VIGA PRINCIPAL

N100,101
PREDIMENSIONAMIENTO

DIMENSIONAMIENTO Y METRADO DE
VIGA
INGENIERIA ESTRUCTURAL
LUZ (L)

ALTURA (h1)
(h2)
h

3.5

0.35

0.29
0.40

m
m

0.2

BASE (b)

METRADOS

CARGA MUERTA (CM)

DATOS DE PREDIMENSIONAMIENTO
LUZ (L)

3.5

ALTURA (h)

0.40

BASE (b)

0.2

P.E.CONCRETO

P.P

PESO PROPIO

0.2
P.P

0.40
A.T - BASE

2.4

0.19
Losa

ton/m

LOSA

0.3
P.P

2.6
A.T

0.78
Tabiqueria

ton/m

TABIQUERIA

0.1

2.8

0.28

ton/m

P.P

A.T

0.1

2.8

ACABADOS

Acabados

TOTAL

0.28

ton/m

1.53

ton/m

PESOS
LOSA

0.3

ton/m2

TABIQUERIA

0.1

ton/m2

ACABADO
P.ESPEC. CONCRETO

0.1
2.4

ton/m2
ton/m3

A.T

2.8

A.T - BASE

2.6

CARGA VIVA (CV)


SOBRECARGA
S/C
A.T
CARGA VIVA (C.V)

0.30

CV

2.8

0.84
0.84

TOTAL

ton/m

ANCHO TRIBUTARIO

SOBRECARGA S/C
OFICINAS PUBLICAS

0.30

ton/m2

RESULTADOS FINALES
CARGA MUERTA (CM)
PESO PROPIO

0.19 ton/m

CARGA VIVA (CV)


SOBRECARGA
S/C
0.30 ton/m

LOSA

0.78 ton/m

A.T

TABIQUERIA

0.28 ton/m

ACABADOS

0.28 ton/m

TOTAL

1.53 ton/m

2.8 ton/m

TOTAL

0.84 ton/m

V= 1.4(CM)+1.7(CV)
V

DIMENSIONAMIENTO DE
COLUMNAS
E. Estructural

3.5728

ton/m

Columna Perimetral
C1

N PISOS

C1

P/(n . F'c)

PG

INGENIERIA ESTRUCTURAL

INGENIERIA ESTRUCTURAL

METRADO DE COLUMNA
COLUMNA PERIMETRAL C1
DATOS

COLUMNA PERIMETRAL C1
b
0.17
D
0.17
h(altr.columna)
3.20
VIGA PRINCIPAL
b
0.2
h
0.40
ancho tributario
2.8
VIGA SECUNDARIA
b
h
ancho tributario
1
PESOS PROPIOS pp
Losa
0.30
acabado
0.10
Tabiqueria
0.10
p.esp.concreto
2.40
S/C
0.30

m
m
m
m
m
m
m
m
m

CARGA MUERTA (CM)


PP
0.22
VIGA PRINCIPAL
0.22
VIGA SECUNDARIA
0.00
LOSA
1.50
ACABADO
0.28
TABIQUERIA
0.28
TOTAL
2.50
CM*1,4
3.5049728
CARGA VIVA

LOSA
A.T. VIGA P
ton/m2 A.T. VIGA.S
ton/m2 TOTAL
ton/m2 CM*1,7
ton/m2
ton/m2
V=

0.30
2.8
1.00
0.84
1.428
4.9329728