DATOS GEOMTRICOS
LARGO :
20.00m
VIVIENDA: S/C
200 Kg/m
ANCHO :
12.00m
240 Kg/m
N PRTICOS X-X :
PESO MUERTO
0.06m
N PRTICOS Y-Y :
ANCHO TABIQUERIA
0.15m
N PISOS :
200 Kg/m
ALTURA DE ENTREPISO :
200 Kg/m
CARACTERISTICAS DE LA ZONA
210 Kg/cm
USO :
EDIFICACIONES COMUNES
2400 Kg/cm
SUELO :
4200 Kg/cm
2000 Kg/cm
1800 Kg/cm
S/C AZOTEA
100 Kg/cm
SUELOS INTERMEDIOS
3.70 m
40
LUZ LIBRE /
Luz mayor
luz menor
PERIMETRO
14.04
TIPO DE LOSA
3.7
0.09m
LOSA ALIGERADA
3.32
PERIMETRO /180
0.08m
PROMEDIO
0.09m
USAMOS
h=0.10 m
2. PREDIMENSIONAMIENTO DE VIGAS
2.1 VIGAS EN DIRECCION X-X (EJES 1-2 - 3 -4- 5- 6)
PORTICO X-X
b = 0.25 m
LUZ LIBRE
ALTURA DE VIGA:
3.32 m
LUZ LIBRE /
12
0.28 m
USAMOS
h=0.30 m
b=0.25m
PORTICO Y-Y
b = 0.25 m
LUZ LIBRE
ALTURA DE VIGA:
3.70 m
LUZ LIBRE /
12
0.308 m
USAMOS
h=0.30 m
b=0.25m
1.25 m
LUZ LIBRE /
10
Valor minimo
0.13 m
USAMOS
h=0.25 m
b=0.25m
Pgina 1
CONCRETO ARMADO II
O
NORMA E-020
ceramica, contrapiso
da en dos direcciones
2
1.11
Pgina 2
CONCRETO ARMADO II
3. PREDIMENSIONAMIENTO DE COLUMNAS
Dimensiones minimas para columnas es 25 cm.
Area min columna=
C. Pu
0.7
f'c =
210 Kg/cm
C (para col.)
1.3 interior
C1
fy =
4200 Kg/cm
C3
0.02
C2
2.0 esquina
C4
Ejes
Area
Tributar
ia
Tipo
P. losa
Long.
Vigas
P. Vigas
P. Muerto
P. Muro
2-A
1.42
C4
1704.0
6.7
6003.0
852.0
23411.7
2- B
3.89
C2
4668.0
6.1
5445.0
2334.0
2 -C
6.17
C2
7404.0
8.6
7695.0
3702.0
2-D
3.01
C4
3612.0
3.9
3510.0
3 -A
3.96
C2
4752.0
4.3
3870.0
3- B
7.42
C1
8904.0
6.0
3-C
8.12
C1
9744.0
5.4
3-D
1.98
C2
2376.0
4.0
3573.0
4-A
2.53
C2
3036.0
3.2
2880.0
4-B
5.85
C1
7020.0
5.7
5143.5
4-C
5.85
C1
7020.0
5.7
5130.0
4- D
1.66
C2
1992.0
4.4
3987.0
5-A
C2
3600.0
3.5
3132.0
5-B
6.72
C1
8064.0
6.0
5373.0
5- C
10.58
C1
12696.0
5.9
5283.0
5-D
4.45
C2
5340.0
4.5
6-A
4.14
C4
4968.0
4.2
UBICACIN
P.
P.
Tabiqueria Columna
TIPO
Cm
Cv
1136.0
1950.0
35056.7
1278.0
19656.0
3112.0
1950.0
37165.0
3501.0
9969.8
4936.0
1950.0
35656.8
5553.0
1806.0
15724.8
2408.0
1950.0
29010.8
2709.0
2376.0
35380.8
3168.0
1950.0
51496.8
3564.0
5355.0
4452.0
16602.3
5936.0
1950.0
43199.3
6678.0
4833.0
4872.0
28150.2
6496.0
1950.0
56045.2
7308.0
1188.0
23411.7
1584.0
1950.0
34082.7
1782.0
1518.0
23166.0
2024.0
1950.0
34574.0
2277.0
3510.0
14183.9
4680.0
1950.0
36487.4
5265.0
3510.0
26848.0
4680.0
1950.0
49138.0
5265.0
996.0
9880.7
1328.0
1950.0
20133.7
1494.0
1800.0
11677.4
2400.0
1950.0
24559.4
2700.0
4032.0
11677.4
5376.0
1950.0
36472.4
6048.0
6348.0
19656.0
8464.0
1950.0
54397.0
9522.0
4023.0
2670.0
16461.9
3560.0
1950.0
34004.9
4005.0
3771.0
2484.0
26254.8
3312.0
1950.0
42739.8
3726.0
6- B
8.59
C2
10308.0
9.8
8775.0
5154.0
16567.2
6872.0
1950.0
49626.2
7731.0
6- C
7.15
C2
8580.0
8.1
7317.0
4290.0
16567.2
5720.0
1950.0
44424.2
6435.0
6- D
2.81
C4
3372.0
3.4
3042.0
1686.0
16567.2
2248.0
1950.0
28865.2
2529.0
SECCION ASUMIDA
COLUMNA
PORTICO 2
PORTICO 3
PORTICO 4
PORTICO 5
RESUMEN DE COL
TIPO
b(cm)
t(cm)
COL.ESQUINERA
C4
25.00
25.00
COL. ESQUINERA
COL. EXTERIOR
C2
25.00
25.00
COL. INTERIOR
COL.EXTERIOR
COL. EXTERIOR
C2
25.00
25.00
COL.ESQUINERA
C4
25.00
25.00
COL. EXTERIOR
C2
25.00
25.00
COL. INTERIOR
C1
25.00
25.00
COL. EXTERIOR
C1
25.00
25.00
COL. EXTERIOR
C2
25.00
25.00
COL. EXTERIOR
C2
25.00
25.00
COL. INTERIOR
C1
25.00
25.00
COL. INTERIOR
C1
25.00
25.00
COL. EXTERIOR
C2
25.00
25.00
COL. EXTERIOR
C2
25.00
25.00
COL. INTERIOR
C1
25.00
25.00
COLUMNA
Pgina 3
CONCRETO ARMADO II
Pu
Area Min.
51252.0
557.8
23.6
57982.7
536.4
23.2
59359.6
549.2
23.4
45220.4
492.2
22.2
78154.3
723.1
26.9
71831.6
508.2
22.5
90886.9
643.0
25.4
50745.2
469.5
21.7
52274.5
483.6
22.0
60032.9
424.7
20.6
77743.7
550.0
23.5
30726.9
284.3
16.9
38973.2
360.6
19.0
61343.0
434.0
20.8
92343.2
653.3
25.6
54415.4
503.4
22.4
66169.9
720.2
26.8
82619.4
764.4
27.6
73133.4
676.6
26.0
44710.6
486.6
22.1
RESUMEN DE COLUMNAS
TIPO
C4
25.0 cm
25.0 cm
C1
25.0 cm
25.0 cm
C2
25.0 cm
25.0 cm
Pgina 4
CONCRETO ARMADO II
PORTICO 5
PORTICO 6
COL. INTERIOR
C1
25.00
25.00
COL. EXTERIOR
C2
25.00
25.00
COL. ESQUINERA
C4
25.00
25.00
COL. EXTERIOR
C2
25.00
25.00
COL. EXTERIOR
C2
25.00
25.00
COL.ESQUINERA
C4
25.00
25.00
Pgina 5
CONCRETO ARMADO II
Pgina 6
CONCRETO ARMADO I
VIGA PRINCIPAL
VIGA SECUNDARIA
VIGA EN VOLADIZO
COLUMNA
P. ESP. DEL C
AZOTEA: S/C
VIVIENDA:S/C
LOSA MACIZA(0,15m)
P.ESP. MURO DE ALBAILERIA
ALTURA ENTRE PISO
0.120 T/m
0.200 T/m
0.200 T/m
0.020 T/m
B
0.80m
1. PRIMER PISO
1.1. VIGAS PRNCIPALES
Eje P. Eje S.
Unidades
A-B
2
B-C
C-D
A-B
3
B-C
C-D
A-B
4
B-C
C-D
A-B
5
B-C
C-D
A-B
6
B-C
C-D
Ancho
P. Propio
Longitud Tributari
Viga
oB
m
3.570
3.050
3.380
3.570
3.050
3.380
3.570
3.050
3.380
3.570
3.050
3.380
3.570
3.050
3.380
m
1.120
2.400
3.170
2.720
2.720
2.720
2.280
2.940
2.940
2.650
3.220
3.220
2.990
3.480
2.360
T/m
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
Peso losa
maciza
Peso Acabado
Longitud
muro
T/m
0.305
0.753
1.022
0.865
0.865
0.865
0.711
0.942
0.942
0.840
1.040
1.040
0.959
1.131
0.739
T/m
0.134
0.288
0.380
0.326
0.326
0.326
0.274
0.353
0.353
0.318
0.386
0.386
0.359
0.418
0.283
m
3.570
3.050
3.380
3.570
3.050
3.380
3.570
3.050
3.380
3.570
3.050
3.380
3.570
3.050
3.380
Peso
Carga
Peso de
Tabique Muerta
Muro
ria
(Wm)
T/m
0.390
0.390
0.390
0.390
0.390
0.390
0.390
0.390
0.390
0.390
0.390
0.390
0.390
0.390
0.390
T/m
0.224
0.480
0.634
0.544
0.544
0.544
0.456
0.588
0.588
0.530
0.644
0.644
0.598
0.696
0.472
T/m
1.233
2.091
2.606
2.305
2.305
2.305
2.010
2.452
2.452
2.258
2.640
2.640
2.486
2.814
2.064
Carga
Viva
(Wv)
1.4 * Wm
1.7 * Wv
Wu = 1.4
(Wm) + 1.7
(Wv)
T/m
0.224
0.480
0.634
0.544
0.544
0.544
0.456
0.588
0.588
0.530
0.644
0.644
0.598
0.696
0.472
T/m
1.726
2.927
3.649
3.227
3.227
3.227
2.814
3.433
3.433
3.161
3.696
3.696
3.480
3.940
2.889
T/m
0.381
0.816
1.078
0.925
0.925
0.925
0.775
1.000
1.000
0.901
1.095
1.095
1.017
1.183
0.802
T/m
2.107
3.743
4.727
4.152
4.152
4.152
3.589
4.433
4.433
4.062
4.791
4.791
4.497
5.123
3.692
Pgina 6
CONCRETO ARMADO I
Para las vigas secundarias ya no se considera la carga viva, solo la carga muerta, por lo tanto no habra combinacion de carga
1.2. VIGAS SECUNDARIAS
Carga Ubicada en 2 Piso
P.
