Está en la página 1de 175

CRONOGRAMA VALORIZADO DE OBRA - BOCATOMA - A FECHA DE AMPLIACIN DE PLAZO N 09

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - PUNO
EJECUTA: CONSORCIO ATENEO

DESCRIPCIN

ITEM

UND
01

CONSTRUCCION DE BOCATOMA

01.01

TRABAJOS PRELIMINARES

01.01.01

CARTEL DE OBRA 5.00x3.00m

UND

01.01.02

CASA DEL TOMERO

01.01.03

CAMPAMENTO BOCATOMA

01.01.04
01.01.05
01.01.06

CAMINOS DE ACCESO

01.01.07

PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

METRADO
METRADO

COSTOS
UNITARIOS

PARCIAL

04 DICIEMBRE
METRADO

COSTO

UBICACIN: MACARI - MELGAR - PUNO

ENERO
METRADO

FEBRERO
COSTO

2,107,267.02

0.00

0.00

METRADO

COSTO

MARZO
METRADO

COSTO

104,301.02

43,433.96

23,526.99

21,526.52

12,844.13

11,605.65

2,988.45

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14,912.58

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

29,811.52

0.00

0.00

0.00

0.00

TRAZO Y REPLANTEO DE BOCATOMA

M2

2,500.00

3.11

7,775.00

0.00

0.00

0.00

0.00

TRANSPORTE DE MAQUINARIA Y EQUIPO

GLB

2.00

9,945.00

19,890.00

0.00

0.00

0.00

0.00

1,700.00

31.43

53,431.00

0.00

0.00

0.00

0.00

M3

841.82

TRANSPORTE DE ROCA

M3

841.82

01.02.04

DESVIO DE RIO

M3

2,880.00

01.02.05

EXCAVACION EN MATERIAL SUELTO

M3

6,355.35

01.02.06

ACARREO DE MATERIAL PROVENIENTE DE EXCAV. CON MAQUINARIA

M3

3,177.68

3.11

01.02.07

RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO

M3

3,822.30

10.63

01.02.08

ENROCADO DE PROTECCION

M3

841.82

14.45

12,164.30

01.02.09

ELIMINACION DE MATERIAL EXCEDENTE

M3

3,039.86

4.87

01.03

CONCRETOS

01.03.01

CONCRETO f'c=175 KG/CM2 PARA ESTRUCTURAS DE BOCATOMA

M3

819.09

377.73

01.03.02

CONCRETO f'c=210 KG/CM2 PARA ESTRUCTURAS DE BOCATOMA

M3

202.50

416.57

01.03.03

CONCRETO f'c=175 KG/CM2+30%PM

M3

57.10

289.73

01.04

ENCOFRADO Y DESENCOFRADO

01.04.01

ENCOFRADO Y DESENCOFRADO PLANO

M2

01.04.02

ENCOFRADO Y DESENCOFRADO CURVO

01.05

ACERO DE REFUERZO

01.05.01

ACERO DE REFUERZO fy=4200 Kg/cm2.

01.06

VARIOS

01.06.01

COSTO

32,554.45

91,609.52

DESQUINCHE Y ACOPIO DE ROCA EN CANTERA

14 NOVIEMBRE
METRADO

0.00

126.32

01.02.03

COSTO

0.00

91,609.52

01.02.02

OCTUBRE
METRADO

5,964.28

1.00

22.70

COSTO

5,964.28

236.00

2,077.03

METRADO

65,049.40

M2

24.20

COSTO

428,556.64

GLB

841.82

METRADO

615,457.45

0.00

M3

COSTO

515,705.76

0.00

KM

METRADO

191,485.32

0.00

MANTENIMIENTO DE CAMINOS DE ACCESO

COSTO
111,482.59

0.00

EXPLOTACION DE ROCA EN CANTERA

METRADO

141,011.13

5,964.28

MOVIMIENTO DE TIERRAS

COSTO

SEPTIEMBRE

32,554.45

258,745.45

01.02.01

METRADO

AGOSTO

0.00

5,964.28

01.02

COSTO

JULIO

5,964.28

1.00

1.00

METRADO

FECHA: NOVIEMBRE DEL 2014

CRONOGRAMA VALORIZADO MENSUAL


MAYO
JUNIO

ABRIL

0.24

21,831.95

0.60

54,864.99

0.00

236.00

29,811.52

250.00

777.50

1.00

9,945.00

0.16

250.00

777.50

1,523.28

511.76

1,591.57

0.00

0.30

2,983.50

0.10

994.50

0.10

994.50

0.20

1,989.00

0.00

560.00

17,600.80

469.33

14,751.04

360.61

11,333.97

310.06

9,745.19

0.60

53431.00

0.00

0.00

0.00

0.00

25,530.10

32,551.67

0.00

12,164.30

0.00

0.00

0.00

0.00

227.99

5,175.37

236.76

5,374.45

227.99

5,175.37

149.08

3,384.12

0.00

0.00

841.82

9.57

8,056.22

0.00

0.00

0.00

0.00

0.00

0.00

68.85

658.89

298.14

2,853.20

287.10

2,747.55

187.73

1,796.58

0.00

0.00

841.82

8056.22

14.01

11,793.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

161.95

2,268.92

363.36

5,090.67

316.51

4,434.31

0.00

0.00

841.82

11793.90

4.53

13,046.40

0.00

0.00

0.00

0.00

0.00

2,880.00

13,046.40

0.00

0.00

0.00

0.00

2880.00

13046.40

4.00

25,421.40

0.00

0.00

0.00

0.00

0.00

3,120.93

12,483.70

0.00

0.00

0.00

6355.35

25421.38

9,882.58

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

562.71

1,750.03

8,132.56

0.00

0.00

3177.68

9882.58

40,631.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3,822.30

40,631.05

0.00

0.00

0.00

3822.30

40631.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12,164.30

841.82

12164.30

3039.86

35.55

99.11

38,976.20

4.70

FABRICACION Y MONTAJE DE COMPUERTA DE BARRAJE MOVIL CON


MECANIZMO DE IZAJE

UND

6.00

93,850.00

01.06.02

FABRICACION Y MONTAJE DE COMPUERTA DE REGULACION CON


MECANISMO DE IZAJE

UND

1.00

01.06.03

FABRICACION Y MONTAJE DE COMPUERTA DESRIPEADORA CON MECANISMO


DE IZAJE

UND

1.00

01.06.04

BOMBEO DE AGUA

HM

01.06.05

TRANSPORTE DE MATERIALES DE CONSTRUCCION

01.06.06

ACARREOS Y TRANSPORTE DE MATERIALES DENTRO DE LA OBRA

01.06.07

BARANDA DE FIERRO GALVANIZADO DE =2"

01.06.08

423.00

1,692.00

14,804.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

410,293.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

309,394.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

84,355.43

0.00

0.00

0.00

0.00

0.00

0.00

0.00

428.16

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

164,386.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,614.97

3,039.86

99,496.87
219.61

0.00

16,543.58
167,909.36

1,712.64

57.10

403.26

327.93

0.00

81.42

123,869.00

271.55

33,917.13

96.82

0.00
10,105.99
0.00

819.09

40,332.31

10,105.99

202.50

16,543.58

0.00

0.00

0.00

57.10

60,256.83

62,574.13

15,677.62

28,820.99

825.19

58,976.33

856.92

61,244.07

214.70

15,344.61

579.79

12.92

1,280.50

13.42

1,330.06

3.36

333.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

932,220.92

0.00

0.00

0.00

0.00

0.00

11,180.00

39,987.57

41,526.10

563,100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.79

167,991.50

2.67

250,579.50

1.54

76,850.00

76,850.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.33

25,360.50

0.49

37,656.50

44,850.00

44,850.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.33

14,800.50

0.49

21,976.50

1,500.00

109.70

164,550.00

0.00

0.00

0.00

0.00

0.00

50.00

5,485.00

274.42

30,103.87

284.98

31,262.31

274.42

30,103.87

274.42

TON

474.00

113.90

53,988.60

0.00

0.00

0.00

0.00

0.00

50.00

5,695.00

72.82

8,294.20

75.62

8,613.12

72.82

8,294.20

TON

474.00

14.62

6,929.88

0.00

0.00

0.00

0.00

0.00

0.00

72.95

1,066.53

75.75

1,107.47

72.95

47.50

95.45

4,533.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

29.29

CERCO DE PROTECCION_BOCATOMA

34.10

232.25

7,919.73

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.39

1,484.08

01.06.09

JUNTA WATER STOP DE 6"

179.40

25.20

4,520.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

69.52

01.06.10

FABRICACION Y COLOCACION DE LIMNIMETRO DE H=1.20m

UND

1.00

1,145.38

1,145.38

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.24

01.06.11

TUBERIA DE DRENAJE EN MUROS

UND

32.00

33.37

1,067.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

29.60

987.75

2.40

80.09

01.06.12

PRUEBA DE CALIDAD DEL CONCRETO(PRUEBA A LA COMPRESION)

UND

71.00

38.94

2,764.74

0.00

0.00

0.00

0.00

0.00

0.00

543.21

13.43

522.96

13.44

523.35

13.43

522.96

114,243.65

13.95

114,243.65

11,968.24

19109.31

14804.12
410293.87

29,400.79

0.00

24,307.16

24.26

50264.13
154909.26

0.00

3,523.36

12,693.76

24.20

102,572.58

183,188.14

12,693.76

841.82

1,993.95

142,904.89

183,188.14

2,700.80

5.85

14,804.12
157,786.13

82,953.29

0.96

19890.00

0.00

0.00

9,616.65

7775.00

2.00
1700.00

0.00

0.00

4.63

2500.00

0.00

0.00

57,107.31

9,263.55

0.00
994.50

0.00

9,533.04

4.46

0.10

0.00

0.00

12,188.57

9,263.55

1,989.00

29811.52

0.00

2,383.26

4.46

0.00
0.20

0.00

91609.52

236.00

0.00

15,367.31

9,616.65

489.80

1.00

0.00

0.00

KG

4.63

1,581.87

5964.28

0.00

19,109.31

M2

9,263.55

508.64

258745.45

50,264.13

71.47

4.46

1,523.28

COSTO
2107267.01

1.00

154,909.28

2,300.07

1,246.22

489.80

VALORIZACIN TOTAL
METRADO

309394.87
84355.43
16543.58
167909.36

2300.07
35.55

164386.00
3523.36

56,250.73

0.00

0.00

0.00

56,250.73

0.00

0.00

0.00

211,471.97

24,113.04

144,529.00

0.00

6.00

0.18

13,833.00

0.00

1.00

0.18

8,073.00

0.00

1.00

44850.00

30,103.87

284.98

31,262.31

56.78

6,228.77

1500.00

164550.00

72.82

8,294.20

75.62

8,613.12

54.30

6,184.77

474.00

53988.60

1,066.53

72.95

1,066.53

75.75

1,107.47

103.65

1,515.36

474.00

6929.88

2,795.73

18.21

1,738.14

0.00

47.50

4533.88

27.71

6,435.65

34.10

7919.73

1,751.90

109.88

2,768.98

179.40

4520.88

274.89

0.76

870.49

1.00

1145.38

0.00

32.00

1067.84

109.03

71.00

2764.74

251,923.55

352,018.69

0.00

0.00
13.95

543.21

2.80

183188.14
38976.20

183188.14
932220.92
563100.00
76850.00

CRONOGRAMA VALORIZADO DE OBRA - BOCATOMA - A FECHA DE AMPLIACIN DE PLAZO N 09


OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - PUNO
EJECUTA: CONSORCIO ATENEO

