
1,102.64
288.15
87.74

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

35.04
36.34
-

966.31
1,139.26
-

100.0%
70.8%
0.0%
0.0%
0.0%

35.04
36.34
-

1,106.25
4,003.79
873.59
879.09
3,645.31

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

19.34
-

553.12
-

50.0%
0.0%
0.0%
0.0%
0.0%

19.34
-

1,260.45

0.00

0.00%

100.00

605.00

48.0%

100.00

7,005.10
2,529.97
807.13
1,300.01

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

6.19
319.56
14.60
-

2,677.24
1,926.95
479.03
-

38.2%
76.2%
59.3%
0.0%

6.19
319.56
14.60
-

8,255.09
4,749.89

0.00
0.00

0.00%
0.00%

300.00
-

1,809.00
-

21.9%
0.0%

300.00
-

2,581.37
102.34
911.17

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.0%
0.0%
0.0%

7,209.87
6,804.51
8,514.14

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.0%
0.0%
0.0%

603.46
157.25
300.14

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.0%
0.0%
0.0%

1,901.83
1,583.10
9,499.36

0.00
0.00
0.00

0.00%
0.00%
0.00%

309.36
1,156.33

0.00
0.00

0.00%
0.00%

8,544.53
3,593.13

0.00
0.00

0.00%
0.00%

20.00
11.79
1,060.00
-

738.00
5,805.99
402.80
-

38.8%
0.0%
61.1%
0.0%
0.0%
4.7%
0.0%

20.00
11.79
1,060.00
-

659.46

26.41

659.46

100.00%

0.0%

26.41

30,616.74

0.00

0.00%

0.0%

42,344.01

0.00

0.00%

0.0%

18,579.37

0.00

0.00%

0.0%

19,469.97

0.00

0.00%

3,856.90

0.00

0.00%

630.30

19,469.97

100.0%

0.0%

630.30

4,827.02

0.00

0.00%

0.0%

3,066.82

0.00

0.00%

0.0%

780.21

0.00

0.00%

0.0%

2208.60

100.00%

0.0%

0.00

0.00%

0.0%

168.71

13.65

168.71

100.00%

0.0%

13.65

8,755.75
7,064.92
11,961.44

294.41
17.33
2055.23

8755.75
7064.92
11961.44

100.00%
100.00%
100.00%

0.0%
0.0%
0.0%

294.41
17.33
2,055.23

6,856.26
3,007.54

230.54
516.76

6856.26
3007.54

100.00%
100.00%

0.0%
0.0%

230.54
516.76

1,593.47
2,393.02

0.00
0.00

0.00
0.00

0.00%
0.00%

0.0%
0.0%

2,208.60
8,430.72

88.45

88.45
-

2,409.77

0.00

0.00

0.00%

0.0%

1,048.04
2,344.10
2,648.45

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.0%
0.0%
0.0%

1,032.66
1,016.93
1,492.71

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.0%
0.0%
0.0%

627.77
1,494.31
2,027.05

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

1,835.78
2,295.18
2,982.17

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

10.60
1.83
174.00

315.24
746.04
1,012.68

50.2%
49.9%
50.0%

0.0%
0.0%
0.0%

10.60
1.83
174.00

994.14
296.64
2,828.70
3,831.00
1,271.94
668.50
1,315.16
731.88

54.00
24.00

994.14
296.64

100.00%
100.00%

0.0%
0.0%

54.00
24.00

35.00
50.00

2828.70
3831.00

100.00%
100.00%

0.0%
0.0%

35.00
50.00

17.00
0.00
35.00
77.00
36.00

1271.94

100.00%

0.0%

668.50
1315.16
731.88

100.00%
100.00%
100.00%

0.0%
0.0%
0.0%

17.00
35.00
77.00
36.00

8,276,948.93

499,431.35

6.03%

49,395.61

0.60%

920,060.23

55,516.46

6.03%

5,490.78

0.60%

420,363.64
70,863.00
183,142.87

25,364.75
4,275.88
11,050.85

6.03%
6.03%
6.03%

2,508.67
422.90
1,092.97

0.60%
0.60%
0.60%

9,871,378.67

595,639.29

6.03%

58,910.94

0.60%

DISTRITO DE ECHARATI-LA CONVENCION-CUSCO"

Valorizacin Acumulada
Costo

Saldo por Valorizar

Metrado

Costo

11774.33
1314.70

100%
100%

0.00
0.00

0.00
0.00

0%
0%

3860.39
441.51
817.58

100%
100%
100%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

4550.61
909.59
18428.10

100%
100%
100%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

13213.80
2046.60
563.65

100%
100%
100%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

3,593.67
1,060.15

100.0%
100%

0.00
0.00

0.0%
0%

1,236.09

100.0%

0.00

0.0%

1,820.96
3,089.76

100%
100%

0.00
0.00

0%
0%

7,150.40
1,657.14

100.0%
100.0%

0.00
0.00

0.00
0.00

0.0%
0.0%

11,241.27
579.36
26857.44

100.0%
100.0%
100.0%

0.00
0.00
0.00

0.00
0.00
0.00

0.0%
0.0%
0.00%

14,529.74
2,333.30
10,987.53
17,910.41

100.0%
100.0%
100.0%
100.0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

6,451.45
532.87
107.46

100%
100%
100%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

211.38
1,096.90

100%
100%

0.00
0.00

0.00
0.00

0%
0%

2,883.76
2,528.06
2,207.27

100.0%
100.0%
100.0%

0.00
0.00
0.00

0.00
0.00
0.00

0.0%
0.0%
0.0%

691.27
920.06

100.0%
100.0%

0.00
0.00

0.00
0.00

0.0%
0.0%

3,480.33
10,916.08
6094.68
8722.12
0.00

100.0%
100.0%
100.0%
100.0%
0.00%

0.00
0.00
0.00
0.00
285.65

0.00
0.00
0.00
0.00
11,805.91

0.00%
0.00%
0.00%
0.00%
100.00%

5,242.20
18,018.37
9,695.34
3,740.67
6,353.15

100.0%
100.0%
100.0%
100.0%
100.0%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

18,013.36
9,868.61
10,668.12

100.0%
100.0%
100.0%

0.00
0.00
0.00

0.00
0.00
0.00

0.0%
0.0%
0.0%

10681.77
3096.47
5315.52

100.0%
100.0%
100.0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

13748.46
10501.28
42306.00

100.0%
100.0%
100.0%

0.00
0.00
0.00

0.00
0.00
0.00

0.0%
0.0%
0.0%

2394.20
1499.33
2828.06

100.0%
100.0%
100.0%

0.00
0.00
0.00

0.00
0.00
0.00

0.0%
0.0%
0.0%

13712.78
3094.16
11559.50
16870.31

100.0%
100.0%
100.0%
100.0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.0%
0.00%
0.00%
0.00%

