Documentos de Académico
Documentos de Profesional
Documentos de Cultura
No
1.-
DESCRIPCION
MURO EXTERIOR, INCLUYE
CANT
UNID
6.75 M3
PU
1,179.01
VALOR
SUBTOTAL
7,958.32
7,958.32
2.-
LOSA, INCLUYE
93.33 M3
773.00
72,144.09
72,144.09
TOTAL GRAL
Notes :
Only the executed items will be charged
This quote includes only the items above.
Any item outside this quote will be treated as an additional
Payment plan: 50% with the PO and 50% at the end
After 10 days of signing the beneficial occupancy, a 2% will be charged to the final bill.
80,102.41