Wu = 1.4
Longitud
Carga Muerta Carga Viva
Propio
Peso de Muro
1.4 * Wm 1.7 * Wv (Wm) +
muro (m)
(Wm)
(Wv)
Viga
1.7 (Wv)
Eje S. Eje P.
Longitud
Unidades
1-2
2-3
3-4
A
4-5
5-6
1-2
2-3
3-4
B
4-5
5-6
1-2
2-3
C
3-4
4-5
5-6
1-2
2-3
D
3-4
4-5
5-6
T/m
T/m
T/m
T/m
T/m
T/m
T/m
2.020
3.420
0.180
0.180
2.020
3.420
0.390
0.390
0.570
0.570
no
no
0.798
0.798
0.000
0.000
0.798
0.798
4.000
0.180
4.000
0.390
0.570
no
0.798
0.000
0.798
2.020
3.420
2.450
4.000
1.400
2.020
3.420
2.450
4.000
1.400
2.020
3.420
2.450
4.000
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
2.020
3.420
2.450
4.000
1.400
2.020
3.420
2.450
4.000
1.400
2.020
3.420
2.450
4.000
0.390
0.390
0.390
0.390
0.390
0.390
0.390
0.390
0.390
0.390
0.390
0.390
0.390
0.390
0.570
0.570
0.570
0.570
0.570
0.570
0.570
0.570
0.570
0.570
0.570
0.570
0.570
0.570
no
no
no
no
no
no
no
no
no
no
no
no
no
no
0.798
0.798
0.798
0.798
0.798
0.798
0.798
0.798
0.798
0.798
0.798
0.798
0.798
0.798
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.798
0.798
0.798
0.798
0.798
0.798
0.798
0.798
0.798
0.798
0.798
0.798
0.798
0.798
Pgina 7
CONCRETO ARMADO I
2. AZOTEA
1.1. VIGAS PRNCIPALES
Eje P. Eje S.
Unidades
2
Ancho
P. Propio
Longitud Tributari
Viga
oB
m
m
T/m
Peso losa
maciza
Peso Acabado
Longitud
muro
T/m
T/m
Peso
Carga
Peso de
Tabique Muerta
Muro
ria
(Wm)
T/m
T/m
T/m
Carga
Viva
(Wv)
T/m
A-B
3.570
1.120
0.180
0.305
0.134
3.570
0.390
0.224
1.233
0.112
1.726
0.190
1.916
B-C
C-D
A-B
B-C
C-D
A-B
B-C
C-D
A-B
B-C
C-D
A-B
B-C
C-D
3.050
3.380
3.570
3.050
3.380
3.570
3.050
3.380
3.570
3.050
3.380
3.570
3.050
3.380
2.400
3.170
2.720
2.720
2.720
2.280
2.940
2.940
2.650
3.220
3.220
2.990
3.480
2.360
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.753
1.022
0.865
0.865
0.865
0.711
0.942
0.942
0.840
1.040
1.040
0.959
1.131
0.739
0.288
0.380
0.326
0.326
0.326
0.274
0.353
0.353
0.318
0.386
0.386
0.359
0.418
0.283
3.050
3.380
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
3.570
3.050
3.380
0.390
0.390
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.390
0.390
0.390
0.480
0.634
0.544
0.544
0.544
0.456
0.588
0.588
0.530
0.644
0.644
0.598
0.696
0.472
2.091
2.606
1.915
1.915
1.915
1.620
2.062
2.062
1.868
2.250
2.250
2.486
2.814
2.064
0.240
0.317
0.272
0.272
0.272
0.228
0.294
0.294
0.265
0.322
0.322
0.299
0.348
0.236
2.927
3.649
2.681
2.681
2.681
2.268
2.887
2.887
2.615
3.150
3.150
3.480
3.940
2.889
0.408
0.539
0.462
0.462
0.462
0.388
0.500
0.500
0.451
0.547
0.547
0.508
0.592
0.401
3.335
4.188
3.143
3.143
3.143
2.656
3.387
3.387
3.066
3.697
3.697
3.988
4.531
3.290
Pgina 8
CONCRETO ARMADO I
Para las vigas secundarias ya no se considera la carga viva, solo la carga muerta, por lo tanto no habra combinacion de carga
1.2. VIGAS SECUNDARIAS
Carga Ubicada en 2 Piso
P.
Wu = 1.4
Longitud
Carga Muerta Carga Viva
Eje S. Eje P. Longitud Propio
Peso de Muro
1.4 * Wm 1.7 * Wv (Wm) +
muro (m)
(Wm)
(Wv)
Viga
1.7 (Wv)
Unidades
m
T/m
m
T/m
T/m
T/m
T/m
T/m
T/m
1-2
2-3
2.020
0.180
2.020
0.390
0.570
no
0.798
0.000
0.798
A
3-4
3.420
0.180
3.420
0.390
0.570
no
0.798
0.000
0.798
4-5
5-6
4.000
0.180
4.000
0.390
0.570
no
0.798
0.000
0.798
1-2
2-3
2.020
0.180
2.020
0.000
0.180
no
0.252
0.000
0.252
B
3-4
3.420
0.180
3.420
0.000
0.180
no
0.252
0.000
0.252
4-5
2.450
0.180
2.450
0.000
0.180
no
0.252
0.000
0.252
5-6
4.000
0.180
4.000
0.000
0.180
no
0.252
0.000
0.252
1-2
1.400
0.180
1.400
0.000
0.180
no
0.252
0.000
0.252
2-3
2.020
0.180
2.020
0.000
0.180
no
0.252
0.000
0.252
C
3-4
3.420
0.180
3.420
0.000
0.180
no
0.252
0.000
0.252
4-5
2.450
0.180
2.450
0.000
0.180
no
0.252
0.000
0.252
5-6
4.000
0.180
4.000
0.000
0.180
no
0.252
0.000
0.252
1-2
1.400
0.180
1.400
0.390
0.570
no
0.798
0.000
0.798
2-3
2.020
0.180
2.020
0.390
0.570
no
0.798
0.000
0.798
D
3-4
3.420
0.180
3.420
0.390
0.570
no
0.798
0.000
0.798
4-5
2.450
0.180
2.450
0.390
0.570
no
0.798
0.000
0.798
5-6
4.000
0.180
4.000
0.390
0.570
no
0.798
0.000
0.798
Pgina 9
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Err:509
Err:509
4
Err:509
Err:509
6
Err:509
Err:509
7
Err:509
Err:509
9
Err:509
Err:509
10
Err:509
Err:509
16
12
11
14
6.00
17
6.00
18
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Err:509
Err:509
4
Err:509
Err:509
6
Err:509
Err:509
7
Err:509
Err:509
9
Err:509
Err:509
10
Err:509
Err:509
12
11
15
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
16
6.00
17
6.00
18
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
10
#REF!
12
11
#REF!
13
#REF!
14
15
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
16
3.10
17
4.60
18
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
10
#REF!
12
11
#REF!
13
#REF!
14
15
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
16
3.10
17
4.60
18
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
10
#REF!
12
11
#REF!
13
#REF!
14
15
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
16
3.10
17
4.60
18
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
10
#REF!
12
11
#REF!
#REF!
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
13
16
15
14
3.10
17
4.60
18
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
2.87
MOMENTOS DE EMPOTRAMIENTO
ME12=
-9.43 tn.m
ME23=
-9.43 tn.m
ME21=
9.43 tn.m
ME32=
9.43 tn.m
ME45=ME78=ME1011=
ME54=ME87=ME1110=
ME56=ME89=ME1112=
ME65=ME98=ME1211=
2.87
2.87
COEFICIENTES DE GIRO
NUDO 1:
k12=
43402.78
K14=
0.00
43402.78
NUDO 2:
k21=
K25=
K23=
43402.78
0.00
43402.78
86805.56
u12=
u14=
u21=
u25=
u23=
Cv
Cm
M1314=
M1413=
M1415=
M1514=
Err:509
Err:509
Err:509
Err:509
-0.500
0.000
-0.250
0.000
-0.250
NUDO 6,9,12,15:
k63=
23519.16
K65=
43402.78
K69=
11250.00
78171.94
u63=
u65=
u69=
-0.150
-0.278
-0.072
NUDO 13:
k1310=
0.00
K1314= 43402.78
K1316=
0.00
43402.78
u1310=
u1314=
u1316=
0.000
-0.500
0.000
NUDO 15:
k1514= 43402.78
k1512= 23519.16
k1518= 15237.02
82158.96
u1514=
u1512=
u1518=
-0.264
-0.143
-0.093
NUDO 3:
k32=
K36=
NUDO 4,7,10,13:
k41=
K45=
K47=
NUDO 5,8,11,14:
k54=
k52=
k56=
k58=
2.87
4.43
NUDO 14:
k1413=
k1411=
k1415=
k1417=
COEFICIENTE DE
NIVEL 5,4,3,2,1:
k14=
K25=
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
K36=
2.87
MOMENTOS DE EMPOTRAMIENTO
ME12=
-12.56 tn.m
ME23=
-9.43 tn.m
ME21=
12.56 tn.m
ME32=
9.43 tn.m
ME45=ME78=ME1011=ME1314=
ME54=ME87=ME1110=ME1413=
ME56=ME89=ME1112=ME1415=
ME65=ME98=ME1211=ME1514=
2.87
2.87
Cv
Cm
COEFICIENTES DE GIRO
NUDO 1:
k12=
17864.58
K14=
43572.15
61436.74
NUDO 2:
k21=
K25=
K23=
17864.58
43572.15
17864.58
79301.32
Err:509
Err:509
Err:509
Err:509
u12=
u14=
-0.145
-0.355
u21=
u25=
u23=
-0.113
-0.275
-0.113
NUDO 6,9,12,15:
k63=
43572.15
K65=
17864.58
K69=
20842.01
82278.75
u63=
u65=
u69=
-0.265
-0.109
-0.127
NUDO 13:
k1310= 43572.15
K1314= 17864.58
K1316= 28228.46
89665.20
u1310=
u1314=
u1316=
-0.243
-0.100
-0.157
u1514=
u1512=
u1518=
-0.100
-0.243
-0.157
NUDO 3:
k32=
K36=
NUDO 4,7,10,13:
k41=
K45=
K47=
NUDO 5,8,11,14:
k54=
k52=
k56=
k58=
2.87
4.43
NUDO 15:
k1514= 17864.58
k1512= 43572.15
k1518= 28228.46
NUDO 14:
k1413=
k1411=
k1415=
k1417=
COEFICIENTE DE
NIVEL 5,4,3,2,1:
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
89665.20
k14=
K25=
K36=
2.60
MOMENTOS DE EMPOTRAMIENTO
ME12=
#REF!