9830.92
747.37
1130.65

100.0%
100.0%
100.0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

90.29
-

100.0%
0.0%
0.0%

0.00
2.53
38.40

0.00
6.11
221.95

0.0%
100.0%
100.0%

740.74

100.0%

0.00

0.00

0.0%

1,161.72
1,039.42
1,410.43

100.0%
100.0%
100.0%

0.00
0.00
0.00

0.00
0.00
0.00

0.0%
0.0%
0.0%

0.0%
0.0%

31.11
3.20

207.17
1441.28

100.0%
100.0%

100.0%
100.0%
100.0%

0.00
0.00
0.00

0.58
0.10
0.00

0.0%
0.0%
0.0%

0.0%
0.0%
0.0%

31.55
22.12
0.75

210.13
454.52
390.37

100.0%
100.0%
100.0%

100.0%
100.0%

0.00
0.00

0.00
0.02

0.0%
0.0%

0.0%

29.94

181.16

100.0%

1,246.35
1,758.11
4,588.95
127.37
1,819.25
-

18.71
-

100.0%
0.0%

0.00
57.40

0.00
220.42

0.0%
100.0%

0.0%
0.0%
0.0%
0.0%
0.0%

30.05
41.17
41.80
139.52
38.18

828.72
1290.68
909.65
337.64
220.68

100.0%
100.0%
100.0%
100.0%
100.0%

0.0%
0.0%
0.0%
0.0%
0.0%

40.90
15.49
44.24
3.93
84.00

1169.74
3446.70
1193.10
996.67
3471.72

100.0%
100.0%
100.0%
100.0%
100.0%

0.0%
0.0%
0.0%
0.0%
0.0%

299.07
16.47
386.56
22.15
3.78

1809.36
7122.57
2330.95
726.87
1682.00

100.0%
100.0%
100.0%
100.0%
100.0%

0.0%
0.0%
0.0%

1235.23
79.29
11.89

7448.44
2819.69
5227.25

100.0%
100.0%
100.0%

0.0%
0.0%
0.0%

622.38
33.69
2.33

4145.05
692.33
1050.48

100.0%
100.0%
100.0%

0.0%
0.0%

22.97
179.72

11096.35
8779.22

100.0%
100.0%

0.0%

1173.60

7076.83

100.0%

0.0%
0.0%
0.0%

205.30
6.81
0.49

1367.31
139.95
252.97

100.0%
100.0%
100.0%

0.0%
0.0%
0.0%
29.8%

90.77
44.69
497.00
15.72

3349.34
629.68
3310.03
7741.96

100.0%
100.0%
100.0%
70.2%

0.0%
0.0%
0.0%

6.00
264.22
82.92

2161.38
5051.89
3142.67

100.0%
100.0%
100.0%

88.11
457.23

100.0%
100.0%

0.00
0.00

0.00
0.00

0.0%
0.0%

966.31
1,139.26
-

100.0%
70.8%
0.0%
0.0%
0.0%

0.00
15.00
50.67
119.07
15.18

0.00
470.25
1102.64
288.15
87.74

0.0%
29.2%
100.0%
100.0%
100.0%

553.12
-

50.0%
0.0%
0.0%
0.0%
0.0%

19.34
17.99
32.39
3.47
88.20

553.12
4003.79
873.59
879.09
3645.31

50.0%
100.0%
100.0%
100.0%
100.0%

605.00

48.0%

108.34

655.45

52.0%

3,284.64
-

2,677.24
1,926.95
479.03
-

38.2%
76.2%
59.3%
0.0%

10.01
100.00
10.00
2.92

4327.87
603.02
328.10
1300.01

61.8%
23.8%
40.7%
100.0%

1,809.00
-

21.9%
0.0%

1069.00
10.81

6446.09
4749.89

78.1%
100.0%

0.0%
0.0%
0.0%

387.59
4.98
2.02

2581.37
102.34
911.17

100.0%
100.0%
100.0%

0.0%
0.0%
0.0%

14.92
139.29
1411.96

7209.87
6804.51
8514.14

100.0%
100.0%
100.0%

0.0%
0.0%
0.0%

90.61
7.65
0.58

603.46
157.25
300.14

100.0%
100.0%
100.0%

38.8%
0.0%
61.1%

31.54
237.70
7.50

1163.83
1583.10
3693.38

61.2%
100.0%
38.9%

0.0%
0.0%

16.18
30.51

309.36
1156.33

100.0%
100.0%

4.7%
0.0%

21425.60
9455.60

8141.73
3593.13

95.3%
100.0%

738.00
5,805.99
402.80
-

659.46

100.0%

0.00

0.00

0.0%

0.0%

207.98

30616.74

100.0%

0.0%

1370.80

42344.01

100.0%

0.0%

126.21

18579.37

100.0%

100.0%

0.00

0.00

0.0%

0.0%

26.20

3856.90

100.0%

19,469.97

0.0%

32.79

4827.02

100.0%

0.0%

122.82

3066.82

100.0%

0.0%

5.30

780.21

100.0%

100.0%

0.00

0.00

0.0%

0.0%

57.27

8430.72

100.0%

168.71

100.0%

0.00

0.00

0.0%

8,755.75
7,064.92
11,961.44

100.0%
100.0%
100.0%

0.00
0.00
0.00

0.00
0.00
0.00

0.0%
0.0%
0.0%

6,856.26
3,007.54

100.0%
100.0%

0.00
0.00

0.00
0.00

0.0%
0.0%

0.0%
0.0%

53.58
5.87

1593.47
2393.02

100.0%
100.0%

2,208.60
-

0.0%

414.05

2409.77

100.0%

0.0%
0.0%
0.0%

35.24
5.75
455.06

1048.04
2344.10
2648.45

100.0%
100.0%
100.0%

0.0%
0.0%
0.0%

34.72
2.49
256.48

1032.66
1016.93
1492.71

100.0%
100.0%
100.0%

50.2%
49.9%
50.0%

10.51
1.84
174.29

312.52
748.28
1014.37

49.8%
50.1%
50.0%

0.0%
0.0%
0.0%

61.73
5.63
512.40

1835.78
2295.18
2982.17

100.0%
100.0%
100.0%

315.24
746.04
1,012.68

994.14
296.64

100.0%
100.0%

2,828.70
3,831.00

100.0%
100.0%

1,271.94

100.0%

668.50
1,315.16
731.88

100.0%
100.0%
100.0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

548,826.97

6.63%

332,968.03

4.02%

61,007.25

6.63%

37,012.51

4.02%

27,873.42
4,698.78
12,143.82

6.63%
6.63%
6.63%

16,910.54
2,850.70
7,367.54

4.0%
4.0%
4.0%

654,550.23

6.63%

397,109.32

4.0%

OBRA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE L

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJEC
Item

DESCRIPCION

Und.

Metrado

OBRA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE L

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJEC
Item

DESCRIPCION

1
OBRAS DE CONCRETO ARMADO
1.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA PESADA Y EQUIPOS.
CORTE DE MATERIAL SUELTO, PARA EXPLANACIONES
ELIMINACION DE MATERIAL EXEDENTE, CON MAQUINARIA
TRANSPORTE DE AGREGADOS A PIE DE OBRA
1.02 BLOQUES PRIMARIA
01.02.01.03
OBRAS DE CONCRETO SIMPLE

Und.

GLB
m3
m3
m3

Metrado

1
9994.24
12492.8
3500

OBRA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE L

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJEC
Item

DESCRIPCION

ENCOFRADO Y DESENCOFRADO EN CIMIENTOS CORRIDOS


01.02.01.11
ESTRUCTURAS METALICAS Y COBERTURAS
TIJERAL METALICO TIPO 04B
CORREAS METALICAS DE 50 X 100 mm X 2.5 mm
PARASOLES
ACERO DE REFUERZO ENPARA SOLES Fy=4200 Kg/cm2
ENCOFRADO Y DESENCOFRADO EN PARA SOLES
CONCRETO EN PARA SOLES F'C= 210 KG/CM2
1.03 BLOQUES SECUNDARIA
01.03.01.03
OBRAS DE CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO EN CIMINIENTOS CORRIDOS
01.03.01.11
ESTRUCTURAS METALICAS Y COBERTURAS
TIJERAL DE METAL TIPO 03

Und.

Metrado

m3

226

und
ml

4
1212.8

kg
m2
m3

879.1
90.86
8.75

186.00
und

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE L

OBRA

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJEC
Item

DESCRIPCION

1.04
01.04.01.03

CORREA METALICA DE TUBO RECTANGULAR DE 50x100mm e=2.5mm


PARASOLES
ACERO DE REFUERZO ENPARA SOLES Fy=4200 Kg/cm2
ENCOFRADO Y DESENCOFRADO EN PARA SOLES Y RAMPAS
CONCRETO EN PARA SOLES F'C= 210 KG/CM2
SALA DE CMPUTO PRIMARIA Y SECUNDARIA
OBRAS DE CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO EN CIMIENTOS CORRIDOS
PARASOLES
ACERO DE REFUERZO EN PARASOLES Fy=4200 Kg/cm2
ENCOFRADO Y DESENCOFRADO EN PARASOLES
CONCRETO EN PARASOLES F'C= 210 KG/CM2
MURO DE CONTENCION L=4m

Und.