DESCRIPCIN

ITEM

PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

METRADO
UND

METRADO

COSTOS
UNITARIOS

02

CONSTRUCCION DIQUE DE ENCAUZAMIENTO

02.01

TRABAJOS PRELIMINARES

02.01.01

TRAZO Y REPLANTEO DE DIQUES

M2

8,160.00

0.56

02.01.02

LIMPIEZA Y DESBROCE DE TERRENO

M2

5,440.00

02.01.03

DESVIO DE RIO

M3

2,040.00

02.02

MOVIMIENTO DE TIERRAS

02.02.01

EXPLOTACION DE ROCA EN CANTERA

M3

5,442.04

02.02.02

DESQUINCHE Y ACOPIO DE ROCA EN CANTERA

M3

02.02.03

TRANSPORTE DE ROCA

M3

02.02.04

EXCAVACION DE UA DE CIMENTACION

02.02.05

CONFORMACION DE TERRAPLEN DE DIQUE

02.02.06

PARCIAL

04 DICIEMBRE
METRADO

COSTO

UBICACIN: MACARI - MELGAR - PUNO

ENERO
METRADO

FEBRERO
COSTO

METRADO

COSTO

MARZO
METRADO

COSTO

METRADO

FECHA: NOVIEMBRE DEL 2014

CRONOGRAMA VALORIZADO MENSUAL


MAYO
JUNIO

ABRIL
COSTO

METRADO

COSTO

METRADO

COSTO

JULIO
METRADO

COSTO

METRADO

486,644.85

0.00

0.00

0.00

0.00

0.00

2,600.00

19,468.40

0.00

0.00

0.00

0.00

0.00

2,600.00

4,569.60

0.00

0.00

0.00

0.00

0.00

0.00

1,597.11

894.38

6,160.26

3,449.75

402.63

1.04

5,657.60

0.00

0.00

0.00

0.00

0.00

2,600.00

76.77

79.84

2,534.20

2,635.57

329.03

4.53

9,241.20

0.00

0.00

0.00

0.00

0.00

0.00

293.25

1,328.42

1,746.75

467,176.45

0.00

0.00

0.00

0.00

0.00

0.00

22.70

123,534.31

0.00

0.00

0.00

0.00

0.00

5,442.04

9.57

52,080.32

0.00

0.00

0.00

0.00

5,442.04

14.01

76,242.98

0.00

0.00

0.00

0.00

5,901.85

5.21

30,748.64

0.00

0.00

0.00

0.00

M3

5,817.92

19.60

114,031.23

0.00

0.00

0.00

RELLENO CON MATERIAL DE FILTRO

M3

510.00

20.74

10,577.40

0.00

0.00

02.02.07

COLOCACION Y ACOMODO DE ENROCADO PESADO

M3

5,442.04

9.29

50,556.55

0.00

02.02.08

LIMPIEZA FINAL DE CAUCE

M2

4,500.00

2.09

9,405.01

0.00

COSTO DIRECTO

2,593,911.87

COSTO DIRECTO X FR=0.9

2,334,520.68

GASTOS GENERALES 14.87%


UTILIDAD 10%
SUB TOTAL
IMPUESTO IGV 18%
TOTAL PRESUPUESTO

347,050.66

COSTO

METRADO

COSTO

OCTUBRE
METRADO

COSTO

14 NOVIEMBRE
METRADO

COSTO

VALORIZACIN TOTAL
METRADO

COSTO

220,381.55

64,097.44

1,359.32

567.66

0.00

0.00

0.00

225.47

0.00

0.00

0.00

8160.00

342.19

0.00

0.00

0.00

5440.00

7,912.78

0.00

0.00

0.00

0.00

2040.00

0.00

0.00

181,338.14

220,381.55

64,097.44

1,359.32

0.00

0.00

0.00

3,324.47

75,465.47

2,117.57

48,068.84

0.00

0.00

5442.04

123534.31

0.00

0.00

0.00

0.00

5,442.04

52,080.32

0.00

0.00

5442.04

52080.32

0.00

0.00

0.00

0.00

1,229.69

17,227.96

4,212.35

59,015.02

0.00

0.00

5442.04

0.00

0.00

0.00

0.00

0.00

3,651.77

19,025.72

2,250.08

11,722.92

0.00

5901.85

30748.64

0.00

0.00

0.00

0.00

0.00

36,564.39

3,493.91

68,480.64

458.48

8,986.21

0.00

5817.92

114031.23

0.00

0.00

0.00

0.00

0.00

0.00

0.00

121.12

2,512.03

388.88

8,065.37

0.00

510.00

10577.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,244.84

20,854.56

3,197.20

29,701.99

0.00

5442.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,160.16

2,424.74

2,689.45

5,620.96

1,359.32

4500.00

0.00

0.00

5,964.28

0.00

32,554.45

143,611.13

113,785.24

205,483.41

697,611.56

835,839.00

492,654.08

66,408.71

2,593,911.86

0.00

0.00

5,367.85

0.00

29,299.01

129,250.02

102,406.72

184,935.07

627,850.40

752,255.10

443,388.67

59,767.84

2,334,520.67

0.00

0.00

797.99

0.00

4,355.60

19,214.35

13,998.09

SEPTIEMBRE

181,905.80

2,500.00

2,302.64

AGOSTO

2,302.64

15,223.82

13,998.09

27,492.51

1,865.53

93,336.46

0.00

111,830.50

65,914.31

650.39

8,885.11

486644.85
19468.40
4569.60
5657.60
9241.20
467176.45

76242.98

50556.55
9405.01

347,050.65

233,452.07

0.00

0.00

536.79

0.00

2,929.90

12,925.00

10,240.67

18,493.51

62,785.04

75,225.51

44,338.87

5,976.78

233,452.07

2,915,023.41

0.00

0.00

6,702.62

0.00

36,584.51

161,389.37

127,871.21

230,921.09

783,971.90

939,311.11

553,641.85

74,629.73

2,915,023.40

524,704.21

0.00

0.00

1,206.47

0.00

6,585.21

29,050.09

23,016.82

41,565.80

141,114.94

169,076.00

99,655.53

13,433.35

524,704.21

0.00

0.00

7,909.10

0.00

43,169.72

190,439.46

150,888.02

272,486.88

925,086.85

1,108,387.12

653,297.39

88,063.08

3,439,727.61

PORCENTAJE DE AVANCE PARCIAL (%)

3,439,727.62

0.00%

0.00%

0.23%

0.00%

1.26%

5.54%

4.39%

7.92%

26.89%

32.22%

18.99%

2.56%

100.00%

PORCENTAJE DE AVANCE ACOMULADO (%)

0.00%

0.00%

0.23%

0.23%

1.48%

7.02%

11.41%

19.33%

46.22%

78.45%

97.44%

100.00%

100.00%

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

ITEM

DESCRIPCIN

METRADO
UND

METRADO

01

CONSTRUCCION DE CANAL PRINCIPAL

01.01

OBRAS PROVISIONALES

01.01.01

CAMPAMENTO PROVISIONAL DE OBRA CL.

m2

150.00

01.01.02

CARTEL DE OBRA 5x3m

Und

1.00

01.01.03

TRANSPORTE DE MATERIAL DE CONSTRUCCIN

Ton

1,222.90

01.01.04

TRANSPORTE DE MAQUINARIA Y EQUIPO

Glb

2.00

01.02

TRABAJOS PRELIMINARES

01.02.01

CONTROL TOPOGRAFICO EN SUPERFICIE Cp

Mes

8.00

01.02.02

LIMPIEZA Y DESBROCE A MAQUINA e=0.20M

m2

11,715.00

01.02.03

APERTURA DE CAMINOS DE ACCESO

km

2.50

01.02.04

MANTENIMIENTO DE CAMINOS

10,000.00

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

ITEM

DESCRIPCIN

METRADO
UND

METRADO

01.03

MOVIMIENTO DE TIERRAS

01.03.01

EXCAVACION DE PLATAFORMA EN MATERIAL SUELTO A MAQ.

m3

26,517.04

01.03.02

EXCAVACION DE PLATAFORMA EN ROCA SUELTA A MAQ.

m3

491.43

01.03.03

EXCAVACION DE PLATAFORMA EN ROCA FIJA A MAQ.

m3

1,458.00

01.03.04

EXCAVACION DE CAJA DE CANAL A MAQUINA MAT. SUELTO

m3

7,020.52

01.03.05

EXCAVACION Y REFINE DE CAJA DE CANAL A MANO EN MATERIAL SUELTO

m3

1,898.13

01.03.06

EXCAVACION Y REFINE DE CAJA DE CANAL A MAQUINA EN ROCA SUELTA

m3

284.63

01.03.07

EXCAVACION Y REFINE DE CAJA DE CANAL A MAQUINA EN ROCA FIJA

m3

853.88

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

DESCRIPCIN

ITEM

METRADO
UND

METRADO

01.03.08

EXCAVACIN DE ZANJAS DE DRENAJE

m3

19.68

01.03.09

TERRAPLEN COMPACTADO CP

m3

8,262.01

01.03.10

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

1,431.29

01.03.11

PERFILADO FINAL Y PROTECCION DE BERMAS CON MATERIAL GRANULAR

m2

10,797.60

01.03.12

ELIMINACION DE MATERIAL EXCEDENTE

m3

8,775.65

01.04

SUMINISTRO Y COLOCACION DE GEOTEXTIL

01.04.01

SUMINISTRO Y COLOCACION DE GEOTEXTIL NO TEJIDO

m2

3,350.00

01.05

ENCOFRADO Y DESENCOFRADO

01.05.01

ENCOFRADO Y DESENCOFRADO DE CANAL

m2

3,845.69

01.06

ACEROS

01.06.01

ACERO DE REFUERZO

Kg

48,396.39

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

DESCRIPCIN

ITEM

METRADO
UND

METRADO

01.07

CONCRETOS

01.07.01

CONCRETO F'C= 100KG/CM2. PARA SOLADO

m3

101.22

01.07.02

CONCRETO F'C= 175 Kg/cm2 PARA CANALES CERRADOS

m3

677.19

01.07.03

CONCRETO F'C= 175 Kg/cm2 PARA REVESTIMIENTO DE CANALES

m3

1,816.34

01.08

SUMINISTRO Y COLOCACION DE LLORADEROS

01.08.01

SUMINISTRO Y COLOCACION DE LLORADEROS 1''

525.00

01.09

JUNTAS Y SELLOS

01.09.01

JUNTA WATER STOP 6''

717.90

01.09.02

JUNTAS ELASTOMERICAS e=3/4''

6,946.30

01.10

TRANSPORTES

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

DESCRIPCIN

ITEM

METRADO
UND

METRADO

m3

10,740.61

01.10.01

TRANS. MATERIAL DE RELLENO

02

OBRAS DE ARTE

02.01

TRABAJOS PRELIMINARES

02.01.01

TRAZO Y REPLANTEO

m2

1,821.11

02.01.02

LIMPIEZA Y DESBROCE A MANO

m2

1,821.11

02.02

MOVIMIENTO DE TIERRAS

02.02.01

EXCAVACION EN OBRAS DE ARTE Cp.

m3

736.98

02.02.02

RELLENO COMPACTADO DE OBRAS DE ARTE Cp.

m3

453.95

02.02.03

ELIMINACION DE MATERIAL EXCEDENTE

m3

340.00

02.03

CONCRETOS

02.03.01

CONCRETO F'C= 100KG/CM2. PARA SOLADO

m3

6.01

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

ITEM

DESCRIPCIN

METRADO
UND

METRADO

02.03.02

CONCRETO F'C= 175 Kg/cm2 +30% PM Cp.

m3

445.53

02.03.03

CONCRETO F'C= 175 Kg/cm2 Cp.

m3

234.24

02.03.04

CONCRETO F'C 210 KG/CM2 Cp.

m3

67.21

02.04

ENCOFRADO Y DESENCOFRADO

02.04.01

ENCOFRADO Y DESENCOFRADO DE OBRAS DE ARTE

m2

2,981.22

02.05

ACERO DE REFUERZO

02.05.01

ACERO DE REFUERZO OBRAS DE ARTE

Kg

17,742.63

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

DESCRIPCIN

ITEM

METRADO
UND

METRADO

02.06

JUNTAS Y SELLOS

02.06.01

JUNTAS ELASTOMERICAS e=3/4''

304.32

02.06.02

JUNTA DE DILATACIN e=1''

297.60

02.06.03

JUNTA WATER STOP 6''

85.40

03

CRUCE Y DESVIO PROVISIONAL DE CARRETERA

03.01

TRAZO Y REPLANTEO CD

42.50

03.02

TRAZO Y REPLANTEO

m2

62.40

03.03

TRANS. MATERIAL DE RELLENO

m3

97.42

03.04

TERRAPLEN COMPACTADO CP

m3

74.94

03.05

LIMPIEZA Y DESBROCE A MANO

m2

62.40

03.06

SEALIZACIN POR TRAJOS DE DESVIO

Glb

1.00

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

DESCRIPCIN

ITEM

METRADO
UND

METRADO

03.07

EXCAVACION EN OBRAS DE ARTE Cp.

m3

64.00

03.08

CONCRETO F'C= 100KG/CM2. PARA SOLADO

m3

72.80

03.09

ACERO DE REFUERZO OBRAS DE ARTE

Kg

2,228.87

03.10

ENCOFRADO Y DESENCOFRADO DE OBRAS DE ARTE

m2

172.59

03.11

CONCRETO F'C 210 KG/CM2 Cp.

m3

28.20

03.12

CONCRETO F'C= 175 Kg/cm2 Cp.

m3

1.60

03.13

JUNTA WATER STOP 6''

24.50

03.14

JUNTAS ELASTOMERICAS e=3/4''

24.50

03.15

RELLENO COMPACTADO DE OBRAS DE ARTE Cp.