ME23=
#REF!
ME21=
#REF!
ME32=
#REF!
ME45=ME78=ME1011=ME1314=
ME54=ME87=ME1110=ME1413=
ME56=ME89=ME1112=ME1415=
ME65=ME98=ME1211=ME1514=
2.60
2.60
Cv
Cm
COEFICIENTES DE GIRO
NUDO 1:
k12=
34576.61
K14=
0.00
34576.61
NUDO 2:
k21=
K25=
K23=
34576.61
0.00
23301.63
57878.24
u12=
u14=
u21=
u25=
u23=
#REF!
#REF!
#REF!
#REF!
-0.500
0.000
-0.299
0.000
-0.201
NUDO 6,9,12,15:
k63=
25961.54
K65=
23301.63
K69=
14673.91
63937.08
u63=
u65=
u69=
-0.203
-0.182
-0.115
NUDO 13:
k1310=
0.00
K1314= 34576.61
K1316=
0.00
34576.61
u1310=
u1314=
u1316=
0.000
-0.500
0.000
u1514=
-0.155
NUDO 3:
k32=
K36=
NUDO 4,7,10,13:
k41=
K45=
K47=
NUDO 5,8,11,14:
k54=
k52=
k56=
k58=
2.60
2.60
NUDO 15:
k1514= 23301.63
NUDO 14:
k1413=
k1411=
k1415=
k1417=
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
k1512=
k1518=
25961.54
25961.54
75224.71
u1512=
u1518=
-0.173
-0.173
COEFICIENTE DE
NIVEL 5,4,3,2,1:
k14=
K25=
K36=
2.60
MOMENTOS DE EMPOTRAMIENTO
ME12=
#REF!
ME23=
#REF!
ME21=
#REF!
ME32=
#REF!
ME45=ME78=ME1011=ME1314=
ME54=ME87=ME1110=ME1413=
ME56=ME89=ME1112=ME1415=
ME65=ME98=ME1211=ME1514=
2.60
2.60
Cv
Cm
COEFICIENTES DE GIRO
NUDO 1:
k12=
34576.61
K14=
0.00
34576.61
NUDO 2:
k21=
K25=
K23=
34576.61
0.00
23301.63
57878.24
u12=
u14=
u21=
u25=
u23=
#REF!
#REF!
#REF!
#REF!
-0.500
0.000
-0.299
0.000
-0.201
NUDO 6,9,12,15:
k63=
25961.54
K65=
23301.63
K69=
14673.91
63937.08
u63=
u65=
u69=
-0.203
-0.182
-0.115
NUDO 13:
k1310=
0.00
K1314= 34576.61
K1316=
0.00
34576.61
u1310=
u1314=
u1316=
0.000
-0.500
0.000
NUDO 3:
k32=
K36=
NUDO 4,7,10,13:
k41=
K45=
K47=
NUDO 5,8,11,14:
k54=
k52=
k56=
k58=
2.60
NUDO 14:
k1413=
k1411=
k1415=
k1417=
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
2.60
NUDO 15:
k1514= 23301.63
k1512= 25961.54
k1518= 25961.54
75224.71
u1514=
u1512=
u1518=
-0.155
-0.173
-0.173
COEFICIENTE DE
NIVEL 5,4,3,2,1:
k14=
K25=
K36=
2.60
MOMENTOS DE EMPOTRAMIENTO
ME12=
#REF!
ME23=
#REF!
ME21=
#REF!
ME32=
#REF!
ME45=ME78=ME1011=ME1314=
ME54=ME87=ME1110=ME1413=
ME56=ME89=ME1112=ME1415=
ME65=ME98=ME1211=ME1514=
2.60
2.60
Cv
Cm
COEFICIENTES DE GIRO
NUDO 1:
k12=
34576.61
K14=
0.00
34576.61
NUDO 2:
k21=
K25=
K23=
34576.61
0.00
23301.63
57878.24
NUDO 6,9,12,15:
k63=
25961.54
K65=
23301.63
K69=
14673.91
63937.08
u12=
u14=
u21=
u25=
u23=
#REF!
#REF!
#REF!
#REF!
-0.500
0.000
-0.299
0.000
-0.201
NUDO 3:
k32=
K36=
NUDO 4,7,10,13:
k41=
K45=
K47=
u63=
u65=
u69=
-0.203
-0.182
-0.115
NUDO 5,8,11,14:
k54=
k52=
k56=
k58=
u1310=
u1314=
u1316=
0.000
-0.500
0.000
NUDO 14:
k1413=
k1411=
2.60
NUDO 13:
k1310=
0.00
K1314= 34576.61
K1316=
0.00
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
34576.61
2.60
NUDO 15:
k1514= 23301.63
k1512= 25961.54
k1518= 25961.54
75224.71
k1415=
k1417=
u1514=
u1512=
u1518=
-0.155
-0.173
-0.173
COEFICIENTE DE
NIVEL 5,4,3,2,1:
k14=
K25=
K36=
2.60
MOMENTOS DE EMPOTRAMIENTO
ME12=
#REF!
ME23=
#REF!
ME21=
#REF!
ME32=
#REF!
ME45=ME78=ME1011=ME1314=
ME54=ME87=ME1110=ME1413=
ME56=ME89=ME1112=ME1415=
ME65=ME98=ME1211=ME1514=
2.60
2.60
Cv
Cm
COEFICIENTES DE GIRO
NUDO 1:
k12=
34576.61
K14=
0.00
34576.61
NUDO 2:
k21=
K25=
K23=
34576.61
0.00
23301.63
57878.24
NUDO 6,9,12,15:
k63=
25961.54
K65=
23301.63
K69=
14673.91
63937.08
u12=
u14=
#REF!
#REF!
#REF!
#REF!
-0.500
0.000
NUDO 3:
k32=
K36=
NUDO 4,7,10,13:
k41=
K45=
K47=
u21=
u25=
u23=
-0.299
0.000
-0.201
u63=
u65=
u69=
-0.203
-0.182
-0.115
NUDO 5,8,11,14:
k54=
k52=
k56=
k58=
u1310=
0.000
NUDO 14:
2.60
NUDO 13:
k1310=
0.00
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
K1314=
K1316=
2.60
34576.61
0.00
34576.61
NUDO 15:
k1514= 23301.63
k1512= 25961.54
k1518= 25961.54
75224.71
u1314=
u1316=
-0.500
0.000
u1514=
u1512=
u1518=
-0.155
-0.173
-0.173
k1413=
k1411=
k1415=
k1417=
COEFICIENTE DE
NIVEL 5,4,3,2,1:
k14=
K25=
K36=
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
MOMENTOS DE EMPOTRAMIENTO
ME12=
-9.43 tn.m
ME23=
ME21=
9.43 tn.m
ME32=
ME45=ME1011=
ME54=ME1110=
ME56=ME1112=
ME65=ME1211=
NUDO 3:
k32=
K36=
43402.78
11250.00
54652.78
NUDO 4,7,10,13:
k41=
0.00
K45=
43402.78
K47=
0.00
43402.78
NUDO 5,8,11,14:
k54=
43402.78
k52=
43572.15
k56=
43402.78
k58=
43572.15
173949.86
NUDO 14:
k1413=
k1411=
k1415=
k1417=
43402.78
43572.15
43402.78
20842.01
151219.72
u32=
u36=
u41=
u45=
u47=
u54=
u52=
u56=
u58=
u1413=
u1411=
u1415=
u1417=
-0.397
-0.103
Err:509
Err:509
Err:509
Err:509
COEFICIENTES DE GIRO
NUDO 1:
k12=
43402.78
K14=
0.00
43402.78
0.000
-0.500
0.000
NUDO 2:
k21=
K25=
K23=
-0.125
-0.125
-0.125
-0.125
NUDO 6,9,12,15:
k63=
23519.16
K65=
43402.78
K69=
11250.00
78171.94
-0.144
-0.144
-0.144
-0.069
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
k14=
0.00
u41=
#DIV/0!
K25=
0.00
u45=
#DIV/0!
NUDO 13:
k1310=
K1314=
K1316=
NUDO 15:
k1514=
k1512=
k1518=
43402.78
0.00
43402.78
86805.56
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
u12=
u14=
u21=
u25=
u23=
u63=
u65=
u69=
0.00
43402.78
0.00
43402.78
u1310=
u1314=
u1316=
43402.78
23519.16
15237.02
82158.96
u1514=
u1512=
u1518=
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
K36=
0.00
0.00
u47=
#DIV/0!
NUDO 3:
k32=
K36=
17864.58
20842.01
38706.60
NUDO 4,7,10,13:
k41=
43572.15
K45=
17864.58
K47=
43572.15
105008.89
NUDO 5,8,11,14:
k54=
17864.58
k52=
74332.17
k56=
17864.58
k58=
74332.17
184393.51
NUDO 14:
k1413=
k1411=
k1415=
k1417=
17864.58
74332.17
43402.78
35555.56
171155.09
Err:509
Err:509
Err:509
Err:509
COEFICIENTES DE GIRO
NUDO 1:
k12=
17864.58
K14=
43572.15
61436.74
u32=
u36=
-0.231
-0.269
u41=
u45=
u47=
-0.207
-0.085
-0.207
NUDO 2:
k21=
K25=
K23=
-0.048
-0.202
-0.048
-0.202
NUDO 6,9,12,15:
k63=
43572.15
K65=
17864.58
K69=
20842.01
82278.75
u54=
u52=
u56=
u58=
u1413=
u1411=
u1415=
u1417=
-0.052
-0.217
-0.127
-0.104
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
NUDO 13:
k1310=
K1314=
K1316=
NUDO 15:
k1514=
k1512=
k1518=
17864.58
43572.15
17864.58
79301.32
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
u12=
u14=
u21=
u25=
u23=
u63=
u65=
u69=
43572.15
17864.58
28228.46
89665.20
u1310=
u1314=
u1316=
17864.58
43572.15
28228.46
u1514=
u1512=
u1518=
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
k14=
K25=
K36=
43572.15
43572.15
43572.15
130716.46
u41=
u45=
u47=
-0.500
-0.500
-0.500
89665.20
NUDO 3:
k32=
K36=
23301.63
14673.91
37975.54
NUDO 4,7,10,13:
k41=
0.00
K45=
34576.61
K47=
0.00
34576.61
NUDO 5,8,11,14:
k54=
34576.61
k52=
25961.54
k56=
23301.63
k58=
25961.54
109801.32
NUDO 14:
k1413=
k1411=
k1415=
k1417=
34576.61
25961.54
56612.32
14673.91
131824.38
u32=
u36=
u41=
u45=
u47=
u54=
u52=
u56=
u58=
u1413=
u1411=
u1415=
u1417=
-0.307
-0.193
#VALUE!
#VALUE!
#REF!
