DINAS PEKERJAAN UMUM


KABUPATEN TEGAL

DAFTAR HARGA BAHAN


KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN

NO

:
:
:
:

URAIAN

SAT.

HARGA SATUAN
( Rp )
###

I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
II.
1
2
3
4
5
6
7
8
11

BAHAN DASAR
Abu Batu
Batu Bata 3 x 11 x 22 (20)
Batu kali
Batu Blonos
Batu kenting uk. 20/30 cm
Batu pecah dg mesin (0,5-<1 cm) (Screening)
Batu pecah dg mesin (1-2cm)
Batu pecah dg mesin (2-3 cm)
Batu pecah dg mesin (3-5 cm)
Batu pecah dg tangan (2-3 cm)
Batu pecah dg tangan (3-5 cm)
Batu pecah dg tangan (5-7 cm)
Batu pecah dg mesin (2/3 cm) per kg
Filler
Kerikil Sungai
Pasir
Pasir (Harga pasir per kg)
Pasir Urug
PC Semen Abu - abu ( 50 Kg )
PC Semen Warna ( 40 Kg )
Sirtu
Tanah Urug

M3
Bh
M3
M3
Bh
M3
M3
M3
M3
M3
M3
M3
Kg
Kg
M3
M3
Kg
M3
Kg
Kg
M3
M3

PENUTUP ATAP
Asbes Gelombang (2,40x1,08)x6 mm (gelombang kecil)
Asbes Gelombang (2,10x1,08)x6 mm (gelombang kecil)
Asbes Gelombang (1,80x1,08)x6 mm (gelombang kecil)
Asbes Gelombang (2,40x0,8)x3,5 mm (gelombang kecil)
Asbes Gelombang (2,10x0,8)x3,5 mm (gelombang kecil)
Asbes Gelombang (1,80x0,8)x3,5 mm (gelombang kecil)
Bubungan Asbes gelombang besar
Bubungan Asbes gelombang kecil
Bubungan Genteng keramik "KIA"

Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
m'
m'
Bh

#
207,000
750
111,400
101,429
200,000
200,000
195,000
200,000
175,000
130,000
128,500
1,600
40,000
100,000
75,000
1,340
1,875
72,000
70,000
38,100
35,000
28,100
38,500
35,650
30,000
22,400
16,480
8,000

Daerah A

NO

URAIAN

SAT.

Hal. 2

HARGA SATUAN
( Rp )
###

12
13
14
15
16
17
18
19
20

Bubungan Genteng Morando


Bubungan genteng pres jtw isi 4/m2
Bubungan genteng pres kebumen
Bubungan genteng kodok
Genteng Keramik Glazur KIA isi 15/m2 warna muda
Genteng Keramik Glazur KIA isi 14/m2 warna tua
Genteng Morando Glazur isi 20/m2 1550x20
Genteng Pres Jatiwangi isi 25/m2 750x25
Genteng Pres Kebumen

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

5,100
3,200
3,600
4,400
8,000
8,500
3,500
1,760
2,000

Daerah A

NO

URAIAN

SAT.

Hal. 3

HARGA SATUAN
( Rp )
###

21
22
23
24
25
26
27
28
29
III.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

Genteng Morando Natural isi 20/m2 oven 950x20


Genteng kodok
Genteng asbes
Glass Block
Seng BJLS 20, uk 90 cm
Seng plat 3' x 6' ( 90 cm x 180 cm ) bjls 24
Seng plat 3' x 6' ( 90 cm x 180 cm ) bjls 28
Seng Plat BJLS 20
Seng Plat BJLS 30

Bh
Bh
Lbr
Bh
M'
M'
Lbr
M2
M3

BAHAN KAYU
Bambu
Kayu Bakar
Kayu bengkirai 6/14 cm
Kayu bengkir uk 2 cm x 3 cm
Kayu Bengkir Uk 3 cm x 5 cm
Kayu Bengkir Uk 5 cm x 7 cm
Kayu Bengkir Uk 8 cm x 12 cm
Kayu Bengkir Uk 4 cm x 6 cm
Kayu Bengkir Uk 3 cm x 20 cm
Kayu Papan bengkirai 2x20x400
Kayu Papan bengkirai 2x25x400
Kayu Papan bengkirai 2x30x400
Kayu Papan jati (rakyat)
Kayu Jati 8/20 cm (rakyat)
Kayu Jati 3/20 cm (rakyat)
Kayu Jati 6/14 cm (rakyat)
Kayu Jati 5/7 cm (rakyat)
Kayu Jati 2/3 cm (rakyat)
Kayu Papan jati (perum)
Kayu Jati 8/20 cm (perum)
Kayu Jati 3/20 cm (perum)
Kayu Jati 6/14 cm (perum)
Kayu Jati 5/7 cm (perum)
Kayu Jati 2/3 cm (perum)
Kayu Papan kempas
Kayu Kempas 8/12
Kayu Kempas 3/20
Kayu Kempas 5/7
Kayu Kempas 4/6
Kayu Kempas 3/5
Kayu Kempas 2/3
Kayu Meranti 5/7
Kayu Meranti 4/6
Kayu Meranti 3/5

Btg
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

3,100
2,500
30,000
18,000
25,000
39,500
41,500
41,200
26,000
11,400
122,000
10,200,000
10,000,000
10,200,000
5,037,500
11,000,000
11,250,000
9,375,000
11,500,000
6,700,000
7,000,000
6,125,000
6,500,000
6,000,000
5,250,000
11,196,500
10,951,400
10,951,400
10,951,400
10,951,400
10,951,400
6,432,350
6,163,900
6,432,350
4,595,000
4,595,000
4,288,700
4,595,000
3,676,000
3,676,000
3,676,000

Daerah A

NO

URAIAN

SAT.

Hal. 4

HARGA SATUAN
( Rp )
###

35
36
37
38
39
40
41
42
43

Kayu Meranti 2/3


Kayu Papan kruing
Kayu Kruing 8/12
Kayu Kruing 3/20
Kayu Kruing 5/7
Kayu Kruing 4/6
Kayu Kruing 3/5
Kayu Kruing 2/3
Kayu Papan Cetak Pinus

0.016
0.0384
0.024
0.014
0.0096
0.006
0.0024

62.5
26.041667
41.666667
71.428571
104.16667
166.667

M3
M3
M3
M3
M3
M3
M3
M3
M3

3,676,000
7,500,000
6,739,300
7,045,700
6,126,700
5,881,600
3,553,400
3,553,400
2,210,200

Daerah A

NO

URAIAN

SAT.

Hal. 5

HARGA SATUAN
( Rp )
###

44
45
46
48
49
50
51
IV.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
V.
1
2
3
4
5
6
7
8

Kayu Stoot ( bambu ) 5 mtr


Kayu Lokal 5/7
Kayu Lokal 4/6
Kayu Lokal 2/3
Kayu Lokal Papan
Dolken kayu lokal
Dolken Kayu 8-10/400 cm

Btg
M3
M3
M3
M3
M3
Btg

BAHAN PENUTUP DINDING / LANTAI


Batu Muka Segi 6 tebal 10 cm
Batu Tempel Palimanan hijau
Batu Tempel Palimanan kuning
Batu Tempel ( Tidak Beraturan ) kecil
Batu Tempel ( Tidak Beraturan ) besar
Batu Candi 20/20, 5/20
Batu Susun sirih Andesit (Jabar) 3x30x1,3 cm
Batu Susun sirih Templek
Batu Andesit (Candi Jawa Barat) 15x30cm Bakar
Batu Andesit (Candi Jawa Barat) 15x30cm Mesin
Batu Candi 20/40
Batu Candi 15/30
Granito Uk. 60 x 60 cm
Keramik 20/25, putih
Keramik 20/25, warna
Keramik 20/20, anti slip ( u/.lantai Km/wc)
Keramik 20/20, warna
Keramik 10/20, warna
Keramik 30/30 (putih polos)
Keramik 30/30, warna
Keramik 40/40, (putih polos)
Keramik 40/40, warna
Keramik Uk. 10 x 30 cm Plint
Keramik Uk. 10 x 40 cm Plint
Keramik lis Uk. 7 x 20
Keramik kuku macan

Bh
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M'
M'
Bh
M'

BAHAN CETAK
Buis Beton 1/2 dia 20 cm
Buis Beton 20 cm
Buis Beton 30 cm
Buis Beton 40 cm
Buis Beton 50 cm
Buis Beton 60 cm
Buis Beton 80 cm
Paving Block tebal 6 cm abu - abu K175

m'
m'
m'
m'
m'
m'
m'
M2

8,000
1,198,850
1,966,900
2,832,500
1,545,000
1,621,000
18,025
4,000
118,000
100,000
125,000
130,000
153,200
134,800
200,400
183,750
183,750
122,500
104,100
45,600
47,150
48,150
50,470
46,350
42,230
44,700
46,350
47,700
14,467
11,575
6,000
5,665
56,650
56,650
77,250
103,000
123,600
154,500
154,500
60,000

Daerah A

NO

URAIAN

SAT.

Hal. 6

HARGA SATUAN
( Rp )
###

9
10
11
12
13
14

Paving Block tebal 6 cm warna K175


Paving Block tebal 8 cm abu - abu K175
Paving Block tebal 8 cm warna K175
Paving Block tebal 6 cm abu - abu lokal
Paving Block tebal 6 cm warna lokal
Rooster bata

M2
M2
M2
M2
M2
Bh

70,000
80,000
87,000
42,000
42,000
18,000
-

Daerah A

NO

URAIAN

SAT.

Hal. 7

HARGA SATUAN
( Rp )
###

VI.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
VII.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
22

BAHAN BESI DAN ALUMINIUM


Besi Beton polos
Besi Beton ulir
Besi Profil IWF
Besi Profil Siku / U
Besi Profil kanal CNP
Besi Strip ( tebal 5mm, lebar 5 cm )
Besi plat bordes T = 2,3 mm (1,2 m' x 2,4 m')
Besi plat bordes T = 3 mm (1,2 m' x 2,4 m')
Besi plat bordes T = 5 mm (1,2 m' x 2,4 m')
Besi plat bordes T = 6 mm (1,2 m' x 2,4 m')
Besi Hollow 2x 4 cm , Pjg 6 m
Besi Hollow 2x 4 cm , Pjg 6 m
Besi Hollow 3 x 3 cm, Pjg 6 m
Besi Hollow 3 x 3 cm, Pjg 6 m
Kawat Beton
Kawat Bronjong d4mm galvanis
Kusen Aluminium uk. 4"
Plat alumunium 0,6 mm
Plat alumunium ( Aluminium Sheet ) 0,3 mm

Kg
Kg
Kg
Kg
Kg
Kg
lbr
lbr
lbr
lbr
m'
Kg
m'
Kg
Kg
Kg
M'
M2
M2

BAHAN PIPA DAN PIPA


Knee Galvanis 1/2"
Knee Galvanis 3/4"
Knee Galvanis 1"
Knee Galvanis 11/2"
Knee Galvanis 2"
Knee Galvanis 2 1/2"
Knee Galvanis 3"
Knee Galvanis 4"
Overstock Galvanis 1" x 3/4"
Knee PVC 1/2"
Knee PVC 3/4"
Knee PVC 1"
Knee PVC 1 1/2"
Knee PVC 2"
Knee PVC 2 1/2"
Knee PVC 3" ( AW )
Knee PVC 4" ( AW )
Knee pipa pVC (hitam) 4"
Pipa PVC 1/2"
Pipa PVC 3/4"
Pipa PVC 1"
Pipa PVC 1 1/2"
Pipa PVC 2"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M'
M'
M'
M'
M'

AIR

BERSIH

10,100
10,400
12,100
10,600
12,100
11,000
1,011,200
1,427,600
1,844,000
2,260,300
9,300
12,800
9,300
14,000
20,000
18,000
82,100
80,960
6,300
5,000
7,370
11,660
22,220
39,160
86,350
158,840
9,680
9,680
3,000
3,200
4,300
5,150
5,300
6,300
9,785
12,103
6,500
4,700
6,100
8,400
15,900
15,300

Daerah A

NO

URAIAN

SAT.

Hal. 8

HARGA SATUAN
( Rp )
###

23
24
25
26
27
28
29
30
31

Pipa PVC 2 1/2"


Pipa PVC 3" ( AW )
Pipa PVC 4" ( AW )
Pipa PVC ( hitam ) 4"
Klem PVC 3/4" AW
Pipa Galvanis 1/2"
Pipa Galvanis 3/4"
Pipa Galvanis 1"
Pipa Galvanis 11/2"

M'
M'
M'
M'
Bh
M'
M'
M'
M'

17,500
30,600
49,000
13,600
1,850
30,600
42,800
55,100
67,400

Daerah A

NO

URAIAN

SAT.

Hal. 9

HARGA SATUAN
( Rp )
###

32
33
34
35
36
37
38
39
40
A.
1
2
3
4
5
6
7
8
9
10
11
12
B.
1
2
3
4
5
6
7
8
9
10
11
12
C.
1
2
3
4
5
6
7
8

Pipa Galvanis 2"


Pipa Galvanis 2 1/2"
Pipa Galvanis 3"
Pipa Galvanis 4"
Pipa : Runcing dia 3/4"
Pipa : BC dia 50 mm2
Pipa : Klem BC dia 50 mm2
Pipa : Sepatu Kabel dia 50 mm2
Seal tape
PIPA AIR BERSIH
PIPA PVC ( S - 12,5 )
Pipa uPVC 1" ( S - 12,5 )
Pipa uPVC 1 1/4" ( S - 12,5 )
Pipa uPVC 1 1/2" ( S - 12,5 )
Pipa uPVC 2" ( S - 12,5 )
Pipa uPVC 2 1/2" ( S - 12,5 )
Pipa uPVC 3" ( S - 12,5 )
Pipa uPVC 4" ( S - 12,5 )
Pipa uPVC 5" ( S - 12,5 )
Pipa uPVC 6" ( S - 12,5 )
Pipa uPVC 8" ( S - 12,5 )
Pipa uPVC 9" ( S - 12,5 )
Pipa uPVC 10" ( S - 12,5 )
PIPA POLYETYLINE ( PE - PN. 10 - SDR 17 )
Pipa PE 1"
Pipa PE 1 1/4"
Pipa PE 1 1/2"
Pipa PE 2"
Pipa PE 2 1/2"
Pipa PE 3"
Pipa PE 4"
Pipa PE 5"
Pipa PE 6"
Pipa PE 8"
Pipa PE 9"
Pipa PE 10"
PIPA MEDIUM GALVANIZED
Pipa Medium Galvanized 1/2 "
Pipa Medium Galvanized 3/4 "
Pipa Medium Galvanized 1 "
Pipa Medium Galvanized 1 1/4 "
Pipa Medium Galvanized 1 1/2 "
Pipa Medium Galvanized 2 "
Pipa Medium Galvanized 2 1/2 "
Pipa Medium Galvanized 3 "

M'
M'
M'
M'
Bh
Bh
Bh
Bh
Bh

M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'

79,600
120,200
203,200
283,450
226,000
73,000
9,800
10,350
2,700
9,700
12,600
19,650
29,000
41,300
60,550
88,850
144,650
190,000
296,800
375,350
468,200
9,300
13,950
22,100
33,850
53,900
75,600
161,500
207,600
207,600
299,000
531,300
822,950
44,700
56,350
93,200
114,600
132,000
183,000
233,800
307,900

Daerah A

NO

URAIAN

SAT.

Hal. 10

HARGA SATUAN
( Rp )
###

9
10
11
12
D.
1
2
3
4

Pipa Medium Galvanized 4 "


Pipa Medium Galvanized 5 "
Pipa Medium Galvanized 6 "
Pipa Medium Galvanized 8 "
ACCESSORIES PIPA
Fitting PVC DN 63 x 63 mm
Fitting PVC DN 90 x 90 mm
Fitting PVC DN 90 x 63 mm
Fitting PVC DN 110 x 110 mm

M'
M'
M'
M'
Bh
Bh
Bh
Bh

467,700
485,625
678,000
1,032,000
159,300
251,000
223,100
418,350

Daerah A

NO

URAIAN

SAT.

Hal. 11

HARGA SATUAN
( Rp )
###

5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

Fitting PVC DN 110 x 90 mm


Fitting PVC DN 110 x 63 mm
Fitting PVC DN 160 x 160 mm
Fitting PVC DN 160 x 110 mm
Fitting PVC DN 160 x 90 mm
Fitting PVC DN 160 x 63 mm
Fitting PVC DN 200 x 200 mm
Fitting PVC DN 200 x 160 mm
Fitting PVC DN 200 x 110 mm
Fitting PVC DN 200 x 90 mm
Fitting PVC DN 250 x 250 mm
PVC Reducer Socket RR Joint uk. DN 90 x 63 mm
PVC Reducer Socket RR Joint uk. DN 110 x 90 mm
PVC Reducer Socket RR Joint uk. DN 110 x 63 mm
PVC Reducer Socket RR Joint uk. DN 160 x 110 mm
PVC Reducer Socket RR Joint uk. DN 200 x 160 mm
PVC Reducer Socket RR Joint uk. DN 250 x 200 mm
Long Bend All Socket RR Joint 90 DN. 63 mm
Long Bend All Socket RR Joint 90 DN. 75 mm
Long Bend All Socket RR Joint 90 DN. 90 mm
Long Bend All Socket RR Joint 90 DN. 110 mm
Long Bend All Socket RR Joint 90 DN. 140 mm
Long Bend All Socket RR Joint 90 DN. 160 mm
Long Bend All Socket RR Joint 90 DN. 200 mm
Long Bend All Socket RR Joint 90 DN. 250 mm
Long Bend All Socket RR Joint 45 DN. 63 mm
Long Bend All Socket RR Joint 45 DN. 75 mm
Long Bend All Socket RR Joint 45 DN. 90 mm
Long Bend All Socket RR Joint 45 DN. 110 mm
Long Bend All Socket RR Joint 45 DN. 140 mm
Long Bend All Socket RR Joint 45 DN. 160 mm
Long Bend All Socket RR Joint 45 DN. 200 mm
Long Bend All Socket RR Joint 45 DN. 250 mm
Long Bend All Socket RR Joint 22,5 DN. 63 mm
Long Bend All Socket RR Joint 22,5 DN. 75 mm
Long Bend All Socket RR Joint 22,5 DN. 90 mm
Long Bend All Socket RR Joint 22,5 DN. 110 mm
Long Bend All Socket RR Joint 22,5 DN. 140 mm
Long Bend All Socket RR Joint 22,5 DN. 160 mm
Long Bend All Socket RR Joint 22,5 DN. 200 mm
Long Bend All Socket RR Joint 22,5 DN. 250 mm
Flanges Socket RR Joint DN. 63 mm
Flanges Socket RR Joint DN. 90 mm
Flanges Socket RR Joint DN. 110 mm
Flanges Socket RR Joint DN. 160 mm

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

378,200
339,100
772,700
670,450
605,000
520,600
1,783,000
1,601,200
1,326,600
1,377,100
1,245,200
61,100
86,000
87,200
167,300
268,900
527,900
37,300
50,200
73,500
138,200
213,800
320,200
650,900
1,182,400
38,200
42,500
64,200
102,900
169,750
276,900
459,100
851,500
28,600
37,300
55,500
87,500
140,500
235,600
391,500
686,000
113,100
156,100
195,200
329,100

Daerah A

NO

URAIAN

SAT.

Hal. 12

HARGA SATUAN
( Rp )
###

50
51
52
53
54
55
56
57
58

Flanges Socket RR Joint DN. 200 mm


Flanges Socket RR Joint DN. 250 mm
CI Gte Valve Flanged Flat Body "AFT" 40 mm
CI Gte Valve Flanged Flat Body "AFT" 50 mm
CI Gte Valve Flanged Flat Body "AFT" 65 mm
CI Gte Valve Flanged Flat Body "AFT" 80 mm
CI Gte Valve Flanged Flat Body "AFT" 100 mm
CI Gte Valve Flanged Flat Body "AFT" 125 mm
CI Gte Valve Flanged Flat Body "AFT" 150 mm

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

516,100
803,100
989,500
1,095,800
1,394,600
1,593,900
2,125,200
2,750,000
3,453,450

Daerah A

NO

URAIAN

SAT.

Hal. 13

HARGA SATUAN
( Rp )
###

59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103

CI Gte Valve Flanged Flat Body "AFT" 200 mm


CI Gte Valve Flanged Flat Body "AFT" 250 mm
Giboult Joint Cast Iron PN. 10 uk. 50 mm
Giboult Joint Cast Iron PN. 10 uk. 80 mm
Giboult Joint Cast Iron PN. 10 uk. 100 mm
Giboult Joint Cast Iron PN. 10 uk. 150 mm
Giboult Joint Cast Iron PN. 10 uk. 200 mm
Giboult Joint Cast Iron PN. 10 uk. 250 mm
Dismantling Joint Cast Iron PN. 10 uk. 50 mm
Dismantling Joint Cast Iron PN. 10 uk. 80 mm
Dismantling Joint Cast Iron PN. 10 uk. 100 mm
Dismantling Joint Cast Iron PN. 10 uk. 150 mm
Dismantling Joint Cast Iron PN. 10 uk. 200 mm
Dismantling Joint Cast Iron PN. 10 uk. 250 mm
Tangki air (Hidran Umum) uk. 1000 ltr
Tangki air (Hidran Umum) uk. 2000 ltr
Tangki air (Hidran Umum) uk. 3000Cast Iron ( CI )
All Flange Tee uk. 50 x 50 mm
Cast Iron ( CI )
All Flange Tee uk. 75 x 75 mm
Cast Iron ( CI )
All Flange Tee uk. 100 x 50 mm Cast Iron ( CI )
All Flange Tee uk. 100 x 75 mm Cast Iron ( CI )
All Flange Tee uk. 100 x 100 mm Cast Iron ( CI )
All Flange Tee uk. 150 x 50 mm Cast Iron ( CI )
All Flange Tee uk. 150 x 75 mm Cast Iron ( CI )
All Flange Tee uk. 150 x 100 mm Cast Iron ( CI )
All Flange Tee uk. 150 x 150 mm Cast Iron ( CI )
All Flange Tee uk. 200 x 75 mm Cast Iron ( CI )
All Flange Tee uk. 200 x 100 mm Cast Iron ( CI )
All Flange Tee uk. 200 x 150 mm Cast Iron ( CI )
All Flange Tee uk. 200 x 200 mm Cast Iron ( CI )
All Flange Bend 90 uk. 50 mm
Cast Iron ( CI )
All Flange Bend 90 uk. 75 mm
Cast Iron ( CI )
All Flange Bend 90 uk. 100 mm Cast Iron ( CI )
All Flange Bend 90 uk. 150 mm Cast Iron ( CI )
All Flange Bend 90 uk. 200 mm Cast Iron ( CI )
All Flange Bend 90 uk. 250 mm Cast Iron ( CI )
All Flange Bend 45 uk. 50 mm
Cast Iron ( CI )
All Flange Bend 45 uk. 75 mm
Cast Iron ( CI )
All Flange Bend 45 uk. 100 mm Cast Iron ( CI )
All Flange Bend 45 uk. 150 mm Cast Iron ( CI )
All Flange Bend 45 uk. 200 mm Cast Iron ( CI )
All Flange Bend 45 uk. 250 mm
All Flange Bend 11 1/4 - 22 1/2 uk. 50 mm
All Flange Bend 11 1/4 - 22 1/2 uk. 75 mm
All Flange Bend 11 1/4 - 22 1/2 uk. 100 mm

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

5,512,200
8,301,500
237,000
285,500
342,600
541,900
670,700
890,900
644,200
710,600
746,400
1,275,100
1,779,800
2,324,400
3,187,800
6,508,425
7,438,200
317,500
454,700
526,900
541,300
577,500
815,600
830,100
858,900
945,700
1,219,900
1,248,800
1,321,000
1,443,800
216,500
317,500
404,000
721,900
996,100
1,443,800
223,800
332,000
404,100
692,900
1,025,000
1,530,100
692,900
433,100
541,300

Daerah A

NO

URAIAN

SAT.

Hal. 14

HARGA SATUAN
( Rp )
###

104
105
106
107
108
109
110
111
112

All Flange Bend 11 1/4 - 22 1/2 uk. 150 mm


All Flange Bend 11 1/4 - 22 1/2 uk. 200 mm
All Flange Bend 11 1/4 - 22 1/2 uk. 250 mm
All Flange Reducer uk. 80 x 50 mm
All Flange Reducer uk. 100 x 50 mm
All Flange Reducer uk. 100 x 80 mm
All Flange Reducer uk. 150 x 80 mm
All Flange Reducer uk. 150 x 100 mm
All Flange Reducer uk. 200 x 75 mm

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

743,500
1,176,700
1,718,000
252,650
274,200
288,750
498,000
526,900
613,600

Daerah A

NO

URAIAN

SAT.

Hal. 15

HARGA SATUAN
( Rp )
###

113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157

All Flange Reducer uk. 200 x 100 mm


All Flange Reducer uk. 200 x 150 mm
All Flange Reducer uk. 250 x 75 mm
All Flange Reducer uk. 250 x 100 mm
All Flange Reducer uk. 250 x 150 mm
All Flange Reducer uk. 250 x 200 mm
Wall Pipe uk. 100 x 0.30 mm
Wall Pipe uk. 100 x 0.40 mm
Wall Pipe uk. 100 x 0.50 mm
Wall Pipe uk. 100 x 0.60 mm
Wall Pipe uk. 100 x 0.70 mm
Wall Pipe uk. 100 x 0.80 mm
Wall Pipe uk. 100 x 0.90 mm
Wall Pipe uk. 100 x 1.00 mm
Wall Pipe uk. 150 x 0.30 mm
Wall Pipe uk. 150 x 0.40 mm
Wall Pipe uk. 150 x 0.50 mm
Wall Pipe uk. 150 x 0.60 mm
Wall Pipe uk. 150 x 0.70 mm
Wall Pipe uk. 150 x 0.80 mm
Wall Pipe uk. 150 x 0.90 mm
Wall Pipe uk. 150 x 1.00 mm
Wall Pipe uk. 200 x 0.40 mm
Wall Pipe uk. 200 x 0.50 mm
Wall Pipe uk. 200 x 0.60 mm
Wall Pipe uk. 200 x 0.70 mm
Wall Pipe uk. 200 x 0.80 mm
Wall Pipe uk. 200 x 0.90 mm
Wall Pipe uk. 200 x 1.00 mm
Wall Pipe uk. 250 x 0.40 mm
Wall Pipe uk. 250 x 0.50 mm
Wall Pipe uk. 250 x 0.60 mm
Wall Pipe uk. 250 x 0.70 mm
Wall Pipe uk. 250 x 0.80 mm
Wall Pipe uk. 250 x 0.90 mm
Wall Pipe uk. 250 x 1.00 mm
Giboult Joint uk. 50 mm
Giboult Joint uk. 75 mm
Giboult Joint uk. 100 mm
Giboult Joint uk. 150 mm
Giboult Joint uk. 200 mm
Giboult Joint uk. 250 mm
Bend All Socket 90 uk. 50 mm
Bend All Socket 90 uk. 100 mm
Bend All Socket 90 uk. 150 mm

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

649,600
685,700
887,900
901,800
938,400
1,032,300
721,900
765,200
822,900
880,600
938,400
981,700
1,039,490
1,126,000
1,010,600
1,082,700
1,155,000
1,227,200
1,299,400
1,371,500
1,443,800
1,530,400
1,660,300
1,790,200
1,912,900
2,041,800
2,165,500
2,295,600
2,468,800
2,165,500
2,324,400
2,468,800
2,613,100
2,757,500
2,901,900
3,060,600
180,500
274,200
345,200
541,300
810,800
1,176,600
454,700
456,600
721,900

Daerah A

NO

URAIAN

SAT.

Hal. 16

HARGA SATUAN
( Rp )
###

158
159
160
161
162
163
164
165
166

Bend All Socket 90 uk. 200 mm


Bend All Socket 90 uk. 250 mm
Flange Socket ( CI ) DN 50. mm
Flange Socket ( CI ) DN 80 mm
Flange Socket ( CI ) DN 100 mm
Flange Socket ( CI ) DN 150 mm
Flange Socket ( CI ) DN 200 mm
Flange Socket ( CI ) DN 250 mm
Air Relief Valve ( CI ) DN 50 mm

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

1,624,100
2,526,500
418,600
469,200
815,600
1,176,600
1,949,600
2,382,200
1,713,400

Daerah A

NO

URAIAN

SAT.

Hal. 17

HARGA SATUAN
( Rp )
###

167
168
169
170

Air Relief Valve ( CI ) DN 80 mm


Air Relief Valve ( CI ) DN 100 mm
Air Relief Valve ( CI ) DN 150 mm
Air Relief Valve ( CI ) DN 200 mm

VIII. B A H A N L A N G I T - L A N G I T
1 Asbes Plat tebal 6 mm (1,00 x 1,00)
2 Bilik bambu
3 Eternit 1 x 1 m2 t = 4 mm Djabesmen / harflex
4 Eternit (saflex) 1 x 1 m2, t = 5 mm
5 Gypsum uk. 1,2 x 2,4 tebal 9mm
6 Lis gypsum
7 Lis kayu profil
8 Lis kayu 2/4
9 Teakwood 0,9 x 2,1 t = 3 mm
10 Teakwood 0,9 x 2,1 t = 4 mm
11 Teakwood 1,2 x 2,4 t = 3 mm
12 Teakwood 1,2 x 2,4 t = 6 mm
13 Triplek 1.2 x 2.4 tbl = 3 mm
14 Triplek 1.2 x 2.4 tbl = 4 mm
15 Triplek 1.2 x 2.4 tbl = 6 mm
16 Triplek 0.9 x 2.1 uk pintu tbl 4 mm
17 Triplek 0.9 x 2.1 uk pintu tbl 3 mm
IX.
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
9
10
11
12

BAHAN FINISHING
Amplas
Coating Heritage alami
Dempul kayu
Plamur Kayu
Plamur tembok
Cat Besi
Cat Kayu
Cat Tembok
Cat Tembok exterior
Flinkote
Kuas 3"
Kuas 2"
Lem kayu
Lem Kuning
Lem Putih
Lem Vinyl
Lem Perekat Wallpaper
Oker Putih
Oker Warna
Melamik

Bh
Bh
Bh
Bh

Lbr
M2
m2
m2
Lbr
M'
M'
M'
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr

Lbr
Ltr
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Bh
Bh
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

1,177,900
4,316,800
8,633,600
13,402,000
22,000
49,000
15,900
14,000
66,200
6,000
4,000
3,000
73,500
159,400
102,900
154,400
48,100
67,400
84,600
42,800
40,700
2,900
62,200
18,400
18,400
15,200
45,300
42,800
20,000
113,300
25,000
6,100
5,000
25,400
49,000
25,400
7,600
15,200
18,300
19,600
61,200

Daerah A

NO

URAIAN

SAT.

Hal. 18

HARGA SATUAN
( Rp )
###

13
14
15
16
17
18
19
20
21

Menie Besi
Menie kayu
Minyak Cat
Politur
Politur Jadi
Residu
Rol Cat
Sirlak
Spiritus

Kg
Kg
Ltr
Kg
Kg
Ltr
Bh
Kg
Ltr

24,500
24,500
15,200
39,100
41,600
49,000
18,300
91,900
12,200

Daerah A

NO

URAIAN

SAT.

Hal. 19

HARGA SATUAN
( Rp )
###

22
23
24
35

Teer
Teak oil
Vernis
Vernis Batu alam

Ltr
Kg
Ltr
Ltr

1
2
3
4
5
6
7
8
9
10
11
12
13
14

BAHAN KACA
Kaca patri
Kaca bening 5 mm
Kaca ryban 5 mm
Kaca Es
Kaca Bening 12 mm
Kaca Cermin tebal 5mm
Kaca nako
Kaca one way
Kaca tebal 3 mm
Kaca tebal 8 mm
Kaca, cermin tebal 8 mm
Kaca cermin, tebal 6 mm
Kaca Wireglass
Profil Kaca

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M'

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

BAHAN INSTALASI LISTRIK


HARDWARE JARINGAN 20 KV
Armour Rod # for 35 mm2
Armour Rod # for 50 mm2
Armour Rod # for 70 mm2
Armour Rod # for 150 mm2
Armour Rod # for 240 mm2
Armour Tape 1/4" wide
Aluminium connector
Armour rod # for AAAC 70 mm2
Amor rod tapping
Amor tape
Anchor rod 5/8 x 7"
Anchor rod 3/4 x 8"
Anchor rod 3/4 x 7"
Anchor Expanding 8.000 lbs
Anchor Expanding 10.000 lbs
Angle clamp primer
Bolt eye 5/8 x 10"
Bolt eye 5/8 x 12"
Bolt eye 5/8 x ridg length"
Bolt Machine 5/8" x ( 14" s/d 22" )
Bolt Machine 5/8 x 8"
Bolt Machine 5/8 x 9"

Set
Set
Set
Set
Set
Mtr
Bh
Set
Set
m
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

X.

XI

6,100
10,350
26,900
63,650
90,000
75,000
90,300
85,400
306,300
165,400
75,000
490,100
80,500
245,000
182,000
165,400
343,100
9,500
30,200
45,400
60,500
80,800
121,250
5,900
26,400
55,050
16,900
3,700
87,550
88,200
88,200
102,050
103,300
2,100
16,650
16,650
16,000
21,100
16,900
14,420

Daerah A

NO

URAIAN

SAT.

Hal. 20

HARGA SATUAN
( Rp )
###

23
24
25
26
27
28
29
30
31

Bolt Machine 5/8 x 10"


Bolt Machine 5/8 x 12"
Bolt cariage 1/2" x 3/4"
Bolt Single Up Side 5/8" x 8"
Bolt Single Up Side 5/8" x 9"
Bolt Single Up Side 5/8" x 10"
Bolt Single Up Side 5/8" x 12"
Bolt Double Up Side 5/8" x (14" s/d 22" )
Bolt Double Up Side 5/8" x 10"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

19,050
17,600
4,000
26,900
27,800
30,200
26,500
36,900
27,600

Daerah A

NO

URAIAN

SAT.

Hal. 21

HARGA SATUAN
( Rp )
###

32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76

Bolt Double Up Side 5/8" x 12"


Bolt Double Up Side 5/8" x 9"
Bolt Double Up Side 5/8" x 8"
Bolt Double Arming 5/8" x (16" s/d 24" )
Bolt Double Arming 5/8" x 10"
Bolt Double Arming 5/8" x 12"
Bolt Double Arming 5/8" x 14"
Bimetalic Connector ( 35 s/d 240 ) mm2
Brace steel 550 mm
Brace steel 770 mm
Brace steel 1,262 mm
Bracket center
Bracket Secondary / Bracket Insulated
Brecket transformer
Bracket Extension For cut out
Bracket band segment vertical plat(Hot dip galvanis
Center Bracket 6 KN
Center Bracket 12,5 KN
Caterpain
Clamp bougel
Clamp ground rod
Clamp ground wire
Clamp hot line top assembly
Clamp Hot line ( 35 mm2 s/d 70 mm2)
Clamp Hot line ( 150 mm2 s/d 240 mm2)
Clamp Loop Dead End / LC ( 35 s/d 240 ) mm2
Clevis Swinging Secondary
Compression Connector H Type 150 mm2 / 240 mm2
Compression Connector H Type 240 mm2 / 240 mm2
Compression Connector H Type 50 mm2 / 70 mm2
Compression Connector H Type 70 mm2 / 150 mm2
Compression Connector H Type 70 mm2 / 70 mm2
Compression Terminal Lug 35 mm2
Compression Terminal Lug 50 mm2
Compression Terminal Lug 70 mm2
Compression Terminal Lug 150 mm2
Compression Terminal Lug 240 mm2
Cross Arm Steel 1.500 mm (UNSP 10) galvanis
Cross Arm Steel 2000 mm (UNSP 10) galvanis
Cross Arm Steel 3000 mm (UNSP 10) galvanis
Dead End Assembly ( CJ6-T)
Distribusi trafo CSP 50 KVA
Distribusi trafo CSP 25 KVA
Distribusi trafo CST 105 / CG 1 Phase 50 KVA
Distribusi trafo CST 106 / CG 3 Phase 50 KVA

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Unit
Unit
Unit

28,700
26,600
25,600
22,500
27,150
29,200
31,200
40,400
21,950
26,400
82,430
42,850
18,540
334,750
60,500
368,760
67,300
79,900
3,200
13,150
13,900
13,900
149,350
64,600
110,200
25,770
19,050
40,000
43,280
24,720
37,000
28,600
36,050
10,600
13,300
25,400
31,800
269,600
359,500
539,400
73,140
33,359,700
31,953,100
27,912,500
36,540,000

Daerah A

NO

URAIAN

SAT.

Hal. 22

HARGA SATUAN
( Rp )
###

77
78
79
80
81
82
83
84
85

Distribusi trafo CST 106 / CG 3 Phase 100 KVA


Distribusi trafo CST 106 / CG 3 Phase 160 KVA
Freeformed Guy Wire 22 mm2
Freeformed Guy Wire 35 mm2
Freeformed Guy Wire 70 mm2
Fuse Cut Out 20 KV, 100A
Fuse Link 3A
Fuse Link 6A
Fuse Link 8A

Unit
Unit
Bh
Bh
Bh
Bh
Bh
Bh
Bh

44,152,500
68,005,000
27,600
32,800
38,200
1,133,000
36,900
36,900
36,900

Daerah A

NO

URAIAN

SAT.

Hal. 23

HARGA SATUAN
( Rp )
###

86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130

Fuse Link 10A


Fuse Link 15A
Fuse Link 20A
Fuse Link 25A
Fuse Link 30A
Fuse Link 50A
Fuse Link 60A
Fuse Link 65A
Fuse Link 80A
Fuse Link 100A
NT Fuse 63 - 100 A lengkap size 00
NT Fuse 63 - 100 A lengkap size 0
NT Fuse 63 - 100 A lengkap size 1
NT Fuse 63 - 100 A lengkap size 2
NT Fuse 63 - 100 A lengkap size 3
Guy Attachment / Guy hok
Guy wire SM 7 strad
Guy wire 22 mm2
Guy wire 35 mm2
Guy wire 70 mm2
Ground rod 5/8" x 8 " steel
Ground Wire CU 16 mm2
Ground Wire CU 25 mm2
Ground Wire CU 50 mm2
Grounding Iron Plate Form Plat / Eart safety mats
Ground rod and Washer
Ground rod 5/8" x 8 " Cooper weld
Insulating tape
Insulator suspension 10 KVA
Insulator starint road
Isolator Tumpu ( Line Post ) 20 KV
Isolator Tumpu ( Pin Post ) 20 KV
Isolator tarik ( Suspension ) 20 KV
Isolator tarik ( Suspension ) 20 KV Komplit dng Strain Clamp 35Jamper AAC 70 mm2
Jamper ruquaired
Kabel TX 2 x 70 + 1 x 50
Joint sleeve 35 mm2
Joint sleeve 50 mm2
Joint sleeve 70 mm2
Joint sleeve 150 mm2
Joint sleeve 240 mm2
Kousen
Large Angle Assembly ( CJ7-T)
Lock Nut 5/8"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
m
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
unit
unit
m
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

36,900
36,900
47,100
47,100
47,100
60,500
60,500
60,500
60,500
60,500
50,400
74,000
94,300
114,400
148,200
12,800
7,000
8,450
12,400
22,500
73,500
23,200
36,900
67,300
1,138,400
11,300
119,800
23,300
215,000
28,100
215,600
215,600
245,200
377,400
22,000
31,300
41,900
26,950
31,900
33,700
96,900
118,600
4,000
106,200
9,900

Daerah A

NO

URAIAN

SAT.

Hal. 24

HARGA SATUAN
( Rp )
###

131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175

LCC 240 mm2


Nut eye 5/8"
Nut Timble Eye 5/8"
Oval eye bolt 5/8" x 8"
Oval eye bolt 5/8" x 9"
Oval eye bolt 5/8" x (14 s/d 22")
Oval eye bolt 5/8" x 10"
Oval eye bolt 5/8" x 12"
Oval Eye Nut 5/8"
Paralel Group Clamp(150-70 mm2/35-16 mm2)
Pin Adapater insulator
Plastic Strap for Clamping
Pole band Double rack 3" atau 3 1/2"
Pole band Double rack 4" atau 4 1/2"
Pole band Double rack 5" atau 5 1/2"
Pole band Double rack 6" atau 6 1/2"
Pole band Double rack 7" atau 7 1/2"
Pole band Double rack 8" atau 8 1/2"
Pole band Double rack 9" s/d 12"
Pole band Double Side 3" atau 3 1/2"
Pole band Double Side 4" atau 4 1/2"
Pole band Double Side 5" atau 5 1/2"
Pole band Double Side 6" atau 6 1/2"
Pole band Double Side 7" atau 7 1/2"
Pole band Double Side 8" atau 8 1/2"
Pole band Double Side 9" s/d 12"
Pole band Single rack 3" atau 3 1/2"
Pole band Single rack 4" atau 4 1/2"
Pole band Single rack 5" atau 5 1/2"
Pole band Single rack 6" atau 6 1/2"
Pole band Single rack 7" atau 7 1/2"
Pole band Single rack 8" atau 8 1/2"
Pole band Single rack 9" s/d 12"
Pole Band Single rack 10"
Pole band Single Up Side 3" atau 3 1/2"
Pole band Single Up Side 4" atau 4 1/2"
Pole band Single Up Side 5" atau 5 1/2"
Pole band Single Up Side 6" atau 6 1/2"
Pole band Single Up Side 7" atau 7 1/2"
Pole band Single Up Side 8" atau 8 1/2"
Pole band Single Up Side 9" s/d 12"
Primary Angle Clamp ( 35 s/d 70) mm2
Primary Angle Clamp ( 150 s/d 240 ) mm2
Primary Dead End Clamp ( 35 s/d 70) mm2
Primary Dead End ( 150 s/d 240 ) mm2

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

191,900
9,800
15,000
20,950
11,100
22,800
16,750
18,000
19,096
23,300
31,000
2,060
26,200
27,470
28,900
30,200
45,700
51,550
36,900
30,200
32,200
34,300
36,300
50,600
56,200
44,400
24,200
25,500
26,900
28,200
29,500
30,900
35,000
45,500
28,200
30,200
32,200
34,300
47,300
52,400
42,300
56,650
60,500
67,300
94,300

Daerah A

NO

URAIAN

SAT.

Hal. 25

HARGA SATUAN
( Rp )
###

176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194

Shackle Anchor 5/8"


Side Bracket
Split bolt connector
Split plastic sleeve
Spol Insulator ANSI 53-2
Spol Insulator ANSI 53-4
Stainless Steel Strap 20 x 0,7 mm
Stainless Steel Strap
Strap for clamping
Steel L 70 x 70 x 7 x 1.000 mm galvanis
Steel L 70 x 70 x 7 x 1.262 mm galvanis
Steel L 70 x 70 x 7 x 780 mm galvanis
Stopping Buckle / Yokes
Suspension / Small Angle Assembly ( CJ5-T)
Tap Connector ( 35s/d 70) mm2
Tap Connector ( 35s/d 150) mm2
Tap Connector ( 70 s/d 150 ) mm2
Tap Connector ( 70 s/d 240 ) mm2
Three Bolt Clamp

Bh
Bh
Bh
Bh
Bh
Bh
Mtr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

18,000
69,300
23,100
2,100
36,050
41,200
10,900
2,800
2,650
20,600
215,200
107,200
2,100
33,100
5,200
13,600
18,300
23,200
38,100

Daerah A

NO

URAIAN

SAT.

Hal. 26

HARGA SATUAN
( Rp )
###

195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239

Tie Wire # 4 / Alluminium Bonding Wire # 20


Washer Square 2 1/4"
Washer Square 2 1/2"
Washer Round 3/8"
Penghalang panjat
Papan tanda bahaya
Lampu pijar 110/220 Volt:
Lampu pijar 110/220 Volt:
Lampu pijar 110/220 Volt:
Lampu pijar 110/220 Volt:
Lampu pijar 110/220 Volt:
Lampu pijar 110/220 Volt:
Lampu pijar 110/220 Volt:
Lampu pijar 110/220 Volt:
Lampu Pijar jenis cabe 25 watt
Lampu TL
Lampu TL
Lampu TL
Lampu TL
Lampu TL
Lampu TL
Cirole
Cirole
Lampu Halogen 220 Volt
Lampu Halogen 220 Volt
Lampu Halogen 220 Volt
HPL 22 Volt
HPL 22 Volt
HPL 22 Volt
Lampu HPIT 220 Volt
Spot Light 220 Volt
CFL 110 / 220 Volt
MHL 220 Volt
Starter TL

Bola lampu
ML 220 VE.27
ML 220 VE.27
ML 220 VE.27
ML 220 VE.40
HPL 220 VE.27

5
10
15
25
40
60
75
100

10
15
18
20
36
40
20
30
500
1000
1500
50
80
100
400
100
125
150
16
18
100
160
810
Fs2
100
160
250
250
80

Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt

Mtr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt
(10-400 Wat
(20 watt )

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

Watt
Watt
Watt
Watt
Watt

Bh
Bh
Bh
Bh
Bh

6,600
3,200
3,200
1,500
88,100
17,600
6,600
8,600
9,300
9,970
10,700
11,350
11,350
13,400
12,100
16,100
18,700
22,800
24,100
26,900
32,200
48,400
61,950
100,900
161,600
175,150
114,400
121,250
121,250
47,300
100,900
100,900
114,400
94,300
148,200
100,900
107,700
6,600
6,600
202,100
188,600
336,500
336,900

Daerah A

NO

URAIAN

SAT.

Hal. 27

HARGA SATUAN
( Rp )
###

240
241
242
243
244
245
246
247
248

HPL 220 VE.27


HPL 220 VE.40
HPL 220 VE.40
SON E.27
SON E.40
SON E.40
SON E.27
SON
BALAST / TRAFO

125
250
400
70
150
250
400
250

Watt
Watt
Watt
Watt
Watt
Watt
Watt
Watt

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

148,200
154,900
363,800
417,700
269,500
363,800
43,300
309,900
296,500

Daerah A

NO

URAIAN

SAT.

Hal. 28

HARGA SATUAN
( Rp )
###

249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293

HPL 050 L. 200


HPL 070 L.200
HPL 080 L.200
HPL 125 L. 200
HPL 250 L. 200
HPL 400 L. 200
SON 150 L. 08
SON 250 L. 08
SON 250 Watt
SON 250 Watt BSN 250 L
HPL 400 Watt
HPL 250 Watt
HPL 125 Watt
HPL 80 Watt
Contactor

Lampu talang
Starter TLS 10-40
Ignitor SN 58
Kapasitor
MCB

Megnetic Switch MS

Stop kontak

Saklar Engkel
Staker
Klem U

25 Ampere
35 Ampere
16 Ampere

6-16 Ampere
17-35 Ampere
Lebih dari 63 Ampere
10 Ampere
20 Ampere
29 Ampere
35 Ampere
50 Ampere
65 Ampere
95 Ampere
125 Ampere
150 Ampere
220 Ampere
outbow
outbow
In bow
In bow
In bow
In bow
outbow
In bow
Biasa / tanopa arde
dengan arde

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

269,500
269,500
283,000
296,500
350,400
404,300
377,400
296,500
539,100
336,900
309,900
235,700
161,600
148,200
229,000
229,000
229,000
94,300
6,600
134,700
113,500
67,300
80,800
309,900
1,078,200
1,347,800
1,887,000
2,021,800
2,695,700
4,043,600
5,661,000
8,761,100
9,435,100
12,804,700
20,150
107,800
1,900
67,300
47,100
40,400
20,150
18,700
4,000
16,100

Daerah A

NO

URAIAN

SAT.

Hal. 29

HARGA SATUAN
( Rp )
###

294 Klem Kabel


295 Fitting
296
297
298
299
300
301
302

Plafon
Gantung
NYM Uk.
NYM Uk.
NYM Uk.
NYM Uk.
NYY Uk.
NYY Uk.

2x2,5 mm
2 x 4 mm
4 x 4 mm
4 X 2,5
2x2,5 mm
3x2,5 mm

Bh
Pak
Bh
Bh
m'
m'
m'
m'
m'

13,400
13,400
8,600
4,550
9,300
20,100
26,900
20,150
9,300

Daerah A

NO

URAIAN

SAT.

Hal. 30

HARGA SATUAN
( Rp )
###

303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347

Fuse Box

Isolasi

NYY Uk.
NYY Uk.
NYY Uk.
NYY Uk.
NYY Uk.
DX / Twisted
LVTC 2x70 +N.50
LVTC 2x35 +N.50
1
2
3
kecil
besar

Test pen
Fotosel ( otomat )
Modul Lampu amar
Modul Traffic Light
Tangga Aluminium Lipat P 8 meter
Klem Pole Band
Pal Bantu RS 9
Konsol panjang 6 meter 2 " tebal 3 mm Medium A
Konsol panjang 6 meter 2 " tebal 2 mm Medium A
Pool Massa
Kap lampu Son 250 Watt Lengkap
Kap lampu Son 250 Watt Type SMR 511
Kap lampu TL isi 2
Kap Lampu TL isi 2 type TMR 524/2.36 W
Kap Lampu Caping
Lampu Pijar 200 watt
Bok panel instalasi lengkap
Tutup Trafo
Fiting HPL
Biaya Pemasangan titik lampu
Lampu sorot 125 watt
Lampu tanam
Kabel PVC
Kabel telepon
Kabel Antena
Klem Plastik
Sekering
Fiting SON
Paralon listrik
T Doos
Stop kontak AC

2x4 mm
3x4 mm
4x4 mm
4x6 mm
4x10 mm

Group
Group
Group

m'
m'
m'
m'
m'
m'
m'
m'
m'
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Roll
Roll
Roll
Bh
Bh
Bh
Btg
Bh
Bh

14,700
16,100
21,500
26,900
22,800
53,800
14,700
53,800
40,400
33,600
47,100
67,300
2,650
10,700
20,150
202,000
242,500
3,369,600
5,391,400
175,150
2,021,800
673,900
606,500
121,250
3,774,000
1,010,900
606,500
272,600
1,077,000
26,900
1,887,000
26,900
53,800
53,800
134,700
215,500
121,250
126,200
215,500
950
33,600
53,800
80,800
6,600
80,800

Daerah A

NO

URAIAN

SAT.

Hal. 31

HARGA SATUAN
( Rp )
###

348
349
350
351
352
353
354
355
356

Contak cleaner
Jek AC
Kawat Arde
Kabel Setrika
Elemen Setrika
Saklar hendel
Saklar Coloum
Mic
Pal Bantu berornamen RS 7 dengan 2 buah konsol 3 mtr

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

33,600
26,900
26,900
6,600
20,150
235,800
2,021,800
673,900
6,739,300

Daerah A

NO

URAIAN

SAT.

Hal. 32

HARGA SATUAN
( Rp )
###

357
358
359
360
361
362
363
364
365
366
367
368
369
370

371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398

Pal bantu berornamen


Upah pasang lampu konsol
Upah pasang pal bantu
Upah pasang lampu cabang dua
Aluminium connector
Tambang plastik besar
Sayang bambu komplit
Martil / palu 5 Kg
Bor listrik
Mata bor
Kunci
Kunci Inggris
Lampas baja
Digger Tanah
Pemasangan Jaringan Listrik
KWH Meter 1 phasa 220 v, 5 / 20 A, st
1 F,5/20A,S
KWH Meter 1 Phasa 220 v, 20/60A, st
1 F,20/60A,
KWH Meter 1 Phasa 220 v, 50/100 A, st
1 F,50/100A
KWH Meter 3 Phasa 220/380 v,5/20 A, st
3 F,5/20A,S
KWH Meter 3 Phasa 220/380 v,20/60 A, st
3 F,20/60A,
KWH Meter 3 Phasa 220/380 v,50/100A, st
3 F,50/100A
KWH Meter 3 Phasa 220/380 v,5/20 A, DT
3 F,5/20A,D
KWH Meter 3 Phasa 220/380 v,20/60 A, DT
3 F,20//60A
KWH Meter 3 Phasa 220/380 v,50/100 A, DT
3 F,50/100
KVARH Meter 3 Ph 220/380 v,5/20 A, ST
3 F,5/20A,D
KVARH Meter 3 Ph 220/380 v,20/60 A, ST
3 F,20/60A,
KVARH Meter 3 Ph 220/380 v,50/100 A, ST
3 F,50/100A
KWH Meter 3 Phasa 57, 7/100 v, /5A, ST
3 F,/5 A,ST
KWH Meter 3 Phasa 57, 7/100 v, /5A, DT
3 F, /5 A,DT
KVARH Meter 3 Ph, 57, 7v/100 v, /5 A, ST
3 F,/5 A,ST
Metering Out Fit 3 Ph, 20 KV
Metering Out Fit 1 Ph, 20 KV
Kwh Meter Electronic Class 0,5
Kwh Meter Electronic Class 0,2
Optical Communication Probe
GSM Modem berikut kartu perdana
PSTN Modem
Pengadaan & Penarikan Kabel Telepon dari PABX ke KWH
Meter Elektronik, panjang sekitar 100 meter
KOTAK APP
Kotak APP Type Lipat, lengkap
Type I Lipat
Kotak APP Type III Lipat, lengkap
Type III
Kotak APP TR Type IV Tanpa Topi, lengkap
Type IV
Kotak APP TR Type I A Single tarif lengkap
Type I

Bh
Bh
Bh
Bh
m'
m'
Set
Bh
Bh
Set
Bh
Bh
Bh
Bh

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Unit
Bh
Bh
Unit
Unit
Bh
Bh
Unit
Unit
Unit
Unit
Unit
Bh
Bh
Bh
Bh

5,484,100
269,500
370,500
673,900
20,700
3,800
127,900
33,600
1,213,000
269,500
20,150
47,100
100,900
202,100
204,200
166,300
297,700
1,199,550
1,266,700
1,347,300
1,546,800
1,616,800
1,751,500
1,198,800
1,266,700
1,347,300
1,226,400
1,549,900
929,300
32,861,300
29,705,200
8,184,200
20,157,100
4,596,200
3,927,019
2,372,172
296,521
50,300
235,800
4,717,550
5,822,700

Daerah A

NO

URAIAN

SAT.

Hal. 33

HARGA SATUAN
( Rp )
###

399 Kotak APP TR Double Tarif, lengkap


400 Kotak APP TM, lengkap
TRANSFORMATOR
401 Trafo 1 Phasa CSP 12,7 KV/B2
402 Trafo 3 Phasa 20 KV/B2
403 Trafo 3 Phasa 20 KV/B2
404 Trafo 3 Phasa 20 KV/B2
405 Trafo 3 Phasa 20 KV/B2
406 Trafo 3 Phasa 20 KV/B2

Double tarif
TM

Bh
Bh

50 KVA
50 KVA
100 KVA
160 KVA
200 KVA
250 KVA

Bh
Bh
Bh
Bh
Bh
Bh

6,038,400
5,607,000
32,427,490
41,252,200
50,805,400
70,900,760
81,618,230
90,687,000

Daerah A

NO

URAIAN

SAT.

Hal. 34

HARGA SATUAN
( Rp )
###

407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449

Trafo 3 Phasa 20 KV/B2


Trafo 3 Phasa 20 KV/B3
Trafo 3 Phasa 20 KV/B2
LVCB 2 Jurusan
LVCB 3 Jurusan
LVCB 4 Jurusan
KONDUKTOR
AAAC 25 mm2
AAAC 35 mm2
AAAC 50 mm2
AAAC 70 mm2
AAAC 150 mm2
AAAC 240 mm2
AAAC/S 150 mm2
AAAC/S 240 mm2
ACSR 70 mm2
ACSR 150 mm2
ACSR 240 mm2
KABEL TM/TR
NFA2X-T 2 x 35 + N 50 mm2
NFA2X-T 2 x 70 + N 50 mm2
NFA2X-T 3 x 70 + N 50 mm2
NFA2X 2 x 10 mm2
NFA2X 2 x 16 mm2
NFA2X 2 x 25 mm2
NFA2X 4 x 10 mm2
NFA2X 4 x 16 mm2
NFA2X 4 x 25 mm2
Kabel NYFGBY 4 x 4 mm2
Kabel NYFGBY 4 x 50 mm2 CU
Kabel NYFGBY 4 x 95 mm2 CU
Kabel NYFGBY 4 x 150 mm2 CU
Kabel NYY 1X 150 mm2
Kabel NA2XSEFGbY 20 KV, 3 X 150 mm2
Kabel NA2XSY 20 KV, 1 X 240 mm2
Kabel NA2XSEYBY 20 KV, 3 X 240 mm2
Kabel NA2XSY 20 KV, 1 X 150 mm2
Kabel NA2XSEYBY 20 KV, 3 X 300 mm2
Kabel NA2XSY 20 KV, 1 X 70 mm2
Kabel NA2XSEYBY 20 KV, 3 X 95 mm2
Kabel NA2XS2Y 20 KV, 1 X 150 mm2
Kabel NA2XS2Y 20 KV, 1 X 240 mm2
Kabel NA2XS2Y 20 KV, 1 X 300 mm2
Kabel NFA2XSY-T-3 X 240+50 mm2,20 KV
Kabel NYA Fleksibel 2,5 mm2

315 KVA
400 KVA
630 KVA
LVCB
LVCB
LVCB

Bh
Bh
Bh
Bh
Bh
Bh

25 mm2
35 mm2
50 mm2
70 mm2
150 mm2
240 mm2
150 mm2
240 mm2
70 mm2
150 mm2
240 mm2

Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr

2x35+N50m
2x70+N50m
3x70+N50m
2x10 mm2
2x16 mm2
2x25 mm2
4x10 mm2
4x16 mm2
4x25 mm2
4x4 mm2
4x50 mm2
4x95 mm2
4x150 mm2
1x150 mm2
3x150 mm2
1x240 mm2
3x240 mm2
1x120 mm2
3x300 mm2
1x95 mm2
3x95 mm2
1x150 mm2
1x240 mm2
1x300 mm2
3x240 mm2
2,5 mm2

Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr

91,374,000
97,007,600
141,946,800
120,227,000
15,800,700
19,923,650
22,000
27,500
38,500
49,500
82,500
93,500
88,000
110,000
14,850
31,700
51,900
23,100
35,600
45,900
4,300
6,900
9,100
9,500
13,600
18,450
37,000
271,600
514,950
798,500
167,100
367,000
122,100
421,700
100,700
487,400
71,610
259,390
100,700
122,000
135,500
334,800
2,400

Daerah A

NO

URAIAN

SAT.

