ZAPATA AISLADA-CUADRADA PARA ESTRUCTURA

1) DATOS
L Columna

100

cm

S Columna

40

cm

D (Muerta)

300

Tn

300,000.00 Kg

L1 (Viva)

60

Tn

60,000.00 Kg

Cap. Port. Terreno

2.00

Kg/cm2

Wconcreto

2400

Kg/m3

Wsuelo
S/C

1600
0.00

Kg/m2

H-TOTAL
H1- ZAPATA
H2
He
d

0.80
0.80
0.00
0.00
0.70

Kg/m2
m
m

0.80

m
m
m

2) CALCULO
ARTIFICIO= BAJAR LA CAPACIDAD PORTANTE

Terreno

1.808

Area

D+L
terreno

Kg/cm2

199115.04 cm2

L =

446.22

REDONDEAR AL DECIMO
400 cm

T
b

430.00
370.00

cm
cm

Pu
qu

1.2 D + 1.6 L

1.2 D + 1.6 L

TxS

456 Tn

28.66 Tn/m2
28.66 Tn/m2

3) CHEQUEO POR PUNZONAMIENTO

vu
vn
vc 1

373

498

731

Vn1 < Vc1

Tn
Tn

Tn

Ok

RESULTANTE=qu

Vu

4.30
3.70

4) CHEQUEO POR CORTE TOMANDO 1 METRO EN AMBAS DIRECCIONES

vu 1
vn 1
vc 1

27.23

Tn

36.30

Tn

53.76

Tn

Vn1 < Vc1

Ok
AREA DE CORTE

1.00

1.65
100
40
0.70

0.95

1.65

4.30
1.65

5) CALCULO DE ACERO
INGRESE= (T+L)/2=

Mu
Mn

=
=
PRIMER TANTEO

1.65
39.01

Tn

43.35

Tn-m

5%d
Asumir a
=
Calculo As
=
Verificacion a =
SEGUNDO TANTEO
Asumir a
=
Calculo As
=
Verificacion a =

3.50
15.12
3.56

cm

3.56
15.13
3.56

cm

14.40

cm2

15.13

cm2

5.07

cm2

0.34

mts

1mts

cm2
cm

cm2
cm

ACERO DE TEMPERATURA

As

SE TOMA EL MAYOR

Para 1"
Espaciamiento

=
=

34 cm

1.65
Mu-= (Wu*L)/2

UCTURAS DE 10 PISOS
T
b

40
100
COLUMNA
Pu=
He

H2
H1

456

Tn

0.00

0.00
0.80

ZAPATA
T
1.65
100
b
3.70
1.65

40

4.30

PERIMETRO DEL PUNZON

1.70
c2+d
3.70
S=

c1
1.70

c2

40.00
100.00

c1+d
1.70

T=

4.30

RESULTANTE=qu

Vv

0.95

1.70

1.00

3.70

1.00

CALCULO ACERO

1.65

UBICACIN DE LA ZAPATA

s= 30

s= 40

s= 20

ZAPATA AISLADA-RECTANGULAR PARA ESTRUCTUR


1) DATOS
L Columna

100

cm

S Columna

40

cm

Bc

2.5

Cm

D (Muerta)

300

Tn

300,000.00 Kg

L1 (Viva)

60

Tn

60,000.00 Kg

Cap. Port. Terreno

2.00

Kg/cm2

Wconcreto

2400

Kg/m3

Wsuelo
S/C

1600
0.00

Kg/m2

H-TOTAL
H1- ZAPATA
H2
He
d

2.50
0.90
1.60
0.25
0.80

Kg/m2
m
m

2.50

m
m
m

2) CALCULO
ARTIFICIO= BAJAR LA CAPACIDAD PORTANTE

Terreno

1.468

Area

D+L
terreno

Kg/cm2

245231.61 cm2

L =

495.21

REDONDEAR AL DECIMO
500.00 cm

T
b

530.00
470.00

cm
cm

Pu
qu

1.2 D + 1.6 L

456 Tn

1.2 D + 1.6 L

18.306 Tn/m2

TxS

18.31 Tn/m2

3) CHEQUEO POR PUNZONAMIENTO

vu
vn
vc 1
vc 2

416.55

555.40

737.32

Tn

663.59
40

Tn

INGRESE s

vc 3

Tn
Tn

1,351.76

SE TOMA EL MENOR

663.59
(s*d)/(2*b0)=

2.67

Tn

663.59

Vn1 < Vc1

Menor de Vc1 y Vc2

Tn

Ok

RESULTANTE=qu

Vu

5.30
4.70

4) CHEQUEO POR CORTE TOMANDO 1 METRO EN AMBAS DIRECCIONES

vu 1
vn 1
vc 1

24.72

Tn

32.96

Tn

61.44

Tn

Vn1 < Vc1

Ok
AREA DE CORTE

1.00

2.15
100
40
0.80

1.35

2.15

5.30
2.15

5) CALCULO DE ACERO
INGRESE= (T+L)/2=

Mu
Mn

=
=
PRIMER TANTEO

2.15
42.32

Tn

47.02

Tn-m

5%d
Asumir a
=
Calculo As
=
Verificacion a =
SEGUNDO TANTEO
Asumir a
=
Calculo As
=
Verificacion a =

