BPVUWUCTE
Viridian Air Systems
Howden Type SG45 CVC
Bogota Landfill
Columbia
10240 - 0001-0
Landfil, Columbia
Page of 8BROW
With reference to your inquiry Bogota Landfil, Columbia, dated 24-08-2011, Howden Water Technology A/S
hereby takes pleasure in submitting quotation no. HWT-T-10240- (001-0. Ti bid includes 2 of SG45s -2,
‘working Blowers. Pease eas quotation a: fliows:
‘S645 compressor rating
Volumetric lows per blower: Nm3for 15878
Defined as 1.01325 bars, O°, ORE
Volume Flow at Compressor intt ange ma/he 24883
Total niet Pressure (a volute ange) bars 0,008
Differential pressure: bars 0825
Tora outet loss allowed for: hare anna
Total Outlet Pressure fat volute flange) bars oat
“Total Pressure rise across Compressor flanges bare 0,825,
Barometer bars 0729
Inlet Temperature “ 2
Relative Humidity % 30
Blower RPM Rem 14886
Shaft power ws
Mator power ew 570
Motor SPs Rem 3600,
Motor info 2 Pole 50H
Shak power aba rst, ‘o7sea
syatem inlet fow TE cesoxt ecesoxmT TS"c@oOx
Ret Fow | Nm | Flow [ew | flow [ev | Flow [iw
100% [15978 | 24440 530 | 2aeao_| 490] 2374 | ae7
90% | 14380] 23996 | «as | 24996 | asi] _2sa87 | 07
0% | 2782] 19852 | 439 | 19552 | aza_| 19089 | 406
67% | 10682_| 16283 | 370 | 36793 | 346 | 15916 | 343
5% | 7190 | 10958 [266 | a0s8 [251] 10763 [252
‘The performance quoted atthe specified inks volume flow head (pressure) s subject to atest
tolerance of 0% an flow, O%: on head (pressure) and £ 4% o8 the sha power consumption
‘measured per IS05389 or ASME PTC10 (1997) energy balarce method
Page 2 of8Rive
Scope:
2 off Howden Turbo Compressors - Type: SG45-CVC
Howden SG-CVC-type Single Stage Turbo Compressor Package consisting ofa high efficiency turbo compressor equipped
With 30 mifed type aluminium alloy impeller, niet Sue Vaves (\GV) and discharge Variable Vane Dilfusors(VOO} including
‘actuators, integrated with a suitable precision type heavy duty gearbox inc accelerometer - all mounted on 3 baseplate
Including » basi Tube el system wt nase satety valve and cuple oi fter, canteo valves, ternpersture transmitters O°
high speed shatt bearings air eaoied ol coor, base instcumentation, an auxliary and direct driven lube ol pum,
suitable al steel spacer coupling and CE/ASHREA compliant coupling guard
‘The above blower package includes the following base instrumentation:
* Init air temperature transmitter
+ Inlet ar temoerature transmitter (eeieculst.on}- surge sravertion
"olat ai iterditferenil pressure high = switch
7 IGV (Inlet Gude Vanes) elecric type actuatr (three phase
~ vou vanaie vane umrusors electictype actuator (tee phase)
+> outlet ar pressure transmitter
72 off PT200 HSS bearing temperature transmitters
+ Rotation detection sensor
* Kir cooled oil cooler
+ Gearbox with vibration monitoring accelerometer
+01 her afferent pressure high -switeh
+ od pressure wansmiter
+ O8 temperature transmitter in ol reservoir
* Of temperature transmitter at gear nfet
+o naater
Algo included in the standard package
= Mounting ans algnment of the electric main deve motor
“om in Engich
* Seaworthy export packing
+ Material certificates if requested
+ Standard 6 months preservation
= 1 sec or pect coos ang trame ror vav/vvuy
* Overspead test ofimpeller
* Hydrostatic test of volute
Page 30f82 off LPs (Local Control Panel) Included
Howden designed Multi Master LCP for Combi Vane Contented power optimization and machine conditions
‘mentoring incl fully programmed Allen Brediey Compact Lew PLC controller, all necessary contactors,
Powersupply, internal wiring, aP SW ceguiator, al uit int a P54 ste! panel for skid -or remote mounting
Peo-Face 6" WM touch panel Full Featuring Easy to Operate Venu, Compliance with current E2C Machinery
Directive. Data transmission between panels and to DCS via thernet TCP/IP, Easy to operate screen tvbe
‘uman-Rachine-Interface, Minimal site cabling needed,
2off Main Drive Motor, 440V, S70KW, air-cooling Included
STOW (inching 8% margin), 2 Pole electrical ar-cnoled mtr, suitable for 440V, 60M supply fulload: 884
‘3600 RPM. Protection ass 155. insulation clas F/8, Equipped with 3x2 x PTIOD in windings. PT100In
bearings Space heater. Starting curent: 720% (+ tolerances, Rated for 40°C. Suitable for use upto 2600
mas and sultable fo start with V/O connection. Motor of proved make
2off inlet Filter/silencer lncluded
1 stag Air inlet FterStencer suitable for mounting of compact tye 400 mm G4 pocket fers cr an inte
fiter unit or connector to connect to plenum and external fier sytem. Stel frame with aluzink cover.