Hal. 35

HARGA SATUAN
( Rp )
###

450
451
452
453
454
455

Kabel NYA Fleksibel 4 mm2


Kabel NYA Fleksibel 6 mm2
Kabel NYA Fleksibel 10 mm2
Kabel NYA Fleksibel 16 mm2
Kabel LVTC Ukuran 3 x 35 + N.25
Kabel LVTC Ukuran 3 x 70 + N.25

4 mm2
6 mm2
10 mm2
16 mm2

Mtr
Mtr
Mtr
Mtr
Mtr
Mtr

5,400
7,950
12,730
13,050
27,400
39,100
-

Daerah A

NO

URAIAN

SAT.

Hal. 36

HARGA SATUAN
( Rp )
###

456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498

SEPATU KABEL
Sepatu Kabel AL/CU Ring
Sepatu Kabel AL/CU Ring
Sepatu Kabel AL/CU Ring
Sepatu Kabel AL/CU Ring
Sepatu Kabel AL/CU Ring
Sepatu Kabel AL/CU Ring
Sepatu Kabel AL/CU Ring
Sepatu Kabel AL/CU Kepala
Sepatu Kabel AL/CU Kepala
Sepatu Kabel AL/CU Kepala
Sepatu Kabel AL/CU Kepala
Sepatu Kabel AL/CU Kepala
Sepatu Kabel AL/CU Kepala
Sepatu Kabel AL/CU Kepala
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel CU/CU
Sepatu Kabel CU/CU
Sepatu Kabel CU/CU
Sepatu Kabel CU/CU
Sepatu Kabel CU/CU
Sepatu Kabel CU/CU
TIANG BETON
C 7M-100 daN
C 7M-100 daN+E
C 9M-100 daN
C 9M-100 daN+E
C 9M-200 daN
C 9M-200 daN+E
C 11M-200 daN
C 11M-200 daN+E
C 11M-350 daN
C 11M-350 daN+E
C 12M-200 daN
C 12M-200 daN+E
C 12M-350 daN
C 12M-350 daN+E
C 12M-500 daN
C 12M-500 daN+E

50
70
95
120
150
185
240
50
70
95
120
150
185
240
35
50
70
95
120
150
240
35
50
70
95
150
240

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

7M-100 daN
7M-100 da
9M-100 daN
9M-100 da
9M-200 daN
9M-200 da
11M-200 da
11M-200 d
11M-350 da
11M-350 d
12M-200 da
12M-200 d
12M-350 da
12M-350 d
12M-500 da
12M-500 d

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

64,600
68,200
71,700
81,900
87,700
111,200
128,300
48,400
52,500
55,050
57,900
66,400
81,150
85,000
9,200
9,800
9,800
11,550
14,500
19,800
26,200
21,100
23,800
30,650
38,000
61,200
107,150
1,589,200
1,703,600
2,077,800
2,226,840
2,783,000
2,585,000
3,432,660
3,740,000
4,370,000
4,345,000
4,887,500
4,294,290
4,485,000
4,688,100
5,233,300
5,450,400

Daerah A

NO

URAIAN

SAT.

Hal. 37

HARGA SATUAN
( Rp )
###

499
500
501
502
503
504
505
506

C 13M-350 daN
C 13M-350 daN+E
C 13M-500 daN
C 13M-500 daN+E
C 14M-350 daN
C 14M-350 daN+E
C 14M-500 daN
C 14M-500 daN+E

13M-350 da
13M-350 d
13M-500 da
13M-500 d
14M-350 da
14M-350 d
14M-500 da
14M-500 d

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

5,487,400
5,712,630
5,868,550
6,093,780
6,208,125
6,455,200
6,886,110
7,133,280

Daerah A

NO

URAIAN

SAT.

Hal. 38

HARGA SATUAN
( Rp )
###

507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545

ABSW
Load Break switch 20 KV-630A
Load Break switch 20 KV-630A (Motorized)SF
6 lengkap dengan kontrol
D.S
Disconnecting Switch 20 KV-630 A
ARESTER
Lightning Arester 20 KV, 5 KA
Lightning Arester 20 KV, 10 KA
CAPACITOR POLE MOUNTED
Micro Cap Controller
Current Sensor
ACCESSORIES APP
Kawat Segel
Timah segel
Service wedge Clamp 616
Service wedge Clamp 625
Strain Hook Clamp 1 1/2"
Loden manset 0,8 Kg
Protective Cup 1 1/2" P
Connector ( 6-25 / 35-70 ) mm2
Connector ( 6-25 / 6-25 ) mm2
Klem Bugel 1 1/2" untuk tiang atap
Gas Pipe 1 1/2x6 m
PEKERJAAN KABEL TANAH
Terminating kabel 3 x 300 mm2 ID
Terminating kabel 1 x 300 mm2 ID
Terminating kabel 3 x 300 mm2 OD
Terminating kabel 1 x 300 mm2 OD
Terminating kabel 3 X 240 mm2 ID
Terminating kabel 1 x 240 mm2 ID
Terminating kabel 3 x 240 mm2 OD
Terminating kabel 1 x 240 mm2 OD
Terminating kabel 3 x 95 mm2 ID
Terminating kabel 1 x 95 mm2 ID
Terminating kabel 3 x 95 mm2 OD
Terminating kabel 1 x 95 mm2 OD
Jointing Raychem 24 kV 3 x 300 mm2 (Armoured) O
Jointing Raychem 24 kV x 300 mm2 (Unarmoured) I
Jointing Raychem 24 kV 3 x 240 mm2 (Armoured) O
Jointing Raychem 24 kV 1 x 240 mm2 (Unarmoured)
Jointing Raychem 24 kV 3 x 95 mm2 (Armoured) OD
Jointing Raychem 24 kV 1 x 95 mm2 (Unarmoured)
Klem beugel bevesteging 8 x 6"
Pipa PVC 6" panjang 4 meter

20 KV, 630
20 KV, 630

Set
Set

20 KV, 630

Set

20 KV, 5 KA
20 KV, 10 K

Bh
Bh
Bh
Bh
Roll
Kg
Set
Set
Set
Bh
Set
Set
Set
Set
Btg

3 x 300 mm
1 x 300 mm
3 x 300 mm
1 x 300 mm
3 x 240 mm
1 x 240 mm
3 x 240 mm
1 x 240 mm
3 x 95 mm2
1 x 95 mm2
3 x 95 mm2
1 x 95 mm2
3 x 300 mm
3 x 1 x 300
3 x 240 mm
3 x 1 x 240
3 x 95 mm2
3 x 1 x 95
8 x 6"
6"

Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Bh
Bh

23,586,900
172,527,800
10,108,250
724,300
826,200
24,814,450
17,717,900
80,800
60,400
3,600
4,900
8,600
48,400
4,900
8,600
6,600
4,200
35,710
4,177,800
2,559,950
4,986,230
2,897,300
3,778,925
3,371,540
5,379,800
3,805,400
2,844,200
240,175
4,177,800
3,182,700
4,295,200
4,447,200
473,950
4,380,450
4,380,450
3,705,700
30,230
1,313,000

Daerah A

NO

URAIAN

SAT.

Hal. 39

HARGA SATUAN
( Rp )
###

546 Pipa shock PVC


547 Klem beugel 7/8"
548 Tanda urutan phasa untuk kabel
XII.
1
2
3
4

ALAT - ALAT PENGUNCI & PENGGANTUNG


Door Closer
Door holder / Pegangan pintu
Door stop
Engsel angin

7/8"

Bh
Bh
Bh

Bh
Bh
Bh
Bh

20,150
9,300
7,300
183,750
19,000
306,300
14,300

Daerah A

NO

URAIAN

SAT.

Hal. 40

HARGA SATUAN
( Rp )
###

5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Engsel Jendela
Engsel Jendela Kuning
Engsel Pintu Kuning
Engsel Pintu Biasa
Engsel Pintu
Grendel jendela kuning
Grendel jendela biasa
Grendel pintu kuning
Grendel pintu biasa
Hak angin kuning
Hak angin biasa
Kait Angin
Kunci bulat
Kunci tanam 2 slag
Kunci tanam besar / antik
Kunci lemari
Kunci selot
Kunci silinder

XIII. B A H A N S A N I T A I R
1 Bak cuci stainless steel Royal
2 Bak cuci stainless steel Viega ( 1.00 x 0.90 ) m2
3 Bak cuci stainless steel 80 cm
4 Bak fiberglass vol 30 ltr
5 Bak mandi fiber glass, vol 120 ltr sudut
6 Bak mandi fiber glass, vol 120 ltr kotak
7 Bak mandi fiber glass, vol 150 ltr
8 Bak mandi fiber glass, vol 1000 ltr
9 Bak Tandon air fiber isi 500 Ltr
10 Bak Tandon air fiber isi 1000 Ltr
11 Bak Kontrol 30 x 30 cm
12 Floor Drain / Saringan pembuang pada lantai KM/WC
13 Kloset duduk / Monoblok "INA", Putih
14 Kloset duduk / Monoblok "INA", Warna Tua
15 Kloset duduk / Monoblok + pembilas otomatis "INA"
16 Kloset duduk Colour
17 Kloset Jongkok INA warna tua
18 Kloset Jongkok INA warna muda
19 Stop Kran 1/2"
20 Stop Kran 3/4"
21 Shower Tray
22 Tempat Sabun keramik
23 Urinoir
24 Water Drain Asesoris
25 Wastafel ( INA )

Bh
Bh
Bh
Bh
Set
Psg
Psg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Set
Bh

10,100
11,100
14,900
13,400
12,200
9,700
6,000
14,600
7,300
18,300
7,300
9,100
46,450
85,700
79,600
11,400
90,000
11,400
211,250
208,300
183,750
189,900
219,600
165,400
220,500
1,002,200
919,000
1,215,300
584,700
18,400
1,102,700
1,470,400
1,623,200
306,300
147,000
122,500
19,050
25,400
300,100
25,400
363,800
87,550
343,700

Daerah A

NO

URAIAN

SAT.

Hal. 41

HARGA SATUAN
( Rp )
###

26 Wastafel Colour
XIV. ALAT PENGIKAT KAYU
1 Baut Salang kuda2
2 Baut lawa - lawa
3 Paku (Reng, Usuk, Plafond)
4 Paku 12 cm
5 Paku Asbes
6 Paku sekrup
7 Paku sekrup
8 Paku skrup fixer
9 Paku Sekrup Asbes
10 Paku Payung
11 Paku Keling
12 Paku Eternit
13 Paku Pancing
XV.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

LAIN - LAIN
Anti Rayap
Air
Air
Aspal curah
Aspal Drum
Alat Bantu
Daun Naco
Elastomer strip uk. 30 x 30
Elastomer strip uk. 20 x 20
Gebalan rumput
Geotextile
Ijuk
Karpet
Karet dan epoxy mortar
Lampu bohlam 25 watt
Lampu TL 20 watt ( komplit )
Minyak Bekisting
Minyak flux
Minyak pelumas
Minyak Tanah
Minyak Bakar
Minyak solar
Minyak solar industri
Minyak bensin
Minyak bensin industri
Sealent
Sewa Wales

Bh

Kg
Bh
Kg
Bh
Kg
Bh
Kg
Bh
Bh
Kg
Kg
Kg
Kg

Ltr
Ltr
m3
Kg
Kg
Set
Bh
Bh
Bh
M2
M2
Kg
M2
Kg
Bh
Bh
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Tube
Hari

224,500
21,900
14,600
20,750
180
25,600
1,500
24,500
1,500
1,200
23,900
25,400
24,500
45,300
20,300
120
123,600
8,000
9,310
40,000
14,600
859,300
610,000
33,300
216,400
42,800
15,200
26,900
7,300
67,400
18,300
17,700
29,700
7,500
6,200
4,950
11,056
4,950
7,300
30,500
-

Daerah A

NO

URAIAN

SAT.

Hal. 42

HARGA SATUAN
( Rp )
###

28 Soda api
28 Sabun
CATATAN :
- Harga sudah termasuk keuntungan
pemborong
- Harga belum termasuk PPN 10%
- Wilayah daerah A terdiri dari :
Kec. Slawi, Pangkah, Lebaksiu, Dukuhwaru,
Talang dan Adiwerna

Kg
Kg
Slawi,

Februari 2013

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN TEGAL

Ir. SUDARYONO, MT
Pembina Tk. I
NIP. 19610416 198810 1 001

24,500
10,900

DAFTAR HARGA SATUAN UPAH TENAGA


KEGIATAN
PEKERJAAN

:
:

LOKASI
:
TAHUN ANGGARAN :

NO

URAIAN

SATUAN

HARGA ( Rp )

1 Pekerja

OH

42,500.00

2 Tukang gali
3 Mandor

OH
OH

50,000.00
60,000.00

4 Tukang cat/ plitur / batu


5 Kepala tukang cat/ plitur / batu

OH
OH

50,000.00
60,000.00

6 Tukang kayu
7 Kepala tukang kayu

OH
OH

50,000.00
60,000.00

8 Tukang Besi / ledeng


9 Kepala Tukang besi / ledeng
10 Tukang Besi Profil

OH
OH
OH

50,000.00
50,000.00
50,000.00

11 Kepala Tukang besi Profil


12 Mekanik

OH
OH

60,000.00
60,000.00

13 Mekanik Pembantu
14 Operator terlatih/ masinis

OH
OH

50,000.00
55,000.00

15 Operator kurang terlatih


16 Pembantu operator/ pemb. masinis

OH
OH

50,000.00
40,000.00

17 Sopir truk
18 Sopir personil
19 Pembantu sopir

OH
OH
OH

50,000.00
45,000.00
38,000.00

20 Buruh lapangan tak terlatih


21 Buruh lapangan semi terlatih

OH
OH

35,000.00
40,000.00

22 Buruh lapangan terlatih


23 Tukang masak aspal

OH
OH

31,800.00
50,000.00

24 Penjaga malam

OH

33,000.00

B.

UPAH TENAGA PEMASANGAN JARINGAN LISTRIK


1 Pasang CA1
Unit/Set
2 Pasang CA1'
Unit/Set

22,400.00
21,250.00

3 Pasang CA2-1
4 Pasang CA2

35,300.00
44,900.00

Unit/Set
Unit/Set

Hal. 43

NO

URAIAN

SATUAN

HARGA ( Rp )

5 Pasang CA2'

Unit/Set

43,350.00

6 Pasang CA3
7 Pasang CA3'
8 Pasang CA4

Unit/Set
Unit/Set
Unit/Set

58,200.00
43,350.00
46,350.00

9 Pasang CA4'
10 Pasang CA5

Unit/Set
Unit/Set

55,300.00
29,950.00

Hal. 44

NO

URAIAN

SATUAN

HARGA ( Rp )

11 Pasang CA5'

Unit/Set

55,300.00

12 Pasang CA5-1
13 Pasang CA5-1'
14 Pasang CA6

Unit/Set
Unit/Set
Unit/Set

29,950.00
26,100.00
56,650.00

15 Pasang CA6'
16 Pasang SE 1-2 ( 7 M)

Unit/Set
Unit/Set

54,550.00
27,190.00

17 Pasang E 1-2 ( 7 M )
18 Pasang SE 1-2 ( 9 M)

Unit/Set
Unit/Set

27,190.00
27,190.00

19 Pasang E 1-2 ( 9 M )
20 Pasang SE 1-2 ( 11 M)

Unit/Set
Unit/Set

27,190.00
27,190.00

21 Pasang E 1-2 ( 11 M )
22 Pasang SE 1-2 ( 12 M)
23 Pasang E 1-2 ( 12 M )

Unit/Set
Unit/Set
Unit/Set

27,190.00
27,190.00
27,190.00

24 Pasang SE1-3 (11 M)


25 Pasang E1-3(11 M)

Unit/Set
Unit/Set

27,190.00
27,190.00

26 Pasang SE1-3 (12 M)


27 Pasang E1-3 (12 M)

Unit/Set
Unit/Set

35,750.00
35,750.00

28 Pasang SE2-2
29 Pasang SE2-3

Unit/Set
Unit/Set

35,750.00
38,600.00

30 Pasang E2-3
31 Pasang F 1-2

Unit/Set
Unit/Set

36,200.00
19,400.00

32 Pasang F 1-3
33 Pasang J5-T (CJ2)
34 Pasang J7 - T (CJ3)

Unit/Set
Unit/Set
Unit/Set

19,400.00
25,275.00
19,400.00

35 Pasang J6 - T (CJ4)
36 Pasang MJ6 - T (CJ4)

Unit/Set
Unit/Set

25,275.00
14,100.00

37 Pasang SG 105 25 KVA


38 Pasang SG 105 50 KVA

Unit/Set
Unit/Set

681,200.00
681,200.00

39 Pasang SG 106 25 KVA


40 Pasang SG 106 50 KVA

Unit/Set
Unit/Set

681,200.00
681,200.00

41 Pasang P.12
42 Pasang P12.C
43 Pasang P12.C'

Unit/Set
Unit/Set
Unit/Set

50,900.00
10,700.00
29,900.00

44 Pasang CM5 - 2
45 Pasang CM2-11

Unit/Set
Unit/Set

29,900.00
29,900.00

46 Pasang CM2 - 12
47 Pasang CM2 - 12A

Unit/Set
Unit/Set

11,900.00
19,400.00

48 Pasang CM2-15
49 Pasang CM3-4

Unit/Set
Unit/Set

147,500.00
14,400.00
Hal. 45

NO

URAIAN

SATUAN

HARGA ( Rp )

50 Pasang CM2-11 M

Unit/Set

54,800.00

51 Pasang CM5-3
52 Pasang CM5-4
53 Pasang CM5-5

Unit/Set
Unit/Set
Unit/Set

29,900.00
21,700.00
21,700.00

54 Pasang CM5-6
55 Pasang CM5-8

Unit/Set
Unit/Set

51,000.00
35,000.00

Hal. 46

NO

URAIAN

SATUAN

HARGA ( Rp )

56 Pasang CM5-9

Unit/Set

59,800.00

57 Pasang CM5-12
58 Pasang CM5-13
59 Pasang CM5-16

Unit/Set
Unit/Set
Unit/Set

51,000.00
35,700.00
51,000.00

60 Pasang CM5-20
61 Pasang CJ5

Unit/Set
Unit/Set

35,700.00
17,600.00

62 Pasang CJ6
63 Pasang CJ6X / SJ6X

Unit/Set
Unit/Set

22,900.00
17,600.00

64 Pasang CJ7
65 Pasang CJ8

Unit/Set
Unit/Set

30,900.00
17,600.00

66 Pasang CJ10
67 Pasang SJ5
68 Pasang SJ6

Unit/Set
Unit/Set
Unit/Set

30,900.00
17,600.00
14,900.00

69 Pasang SJ7
70 Pasang SJ8

Unit/Set
Unit/Set

36,200.00
17,600.00

71 Pasang SJ10
72 Pasang SA1

Unit/Set
Unit/Set

30,900.00
21,700.00

73 Pasang SA1'
74 Pasang SA2

Unit/Set
Unit/Set

18,800.00
35,300.00

75 Pasang SA2'
76 Pasang SA3

Unit/Set
Unit/Set

32,300.00
51,000.00

77 Pasang SA3'
78 Pasang SA4
79 Pasang SA4'

Unit/Set
Unit/Set
Unit/Set

48,100.00
27,100.00
39,750.00

80 Pasang SA5
81 Pasang SA5'

Unit/Set
Unit/Set

51,000.00
48,100.00

82 Pasang SA5-1
83 Pasang SA5-1'

Unit/Set
Unit/Set

55,600.00
24,200.00

84 Pasang SA6
85 Pasang SA6'

Unit/Set
Unit/Set

67,900.00
39,750.00

86 Pasang B1
87 Pasang B1A
88 Pasang B2

Unit/Set
Unit/Set
Unit/Set

46,000.00
339,500.00
67,900.00

89 Pasang B3
90 Pasang B4

Unit/Set
Unit/Set

280,600.00
116,000.00

91 Pasang B5
92 Pasang CC1

Unit/Set
Unit/Set

57,800.00
52,700.00

93 Pasang CC1'
94 Pasang CC1-1

Unit/Set
Unit/Set

54,900.00
57,800.00
Hal. 47

NO

URAIAN

SATUAN

HARGA ( Rp )

95 Pasang CC1-A

Unit/Set

57,800.00

96 Pasang CC.1-A'
97 Pasang CC.2
98 Pasang CC.2'

Unit/Set
Unit/Set
Unit/Set

54,900.00
67,900.00
64,900.00

99 Pasang CC2 - A
100 Pasang CC2-1

Unit/Set
Unit/Set

67,900.00
67,900.00

Hal. 48

NO

URAIAN

SATUAN

HARGA ( Rp )

101 Pasang CC2 - A'

Unit/Set

64,900.00

102 Pasang CC.3


103 Pasang CC.3'
104 Pasang CC 7

Unit/Set
Unit/Set
Unit/Set

67,900.00
67,900.00
56,100.00

105 Pasang CC 7'


106 Pasang CC 7 A

Unit/Set
Unit/Set

64,900.00
86,500.00

107 Pasang CC 7 A'


108 Pasang CC 8

Unit/Set
Unit/Set

83,600.00
140,300.00

109 Pasang CC 8 - A
110 Pasang CC 8 A'

Unit/Set
Unit/Set

140,300.00
137,400.00

111 Pasang SC . 1
112 Pasang SC. 1'
113 Pasang SC . 1 - A

Unit/Set
Unit/Set
Unit/Set

55,600.00
55,600.00
55,600.00

114 Pasang SC 1 - A '


115 Pasang SC 2

Unit/Set
Unit/Set

54,900.00
67,900.00

116 Pasang SC 2 '


117 Pasang SC2-A

Unit/Set
Unit/Set

64,900.00
67,900.00

118 Pasang SC2-A'


119 Pasang SC3

Unit/Set
Unit/Set

56,100.00
67,900.00

120 Pasang SC3'


121 Pasang SC7

Unit/Set
Unit/Set

67,900.00
64,900.00

122 Pasang SC7'


123 Pasang SC7-A
124 Pasang SC7-A'

Unit/Set
Unit/Set
Unit/Set

86,500.00
83,600.00
83,600.00

125 Pasang SC8


126 Pasang SC8-A

Unit/Set
Unit/Set

140,300.00
140,300.00

127 Pasang SC8-A'


128 Pasang SC9

Unit/Set
Unit/Set

137,400.00
67,900.00

129 Pasang SC10


130 Pasang SC 11

Unit/Set
Unit/Set

67,900.00
65,900.00

131 Pasang SC12


132 Pasang DC1
133 Pasang DC2

Unit/Set
Unit/Set
Unit/Set

65,900.00
80,300.00
80,300.00

134 Pasang DC3


135 Pasang DC4

Unit/Set
Unit/Set

80,300.00
80,300.00

136 Pasang DC5


137 Penanaman tiang

Unit/Set
batang

80,300.00
240,600.00

138 Pengangkutan tiang (dataran tinggi)


139 Pengangkutan tiang (dataran rendah)

batang
batang

363,700.00
330,100.00
Hal. 49

NO

URAIAN

SATUAN

HARGA ( Rp )

140 Penomoran Tiang

batang

11,000.00

141 Bongkar tiang


142 Bongkar LVTC 2 x 35 x N50
143 Bongkar pasang trafo

batang
m
buah

107,600.00
4,950.00
563,012.73

144 Biaya tarik jaringan


145 Jaringan JTM AAAC 70 mm2

8,000.00

Hal. 50

NO

URAIAN

SATUAN

HARGA ( Rp )

146 Jaringan JTR only


- Kabel LVTC 2 x 70 + N50
- Kabel LVTC 2 x 35 + N50

m
m
Slawi,

12,375.00
8,600.00

Februari 2013

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN TEGAL

Ir. SUDARYONO, MT
Pembina Tk. I
NIP. 19610416 198810 1 001

Hal. 51

DINAS PEKERJAAN UMUM


KABUPATEN TEGAL

DAFTAR SATUAN PERALATAN


KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN

NO.

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.

:
:
:
:

JENIS - ALAT

VIBRATOR ROLLER 600 KG 7 HP


PLAT BED TRUCK 4 TONE 80 HP
ASPHAL SPRAYER TOWED 350 L 7 HP
WATER PUMP 5 CM 8 HP
ASPHAL FINISHER 30 HP
WATER TANK TRUCK 115 HP
TANDUM ROLLER 6-10 TON 135 HP
PNEUMATIC ROLLER 8-15 TON 95 HP
COMPRESOR AIR 150 M3 20 HP
ROLLER 3 WHEELED 8-10 TON 51 HP
LOADER WHEELED 115 HP
ASPH MIXING PLANT 30 T/H 125 HP
DUMP TRUCK 5 TON 145 HP
BULLDOZER 100 HP
CRUSHER 30 TON/H 140 HP
SPRAYER SELFROP 400 L 6 HP
CONCRETE VIBRATOR 4 HP
CONCRETE MIXER 0,125 M3 6 HP
PLATE VIBRATOR TAMPER 4 HP
ASPAL SPREAYER TOWED 1000 L / 25 HP
COMPRESOR AIR 210 M3 / 35 HP
CONCRETE MIXER 0,50 M3 / 20 HP
EXCAVATOR
MOTOR GRADER
MESIN LAS LISTRIK
EXCAVATOR

KODE

SATUAN

E087
E221
E153
E341
E157
E182
E081
E084
E301
E080
E052
E155
E212
E001
E031
E154
E089
E251
E088
E153 a
E301 a
E253
E020
E010
3.1 (1) a

Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam

Slawi,

HARGA
ALAT
Rp.
172,111.27
225,719.94
45,229.00
11,722.42
124,471.80
226,368.33
127,286.30
238,449.28
51,899.52
92,330.20
204,726.82
726,885.00
230,563.48
319,682.01
601,324.46
24,311.73
6,776.96
7,857.62
7,732.99
62,776.92
66,452.52
41,300.49
424,683.17
390,833.66
85,000.00
361,251.00

Februari 2013

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN TEGAL

Ir. SUDARYONO, MT
Pembina Tk. I
NIP. 19610416 198810 1 001

URAIAN ANALISA ALAT

No.

A.
1.
2.
3.
4.

5.

B.
1.

URAIAN

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a.
b.
c.
Alat Yang Dipakai :
a.
b.
c.

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (sudah termasuk PPN)
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi =

KOEF.

SATUAN

EXCAVATOR 80-140 HP
Pw
90.0
HP
Cp
0.5
M3
A
8.0
Tahun
W
1,250.0
Jam
B
1,210,000,000
Rupiah
A'
4.0
Tahun
W'
1,500.0
Jam
B'
665,500,000
Rupiah
Usia 4 tahun
C

121,000,000

i x (1 + i)^A'
(1 + i)^A' - 1

0.38629

( B' - C ) x D
W'

140,222.95

Rupiah

887.33

Rupiah

141,110.28

Rupiah

0.002 x B'
W'

Biaya Pasti per Jam


C.

KODE

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms

124,381.13

Rupiah

2.

Pelumas

26,730.00

Rupiah

3.

Perawatan dan
perbaikan =

55,458.33

Rupiah

4.
5.

Operator
Pembantu Operator

L
M

7,857.14
5,714.29

Rupiah
Rupiah

220,140.89

Rupiah

361,251.00

Rupiah

20.00
7,857.14
5,714.29
4,950.00
11,056.10

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp
(12,5 % - 17,5 %) x B'
W'
= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM

(G+P)

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar (industri)
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

29,700.00

KET.

E10

Usia 4 tahun
Usia 4 tahun
Usia 4 tahun

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 087

DISIAPKAN :
BINA PROGRAM

VIBRATOR ROLLER 3, 4 - 5 Ton


7 HP
Rp.
492,000,000.00
6 TH = 7.200 Jam

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

TANGGAL :
Januari 2012

CRF =

0.24668

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

492,000,000.00 x

0.030 x
--

492,000,000.00 x
--

0.24668 x

1.00
1,200.00

91,024.92

=
=

12,300.00

103,325

=
=
=

5,544.00
1,247.40
61,994.95

68,786.35

2. Lain - lain

Asuransi 3 % / thn
Sewa Vibrator Roller 600 Kg

1.00
1,200.00
--

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Pelumas

= Rp.
= Rp.

4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresiasi)
= Rp.

0.160 x
0.006 x
0.600 x

7x
7x
103,324.92

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

103,324.92 +

68,786.35 =

172,111.27 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 221

DISIAPKAN :
BINA PROGRAM

FLAT BLAD TRUCK 4 TONE


80 HP
Rp.
576,700,000.00
6 TH = 9.000 Jam

TANGGAL :
Januari 2012

CRF =

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

0.24668

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

576,700,000.00 x

0.030 x

576,700,000.00 x

0.24668 x

1.00
1,500.00

85,356.21

11,534.00

96,890.21

=
=
=
=

63,360.00
14,256.00

128,829.73

2. Lain - lain
Asuransi 3 % / thn

1.00
1,500.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
Pelumas

= Rp.
= Rp.

0.160 x
0.006 x

Perbaikan & Spareparts (60 % x depresiasi)


= Rp.

0.600 x

80 x
80 x

4,950.00
29,700.00

85,356.21

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

96,890.21 +

128,829.73 =

225,719.94 / Jam

51,213.73

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 153

DISIAPKAN :
BINA PROGRAM

ASPAL SPRAYER TOWED 350 L


15 HP
Rp.
62,500,000.00
6 TH = 4.500 Jam

TANGGAL :
Januari 2012

CRF =

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

0.24668

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

62,500,000.00 x

0.030 x

62,500,000.00 x

0.24668 x

1.00
750.00

18,501.00

2,500.00

21,001.00

=
=
=

11,880.00
1,247.40
11,100.60

24,228.00

2. Lain - lain
Asuransi 3 % / thn

1.00
750.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia =

0.16 x
0.006 x
0.600 x

15 x
7 x
18,501.00

4950
29700

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

21,001.00 +

24,228.00 =

45,229.00 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 341

DISIAPKAN :
BINA PROGRAM

WATER PUMP Q 5 CM
8 HP
Rp.
5,835,000.00
4 TH = 3.000 Jam

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

TANGGAL :
Januari 2012

CRF =

0.33271

2,329.64

233.40

2,563.04

=
=
=

6,336.00
1,425.60
1,397.78

9,159.38

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

5,835,000.00 x

0.030 x

5,835,000.00 x

0.33271 x

1.00
750.00

2. Lain - lain
Asuransi 3 % / thn

1.00
750.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

8x
8x
2,329.64

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

2,563.04 +

9,159.38 =

11,722.42 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB

PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 157

DISIAPKAN :
BINA PROGRAM

ASPHAL FINISHER
47 HP
Rp.
270,000,000.00
7 TH = 8.400 Jam

TANGGAL :
Januari 2012

CRF =

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

0.22260

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

270,000,000.00 x

0.030 x

270,000,000.00 x

0.22260 x

1.00
1,200.00

45,076.50

6,750.00

51,826.50

=
=
=

37,224.00
8,375.40
27,045.90

72,645.30

2. Lain - lain
Asuransi 3 % / thn

1.00
1,200.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

47 x
47 x
45,076.50

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

51,826.50 +

72,645.30 =

124,471.80 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 182

DISIAPKAN :
BINA PROGRAM

WATER TANK TRUCK


115 HP
Rp.
447,000,000.00
6 TH = 9.000 Jam

TANGGAL :
Januari 2012

CRF =

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

0.24668

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

447,000,000.00 x

0.030 x

447,000,000.00 x

0.24668 x

1.00
1,500.00

66,159.58

8,940.00

75,099.58

=
=
=

91,080.00
20,493.00
39,695.75

151,268.75

2. Lain - lain
Asuransi 3 % / thn

1.00
1,500.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

115 x
115 x
66,159.58

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

75,099.58 +

151,268.75 =

226,368.33 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 081

DISIAPKAN :
BINA PROGRAM

TANDEM ROLLER 6 - 10 TON


40 HP
Rp.
457,500,000.00
10 TAHUN = 15.000 Jam

TANGGAL :
Januari 2012

CRF =

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

0.18062

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

457,500,000.00 x

0.030 x

457,500,000.00 x

0.18062 x

1.00
1,500.00

49,580.19

9,150.00

58,730.19

=
=
=

31,680.00
7,128.00
29,748.11

68,556.11

2. Lain - lain
Asuransi 3 % / thn

1.00
1500

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

40 x
40 x
49,580.19

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

58,730.19 +

68,556.11 =

127,286.30 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 084

DISIAPKAN :
BINA PROGRAM

PNEUMATIC ROLLER 8-15 TON


95 HP
Rp.
761,243,181.82
10 TAHUN = 15.000 Jam

TANGGAL :
Januari 2012

CRF =

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

0.18062

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

761,243,181.82 x

0.030 x

761,243,181.82 x

0.18062 x

1.00
1,500.00

82,497.45

15,224.86

97,722.31

=
=
=

74,299.50
16,929.00
49,498.47

140,726.97

2. Lain - lain
Asuransi 3 % / thn

1.00
1,500.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.158 x
0.006 x
0.600 x

95 x
95 x
82,497.45

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

97,722.31 +

140,726.97 =

238,449.28 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 301

DISIAPKAN :
BINA PROGRAM

COMPRESORE AIR 150 M3


20 HP
Rp.
75,000,000.00
8 TAHUN = 6.000 Jam

TANGGAL :
Januari 2012

CRF =

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

0.20483

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

75,000,000.00 x

0.030 x

75,000,000.00 x

0.20483 x

1.00
750.00

18,434.70

3,000.00

21,434.70

=
=
=

15,840.00
3,564.00
11,060.82

30,464.82

2. Lain - lain
Asuransi 3 % / thn

1.00
750.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

20 x
20 x
18,434.70

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

21,434.70 +

30,464.82 =

51,899.52 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
SEWA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 080

DISIAPKAN :
BINA PROGRAM

ROLLER 3 WHEELED 8 - 10 TON


51 HP
Rp.
42,850.00
10 TAHUN = 15.000 Jam

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

TANGGAL :
Januari 2012

CRF =

0.18062

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

0.00 x

0.030 x
--

0.00 x

0.18062 x

1.00
1,500.00

0.00

=
=

0.00
42,850.00

42,850.00

=
=
=

40,392.00
9,088.20
0.00

49,480.20

2. Lain - lain
Asuransi 3 % / thn
Sewa Roller 3 Whelled 6 - 10 Ton

--

1.00
1,500.00
--

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

51 x
51 x

4,950.00
29,700.00

0.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

42,850.00 +

49,480.20 =

92,330.20 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BAIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 052

DISIAPKAN :
BINA PROGRAM

LOADER WHEELED
115 HP
Rp.
430,000,000.00
8 TAHUN = 12.000 Jam

TANGGAL :
Januari 2012

CRF =

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

0.20483

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

430,000,000.00 x

0.030 x

430,000,000.00 x

0.20483 x

1.00
1,500.00

52,846.14

8,600.00

61,446.14

=
=
=

91,080.00
20,493.00
31,707.68

143,280.68

2. Lain - lain
Asuransi 3 % / thn

1.00
1,500.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Diesel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

115 x
115 x
52,846.14

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

61,446.14 +

143,280.68 =

204,726.82 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 155

DISIAPKAN :
BINA PROGRAM

ASPHALT MIXING PLANT 30 T/H


125 HP
Rp.
2,000,000,000.00
10 TAHUN = 12.000 Jam

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

TANGGAL :
Januari 2012

CRF =

0.18062

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

2,000,000,000.00 x

0.030 x

2,000,000,000.00 x

0.18062 x

1.00
1,200.00

270,930.00

50,000.00

320,930.00

=
=
=

221,122.00
22,275.00
162,558.00

405,955.00

2. Lain - lain
Asuransi 3 % / thn

1.00
1,200.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Diesel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

11,056.10 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

125 x
125 x
270,930.00

11,056.10
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

320,930.00 +

405,955.00 =

726,885.00 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 212

DISIAPKAN :
BINA PROGRAM

DUMP TRUCK 5 TON


145 HP
Rp.
350,000,000.00
6 TAHUN = 9.000 Jam

TANGGAL :
Januari 2012

CRF =

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

0.24668

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

350,000,000.00 x

0.030 x

350,000,000.00 x

0.24668 x

1.00
1,500.00

51,802.80

7,000.00

58,802.80

=
=
=

114,840.00
25,839.00
31,081.68

171,760.68

2. Lain - lain
Asuransi 3 % / thn

1.00
1,500.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Diesel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

=
= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

145 x
145 x
51,802.80

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

58,802.80 +

171,760.68 =

230,563.48 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 020

DISIAPKAN :
BINA PROGRAM

EXCAVATOR
90 HP
Rp.
1,210,000,000.00
8 TAHUN = 12.000 Jam

TANGGAL :
Januari 2012

CRF =

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

0.20483

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

1,210,000,000.00 x

0.030 x

1,210,000,000.00 x

0.20483 x

1.00
1,200.00

185,883.23

30,250.00

216,133.23

=
=
=

79,200.00
17,820.00
111,529.94

208,549.94

2. Lain - lain
Asuransi 3 % / thn

1.00
1,200.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Diesel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

100 x
100 x
185,883.23

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

216,133.23 +

208,549.94 =

424,683.17 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 010

DISIAPKAN :
BINA PROGRAM

MOTOR GRADER
115 HP
Rp.
1,085,000,000.00
8 TAHUN = 12.000 Jam

TANGGAL :
Januari 2012

CRF =

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

0.20483

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

1,085,000,000.00 x

0.030 x

1,085,000,000.00 x

0.20483 x

1.00
1,200.00

166,680.41

27,125.00

193,805.41

=
=
=

79,200.00
17,820.00
100,008.25

197,028.25

2. Lain - lain
Asuransi 3 % / thn

1.00
1,200.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Diesel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

100 x
100 x
166,680.41

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

193,805.41 +

197,028.25 =

390,833.66 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 001

DISIAPKAN :
BINA PROGRAM

BULLDOZER
100 HP
Rp.
822,250,000.00
8 TAHUN = 9.600 Jam

TANGGAL :
Januari 2012

CRF =

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

0.20483

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

822,250,000.00 x

0.030 x

822,250,000.00 x

0.20483 x

1.00
1,200.00

126,316.10

20,556.25

146,872.35

=
=
=

79,200.00
17,820.00
75,789.66

172,809.66

2. Lain - lain
Asuransi 3 % / thn

1.00
1,200.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Diesel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

100 x
100 x
126,316.10

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

146,872.35 +

172,809.66 =

319,682.01 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 031

DISIAPKAN :
BINA PROGRAM

CRUSHER 30 TON/H
140 HP
Rp.
1,699,731,000.00
10 TAHUN = 15.000 Jam

TANGGAL :
Januari 2012

CRF =

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

0.18062

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

1,699,731,000.00 x

0.030 x

1,699,731,000.00 x

0.18062 x

1.00
1,500.00

184,203.25

33,994.62

218,197.87

=
=
=

247,656.64
24,948.00
110,521.95

383,126.59

2. Lain - lain
Asuransi 3 % / thn

1.00
1,500.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Diesel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

11,056.10 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

140 x
140 x
184,203.25

11,056.10
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

218,197.87 +

383,126.59 =

601,324.46 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 154

DISIAPKAN :
BINA PROGRAM

SPRAYER SELFROP 400 L


6 HP
Rp.
36,000,000.00
6 TH = 4.500 Jam

TANGGAL :
Januari 2012

CRF =

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

0.24668

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

36,000,000.00 x

0.030 x

36,000,000.00 x

0.24668 x

1.00
750.00

10,656.58

1,440.00

12,096.58

=
=
=

4,752.00
1,069.20
6,393.95

12,215.15

2. Lain - lain
Asuransi 3 % / thn

1.00
750.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

6x
6x
10,656.58

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

12,096.58 +

12,215.15 =

24,311.73 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 089

DISIAPKAN :
BINA PROGRAM

CONCRETE VIBRATOR
4 HP
Rp.
4,000,000.00
5 TH = 3.000 Jam

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

TANGGAL :
Januari 2012

CRF =

0.28085

1,685.10

200.00

1,885.10

=
=
=

3,168.00
712.80
1,011.06

4,891.86

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

4,000,000.00 x

0.030 x

4,000,000.00 x

0.28085 x

1.00
600.00

2. Lain - lain
Asuransi 3 % / thn

1.00
600.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

4x
4x
1,685.10

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

1,885.10 +

4,891.86 =

6,776.96 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 251

DISIAPKAN :
BINA PROGRAM

CONCRETE MIXER 0,125 M3


6 HP
Rp.
6,000,000.00
4 TH = 6.000 Jam

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

TANGGAL :
Januari 2012

CRF =

0.33271

1,197.76

120.00

1,317.76

=
=
=

4,752.00
1,069.20
718.66

6,539.86

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

6,000,000.00 x

0.030 x

6,000,000.00 x

0.33271 x

1.00
1,500.00

2. Lain - lain
Asuransi 3 % / thn

1.00
1,500.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

6x
6x
1,197.76

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

1,317.76 +

6,539.86 =

7,857.62 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 088

DISIAPKAN :
BINA PROGRAM

PLAT VIBRATOR TAMPER


4 HP
Rp.
7,500,000.00
6 TH = 4.500 Jam

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

TANGGAL :
Januari 2012

CRF =

0.24668

2,220.12

300.00

2,520.12

=
=
=

3,168.00
712.80
1,332.07

5,212.87

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

7,500,000.00 x

0.030 x

7,500,000.00 x

0.24668 x

1.00
750.00

2. Lain - lain
Asuransi 3 % / thn

1.00
750.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

4x
4x
2,220.12

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

2,520.12 +

5,212.87 =

7,732.99 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 153 a

DISIAPKAN :
BINA PROGRAM

ASPAL SPRAYER TOWED 1000 L


25 HP
Rp.
120,000,000.00
6 TH = 7,200 Jam

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

TANGGAL :
Januari 2012

CRF =

0.24668

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

120,000,000.00 x

0.030 x

120,000,000.00 x

0.24668 x

1.00
1,200.00

22,201.20

3,000.00

25,201.20

=
=
=

19,800.00
4,455.00
13,320.72

37,575.72

2. Lain - lain
Despresiasi

1.00
1,200.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar / minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia =

0.16 x
0.006 x
0.600 x

25 x
25 x
22,201.20

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

25,201.20 +

37,575.72 =

62,776.92 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KODE
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 301 a

DISIAPKAN :
BINA PROGRAM

COMPRESORE AIR 210 M3


35 HP
Rp.
75,000,000.00
8 TAHUN = 6.000 Jam

TANGGAL :
Januari 2012

CRF =

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

0.20483

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

75,000,000.00 x

0.030 x

75,000,000.00 x

0.20483 x

1.00
750.00

18,434.70

3,000.00

21,434.70

=
=
=

27,720.00
6,237.00
11,060.82

45,017.82

2. Lain - lain
Despresiasi

1.00
750.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

35 x
35 x
18,434.70

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

21,434.70 +

45,017.82 =

66,452.52 / Jam

DIREKTORAT JENDRAL BINA MARGA


DIREKTORAT BINA PROGRAM JALAN
SUB.DIT PERENC. JALAN LOKAL & KAB
PROPINSI :
JAWA TENGAH

JENIS ALAT
TENAGA
HARGA
UMUR KERJA

KODE
(33)

BIAYA ALAT UNTUK PERHITUNGAN


ANALISA BIAYA PEKERJAAN

KABUPATEN :
TEGAL

KODE :
(28)

KODE
E. 253

DISIAPKAN :
BINA PROGRAM

CONCRETE MIXER 0,50 M3


20 HP
Rp.
64,515,000.00
5 TH = 7.500 Jam

TANGGAL :
Januari 2012

CRF =

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS )

0.33271

( Rp. / Jam )

1. Despresiasi 90 %

0.90 x

64,515,000.00 x

0.030 x

64,515,000.00 x

0.33271 x

1.00
1,500.00

12,878.87

1,290.30

14,169.17

=
=
=

15,840.00
3,564.00
7,727.32

27,131.32

2. Lain - lain
Despresiasi

1.00
1,500.00

SUB TOTAL
B. BIAYA OPERASI (OPERATION COST )

( Rp. / Jam )

Kebutuhan bahan bakar & pelumas tiap HP :


Disel
Bensin
Pelumas

0.160 liter / HP / jam


0.170 liter / HP / jam
0.006 liter / HP / jam

Harga : Solar/minyak Diesel


Bensin
Pelumas

= Rp.
= Rp.
= Rp.

4,950.00 / liter
4,950.00 / liter
29,700.00 / liter

Bahan bakar
= Rp.
Pelumas
= Rp.
Perbaikan & Spareparts (60 % x depresia = Rp.

0.160 x
0.006 x
0.600 x

20 x
20 x
12,878.87

4,950.00
29,700.00

SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A+B

14,169.17 +

27,131.32 =

41,300.49 / Jam

DAFTAR ANALISA PEKERJAAN


DAF TAR
KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN

KODE

ANALI SA

P E K E R J AAN

:
:
:
:

KOEF

SAT.

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp

JUMLAH
HARGA
Rp

PEKERJAAN PERSIAPAN
A.6.2
6.2.1

1.000

m'

1.250
2.500
1.200
0.005
0.009
0.072
0.060
0.450

Btg
Kg
Lbr
m3
m3
m3
Kg
Kg

Pagar Sementara dari Seng Gelombang Tinggi 2,00 m


Bahan
Kayu Dolken diameter 8 - 10 / 400 cm
Portland Semen
Seng Gelombang 3" - 5"
Pasir
Koral Beton
Kayu 5/7X4m Kayu Kruing
Paku Biasa 2" - 5"
Meni Besi

0.200
0.400
0.020
0.020

OH
OH
OH
OH

Tenaga
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

m'

6.2.2

A.6.4
6.4.1

0.012
0.020
0.007

Pengukuran dan Pemasangan Bouwplank


Bahan
m3 Kayu 5/7x 4m Kayu Kruing
Kg Paku Biasa 2" - 5"
m3 Kayu Papan 3/20 Kruing

0.100
0.100
0.010
0.005

OH
OH
OH
OH

6.4.2

A.6.8
6.8.2

1
0.100
0.050

A.6.11
6.11.1

m2 Membersihkan Lapangan dan Perataan


Tenaga
OH Pekerja
OH Mandor

1.000
0.250

Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm


Bahan
Btg Bambu diameter 6 - 8 / 600 cm
Kg Tali Ijuk

0.170
0.250
0.002
0.001

OH
OH
OH
OH

1
6.667
0.333

A.6.14
6.14.2

50,000.00
42,500.00
60,000.00
60,000.00

29,400.00
10,000.00
17,000.00
1,200.00
1,200.00

6,126,700.00
20,750.00
7,500,000.00

136,585.40
126,435.40
73,520.40
415.00
52,500.00

50,000.00
42,500.00
60,000.00
60,000.00

10,150.00
5,000.00
4,250.00
600.00
300.00

42,500.00
60,000.00

7,250.00
7,250.00
4,250.00
3,000.00

11,400.00
42,800.00

41,423.00
22,100.00
11,400.00
10,700.00

50,000.00
42,500.00
60,000.00
60,000.00

19,323.00
8,500.00
10,625.00
120.00
78.00

42,500.00
60,000.00

303,327.50
303,327.50
283,347.50
19,980.00

42,500.00

285,327.50
285,327.50
283,347.50

1 m2

6.11.2

A.6.13
6.13.2

Tenaga
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

18,025.00
1,340.00
25,000.00
100,000.00
195,000.00
6,126,700.00
20,750.00
24,500.00

540,928.65
511,528.65
22,531.25
3,350.00
30,000.00
500.00
1,755.00
441,122.40
1,245.00
11,025.00

1
6.667

Tenaga
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

m3 Bongkaran Beton Bertulang


Tenaga
OH Pekerja
OH Mandor
m3 Bongkaran Dinding Tembok Bata Merah
Tenaga
OH Pekerja

Hal. 79

KODE

KOEF
0.033

SAT.
OH Mandor

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp
60,000.00

JUMLAH
HARGA
Rp
1,980.00

Hal. 80

KODE

KOEF

SAT.

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp

JUMLAH
HARGA
Rp

PEKERJAAN TANAH
B.6.1
6.1.2

42,500.00
60,000.00

33,375.00
33,375.00
31,875.00
1,500.00

42,500.00
60,000.00

44,420.00
44,420.00
42,500.00
1,920.00

42,500.00
60,000.00

67,350.00
67,350.00
63,750.00
3,600.00

42,500.00
60,000.00

53,700.00
53,700.00
51,000.00
2,700.00

42,500.00
60,000.00

2,425.00
2,425.00
2,125.00
300.00

42,500.00
60,000.00

14,625.00
14,625.00
14,025.00
600.00

42,500.00
60,000.00

11,265.00
11,265.00
10,625.00
640.00

42,500.00
60,000.00

24,250.00
24,250.00
21,250.00
3,000.00

1.200

m3 Urugan Pasir
Bahan
m3 Pasir Urug

75,000.00

103,350.00
90,000.00
90,000.00

0.300
0.010

Tenaga
OH Pekerja
OH Mandor

42,500.00
60,000.00

13,350.00
12,750.00
600.00

100,000.00
#REF!

#REF!
#REF!
40,000.00
#REF!

42,500.00
50,000.00
60,000.00
60,000.00

61,200.00
34,000.00
20,000.00
2,400.00
4,800.00

42,800.00

264,075.00
256,800.00

0.750
0.025
B.6.4
6.4.2

1
1.000
0.032

B.6.5
6.5.2

1
1.500
0.060

B.6.6
6.6.2

1
1.200
0.045

B.6.7
6.7.2

1
0.050
0.005

B.6.8
6.8.2

1
0.330
0.010

B.6.9

1
0.250
0.011

B.6.10
6.10.2

1
0.500
0.050

B.6.11
6.11.1

6.11.2

B.6.12
6.12.1

m3 Galian Tanah Biasa Sedalam 1 m


Tenaga
OH Pekerja
OH Mandor
m3 Galian Tanah Keras Sedalam 1 m
Tenaga
OH Pekerja
OH Mandor
m3 Galian Tanah Cadas Sedalam 1 m
Tenaga
OH Pekerja
OH Mandor
m3 Galian Tanah Lumpur Sedalam 1 m
Tenaga
OH Pekerja
OH Mandor
m2 Pekerjaan Striping Tebing Setinggi 1 m
Tenaga
OH Pekerja
OH Mandor
m3 MembuangTanah sejauh 30 m'
Tenaga
OH Pekerja
OH Mandor
m3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)
Tenaga
OH MembuangTanah sejauh 30 m'
OH Tenaga
m3 Pemadatan Tanah (per 20 cm)
Tenaga
OH Pekerja
OH Mandor

0.400
0.135
0.948

m3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL


Bahan
m3 Pasir
m3 Kapur Padam
m3 Tanah Liat

0.800
0.400
0.040
0.080

OH
OH
OH
OH

6.12.2

B.6.14
6.14.1

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

m2 Pemasangan Lapisan Ijuk tebal 10 cm


Bahan

Hal. 81

KODE

KOEF

SAT.

URAIAN PAKERJAAN

6.000

kg

0.150
0.015

Tenaga
OH Pekerja
OH Mandor

6.14.2

Ijuk

HARGA BAHAN
/ UPAH
Rp
42,800.00

JUMLAH
HARGA
Rp
256,800.00

42,500.00
60,000.00

7,275.00
6,375.00
900.00

Hal. 82

KODE
B.6.15
6.15.1

1.200

m3 Urugan Sirtu
Bahan
m3 Sirtu

72,000.00

JUMLAH
HARGA
Rp
98,525.00
86,400.00
86,400.00

0.250
0.025

Tenaga
OH Pekerja
OH Mandor

42,500.00
60,000.00

12,125.00
10,625.00
1,500.00

111,400.00
1,340.00
100,000.00

563,110.00
452,860.00
133,680.00
270,680.00
48,500.00

42,500.00
50,000.00
60,000.00
60,000.00

110,250.00
63,750.00
37,500.00
4,500.00
4,500.00

111,400.00
1,340.00
100,000.00

480,570.00
370,320.00
133,680.00
182,240.00
54,400.00

42,500.00
50,000.00
60,000.00
60,000.00

110,250.00
63,750.00
37,500.00
4,500.00
4,500.00

111,400.00
1,340.00
100,000.00

456,810.00
346,560.00
133,680.00
156,780.00
56,100.00

42,500.00
50,000.00
60,000.00
60,000.00

110,250.00
63,750.00
37,500.00
4,500.00
4,500.00

KOEF

SAT.
1

6.15.2

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp

PEKERJAAN PONDASI
C.6.1
6.1.1

1
1.200
202.000
0.485

m3 Pasang Pondasi Batu Kali 1Pc : 3 Psr


Bahan
m3 Batu Kali
Kg Portland Sement
m3 Pasir

6.1.2
1.500
0.750
0.075
0.075
C.6.3
6.3.1

1
1.200
136.000
0.544

OH
OH
OH
OH

m3 Pasang Pondasi Batu Kali 1Pc : 5 Psr


Bahan
m3 Batu Kali
Kg Portland Sement
m3 Pasir

6.3.2
1.500
0.750
0.075
0.075
C.6.4
6.3.1

1
1.200
117.000
0.561

OH
OH
OH
OH

C.6.7
6.7.1

1
1.200
61.000
0.147
0.492

6.7.2
.

C.6.9
6.9.1

1.500
0.600
0.060
0.075
1
1.200
0.432

6.9.2
.

