PRESUPUESTO ANALITICO

FUNCION

021 CULTURA Y DEPORTE

PROGRAMA

046 DEPORTE

SUB-PROGRAMA

0102 INFRAESTRUCTURA DEPORTIVA Y RECREATIVA

COMPONENTE

2.244978 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

PROYECTO
OBRA

:
:

2.006326 CONSTRUCCION DE LOSAS DEPORTIVAS


XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ISABXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

METAS

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

PPTO. TOTAL DE OBRA


PPTO. REFERENCIAL OBRA
ANALISTA
MODALIDAD
FECHA
UBICACIN

:
:
:
:
:
:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
409,820.88 Nuevos Soles
385,380.93 Nuevos Soles
ING. CCCCCCCCCCCCCCCCCCCCCCCCCC
CONTRATA A SUMA ALZADA
JUNIO 2011
DISTRITO
: VISTA ALEGRE
PROVINCIA
: NASCA
(

PROVINCIA
V

: NASCA

(
R
DPTO.

: ICA

V
E
A
R
N
E
A
X
N
O
E
X
2
)O

CODIGO

DESCRIPCION
2
)

2.6.23.99

COSTO DE CONSTRUCCION POR CONTRATA

2.6.81.3

ELABORACION DE EXPEDIENTES TECNICOS

2.6.81.3 1

ELABORACION DE EXPEDIENTES TECNICOS

2.6.81.4 2

2.6.81.4 3

OBRA

ELAB. DE
EXP.
TECNICO

GASTOS DE
ADMINISTRA
COSTO DE
SUPERVISIO
OBRA
TIVOS(1.00%
N

GASTOS

TOTAL

CD)

OTRAS ESTRUCTURAS DIVERSAS

2.6.23.99.1

2.6.81.4

ESTUDIOS

385,380.93

385,380.93

10,800.00

10,800.00

OTROS GASTOS DIVERSOS DE ACTIVOS NO FINANCIEROS


GASTO POR LA COMPRA DE BIENES
COMBUSTIBLE Y LUBRICANTES

Err:509

MATERIALES DE ESCRITORIO

Err:509

Err:509

GASTOS POR LA CONTRATACION DE SERVICIOS


SUPERVISION

10,800.00
TOTAL

10,800.00

385,380.93

10,800.00

10,800.00
Err:509

Err:509

PRESUPUESTO ANALITICO
FUNCION

SALUD

PROGRAMA

SALUD INDIVIUAL

SUB-PROGRAMA

ATENCIN MDICO BSICA

COMPONENTE

PROYECTO

2243381 CONSTRUCCION DE CLASS CONDORILLO ALTO

OBRA

PROYECTO:AMPLIACION DEL PUESTO DE SALUD CONDORILLO ALTO

METAS

:
0043

CONSTRUCCION DE 7 AMBIENTES DE MATERIAL NOBLE ( TRIAJE


16.40M2,SERVICIO DE
ENFERMERIA 16.47M2,ESTIMULACION TEMPRANA
18.23M2,SS.HH. DAMAS 4.89M2,SS.HH.

PPTO. TOTAL DE OBRA

PPTO. REFERENCIAL OBRA

S/. 244,492.42Nuevos Soles

ANALISTA

ING. CEFERINO GODOFREDO CONDORCHOA ANCULLE

MODALIDAD

CONTRATA
( A SUMA ALZADA

FECHA

OCTUBREER 2011

UBICACIN

DISTRITO AN

S/. 222,849.92Nuevos Soles

CHINCHA ALTA

X
PROVINCIA
O

CHINCHA

DPTO.

: ICA

2
)

OBRA

CODIGO

2.6.23.99

ELABORA
CION DE SUPERVISI
GASTOS
IMPUESTO
COSTO
COSTO
UTILIDAD
EXPEDIE
ON DE
GENERAL
SUB TOTAL S DE IGV REFERENCIA
DIRECTO
8%
NTE
OBRA(<=5
ES 12%
18%
L DE OBRA
TECNICO
%)
(<=5%)

DESCRIPCION

GASTO
S
ADMINI
STRATI
VOS(1.0
0%CD)

PREVE
NCION
MAYOR
ES
COSTO
S

TOTAL

OTRAS ESTRUCTURAS DIVERSAS

2.6.23.99.1

COSTO DE CONSTRUCCION POR CONTRATA

2.6.81.3

ELABORACION DE EXPEDIENTES TECNICOS

157,379.89 18,885.59

2.6.81.3 1

ELABORACION DE EXPEDIENTES TECNICOS

2.6.81.4 3

GASTOS POR LA CONTRATACION DE SERVICIOS

12,590.39

188,855.87

33,994.06

222,849.92

0.00
10,500.00

SUPERVISION

10,500.00
11,142.50

TOTAL
RESUMEN:
COSTO DIRECTO

S/.

157,379.89

GASTOS GENERALES (12%)

S/.

18,885.59

UTILIDAD (8%)

S/.

12,590.39

SUB TOTAL

S/.

188,855.87

IGV (18%)

PRESUPUESTO DE OBRA POR CONTRATA

S/.

222,849.92

ELABORACION DE EXPEDIENTE TECNICO

S/.

10,500.00

SUPERVISION DE OBRA

S/.

11,142.50

PRESUPUESTO TOTAL DE OBRA

S/.

244,492.42

33994.06

222,849.92

11,142.50

244,492.42