m3

72.80

03.16

ELIMINACION DE MATERIAL EXCEDENTE

m3

97.42

04

VARIOS

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

ITEM

DESCRIPCIN

METRADO
UND

METRADO

Und

40.00

352.58

04.01

COMPUERTA LATERAL TIPO IZAJE DE 0.30X0.60 M

04.02

BARANDA DE TUBO DE ACERO = 1 1/2'' H=0.60 @ 0.80m

04.03

PLANCHA DE F.G 1/4'' 0.9x3m

Und

1.00

04.04

ENROCADO DE PROTECCION A MANO

m3

225.23

05

CONTROL DE CALIDAD

05.01

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

Und

324.00

05.02

PRUEBAS DE CONTROL DE COMPACTACION DE TERRAPLEN

Und

198.00

COSTO DIRECTO
COSTO DIRECTO X FR=0.9
GASTOS GENERALES 14.87%

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

ITEM

DESCRIPCIN

METRADO
UND

METRADO

UTILIDAD 10%
SUB TOTAL
IMPUESTO IGV 18%
TOTAL PRESUPUESTO
PORCENTAJE DE AVANCE PARCIAL (%)
PORCENTAJE DE AVANCE ACOMULADO (%)

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS
UNITARIOS

PARCIAL

04 DICIEMBRE
METRADO

COSTO

ENERO
METRADO

COSTO

3,095,518.01

7,673.96

0.00

188,922.92

7,673.96

0.00

269.24

40,386.00

0.00

0.00

7,673.96

7,673.96

7,673.96

0.00

80.15

98,015.44

0.00

0.00

21,423.76

42,847.52

0.00

0.00

164,407.69

0.00

0.00

13,598.32

108,786.56

0.00

0.00

1.24

14,526.60

0.00

0.00

4,357.81

10,894.53

0.00

0.00

3.02

30,200.00

0.00

0.00

1.00

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS
UNITARIOS

PARCIAL

04 DICIEMBRE
METRADO

COSTO

ENERO
METRADO

COSTO

705,990.80

0.00

0.00

6.35

168,383.20

0.00

0.00

20.60

10,123.46

0.00

0.00

26.54

38,695.32

0.00

0.00

8.85

62,131.60

0.00

0.00

62.72

119,050.71

0.00

0.00

23.69

6,742.88

0.00

0.00

23.61

20,160.11

0.00

0.00

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS

04 DICIEMBRE

UNITARIOS

PARCIAL

51.40

1,011.55

0.00

0.00

15.00

123,930.15

0.00

0.00

7.92

11,335.83

0.00

0.00

6.63

71,588.09

0.00

0.00

8.30

72,837.90

0.00

0.00

13,735.00

0.00

0.00

13,735.00

0.00

0.00

308,578.17

0.00

0.00

308,578.17

0.00

0.00

207,620.51

0.00

0.00

207,620.51

0.00

0.00

4.10

80.24

4.29

METRADO

COSTO

ENERO
METRADO

COSTO

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS
UNITARIOS

PARCIAL

04 DICIEMBRE
METRADO

COSTO

ENERO
METRADO

COSTO

1,155,343.50

0.00

0.00

235.57

23,844.40

0.00

0.00

383.19

259,492.44

0.00

0.00

480.09

872,006.67

0.00

0.00

10,857.00

0.00

0.00

10,857.00

0.00

0.00

130,190.85

0.00

0.00

20.44

14,673.88

0.00

0.00

16.63

115,516.97

0.00

0.00

209,871.58

0.00

0.00

20.68

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS

04 DICIEMBRE

UNITARIOS

PARCIAL

19.54

209,871.58

0.00

0.00

588,419.71

0.00

0.00

6,920.22

0.00

0.00

1.12

2,039.64

0.00

0.00

2.68

4,880.57

0.00

0.00

51,180.88

0.00

0.00

41.01

30,223.55

0.00

0.00

39.95

18,135.30

0.00

0.00

8.30

2,822.03

0.00

0.00

220,572.98

0.00

0.00

1,415.78

0.00

0.00

235.57

METRADO

COSTO

ENERO
METRADO

COSTO

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS

04 DICIEMBRE

UNITARIOS

PARCIAL

264.48

117,833.77

0.00

0.00

326.27

76,425.48

0.00

0.00

370.45

24,897.94

0.00

0.00

221,832.58

0.00

0.00

221,832.58

0.00

0.00

76,115.88

0.00

0.00

76,115.88

0.00

0.00

74.41

4.29

METRADO

COSTO

ENERO
METRADO

COSTO

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS
UNITARIOS

PARCIAL

04 DICIEMBRE
METRADO

COSTO

ENERO
METRADO

COSTO

11,797.17

0.00

0.00

16.63

5,060.84

0.00

0.00

16.77

4,990.75

0.00

0.00

20.44

1,745.58

0.00

0.00

70,987.26

0.00

0.00

2.58

109.65

0.00

0.00

1.12

69.89

0.00

0.00

19.54

1,903.58

0.00

0.00

15.00

1,124.07

0.00

0.00

2.68

167.23

0.00

0.00

9,840.72

9,840.72

0.00

0.00

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS

04 DICIEMBRE
METRADO

COSTO

ENERO

UNITARIOS

PARCIAL

METRADO

COSTO

41.01

2,624.64

0.00

0.00

235.57

17,149.50

0.00

0.00

4.29

9,561.86

0.00

0.00

74.41

12,842.24

0.00

0.00

370.45

10,446.69

0.00

0.00

326.27

522.03

0.00

0.00

20.44

500.78

0.00

0.00

16.63

407.44

0.00

0.00

39.95

2,908.36

0.00

0.00

8.30

808.58

0.00

0.00

81,297.02

0.00

0.00

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS

04 DICIEMBRE
METRADO

COSTO

ENERO

UNITARIOS

PARCIAL

METRADO

COSTO

618.40

24,736.00

0.00

0.00

89.22

31,457.19

0.00

0.00

2,279.25

2,279.25

0.00

0.00

101.34

22,824.58

0.00

0.00

8,847.90

0.00

0.00

16.95

5,491.80

0.00

0.00

16.95

3,356.10

0.00

0.00

3,845,069.90

7,673.96

0.00

3,460,562.91

6,906.56

0.00

514,448.48

1,026.73

0.00

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS
UNITARIOS

CIAL (%)

MULADO (%)

PARCIAL

04 DICIEMBRE
METRADO

COSTO

ENERO
METRADO

COSTO

346,056.29

690.66

0.00

4,321,067.69

8,623.95

0.00

777,792.18

1,552.31

0.00

5,098,859.87

10,176.26

0.00

0.20%

0.00%

0.20%

0.20%

CRONOGRAMA VALORIZADO DE OBRA - CANA


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

COSTO

MARZO
METRADO

COSTO

METRADO

COSTO

13,598.32

52,197.22

18,128.32

0.00

21,423.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

21,423.76

0.00

25,280.71

18,128.32

0.00

1.00

13,598.32
1.00

ABRIL

13,598.32

1.00

13,598.32

1.00

0.00

3,120.00

3,868.80

0.00

0.00

1.10

4,793.59

0.00

0.00

1,000.00

3,020.00

1,500.00

13,598.32

4,530.00

CRONOGRAMA VALORIZADO DE OBRA - CANA


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

COSTO

MARZO
METRADO

0.00

ABRIL

COSTO

METRADO

COSTO

5,492.75

0.00

5,492.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

865.00

CRONOGRAMA VALORIZADO DE OBRA - CANA


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

COSTO

MARZO
METRADO

ABRIL

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CRONOGRAMA VALORIZADO DE OBRA - CANA


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

COSTO

MARZO
METRADO

ABRIL

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CRONOGRAMA VALORIZADO DE OBRA - CANA


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

COSTO

MARZO
METRADO

ABRIL

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CRONOGRAMA VALORIZADO DE OBRA - CANA


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

COSTO

MARZO
METRADO

ABRIL

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CRONOGRAMA VALORIZADO DE OBRA - CANA


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

COSTO

MARZO
METRADO

ABRIL

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

32,989.28

0.00

0.00

42.50

109.65

0.00

0.00

62.40

69.89

0.00

0.00

97.42

1,903.58

0.00

0.00

74.94

1,124.07

0.00

0.00

62.40

167.23

0.00

0.00

1.00

9,840.72

CRONOGRAMA VALORIZADO DE OBRA - CANA


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

COSTO

MARZO
METRADO

ABRIL

COSTO

METRADO

COSTO

0.00

0.00

64.00

2,624.64

0.00

0.00

72.80

17,149.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CRONOGRAMA VALORIZADO DE OBRA - CANA


