NPT = 0.1 m
NTN = 0 m
Hf = 1 m
Df = 0.9 m
SOLUCION
DETERMINAMOS LA LONGITUD DE ANCLAJE EN COMPRESION DE UNA VARILLA #8
REDONDEANDO
1 VARILLA=
1 VARILLA
58.9 cm
42.7 cm
60 cm
44 cm
PREDIMENSIONAMIENTO DE COLUMNAS
Dimensionamiento de la Columna
0.45 m
T2=
T1=
AREA=
0.45 m
0.45 m
2025 cm2
0.45 m
n =t - hf x prom - S/C
n =
25.40 Tn/m2
prom = (s +c)/2
prom =
2.1
Tn
LX L
3.49
3.49 m2
0.45
3.50
0.45
3.50
OK
Pu = 1,4*PD + 1,7*PL
Pu =
473 Tn
REDIMENSIONAR
d/2
d/2
d/2
Cortante ultima Actuante Vu
Vu =Pu-Wnu x m x n
Cortante Resistente Vc
Vc =1,10f'c x b0 x d
donde
bo =
2m+2n
0.9
0.45
d/2
0.45
m
m = t1+d n = t2+d
Entonces Vu =Vc
5/8
0.0159 m
Vc=0.9x1.1*210(1.8+4d)*d*10
recubr.
r=
0.075
m
d(efectivo) 6791.71 cm
r=
7.5 cm
VERIFICACION POR CORTANTE
Condision de Diseo Vu Vc
0.9
Vc
Vu =
Vu Vc
16431.42 Tn
-8972.41 Tn
OK
Vc = 0,53*f'c *s*d
Vu =Wnu*S*(Lv-d)
Lv = 1.53
Mu = Wnu*B*Lv^2/2
Mu = *f'c*S*d^2**(1-0,59*)
=fc / fy
As =*S*d
=
0.9
Mu =
157.15 Tn*m
= -0.00046
= -2E-005
As = -54.8709 cm2
4278.775 cm2
Entonces usar
= 0.0018
trabajar con acero min !!!
As =
A=
5/8
n=
2162.83
n=
5 varillas
4278.77 cm2
1.98
ESPACIAMIENTO
s=
0.83 m
s=
21.00 cm
entonces usar
5 5/8 @ 0.21 m
EN DIRECCION TRANSVERSAL
Ast =As*T/S
Ast =
4278.77 cm2
numero de varillas
2162.83 varillas
6.00 varillas
0.556 m
19.00 cm
6 5/8 @ 0.19 m
6 5/8 @ 0.19 m
5 5/8 @ 0.21 m
6 5/8 @ 0.19 m
n=
n=
s=
s=
usar
0.45
S = 3.5m
6 5/8 @ 0.19 m
0.45
5 5/8 @ 0.21 m
T = 3.5 m
Pu=
P
0.7
473 tn
506.0475 tn
Pup=0.85*f'c*Acol
Pu<P
SE VERIFICA
No se produce aplastamiento del concreto de la columna
3.5 m
12.25 m2
0.2025 m2
7.777778
0.405
0.405
506.0475 tn
Pu<P
SE VERIFICA
No se produce aplastamiento del concreto en la zapata
CURSO: CIMENTACIONES
ALUMNO: AGUILAR GALVAN JESUS IVAN
CODIGO: D08965G
SECCION: C2
1.-
90.00 Tn
72.00 Tn
34.00 Tn-m
1.10 m
2.40 Tn/m
p =
qa =
S/C =
F'c =
F'c =
Fy =
b =
t =
1.90 Tn/m
2.00 kg/cm
0.40 Tn/m
210 kg/cm
420 kg/cm
4,200 kg/cm
0.60 m
0.60 m
N.P.T.
N.T.N.
###
P =
Pu =
M =
Df =
c =
PREDIMENCIONAMIENTO
a.- SECCION DE LA ZAPATA
n= t - prom*Df - SC
n=
17.51 Tn/m2
Az= P/n
Az=
5.14 m2
2.27
B= 2.30 m
T= 2.30 m
b.- CALCULO DE ESFUERZO q1 Y q2
qu1, qu2= (P)/(B*T) (6*M)/(B*T)
qu1=
33.78 Tn/m2
AUMENTAR DIMENCIONES
2
qu2=
0.25 Tn/m
OK
###
B= 2.40 m
T= 2.40 m
2.27
q1=
q2=
30.38 Tn/m2
0.87 Tn/m2
AUMENTAR DIMENCIONES
OK
lv1= 0.90 m
lv2= 0.90 m
Verificando
e= (M)/(P) < T/6
e= 0.380 m
<
0.400 m OK
CARGA TRAPEZIODAL
0.24 mts
0.60 mts
0.070 mts
5/8 '' Area = 1.98 cm
0.522 mts
OK !!!!