4.00
14.35
3.38

cm

3.38
14.30
3.36

cm

16.20

cm2

16.20

cm2

5.07

cm2

0.31

mts

1mts

cm2
cm

cm2
cm

ACERO DE TEMPERATURA

As

SE TOMA EL MAYOR

Para 1"
Espaciamiento

=
=

31 cm

2.15
Mu-= (Wu*L)/2

RUCTURAS DE 10 PISOS
T
b

40
100
COLUMNA
Pu=
He

H2
H1

456

Tn

0.25

1.60
0.90

ZAPATA
T
2.15
100
b
4.70
2.15

40

5.30

PERIMETRO DEL PUNZON

1.80
c2+d
4.70
S=

c1
1.20

c2

40.00
100.00

c1+d
1.80

T=

5.30

RESULTANTE=qu

Vv

1.35

1.20

1.00

4.70

1.00

CALCULO ACERO

2.15

UBICACIN DE LA ZAPATA

s= 30

s= 40

s= 20

ZAPATA AISLADA-RECTANGULAR PARA ESTRUCTURA


1) DATOS
L Columna

100 cm

S Columna

40 cm

Bc

2.5 Cm

D (Muerta)

300 Tn

300,000.00 Kg

L1 (Viva)

60 Tn

60,000.00 Kg

Cap. Port. Terreno

2.00 Kg/cm2

Wconcreto

2400 Kg/m3

Wsuelo
S/C

1600 Kg/m2
0.00 Kg/m2

H-TOTAL
H1- ZAPATA
H2
He
d

2.50 m
0.90 m
1.60 m
0.25 m
0.80 m

2.50

2) CALCULO
ARTIFICIO= BAJAR LA CAPACIDAD PORTANTE

Terreno

1.468

Area

D+L
terreno

Kg/cm2

245231.61 cm2
b

L =

REDONDEAR AL DECIMO
495.21
500.00 cm

T
b

530.00 cm
470.00 cm

Pu
qu

1.2 D + 1.6 L

456 Tn

1.2 D + 1.6 L

18.306 Tn/m2
18.31 Tn/m2

TxS

3) CHEQUEO POR PUNZONAMIENTO

vu
vn
vc 1

416.55 Tn

555.40 Tn

737.32 Tn

Menor de Vc1 y Vc2

vc 2

663.59 Tn
20

INGRESE s

vc 3

4.70
1.33

860.21 Tn

SE TOMA EL MENOR

Vn1 < Vc1

663.59
(s*d)/(2*b0)=

663.59 Tn
Ok

RESULTANTE=qu

Vu
4.70

5.30

S=

4) CHEQUEO POR CORTE

CHEQUEO POR CORTE


TOMANDO LADO MAYOR

vu 1
vn 1
vc 1

131.01 Tn

174.68 Tn

325.65 Tn

Vn1 < Vc1

Ok

CHEQUEO POR CORTE


TOMANDO LADO MENOR

vu 1
vn 1
vc 1

116.18 Tn

154.91 Tn

288.78 Tn

Vn1 < Vc1

Ok

AREA DE CORTE

2.15
1.00

0.40

4.70

d
2.15

0.80
1.35

1.35

5.30
2.15

5) CALCULO DE ACERO
INGRESE= (T+L)/2=

Mu
Mn

=
=
PRIMER TANTEO

Asumir a
=
Calculo As
=
Verificacion a =
SEGUNDO TANTEO
Asumir a
=
Calculo As
=
Verificacion a =

2.15
42.32 Tn
47.02 Tn-m
5%d
4.00 cm
14.35 cm2
3.38 cm

1mts

3.38 cm
14.30 cm2
3.36 cm

ACERO DE TEMPERATURA

As

16.20 cm2

SE TOMA EL MAYOR

Para 1"
Espaciamiento

=
=

16.20 cm2
5.07 cm2
0.31 mts

30 cm

2.15
Mu-= (Wu*L)/2

CTURAS DE 10 PISOS
T
40
100
COLUMNA
Pu=
He

H2
H1

456

Tn

0.25

1.60
0.90

ZAPATA
T
2.15
100
4.70
2.15

40

5.30

PERIMETRO DEL PUNZON

1.80
c1+d

c1
1.20

c2

40.00

c2+d

100.00

c1+d
1.80

T=

5.30

1.20
c2+d

RESULTANTE=qu

Vu

5.30

1.35

RESULTANTE=qu

Vu
1.35

4.70

CALCULO ACERO

2.15

UBICACIN DE LA ZAPATA

s= 30

s= 40

s= 20