S10

Pgina :

Precios y cantidades de recursos requeridos por tipo


Obra

0403002

Subpresupuesto

001

Fecha

01/01/2012

Lugar

061301

"Instalacin de pistas y veredas de las calles Santa Cruz, Julio Horna Vera, Trujillo y Los
Laureles, de la Urbanizacin Santa Rosa, Provincia de Santa Cruz - Cajamarca"
PAVIMENTO RIGIDO - URBANIZACION SANTA ROSA - SANTA CRUZ - CAJAMARCA
CAJAMARCA - SANTA CRUZ - SANTA CRUZ

Cdigo

Recurso

Unidad

0147000022
0147010001
0147010002
0147010003
0147010004

OPERADOR DE EQUIPO LIVIANO


CAPATAZ
OPERARIO
OFICIAL
PEON

hh
hh
hh
hh
hh

Cantidad

Precio S/.

668.0552
430.8528
4,623.1937
1,279.1394
17,384.4321

15.22
15.22
15.22
13.23
11.93

Parcial S/. Presupuestado S/.

MANO DE OBRA
10,167.80
6,557.58
70,365.01
16,923.01
207,396.27

10,169.64
6,557.74
70,448.38
16,944.82
207,437.46

311,409.67

311,558.04

MATERIALES
0202000010
0202000015
0202010005
0202100010
0203020003
0204000000
0205000003
0205000041
0205010000
0205010004
0205510001
0213000006
0217220006
0221000001
0224110003
0229060005
0229500003
0230460050
0230980011
0231510020
0232000032
0232970002
0238000003
0239010100
0239020100
0239050000
0239160010
0239160011
0239900101
0239990004
0243040000
0244030024
0250010005
0251010016
0251040128
0253010000
0253050013
0254010001
0254060000
0254450074
0272000108
0272020030

ALAMBRE NEGRO # 16
ALAMBRE NEGRO # 8
CLAVOS PARA MADERA CON CABEZA DE 3"
PERNO HEXAGONAL DE 3/4" X 3 1/2"
ACERO CORRUGADO fy=4200 kg/cm2 GRADO
60
ARENA FINA
PIEDRA CHANCADA DE 1/2"
PIEDRA OVER 6"
AFIRMADO
ARENA GRUESA
GRAVA GRUESA PARA DRENAJE
ASFALTO RC-250
CAJA DE DESAGUE 12" x 24"
CEMENTO PORTLAND MS TIPO I (42.5 kg)
PIEDRA LAJA
YESO DE 28 Kg
SOLDADURA CELLOCORD 1/8"
PEGAMENTO PARA PVC x 4 Gl
MANTENIMIENTO Y SEGURIDAD EN OBRA
CAJA DE CONCRETO PARA MEDIDOR AGUA
FLETE
MOVILIZACION Y DESMOVILIZACION
HORMIGON
ALQUILER DE LOCAL
TEKNOPOR DE 1/2" X 4' X 8'
AGUA
BROCHA
CORDEL
FIERRO LISO 1"
TAPA METALICA
MADERA TORNILLO
TRIPLAY DE 8 mm
TAPA CON MARCO FIERRO FUNDIDO DE
DESAGUE 12" X 24"
ANGULO DE ACERO LIVIANO DE 2 1/2" X 2
1/2" X 1/4" X 6 m
PLATINA DE FIERRO 1 1/2" X 1/4"
GRASA AMARILLA
XILOL
PINTURA ESMALTE SINTETICO
PINTURA ANTICORROSIVA
PINTURA ESMALTE PARA TRAFICO
TUBERIA PVC SAP C-10 2" X 5m
TUBO PVC C-10 SAP 1"

kg
kg
kg
pza
kg

617.5538
470.3874
497.6044
36.0000
10,786.1995

3.70
3.70
3.70
4.50
3.50

2,284.95
1,740.43
1,841.14
162.00
37,751.70

2,264.63
1,749.67
1,831.93
162.00
37,802.50

m3
m3
m3
m3
m3
m3
gal
u
bls
m2
bls
kg
u
glb
u
glb
glb
m3
mes
pl
m3
u
m
m
u
p2
m2
pza

0.4260
1,364.3915
1,839.0575
1,474.9920
821.7152
7.6440
385.2183
71.0000
16,042.7825
504.5355
417.1110
27.3000
0.7100
1.0000
71.0000
1.0000
2.0000
4.7600
5.0000
316.3464
2,620.9747
2.1380
931.6666
144.1902
71.0000
20,688.4041
30.6000
71.0000