1.00 OK
234.76
159.41
317.48 Tn
OK
2.- DISEO
f.- DISEO POR FLEXION
Mmax= qu*B*lv^2/2
Mmax=
23.69 Tn-m
=
0.0194
=
0.0010
min=
0.0018 (R.N.E. NORMA E.060)
As - "B"= 22.55 cm
DIMENCIONES
hz = 0.60 m
B= 2.40 m
T= 2.40 m
USAR 11 5/8 '' @
USAR 11 5/8 '' @
###
###
LADO "B"
LADO "T"
5/8'' @ 0.22
T = 2.40 m
B = 2.40 m
t = 0.60 m
b = 0.60 m
5/8'' @ 0.22
DISEO EN PLANTA
DISEO EN ELEVACION
t = 0.60 m
N.P.T.
###
N.T.N.
5/8'' @ 0.22
###
5/8'' @ 0.22
T = 2.40 m
CURSO: CIMENTACIONES
ALUMNO: AGUILAR GALVAN JESUS IVAN
CODIGO: D08965G
SECCION: C2
20.00 Tn
38.00 Tn
58.00 Tn
12.00 Tn
18.00 Tn
30.00 Tn
0.20 m
2.40 Tn/m
2.10 Tn/m
2.00 Tn/m
###
0.50 Tn/m
###
###
0.60 m
0.60 m
0.93 m
1.53 m
Df
c
s
p
qa
S/C
F'c
Fy
b
t
l=
l 3=
t2
t1
t1
l1 =
4.5
1.- PREDIMENSIONAMIENTO
a.- SECCION DE LA ZAPATA
n= t - prom*Df - SC
n=
12.90 Tn/m2
Az= (PS1+PS2)/n
Az=
4.50 m2
Azm=
2.95 m2
1.72
1.80 m
2.40 m
1.72
= 0.69 Kg/cm2
0.60 m
0.070 mts
5/8 ''
0.522 mts
r=
USAR =
d=
MMAX= -3.09
Tn-m
MMAXC= -3.09
MMAXE= -3.40
MMAXI= -3.40
###
###
###
Tn-m
Tn-m
Tn-m
###
###
###
###
Tn
Tn
Tn
Tn
VMAXE+=
VMAXE-=
VMAXI+=
VMAXI-=
9.22
-2.78
-9.22
8.78
= 9.22
Tn
= 9.22
Tn
Vd1E=
-1.06 Tn
Vd2I= VMAXI-WNU*d2I
Vd2I=
-1.06 Tn
VdMAX=
-1.06 Tn
Cortantes en el concreto
*VC= *0.53*f'c0.5*B*d
*VC=
61.35 Tn
ok !!!!
OK !!!!
1.00 OK
234.76
159.41
201.18 Tn
ok !!!!
Columna interior
Vu= PU2-WNU(t+d)*(b+d)/B
Vu=
9.26 Tn
Vc= *Dc*bo*d
bo= 2*(t+b+2*d)
bo=
4.49 mts
Dc= 0.27*(2+4/Bc)*f'c^0.5 o 1.1*f'c^0.5
Bc= b/t 2
Bc=
Dc=
Dc=
Vc=
OK !!!!
1.00 OK
234.76
159.41
317.48 Tn
ok !!!!
* Acero superior
Mmax=
=
=
min=
3.09 Tn-m
0.0033
0.0002
0.0018 (R.N.E. NORMA E.060)
As - "B"=
16.91 cm
DIMENCIONES
###
###
###
# Varillas =
9.00 und
LADO "B"
###
0.20 mts
LADO "B"
###
0.45 mts
LADO "Lz"
* Acero inferior
Mmax=
=
=
min=
3.40 Tn-m
0.0037
0.0002
0.0018 (R.N.E. NORMA E.060)
As - "B"=
16.91 cm
DIMENCIONES
###
###
###
# Varillas =
9.00 und
LADO "B"
###
0.20 mts
LADO "B"
EN LA DIRECCION TRANSVERSAL
* Para zapata exterior
qNU= PU1/B
qNU=
6.67 Tn/m
b= b+d/2
b=
0.86 m
Mmax= qNU*lv2/2
lv= (B-b)/2
lv=
0.60 m
Mmax=
=
1.20 Tn-m
0.0027
=
min=
0.0001
0.0018 (R.N.E. NORMA E.060)
As - "B"=
8.09 cm
DIMENCIONES
# Varillas =
4.00 und
LADO "b"
###
0.32 mts
LADO "b"
1.12 m
Mmax= qNU*lv2/2
lv= (B-b)/2
lv=
0.60 m
Mmax=
=
=
min=
1.80 Tn-m
0.0031
0.0002
0.0018 (R.N.E. NORMA E.060)
As - "B"=
10.54 cm
DIMENCIONES
# Varillas =
5.00 und
LADO "b"
###
0.28 mts
LADO "b"
S/C = 500kg/m
t2
lv
Lz
Xo