#REF!
COEFICIENTES DE GIRO
NUDO 1:
k12=
34576.61
K14=
0.00
34576.61
0.000
-0.500
0.000
NUDO 2:
k21=
K25=
K23=
-0.157
-0.118
-0.106
-0.118
NUDO 6,9,12,15:
k63=
25961.54
K65=
23301.63
K69=
14673.91
63937.08
-0.131
-0.098
-0.215
-0.056
NUDO 13:
k1310=
K1314=
K1316=
NUDO 15:
k1514=
34576.61
0.00
23301.63
57878.24
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
u12=
u14=
u21=
u25=
u23=
u63=
u65=
u69=
0.00
34576.61
0.00
34576.61
u1310=
u1314=
u1316=
23301.63
u1514=
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
k14=
0.00
u41=
#DIV/0!
K25=
0.00
u45=
#DIV/0!
K36=
0.00
u47=
#DIV/0!
0.00
k1512=
k1518=
25961.54
25961.54
75224.71
u1512=
u1518=
NUDO 3:
k32=
K36=
23301.63
14673.91
37975.54
NUDO 4,7,10,13:
k41=
0.00
K45=
34576.61
K47=
0.00
34576.61
NUDO 5,8,11,14:
k54=
34576.61
k52=
25961.54
k56=
23301.63
k58=
25961.54
109801.32
NUDO 14:
k1413=
k1411=
k1415=
k1417=
34576.61
25961.54
56612.32
14673.91
u32=
u36=
u41=
u45=
u47=
u54=
u52=
u56=
u58=
u1413=
u1411=
u1415=
u1417=
-0.307
-0.193
#VALUE!
#VALUE!
#REF!
#REF!
COEFICIENTES DE GIRO
NUDO 1:
k12=
34576.61
K14=
0.00
34576.61
0.000
-0.500
0.000
NUDO 2:
k21=
K25=
K23=
-0.157
-0.118
-0.106
-0.118
NUDO 6,9,12,15:
k63=
25961.54
K65=
23301.63
K69=
14673.91
63937.08
-0.131
-0.098
-0.215
-0.056
NUDO 13:
k1310=
K1314=
K1316=
34576.61
0.00
23301.63
57878.24
0.00
34576.61
0.00
34576.61
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
u12=
u14=
u21=
u25=
u23=
u63=
u65=
u69=
u1310=
u1314=
u1316=
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
131824.38
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
k14=
0.00
u41=
#DIV/0!
K25=
0.00
u45=
#DIV/0!
K36=
0.00
u47=
#DIV/0!
0.00
NUDO 15:
k1514=
k1512=
k1518=
23301.63
25961.54
25961.54
75224.71
u1514=
u1512=
u1518=
NUDO 3:
k32=
K36=
23301.63
14673.91
37975.54
NUDO 4,7,10,13:
k41=
0.00
K45=
34576.61
K47=
0.00
34576.61
NUDO 5,8,11,14:
k54=
34576.61
k52=
25961.54
k56=
23301.63
k58=
25961.54
109801.32
NUDO 14:
k1413=
k1411=
34576.61
25961.54
u32=
u36=
u41=
u45=
u47=
u54=
u52=
u56=
u58=
u1413=
u1411=
-0.307
-0.193
#VALUE!
#VALUE!
#REF!
#REF!
COEFICIENTES DE GIRO
NUDO 1:
k12=
34576.61
K14=
0.00
34576.61
0.000
-0.500
0.000
NUDO 2:
k21=
K25=
K23=
-0.157
-0.118
-0.106
-0.118
NUDO 6,9,12,15:
k63=
25961.54
K65=
23301.63
K69=
14673.91
63937.08
-0.131
-0.098
NUDO 13:
k1310=
K1314=
K1316=
34576.61
0.00
23301.63
57878.24
0.00
34576.61
0.00
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
u12=
u14=
u21=
u25=
u23=
u63=
u65=
u69=
u1310=
u1314=
u1316=
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
k1415=
k1417=
56612.32
14673.91
131824.38
u1415=
u1417=
-0.215
-0.056
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
k14=
0.00
u41=
#DIV/0!
K25=
0.00
u45=
#DIV/0!
K36=
0.00
u47=
#DIV/0!
0.00
34576.61
NUDO 15:
k1514=
k1512=
k1518=
23301.63
25961.54
25961.54
75224.71
u1514=
u1512=
u1518=
NUDO 3:
k32=
K36=
23301.63
14673.91
37975.54
u32=
u36=
-0.307
-0.193
#VALUE!
#VALUE!
#REF!
#REF!
COEFICIENTES DE GIRO
NUDO 1:
k12=
34576.61
K14=
0.00
34576.61
NUDO 4,7,10,13:
k41=
0.00
K45=
34576.61
K47=
0.00
34576.61
u41=
u45=
u47=
0.000
-0.500
0.000
NUDO 2:
k21=
K25=
K23=
NUDO 5,8,11,14:
k54=
34576.61
k52=
25961.54
k56=
23301.63
k58=
25961.54
109801.32
u54=
u52=
u56=
u58=
-0.157
-0.118
-0.106
-0.118
NUDO 6,9,12,15:
k63=
25961.54
K65=
23301.63
K69=
14673.91
63937.08
NUDO 14:
34576.61
0.00
23301.63
57878.24
NUDO 13:
k1310=
0.00
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
u12=
u14=
u21=
u25=
u23=
u63=
u65=
u69=
u1310=
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
k1413=
k1411=
k1415=
k1417=
34576.61
25961.54
56612.32
14673.91
131824.38
u1413=
u1411=
u1415=
u1417=
-0.131
-0.098
-0.215
-0.056
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
k14=
0.00
u41=
#DIV/0!
K25=
0.00
u45=
#DIV/0!
K36=
0.00
u47=
#DIV/0!
0.00
K1314=
K1316=
NUDO 15:
k1514=
k1512=
k1518=
34576.61
0.00
34576.61
u1314=
u1316=
23301.63
25961.54
25961.54
75224.71
u1514=
u1512=
u1518=
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
A ALTERNANCIA)
METODO DE KANI (
TRUCTURALES
INERCIA DE ELEMENTOS
VIGAS:
COLUMNAS 1:
COLUMNAS 2:
COLUMNAS 3:
Cv
Cm
MOMENTOS DE EMPOTR
ME12=
-8.04 tn.m
ME21=
8.04 tn.m
-8.04 tn.m
8.04 tn.m
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
-0.500
0.000
-0.250
0.000
-0.250
-0.150
-0.278
-0.072
0.000
-0.500
0.000
-0.264
-0.143
-0.093
Err:509
Err:509
Err:509
Err:509
ME45=ME1011=
ME54=ME1110=
ME56=ME1112=
ME65=ME1211=
NUDO 3:
k32=
K36=
43402.78
11250.00
54652.78
NUDO 4,7,10,13:
k41=
0.00
K45=
43402.78
K47=
0.00
43402.78
NUDO 5,8,11,14:
k54=
43402.78
k52=
43572.15
k56=
43402.78
k58=
43572.15
173949.86
NUDO 14:
k1413=
k1411=
k1415=
k1417=
43402.78
43572.15
43402.78
20842.01
151219.72
u32=
u36=
u41=
u45=
u47=
u54=
u52=
u56=
u58=
u1413=
u1411=
u1415=
u1417=
-0.397
-0.103
Err:509
Err:509
Err:509
Err:509
COEFICIENTES DE GIRO
NUDO 1:
k12=
43402.78
K14=
0.00
43402.78
0.000
-0.500
0.000
NUDO 2:
k21=
K25=
K23=
-0.125
-0.125
-0.125
-0.125
NUDO 6,9,12,15:
k63=
23519.16
K65=
43402.78
K69=
11250.00
78171.94
-0.144
-0.144
-0.144
-0.069
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
k14=
0.00
u41=
#DIV/0!
K25=
0.00
u45=
#DIV/0!
43402.78
0.00
43402.78
86805.56
NUDO 13:
k1310=
0.00
K1314= 43402.78
K1316=
0.00
43402.78
NUDO 15:
k1514= 43402.78
k1512= 23519.16
k1518= 15237.02
82158.96
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
K36=
0.00
0.00
u47=
#DIV/0!
A ALTERNANCIA)
METODO DE KANI (
TRUCTURALES
INERCIA DE ELEMENTOS
VIGAS:
COLUMNAS 1:
COLUMNAS 2:
COLUMNAS 3:
Cv
Cm
MOMENTOS DE EMPOTR
ME12= -10.95 tn.m
ME21=
10.95 tn.m
-8.04 tn.m
8.04 tn.m
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
-0.145
-0.355
-0.113
-0.275
-0.113
-0.265
-0.109
-0.127
-0.243
-0.100
-0.157
-0.100
-0.243
-0.157
Err:509
Err:509
Err:509
Err:509
ME45=ME1011=
ME54=ME1110=
ME56=ME1112=
ME65=ME1211=
NUDO 3:
k32=
K36=
17864.58
20842.01
38706.60
NUDO 4,7,10,13:
k41=
43572.15
K45=
17864.58
K47=
43572.15
105008.89
NUDO 5,8,11,14:
k54=
17864.58
k52=
74332.17
k56=
17864.58
k58=
74332.17
184393.51
NUDO 14:
k1413=
k1411=
k1415=
k1417=
17864.58
74332.17
43402.78
35555.56
171155.09
Err:509
Err:509
Err:509
Err:509
COEFICIENTES DE GIRO
NUDO 1:
k12=
17864.58
K14=
43572.15
61436.74
u32=
u36=
-0.231
-0.269
u41=
u45=
u47=
-0.207
-0.085
-0.207
NUDO 2:
k21=
K25=
K23=
-0.048
-0.202
-0.048
-0.202
NUDO 6,9,12,15:
k63=
43572.15
K65=
17864.58
K69=
20842.01
82278.75
u54=
u52=
u56=
u58=
u1413=
u1411=
u1415=
u1417=
-0.052
-0.217
-0.127
-0.104
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
17864.58
43572.15
17864.58
79301.32
NUDO 13:
k1310= 43572.15
K1314= 17864.58
K1316= 28228.46
89665.20
NUDO 15:
k1514= 17864.58
k1512= 43572.15
k1518= 28228.46
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
k14=
K25=
K36=
43572.15
43572.15
43572.15
130716.46
u41=
u45=
u47=
-0.500
-0.500
-0.500
89665.20
A ALTERNANCIA)
METODO DE KANI (
TRUCTURALES
INERCIA DE ELEMENTOS
VIGAS:
COLUMNAS 1:
COLUMNAS 2:
COLUMNAS 3:
Cv
Cm
MOMENTOS DE EMPOTR
ME12=
#VALUE!
ME21=
#VALUE!
#VALUE!
#VALUE!