105.00
85.00
90.00
40.00
105.00
55.00
13.50
45.00
18.43
60.00
0.25
11.76
46.22
7,650.00
40.00
63,829.56
11,387.60
75.00
300.00
20.00
5.00
8.00
0.25
12.50
30.00
3.85
12.00
35.00

44.73
115,973.28
165,515.17
58,999.68
86,280.10
420.42
5,200.45
3,195.00
295,668.48
30,272.13
104.28
321.05
32.82
7,650.00
2,840.00
63,829.56
22,775.20
357.00
1,500.00
6,326.93
13,104.87
17.10
232.92
1,802.38
2,130.00
79,650.36
367.20
2,485.00

45.44
115,973.30
165,515.17
58,999.68
86,280.72
420.42
5,211.42
3,195.00
295,668.99
30,272.13
83.42
320.84
32.66
7,650.00
2,840.00
63,829.56
22,775.20
357.00
1,500.00
6,326.92
13,105.88
16.80
243.35
1,803.48
2,130.00
79,682.36
367.20
2,485.00

pza

38.2200

18.24

697.13

697.32

m
kg
gal
gal
gal
gal
u
u

209.3000
0.2926
6.1041
1.5500
3.3696
24.2745
0.1602
12.0145

5.65
4.20
50.00
35.00
29.41
60.00
21.00
15.00

1,182.55
1.23
305.20
54.25
99.10
1,456.47
3.36
180.22

1,182.48
1.95
305.21
54.25
99.32
1,456.47
3.35
179.44

1,014,855.84

1,014,922.46

EQUIPOS
0337540001
0348010007
0348040003
0348070021
0348110002

MIRAS Y JALONES
MEZCLADORA DE CONCRETO DE 11p3 18 HP
CAMION CISTERNA 4 X 2 (AGUA) 122 HP 2,000
gl
SOLDADORA ELECTRICA
CAMION VOLQUETE DE 6 m3

hm
hm
hm

444.6403
916.6322
53.6100

2.52
10.00
67.23

1,120.49
9,166.32
3,604.20

1,084.50
9,161.07
3,611.44

hm
hm

29.1200
259.6530

6.72
196.73

195.69
51,081.53

195.52
51,073.75

S10

Pgina :

Precios y cantidades de recursos requeridos por tipo


Obra

0403002

Subpresupuesto

001

Fecha

01/01/2012

Lugar

061301

"Instalacin de pistas y veredas de las calles Santa Cruz, Julio Horna Vera, Trujillo y Los
Laureles, de la Urbanizacin Santa Rosa, Provincia de Santa Cruz - Cajamarca"
PAVIMENTO RIGIDO - URBANIZACION SANTA ROSA - SANTA CRUZ - CAJAMARCA
CAJAMARCA - SANTA CRUZ - SANTA CRUZ

Cdigo

Recurso

Unidad

Cantidad

Precio S/.

0349030004
0349030007

COMPACTADOR PLANCHA VIB 7.0 HP


RODILLO LISO VIBRATORIO
AUTOPROPULSADO 101-135HP 10-12 ton
CARGADOR SOBRE LLANTAS 125 HP 2.5 yd3
TRACTOR DE ORUGAS DE 190-240 HP
EXCAVADORAS/ORUG 115-165HP 0.75-1.6YD3
MARTILLO ELECTRICO DE 21 kg
VIBRADOR DE CONCRETO DE 1.50" 4 HP
MOTONIVELADORA DE 125 HP
NIVEL DE INGENIERO
TEODOLITO

hm
hm

58.3818
147.5640

20.18
134.45

1,178.14
19,839.98

1,180.40
19,869.26

hm
hm
hm
hm
hm
hm
hm
hm

86.4644
57.1710
8.4664
241.9388
924.5538
139.4951
222.7373
222.7373

134.45
238.00
151.26
11.00
12.50
156.77
7.56
9.62

11,625.14
13,606.70
1,280.63
2,661.33
11,556.92
21,868.65
1,683.89
2,142.73

11,632.45
13,606.76
1,280.54
2,659.98
11,563.03
21,855.22
1,668.45
2,168.97

152,612.34

152,611.34

1,478,877.85

1,479,091.84

0349040009
0349040034
0349040092
0349060055
0349070003
0349090000
0349190006
0349880003

Total

S/.

Parcial S/. Presupuestado S/.

S/.
La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que se est utilizando

1,479,091.84