Metrado

ml

757.4

kg
m2
m3

606.52
63.86
6.39

m2

123.24

kg
m2
m3

279.23
56.7
2.88

OBRA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE L

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJEC
Item

DESCRIPCION

EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS EN TERRENO NORMAL


ELIMINACION DE MATERIAL EXEDENTE
RELLENO Y COMPACTADO CON MATERIAL GRANULAR
ACERO DE REFUERZO EN MURO DE CONTENCION Fy=4200 Kg/cm2
ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENCION
CONCRETO EN MURO DE CONTENCION F'C= 210 KG/CM2
1.05
SALN DE USO MLTIPLE
01.05.01.03
OBRAS DE CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO EN CIMIENTO CORRIDOS
1.06
TPICO, SICOLOGA Y ADMINISTRACIN
01.06.01.03
OBRAS DE CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO EN CIMIENTOS CORRIDOS
PARA SOLES

Und.

Metrado

m3
m3
m3
kg
m2
m3

24.8
28.768
5
356
25
8.64

m2

39.39

m3

96.46

OBRA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE L

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJEC
Item

DESCRIPCION

ACERO DE REFUERZO EN PARA SOLES Fy=4200 Kg/cm2


ENCOFRADO Y DESENCOFRADO EPARASOLES
CONCRETO EN EPARA SOLES F'C= 210 KG/CM2
1.07
TALLER DE CONFECCIN, ARTESANIAS E IDIOMAS
01.07.01.03
OBRAS DE CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO EN CIMIENTO CORRIDOS
PARA SOLES
ACERO DE REFUERZO EN PARA SOLES Fy=4200 Kg/cm2
ENCOFRADO Y DESENCOFRADO EPARASOLES
CONCRETO EN EPARA SOLES F'C= 210 KG/CM2
MURO DE CONTENCION L=8m
EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS EN TERRENO NORMAL
ELIMINACION DE MATERIAL EXEDENTE

Und.

Metrado

kg
m2
m3

156.4
25.8
1.47

m2

106.1736

kg
m2
m3

269.8
24.26
2.79

m3
m3

49.6
57.536

OBRA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE L

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJEC
Item

DESCRIPCION
RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO
ACERO DE REFUERZO EN MURO DE CONTENCION Fy=4200 Kg/cm2
ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENCION
CONCRETO EN MURO DE CONTENCION F'C= 210 KG/CM2

Und.
m3
kg
m2
m3

Metrado
16
712
50
17.28

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE L

OBRA

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJEC
Item

DESCRIPCION

BIBLIOTECA GENERAL
01.08.01.03
OBRAS DE CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO EN CIMIENTO CORRIDOS
01.08.01.11
ESTRUCTURAS METALICAS Y COBERTURAS
TIJERAL DE METAL TIPO 08
PARA SOLES
ACERO DE REFUERZO EN PARA SOLES Fy=4200 Kg/cm2
ENCOFRADO Y DESENCOFRADO EPARASOLES
CONCRETO EN EPARA SOLES F'C= 210 KG/CM2
1.1
VIVIENDA DE DOCENTES
01.10.01.03
OBRAS DE CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO EN CIMIENTOS CORRIDOS
PARA SOLES

Und.

Metrado

1.08

m2

132.176

und

kg
m2
m3

204.4
15.35
2.21

m2

233.38

OBRA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE L

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJEC
Item

01.01.04.02
01.01.04.04
01.01.04.06
01.01.05
01.01.05.01

DESCRIPCION
ACERO DE REFUERZO EN PARA SOLES Fy=4200 Kg/cm2
ENCOFRADO Y DESENCOFRADO EPARASOLES
CONCRETO EN EPARA SOLES F'C= 210 KG/CM2
1
ARQUITECTURA
1.01
BLOQUES PRIMARIA
PISOS
PISO CERAMICO ALTO TRANSITO EN AULAS
VEREDAS
BRUA EN VEREDAS
CEMENTO PULIDO EN PARASOLES
BRUAS EN PARASOLES
ZOCALOS Y CONTRAZOCALOS
ZOCALOS

Und.

Metrado

kg
m2
m3

1229.63
127.95
11.52

m2

1370.8

ml

443.8

ml

47.25

OBRA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE L

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJEC
Item

01.01.10.03

01.02.04.02
01.02.04.04
01.02.04.06
01.02.05
01.02.05.01

DESCRIPCION
CONTRAZOCALO DE CERAMICO h=10cm
PINTURA DE ESTRUCTURAS METALICAS
PINTURA ANTI CORROSIVA EN TIJERALES METALICOS
PINTURA ANTI CORROSIVA EN CORREAS METALICAS
1.02
BLOQUES SECUNDARIA
PISOS
PISO CERAMICO ALTO TRANSITO EN AULAS
VEREDAS
BRUA EN VEREDAS
CEMENTO PULIDO EN PARASOLES
BRUAS EN PARASOLES
ZOCALOS Y CONTRAZOCALOS
ZOCALOS

Und.
ml

Metrado
442

und
ml

35
1212.8

m2

650.30

ml

371.17

ml

32.4

OBRA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE L

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJEC
Item

01.02.10.03

01.03.04.02
01.03.04.04
01.03.09.03

DESCRIPCION
CONTRAZOCALO DE CERAMICO h=10cm
PINTURA DE ESTRUCTURAS METALICAS
PINTURA ANTI CORROSIVA EN TIJERALES METALICOS
PINTURA ANTI CORROSIVA EN CORREAS METALICAS
1.03
SALA DE CMPUTO PRIMARIA Y SECUNDARIA
VEREDAS
BRUA EN VEREDAS
CEMENTO PULIDO EN PARASOLES
BRUAS EN PARASOLES
PINTURA DE ESTRUCTURAS METALICAS
PINTURA ANTI CORROSIVA EN TIJERALES METALICOS
PINTURA ANTI CORROSIVA EN CORREAS METALICAS
1.04
SALON DE USO MULTIPLE

Und.
ml

Metrado
296

und
ml

24
757.4

ml

259.64

ml

22.00

und
ml

39.00
695.40

OBRA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE L

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJEC
Item
01.04.03
01.04.03.01

01.04.03.02

DESCRIPCION
PISOS Y PAVIMENTOS
PISOS
CONTRAPISO DE 35MM. EN SALON Y COCINA
PISO CERAMICO ALTO TRANSITO EN SALON MULTIUSOS
CONTRAZOCALO DE CERAMICO h=10cm
VEREDAS
BRUA EN VEREDAS
PINTURA DE ESTRUCTURAS METALICAS
PINTURA ANTI CORROSIVA EN TIJERALES METALICOS
PINTURA ANTI CORROSIVA EN CORREAS METALICAS

Und.

Metrado

m2
m2
ml

259.42
259.42
104.55

ml

108.141

und
ml

19
680

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE L

OBRA

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJEC
Item

DESCRIPCION

Metrado

1.05
01.05.04.02
01.05.04.04
01.05.09.03

01.06.09.03

TALLER DE CONFECCIN, ARTESANIAS E IDIOMAS


VEREDAS
BRUA EN VEREDAS
CEMENTO PULIDO EN PARASOLES
BRUA EN PARASOLES
PINTURA DE ESTRUCTURAS METALICAS
PINTURA ANTI CORROSIVA EN TIJERALES METALICOS
PINTURA ANTI CORROSIVA EN CORREAS METALICAS
1.06
TPICO, SICOLOGA Y ADMINISTRACIN
PINTURA DE ESTRUCTURAS METALICAS
PINTURA ANTI CORROSIVA EN TIJERALES METALICOS
PINTURA ANTI CORROSIVA EN CORREAS METALICAS
1.07
BIBLIOTECA GENERAL

Und.

ml

169.8

ml

23.1

und
ml

38
886.62

und
ml

27
335.8

OBRA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE L

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJEC
Item

DESCRIPCION

VEREDAS
BRUA EN VEREDAS
01.07.04.04
CEMENTO PULIDO EN PARASOLES
BRUA EN PARASOLES
01.07.09.03
PINTURA DE ESTRUCTURAS METALICAS
PINTURA ANTI CORROSIVA EN TIJERALES METALICOS
PINTURA ANTI CORROSIVA EN CORREAS METALICAS
1.08
DUCHAS Y VESTIDORES (PRIMARIA Y SECUNDARIA)
01.08.05.05
VEREDAS
BRUA EN VEREDAS
PINTURA DE ESTRUCTURAS METALICAS
PINTURA ANTI CORROSIVA EN TIJERALES METALICOS
PINTURA ANTI CORROSIVA EN CORREAS METALICAS

Und.