0.780

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

m3 Pasang Pondasi Batu Kali 1Pc : 6 Psr


Bahan
m3 Batu Kali
Kg Portland Sement
m3 Pasir

6.3.2
1.500
0.750
0.075
0.075

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

m3 Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 Psr


Bahan
m3
Batu Kali
kg
Portland Sement
m3
Kapur Pasang
m3
Pasir
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m3 Pasang Pondasi Batu Kosong
Bahan
m3 Batu blonos
m3 Pasir Urug
Tenaga
OH Pekerja

111,400.00
1,340.00
100,000.00
42,500.00
50,000.00
60,000.00
60,000.00

101,428.57
75,000.00
42,500.00

366,470.00
264,620.00
133,680.00
81,740.00
49,200.00
101,850.00
63,750.00
30,000.00
3,600.00
4,500.00
211,444.29
154,114.29
121,714.29
32,400.00
57,330.00
33,150.00
Hal. 83

KODE

KOEF
0.390
0.039
0.039

SAT.
OH Tukang Batu
OH Kepala Tukang
OH Mandor

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
19,500.00
2,340.00
2,340.00

Hal. 84

KODE
C.6.10
6.10.1

KOEF

SAT.
1

m3

0.480
126.000
194.000
0.312
0.468
1.800

m3
Kg
Kg
m3
m3
Kg

3.000
0.850
0.085
0.150

OH
OH
OH
OH

6.10.2

C.6.11
6.11.1

1
0.450
194.000
0.312
0.468

6.11.2
2.380
0.300
0.030
0.080

D.6.2
6.7.1

1
140.000
32.950
0.091

6.7.2
0.600
0.200
0.020
0.030
D.6.3
6.7.1

1
140.000
26.550
0.093

6.7.2
0.600
0.200
0.020
0.030
D.6.4
6.7.1

m3 Pasang Pondasi Sumuran diameter 100 cm


Bahan
m3 Batu Kali cm
Kg Portland Semen
m3 Pasir
m3 Koral Beton
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
P E K E R J AAN
DINDING
m2 Pasang Batu Merah Tebal 1 bata, 1 Pc : 3 Psr
Bahan
Buah Bata Merah 5 x 11 x 22
Kg Portland Semen
m3 Pasir
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m2 Pasang Batu Merah Tebal 1 bata, 1 Pc : 4 Psr
Bahan
Buah Bata Merah 5 x 11 x 22
Kg Portland Semen
m3 Pasir
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor

m2 Pasang Batu Merah Tebal 1 bata, 1 Pc : 5 Psr


Bahan
140.000 Buah Bata Merah 5 x 11 x 22
22.200 Kg Portland Semen
0.102 m3 Pasir

111,400.00
1,340.00
100,000.00
195,000.00
42,500.00
50,000.00
60,000.00
60,000.00

750.00
1,340.00
100,000.00
42,500.00
50,000.00
60,000.00
60,000.00

0.600
0.200
0.020
0.030

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

m2 Pasang Batu Merah Tebal 1 bata, 1 Pc : 6 Psr


Bahan
140.000 Buah Bata Merah 5 x 11 x 22

JUMLAH
HARGA
Rp
1,959,792.00
1,775,692.00
53,472.00
1,272,600.00
259,960.00
62,400.00
91,260.00
36,000.00
184,100.00
127,500.00
42,500.00
5,100.00
9,000.00
555,300.00
432,550.00
50,130.00
259,960.00
31,200.00
91,260.00
122,750.00
101,150.00
15,000.00
1,800.00
4,800.00

196,753.00
158,253.00
105,000.00
44,153.00
9,100.00
38,500.00
25,500.00
10,000.00
1,200.00
1,800.00

42,500.00
50,000.00
60,000.00
60,000.00

188,377.00
149,877.00
105,000.00
35,577.00
9,300.00
38,500.00
25,500.00
10,000.00
1,200.00
1,800.00

750.00
1,340.00
100,000.00

183,448.00
144,948.00
105,000.00
29,748.00
10,200.00

42,500.00
50,000.00
60,000.00
60,000.00

38,500.00
25,500.00
10,000.00
1,200.00
1,800.00

750.00

180,490.00
141,990.00
105,000.00

750.00
1,340.00
100,000.00

6.7.2

D.6.5
6.7.1

HARGA BAHAN
/ UPAH
Rp
Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Kali
Bahan
Batu Kali cm
111,400.00
Besi Beton
10,100.00
Portland Semen
1,340.00
Pasir Beton
200,000.00
Koral Beton
195,000.00
Kawat Beton
20,000.00
Tenaga
Pekerja
42,500.00
Tukang Batu
50,000.00
Kepala Tukang
60,000.00
Mandor
60,000.00
URAIAN PAKERJAAN

Hal. 85

KODE

KOEF
18.500
0.122

SAT.
Kg Portland Semen
m3 Pasir

6.7.2
0.600
0.200
0.020
0.030

URAIAN PAKERJAAN

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
1,340.00
100,000.00

JUMLAH
HARGA
Rp
24,790.00
12,200.00

42,500.00
50,000.00
60,000.00
60,000.00

38,500.00
25,500.00
10,000.00
1,200.00
1,800.00

Hal. 86

KODE
D.6.6
6.7.1

KOEF

SAT.

m2 Pasang Batu Merah Tebal 1 bata, 1 Pc : 3Kp : 10 Psr


Bahan
140.000 Buah Bata Merah 5 x 11 x 22
10.080 Kg Portland Semen
0.0925 m3 Pasir

0.600
0.200
0.020
0.030

OH
OH
OH
OH

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

m2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Psr


Bahan
70.000 Buah Bata Merah 5 x 11 x 22
14.370 Kg Portland Semen
0.040 m3 Pasir

0.300
0.100
0.010
0.015

OH
OH
OH
OH

38,500.00
25,500.00
10,000.00
1,200.00
1,800.00

750.00
1,340.00
100,000.00

100,943.00
81,693.00
52,500.00
25,393.00
3,800.00

42,500.00
50,000.00
60,000.00
60,000.00

19,250.00
12,750.00
5,000.00
600.00
900.00

750.00
1,340.00
100,000.00

95,005.80
75,755.80
52,500.00
19,255.80
4,000.00

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

42,500.00
50,000.00
60,000.00
60,000.00

19,250.00
12,750.00
5,000.00
600.00
900.00

750.00
1,340.00
100,000.00

91,460.00
72,210.00
52,500.00
15,410.00
4,300.00

42,500.00
50,000.00
60,000.00
60,000.00

19,250.00
12,750.00
5,000.00
600.00
900.00

750.00
1,340.00
100,000.00

89,221.20
69,971.20
52,500.00
12,971.20
4,500.00

42,500.00
50,000.00
60,000.00
60,000.00

19,250.00
12,750.00
5,000.00
600.00
900.00

750.00
1,340.00

87,798.80
68,548.80
52,500.00
11,148.80

m2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 4 Psr


Bahan
70.000 Buah Bata Merah 5 x 11 x 22
11.500 Kg Portland Semen
0.043 m3 Pasir

6.8.2
0.300
0.100
0.010
0.015

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

m2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 5 Psr


Bahan
70.000 Buah Bata Merah 5 x 11 x 22
9.680 Kg Portland Semen
0.045 m3 Pasir

6.8.2
0.300
0.100
0.010
0.015
D.6.11
6.8.1

42,500.00
50,000.00
60,000.00
60,000.00

6.8.2

D.6.10
6.8.1

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

m2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Psr


Bahan
70.000 Buah Bata Merah 5 x 11 x 22
18.950 Kg Portland Semen
0.038 m3 Pasir

0.300
0.100
0.010
0.015

D.6.9
6.8.1

750.00
1,340.00
100,000.00

JUMLAH
HARGA
Rp
166,257.20
127,757.20
105,000.00
13,507.20
9,250.00

6.7.2

D.6.8
6.8.1

HARGA BAHAN
/ UPAH
Rp

6.7.2

D.6.7
6.7.1

URAIAN PAKERJAAN

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

m2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 6 Psr


Bahan
70.000 Buah Bata Merah 5 x 11 x 22
8.320 Kg Portland Semen

Hal. 87

KODE

KOEF

SAT.

URAIAN PAKERJAAN

0.049

m3 Pasir

0.300
0.100
0.010
0.015

OH
OH
OH
OH

6.8.2

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
100,000.00

JUMLAH
HARGA
Rp
4,900.00

42,500.00
50,000.00
60,000.00
60,000.00

19,250.00
12,750.00
5,000.00
600.00
900.00

Hal. 88

KODE
D.6.13
6.13.1

KOEF

SAT.
1

70.000
4.500
0.050
0.015

m2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Psr


Bahan
Buah Bata Merah 5 x 11 x 22
Kg Portland Semen
m3 Pasir
m3 Kapur Padam

6.13.2
0.300
0.100
0.010
0.015

URAIAN PAKERJAAN

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
PEKERJAAN

E.6.1
6.3.1

1
15.504
0.016

0.200
0.150
0.015
0.010
E.6.2
6.3.1

1
10.224
0.020

OH
OH
OH
OH

0.200
0.150
0.015
0.010
E.6.3
6.3.1

OH
OH
OH
OH

7.776
0.023

0.200
0.150
0.015
0.010

OH
OH
OH
OH

1
6.340
0.012

0.300
0.140
0.014
0.015

OH
OH
OH
OH

1
3.250

6.27.2

Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor

m2 Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Psr


Bahan
Kg Portland Semen
m3 Pasir

6.26.2

E.6.27
6.27.1

Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor

m2 Plesteran 1 Pc : 3 Psr Tebal 15 mm


Bahan
Kg Portland Semen
m3 Pasir

6.3.2

E.6.26
6.26.1

Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor

m2 Plesteran 1 Pc : 2 Psr Tebal 15 mm


Bahan
Kg Portland Semen
m3 Pasir

6.3.2

Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor

m2 Acian
Bahan
Kg Portland Semen
Tenaga

750.00
1,340.00
100,000.00
-

JUMLAH
HARGA
Rp
82,780.00
63,530.00
52,500.00
6,030.00
5,000.00
-

42,500.00
50,000.00
60,000.00
60,000.00

19,250.00
12,750.00
5,000.00
600.00
900.00

1,340.00
100,000.00

39,875.36
22,375.36
20,775.36
1,600.00

42,500.00
50,000.00
60,000.00
60,000.00

17,500.00
8,500.00
7,500.00
900.00
600.00

1,340.00
100,000.00

33,200.16
15,700.16
13,700.16
2,000.00

42,500.00
50,000.00
60,000.00
60,000.00

17,500.00
8,500.00
7,500.00
900.00
600.00

1,340.00
100,000.00

30,219.84
12,719.84
10,419.84
2,300.00

42,500.00
50,000.00
60,000.00
60,000.00

17,500.00
8,500.00
7,500.00
900.00
600.00

1,340.00
100,000.00

31,185.60
9,695.60
8,495.60
1,200.00

42,500.00
50,000.00
60,000.00
60,000.00

21,490.00
12,750.00
7,000.00
840.00
900.00

1,340.00

16,810.00
4,355.00
4,355.00

PLE S T E RAN

m2 Plesteran 1 Pc : 1 Psr Tebal 15 mm


Bahan
Kg Portland Semen
m3 Pasir

6.3.2

HARGA BAHAN
/ UPAH
Rp

12,455.00
Hal. 89

KODE

KOEF
0.150
0.100
0.010
0.008

SAT.
OH
OH
OH
OH

URAIAN PAKERJAAN
Pekerja
Tukang batu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
6,375.00
5,000.00
600.00
480.00

Hal. 90

KODE

F.6.1
6.1.2

KOEF

SAT.

1
1.100
1.250
1.000

6.1.2
6.000
20.000
2.000
0.300
F.6.2
6.2.1

1.000
1.200
1.250
1.000

6.2.2
6.000
20.000
2.000
0.300
F.6.2a
6.2.1

1
1.200
1.250
1.000

6.2.2
6.000
20.000
2.000
0.300
F.6.2b
6.2.1

1
1.200
1.250
1.000

6.2.2
6.000
20.000
2.000
0.300
F.6.3
6.3.1

1.000

PEKERJAAN K A Y U
m3 Membuat Kosen Pintu & Jendela Kayu klas I
Bahan
m3 Kayu Klas I (Jati R) , Balok
kg Paku Biasa 2" - 5 "
kg Lem Kayu
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m3 Membuat Kosen Pintu & Jendela Kayu klas II atau III
Bahan
m3 Kayu Klas II (bengkir) , Balok
kg Paku Biasa 2" - 5 "
kg Lem Kayu
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m3 Membuat Kosen Pintu & Jendela Kayu klas II (Bengkir)
Bahan
m3 Kayu Klas II (bengkir) , Balok
kg Paku Biasa 2" - 5 "
kg Lem Kayu
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m3 Membuat Kosen Pintu & Jendela Kayu klas III (Kruing)
Bahan
m3 Kayu Klas III (Kruing) , Balok
kg Paku Biasa 2" - 5 "
kg Lem Kayu
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

0.040
0.050

m2 Membuat Pintu KlampStandard Kayu Klas II atau III


Bahan
m3 Kayu Klas II (Bengkir), papan
Kg Paku Biasa 2" - 5 "

0.350
1.050
0.105
0.018

OH
OH
OH
OH

6.3.2

F.6.3a
6.3.1

URAIAN PAKERJAAN

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.040
0.050

m2 Membuat Pintu KlampStandard Kayu Klas II (Kayu Bengkir)


Bahan
m3 Kayu Klas II (Bengkir), papan
Kg Paku Biasa 2" - 5 "

0.350
1.050

Tenaga
OH Pekerja
OH Tukang Kayu

6.3.2

HARGA BAHAN
/ UPAH
Rp

7,000,000.00
20,750.00
25,400.00
42,500.00
50,000.00
60,000.00
60,000.00

10,200,000.00
20,750.00
25,400.00
50,000.00
60,000.00
60,000.00
-

10,200,000.00
20,750.00
25,400.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
9,144,337.50
7,751,337.50
7,700,000.00
25,937.50
25,400.00
1,393,000.00
255,000.00
1,000,000.00
120,000.00
18,000.00
13,911,337.50
12,291,337.50
12,240,000.00
25,937.50
25,400.00
1,620,000.00
300,000.00
1,200,000.00
120,000.00
13,684,337.50
12,291,337.50
12,240,000.00
25,937.50
25,400.00
1,393,000.00
255,000.00
1,000,000.00
120,000.00
18,000.00

42,500.00
50,000.00
60,000.00
60,000.00

9,531,497.50
8,138,497.50
8,087,160.00
25,937.50
25,400.00
1,393,000.00
255,000.00
1,000,000.00
120,000.00
18,000.00

11,250,000.00
25,400.00

526,025.00
451,270.00
450,000.00
1,270.00

42,500.00
50,000.00
60,000.00
60,000.00

74,755.00
14,875.00
52,500.00
6,300.00
1,080.00

11,250,000.00
25,400.00

526,025.00
451,270.00
450,000.00
1,270.00

42,500.00
50,000.00

74,755.00
14,875.00
52,500.00

6,739,300.00
20,750.00
25,400.00

Hal. 91

KODE

KOEF
0.105
0.018

SAT.
OH Kepala Tukang
OH Mandor

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp
60,000.00
60,000.00

JUMLAH
HARGA
Rp
6,300.00
1,080.00

Hal. 92

KODE
F.6.3b
6.3.1

KOEF

SAT.
1

0.040
0.050

m2 Membuat Pintu KlampStandard Kayu Klas III (Kayu Kruing)


Bahan
m3 Kayu Klas III (Kruing), papan
Kg Paku Biasa 2" - 5 "

0.350
1.050
0.105
0.018

OH
OH
OH
OH

1.000

m2 Membuat Daun Pintu Panel Kayu Klas I, II, III


Bahan
m3 Kayu Klas II (Jati R), papan
kg Lem Kayu
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

6.3.2

F.6.5
6.5.1

0.040
0.050
6.5.2
1.000
2.500
0.250
0.050
F.6.5a
6.5.1

1
0.040
0.050

6.5.2
1.000
2.500
0.250
0.050
F.6.5b
6.5.1

1
0.040
0.050

6.5.2
1.000
2.500
0.250
0.050
F.6.5c
6.5.1

1
0.040
0.050

6.5.2
1.000
2.500
0.250
0.050
F.6.6
6.6.1

1.000
0.024
0.300

6.6.2
0.800
2.000
0.200
0.040
F.6.6a
6.6.1

URAIAN PAKERJAAN

1
0.024

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

m2 Membuat Daun Pintu Panel Kayu Klas I (Jati R)


Bahan
m3 Kayu Klas II (Jati R), papan
kg Lem Kayu
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Membuat Daun Pintu Panel Kayu Klas II (Bengkir)
Bahan
m3 Kayu Klas II (Bengkir), papan
kg Lem Kayu
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Membuat Daun Pintu Panel Kayu Klas III (Kruing)
Bahan
m3 Kayu Klas III (Kruing), papan
kg Lem Kayu
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Membuat Pintu & Jendela Kaca Kayu Klas I, II, III
Bahan
m3 Kayu Klas I (Jati R), papan
kg Lem Kayu
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Membuat Pintu & Jendela Kaca Kayu Klas I (Jati R)
Bahan
m3 Kayu Klas I (Jati R), papan

HARGA BAHAN
/ UPAH
Rp

7,500,000.00
25,400.00

JUMLAH
HARGA
Rp
376,025.00
301,270.00
300,000.00
1,270.00

42,500.00
50,000.00
60,000.00
60,000.00

74,755.00
14,875.00
52,500.00
6,300.00
1,080.00

6,700,000.00
25,400.00
42,500.00
50,000.00
60,000.00
60,000.00

6,700,000.00
25,400.00
42,500.00
50,000.00
60,000.00
60,000.00

11,250,000.00
25,400.00
42,500.00
50,000.00
60,000.00
60,000.00

7,500,000.00
25,400.00
42,500.00
50,000.00
60,000.00
60,000.00

454,770.00
269,270.00
268,000.00
1,270.00
185,500.00
42,500.00
125,000.00
15,000.00
3,000.00
454,770.00
269,270.00
268,000.00
1,270.00
185,500.00
42,500.00
125,000.00
15,000.00
3,000.00
636,770.00
451,270.00
450,000.00
1,270.00
185,500.00
42,500.00
125,000.00
15,000.00
3,000.00
486,770.00
301,270.00
300,000.00
1,270.00
185,500.00
42,500.00
125,000.00
15,000.00
3,000.00

42,500.00
50,000.00
60,000.00
60,000.00

316,820.00
168,420.00
160,800.00
7,620.00
148,400.00
34,000.00
100,000.00
12,000.00
2,400.00

6,700,000.00

316,820.00
168,420.00
160,800.00

6,700,000.00
25,400.00

Hal. 93

KODE

KOEF

SAT.

0.300

kg

0.800
2.000
0.200
0.040

OH
OH
OH
OH

6.6.2

URAIAN PAKERJAAN
Lem Kayu
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
25,400.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
7,620.00
148,400.00
34,000.00
100,000.00
12,000.00
2,400.00

Hal. 94

KODE
F.6.6b
6.6.1

KOEF

SAT.
1

0.024
0.300
6.6.2
0.800
2.000
0.200
0.040
F.6.6c
6.6.1

1
0.024
0.300

6.6.2
0.800
2.000
0.200
0.040
F.6.7
6.7.1

1.000
0.064
0.500

6.7.2
1.000
3.000
0.300
0.050
F.6.8
6.8.1

1.000

m2 Membuat Pintu & Jendela Kaca Kayu Klas II (Bengkir)


Bahan
m3 Kayu Klas II (Bengkir), papan
kg Lem Kayu
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Membuat Pintu & Jendela Kaca Kayu Klas III (Kruing)
Bahan
m3 Kayu Klas III (Kruing), papan
kg Lem Kayu
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Membuat Pintu & Jendela Jalusi Kayu Klas I atau II
Bahan
m3 Kayu Klas I (Jati R), papan
kg Lem Kayu
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

42,500.00
50,000.00
60,000.00
60,000.00

7,500,000.00
25,400.00
42,500.00
50,000.00
60,000.00
60,000.00

6,700,000.00
25,400.00
42,500.00
50,000.00
60,000.00
60,000.00

0.600
2.000
0.200
0.040

OH
OH
OH
OH

336,020.00
187,620.00
180,000.00
7,620.00
148,400.00
34,000.00
100,000.00
12,000.00
2,400.00
655,000.00
441,500.00
428,800.00
12,700.00
213,500.00
42,500.00
150,000.00
18,000.00
3,000.00
434,472.50
294,572.50
281,250.00
622.50
12,700.00
139,900.00
25,500.00
100,000.00
12,000.00
2,400.00

0.025
0.030
0.500
1.000

m2 Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm)
Bahan
m3 Kayu Klas II (Bengkir), papan
11,250,000.00
Kg Paku Biasa 1/2" - 1"
20,750.00
Ltr Lem Kayu
25,400.00
Lbr Plywood tebal 4 mm uk.90x220cm
-

434,472.50
294,572.50
281,250.00
622.50
12,700.00
-

0.600
2.000
0.200
0.040

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

JUMLAH
HARGA
Rp
426,020.00
277,620.00
270,000.00
7,620.00
148,400.00
34,000.00
100,000.00
12,000.00
2,400.00

42,500.00
50,000.00
60,000.00
60,000.00

0.025
0.030
0.500
1.000
6.8.2

11,250,000.00
25,400.00

0.025
0.030
0.500
1.000

6.8.2

F.6.8b
6.8.1

HARGA BAHAN
/ UPAH
Rp

m2 Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II atau III (lbr s/d 90 cm)
Bahan
m3 Kayu Klas II (Bengkir), papan
11,250,000.00
Kg Paku Biasa 1/2" - 1"
20,750.00
Ltr Lem Kayu
25,400.00
Lbr Plywood tebal 4 mm uk.90x220cm
-

6.8.2

F.6.8a
6.8.1

URAIAN PAKERJAAN

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

42,500.00
50,000.00
60,000.00
60,000.00

139,900.00
25,500.00
100,000.00
12,000.00
2,400.00

m2 Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas III (lbr s/d 90 cm)
Bahan
m3 Kayu Klas III (Kruing), papan
7,500,000.00
Kg Paku Biasa 1/2" - 1"
20,750.00
Ltr Lem Kayu
25,400.00
Lbr Plywood tebal 4 mm uk.90x220cm
-

340,722.50
200,822.50
187,500.00
622.50
12,700.00
-

Tenaga

139,900.00
Hal. 95

KODE

KOEF
0.600
2.000
0.200
0.040

SAT.
OH
OH
OH
OH

URAIAN PAKERJAAN
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
25,500.00
100,000.00
12,000.00
2,400.00

Hal. 96

KODE
F.6.9
6.9.1

KOEF

SAT.

1.000

m2

0.026
0.030
0.500
1.000

m3
Kg
Ltr
Lbr

0.800
2.000
0.200
0.040

OH
OH
OH
OH

6.9.2

F.6.9a
6.9.1

1
0.026
0.030
0.500
1.000

6.9.2
0.800
2.000
0.200
0.040
F.6.9b
6.9.1

1
0.026
0.030
0.500
1.000

6.9.2

F.6.10
6.10.1

0.800
2.000
0.200
0.040
1.000
0.060
0.150

6.10.2
0.500
2.000
0.200
0.025

F.6.11
6.11.1

1
0.025
0.030
0.300
1.000

6.11.2
0.800
2.000
0.200
0.040

HARGA BAHAN
/ UPAH
Rp
Membuat Pintu Plywood rangkap, rangka expose kayu klas I atau III
Bahan
Kayu Klas I (Jati R), papan
6,700,000.00
Paku Biasa 1/2" - 1"
20,750.00
Lem Kayu
25,400.00
Plywood tebal 4 mm uk.90x220cm
Tenaga
Pekerja
42,500.00
Tukang Kayu
50,000.00
Kepala Tukang
60,000.00
Mandor
60,000.00
URAIAN PAKERJAAN

m2 Membuat Pintu Plywood rangkap, rangka expose kayu klas I


Bahan
m3 Kayu Klas I (Jati R), papan
Kg Paku Biasa 1/2" - 1"
Ltr Lem Kayu
Lbr Plywood tebal 4 mm uk.90x220cm
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Membuat Pintu Plywood rangkap, rangka expose kayu klas II
Bahan
m3 Kayu Klas II (Bengkir), papan
Kg Paku Biasa 1/2" - 1"
Ltr Lem Kayu
Lbr Plywood tebal 4 mm uk.90x220cm
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Membuat Jalusi mati Kosen Kayu Klas I atau II
Bahan
m3 Kayu Klas I (Jati R), papan
Kg Paku Biasa 1/2" - 1"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

m2 Membuat Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I


Bahan
m3 Kayu Klas I (Jati R), papan
Kg Paku Biasa 1/2" - 1"
kg Lem Kayu
Lbr Teakwood (90 x 220) cm x 4 mm
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

6,700,000.00
20,750.00
25,400.00
42,500.00
50,000.00
60,000.00
60,000.00

11,250,000.00
20,750.00
25,400.00
42,500.00
50,000.00
60,000.00
60,000.00

6,700,000.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

6,700,000.00
20,750.00
25,400.00
159,400.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
333,242.50
184,842.50
171,520.00
622.50
12,700.00
148,400.00
34,000.00
100,000.00
12,000.00
2,400.00
333,242.50
184,842.50
171,520.00
622.50
12,700.00
148,400.00
34,000.00
100,000.00
12,000.00
2,400.00
449,722.50
301,322.50
288,000.00
622.50
12,700.00
148,400.00
34,000.00
100,000.00
12,000.00
2,400.00
539,862.50
405,112.50
402,000.00
3,112.50
134,750.00
21,250.00
100,000.00
12,000.00
1,500.00

483,542.50
335,142.50
167,500.00
622.50
7,620.00
159,400.00
148,400.00
34,000.00
100,000.00
12,000.00
2,400.00

Hal. 97

KODE
F.6.13a
6.13.1

KOEF

HARGA BAHAN
/ UPAH
Rp
Memasang Konstruksi Kuda-kuda Konvensional Kayu Kelas I Bentang 6 meter
Bahan
Kayu Jati, balok
7,000,000.00
Besi Strip
11,000.00
Paku Biasa 2" - 5"
20,750.00
Tenaga
Pekerja
42,500.00
Tukang Kayu
50,000.00
Kepala Tukang
60,000.00
Mandor
60,000.00

JUMLAH
HARGA
Rp
8,835,200.00
7,981,200.00
7,700,000.00
165,000.00
116,200.00
854,000.00
170,000.00
600,000.00
72,000.00
12,000.00

m3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Kelas II Bentang 6 meter


Bahan
m3 Kayu Bengkir, balok
10,200,000.00
Kg Besi Strip
11,000.00
Kg Paku Biasa 2" - 5"
20,750.00
Tenaga
OH Pekerja
42,500.00
OH Tukang Kayu
50,000.00
OH Kepala Tukang
60,000.00
OH Mandor
60,000.00

12,355,200.00
11,501,200.00
11,220,000.00
165,000.00
116,200.00
854,000.00
170,000.00
600,000.00
72,000.00
12,000.00

m3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Kelas III Bentang 6 meter


Bahan
m3 Kayu Kruing, balok
6,739,300.00
Kg Besi Strip
11,000.00
Kg Paku Biasa 2" - 5"
20,750.00
Tenaga
OH Pekerja
42,500.00
OH Tukang Kayu
50,000.00
OH Kepala Tukang
60,000.00
OH Mandor
60,000.00

8,548,430.00
7,694,430.00
7,413,230.00
165,000.00
116,200.00
854,000.00
170,000.00
600,000.00
72,000.00
12,000.00

SAT.
1

m3

1.100
15.000
5.600

m3
Kg
Kg

4.000
12.000
1.200
0.200

OH
OH
OH
OH

6.13.2

F.6.13b
6.13.1

1
1.100
15.000
5.600

6.13.2
4.000
12.000
1.200
0.200
F.6.13c
6.13.1

1
1.100
15.000
5.600

6.13.2
4.000
12.000
1.200
0.200
F.6.14
6.14.1

1
1.200
15.000
5.600

6.14.2
6.000
20.000
2.000
0.300
F.6.15a
6.15.1

1
1.100
15.000
3.000

6.15.2
2.400
7.200
0.720
0.120
F.6.15b
6.15.1

1
1.100
15.000
3.000

6.15.2
2.400
7.200
0.720

URAIAN PAKERJAAN

m3 Memasang Konstruksi Kuda-kuda Expose, Kayu Klas I


Bahan
m3 Kayu Klas I (Jati R), balok
Kg Besi Strip
Kg Paku Biasa 2" - 5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m3 Memasang konstruksi Gording, Kayu Klas I
Bahan
m3 Kayu Klas I (Jati R), balok
Kg Besi Strip
Kg Paku Biasa 2" - 5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m3 Memasang konstruksi Gording, Kayu Klas II
Bahan
m3 Kayu Klas II (Bengkir), balok
Kg Besi Strip
Kg Paku Biasa 2" - 5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang

7,000,000.00
11,000.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

7,000,000.00
11,000.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

10,200,000.00
11,000.00
20,750.00
42,500.00
50,000.00
60,000.00

10,074,200.00
8,681,200.00
8,400,000.00
165,000.00
116,200.00
1,393,000.00
255,000.00
1,000,000.00
120,000.00
18,000.00
8,439,650.00
7,927,250.00
7,700,000.00
165,000.00
62,250.00
512,400.00
102,000.00
360,000.00
43,200.00
7,200.00
11,959,650.00
11,447,250.00
11,220,000.00
165,000.00
62,250.00
512,400.00
102,000.00
360,000.00
43,200.00
Hal. 98

KODE

KOEF

SAT.

0.120
F.6.15c
6.15.1

1
1.100
15.000
3.000

6.15.2
2.400
7.200
0.720
0.120

URAIAN PAKERJAAN

OH Mandor
m3 Memasang konstruksi Gording, Kayu Klas III
Bahan
m3 Kayu Klas III (Kruing), balok
Kg Besi Strip
Kg Paku Biasa 2" - 5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

HARGA BAHAN
/ UPAH
Rp
60,000.00

6,739,300.00
11,000.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
7,200.00
8,152,880.00
7,640,480.00
7,413,230.00
165,000.00
62,250.00
512,400.00
102,000.00
360,000.00
43,200.00
7,200.00

Hal. 99

KODE

F.6.16
6.16.1

KOEF

SAT.

1
0.014
0.036
0.250

6.16.2
0.100
0.100
0.010
0.005
F.6.16a
6.16.1

1
0.014
0.003
0.250

6.16.2
0.100
0.100
0.010
0.005
F.6.17
6.17.1

1
0.014
0.008
0.250

6.17.2
0.100
0.100
0.010
0.005
F.6.18
6.18.1

1
0.165
0.200

6.18.2
0.120
0.120
0.012
0.006
F.6.19
6.19.1

1.000
0.015
0.200

6.19.2
0.150
0.250
0.025
0.075
F.6.19a
6.19.1

1
0.015
0.200

6.19.2
0.150
0.250
0.025
0.075

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp

m2 Memasang Rangka Atap Genteng Keramik, Kayu Klas III


Bahan
m3 Kayu Klas III (Kruing), Kaso-kaso (5x7) cm
m3 Reng (2x3) cm
Kg Paku Biasa 2" - 5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

JUMLAH
HARGA
Rp

42,500.00
50,000.00
60,000.00
60,000.00

229,033.70
218,883.70
85,773.80
127,922.40
5,187.50
10,150.00
4,250.00
5,000.00
600.00
300.00

m2 Memasang Rangka Atap Genteng Pres Kebumen/Jatiwangi, Kayu Klas III


Bahan
m3 Kayu Klas III (Kruing), Kaso-kaso (5x7) cm
6,126,700.00
m3 Reng (2x3) cm
3,553,400.00
Kg Paku Biasa 2" - 5"
20,750.00
Tenaga
OH Pekerja
42,500.00
OH Tukang Kayu
50,000.00
OH Kepala Tukang
60,000.00
OH Mandor
60,000.00

111,771.50
101,621.50
85,773.80
10,660.20
5,187.50
10,150.00
4,250.00
5,000.00
600.00
300.00

m2 Memasang Rangka Atap Genteng Beton, Kayu Klas III


Bahan
m3 Kayu Klas III (Kruing), Kaso-kaso (5x7) cm
m3 Reng (3x5) cm
Kg Paku Biasa 2" - 5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

127,761.80
117,611.80
85,773.80
26,650.50
5,187.50
10,150.00
4,250.00
5,000.00
600.00
300.00

m2 Memasang Rangka Atap Sirap, Kayu Klas III


Bahan
m3 Kayu Klas III (Kruing), balok
Kg Paku Biasa 2" - 5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas II atau III
Bahan
m3 Kayu Klas II atau III, balok
Kg Paku Biasa 2" - 5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas II
Bahan
m3 Kayu Klas II (Bengkir), balok
Kg Paku Biasa 2" - 5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

6,126,700.00
3,553,400.00
20,750.00

6,126,700.00
3,553,400.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

6,126,700.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

10,000,000.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

10,000,000.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

1,027,235.50
1,015,055.50
1,010,905.50
4,150.00
12,180.00
5,100.00
6,000.00
720.00
360.00
183,025.00
158,150.00
154,000.00
4,150.00
24,875.00
6,375.00
12,500.00
1,500.00
4,500.00
183,025.00
158,150.00
154,000.00
4,150.00
24,875.00
6,375.00
12,500.00
1,500.00
4,500.00
Hal. 100

KODE
F.6.19b
6.19.1

KOEF

SAT.
1

0.015
0.200
6.19.2
0.150
0.250
0.025
0.075

URAIAN PAKERJAAN

m2 Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas III


Bahan
m3 Kayu Klas III (Kruing), balok
Kg Paku Biasa 2" - 5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

HARGA BAHAN
/ UPAH
Rp

6,126,700.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
123,376.18
98,501.18
94,351.18
4,150.00
24,875.00
6,375.00
12,500.00
1,500.00
4,500.00

Hal. 101

KODE
F.6.20
6.20.1

KOEF

SAT.

1.000
0.016
0.250

6.20.2
0.200
0.300
0.030
0.010
F.6.20a
6.20.1

1
0.016
0.250

6.20.2
0.200
0.300
0.030
0.010
F.6.20b
6.20.1

m2 Memasang Rangka Langit-langit (60x60) cm, kayu Klas II atau III


Bahan
m3 Kayu Klas II (Kruing), balok
Kg Paku Biasa 2" - 5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Rangka Langit-langit (60x60) cm, kayu Klas II
Bahan
m3 Kayu Klas II (Bengkir), balok
Kg Paku Biasa 2" - 5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

0.200
0.300
0.030
0.010

m2 Memasang Rangka Langit-langit (60x60) cm, kayu Klas III


Bahan
m3 Kayu Klas III (Kruing), balok
Kg Paku Biasa 2" - 5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

1.000

m'

0.0108
0.100

m3
Kg

0.100
0.200
0.025
0.005

OH
OH
OH
OH

m'

0.0054
0.100

m3
Kg

0.100
0.200
0.025
0.005

OH
OH
OH
OH

m'

0.0054
0.100

m3
Kg

0.100
0.200
0.025
0.005

OH
OH
OH
OH

m'

0.016
0.250
6.20.2

F.6.21
6.21.1

6.21.2

F.6.21a
6.21.1

6.21.2

F.6.21b
6.21.1

6.21.2

F.6.21c
6.21.1

URAIAN PAKERJAAN

0.0054
0.100

Memasang Listplank Uk. (3x20)cm Kayu klas I atau II


Bahan
Kayu klas I (Jati R), papan
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Memasang Listplank Uk. (3x20)cm Kayu klas I
Bahan
Kayu klas I (Jati R), papan
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Memasang Listplank Uk. (3x20)cm Kayu klas II
Bahan
Kayu klas II (Bengkir), papan
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Memasang Listplank Uk. (3x20)cm Kayu klas III


Bahan
m3 Kayu klas III (Kruing), papan
Kg Paku Biasa 2" - 5"

HARGA BAHAN
/ UPAH
Rp

6,739,300.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

10,000,000.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

6,126,700.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

6,700,000.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

6,700,000.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
140,938.09
115,038.09
109,850.59
5,187.50
25,900.00
8,500.00
15,000.00
1,800.00
600.00
194,087.50
168,187.50
163,000.00
5,187.50
25,900.00
8,500.00
15,000.00
1,800.00
600.00
130,952.71
105,052.71
99,865.21
5,187.50
25,900.00
8,500.00
15,000.00
1,800.00
600.00
90,485.00
74,435.00
72,360.00
2,075.00
16,050.00
4,250.00
10,000.00
1,500.00
300.00
54,305.00
38,255.00
36,180.00
2,075.00
16,050.00
4,250.00
10,000.00
1,500.00
300.00

42,500.00
50,000.00
60,000.00
60,000.00

78,875.00
62,825.00
60,750.00
2,075.00
16,050.00
4,250.00
10,000.00
1,500.00
300.00

7,500,000.00
20,750.00

58,625.00
42,575.00
40,500.00
2,075.00

11,250,000.00
20,750.00

Hal. 102

KODE

KOEF

SAT.

6.21.2
0.100
0.200
0.025
0.005

OH
OH
OH
OH

URAIAN PAKERJAAN
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
16,050.00
4,250.00
10,000.00
1,500.00
300.00

Hal. 103

KODE

F.6.22a
6.22.1

KOEF

SAT.

m'

0.006
0.050

m3
Kg

0.100
0.200
0.020
0.005

OH
OH
OH
OH

1.000

m2 Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III


Bahan
m3 Kayu klas II (Kruing), balok
Kg Paku Biasa 2" - 5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

0.028
0.150
6.23.2
0.150
0.450
0.045
0.008
F.6.23a
6.23.1

1.000
0.028
0.150

6.23.2
0.150
0.450
0.045
0.008
F.6.23b
6.23.1

1
0.028
0.150

6.23.2
0.150
0.450
0.045
0.008
F.6.24
6.24.1

1.000
0.028
0.150
0.860
0.560

6.24.2
0.150
0.450
0.045
0.008
F.6.24a
6.24.1

HARGA BAHAN
/ UPAH
Rp

1.000

6.22.2

F.6.23
6.23.1

URAIAN PAKERJAAN

1
0.028
0.150
0.860
0.560

6.24.2
0.150
0.450
0.045
0.008

Memasang Listplank Uk. (3x30)cm klas III


Bahan
Kayu klas III (Kruing), papan
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

m2 Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas II


Bahan
m3 Kayu klas II (Bengkir), balok
Kg Paku Biasa 2" - 5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas III
Bahan
m3 Kayu klas III (Kruing), balok
Kg Paku Biasa 2" - 5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II
Bahan
m3 Kayu klas II (Kruing), balok
Kg Paku Biasa 2" - 5"
Lbr Teakwood 120 x 240 cm tebal 4mm
Ltr Lem
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II
Bahan
m3 Kayu klas II (Bengkir), balok
Kg Paku Biasa 2" - 5"
Lbr Teakwood 120 x 240 cm tebal 4mm
Ltr Lem
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

7,500,000.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

6,739,300.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

10,200,000.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

6,739,300.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

6,739,300.00
20,750.00
102,900.00
25,400.00
42,500.00
50,000.00
60,000.00
60,000.00

10,200,000.00
20,750.00
102,900.00
25,400.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
58,037.50
42,287.50
41,250.00
1,037.50
15,750.00
4,250.00
10,000.00
1,200.00
300.00
223,867.90
191,812.90
188,700.40
3,112.50
32,055.00
6,375.00
22,500.00
2,700.00
480.00
320,767.50
288,712.50
285,600.00
3,112.50
32,055.00
6,375.00
22,500.00
2,700.00
480.00
223,867.90
191,812.90
188,700.40
3,112.50
32,055.00
6,375.00
22,500.00
2,700.00
480.00
326,585.90
294,530.90
188,700.40
3,112.50
88,494.00
14,224.00
32,055.00
6,375.00
22,500.00
2,700.00
480.00
423,485.50
391,430.50
285,600.00
3,112.50
88,494.00
14,224.00
32,055.00
6,375.00
22,500.00
2,700.00
480.00
Hal. 104

KODE

KOEF

SAT.

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp

JUMLAH
HARGA
Rp

Hal. 105

KODE
F.6.24b
6.24.1

KOEF

SAT.
1

m2

0.028
0.150
0.860
0.560

m3
Kg
Lbr
Ltr

0.150
0.450
0.045
0.008

OH
OH
OH
OH

6.24.2

F.6.26
6.26.1

1
0.007
0.100
0.150

6.26.2
0.600
1.800
0.180
0.030
F.6.27
6.27.1

1
0.400
0.050

6.27.2
0.025
0.075
0.008
0.001
F.6.28
6.28.1

1.000
1.500
0.014
0.050
0.003

6.28.2
0.100
0.050
0.005
0.005
F.6.28a
6.28.1

1
1.500
0.014
0.050
0.003

6.28.2
0.100
0.050
0.005
0.005
F.6.28b
6.28.1

1
1.500
0.014
0.050
0.003

6.28.2

HARGA BAHAN
/ UPAH
Rp
Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas III
Bahan
Kayu klas III (Kruing), balok
6,739,300.00
Paku Biasa 2" - 5"
20,750.00
Teakwood 120 x 240 cm tebal 4mm
102,900.00
Lem
25,400.00
Tenaga
Pekerja
42,500.00
Tukang Kayu
50,000.00
Kepala Tukang
60,000.00
Mandor
60,000.00
URAIAN PAKERJAAN

m2 Memasang Dinding Lambriziring dari Papan klas I


Bahan
m3 Kayu klas I (Jati R), papan
Kg Paku Biasa 2" - 5"
Kg Paku Sekrup 3,5"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Dinding Lambriziring dari Plywood ukuran (120x240) cm
Bahan
Lbr Plywood 4'x8"x 4mm
Kg Paku Biasa 1/2" - 1"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Dinding Bilik, Rangka Kayu Klas III atau IV
Bahan
m2 Bilik Bambu
m3 Kayu Klas III (Meranti)
Kg Paku Biasa 1/2" - 1"
m' List Kayu 2/4
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Dinding Bilik, Rangka Kayu Klas III
Bahan
m2 Bilik Bambu
m3 Kayu Klas III (Kruing)
Kg Paku Biasa 1/2" - 1"
m' List Kayu 2/4
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Dinding Bilik, Rangka Kayu Klas IV
Bahan
m2 Bilik Bambu
m3 Kayu Klas IV (Meranti)
Kg Paku Biasa 1/2" - 1"
m' List Kayu 2/4
Tenaga

6,700,000.00
20,750.00
1,500.00
42,500.00
50,000.00
60,000.00
60,000.00

20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

49,000.00
20,750.00
25,400.00
42,500.00
50,000.00
60,000.00
60,000.00

49,000.00
7,045,700.00
20,750.00
3,000.00
42,500.00
50,000.00
60,000.00
60,000.00

49,000.00
20,750.00
3,000.00

JUMLAH
HARGA
Rp
326,585.90
294,530.90
188,700.40
3,112.50
88,494.00
14,224.00
32,055.00
6,375.00
22,500.00
2,700.00
480.00
177,300.00
49,200.00
46,900.00
2,075.00
225.00
128,100.00
25,500.00
90,000.00
10,800.00
1,800.00
6,378.00
1,037.50
1,037.50
5,340.50
1,062.50
3,750.00
450.00
78.00
81,963.70
74,613.70
73,500.00
1,037.50
76.20
7,350.00
4,250.00
2,500.00
300.00
300.00
180,536.30
173,186.30
73,500.00
98,639.80
1,037.50
9.00
7,350.00
4,250.00
2,500.00
300.00
300.00
81,896.50
74,546.50
73,500.00
1,037.50
9.00
7,350.00
Hal. 106

KODE

KOEF
0.100
0.050
0.005
0.005

SAT.
OH
OH
OH
OH

URAIAN PAKERJAAN
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
4,250.00
2,500.00
300.00
300.00

Hal. 107

KODE

G.6.1
6.1.1

KOEF

SAT.

1
247.000
869.000
999.000
215.000

6.1.2
1.650
0.275
0.028
0.083
G.6.2
6.2.1

1
276.000
828.000
1,012.000
215.000

6.2.2
1.650
0.275
0.028
0.083
G.6.3
6.3.1

1
299.000
799.000
1,017.000
215.000

6.3.2
1.650
0.275
0.028
0.083
G.6.4
6.4.1

1
230.000
893.000
1,027.000
200.000

6.4.2
1.200
0.200
0.020
0.006
G.6.5
6.5.1

1
326.000
760.000
1,029.000
215.000

6.5.2
1.650
0.275
0.028
0.083
G.6.6
6.6.1

1
352.000

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp

PEKERJAAN B E T O N
m3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87
Bahan
Kg Portland Semen
Kg Pasir
Kg Kerikil (maksimum 30 mm)
ltr Air
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78
Bahan
Kg Portland Semen
kg Pasir
kg Kerikil (maksimum 30 mm)
ltr Air
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72
Bahan
Kg Portland Semen
kg Pasir
kg Kerikil (maksimum 30 mm)
ltr Air
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor

1,340.00
120.00
42,500.00
50,000.00
60,000.00
60,000.00

1,340.00
120.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
447,315.00
356,780.00
330,980.00
25,800.00
90,535.00
70,125.00
13,750.00
1,680.00
4,980.00
486,175.00
395,640.00
369,840.00
25,800.00
90,535.00
70,125.00
13,750.00
1,680.00
4,980.00

42,500.00
50,000.00
60,000.00
60,000.00

516,995.00
426,460.00
400,660.00
25,800.00
90,535.00
70,125.00
13,750.00
1,680.00
4,980.00

m3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
Bahan
Kg Portland Semen
1,340.00
kg Pasir
kg Kerikil (maksimum 30 mm)
ltr Air
120.00
Tenaga
OH Pekerja
42,500.00
OH Tukang Batu
50,000.00
OH Kepala Tukang
60,000.00
OH Mandor
60,000.00

394,760.00
332,200.00
308,200.00
24,000.00
62,560.00
51,000.00
10,000.00
1,200.00
360.00

m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66
Bahan
Kg Portland Semen
Kg Pasir
Kg Kerikil (maksimum 30 mm)
ltr Air
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor

42,500.00
50,000.00
60,000.00
60,000.00

553,175.00
462,640.00
436,840.00
25,800.00
90,535.00
70,125.00
13,750.00
1,680.00
4,980.00

1,340.00

588,015.00
497,480.00
471,680.00

m3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm, w/c = 0,61
Bahan
Kg Portland Semen

1,340.00
120.00

1,340.00
120.00

Hal. 108

KODE

KOEF

SAT.

731.000
1,031.000
215.000

Kg
Kg
ltr

1.650
0.275
0.028
0.083

OH
OH
OH
OH

6.6.2

URAIAN PAKERJAAN
Pasir
Kerikil (maksimum 30 mm)
Air
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp

JUMLAH
HARGA
Rp
120.00

42,500.00
50,000.00
60,000.00
60,000.00

25,800.00
90,535.00
70,125.00
13,750.00
1,680.00
4,980.00

Hal. 109

KODE
G.6.7
6.7.1

KOEF

SAT.
1

m3

371.000
698.000
1,047.000
215.000

Kg
Kg
Kg
ltr

1.650
0.275
0.028
0.083

OH
OH
OH
OH

6.7.2

G.6.8
6.8.1

m3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm, w/c = 0,56
Bahan
Kg Portland Semen
Kg Pasir
Kg Kerikil (maksimum 30 mm)
ltr Air
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor

384.000
692.000
1,039.000
215.000
6.8.2
1.650
0.275
0.028
0.083
G.6.9
6.9.1

m3 Membuat Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c = 0,53
Bahan
Kg Portland Semen
kg Pasir
kg Kerikil (maksimum 30 mm)
ltr Air
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor

406.000
684.000
1,026.000
215.000
6.9.2
1.650
0.275
0.028
0.083
G.6.10
6.10.1

m3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (122)cm, w/c = 0,52
Bahan
Kg Portland Semen
Kg Pasir
Kg Kerikil (maksimum 30 mm)
ltr Air
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor

413.000
681.000
1,021.000
215.000
6.10.2
1.650
0.275
0.028
0.083
G.6.11
6.11.1

m3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (122)cm, w/c = 0,49
Bahan
Kg Portland Semen
Kg Pasir
Kg Kerikil (maksimum 30 mm)
ltr Air
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor

439.000
670.000
1,006.000
215.000
6.11.2
2.100
0.350
0.035
0.105
CATATAN
G.6.17
6.17.1

HARGA BAHAN
/ UPAH
Rp
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58
Bahan
Portland Semen
1,340.00
Pasir
Kerikil (maksimum 30 mm)
Air
120.00
Tenaga
Pekerja
42,500.00
Tukang Batu
50,000.00
Kepala Tukang
60,000.00
Mandor
60,000.00
URAIAN PAKERJAAN

1,340.00
120.00
42,500.00
50,000.00
60,000.00
60,000.00

1,340.00
120.00
42,500.00
50,000.00
60,000.00
60,000.00

1,340.00
120.00
42,500.00
50,000.00
60,000.00
60,000.00

1,340.00
120.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
613,475.00
522,940.00
497,140.00
25,800.00
90,535.00
70,125.00
13,750.00
1,680.00
4,980.00
630,895.00
540,360.00
514,560.00
25,800.00
90,535.00
70,125.00
13,750.00
1,680.00
4,980.00
660,375.00
569,840.00
544,040.00
25,800.00
90,535.00
70,125.00
13,750.00
1,680.00
4,980.00
669,755.00
579,220.00
553,420.00
25,800.00
90,535.00
70,125.00
13,750.00
1,680.00
4,980.00
729,210.00
614,060.00
588,260.00
25,800.00
115,150.00
89,250.00
17,500.00
2,100.00
6,300.00

Bobot isi pasir = 1.400 kg/m3, bobot krikil = 1.350 kg/m3, Bukling factor pasir 20%
Kg Pembesian dg Besi Polos
Bahan

11,611.50
10,905.00
Hal. 110

KODE

KOEF

SAT.

1.0500
0.0150

Kg
Kg

0.0070
0.0070
0.0007
0.0004

OH
OH
OH
OH

6.17.2

URAIAN PAKERJAAN
Besi Beton (polos)
Kawat Beton
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
10,100.00
20,000.00
42,500.00
50,000.00
50,000.00
60,000.00

JUMLAH
HARGA
Rp
10,605.00
300.00
706.50
297.50
350.00
35.00
24.00

Hal. 111

KODE
G.6.17a
6.17.1

KOEF

SAT.
1

1.0500
0.0150
6.17.2
0.0070
0.0070
0.0007
0.0004
G.6.18
6.18.1

1
1.0500
0.0100

6.18.2
0.0050
0.0050
0.0005
0.0003
G.6.19
6.19.1

1
1.0200
0.0050

6.19.2
0.0025
0.0250
0.0025
0.0001
G.6.20
6.20.1

1
0.040
0.300
0.100

6.20.2
0.520
0.260
0.026
0.026
G.6.21
6.21.1

1
0.045
0.300
0.100

6.21.2
0.520
0.260
0.026
0.026
G.6.22a
6.22.1

1
0.040
0.400
0.200

6.22.2
0.660
0.330
0.033
0.033
G.6.23a

URAIAN PAKERJAAN

Kg Pembesian dg Besi Ulir


Bahan
Kg Besi Beton (ulir)
Kg Kawat Beton
Tenaga
OH Pekerja
OH Tukang Besi
OH Kepala Tukang
OH Mandor
Kg Kabel Presstresed Polos/strand
Bahan
Kg Besi presstred polos
Kg Kawat Beton
Tenaga
OH Pekerja
OH Tukang Besi
OH Kepala Tukang
OH Mandor
Kg Jaring Kawat baja/Wire Mesh
Bahan
Kg Jaring Kawat Baja dilas
Kg Kawat Beton
Tenaga
OH Pekerja
OH Tukang Besi
OH Kepala Tukang
OH Mandor
m2 Memasang Bekisting untuk Pondasi
Bahan
m3 Kayu Klas III (Terentang)
Kg Paku Biasa 2" - 5"
Ltr Minyak Bekisting
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Bekisting untuk Sloof
Bahan
m3 Kayu Klas III (Terentang)
Kg Paku Biasa 2" - 5"
Ltr Minyak Bekisting
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Bekisting untuk Kolom
Bahan
m3 Papan cetak pinus
Kg Paku Biasa 2" - 5"
Ltr Minyak Bekisting
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Bekisting untuk Balok

HARGA BAHAN
/ UPAH
Rp

10,400.00
20,000.00
42,500.00
50,000.00
50,000.00
60,000.00

#REF!
20,000.00
42,500.00
50,000.00
50,000.00
60,000.00

12,617.50
20,000.00
42,500.00
50,000.00
50,000.00
60,000.00

2,210,200.33
20,750.00
18,300.00
42,500.00
50,000.00
60,000.00
60,000.00

2,210,200.33
20,750.00
18,300.00
42,500.00
50,000.00
60,000.00
60,000.00

2,210,200.33
20,750.00
18,300.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
11,926.50
11,220.00
10,920.00
300.00
706.50
297.50
350.00
35.00
24.00
#REF!
#REF!
#REF!
200.00
505.50
212.50
250.00
25.00
18.00
14,457.10
12,969.85
12,869.85
100.00
1,487.25
106.25
1,250.00
125.00
6.00
134,683.01
96,463.01
88,408.01
6,225.00
1,830.00
38,220.00
22,100.00
13,000.00
1,560.00
1,560.00
145,734.02
107,514.02
99,459.02
6,225.00
1,830.00
38,220.00
22,100.00
13,000.00
1,560.00
1,560.00
148,878.01
100,368.01
88,408.01
8,300.00
3,660.00
48,510.00
28,050.00
16,500.00
1,980.00
1,980.00
148,878.01
Hal. 112

KODE

KOEF

6.23.1
0.040
0.400
0.200
6.23.2
0.660
0.330
0.033
0.033

SAT.

URAIAN PAKERJAAN

Bahan
m3 Papan cetak pinus
Kg Paku Biasa 2" - 5"
Ltr Minyak Bekisting
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

HARGA BAHAN
/ UPAH
Rp
2,210,200.33
20,750.00
18,300.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
100,368.01
88,408.01
8,300.00
3,660.00
48,510.00
28,050.00
16,500.00
1,980.00
1,980.00

Hal. 113

KODE
G.6.24a
6.24.1

KOEF

SAT.
1

0.040
0.400
0.200
0.015
0.350
6.000
6.24.2
0.660
0.330
0.033
0.033
G.6.25a
6.25.1

1
0.030
0.400
0.200
0.020
0.350
3.000
4.000

6.25.2
0.660
0.330
0.033
0.033
G.6.26a
6.26.1

1
0.030
0.400
0.150
0.015
0.350
2.000

6.26.2
0.660
0.330
0.033
0.033
G.6.27
6.27.1

1
0.026
0.600
0.500

6.27.2
0.150
0.050
0.005
0.008
G.6.28
6.28.1

1
0.200
1.500
0.400
157.500
2.250
336.000
0.540
0.810

URAIAN PAKERJAAN

m2 Memasang Bekisting untuk Lantai


Bahan
m3 Papan cetak pinus
Kg Paku Biasa 2" - 5"
Ltr Minyak Bekisting
m3 Balok Kayu lokal
Lbr Triplek tebal 3mm
Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Bekisting untuk Dinding
Bahan
m3 Papan cetak pinus
Kg Paku Biasa 2" - 5"
Ltr Minyak Bekisting
m3 Balok Kayu lokal
Lbr Triplek tebal 3mm
Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
Buah Formite/Penjaga jarak / Spacer (alat bantu)
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Bekisting untuk Tangga
Bahan
m3 Papan cetak pinus
Kg Paku Biasa 2" - 5"
Ltr Minyak Bekisting
m3 Balok Kayu lokal
Lbr Triplek tebal 3mm
Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Jembatan Cor
Bahan
m3 Kayu Terentang
kg Paku Biasa 2" - 5"
m3 Dolken Kayu Galam diameter 8 - 10 / 4 m
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m3 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)
Bahan
m3 Kayu Klas III (Terentang)
Kg Paku Biasa 2" - 5"
Ltr Minyak Bekisting
Kg Besi Beton Polos
Kg Kawat Beton
Kg Portland Semen
m3 Pasir
m3 Kerikil Beton

HARGA BAHAN
/ UPAH
Rp

2,210,200.33
20,750.00
18,300.00
1,198,849.50
48,100.00
18,025.00
42,500.00
50,000.00
60,000.00
60,000.00

2,210,200.33
20,750.00
18,300.00
1,198,849.50
48,100.00
18,025.00
5,000.00
42,500.00
50,000.00
60,000.00
60,000.00

2,210,200.33
20,750.00
18,300.00
1,198,849.50
48,100.00
18,025.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
291,845.76
243,335.76
88,408.01
8,300.00
3,660.00
17,982.74
16,835.00
108,150.00
48,510.00
28,050.00
16,500.00
1,980.00
1,980.00
241,663.00
193,153.00
66,306.01
8,300.00
3,660.00
23,976.99
16,835.00
54,075.00
20,000.00
48,510.00
28,050.00
16,500.00
1,980.00
1,980.00
196,728.75
148,218.75
66,306.01
8,300.00
2,745.00
17,982.74
16,835.00
36,050.00
48,510.00
28,050.00
16,500.00
1,980.00
1,980.00

42,500.00
50,000.00
60,000.00
60,000.00

89,466.79
79,811.79
58,349.29
12,450.00
9,012.50
9,655.00
6,375.00
2,500.00
300.00
480.00

2,210,200.33
20,750.00
18,300.00
10,100.00
20,000.00
1,340.00
100,000.00
195,000.00

3,166,545.07
2,778,425.07
442,040.07
31,125.00
7,320.00
1,590,750.00
45,000.00
450,240.00
54,000.00
157,950.00

2,210,200.33
20,750.00
18,025.00

Hal. 114

KODE

KOEF

SAT.

