Está en la página 1de 2

TRANSFORMER

TRANSFORMER TESTS

UNSOLVED

Q.) Explain the procedure of conducting the oc test.

Q.) Explain the procedure of conducting the sc test.

Q.) Give the purpose of conducting the oc test.

Q.) Give the purpose of conducting the sc test.

Q.) A 1000/300V, 50Hz , single phase transformer on test give the


result as follows:
OC test (on high voltage side): 1000V
SC test (on low voltage side): 60V

0.25A
10A

80W
100W

At pf 0.9 lagging the voltage regulation of transformer at full load


is 4.5%.

Q.) Tests are conducted on a 50kVA, 6400/250V, 50Hz, single


phase transformer. The results are as follows:
OC test:

6400V

SC test:

180V

1A

2kW (on HV side)

150A 3kW ( on LV side)

Calculate the efficiency at full load pf of 0.8 lagging.

TRANSFORMER

TRANSFORMER TESTS

UNSOLVED

Q.) Why the wattmeter reads iron losses in oc test and copper
losses in sc test of the transformer.

Q.) What conclusions do we get by conducting the oc and sc tests


of a transformer.

También podría gustarte