Metrado

01.07.04.02

ml

176.09

ml

12.1

und
ml

20
500.7

22.248
und
ml

23
341.4

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE L

OBRA

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJEC
Item

DESCRIPCION
1.09

01.09.04.04
01.09.04.06
01.09.09.03

Und.

VIVIENDA DE DOCENTES
VEREDAS
BRUA EN VEREDAS
CEMENTO PULIDO EN PARASOLES
BRUA EN PARASOLES
PINTURA DE ESTRUCTURAS METALICAS
PINTURA ANTI CORROSIVA EN TIJERALES METALICOS
PINTURA ANTI CORROSIVA EN CORREAS METALICAS

Metrado

275.3

COSTO DIRECTO
GASTOS GENERALES

ml

30.71

und
ml

27
1032

OBRA

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE L

FECHA DE INICIO DE OBRA

6/4/2012

CORRESPONDIENTE AL MES DE

ABRIL - 2014

EJEC
Item

DESCRIPCION

Und.
GASTOS DE SUPERVICION
COSTO LIQUIDACION
ELABORACION EXPEDIENTE TECNICO
PRESUPUESTO TOTAL

Metrado

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURA
VALORIZACION PARTIDAS NUEVAS

E LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

ECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Precio Unitario

Parcial

Metrado

Costo

Valorizacin Actual
%

Metrado

Costo

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURA
VALORIZACION PARTIDAS NUEVAS

E LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

ECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Precio Unitario

12500
8.73
5.86
40.4

Parcial

12,500.00
87,249.72
73,207.81
141,400.00

Metrado

Costo

1.00
9994.24
9,224.27
2,894.75

12,500.00
87,249.72
54,054.25
116,947.80

Valorizacin Actual
%

100.00%
100.00%
73.84%
82.71%

Metrado

0.00
0.00
120.00
46.00

Costo

0.00
0.00
703.20
1,858.40

0.00%
0.00%
0.96%
1.31%

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURA
VALORIZACION PARTIDAS NUEVAS

E LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

ECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Precio Unitario

Parcial

Metrado

Costo

Valorizacin Actual
%

Metrado

Costo

38.5

8,701.00

226.00

8,701.00

100.00%

0.00

0.00

0.00%

795.88
62.37

3,183.52
75,642.34

0.00
508.00

0.00
31,683.96

0.00%
41.89%

4.00
704.80

3,183.52
43,958.38

100.00%
58.11%

7.15
47.85
507.16

6,285.57
4,347.65
4,437.65

879.1
90.86
8.75

6,285.57
4,347.65
4,437.65

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

38.50

7,161.00

186.00

7,161.00

100.00%

0.00

0.00

0.00%

1104.78

2,209.56

2,209.56

100.00%

0.00

0.00

0.00%

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURA
VALORIZACION PARTIDAS NUEVAS

E LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

ECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Precio Unitario

Parcial

Metrado

Costo

Valorizacin Actual
%

Metrado

Costo

62.37

47,239.04

757.4

47,239.04

100.00%

0.00

0.00

0.00%

7.15
47.85
507.16

4,336.62
3,055.70
3,240.75

606.52
63.86
6.39

4,336.62
3,055.70
3,240.75

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

38.5

4,744.74

0.00

0.00

0.00%

0.00

0.00

0.00%

7.15
47.85
507.16

1,996.49
2,713.10
1,460.62

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

138.10
28.35
1.44

987.42
1,356.55
730.31

49.46%
50.00%
50.00%

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURA
VALORIZACION PARTIDAS NUEVAS

E LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

ECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Precio Unitario

Parcial

Metrado

Costo

Valorizacin Actual
%

Metrado

Costo

29.34
16.28
135.35
7.15
47.85
507.16

727.63
468.34
676.75
2,545.40
1,196.25
4,381.86

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

38.5

1,516.52

0.00

0.00

0.00%

0.00

0.00

0.00%

38.5

3,713.71

0.00

0.00

0.00%

0.00

0.00

0.00%

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURA
VALORIZACION PARTIDAS NUEVAS

E LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

ECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Precio Unitario

Parcial

Metrado

7.15
47.85
507.16

1,118.26
1,234.53
745.53

156.4
25.8
1.47

38.5

4,087.68

0.00

7.15
47.85
507.16

1,929.07
1,160.84
1,414.98

269.8
24.26
2.79

29.34
16.28

1,455.26
936.69

0.00
0.00

Costo

Valorizacin Actual
%

Metrado

Costo

1,118.26
1,234.53
745.53

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00%

0.00

0.00

0.00%

1,929.07
1,160.84
1,414.98

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURA
VALORIZACION PARTIDAS NUEVAS

E LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

ECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Precio Unitario
135.35
7.15
47.85
507.16

Parcial
2,165.60
5,090.80
2,392.50
8,763.72

Metrado
0.00
0.00
0.00
0.00

Costo

Valorizacin Actual
%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

Metrado
0.00
0.00
0.00
0.00

Costo
0.00
0.00
0.00
0.00

%
0.00%
0.00%
0.00%
0.00%

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURA
VALORIZACION PARTIDAS NUEVAS

E LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

ECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Precio Unitario

Parcial

Metrado

Costo

Valorizacin Actual
%

Metrado

Costo

38.5

5,088.78

0.00

0.00

0.00%

0.00

0.00

0.00%

360.23

2,521.61

0.00

0.00

0.00%

0.00

0.00

0.00%

7.15
47.85
507.16

1,461.46
734.50
1,120.82

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

38.5

8,985.13

233.38

8,985.13

100.00%

0.00

0.00

0.00%

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURA
VALORIZACION PARTIDAS NUEVAS

E LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

ECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Precio Unitario

Parcial

Metrado

7.15
47.85
507.16

8,791.85
6,122.41
5,842.48

1229.63
127.95
11.52

72.04

98,752.43

4.83
5.23

Costo

Valorizacin Actual
%

Metrado

Costo

8,791.85
6,122.41
5,842.48

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2,143.55

0.00

0.00

0.00%

443.80

2,143.55

100.00%

247.12

0.00

0.00

0.00%

47.25

247.12

100.00%

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURA
VALORIZACION PARTIDAS NUEVAS

E LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

ECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Precio Unitario

Parcial

Metrado

Costo

Valorizacin Actual
%

Metrado

Costo

19.81

8,756.02

0.00

0.00

0.00%

0.00

0.00

0.00%

23.5
4.04

822.50
4,899.71

0.00
0.00

0.00
0.00

0.00%
0.00%

35.00
1,212.80

822.50
4,899.71

100.00%
100.00%

72.04

46,847.61

0.00

0.00

0.00%

0.00

0.00

0.00%

4.83

1,792.75

0.00

0.00

0.00%

371.17

1,792.75

100.00%

5.23

169.45

0.00

0.00

0.00%

32.40

169.45

100.00%

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURA
VALORIZACION PARTIDAS NUEVAS

E LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

ECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Precio Unitario

Parcial

Metrado

19.81

5,863.76

0.00

23.5
4.04

564.00
3,059.90

24
757.4

4.83

1,254.06

5.23
23.50
4.04

Costo

Valorizacin Actual
%

Metrado

Costo

0.00

0.00%

0.00

0.00

0.00%

564.00
3,059.90

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

115.06

0.00

0.00

0.00%

0.00

0.00

0.00%

916.50
2,809.42

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURA
VALORIZACION PARTIDAS NUEVAS

E LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

ECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Precio Unitario

Parcial

Metrado

Costo

Valorizacin Actual
%

Metrado

Costo

30.89
72.04
19.81

8,013.48
18,688.62
2,071.14

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

4.83

522.32

0.00

0.00

0.00%

0.00

0.00

0.00%

23.5
4.04

446.50
2,747.20

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURA
VALORIZACION PARTIDAS NUEVAS

E LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

ECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Precio Unitario

Parcial

Metrado

Costo

Valorizacin Actual
%

Metrado

Costo

4.83

820.13

0.00

0.00

0.00%

0.00

0.00

0.00%

5.23

120.81

0.00

0.00

0.00%

0.00

0.00

0.00%

23.5
4.04

893.00
3,581.94

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

23.5
4.04

634.50
1,356.63

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURA
VALORIZACION PARTIDAS NUEVAS

E LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

ECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Precio Unitario

Parcial

Metrado

Costo

Valorizacin Actual
%

Metrado

Costo

4.83

850.51

0.00

0.00

0.00%

0.00

0.00

0.00%

4.04

48.88

0.00

0.00

0.00%

0.00

0.00

0.00%

23.5
4.04

470.00
2,022.83

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

4.83

107.46

0.00

0.00

0.00%

0.00

0.00

0.00%

23.5
4.04

540.50
1,379.26

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURA
VALORIZACION PARTIDAS NUEVAS

E LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

ECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Precio Unitario

Parcial

Metrado

Costo

Valorizacin Actual
%

Metrado

Costo

4.83

1,329.70

275.3

1,329.70

100.00%

0.00

0.00

0.00%

5.23

160.61

30.71

160.61

100.00%

0.00

0.00

0.00%

23.5
4.04

634.50
4,169.28

27
1032

634.50
4,169.28

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

62,852.86
6,986.68

0.76%

8,276,948.93
920,060.23

440,713.32
48,989.40

5.32%

MUNICIPALIDAD DISTRITAL DE ECHARATI

GERENCIA DE INFRAESTRUCTURA
VALORIZACION PARTIDAS NUEVAS

E LA I.E JOSE PIO AZA DE KORIBENI,DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

ECUCION DE OBRAS POR ADMINISTRACION PRESUPUESTARIA DIRECTA


Valorizacin Anterior
Precio Unitario

Parcial
420,363.64
70,863.00
183,142.87
9,871,378.67

Metrado

Costo
22,382.63
3,773.16
9,751.60
525,610.11

Valorizacin Actual
%

5.32%

Metrado

Costo
3,192.12
538.11
1,390.74
74,960.51

0.76%

Valorizacin Acumulada
Metrado

Costo

Saldo por Valorizar


%

Metrado

Costo

Valorizacin Acumulada
Metrado

1.00
9,994.24
9,344.27
2,940.75

Costo

12,500.00
87,249.72
54,757.45
118,806.20

Saldo por Valorizar


%

100.00%
100.00%
74.80%
84.02%

Metrado

0.00
0.00
3,148.53
559.25

Costo

0.00
0.00
18,450.36
22,593.80

0.00%
0.00%
25.20%
15.98%

Valorizacin Acumulada
Metrado

Costo

Saldo por Valorizar


%

Metrado

Costo

226.00

8,701.00

100.00%

0.00

0.00

0.00%

4.00
1,212.80

3,183.52
75,642.34

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%

879.10
90.86
8.75

6,285.57
4,347.65
4,437.65

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%

186.00

7,161.00

100.00%

0.00

0.00

0.00%

2.00

2,209.56

100.00%

0.00

0.00

0.00%

0.00%

0.00%
0.00%

Valorizacin Acumulada
Metrado

Costo

Saldo por Valorizar


Metrado

Costo

757.40

47,239.04

100.00%

0.00

0.00

0.00%

606.52
63.86
6.39

4,336.62
3,055.70
3,240.75

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%

0.00

0.00

0.00%

123.24

4,744.74

100.00%

138.10
28.35
1.44

987.42
1,356.55
730.31

49.46%
50.00%
50.00%

141.13
28.35
1.44

1,009.08
1,356.55
730.31

50.54%

0.00%
0.00%

50.00%
50.00%

Valorizacin Acumulada
Metrado

Costo

Saldo por Valorizar


Metrado

Costo

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

24.80
28.77
5.00
356.00
25.00
8.64

727.63
468.34
676.75
2,545.40
1,196.25
4,381.86

100.00%

0.00

0.00

0.00%

39.39

1,516.52

100.00%

0.00

0.00

0.00%

96.46

3,713.71

100.00%

100.00%
100.00%
100.00%
100.00%
100.00%

Valorizacin Acumulada
Metrado

Costo

Saldo por Valorizar


Metrado

Costo

156.40
25.80
1.47

1,118.26
1,234.53
745.53

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%

0.00

0.00

0.00%

106.17

4,087.68

100.00%

269.80
24.26
2.79

1,929.07
1,160.84
1,414.98

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

49.60
57.54

1,455.26
936.69

100.00%

0.00%
0.00%

0.00%
0.00%

100.00%

Valorizacin Acumulada
Metrado
0.00
0.00
0.00
0.00

Costo
0.00
0.00
0.00
0.00

Saldo por Valorizar


Metrado

%
0.00%
0.00%
0.00%
0.00%

16.00
712.00
50.00
17.28

Costo
2,165.60
5,090.80
2,392.50
8,763.72

%
100.00%
100.00%
100.00%
100.00%

Valorizacin Acumulada
Metrado

Costo

Saldo por Valorizar


Metrado

Costo

0.00

0.00

0.00%

132.18

5,088.78

100.00%

0.00

0.00

0.00%

7.00

2,521.61

100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

204.40
15.35
2.21

1,461.46
734.50
1,120.82

100.00%

233.38

8,985.13

100.00%

0.00

0.00

0.00%

100.00%
100.00%

Valorizacin Acumulada
Metrado

Costo

Saldo por Valorizar


Metrado

Costo

1,229.63
127.95
11.52

8,791.85
6,122.41
5,842.48

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%

0.00

0.00

0.00%

1,370.80

98,752.43

100.00%

443.80

2,143.55

100.00%

0.00

0.00

0.00%

47.25

247.12

100.00%

0.00

0.00

0.00%

0.00%
0.00%

Valorizacin Acumulada
Metrado

Costo

Saldo por Valorizar


Metrado

Costo

0.00

0.00

0.00%

442.00

8,756.02

100.00%

35.00
1,212.80

822.50
4,899.71

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%

0.00

0.00

0.00%

650.30

46,847.61

100.00%

371.17

1,792.75

100.00%

0.00

0.00

0.00%

32.40

169.45

100.00%

0.00

0.00

0.00%

0.00%

Valorizacin Acumulada
Metrado

Costo

Saldo por Valorizar


Metrado

Costo

0.00

0.00

0.00%

296.00

5,863.76

100.00%

24.00
757.40

564.00
3,059.90

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%

0.00

0.00

0.00%

259.64

1,254.06

100.00%

0.00

0.00

0.00%

22.00

115.06

100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

39.00
695.40

916.50
2,809.42

100.00%

0.00%

100.00%

Valorizacin Acumulada
Metrado

Costo

Saldo por Valorizar


Metrado

Costo

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

259.42
259.42
104.55

8,013.48
18,688.62
2,071.14

100.00%

0.00

0.00

0.00%

108.14

522.32

100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

19.00
680.00

446.50
2,747.20

100.00%

100.00%
100.00%

100.00%

Valorizacin Acumulada
Metrado

Costo

Saldo por Valorizar


Metrado

Costo

0.00

0.00

0.00%

169.80

820.13

100.00%

0.00

0.00

0.00%

23.10

120.81

100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

38.00
886.62

893.00
3,581.94

100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

27.00
335.80

634.50
1,356.63

100.00%

100.00%

100.00%

Valorizacin Acumulada
Metrado

Costo

Saldo por Valorizar


Metrado

Costo

0.00

0.00

0.00%

176.09

850.51

100.00%

0.00

0.00

0.00%

12.10

48.88

100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

20.00
500.70

470.00
2,022.83

100.00%

0.00

0.00

0.00%

22.25

107.46

100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

23.00
341.40

540.50
1,379.26

100.00%

100.00%

100.00%

Valorizacin Acumulada
Metrado

Costo

Saldo por Valorizar


%

Metrado

Costo

275.30

1,329.70

100.00%

0.00

0.00

0.00%

30.71

160.61

100.00%

0.00

0.00

0.00%

27.00
1,032.00

634.50
4,169.28

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%

503,566.18
55,976.09

6.08%

310,561.29
34,521.79

0.00%

3.75%
3.8%

Valorizacin Acumulada
Metrado

Costo
25,574.75
4,311.28
11,142.34
600,570.63

Saldo por Valorizar


%

6.08%

Metrado

Costo
15,772.56
2,658.87
6,871.75
370,386.25

%
3.8%
3.8%
3.8%
3.75%

I.INFORMACIN GENERAL
DATOS DEL PIP
SECTOR:

