Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Cronograma Mano de Obra Condorillo
Cronograma Mano de Obra Condorillo
PROYECTO:
Cliente
Lugar
PRESUPUESTO
METRADO
Item
Descripcin
Und.
COSTO
UNITARIO
METRADO
1er MES
2do MES
5ta Semana
01
ESTRUCTURAS
01.01
TRABAJOS PROVISIONALES
01.01.01
Und.
150.97
150.97
150.97
01.01.02
m2
25
4.62
115.50
115.50
01.01.03
glb
0.00
0.00
01.02
OBRAS PRELIMINARES
01.02.01
TRAZO Y REPLANTEO
m2
343
0.92
315.56
315.56
01.02.02
m3
1.2
38.47
46.16
46.16
01.02.03
glb
0.00
0.00
01.03
MOVIMIENTO DE TIERRAS
01.03.01
m3
98.08
43.63
4,279.23
4,279.23
01.03.03
m3
98.08
7.91
775.81
775.81
01.03.02
m3
15.37
15.58
239.46
01.03.04
100.7
6.81
685.77
01.04
CONCRETO SIMPLE
01.04.01
m2
10.3
17.71
182.41
182.41
01.04.02
m3
75.14
48.98
3,680.36
1,214.52
01.04.03
m3
3.03
102.04
309.18
154.59
154.59
01.04.04
70.75
18.21
1,288.36
644.18
644.18
01.04.05
m2
546.4
10.64
5,813.70
01.05
CONCRETO ARMADO
01.05.01
m3
7.28
52.75
384.02
192.01
192.01
01.05.02
m2
71.08
17.23
1,224.71
612.36
612.36
01.05.03
kg
427.72
0.96
410.61
205.31
205.31
01.05.04
m3
3.28
155.07
508.63
01.05.05
COLUMNAS-ENCOFRADO Y DESENCOFRADO
m2
35.36
24.12
852.88
01.05.06
kg
738.85
0.96
709.30
01.05.07
m3
4.51
89.74
404.73
202.37
202.37
01.05.08
COLUMNETAS-ENCOFRADO Y DESENCOFRADO
m2
63.9
17.00
1,086.30
543.15
543.15
01.05.09
kg
1212.85
0.96
1,164.34
01.05.10
m3
5.64
73.68
415.56
415.56
01.05.11
VIGAS-ENCOFRADO Y DESENCOFRADO
m2
30
30.15
904.50
904.50
239.46
342.89
342.89
2465.8412
639.51
639.51
254.32
254.32
426.44
426.44
709.30
1164.34
2267.34
2267.34
PROYECTO:
Cliente
Lugar
PRESUPUESTO
METRADO
Item
Descripcin
Und.
METRADO
COSTO
UNITARIO
1er MES
2do MES
kg
805.33
0.96
773.12
386.56
01.05.13
m3
14.7
56.62
832.31
832.31
01.05.14
m2
39.21
20.11
788.51
788.51
01.05.15
kg
218.32
0.69
150.64
150.64
01.05.16
m3
10.01
75.81
758.86
758.86
01.05.17
m2
103.96
17.87
1,857.77
1,857.77
01.05.18
kg
619.45
0.96
594.67
594.67
01.05.19
909.24
0.70
636.47
636.47
02
ARQUITECTURA
02.01
MUROS Y TABIQUERIA
02.01.01
m2
91.85
28.39
2,607.62
02.01.02
m2
273.88
18.31
5,014.74
02.02
02.02.01
TARRAJEO PRIMARIO
m2
33.06
12.21
02.02.02
TARRAJEO DE COLUMNAS
m2
28.7
22.89
02.02.03
TARRAJEO COLUMNETAS
m2
29.09
02.02.04
m2
103.96
02.02.05
TARRAJEO VIGAS
m2
02.02.06
m2
02.02.07
02.02.08
02.02.09
1303.81
5ta Semana
386.56
1303.81
1353.9798
1,830.38
1,830.38
403.66
302.75
100.92
656.94
492.71
164.24
22.89
665.87
499.40
166.47
18.31
1,903.51
1,427.63
475.88
29.68
28.17
836.09
627.07
209.02
25.26
28.17
711.57
533.68
177.89
m2
87.43
15.27
1,335.06
1,001.30
333.77
m2
225.38
9.16
2,064.48
1,548.36
516.12
BRUAS
167.41
6.68
1,118.30
838.73
279.58
02.02.10
76.5
9.27
709.16
531.87
177.29
02.02.11
REVESTINIEMTO DE CERAMICA 20 x 30
m2
33.06
16.65
550.45
412.84
137.61
02.03
PISOS Y PAVIMENTOS
02.03.01
CONTRAPISO DE 48 mm
m2
91.4
13.66
1,248.52
02.03.02
PISO DE CERAMICA 30 X 30 CM
m2
91.4
15.27
1,395.68
02.03.03
m2
38.56
5.07
195.50
195.50
02.03.04
m2
38.56
11.99
462.33
462.33
02.03.05
VEREDA DE CONCRETO-ENCOFRADIO
m2
12.74
6.03
76.82
76.82
02.04
CONTRAZOCALOS
02.04.01
31.72
8.34
264.54
264.54
1,248.52
1,395.68
PROYECTO:
Cliente
Lugar
PRESUPUESTO
METRADO
Item
Descripcin
Und.
