Actividad constructiva

Limpieza y descapote del terreno(m2) (A,D) (1,9)


Excavacion para vigas de fundacion 0,30m * 0,35m (m3)
1 (A ,D)
2 (A,B)
3 (A)
4 (A,D)
5 (A,C)
6 (A)
7 (A,D)
8 (A)
9 (A,D)
A (1,9)
B (1,9)
C (1, 2)
D (1,9)
Solados esp = 5.00 cm (m2)
1 (A ,D)
2 (A,B)
3 (A)
4 (A,D)
5 (A,C)
6 (A)
7 (A,D)
8 (A)
9 (A,D)
A (1,9)
B (1,9)
C (1, 2)
D (1,9)
Sobrecimiento en bloque de concreto (ml)
1 (A ,D)
2 (A,B)
3 (A)
4 (A,D)
5 (A,C)
6 (A)
7 (A,D)
8 (A)
9 (A,D)
A (1,9)
B (1,9)
C (1, 2)
D (1,9)

Operaciones
6,10m x 10,00m
6.10mx0.30x0.35
2.72mx0.30x0.35
3.08mx0.30x0.35

10.00mx0.30x0.35
5.07mx0.30x0.35
4.93mx0.30x0.35

6.10mx0.30
2.72mx0.30
3.08mx0.30

10.00mx0.30
5.07mx0.30
4.93mx0.30

6.10m
2.72m
3.08m

10.00m
5.07m
4.93m

Mamposteria ordinaria en ladrillo de arcilla (m2)


1 (A ,D)
2 (A,B)
3 (A)
4 (A,D)
5 (A,C)
6 (A)
7 (A,D)
8 (A)
9 (A,D)
A (1,9)
B (1,9)
C (1, 2)
D (1,9)

6.10mx2.40
2.72mx2.40
3.08mx2.40

10.00mx2.40
5.07mx2.40
4.93mx2.40

Frecuencia

Resultado Parcial

61

Resultado Final
61

4
1
1

2.562
0.2856
0.0323

2
1
1

2.1
0.5323
0.5176
6.0298

4
1
1

7.32
0.816
0.924

2
1
1

6
152.1
1.479

4
1
1

24.4
2.72
3.08

2
1
1

20
5.07
4.93

141.54

60.2

Observaciones

4
1
1

58.56
6.528
7.392

2
1
1

48
12.168
11.808

144.156