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

COSTO

MARZO
METRADO

ABRIL

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13,598.32

52,197.22

51,117.60

12,238.49

46,977.50

46,005.84

1,819.38

6,983.69

6,839.24

CRONOGRAMA VALORIZADO DE OBRA - CANA


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

COSTO

MARZO
METRADO

ABRIL

COSTO

METRADO

COSTO

1,223.85

4,697.75

4,600.58

15,281.71

58,658.94

57,445.67

2,750.71

10,558.61

10,340.22

18,032.42

69,217.55

67,785.89

0.35%

1.36%

1.33%

0.55%

1.91%

3.24%

A - CANAL PRINCIPAL - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

COSTO

METRADO

COSTO

31,557.20

138,936.12

129,935.50

0.00

1,603.00

56,416.00

0.00

0.00

0.00

0.00

0.00

1.00

METRADO

20.00

1,603.00

150.00

40,386.00
0.00

200.00

16,030.00

0.00

0.00

0.00

13,598.32

23,317.03

16,729.65

13,598.32

1.00

13,598.32

0.70

9,518.82

0.00

3,645.00

4,519.80

1,806.24

2,239.74

0.00

0.50

2,178.91

0.30

1,307.34

0.00

1,000.00

3,020.00

1,213.16

3,663.74

A - CANAL PRINCIPAL - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

METRADO

17,958.88
2,828.17

COSTO

METRADO

114,016.09

COSTO
56,789.85

17,958.88

17,186.44

109,133.87

4,294.11

27,267.60

0.00

48.72

1,003.53

232.30

4,785.38

0.00

146.15

3,878.70

932.06

24,736.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

A - CANAL PRINCIPAL - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

METRADO

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

A - CANAL PRINCIPAL - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

METRADO

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

A - CANAL PRINCIPAL - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

METRADO

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

28,919.87

92,504.90

0.00

924.24

1,829.76

0.00

243.22

272.41

496.94

556.57

0.00

243.22

651.83

475.07

1,273.19

0.00
0.00

14,620.73
336.34

0.00

13,793.30

5,532.66
134.91

5,532.66

0.00

0.00

827.43

0.00

0.00

7,011.36

33,469.94

0.00

0.00

0.00

0.00

99.69

A - CANAL PRINCIPAL - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

METRADO

COSTO

METRADO

COSTO

0.00

26.51

7,011.36

126.55

33,469.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6,363.54

51,672.54

0.00

85.52

6,363.54

694.43

51,672.54

0.00

0.00

0.00

0.00

0.00

0.00

A - CANAL PRINCIPAL - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

METRADO

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

34,160.15

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

A - CANAL PRINCIPAL - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

METRADO

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,228.87

9,561.86

0.00

0.00

172.59

12,842.24

0.00

0.00

28.20

10,446.69

0.00

0.00

0.00

500.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

808.58

0.00

0.00

0.00

0.00
0.00

0.00
0.00

24.50

97.42

A - CANAL PRINCIPAL - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

METRADO

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

33.90

0.00

33.90

0.00

0.00

0.00

0.00

31,557.20

202,050.04

222,440.40

28,401.48

181,845.04

200,196.36

4,222.17

27,033.15

29,761.26

0.00

2.00

A - CANAL PRINCIPAL - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

METRADO

COSTO

METRADO

COSTO

2,840.15

18,184.50

20,019.64

35,463.80

227,062.69

249,977.26

6,383.48

40,871.28

44,995.91

41,847.29

267,933.97

294,973.16

0.82%

5.25%

5.79%

4.06%

9.32%

15.10%

FECHA: NOVIEMBRE DEL 2014

AGOSTO
METRADO

205.00

SEPTIEMBRE

COSTO

METRADO

COSTO

210,936.54

1,170,276.13

16,430.75

16,430.75

0.00

0.00

0.00

0.00

16,430.75

205.00

16,430.75

0.00

0.00

16,728.86

15,877.78

0.70

9,518.82

0.70

9,518.82

1,739.34

2,156.78

1,404.42

1,741.48

0.35

1,525.23

0.25

1,089.45

1,168.22

3,528.02

1,168.22

3,528.02

OCTUBRE
METRADO

205.00

0.40

1,213.16

FECHA: NOVIEMBRE DEL 2014

AGOSTO
METRADO

SEPTIEMBRE

COSTO

METRADO

COSTO

122,461.08

170,889.30

1,343.32

8,530.08

0.00

210.41

4,334.45

0.00

379.79

10,079.63

0.00

2,555.91

22,619.80

4,464.61

39,511.80

216.70

13,591.42

699.14

43,850.06

0.00

284.63

6,742.88

0.00

853.88

20,160.11

OCTUBRE
METRADO

726.03

FECHA: NOVIEMBRE DEL 2014

AGOSTO
METRADO

SEPTIEMBRE

COSTO

METRADO

0.00
4,220.38

3,350.00

120.18

63,305.70

4,041.63

60,624.45

0.00

0.00

0.00

0.00

0.00

0.00

13,735.00

0.00

13,735.00

0.00

9,643.24

170,489.14

9,643.24

7,723.97

METRADO

0.00

2,124.74

7,723.97
1,800.46

COSTO

OCTUBRE

170,489.14

1,431.29

3,181.17

1,600.77

136,559.92
31,832.15

136,559.92

14,763.78

FECHA: NOVIEMBRE DEL 2014

AGOSTO
METRADO

SEPTIEMBRE

COSTO

METRADO

23,263.79

COSTO

OCTUBRE
METRADO

433,365.15

57.78

13,611.23

43.44

10,233.16

25.19

9,652.56

445.41

170,676.66

206.59

0.00

525.85

252,455.33

598.92

403.88
19.53

403.88

7,141.01
345.31

545.95
26.71

545.95

7,141.01

160.16

9,651.56
472.19

9,651.56

219.00

0.00

0.00

618.33

0.00

209,871.52

FECHA: NOVIEMBRE DEL 2014

AGOSTO
METRADO

SEPTIEMBRE

COSTO

METRADO

COSTO

0.00

10,740.61

209,871.52

115,258.68

163,085.12

1,761.97

1,761.97

OCTUBRE
METRADO

478.53

535.95

478.53

535.95

123.89

457.47

1,226.02

457.47

1,226.02

187.88

16,737.00

13,744.62

126.21

5,175.87

126.21

5,175.87

289.39

11,561.13

164.56

6,574.17

0.00

240.31

1,994.57

38,844.72
0.00

13.31

69,655.20
3.77

888.10

2.24

FECHA: NOVIEMBRE DEL 2014

AGOSTO

SEPTIEMBRE

OCTUBRE

METRADO

COSTO

METRADO

COSTO

METRADO

121.86

32,229.53

121.86

32,229.53

48.75

15.62

5,096.34

86.28

28,150.58

89.60

4.10

1,518.85

22.64

8,386.99

23.51

49,758.71
668.71

49,758.71

49,758.71
668.71

8,156.28
1,901.23

8,156.28

49,758.71

694.43

28,164.62
6,565.18

28,164.62

6,817.69

FECHA: NOVIEMBRE DEL 2014

AGOSTO
METRADO

SEPTIEMBRE

COSTO

METRADO

COSTO

OCTUBRE
METRADO

0.00

0.00

0.00

0.00

129.34

0.00

0.00

252.96

0.00

0.00

3,837.83

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

FECHA: NOVIEMBRE DEL 2014

AGOSTO
METRADO

SEPTIEMBRE

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

522.03

0.00

0.00

0.00

24.50

407.44

0.00

72.80

2,908.36

0.00

0.00

0.00

13,994.07

65,616.53

1.60

OCTUBRE
METRADO

FECHA: NOVIEMBRE DEL 2014

AGOSTO

SEPTIEMBRE

METRADO

COSTO

METRADO

COSTO

8.00

4,947.20

32.00

19,788.80

58.76

5,242.57

293.82

26,214.62

0.00

0.26

592.61

3,804.30

187.69

19,020.50

37.54

949.20

OCTUBRE
METRADO

0.74

2,525.55

6.00

101.70

97.00

1,644.15

100.00

50.00

847.50

52.00

881.40

54.00

344,976.31

1,401,503.33

310,478.68

1,261,353.00

46,155.87

187,513.17

FECHA: NOVIEMBRE DEL 2014

AGOSTO
METRADO

SEPTIEMBRE

COSTO

METRADO

COSTO

31,047.87

126,135.30

387,682.42

1,575,001.47

69,782.83

283,500.26

457,465.25

1,858,501.74

8.97%

36.45%

24.07%

60.52%

OCTUBRE
METRADO

RE DEL 2014

OCTUBRE
COSTO

NOVIEMBRE
METRADO

COSTO

DICIEMBRE
METRADO

COSTO

685,362.37

437,088.16

191,295.32

16,430.75

16,030.00

36,483.95

0.00

0.00

0.00

0.00

0.00

0.00

16,430.75

16,030.00

187.90

15,060.19

0.00

0.00

1.00

21,423.76

9,103.07

7,471.83

5,439.33

200.00

0.30

4,079.50

4,573.79
0.20

2,719.66

0.00

0.00

0.00

0.00

0.00

0.00

3,663.74

1,123.29

3,392.34

613.95

1,854.13

06 ENERO
METRADO

RE DEL 2014

OCTUBRE
COSTO

NOVIEMBRE
METRADO

COSTO

DICIEMBRE
METRADO

COSTO

83,276.13

100,856.46

34,250.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

16,072.63

0.00

0.00

0.00

0.00

0.00

0.00

0.00

45,536.60

256.26

06 ENERO
METRADO

RE DEL 2014

OCTUBRE

NOVIEMBRE

DICIEMBRE

COSTO

METRADO

COSTO

METRADO

COSTO

0.00

7.60

390.64

12.08

620.91

0.00

0.00

0.00

11,335.82

0.00

0.00

0.00

5,725.34

37,959.00

5,072.26

33,629.08

26,403.71

5,594.48

46,434.18

0.00

0.00

0.00

0.00

0.00

0.00

0.00

128,445.78

0.00

0.00

128,445.78

0.00

0.00

63,336.62

0.00

0.00

63,336.62

0.00

0.00

06 ENERO
METRADO

RE DEL 2014

OCTUBRE
COSTO

NOVIEMBRE
METRADO

COSTO

DICIEMBRE
METRADO

COSTO

366,698.72

266,238.71

65,777.13

0.00

0.00

0.00

79,163.22

0.00

0.00

287,535.50

554.56

266,238.71

137.01

0.00

0.00

3,312.11

0.00

0.00

14,759.19

46,491.16

50,210.46

4,476.36

0.00

0.00

0.00

2,795.62

46,491.16
0.00

3,019.27

METRADO

65,777.13

3,312.11

10,282.83

06 ENERO

50,210.46
0.00

513.08

RE DEL 2014

OCTUBRE
COSTO

NOVIEMBRE
METRADO

COSTO

DICIEMBRE
METRADO

COSTO

0.00

0.00

0.00

139,865.76

47,504.17

1,281.18

642.28

0.00

0.00

138.76

0.00

0.00

503.52

0.00

0.00

545.84

0.00

0.00

545.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

51,364.15

20,227.61

0.00

527.68

0.00

0.00

06 ENERO
METRADO

RE DEL 2014

OCTUBRE
COSTO

NOVIEMBRE
METRADO

12,893.40

COSTO

DICIEMBRE
METRADO

COSTO

0.00

0.00

29,233.79

42.74

13,944.78

0.00

8,709.28

16.96

6,282.83

0.00

12,606.54

0.00

12,606.54

0.00

10,547.09

0.00

10,547.09

0.00

51,672.54
51,672.54

169.42

29,247.89
29,247.89

2,458.53

06 ENERO
METRADO

RE DEL 2014

OCTUBRE
COSTO

NOVIEMBRE
METRADO

6,393.06

COSTO

DICIEMBRE
METRADO

COSTO

4,122.93

1,281.18

2,150.92

174.98

2,909.92

0.00

4,242.14

44.64

748.61

0.00

0.00

22.72

464.40

62.68

1,281.18

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

06 ENERO
METRADO

RE DEL 2014

OCTUBRE
COSTO

NOVIEMBRE
METRADO

COSTO

DICIEMBRE
METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,686.65

0.00

0.00

06 ENERO
METRADO

RE DEL 2014

OCTUBRE
COSTO

NOVIEMBRE
METRADO

COSTO

DICIEMBRE
METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

1,686.65

0.00

0.00

0.00

0.00

0.00

2,610.30

2,305.20

423.75

1,695.00

94.00

1,593.30

25.00

423.75

915.30

42.00

711.90

0.00

829,525.07

486,897.53

193,000.25

746,572.56

438,207.78

173,700.23

110,985.74

65,144.12

25,822.34

06 ENERO
METRADO

RE DEL 2014

OCTUBRE
COSTO

NOVIEMBRE
METRADO

COSTO

DICIEMBRE
METRADO

COSTO

74,657.26

43,820.78

17,370.02

932,215.56

547,172.68

216,892.58

167,798.80

98,491.08

39,040.66

1,100,014.36

645,663.76

255,933.25

21.57%

12.66%

5.02%

82.10%

94.76%

99.78%

06 ENERO
METRADO

NERO - 2016
COSTO

VALORIZACIN TOTAL
METRADO

COSTO

8,532.52

3,095,517.68

0.00

188,922.92

0.00

150.00

40,386.00

0.00

1.00

7,673.96

0.00

1,222.90

98,015.44

0.00

2.00

42,847.52

0.00

164,407.69

0.00

8.00

108,786.56

0.00

11,715.00

14,526.60

0.00

2.50

10,894.53

0.00

10,000.00

30,200.00

NERO - 2016
COSTO

VALORIZACIN TOTAL
METRADO

0.00

COSTO
705,990.54

0.00

26,517.04

168,383.18

0.00

491.43

10,123.36

0.00

1,458.00

38,695.20

0.00

7,020.52

62,131.60

0.00

1,898.13

119,050.71

0.00

284.63

6,742.88

0.00

853.88

20,160.11

NERO - 2016

VALORIZACIN TOTAL

COSTO

METRADO

COSTO

0.00

19.68

1,011.55

0.00

8,262.01

123,930.15

0.00

1,431.29

11,335.82

0.00

10,797.60

71,588.09

0.00

8,775.65

72,837.90

0.00
0.00

13,735.00
3,350.00

0.00
0.00

308,578.17
3,845.69

0.00
0.00

13,735.00

308,578.17
207,620.51

48,396.39

207,620.51

NERO - 2016
COSTO

VALORIZACIN TOTAL
METRADO

0.00

COSTO
1,155,343.50

0.00

101.22

23,844.40

0.00

677.19

259,492.44

0.00

1,816.34

872,006.67

0.00
0.00

10,857.00
525.00

8,532.52

10,857.00
130,190.85

0.00

717.90

14,673.88

8,532.52

6,946.30

115,516.97

0.00

209,871.52

NERO - 2016

VALORIZACIN TOTAL

COSTO

METRADO

COSTO

0.00

10,740.61

209,871.52

0.00

588,419.68

0.00

6,920.22

0.00

1,821.11

2,039.64

0.00

1,821.11

4,880.57

0.00

51,180.85

0.00

736.98

30,223.55

0.00

453.95

18,135.30

0.00

340.00

2,822.00

0.00
0.00

220,572.98
6.01

1,415.78

NERO - 2016

VALORIZACIN TOTAL

COSTO

METRADO

COSTO

0.00

445.53

117,833.77

0.00

234.24

76,425.48

0.00

67.21

24,897.94

0.00
0.00

221,832.58
2,981.22

0.00
0.00

221,832.58
76,115.88

17,742.63

76,115.88

NERO - 2016
COSTO

VALORIZACIN TOTAL
METRADO

0.00

COSTO
11,797.17

0.00

304.32

5,060.84

0.00

297.60

4,990.75

0.00

85.40

1,745.58

0.00

70,987.26

0.00

42.50

109.65

0.00

62.40

69.89

0.00

97.42

1,903.58

0.00

74.94

1,124.07

0.00

62.40

167.23

0.00

1.00

9,840.72

NERO - 2016

VALORIZACIN TOTAL

COSTO

METRADO

COSTO

0.00

64.00

2,624.64

0.00

72.80

17,149.50

0.00

2,228.87

9,561.86

0.00

172.59

12,842.24

0.00

28.20

10,446.69

0.00

1.60

522.03

0.00

24.50

500.78

0.00

24.50

407.44

0.00

72.80

2,908.36

0.00

97.42

808.58

0.00

81,297.25

NERO - 2016

VALORIZACIN TOTAL

COSTO

METRADO

COSTO

0.00

40.00

24,736.00

0.00

352.58

31,457.19

0.00

1.00

2,279.25

0.00

225.23

22,824.81

0.00

8,847.90

0.00

324.00

5,491.80

0.00

198.00

3,356.10

8,532.52

3,845,069.77

7,679.27

3,460,562.79

1,141.60

514,448.47

NERO - 2016
COSTO

VALORIZACIN TOTAL
METRADO

COSTO

767.93

346,056.28

9,588.80

4,321,067.54

1,725.98

777,792.16

11,314.78

5,098,859.70

0.22%

100.00%

100.00%

100.00%

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

ITEM

DESCRIPCIN

METRADO
UND

METRADO

1.00

CONSTRUCCION CANALES LATERALES

1.01

OBRAS PROVISIONALES

01.01.01

CAMPAMENTO PROVISIONAL DE OBRA

m2

210.00

01.01.02

CARTEL DE OBRA 5.0 x 3.0 m.