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
-0.500
0.000
-0.299
0.000
-0.201
-0.203
-0.182
-0.115
0.000
-0.500
0.000
#VALUE!
#VALUE!
#VALUE!
#VALUE!
ME45=ME1011=
ME54=ME1110=
ME56=ME1112=
ME65=ME1211=
NUDO 3:
k32=
K36=
23301.63
14673.91
37975.54
NUDO 4,7,10,13:
k41=
0.00
K45=
34576.61
K47=
0.00
34576.61
NUDO 5,8,11,14:
k54=
34576.61
k52=
25961.54
k56=
23301.63
k58=
25961.54
109801.32
NUDO 14:
k1413=
k1411=
k1415=
k1417=
34576.61
25961.54
56612.32
14673.91
131824.38
u32=
u36=
u41=
u45=
u47=
u54=
u52=
u56=
u58=
u1413=
u1411=
u1415=
u1417=
-0.307
-0.193
#VALUE!
#VALUE!
#VALUE!
#VALUE!
COEFICIENTES DE GIRO
NUDO 1:
k12=
34576.61
K14=
0.00
34576.61
0.000
-0.500
0.000
NUDO 2:
k21=
K25=
K23=
-0.157
-0.118
-0.106
-0.118
NUDO 6,9,12,15:
k63=
25961.54
K65=
23301.63
K69=
14673.91
63937.08
-0.131
-0.098
-0.215
-0.056
-0.155
34576.61
0.00
23301.63
57878.24
NUDO 13:
k1310=
0.00
K1314= 34576.61
K1316=
0.00
34576.61
NUDO 15:
k1514= 23301.63
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
-0.173
-0.173
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
k14=
0.00
u41=
#DIV/0!
K25=
0.00
u45=
#DIV/0!
K36=
0.00
u47=
#DIV/0!
0.00
k1512=
k1518=
25961.54
25961.54
75224.71
A ALTERNANCIA)
METODO DE KANI (
TRUCTURALES
INERCIA DE ELEMENTOS
VIGAS:
COLUMNAS 1:
COLUMNAS 2:
COLUMNAS 3:
Cv
Cm
MOMENTOS DE EMPOTR
ME12=
#VALUE!
ME21=
#VALUE!
#VALUE!
#VALUE!
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
-0.500
0.000
-0.299
0.000
-0.201
-0.203
-0.182
-0.115
0.000
-0.500
0.000
#VALUE!
#VALUE!
#VALUE!
#VALUE!
ME45=ME1011=
ME54=ME1110=
ME56=ME1112=
ME65=ME1211=
NUDO 3:
k32=
K36=
23301.63
14673.91
37975.54
NUDO 4,7,10,13:
k41=
0.00
K45=
34576.61
K47=
0.00
34576.61
NUDO 5,8,11,14:
k54=
34576.61
k52=
25961.54
k56=
23301.63
k58=
25961.54
109801.32
NUDO 14:
k1413=
k1411=
k1415=
k1417=
34576.61
25961.54
56612.32
14673.91
u32=
u36=
u41=
u45=
u47=
u54=
u52=
u56=
u58=
u1413=
u1411=
u1415=
u1417=
-0.307
-0.193
#VALUE!
#VALUE!
#VALUE!
#VALUE!
COEFICIENTES DE GIRO
NUDO 1:
k12=
34576.61
K14=
0.00
34576.61
0.000
-0.500
0.000
NUDO 2:
k21=
K25=
K23=
-0.157
-0.118
-0.106
-0.118
NUDO 6,9,12,15:
k63=
25961.54
K65=
23301.63
K69=
14673.91
63937.08
-0.131
-0.098
-0.215
-0.056
34576.61
0.00
23301.63
57878.24
NUDO 13:
k1310=
0.00
K1314= 34576.61
K1316=
0.00
34576.61
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
131824.38
-0.155
-0.173
-0.173
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
k14=
0.00
u41=
#DIV/0!
K25=
0.00
u45=
#DIV/0!
K36=
0.00
u47=
#DIV/0!
0.00
NUDO 15:
k1514= 23301.63
k1512= 25961.54
k1518= 25961.54
75224.71
A ALTERNANCIA)
METODO DE KANI (
TRUCTURALES
INERCIA DE ELEMENTOS
VIGAS:
COLUMNAS 1:
COLUMNAS 2:
COLUMNAS 3:
Cv
Cm
MOMENTOS DE EMPOTR
ME12=
#VALUE!
ME21=
#VALUE!
#VALUE!
#VALUE!
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
-0.500
0.000
-0.299
0.000
-0.201
-0.203
-0.182
-0.115
0.000
-0.500
0.000
#VALUE!
#VALUE!
#VALUE!
#VALUE!
ME45=ME1011=
ME54=ME1110=
ME56=ME1112=
ME65=ME1211=
NUDO 3:
k32=
K36=
23301.63
14673.91
37975.54
NUDO 4,7,10,13:
k41=
0.00
K45=
34576.61
K47=
0.00
34576.61
NUDO 5,8,11,14:
k54=
34576.61
k52=
25961.54
k56=
23301.63
k58=
25961.54
109801.32
NUDO 14:
k1413= 34576.61
k1411= 25961.54
u32=
u36=
u41=
u45=
u47=
u54=
u52=
u56=
u58=
u1413=
u1411=
-0.307
-0.193
#VALUE!
#VALUE!
#VALUE!
#VALUE!
COEFICIENTES DE GIRO
NUDO 1:
k12=
34576.61
K14=
0.00
34576.61
0.000
-0.500
0.000
NUDO 2:
k21=
K25=
K23=
-0.157
-0.118
-0.106
-0.118
NUDO 6,9,12,15:
k63=
25961.54
K65=
23301.63
K69=
14673.91
63937.08
-0.131
-0.098
NUDO 13:
k1310=
0.00
K1314= 34576.61
K1316=
0.00
34576.61
0.00
23301.63
57878.24
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
k1415=
k1417=
-0.155
-0.173
-0.173
56612.32
14673.91
131824.38
u1415=
u1417=
-0.215
-0.056
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
k14=
0.00
u41=
#DIV/0!
K25=
0.00
u45=
#DIV/0!
K36=
0.00
u47=
#DIV/0!
0.00
34576.61
NUDO 15:
k1514= 23301.63
k1512= 25961.54
k1518= 25961.54
75224.71
A ALTERNANCIA)
METODO DE KANI (
TRUCTURALES
INERCIA DE ELEMENTOS
VIGAS:
COLUMNAS 1:
COLUMNAS 2:
COLUMNAS 3:
Cv
Cm
MOMENTOS DE EMPOTR
ME12=
#VALUE!
ME21=
#VALUE!
#VALUE!
#VALUE!
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
-0.500
0.000
-0.299
0.000
-0.201
-0.203
-0.182
-0.115
0.000
#VALUE!
#VALUE!
#VALUE!
#VALUE!
ME45=ME1011=
ME54=ME1110=
ME56=ME1112=
ME65=ME1211=
NUDO 3:
k32=
K36=
23301.63
14673.91
37975.54
u32=
u36=
-0.307
-0.193
#VALUE!
#VALUE!
#VALUE!
#VALUE!
COEFICIENTES DE GIRO
NUDO 1:
k12=
34576.61
K14=
0.00
34576.61
NUDO 4,7,10,13:
k41=
0.00
K45=
34576.61
K47=
0.00
34576.61
u41=
u45=
u47=
0.000
-0.500
0.000
NUDO 2:
k21=
K25=
K23=
NUDO 5,8,11,14:
k54=
34576.61
k52=
25961.54
k56=
23301.63
k58=
25961.54
109801.32
u54=
u52=
u56=
u58=
-0.157
-0.118
-0.106
-0.118
NUDO 6,9,12,15:
k63=
25961.54
K65=
23301.63
K69=
14673.91
63937.08
NUDO 14:
NUDO 13:
k1310=
34576.61
0.00
23301.63
57878.24
0.00
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
-0.500
0.000
-0.155
-0.173
-0.173
k1413=
k1411=
k1415=
k1417=
34576.61
25961.54
56612.32
14673.91
131824.38
u1413=
u1411=
u1415=
u1417=
-0.131
-0.098
-0.215
-0.056
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
k14=
0.00
u41=
#DIV/0!
K25=
0.00
u45=
#DIV/0!
K36=
0.00
u47=
#DIV/0!
0.00
K1314=
K1316=
34576.61
0.00
34576.61
NUDO 15:
k1514= 23301.63
k1512= 25961.54
k1518= 25961.54
75224.71
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
ENTOS DE EMPOTRAMIENTO
-8.04 tn.m
ME23=
8.04 tn.m
ME32=
Err:509
Err:509
Err:509
Err:509
Cv
Cm
-9.43 tn.m
9.43 tn.m
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
Err:509
Err:509
Err:509
Err:509
CIENTES DE GIRO
43402.78
0.00
43402.78
43402.78
0.00
43402.78
86805.56
DO 6,9,12,15:
23519.16
43402.78
11250.00
78171.94
u12=
u14=
u21=
u25=
u23=
-0.500
0.000
-0.250
0.000
-0.250
u63=
u65=
u69=
-0.150
-0.278
-0.072
0.00
43402.78
0.00
43402.78
u1310=
u1314=
u1316=
0.000
-0.500
0.000
43402.78
23519.16
15237.02
82158.96
u1514=
u1512=
u1518=
-0.264
-0.143
-0.093
NUDO 3:
k32=
K36=
u32=
u36=
-0.397
-0.103
NUDO 4,7,10,13:
k41=
0.00
K45=
43402.78
K47=
0.00
43402.78
u41=
u45=
u47=
0.000
-0.500
0.000
NUDO 5,8,11,14:
k54=
43402.78
k52=
43572.15
k56=
43402.78
k58=
43572.15
173949.86
u54=
u52=
u56=
u58=
-0.125
-0.125
-0.125
-0.125
u1413=
u1411=
u1415=
u1417=
-0.144
-0.144
-0.144
-0.069
NUDO 14:
k1413=
k1411=
k1415=
k1417=
43402.78
11250.00
54652.78
43402.78
43572.15
43402.78
20842.01
151219.72
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
k14=
0.00
u41=
#DIV/0!
K25=
0.00
u45=
#DIV/0!
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
K36=
0.00
0.00
u47=
#DIV/0!