GOBIERNO LOCAL

PLIEGO:

MUNICIPALIDAD DISTRITAL DE ECHARATI

Nombre del Proyecto:

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL NIV

Objetivo del Proyecto:

EFICIENTE PRESTACION DE LOS SERVICIOS EDUCATIVOS E

Presenta Plan de Trabajo y/o Trmino de Referencia:

PdT

Elaboracin del Expediente Tcnico:

PdT

Cdigo SNIP:

213775

Fecha de la declaracin de viabilidad:

5/8/2012

Monto de Inversin:perfil aprobado


Modalidad de Ejecucin:

ADMINISTRACIN DIRECTA

Cdigo DNPP (SIAF):

2.157177

Monto de Inversin Modificado:(Expediente Tcnico)

9,871,378.67

Porcentaje de modificacin:

-0.95%

Registro de Formatos:

F15:

Fecha del primer desembolso:


DATOS DE LA UNIDAD EJECUTORA
NOMBRE DE LA UNIDAD EJECUTORA:

MUNICIPALIDAD DISTRITAL DE ECHARATI

NOMBRE Y CARGO DEL RESPONSABLE:

Ing Luis Efran, ALTAMIRANO ROJAS

TIEMPO DE EJECUCIN

12 Meses

FECHA DE INICIO DEL PROYECTO (Ejec.):

6/4/2012

PLAZO DE EJECUCIN SEGN CONTRATO (MESES):

12

FECHA DE CULMINACIN PREVISTA SEGN CONTRATO:

6/3/2013

AMPLIACIN DE PLAZO Y PRESUPUESTO

SI

Presentacin del Residente y Supervisor de Obra


1ra Ampliacin
DESCRIPCIN
Ampliacin de plazo (das calendario)
Ampliacin presupuesta (S/.)

Fecha de present.

Cantidad

6/26/2013

300.00

0.00

0.00

% Perfil/exped. Modif.

0.00

Nota: la segunda ampliacion de plazo y la primera amplaicion de presupuesto aun no


se han registrado en el sistema.
Aprobacin de la Ampliacin
1ra Ampliacin
DESCRIPCIN

Ampliacin de plazo (das calendario)


Ampliacin presupuesta (S/.)
% Perfil/exped. Modif.
II. SEGUIMIENTO DEL PIP (Eficiencia)
2.1. Situacin de los Estudios Definitivos (Expedientes Tcnicos)

Fecha de present. Fecha de Aprobacin


6/26/2013

7/5/2013

0.00

0.00
0.00

Estudio definitivo

Fecha

Modalidad

Modificacionea de acuerdo a resultado del informe de consistencia y/o haber ocurrido incremento de monto de inversin y/o verificacin de viabi

2.2. Si el PIP est a nivel de Expediente Tcnico:


Preinversin
Componentes / Actividades

PIP Viable o presentado


Unidad de medida

EXPEDIENTE TCNICO

Glb

COMPONENTE 01; CONSTRUCION DE INFRAESTRUCTURA

Cantidad (S/.)
180,000.00
7,753,077.00

CONSTRUCCION DE AULAS

Glb

2,456,330.00

CONSTRUCCION DE DIRECCION CON SSHH.

Glb

452,365.00

CONSTRUCCION DE SSHH

Glb

42,544.00

CONSTRUCCION DE SALA MULTIUSO

Glb

325,436.00

CERCO PERIMETRICO, ATRIO Y PORTADA DE INGRESO

Glb

638,884.00

PATIO DE RECREACION

Glb

114,524.00

OBRAS COMPLEMENTARIAS

Glb

52,436.00

ESTRUCTURAS

Glb

ARQUITECTURA

Glb

2,272,230.00

PATIO Y CANCHAS POLIDEPORTIVAS

Glb

555,992.00

INSTALACIONES SANITARIAS

Glb

337,524.00

INSTALACIONES ELECTRICAS

Glb

504,812.00

FLETE

Glb

281,010.00

COMPONENTE 02; MOBILIARIOS Y EQUIPOS

GLB

323,011.00

COMPONENTE 03; PLAN DE MITIGACION AMBIENTAL

GLB

7,080.00

COSTO DIRECTO

8,083,168.00

GASTOS GENERALES

Glb

770,060.00

GASTOS DE SUPERVISIN

Glb

418,210.00

LIQUIDACIN

Glb

83,642.00

FLETE

Glb

281,010.00

OTROS

Glb

149,992.00

TOTAL
Nota: Adjuntar la copia del F15, F16, Resolucin y otros documentos incluye contrato de la empresa.

9,966,082.00

2.3. Avance Fsico

P
Componente/Acciones
Indicador (slo el principal)

EXPEDIENTE TCNICO

Expediente

COMPONENTE 01; CONSTRUCION DE INFRAESTRUCTURA

OBRAS PROVISIONALES

BLOQUE VIVIENDAS DOCENTES PRIMARIA Y SECUNDARIA

INFR

INSTALACIONE

INSTALACIONE
BLOQUE AULAS SECUNDARIA

INFR

INSTALACIONE

INSTALACIONE
BLOQUE AULAS PRIMARIA

INFR

INSTALACIONE

INSTALACIONE
BLOQUE AUDITORIUM

INFR

INSTALACIONE

INSTALACIONE
BLOQUE BIBLIOTECA

INFR

INSTALACIONE

INSTALACIONE
COMPONENTE 01; CONSTRUCION DE INFRAESTRUCTURA

BLOQUE TALLERES

INFR

INSTALACIONE

INSTALACIONE

BLOQUE SALA DE CMPUTO

INFR

INSTALACIONE

INSTALACIONE
BLOQUE ADMINISTRACIN

INFR

INSTALACIONE

INSTALACIONE
SERVICIOS HIGINICOS I Y II

INFR

INSTALACIONE

INSTALACIONE
AREAS EXTERIORES Y OBRAS COMPLEMENTARIAS

INFR

INSTALACIONE

INSTALACIONE
HUERTOS Y JARDINDES
BLOQUE LOSA DEPORTIVA I Y II, PATIO DE HONOR
CERCO PERIMETRICO
FLETE TERRESTRE

COMPONENTE 02; MOBILIARIOS Y EQUIPOS


CARPETAS UNIPERSONALES NIVEL PRIMARIO
COMPUTADORAS NIVEL PRIMARIO
MESA PEDAGGICA MADERA INCLUIDA 8 SILLAS
CARPETAS UNIPERSONALES NIVEL SECUNDARIO
COMPUTADORAS NIVEL SECUNDARIO

OTROS
COMPONENTE 03; PLAN DE MITIGACION AMBIENTAL
COSTO DIRECTO
GASTOS GENERALES

GG

GASTOS DE SUPERVISIN

GS
Proceso de seleccin para la contratacin del consultor

LIQUIDACIN

Preliquidacin
Liquidacin del proyecto y aprobacin

2.4. Avance Financiero (**)


Fuente de Financiamiento:
Modalidad de Ejecucin:

P
Componente/Acciones

EXPEDIENTE TCNICO

Indicador (slo el principal)

Expediente

COMPONENTE 01; CONSTRUCION DE INFRAESTRUCTURA


CONSTRUCCIN DE INFRAESTRUCTURA
COMPONENTE 02; MOBILIARIOS Y EQUIPOS
MOBILIARIO Y EQUIPOS
COMPONENTE 03; PLAN DE MITIGACION AMBIENTAL
MITIGACIN AMBIENTAL
COSTO DIRECTO
GASTOS GENERALES

GG

GASTOS DE SUPERVISIN

GS

LIQUIDACIN

Liquidacin

FLETE

OTROS

TOTAL

(**) Este avance se comparar con el cronograma programado registrado en el SIAF-MPP


2.5.Cuadro resumen de las metas (PIP Viable y Ejecucin de la inversin).