6.28.2
5.300
0.275
1.300
1.050
0.262
0.265

OH
OH
OH
OH
OH
OH

URAIAN PAKERJAAN
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
42,500.00
50,000.00
50,000.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
388,120.00
225,250.00
13,750.00
65,000.00
52,500.00
15,720.00
15,900.00

Hal. 115

KODE
G.6.29
6.29.1

KOEF

SAT.
1

0.270
2.000
0.600
210.000
3.000
336.000
0.540
0.810
6.29.2
5.650
0.275
1.560
1.400
0.323
0.283
G.6.30
6.30.1

1
0.400
4.000
2.000
315.000
4.500
336.000
0.540
0.810
0.150
3.500
20.000

m3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)


Bahan
m3 Kayu Klas III (Terentang)
Kg Paku Biasa 2" - 5"
Ltr Minyak Bekisting
Kg Besi Beton Polos
Kg Kawat Beton
Kg Portland Semen
m3 Pasir
m3 Kerikil Beton
Tenaga
OH Pekerja
OH Tukang batu
OH Tukang Kayu
OH Tukang Besi
OH Kepala Tukang
OH Mandor
m3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)
Bahan
m3 Kayu Klas III (Terentang)
Kg Paku Biasa 2" - 5"
Ltr Minyak Bekisting
kg Besi Beton Polos
kg Kawat Beton
Kg Portland Semen
m3 Pasir
m3 Kerikil Beton
m3 Kayu Klas II Balok
Lbr Plywood tebal 4mm
Btg Dolken diameter 8 / 4rm

6.30.2
7.050
0.275
1.650
2.100
0.403
0.353
G.6.31
6.31.1

1
0.320
3.200
1.600
210.000
3.000
336.000
0.540
0.810
0.140
2.800
16.000

OH
OH
OH
OH
OH
OH

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)


Bahan
m3 Kayu Klas III (Terentang)
Kg Paku Biasa 2" - 5"
Ltr Minyak Bekisting
Kg Besi Beton Polos
Kg Kawat Beton
Kg Portland Semen
m3 Pasir
m3 Kerikil Beton
m3 Kayu Klas II Balok
Lbr Plywood tebal 4mm
Btg Dolken diameter 8 / 4rm

6.31.2
6.350
0.275
1.650
1.400
0.333
0.318

URAIAN PAKERJAAN

OH
OH
OH
OH
OH
OH

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp

42,500.00
50,000.00
50,000.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
3,930,659.09
3,492,424.09
596,754.09
41,500.00
10,980.00
2,121,000.00
60,000.00
450,240.00
54,000.00
157,950.00
438,235.00
240,125.00
13,750.00
78,000.00
70,000.00
19,380.00
16,980.00

2,210,200.33
20,750.00
18,300.00
10,100.00
20,000.00
1,340.00
100,000.00
195,000.00
6,126,700.00
18,025.00

6,763,110.13
6,216,875.13
884,080.13
83,000.00
36,600.00
3,181,500.00
90,000.00
450,240.00
54,000.00
157,950.00
919,005.00
360,500.00

42,500.00
50,000.00
50,000.00
50,000.00
60,000.00
60,000.00

546,235.00
299,625.00
13,750.00
82,500.00
105,000.00
24,180.00
21,180.00

2,210,200.33
20,750.00
18,300.00
10,100.00
20,000.00
1,340.00
100,000.00
195,000.00
6,126,700.00
18,025.00

5,267,457.11
4,792,272.11
707,264.11
66,400.00
29,280.00
2,121,000.00
60,000.00
450,240.00
54,000.00
157,950.00
857,738.00
288,400.00

42,500.00
50,000.00
50,000.00
50,000.00
60,000.00
60,000.00

475,185.00
269,875.00
13,750.00
82,500.00
70,000.00
19,980.00
19,080.00

2,210,200.33
20,750.00
18,300.00
10,100.00
20,000.00
1,340.00
100,000.00
195,000.00

Hal. 116

KODE
G.6.32
6.32.1

KOEF

SAT.
1

0.320
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.120
2.800
32.000
6.32.2
5.300
0.275
1.300
1.050
0.265
0.265
G.6.33
6.33.1

1
0.240
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.160
2.800
24.000

6.33.2
5.300
0.275
1.300
1.050
0.262
0.265
G.6.34
6.34.1

1
0.250
3.000
1.200
210.000
3.000
336.000
0.540
0.810
0.105
2.500
14.000

6.34.2
5.650
0.275
1.560
1.400
0.323
0.283

URAIAN PAKERJAAN

m3 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)


Bahan
m3 Kayu Klas III (Terentang)
Kg Paku Biasa 2" - 5"
Ltr Minyak Bekisting
Kg Besi Beton Polos
Kg Kawat Beton
Kg Portland Semen
m3 Pasir
m3 Kerikil Beton
m3 Kayu Klas II Balok
Lbr Plywood tebal 4mm
Btg Dolken diameter 8 / 4rm
Tenaga
OH Pekerja
OH Tukang batu
OH Tukang Kayu
OH Tukang Besi
OH Kepala Tukang
OH Mandor
m3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)
Bahan
m3 Kayu Klas III (Terentang)
Kg Paku Biasa 2" - 5"
Ltr Minyak Bekisting
Kg Besi Beton Polos
Kg Kawat Beton
Kg Portland Semen
m3 Pasir
m3 Kerikil Beton
m3 Kayu Klas II Balok
Lbr Plywood tebal 4mm
Btg Dolken diameter 8 / 4rm
Tenaga
OH Pekerja
OH Tukang batu
OH Tukang Kayu
OH Tukang Besi
OH Kepala Tukang
OH Mandor
m3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)
Bahan
m3 Kayu Klas III (Terentang)
Kg Paku Biasa 2" - 5"
Ltr Minyak Bekisting
Kg Besi Beton Polos
Kg Kawat Beton
Kg Portland Semen
m3 Pasir
m3 Kerikil Beton
m3 Kayu Klas II Balok
Lbr Plywood tebal 4mm
Btg Dolken diameter 8 / 4rm
Tenaga
OH Pekerja
OH Tukang batu
OH Tukang Kayu
OH Tukang Besi
OH Kepala Tukang
OH Mandor

HARGA BAHAN
/ UPAH
Rp

2,210,200.33
20,750.00
18,300.00
10,100.00
20,000.00
1,340.00
100,000.00
195,000.00
6,126,700.00
18,025.00
42,500.00
50,000.00
50,000.00
50,000.00
60,000.00
60,000.00

2,210,200.33
20,750.00
18,300.00
10,100.00
20,000.00
1,340.00
100,000.00
195,000.00
6,126,700.00
18,025.00
42,500.00
50,000.00
50,000.00
50,000.00
60,000.00
60,000.00

2,210,200.33
20,750.00
18,300.00
10,100.00
20,000.00
1,340.00
100,000.00
195,000.00
6,126,700.00
18,025.00
42,500.00
50,000.00
50,000.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
4,801,188.11
4,412,888.11
707,264.11
66,400.00
29,280.00
1,590,750.00
45,000.00
450,240.00
54,000.00
157,950.00
735,204.00
576,800.00
388,300.00
225,250.00
13,750.00
65,000.00
52,500.00
15,900.00
15,900.00
4,725,060.08
4,336,940.08
530,448.08
66,400.00
29,280.00
1,590,750.00
45,000.00
450,240.00
54,000.00
157,950.00
980,272.00
432,600.00
388,120.00
225,250.00
13,750.00
65,000.00
52,500.00
15,720.00
15,900.00
4,813,838.58
4,375,603.58
552,550.08
62,250.00
21,960.00
2,121,000.00
60,000.00
450,240.00
54,000.00
157,950.00
643,303.50
252,350.00
438,235.00
240,125.00
13,750.00
78,000.00
70,000.00
19,380.00
16,980.00

Hal. 117

KODE
G.6.35
6.35.1

KOEF

SAT.

URAIAN PAKERJAAN

m'

0.002
0.010
3.000
0.450
4.000
0.006
0.009

m3
Kg
Kg
Kg
Kg
m3
m3

0.180
0.020
0.020
0.020
0.006
0.009

OH
OH
OH
OH
OH
OH

Membuat Kolom Penguat Beton Bertulang (11 x 11) cm


Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir
Kerikil Beton
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m'

6.35.2

G.6.36
6.36.1

0.003
0.020
3.600
0.050
5.500
0.009
0.015

Membuat Ring Balok Beton Bertulang (10 x 15) cm


Bahan
m3 Kayu Klas III (Terentang)
Kg Paku Biasa 2" - 5"
Kg Besi Beton Polos
Kg Kawat Beton
Kg Portland Semen
m3 Pasir
m3 Kerikil Beton

0.297
0.033
0.033
0.033
0.010
0.005

OH
OH
OH
OH
OH
OH

6.36.2

SPL.1

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp

42,500.00
50,000.00
50,000.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
63,192.90
51,642.90
4,420.40
207.50
30,300.00
9,000.00
5,360.00
600.00
1,755.00
11,550.00
7,650.00
1,000.00
1,000.00
1,000.00
360.00
540.00

2,210,200.33
20,750.00
10,100.00
20,000.00
1,340.00
100,000.00
195,000.00

74,073.10
55,600.60
6,630.60
415.00
36,360.00
1,000.00
7,370.00
900.00
2,925.00

42,500.00
50,000.00
50,000.00
50,000.00
60,000.00
60,000.00

18,472.50
12,622.50
1,650.00
1,650.00
1,650.00
600.00
300.00

2,210,200.33
20,750.00
10,100.00
20,000.00
1,340.00
100,000.00
195,000.00

1.000
115.000
18.000

SLOOF 15 / 20 Tulangan dia. 10mm


m3 Beton K.225
G.6.7
kg Pembesian
G.6.17
m2 Papan Bekisting Sloof
G.6.21

613,475.00
11,611.50
145,734.02

4,572,009.77
613,475.00
1,335,322.50
2,623,212.27

1.000
155.000
18.000

SLOOF 15 / 20 Tulangan dia. 12mm


m3 Beton K.225
G.6.7
kg Pembesian
G.6.17
m2 Papan Bekisting Sloof
G.6.21

613,475.00
11,611.50
145,734.02

5,036,469.77
613,475.00
1,799,782.50
2,623,212.27

1.000
92.000
17.000

SLOOF 15 / 25 Tulangan dia.10mm


m3 Beton K.275
G.6.9
kg Pembesian
G.6.17
m2 Papan Bekisting Sloof
G.6.21

660,375.00
11,611.50
145,734.02

4,206,111.26
660,375.00
1,068,258.00
2,477,478.26

1.000
124.000
17.000

SLOOF 15 / 25 Tulangan dia.12mm


m3 Beton K.275
G.6.9
kg Pembesian
G.6.17
m2 Papan Bekisting Sloof
G.6.21

660,375.00
11,611.50
145,734.02

4,577,679.26
660,375.00
1,439,826.00
2,477,478.26

1.000
192.000
23.000

RINGBALK 12 / 15 Tulangan dia.10mm


m3 Beton K.225
G.6.7
kg Pembesian
G.6.17
m2 Papan Bekisting Balok
G.6.23a

613,475.00
11,611.50
148,878.01

6,267,077.31
613,475.00
2,229,408.00
3,424,194.31

1.000
258.000
23.000

RINGBALK 12 / 15 Tulangan dia.12mm


m3 Beton K.225
G.6.7
kg Pembesian
G.6.17
m2 Papan Bekisting Balok
G.6.23a

613,475.00
11,611.50
148,878.01

7,033,436.31
613,475.00
2,995,767.00
3,424,194.31

SPL.1a

SPL.2

SPL.2a

SPL.3

SPL.3a

Hal. 118

KODE

1.000
144.000
22.000

RINGBALK 12/20 tulangan dia. 10mm


m3 Beton K.225
G.6.7
kg Pembesian
G.6.17
m2 Papan Bekisting Balok
G.6.23a

613,475.00
11,611.50
148,878.01

JUMLAH
HARGA
Rp
5,560,847.29
613,475.00
1,672,056.00
3,275,316.29

1.000
193.000
22.000

RINGBALK 12/20 tulangan dia. 12mm


m3 Beton K.225
G.6.7
kg Pembesian
G.6.17
m2 Papan Bekisting Balok
G.6.23a

613,475.00
11,611.50
148,878.01

6,129,810.79
613,475.00
2,241,019.50
3,275,316.29

KOEF

SPL.4

SPL.4a

SAT.

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp

Hal. 119

KODE

1.000
239.000
25.000

KOLOM PRAKTIS 12/12 tulangan dia. 10mm


m3 Beton K.225
G.6.7
kg Pembesian
G.6.17
m2 Papan Bekisting Kolom
G.6.22a

613,475.00
11,611.50
148,878.01

JUMLAH
HARGA
Rp
7,110,573.83
613,475.00
2,775,148.50
3,721,950.33

1.000
322.000
25.000

KOLOM PRAKTIS 12/12 tulangan dia. 12mm


m3 Beton K.225
G.6.7
kg Pembesian
G.6.17
m2 Papan Bekisting Kolom
G.6.22a

613,475.00
11,611.50
148,878.01

8,074,328.33
613,475.00
3,738,903.00
3,721,950.33

1.000
93.000
14.000

KOLOM 25 / 20 Tulangan dia. 12mm


m3 Beton K.275
G.6.9
kg Pembesian
G.6.17
m2 Papan Bekisting Kolom
G.6.22a

660,375.00
11,611.50
148,878.01

3,824,536.69
660,375.00
1,079,869.50
2,084,292.19

1.000
75.000
12.000

KOLOM 25 / 25 tulangan dia. 12mm


m3 Beton K.275
G.6.9
kg Pembesian
G.6.17
m2 Papan Bekisting Kolom
G.6.22a

660,375.00
11,611.50
148,878.01

3,317,773.66
660,375.00
870,862.50
1,786,536.16

1.000
100.000
12.500

BALOK 20 / 40
m3 Beton K.275
kg Pembesian
m2 Papan Bekisting Balok

G.6.9
G.6.17
G.6.23a

660,375.00
11,611.50
148,878.01

3,682,500.17
660,375.00
1,161,150.00
1,860,975.17

1.000
155.000
9.000

BALOK 30 / 50
m3 Beton K.275
kg Pembesian
m2 Papan Bekisting Balok

G.6.9
G.6.17
G.6.23a

660,375.00
11,611.50
148,878.01

3,800,059.62
660,375.00
1,799,782.50
1,339,902.12

1.000
110.000
8.000

Plat beton tebal 12 cm


m3 Beton K.225
kg Pembesian
m2 Papan Bekisting Lantai

G.6.7
G.6.17
G.6.24a

613,475.00
11,611.50
291,845.76

4,225,506.05
613,475.00
1,277,265.00
2,334,766.05

KOEF

SAT.

SPL.5

SPL.5a

SPL.6

SPL.7

SPL.8

SPL.9

SPL.10

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp

PEKERJAAN PENUTUP ATAP


H.6.1
6.1.1

1
25.000

6.1.2
0.150
0.075
0.008
0.008
H.6.2
6.2.1

1
25.000

6.2.2
0.150
0.075
0.008
0.008
H.6.2a
6.3.1

m2 Pasang Atap Genteng Plentong Kecil


Bahan
Buah Genteng Plentong
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Pasang Atap Genteng Kodok / Glasur
Bahan
Buah Genteng Kodok / Glasur
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

m2 Pasang Atap Genteng Press (Kebumen)


Bahan
25.000 Buah Genteng Press (Kebumen)

1,650.00
42,500.00
50,000.00
60,000.00
60,000.00

42,500.00
50,000.00
60,000.00
60,000.00

73,585.00
62,500.00
62,500.00
11,085.00
6,375.00
3,750.00
480.00
480.00

2,000.00

61,085.00
50,000.00
50,000.00

42,500.00
50,000.00
60,000.00
60,000.00

11,085.00
6,375.00
3,750.00
480.00
480.00

2,500.00

6.3.2
0.150
0.075
0.008
0.008

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

52,335.00
41,250.00
41,250.00
11,085.00
6,375.00
3,750.00
480.00
480.00

Hal. 120

KODE
H.6.2b
6.3.1

KOEF

SAT.

URAIAN PAKERJAAN

m2 Pasang Atap Genteng Press (Jatiwangi)


Bahan
25.000 Buah Genteng Press (Jatiwangi)

HARGA BAHAN
/ UPAH
Rp

1,760.00

JUMLAH
HARGA
Rp
55,085.00
44,000.00
44,000.00

42,500.00
50,000.00
60,000.00
60,000.00

11,085.00
6,375.00
3,750.00
480.00
480.00

6.3.2
0.150
0.075
0.008
0.008

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Hal. 121

KODE
H.6.3
6.3.1

KOEF

SAT.
1

12.000
6.3.2
0.150
0.060
0.006
0.008
H.6.4
6.4.1

m2 Pasang Atap Genteng Plentong Super / Besar


Bahan
Buah Genteng Plentong Super / Besar
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m'

5.000 Buah
8.000 Kg
0.032 m3
6.4.2

H.6.5
6.5.1

0.400
0.200
0.020
0.002

OH
OH
OH
OH

m'

5.000 Buah
8.000 Kg
0.032 m3
6.5.2

H.6.6
6.6.1

0.400
0.200
0.020
0.002

OH
OH
OH
OH

m'

4.000 Buah
8.000 Kg
0.032 m3
6.6.2

H.6.6a
6.6.1

0.400
0.200
0.020
0.002

OH
OH
OH
OH

m'

4.000 Buah
8.000 Kg
0.032 m3
6.6.2

H.6.6b
6.6.1

0.400
0.200
0.020
0.002

OH
OH
OH
OH

m'

4.000 Buah
8.000 Kg
0.032 m3
6.6.2
0.400
0.200
0.020
0.002

URAIAN PAKERJAAN

OH
OH
OH
OH

Pasang Genteng Bubung Plentong


Bahan
Genteng Bubung Plentong
Portland Semen
Pasir
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Pasang Genteng Bubung Kodok / Glasur
Bahan
Genteng Bubung Kodok / Glasur
Portland Semen
Pasir
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Pasang Genteng Bubung Plentong Besar
Bahan
Genteng Bubung Plentong Besar
Portland Semen
Pasir
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Pasang Genteng Bubung Pres (Kebumen)
Bahan
Genteng Bubung Press (Kebumen)
Portland Semen
Pasir
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Pasang Genteng Bubung Pres (Jatiwangi)
Bahan
Genteng Bubung Press (Jatiwangi)
Portland Semen
Pasir
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp

2,050.00
42,500.00
50,000.00
60,000.00
60,000.00

4,120.00
1,340.00
100,000.00
42,500.00
50,000.00
60,000.00
60,000.00

4,400.00
1,340.00
100,000.00
42,500.00
50,000.00
60,000.00
60,000.00

4,120.00
1,340.00
100,000.00
42,500.00
50,000.00
60,000.00
60,000.00

3,600.00
1,340.00
100,000.00
42,500.00
50,000.00
60,000.00
60,000.00

3,200.00
1,340.00
100,000.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
34,815.00
24,600.00
24,600.00
10,215.00
6,375.00
3,000.00
360.00
480.00
62,840.00
34,520.00
20,600.00
10,720.00
3,200.00
28,320.00
17,000.00
10,000.00
1,200.00
120.00
64,240.00
35,920.00
22,000.00
10,720.00
3,200.00
28,320.00
17,000.00
10,000.00
1,200.00
120.00
58,720.00
30,400.00
16,480.00
10,720.00
3,200.00
28,320.00
17,000.00
10,000.00
1,200.00
120.00
56,640.00
28,320.00
14,400.00
10,720.00
3,200.00
28,320.00
17,000.00
10,000.00
1,200.00
120.00
55,040.00
26,720.00
12,800.00
10,720.00
3,200.00
28,320.00
17,000.00
10,000.00
1,200.00
120.00
Hal. 122

KODE
H.6.9
6.9.1

KOEF

SAT.
1

0.600
0.120
6.9.2
0.140
0.075
0.008
0.008

URAIAN PAKERJAAN

m2 Pasang Atap Asbes Gelombang (2,25x0,92 m) x 5 mm


Bahan
Lbr Asbes Gelombang
Kg Paku Pancing 60 x 230
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

HARGA BAHAN
/ UPAH
Rp

45,300.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
16,096.00
5,436.00
5,436.00
10,660.00
5,950.00
3,750.00
480.00
480.00

Hal. 123

KODE
H.6.10
6.10.1

KOEF

SAT.
1

0.600
0.120
6.10.2
0.140
0.070
0.007
0.007
H.6.12
6.12.1

1
0.350
0.120

6.12.2
0.140
0.070
0.007
0.007
H.6.15
6.15.1

1
0.510
0.120

6.15.2
0.140
0.067
0.007
0.007
H.6.38
6.38.1

1
0.700
0.020

6.38.2
0.120
0.060
0.006
0.006
H.6.39
6.39.1

m2 Pasang Atap Asbes Gelombang (2,00x0,92 m) x 5 mm


Bahan
Lbr Asbes Gelombang
Kg Paku Pancing 60 x 230
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Pasang Atap Asbes Gelombang (3,00x1,05 m) x 4 mm
Bahan
Lbr Asbes Gelombang
Kg Paku Pancing 60 x 230
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Pasang Atap Asbes Gelombang (2,10x1,05 m) x 4 mm
Bahan
Lbr Asbes Gelombang
Kg Paku Pancing 60 x 230
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Pasang Atap Seng Gelombang
Bahan
Lbr Seng Gelombang 3" x 6" BJLS 28
Kg Paku Biasa 1/2" - 1"
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

m'

0.300
0.040

Lbr
Kg

0.150
0.070
0.008
0.006

OH
OH
OH
OH

6.39.2

H.6.42
6.42.1

1
1.050
0.120

6.42.2
0.150
0.050
0.005
0.008
H.6.43
6.15.1

1
1.200
0.120

URAIAN PAKERJAAN

Pasang Atap Nok Seng


Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa 1/2" - 1"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

m2 Pasang Allumunium Foil / Sisalation


Bahan
m2 Sisalation / Allumunium Foil
Kg Paku Pancing 60 x 230
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Pasang Atap Asbes Motif Genteng
Bahan
lbr Genteng Asbes
Kg Paku Pancing 60 x 230

HARGA BAHAN
/ UPAH
Rp

45,300.00
42,500.00
50,000.00
60,000.00
60,000.00

45,300.00
42,500.00
50,000.00
60,000.00
60,000.00

45,300.00
42,500.00
50,000.00
60,000.00
60,000.00

39,500.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

39,500.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

#REF!
45,300.00
42,500.00
50,000.00
60,000.00
60,000.00

30,000.00
45,300.00

JUMLAH
HARGA
Rp
15,726.00
5,436.00
5,436.00
10,290.00
5,950.00
3,500.00
420.00
420.00
15,726.00
5,436.00
5,436.00
10,290.00
5,950.00
3,500.00
420.00
420.00
15,576.00
5,436.00
5,436.00
10,140.00
5,950.00
3,350.00
420.00
420.00
36,885.00
28,065.00
27,650.00
415.00
8,820.00
5,100.00
3,000.00
360.00
360.00
23,395.00
12,680.00
11,850.00
830.00
10,715.00
6,375.00
3,500.00
480.00
360.00
#REF!
#REF!
#REF!
5,436.00
9,655.00
6,375.00
2,500.00
300.00
480.00
58,711.00
41,436.00
36,000.00
5,436.00
Hal. 124

KODE

KOEF

SAT.

6.15.2
0.150
0.200
0.010
0.005

OH
OH
OH
OH

URAIAN PAKERJAAN
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
17,275.00
6,375.00
10,000.00
600.00
300.00

Hal. 125

KODE

KOEF

SAT.

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp

JUMLAH
HARGA
Rp

PEKERJAAN LANGIT - LANGIT


I.6.1
6.1.1

1
1.100
0.010

6.1.2
0.030
0.070
0.007
0.002
I.6.1a
6.1.1

1
1.100
0.010

6.1.2
0.030
0.070
0.007
0.002
I.6.1b
6.1.1

1
1.100
0.010

6.1.2
0.030
0.070
0.007
0.002
I.6.2
6.2.1

1
12.000
0.050

6.2.2
0.060
0.120
0.012
0.003
I.6.3
6.3.1

1
5.800
0.050

6.3.2
0.060
0.100
0.010
0.003
I.6.5a
6.5.1

1
0.375
0.030

6.5.2
0.070
0.100
0.010
0.004
I.6.5b
6.5.1

m2 Memasang Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm


Bahan
Lbr Plat Asbes
Kg Paku eternit
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Langit-langit Harflex (1,00x1,00) m, tebal 4 mm
Bahan
Lbr Harflex tbl. 4 mm
Kg Paku eternit
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Langit-langit Saflex (1,00x1,00) m, tebal 5 mm
Bahan
Lbr Saflex tbl. 5 mm
Kg Paku eternit
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Langit-langit Akustik Ukuran (30x30) cm
Bahan
Lbr Akustik Uk.30 x 30 cm
Kg Paku
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Langit-langit Akustik Ukuran (30x60) cm
Bahan
Lbr Akustik
Kg Paku
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm
Bahan
Lbr Tripleks (3 mm)
Kg Paku Tripleks
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Langit-langit Tripleks Uk (120x240) cm, 4 mm
Bahan

22,000.00
24,500.00
42,500.00
50,000.00
60,000.00
60,000.00

15,900.00
24,500.00
42,500.00
50,000.00
60,000.00
60,000.00

14,000.00
24,500.00
42,500.00
50,000.00
60,000.00
60,000.00

#REF!
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

#REF!
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

48,100.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

29,760.00
24,445.00
24,200.00
245.00
5,315.00
1,275.00
3,500.00
420.00
120.00
23,050.00
17,735.00
17,490.00
245.00
5,315.00
1,275.00
3,500.00
420.00
120.00
20,960.00
15,645.00
15,400.00
245.00
5,315.00
1,275.00
3,500.00
420.00
120.00
#REF!
#REF!
#REF!
1,037.50
9,450.00
2,550.00
6,000.00
720.00
180.00
#REF!
#REF!
#REF!
1,037.50
8,330.00
2,550.00
5,000.00
600.00
180.00
27,475.00
18,660.00
18,037.50
622.50
8,815.00
2,975.00
5,000.00
600.00
240.00
34,712.50
25,897.50
Hal. 126

KODE

KOEF
0.375
0.030

6.5.2
0.070
0.100
0.010
0.004

SAT.
Lbr Tripleks (4 mm)
Kg Paku Tripleks
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp
67,400.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
25,275.00
622.50
8,815.00
2,975.00
5,000.00
600.00
240.00

Hal. 127

KODE
I.6.5c
6.5.1

KOEF

SAT.
1

0.375
0.030
6.5.2
0.070
0.100
0.010
0.004
I.6.6
6.6.1

1
0.015
0.010

6.6.2
0.600
0.800
0.080
0.030
I.6.7
6.7.1

1
0.364
0.110

6.7.2
0.100
0.050
0.005
0.005
I.6.9
6.9.1

1
1.050
0.010

6.9.2
0.050
0.050
0.005
0.003

J.6.1
6.1.1

6.1.2

J.6.2
6.2.1

6.2.2

J.6.4
6.4.1

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp

m2 Memasang Langit-langit Tripleks Uk (120x240) cm, 6 mm


Bahan
Lbr Tripleks (6 mm)
Kg Paku Tripleks
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm
Bahan
m3 Kayu Jati,Papan
Kg Paku
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm
Bahan
Lbr Gypsum Board
Kg Paku Sekrup
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m1 List Langit-Langit Kayu Profil
Bahan
m1 List Kayu Profil
Kg Paku
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

PEKERJAAN SANITASI
1 Unit Memasang Closet Duduk / Mono Blok
Bahan
1.000 Buah Kloset Duduk / Monoblok
0.060
Kelengkapan 6% dari harga Kloset
Tenaga
3.300 OH Pekerja
1.100 OH Tukang Batu
0.001 OH Kepala Tukang
0.160 OH Mandor
1 Unit Memasang Closet Jongkok Porselen
Bahan
1.000 Buah Kloset Jongkok
6.000 Kg Portland Semen
0.010 m3 Pasir
Tenaga
1.000 OH Pekerja
1.500 OH Tukang Batu
1.500 OH Kepala Tukang
0.160 OH Mandor
1 Unit Memasang Urinoir
Bahan

84,600.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

6,700,000.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

66,200.00
1,500.00
42,500.00
50,000.00
60,000.00
60,000.00

4,000.00
20,750.00
42,500.00
50,000.00
60,000.00
60,000.00

1,102,700.00
1,102,700.00
42,500.00
50,000.00
60,000.00
60,000.00

147,000.00
1,340.00
100,000.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
41,162.50
32,347.50
31,725.00
622.50
8,815.00
2,975.00
5,000.00
600.00
240.00
172,807.50
100,707.50
100,500.00
207.50
72,100.00
25,500.00
40,000.00
4,800.00
1,800.00
31,611.80
24,261.80
24,096.80
165.00
7,350.00
4,250.00
2,500.00
300.00
300.00
9,512.50
4,407.50
4,200.00
207.50
5,105.00
2,125.00
2,500.00
300.00
180.00

1,373,772.00
1,168,862.00
1,102,700.00
66,162.00
204,910.00
140,250.00
55,000.00
60.00
9,600.00
373,140.00
156,040.00
147,000.00
8,040.00
1,000.00
217,100.00
42,500.00
75,000.00
90,000.00
9,600.00
586,480.00
481,980.00
Hal. 128

KODE

6.4.1

KOEF

SAT.

URAIAN PAKERJAAN

1.000 Buah Urinoir


0.300
- Perlengkapan 30% Harga Urinoir
6.000 Kg Portland Semen
0.010 m3 Pasir
Tenaga
1.000 OH Pekerja
1.000 OH Tukang Batu
0.100 OH Kepala Tukang
0.100 OH Mandor

HARGA BAHAN
/ UPAH
Rp
363,800.00
363,800.00
1,340.00
100,000.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
363,800.00
109,140.00
8,040.00
1,000.00
104,500.00
42,500.00
50,000.00
6,000.00
6,000.00

Hal. 129

KODE
J.6.5
6.5.1

6.5.2

J.6.8
6.8.1

6.8.2

J.6.14
6.14.1

KOEF

SAT.

1 Unit Memasang Wastafel


Bahan
1.000 Buah Wastafel Meja Oval
0.300
- Perlengkapan 30% Harga Wastafel
6.000 Kg Portland Semen
0.010 m3 Pasir
Tenaga
1.200 OH Pekerja
0.145 OH Tukang Batu
0.150 OH Kepala Tukang
0.100 OH Mandor
1 Unit Memasang Bak Mandi Batu Bata Vol. 0,30 m3
Bahan
0.400 m3 Batu Bata
120.000 Kg Portland Semen
0.300 m3 Pasir
360.000 buah Porselen 11 x 11 cm
6.000 Kg Semen Nat
Tenaga
6.000 OH Pekerja
3.000 OH Tukang Batu
0.300 OH Kepala Tukang
0.300 OH Mandor
1

m'

1.100 Buah
0.027 m3
0.680 Kg
0.056 m3
0.024 m3
6.14.2

J.6.15a
6.15.1

0.140
0.070
0.007
0.007

OH
OH
OH
OH

m'

1.100 Buah
0.550 m3
10.300 Kg
0.061 m3
0.069 m3
6.15.2

J.6.15b
6.15.1

URAIAN PAKERJAAN

0.380
0.190
0.019
0.019

OH
OH
OH
OH

m'

1.100 Buah
0.550 m3
10.300 Kg
0.061 m3
0.069 m3
6.15.2
0.380
0.190
0.019
0.019

OH
OH
OH
OH

Memasang Pipa Beton, 15 cm - 20 cm


Bahan
Pipa Beton
Batu Bata
Portland Semen
Pasir
Pasir Urug
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Memasang Pipa Beton, 30 cm
Bahan
Pipa Beton 30 cm
Batu Bata
Portland Semen
Pasir
Pasir Urug
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Memasang Pipa Beton, 40 cm
Bahan
Pipa Beton 40 cm
Batu Bata
Portland Semen
Pasir
Pasir Urug
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp

343,700.00
343,700.00
1,340.00
100,000.00
42,500.00
50,000.00
60,000.00
60,000.00

562,500.00
1,340.00
100,000.00
1,875.00
42,500.00
50,000.00
60,000.00
60,000.00

56,650.00
562,500.00
1,340.00
100,000.00
75,000.00
42,500.00
50,000.00
60,000.00
60,000.00

77,250.00
562,500.00
1,340.00
100,000.00
75,000.00
42,500.00
50,000.00
60,000.00
60,000.00

103,000.00
562,500.00
1,340.00
100,000.00
75,000.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
529,100.00
455,850.00
343,700.00
103,110.00
8,040.00
1,000.00
73,250.00
51,000.00
7,250.00
9,000.00
6,000.00
868,050.00
427,050.00
225,000.00
160,800.00
30,000.00
11,250.00
441,000.00
255,000.00
150,000.00
18,000.00
18,000.00
96,103.70
85,813.70
62,315.00
15,187.50
911.20
5,600.00
1,800.00
10,290.00
5,950.00
3,500.00
420.00
420.00
447,357.00
419,427.00
84,975.00
309,375.00
13,802.00
6,100.00
5,175.00
27,930.00
16,150.00
9,500.00
1,140.00
1,140.00
475,682.00
447,752.00
113,300.00
309,375.00
13,802.00
6,100.00
5,175.00
27,930.00
16,150.00
9,500.00
1,140.00
1,140.00
Hal. 130

KODE
J.6.15c
6.15.1

KOEF

SAT.
1

m'

1.100 Buah
0.550 m3
10.300 Kg
0.061 m3
0.069 m3
6.15.2
0.380
0.190
0.019
0.019

OH
OH
OH
OH

URAIAN PAKERJAAN
Memasang Pipa Beton, 50 cm
Bahan
Pipa Beton 50 cm
Batu Bata
Portland Semen
Pasir
Pasir Urug
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp

123,600.00
562,500.00
1,340.00
100,000.00
75,000.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
498,342.00
470,412.00
135,960.00
309,375.00
13,802.00
6,100.00
5,175.00
27,930.00
16,150.00
9,500.00
1,140.00
1,140.00

Hal. 131

KODE

J.6.15d
6.15.1

KOEF

SAT.

m'

1.100 Buah
0.550 m3
10.300 Kg
0.061 m3
0.069 m3
6.15.2

J.6.15e
6.15.1

0.380
0.190
0.019
0.019

OH
OH
OH
OH

m'

1.100 Buah
0.550 m3
10.300 Kg
0.061 m3
0.069 m3
6.15.2
0.380
0.190
0.019
0.019
J.6.20
6.20.1

OH
OH
OH
OH

1 m'
1.200
0.350

m'

0.054
0.090
0.009
0.027

OH
OH
OH
OH

6.20.2

J.6.23
6.23.1

1 m'
1.200
0.350

m'

0.108
0.180
0.018
0.005

OH
OH
OH
OH

6.23.2

J.6.24
6.24.1

1 m'
1.200
0.350

m'

0.135
0.225
0.023
0.007

OH
OH
OH
OH

6.24.2

J.6.25
6.25.1

URAIAN PAKERJAAN

Memasang Pipa Beton, 60 cm


Bahan
Pipa Beton 60 cm
Batu Bata
Portland Semen
Pasir
Pasir Urug
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Memasang Pipa Beton, 80 cm
Bahan
Pipa Beton 80 cm
Batu Bata
Portland Semen
Pasir
Pasir Urug
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Memasang Pipa Galvanis "
Bahan
Pipa Galvanis
Perlengkapan 35% Harga Pipa
Tenaga
Pekerja
Tukang Ledeng
Kepala Tukang
Mandor
Memasang Pipa Galvanis 3"
Bahan
Pipa Galvanis
Perlengkapan 35% Harga Pipa
Tenaga
Pekerja
Tukang Ledeng
Kepala Tukang
Mandor
Memasang Pipa Galvanis 4"
Bahan
Pipa Galvanis
Perlengkapan 35% Harga Pipa
Tenaga
Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

154,500.00
562,500.00
1,340.00
100,000.00
75,000.00
42,500.00
50,000.00
60,000.00
60,000.00

154,500.00
562,500.00
1,340.00
100,000.00
75,000.00
42,500.00
50,000.00
60,000.00
60,000.00

55,100.00
55,100.00
42,500.00
50,000.00
60,000.00
60,000.00

203,200.00
203,200.00
42,500.00
50,000.00
60,000.00
60,000.00

283,450.00
283,450.00
42,500.00
50,000.00
60,000.00
60,000.00

1 m'
1.200
0.350

6.25.2
0.036
0.060

Memasang Pipa PVC type AW "


Bahan
m' Pipa PVC
Perlengkapan 35% Harga Pipa
Tenaga
OH Pekerja
OH Tukang Ledeng

HARGA BAHAN
/ UPAH
Rp

4,700.00
4,700.00
42,500.00
50,000.00

JUMLAH
HARGA
Rp
532,332.00
504,402.00
169,950.00
309,375.00
13,802.00
6,100.00
5,175.00
27,930.00
16,150.00
9,500.00
1,140.00
1,140.00
532,332.00
504,402.00
169,950.00
309,375.00
13,802.00
6,100.00
5,175.00
27,930.00
16,150.00
9,500.00
1,140.00
1,140.00
94,360.00
85,405.00
66,120.00
19,285.00
8,955.00
2,295.00
4,500.00
540.00
1,620.00
329,954.00
314,960.00
243,840.00
71,120.00
14,994.00
4,590.00
9,000.00
1,080.00
324.00
458,093.00
439,347.50
340,140.00
99,207.50
18,745.50
5,737.50
11,250.00
1,350.00
408.00
12,283.00
7,285.00
5,640.00
1,645.00
4,998.00
1,530.00
3,000.00
Hal. 132

KODE

KOEF

SAT.

0.006
0.002
J.6.29
6.29.1

URAIAN PAKERJAAN

OH Kepala Tukang
OH Mandor

1 m'
1.200
0.350

m'

0.054
0.090
0.009
0.003

OH
OH
OH
OH

6.29.2

Memasang Pipa PVC type AW 2"


Bahan
Pipa PVC
Perlengkapan 35% Harga Pipa
Tenaga
Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
60,000.00
60,000.00

15,300.00
15,300.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
360.00
108.00
31,212.00
23,715.00
18,360.00
5,355.00
7,497.00
2,295.00
4,500.00
540.00
162.00

Hal. 133

KODE

J.6.31
6.31.1

KOEF

SAT.

1 m'
1.200
0.350

m'

0.081
0.135
0.014
0.004

OH
OH
OH
OH

6.31.2

J.6.33
6.33.1

6.33.2

J.6.35a
6.35.1

6.35.2

J.6.35b
6.35.1

6.35.2

J.6.36
6.36.1
6.36.2

K.6.1
6.1.1

Memasang Pipa PVC type AW 3"


Bahan
Pipa PVC
Perlengkapan 35% Harga Pipa
Tenaga
Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

1 Buah Memasang Bak Cuci Piring Stainles Steel


Bahan
1.000 Buah Bak Cuci Stainles Steel
1.000 Set Water Drain & assesories
Tenaga
0.030 OH Pekerja
0.300 OH Tukang Ledeng
0.030 OH Kepala Tukang
0.002 OH Mandor
1 Buah Memasang Kran 1/2"
Bahan
1.000 Buah Kran Air
0.025 Set Seal Tape
Tenaga
0.010 OH Pekerja
0.100 OH Tukang Ledeng
0.010 OH Kepala Tukang
0.005 OH Mandor
1 Buah Memasang Kran 3/4"
Bahan
1.000 Buah Kran Air
0.025 Set Seal Tape
Tenaga
0.010 OH Pekerja
0.100 OH Tukang Ledeng
0.010 OH Kepala Tukang
0.005 OH Mandor
1 Buah Memasang Floor Drain
Bahan
1.000 Buah Floor Drain
Tenaga
0.010 OH Pekerja
0.100 OH Tukang Batu
0.010 OH Kepala Tukang
0.005 OH Mandor

1
1.150
0.060

6.1.2
0.060
0.060
0.006
0.003
K.6.2
6.2.1

URAIAN PAKERJAAN

PEKERJAAN BESI & ALLUMUNIUM


Kg Memasang Besi Profil
Bahan
Kg Besi Profil
Kg Meni Besi
Tenaga
OH Pekerja
OH Tukang Besi
OH Kepala Tukang
OH Mandor

kg

1.150

kg

Memasang Rangka Kuda-kuda Baja IWF


Bahan
Besi Baja IWF

HARGA BAHAN
/ UPAH
Rp

30,600.00
30,600.00
42,500.00
50,000.00
60,000.00
60,000.00

211,250.00
87,550.00
42,500.00
50,000.00
60,000.00
60,000.00

19,050.00
2,700.00
42,500.00
50,000.00
60,000.00
60,000.00

25,400.00
2,700.00
42,500.00
50,000.00
60,000.00
60,000.00

18,400.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
58,678.50
47,430.00
36,720.00
10,710.00
11,248.50
3,442.50
6,750.00
810.00
246.00
316,965.00
298,800.00
211,250.00
87,550.00
18,165.00
1,275.00
15,000.00
1,800.00
90.00
25,442.50
19,117.50
19,050.00
67.50
6,325.00
425.00
5,000.00
600.00
300.00
31,792.50
25,467.50
25,400.00
67.50
6,325.00
425.00
5,000.00
600.00
300.00
24,725.00
18,400.00
18,400.00
6,325.00
425.00
5,000.00
600.00
300.00

42,500.00
50,000.00
50,000.00
60,000.00

19,690.00
13,660.00
12,190.00
1,470.00
6,030.00
2,550.00
3,000.00
300.00
180.00

12,100.00

19,945.00
13,915.00
13,915.00

10,600.00
24,500.00

Hal. 134

KODE

KOEF

SAT.

6.2.2
0.060
0.060
0.006
0.003

OH
OH
OH
OH

URAIAN PAKERJAAN
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
42,500.00
50,000.00
50,000.00
60,000.00

JUMLAH
HARGA
Rp
6,030.00
2,550.00
3,000.00
300.00
180.00

Hal. 135

KODE
K.6.3
6.3.1

KOEF

SAT.

100

kg

1.000
0.100

ltr
ltr

6.3.2
1.050 OH
1.050 OH
0.105 OH
0.005 OH
0.008 Jam
K.6.4
6.4.1

1
15.000
32.800
0.050

6.4.2
1.050
1.050
0.105
0.052
K.6.5
6.5.1

1
0.040
0.030
0.004

6.5.2
0.004
0.002
0.000
0.000
0.017
K.6.7

6.7.1
6.7.2

1.000
1.200
1.200
0.120
0.006

K.6.8
6.8.1

1
1.000

6.8.2
0.440
0.440
0.044
0.022
K.6.10
6.10.1

m2 Membuat Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku
Bahan
Kg Besi Siku L.30.30.3
Kg Besi Plat Baja
Kg Kawat Las
Tenaga
OH Pekerja
OH Tukang Besi
OH Kepala Tukang
OH Mandor
cm Mengerjakan Pengelasan dengan Las Listrik
Bahan
kg Kawat Las
ltr Solar
ltr Minyak Pelumas
Tenaga
OH Pekerja
OH Tukang Besi
OH Kepala Tukang
OH Mandor
Jam Sewa Alat
m2 Memasang Pintu Rolling Door Besi
Bahan
m2 Pintu Gulung Besi
Tenaga
OH Pekerja
OH Tukang Besi
OH Kepala Tukang
OH Mandor
m2 Memasang Pintu Lipat (Folding Door)
Bahan
m2 Pintu Lipat
Tenaga
OH Pekerja
OH Tukang Besi
OH Kepala Tukang
OH Mandor

1.000
1.000
0.100
0.050
1.000

m'

1.100

m'

1.000

HARGA BAHAN
/ UPAH
Rp

Mengerjakan Pekerjaan Perakitan (Kuda-kuda Baja)


Bahan
Solar
Minyak Pelumas
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Sewa Alat

m2 Memasang Rolling Door Allumunium


Bahan
m2 Rolling Allumunium
Tenaga
OH Pekerja
OH Tukang Besi
OH Kepala Tukang
OH Mandor

6.10.2

K.6.11
6.11.1

URAIAN PAKERJAAN

Memasang Kusen Pintu Allumunium


Bahan
Profil Allumunium

4,950.00
29,700.00
42,500.00
50,000.00
50,000.00
60,000.00
85,000.00

10,600.00
11,000.00
20,600.00
42,500.00
50,000.00
50,000.00
60,000.00

20,600.00
4,950.00
29,700.00
42,500.00
50,000.00
50,000.00
60,000.00
85,000.00

410,146.00
42,500.00
50,000.00
50,000.00
60,000.00

637,100.00
42,500.00
50,000.00
50,000.00
60,000.00

JUMLAH
HARGA
Rp
111,287.00
7,920.00
4,950.00
2,970.00
103,367.00
44,625.00
52,500.00
5,250.00
312.00
680
626,325.00
520,830.00
159,000.00
360,800.00
1,030.00
105,495.00
44,625.00
52,500.00
5,250.00
3,120.00
2,828.30
1,091.30
824.00
148.50
118.80
1,737.00
170.00
100.00
10.00
12.00
1,445.00
527,506.00
410,146.00
410,146.00
117,360.00
51,000.00
60,000.00
6,000.00
360.00
681,320.00
637,100.00
637,100.00
44,220.00
18,700.00
22,000.00
2,200.00
1,320.00

42,500.00
50,000.00
50,000.00
60,000.00

542,164.00
441,664.00
441,664.00
100,500.00
42,500.00
50,000.00
5,000.00
3,000.00

58,504.00

109,300.40
69,184.40
64,354.40

441,664.00

Hal. 136

KODE

6.11.2

KOEF

SAT.

2.000 buah Skrup Fixer


0.060 Tube Sealant
Tenaga
0.430 OH Pekerja
0.430 OH Tukang Besi
0.004 OH Kepala Tukang
0.002 OH Mandor

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp
1,500.00
30,500.00
42,500.00
50,000.00
50,000.00
60,000.00

JUMLAH
HARGA
Rp
3,000.00
1,830.00
40,116.00
18,275.00
21,500.00
215.00
126.00

Hal. 137

KODE
K.6.15
6.15.1

KOEF

SAT.
1

6.177
27.080
6.15.2
1.670
1.670
0.167
0.083
K.6.16
6.16.1

1
1.100
11.110
1.716

6.16.2
0.100
0.100
0.010
0.005
K.6.17
6.17.1

1
1.100
10.000
7.000

6.17.2
0.200
0.200
0.020
0.001
K.6.18
6.18.1

HARGA BAHAN
/ UPAH
Rp

m2 Memasang Terali Besi Strip (2x3) cm


Bahan
m' Besi Strip 2x3
cm Pengelasan
Tenaga
OH Pekerja
OH Tukang Las
OH Kepala Tukang
OH Mandor

#REF!
2,828.30
42,500.00
50,000.00
50,000.00
60,000.00

m2 Memasang Kawat Nyamuk


Bahan
m2 Kawat Nyamuk nylon
cm Pengelasan
kg Baja Strip (0,2x2) cm
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

13,390.00
2,828.30
11,000.00
42,500.00
50,000.00
60,000.00
60,000.00

m2 Memasang Jendela Nako & Tralis


Bahan
m2 Jendela Nako
buah Paku Skrup 1 - 2,5 cm
m' Besi Strip
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

m'

1.050
0.015
0.019

Lbr
Kg
m3

0.200
0.400
0.025
0.010

OH
OH
OH
OH

m'

1.050
0.010
0.500

Lbr
Kg
Kg

0.150
0.300
0.030
0.007

OH
OH
OH
OH

6.18.2

K.6.19
6.19.1

URAIAN PAKERJAAN

6.19.2

Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm


Bahan
Seng Plaat
Paku Biasa 1 - 2,5 cm
Kayu Papan Klas II atau III
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

75,000.00
1,500.00
#REF!
42,500.00
50,000.00
60,000.00
60,000.00

39,500.00
20,750.00
7,500,000.00

Memasang Talang 1/2 Lingkaran 15 cm, Seng Plaat BJLS 30 Lebar 45 cm


Bahan
Seng Plaat
Paku Biasa 1 - 2,5 cm
Besi strip
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
#REF!
#REF!
#REF!
76,590.36
167,805.00
70,975.00
83,500.00
8,350.00
4,980.00
75,177.41
65,027.41
14,729.00
31,422.41
18,876.00
10,150.00
4,250.00
5,000.00
600.00
300.00
#REF!
#REF!
82,500.00
15,000.00
#REF!
19,760.00
8,500.00
10,000.00
1,200.00
60.00
214,886.25
184,286.25
41,475.00
311.25
142,500.00
30,600.00
8,500.00
20,000.00
1,500.00
600.00

42,500.00
50,000.00
60,000.00
60,000.00

70,777.50
47,182.50
41,475.00
207.50
5,500.00
23,595.00
6,375.00
15,000.00
1,800.00
420.00

85,700.00

112,025.00
85,700.00
85,700.00

42,500.00
50,000.00
60,000.00

26,325.00
425.00
25,000.00
600.00

39,500.00
20,750.00
11,000.00

PEKERJAAN KUNCI dan KACA


L.6.2
6.2..1

1 Buah Memasang Kunci Tanam Biasa


Bahan
1.000 Buah Kunci Tanam Biasa

6.2.2
0.010
0.500
0.010

Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang

Hal. 138

KODE

KOEF
0.005

L.6.3
6.3.1

SAT.

URAIAN PAKERJAAN

OH Mandor

1 Buah Memasang Kunci Kamar Mandi


Bahan
1.000 Buah Kunci Tanam Kamar Mandi

6.3..2
0.005
0.500
0.005
0.003

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
60,000.00

JUMLAH
HARGA
Rp
300.00

46,450.00

72,112.50
46,450.00
46,450.00

42,500.00
50,000.00
60,000.00
60,000.00

25,662.50
212.50
25,000.00
300.00
150.00

Hal. 139

KODE
L.6.4
6.4.1

1 Buah Memasang Kunci Selinder


Bahan
1.000 Buah Kunci Selinder

11,400.00

JUMLAH
HARGA
Rp
37,062.50
11,400.00
11,400.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

42,500.00
50,000.00
60,000.00
60,000.00

25,662.50
212.50
25,000.00
300.00
150.00

14,900.00

24,387.50
14,900.00
14,900.00

42,500.00
50,000.00
60,000.00
60,000.00

9,487.50
637.50
7,500.00
900.00
450.00

11,100.00

17,425.00
11,100.00
11,100.00

42,500.00
50,000.00
60,000.00
60,000.00

6,325.00
425.00
5,000.00
600.00
300.00

14,300.00

26,950.00
14,300.00
14,300.00

42,500.00
50,000.00
60,000.00
60,000.00

12,650.00
850.00
10,000.00
1,200.00
600.00

9,100.00

18,182.50
9,100.00
9,100.00

42,500.00
50,000.00
60,000.00
60,000.00

9,082.50
637.50
7,500.00
900.00
45.00

183,750.00

214,025.00
183,750.00
183,750.00

42,500.00
50,000.00
60,000.00
60,000.00

30,275.00
2,125.00
25,000.00
3,000.00
150.00

KOEF

SAT.

6.4.2
0.005
0.500
0.005
0.003
L.6.5
6.5.1

OH
OH
OH
OH

1 Buah Memasang Engsel Pintu


Bahan
1.000 Buah Engsel pintu

6.5.2
0.015
0.150
0.015
0.008
L.6.6
6..6.1

OH
OH
OH
OH

0.010
0.100
0.010
0.005

OH
OH
OH
OH

0.020
0.200
0.020
0.010

OH
OH
OH
OH

0.015
0.150
0.015
0.001

OH
OH
OH
OH

0.050
0.500
0.050
0.003

6.11.2

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Door Closer


Bahan
1.000 Buah Door Closer

6.10.2

L.6.11
6.11.1

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Kait Angin


Bahan
1.000 Buah Kait Angin

6.9.2

L.6.10
6.10.1

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Engsel Angin


Bahan
1.000 Buah Engsel Angin

6.7.2

L.6.9
6.9.1

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Engsel Jendela Kupu-kupu


Bahan
1.000 Buah Engsel Jendela

6.6.2

L.6.7
6.7.1

URAIAN PAKERJAAN

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Kunci Selot


Bahan
1.000 Buah Kunci Selot
Tenaga

HARGA BAHAN
/ UPAH
Rp

90,000.00

102,110.00
90,000.00
90,000.00
12,110.00
Hal. 140

KODE

KOEF
0.020
0.200
0.020
0.001

SAT.
OH
OH
OH
OH

URAIAN PAKERJAAN
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
850.00
10,000.00
1,200.00
60.00

Hal. 141

KODE
L.6.13
6.12.1
6.12.2

L.6.14
6.14.1
6.14.2

L.6.15
6.15.1
6.15.2

L.6.16
6.16.1

KOEF

SAT.

1 Buah Pasang Door Stop


Bahan
1.000 Buah Door Stop
Tenaga
0.010 OH Pekerja
0.100 OH Tukang Kayu
0.010 OH Kepala Tukang
0.001 OH Mandor
1 Buah Pasang Rel Pintu Dorong
Bahan
1.000 Buah Rel Pintu Dorong
Tenaga
0.060 OH Pekerja
0.600 OH Tukang Kayu
0.060 OH Kepala Tukang
0.003 OH Mandor
1 Buah Pasang Kunci Lemari
Bahan
1.000 Buah Kunci Lemari
Tenaga
0.025 OH Pekerja
0.250 OH Tukang Kayu
0.025 OH Kepala Tukang
0.001 OH Mandor
1
1.100

6.16.2
0.015
0.150
0.015
0.001
L.6.17
6.17.1

1
1.100

6.17.2
0.015
0.150
0.015
0.001
L.6.20
6.20.1

URAIAN PAKERJAAN

1
1.100

6.20.2
0.015
0.150
0.015
0.001

m2 Pasang Kaca tebal 3 mm


Bahan
m2 Kaca tebal 3mm
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Pasang Kaca tebal 5 mm
Bahan
m2 Kaca tebal 5mm
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor
m2 Pasang Kaca Cermin tebal 5 mm
Bahan
m2 Kaca Cermin
Tenaga
OH Pekerja
OH Tukang Kayu
OH Kepala Tukang
OH Mandor

HARGA BAHAN
/ UPAH
Rp

306,300.00
42,500.00
50,000.00
60,000.00
60,000.00

149,350.00
42,500.00
50,000.00
60,000.00
60,000.00

11,400.00
42,500.00
50,000.00
60,000.00
60,000.00

80,500.00
42,500.00
50,000.00
60,000.00
60,000.00

75,000.00
42,500.00
50,000.00
60,000.00
60,000.00

165,400.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
312,355.00
306,300.00
306,300.00
6,055.00
425.00
5,000.00
600.00
30.00
185,680.00
149,350.00
149,350.00
36,330.00
2,550.00
30,000.00
3,600.00
180.00
26,537.50
11,400.00
11,400.00
15,137.50
1,062.50
12,500.00
1,500.00
75.00
97,632.50
88,550.00
88,550.00
9,082.50
637.50
7,500.00
900.00
45.00
91,582.50
82,500.00
82,500.00
9,082.50
637.50
7,500.00
900.00
45.00
191,022.50
181,940.00
181,940.00
9,082.50
637.50
7,500.00
900.00
45.00

PEKERJAAN PENUTUP LANTAI dan DINDING


M.6.9
6.9.1

1
6.630
9.800
0.045
1.300

6.9.2
0.250

m2 Memasang lantai Ubin Granito Uk. 40 x 40 cm


Bahan
Buah Ubin Granito 40x40 cm
Kg Portland Semen
m3 Pasir
Kg Semen Warna
Tenaga
OH Pekerja

1,340.00
100,000.00
1,875.00
42,500.00

38,194.50
20,069.50
13,132.00
4,500.00
2,437.50
18,125.00
10,625.00
Hal. 142

KODE

KOEF
0.120
0.012
0.013

SAT.
OH Tukang Batu
OH Kepala Tukang
OH Mandor

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
6,000.00
720.00
780.00

Hal. 143

KODE
M.6.34
6.34.1

KOEF

SAT.

1.000
1.000
10.000
0.045
1.500

6.34.2
0.620
0.350
0.035
0.030
M.6.35
6.35.1

1
1.000
10.000
0.045
1.500

6.35.2
0.620
0.350
0.035
0.030
M.6.36
6.36.1

1
1.000
10.400
0.045
1.620

6.36.2
0.620
0.350
0.035
0.030
M.6.39
6.39.1

m2 Memasang Lantai Keramik motif / warna/ 30 x 30 cm


Bahan
Buah Ubin Keramik motif / warna 30 x 30 cm
Kg Portland Semen
m3 Pasir
Kg Semen Warna
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m2 Memasang Lantai Keramik 30 x 30 cm
Bahan
m2 Ubin Keramik 30 x 30 cm
Kg Portland Semen
m3 Pasir
Kg Semen Warna
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m2 Pasang Lantai Keramik 20 x 20 cm
Bahan
m2 Ubin Keramik 20 x 20 cm
Kg Portland Semen
m3 Pasir
Kg Semen Warna
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor

1 m'
5.300 Buah
1.140 Kg
0.003 m3
0.025 Kg

6.39.2
0.090
0.090
0.009
0.005
M.6.40
6.40.1

OH
OH
OH
OH

1 m'
10.600 Buah
1.140 Kg
0.003 m3
0.050 Kg
0.090
0.090
0.009
0.005

M.6.44
6.44.1

1
1.050
0.350

URAIAN PAKERJAAN

OH
OH
OH
OH

Memasang Plint Keramik Ukuran 10x20 cm


Bahan
Ubin Keramik 10 x 20 cm
Portland Semen
Pasir
Semen Warna
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Memasang Plint Keramik Ukuran 10x10 cm
Bahan
Ubin Keramik 10 x 10 cm
Portland Semen
Pasir
Semen Warna
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

m2 Memasang Lantai Karpet


Bahan
m2 Karpet
kg Lem

HARGA BAHAN
/ UPAH
Rp

44,700.00
1,340.00
100,000.00
1,875.00
42,500.00
50,000.00
60,000.00
60,000.00

42,230.00
1,340.00
100,000.00
1,875.00
42,500.00
50,000.00
60,000.00
60,000.00

48,149.50
1,340.00
100,000.00
1,875.00
42,500.00
50,000.00
60,000.00
60,000.00

1,340.00
100,000.00
1,875.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
113,162.50
65,412.50
44,700.00
13,400.00
4,500.00
2,812.50
47,750.00
26,350.00
17,500.00
2,100.00
1,800.00
110,692.50
62,942.50
42,230.00
13,400.00
4,500.00
2,812.50
47,750.00
26,350.00
17,500.00
2,100.00
1,800.00
117,373.00
69,623.00
48,149.50
13,936.00
4,500.00
3,037.50
47,750.00
26,350.00
17,500.00
2,100.00
1,800.00
11,039.48
1,874.48
1,527.60
300.00
46.88
9,165.00
3,825.00
4,500.00
540.00
300.00

42,500.00
50,000.00
60,000.00
60,000.00

11,086.35
1,921.35
1,527.60
300.00
93.75
9,165.00
3,825.00
4,500.00
540.00
300.00

15,200.00
49,000.00

50,395.00
33,110.00
15,960.00
17,150.00

1,340.00
100,000.00
1,875.00

Hal. 144

KODE

KOEF

SAT.

