Está en la página 1de 1

PETROLEUM EQUIPMENT ASSEMBLY & METAL STRUCTURE J.S.C.

No. 2 Nguyen Huu Canh Street, Thang Nhat Ward, Vung Tau City, Vietnam.
Tel: +84-64-384 8229, Fax: +84-64-384 8404
__________________________________________________________________________________
_________

Date:

30th June 2014

To:

Phillip H. G. Lim
MEPCOM OFFSHORE AND MARINE PTE LTD
24, Sin Ming Lane, #07-93 Singapore 573970

Project:

DIPTI BUOY

Dear Sirs,
We refer to your invitation to prepare a proposal for Fabrication of the 6 nos Marine Buoys
and having carefully examined the drawing, hereby offer to execute the Work in conformity.
The Price attached herewith and we hereby agree to undertake the Work.
In consideration of you having supplied the drawing, we agree to abide by this Quotation for
a period as indicated in our proposal Appendix 1 Commercial Terms & Conditions
Validity Period
We are experienced and familiar with the stringent requirements for detail design and
fabrication of buoyancy tank. The engineering design is in accordance to Codes and
Standards, such as ASTM/API 650 etc.
Please do not hesitate to contact me should you need any clarifications. Thank you.
Yours sincerely,

____________________________
Nguyen Dinh The
Managing Director

__________________________________________________________________________________________
__

También podría gustarte