PIP Viable o presentado


Componentes / Actividades

Unidad de medida
EXPEDIENTE TCNICO

Glb

COMPONENTE 01; CONSTRUCION DE INFRAESTRUCTURA

CONSTRUCCIN DE INFRAESTRUCTURA

M2

Glb

323,011.00
7,080.00

Glb

COSTO DIRECTO
GASTOS GENERALES

7,753,077.00

323,011.00

COMPONENTE 03; PLAN DE MITIGACION AMBIENTAL


MITIGACIN AMBIENTAL

180,000.00
7,753,077.00

COMPONENTE 02; MOBILIARIOS Y EQUIPOS

MOBILIARIO Y EQUIPOS

Cantidad (S/)

7,080.00
8,083,168.00

Glb

770,060.00

GASTOS DE SUPERVISIN

Glb

418,210.00

LIQUIDACIN

Glb

83,642.00

FLETE

Glb

281,010.00

OTROS

Glb

149,992.00

TOTAL

9,966,082.00

III INFORMACIN DE AVANCES, LOGROS Y PROBLEMAS EN LA EJECUCIN:


COMPONENTE I

META FSICA PROGRAMADA ACUMULADA


COMPONENTES
Unidad de Medida

Cantidad (%)

OBRAS PROVISIONALES

GLB

100%

BLOQUE VIVIENDAS DOCENTES PRIMARIA Y SECUNDARIA

M2

100%

BLOQUE AULAS SECUNDARIA

M2

100%

COMPONENTE 01; CONSTRUCION DE INFRAESTRUCTURA

BLOQUE AULAS PRIMARIA

M2

100%

BLOQUE AUDITORIUM

M2

100%

BLOQUE BIBLIOTECA

M2

100%

BLOQUE TALLERES

M2

100%

BLOQUE SALA DE CMPUTO

M2

100%

BLOQUE ADMINISTRACIN

M2

100%

SERVICIOS HIGINICOS I Y II

M2

100%

AREAS EXTERIORES Y OBRAS COMPLEMENTARIAS

M2

100%

HUERTOS Y JARDINDES

M2

100%

BLOQUE LOSA DEPORTIVA I Y II, PATIO DE HONOR

M2

100%

CERCO PERIMETRICO

ML

100%

FLETE TERRESTRE

GLB

100%

Principales logros o hecho

_ se realizo el cambio del residente de obra e inspector, a partir del mes de febrero 2014 con quienes se biene rep
- Se aprecia un considerable avance fsico en cuanto a las construcciones de los mdulos tanto en aulas Primaria
- se viene tramitando la segunda ampliacion de plazo y primera amplaicion presupuestal para su registro respecti

Principales problemas que explican el ba

falta de personal tcnico calificado, operarios, oficiales bajos rendimientos de avance por contar solo con obreros de la zona con baja capacita
en el expediente tcnico y tenindose esos problemas la obra se sigue ejecutando a un

Acciones tomadas para superar

Se ha optado por modalidad de servicios de sub contrata por mano de obra. Elaboracin del expedientillo de

COMPONENTE II

META FSICA PROGRAMADA ACUMULADA


COMPONENTES
Unidad de Medida

COMPONENTE 02; MOBILIARIOS Y EQUIPOS

Cantidad (%)

MOBILIARIO Y EQUIPOS

Glb

100%

Principales logros o hecho


An no se

Principales problemas que explican el ba


An no se

Acciones tomadas para superar


An no se

COMPONENTE III

META FSICA PROGRAMADA ACUMULADA


COMPONENTES
Unidad de Medida

Cantidad (%)

Glb

100%

COMPONENTE 03; PLAN DE MITIGACION AMBIENTAL

MITIGACIN AMBIENTAL

Principales logros o hecho


An no se

Principales problemas que explican el ba


An no se

Acciones tomadas para superar


An no se

Nombres y apellidos del informante: Ing. MANUEL CARPIO GANDULIAS

Correo electrnico del informante: ic_manu_cg@hotmail.com


Telfono del informante: 993488932
Nota: Llenar la presente ficha una por cada proyecto de inversin o estudio de preinversin cofinanciado.
Considerar en la meta financiera ejecutada el monto girado.
Agregar los recuadros necesarios segn el nmero de componentes de cada proyecto o estudio de preinversin que se informa.

Residente de Obra

Inspector de Obra

Ing Manuel carpio Gandulias


CIP: 106532

Ing. JULIO CARBAJAL COILA


CIP: 29186

FORMATO SNIP 19
FICHA DE SEGUIMIENTO DEL PROYECTO DE INVERSIN

TI

UCATIVOS DEL NIVEL PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE KORIBENI, DISTRITO DE ECHARATE-LA CONVENCION-CUSCO"

IOS EDUCATIVOS EN LOS NIVELES PRIMARIO Y SECUNDARIO DE LA I.E JOSE PIO AZA DE CORIBENI

TI

TdR
TdR

F 16:

2da Ampliacin

3ra Ampliacin

Fecha de present.

Cantidad

Fecha de present.

4/20/2014

245.00

0.00

0.00

4/21/2014

1, 885,727.16

0.00

0.00

17.48

Cantidad

0.00

1ra Ampliacin

0.00

2da Ampliacin

Cantidad

Fecha de
Culminacin

300.00

3/30/2014

0.00

0.00

Fecha de present.

Fecha de Aprobacin

Cantidad

0.00

0.00

0.00

0.00

0.00

0.00
0.00

Modalidad

rificacin de viabilidad:

Estado

Costo S/.

Nombre del Responsable

Inversin
Expediente Tcnico / Estudio Definitivo 1/
Unidad de medida
Glb

Variacin %
perfil/exped.

Cantidad (S/.)
183,142.87
7,883,830.73

Glb
Glb
Glb
Glb
Glb
Glb
Glb
Glb

2,494,281.07

Glb

3,484,334.30
-0.95%

-0.95%

Glb
Glb

582,317.23

Glb

507,327.64

Glb

815,570.49

GLB

376,476.00

GLB

16,642.20
8,276,948.93

Glb

920,060.23

Glb

420,363.64

Glb

70,863.00

Glb
Glb
9,871,378.67

PIP Viable
Meta total
vigente/Exp. Tc.

Ejecucin del Mes

GLB

M2

408.75

0.00

INFRAESTRUCTURA

glb

1.00

0.00

ARQUITECTURA

glb

1.00

0.00

INSTALACIONES SANITARIAS

glb

1.00

0.00

INSTALACIONES ELECTRICAS

glb

1.00

0.00

M2

545.65

18.03

INFRAESTRUCTURA

glb

1.00

0.00

ARQUITECTURA

glb

1.00

0.09

INSTALACIONES SANITARIAS

glb

1.00

0.00

l principal)