6.44.2
0.170
0.170
0.017
0.009

OH
OH
OH
OH

URAIAN PAKERJAAN
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
17,285.00
7,225.00
8,500.00
1,020.00
540.00

Hal. 145

KODE
M.6.46a
6.46.1

KOEF

SAT.
1

1.050
0.600
6.46.2
0.650
0.350
0.035
0.033
M.6.46b
6.46.1

1
1.050
0.600

6.46.2
0.650
0.350
0.035
0.033
M.6.46c
6.46.1

1
1.050
0.600

6.46.2
0.650
0.350
0.035
0.033
M.6.46d
6.46.1

1
1.050
0.600

6.46.2
0.650
0.350
0.035
0.033
M.6.46e
6.46.1

1
1.050
0.600

6.46.2
0.650
0.350
0.035
0.033
M.6.46f
6.46.1

1
1.050
0.600

6.46.2
0.650
0.350
0.035
0.033
M.6.46g
6.46.1

1
1.050
0.600

URAIAN PAKERJAAN

m2 Memasang Lantai Parquet Merbau uk. 14x90x300/400/500 mm


Bahan
m2 Parquet Jati Parquet ky merbau 14x90x300/400/500mm
Kg Lem Vynil
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m2 Memasang Lantai Parquet Merbau uk. 14x90x900 mm
Bahan
m2 Parquet Jati Parquet ky merbau 14x90x900mm
Kg Lem Vynil
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m2 Memasang Lantai Parquet Merbau uk. 10x120x1.200 mm
Bahan
m2 Parquet Jati Parquet ky merbau 10 x 120 x 1.200 mm
Kg Lem Vynil
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m2 Memasang Lantai Parquet Merbau uk. 12x120x1.200 mm
Bahan
m2 Parquet Jati Parquet ky merbau 12 x 120 x 1.200 mm
Kg Lem Vynil
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m2 Memasang Lantai Parquet Merbau uk. 14x140x1.200 mm
Bahan
m2 Parquet Jati Parquet ky merbau 14 x 140 x 1.200 mm
Kg Lem Vynil
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m2 Memasang Lantai Parquet Jati uk. 12x120x1.200 mm
Bahan
m2 Parquet Jati Parquet ky Jati 12x120x1.200 mm
Kg Lem Vynil
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m2 Memasang Lantai Parquet Jati uk. 14x140x1.200 mm
Bahan
m2 Parquet Jati Parquet ky Jati 14x140x1.200 mm
Kg Lem Vynil

HARGA BAHAN
/ UPAH
Rp

7,600.00
42,500.00
50,000.00
60,000.00
60,000.00

7,600.00
42,500.00
50,000.00
60,000.00
60,000.00

7,600.00
42,500.00
50,000.00
60,000.00
60,000.00

7,600.00
42,500.00
50,000.00
60,000.00
60,000.00

7,600.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
53,765.00
4,560.00
4,560.00
49,205.00
27,625.00
17,500.00
2,100.00
1,980.00
53,765.00
4,560.00
4,560.00
49,205.00
27,625.00
17,500.00
2,100.00
1,980.00
53,765.00
4,560.00
4,560.00
49,205.00
27,625.00
17,500.00
2,100.00
1,980.00
53,765.00
4,560.00
4,560.00
49,205.00
27,625.00
17,500.00
2,100.00
1,980.00
53,765.00
4,560.00
4,560.00
49,205.00
27,625.00
17,500.00
2,100.00
1,980.00

42,500.00
50,000.00
60,000.00
60,000.00

53,765.00
4,560.00
4,560.00
49,205.00
27,625.00
17,500.00
2,100.00
1,980.00

7,600.00

53,765.00
4,560.00
4,560.00

7,600.00

Hal. 146

KODE

KOEF

SAT.

6.46.2
0.650
0.350
0.035
0.033

OH
OH
OH
OH

URAIAN PAKERJAAN
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
49,205.00
27,625.00
17,500.00
2,100.00
1,980.00

Hal. 147

KODE
M.6.53
6.53.1

KOEF

SAT.
1

1.000
9.300
0.018
2.750
6.53.2
0.600
0.450
0.045
0.030
M.6.54
6.54.1

1
1.000
9.300
0.018
1.940

6.54.2
0.600
0.450
0.045
0.030
M.6.57
6.57.1

1
1.100
11.750
0.035

6.57.2
0.620
0.350
0.035
0.030
M.6.60
6.60.1

1
2.200
0.250

6.60.2
0.750
0.170
0.017
0.004
M.6.63
6.63.1

URAIAN PAKERJAAN

m2 Memasang Dinding Keramik 10x20 cm,


Bahan
m2 Keramik 10 x 20 cm
Kg Portland Semen
m3 Pasir
Kg Semen Warna
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m2 Memasang Dinding Keramik 20x25 cm,
Bahan
m2 Keramik 20 x 25 cm
Kg Portland Semen
m3 Pasir
Kg Semen Warna
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m2 Memasang Dinding Batu Paros / Batu Tempel Hitam
Bahan
m2 Batu Tempel Hitam
Kg Portland Semen
m3 Pasir
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m2 Memasang Wall Paper Lebar 50 cm
Bahan
m' Wall Paper
kg Lem
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor

m'

0.003
0.050

m3
kg

0.120
0.120
0.012
0.006

OH
OH
OH
OH

6.61.2

Memasang Plint Kayu Klas II Ukuran 2x10 cm


Bahan
Papan Kayu Klas II
Paku Sekrup 5 cm
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp

46,350.00
1,340.00
100,000.00
1,875.00
42,500.00
50,000.00
60,000.00
60,000.00

47,150.00
1,340.00
100,000.00
1,875.00
42,500.00
50,000.00
60,000.00
60,000.00

1,340.00
100,000.00
42,500.00
50,000.00
60,000.00
60,000.00

15,200.00
42,500.00
50,000.00
60,000.00
60,000.00

7,500,000.00
24,500.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
118,268.25
65,768.25
46,350.00
12,462.00
1,800.00
5,156.25
52,500.00
25,500.00
22,500.00
2,700.00
1,800.00
117,549.50
65,049.50
47,150.00
12,462.00
1,800.00
3,637.50
52,500.00
25,500.00
22,500.00
2,700.00
1,800.00
66,995.00
19,245.00
15,745.00
3,500.00
47,750.00
26,350.00
17,500.00
2,100.00
1,800.00
45,435.00
3,800.00
3,800.00
41,635.00
31,875.00
8,500.00
1,020.00
240.00
35,905.00
23,725.00
22,500.00
1,225.00
12,180.00
5,100.00
6,000.00
720.00
360.00

PEKERJAAN PENGECATAN
N.6.1
6.1.1

1
0.050

6.1.2
0.150
0.003

m2 Mengikis / Mengerok Permukaan Cat Tembok Lama


Bahan
Kg Soda Api
Tenaga
OH Pekerja
OH Mandor

24,500.00
42,500.00
60,000.00

7,750.00
1,225.00
1,225.00
6,525.00
6,375.00
150.00
Hal. 148

KODE
N.6.2
6.2.1

KOEF

SAT.
1

0.050
6.2.2
0.150
0.003

URAIAN PAKERJAAN

m2 Mencuci Bidang Permukaan Tembok yang Pernah dicat


Bahan
Kg Sabun
Tenaga
OH Pekerja
OH Mandor

HARGA BAHAN
/ UPAH
Rp

10,900.00
42,500.00
60,000.00

JUMLAH
HARGA
Rp
7,070.00
545.00
545.00
6,525.00
6,375.00
150.00

Hal. 149

KODE
N.6.3
6.3.1

KOEF

SAT.
1

0.050
6.3.2
0.150
0.003
N.6.4
6.4.1

1
0.050

6.4.2
0.150
0.003
N.6.6
6.6.1

m2 Mengerok Karat Cat Lama permukaan Baja dg cara manual


Bahan
Kg Sabun
Tenaga
OH Pekerja
OH Mandor
m2 Penyabun Permukaan Tembok Lama
Bahan
Kg Sabun
Tenaga
OH Pekerja
OH Mandor

42,500.00
60,000.00

42,500.00
50,000.00
60,000.00
60,000.00

7,325.00
2,975.00
3,750.00
450.00
150.00

0.200
0.150
0.170
0.260

m2 Pengecatan Kayu Bidang Baru (1 lap.Plamir)1 lap.Cat Dasar & 2 lap.Cat Penutup
Bahan
Kg Cat Meni
24,500.00
Kg Plamir
18,400.00
Kg Cat Dasar
42,800.00
Kg Cat Penutup 2 kali
42,800.00

29,999.00
26,064.00
4,900.00
2,760.00
7,276.00
11,128.00

0.070
0.009
0.006
0.003

OH
OH
OH
OH

0.150
0.170
0.170

m2 Pengecatan Kayu Bidang Lama


Bahan
Kg Plamir
Kg Cat Dasar
Kg Cat Penutup

0.070
0.075
0.008
0.003

OH
OH
OH
OH

6.8.2

Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor

3,935.00
2,975.00
450.00
360.00
150.00

0.200
0.150
0.170
0.350

m2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)1 lap.Cat Dasar & 3 lap.Cat Penutup
Bahan
Kg Cat Meni
24,500.00
Kg Plamir
18,400.00
Kg Cat Dasar
42,800.00
Kg Cat Penutup 2 kali
42,800.00

38,531.00
29,916.00
4,900.00
2,760.00
7,276.00
14,980.00

0.070
0.105
0.004
0.003

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor

18,400.00
15,200.00
2,900.00

42,500.00
50,000.00
60,000.00
60,000.00

6.9.2

N.6.10

10,900.00

7,070.00
545.00
545.00
6,525.00
6,375.00
150.00

18,400.00
42,800.00
42,800.00

6.7.2

N.6.9
6.9.1

42,500.00
60,000.00

24,637.00
17,312.00
2,760.00
7,276.00
7,276.00

0.040
0.040
0.004
0.003

N.6.8
6.8.1

10,900.00

JUMLAH
HARGA
Rp
7,070.00
545.00
545.00
6,525.00
6,375.00
150.00

42,500.00
50,000.00
60,000.00
60,000.00

6.6.2

m2 Mendempul dan Menggosok Kayu


Bahan
Kg Dempul Jadi
Kg Minyak Cat
lbr Amplas
Tenaga
OH Pekerja
OH Tukang Cat
OH Kepala Tukang
OH Mandor

HARGA BAHAN
/ UPAH
Rp

6,156.00
2,066.00
1,472.00
304.00
290.00
4,090.00
1,700.00
2,000.00
240.00
150.00

0.080
0.020
0.100

N.6.7
6.7.1

URAIAN PAKERJAAN

Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor

m2 Pelaburan Bidang Kayu dg Teak Oil

42,500.00
50,000.00
60,000.00
60,000.00

8,615.00
2,975.00
5,250.00
240.00
150.00
12,506.00
Hal. 150

KODE

0.360

Ltr

Bahan
Teak Oil

10,350.00

JUMLAH
HARGA
Rp
3,726.00
3,726.00

0.040
0.063
0.063
0.003

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor

42,500.00
50,000.00
60,000.00
60,000.00

8,780.00
1,700.00
3,150.00
3,780.00
150.00

KOEF

SAT.

6.10.1

6.10.2

URAIAN PAKERJAAN

HARGA BAHAN
/ UPAH
Rp

Hal. 151

KODE
N.6.11
6.11.1

KOEF

SAT.
1

0.150
0.372
2.000
6.11.2
0.060
0.016
0.003
N.6.12
6.12.1

1
0.350

0.100
0.006

Tenaga
OH Pekerja
OH Mandor

1
0.150
0.050
0.100
0.010

6.13.2
0.160
0.160
0.016
0.003
N.6.14
6.14.1

1
0.100
0.100
0.260

6.14.2
0.020
0.063
0.006
0.003
N.6.14a

6.14.1
0.100
0.260
6.14.2
0.020
0.063
0.006
0.003
N.6.15
6.15.1

1
0.100
0.180

6.15.2
0.028
0.042
0.004
0.003
N.6.20

HARGA BAHAN
/ UPAH
Rp

m2 Pelaburan Bidang Kayu dg Politur


Bahan
Ltr Politur
Ltr Politur Jadi
Lbr Ampelas
Tenaga
OH Tukang Cat
OH Kepala Tukang
OH Mandor
m2 Pelaburan Bidang Kayu dg Cat Residu & Ter
Bahan
Ltr Residu atau Ter

6.12.2

N.6.13
6.13.1

URAIAN PAKERJAAN

m2 Pelaburan Bidang Kayu dg Vernis


Bahan
Ltr Vernis
Ltr Dempul
Lbr Ampelas
Buah Kuas
Tenaga
OH Pekerja
OH Tukang Cat
OH Kepala Tukang
OH Mandor
m2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup)
Bahan
Kg Plamir
Kg Cat Dasar
Kg Cat Penutup 2 kali
Tenaga
OH Pekerja
OH Tukang Cat
OH Kepala Tukang
OH Mandor
m2 Pengecat Tembok Baru - Exterior (1lap.Plamir, 1lap Cat Dasar
2 lap. Cat Penutup)
Bahan
Kg Plamir
Kg Cat Dasar
Kg Cat Penutup 2 kali
Tenaga
OH Pekerja
OH Tukang Cat
OH Kepala Tukang
OH Mandor
m2 Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup)
Bahan
Kg Cat Dasar
Kg Cat Penutup 2 kali
Tenaga
OH Pekerja
OH Tukang Cat
OH Kepala Tukang
OH Mandor
m2 Pengecatan Permukaan Baja dg Meni Besi

50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
31,250.20
27,140.20
5,865.00
15,475.20
5,800.00
4,110.00
3,000.00
960.00
150.00

6,100.00

6,745.00
2,135.00
2,135.00

42,500.00
60,000.00

4,610.00
4,250.00
360.00

39,100.00
41,600.00
2,900.00

26,900.00
18,400.00
2,900.00
6,100.00
42,500.00
50,000.00
60,000.00
60,000.00

15,200.00
20,000.00
20,000.00
42,500.00
50,000.00
60,000.00
60,000.00

21,216.00
5,306.00
4,035.00
920.00
290.00
61.00
15,910.00
6,800.00
8,000.00
960.00
150.00
13,248.00
8,720.00
1,520.00
2,000.00
5,200.00
4,528.00
850.00
3,150.00
378.00
150.00
45,316.00

15,200.00
113,300.00
113,300.00
42,500.00
50,000.00
60,000.00
60,000.00

20,000.00
20,000.00
42,500.00
50,000.00
60,000.00
60,000.00

40,788.00
11,330.00
29,458.00
4,528.00
850.00
3,150.00
378.00
150.00
9,292.00
5,600.00
2,000.00
3,600.00
3,692.00
1,190.00
2,100.00
252.00
150.00
14,510.00
Hal. 152

KODE

KOEF

SAT.

6.20.1
0.100
0.010

Kg
Kg

0.020
0.200
0.002
0.010

OH
OH
OH
OH

6.20.2

URAIAN PAKERJAAN
Bahan
Meni Besi
Perekat / Lem
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor

HARGA BAHAN
/ UPAH
Rp
24,500.00
49,000.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
2,940.00
2,450.00
490.00
11,570.00
850.00
10,000.00
120.00
600.00

Hal. 153

KODE
N.6.21
6.21.1

KOEF

SAT.
1

0.100
0.010
0.002
6.21.2
0.250
0.225
0.023
0.008
N.6.24

6.24.1
0.110
0.170
0.080
6.24.2
0.500
0.800
0.300
0.200
BOW.M.15

1
1.000
0.100
0.400
0.200
0.020
0.020

BOW.M.15a

1
1.000
0.100
0.400
0.200
0.020
0.020

BOW.M.15b

1
1.000
0.100
0.400
0.200
0.020
0.020

BOW.M.15c

1
1.000
0.100
0.400
0.200
0.020
0.020

BOW.M.15d

URAIAN PAKERJAAN

m2 Pengecatan Permukaan Baja dg Meni Besi & Perancah


Bahan
Kg Meni Besi
Kg Perekat / Lem
m3 Perancah Kayu
Tenaga
OH Pekerja
OH Tukang Cat
OH Kepala Tukang
OH Mandor
m2 Pengecatan Permukaan Baja lapis Seng (Galvanis) secara
Manual sistem 3 lap. Cat Konvensional dg Tebal 200 m
Bahan
Kg Cat dasar
Kg Cat Antara
Kg Cat Penutup
Tenaga
OH Pekerja
OH Tukang Cat
OH Kepala Tukang
OH Mandor
m2 Pasang Paving Blok Abu-abu Tebal 6 cm (K.175)
Bahan
m2 Paving blok abu-abu tebal 6 cm
m3 Pasir urug
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m2 Pasang Paving Blok Warna Tebal 6 cm (K.175)
Bahan
m2 Paving blok warna tebal 6 cm
m3 Pasir urug
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m2 Pasang Paving Blok Abu-abu Tebal 8 cm (K.175)
Bahan
m2 Paving blok abu-abu tebal 8 cm
m3 Pasir urug
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m2 Pasang Paving Blok Warna Tebal 8 cm (K.175)
Bahan
m2 Paving blok warna tebal 8 cm
m3 Pasir urug
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor
m2 Pasang Paving Blok Abu-abu (Lokal)

HARGA BAHAN
/ UPAH
Rp

24,500.00
49,000.00
1,621,000.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
29,857.00
6,182.00
2,450.00
490.00
3,242.00
23,675.00
10,625.00
11,250.00
1,350.00
450.00
107,558.00

45,300.00
45,300.00
45,300.00
42,500.00
50,000.00
60,000.00
60,000.00

60,000.00
75,000.00
42,500.00
50,000.00
60,000.00
60,000.00

70,000.00
75,000.00
42,500.00
50,000.00
60,000.00
60,000.00

80,000.00
75,000.00
42,500.00
50,000.00
60,000.00
60,000.00

87,000.00
75,000.00
42,500.00
50,000.00
60,000.00
60,000.00

16,308.00
4,983.00
7,701.00
3,624.00
91,250.00
21,250.00
40,000.00
18,000.00
12,000.00
96,900.00
67,500.00
60,000.00
7,500.00
29,400.00
17,000.00
10,000.00
1,200.00
1,200.00
106,900.00
77,500.00
70,000.00
7,500.00
29,400.00
17,000.00
10,000.00
1,200.00
1,200.00
116,900.00
87,500.00
80,000.00
7,500.00
29,400.00
17,000.00
10,000.00
1,200.00
1,200.00
123,900.00
94,500.00
87,000.00
7,500.00
29,400.00
17,000.00
10,000.00
1,200.00
1,200.00
78,900.00
Hal. 154

KODE

KOEF

1.000
0.100
0.400
0.200
0.020
0.020

SAT.

URAIAN PAKERJAAN

Bahan
m2 Paving blok abu-abu (lokal)
m3 Pasir urug
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor

HARGA BAHAN
/ UPAH
Rp
42,000.00
75,000.00
42,500.00
50,000.00
60,000.00
60,000.00

JUMLAH
HARGA
Rp
49,500.00
42,000.00
7,500.00
29,400.00
17,000.00
10,000.00
1,200.00
1,200.00

Hal. 155

KODE
BOW.M.15e

KOEF

SAT.
1

1.000
0.100
0.400
0.200
0.020
0.020
BOW.A.6

BOW.A.7a

BOW.A.9

1 m3 Pembuangan tanah sejauh 200 m'


Dipakai rumus K = a/275 x (L+75)
K = (30.000 / 275) x (200 + 75)
154.545

42,500.00
60,000.00

14,625.00
14,625.00
14,025.00
600.00
27,045.00

175.00

27,045.45
42,500.00

Mengangkat tanah sedalam lebih dari 1 m'


Tenaga
OH Pekerja
OH Mandor

275.00

42,500.00

42,500.00
60,000.00

6,825.00
6,825.00
6,375.00
450.00

1 m3

1 m3
0.700 m3
3.500
10.500
1.050
0.175

BOW.G.5b.
6.26.1

42,500.00
50,000.00
60,000.00
60,000.00

42,000.00
75,000.00

Pembuangan tanah sejauh 30 m'


Tenaga
OH Pekerja
OH Mandor

1 m3 Pembuangan tanah sejauh 100 m'


Dipakai rumus K = a/275 x (L+75)
K = (30.000 / 275) x (100 + 75)
154.545

0.150
0.008
BOW F.1

m2 Pasang Paving Blok Warna (Lokal)


Bahan
m2 Paving blok warna (lokal)
m3 Pasir urug
Tenaga
OH Pekerja
OH Tukang Batu
OH Kepala Tukang
OH Mandor

JUMLAH
HARGA
Rp
78,900.00
49,500.00
42,000.00
7,500.00
29,400.00
17,000.00
10,000.00
1,200.00
1,200.00

1 m3
0.330
0.010

BOW.A.7

HARGA BAHAN
/ UPAH
Rp

URAIAN PAKERJAAN

OH
OH
OH
OH

1.000 m3
1.000 m3
15.000 kg

6.26.2
2.100 OH
0.730 OH
0.052 OH

Stootwerk beton bertulang


Bahan
Dolken kayu lokal
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

1,621,000.00
42,500.00
50,000.00
60,000.00
60,000.00

Bronjong penahan kawat 4 mm


Bahan
Batu kali blonos
Kawat pengikat 4mm
Tenaga
Pekerja
Tukang besi
Mandor

1,881,950.00
1,134,700.00
1,134,700.00
747,250.00
148,750.00
525,000.00
63,000.00
10,500.00
500,298.00
371,428.57
101,428.57
270,000.00
128,870.00
89,250.00
36,500.00
3,120.00

101,428.57
18,000.00
42,500.00
50,000.00
60,000.00

Slawi,

Februari 2013

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN TEGAL

Ir. SUDARYONO, MT
Pembina Tk. I
NIP. 19610416 198810 1 001

Hal. 156

ANALISA HARGA SATUAN


GALIAN TANAH UNTUK KONSTRUKSI
( MENGGUNAKAN ALAT )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE
K. 111

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

URAIAN :

ANGGAPAN/ASUMSI :

1. Tanah yang dipotong umumnya berada disisi jalan


2. Penggalian dilakukan dengan menggunakan Excavator
3. Selanjutnya Excavator menuangkan material hasil galian
kedalam Dump truck
4. Dump truck membuang material hasil galian keluar
lokasi jalan sejauh 1 km

1. Menggunakan alat berat (cara mekanik)


2. Digali dengan excavator
3. Jam kerja efektif per - hari

PEKERJA
P
E
K
E
R
J
A

1
4
2

Alat bantu

P E R ALATAN

P
E
R
A
L
A
T
A
N

HARI

Mandor
Buruh terlatih
Supir terlatih

MAT E R IAL
M
A
T
E
R
I
A
L

VOL

Excavator
Flat Bed Truck 4 Tone 80 HP

VOLUME/QUANTITY

KODE
1
1
1

/////////////////// SATUAN
///////////////////
///////////////////
set

JUMLAH

HARI
KERJA
1
2

TOTAL VOL
(org.hari)

L061
L106
L091

KODE

B IAYA
(Rp.)
60,000.00
127,200.01
200,000.00

SUB TOTAL
(Rp.)

1
4
4

U PAH
Rp./Hari/orang
60,000.00
31,800.00
50,000.00

buruh
B IAYA
(Rp.)
40,000.00

387,200.01
SUB TOTAL
(Rp.)

HARGA
(Rp./unit)
40,000.00

TOTAL
VOL

M170

KODE

JAM
KERJA

E. 020
E. 221

5
10

TANGGAL :
Januari 2012

B IAYA
(Rp. / jam )
424,683.17
225,719.94

MATERIAL
B IAYA
(Rp.)
2,123,415.85
2,257,199.40

PERALATAN
TOTAL (Rp.)
:

100 M3

Harga Satuan Rp.

40,000.00
SUB TOTAL
(Rp.)

48,078.15 per M3

4,380,615.25
4,807,815.26

ANALISA HARGA SATUAN


URUGAN SIRTU DAN PEMADATAN
( MENGGUNAKAN ALAT )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE
K. 221.B

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

URAIAN :

ANGGAPAN/ASUMSI :

1. Leveransir mengangkut sirtu/material kelapangan/


kelokasi buruhan
2. Material dihamparkan dengan motor grader
3. Meratakan dan pemadatan lapis demi lapis.
tebal tiap lapis 15 cm.
3. Hamparan material disiram air dengan Water
tank truck(sebelum pelaksanaan pemadatan) dan
dipadatkan dengan Roller 3 Wheeled 8-10 ton
4. Selama pemadatan sekelompok buruh akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu

1. buruhan dilakukan secara mekanis


2. Kapasitas kerja 120 m3 per hari
3. Tebal hamparan padat

PEKERJA
P
E
K
E
R
J
A

1
3
4

Alat bantu
Sirtu

P E R ALATAN

P
E
R
A
L
A
T
A
N

HARI

Mandor
Supir terlatih
Buruh terlatih

MAT E R IAL
M
A
T
E
R
I
A
L

VOL

WATER TANK TRUCK 115 HP


ROLLER 3 WHEELED 8-10 TON 51 HP
MOTOR GRADER

VOLUME/QUANTITY

KODE
1
1
1

/////////////////// SATUAN
///////////////////
///////////////////
set
m3

JUMLAH

HARI
KERJA

1
1
1

TOTAL VOL
(org.hari)

L061
L091
L106

KODE

KODE

1
3
4

U PAH
Rp./hari/orang
60,000.00
50,000.00
31,800.00

B IAYA
(Rp.)
60,000.00
150,000.00
127,200.01

buruh
B IAYA
(Rp.)
40,000.00
10,368,000.00

337,200.01
SUB TOTAL
(Rp.)

1
144

HARGA
(Rp./unit)
40,000.00
72,000.00

MATERIAL
B IAYA
(Rp.)

10,408,000.00
SUB TOTAL
(Rp.)

TOTAL
VOL

M170
M045

JAM
KERJA

E182
E080
E010

TANGGAL :
Januari 2012

B IAYA
(Rp. / jam )

5
5
5

226,368.33
92,330.20
390,833.66

1,131,841.65
461,651.00
1,954,168.30

PERALATAN
TOTAL (Rp.)
:

120 M3

Harga Satuan Rp.

SUB TOTAL
(Rp.)

119,107.17 per M3

3,547,660.95
14,292,860.96

ANALISA HARGA SATUAN


URUGAN DAN PEMADATAN TANAH DASAR
( MENGGUNAKAN ALAT )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

URAIAN :

ANGGAPAN/ASUMSI :

1. Plat bad truck mengangkut kelapangan dengan jarak


quari kelapangan
2. Material dihamparkan dengan motor grader
3. Meratakan dan pemadatan lapis demi lapis.
tebal tiap lapis 15 cm.
3. Hamparan material disiram air dengan Water
tank truck(sebelum pelaksanaan pemadatan) dan
dipadatkan dengan Roller 3 Wheeled 8-10 ton
4. Selama pemadatan sekelompok buruh akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu

1. buruhan dilakukan secara mekanis


2. Kapasitas kerja 120 m3 per hari
3. Tebal hamparan padat

PEKERJA
P
E
K
E
R
J
A

1
4
4

Alat bantu

P E R ALATAN

P
E
R
A
L
A
T
A
N

HARI

Mandor
Supir terlatih
Buruh terlatih

MAT E R IAL
M
A
T
E
R
I
A
L

VOL

FLAT BED TRUCK 4 TONE 80 HP


WATER TANK TRUCK 115 HP
ROLLER 3 WHEELED 8-10 TON 51 HP
MOTOR GRADER

VOLUME/QUANTITY

KODE
1
1
1

/////////////////// SATUAN
///////////////////
///////////////////
set

JUMLAH

HARI
KERJA
5
1
1
1

TOTAL VOL
(org.hari)

L061
L091
L106

KODE

KODE

SUB TOTAL
(Rp.)

1
4
4

B IAYA
(Rp.)
60,000.00
200,000.00
127,200.01

buruh
B IAYA
(Rp.)
40,000.00

387,200.01
SUB TOTAL
(Rp.)

HARGA
(Rp./unit)
40,000.00

JAM
KERJA

E221
E182
E080
E010

TANGGAL :
Januari 2012

U PAH
Rp./hari/orang
60,000.00
50,000.00
31,800.00

TOTAL
VOL

M170

KODE
K. 221.A

B IAYA
(Rp. / jam )
10
5
5
5

225,719.94
226,368.33
92,330.20
390,833.66

MATERIAL
B IAYA
(Rp.)
2,257,199.40
1,131,841.65
461,651.00
1,954,168.30

PERALATAN
TOTAL (Rp.)
:

120 M3

Harga Satuan Rp.

40,000.00
SUB TOTAL
(Rp.)

51,933.84 per M3

5,804,860.35
6,232,060.36

ANALISA HARGA SATUAN


GALIAN TANAH UNTUK KONSTRUKSI
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE
K. 224

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

URAIAN :

ANGGAPAN/ASUMSI :

1. Galian tanah dengan tenaga manusia (50 m3/hari)


2. Tanah galian disingkirkan sejauh minimal 30 m dari
lobang galian

1. Menggunakan tenaga manusia


2. Kapasitas kerja kelompok 50 m3/hari
3. Kedalaman rata-rata galian s/d 3 m
4. Untuk jenis tanah berbatu, harga satuan buruhan K.224 dikalikan
dengan faktor 1,5

PEKERJA
P
E
K
E
R
J
A

Mandor
Buruh tak terampil
Buruh terlatih

MAT E R IAL
M
A
T
E
R
I
A
L

Alat bantu

P E R ALATAN

VOL

HARI
1
30
2

KODE
1
1
1

/////////////////// SATUAN
///////////////////
///////////////////
set

JUMLAH

HARI
KERJA

TOTAL VOL
(org.hari)

L061
L101
L106

KODE

JAM
KERJA

P
E
R
A
L
A
T
A
N

VOLUME/QUANTITY

buruh
B IAYA
(Rp.)
40,000.00

1,173,600.00
SUB TOTAL
(Rp.)

HARGA
(Rp./unit)
40,000.00

TOTAL
VOL

M170

KODE

B IAYA
(Rp.)
60,000.00
1,050,000.00
63,600.00

SUB TOTAL
(Rp.)

1
30
2

U PAH
Rp./hari/orang
60,000.00
35,000.00
31,800.00

B IAYA
(Rp. / jam )

MATERIAL
B IAYA
(Rp.)

PERALATAN
TOTAL (Rp.)
:

50 M3

Harga Satuan Rp.

24,272.00 per M3

40,000.00
SUB TOTAL
(Rp.)

1,213,600.00

ANALISA HARGA SATUAN


MEMBENTUK BAHU JALAN KERAS
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE
K. 410

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

URAIAN :

ANGGAPAN/ASUMSI :

1. Bahan timbunan yang baik dihampar dengan tenaga


orang
2. Pemadatan bahu jalan dengan Plat Vibrator Stamper

1. Menggunakan tenaga orang (96 m3/hari, pemadatan 960 m bahu jalan)


2. Matrial pilihan dikirim sampai tempat buruhan oleh levelansir
3. Levelansir meletakan matrial timbunan sepanjang bahu jalan
4. 10 cm tembunan padat dibutuhkan pada 1 m lebar bahu jalan
5. Penghamparan timbunan dengan tenaga manusia
6. Pemadatan dengan Plate Vibrator Stamper

PEKERJA

P
E
K
E
R
J
A

Mandor
Buruh tak terlatih
Buruh semi terlatih

VOL

HARI

2
66
1

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L101
L103

2
66
1

U PAH
Rp./hari/orang
60,000.00
35,000.00
40,000.00

B IAYA
(Rp.)
120,000.00
2,310,000.00
40,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Sirtu
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////

M045
M170

m3
set

TOTAL
VOL

HARGA
(Rp./unit)

120.00
2.50

72,000.00
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Plat Vibrator Stamper 4 HP

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
4

96 M3

KODE

JAM
KERJA

E088

Harga Satuan Rp.

B IAYA
(Rp. / jam )
20

2,470,000.00
SUB TOTAL
(Rp.)

8,640,000.00
100,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

7,732.99

8,740,000.00
SUB TOTAL
(Rp.)

154,659.80

PERALATAN

154,659.80

TOTAL (Rp.)

11,364,659.80

118,381.87 per M3

ANALISA HARGA SATUAN


KONSTRUKSI LAPIS PONDASI BAWAH (LPB) KLAS A
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
K. 511

DISIAPKAN OLEH :
BINA PROGRAM

URAIAN :

ANGGAPAN/ASUMSI :

1. Membentuk/meratakan kembali permukaan jalan


lama
2. Agregat ditempatkan disepanjang jalan
3. Menghampar agregat
4. Jalan disiram dengan truk air
5. Pemadatan dilakukan dengan mesin gilas
6. Perapihan dgn tenaga manusia

1. Menggunakan tenaga manusia


2. Menggunakan buruh (60 m3/hari)
3. Dimulai dengan buruhan memperbaiki turunan
4. Bahan dicampur dan diratakan 12 cm
5. Tebal lapis 10 cm
6. Harga matrial berdasarkan harga dilokasi proyek

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Supir
Buruh tak terlatih

VOL

HARI

1
1
1
66

KODE

1
1
1
1

TOTAL VOL
(org.hari)

L061
L081
L091
L101

U PAH
Rp./hari/orang

1
1
1
66

60,000.00
55,000.00
50,000.00
35,000.00

TANGGAL :
Januari 2012

B IAYA
(Rp.)
60,000.00
55,000.00
50,000.00
2,310,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Batu pecah mesin 3-5 cm


Batu pecah mesin 2-3 cm
Batu pecah mesin 1-2 cm
Batu pecah mesin 0,5-1 cm
Pasir urug
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////

M028
M029
M030
M026
M040
M170

m3
m3
m3
m3
m3
set

TOTAL
VOL

HARGA
(Rp./unit)

18.00
9.00
6.00
10.00
29.00
2.00

200,000.00
195,000.00
200,000.00
200,000.00
75,000.00
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Roller 3 Wheel 8-10 T 51 Hp


Water Tank Truck 115 HP

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
1
1

60 M3

KODE

1
1

JAM
KERJA

E080
E182

Harga Satuan Rp.

B IAYA
(Rp. / jam )
5
5

92,330.20
226,368.33

2,475,000.00
SUB TOTAL
(Rp.)

3,600,000.00
1,755,000.00
1,200,000.00
2,000,000.00
2,175,000.00
80,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

10,810,000.00
SUB TOTAL
(Rp.)

461,651.00
1,131,841.65

PERALATAN

1,593,492.65

TOTAL (Rp.)

14,878,492.65

247,974.88 per M3

ANALISA HARGA SATUAN


KONSTRUKSI LAPIS PONDASI ATAS (LPA) KLAS A
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
K. 521

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

URAIAN :

ANGGAPAN/ASUMSI :

1. Agregat ditimbun disepanjang jalan


2. Matrial dihampar dengan tenaga manusia
3. Pemadatan perkerasan dengan mesin gilas roda
baja dan tangki air

1. Menggunakan tenaga manusia


2. Pengadaan matrial oleh levelansir
3. Buruh menghampar batu pecah diatas LPB (15 cm)
4. Menggunakan 135 m3 batu pecah mesin dengan binder (pasir urug) 24 m3
atau 140 m3 kerikil pecah mesin dengan binder (pasir urug) 15 m3
5. Rangga-rongga ditutup pasir urug dengan tenaga manusia
6. Dipadatkan sampai 10 cm padat
7. Hasil kerja menghampar dan memadatkan 600 m2/hari

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Supir
Buruh tak terlatih

VOL

HARI

2
1
1
66

KODE

2
2
2
2

TOTAL VOL
(org.hari)

L061
L081
L091
L101

4
2
2
132

U PAH
Rp./hari/orang
60,000.00
55,000.00
50,000.00
35,000.00

B IAYA
(Rp.)
240,000.00
110,000.00
100,000.00
4,620,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Batu pecah tersaring


Pasir urug
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////

K017
M040
M170

m3
m3
set

TOTAL
VOL

HARGA
(Rp./unit)

150.00
15.00
5.50

272,015.39
75,000.00
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Roller 3 Wheeld 8-10 T 51 HP


Water Tank Truck 115 HP

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
1
1

120 M3

KODE

2
2

JAM
KERJA

E080
E182

Harga Satuan Rp.

B IAYA
(Rp. / jam )
10
10

92,330.20
226,368.33

5,070,000.00
SUB TOTAL
(Rp.)

40,802,308.50
1,125,000.00
220,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

42,147,308.50
SUB TOTAL
(Rp.)

923,302.00
2,263,683.30

PERALATAN

3,186,985.30

TOTAL (Rp.)

50,404,293.80

420,035.78 per M3

ANALISA HARGA SATUAN


MENGHAMPAR LAPIS PONDASI ATAS ASPAL BETON
LASTON ATAS (MENGGUNAKAN ALAT)
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
K. 528

DISIAPKAN OLEH :
BINA PROGRAM

URAIAN :

ANGGAPAN/ASUMSI :

1. Permukaan jalan dibersihkan dan kering


2. Siram aspal pengikat pada tara 0,5 l/m2
3. ATB dihampar dengan aspal finisher
4. Temperatur ATB 80 derajat celcius dan tidak kurang
dari 60 derajat celcius.

1. Menggunakan alat berat


2. ATB dihamparkan dan dipadatkan ketebalan tebal 10 cm
3. Spesifikasi BM no. 03/PT/B/1983

PEKERJA

P
E
K
E
R
J
A

VOL

Mandor
Operator terlatih
Buruh tak terlatih
Buruh terlatih

HARI

1
4
12
8

KODE

1
1
1
1

TOTAL VOL
(org.hari)

L061
L081
L101
L106

U PAH
Rp./hari/orang

1
4
12
8

TANGGAL :
Januari 2012

B IAYA
(Rp.)

60,000.00
55,000.00
35,000.00
31,800.00

60,000.00
220,000.00
420,000.00
254,400.01

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

ATB ( Laston Atas )


Batu pecah mesin 0.5
Aspal curah
Minyak bakar
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////
///////////////////

K026
M041
M062
M065
M170

tonne
m3
kg
lt
set

TOTAL
VOL

HARGA
(Rp./unit)

100.00
0.60
135.00
90.00
0.50

835,984.37
200,000.00
8,000.00
6,200.00
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

JUMLAH

Roller 3 Wheel 8-10 T 51 HP


Pneumatic Roller 8-15 T 95 HP
Asphal Sprayer Towed 350 L 7 HP
Asphal Finisher 30 HP
Compressor air 150 m3 20 HP

VOLUME/QUANTITY

Untuk Panjang, 1 KM, Lebar 4 m, Tebal 5 cm

HARI
KERJA
1
1
1
1
1

101.25 Ton
45 M3

KODE

1
1
1
1
1

JAM
KERJA

E080
E084
E153
E157
E301

B IAYA
(Rp. / jam )
5
5
3
5
4

Harga Satuan Rp.


Harga Satuan Rp.

200.00

92,330.20
238,449.28
45,229.00
124,471.80
51,899.52

954,400.01
SUB TOTAL
(Rp.)

83,598,437.00
120,000.00
1,080,000.00
558,000.00
20,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

85,376,437.00
SUB TOTAL
(Rp.)

461,651.00
1,192,246.40
135,687.00
622,359.00
207,598.08

PERALATAN

2,619,541.48

TOTAL (Rp.)

88,950,378.49

878,522.26 Per Ton


1,976,675.08 Per m3

1,976,675.08

395,335,016.00

ANALISA HARGA SATUAN


KONSTRUKSI PASANGAN BATU
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE
K. 810

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

URAIAN :

ANGGAPAN/ASUMSI :

1. Matrial disiapkan dilokasi oleh levelansir


2. buruh membawa batu pecah ketempat tukang
batu bekerja
3. Tukang batu memasang batu pecah dengan adukan
pasir cemen

1. Dilakukan untuk buruhan gorong-gorong,jembatan,dinding penahan tanah


dan struktur lainya yang menggunakan konstruksi pasangan batu

PEKERJA

P
E
K
E
R
J
A

Mandor
Tukang batu
Buruh tak terlatih

2. Matrial-matrial dikirim ketempat buruhan oleh levelansir


3. Tidak termasuk galian/timbunan
4. Bagian M 170 diperbolehkan pakai bambu

VOL

HARI

1
4
12

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L079
L101

U PAH
Rp./hari/orang

1
4
12

B IAYA
(Rp.)

60,000.00
50,000.00
35,000.00

60,000.00
200,000.00
420,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Batu kali
Pasir
Semen
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////

M020
M041
M080
M170

m3
m3
kg
set

TOTAL
VOL

HARGA
(Rp./unit)

5.00
1.20
760.00
0.70

111,400.00
100,000.00
1,340.00
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Water Pump Q 5 cm 8 HP

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
1

5 M3

KODE

JAM
KERJA

E341

Harga Satuan Rp.

B IAYA
(Rp. / jam )
2

680,000.00
SUB TOTAL
(Rp.)

557,000.00
120,000.00
1,018,400.00
28,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

11,722.42

1,723,400.00
SUB TOTAL
(Rp.)

23,444.84

PERALATAN

23,444.84

TOTAL (Rp.)

2,426,844.84

485,368.97 per M3

ANALISA HARGA SATUAN


MEMPRODUKSI CAMPURAN ASPAL BETON UNTUK LAPIS
POND ATAS (LASTON ATAS) (MENGGUNAKAN ALAT)
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

URAIAN :

ANGGAPAN/ASUMSI :

1. Semua matrial dikirim levelansir


2. Loader menjaga bin tetap penuh
3. Produksi AMP 100 ton/hari
4. Dimuat dengan Dumptruk ditutup terpal untuk
menjaga temperatur

1. ATB di buat di AMP produksi 100 ton/hari


2. Dipakai Agregat pecah tersaring
3. Aspal dipaskan duluan agar siap pada waktunya
4. Biaya Produksi termasuk pengangkutan sampai 40 Km
5. Dimuat dalam dump truk 5 ton dikirim ketempat buruhan
6. Spesifikasi B.M.No.03/PT/B/1983

PEKERJA

P
E
K
E
R
J
A

VOL

HARI

Mandor
Mekanik terlatih
Operator terlatih
Operator semi terlatih
Supir
Buruh tak terlatih
Buruh semi terlatih

2
1
4
3
6
7
7

KODE

1
1
1
1
1
1
1

TOTAL VOL
(org.hari)

L061
L071
L081
L082
L091
L101
L103

KODE
K. 026

U PAH
Rp./hari/orang
2
1
4
3
6
7
7

60,000.00
60,000.00
55,000.00
50,000.00
50,000.00
35,000.00
40,000.00

TANGGAL :
Januari 2012

B IAYA
(Rp.)
120,000.00
60,000.00
220,000.00
150,000.00
300,000.00
245,000.00
280,000.00
PEKERJA

MAT E R IAL

M
A
T
E
R
I
A
L

Batu pecah mesin 0.5


Aspal curah
Kerikil pecah tersaring
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////

M041
M062
K017
M170

m3
kg
m3
set

TOTAL
VOL

HARGA
(Rp./unit)

25.00
5,900.00
47.00
0.20

200,000.00
8,000.00
272,015.39
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Loader Wheel 115 HP


Asphal Mixing plat 30 T 125 HP
Dump truk 5 T 145 HP
Buldozer 100 HP
Crusher 30 T/h 140 HP

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
2
1
7
1
1

100 tonne

KODE

1
1
1
1
1

JAM
KERJA

E052
E155
E212
E001
E031

Harga Satuan Rp.

B IAYA
(Rp. / jam )
9
5
35
4
4

204,726.82
726,885.00
230,563.48
319,682.01
601,324.46

1,375,000.00
SUB TOTAL
(Rp.)

5,000,000.00
47,200,000.00
12,784,723.33
8,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

64,992,723.33
SUB TOTAL
(Rp.)

1,842,541.38
3,634,425.00
8,069,721.80
1,278,728.04
2,405,297.84

PERALATAN

17,230,714.06

TOTAL (Rp.)

83,598,437.39

835,984.37 per tonne

ANALISA HARGA SATUAN


PLESTERAN PC SPS. 1 : 3
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :

KODE
K. 011 a

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. Menggunakan tenaga manusia
2. Semua bahan diterima dilokasi
3. Dengan campuran 1pc : 3 Psr

PEKERJA

P
E
K
E
R
J
A

Mandor
Tukang batu
Buruh tak terlatih

VOL

HARI

20
150
400

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L079
L101

20
150
400

U PAH
Rp./hari/orang
60,000.00
50,000.00
35,000.00

B IAYA
(Rp.)
1,200,000.00
7,500,000.00
14,000,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Pasir
Semen
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////

M041
M080
M170

m3
kg
set

TOTAL
VOL
14.50
4,160.00
10.00

HARGA
(Rp./unit)
100,000.00
1,340.00
40,000.00

B IAYA
(Rp.)

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

B IAYA
(Rp. / jam )

P
E
R
A
L
A
T
A
N

B IAYA
(Rp.)

SUB TOTAL
(Rp.)

7,424,400.00
SUB TOTAL
(Rp.)

PERALATAN
TOTAL (Rp.)

VOLUME/QUANTITY

22,700,000.00

1,450,000.00
5,574,400.00
400,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

1000 m2

Harga Satuan Rp.

30,124.40 m2

30,124,400.00

ANALISA HARGA SATUAN


PERANCAH (BEGISTING) UNTUK BETON BERTULANG
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
K. 710

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

URAIAN :

ANGGAPAN/ASUMSI :

1. Pengadaan bahan oleh levelansir


2. Tukang kayu memotong dan membuat acuan/
perancah
3. Tukang kayu membongkar acuan/perancah setelah
disetujui oleh Direksi

1. Kelompok tukang kayu memasang 100 m2 dalam 5 hari kerja


2. 1/3 material dapat dipakai kembali
3. Penagadaan bahan oleh levelansir
4. Untuk 1 m3 beton digunakan 40 lbr plywood (120 cm x 240 cm x 1,70 cm)
5. Tukang kayu membongkar perancah

PEKERJA

P
E
K
E
R
J
A

VOL

HARI

Mandor
Tukang kayu
Buruh tak terlatih
Buruh semi terlatih

1
4
7
3

KODE

5
5
5
5

TOTAL VOL
(org.hari)

L061
L079
L101
L103

5
20
35
15

U PAH
Rp./hari/orang
60,000.00
50,000.00
35,000.00
40,000.00

B IAYA
(Rp.)
300,000.00
1,000,000.00
1,225,000.00
600,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Paku jembatan
Kayu bigesting
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////

M166
M181
M170

kg
m3
set

TOTAL
VOL
20.00
3.00
3.00

HARGA
(Rp./unit)

B IAYA
(Rp.)

20,750.00
2,210,200.33
40,000.00

415,000.00
6,630,601.00
120,000.00

MATERIAL
P E R ALATAN

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

P
E
R
A
L
A
T
A
N

B IAYA
(Rp. / jam )

B IAYA
(Rp.)

3,125,000.00
SUB TOTAL
(Rp.)

7,165,601.00
SUB TOTAL
(Rp.)

PERALATAN
TOTAL (Rp.)

VOLUME/QUANTITY

SUB TOTAL
(Rp.)

100 M2

Harga Satuan Rp.

102,906.01 per M2

10,290,601.00

ANALISA HARGA SATUAN


PENULANGAN BETON (MEMOTONG,MEMBENGKOK DAN
MEMASANG BESI TULANGAN ( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
K. 715

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

URAIAN :

ANGGAPAN/ASUMSI :

1. Pemotongan dan pembengkokan dan perakitan


tulangan dilakukan ditempat buruhan bersama
sama persiapan buruhan beton

1. 200 kg tulangan jadi disiapkan dalam 1 hari


2. Besi tulangan dikirim ke tempat buruhan oleh levelansir
3. Bahan-bahan tulangan dikirim ketempat buruhan oleh levelansir
4. Penyusutan tulangan dihitung 10 % dan pemakaian kawat baja dihitung 1%

PEKERJA

P
E
K
E
R
J
A

VOL

HARI

Mandor
Tukang besi
Buruh tak terlatih
Buruh semi terlatih

1
1
2
2

KODE

1
1
1
1

TOTAL VOL
(org.hari)

L061
L079
L101
L103

U PAH
Rp./hari/orang
1
1
2
2

B IAYA
(Rp.)

60,000.00
50,000.00
35,000.00
40,000.00

60,000.00
50,000.00
70,000.00
80,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Besi beton & kawat beton


Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////

M167
M170

kg
set

TOTAL
VOL
225.00
0.20

HARGA
(Rp./unit)
10,100.00
40,000.00

B IAYA
(Rp.)

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

P
E
R
A
L
A
T
A
N

B IAYA
(Rp. / jam )

B IAYA
(Rp.)

SUB TOTAL
(Rp.)

2,280,500.00
SUB TOTAL
(Rp.)

PERALATAN
TOTAL (Rp.)

VOLUME/QUANTITY

260,000.00

2,272,500.00
8,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

200 kg

Harga Satuan Rp.

12,702.50 per kg

2,540,500.00

ANALISA HARGA SATUAN


BETON STRUKTUR/UNTUK KONSTRUKSI
KLAS K. 175 ( KLAS A )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
K. 725

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

URAIAN :

ANGGAPAN/ASUMSI :

1. Matrial dikirim oleh levelansir


2. Pasang bigesting (lihat K.211)
3. Pengadukan beton ditempat buruhan
4. Adukan beton dituang ditempat yang dikehendaki
dan digetar supaya padat

1. Keperluan matrial dikirim ketempat buruhan oleh levelansir


2. Produksi 6,4 m3/hari-6 jam, 9 campuran/jam
3. Campuran beton 1:2:3
4. Untuk 1 m3 dibutuhkan 7,50 pc (40kg/zak) atau 300 Kg pc/m3
5. Perancah langsung dipasang di tempat
6. Tidak termasuk buruhan pembesian
7. Dipakai agregat pecah dan tersaring

PEKERJA

P
E
K
E
R
J
A

Mandor
Buruh tak terlatih
Buruh semi terlatih

VOL

HARI

1
12
2

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L101
L103

U PAH
Rp./hari/orang

1
12
2

B IAYA
(Rp.)

60,000.00
35,000.00
40,000.00

60,000.00
420,000.00
80,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Pasir
Semen
Alat bantu
Batu pecah tersaring

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////

M041
M080
M170
K017

m3
kg
set
m3

TOTAL
VOL

HARGA
(Rp./unit)

3.00
1,920.00
0.60
4.60

100,000.00
1,340.00
40,000.00
272,015.39

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Concrete Vibrator 4 HP
Concrete Mixer 0,125 m3 6 HP
Water Pump Q 5 cm 8 HP

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
1
1
1

6 M3

KODE

1
1
1

JAM
KERJA

E089
E251
E341

Harga Satuan Rp.

B IAYA
(Rp. / jam )
5
5
5

560,000.00
SUB TOTAL
(Rp.)

300,000.00
2,572,800.00
24,000.00
1,251,270.79

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

6,776.96
7,857.62
11,722.42

4,148,070.79
SUB TOTAL
(Rp.)

33,884.80
39,288.10
58,612.10

PERALATAN

131,785.00

TOTAL (Rp.)

4,839,855.79

806,642.63 per M3

ANALISA HARGA SATUAN


BRONJONG PENAHAN
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE
K. 815

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

URAIAN :

ANGGAPAN/ASUMSI :

1. Gali muka tanah untuk tempat bronjong


2. Rangkai dan bentuk anyaman bronjong
3. Isi anyaman kawat dengan batu
4. Anyaman dibuat kokoh dengan ikatan kawat
5. Timbunan kembali hingga mantap

1. Batu dikirim kelapangan oleh levelansir


2. Anyaman bronjong dikirim kelapangan oleh levelansir
3. Selesai dalam 2 hari

PEKERJA

P
E
K
E
R
J
A

Mandor
Buruh tak terlatih
Buruh semi terlatih
Buruh terampil

VOL

HARI

1
35
5
2

KODE

2
2
2
2

TOTAL VOL
(org.hari)

L061
L101
L103
L106

2
70
10
4

U PAH
Rp./hari/orang
60,000.00
35,000.00
40,000.00
31,800.00

TANGGAL :
Januari 2012

B IAYA
(Rp.)
120,000.00
2,450,000.00
400,000.00
127,200.01

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Batu blonos
Alat bantu
Kawat pengikat

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////

M020
M170
M162

m3
set
kg

TOTAL
VOL
25.00
3.30
200.00

HARGA
(Rp./unit)
101,428.57
40,000.00
18,000.00

B IAYA
(Rp.)

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

P
E
R
A
L
A
T
A
N

VOLUME/QUANTITY

25 M3

Harga Satuan Rp.

B IAYA
(Rp. / jam )

3,097,200.01
SUB TOTAL
(Rp.)

2,535,714.29
132,000.00
3,600,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

6,267,714.29
SUB TOTAL
(Rp.)

PERALATAN

0.00

TOTAL (Rp.)

9,364,914.29

374,596.57 per M3

ANALISA HARGA SATUAN


PRODUKSI KRIKIL PECAH TERSARING MENGGUNAKAN
KERIKIL SUNGAI ( MENGGUNAKAN ALAT )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
K. 017

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

URAIAN :

ANGGAPAN/ASUMSI :

1. Buldozer membuat timbunan dipinggir sungai


2. Wheel loader memuat ketruk yang membongkar
batu ditempat penyaringan
3. Batu oversize dipecah mesin
4. Hasil pecahan batu dicampur kembali dengan batu
dari sungai yang lolos saringan

1. Menggunakan alat berat (60m3/hari) matrial diolah dua kali


2. Batu diambil dari sungai & diangkut ketempat pemecah batu
3. 33,3 % batu lolos saringan pada mesin dengan produksi 15 ton/jam
4. 70 % batu yang sudah dipecah dicampur kembali dengan batu dari sungai
yang lolos saringan
5. Volume yang diukur berdasarkan 5 ton/truk (lepas), 1 trip/tr BJ = 1,5
6. Jarak angkut dari tempat sumber ketempat buruhan 10 Km
7. Rata-rata umur alat bantu 1 bulan orang per set

PEKERJA

P
E
K
E
R
J
A

VOL

HARI

Mandor
Operator terlatih
Operator semi terlatih
Supir
Buruh tak terlatih
Buruh semi terlatih

1
3
2
4
4
4

KODE

1
1
1
1
1
1

TOTAL VOL
(org.hari)

L061
L081
L082
L091
L101
L103

U PAH
Rp./hari/orang
1
3
2
4
4
4

B IAYA
(Rp.)

60,000.00
55,000.00
50,000.00
50,000.00
35,000.00
40,000.00

60,000.00
165,000.00
100,000.00
200,000.00
140,000.00
160,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Kerikil sungai
Alat bantu

P E R ALATAN

P
E
R
A
L
A
T
A
N

Bulldozer 100 HP
Crusher 30 T/h 140 HP
Loader Wheeld 115 HP
Dump truk 5 T 145 HP

VOLUME/QUANTITY

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////

m3
kg

M012
M170

JUMLAH

HARI
KERJA

TOTAL
VOL

HARGA
(Rp./unit)

80.00
0.20

40,000.00
40,000.00

B IAYA
(Rp.)

1
1
1
4

60 M3

1
1
1
1

JAM
KERJA

E001
E031
E052
E212

Harga Satuan Rp.

B IAYA
(Rp. / jam )
6
6
6
24

319,682.01
601,324.46
204,726.82
230,563.48

825,000.00
SUB TOTAL
(Rp.)

3,200,000.00
8,000.00

MATERIAL
KODE

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

3,208,000.00
SUB TOTAL
(Rp.)

1,918,092.06
3,607,946.76
1,228,360.92
5,533,523.52

PERALATAN

12,287,923.26

TOTAL (Rp.)

16,320,923.26

272,015.39 per M3

ANALISA HARGA SATUAN


PROPELERING PENETRASI MAKADAM
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
K. 637

DISIAPKAN OLEH :
BINA PROGRAM

URAIAN :

ANGGAPAN/ASUMSI :

1. Semprotkan aspal tack coat 0,5 l/m3


2. Hampar split 3-5 cm, rata-2 16 m2/m3
3. Hampar agregat 2-3 cm, 60 m2/m3
4. Padatkan masing-2 lapis batu
5. Semprotkan aspal 3,7 l/m3
6. Tabur agregat 1-2 cm, 70 m2/m3
7. Semprot aspal 1,5 l/m2
8. Tabur Bt pch 0,5-1 cm pada 90 m2/m3

1. Menggunakan tenaga manusia


2. Batu pecah dikirim ketempat buruhan oleh levelansir
3. Tebal perkerasan total 7 cm
4. Hasil kerja 2000 m2/minggu (6 hari)

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Buruh tak terlatih
Buruh terlatih
Supir

VOL

HARI

2
2
66
2
1

KODE

3
3
3
3
3

TOTAL VOL
(org.hari)

L061
L081
L101
L106
L091

6
6
198
6
3

U PAH
Rp./hari/orang
60,000.00
55,000.00
35,000.00
31,800.00
50,000.00

TANGGAL :
Januari 2012

B IAYA
(Rp.)
360,000.00
330,000.00
6,930,000.00
190,800.01
150,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Batu pecah mesin 3-5 cm


Batu pecah mesin 2-3 cm
Batu pecah mesin 1-2 cm
Batu pecah mesin 0,5-1 cm
Abu batu
Aspal
Minyak bakar
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////

M 028
M 029
M 030
M 026
M 027
M 061
M 065
M 170

m3
m3
m3
m3
m3
kg
lt
set

TOTAL
VOL

HARGA
(Rp./unit)

62.00
16.60
14.20
11.10
1.00
5,500.00
365.00
8.00

200,000.00
195,000.00
200,000.00
200,000.00
207,000.00
9,310.00
6,200.00
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Roller 3 Wheeld 8-10 T 51 HP


Aspal Sprayer 400 L 6 HP
Flat Bed truck 4 T 80 HP

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
1
1
1

70 m3

KODE

3
3
3

JAM
KERJA

E080
E154
E221

Harga Satuan Rp.

B IAYA
(Rp. / jam )
15
15
15

92,330.20
24,311.73
225,719.94

7,960,800.01
SUB TOTAL
(Rp.)

12,400,000.00
3,237,000.00
2,840,000.00
2,220,000.00
207,000.00
51,205,000.00
2,263,000.00
320,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

74,692,000.00
SUB TOTAL
(Rp.)

1,384,953.00
364,675.95
3,385,799.10

PERALATAN

5,135,428.05

TOTAL (Rp.)