und

1.00

01.01.03

TRANSPORTE DE MATERIAL DE CONSTRUCCION

ton

1,027.45

01.01.04

TRANSPORTE DE MAQUINARIA Y EQUIPO

GLB

2.00

1.02

TRABAJOS PRELIMINARES

01.02.01

TRAZO Y REPLANTEO DE CANAL

10,000.00

01.02.02

LIMPIEZA Y DESBROCE A MAQUINA e=0.30 m.

m2

66,675.00

01.02.03

APERTURA DE CAMINOS DE ACCESO

8,500.00

01.02.04

MANTENIMIENTO DE CAMINOS DE ACCESO

10,675.00

1.03

MOVIMIENTO DE TIERRAS

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

ITEM

DESCRIPCIN

METRADO
UND

METRADO

01.03.01

EXCAVACION DE PLATAFORMA EN MATERIAL SUELTO A MAQUINA

m3

907.12

01.03.02

EXCAVACION DE CAJA CANAL EN MATERIAL SUELTO A MAQUINA CL

m3

11,160.41

01.03.03

EXCAVACION Y REFINE EN CAJA CANAL A MANO EN MATERIAL SUELTO

m3

1,240.05

01.03.04

DEMOLICION DE CANAL EXISTENTE

m3

160.72

01.03.05

ACOPIO DE MATERIAL DE RELLENO EN CANTERA

m3

55,134.79

01.03.06

ZARANDEO DE MATERIAL DE RELLENO

m3

55,134.79

01.03.07

TRANSPORTE DE MATERIAL COHESIVO

m3

41,351.09

01.03.08

TRANSPORTE DE MATERIAL AGREGADO

m3

13,783.70

01.03.09

TERRAPLEN COMPACTADO

m3

45,945.66

01.03.10

PERFILADO FINAL Y PROTECCION DE BERMAS CON MATERIAL GRANULAR

m2

26,377.00

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

DESCRIPCIN

ITEM

METRADO
UND

METRADO

01.03.11

ELIMINACION DE MATERIAL EXCEDENTE DE CORTE

m3

15,969.09

01.03.12

CONFORMACION DE DEPOSITOS DE MATERIAL EXCEDENTE

m3

15,969.09

1.04

OBRAS DE CONCRETO

01.04.01

CONCRETO F'C=175 KG/CM2 PARA REVESTIMIENTO DE CANALES

m3

2,201.15

1.05

ENCOFRADO Y DESENCOFRADO EN CANALES

01.05.01

CERCHAS DE MADERA (CANAL SEMI CIRCULAR)

und

667.00

01.05.02

COLOCACION DE CERCHAS DE MADERA

und

4,001.00

1.06

JUNTAS Y SELLOS

01.06.01

JUNTAS ESLASTOMERICAS e=3/4 "

12,930.33

2.00

CONSTRUCCION DE OBRAS DE ARTE

2.01

TRABAJOS PRELIMINARES

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

DESCRIPCIN

ITEM

METRADO
UND

METRADO

02.01.01

TRAZO Y REPLANTEO EN OBRAS DE ARTE

m2

2,219.96

02.01.02

LIMPIEZA Y DESBROCE A MANO

m2

2,219.96

2.02

MOVIMIENTO DE TIERRAS

02.02.01

EXCAVACION PARA CIMENTACION DE OBRAS DE ARTE

m3

791.72

02.02.02

RELLENO COMPACTADO DE OBRAS DE ARTE CON MATERIAL PROPIO

m3

697.39

02.02.03

ELIMINACION DE MATERIAL EXCEDENTE DE CORTE EN OBRAS DE ARTE

m3

328.90

2.03

CONCRETOS

02.03.01

CONCRETO F'C=140 KG/CM2 +30% P.M.

m3

7.88

02.03.02

CONCRETO F'C=175 KG/CM2 +30% P.M

m3

235.80

02.03.03

CONCRETO F'C=175 KG/CM2 P/OBRAS DE ARTE.

m3

318.84

02.03.04

CONCRETO F'C=210 KG/CM2 p

m3

43.58

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

DESCRIPCIN

ITEM

METRADO
UND

METRADO

m2

1,906.06

kg

16,588.68

2.04

ENCOFRADO Y DESENCOFRADO

02.04.01

ENCOFRADO Y DESENCOFRADO NORMAL.

2.05

ACERO DE REFUERZO

02.05.01

ACERO CORTADO Y HABILITADO.

2.06

JUNTAS Y SELLOS

02.06.01

JUNTAS ESLASTOMERICAS e=3/4 "

538.55

02.06.02

JUNTAS DE DILATACION e=1"

281.20

02.06.03

JUNTAS WATER STOP DE 6 "

206.84

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

DESCRIPCIN

ITEM

METRADO
UND

METRADO

und

104.00

575.52

3.00

VARIOS

3.01

COMPUERTA TIPO IZAJE 0.30X0.30 M.

3.02

BARANDA DE FIERRO GALVANIZADO DE1 1/2 "

3.03

ENROCADO DE PROTECCION A MANO

m3

22.36

3.04

SUMINISTRO Y COLOCACION DE ATAGUIAS.

und

72.00

3.05

ACARREO DE MATERIAL DE CONSTRUCCION EN OBRA

ton

1,027.45

4.00

CONTROL DE CALIDAD

4.01

PRUEBAS DE CALIDAD DE CONCRETO (PRUEBA A LA COMPRESION)

und

281.00

4.02

PRUEBAS DE CONTROL DE COMPACTACION DE TERRAPLEN

und

666.00

COSTO DIRECTO
COSTO DIRECTO X FR=0.9

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

ITEM

DESCRIPCIN

METRADO
UND

METRADO

GASTOS GENERALES 14.87%


UTILIDAD 10%
SUB TOTAL
IMPUESTO IGV 18%
TOTAL PRESUPUESTO
PORCENTAJE DE AVANCE PARCIAL (%)
PORCENTAJE DE AVANCE ACOMULADO (%)

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS
UNITARIOS

PARCIAL

04 DICIEMBRE
METRADO

COSTO

ENERO
METRADO

COSTO

4,441,746.86

135,585.31

78,056.49

118,257.59

73,079.56

2,331.03

264.68

55,582.80

210.00

55,582.80

0.00

7,560.27

7,560.27

1.00

7,560.27

0.00

34.30

35,241.54

9,936.49

19,872.98

0.00
1.00

205,339.00

67.96

2,331.03

9,936.49

0.00

62,505.75

65,643.50

3.62

36,200.00

5,000.00

18,100.00

2,500.00

9,050.00

1.30

86,677.50

19,827.50

25,775.75

41,395.00

53,813.50

6.21

52,785.00

3,000.00

18,630.00

2.78

29,676.50

0.00

2,782,695.67

0.00

0.00
1,000.00

2,780.00
10,081.97

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS

04 DICIEMBRE
METRADO

COSTO

ENERO

UNITARIOS

PARCIAL

METRADO

5.25

4,762.38

0.00

0.00

5.14

57,364.51

0.00

0.00

54.19

67,198.31

0.00

0.00

62.73

10,081.97

0.00

4.57

251,965.99

0.00

0.00

5.13

282,841.47

0.00

0.00

18.23

753,830.37

0.00

0.00

19.34

266,576.76

0.00

0.00

17.09

785,211.33

0.00

0.00

2.31

60,930.87

0.00

0.00

160.72

COSTO

10,081.97

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS

04 DICIEMBRE

UNITARIOS

PARCIAL

11.78

188,115.88

0.00

0.00

3.37

53,815.83

0.00

0.00

961,968.58

0.00

0.00

961,968.58

0.00

0.00

107,767.74

0.00

0.00

44.84

29,908.28

0.00

0.00

19.46

77,859.46

0.00

0.00

265,718.28

0.00

0.00

265,718.28

0.00

0.00

490,761.98

0.00

0.00

12,143.18

0.00

0.00

437.03

20.55

METRADO

COSTO

ENERO
METRADO

COSTO

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS

04 DICIEMBRE
METRADO

COSTO

ENERO

UNITARIOS

PARCIAL

METRADO

COSTO

2.33

5,172.51

0.00

0.00

3.14

6,970.67

0.00

0.00

71,904.25

0.00

0.00

38.73

30,663.32

0.00

0.00

53.09

37,024.44

0.00

0.00

12.82

4,216.50

0.00

0.00

227,775.64

0.00

0.00

317.79

2,504.19

0.00

0.00

338.28

79,766.42

0.00

0.00

399.06

127,236.29

0.00

0.00

419.20

18,268.74

0.00

0.00

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS
UNITARIOS

PARCIAL

04 DICIEMBRE
METRADO

COSTO

ENERO
METRADO

COSTO

94,045.00

0.00

0.00

94,045.00

0.00

0.00

66,022.95

0.00

0.00

66,022.95

0.00

0.00

18,870.97

0.00

0.00

20.55

11,067.20

0.00

0.00

12.68

3,565.62

0.00

0.00

20.49

4,238.15

0.00

0.00

49.34

3.98

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS
UNITARIOS

PARCIAL

04 DICIEMBRE
METRADO

COSTO

ENERO
METRADO

COSTO

145,694.96

0.00

0.00

688.25

71,578.00

0.00

0.00

77.52

44,614.31

0.00

0.00

227.22

5,080.64

0.00

0.00

109.16

7,859.52

0.00

0.00

16.12

16,562.49

0.00

0.00

28,966.94

0.00

0.00

22.62

6,356.22

0.00

0.00

33.95

22,610.72

0.00

0.00

5,107,170.74

135,585.31

78,056.49

4,596,453.67

122,026.78

70,250.84

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS
UNITARIOS

CIAL (%)

MULADO (%)