Unidad de medida

Meta total vigente/


Perfil Aprobado

Glb

1
-

IA Y SECUNDARIA

INSTALACIONES ELECTRICAS

glb

1.00

0.00

M2

760.09

35.43

INFRAESTRUCTURA

glb

1.00

0.03

ARQUITECTURA

glb

1.00

0.09

INSTALACIONES SANITARIAS

glb

1.00

0.00

INSTALACIONES ELECTRICAS

glb

1.00

0.00

M2

265

INFRAESTRUCTURA

glb

1.00

0.000

ARQUITECTURA

glb

1.00

0.000

INSTALACIONES SANITARIAS

glb

1.00

0.000

INSTALACIONES ELECTRICAS

glb

1.00

0.000

M2

175.75

INFRAESTRUCTURA

glb

1.00

0.000

ARQUITECTURA

glb

1.00

0.000

INSTALACIONES SANITARIAS

glb

1.00

0.000

INSTALACIONES ELECTRICAS

glb

1.00

0.000

M2

201.03

7.55

INFRAESTRUCTURA

glb

1.00

0.02

ARQUITECTURA

glb

1.00

0.07

INSTALACIONES SANITARIAS

glb

1.00

0.00

INSTALACIONES ELECTRICAS

glb

1.00

0.00

M2

223.05

35.74

INFRAESTRUCTURA

glb

1.00

0.38

ARQUITECTURA

glb

1.00

0.01

INSTALACIONES SANITARIAS

glb

1.00

0.00

INSTALACIONES ELECTRICAS

glb

1.00

0.00

M2

121.5

4.29

INFRAESTRUCTURA

glb

1.00

0.05

ARQUITECTURA

glb

1.00

0.02

INSTALACIONES SANITARIAS

glb

1.00

0.00

INSTALACIONES ELECTRICAS

glb

1.00

0.00

M2

77.84

INFRAESTRUCTURA

glb

1.00

0.00

ARQUITECTURA

glb

1.00

0.00

INSTALACIONES SANITARIAS

glb

1.00

0.00

INSTALACIONES ELECTRICAS

glb

1.00

0.00

M2

1104

0.311

INFRAESTRUCTURA

glb

1.00

0.001

INSTALACIONES SANITARIAS

glb

1.00

0.000

INSTALACIONES ELECTRICAS

glb

1.00

0.000

M2

76772

2594.61

M2

1889

35.05

ML

705

GLB

0.125

MENTARIAS

DE HONOR

Glb

Unid.

300

Unid.

21

8 SILLAS

Unid.

21

UNDARIO

Unid.

200

Unid.

21

ARIO

n del consultor

Glb

Glb

Glb

Glb

Glb

Glb

Glb

l principal)

CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES


ADMINISTRACIN DIRECTA
PIP Viable

Unidad de medida

Glb

Glb

Glb

Meta total vigente/


Perfil Aprobado

Meta total
vigente/Exp. Tc.

180,000.00

183,142.87

7,753,077.00

7,883,830.73

166,869.13

7,753,077.00

7,883,830.73

166,869.13

323,011.00

376,476.00

323,011.00

7,080.00

16,642.20

7,080.00

16,642.20

8,083,168.00

8,276,948.93

Glb

770,060.00

920,060.23

Glb

418,210.00

420,363.64

Glb

Ejecucin del Mes

0
166,869.13

Glb

83,642.00

Glb

281,010.00

Glb

149,992.00

9,966,082.00

70,863.00

9,871,378.67

166,869.13

0.16

0.8400

Ejecucin de la Inversin
Expediente Tcnico
Ejecucin del mes

Cantidad (S/)

Cantidad (S/)

183,142.87

Cantidad (S/)

Cantidad (S/)

166,869.13

7,883,830.73

166,869.13

16,642.20
16,642.20
7,900,472.93
920,060.23

166,869.13
-

% de Modificacin

7,883,830.73

Ejecucin de Mayores Ejecucin de Nuevas


Metrados
Metas

420,363.64

70,863.00

9,494,902.67

166,869.13

META FSICA EJECUTADA ACUMULADA

Unidad de Medida

Cantidad (%)

GLB

100%

M2

43%

M2

63%

META FINANCIERA PROGRAMADA


ACUMULADA (S/.)

Unidad de Medida

Cantidad (S/.)

META FINANCIERA EJECUTADA ACUMUL


(S/.)

Unidad de Medida

M2

57%

M2

0%

M2

0%

Glb

9,871,378.67

Glb

M2

23%

M2

23%
Glb

M2

31%

M2

0%

M2

2%

M2

7%

M2

3%

ML

0%

GLB

25%

9,871,378.67

Glb

s logros o hechos positivos de resaltar:

es se biene reprogramando la ejecucion de la obra.


aulas Primaria como Secundaria para el mes de abril.
gistro respectivo.

ue explican el bajo nivel de avance fsico o financiero:

con baja capacitacin tcnica en construccin - Se sigue teniendo problemas como son los bajos rendimientos que existen y estos no estaban contemp
e ejecutando a un ritmo positivo. - no se atiende los requerimientos de fierro y materiales elctricos.

as para superar los problemas presentados:

el expedientillo del sustento de mayores metrados y nuevas metas para la ampliacin presupuestal y ampliacin de plazo.

META FSICA EJECUTADA ACUMULADA

Unidad de Medida

Cantidad (%)

META FINANCIERA PROGRAMADA


ACUMULADA (S/.)

Unidad de Medida

Cantidad (S/.)

META FINANCIERA EJECUTADA ACUMUL


(S/.)

Unidad de Medida

Glb

0.00%

s logros o hechos positivos de resaltar:


An no se ejecuta

ue explican el bajo nivel de avance fsico o financiero:


An no se ejecuta

as para superar los problemas presentados:


An no se ejecuta

Glb

Glb

META FINANCIERA PROGRAMADA


ACUMULADA (S/.)

META FSICA EJECUTADA ACUMULADA

Unidad de Medida

Cantidad (%)

Unidad de Medida

Glb

0.00%

Glb

s logros o hechos positivos de resaltar:


An no se ejecuta

ue explican el bajo nivel de avance fsico o financiero:


An no se ejecuta

as para superar los problemas presentados:


An no se ejecuta

Cantidad (S/.)

16,642.20

META FINANCIERA EJECUTADA ACUMUL


(S/.)

Unidad de Medida

Glb

informa.

Gerente de Lnea
Ing WILBER LAPA BERROCAL

Responsable de OPI
ING. MARCO ANTONIO VELSQUEZ PAREDES

ON-CUSCO"

9,966,082.00

Resolucin N

667-2013-GM-MDE/LC (16/10/2013)

Expediente Tcnico

Fecha de Culminacin
0.00
0.00

mbre del Responsable

Modificaciones en Ejecucin
Avance acum.

(a)

Avance Total
Mayores Metrados

Nuevas Metas

Deductivos

(b)

(c)

(d)

1.00

a+b+c-d

2.42

3.419

175.46

0.97

1.57

0.17

2.713

0.34

0.01

0.02

0.363

0.19

0.10

0.289

0.06

0.00

0.065

344.02
1.00

0.02

0.15

1.170

0.43

0.06

0.02

0.499

0.08

0.08

0.164

0.14

0.138

430.83
0.75

0.05

0.119

0.917

0.40

0.00

0.02

0.416

0.13

0.36

0.000

0.490

0.15

0.151

0.18
0.001

0.001

0.000

0.000

0.000

0.000

0.000

0.000

0.08
0.001

0.001

0.000

0.000

0.000

0.000

0.000

0.000

46.40
0.52

0.02

0.03

0.570

0.07

0.00

0.00

0.068

0.00

0.000

0.00

0.000

51.95
0.56

0.10

0.02

0.680

0.01

0.014

0.00

0.000

0.00

0.000

38.13
0.60

0.103

0.02

0.720

0.02

0.024

0.00

0.004

0.00

0.000

0.02
0.00

0.001

0.00

0.000

0.00

0.000

0.00

0.000

18.11
0.040

0.040

0.000

0.000

0.000

0.000

5383.12
57.63
0.70
0.25

0
0
0
0
0

0
0

Modificaciones en Ejecucin
Avance acum.

(a)

Mayores Metrados

Nuevas Metas

Deductivos

(b)

(c)

(d)

Avance Total

a+b+c-d

183,142.87
6,047,715.59

6,047,715.59
0
0
6,047,715.59
486,266.05
222,168.68

6,939,293.19

CIERA EJECUTADA ACUMULADA


(S/.)

Cantidad (S/.)

6,939,293.19

6,939,293.19

n y estos no estaban contemplados

CIERA EJECUTADA ACUMULADA


(S/.)

Cantidad (S/.)

CIERA EJECUTADA ACUMULADA


(S/.)

Cantidad (S/.)

0.00

TONIO VELSQUEZ PAREDES

9,966,082.00

Variacin %
Perfil/Modif.

Variacin %
Perfil/Modif.