Including inlet aie fier eiferentil pressure hah switch. Firat ave areas flows: 1 eran 126.2
micron ~ 40%, 3 micron 85%, 4 micron 95%; § micron 99,54, Higher fitration level can be quoted if
mauled iy the ructommar
2 off Discharge Expansion Joint (compensator), ON300 Included
Discharge Metal Expansion Joint PN stainless steel type, ore loose flange w, ar guide pipe. Stainless steel
according to O1N250.
2 off Discharge Cone silenced, DN300/DNSOO Included
Combined Discharge Cane Spe diffusa with intaprated slancer for mounting on comeressor outlet for
‘optima dynamic pressure head recovery. ir speed at outlet c= 25 mye. Fabricated an painted.
2 off Slow-off valve w/silencer, ON200 Included
‘DN200 Buttery type Blow-oft Valve (Bypass) N10 for Range nstatiation inc electrical actuator and mit
suitehes Induding Blowoff Yate sitercer
2 off Dual Wafer Check (Non-return) Valve, DNSOO Included
‘S00 Dua Wafer Cheek {Non-return} Valve PAO for mounting between flanges, Valve to be placed in
hovsootalpnalino tn rir peoccrs
2 off Flexible machine supports Included
Set of flexible machine surports prasare fo ging the supp2t onto a fat Noor w/o the use af anchor
bolts For easy instalation.
2 off Acoustic Fnrlncure «Far indoor installation Included
Acoustic Enclosure covering the ful kid and equlpped with suitable electrical thermostatic controlled cooling
Air far(s). The acoustic enclosure reduces the sound pressurewith app. 25 dB, which typicaly ensures 8
sound pressure $75 dB(A) FF, 1 metre (according to 150 3746|-for specific noe emissions see nol
caleuations. However this sound pressure daes not nclude the BOV during blow-oF. Fr indo instalation,
2 off Standard Factory Test Included
Factor test in Howden workshop, based on S05389,
Pore sofBONN
Optionals:
1 off Witness Testing - China
Witness Testing of ene compressor unit at a Howden Faccory ealloated testi, up to maximum 4 guarantee
points witnessed according to 05389 or ASME PTCIO.
1 off Installation Superv
Installtion supervision, each day 8 hours ex), accommodation and transportation to ste
Daly rate 960 5 working days (estimated use of tm,
Instaliation Supervision scope is as follows:
4. Check tie winpnessor equipment for completeness/darrage pri to installation,
2. Check foundation accarding tthe drawing
3. Fax centre ines ofthe compressors on the foundation.
4. Oversee the iting/moving ofthe cormpressor Into the correct poston ensuring itis done safely and
without damage to the enmnencene
5. Check the compressor i bolted correctly te the foundation
65 Check compressor to motar alignment.
7. Supervise the instalation of the compressor ancilary equpment.
2) Discharge pinework/belows/silencer to ensure alignment ang that no spe loads are transferred tothe
compressor.
bilnler filter aaament and ing
Acoustic enclosure alignment and fing (this does NOT include assembly ofthe acoustic enclosure)
‘The cient would be responsible forthe folowing
“Providing suitably skilled and competant installstion testo carryout our engineers instructions.
“Any erancage an lifting equinment thats require,
1Loff Commissioning supervision
Corvissioning, each day § ours axl. aczommodstion andtransportation to sie
Dally rate 96 x5 working days festimated ute of time, depending on site constants).
During commissioning the followings checked!
4. Compressor instalation: Clean compressor and clear for startup.
43. Onsite funetional test. Check coupling alignment and diretiona! rotation.
4, Aneta.
5 Startup and shutdown sequences including emergency stops.
5. Compressor system cunning in "local auto” mode.
7 System response when emergency stop condition arises curing operation.
8. Compressor system running in "remote auto” ered
8-3 day taining for staff includes.
The cliont would be responsibie forthe folowing:
- Providing access to equipment
Ensure compressors readiness for commissioning
Pages ofBb ENV
2 off Vibration monitoring - Bently Nevada
\sration monitaring Bently Nevada - single proximity probe. One foreach blower.
off Remote monitoring system
Remote monitoring system including site manager and mocem with antenna, Equipment i suitable for ether
(G45 /36 or cables connection. Customer wil have to provise SIM-card, This functionality enables KUT to
connect tothe customer's equipment to advise and assist in ease of malunction and errs in the system.
off Freight - XW
XW: Blower delivery in Ex Works, HHEL, Wei Hl, China, not loaded & ancary delivery EX: Works
Copenhagen Danmark, not loaded. According to incoterms 2010,
“nf Freight «C18
Ci Cost, Insurance and Freight, Bogota Port, Columbla, duty unpaid. According to incoterms 2010. Split
detvery. (INDICATIVE COST -subjeet to confirming haulageand chipping deta
Page 6 of