17864.58
20842.01
38706.60
u32=
u36=
-0.231
-0.269
NUDO 4,7,10,13:
k41=
43572.15
K45=
17864.58
K47=
43572.15
105008.89
u41=
u45=
u47=
-0.207
-0.085
-0.207
NUDO 5,8,11,14:
k54=
17864.58
k52=
74332.17
k56=
17864.58
k58=
74332.17
184393.51
u54=
u52=
u56=
u58=
-0.048
-0.202
-0.048
-0.202
u1413=
u1411=
u1415=
u1417=
-0.052
-0.217
-0.127
-0.104
ENTOS DE EMPOTRAMIENTO
-10.95 tn.m
ME23=
10.95 tn.m
ME32=
Err:509
Err:509
Err:509
Err:509
Cv
Cm
-9.43 tn.m
9.43 tn.m
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
Err:509
Err:509
Err:509
Err:509
CIENTES DE GIRO
17864.58
43572.15
61436.74
u12=
u14=
-0.145
-0.355
17864.58
43572.15
17864.58
79301.32
u21=
u25=
u23=
-0.113
-0.275
-0.113
DO 6,9,12,15:
43572.15
17864.58
20842.01
82278.75
u63=
u65=
u69=
-0.265
-0.109
-0.127
43572.15
17864.58
28228.46
89665.20
u1310=
u1314=
u1316=
-0.243
-0.100
-0.157
17864.58
43572.15
28228.46
u1514=
u1512=
u1518=
-0.100
-0.243
-0.157
NUDO 3:
k32=
K36=
NUDO 14:
k1413=
k1411=
k1415=
k1417=
17864.58
74332.17
43402.78
35555.56
171155.09
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
89665.20
k14=
K25=
K36=
43572.15
43572.15
43572.15
130716.46
u41=
u45=
u47=
-0.500
-0.500
-0.500
23301.63
14673.91
37975.54
u32=
u36=
-0.307
-0.193
NUDO 4,7,10,13:
k41=
0.00
K45=
34576.61
K47=
0.00
34576.61
u41=
u45=
u47=
0.000
-0.500
0.000
NUDO 5,8,11,14:
k54=
34576.61
k52=
25961.54
k56=
23301.63
k58=
25961.54
109801.32
u54=
u52=
u56=
u58=
-0.157
-0.118
-0.106
-0.118
u1413=
u1411=
u1415=
u1417=
-0.131
-0.098
-0.215
-0.056
ENTOS DE EMPOTRAMIENTO
#VALUE!
ME23=
#VALUE!
ME32=
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Cv
Cm
#REF!
#REF!
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
#VALUE!
#VALUE!
#VALUE!
#VALUE!
CIENTES DE GIRO
34576.61
0.00
34576.61
34576.61
0.00
23301.63
57878.24
DO 6,9,12,15:
25961.54
23301.63
14673.91
63937.08
u12=
u14=
u21=
u25=
u23=
-0.500
0.000
-0.299
0.000
-0.201
u63=
u65=
u69=
-0.203
-0.182
-0.115
0.00
34576.61
0.00
34576.61
u1310=
u1314=
u1316=
0.000
-0.500
0.000
23301.63
u1514=
-0.155
NUDO 3:
k32=
K36=
NUDO 14:
k1413=
k1411=
k1415=
k1417=
34576.61
25961.54
56612.32
14673.91
131824.38
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
25961.54
25961.54
75224.71
u1512=
u1518=
-0.173
-0.173
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
k14=
0.00
u41=
#DIV/0!
K25=
0.00
u45=
#DIV/0!
K36=
0.00
u47=
#DIV/0!
0.00
ENTOS DE EMPOTRAMIENTO
#VALUE!
ME23=
#VALUE!
ME32=
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Cv
Cm
#REF!
#REF!
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
#VALUE!
#VALUE!
#VALUE!
#VALUE!
CIENTES DE GIRO
34576.61
0.00
34576.61
34576.61
0.00
23301.63
57878.24
DO 6,9,12,15:
25961.54
23301.63
14673.91
63937.08
0.00
34576.61
0.00
34576.61
u12=
u14=
u21=
u25=
u23=
-0.500
0.000
-0.299
0.000
-0.201
u63=
u65=
u69=
-0.203
-0.182
-0.115
u1310=
u1314=
u1316=
0.000
-0.500
0.000
NUDO 3:
k32=
K36=
u32=
u36=
-0.307
-0.193
NUDO 4,7,10,13:
k41=
0.00
K45=
34576.61
K47=
0.00
34576.61
u41=
u45=
u47=
0.000
-0.500
0.000
NUDO 5,8,11,14:
k54=
34576.61
k52=
25961.54
k56=
23301.63
k58=
25961.54
109801.32
u54=
u52=
u56=
u58=
-0.157
-0.118
-0.106
-0.118
u1413=
u1411=
u1415=
u1417=
-0.131
-0.098
-0.215
-0.056
NUDO 14:
k1413=
k1411=
k1415=
k1417=
23301.63
14673.91
37975.54
34576.61
25961.54
56612.32
14673.91
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
131824.38
23301.63
25961.54
25961.54
75224.71
u1514=
u1512=
u1518=
-0.155
-0.173
-0.173
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
k14=
0.00
u41=
#DIV/0!
K25=
0.00
u45=
#DIV/0!
K36=
0.00
u47=
#DIV/0!
0.00
ENTOS DE EMPOTRAMIENTO
#VALUE!
ME23=
#VALUE!
ME32=
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Cv
Cm
#REF!
#REF!
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
#VALUE!
#VALUE!
#VALUE!
#VALUE!
CIENTES DE GIRO
34576.61
0.00
34576.61
34576.61
0.00
23301.63
57878.24
DO 6,9,12,15:
25961.54
23301.63
14673.91
63937.08
0.00
34576.61
0.00
u12=
u14=
u21=
u25=
u23=
-0.500
0.000
-0.299
0.000
-0.201
u63=
u65=
u69=
-0.203
-0.182
-0.115
u1310=
u1314=
u1316=
0.000
-0.500
0.000
NUDO 3:
k32=
K36=
23301.63
14673.91
37975.54
u32=
u36=
-0.307
-0.193
NUDO 4,7,10,13:
k41=
0.00
K45=
34576.61
K47=
0.00
34576.61
u41=
u45=
u47=
0.000
-0.500
0.000
NUDO 5,8,11,14:
k54=
34576.61
k52=
25961.54
k56=
23301.63
k58=
25961.54
109801.32
u54=
u52=
u56=
u58=
-0.157
-0.118
-0.106
-0.118
u1413=
u1411=
-0.131
-0.098
NUDO 14:
k1413= 34576.61
k1411= 25961.54
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
34576.61
23301.63
25961.54
25961.54
75224.71
k1415=
k1417=
u1514=
u1512=
u1518=
-0.155
-0.173
-0.173
56612.32
14673.91
131824.38
u1415=
u1417=
-0.215
-0.056
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
k14=
0.00
u41=
#DIV/0!
K25=
0.00
u45=
#DIV/0!
K36=
0.00
u47=
#DIV/0!
0.00
ENTOS DE EMPOTRAMIENTO
#VALUE!
ME23=
#VALUE!
ME32=
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Cv
Cm
#REF!
#REF!
ME78=ME1314=
ME87=ME1413=
ME89=ME1415=
ME98=ME1514=
#VALUE!
#VALUE!
#VALUE!
#VALUE!
CIENTES DE GIRO
34576.61
0.00
34576.61
34576.61
0.00
23301.63
57878.24
DO 6,9,12,15:
25961.54
23301.63
14673.91
63937.08
0.00
u12=
u14=
-0.500
0.000
u21=
u25=
u23=
-0.299
0.000
-0.201
u63=
u65=
u69=
-0.203
-0.182
-0.115
u1310=
0.000
NUDO 3:
k32=
K36=
23301.63
14673.91
37975.54
u32=
u36=
-0.307
-0.193
NUDO 4,7,10,13:
k41=
0.00
K45=
34576.61
K47=
0.00
34576.61
u41=
u45=
u47=
0.000
-0.500
0.000
NUDO 5,8,11,14:
k54=
34576.61
k52=
25961.54
k56=
23301.63
k58=
25961.54
109801.32
u54=
u52=
u56=
u58=
-0.157
-0.118
-0.106
-0.118
NUDO 14:
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
34576.61
0.00
34576.61
u1314=
u1316=
-0.500
0.000
23301.63
25961.54
25961.54
75224.71
u1514=
u1512=
u1518=
-0.155
-0.173
-0.173
k1413=
k1411=
k1415=
k1417=
34576.61
25961.54
56612.32
14673.91
131824.38
u1413=
u1411=
u1415=
u1417=
-0.131
-0.098
-0.215
-0.056
COEFICIENTE DE DESPLAZAMIENTO
NIVEL 5,4,3,2,1:
k14=
0.00
u41=
#DIV/0!
K25=
0.00
u45=
#DIV/0!
K36=
0.00
u47=
#DIV/0!
0.00
0.000
0.000
0.000
10
0.000
13
-9.430
-0.500
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
0.000
Err:509
-0.500
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
0.000
Err:509
-0.500
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-9.430
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
0.000
Err:509
-0.500
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
0.000
0.000
-12.455
-0.500
0.000
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-12.455
6.227
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
12.455
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.000
16
9.430
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
5
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
11
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
14
#DIV/0!
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
3
-0.250
-9.430
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
-0.125
-0.125
Err:509
-0.125
-0.125
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
-0.144
-0.144
1.687
-0.144
-0.069
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
17
9.430
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
6
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
12
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
15
-10.768
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
10.768
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
#DIV/0!
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
9.430
-0.103
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-0.150
-0.278
Err:509
-0.072
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-0.150
-0.278
Err:509
-0.072
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.000
0.000
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-0.150
-0.278
Err:509
-0.072
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-0.143
-0.264
10.768
-0.093
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.000
10
0.000
13
#DIV/0!
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-9.430
-0.500
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
0.000
Err:509
-0.500
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
0.000
Err:509
-0.500
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-9.430
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
0.000
Err:509
-0.500
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
0.000
0.000
-12.455
-0.500
0.000
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-12.455
6.227
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
12.455
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.000
16
MOMENTOS
-0.397
18
CARGAS ULTIMAS
0.000
-0.250
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
-0.125
-0.125
Err:509
-0.125
-0.125
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
-0.125
-0.125
Err:509
-0.125
-0.125
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
9.430
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
5
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
11
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
14
#DIV/0!
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
-0.125
-0.125
Err:509
-0.125
-0.125
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
-0.144
-0.144
Err:509
-0.144
-0.069
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
8.043
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
6
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
12
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
#DIV/0!