PARCIAL

04 DICIEMBRE
METRADO

COSTO

ENERO
METRADO

COSTO

683,310.40

18,140.54

10,443.51

459,645.37

12,202.68

7,025.08

5,739,409.43

152,370.00

87,719.44

1,033,093.70

27,426.60

15,789.50

6,772,503.13

179,796.60

103,508.94

2.65%

1.53%

2.65%

4.18%

CRONOGRAMA VALORIZADO DE OBRA - CANALE


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

5,452.50

1,000.00

COSTO

MARZO
METRADO

ABRIL

COSTO

METRADO

COSTO

331,568.41

391,385.25

243,017.47

0.00

0.00

437.33

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9,868.25

1,362.97

8,990.00

0.00

0.00

0.00

7,088.25

0.00

0.00

0.00

0.00

1,000.00

6,210.00

1,362.97

1,000.00

2,780.00

2,780.00
321,700.16

490.28

390,022.28

12.75

437.33

151,717.79

CRONOGRAMA VALORIZADO DE OBRA - CANALE


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

COSTO

MARZO
METRADO

ABRIL

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

2,234.34

11,484.51

0.00

0.00

125.46

6,798.68

0.00

0.00

0.00

7,578.48

34,633.65

9,187.98

41,989.07

4,530.22

20,703.11

7,578.48

38,877.60

9,187.98

47,134.34

840.00

4,309.20

5,683.86

103,616.77

6,890.99

125,622.75

1,447.13

26,381.18

1,894.62

36,641.95

2,297.00

44,423.98

1,405.22

27,176.95

6,315.40

107,930.19

7,656.65

130,852.15

700.00

11,963.00

0.00

0.00

0.00

CRONOGRAMA VALORIZADO DE OBRA - CANALE


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

COSTO

MARZO
METRADO

ABRIL

COSTO

METRADO

COSTO

0.00

0.00

2,831.76

33,358.13

0.00

0.00

2,831.76

9,543.03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

120.00

5,380.80

0.00

0.00

296.80

5,775.73

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,560.81

11,416.47

0.00

67.58

106.36

70,715.82
161.81

70,715.82
11,156.53

CRONOGRAMA VALORIZADO DE OBRA - CANALE


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

MARZO

ABRIL

COSTO

METRADO

COSTO

METRADO

COSTO

0.00

9.60

22.37

22.20

51.73

0.00

14.40

45.22

17.40

54.64

0.00
0.00

518.98
518.98

26.40

1,022.47

0.00

0.00

48.31

2,564.78

0.00

0.00

0.00

0.00

974.25

5,446.31

0.00

0.00

0.00

0.00

13.40

3,587.25

2.88

974.25

16.10

5,446.31

0.00

0.00

0.00

0.00

0.00

0.00

CRONOGRAMA VALORIZADO DE OBRA - CANALE


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

COSTO

MARZO
METRADO

ABRIL

COSTO

METRADO

COSTO

0.00

0.00

2,276.55

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

46.14

2,276.55

CRONOGRAMA VALORIZADO DE OBRA - CANALE


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

15.00

COSTO

MARZO
METRADO

ABRIL

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

509.25

509.25

1,403.00

0.00

0.00

20.00

452.40

509.25

28.00

950.60

509.25

15.00

332,077.66

393,455.31

255,836.93

298,869.89

354,109.78

230,253.24

CRONOGRAMA VALORIZADO DE OBRA - CANALE


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

COSTO

MARZO
METRADO

ABRIL

COSTO

METRADO

COSTO

44,430.10

52,642.08

34,229.53

29,886.99

35,410.98

23,025.32

373,186.99

442,162.84

287,508.09

67,173.66

79,589.31

51,751.46

440,360.64

521,752.15

339,259.54

6.50%

7.70%

5.01%

10.69%

18.39%

23.40%

CANALES LATERALES - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

159.38

COSTO

METRADO

METRADO

COSTO

300,645.13

703,492.14

521,684.84

5,466.56

8,746.50

3,316.12

0.00

0.00

0.00

0.00

0.00

0.00

5,466.56

255.00

8,746.50

96.68

3,316.12

0.00

0.00

0.00

2,780.00

15,588.40

10,225.00

0.00

300.00

0.00

1,000.00

COSTO

1,086.00

400.00

0.00

1,448.00
0.00

0.00

1,440.00

8,942.40

1,100.00

6,831.00

2,780.00

2,000.00

5,560.00

700.00

1,946.00

151,348.71

476,508.45

353,618.07

CANALES LATERALES - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

METRADO

0.00

COSTO

METRADO

0.00

COSTO
0.00

1,602.90

8,238.91

739.80

3,802.57

1,584.97

8,146.75

136.50

7,396.94

246.60

13,363.25

181.50

9,835.49

0.00

0.00

0.00

2,156.84

9,856.76

9,527.54

43,540.86

6,788.32

31,022.62

3,447.06

17,683.42

9,927.54

50,928.28

6,847.10

35,125.62

1,768.16

32,233.56

7,445.66

135,734.29

5,135.32

93,616.88

266.54

5,154.88

2,881.89

55,735.66

1,711.77

33,105.63

2,872.55

49,091.88

8,272.95

141,384.72

5,561.46

95,045.35

0.00

1,799.20

4,156.15

4,945.69

11,424.54

CANALES LATERALES - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

METRADO

COSTO

METRADO

COSTO

1,431.84

16,867.08

1,839.12

21,664.83

2,398.50

28,254.33

1,431.84

4,825.30

1,839.12

6,197.83

2,386.01

8,040.85

125,876.79
288.03

125,876.79

181,911.59
416.25

15,173.07

181,911.59

139,377.61
318.92

20,737.20

139,377.61
15,148.04

120.00

5,380.80

150.00

6,726.00

90.00

4,035.60

503.20

9,792.27

720.00

14,011.20

571.04

11,112.44

0.00

0.00

0.00

0.00

0.00

0.00

0.00

20,575.97

90,896.72

0.00

1,283.12

2,132.54

CANALES LATERALES - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

METRADO

COSTO

METRADO

COSTO

0.00

244.31

569.24

369.85

861.75

0.00

227.35

713.88

404.71

1,270.79

0.00

4,951.86

13,271.39

0.00

70.29

2,722.33

110.25

4,269.98

0.00

33.15

1,759.93

169.55

9,001.41

0.00

36.63

469.60

0.00

0.00

9,575.23

48,852.30

0.00

0.00

0.00

0.00

15.40

5,209.51

70.00

23,679.60

0.00

10.94

4,365.72

63.08

25,172.70

0.00

0.00

0.00

CANALES LATERALES - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

METRADO

0.00
0.00

METRADO

3,508.57
71.11

0.00
0.00

COSTO
3,508.57

17,032.17
345.20

1,220.31
306.61

1,220.31

COSTO
17,032.17
8,763.92

2,201.99

8,763.92

0.00

36.88

844.39

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.80

36.88

41.21

844.39

CANALES LATERALES - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

METRADO

0.00
0.00

COSTO

METRADO

849.45

24,068.59

688.25

19.89

13,689.29

0.00

0.00

101.29

7,852.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

COSTO

10.00

905.20

161.20

156.78

1,108.86

2,527.29
4,254.56

10.00

226.20

13.00

294.06

38.00

859.56

20.00

679.00

24.00

814.80

100.00

3,395.00

301,550.33

726,026.42

640,904.71

271,395.30

653,423.78

576,814.24

CANALES LATERALES - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

METRADO

COSTO

METRADO

COSTO

40,345.72

97,138.21

85,749.41

27,139.53

65,342.38

57,681.42

338,880.55

815,904.36

720,245.07

60,998.50

146,862.79

129,644.11

399,879.04

962,767.15

849,889.18

5.90%

14.22%

12.55%

29.30%

43.52%

56.07%

FECHA: NOVIEMBRE DEL 2014

AGOSTO
METRADO

93.10

400.00

SEPTIEMBRE

COSTO

METRADO

COSTO

OCTUBRE
METRADO

COSTO

552,540.57

554,796.25

360,701.35

3,193.33

3,193.33

3,316.12

0.00

0.00

0.00

0.00

0.00

0.00

3,193.33

93.10

3,193.33

96.68

3,316.12

0.00

0.00

0.00

9,604.00

9,355.60

3,394.00

1,448.00

400.00

0.00

1,448.00

1,448.00

0.00

0.00
0.00

1,000.00

6,210.00

960.00

5,961.60

700.00

1,946.00

700.00

1,946.00

341,901.69

400.00

341,967.11

700.00

1,946.00
193,584.01

FECHA: NOVIEMBRE DEL 2014

AGOSTO

SEPTIEMBRE

OCTUBRE

METRADO

COSTO

METRADO

COSTO

METRADO

COSTO

262.92

1,380.33

275.38

1,445.75

285.97

1,501.34

1,526.27

7,845.03

1,526.27

7,845.03

1,584.97

8,146.75

174.78

9,471.33

174.78

9,471.33

181.50

9,835.49

0.00

0.00

0.00

6,536.90

29,873.63

6,536.90

29,873.63

2,291.61

10,472.66

6,593.50

33,824.66

6,593.50

33,824.66

4,119.63

21,133.70

4,945.12

90,149.54

4,945.12

90,149.54

3,078.54

56,121.88

1,648.38

31,879.67

1,648.38

31,879.67

26.17

506.22

5,355.48

91,525.15

5,355.48

91,525.15

2,232.08

38,146.25

4,762.51

11,001.40

4,762.51

11,001.40

4,945.69

11,424.54

FECHA: NOVIEMBRE DEL 2014

AGOSTO

SEPTIEMBRE

OCTUBRE

METRADO

COSTO

METRADO

COSTO

METRADO

COSTO

2,309.67

27,207.91

2,309.67

27,207.91

2,398.50

28,254.33

2,297.64

7,743.05

2,297.64

7,743.05

2,386.01

8,040.85

134,211.91
307.10

134,211.91

134,211.91
307.10

14,736.46

134,211.91

95,674.61
218.92

14,736.46

95,674.61
11,426.32

90.00

4,035.60

90.00

4,035.60

7.00

313.88

549.89

10,700.86

549.89

10,700.86

571.04

11,112.44

48,893.18
2,379.23

48,893.18

51,331.85
2,497.90

51,331.85

53,306.29
2,593.98

53,306.29

101,230.23

103,034.20

82,045.86

2,701.84

2,620.84

2,051.54

FECHA: NOVIEMBRE DEL 2014

AGOSTO

SEPTIEMBRE

OCTUBRE

METRADO

COSTO

METRADO

COSTO

METRADO

COSTO

359.86

838.47

459.86

1,071.47

469.85

1,094.75

593.43

1,863.37

493.43

1,549.37

304.71

956.79

16,652.97

16,652.97

12,902.86

206.17

7,984.96

206.17

7,984.96

155.92

6,038.78

163.27

8,668.00

163.27

8,668.00

119.84

6,362.31

0.00

0.00

39.14

501.77

51,138.73

51,149.75

29,939.01

3.01

956.55

4.87

1,547.64

0.00

70.00

23,679.60

61.42

20,777.16

0.00

60.74

24,238.90

60.74

24,238.90

63.08

25,172.70

5.40

2,263.68

10.94

4,586.05

11.37

4,766.30

FECHA: NOVIEMBRE DEL 2014

AGOSTO
METRADO

SEPTIEMBRE

COSTO

METRADO

16,584.16
336.12

16,584.16

12,158.86

METRADO

16,584.16
336.12

12,158.86
3,054.99

COSTO

OCTUBRE

16,584.16

17,032.17
345.20

12,158.86
3,054.99

1,993.66

12,158.86

COSTO
17,032.17
12,473.44

3,134.03

3,867.62

12,473.44
7,646.84

0.00

88.58

1,820.32

271.05

5,570.08

89.36

1,133.08

93.59

1,186.72

97.19

1,232.37

42.00

860.58

42.00

860.58

41.21

844.39

FECHA: NOVIEMBRE DEL 2014

AGOSTO
METRADO

SEPTIEMBRE

COSTO

METRADO

23,497.49

COSTO

OCTUBRE
METRADO

25,516.95

COSTO
26,497.77

19.15

13,179.99

19.15

13,179.99

19.89

13,689.29

97.54

7,561.30

97.54

7,561.30

101.29

7,852.00

0.00

170.98

0.00

0.00

0.00