COSTO
UNITARIO
METRADO
1er MES
2do MES
02.05
CARPINTERIA DE MADERA
02.05.01
5ta Semana
m2
9.33
8.34
77.81
77.81
m2
14.52
60.88
883.98
883.98
02.05.02
PUERTA CONTRAPLACADA
m2
9.54
60.88
580.80
580.80
02.06
CARPINTERIA METALICA
02.06.01
VENTANA DE FIERRO
m2
18.45
36.20
667.89
667.89
02.07
CERRAJERIA
02.07.01
pza
27.08
189.56
189.56
02.07.02
pza
25
8.12
203.00
203.00
02.07.03
CERROJO DE 2"
4.51
22.55
22.55
02.08
PINTURA
02.08.01
m2
103.96
5.65
587.37
440.53
146.84
02.08.02
569.25
6.60
3,757.05
2,817.79
939.26
02.08.03
m2
31.72
5.65
179.22
134.42
44.81
02.08.04
m2
53.4
4.84
258.46
193.85
64.62
02.08.05
m2
18.45
4.84
89.30
66.98
22.33
02.09
02.09.01
p2
234.33
1.05
246.05
246.05
02.10
VARIOS
02.10.01
LIMPIEZA FINAL
m2
350
2.69
941.50
941.50
02.10.02
43.8
1.93
84.53
02.10.03
DISEO DE MEZCLA
0.00
0.00
02.10.04
0.00
0.00
02.10.05
KG
122,467.74
0.00
0.00
03
INSTALACIONES SANITARIAS
03.01
DESAGE Y VENTILACION
03.01.01
pto
42.37
211.85
211.85
03.01.02
pto
42.37
84.74
84.74
03.01.03
pto
42.37
84.74
84.74
03.01.04
pto
42.37
42.37
42.37
03.02
REDES DE DISTRIBUCION
03.02.01
25
15.27
381.75
381.75
0.00
84.53
PROYECTO:
Cliente
Lugar
PRESUPUESTO
METRADO
Item
Descripcin
Und.
COSTO
UNITARIO
METRADO
1er MES
2do MES
5ta Semana
03.02.02
16
12.91
206.56
206.56
03.02.03
41
1.19
48.79
48.79
03.03
ACCESORIOS DE REDES
03.03.01
pza
0.00
0.00
03.03.02
pza
0.00
0.00
03.03.03
pza
0.00
0.00
03.03.04
pza
0.00
0.00
03.03.05
pza
0.00
0.00
03.03.06
pza
0.00
0.00
03.03.07
pza
0.00
0.00
03.03.08
pza
0.00
0.00
03.04
ADITAMENTO VARIOS
03.04.01
pza
0.00
0.00
03.04.02
pza
0.00
0.00
03.04.03
pza
12.18
24.36
24.36
03.04.04
pza
12.18
12.18
12.18
03.05
CAMARAS DE INSPECCION
03.05.01
pza
82.19
82.19
82.19
03.06
03.06.01
pto
23.08
207.72
03.07
03.07.01
pza
42.37
84.74
84.74
03.07.02
LAVADERO OVALIN
pza
42.37
169.48
169.48
03.07.03
pza
30.44
30.44
30.44
03.07.04
20.29
20.29
20.29
03.07.05
URINARIOS
15.22
30.44
30.44
03.08
REDES DE DISTRIBUCION
03.08.01
18.7
8.87
165.87
165.87
03.08.02
12.3
8.87
109.10
109.10
03.09
ACCESORIOS DE REDES
03.09.01
0.00
0.00
03.09.02
0.00
0.00
207.72
PROYECTO:
Cliente
Lugar
PRESUPUESTO
METRADO
Item
Descripcin
Und.
COSTO
UNITARIO
METRADO
1er MES
2do MES
5ta Semana
03.09.03
0.00
0.00
03.09.04
0.00
0.00
03.10
LLAVES ,VALVULAS
03.10.01
pza
13.53
13.53
13.53
03.10.02
pza
12.18
36.54
36.54
03.10.03
VALVULA CHECK
pza
1.52
1.52
1.52
04
INSTALACIONES ELECTRICAS
04.01
SALIDAS
04.01.01
pto
20.29
121.74
121.74
04.01.02
pto
17.39
121.73
121.73
04.01.03
pto
13.53
108.24
108.24
04.01.04
pto
24.35
194.80
194.80
04.01.05
pto
15.22
121.76
121.76
04.02
04.02.01
149.89
6.09
912.83
912.83
04.03
TABLERO Y CUCHILLAS
04.03.01
121.76
121.77
121.77
04.04
ARTEFACTOS ELECTRICOS
04.04.01
12.18
85.28
85.28
04.04.02
12.18
73.09
73.09
TOTAL
67,240.75
7,899.76
5,122.81
9,640.82
6,874.65
14,770.71
11,496.54
5,732.90
5,702.58