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
M-
M+
M-
M-
M+
M-
3.143
1
Err:509
Err:509
Err:509
Err:509
2
Err:509
Err:509
Err:509
Err:509
3
Err:509
3.143
1
2
2.681
0.000
Err:509
Err:509
4
Err:509
Err:509
Err:509
Err:509
5
Err:509
Err:509
Err:509
Err:509
6
Err:509
Err:509
Err:509
0.000
Err:509
Err:509
7
Err:509
Err:509
Err:509
Err:509
8
Err:509
Err:509
Err:509
Err:509
9
Err:509
Err:509
Err:509
0.000
10
Err:509
11
Err:509
12
10
Err:509
Err:509
Err:509
Err:509
11
Err:509
Err:509
Err:509
Err:509
12
Err:509
10
Err:509
11
Err:509
12
0.000
13
Err:509
14
Err:509
15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
14
Err:509
15
0.000
17
6.000
18
15
Err:509
Err:509
18
13
6.000
14
Err:509
Err:509
17
Err:509
16
13
Err:509
Err:509
16
16
6.000
17
6.000
18
0.000
M-
M+
M-
M-
M+
M-
1
Err:509
Err:509
Err:509
Err:509
2
Err:509
Err:509
Err:509
Err:509
3
Err:509
4
Err:509
Err:509
Err:509
Err:509
5
Err:509
Err:509
Err:509
Err:509
6
Err:509
7
Err:509
Err:509
Err:509
Err:509
8
Err:509
Err:509
Err:509
Err:509
9
Err:509
10
Err:509
Err:509
Err:509
Err:509
11
Err:509
Err:509
Err:509
Err:509
12
Err:509
13
Err:509
Err:509
Err:509
Err:509
14
Err:509
Err:509
Err:509
Err:509
15
Err:509
18
8.043
-0.103
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
-0.150
-0.278
Err:509
-0.072
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
-0.150
-0.278
Err:509
-0.072
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-0.397
0.000
0.000
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
-0.150
-0.278
Err:509
-0.072
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
-0.143
-0.264
Err:509
-0.093
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
18
0.000
10
0.000
13
#DIV/0!
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-8.043
-0.500
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
0.000
Err:509
-0.500
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
0.000
Err:509
-0.500
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-8.043
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
8.043
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
0.000
Err:509
-0.500
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
0.000
Err:509
-0.500
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.000
16
MOMENTOS
17
-8.043
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
17
3.143
MOMENTOS FINALES
1.387
-0.250
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
-0.125
-0.125
Err:509
-0.125
-0.125
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
-0.125
-0.125
Err:509
-0.125
-0.125
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
CARGAS ULTIMAS
16
3
-0.250
11
14
#DIV/0!
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
3
-0.250
-1.387
-0.250
0.000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-0.125
-0.125
Err:509
-0.125
-0.125
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-0.125
-0.125
Err:509
-0.125
-0.125
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-9.430
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
9.430
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-0.125
-0.125
Err:509
-0.125
-0.125
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-0.144
-0.144
Err:509
-0.144
-0.069
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-12.455
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
12.455
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
17
12
15
#DIV/0!
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-0.397
9.430
-0.103
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-0.150
-0.278
Err:509
-0.072
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-0.150
-0.278
Err:509
-0.072
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-0.150
-0.278
Err:509
-0.072
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 #DIV/0!
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-0.143
-0.264
12.455
-0.093
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
18
CARGAS ULTIMAS
#DIV/0!
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
MOMENTOS
M-
M+
M-
M-
M+
M-
1
Err:509
Err:509
Err:509
Err:509
2
Err:509
Err:509
Err:509
Err:509
3
Err:509
2.681
1
2
3.143
0.000
4
Err:509
Err:509
Err:509
Err:509
5
Err:509
Err:509
Err:509
Err:509
6
Err:509
Err:509
Err:509
0.000
7
Err:509
Err:509
Err:509
Err:509
8
Err:509
Err:509
Err:509
Err:509
9
Err:509
Err:509
Err:509
0.000
10
Err:509
Err:509
Err:509
Err:509
11
Err:509
Err:509
Err:509
Err:509
12
Err:509
10
Err:509
11
Err:509
12
0.000
13
Err:509
Err:509
16
Err:509
Err:509
Err:509
14
Err:509
Err:509
17
Err:509
Err:509
Err:509
15
Err:509
Err:509
18
13
Err:509
14
Err:509
15
0.000
16
6.000
17
6.000
18
0.000
M-
M+
M-
M-
M+
M-
1
Err:509
Err:509
Err:509
Err:509
2
Err:509
Err:509
Err:509
Err:509
3
Err:509
4
Err:509
Err:509
Err:509
Err:509
5
Err:509
Err:509
Err:509
Err:509
6
Err:509
7
Err:509
Err:509
Err:509
Err:509
8
Err:509
Err:509
Err:509
Err:509
9
Err:509
10
Err:509
Err:509
Err:509
Err:509
11
Err:509
Err:509
Err:509
Err:509
12
Err:509
13
Err:509
Err:509
16
Err:509
Err:509
Err:509
14
Err:509
Err:509
17
Err:509
Err:509
Err:509
15
Err:509
Err:509
18
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
PROYECTO VIVIENDA MULTIFAMILIAR - 5 PISOS
MOMENTOS VIGAS - PORTICOS X-X
ENVOLVENTE
PRIMER PISO
SEGUNDO PISO
VIGAS
TRCER PISO
CUARTO PISO
QUINTO PISO
Izquierda
Derecha
M Max. Posiitivo
Viga A-B
6.950 Tn-m
14.800 Tn-m
10.060 Tn-m
Viga B -C
14.800 Tn-m
6.950 Tn-m
10.060 Tn-m
Viga A-B
9.080 Tn-m
13.440 Tn-m
9.750 Tn-m
Viga B-C
13.440 Tn-m
9.080 Tn-m
9.750 Tn-m
Viga A-B
9.280 Tn-m
13.010 Tn-m
9.850 Tn-m
Viga B-C
13.010 Tn-m
9.280 Tn-m
9.850 Tn-m
Viga A-B
9.800 Tn-m
12.550 Tn-m
9.890 Tn-m
Viga B-C
12.550 Tn-m
9.800 Tn-m
9.890 Tn-m
Viga A-B
5.250 Tn-m
11.120 Tn-m
9.230 Tn-m
Viga B-C
11.120 Tn-m
5.250 Tn-m
9.230 Tn-m
ENVOLVENTE
PRIMER PISO
SEGUNDO PISO
VIGAS
TERCER PISO
CUARTO PISO
QUINTO PISO
M Max. Posiitivo
Izquierda
Derecha
Viga A-B
Viga B -C
9.970 Tn-m
22.050 Tn-m
22.050 Tn-m
9.970 Tn-m
14.150 Tn-m
14.150 Tn-m
Viga A-B
12.860 Tn-m
20.470 Tn-m
13.670 Tn-m
Viga B -C
20.470 Tn-m
12.860 Tn-m
13.670 Tn-m
Viga A-B
12.890 Tn-m
20.180 Tn-m
13.770 Tn-m
Viga B -C
20.180 Tn-m
12.890 Tn-m
13.770 Tn-m
Viga A-B
13.410 Tn-m
19.760 Tn-m
13.770 Tn-m
Viga B -C
19.760 Tn-m
13.410 Tn-m
13.770 Tn-m
Viga A-B
6.970 Tn-m
16.770 Tn-m
12.370 Tn-m
Viga B -C
16.770 Tn-m
6.970 Tn-m
12.370 Tn-m
ENVOLVENTE
PRIMER PISO
SEGUNDO PISO
VIGAS
TERCER PISO
CUARTO PISO
QUINTO PISO
M Max. Posiitivo
Izquierda
Derecha
Viga A-B
8.760 Tn-m
19.360 Tn-m
12.400 Tn-m
Viga B -C
19.360 Tn-m
8.760 Tn-m
12.400 Tn-m
Viga A-B
11.290 Tn-m
17.986 Tn-m
11.960 Tn-m
Viga B -C
17.986 Tn-m
11.290 Tn-m
11.960 Tn-m
Viga A-B
11.320 Tn-m
17.730 Tn-m
12.060 Tn-m
Viga B -C
17.730 Tn-m
11.320 Tn-m
12.060 Tn-m
Viga A-B
11.760 Tn-m
17.370 Tn-m
12.070 Tn-m
Viga B -C
17.370 Tn-m
11.760 Tn-m
12.070 Tn-m
Viga A-B
6.080 Tn-m
14.560 Tn-m
10.730 Tn-m
Viga B -C
14.560 Tn-m
6.080 Tn-m
10.730 Tn-m
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
ENVOLVENTE
PRIMER PISO
SEGUNDO PISO
VIGAS
TERCER PISO
CUARTO PISO
QUINTO PISO
Izquierda
Derecha
M Max. Posiitivo
Viga A-B
7.180 Tn-m
15.880 Tn-m
10.150 Tn-m
Viga B -C
15.880 Tn-m
7.180 Tn-m
10.150 Tn-m
Viga A-B
9.250 Tn-m
14.730 Tn-m
9.770 Tn-m
Viga B -C
14.730 Tn-m
9.250 Tn-m
9.770 Tn-m
Viga A-B
9.270 Tn-m
14.520 Tn-m
9.840 Tn-m
Viga B -C
14.520 Tn-m
9.270 Tn-m
9.840 Tn-m
Viga A-B