87,788,228.06

1,254,117.54 per m3

ANALISA HARGA SATUAN


LAPIS PENETRASI MAKADAM 5 CM ( LAPEN )
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
K. 618

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

URAIAN :

ANGGAPAN/ASUMSI :

1. Semprotkan aspal tack coat 0,8 l/m3


2. Hamparkan dengan agregat pokok 3-5;25 m2/m3
dan dipadatkan
3. Hamparkan split 2-3;45 m2/m3 dan padatkan
4. Semprotkan aspal (2,5 kg/m2)
5. Hamparkan agregat pengunci 1-2;90 m2/m3
6. Semprotkan aspal 1,5 kg/m2 digilas
7. Taburkan batu pecah 0,5-1 cm rata-2 400 m2/m3

1. Menggunakan tenaga buruh


2. Harga matrial(agregat pokok,agregat pengunci,agregat penutup,aspal adalah
harga dilokasi proyek
3. Volume aspal cair untuk tack coat/prime coat 0,8 l/m2
4. Tebal lapisan penetrasi 5 cm
5. Agregat dikirim sampai tempat buruhan oleh levelansir

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Buruh tak terampil
Buruh terampil
Supir

VOL

HARI

2
2
66
2
1

KODE

3
3
3
3
3

TOTAL VOL
(org.hari)

L061
L081
L101
L106
L091

6
6
198
6
3

U PAH
Rp./hari/orang
60,000.00
55,000.00
35,000.00
31,800.00
50,000.00

B IAYA
(Rp.)
360,000.00
330,000.00
6,930,000.00
190,800.01
150,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Batu pecah 3-5 cm


Batu pecah 2-3 cm
Batu pecah 1-2 cm
Batu pecah 0,5 - 1 cm
Abu batu
Aspal
Minyak bakar
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////

M 028
M 029
M 030
M 026
M 027
M 061
M 065
M 170

m3
m3
m3
m3
m3
kg
lt
set

TOTAL
VOL

HARGA
(Rp./unit)

52.50
30.60
10.57
9.14
1.22
6,270.00
450.00
8.00

200,000.00
195,000.00
200,000.00
200,000.00
207,000.00
9,310.00
6,200.00
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Roller 3 Wheeld 8-10 T 51 HP


Asphal Sprayer 400 L 6 HP
Flat Bad Truck 4 T 80 HP

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
1
1
1

1400 m2

KODE

3
3
3

JAM
KERJA

E080
E154
E221

Harga Satuan Rp.

B IAYA
(Rp. / jam )
15
15
15

92,330.20
24,311.73
225,719.94

7,960,800.01
SUB TOTAL
(Rp.)

10,500,000.00
5,967,000.00
2,114,000.00
1,828,000.00
252,540.00
58,373,700.00
2,790,000.00
320,000.00
MATERIAL

P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

82,145,240.00
SUB TOTAL
(Rp.)

1,384,953.00
364,675.95
3,385,799.10

PERALATAN

5,135,428.05

TOTAL (Rp.)

95,241,468.06

68,029.62 per m2

ANALISA HARGA SATUAN


MEMBUAT PARIT GALIAN TANAH
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE
K. 110

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

URAIAN :

ANGGAPAN/ASUMSI :

1. Galian parit
2. Pembuangan hasil galian menggunakan Truck

1. Menggunakan tenaga manusia 100 m/hari


2. Dimensi saluran : lbr bawah = 0,50 m, lbr atas 1,30 m, kedalaman = 0,60 m
3. 25 % hasil galian dibuang setempat
4. Hasil galian dibuang sejauh 2 km
5. Menggali da membuang dihitung 1,50 m3/hari/orang
6. Penggunaan alat bantu 1 bulan orang

PEKERJA

P
E
K
E
R
J
A

Mandor
Sopir
Buruh tak terlatih

VOL

HARI

1
2
36

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L091
L101

1
2
36

U PAH
Rp./hari/orang
60,000.00
-35,000.00

B IAYA
(Rp.)
60,000.00
-1,260,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////

M170

set

TOTAL
VOL

HARGA
(Rp./unit)
1.5

B IAYA
(Rp.)

40,000.00

P
E
R
A
L
A
T
A
N

Plat Bed Truck 4 Ton 80 HP

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
2

54 M3

KODE

JAM
KERJA

1 E.221

Harga Satuan Rp.

10

1,320,000.00
SUB TOTAL
(Rp.)

60,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp. / jam )

B IAYA
(Rp.)

--

--

60,000.00
SUB TOTAL
(Rp.)

PERALATAN

0.00

TOTAL (Rp.)

1,380,000.00

25,555.56 per M3

ANALISA HARGA SATUAN


PENIMBUNAN DAN PEMADATAN (urugan kembali)
( MENGGUNAKAN BURUH )
KODE :
(28)

1. Struktur dibersihkan dari bahan bahan organik


2. Timbun kembali bagian belakang srtuktur
3. Padatkan dengan stamper dan Plat Vibrator Stamper

PEKERJA

P
E
K
E
R
J
A

Mandor
Buruh tak terlatih
Buruh semi terlatih

KODE
K. 225 a

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

1. Timbunan dipadatkan berlapis tebal 10 cm

VOL

HARI

1
10
1

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L101
L103

1
10
1

U PAH
Rp./hari/orang

B IAYA
(Rp.)

60,000.00
35,000.00
40,000.00

60,000.00
350,000.00
40,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Material galian pilihan


Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////

M045
M170

m3
set

TOTAL
VOL

HARGA
(Rp./unit)

20.00
0.30

72,000.00
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Mesin gilas bergetar 1 Tonne 7 HP


Plate Vibrator Tamper 4 HP

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
1
1

15 M3

KODE

1
2

JAM
KERJA

E087
E088

Harga Satuan Rp.

B IAYA
(Rp. / jam )
5
10

450,000.00
SUB TOTAL
(Rp.)

1,440,000.00
12,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

-7,732.99

1,452,000.00
SUB TOTAL
(Rp.)

-77,329.90

PERALATAN

77,329.90

TOTAL (Rp.)

1,979,329.90

131,955.33 per M3

ANALISA HARGA SATUAN


PENIMBUNAN DAN PEMADATAN
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE
K. 225

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

URAIAN :

ANGGAPAN/ASUMSI :

1. Struktur dibersihkan dari bahan bahan organik


2. Timbun kembali bagian belakang srtuktur
3. Padatkan dengan stamper dan Plat Vibrator Stamper

1. Bahan timbunan dikirim ke lapangan oleh levelansir


2. Timbunan dipadatkan berlapis tebal 10 cm

PEKERJA

P
E
K
E
R
J
A

Mandor
Buruh tak terlatih
Buruh semi terlatih

VOL

HARI

1
10
1

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L101
L103

1
10
1

U PAH
Rp./hari/orang

TANGGAL :
Januari 2012

B IAYA
(Rp.)

60,000.00
35,000.00
40,000.00

60,000.00
350,000.00
40,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Sirtu
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////

M045
M170

m3
set

TOTAL
VOL

HARGA
(Rp./unit)

20.00
0.30

72,000.00
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Mesin gilas bergetar 1 Tonne 7 HP


Plate Vibrator Tamper 4 HP

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
1
1

15 M3

KODE

1
2

JAM
KERJA

E087
E088

Harga Satuan Rp.

B IAYA
(Rp. / jam )
5
10

450,000.00
SUB TOTAL
(Rp.)

1,440,000.00
12,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

-7,732.99

1,452,000.00
SUB TOTAL
(Rp.)

-77,329.90

PERALATAN

77,329.90

TOTAL (Rp.)

1,979,329.90

131,955.33 per M3

ANALISA HARGA SATUAN


LABURAN ASPAL SATU LAPIS ( BURTU )
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Bersihkan permukaan aspal dari matrial lepas
2. Semprotkan primer aspal cair MC "0"
3. Lapisi permukaan aspal dengan bitumen dan taburkan
split serta digilas

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Supir
Buruh tak terlatih
Buruh semi terlatih
Buruh terlatih

KODE :
(28)

KODE
K. 615

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. Hasil kerja 600 m2/hari
2. Agregat ukuran halus hasil saringan 20 mm dari mesin pemecah batu ditimbun
ditempat buruhan oleh levelansir
3. Permukaan yang dilabur telah selesai digilas dan terikat dengan binder
4. Laburan permukaan menggunakan aspal "MC" 1.0 liter/m2
5. Menggunakan minyak residu = 1,60 liter/m2
6. Agregat halus 1,2 cm disebar

VOL

HARI

1
1
2
15
2
2

KODE

3
3
3
3
3
3

TOTAL VOL
(org.hari)

L061
L081
L091
L101
L103
L106

3
3
6
45
6
6

U PAH
Rp./hari/orang
60,000.00
55,000.00
-35,000.00
40,000.00
31,800.00

B IAYA
(Rp.)
180,000.00
165,000.00
-1,575,000.00
240,000.00
190,800.01
buruh

MAT E R IAL

M
A
T
E
R
I
A
L

Aspal
Minyak bakar
Kerikil pecah tersaring
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////

M061
M065
K017
M170

kg
lt
m3
set

TOTAL
VOL

HARGA
(Rp./unit)

3,745.00
580.00
36.00
1.50

9,310.00
6,200.00
272,015.39
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Peralatan traktor dll


Roller 3 Wheled 8-10 T 51 HP
Asphal Spayer Towed 350 L 7 HP
Dump truck 3,50 Tonne
Wheel Tracktor 60 HP
Chipspreader

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
1
1
1
2
1
2

1800 M2

KODE

3
3
3
3
3
3

JAM
KERJA

E401
E080
E153
E211
E053
E130

Harga Satuan Rp.

B IAYA
(Rp. / jam )
15
15
15
30
15
30

-92,330.20
45,229.00
----

2,350,800.01
SUB TOTAL
(Rp.)

34,865,950.00
3,596,000.00
9,792,554.04
60,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

48,314,504.04
SUB TOTAL
(Rp.)

-1,384,953.00
678,435.00
----

PERALATAN

2,063,388.00

TOTAL (Rp.)

52,728,692.05

29,293.72 per M2

ANALISA HARGA SATUAN


LABURAN ASPAL DUA LAPIS ( BURDA )
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Permukaan harus rata kering dan bersih
2. Untuk permukaan jalan yang tak beraspal perlu
prime coat 0,7 liter/m2
3. Menebarkan agregat/batu pecah 1,20 cm dengan
gradasi seragam dua lapis
4. Pemadatan dengan mesin gilas roda baja

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Supir
Buruh tak terlatih
Buruh terlatih
Buruh semi terlatih

KODE :
(28)

KODE
K. 617

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. Kapasitas 450 m2/hari
2. Agregat ukuran 1 - 2 cm dari pemecah batu ditimbun dilokasi buruhan
oleh levelansir
3. Permukaan yang diaspal harus sudah dipadatkan diadakan dibinding disiram
primer aspal cair 1 liter /m2
4. Bitumen residu yang dipakai : lapis 1 sebanyak 1,60 liter/m2
: lapis 2 sebanyak 1,30 liter/m2
VOL

HARI

1
2
2
15
2
2

KODE

4
4
4
4
4
4

TOTAL VOL
(org.hari)

L061
L081
L091
L101
L106
L103

4
8
8
60
8
8

U PAH
Rp./hari/orang
60,000.00
55,000.00
-35,000.00
31,800.00
40,000.00

B IAYA
(Rp.)
240,000.00
440,000.00
-2,100,000.00
254,400.01
320,000.00
buruh

MAT E R IAL

M
A
T
E
R
I
A
L

Batu pecah tersaring


Aspal
Minyak bakar
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////

K017
M061
M065
M170

m3
kg
lt
set

TOTAL
VOL

HARGA
(Rp./unit)

54.00
6,085.00
580.00
2.50

272,015.39
9,310.00
6,200.00
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Peralatan traktor dll


Roller Wheeed 8-10 T 51 HP
Aspal Spayer Towed 350 L 7 HP
Dump truck 3,50 Tone
Wheel Tracktor 60 HP
Chipspreader

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
1
1
1
1
1
2

1800 M2

KODE

3
3
3
3
3
3

JAM
KERJA

E401
E080
E153
E211
E053
E130

Harga Satuan Rp.

B IAYA
(Rp. / jam )
15
15
15
15
15
30

-92,330.20
45,229.00
----

3,354,400.01
SUB TOTAL
(Rp.)

14,688,831.06
56,651,350.00
3,596,000.00
100,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

75,036,181.06
SUB TOTAL
(Rp.)

-1,384,953.00
678,435.00
----

PERALATAN

2,063,388.00

TOTAL (Rp.)

80,453,969.07

44,696.65 per M2

ANALISA HARGA SATUAN


MEMPRODUKSI LAPIS TIPIS ASPAL BETON
( MENGGUNAKAN ALAT )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Semua matrial dikirim oleh levelansir
2. Loader menjaga agar bin tetap penuh
3. Hasil produksi 100 ton/hari
4. Pengangkutan dengan dump truck tertutup dengan
terpal

PEKERJA

P
E
K
E
R
J
A

Mandor
Mekanik terlatih
Operator terlatih
Operator semi terlatih
Sopir
Buruh tak terlatih
Buruh semi terlatih

KODE :
(28)

KODE
K. 035

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. HRS dari AMP dengan produksi 100 Ton/hari
2. Dipakai agregat pecah tersaring
3. Aspal dipanaskan duluan agar siap pada waktunya
4. Biaya produksi termasuk pengangkutan sejauh 40 Km dari AMP
5. Produksi dimuat dengan truck 5 ton diantar ketempat buruhan
6. Rata-rata umur alat bantu 1 bulan 1 orang/set
7. Spec.BM No. 12/PT/1983 (tabel 3.3)

VOL

HARI

1
1
3
2
17
5
6

KODE

1
1
1
1
1
1
1

TOTAL VOL
(org.hari)

L061
L071
L081
L082
L091
L101
L103

1
1
3
2
17
5
6

U PAH
Rp./hari/orang
60,000.00
60,000.00
55,000.00
40,000.00
50,000.00
35,000.00
40,000.00

B IAYA
(Rp.)
60,000.00
60,000.00
165,000.00
80,000.00
850,000.00
175,000.00
240,000.00
buruh

MAT E R IAL

M
A
T
E
R
I
A
L

Batu pecahmesin 0.5


Aspal curah
Batu pecah tersaring
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////

M041
M061
M017
M170

m3
kg
kg
set

TOTAL
VOL

HARGA
(Rp./unit)

38.00
9,000.00
14.00
0.20

200,000.00
8,000.00
272,015.39
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Loader Wheeled 115 HP


Asph Mixing plant 30 T/h 125 HP
Dump truck 5 T 145 HP
Bulldozer 100 HP
Pemecah batu

VOLUME/QUANTITY

JUMLAH

HARI
KERJA

1
1
17
1
1

100 TONE

KODE

1
1
1
1
1

E052
E155
E212
E001
E031

JAM
KERJA

B IAYA
(Rp. / jam )
6
5
28
1
1

204,726.82
726,885.00
230,563.48
319,682.01
601,324.46

1,630,000.00
SUB TOTAL
(Rp.)

7,600,000.00
72,000,000.00
3,808,215.46
8,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

83,416,215.46
SUB TOTAL
(Rp.)

1,228,360.92
3,634,425.00
6,455,777.44
319,682.01
601,324.46

PERALATAN

12,239,569.83

TOTAL (Rp.)

97,285,785.29

972,857.85 Per Tonne

ANALISA HARGA SATUAN


PENGHAMPARAN DAN PEMADATAN LATASTON
( MENGGUNAKAN ALAT )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Pengiriman matrial sampai bin preader
2. Matrial dihampar dengan mesin spreader dipadatkan
dengan mesin gilas roda dan roda ban pneumatick

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Buruh tak terlatih
Buruh terlatih

KODE :
(28)

KODE
K. 636

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. Menggunakan alat berat 1500 m2 / hari
2. Asbuton campuran panas dikirim oleh levelansir ke tempat buruhan
3. BJ asbuton padat 2,2 ton / m3
4. Spec. BM No. 12 / DT / B / 1983
5. Rata-rata tebal lapisan 3 cm

VOL

HARI

1
4
12
8

KODE

1
1
1
1

TOTAL VOL
(org.hari)

L061
L081
L101
L106

U PAH
Rp./hari/orang

1
4
12
8

B IAYA
(Rp.)

60,000.00
55,000.00
35,000.00
31,800.00

60,000.00
220,000.00
420,000.00
254,400.01

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Aspal curah
Minyak bakar
Campuran Lataston
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////

M061
M065
K035
M170

kg
lt
Ton
set

TOTAL
VOL

HARGA
(Rp./unit)

450.00
300.00
100.00
0.50

8,000.00
6,200.00
972,857.85
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Tandum Roller 6-10 T 135 HP


Pneumatic Roller 8-15 T 95 HP
Aspal Sprayer Towed 350 L 7 HP
Asphal Finisher 30 HP
Compresor air 150 m3 20 HP

VOLUME/QUANTITY

JUMLAH

HARI
KERJA

1
1
1
1
1

1500 M2

KODE

1
1
1
1
1

JAM
KERJA

E081
E084
E153
E157
E301

Harga Satuan Rp.

B IAYA
(Rp. / jam )

5
5
5
5
4

127,286.30
238,449.28
45,229.00
124,471.80
51,899.52

954,400.01
SUB TOTAL
(Rp.)

3,600,000.00
1,860,000.00
97,285,785.29
20,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

102,765,785.29
SUB TOTAL
(Rp.)

636,431.50
1,192,246.40
226,145.00
622,359.00
207,598.08

PERALATAN

2,884,779.98

TOTAL (Rp.)

106,604,965.28

71,069.98 per m2

ANALISA HARGA SATUAN


KONSTRUKSI LAPIS PONDASI ATAS ( LPB ) TELFORD
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Matrial disiapkan dilokasi buruhan
2. Menghampar pasir setebal 5 cm
3. Batu pecah berukuran 15 - 20 cm
4. Batu pecah yang lebih kecil mengisi rongga diatasnya
sehingga rata kemudian dipadatkan/digilas dengan
mesin gilas

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Buruh tak terlatih

KODE :
(28)

KODE
K. 516

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. Menggunakan tenaga manusia 400 m2 per/hari
2. Matrial -matrial dikirim ke tempat buruhan oleh levelansir
3. Batu sudah dipecah
4. Tanah dasar sudah disiapkan
5. Dipadatkan sampai tebal 20 cm

VOL

HARI

3
1
99

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L081
L101

U PAH
Rp./hari/orang

3
1
99

60,000.00
55,000.00
35,000.00

B IAYA
(Rp.)
180,000.00
55,000.00
3,465,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Batu belah uk. 15 - 20 cm


Batu pecah tangan uk. 5 - 7 cm
Pasir urug
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////

M020
M022
M040
M170

m3
m3
m3
set

TOTAL
VOL

HARGA
(Rp./unit)

50.00
20.00
30.00
4.00

111,400.00
128,500.00
75,000.00
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Roller 3 Wheled 8-10 T 51 HP

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
1

80 M3

KODE

JAM
KERJA

E080

Harga Satuan Rp.

B IAYA
(Rp. / jam )
5

92,330.20

183,895.64 m3

3,700,000.00
SUB TOTAL
(Rp.)

5,570,000.00
2,570,000.00
2,250,000.00
160,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

10,550,000.00
SUB TOTAL
(Rp.)

461,651.00

PERALATAN

461,651.00

TOTAL (Rp.)

14,711,651.00

ANALISA HARGA SATUAN


LABURAN ASPAL PASIR ( BURAS )
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Hanya berfungsi sebagai penutup permukaan jalan
supaya tidak berdebu
2. Lubang-lubang yang ada harus ditambal dan
permukaan harus kering bebas debu
3. Aspal yang telah dipanaskan s/d 110 derajat celcius
disiramkan secara merata
4. Kemudian pasir disebarkan diatasnya dan digilas
dengan mesin gilas roda baja

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Supir
Buruh tak terlatih
Buruh semi terlatih
Buruh terlatih

KODE
K. 612

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. Kemampuan kerja 2400 (4x600) m2/hari
2. Pasir dikirim oleh levelansir sampai ketempat kerja
3. Kebutuhan aspal 1,2 lt/m2 aspal residu 0,96 lt/m3
4. Pasir disebar rata-rata 55 m2/m3
5. Pemanasan aspal dengan ketel dilakukan dilokasi buruhan

VOL

HARI

1
1
2
10
2
2

KODE

1
1
1
1
1
1

TOTAL VOL
(org.hari)

L061
L081
L091
L101
L103
L106

1
1
2
10
2
2

U PAH
Rp./hari/orang

B IAYA
(Rp.)

60,000.00
55,000.00
-35,000.00
40,000.00
31,800.00

60,000.00
55,000.00
-350,000.00
80,000.00
63,600.00
buruh

MAT E R IAL

M
A
T
E
R
I
A
L

Batu pecah mesin 0,5 - 1 cm


Aspal
Minyak bakar
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////

M026
M061
M065
M170

m3
kg
lt
set

TOTAL
VOL

HARGA
(Rp./unit)

43.00
2,900.00
300.00
0.50

200,000.00
9,310.00
6,200.00
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Roller 3 Wheled 8-10 T 51 HP


Asphal Sprayer Towed 350 L 7 HP
Plate Bad Truck 4 Ton 80 HP

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
1
1
2

2400 M2

KODE

1
1
1

JAM
KERJA

E080
E153
E221

Harga Satuan Rp.

B IAYA
(Rp. / jam )
5
5
10

608,600.00
SUB TOTAL
(Rp.)

8,600,000.00
26,999,000.00
1,860,000.00
20,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

92,330.20
45,229.00
--

37,479,000.00
SUB TOTAL
(Rp.)

461,651.00
226,145.00
--

PERALATAN

687,796.00

TOTAL (Rp.)

38,775,396.00

16,156.42 per M2

ANALISA HARGA SATUAN


PENGHAMPARAN DAN PEMADATAN LATASIR 2 CM
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Suplier mengirim matrial sampai bin spreader
2. Matrial dihampar dengan spreader dan dipadatkan
dengan mesin gilas roda baja

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Buruh tak terlatih
Buruh semi terlatih

KODE :
(28)

KODE
K. 621

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. Kapasitas 1750 m2/hari
2. Pasir aspal dikirim oleh levelansier ketempat buruhan
3. BJ asbuton padat 1,90 ton/m3
4. Rata - rata tebal lapisan padat 2 cm

VOL

HARI

1
1
17
8

KODE

3
3
3
3

TOTAL VOL
(org.hari)

L061
L081
L101
L103

3
3
51
24

U PAH
Rp./hari/orang
60,000.00
55,000.00
35,000.00
40,000.00

B IAYA
(Rp.)
180,000.00
165,000.00
1,785,000.00
960,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Campuran Latasir
Aspal curah
Minyak bakar
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////

K020
M061
M065
M170

Tone
kg
lt
set

TOTAL
VOL

HARGA
(Rp./unit)

200.00
1,320.00
200.00
1.00

1,031,075.03
8,000.00
6,200.00
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Peralatan traktor dll


Roller 3 Wheled 8-10 T 51 HP
Aspal sprayer Towed 350 L 7 HP
Dump truck 3,50 Tone
Wheel Tracktor 60 HP
Chipspreader

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
1
1
1
1
1
1

5250 M2

KODE

3
3
3
3
3
3

JAM
KERJA

E401
E080
E153
E211
E053
E130

Harga Satuan Rp.

B IAYA
(Rp. / jam )
15
15
15
15
15
15

-92,330.20
45,229.00
----

3,090,000.00
SUB TOTAL
(Rp.)

206,215,006.00
10,560,000.00
1,240,000.00
40,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

218,055,006.00
SUB TOTAL
(Rp.)

-1,384,953.00
678,435.00
----

PERALATAN

2,063,388.00

TOTAL (Rp.)

223,208,394.00

42,515.88 per M2

ANALISA HARGA SATUAN


MEMBUAT CAMPURAN, MENGHAMPAR DAN PEMADATAN LATASIR 2 CM
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Suplier mengirim matrial sampai bin spreader
2. Matrial dihampar dengan spreader dan dipadatkan
dengan mesin gilas roda baja

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Buruh tak terlatih
Buruh semi terlatih

KODE :
(28)

KODE
K. 621 a

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. Menggunakan tenaga buruh 400 m2/hari
2. Pasir aspal dikirim oleh levelansier ketempat buruhan
3. Rata - rata tebal lapisan padat berkisar antara 1,5 cm s/d 2 cm

VOL

HARI

1
1
25
10

KODE

1
1
1
1

TOTAL VOL
(org.hari)

L061
L081
L101
L103

U PAH
Rp./hari/orang

1
1
25
10

B IAYA
(Rp.)

60,000.00
55,000.00
35,000.00
40,000.00

60,000.00
55,000.00
875,000.00
400,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Aspal untuk campuran


Batu pecah mesin 0.5
Abu batu (filler)
Aspal untuk prime coat
Minyak bakar

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////
///////////////////

M061
M041
M027
M061
M065

kg
m3
m3
kg
Ltr

TOTAL
VOL

HARGA
(Rp./unit)

1,371.40
6.86
1.57
100.57
223.00

9,310.00
200,000.00
207,000.00
8,000.00
6,200.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Roller 3 Wheled 8-10 T 51 HP


Aspal Sprayer Towed 350 L 7 HP

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
1
1

400 M2

KODE

1
1

JAM
KERJA

E080
E153

Harga Satuan Rp.

B IAYA
(Rp. / jam )
5
5

1,390,000.00
SUB TOTAL
(Rp.)

12,767,734.00
1,372,000.00
324,990.00
804,560.00
1,382,600.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

92,330.20
45,229.00

16,651,884.00
SUB TOTAL
(Rp.)

461,651.00
226,145.00

PERALATAN

687,796.00

TOTAL (Rp.)

18,729,680.00

46,824.20 per M2

ANALISA HARGA SATUAN


MEMPRODUKSI CAMPURAN LATASIR
( MENGGUNAKAN ALAT )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Semua matrial dikirim oleh Suplair ke AMP
2. Wheel loader menjaga bin selalu penuh
3. Produksi mesin 100 Tone/hari
4. Hasil produksi diangkut dengan Dump Truck ke
lokasi penghamparan

PEKERJA

P
E
K
E
R
J
A

Mandor
Mekanik terlatih
Operator terlatih
Supir
Buruh tak terlatih
Buruh semi terlatih

KODE
K. 020

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. LATASIR dihasilkan dari AMP produksi 100 Tone/hari
2. Aspal dipanaskan agar tersedia pada waktunya
3. Hasil produksi termasuk pengangkutan sampai 40 km ketempat buruhan
4. Hasil dimuat dalam Dump truck Kap 5 Tone dan dikirim ketempat buruhan
5. Rata-rata umur alat bantu sebulan/orang set
6. Sesuai spesifikasi BM No.12/PT/B/1983

VOL

HARI

1
1
2
14
4
5

KODE

1
1
1
1
1
1

TOTAL VOL
(org.hari)

L061
L071
L081
L091
L101
L103

1
1
2
14
4
5

U PAH
Rp./hari/orang
60,000.00
60,000.00
55,000.00
50,000.00
35,000.00
40,000.00

B IAYA
(Rp.)
60,000.00
60,000.00
110,000.00
700,000.00
140,000.00
200,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Pasir beton
Aspal curah
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////

M041
M061
M170

m3
kg
set

TOTAL
VOL

HARGA
(Rp./unit)

45.00
9,000.00
1.00

200,000.00
8,000.00
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Loader Wheled 115 Hp


Asph MIxing Plant 30 T 125 HP
Dump truck 5 Tone 145 HP

VOLUME/QUANTITY

JUMLAH

HARI
KERJA

1
1
14

100 TONE

KODE

1
1
1

JAM
KERJA

E052
E155
E212

Harga Satuan Rp.

B IAYA
(Rp. / jam )
5
5
70

204,726.82
726,885.00
230,563.48

1,270,000.00
SUB TOTAL
(Rp.)

9,000,000.00
72,000,000.00
40,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

81,040,000.00
SUB TOTAL
(Rp.)

1,023,634.10
3,634,425.00
16,139,443.60

PERALATAN

20,797,502.70

TOTAL (Rp.)

103,107,502.70

1,031,075.03 per Tonne

ANALISA HARGA SATUAN


PENGUPASAN TANAH DAN PEMBERSIHAN SEMAK PADA DAMIJA
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Mengupas dan membuang semak - semak dengan
tenaga manusia pada DMJ (Daerah milik jalan )

PEKERJA

P
E
K
E
R
J
A

Mandor
Buruh tak terlatih

KODE :
(28)

KODE
K. 210

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. Menngunakan tenaga manusia (9 m x 100 m/hari
2. Hasil kerja 25 m2/orang hari
3. Menggunakan alat bantu rata-rata 1 bulan orang
4. Bakarlah sampah ditempat buruhan

VOL

HARI

1
36

KODE

1
1

TOTAL VOL
(org.hari)

L061
L101

1
36

U PAH
Rp./hari/orang
60,000.00
35,000.00

B IAYA
(Rp.)
60,000.00
1,260,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////

M170

set

TOTAL
VOL
1.50

HARGA
(Rp./unit)
40,000.00

B IAYA
(Rp.)

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

B IAYA
(Rp. / jam )

P
E
R
A
L
A
T
A
N

VOLUME/QUANTITY

900 m2

Harga Satuan Rp.

1,533.33 m2

1,320,000.00
SUB TOTAL
(Rp.)

60,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

60,000.00
SUB TOTAL
(Rp.)

PERALATAN

0.00

TOTAL (Rp.)

1,380,000.00

ANALISA HARGA SATUAN


MEMBERSIHKAN RUMPUT & TANAMAN DI BAHU JALAN
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Patok semak belukan yang tumbuh pada bahu jalan
2. Bersihkan rumput/semak dari bahu jalan dan aspalan

PEKERJA

P
E
K
E
R
J
A

Mandor
Buruh tak terlatih

KODE :
(28)

KODE
K. 422

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. Menngunakan tenaga manusia (2 x 1,50 m x 500 m/hari
2. Dengan lebar 1,50 m dari tepi jalan rata-rata luas yang dibersihakan
3000 m2/km satu sisi
3. Hasil kerja 60 m2/hari orang
4. Sampah/reruntuhan dibuang sejauh 1 km
5. Penggunaan alat bantu 1 orang bulan

VOL

HARI

1
25

KODE

1
1

TOTAL VOL
(org.hari)

L061
L101

1
25

U PAH
Rp./hari/orang
60,000.00
35,000.00

B IAYA
(Rp.)
60,000.00
875,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////

M170

set

TOTAL
VOL
1.00

HARGA
(Rp./unit)
40,000.00

B IAYA
(Rp.)

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

B IAYA
(Rp. / jam )

P
E
R
A
L
A
T
A
N

VOLUME/QUANTITY

1500 m2

Harga Satuan Rp.

650.00 m2

935,000.00
SUB TOTAL
(Rp.)

40,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

40,000.00
SUB TOTAL
(Rp.)

PERALATAN

0.00

TOTAL (Rp.)

975,000.00

ANALISA HARGA SATUAN


PENGECATAN ULANG BESI
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. Permukaan lama yang akan dicat kembali dibersihkan
2. Permukaan yang sudah bersih dicat kembali satu kali cat

PEKERJA

P
E
K
E
R
J
A

KODE
K. T01

VOL

HARI

Mandor
Tukang cat
buruh semi terlatih

1
1
2

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L079
L103

U PAH
Rp./hari/orang
1
1
2

60,000.00
50,000.00
40,000.00

B IAYA
(Rp.)
60,000.00
50,000.00
80,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Cat besi
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////

M082
M170

Kg
Set

TOTAL
VOL
3.90
0.50

HARGA
(Rp./unit)
45,300.00
40,000.00

B IAYA
(Rp.)

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

B IAYA
(Rp. / jam )

P
E
R
A
L
A
T
A
N

VOLUME/QUANTITY

30 m2

Harga Satuan Rp.

12,889.00 m2

190,000.00
SUB TOTAL
(Rp.)

176,670.00
20,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

196,670.00
SUB TOTAL
(Rp.)

PERALATAN

0.00

TOTAL (Rp.)

386,670.00

ANALISA HARGA SATUAN


PENGECATAN DENGAN CAT DASAR
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. Permukaan yang akan dicat dibersihkan terlebih dulu
2. Permukaan yang sudah bersih dicat dasar satu kali cat

PEKERJA

P
E
K
E
R
J
A

KODE
K. T03

VOL

HARI

Mandor
Tukang cat
buruh semi terlatih

1
1
2

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L079
L103

U PAH
Rp./hari/orang
1
1
2

60,000.00
50,000.00
40,000.00

B IAYA
(Rp.)
60,000.00
50,000.00
80,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Cat menie besi


Amplas
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////

M081
M083
M170

Kg
Lb
Set

TOTAL
VOL
3.60
9.00
0.50

HARGA
(Rp./unit)
24,500.00
2,900.00
40,000.00

B IAYA
(Rp.)

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

B IAYA
(Rp. / jam )

P
E
R
A
L
A
T
A
N

VOLUME/QUANTITY

30 m2

Harga Satuan Rp.

10,810.00 m2

190,000.00
SUB TOTAL
(Rp.)

88,200.00
26,100.00
20,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

134,300.00
SUB TOTAL
(Rp.)

PERALATAN

0.00

TOTAL (Rp.)

324,300.00

ANALISA HARGA SATUAN


PENGECATAN BESI BARU
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. Permukaan yang akan dicat dibersihkan terlebih dulu
2. Permukaan yang sudah bersih dicat dasar satu kali cat
3. Sudah dicat dasar dicat permukaan tiga kali

PEKERJA

P
E
K
E
R
J
A

KODE
K. T02

Mandor
Tukang cat
buruh semi terlatih

VOL

HARI

1
5
10

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L079
L103

1
5
10

U PAH
Rp./hari/orang
60,000.00
50,000.00
40,000.00

B IAYA
(Rp.)
60,000.00
250,000.00
400,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Cat menie besi


Cat besi
Minyak cat
Amplas
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////
///////////////////

M081
M082
M066
M083
M170

Kg
Kg
Lt
Lb
Set

TOTAL
VOL
12.00
42.50
5.70
9.00
1.50

HARGA
(Rp./unit)
24,500.00
45,300.00
15,200.00
2,900.00
40,000.00

B IAYA
(Rp.)

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

B IAYA
(Rp. / jam )

P
E
R
A
L
A
T
A
N

VOLUME/QUANTITY

100 m2

Harga Satuan Rp.

31,019.90 m2

710,000.00
SUB TOTAL
(Rp.)

294,000.00
1,925,250.00
86,640.00
26,100.00
60,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

2,391,990.00
SUB TOTAL
(Rp.)

PERALATAN

0.00

TOTAL (Rp.)

3,101,990.00

ANALISA HARGA SATUAN


PELAPISAN PRIME COAT
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. Permukaan yang akan diprime coat sudah dipadatkan terlebih dahulu
2. Semprotkan campuran prime coat 2 lt/m2
3. Biarkan permukaan yang sudah diprime coat minimal 24 jam, dan dijaga
jangan dilewati kendaraan atau kena hujan

PEKERJA

P
E
K
E
R
J
A

KODE
K. T04

VOL

HARI

Mandor
Operator
Buruh semi terlatih
Buruh tak terlatih

1
1
4
2

KODE

1
1
1
1

TOTAL VOL
(org.hari)

L061
L081
L103
L 101

U PAH
Rp./hari/orang
1
1
4
2

60,000.00
55,000.00
40,000.00
35,000.00

B IAYA
(Rp.)
60,000.00
55,000.00
160,000.00
70,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Aspal curah
Minyak aspal
Minyak bakar
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////
///////////////////

M061
M064
M065
M170

Kg
Lt
Lt
Set

TOTAL
VOL

HARGA
(Rp./unit)

640.00
320.00
42.80
2.00

8,000.00
7,500.00
6,200.00
40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Asphal spreyer

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
1

800 m2

KODE

JAM
KERJA

E153

Harga Satuan Rp.

B IAYA
(Rp. / jam )
5

45,229.00

10,545.63 m2

345,000.00
SUB TOTAL
(Rp.)

5,120,000.00
2,400,000.00
265,360.00
80,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

7,865,360.00
SUB TOTAL
(Rp.)

226,145.00

PERALATAN

226,145.00

TOTAL (Rp.)

8,436,505.00

ANALISA HARGA SATUAN


PEMBUATAN DAN PEMASANGAN KONSTRUKSI BAJA / BESI
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. Bahan baja/besi dilokasi buruhan
2. Pembuatan/perakitan dan pemasangan dilaksanakan dilokasi buruhan

PEKERJA

P
E
K
E
R
J
A

KODE :
(28)

KODE
K. T05

Mandor
Tukang besi
Buruh semi terlatih

VOL

HARI

1
4
28

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L079
L103

1
4
28

U PAH
Rp./hari/orang
60,000.00
50,000.00
40,000.00

B IAYA
(Rp.)
60,000.00
200,000.00
1,120,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Besi propil
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////

M185
M170

Kg
Set

TOTAL
VOL
1,000.00
5.00

HARGA
(Rp./unit)
10,600.00
40,000.00

B IAYA
(Rp.)

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

P
E
R
A
L
A
T
A
N

VOLUME/QUANTITY

1000 kg

Harga Satuan Rp.

B IAYA
(Rp. / jam )

1,380,000.00
SUB TOTAL
(Rp.)

10,600,000.00
200,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

10,800,000.00
SUB TOTAL
(Rp.)

PERALATAN

0.00

TOTAL (Rp.)

12,180,000.00

12,180.00 per Kg

ANALISA HARGA SATUAN


PEMASANGAN DEKPLANK JEMBATAN
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN/ASUMSI :
1. Kayu dekplank yang sudah sesuai ukuran diantar sampai lokasi buruhan
2. Pemasangan baud sebanyak 12 bh tiap m2 selang / seling

PEKERJA

P
E
K
E
R
J
A

KODE :
(28)

KODE
K. T06

Mandor
Tukang kayu
buruh terlatih

VOL

HARI

1
6
20

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L079
L106

1
6
20

U PAH
Rp./hari/orang
60,000.00
50,000.00
31,800.00

B IAYA
(Rp.)
60,000.00
300,000.00
636,000.04

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Dekplank kayu jati uk. 20 cm x 8 cm


Paku jembatan / baud lawa-lawa
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////

M182
M167
M170

m3
bh
Set

TOTAL
VOL
7.04
960.00
2.00

HARGA
(Rp./unit)
7,000,000.00
14,600.00
40,000.00

B IAYA
(Rp.)

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

B IAYA
(Rp. / jam )

P
E
R
A
L
A
T
A
N

VOLUME/QUANTITY

80 m2

Harga Satuan Rp.

804,650.00 m2

996,000.04
SUB TOTAL
(Rp.)

49,280,000.00
14,016,000.00
80,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

63,376,000.00
SUB TOTAL
(Rp.)

PERALATAN

0.00

TOTAL (Rp.)

64,372,000.04

ANALISA HARGA SATUAN


BETON STRUKTUR KLAS K 225
( MENGGUNAKAN ALAT PENGADUK BETON 125 LITER )
PROPINSI :
JAWA TENGAH
URAIAN :
1. Pemasok mengirim matrial
2. Acuan dan tulangan besi beton dipasang
3. Beton diaduk dilokasi buruhan
4. Beton dicor dan digetar sampai padat

PEKERJA
P
E
K
E
R
J
A

Mandor
Buruh tak terlatih
Buruh terlatih

MAT E R IAL
M
A
T
E
R
I
A
L

Pasir
Semen
Batu pecah tersaring
Alat bantu

P E R ALATAN
P
E
R
A
L
A
T
A
N

Alat penggetar beton


Pengaduk beton 125 ltr
pompa air ( Q 50 mm )

VOLUME/QUANTITY

KODE :
(33)

KODE
K. 722

KABUPATEN :
KODE :
DISIAPKAN OLEH :
TANGGAL :
TEGAL
(28)
BINA PROGRAM
Januari 2012
ANGGAPAN :
1. Bahan-bahan dasar dikirim kelokasi buruhan oleh pemasok
2. Dipakai agregat pecah dan tersaring yang termurah
3. Dicor 6,17 m3/hari dengan 54 asukan /6 jam/hari
4. Adukan 1pc:2psr:3krl(yaitu 1:5); semen 350 kg/m3;air 160 kg/m3;2487 kg/m3
5. Anggap tiap adukan membutuhkan 1 zak (27,8 lt lepas) semen porland;55,6 lt
pasir;83,3 lt air
6. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
7. Beton bertulang dipakai untuk pilar, gorong-2, dinding penahan dll
8. Sesuai peraturan beton bertulang indonesia (PBI 1971 N.1.2)

VOL

HARI
1
12
2

KODE
6
6
6

TOTAL VOL
(org.hari)
6
72
12

U PAH
Rp./hari/orang
60,000.00
35,000.00
31,800.00

B IAYA
(Rp.)
360,000.00
2,520,000.00
381,600.02

TOTAL
VOL
18.00
12,960.00
27.00
2.88

HARGA
(Rp./unit)
100,000.00
1,340.00
272,015.39
40,000.00

buruh
B IAYA
(Rp.)
1,800,000.00
17,366,400.00
7,344,415.53
115,200.00

3,261,600.02
SUB TOTAL
(Rp.)

B IAYA
(Rp. / jam )
6,776.96
7,857.62
11,722.42

MATERIAL
B IAYA
(Rp.)
203,308.80
235,728.60
351,672.60

26,626,015.53
SUB TOTAL
(Rp.)

L061
L101
L106

/////////////////// SATUAN KODE


///////////////////
///////////////////
m3
M041
///////////////////
kg
M080
///////////////////
m3
K017
///////////////////
set
M170
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
JUMLAH
HARI
KODE
KERJA
1
6 E089
1
6 E251
1
6 E341

JAM
KERJA
30
30
30

PERALATAN
TOTAL (Rp.)
:

37 M3

Harga Satuan Rp.

829,143.93 per M3

SUB TOTAL
(Rp.)

790,710.00
30,678,325.55

ANALISA HARGA SATUAN


MENGGALI DAN MENGANGKUT TANAH UNTUK MENGURUG
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :

P
E
K
E
R
J
A

Mandor
Supir
Buruh tak terlatih

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN :
1. Menggunakan tenaga manusia (60 m3/hari)
2. Dipakai matrial dari penggalian didaerah jalan atau tempat lain yang
diperbolehkan
3. Jarak angkut PP < Km ( 1 trip ) / jam/truk
4. Perataan dengan tenaga manusia tebal pemadatan 10 cm
5. Pemadatan menggunakan plat vibrator stamper
6. Tidak termasuk buruhan persiapan dilokasi pengambilan

1. Penggalian dan pemuatan ketruk dengan tenaga


manusia
2. Pengiriman ketempat buruhan dengan truk
3. Membongkar dan meratakan dengan tenaga
manusia
4. Pemadatan lapisan - lapisan

PEKERJA

KODE :
(28)

KODE
K. 220

VOL

HARI

3
6
90

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L091
L101

3
6
90

U PAH
Rp./hari/orang
60,000.00
50,000.00
35,000.00

B IAYA
(Rp.)
180,000.00
300,000.00
3,150,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////
///////////////////

M170

set

TOTAL
VOL

HARGA
(Rp./unit)

6.00

40,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Flat blad truk


Plat vibrator stamper

VOLUME/QUANTITY

JUMLAH

HARI
KERJA
6
1

60 m3

KODE

1
1

JAM
KERJA

E221
E088

Harga Satuan Rp.

B IAYA
(Rp. / jam )
30
5

131,919.87
8,604.69

131,176.99 m3

3,630,000.00
SUB TOTAL
(Rp.)

240,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

240,000.00
SUB TOTAL
(Rp.)

3,957,596.10
43,023.45

PERALATAN

4,000,619.55

TOTAL (Rp.)

7,870,619.55

ANALISA HARGA SATUAN


PEMASANGAN DEKPLANK JEMBATAN
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN :
1. Kayu dekplank yang sudah sesuai ukuran diantar sampai lokasi buruhan
2. Pemasangan baud sebanyak 12 bh tiap m2 selang / seling

PEKERJA

P
E
K
E
R
J
A

KODE :
(28)

KODE
K. T06 a

Mandor
Tukang kayu
Buruh terlatih

VOL

HARI

1
6
20

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L079
L106

1
6
20

U PAH
Rp./hari/orang
60,000.00
50,000.00
31,800.00

B IAYA
(Rp.)
60,000.00
300,000.00
636,000.04

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

/////////////////// SATUAN
///////////////////

Dekplank kayu bengkire uk. 20 cm x 8 cm ///////////////////


Paku jembatan / baud lawa-lawa
///////////////////
Alat bantu
///////////////////

m3
bh
Set

KODE

M182
M167
M170

TOTAL
VOL
7.04
960.00
2.00

HARGA
(Rp./unit)
0.00
14,600.00
40,000.00

B IAYA
(Rp.)

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

B IAYA
(Rp. / jam )

P
E
R
A
L
A
T
A
N

VOLUME/QUANTITY

80 m2

Harga Satuan Rp.

188,650.00 m2

996,000.04
SUB TOTAL
(Rp.)

0.00
14,016,000.00
80,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

14,096,000.00
SUB TOTAL
(Rp.)

PERALATAN

0.00

TOTAL (Rp.)

15,092,000.04

ANALISA HARGA SATUAN


STABILISASI TANAH / LPB DENGAN KAPUR
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
K. 322

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

URAIAN :

ANGGAPAN :

1. Tanah dasar / LPB digemburkan setebal. 15 cm


2. Kapur dihampar dan dicampur dengan tanah gembur
3. Dipadatkan dengan kondisi air optimum

1. Menggunakan tenaga manusia ( 5 m x 360 m / hari )


2. Dasar jalan sudah diratakan
3. Tanah digemburkan setebal 15 cm dengan tenaga manusia
4. Pengiriman bahan kapur sampai ditempat kerja oleh leveransir
5. Kapur dicampur dengan tanah setebal 15 cm dengan tenaga manusia

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Sopir
Buruh tak terlatih
Buruh semi terlatih

VOL

HARI

3
1
1
99
6

KODE

1
1
1
1
1

TOTAL VOL
(org.hari)

L061
L081
L091
L101
L103

U PAH
Rp./hari/orang

3
1
1
99
6

B IAYA
(Rp.)

60,000.00
55,000.00
50,000.00
35,000.00
40,000.00

180,000.00
55,000.00
50,000.00
3,465,000.00
240,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Kapur
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////

M081 a
M170

m3
set

TOTAL
VOL

HARGA
(Rp./unit)

11.00
4.00

B IAYA
(Rp.)

0.00
40,000.00

P
E
R
A
L
A
T
A
N

Mesin gilas 3 roda 8 - 10 T


Truck tangki air 68 HP

VOLUME / QUANTITY

JUMLAH

HARI
KERJA
1
1

270 m3

KODE

1
1

JAM
KERJA

E080
E182

Harga Satuan Rp.

B IAYA
(Rp. / jam )
5
5

B IAYA
(Rp.)

92,330.20
226,368.33

21,272.20

3,990,000.00
SUB TOTAL
(Rp.)

0.00
160,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

160,000.00
SUB TOTAL
(Rp.)

461,651.00
1,131,841.65

PERALATAN

1,593,492.65

TOTAL (Rp.)

5,743,492.65

per

m3

ANALISA HARGA SATUAN


STABILISASI TANAH / LPB DENGAN SEMEN
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :

KODE :
(28)

KODE
K. 325

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN :

1. Tanah dasar / LPB digemburkan / dicangkul sedalam 15 cm 1. Menggunakan tenaga manusia ( 5 m x 250 m / hari )
2. Semen disebarkan dan dicampur kedalam tanah gembur
2. Badan jalan telah dibentuk
tersebut
3. Tanah digemburkan dengan tanaga manusia sedalam 15 cm
3. Diberi air sampai kelembaban optimum dan dipadatkan
4. Bahan semen dikirim sampai ditempat kerja oleh leveransir
5. Semen dicampur dengan tanah sedalam 15 cm dan 4 % dari volume dengan
tenaga orang

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Sopir
Buruh tak terlatih
Buruh terlatih

VOL

HARI

3
1
1
66
6

KODE

2
2
2
2
2

TOTAL VOL
(org.hari)

L061
L081
L091
L101
L106

6
2
2
132
12

U PAH
Rp./hari/orang

B IAYA
(Rp.)

60,000.00
55,000.00
50,000.00
35,000.00
31,800.00

360,000.00
110,000.00
100,000.00
4,620,000.00
381,600.02

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Semen
Alat bantu

/////////////////// SATUAN
///////////////////

KODE

TOTAL
VOL

///////////////////
///////////////////

M080
M170

21,000.00
6.00

kg
set

HARGA
(Rp./unit)

B IAYA
(Rp.)

1,340.00
40,000.00

P
E
R
A
L
A
T
A
N

Mesin gilas 3 roda 8 - 10 T


Truck tangki air 68 HP

VOLUME / QUANTITY

JUMLAH

HARI
KERJA
1
1

375 m3

KODE

2
2

JAM
KERJA

E080
E182

Harga Satuan Rp.

B IAYA
(Rp. / jam )
10
8

B IAYA
(Rp.)

92,330.20
226,368.33

97,828.93

5,571,600.02
SUB TOTAL
(Rp.)

28,140,000.00
240,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

28,380,000.00
SUB TOTAL
(Rp.)

923,302.00
1,810,946.64

PERALATAN

2,734,248.64

TOTAL (Rp.)

36,685,848.66

per

m3

ANALISA HARGA SATUAN


BETON STRUKTUR KLAS K 350
( MENGGUNAKAN ALAT PENGADUK BETON 500 LITER)
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Pemasok mengirim matrial
2. Acuan dan tulangan besi beton dipasang
3. Beton diaduk dilokasi buruhan
4. Beton dicor dan digetar sampai padat

PEKERJA
P
E
K
E
R
J
A

Mandor
Buruh tak terlatih
Buruh terlatih

MAT E R IAL
M
A
T
E
R
I
A
L

Pasir
Semen
Batu pecah tersaring
Alat bantu

P E R ALATAN
P
E
R
A
L
A
T
A
N

Alat penggetar beton/concrete vibrator


Pengaduk beton 500 ltr/26 hp
pompa air ( Q 50 mm = 30 m3 /jam)

VOLUME/QUANTITY

KODE :
(28)

KODE
K. 730

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN :
1. Bahan-bahan dasar dikirim kelokasi buruhan oleh pemasok
2. Dipakai agregat pecah dan tersaring
3. Dicor 22,6 m3/hari dengan 48 adukan /6 jam/hari
4. Adukan 4pc:6psr:11krl(yaitu 4:11);per semen 425 kg/m3;air 10 kg/m3;2642 kg/m3
5. Anggap tiap adukan membutuhkan 5 zak (138,9 lt lepas) semen porland;208,3 lt psr,
, 381,9 lt psr kerikil, 84,7 air
6. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
7. Beton dipakai untuk bagian-bagian struktur pratekan, lantai jembatan dll
8. Sesuai peraturan beton bertulang indonesia (PBI 1971 N.1.2)
VOL

HARI
2
50
5

KODE
6
6
6

L061
L101
L106

/////////////////// SATUAN KODE


///////////////////
///////////////////
m3
M041
///////////////////
kg
M080
///////////////////
m3
K017
///////////////////
set
M170
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
JUMLAH
HARI
KODE
KERJA
4
6 E089
1
6 E253
1
6 E341

TOTAL VOL
(org.hari)
12
300
30

U PAH
Rp./hari/orang
60,000.00
35,000.00
31,800.00

B IAYA
(Rp.)
720,000.00
10,500,000.00
954,000.05

SUB TOTAL
(Rp.)

TOTAL
VOL
60.00
57,600.00
110.00
12.00

HARGA
(Rp./unit)
100,000.00
1,340.00
272,015.39
40,000.00

buruh
B IAYA
(Rp.)
6,000,000.00
77,184,000.00
29,921,692.90
480,000.00

12,174,000.05
SUB TOTAL
(Rp.)

B IAYA
(Rp. / jam )
6,776.96
41,300.49
11,722.42

MATERIAL
B IAYA
(Rp.)
975,882.24
1,486,817.64
140,669.04

113,585,692.90
SUB TOTAL
(Rp.)

JAM
KERJA
144
36
12

PERALATAN
TOTAL (Rp.)
:

135 M3

Harga Satuan Rp.

950,837.50 per M3

2,603,368.92
128,363,061.87

ANALISA HARGA SATUAN


BETON STRUKTUR KELAS K125
( MENGGUNAKAN ALAT PENGADUK BETON 250 LITER )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Pemasok mengirim matrial
2. Beton diaduk dilokasi buruhan
3. Beton dicor dan digetar sampai padat

PEKERJA
P
E
K
E
R
J
A

Mandor
Buruh tak terlatih
Buruh terlatih

MAT E R IAL
M
A
T
E
R
I
A
L

Pasir ayak untuk beton


Semen
Batu pecah tersaring
Alat bantu

P E R ALATAN
P
E
R
A
L
A
T
A
N

Alat penggetar beton


Pengaduk beton 125 ltr
pompa air ( Q 50 mm )

VOLUME/QUANTITY

KODE :
(28)

KODE
K. 723

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN :
1. Bahan-bahan dasar dikirim kelokasi buruhan oleh pemasok
2. Dipakai agregat pecah dan tersaring
3. Dicor 11.5 m3/hari dengan 48 adukan /6 jam/hari
4. Adukan 1pc:3psr:4krl(yaitu 1:7); semen 250 kg/m3;air 130 kg/m3;2359 kg/m3
5. Anggap tiap adukan membutuhkan 1,5 zak (21,5 lt lepas) semen porland;125 lt
pasir; 166,7 lt kerikil; 31,2 lt air
6. Tidak termasuk acuan dan tulangan besi beton yang sudah pisang
7. Beton dipakai untuk bagian - bagian struktur pratekan, lantai jembatan dll
8. Sesuai peraturan beton bertulang indonesia (PBI 1971 N.1.2)
VOL

HARI
1
25
3

KODE
6
6
6

TOTAL VOL
(org.hari)
6
150
18

U PAH
Rp./hari/orang
60,000.00
35,000.00
31,800.00

B IAYA
(Rp.)
360,000.00
5,250,000.00
572,400.03

TOTAL
VOL
36.00
432.00
48.00
6.00

HARGA
(Rp./unit)
100,000.00
53,600.00
272,015.39
40,000.00

buruh
B IAYA
(Rp.)
3,600,000.00
23,155,200.00
13,056,738.72
240,000.00

6,182,400.03
SUB TOTAL
(Rp.)

B IAYA
(Rp. / jam )
6,776.96
7,857.62
11,722.42

MATERIAL
B IAYA
(Rp.)
487,941.12
282,874.32
140,669.04

40,051,938.72
SUB TOTAL
(Rp.)

L061
L101
L106

/////////////////// SATUAN KODE


///////////////////
///////////////////
m3
M041
///////////////////
40 kg
M080
///////////////////
m3
K017
///////////////////
set
M170
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
JUMLAH
HARI
KODE
KERJA
2
6 E089
1
6 E251
1
6 E341

JAM
KERJA
72
36
12

PERALATAN
TOTAL (Rp.)
:

69 M3

Harga Satuan Rp.

683,272.80 per M3

SUB TOTAL
(Rp.)

911,484.48
47,145,823.23

ANALISA HARGA SATUAN


BETON STRUKTUR KLAS K 300
( MENGGUNAKAN ALAT PENGADUK BETON 500 LITER)
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Pemasok mengirim matrial
2. Acuan dan tulangan besi beton dipasang
3. Beton diaduk dilokasi buruhan
4. Beton dicor dan digetar sampai padat

PEKERJA
P
E
K
E
R
J
A

Mandor
Buruh tak terlatih
Buruh terlatih

MAT E R IAL
M
A
T
E
R
I
A
L

Pasir ayak untuk beton


Semen
Batu pecah tersaring
Alat bantu

P E R ALATAN
P
E
R
A
L
A
T
A
N

Alat penggetar beton/concrete vibrator


Pengaduk beton 500 ltr/26 hp
pompa air ( Q 50 mm = 30 m3 /jam)

VOLUME/QUANTITY

KODE :
(28)

KODE
K. 730A

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN :
1. Bahan-bahan dasar dikirim kelokasi buruhan oleh pemasok
2. Dipakai agregat pecah dan tersaring
3. Dicor 22,6 m3/hari dengan 48 adukan /6 jam/hari
4. Adukan 4pc:6psr:11krl(yaitu 4:11);per semen 425 kg/m3;air 10 kg/m3;2642 kg/m3
5. Anggap tiap adukan membutuhkan 5 zak (138,9 lt lepas) semen porland;208,3 lt psr,
, 381,9 lt psr kerikil, 84,7 air
6. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
7. Beton dipakai untuk bagian-bagian struktur pratekan, lantai jembatan dll
8. Sesuai peraturan beton bertulang indonesia (PBI 1971 N.1.2)
VOL

HARI
2
50
5

KODE
6
6
6

L061
L101
L106

/////////////////// SATUAN KODE


///////////////////
///////////////////
m3
M041
///////////////////
40 kg
M080
///////////////////
m3
K017
///////////////////
set
M170
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
JUMLAH
HARI
KODE
KERJA
4
6 E089
1
6 E253
1
6 E341

TOTAL VOL
(org.hari)
12
300
30

U PAH
Rp./hari/orang
60,000.00
35,000.00
31,800.00

B IAYA
(Rp.)
720,000.00
10,500,000.00
954,000.05

SUB TOTAL
(Rp.)

TOTAL
VOL
78.00
1,350.00
91.40
12.00

HARGA
(Rp./unit)
100,000.00
53,600.00
272,015.39
40,000.00

buruh
B IAYA
(Rp.)
7,800,000.00
72,360,000.00
24,862,206.65
480,000.00

12,174,000.05
SUB TOTAL
(Rp.)