18.50

2,019.46

19.30

2,106.79

2,756.20

170.98

2,756.20

176.78

2,849.69

4,299.80

4,299.80

5,318.30

40.00

904.80

40.00

904.80

40.00

904.80

100.00

3,395.00

100.00

3,395.00

130.00

4,413.50

681,568.09

687,647.20

474,563.28

613,411.28

618,882.48

427,106.95

FECHA: NOVIEMBRE DEL 2014

AGOSTO
METRADO

COSTO

SEPTIEMBRE
METRADO

COSTO

OCTUBRE
METRADO

COSTO

91,189.93

92,003.28

63,493.87

61,341.13

61,888.25

42,710.70

765,942.34

772,774.01

533,311.52

137,869.62

139,099.32

95,996.07

903,811.97

911,873.33

629,307.59

13.35%

13.46%

9.29%

69.41%

82.88%

92.17%

NOVIEMBRE
METRADO

89.52

COSTO

DICIEMBRE
METRADO

700.00

METRADO

COSTO

190,347.58

68,402.80

9,523.08

3,070.54

12,106.99

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3,070.54

63.28

2,170.50

0.00

0.00

1.00

9,936.49

0.00

2,989.52

0.00

1,086.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,903.52

0.00

0.00

0.00

3,032.00
300.00

COSTO

06 DICIEMBRE - 2016

1,086.00

1,946.00
50,245.43

300.00

684.72

NOVIEMBRE

DICIEMBRE
METRADO

COSTO

06 DICIEMBRE - 2016

METRADO

COSTO

METRADO

COSTO

82.85

434.96

0.00

0.00

360.89

1,854.97

0.00

0.00

18.93

1,025.82

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.19

203.99

0.00

0.00

3.73

72.14

0.00

0.00

1,623.61

27,747.49

0.00

0.00

5,161.40

11,922.83

0.00

0.00

NOVIEMBRE

DICIEMBRE

METRADO

COSTO

450.03

5,301.35

0.00

0.00

499.07

1,681.87

0.00

0.00

79,988.34

0.00

0.00

79,988.34

0.00

0.00

4,653.66

0.00

0.00

0.00

0.00

0.00

4,653.66

0.00

0.00

49,357.61

53,306.29

9,523.08

183.03

239.14

2,401.83

49,357.61

METRADO

2,593.98

COSTO

06 DICIEMBRE - 2016

53,306.29

METRADO

463.41

COSTO

9,523.08

64,373.42

15,628.31

0.00

1,179.35

0.00

0.00

NOVIEMBRE

DICIEMBRE

METRADO

COSTO

284.43

662.72

0.00

0.00

164.53

516.62

0.00

0.00

2,274.73

1,091.24

0.00

120.84

0.00

0.00

0.00

0.00

0.00

1,091.24

0.00

28,457.34

2,242.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

60.26

24,047.36

0.00

0.00

10.52

4,409.98

2,242.72

0.00

3.12

168.01

2,153.89

METRADO

85.12

5.35

COSTO

06 DICIEMBRE - 2016
METRADO

COSTO

NOVIEMBRE
METRADO

COSTO

DICIEMBRE
METRADO

16,136.15

COSTO

06 DICIEMBRE - 2016
METRADO

COSTO

4,891.07

0.00

4,891.07

0.00

7,403.28

0.00

7,403.28

0.00

4,481.57

0.00

0.00

178.92

3,676.81

0.00

0.00

1.06

13.44

0.00

0.00

38.62

791.32

0.00

0.00

327.04

16,136.15

99.13

11,844.28
2,975.95

11,844.28

1,860.12

NOVIEMBRE
METRADO

COSTO

DICIEMBRE
METRADO

COSTO

06 DICIEMBRE - 2016
METRADO

COSTO

29,223.49

15,275.50

765.73

24.92

17,151.19

0.00

0.00

93.79

7,270.60

84.07

6,517.11

0.00

0.12

27.27

18.87

4,287.64

17.87

1,950.69

16.33

1,782.58

0.00

175.17

2,823.74

166.76

2,688.17

0.00

904.80

0.00

904.80

0.00

5,454.10
40.00

3.37

765.73

40.00

904.80

134.00

4,549.30

0.00

0.00

289,398.59

100,211.42

10,288.81

260,458.73

90,190.28

9,259.93

NOVIEMBRE
METRADO

COSTO

DICIEMBRE
METRADO

COSTO

06 DICIEMBRE - 2016
METRADO

COSTO

38,719.89

13,407.72

1,376.58

26,045.87

9,019.03

925.99

325,224.49

112,617.02

11,562.51

58,540.41

20,271.06

2,081.25

383,764.90

132,888.09

13,643.76

5.67%

1.96%

0.20%

97.84%

99.80%

100.00%

VALORIZACIN TOTAL
METRADO

COSTO
4,441,746.68
118,257.41

210.00

55,582.80

1.00

7,560.27

1,027.45

35,241.36

2.00

19,872.98
205,338.99

10,000.00

36,200.00

66,675.00

86,677.50

8,500.00

52,785.00

10,675.00

29,676.49
2,782,695.67

VALORIZACIN TOTAL
METRADO

COSTO

907.12

4,762.38

11,160.41

57,364.51

1,240.05

67,198.31

160.72

10,081.97

55,134.79

251,965.99

55,134.79

282,841.47

41,351.09

753,830.37

13,783.70

266,576.76

45,945.66

785,211.33

26,377.00

60,930.87

VALORIZACIN TOTAL
METRADO

COSTO

15,969.09

188,115.88

15,969.09

53,815.83
961,968.58

2,201.15

961,968.58
107,767.74

667.00

29,908.28

4,001.00

77,859.46
265,718.28

12,930.33

265,718.28
490,761.98
12,143.18

VALORIZACIN TOTAL
METRADO

COSTO

2,219.96

5,172.51

2,219.96

6,970.67
71,904.25

791.72

30,663.32

697.39

37,024.44

328.90

4,216.50
227,775.64

7.88

2,504.19

235.80

79,766.42

318.84

127,236.29

43.58

18,268.74

VALORIZACIN TOTAL
METRADO

COSTO
94,045.00

1,906.06

94,045.00
66,022.95

16,588.68

66,022.95
18,870.97

538.55

11,067.20

281.20

3,565.62

206.84

4,238.15

VALORIZACIN TOTAL
METRADO

COSTO
145,694.96

104.00

71,578.00

575.52

44,614.31

22.36

5,080.64

72.00

7,859.52

1,027.45

16,562.49
28,966.94

281.00

6,356.22

666.00

22,610.72
5,107,170.56
4,596,453.50

VALORIZACIN TOTAL
METRADO

COSTO
683,310.38
459,645.35
5,739,409.23
1,033,093.66
6,772,502.89
100.00%
100.00%

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

DESCRIPCIN

ITEM

METRADO
UND

METRADO

PLAN DE MITIGACIN AMBIENTAL


1.00

PERSONAL

1.01

Plan de Mitigacion Ambiental

01.01.01

Restauracion en cantera de rocas

Mes

1.00

01.01.02

Restauracion en cantera de relleno

Mes

1.00

01.01.03

Restauracion en cantera de Agregado

Mes

1.00

01.01.04

Restauracion de caminos, vias de acceso

Mes

1.00

01.01.05

Revegetacion con especies nativas y/ o pastos

Mes

1.00

1.00

SERVICIOS

1.02

Plan de Mitigacion Ambiental

01.02.01

Transporte de Plantones

Plant

0.30

01.02.02

Revegetacion de borde de canal con pastos cultivados

Has

2.00

1.03

Plan de Educacion Ambiental

01.03.01

Capacitacion en Conservacion de RRNN y MA

Evento

1.00

01.03.02

Capacitacion en primeros auxilios y seguirdad en el trabajo

Evento

1.00

01.03.03

Elaboracion de Boletines Tecnicos

Mll

0.50

1.04

Plan de Monitoreo Ambiental

01.04.01

Responsable de Medidas de Mitigacion Ambiental

Mes

3.00

01.04.01

Anlisis fsico qumico bactereologico slidos en suspensin, y


dureza.

Unidad

6.00

2.00

BIENES

2.01

Plan de Mitigacion Ambiental

02.01.01

Adquisicion plantones

Plant

2,400.00

2.02

Monitoreo Ambiental

02.02.01

Alquiler de camioneta para la inspeccin

Dias

90.00

02.02.02

Combustible

Gln

14.50

02.02.03

Materiales de muestreo

Global

1.00

02.02.04

Papel bond de 80 gr

Mll

2.00

02.02.05

Lapiceros

Unid

3.00

02.02.06

Toner para impresora

Unid

1.00

02.02.07

Cuaderno de campo

Unid

2.00

2.03

Plan de Contingencia

02.03.01

Medicamentos

Glb

1.00

02.03.02

Botiquin

Glb

1.00

02.03.03

Equipo contra incendios

Unidad

1.00

3.00

COMPENSACION SOCIAL

3.01

Caminos de acceso

m3

3,600.00

3.02

Casa Tomero

m3

400.00

3.03

Encauzamiento

m3

4,200.00

4.00

COMPENSACION DE CANTERAS

4.01

Agregado

m3

13,455.10

4.02

Material de Relleno

m3

63,434.79

4.03

Roca

m3

6,500.00

COSTO DIRECTO
COSTO DIRECTO X FR=0.9
GASTOS GENERALES 14.87%
UTILIDAD 10%
SUB TOTAL
IMPUESTO IGV 18%

TOTAL PRESUPUESTO
PORCENTAJE DE AVANCE PARCIAL (%)
PORCENTAJE DE AVANCE ACOMULADO (%)

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS
UNITARIOS

PARCIAL

04 DICIEMBRE
METRADO

COSTO

ENERO
METRADO

COSTO

12,602.67

0.00

0.00

12,602.67

0.00

0.00

2,000.00

2,000.00

0.00

0.00

2,000.00

2,000.00

0.00

0.00

3,000.00

3,000.00

0.00

0.00

2,000.00

2,000.00

0.00

0.00

3,602.67

3,602.67

0.00

0.00

36,520.00

0.00

0.00

18,720.00

0.00

0.00

2,400.00

720.00

0.00

0.00

9,000.00

18,000.00

0.00

0.00

1,900.00

0.00

0.00

700.00

700.00

0.00

0.00

700.00

700.00

0.00

0.00

1,000.00

500.00

0.00

0.00

15,900.00

0.00

0.00

5,000.00

15,000.00

0.00

0.00

150.00

900.00

0.00

0.00

27,168.00

0.00

0.00

1,200.00

0.00

0.00

1,200.00

0.00

0.00

24,719.50

0.00

0.00

250.00

22,500.00

0.00

0.00

104.00

1,508.00

0.00

0.00

400.00

400.00

0.00

0.00

26.00

52.00

0.00

0.00

2.50

7.50

0.00

0.00

240.00

240.00

0.00

0.00

0.50

6.00

12.00

0.00

0.00

1,248.50

0.00

0.00

500.00

500.00

0.00

0.00

438.50

438.50

0.00

0.00

310.00

310.00

0.00

0.00

41,000.00

0.00

0.00

5.00

18,000.00

0.00

0.00

5.00

2,000.00

0.00

0.00

5.00

21,000.00

0.00

0.00

166,779.78

0.00

0.00

2.00

26,910.20

0.00

0.00

2.00

126,869.58

0.00

0.00

2.00

13,000.00

0.00

0.00

284,070.45

0.00

0.00

255,663.41

0.00

0.00

38,007.01

0.00

0.00

25,566.34

0.00

0.00

319,236.76

0.00

0.00

57,462.62

0.00

0.00

CIAL (%)

MULADO (%)

376,699.37

0.00

0.00

0.00%

0.00%

0.00%

0.00%

CRONOGRAMA VALORIZADO DE OBRA - MITIGACI


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

FEBRERO
METRADO

COSTO

MARZO
METRADO

ABRIL

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18,000.00

0.00

0.00

18,000.00

0.00

0.00

0.00

0.00

0.00

2.00

18,000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

760.56

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3,802.82

2,000.00

14,197.18

3,802.82

0.00

0.00

2,000.00

0.00

0.00

7,578.48

400.00

0.00

0.00

15,156.96

18,375.96

0.00

0.00

2,000.00

4,000.00

18,375.96

2,850.00

5,700.00

15,156.96

9,187.98

2,839.44

14,197.18
9,700.00

0.00

0.00

0.00

18,959.78

20,375.96

41,897.18

17,063.80

18,338.36

37,707.46

2,536.71

2,726.19

5,605.60

1,706.38

1,833.84

3,770.75

21,306.89

22,898.39

47,083.81

3,835.24

4,121.71

8,475.09

25,142.13

27,020.10

55,558.90

6.67%

7.17%

14.75%

6.67%

13.85%

28.60%

TIGACIN AMBIENTAL - A FECHA DE AMPLIACIN DE PLAZO N 09

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

MAYO
METRADO

COSTO

METRADO

COSTO

METRADO

COSTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,950.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,950.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.39