B IAYA
(Rp. / jam )
6,776.96
41,300.49
11,722.42

MATERIAL
B IAYA
(Rp.)
975,882.24
1,486,817.64
140,669.04

105,502,206.65
SUB TOTAL
(Rp.)

JAM
KERJA
144
36
12

PERALATAN
TOTAL (Rp.)
:

135 M3

Harga Satuan Rp.

890,959.82 per M3

2,603,368.92
120,279,575.62

ANALISA HARGA SATUAN


BETON STRUKTUR KLAS K 250
( MENGGUNAKAN ALAT PENGADUK BETON 225 LITER)
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Pemasok mengirim matrial
2. Acuan dan tulangan besi beton dipasang
3. Beton diaduk dilokasi buruhan
4. Beton dicor dan digetar sampai padat

PEKERJA
P
E
K
E
R
J
A

Mandor
Buruh tak terlatih
Buruh terlatih

MAT E R IAL
M
A
T
E
R
I
A
L

Pasir ayak untuk beton


Semen
Batu pecah tersaring
Alat bantu

P E R ALATAN
P
E
R
A
L
A
T
A
N

Alat penggetar beton/concrete vibrator


Pengaduk beton 500 ltr/26 hp
pompa air ( Q 50 mm = 30 m3 /jam)

VOLUME/QUANTITY

KODE :
(28)

KODE
K. 726A

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN :
1. Bahan-bahan dasar dikirim kelokasi buruhan oleh pemasok
2. Dipakai agregat pecah dan tersaring
3. Dicor 22,6 m3/hari dengan 48 adukan /6 jam/hari
4. Adukan 4pc:6psr:11krl(yaitu 4:11);per semen 425 kg/m3;air 10 kg/m3;2642 kg/m3
5. Anggap tiap adukan membutuhkan 5 zak (138,9 lt lepas) semen porland;208,3 lt psr,
, 381,9 lt psr kerikil, 84,7 air
6. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
7. Beton dipakai untuk bagian-bagian struktur pratekan, lantai jembatan dll
8. Sesuai peraturan beton bertulang indonesia (PBI 1971 N.1.2)
VOL

HARI
1
25
3

KODE
1
1
1

TOTAL VOL
(org.hari)
1
25
3

U PAH
Rp./hari/orang
60,000.00
35,000.00
31,800.00

B IAYA
(Rp.)
60,000.00
875,000.00
95,400.01

TOTAL
VOL
10.15
210.00
17.55
6.00

HARGA
(Rp./unit)
100,000.00
53,600.00
272,015.39
40,000.00

buruh
B IAYA
(Rp.)
1,015,000.00
11,256,000.00
4,773,870.09
240,000.00

1,030,400.01
SUB TOTAL
(Rp.)

B IAYA
(Rp. / jam )
6,776.96
41,300.49
11,722.42

MATERIAL
B IAYA
(Rp.)
81,323.52
247,802.94
23,444.84

17,284,870.09
SUB TOTAL
(Rp.)

L061
L101
L106

/////////////////// SATUAN KODE


///////////////////
///////////////////
m3
M041
///////////////////
40 kg
M080
///////////////////
m3
K017
///////////////////
set
M170
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
JUMLAH
HARI
KODE
KERJA
2
1 E089
1
1 E253
1
1 E341

JAM
KERJA
12
6
2

PERALATAN
TOTAL (Rp.)
:

22 M3

Harga Satuan Rp.

848,538.25 per M3

SUB TOTAL
(Rp.)

352,571.30
18,667,841.40

ANALISA HARGA SATUAN


PEMBUATAN DAN PEMASANGAN KONSTRUKSI BAJA / BESI
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN :
1. Bahan baja/besi dilokasi buruhan
2. Pembuatan/perakitan dan pemasangan dilaksanakan dilokasi buruhan

PEKERJA

P
E
K
E
R
J
A

KODE :
(28)

KODE
K. T05a

Mandor
Tukang besi
Buruh semi terlatih

VOL

HARI

1
4
28

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L079
L103

1
4
28

U PAH
Rp./hari/orang
60,000.00
50,000.00
40,000.00

B IAYA
(Rp.)
60,000.00
200,000.00
1,120,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Besi Profil kanal U.10


Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////

M185
M170

Kg
Set

TOTAL
VOL
1,000.00
5.00

HARGA
(Rp./unit)
10,600.00
40,000.00

B IAYA
(Rp.)

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

P
E
R
A
L
A
T
A
N

VOLUME/QUANTITY

1000 kg

Harga Satuan Rp.

B IAYA
(Rp. / jam )

1,380,000.00
SUB TOTAL
(Rp.)

10,600,000.00
200,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

10,800,000.00
SUB TOTAL
(Rp.)

PERALATAN

0.00

TOTAL (Rp.)

12,180,000.00

12,180.00 per Kg

ANALISA HARGA SATUAN


PEMBUATAN DAN PEMASANGAN KONSTRUKSI BAJA / BESI
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :

DISIAPKAN OLEH :

TANGGAL :
Januari 2012

ANGGAPAN :
1. Bahan baja/besi dilokasi buruhan
2. Pembuatan/perakitan dan pemasangan dilaksanakan dilokasi buruhan

PEKERJA

P
E
K
E
R
J
A

KODE :
(28)

KODE
K. T05b

Mandor
Tukang besi
Buruh semi terlatih

VOL

HARI

1
4
28

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L079
L103

1
4
28

U PAH
Rp./hari/orang
60,000.00
50,000.00
40,000.00

B IAYA
(Rp.)
60,000.00
200,000.00
1,120,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Besi Profil Siku L 50.50.5


Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////

M185
M170

Kg
Set

TOTAL
VOL
1,000.00
5.00

HARGA
(Rp./unit)
10,600.00
40,000.00

B IAYA
(Rp.)

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

P
E
R
A
L
A
T
A
N

VOLUME/QUANTITY

1000 kg

Harga Satuan Rp.

B IAYA
(Rp. / jam )

1,380,000.00
SUB TOTAL
(Rp.)

10,600,000.00
200,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

10,800,000.00
SUB TOTAL
(Rp.)

PERALATAN

0.00

TOTAL (Rp.)

12,180,000.00

12,180.00 per Kg

ANALISA HARGA SATUAN


PEMBUATAN DAN PEMASANGAN KONSTRUKSI BAJA / BESI
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
Januari 2012

ANGGAPAN :
1. Bahan baja/besi dilokasi buruhan
2. Pembuatan/perakitan dan pemasangan dilaksanakan dilokasi buruhan

PEKERJA

P
E
K
E
R
J
A

KODE :
(28)

KODE
K. T05c

Mandor
Tukang besi
Buruh semi terlatih

VOL

HARI

1
4
28

KODE

1
1
1

TOTAL VOL
(org.hari)

L061
L079
L103

1
4
28

U PAH
Rp./hari/orang
60,000.00
50,000.00
40,000.00

B IAYA
(Rp.)
60,000.00
200,000.00
1,120,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Besi Profil Siku 70.70.7


Alat bantu

/////////////////// SATUAN
///////////////////

KODE

///////////////////
///////////////////

M185
M170

Kg
Set

TOTAL
VOL
1,000.00
5.00

HARGA
(Rp./unit)
10,600.00
40,000.00

B IAYA
(Rp.)

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

P
E
R
A
L
A
T
A
N

VOLUME/QUANTITY

1000 kg

Harga Satuan Rp.

B IAYA
(Rp. / jam )

1,380,000.00
SUB TOTAL
(Rp.)

10,600,000.00
200,000.00

MATERIAL
P E R ALATAN

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

10,800,000.00
SUB TOTAL
(Rp.)

PERALATAN

0.00

TOTAL (Rp.)

12,180,000.00

12,180.00 per Kg

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

TAHUN ANGGARAN
PROPINSI
MATA PEMBAYARAN
URAIAN
SATUAN PEMBAYARAN

NO.

:
:
:
:
:

KOMPONEN

A.

TENAGA

1.
2.

Pekerja
Mandor

2012
JAWA TENGAH
3.1 (1) a
GALIAN TANAH BIASA MEKANIS
M3

SATUAN

Jam
Jam

PERKIRAAN
KUANTITAS

0.1086
0.0543

HARGA
SATUAN
(Rp.)

6,071.43
8,571.43

JUMLAH HARGA TENAGA


B.

659.36
465.43

1,124.79

BAHAN

JUMLAH HARGA BAHAN

C.

PERALATAN

1.

EXCAVATOR 80-140 HP

Jam

0.0543

JUMLAH HARGA PERALATAN


D.
E.
F.

JUMLAH
HARGA
(Rp.)

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


OVERHEAD & PROFIT
- % x D
HARGA SATUAN PEKERJAAN ( D + E )

361,251.00

19,615.93

19,615.93
20,740.72
20,740.72

Catatan 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran b
untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nom
pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

dibayar dari kontrak) dan biaya-biaya lainnya.

Hal. 209
DINAS PEKERJAAN UMUM
KABUPATEN TEGAL

DAFTAR ANALISA PEKERJAAN


KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN

No

Uraian pekerjaan

1 CA1

Isolator tumpu ( line post) 20 KV


Spool Isolator ansi 53-2
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10 "
Bolt single Upset 5/8" x 10"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
CA1'
Isolator tumpu ( line post) 20 KV
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10 "
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
CA2-1
Isolator tumpu ( line post) 20 KV
Spool Isolator ansi 53-2
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10 "
Bracket Secondary / bracket Insulated
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
CA2
Isolator tumpu ( line post) 20 KV
Spool Isolator ansi 53-2
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10 "
Bracket Secondary / bracket Insulated
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
CA2'
Isolator tumpu ( line post) 20 KV
Center Bracket 12,5 KN
Bolt Machine / bolt Carriage 1/2" x 3/4"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
CA3
Isolator Tarik 20 KV ( 2 pcs )
Spool Isolator ansi 53-2
Oval eye bolt 5/8" x 10"
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Clevis Swinging Secondary
Primary Angle Clamp 35 s/d 70 mm2
Shackle Anchor 5/8
Armour Rod # for AAAC 70 mm2

:
:
:
:

Satuan
Unit
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
set

Volume
1
1
1
1
2
1
3
2.6
1
1
1
1
2
2
1.8
1
1
2
1
2
3
1
2.8
1
1
2
1
2
3
1
2.8
1
1
2
2
2
2
1
1
1
1
1
1
1
2
1
1
1
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp

Rp

Rp

215,600
36,050
79,900
19,050
30,200
3,200
6,600
22,400

215,600
36,050
79,900
38,100
30,200
9,600
17,160
22,400

449,010

215,600
79,900
19,050
3,200
6,600
21,250

215,600
79,900
38,100
6,400
11,880
21,250

373,130

215,600
36,050
79,900
19,050
18,540
6,600
35,300

431,200
36,050
159,800
57,150
18,540
18,480
35,300

756,520

36,050
36,050
79,900
19,050
18,540
6,600
44,900

72,100
36,050
159,800
57,150
18,540
18,480
44,900

407,020

215,600
79,900
4,000
6,600
43,350

431,200
159,800
8,000
13,200
43,350

655,550

245,200
36,050
16,750
29,500
19,096
3,200
19,050
56,650
18,000
60,500

245,200
36,050
16,750
29,500
19,096
6,400
19,050
56,650
18,000
60,500

Hal. 210
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga Jumlah Semua


Rp

Tie Wire #4 / Aluminium Bonding Wire #20


Upah Pemasangan
7 CA3'
Isolator Tarik 20 KV ( 2 pcs )
Pole Band Double Rack 7" atau 7 1/2"
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Angle Clamp 35 s/d 70 mm2
Armour Rod # for AAAC 240 mm2
Upah Pemasangan

mtr
Unit
Unit
bh
bh
bh
bh
bh
set
Unit

0.8
1
1
1
1
1
1
1
1
1

Rp

Rp

6,600
58,200

5,280
58,200

570,676

245,200
45,700
19,096
18,000
56,650
121,250
43,350

245,200
45,700
19,096
18,000
56,650
121,250
43,350

549,246

Hal. 211
No

Uraian pekerjaan

8 CA4

10

11

12

13

Isolator Tarik 20 KV ( 2 pcs )


Spool Isolator ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval eye bolt 5/8" x 10"
Oval eye nut 5/8"
Washer Square 2 1/4 "
Compression Connector H type 70/150 mm2
Armour Rod # for AAAC 70 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
CA4'
Isolator Tarik 20 KV ( 2 pcs )
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Compression Connector H type 70/150 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Upah Pemasangan
CA5
Isolator Tarik 20 KV ( 2 pcs )
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Spool Isolator Ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Armour Rod # for AAAC 70 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
CA5'
Isolator Tarik 20 KV ( 2 pcs )
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Upah Pemasangan
CA5-1
Isolator Tarik 20 KV ( 2 pcs )
Spool Insulator Ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Oval Eye Nut 5/8"
Armour Rod # for AAAC 70 mm2
Compression Connector H type 70/150 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
CA5-1'

Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
Unit
Unit

Volume
1
2
2
2
2
2
2
2
4
2
2
2
2
1
1
2
1
1
2
2
2
2
2
1
1
1
1
2
1
1
1
1
1
1
1
2
1
1
1
1
2
1
1
1
1
1
1
1
1
1
2
1
1
2
1
1
2
1
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp

Rp

Rp

245,200
41,200
19,050
29,500
16,750
19,096
3,200
37,000
60,500
18,000
67,300
25,770
46,350

490,400
82,400
38,100
59,000
33,500
38,192
6,400
148,000
121,000
36,000
134,600
51,540
46,350

1,285,482

245,200
29,500
19,096
16,750
3,200
37,000
18,000
67,300
55,300

490,400
29,500
19,096
33,500
6,400
74,000
36,000
134,600
55,300

878,796

245,200
16,750
3,200
41,200
19,050
29,500
19,096
60,500
18,000
67,300
25,770
29,950

245,200
16,750
6,400
41,200
19,050
29,500
19,096
60,500
18,000
67,300
51,540
29,950

604,486

245,200
16,750
3,200
18,000
67,300
55,300

245,200
16,750
6,400
18,000
67,300
55,300

408,950

245,200
41,200
19,050
29,500
16,750
3,200
19,096
60,500
37,000
18,000
67,300
25,770
29,950

245,200
41,200
19,050
29,500
16,750
6,400
19,096
60,500
74,000
18,000
67,300
51,540
29,950

678,486

Hal. 212
No

Uraian pekerjaan
Isolator Tarik 20 KV ( 2 pcs )
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Compression Connector H type 70/150 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Upah Pemasangan

Satuan
bh
bh
bh
bh
bh
bh
Unit

Volume
1
1
2
1
1
1
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp
245,200
16,750
3,200
37,000
18,000
67,300
26,100

Rp
245,200
16,750
6,400
37,000
18,000
67,300
26,100

Rp

416,750

Hal. 213
No

Uraian pekerjaan

14 CA6

15

16

17

18

19

20

21

Isolator Tarik 20 KV ( 2 pcs )


Spool Insulator Ansi 53-4
Clevis Swinging Secondary
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Armour Rod # for AAAC 70 mm2
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Upah Pemasangan
CA6'
Isolator Tarik 20 KV ( 2 pcs )
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Upah Pemasangan
SE 1-2 ( 7 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp
Guy Wire 22 mm2
Guy Attachment / Guy hok
Upah Pemasangan
E 1-2 ( 7 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp
Washer Square 2 1/4 "
Guy Wire 22 mm2
Guy Attachment / Guy hok
Upah Pemasangan
SE 1-2 ( 9 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp
Guy Wire 22 mm2
Guy Attachment / Guy hok
Upah Pemasangan
E 1-2 ( 9 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp
Washer Square 2 1/4 "
Guy Wire 22 mm2
Guy Attachment / Guy hok
Upah Pemasangan
SE 1-2 ( 11 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp
Guy Wire 22 mm2
Guy Attachment / Guy hok
Upah Pemasangan
E 1-2 ( 11 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp
Washer Square 2 1/4 "
Guy Wire 22 mm2
Guy Attachment / Guy hok
Upah Pemasangan

Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit

Volume
1
2
2
2
2
2
2
4
2
2
4
1
1
2
1
2
2
1
2
1
1
1
2
7
1
1
1
1
2
1
7
1
1
1
1
2
9
1
1
1
1
2
1
9
1
1
1
1
2
11
1
1
1
1
2
1
11
1
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp

Rp

Rp

245,200
41,200
19,050
19,096
18,000
67,300
25,770
60,500
16,750
3,200
56,650

490,400
82,400
38,100
38,192
36,000
134,600
103,080
121,000
33,500
12,800
56,650

1,146,722

245,200
19,096
18,000
67,300
16,750
3,200
54,550

490,400
19,096
36,000
134,600
16,750
6,400
54,550

757,796

45,700
38,100
8,450
12,800
27,190

45,700
76,200
59,150
12,800
27,190

221,040

19,050
38,100
3,200
8,450
12,800
27,190

19,050
76,200
3,200
59,150
12,800
27,190

197,590

45,700
38,100
8,450
12,800
27,190

45,700
76,200
76,050
12,800
27,190

237,940

19,050
38,100
3,200
8,450
12,800
27,190

19,050
76,200
3,200
76,050
12,800
27,190

214,490

45,700
38,100
8,450
12,800
27,190

45,700
76,200
92,950
12,800
27,190

254,840

19,050
38,100
3,200
8,450
12,800
27,190

19,050
76,200
3,200
92,950
12,800
27,190

231,390

Hal. 214
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga Jumlah Semua


Rp

22 SE 1-2 ( 12 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp
Guy Wire 22 mm2
Guy Attachment / Guy hok
Upah Pemasangan

Unit
bh
bh
mtr
bh
Unit

1
1
2
12
1
1

45,700
38,100
8,450
12,800
27,190

Rp
45,700
76,200
101,400
12,800
27,190

Rp

263,290

Hal. 215
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga Jumlah Semua


Rp

23 E 1-2 ( 12 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp
Washer Square 2 1/4 "
Guy Wire 22 mm2
Guy Attachment / Guy hok
Upah Pemasangan
24 SE 1-2 ( 7 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
25 E 1-2 ( 7 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
26 SE 1-2 ( 9 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
27 E 1-2 ( 9 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
28 SE 1-2 ( 11 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
29 E 1-2 ( 11 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
30 SE 1-2 ( 12 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan
31 E 1-2 ( 12 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp (Guy Grip)

Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh

1
1
2
1
12
1
1
1
1
2
1
7
1
1
1
1
2
1
7
1
1
1
1
2
1
9
1
1
1
1
2
1
9
1
1
1
1
2
1
11
1
1
1
1
2
1
11
1
1
1
1
2
1
12
1
1
1
1
2

Rp

Rp

19,050
38,100
3,200
8,450
12,800
27,190

19,050
76,200
3,200
101,400
12,800
27,190

239,840

45,700
38,100
3,200
12,400
12,800
27,190

45,700
76,200
3,200
86,800
12,800
27,190

251,890

19,050
38,100
3,200
12,400
12,800
27,190

19,050
76,200
3,200
86,800
12,800
27,190

225,240

45,700
38,100
3,200
12,400
12,800
27,190

45,700
76,200
3,200
111,600
12,800
27,190

276,690

19,050
38,100
3,200
12,400
12,800
27,190

19,050
76,200
3,200
111,600
12,800
27,190

250,040

45,700
38,100
3,200
12,400
12,800
27,190

45,700
76,200
3,200
136,400
12,800
27,190

301,490

19,050
38,100
3,200
12,400
12,800
27,190

19,050
76,200
3,200
136,400
12,800
27,190

274,840

45,700
38,100
3,200
22,500
12,800
27,190

45,700
76,200
3,200
270,000
12,800
27,190

435,090

19,050
38,100

19,050
76,200

Hal. 216
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga Jumlah Semua


Rp

Washer Square 2 1/4 "


Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan
32 SE1-3 (11 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan

bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit

1
12
1
1
1
1
2
1
11
1
1

Rp

Rp

3,200
22,500
12,800
27,190

3,200
270,000
12,800
27,190

408,440

45,700
38,100
3,200
22,500
12,800
27,190

45,700
76,200
3,200
247,500
12,800
27,190

412,590

Hal. 217
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga Jumlah Semua


Rp

33 E1-3(11 M)
Bolt Machine 5/8" x 10 "
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan
34 SE1-3 (12 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan
35 E1-3 (12 M)
Bolt Machine 5/8" x 10 "
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan
36 SE2-2
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Guy Wire 35 mm2
Nut thimble eye 5/8"
Upah Pemasangan
37 SE2-3
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Guy Wire 70 mm2
Nut thimble eye 5/8"
Upah Pemasangan
38 E2-3
Bolt Machine 5/8" x (14" s/d 22")
Three Bolt Clamp (Guy Grip)
Guy Wire 70 mm2
Nut thimble eye 5/8"
Upah Pemasangan
39 F 1-2
Rod Anchor 5/8" x 7
Expanding Anchor 8.000 lbs
Upah Pemasangan
40 F 1-3
Rod Anchor 5/8" x 7
Expanding Anchor 10.000 lbs
Upah Pemasangan
41 J5-T (CJ2)
Suspension / small angle assembly (CJ5-T)
Stainless Stell Strap 20 x 0,7 mm2
Stoping Buckel / Yokes
Plastic Strap For Clamping
Upah Pemasangan
42 J7 - T (CJ3)
Large angle assembly (CJ7 - T)
Stainless Stell Strap 20 x 0,7 mm2
Stoping Buckel / Yokes
Plastic Strap For Clamping
Upah Pemasangan

Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
Unit
Unit
bh
bh
Unit
Unit
bh
mtr
bh
bh
Unit
Unit
bh
mtr
bh
bh
Unit

1
1
2
1
11
1
1
1
1
2
1
12
1
1
1
1
2
1
12
1
1
1
1
2
20
2
1
1
2
2
20
2
1
1
1
2
20
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Rp

Rp

19,050
3,200
22,500
12,800
27,190

0
38,100
3,200
247,500
12,800
27,190

328,790

45,700
38,100
3,200
22,500
12,800
35,750

45,700
76,200
3,200
270,000
12,800
35,750

443,650

19,050
38,100
3,200
22,500
12,800
35,750

19,050
76,200
3,200
270,000
12,800
35,750

417,000

45,700
38,100
12,400
15,000
35,750

45,700
76,200
248,000
30,000
35,750

435,650

45,700
38,100
22,500
15,000

91,400
76,200
450,000
30,000
0

647,600

19,050
38,100
22,500
15,000
36,200

19,050
76,200
450,000
30,000
36,200

611,450

87,550
102,050
19,400

87,550
102,050
19,400

209,000

87,550
103,300
19,400

87,550
103,300
19,400

210,250

33,100
10,900
2,100
2,060
25,275

33,100
10,900
2,100
2,060
25,275

29,435

106,200
10,900
2,100
2,060
19,400

106,200
10,900
2,100
2,060
19,400

23,560

Hal. 218
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga Jumlah Semua


Rp

43 J6 - T (CJ4)
Dead End Assembly (CJ6 - T)
Stainless Stell Strap 20 x 0,7 mm2
Stoping Buckel / Yokes
Plastic Strap For Clamping
Upah Pemasangan

Unit
bh
mtr
bh
bh
Unit

1
1
1
1
1
1

73,140
10,900
2,100
2,060
25,275

Rp
73,140
10,900
2,100
2,060
25,275

Rp

29,435

Hal. 219
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga Jumlah Semua


Rp

44 MJ6 - T (CJ4)
Insulating Tape (MJ6-T)
Split Plastic Slave (Tutup Kabel)
Stoping Buckel / Yokes
Plastic Strap For Clamping
Stainless Stell Strap 20 x 0,7 mm2
Upah Pemasangan
45 CG105 - 50
Amor rod tapping
Aluminium connector
Braket transformer
Clamp hot line top assembly
Distribusi trafo 50 KVA
Jamper requaired
Kabel TX 2 x 70
Upah Pemasangan
46 P.12
Bolt Machine 5/8 x 12 "
Pipa galvanis 3"
Upah pasang
47 P12.C
Cross Arm Stell 2000
Bolt Machine 5/8" x 10 "
Washer Square 2 1/4 "
Upah Pemasangan
48 P12.C'
Cross Arm Stell 2000
Bolt Machine 5/8" x 10"
Bolt Double Arming 5/8" x 12"
Upah Pemasangan
49 CM5 - 2
Isolator Tumpu 20 KV (Short Sank)
Center Bracket 12,5 KN
Bolt Machine 5/8" x 8"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Compression terminal Lug 35mm2
Upah Pemasangan
50 CM2-11
Ground rod 5/8" x 8" copper weld
Clamp ground rod 5/8"
Bimetal Connector
Ground wire Cu 16 mm2
Ground lug & washer
Upah Pemasangan
51 CM2 - 12
Bimetal Connector
Ground wire Cu 16mm2
Ground lug & Washer
Upah Pemasangan
52 CM2 - 12A
Bimetal Connector
Ground wire Cu 16mm2
Ground lug & Washer
Upah Pemasangan
53 CM2-15
Pole Band Double Rack 9" s/d 12"
Pole Band Double Rack 7" atau 7 1/2"
Ground rod 5/8" x 8" copper weld

Unit
bh
bh
bh
bh
mtr
Unit
Unit
set
bh
bh
bh
bh
bh
mtr
unit
Unit
bh
mtr
set
Unit
bh
bh
bh
Unit
Unit
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
mtr
bh
Unit
Unit
bh
mtr
bh
Unit
Unit
bh
bh
bh

1
1
1
1
1
1
1
1
1
3
2
1
1
1
3
1
1
2
3
1
1
1
2
2
1
1
2
2
2
1
1
1
1
2
2
1.8
2
1
1
1
1
1
2
2
1
1
1
0.8
1
1
1
1
1
1
1
1
1
2
4

Rp

Rp

23,300
2,100
2,100
2,060
10,900
14,100

23,300
2,100
2,100
2,060
10,900
14,100

29,160

16,900
26,400
334,750
149,350
33,359,700
31,300
41,900
681,200

16,900
79,200
669,500
149,350
33,359,700
31,300
125,700
681,200

35,112,850

17,600
203,200
50,900

35,200
609,600
50,900

695,700

359,500
19,050
3,200
10,700

359,500
38,100
6,400
10,700

414,700

359,500
19,050
29,200
29,900

719,000
38,100
58,400
29,900

845,400

215,600
79,900
16,900
3,200
6,600
36,050
29,900

215,600
79,900
33,800
6,400
11,880
72,100
29,900

449,580

119,800
13,900
40,400
23,200
11,300
29,900

119,800
13,900
40,400
34,800
22,600
29,900

261,400

40,400
23,200
11,300
11,900

40,400
18,560
11,300
11,900

82,160

40,400
23,200
11,300
19,400

40,400
23,200
11,300
19,400

94,300

36,900
45,700
119,800

36,900
91,400
479,200

Hal. 220
No

Uraian pekerjaan
Clamp ground rod 5/8"
Bimetal Connector
Ground wire Cu 50 mm2
Ground lug & washer
Grounding Iron Plate form Plat/Earth safety mats
Compression Connector H type 150/240 mm2
Upah Pemasangan

Satuan
bh
bh
mtr
bh
bh
bh
Unit

Volume
4
2
7
2
1
1
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp
13,900
40,400
67,300
11,300
1,138,400
40,000
147,500

Rp
55,600
80,800
471,100
22,600
1,138,400
40,000
147,500

Rp

2,563,500

Hal. 221
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga Jumlah Semua


Rp

54 CM3-4
Pole Band Double Rack 7" atau 7 1/2"
Compression terminal Lug 35mm2
Fuse Cut Out 20 KV, 100 A
Fuse link
Bracket Extension for cut out
Upah Pemasangan
55 CM2-11 M
Ground rod 5/8" x 8" copper weld
Clamp ground rod 5/8"
Bimetal Connector
Ground wire Cu 16 mm2
Ground lug & washer
Pipa Paralon 1/2"
Stoping Buckel / Yokes
Stainless Stell Strap 20 x 0,7 mm2
Upah Pemasangan
56 CM5-3
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
57 CM5-4
Isolator Tumpu 20 KV (Short Sank)
Pole Band Double Rack 7" atau 7 1/2"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
58 CM5-5
Isolator Tumpu 20 KV (Short Sank)
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
59 CM5-6
Compression connector H type 70 mm2/70mm2
AAAC 70 mm2
Lightning arrester 20 KV, 5 KA
Upah Pemasangan
60 CM5-8
Isolator tarik (suspension ) 20 KV
Pole Band Double Rack 7" atau 7 1/2"
Shackle Anchor 5/8
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Primary Dead End Clamp (150 s/d 240 ) mm2
Upah Pemasangan
61 CM5-9
Fuse Cut Out 20 KV, 100 A
Fuse link
Compression terminal Lug 35mm2
Upah Pemasangan
62 CM5-12
Pole Band Single rack 7 1/2"
Cross arm steel 1.500 mm (UNP 10 ) Galvanis
Washer Square 2 1/4 "
Upah Pemasangan
63 CM5-13
Pole Band Single rack 7 1/2"
Brace steel 770 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Upah Pemasangan
64 CM5-16

Unit
bh
bh
bh
bh
bh
Unit

1
2
1
1
1
1
1

bh
bh
bh
mtr
bh
mtr
bh
mtr
Unit
Unit
bh
Unit
Unit
bh
bh
mtr
Unit
Unit
bh
bh
mtr
Unit
Unit
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
unit
bh
bh
bh
unit
unit
bh
bh
bh
Unit
Unit
bh
bh
bh
Unit
Unit

1
1
1
10
2
5.5
6
4.8
1
1
1
1
2
1
1
2
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
2
2
1
1

Rp

Rp

45,700
36,050
1,133,000
60,500
60,500
14,400

91,400
36,050
1,133,000
60,500
60,500
14,400

1,395,850

119,800
13,900
40,400
23,200
11,300
9,700
2,100
10,900
29,900

119,800
13,900
40,400
232,000
22,600
53,350
12,600
52,320
29,900

576,870

45,700
29,900

45,700
29,900

75,600

215,600
45,700
6,600
21,700

215,600
45,700
13,200
21,700

296,200

215,600
3,200
6,600
21,700

215,600
6,400
13,200
21,700

256,900

28,600
49,500
724,300
51,000

28,600
49,500
724,300
51,000

853,400

245,200
45,700
18,000
19,096
3,200
94,300
35,000

245,200
45,700
18,000
19,096
3,200
94,300
35,000

460,496

1,133,000
60,500
36,050
59,800

1,133,000
60,500
36,050
59,800

1,289,350

29,500
269,600
3,200
51,000

29,500
269,600
6,400
51,000

356,500

29,500
26,400
4,000
35,700

29,500
52,800
8,000
35,700

126,000

Hal. 222
No

Uraian pekerjaan

Bolt machine 5/8" x 10"


Pole Band Single rack 8" atau 8 1/2"
Cross arm steel 3.000 mm (UNP 10 ) Galvanis
Washer Square 2 1/4 "
Upah Pemasangan
65 CM5-20
Isolator tarik (suspension ) 20 KV
Shackle Anchor 5/8
Oval Eye Nut 5/8"
Primary Dead End Clamp (150 s/d 240 ) mm2
Upah Pemasangan

Satuan
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
Unit

Volume
1
1
1
2
1
1
1
1
1
1
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp
19,050
30,900
539,400
3,200
51,000

Rp
19,050
30,900
539,400
6,400
51,000

245,200
18,000
19,096
94,300
35,700

245,200
18,000
19,096
94,300
35,700

Rp

646,750

412,296

Hal. 223
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga Jumlah Semua


Rp

66 CJ5
Bolt double up set 5/8" x 10"
Spool Insulator Ansi 53-2
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
67 CJ6

68

69

70

71

72

73

74

Oval eye bolt 5/8" x 10"


Washer Square 2 1/4 "
Clevis Swinging Secondary
Spool Insulator Ansi 53-4
Armour tipe 1/4" wide
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
CJ6X / SJ6X
Oval Eye Nut 5/8"
Armour tipe 1/4" wide
Clevis Swinging Secondary
Spool Insulator Ansi 53-4
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
CJ7
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Clevis Swinging Secondary
Spool Insulator Ansi 53-4
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
CJ8
Bolt single Upset 5/8" x 10"
Spool Insulator Ansi 53-2
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
CJ10
Bolt machine 5/8" x 10"
Washer Square 2 1/4 "
Spool Insulator Ansi 53-2
Bracket Secondary / bracket Insulated
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
SJ5
Pole Band Single Up Set 7" atau 7 1/2"
Spool Insulator Ansi 53-2
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
SJ6
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Clevis Swinging Secondary
Spool Insulator Ansi 53-4
Armour tipe 1/4" wide
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
SJ7
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Clevis Swinging Secondary
Spool Insulator Ansi 53-4
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan

Unit
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
set
bh
Unit
Unit
bh
bh
bh
bh
mtr
Unit

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
0.8
1
1
1
1
0.8
1
1
1
1
1
1
0.8
1
1
1
1
0.8
1
1
1
1
1
1
1
2
1
1
1
1
1
1
0.8
1

Rp

Rp

27,600
36,050
6,600
17,600

27,600
36,050
6,600
17,600

87,850

16,750
3,200
19,050
41,200
5,900
25,770
22,900

16,750
3,200
19,050
41,200
5,900
25,770
22,900

134,770

19,096
5,900
19,050
41,200
25,770
17,600

19,096
5,900
19,050
41,200
51,540
17,600

154,386

16,750
3,200
19,050
41,200
6,600
30,900

16,750
3,200
19,050
41,200
5,280
30,900

116,380

30,200
36,050
6,600
17,600

30,200
36,050
5,280
17,600

89,130

19,050
3,200
36,050
18,540
6,600
30,900

19,050
3,200
36,050
18,540
5,280
30,900

113,020

47,300
36,050
6,600
17,600

47,300
36,050
5,280
17,600

106,230

29,500
19,096
19,050
41,200
5,900
25,770
22,900

29,500
19,096
19,050
41,200
5,900
51,540
22,900

189,186

29,500
19,096
19,050
41,200
6,600
36,200

29,500
19,096
19,050
41,200
5,280
36,200

150,326

Hal. 224
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga Jumlah Semua


Rp

75 SJ8
Pole Band Single Up Set 7" atau 7 1/2"
Spool Insulator Ansi 53-2
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
76 SJ10
Pole Band Single rack 7 1/2"
Bracket Secondary / bracket Insulated
Spool Insulator Ansi 53-4
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan

Unit
bh
bh
mtr
Unit
Unit
bh
bh
bh
mtr
Unit

1
1
1
0.8
1
1
1
1
1
0.8
1

Rp

Rp

47,300
36,050
6,600
17,600

47,300
36,050
5,280
17,600

106,230

29,500
18,540
41,200
6,600
30,900

29,500
18,540
41,200
5,280
30,900

125,420

Hal. 225
No

Uraian pekerjaan

77 SA1
Isolator Tumpu ( line post) 20 KV
Spool Insulator Ansi 53-2
Center Bracket 12,5 KN
Pole Band Single Up set 7" atau 7 1/2"
Pole Band Single rack 7 1/2"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
78 SA1'
Isolator tumpu (line post) 20 KV
Center Bracket 12,5 KN
Pole Band Single rack 7 1/2"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
79 SA2
Isolator tumpu (line post) 20 KV
Spool Insulator Ansi 53-2
Center Bracket 12,5 KN
Pole Band Single rack 7 1/2"
Bracket Secondary / bracket Insulated
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
80 SA2'
Isolator tumpu ( pin post) 20 KV
Center Bracket 12,5 KN
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
81 SA3
Isolator Tarik 20 KV ( 2 pcs )
Spool Insulator Ansi 53-4
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Clevis Swinging Secondary
Primary Dead End Clamp 35 s/d 70 mm2
Tie Wire #4 / Aluminium Bonding Wire #20
Shackle Anchor 5/8
Armour Rod # for AAAC 70 mm2
Upah Pemasangan
82 SA3'
Isolator Tarik 20 KV ( 2 pcs )
Pole Band Double Rack 7" atau 7 1/2"
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Angle Clamp 35 s/d 70 mm2
Armour Rod # for AAAC 70 mm2
Upah Pemasangan
83 SA4
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Compression Connector H type 70/150 mm2
Armour Rod # for AAAC 70 mm2
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Shackle Anchor 5/8

Satuan
Unit
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
mtr
bh
set
Unit
Unit
bh
bh
bh
bh
bh
set
Unit
Unit
bh
bh
bh
bh
bh
bh
set
bh
bh
bh

Volume
1
1
1
1
1
2
2.6
1
1
1
1
2
1.8
1
1
2
1
2
1
1
2.8
2
1
1
2
2
2
2
1
1
1
1
2
2
1
1
0.8
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
4
4
2
2
2
4
2

Harga Satuan Jumlah Harga Jumlah Semua


Rp

Rp

Rp

215,600
36,050
79,900
47,300
29,500
6,600
21,700

215,600
36,050
79,900
47,300
59,000
17,160
21,700

476,710

215,600
79,900
29,500
6,600
18,800

215,600
79,900
59,000
11,880
18,800

385,180

215,600
36,050
79,900
29,500
18,540
6,600
45,700
35,300

431,200
36,050
159,800
29,500
18,540
18,480
91,400
35,300

820,270

215,600
79,900
6,600
45,700
32,300

431,200
159,800
13,200
91,400
32,300

727,900

245,200
41,200
29,500
19,096
19,050
67,300
6,600
18,000
60,500
51,000

245,200
41,200
59,000
38,192
19,050
67,300
5,280
18,000
60,500
51,000

604,722

245,200
45,700
19,096
18,000
56,650
60,500
48,100

245,200
45,700
19,096
18,000
56,650
60,500
48,100

493,246

245,200
41,200
19,050
29,500
19,096
37,000
60,500
67,300
25,770
18,000

490,400
82,400
38,100
118,000
76,384
74,000
121,000
134,600
103,080
36,000

Hal. 226
No

Uraian pekerjaan
Upah Pemasangan

84 SA4'
Isolator Tarik 20 KV ( 2 pcs )
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Compression Connector H type 70/150 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Upah Pemasangan

Satuan
unit
Unit
bh
bh
bh
bh
bh
bh
Unit

Volume
1
1
2
2
2
1
2
2
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp
27,100

Rp
27,100

Rp
1,301,064

245,200
29,500
19,096
37,000
18,000
67,300
39,750

490,400
59,000
38,192
37,000
36,000
134,600
39,750

834,942

Hal. 227
No

Uraian pekerjaan

85 SA5
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Armour Rod # for AAAC 70 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
86 SA5'

87

88

89

90

91

Isolator Tarik 20 KV ( 2 pcs )


Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Upah Pemasangan
SA5-1
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Armour Rod # for AAAC 70 mm2
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Shackle Anchor 5/8
Compression Connector H type 70/150 mm2
Upah Pemasangan
SA5-1'
Isolator Tarik 20 KV ( 2 pcs )
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Primary Dead End Clamp 35 s/d 70 mm2
Shackle Anchor 5/8
Compression Connector H type 70/150 mm2
Upah Pemasangan
SA6
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53-4
Clevis Swinging Secondary
Oval Eye Nut 5/8"
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Armour Rod # for AAAC 70 mm2
Pole Band Single rack 7 1/2"
Shackle Anchor 5/8
Upah Pemasangan
SA6'
Isolator Tarik 20 KV ( 2 pcs )
Oval Eye Nut 5/8"
Primary Dead End Clamp 35 s/d 70 mm2
Pole Band Single rack 7 1/2"
Shackle Anchor 5/8
Upah Pemasangan
B1
Isolator tumpu (line post) 20 KV
Cross Arm Stell 1500

Satuan
Unit
bh
bh
bh
bh
bh
set
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
set
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
Unit
Unit
bh
bh

Volume
1
1
1
1
2
2
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
2
2
1
1
2
1
2
1
1
1
1
1
1
1
1
1
1
2
2
2
4
2
4
2
2
2
1
1
2
2
2
1
2
1
1
2
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp

Rp

Rp

245,200
41,200
19,050
29,500
19,096
60,500
18,000
67,300
25,770
51,000

245,200
41,200
19,050
59,000
38,192
60,500
18,000
67,300
51,540
51,000

650,982

245,200
29,500
19,096
18,000
67,300
57,800

245,200
29,500
19,096
18,000
67,300
57,800

436,896

245,200
41,200
19,050
29,500
19,096
60,500
67,300
25,770
18,000
37,000
55,600

245,200
41,200
19,050
59,000
38,192
60,500
67,300
51,540
18,000
74,000
55,600

729,582

245,200
29,500
19,096
67,300
18,000
37,000
24,200

245,200
29,500
19,096
67,300
18,000
37,000
24,200

440,296

245,200
41,200
19,050
19,096
67,300
25,770
60,500
29,500
18,000
67,900

490,400
82,400
38,100
76,384
134,600
103,080
121,000
59,000
36,000
67,900

1,208,864

245,200
19,096
67,300
29,500
18,000
39,750

490,400
38,192
134,600
29,500
36,000
39,750

768,442

215,600
269,600

431,200
269,600

Hal. 228
No

Uraian pekerjaan
Brace steel 550 mm
Bolt Machine / bolt Carriage 1/2" x 3/4"
Tie Wire #4 / Aluminium Bonding Wire #20
Washer Square 2 1/4 "
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan

Satuan
bh
bh
mtr
bh
bh
Unit

Volume
2
2
10.4
4
2
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp
21,950
4,000
6,600
3,200
45,700
46,000

Rp
43,900
8,000
68,640
12,800
91,400
46,000

Rp

971,540

Hal. 229
No

Uraian pekerjaan

92 B1A
Isolator tumpu (line post) 20 KV
Side Bracket 12,5 KN
Bolt Machine 5/8 x 12 "
Tie Wire #4 / Aluminium Bonding Wire #20
Washer Square 2 1/4 "
Upah Pemasangan
93 B2
Isolator tumpu (line post) 20 KV
Cross Arm Stell 1500
Brace steel 550 mm
Pole Band Double Rack 7" atau 7 1/2"
Washer Square 2 1/4 "
Bolt Double Arming 5/8" x 12"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
94 B3
Isolator Tarik 20 KV ( 2 pcs )
Isolator tumpu (line post) 20 KV
Cross Arm Stell 1500
Brace steel 550 mm
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 12"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Oval Eye Nut 5/8"
Tie Wire #4 / Aluminium Bonding Wire #20
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Compression Connector H type 70/150 mm2
Upah Pemasangan
95 B4
Isolator Tarik 20 KV ( 2 pcs )
Isolator tumpu (line post) 20 KV
Brace steel 550 mm
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 12"
Bolt Machine 5/8" x 8"
Washer Square 2 1/4 "
Bolt Machine / bolt Carriage 1/2" x 3/4"
Cross Arm Stell 1500
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Compression Connector H type 70/150 mm2
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
96 B5
Isolator Tarik 20 KV ( 2 pcs )
Cross Arm Stell 1500
Brace steel 550 mm
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 12"
Bolt Machine 5/8" x 8"
Washer Square 2 1/4 "
Bolt Machine / bolt Carriage 1/2" x 3/4"
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2

Satuan
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
unit
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

Volume
1
2
2
2
10.4
2
1
1
4
2
4
2
4
3
4
10.4
1
1
4
1
2
4
2
3
4
4
2.6
4
4
2
1
1
4
1
8
4
5
2
4
8
4
4
4
4
4
5.2
1
1
2
2
4
2
2
2
4
4
2
2
3

Harga Satuan Jumlah Harga Jumlah Semua


Rp

Rp

Rp

215,600
69,300
17,600
6,600
3,200
339,500

431,200
138,600
35,200
68,640
6,400
339,500

1,019,540

215,600
269,600
21,950
45,700
3,200
29,200
4,000
6,600
67,900

862,400
539,200
87,800
91,400
12,800
87,600
16,000
68,640
67,900

1,833,740

245,200
215,600
269,600
21,950
45,700
29,200
4,000
19,096
6,600
18,000
67,300
37,000
116,000

980,800
215,600
539,200
87,800
91,400
87,600
16,000
76,384
17,160
72,000
269,200
74,000
116,000

2,643,144

245,200
215,600
21,950
45,700
29,200
16,900
3,200
4,000
269,600
19,096
18,000
67,300
37,000
6,600
116,000

980,800
215,600
175,600
182,800
146,000
33,800
12,800
32,000
1,078,400
76,384
72,000
269,200
148,000
34,320
116,000

3,573,704

245,200
269,600
21,950
45,700
29,200
16,900
3,200
4,000
19,096
18,000
67,300

490,400
539,200
87,800
91,400
58,400
33,800
12,800
16,000
38,192
36,000
201,900

Hal. 230
No

Uraian pekerjaan
Upah Pemasangan

97 CC1
Isolator Tarik 20 KV ( 2 pcs )
Spool Insulator ansi 53-2
Center Bracket 12,5 KN
Side Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bolt single Upset 5/8" x 10"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan

Satuan
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
mtr
Unit

Volume
1
1
3
1
1
2
4
1
3
8.6
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp
57,800

Rp
57,800

Rp
1,663,692

245,200
36,050
79,900
69,300
19,050
30,200
3,200
6,600
52,700

735,600
36,050
79,900
138,600
76,200
30,200
9,600
56,760
52,700

1,215,610

Hal. 231
No

Uraian pekerjaan

98 CC1'
Isolator tumpu (line post) 20 KV
Center Bracket 12,5 KN
Side Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
99 CC1-1
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Spool insulator ansi 53-2
Cross Arm Stell 1500
Brace steel 550 mm
Center Bracket 12,5 KN
Washer Square 2 1/4 "
Bolt Machine 5/8" x 10"
Bolt single Upset 5/8" x 10"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Single rack 7 1/2"
Upah Pemasangan
100 CC1-A
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Spool insulator ansi 53-2
Cross Arm Stell 1500
Brace steel 550 mm
Center Bracket 12,5 KN
Washer Square 2 1/4 "
Bolt Machine 5/8" x 10"
Bolt single Upset 5/8" x 10"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Single rack 7 1/2"
Upah Pemasangan
101 CC.1-A'
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Cross Arm Stell 1500
Brace steel 550 mm2
Center Bracket 12,5 KN
Washer Square 2 1/4 "
Bolt Machine / bolt Carriage 1/2" x 3/4"
Bolt Machine 5/8" x 10"
Tie Wire #4 / Aluminium Bonding Wire #20
Pole band Single Rack 71/2"
Upah Pemasangan
102 CC.2
Isolator tumpu (line post) 20 KV
Spool Insulator Ansi 53-2
Side Bracket
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bracket Secondary / Bracket Insulated
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
103 CC.2'

Satuan
Unit
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit

Volume
1
3
1
2
4
4
7.8
1
1
2
1
1
1
2
1
4
3
1
2
8.6
1
1
1
2
1
1
1
2
1
4
3
1
2
8.6
1
1
1
2
1
1
2
1
3
2
3
7.8
1
1
1
3
1
2
1
4
1
3
8.6
1
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp

Rp

Rp

215,600
79,900
69,300
19,050
3,200
6,600
54,900

646,800
79,900
138,600
76,200
12,800
51,480
54,900

1,060,680

215,600
215,600
36,050
269,600
21,950
79,900
3,200
19,050
30,200
4,000
6,600
29,500
57,800

431,200
215,600
36,050
269,600
43,900
79,900
12,800
57,150
30,200
8,000
56,760
29,500
57,800

1,328,460

215,600
215,600
36,050
269,600
21,950
79,900
3,200
19,050
30,200
4,000
6,600
29,500
57,800

431,200
215,600
36,050
269,600
43,900
79,900
12,800
57,150
30,200
8,000
56,760
29,500
57,800

1,328,460

215,600
215,600
269,600
21,950
79,900
3,200
4,000
19,050
6,600
29,500
54,900

431,200
215,600
269,600
43,900
79,900
9,600
8,000
57,150
51,480
29,500
54,900

1,250,830

215,600
269,600
69,300
79,900
19,050
18,540
3,200
6,600
67,900

646,800
269,600
138,600
79,900
76,200
18,540
9,600
56,760
67,900

1,363,900

Hal. 232
No

Uraian pekerjaan
Isolator tumpu (line post) 20 KV
Center Bracket 12,5 KN
Side Bracket
Bolt Machine 5/8" x 10"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan

Satuan
bh
bh
bh
bh
bh
mtr
Unit

Volume
1
1
2
4
2
7.8
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp
215,600
79,900
69,300
19,050
3,200
6,600
64,900

Rp
215,600
79,900
138,600
76,200
6,400
51,480
64,900

Rp

633,080

Hal. 233
No

Uraian pekerjaan

104 CC2 - A
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Spool insulator ansi 53-2
Cross Arm Stell 1500 (UNP 10) galvanis
Brace steel 550 mm2
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Bracket Secondary / Bracket insulated
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
105 CC2-1
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Spool insulator ansi 53-2
Cross Arm Stell 3000 (UNP 10) galvanis
Brace steel 770 mm2
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Bracket Secondary / Bracket insulated
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
106 CC2 - A'
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Cross Arm Stell 1500 (UNP 10) galvanis
Brace steel 550 mm2
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
107 CC.3
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53 - 2
Clevis Swinging Secondary
Primary Angle Clamp 150 s/d 240 mm2
Tie Wire #4 / Aluminium Bonding Wire #20
Armour Rod # for AAAC 240 mm2
Pole Band Single rack 7" atau 7 1/2"
Oval Eye Nut 5/8"
Shackle Anchor 5/8"
Upah Pemasangan
108 CC.3'
Isolator Tarik 20 KV ( 2 pcs )
Primary Angle Clamp 150 s/d 240 mm2
Armour Rod # for AAAC 240 mm2
Oval Eye Nut 5/8"

Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
mtr
set
bh
bh
bh
Unit
Unit
bh
bh
set
bh

Volume
1
4
2
1
2
4
2
3
3
4
4
16.4
1
1
1
1
4
2
1
2
4
2
5
3
4
4
16.4
1
1
1
1
4
2
2
4
2
5
3
4
2
15.6
1
1
1
3
1
1
3
0.8
3
4
3
3
1
1
3
3
3
3

Harga Satuan Jumlah Harga Jumlah Semua


Rp

Rp

Rp

215,600
215,600
36,050
269,600
21,950
79,900
19,050
29,200
4,000
3,200
6,600
18,540
45,700
67,900

862,400
431,200
36,050
539,200
87,800
159,800
57,150
87,600
16,000
12,800
108,240
18,540
45,700
67,900

2,530,380

215,600
215,600
36,050
539,400
26,400
79,900
19,050
29,200
4,000
3,200
6,600
18,540
45,700
67,900

862,400
431,200
36,050
1,078,800
105,600
159,800
95,250
87,600
16,000
12,800
108,240
18,540
45,700
67,900

3,125,880

215,600
215,600
269,600
21,950
79,900
19,050
29,200
4,000
3,200
6,600
45,700
64,900

862,400
431,200
539,200
87,800
159,800
95,250
87,600
16,000
6,400
102,960
45,700
64,900

2,499,210

245,200
36,050
19,050
60,500
6,600
121,250
29,500
19,096
18,000
67,900

735,600
36,050
19,050
181,500
5,280
363,750
118,000
57,288
54,000
67,900

1,638,418

245,200

735,600
0
363,750
57,288

121,250
19,096

Hal. 234
No

Uraian pekerjaan
Shackle Anchor 5/8"
Washer Square 2 1/4 "
Upah Pemasangan

Satuan
bh
bh
Unit

Volume
3
6
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp
18,000
3,200
67,900

Rp
54,000
19,200
67,900

Rp

1,297,738

Hal. 235
No

Uraian pekerjaan

109 CC 7
Isolator Tarik 20 KV ( 2 pcs )
Shackle Anchor 5/8"
Spool insulator ansi 53 - 4
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 10"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Arrmour tipe 1/4" wide
Clevis Swinging Secondary
Primary Dead End Clamp 150 s/d 240 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Shackle Anchor 5/8"
Upah Pemasangan
110 CC 7'
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 14"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Shackle Anchor 5/8"
Primary Dead End Clamp 150 s/d 240 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Oval eye bolt 5/8" x 10"
Upah Pemasangan
111 CC 7 A
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53 - 4
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 10"
Oval Eye Nut 5/8"
Arrmour tipe 1/4" wide
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Clevis Swinging Secondary
Shackle Anchor 5/8"
Primary Dead End Clamp 150 s/d 240 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
112 CC 7 A'
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 10"
Oval Eye Nut 5/8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Shackle Anchor 5/8"

Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

Volume
1
3
3
1
2
4
1
3
1
3
11
1
1
3
2
4
3
1
1
3
2
4
1
3
3
10
3
3
4
1
1
1
3
1
2
4
2
3
1
3
1
4
11
1
3
3
2
1
1
3
2
4
1
3
1
2
4
11
3

Harga Satuan Jumlah Harga Jumlah Semua


Rp

Rp

Rp

245,200
18,000
41,200
60,500
21,950
45,700
29,200
16,750
19,096
3,200
5,900
19,050
94,300
25,770
4,000
18,000
64,900

735,600
54,000
41,200
121,000
87,800
45,700
87,600
16,750
57,288
35,200
5,900
19,050
282,900
51,540
16,000
54,000
64,900

1,776,428

245,200
359,500
21,950
45,700
29,200
19,096
3,200
18,000
94,300
4,000
16,750
86,500

735,600
719,000
87,800
45,700
87,600
57,288
32,000
54,000
282,900
16,000
16,750
86,500

2,221,138

245,200
41,200
269,600
21,950
45,700
29,200
16,750
19,096
5,900
4,000
3,200
19,050
18,000
94,300
25,770
83,600

735,600
41,200
539,200
87,800
91,400
87,600
16,750
57,288
5,900
16,000
35,200
19,050
54,000
282,900
51,540
83,600

2,205,028

245,200
269,600
21,950
45,700
29,200
16,750
19,096
4,000
3,200
18,000

735,600
539,200
87,800
45,700
87,600
16,750
38,192
16,000
35,200
54,000

Hal. 236
No

Uraian pekerjaan
Primary Dead End Clamp 150 s/d 240 mm2
Upah Pemasangan

Satuan
bh
Unit

Volume
3
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp
94,300
83,600

Rp
282,900
83,600

Rp
2,022,542

Hal. 237
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga Jumlah Semua


Rp

113 CC 8
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Tie Wire #4 / Aluminium Bonding Wire #20
Brace steel 770 mm2
Arrmour tipe 1/4" wide
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 10"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Center Bracket 12,5 KN
Loop Dead End Clamp/LC 35 s/d 240 mm2
Clevis Swinging Secondary
Compression Connector H type 150/240mm2
Cross arm steel 1500 mm (UNP 10 ) galvanis
Oval Eye Nut 5/8"
Pole Band Double Rack 7" atau 7 1/2"
Shackle Anchor 5/8"
Spool insulator ansi 53 - 4
Washer Square 2 1/4 "
Primary Dead End Clamp 150 s/d 240 mm2
Upah Pemasangan
114 CC 8 - A
Isolator tumpu (pin post) 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Tie Wire #4 / Aluminium Bonding Wire #20
Brace steel 770 mm2
Arrmour tipe 1/4" wide
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 10"
Bolt Machine 5/8" x 8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Loop Dead End Clamp/LC 35 s/d 240 mm2
Clevis Swinging Secondary
Compression Connector H type 150/240mm2
Cross arm steel 1500 mm (UNP 10 ) galvanis
Oval Eye Nut 5/8"
Pole Band Double Rack 7" atau 7 1/2"
Shackle Anchor 5/8"
Spool insulator ansi 53 - 4
Washer Square 2 1/4 "
Primary Dead End Clamp 150 s/d 240 mm2
Upah Pemasangan
115 CC 8 A'
Isolator tumpu 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 2000 mm (UNP 10 ) galvanis
Brace steel 770 mm2
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Double Rack 7" atau 7 1/2"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Shackle Anchor 5/8"
Tie Wire #4 / Aluminium Bonding Wire #20
Compression Connector H type 150/240mm2
Primary Dead End Clamp 150 s/d 240 mm2
Bolt Machine 5/8" x 8"

Unit
bh
bh
bh
mtr
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
mtr
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
bh

1
2
1
6
7.8
4
1
3
1
4
1
4
2
4
2
7
2
6
2
11
6
1
1
3
6
7.8
8
1
5
1
2
8
4
2
4
4
7
6
6
2
21
6
1
1
3
6
4
8
4
1
8
4
5
21
6
7.8
4
6
2

Rp

Rp

215,600
215,600
245,200
6,600
26,400
5,900
29,200
16,750
4,000
79,900
25,770
19,050
43,280
269,600
19,096
45,700
18,000
41,200
3,200
94,300
140,300

431,200
215,600
1,471,200
51,480
105,600
5,900
87,600
16,750
16,000
79,900
103,080
38,100
173,120
539,200
133,672
91,400
108,000
82,400
35,200
565,800
140,300

4,491,502

215,600
245,200
6,600
26,400
5,900
29,200
16,750
16,900
4,000
25,770
19,050
43,280
269,600
19,096
45,700
18,000
41,200
3,200
94,300
140,300

646,800
1,471,200
51,480
211,200
5,900
146,000
16,750
33,800
32,000
103,080
38,100
173,120
1,078,400
133,672
274,200
108,000
82,400
67,200
565,800
140,300

5,379,402

215,600
245,200
359,500
26,400
29,200
16,750
4,000
45,700
19,096
3,200
18,000
6,600
43,280
94,300
16,900

646,800
1,471,200
1,438,000
211,200
116,800
16,750
32,000
182,800
95,480
67,200
108,000
51,480
173,120
565,800
33,800