1,950.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6,802.82

2,428.55

0.00

0.00

0.00

0.00

0.00

6,802.82

0.00

18,655.10

20,762.40

0.00

1,360.56

9,564.06

485.71

2,428.55

161.81

323.62

1,881.89

3,763.78

1,834.79

3,669.58

4,530.22

9,060.44

7,445.66

14,891.32

7,136.41

14,272.82

90.00

180.00

0.00

1,410.00

2,820.00

9,564.06

25,457.92

25,140.95

8,607.65

22,912.13

22,626.86

1,279.62

3,406.12

3,363.72

860.77

2,291.21

2,262.69

10,748.04

28,609.47

28,253.26

1,934.65

5,149.70

5,085.59

12,682.68

33,759.17

33,338.84

3.37%

8.96%

8.85%

31.96%

40.92%

49.77%

FECHA: NOVIEMBRE DEL 2014

AGOSTO
METRADO

0.30

COSTO

SEPTIEMBRE
METRADO

COSTO

OCTUBRE
METRADO

COSTO

0.00

0.00

2,500.00

0.00

0.00

2,500.00

0.00

0.00

1.00

2,000.00

0.00

0.00

0.25

500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3,959.50

2,790.50

2,148.00

720.00

0.00

0.00

720.00

0.00

0.00

0.00

0.00

0.00

1.00

1,200.00

700.00

0.00

700.00

0.00

0.00

700.00

0.00

500.00

0.00

0.00

2,039.50

2,090.50

2,148.00

0.00
0.50

1.00

0.38

1,900.00

0.38

1,900.00

0.39

1,950.00

0.93

139.50

1.27

190.50

1.32

198.00

2,400.00

1,200.00

25,968.00

0.00

1,200.00

0.00

0.00

1,200.00

0.00

0.00

0.00

24,719.50

0.00

0.00

90.00

22,500.00

0.00

0.00

14.50

1,508.00

0.00

0.00

1.00

400.00

0.00

0.00

2.00

52.00

0.00

0.00

3.00

7.50

0.00

0.00

1.00

240.00

0.00

0.00

2.00

0.00

0.00

1,248.50

0.00

0.00

1.00

500.00

0.00

0.00

1.00

438.50

0.00

0.00

1.00

310.00

0.00

2,357.15

2,428.55

2,357.15
471.43

12.00

2,357.15

471.43

2,357.15

485.71

2,428.55

0.00

0.00

0.00

0.00

0.00

0.00

20,277.86

21,277.86

20,942.40

1,766.83

3,533.66

1,766.83

3,533.66

1,834.79

3,669.58

6,872.10

13,744.20

6,872.10

13,744.20

7,136.41

14,272.82

1,500.00

3,000.00

2,000.00

4,000.00

1,500.00

3,000.00

27,794.51

52,393.51

28,018.95

25,015.06

47,154.16

25,217.06

3,718.75

7,009.95

3,748.78

2,501.51

4,715.42

2,521.71

31,235.31

58,879.53

31,487.54

5,622.36

10,598.32

5,667.76

36,857.67

69,477.84

37,155.29

9.78%

18.44%

9.86%

59.56%

78.00%

87.87%

NOVIEMBRE
METRADO

COSTO

DICIEMBRE
METRADO

COSTO

06 DICIEMBRE - 2016
METRADO

COSTO

4,680.00

4,666.11

756.56

4,680.00

4,666.11

756.56

0.00

0.00

0.00

0.75

1,500.00

0.00

0.00

1.00

3,000.00

0.00

0.00

0.09

180.00

0.91

1,820.00

0.00

0.00

0.79

2,846.11

0.21

756.56

1,983.00

5,689.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,983.00

5,689.00

0.00

0.36

1,800.00

1.10

5,500.00

0.00

1.22

183.00

1.26

189.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

510.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,554.35

2,071.45

0.00

2,071.45

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8,986.30

3,080.88

0.00

2,554.35

414.29

1,460.65

2,921.30

747.51

1,495.02

0.00

3,032.50

6,065.00

792.93

1,585.86

0.00

0.00

0.00

0.00

18,203.65

15,507.44

756.56

16,383.29

13,956.70

680.90

2,435.54

2,074.81

101.22

1,638.33

1,395.67

68.09

20,457.16

17,427.17

850.22

3,682.29

3,136.89

153.04

24,139.45

20,564.06

1,003.26

6.41%

5.46%

0.27%

94.27%

99.73%

100.00%

VALORIZACIN TOTAL
METRADO

COSTO
12602.67
12602.67

1.00

2000.00

1.00

2000.00

1.00

3000.00

1.00

2000.00

1.00

3602.67
36520.00
18720.00

0.30

720.00

2.00

18000.00

1900.00
1.00

700.00

1.00

700.00

0.50

500.00
15900.00

3.00

15000.00

6.00

900.00
27168.00
1200.00

2400.00

1200.00
24719.50

90.00

22500.00

14.50

1508.00

1.00

400.00

2.00

52.00

3.00

7.50

1.00

240.00

2.00

12.00
1248.50

1.00

500.00

1.00

438.50

1.00

310.00
41000.02

3600.00

18000.02

400.00

2000.00

4200.00

21000.00
166779.78

13455.10

26910.20

63434.79

126869.58

6500.00

13000.00
284,070.47
255,663.42
38,007.01
25,566.34
319,236.78
57,462.62

376,699.40
100.00%
100.00%

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

DESCRIPCIN

ITEM

METRADO
UND

METRADO

1.00

CAPACITACIONES

1.01

CURSOS DE CAPACITACIN

01.01.01

Sensibilizacin y Fortalecimiento de Organizaciones de Riego

Evento

1.00

01.01.02

Gestin del Agua en Sistema de Riego

Evento

1.00

01.01.03

Legislacin de Aguas

Evento

1.00

01.01.04

Tarifa de Agua

Evento

1.00

01.01.05

Operacin y Mantenimiento de la Infraestructura de Riego

Evento

1.00

01.01.06

Distribucin del Agua de Riego

Evento

1.00

01.01.07

Agricultura Bajo Riego

Evento

1.00

01.01.08

Manejo de Suelos Segn Aptitud de Riego

Evento

1.00

01.01.09

Manejo de Riego en Cultivos de Pan Llevar

1.02

PASANTIAS A SISTEMA DE RIEGO

01.02.01

Sistemas de Riego y Uso Racional del Recurso Hidrico

Evento

1.00

Visita

1.00

COSTO DIRECTO
COSTO DIRECTO X FR=0.9
GASTOS GENERALES 14.87%
UTILIDAD 10%
SUB TOTAL
IMPUESTO IGV 18%
TOTAL PRESUPUESTO
PORCENTAJE DE AVANCE PARCIAL (%)
PORCENTAJE DE AVANCE ACOMULADO (%)

CRONOGRAMA VAL

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTOS
UNITARIOS

PARCIAL

04 DICIEMBRE
METRADO

COSTO

ENERO
METRADO

COSTO

100,424.00

0.00

9,596.00

86,364.00

0.00

9,596.00

9,596.00

9,596.00

0.00

9,596.00

9,596.00

0.00

0.00

9,596.00

9,596.00

0.00

0.00

9,596.00

9,596.00

0.00

0.00

9,596.00

9,596.00

0.00

0.00

9,596.00

9,596.00

0.00

0.00

9,596.00

9,596.00

0.00

0.00

9,596.00

9,596.00

0.00

0.00

1.00

9,596.00

9,596.00

14,060.00

CIAL (%)

MULADO (%)

9,596.00

0.00

0.00

14,060.00

0.00

0.00

14,060.00

0.00

0.00

100,424.00

0.00

9,596.00

90,381.60

0.00

8,636.40

13,436.16

0.00

1,283.89

9,038.16

0.00

863.64

112,855.92

0.00

10,783.93

20,314.07

0.00

1,941.11

133,169.99

0.00

12,725.04

0.00%

9.56%

0.00%

9.56%

AMA VALORIZADO DE OBRA - CURSOS DE CAPACITACIN - A FECHA DE AMPL


PLAZO DE EJECUCN : 240 DIAS CALENDARIO

CRONOGRAM
FEBRERO
METRADO

COSTO

MARZO
METRADO

ABRIL

COSTO

METRADO

COSTO

0.00

0.00

9,596.00

0.00

0.00

9,596.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

9,596.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9,596.00

0.00

0.00

8,636.40

0.00

0.00

1,283.89

0.00

0.00

863.64

0.00

0.00

10,783.93

0.00

0.00

1,941.11

0.00

0.00

12,725.04

0.00%

0.00%

9.56%

9.56%

9.56%

19.11%

DE AMPLIACIN DE PLAZO N 09

NOGRAMA VALORIZADO MENSUAL


MAYO
METRADO

COSTO

METRADO

JUNIO

JULIO

COSTO

METRADO

COSTO

19,192.00

9,596.00

19,192.00

19,192.00

9,596.00

19,192.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

9,596.00

0.00

0.00

1.00

9,596.00

0.00

0.00

9,596.00

0.00

0.00

1.00

0.00

0.00

1.00

9,596.00

0.00

0.00

1.00

9,596.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

19,192.00

9,596.00

19,192.00

17,272.80

8,636.40

17,272.80

2,567.78

1,283.89

2,567.78

1,727.28

863.64

1,727.28

21,567.86

10,783.93

21,567.86

3,882.21

1,941.11

3,882.21

25,450.08

12,725.04

25,450.08

19.11%

9.56%

19.11%

38.22%

47.78%

66.89%

FECHA: NOVIEMBRE DEL 2014

AGOSTO
METRADO

1.00

COSTO

SEPTIEMBRE
METRADO

COSTO

14 OCTUBRE
METRADO

COSTO

9,596.00

9,596.00

14,060.00

9,596.00

9,596.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9,596.00

0.00

0.00

0.00

1.00

9,596.00

0.00

0.00

0.00

14,060.00

0.00

0.00

9,596.00

9,596.00

14,060.00

8,636.40

8,636.40

12,654.00

1,283.89

1,283.89

1,881.15

863.64

863.64

1,265.40

10,783.93

10,783.93

15,800.55

1,941.11

1,941.11

2,844.10

12,725.04

12,725.04

18,644.65

9.56%

9.56%

14.00%

76.44%

86.00%

100.00%

1.00

14,060.00

VALORIZACIN TOTAL
METRADO

COSTO
100424.00
86364.00

1.00

9596.00

1.00

9596.00

1.00

9596.00

1.00

9596.00

1.00

9596.00

1.00

9596.00

1.00

9596.00

1.00

9596.00

1.00

9596.00
14060.00

1.00

14060.00
100,424.00
90,381.60
13,436.16
9,038.16
112,855.92
20,314.07
133,169.99
100.00%
100.00%

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE RIEGO LLALLIMAYO PROVINCIA DE MELGAR - P
EJECUTA: CONSORCIO ATENEO

DESCRIPCIN

ITEM

METRADO
UND

METRADO

MEJORAMIENTO DEL SISTEMA DE RIEGO CANAL "J" SECTOR DE


RIEGO LLALLIMAYO PROVINCIA DE MELGAR - PUNO

1.00

CONSTRUCCION DE BOCATOMA

GBL

1.00

2.00

CONSTRUCCION DE CANAL PRINCIPAL

GBL

1.00

3.00

CONSTRUCCION CANALES LATERALES

GBL

1.00

4.00

PLAN DE MITIGACIN AMBIENTAL

GBL

1.00

5.00

CAPACITACIONES

GBL

1.00

COSTO DIRECTO
GASTOS GENERALES 14.87%

UTILIDAD 10%
SUB TOTAL
IMPUESTO IGV 18%
TOTAL PRESUPUESTO
PORCENTAJE DE AVANCE PARCIAL (%)
PORCENTAJE DE AVANCE ACOMULADO (%)

NCIA DE MELGAR - PUNO


UBICACIN: MACARI - MELGAR - PUNO

COSTO DIRECTO
UNITARIOS

PARCIAL

04 DICIEMBRE

ENERO

COSTO DIRECTO

COSTO DIRECTO

10,737,582.26

128,933.34

78,887.24

2,334,520.68

2,334,520.68

0.00

0.00

3,460,562.91

3,460,562.91

6,906.56

0.00

4,596,453.67

4,596,453.67

122,026.78

70,250.84

255,663.41

255,663.41

0.00

0.00

90,381.60

90,381.60

0.00

8,636.40

10,737,582.26

128,933.34

78,887.24

1,596,252.71

19,167.28

11,727.40

FEBRE

COSTO DIR

CIAL (%)

MULADO (%)

1,073,758.23

12,893.33

7,888.72

13,407,593.20

160,993.95

98,503.37

2,413,366.78

28,978.91

17,730.61

15,820,959.97

189,972.86

116,233.97

1.20%

0.73%

1.20%

1.94%

CRONOGRAMA VALORIZADO DE OBRA - RESUMEN - A FECHA DE AMP


PLAZO DE EJECUCIN: 240 DIAS CALENDARIO

CRONO
FEBRERO

MARZO

ABRIL

MAYO

OSTO DIRECTO

COSTO DIRECTO

COSTO DIRECTO

COSTO DIRECTO

333,540.04

419,425.64

351,901.94

454,927.25

5,367.85

0.00

29,299.01

129,250.02

12,238.49

46,977.50

46,005.84

28,401.48

298,869.89

354,109.78

230,253.24

271,395.30

17,063.80

18,338.36

37,707.46

8,607.65

0.00

0.00

8,636.40

17,272.80

333,540.04

419,425.64

351,901.94

454,927.25

49,584.18

62,351.96

52,313.86

67,629.64

33,354.00

41,942.56

35,190.19

45,492.73

416,478.22

523,720.17

439,406.00

568,049.62

74,966.08

94,269.63

79,093.08

102,248.93

491,444.30

617,989.80

518,499.08

670,298.55

3.11%

3.91%

3.28%

4.24%

5.04%

8.95%

12.23%

16.46%

E AMPLIACIN DE PLAZO N 09

FECHA: N

CRONOGRAMA VALORIZADO MENSUAL


JUNIO
JULIO

AGOSTO

SEPTIEMBRE

COSTO DIRECTO

COSTO DIRECTO

COSTO DIRECTO

COSTO DIRECTO

969,224.06

1,001,845.32

1,585,391.82

102,406.72

184,935.07

627,850.40

181,845.04

200,196.36

310,478.68

653,423.78

576,814.24

613,411.28

22,912.13

22,626.86

25,015.06

8,636.40

17,272.80

8,636.40

969,224.06

1,001,845.32

1,585,391.82

144,085.19

148,934.67

235,684.90

96,922.41

100,184.53

158,539.18

1,210,231.65

1,250,964.53

1,979,615.90

217,841.70

225,173.61

356,330.86

1,428,073.35

1,476,138.14

2,335,946.76

9.03%

9.33%

14.76%

25.49%

34.82%

49.58%

FECHA: NOVIEMBRE DEL 2014

SEPTIEMBRE

OCTUBRE

NOVIEMBRE

DICIEMBRE

COSTO DIRECTO

COSTO DIRECTO

COSTO DIRECTO

COSTO DIRECTO

2,688,281.14

1,654,939.24

774,817.63

277,847.20

752,255.10

443,388.67

59,767.84

0.00

1,261,353.00

746,572.56

438,207.78

173,700.23

618,882.48

427,106.95

260,458.73

90,190.28

47,154.16

25,217.06

16,383.29

13,956.70

8,636.40

12,654.00

0.00

0.00

2,688,281.14

1,654,939.24

774,817.63

277,847.20

399,640.81

246,023.84

115,184.66

41,304.86

06 DICIEM

COSTO D

268,828.11

165,493.92

77,481.76

27,784.72

3,356,750.06

2,066,457.01

967,484.05

346,936.78

604,215.01

371,962.26

174,147.13

62,448.62

3,960,965.07

2,438,419.27

1,141,631.18

409,385.40

25.04%

15.41%

7.22%

2.59%

74.62%

90.03%

97.25%

99.84%

06 DICIEMBRE - 2016
COSTO DIRECTO

VALORIZACIN TOTAL
COSTO

17,620.10

10737581.97

0.00

2334520.67

7,679.27

3460562.78

9,259.93

4596453.50

680.90

255663.42

0.00

90381.60

17,620.10

10,737,581.97

2,619.41

1,596,252.67

1,762.01

1,073,758.20

22,001.52

13,407,592.83

3,960.27

2,413,366.71

25,961.79

15,820,959.54

0.16%

100.00%

100.00%

100.00%

6500
3500
10000

66675
6.6675
6000

m2

10000
56675