Hal. 238
No

Uraian pekerjaan

Upah Pemasangan
116 SC . 1
Isolator tumpu (line post) 20 KV
Spool Insulator Ansi 53 - 2
Center Bracket 12,5 KN
Side Bracket
Bolt Machine 5/8" x 10"
Pole Band Single Up set 7" atau 7 1/2"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan

Satuan
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
set
Unit

Volume
1
1
3
1
1
2
4
1
4
8.6
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp
137,400

Rp
137,400

Rp
5,347,830

215,600
36,050
79,900
69,300
19,050
47,300
3,200
6,600
55,600

646,800
36,050
79,900
138,600
76,200
47,300
12,800
56,760
55,600

1,150,010

Hal. 239
No

Uraian pekerjaan

117 SC. 1'


Isolator tumpu (line post) 20 KV
Center Bracket 12,5 KN
Side Bracket
Bolt Machine 5/8" x 10"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
118 SC . 1 - A
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Spool Insulator Ansi 53 - 2
Cross arm steel 1500
Brace steel 550 mm2
Center Bracket 12,5 KN
Washer Square 2 1/4 "
Bolt Machine 5/8" x 10"
Pole Band Single rack 7" atau 7 1/2"
Pole Band Single Up set 7" atau 7 1/2"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
119 SC 1 - A '
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Cross arm steel 1500
Brace steel 550 mm2
Center Bracket 12,5 KN
Washer Square 2 1/4 "
Bolt Machine / bolt Carriage 1/2" x 3/4"
Bolt Machine 5/8" x 10"
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Single rack 7" atau 7 1/2"
Upah Pemasangan
120 SC 2
Isolator tumpu (pin post) 20 KV
Spool Insulator Ansi 53 - 2
Side Bracket
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bracket secondary / bracket insulated
Washer Square 2 1/4 "
Pole Band Single rack 7" atau 7 1/2"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
121 SC 2 '
Isolator tumpu (pin post) 20 KV
Side Bracket
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
122 SC2-A
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Spool insulator ansi 53-2
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2

Satuan
Unit
bh
bh
bh
bh
bh
set
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh

Volume
1
3
1
2
4
4
7.8
1
1
2
1
1
1
2
1
4
3
3
1
2
8.6
1
1
2
1
1
2
1
3
2
3
7.8
1
1
1
3
1
2
1
4
1
2
1
8.6
1
1
2
2
1
4
2
7.8
1
1
2
4
1
2
4

Harga Satuan Jumlah Harga Jumlah Semua


Rp

Rp

Rp

215,600
79,900
69,300
19,050
3,200
6,600
55,600

646,800
79,900
138,600
76,200
12,800
51,480
55,600

1,061,380

215,600
215,600
36,050
269,600
21,950
79,900
3,200
19,050
29,500
47,300
4,000
6,600
55,600

431,200
215,600
36,050
269,600
43,900
79,900
12,800
57,150
88,500
47,300
8,000
56,760
55,600

1,402,360

215,600
215,600
269,600
21,950
79,900
3,200
4,000
19,050
6,600
29,500
54,900

431,200
215,600
269,600
43,900
79,900
9,600
8,000
57,150
51,480
29,500
54,900

1,250,830

215,600
36,050
69,300
79,900
19,050
18,540
3,200
29,500
6,600
67,900

646,800
36,050
138,600
79,900
76,200
18,540
6,400
29,500
56,760
67,900

1,156,650

215,600
69,300
79,900
19,050
3,200
6,600
64,900

431,200
138,600
79,900
76,200
6,400
51,480
64,900

848,680

215,600
215,600
36,050
269,600
21,950

431,200
862,400
36,050
539,200
87,800

Hal. 240
No

Uraian pekerjaan
Center Bracket 12,5 KN
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Bracket secondary / bracket insulated
Pole Band Single rack 7" atau 7 1/2"
Upah Pemasangan

Satuan
bh
bh
bh
bh
bh
mtr
bh
bh
Unit

Volume
2
2
3
4
10
16.4
1
2
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp
79,900
19,050
29,200
4,000
3,200
6,600
18,540
29,500
67,900

Rp
159,800
38,100
87,600
16,000
32,000
108,240
18,540
59,000
67,900

Rp

2,543,830

Hal. 241
No

Uraian pekerjaan

123 SC2-A'
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Center Bracket 12,5 KN
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Single rack 7" atau 7 1/2"
Upah Pemasangan
124 SC3
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53-4
Clevis Swinging Secondary
Primary Angle Clamp 150 s/d 240 mm2
Tie Wire #4 / Aluminium Bonding Wire #20
Arrmour rod # for AAAC 240 mm2
Pole band single rack 8" x 8 1/2"
Washer Square 2 1/4 "
Shackle Anchor 5/8
Upah Pemasangan
125 SC3'
Isolator Tarik 20 KV ( 2 pcs )
Primary Angle Clamp 150 s/d 240 mm2
Arrmour rod # for AAAC 240 mm2
Oval eye bolt 5/8" x 8"
Pole band single rack 8" x 8 1/2"
Shackle Anchor 5/8
Arrmour rod # for AAAC 150 mm2
Upah Pemasangan
126 SC7
Isolator Tarik 20 KV ( 2 pcs )
Shackle Anchor 5/8
Spool insulator ansi 53-4
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Single rack 7" atau 7 1/2"
Pole Band Double Rack 7" atau 7 1/2"
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Armour tape 1/4" wide
Clevis Swinging Secondary
Primary dead end clamp(150 s/d 240)mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Upah Pemasangan
127 SC7'
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"

Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
mtr
set
bh
bh
bh
Unit
Unit
bh
bh
set
bh
bh
bh
set
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh

Volume
1
2
4
2
4
2
2
2
4
10
15.6
1
1
1
3
1
1
3
0.8
3
4
8
3
1
1
3
3
3
3
4
3
1
1
1
3
3
1
2
4
1
2
2
3
1
3
10
1
1
3
2
4
1
1
3
2
4
2
2
3

Harga Satuan Jumlah Harga Jumlah Semua


Rp

Rp

Rp

215,600
215,600
269,600
21,950
79,900
19,050
29,200
4,000
3,200
6,600
29,500
56,100

431,200
862,400
539,200
87,800
159,800
38,100
58,400
16,000
32,000
102,960
29,500
56,100

2,413,460

245,200
41,200
19,050
60,500
6,600
121,250
30,900
3,200
18,000
67,900

735,600
41,200
19,050
181,500
5,280
363,750
123,600
25,600
54,000
67,900

1,617,480

245,200
60,500
121,250
16,750
30,900
18,000
80,800
67,900

735,600
181,500
363,750
50,250
123,600
54,000
80,800
67,900

1,657,400

245,200
18,000
41,200
269,600
21,950
29,500
45,700
19,050
29,200
16,750
19,096
3,200
5,900
19,050
94,300
25,770
4,000
64,900

735,600
54,000
41,200
539,200
87,800
29,500
91,400
38,100
87,600
16,750
57,288
32,000
5,900
19,050
282,900
51,540
16,000
64,900

2,250,728

245,200
269,600
21,950
45,700
19,050
29,200

735,600
539,200
87,800
91,400
38,100
87,600

Hal. 242
No

Uraian pekerjaan
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Shackle Anchor 5/8
Primary dead end clamp(150 s/d 240)mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Upah Pemasangan

Satuan
bh
bh
bh
bh
bh
bh

Volume
3
10
3
3
4
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp
19,096
3,200
18,000
94,300
4,000
86,500

Rp
57,288
32,000
54,000
282,900
16,000
86,500

Rp

2,108,388

Hal. 243
No

Uraian pekerjaan

128 SC7-A
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53-4
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Pole Band Single rack 7" atau 7 1/2"
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Oval Eye Nut 5/8"
Armour tape 1/4" wide
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Clevis Swinging Secondary
Shackle Anchor 5/8
Primary dead end clamp(150 s/d 240)mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
129 SC7-A'
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Oval Eye Nut 5/8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Shackle Anchor 5/8
Primary dead end clamp (150 s/d 240)mm2
Upah Pemasangan
130 SC8
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Tie Wire #4 / Aluminium Bonding Wire #20
Brace steel 770 mm2
Armour tape 1/4" wide
Pole Band Double Rack 7" atau 7 1/2"
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Center Bracket 12,5 KN
Loop Dead End Clamp/LC 35 s/d 240 mm2
Clevis Swinging Secondary
Compression Connector H type 150/240mm2
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Spool insulator ansi 53-4
Washer Square 2 1/4 "
Primary dead end clamp (150 s/d 240) mm2
Upah Pemasangan

Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
mtr
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit

Volume
1
3
1
2
4
2
1
2
3
1
3
1
4
11
1
3
3
2
1
1
3
2
4
2
2
3
1
2
4
4
3
3
1
1
1
2
2
7.8
4
2
3
2
5
1
8
1
4
2
4
2
7
6
2
11
6
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp

Rp

Rp

245,200
41,200
269,600
21,950
45,700
29,500
19,050
29,200
16,750
19,096
5,900
4,000
3,200
19,050
18,000
94,300
25,770
83,600

735,600
41,200
539,200
87,800
91,400
29,500
38,100
87,600
16,750
57,288
5,900
16,000
35,200
19,050
54,000
282,900
51,540
83,600

2,272,628

245,200
269,600
21,950
45,700
19,050
29,200
16,750
19,096
4,000
3,200
18,000
94,300
83,600

735,600
539,200
87,800
91,400
38,100
87,600
16,750
38,192
16,000
12,800
54,000
282,900
83,600

2,083,942

215,600
215,600
245,200
6,600
26,400
5,900
45,700
19,050
29,200
16,750
4,000
79,900
25,770
19,050
40,000
359,500
19,096
18,000
41,200
3,200
94,300
140,300

215,600
431,200
490,400
51,480
105,600
11,800
137,100
38,100
146,000
16,750
32,000
79,900
103,080
38,100
160,000
719,000
133,672
108,000
82,400
35,200
565,800
140,300

3,841,482

Hal. 244
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga Jumlah Semua


Rp

131 SC8-A
Isolator tumpu (pin post) 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Tie Wire #4 / Aluminium Bonding Wire #20
Brace steel 770 mm2
Armour tape 1/4" wide
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Bolt machine 5/8" x 10"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Loop Dead End Clamp/LC 35 s/d 240 mm2
Clevis Swinging Secondary
Compression Connector H type 150/240mm2
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Oval Eye Nut 5/8"
Pole Band Double Rack 7" atau 7 1/2"
Pole band single rack 8" x 8 1/2"
Shackle Anchor 5/8
Spool insulator ansi 53-4
Washer Square 2 1/4 "
Primary dead end clamp (150 s/d 240) mm2
Upah Pemasangan
132 SC8-A'
Isolator tumpu (pin post) 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Brace steel 770 mm2
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Double Rack 7" atau 7 1/2"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Shackle Anchor 5/8
Tie Wire #4 / Aluminium Bonding Wire #20
Compression Connector H type 150/240mm2
Primary dead end clamp (150 s/d 240) mm2
Upah Pemasangan
133 SC9
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Center Bracket 12,5 KN
Bolt machine 5/8" x 10"
Washer Square 2 1/4 "
Cross arm steel 1.500 mm (UNP 10 ) galvanis
Steel L 70x70x7x1.682 mm Galvanis
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole band single rack 8" x 8 1/2"
Pole Band Single Up set 7" atau 7 1/2"
Spool insulator ansi 53-2
Upah Pemasangan
134 SC10
Isolator tumpu (pin post) 20 KV
Bolt machine 5/8" x 10"
Washer Square 2 1/4 "
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Steel L 70x70x7x1.682 mm Galvanis
Bolt Machine / bolt Carriage 1/2" x 3/4"

Unit
bh
bh
mtr
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
Unit

1
3
6
7.8
8
1
5
1
2
8
4
2
4
2
7
4
2
6
2
21
6
1
1
3
6
4
8
2
4
1
8
4
5
21
6
7.8
4
6
1

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
bh
bh
bh
bh
bh
bh

1
2
1
3
3
1
1
1
1
1
1
1
1
3
1
1
1
1
1

Rp

Rp

215,600
245,200
6,600
26,400
5,900
29,200
16,750
19,050
4,000
25,770
19,050
40,000
359,500
19,096
45,700
30,900
18,000
41,200
3,200
94,300
140,300

646,800
1,471,200
51,480
211,200
5,900
146,000
16,750
38,100
32,000
103,080
38,100
160,000
719,000
133,672
182,800
61,800
108,000
82,400
67,200
565,800
140,300

4,981,582

215,600
245,200
359,500
26,400
19,050
29,200
16,750
4,000
45,700
19,096
3,200
18,000
6,600
40,000
94,300
137,400

646,800
1,471,200
1,438,000
211,200
38,100
116,800
16,750
32,000
182,800
95,480
67,200
108,000
51,480
160,000
565,800
137,400

5,339,010

215,600
215,600
79,900
19,050
3,200
269,600
215,200
4,000
30,900
47,300
36,050
67,900

215,600
431,200
79,900
57,150
9,600
269,600
215,200
4,000
30,900
47,300
36,050
67,900

1,464,400

215,600
19,050
3,200
359,500
215,200
4,000

646,800
19,050
3,200
359,500
215,200
4,000

Hal. 245
No

Uraian pekerjaan
Pole band single rack 8" x 8 1/2"
Pole Band Single Up set 7" atau 7 1/2"
Spool insulator ansi 53-2
Upah Pemasangan

Satuan
bh
bh
bh
bh

Volume
1
1
1
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp
30,900
47,300
36,050
67,900

Rp
30,900
47,300
36,050
67,900

Rp

1,429,900

Hal. 246
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga Jumlah Semua


Rp

135 SC 11
Isolator tumpu (pin post) 20 KV
Bolt Double Arming 5/8" x (16 s/d 24")
Washer Square 2 1/4 "
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Steel L 70x70x7x1.682 mm Galvanis
Spool insulator ansi 53-2
Bracket secondary / bracket insulated
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Double Rack 8" atau 8 1/2"
Pole Band Single rack 7" atau 7 1/2"
Upah Pemasangan
136 SC12
Isolator tumpu (pin post) 20 KV
Bolt Double Arming 5/8" x (16 s/d 24")
Washer Square 2 1/4 "
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Steel L 70x70x7x1.000 mm Galvanis
Bracket secondary / bracket insulated
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Double Rack 8" atau 8 1/2"
Pole Band Single rack 7" atau 7 1/2"
Spool insulator ansi 53-2
Upah Pemasangan
137 DC1
Isolator tumpu (pin post) 20 KV
Bolt Machine 5/8" x 10"
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Brace steel 770 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Single Up set 7" atau 7 1/2"
Pole band single rack 8" x 8 1/2"
Spool insulator ansi 53-2
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
138 DC2
Isolator tumpu (pin post) 20 KV
Bolt Machine 5/8" x 10"
Washer round 3/8"
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Brace steel 770 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Double Rack 8" atau 8 1/2"
Bracket secondary / bracket insulated
Spool insulator ansi 53-2
Bolt Double Arming 5/8" x 14"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
139 DC3
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Primary dead end clamp (150 s/d 240) mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Brace steel 770 mm2
Shackle Anchor 5/8
Pole Band Double Rack 8" atau 8 1/2"

Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh

1
6
3
11
2
2
1
1
2
1
1
1
1
6
3
10
2
2
1
2
1
1
1
1
1
6
1
1
1
4
4
1
3
1
1
31
1
1
12
4
4
2
2
8
8
3
1
1
5
32
1
1
12
6
12
8
8
6
1

Rp

Rp

215,600
29,200
3,200
359,500
215,200
36,050
18,540
4,000
51,550
29,500
65,900

1,293,600
87,600
35,200
719,000
430,400
36,050
18,540
8,000
51,550
29,500
65,900

2,775,340

215,600
29,200
3,200
539,400
20,600
18,540
4,000
51,550
29,500
36,050
65,900

1,293,600
87,600
32,000
1,078,800
41,200
18,540
8,000
51,550
29,500
36,050
65,900

2,742,740

215,600
19,050
359,500
539,400
26,400
4,000
47,300
30,900
36,050
3,200
6,600
80,300

1,293,600
19,050
359,500
539,400
105,600
16,000
47,300
92,700
36,050
3,200
204,600
80,300

2,797,300

215,600
19,050
359,500
539,400
539,400
26,400
4,000
51,550
18,540
36,050
29,200
6,600
80,300

2,587,200
76,200
1,438,000
1,078,800
1,078,800
211,200
32,000
154,650
18,540
36,050
146,000
211,200
80,300

7,148,940

215,600
215,600
94,300
4,000
26,400
18,000
51,550

2,587,200
1,293,600
1,131,600
32,000
211,200
108,000
51,550

Hal. 247
No

Uraian pekerjaan

Satuan

Oval Eye Nut 5/8"


Clevis Swinging Secondary
Spool insulator ansi 53-4
Washer Square 2 1/4 "
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Compression Connector H type 150/240mm2
Bolt Machine 5/8" x 10"
Bolt double arming 5/8" x (16" s/d 24")
Upah Pemasangan

bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit

Volume
7
1
1
20
2
2
6
1
5
1

Harga Satuan Jumlah Harga Jumlah Semua


Rp
19,096
19,050
41,200
3,200
539,400
359,500
40,000
19,050
29,200
80,300

Rp
133,672
19,050
41,200
64,000
1,078,800
719,000
240,000
19,050
146,000
80,300

Rp

7,956,222

Hal. 248
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga Jumlah Semua


Rp

140 DC4
Isolator Tarik 20 KV ( 2 pcs )
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Bolt Machine / bolt Carriage 1/2" x 3/4"
Bolt double arming 5/8" x (16" s/d 24")
Brace steel 770 mm2
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Compression Connector H type 240/240mm2
Clevis Swinging Secondary
Armour tape 1/4" wide
Pole Band Double Rack 8" atau 8 1/2"
Oval Eye Nut 5/8"
Oval eye bolt 5/8" x 8"
Primary dead end clamp (150 s/d 240) mm2
Shackle Anchor 5/8
Tie Wire #4 / Aluminium Bonding Wire #20
Washer Square 2 1/4 "
Spool insulator ansi 53-4
Upah Pemasangan
141 DC5
Isolator Tarik 20 KV ( 2 pcs )
Bolt Machine / bolt Carriage 1/2" x 3/4"
Bolt double arming 5/8" x (16" s/d 24")
Brace steel 770 mm2
Pole Band Double Rack 8" atau 8 1/2"
Primary dead end clamp (150 s/d 240) mm2
Oval Eye Nut 5/8"
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Armour tape 1/4" wide
Upah Pemasangan

Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit

1
12
4
2
4
7
4
2
6
1
1
1
24
12
12
12
15.6
1
1
1
1
6
4
7
4
2
6
7
2
1
1

Slawi,

Rp

Rp

245,200
215,600
215,600
4,000
29,200
26,400
539,400
40,000
19,050
5,900
51,550
19,096
16,750
94,300
18,000
6,600
3,200
41,200
80,300

2,942,400
862,400
431,200
16,000
204,400
105,600
1,078,800
240,000
19,050
5,900
51,550
458,304
201,000
1,131,600
216,000
102,960
3,200
41,200
80,300

8,191,864

245,200
4,000
29,200
26,400
51,550
94,300
19,096
539,400
5,900
80,300

1,471,200
16,000
204,400
105,600
103,100
565,800
133,672
1,078,800
5,900
80,300

3,764,772

Februari 2013

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN TEGAL

Ir. SUDARYONO, MT
Pembina Tk. I
NIP. 19610416 198810 1 001

Daerah A

Hal. 249

DAFTAR HARGA SATUAN PEKERJAAN


KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN

:
:
:
:

KODE

6
A.6.2
A.6.4
A.6.8
A.6.11
A.6.13
A.6.14

PEKERJAAN PERSIAPAN
Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
Pengukuran dan Pemasangan Bouwplank
Membersihkan Lapangan dan Perataan
Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm
Bongkaran Beton Bertulang
Bongkaran Dinding Tembok Bata Merah

m'
m'
m2
m2
m3
m3

540,928.65
136,585.40
7,250.00
41,423.00
303,327.50
285,327.50

6
B.6.1
B.6.4
B.6.5
B.6.6
B.6.7
B.6.8
B.6.9
B.6.10
B.6.11
B.6.12
B.6.14
B.6.15

PEKERJAAN TANAH
Galian Tanah Biasa Sedalam 1 m
Galian Tanah Keras Sedalam 1 m
Galian Tanah Cadas Sedalam 1 m
Galian Tanah Lumpur Sedalam 1 m
Pekerjaan Striping Tebing Setinggi 1 m
MembuangTanah sejauh 30 m'
Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)
Pemadatan Tanah (per 20 cm)
Urugan Pasir
Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL
Pemasangan Lapisan Ijuk tebal 10 cm
Urugan Sirtu

m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
m2
m3

33,375.00
44,420.00
67,350.00
53,700.00
2,425.00
14,625.00
11,265.00
24,250.00
103,350.00
#REF!
264,075.00
98,525.00

6
C.6.1
C.6.3
C.6.4
C.6.7
C.6.9
C.6.10
C.6.11

PEKERJAAN PONDASI
Pasang Pondasi Batu Kali 1Pc : 3 PP
Pasang Pondasi Batu Kali 1Pc : 5 PP
Pasang Pondasi Batu Kali 1Pc : 6 Psr
Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 PP
Pasang Pondasi Batu Kosong
Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah
Pasang Pondasi Sumuran diameter 100 cm

m3
m3
m3
m3
m3
m3
m3

563,110.00
480,570.00
456,810.00
366,470.00
211,444.29
1,959,792.00
555,300.00

6
D.6.2
D.6.3
D.6.4
D.6.5
D.6.5
D.6.7
D.6.8
D.6.9
D.6.10
D.6.11
D.6.13

PEKERJAAN DINDING
Pasang Batu Merah Tebal 1 bata, 1 Pc : 3 Psr
Pasang Batu Merah Tebal 1 bata, 1 Pc : 4 Psr
Pasang Batu Merah Tebal 1 bata, 1 Pc : 5 Psr
Pasang Batu Merah Tebal 1 bata, 1 Pc : 6 Psr
Pasang Batu Merah Tebal 1 bata, 1 Pc : 3Kp : 10 Psr
Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Pp
Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Pp
Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 4 Psr
Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 5 Psr
Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 6 Psr
Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Pp

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

196,753.00
188,377.00
183,448.00
180,490.00
166,257.20
100,943.00
95,005.80
91,460.00
89,221.20
87,798.80
82,780.00

6
E.6.1
E.6.2
E.6.3
E.6.4
E.6.5
E.6.6
E.6.10
E.6.14

PEKERJAAN PLESTERAN
Plesteran 1 Pc : 1 Pp Tebal 15 mm
Plesteran 1 Pc : 2 Psr : Tebal 15 mm
Plesteran 1 Pc : 3 Pp Tebal 15 mm
Plesteran 1 Pc : 4 Psr Tebal 15 mm
Plesteran 1 Pc : 5 Psr Tebal 15 mm
Plesteran 1 Pc : 6 Psr Tebal 15 mm
Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm
Plesteran 1Pc : 3Pp Tebal 20 mm

m2
m2
m2
m2
m2
m2
m2
m2

39,875.36
33,200.16
30,219.84
28,261.60
27,046.56
26,117.44
22,750.00
40,023.12

II

III

IV

URAIAN PEKERJAAN

SAT

HARGA SATUAN
PEKERJAAN
(Rp)

NO.

Daerah A

NO.

VI

Hal. 250

KODE

URAIAN PEKERJAAN

SAT

E.6.17
E.6.19
E.6.20
E.6.23
E.6.26
E.6.27

Plesteran 1Pc : 6Psr Tebal 20 mm


Berapen 1 Pc : 5Pp Tebal 15 mm
Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm
Plesteran Ciprat 1 Pc : 2 Pp
Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp
Acian

m2
m2
m'
m'
m2
m2

HARGA SATUAN
PEKERJAAN
(Rp)
34,519.92
20,321.56
25,852.50
23,393.80
31,185.60
16,810.00

6
F.6.1
F.6.2a
F.6.2b

PEKERJAAN KAYU
Membuat Kosen Pintu & Jendela Kayu klas I
Membuat Kosen Pintu & Jendela Kayu klas II (Bengkir)
Membuat Kosen Pintu & Jendela Kayu klas III (Kruing)

m3
m3
m3

9,144,337.50
13,684,337.50
9,531,497.50

Daerah A

NO.

VII

Hal. 251

F.6.3a
F.6.3b
F.6.5a
F.6.5b
F.6.5c
F.6.6a
F.6.6b
F.6.6c
F.6.8a
F.6.8b
F.6.9a
F.6.9b
F.6.11
F.6.12
F.6.13a
F.6.13b
F.6.13c
F.6.14
F.6.15a
F.6.15b
F.6.15c
F.6.16
F.6.16a
F.6.17
F.6.18
F.6.19a
F.6.19b
F.6.20a
F.6.20b
F.6.21a
F.6.21b
F.6.21c
F.6.22a
F.6.23a
F.6.23b
F.6.24a
F.6.24b
F.6.26
F.6.27
F.6.28a
F.6.28b

Membuat Pintu KlampStandard Kayu Klas II (Kayu Bengkir)


Membuat Pintu KlampStandard Kayu Klas III (Kayu Kruing)
Membuat Daun Pintu Panel Kayu Klas I (Jati)
Membuat Daun Pintu Panel Kayu Klas II (Bengkir)
Membuat Daun Pintu Panel Kayu Klas III (Kruing)
Membuat Pintu & Jendela Kaca Kayu Klas I (Jati)
Membuat Pintu & Jendela Kaca Kayu Klas II (Bengkir)
Membuat Pintu & Jendela Kaca Kayu Klas III (Kruing)
Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm)
Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas III (lbr s/d 90 cm)
Membuat Pintu Plywood rangkap, rangka expose kayu klas I
Membuat Pintu Plywood rangkap, rangka expose kayu klas II
Membuat Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I
Membuat Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II
Memasang Konstruksi Kuda-kuda Konvensional Kayu Kelas I Bentang 6 meter
Memasang Konstruksi Kuda-kuda Konvensional Kayu Kelas II Bentang 6 meter
Memasang Konstruksi Kuda-kuda Konvensional Kayu Kelas III Bentang 6 meter
Memasang Konstruksi Kuda-kuda Expose, Kayu Klas I
Memasang konstruksi Gording, Kayu Klas I
Memasang konstruksi Gording, Kayu Klas II
Memasang konstruksi Gording, Kayu Klas III
Memasang Rangka Atap Genteng Keramik, Kayu Klas III
Memasang Rangka Atap Genteng Pres Kebumen/Jatiwangi, Kayu Klas III
Memasang Rangka Atap Genteng Beton, Kayu Klas III
Memasang Rangka Atap Sirap, Kayu Klas III
Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas II
Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas III
Memasang Rangka Langit-langit (60x60) cm, kayu Klas II
Memasang Rangka Langit-langit (60x60) cm, kayu Klas III
Memasang Listplank Uk. (3x20)cm Kayu klas I
Memasang Listplank Uk. (3x20)cm Kayu klas II
Memasang Listplank Uk. (3x20)cm Kayu klas III
Memasang Listplank Uk. (3x30)cm Kayu klas III
Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas II
Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas III
Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II
Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas III
Memasang Dinding Lambriziring dari Papan klas I
Memasang Dinding Lambriziring dari Plywood ukuran (120x240) cm
Memasang Dinding Bilik, Rangka Kayu Klas III
Memasang Dinding Bilik, Rangka Kayu Klas IV

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m'
m'
m'
m'
m2
m2
m2
m2
m2
m2
m2
m2

HARGA SATUAN
PEKERJAAN
(Rp)
526,025.00
376,025.00
454,770.00
636,770.00
486,770.00
316,820.00
426,020.00
336,020.00
434,472.50
340,722.50
333,242.50
449,722.50
483,542.50
#REF!
8,835,200.00
12,355,200.00
8,548,430.00
10,074,200.00
8,439,650.00
11,959,650.00
8,152,880.00
229,033.70
111,771.50
127,761.80
1,027,235.50
183,025.00
123,376.18
194,087.50
130,952.71
54,305.00
78,875.00
58,625.00
58,037.50
320,767.50
223,867.90
423,485.50
326,585.90
177,300.00
6,378.00
180,536.30
81,896.50

6
G.6.1
G.6.2
G.6.3
G.6.4
G.6.5
G.6.6
G.6.7
G.6.8
G.6.9
G.6.10
G.6.11
G.6.17
G.6.17a
G.6.18
G.6.19
G.6.20
G.6.21

PEKERJAAN BETON
Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87
Membuat Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78
Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72
Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66
Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm, w/c = 0,61
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58
Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm, w/c = 0,56
Membuat Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c = 0,53
Membuat Beton mutu f'c=26,4 MPa (K300), slum (122)cm, w/c = 0,52
Membuat Beton mutu f'c=28,8 MPa (K325), slum (122)cm, w/c = 0,49
Pembesian dg Besi Polos
Pembesian dg Besi Ulir
Kabel Presstresed Polos/strand
Jaring Kawat baja/Wire Mesh
Memasang Bekisting untuk Pondasi
Memasang Bekisting untuk Sloof

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Kg
Kg
Kg
Kg
m2
m2

447,315.00
486,175.00
516,995.00
394,760.00
553,175.00
588,015.00
613,475.00
630,895.00
660,375.00
669,755.00
729,210.00
11,611.50
11,926.50
#REF!
14,457.10
134,683.01
145,734.02

KODE

URAIAN PEKERJAAN

SAT

Daerah A

NO.

Hal. 252

KODE
G.6.22a
G.6.23a
G.6.24a
G.6.25a
G.6.26a
G.6.27
G.6.28
G.6.29
G.6.30
G.6.31
G.6.32

URAIAN PEKERJAAN
Memasang Bekisting untuk Kolom
Memasang Bekisting untuk Balok
Memasang Bekisting untuk Lantai
Memasang Bekisting untuk Dinding
Memasang Bekisting untuk Tangga
Memasang Jembatan Cor
Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)
Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)
Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)
Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)
Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)

SAT
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3

HARGA SATUAN
PEKERJAAN
(Rp)
148,878.01
148,878.01
291,845.76
241,663.00
196,728.75
89,466.79
3,166,545.07
3,930,659.09
6,763,110.13
5,267,457.11
4,801,188.11

Daerah A

NO.

VIII

IX

Hal. 253

G.6.33
G.6.34
G.6.35
G.6.36
SPL.1
SPL.1a
SPL.2
SPL.2a
SPL.3
SPL.3a
SPL.4
SPL.4a
SPL.5
SPL.5a
SPL.6
SPL.7
SPL.8
SPL.9
SPL.10

Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)


Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)
Membuat Kolom Penguat Beton Bertulang (11 x 11) cm
Membuat Ring Balok Beton Bertulang (10 x 15) cm
Sloof 15 / 20 Tulangan dia. 10mm
Sloof 15 / 20 Tulangan dia. 12mm
Soof 15 / 25 Tulangan dia.10mm
Soof 15 / 25 Tulangan dia.12mm
Ringbalk 12 / 15 Tulangan dia.10mm
Ringbalk 12 / 15 Tulangan dia.12mm
Ringbalk 12/20 tulangan dia. 10mm
Ringbalk 12/20 tulangan dia. 12mm
Kolom Praktis 12/12 tulangan dia. 10mm
Kolom Praktis 12/12 tulangan dia. 12mm
Kolom 25 / 20 Tulangan dia. 12mm
Kolom 25 / 25 tulangan dia. 12mm
Balok 20 / 40
Balok 30 / 50
Plat beton tebal 12 cm

m3
m3
m'
m'
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

HARGA SATUAN
PEKERJAAN
(Rp)
4,725,060.08
4,813,838.58
63,192.90
74,073.10
4,572,009.77
5,036,469.77
4,206,111.26
4,577,679.26
6,267,077.31
7,033,436.31
5,560,847.29
6,129,810.79
7,110,573.83
8,074,328.33
3,824,536.69
3,317,773.66
3,682,500.17
3,800,059.62
4,225,506.05

6
H.6.1
H.6.2
H.6.2a
H.6.2b
H.6.3
H.6.4
H.6.5
H.6.6
H.6.6a
H.6.6b
H.6.9
H.6.10
H.6.12
H.6.15
H.6.38
H.6.39
H.6.42
H.6.43

PEKERJAAN PENUTUP ATAP


Pasang Atap Genteng Plentong Kecil
Pasang Atap Genteng Kodok / Glasur
Pasang Atap Genteng Press (Kebumen)
Pasang Atap Genteng Press (Jatiwangi)
Pasang Atap Genteng Plentong Super / Besar
Pasang Genteng Bubung Plentong
Pasang Genteng Bubung Kodok / Glasur
Pasang Genteng Bubung Plentong Besar
Pasang Genteng Bubung Pres (Kebumen)
Pasang Genteng Bubung Pres (Jatiwangi)
Pasang Atap Asbes Gelombang (2,25x0,92 m) x 5 mm
Pasang Atap Asbes Gelombang (2,00x0,92 m) x 5 mm
Pasang Atap Asbes Gelombang (3,00x1,05 m) x 4 mm
Pasang Atap Asbes Gelombang (2,10x1,05 m) x 4 mm
Pasang Atap Seng Gelombang
Pasang Atap Nok Seng
Pasang Allumunium Foil / Sisalation
Pasang Atap Asbes Motif Genteng

m2
m2
m2
m2
m2
m'
m'
m'
m'
m'
m2
m2
m2
m2
m2
m'
m2
m2

52,335.00
73,585.00
61,085.00
55,085.00
34,815.00
62,840.00
64,240.00
58,720.00
56,640.00
55,040.00
16,096.00
15,726.00
15,726.00
15,576.00
36,885.00
23,395.00
#REF!
58,711.00

6
I.6.1
I.6.5a
I.6.5b
I.6.5c
I.6.6
I.6.7
I.6.9

PEKERJAAN LANGIT-LANGIT
Memasang Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm
Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm
Memasang Langit-langit Tripleks Uk (120x240) cm, 4 mm
Memasang Langit-langit Tripleks Uk (120x240) cm, 6 mm
Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm
Memasng Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm
List Langit-Langit Kayu Profil

m2
m2
m2
m2
m2
m2
m'

29,760.00
27,475.00
34,712.50
41,162.50
172,807.50
31,611.80
9,512.50

PEKERJAAN SANITASI
Memasang Closet Duduk / Mono Blok
Memasang Closet Jongkok Porselen
Memasang Urinoir
Memasang Wastafel
Memasang Bak Mandi Batu Bata Vol. 0,30 m3
Memasang Pipa Beton, 15 cm - 20 cm
Memasang Pipa Beton, 30 cm - 100 cm
Memasang Pipa Beton, 30 cm
Memasang Pipa Beton, 40 cm
Memasang Pipa Beton, 50 cm

Unit
Unit
Unit
Unit
Unit
m'
m'
m'
m'
m'

1,373,772.00
373,140.00
586,480.00
529,100.00
868,050.00
96,103.70
532,332.00
447,357.00
475,682.00
498,342.00

KODE

6
J.6.1
J.6.2
J.6.4
J.6.5
J.6.8
J.6.14
J.6.15
J.6.15a
J.6.15b
J.6.15c

URAIAN PEKERJAAN

SAT

Daerah A

NO.

Hal. 254

KODE
J.6.15d
J.6.15e
J.6.20
J.6.23
J.6.24
J.6.25
J.6.29
J.6.31
J.6.33
J.6.35a

URAIAN PEKERJAAN
Memasang Pipa Beton, 60 cm
Memasang Pipa Beton, 80 cm
Memasang Pipa Galvanis "
Memasang Pipa Galvanis 3"
Memasang Pipa Galvanis 4"
Memasang Pipa PVC type AW "
Memasang Pipa PVC type AW 2"
Memasang Pipa PVC type AW 3"
Memasang Bak Cuci Piring Stainles Steel
Memasang Kran 1/2"

SAT
m'
m'
m'
m'
m'
m'
m'
m'
Buah
Buah

HARGA SATUAN
PEKERJAAN
(Rp)
532,332.00
532,332.00
94,360.00
329,954.00
458,093.00
12,283.00
31,212.00
58,678.50
316,965.00
25,442.50

Daerah A

NO.

XI

XII

XIII

XIV

Hal. 255

KODE

URAIAN PEKERJAAN

J.6.35b
J.6.36

Memasang Kran 3/4"


Memasang Floor Drain

6
K.6.1
K.6.2
K.6.3
K.6.4
K.6.5
K.6.7
K.6.8
K.6.10
K.6.15
K.6.16
K.6.17
K.6.18
K.6.19

PEKERJAAN BESI & ALLUMUNIUM


Memasang Besi Profil
Memasang Rangka Kuda-kuda Baja IWF
Mengerjakan Pekerjaan Perakitan (Kuda-kuda Baja)
Membuat Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku
Mengerjakan Pengelasan dengan Las Listrik
Memasang Pintu Rolling Door Besi
Memasang Pintu Lipat (Folding Door)
Memasang Rolling Door Allumunium
Memasang Terali Besi Strip (2x3) cm
Memasang Kawat Nyamuk
Memasang Jendela Nako & Tralis
Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm
Memasang Talang 1/2 Lingkaran 15 cm, Seng Plaat BJLS 30 Lebar 45 cm

6
L.6.2
L.6.3
L.6.4
L.6.5
L.6.6
L.6.7
L.6.9
L.6.10
L.6.11
L.6.13
L.6.14
L.6.15
L.6.16
L.6.17
L.6.20

PEKERJAAN KUNCI & KACA


Memasang Kunci Tanam Biasa
Memasang Kunci Kamar Mandi
Memasang Kunci Selinder
Memasang Engsel Pintu
Pasang Engsel Jendela Kupu-kupu
Pasang Engsel Angin
Pasang Kait Angin
Pasang Door Closer
Pasang Kunci Selot
Pasang Door Stop
Pasang Rel Pintu Dorong
Pasang Kunci Lemari
Pasang Kaca tebal 3 mm
Pasang Kaca tebal 5 mm
Pasang Kaca Cermin tebal 5 mm

6
M.6.9
M.6.35
M.6.36
M.6.39
M.6.40
M.6.44
M.6.46a
M.6.46b
M.6.46c
M.6.46d
M.6.46e
M.6.46f
M.6.46g
M.6.53
M.6.54
M.6.57
M.6.60
M.6.63
6
N.6.1
N.6.2
N.6.3
N.6.4

SAT
Buah
Buah

HARGA SATUAN
PEKERJAAN
(Rp)
31,792.50
24,725.00

Kg
kg
100 kg
m2
cm
m2
m2
m2
m2
m2
m2
m'
m'

19,690.00
19,945.00
111,287.00
626,325.00
2,828.30
527,506.00
681,320.00
542,164.00
#REF!
75,177.41
#REF!
214,886.25
70,777.50

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
m2
m2
m2

112,025.0
72,112.5
37,062.5
24,387.5
17,425.0
26,950.0
18,182.5
214,025.0
102,110.0
312,355.0
185,680.0
26,537.5
97,632.5
91,582.5
191,022.5

PEKERJAAN PENUTUP LANTAI & DINDING


Memasang lantai Ubin Granito Uk. 40 x 40 cm
Memasang Lantai Keramik 30 x 30 cm
Pasang Lantai Keramik 20 x 20 cm
Memasang Plint Keramik Ukuran 10x20 cm
Memasang Plint Keramik Ukuran 10x10 cm
Memasang Lantai Karpet
Memasang Lantai Parquet Merbau uk. 14x90x300/400/500 mm
Memasang Lantai Parquet Merbau uk. 14x90x900 mm
Memasang Lantai Parquet Merbau uk. 10x120x1.200 mm
Memasang Lantai Parquet Merbau uk. 12x120x1.200 mm
Memasang Lantai Parquet Merbau uk. 14x140x1.200 mm
Memasang Lantai Parquet Jati uk. 12x120x1.200 mm
Memasang Lantai Parquet Jati uk. 14x140x1.200 mm
Memasang Dinding Keramik 10x20 cm,
Memasang Dinding Keramik 20x25 cm,
Memasang Dinding Batu Paros / Batu Tempel Hitam
Memasang Wall Paper Lebar 50 cm
Memasang Plint Kayu Klas II Ukuran 2x10 cm

m2
m2
m2
m'
m'
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m'

38,194.50
110,692.50
117,373.00
11,039.48
11,086.35
50,395.00
53,765.00
53,765.00
53,765.00
53,765.00
53,765.00
53,765.00
53,765.00
118,268.25
117,549.50
66,995.00
45,435.00
35,905.00

PEKERJAAN PENGECATAN
Mengikis / Mengerok Permukaan Cat Tembok Lama
Mencuci Bidang Permukaan Tembok yang Pernah dicat
Mengerok Karat Cat Lama permukaan Baja dg cara manual
Penyabun Permukaan Tembok Lama

m2
m2
m2
m2

7,750.00
7,070.00
7,070.00
7,070.00

Daerah A

NO.

Hal. 256

KODE
N.6.6
N.6.7
N.6.8
N.6.9
N.6.10
N.6.11
N.6.12
N.6.13
N.6.14
N.6.14a
N.6.15

URAIAN PEKERJAAN
Mendempul dan Menggosok Kayu
Pengecatan Kayu Bidang Lama
Pengecatan Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 2 lap.Cat Penutup
Pengecatan Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 3 lap.Cat Penutup
Pelaburan Bidang Kayu dg Teak Oil
Pelaburan Bidang Kayu dg Politur
Pelaburan Bidang Kayu dg Cat Residu & Ter
Pelaburan Bidang Kayu dg Vernis
Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup)
Pengecat Tembok Baru - Exterior (1 lap Cat Dasar 2 lap. Cat Penutup)
Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup)

SAT
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

HARGA SATUAN
PEKERJAAN
(Rp)
6,156.00
24,637.00
29,999.00
38,531.00
12,506.00
31,250.20
6,745.00
21,216.00
13,248.00
45,316.00
9,292.00

Daerah A

NO.

Hal. 257

KODE
N.6.20
N.6.21
N.6.24

XV
BOW.M.15
BOW.M.15a
BOW.M.15b
BOW.M.15c
BOW.M.15d
BOW.M.15e
BOW.A.6
BOW.A.7
BOW.A.7a
BOW.A.9
BOW F.1
XVI

K. 110
K. 111
K. 210
K. 220
K. 224
K. 225
K. 221.A
K. 221.B
K.225 a
K. 410
K. 422
K. 511
K. 516
K. 521
K. 528
K. 528
K. 612
K. 615
K. 617
K. 618
K. T04
K. 621 a
K. 636
K. 637
K. 710
K. 722
K. 723
K. 725
K.726A
K. 730A

K 730
K. 810
K. 011 a
K. 017
K. 026
K. T01
K. T02
K. T03
K. T05
K. T06
K. 035

m2
m2
m2

HARGA SATUAN
PEKERJAAN
(Rp)
14,510.00
29,857.00
107,558.00

PAVING DAN LANGSIRAN


Pasang Paving Blok Abu-abu Tebal 6 cm (K.175)
Pasang Paving Blok Warna Tebal 6 cm (K.175)
Pasang Paving Blok Abu-abu Tebal 8 cm (K.175)
Pasang Paving Blok Warna Tebal 8 cm (K.175)
Pasang Paving Blok Abu-abu (Lokal)
Pasang Paving Blok Warna (Lokal)
Pembuangan tanah sejauh 30 m'
Pembuangan tanah sejauh 100 m'
Pembuangan tanah sejauh 200 m'
Mengangkat tanah sedalam lebih dari 1 m'
Stootwerk beton bertulang

m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3

96,900.00
106,900.00
116,900.00
123,900.00
78,900.00
78,900.00
14,625.00
27,045.00
42,500.00
6,825.00
1,881,950.00

PEKERJAAN JALAN
Membuat parit Galian tanah
Galian tanah untuk konstruksi (menggunakan alat)
Pengupasan tanah dan pembersihan semak pada Damija
Menggali dan mengangkut tanah untuk mengurug berm dipadatkan
Galian tanah untuk konstruksi
Penimbunan dan pemadatan
Urugan dan pemadatan tanah dasar (menggunakan alat)
Urugan sirtu dan pemadatan (menggunakan alat)
Penimbunan dan pemadatan ( Urugan kembali )
Membentuk Bahu jalan keras ( menggunakan sirtu )
Membersihkan rumput & tanaman dibahu jalan
Konstruksi Lapis Pondasi Bawah ( LPB ) Klas A
Konstruksi lapis pondasi bawah ( LPB ) Telford
Konstruksi Lapis Pondasi Atas ( LPA ) Klas A
Menghampar Lapis Pondasi Atas Aspal Beton ( Laston atas )
Menghampar Lap Pondasi Atas Aspal Beton ( Laston atas-ATB ) lap perata
Laburan aspal pasir ( Buras )
Laburan aspal satu lapis ( Burtu )
Laburan aspal dua lapis ( Burda )
Lapis penetrasi tebal 5 cm ( Lapen )
Pelapisan prime coat
Menghampar dan memadatkan Latasir tebal 2 cm ( Buruh ) /Sandsheet
Penghamparan dan pemadatan Lataston ( HRS ) lapis perata (menggunakan
Perataan lapis permukaan
Perancah ( Begisting ) untuk beton bertulang
Beton struktur / untuk Konstruksi Klas K.225
Beton struktur / untuk Konstruksi Klas K.125
Beton struktur / untuk Konstruksi Klas K.175
Beton struktur / untuk Konstruksi Klas K.250
Beton struktur / untuk Konstruksi Klas K.300
Beton struktur / untuk Konstruksi Klas K.350
Konstruksi Pasangan Batu
Plesteran P C
Produksi batu pecah tersaring
Produksi lapis aspal beton ( Laston )
Pengecatan kembali besi
Pengecatan besi baru
Pengecatan besi dengan cat dasar / menie
Pembuatan dan pemasangan konstruksi baja / besi
Pemasangan dekplank jembatan kayu jati
Memproduksi lapis tipis aspal beton

m3
m3
m2
m3
m3
m3
m3
m3
m3
m3
m2
m3
m3
m3
Ton
m3
m2
m2
m2
m2
m2
m2
m2
m3
m2
m3
m3
m3
m3
m3
m3
m3
m2
m3
Ton
m2
m2
m2
kg
m2
Ton

25,555.56
48,078.15
1,533.33
131,176.99
24,272.00
131,955.33
51,933.84
119,107.17
131,955.33
118,381.87
650.00
247,974.88
183,895.64
420,035.78
878,522.26
1,976,675.08
16,156.42
29,293.72
44,696.65
68,029.62
10,545.63
46,824.20
71,069.98
1,254,117.54
102,906.01
829,143.93
683,272.80
806,642.63
848,538.25
890,959.82
950,837.50
485,368.97
30,124.40
272,015.39
835,984.37
12,889.00
31,019.90
10,810.00
12,180.00
804,650.00
972,857.85

URAIAN PEKERJAAN
Pengecatan Permukaan Baja dg Meni Besi
Pengecatan Permukaan Baja dg Meni Besi & Perancah
Pengecatan Permukaan Baja lapis Seng (Galvanis) secara
manual sistem 3 lapis Cat Konvensional dg tebal 200 um

SAT

Daerah A

NO.

Hal. 258

KODE

K. T06 a
K. 322
K. 325
K. T05a
K. T05b
K. T05c
BOW.G.5b
3.1.(1)a

URAIAN PEKERJAAN
Pemasangan dekplank jembatan kayu bengkire
Stabilisasi tanah / LPB dengan kapur ( Buruh )
Stabilisasi tanah / LPB dengan semen ( Buruh )
Pembuatan dan pemasangan konstruksi baja / besi (kanal 10)
Pembuatan dan pemasangan konstruksi baja / besi (L 50.50.5)
Pembuatan dan pemasangan konstruksi baja / besi (L 70.70.5)
Bronjong Penahan
Galian tanah biasa untuk konstruksi (menggunakan alat)

SAT
m2
m3
m3
kg
kg
kg
m3
m3

HARGA SATUAN
PEKERJAAN
(Rp)
188,650.00
21,272.20
97,828.93
12,180.00
12,180.00
12,180.00
500,298.00
20,740.72

Daerah A

Hal. 259

NO.

KODE

XVII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59

CA1
CA1'
CA2-1
CA2
CA2'
CA3
CA3'
CA4
CA4'
CA5
CA5'
CA5-1
CA5-1'
CA6
CA6'
SE 1-2 ( 7 M)
E 1-2 ( 7 M )
SE 1-2 ( 9 M)
E 1-2 ( 9 M )
SE 1-2 ( 11 M)
E 1-2 ( 11 M )
SE 1-2 ( 12 M)
E 1-2 ( 12 M )
SE 1-2 ( 7 M)
E 1-2 ( 7 M )
SE 1-2 ( 9 M)
E 1-2 ( 9 M )
SE 1-2 ( 11 M)
E 1-2 ( 11 M )
SE 1-2 ( 12 M)
E 1-2 ( 12 M )
SE1-3 (11 M)
E1-3(11 M)
SE1-3 (12 M)
E1-3 (12 M)
SE2-2
SE2-3
E2-3
F 1-2
F 1-3
J5-T (CJ2)
J7 - T (CJ3)
J6 - T (CJ4)
MJ6 - T (CJ4)
CG105 - 50
P.12
P12.C
P12.C'
CM5 - 2
CM2-11
CM2 - 12
CM2 - 12A
CM2-15
CM3-4
CM2-11 M
CM5-3
CM5-4
CM5-5
CM5-6

URAIAN PEKERJAAN

SAT

HARGA SATUAN
PEKERJAAN
(Rp)

PEKERJAAN JARINGAN LISTRIK

Pas.
Pas.
Pas.
Pas.
Pas.
Pas.
Pas.
Pas.
Pas.
Pas.
Pas.
Pas.
Pas.

CA1
CA1'
CA2-1
CA2
CA2'
CA3
CA3'
CA4
CA4'
CA5
CA5'
CA5-1
CA5-1'

Pas. CA6
Pas. CA6'
Pas. SE 1-2 ( 7 M)
Pas. E 1-2 ( 7 M )
Pas. SE 1-2 ( 9 M)
Pas. E 1-2 ( 9 M )
Pas. SE 1-2 ( 11 M)
Pas. E 1-2 ( 11 M )
Pas. SE 1-2 ( 12 M)
Pas. E 1-2 ( 12 M )
Pas. SE 1-2 ( 7 M)
Pas. E 1-2 ( 7 M )
Pas. SE 1-2 ( 9 M)
Pas. E 1-2 ( 9 M )
Pas. SE 1-2 ( 11 M)
Pas. E 1-2 ( 11 M )
Pas. SE 1-2 ( 12 M)
Pas. E 1-2 ( 12 M )
Pas. SE1-3 (11 M)
Pas. E1-3(11 M)
Pas. SE1-3 (12 M)
Pas. E1-3 (12 M)
Pas. SE2-2
Pas. SE2-3
Pas. E2-3
Pas. F 1-2
Pas. F 1-3
Pas. J5-T (CJ2)
Pas. J7 - T (CJ3)
Pas. J6 - T (CJ4)
Pas. MJ6 - T (CJ4)
Pas. CG105 - 50
Pas. P.12
Pas. P12.C
Pas. P12.C'
Pas. CM5 - 2
Pas. CM2-11
Pas. CM2 - 12
Pas. CM2 - 12A
Pas. CM2-15
Pas. CM3-4
Pas. CM2-11 M
Pas. CM5-3
Pas. CM5-4
Pas. CM5-5
Pas. CM5-6

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

449,010.00
373,130.00
756,520.00
407,020.00
655,550.00
570,676.00
549,246.00
1,285,482.00
878,796.00
604,486.00
408,950.00
678,486.00
416,750.00
1,146,722.00
757,796.00
221,040.00
197,590.00
237,940.00
214,490.00
254,840.00
231,390.00
263,290.00
239,840.00
251,890.00
225,240.00
250,040.00
250,040.00
301,490.00
274,840.00
435,090.00
408,440.00
412,590.00
328,790.00
443,650.00
417,000.00
435,650.00
647,600.00
611,450.00
209,000.00
210,250.00
29,435.00
23,560.00
29,435.00
29,160.00
35,112,850.00
695,700.00
414,700.00
845,400.00
449,580.00
261,400.00
82,160.00
94,300.00
2,563,500.00
1,395,850.00
576,870.00
75,600.00
296,200.00
256,900.00
853,400.00

Daerah A

NO.

Hal. 260

KODE

60
CM5-8
61
CM5-9
62
CM5-12
63
CM5-13
64
CM5-16
65
CM5-20
66
CJ5
67
CJ6
68 CJ6X / SJ6X
69
CJ7
70
CJ8

URAIAN PEKERJAAN
Pas. CM5-8
Pas. CM5-9
Pas. CM5-12
Pas. CM5-13
Pas. CM5-16
Pas. CM5-20
Pas. CJ5
Pas. CJ6
Pas. CJ6X / SJ6X
Pas. CJ7
Pas. CJ8

SAT
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

HARGA SATUAN
PEKERJAAN
(Rp)
460,496.00
1,289,350.00
356,500.00
126,000.00
646,750.00
412,296.00
87,850.00
134,770.00
154,386.00
116,380.00
89,130.00

Daerah A

NO.
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130

Hal. 261

KODE
CJ10
SJ5
SJ6
SJ7
SJ8
SJ10
SA1
SA1'
SA2
SA2'
SA3
SA3'
SA4
SA4'
SA5
SA5'
SA5-1
SA5-1'
SA6
SA6'
B1
B1A
B2
B3
B4
B5
CC1
CC1'
CC1-1
CC1-A
CC.1-A'
CC.2
CC.2'
CC2 - A
CC2-1
CC2 - A'
CC.3
CC.3'
CC 7
CC 7'
CC 7 A
CC 7 A'
CC 8
CC 8 - A
CC 8 A'
SC . 1
SC. 1'
SC . 1 - A
SC 1 - A '
SC 2
SC 2 '
SC2-A
SC2-A'
SC3
SC3'
SC7
SC7'
SC7-A
SC7-A'
SC8

URAIAN PEKERJAAN
Pas. CJ10
Pas. SJ5
Pas. SJ6
Pas. SJ7
Pas. SJ8
Pas. SJ10
Pas. SA1
Pas. SA1'
Pas. SA2
Pas. SA2'
Pas. SA3
Pas. SA3'
Pas. SA4
Pas. SA4'
Pas. SA5
Pas. SA5'
Pas. SA5-1
Pas. SA5-1'
Pas. SA6
Pas. SA6'
Pas. B1
Pas. B1A
Pas. B2
Pas. B3
Pas. B4
Pas. B5
Pas. CC1
Pas. CC1'
Pas. CC1-1
Pas. CC1-A
Pas. CC.1-A'
Pas. CC.2
Pas. CC.2'
Pas. CC2 - A
Pas. CC2-1
Pas. CC2 - A'
Pas. CC.3
Pas. CC.3'
Pas. CC 7
Pas. CC 7'
Pas. CC 7 A
Pas. CC 7 A'
Pas. CC 8
Pas. CC 8 - A
Pas. CC 8 A'
Pas. SC . 1
Pas. SC. 1'
Pas. SC . 1 - A
Pas. SC 1 - A '
Pas. SC 2
Pas. SC 2 '
Pas. SC2-A
Pas. SC2-A'
Pas. SC3
Pas. SC3'
Pas. SC7
Pas. SC7'
Pas. SC7-A
Pas. SC7-A'
Pas. SC8

SAT
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

HARGA SATUAN
PEKERJAAN
(Rp)
113,020.00
106,230.00
189,186.00
150,326.00
106,230.00
125,420.00
476,710.00
385,180.00
820,270.00
727,900.00
604,722.00
493,246.00
1,301,064.00
834,942.00
650,982.00
436,896.00
729,582.00
440,296.00
1,208,864.00
768,442.00
971,540.00
1,019,540.00
1,833,740.00
2,643,144.00
3,573,704.00
1,663,692.00
1,215,610.00
1,060,680.00
1,328,460.00
1,328,460.00
1,250,830.00
1,363,900.00
633,080.00
2,530,380.00
3,125,880.00
2,499,210.00
1,638,418.00
1,297,738.00
1,776,428.00
2,221,138.00
2,205,028.00
2,022,542.00
4,491,502.00
5,379,402.00
5,347,830.00
1,150,010.00
1,061,380.00
1,402,360.00
1,250,830.00
1,156,650.00
848,680.00
2,543,830.00
2,413,460.00
1,617,480.00
1,657,400.00
2,250,728.00
2,108,388.00
2,272,628.00
2,083,942.00
3,841,482.00

Daerah A

NO.
131
132
133
134
135

Hal. 262

KODE
SC8-A
SC8-A'
SC9
SC10
SC 11

URAIAN PEKERJAAN
Pas. SC8-A
Pas. SC8-A'
Pas. SC9
Pas. SC10
Pas. SC 11

SAT
Unit
Unit
Unit
Unit
Unit

HARGA SATUAN
PEKERJAAN
(Rp)
4,981,582.00
5,339,010.00
1,464,400.00
1,429,900.00
2,775,340.00

Daerah A

NO.
136
137
138
139
140
141

Hal. 263

KODE
SC12
DC1
DC2
DC3
DC4
DC5

URAIAN PEKERJAAN

SAT
Unit
Unit
Unit
Unit
Unit
Unit

Pas. SC12
Pas. DC1
Pas. DC2
Pas. DC3
Pas. DC4
Pas. DC5
Slawi,

HARGA SATUAN
PEKERJAAN
(Rp)
2,742,740.00
2,797,300.00
7,148,940.00
7,956,222.00
8,191,864.00
3,764,772.00

Februari 2013

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN TEGAL

Ir. SUDARYONO, MT
Pembina Tk. I
NIP. 19610416 198810 1 001