9.630 Tn-m
14.230 Tn-m
9.850 Tn-m
Viga B -C
14.230 Tn-m
9.630 Tn-m
9.850 Tn-m
Viga A-B
4.980 Tn-m
11.890 Tn-m
8.740 Tn-m
Viga B -C
11.890 Tn-m
4.870 Tn-m
8.740 Tn-m
ENVOLVENTE
PRIMER PISO
SEGUNDO PISO
VIGAS
TERCER PISO
CUARTO PISO
QUINTO PISO
M Max. Posiitivo
Izquierda
Derecha
Viga A-B
7.850 Tn-m
17.400 Tn-m
11.150 Tn-m
Viga B -C
Viga A-B
Viga B -C
17.400 Tn-m
10.140 Tn-m
16.130 Tn-m
7.850 Tn-m
16.130 Tn-m
10.140 Tn-m
11.150 Tn-m
10.730 Tn-m
10.730 Tn-m
Viga A-B
10.160 Tn-m
15.900 Tn-m
10.810 Tn-m
Viga B -C
15.900 Tn-m
10.160 Tn-m
10.810 Tn-m
Viga A-B
10.570 Tn-m
15.570 Tn-m
10.810 Tn-m
Viga B -C
15.570 Tn-m
10.570 Tn-m
10.810 Tn-m
Viga A-B
5.510 Tn-m
13.290 Tn-m
9.770 Tn-m
Viga B -C
13.290 Tn-m
5.510 Tn-m
9.770 Tn-m
ENVOLVENTE
PRIMER PISO
SEGUNDO PISO
VIGAS
TERCER PISO
CUARTO PISO
QUINTO PISO
M Max. Posiitivo
Izquierda
Derecha
Viga A-B
6.000 Tn-m
12.330 Tn-m
8.060 Tn-m
Viga B -C
12.330 Tn-m
6.000 Tn-m
8.060 Tn-m
Viga A-B
7.860 Tn-m
11.120 Tn-m
7.760 Tn-m
Viga B -C
11.120 Tn-m
7.860 Tn-m
7.760 Tn-m
Viga A-B
8.000 Tn-m
10.780 Tn-m
7.850 Tn-m
Viga B -C
10.780 Tn-m
8.000 Tn-m
7.850 Tn-m
Viga A-B
8.390 Tn-m
10.430 Tn-m
7.870 Tn-m
Viga B -C
10.430 Tn-m
8.390 Tn-m
7.870 Tn-m
Viga A-B
4.410 Tn-m
8.350 Tn-m
6.840 Tn-m
Viga B -C
8.350 Tn-m
4.410 Tn-m
6.840 Tn-m
FACULTAD DE ING.CIVIL-UNPRG
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
FACULTAD DE ING.CIVIL-UNPRG
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
FACULTAD DE ING.CIVIL-UNPRG
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
FACULTAD DE ING.CIVIL-UNPRG
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
FACULTAD DE ING.CIVIL-UNPRG
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
FACULTAD DE ING.CIVIL-UNPRG
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
FACULTAD DE ING.CIVIL-UNPRG
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
FACULTAD DE ING.CIVIL-UNPRG
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
PRIMER PISO
SECCIN DE VIGA:
ESTRIBOS DE 3/8''
b=
0.25 m
f'c=
210
kg/cm^2
h=
0.50 m
fy=
4200
kg/cm^2
Carga ultima:
Wu=
50.00
asumir 1''
25.00
0,25
5,625
C) DISEO
C.1) ACERO POSITIVO
d= H-(r+3/8''+1''/2)
d=
TRAMO A: MAB=
43.78 cm
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a
As=
6.399
a=As*fy/,85*f'c*b
a=
6.023
Asmin=min*b*d
SEGUNDA ITERACION
Asmin=
As=MU*10^5/0,9*fy*(d-a
2.64347 cm^2
SE TOMA:Asmin=11/2''+15/8''=
3.27 cm^2
As=
6.528
a=Asmin*fy/0,85*f'c*b
a=As*fy/,85*f'c*b
amin=
a=
3.07765 cm
Mumin=0,9*fy*Asmin(d-a/2)
6.144
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a
As=
6.538
a=As*fy/,85*f'c*b
max=0,75*b
a=
b=0,85**f'c/fy(6300/(6300+4200))
6.153
As=
b=
0.02168
TOMAMOS:
bmx
0.01626
As= 25/8''+21/2''=
Asmax=bmx*b*d
a=
Mur=10.0621101
SE TOMA:Asmax=21''+23/4''+11/2''=
amax=Asmax*fy/0,85*f'c*b
amax=
16.16 cm
17.2 cm^2
6.15529412
TRAMOB: MAB=
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a
Mumax=0,9*fy*Asmin(d-a/2)
As=
6.399
a=As*fy/,85*f'c*b
B.3) ANALISIS
a=
6.023
SEGUNDA ITERACION
MOMENTOS POSITIVOS:
As=MU*10^5/0,9*fy*(d-a
MAB=
10.060 Tn-m
As=
MBC=
10.060 Tn-m
a=As*fy/,85*f'c*b
a=
MOMENTOS NEGATIVOS
MA=
6.95 Tn-m
6.528
6.144
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
MB=
14.80 Tn-m
MC=
6.95 Tn-m
a=
6.153
6.538
25/8''+21/2''=
a=
OK
APOYO C: MA=
cm^2
PRIMERA ITERACION
6.54
cm^2
As=MU*10^5/0,9*fy
6.155 cm
Mur=
6.538
a=As*fy/,85*f'c*b
cm
TOMAMOS: As=
As=
As=
As=
10.06 Ton-m
a=
C.2) ACERO NEGATIVO
APOYO A: MA=
Asumir
6.950 Tn-m
a=0,1d=
4 cm
As=MU*10^5/0,9*fy
As=
As=MU*10^5/0,9*fy*(d-a/2)
4.421
cm^2
a=
cm
Seguir Iterando
As=MU*10^5/0,9*fy
SEGUNDA ITERACION
As=
As=MU*10^5/0,9*fy*(d-a/2)
4.409
cm^2
a=
cm
Seguir Iterando
As= 23/4''+11/2
As=MU*10^5/0,9*fy*(d-a/2)
4.409
4.41
TOMAMOS:
TERCERA ITERACION
As=
4.149
As=
4.150
4.409
a=As*fy/,85*f'c*b
a=As*fy/,85*f'c*b
a=
4.150
TERCERA ITERACION
4.161
As=
4.409
a=As*fy/,85*f'c*b
a=As*fy/,85*f'c*b
a=
4.161
SEGUNDA ITERACIO
PRIMERA ITERACION
As=
4.421
a=As*fy/,85*f'c*b
a=
cm^2
3.90
Mur= 6.55
a=As*fy/,85*f'c*b
a=
As=
4.149
4.409 cm^2
cm
E) DISEO DE ESTRIBOS
E,1) MOMENTOS RESISTE
OK
Apoyo 1:
TOMAMOS:
As=
15/8''+21/2''=
a=
4.56
cm^2
4.292 cm
Mur=
7.18
Ton-m
APOYO B: MB=
14.800 Tn-m
a=0,2d=
9.352
4.29
Mur=
7.18
9 cm
Mur=
cm
9.66
a=
cm^2
a=As*fy/,85*f'c*b
a=
a=
As=
As=MU*10^5/0,9*fy*(d-a/2)
9.937
4.56
Apoyo 2:
PRIMERA ITERACION
As=
As=
9.09
14.33
Seguir Iterando
Apoyo 3:
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
4.14
As=
a=
3.90
Mur=
6.55
10.013
cm^2
a=As*fy/,85*f'c*b
a=
9.424
cm
Seguir Iterando
TERCERA ITERACION
E,2) DETERMINACION DE
As=MU*10^5/0,9*fy*(d-a/2)
As=
10.022
cm^2
Vi=Wui*l/2+(Muri-Mruj)/l
a=As*fy/,85*f'c*b
a=
As=
9.432
10.022 cm^2
TOMAMOS:
cm
OK
V1=
4.65
V'2=
-7.20
V''2=
7.31
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As=
23/4''+25/8''=
a=
9.092 cm
Mur=
14.33 Ton-m
9.66
cm^2
V3=
-4.54
Vud=Vu-Wu*d
11.85
7.31
5.625
4.65
8.41
x1
13.06
x1+x2
5.625
5.625
Colocanco estri
-7.20
-4.54
Vs=
6.38626 Ton
14.92
x1+x2+x3
Vc=0,53*(f'c)^0,5*b*d
Vc=
8.40623 Ton
Colocanco estribos
Vs= 17.407
Vu/=Vs+Vc
Vs=Vu/-Vc
Vs=
17.41
x1+x2+x3+x4
0.85
0.19217
SEGN LA NOR
Vs=2,1*(f'c)^0,5*b*d
Vsmax=
33.3077 Ton
>
Vs=
Vs
1,1*(f'c)^0,5*b*d
<
Vs=
0.192
17.4469 Ton
>
Vs=
Vs
Ton
OK
s=
d/2
s=
0.6 m
s=
d/4
s=
0.3 m
0.192
Ton
Smax=d/2
b) Longitud de confinami
c) Espaciamientos en zon
exceder de:
se escoge la
menor
d) Fuera de la zona de co
e) En todos los casos los
Smax=
21.89 cm
Smax=
20 cm
Espaciamiento en zona d
S= d/4=
Vs=Ar*fy*d/S
Vs=
13.0552 ton
S= 8*varilla=
Para espaciamiento max.
S= 24*estribo=
S=
30 cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
1 3/8 @
Espaciamiento fuera de l
x4
x3
x2
x1
s=
21.89
Z
DETERMINAMOS Z, X1, X2, X3 ,X4
VIGA A-B Y B-C:
3/8 @
SEGUNDO PISO
SECCIN DE VIGA:
ESTRIBOS DE 3/8''
b=
0.25 m
f'c=
210
kg/cm^2
h=
0.50 m
fy=
4200
kg/cm^2
Carga ultima:
Wu=
50.00
0,25
5,625
asumir 1''
25.00
C) DISEO
C.1) ACERO POSITIVO
d= H-(r+3/8''+1''/2)
d=
TRAMO A: MAB=
43.78 cm
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a
As=
min=0,70*f'c^0,5/fy
a=As*fy/,85*f'c*b
min=
a=
0.00242
6.202
5.837
Asmin=min*b*d
SEGUNDA ITERACION
Asmin=
As=MU*10^5/0,9*fy*(d-a
2.64347 cm^2
SE TOMA:Asmin=11/2''+15/8''=
3.27 cm^2
As=
6.312
a=Asmin*fy/0,85*f'c*b
a=As*fy/,85*f'c*b
amin=
a=
3.07765 cm
Mumin=0,9*fy*Asmin(d-a/2)
5.941
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a
As=
6.321
a=As*fy/,85*f'c*b
max=0,75*b
a=
b=0,85**f'c/fy(6300/(6300+4200))
5.949
As=
b=
0.02168
TOMAMOS:
bmx
0.01626
As= 25/8''+21/2''=
Asmax=bmx*b*d
a=
16.16 cm
6.15529412
Mur=
17.2 cm^2
10.062
TRAMOB: MAB=
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a
Mumax=0,9*fy*Asmin(d-a/2)
As=
a=As*fy/,85*f'c*b
6.202
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
B.3) ANALISIS
a=
5.837
SEGUNDA ITERACION
MOMENTOS POSITIVOS:
As=MU*10^5/0,9*fy*(d-a
MAB=
9.750 Tn-m
As=
MBC=
9.750 Tn-m
a=As*fy/,85*f'c*b
6.312
a=
MOMENTOS NEGATIVOS
MA=
9.08 Tn-m
MB=
13.44 Tn-m
MC=
5.949
TOMAMOS: As=
As=
As=MU*10^5/0,9*fy*(d-a
As=
9.08 Tn-m
a=
6.321
OK
cm^2
APOYO C: MA=
6.54
cm^2
PRIMERA ITERACION
6.155 cm
Mur=
As=MU*10^5/0,9*fy
10.06 Ton-m
As=
6.321
a=As*fy/,85*f'c*b
cm
25/8''+21/2''=
a=
5.941
TERCERA ITERACION
Asumir
9.080 Tn-m
a=0,1d=
5.776
a=As*fy/,85*f'c*b
4 cm
a=
5.436
PRIMERA ITERACION
SEGUNDA ITERACIO
As=MU*10^5/0,9*fy*(d-a/2)
As=MU*10^5/0,9*fy
As=
5.776
cm^2
As=
a=As*fy/,85*f'c*b
a=
5.850
a=As*fy/,85*f'c*b
5.436
cm
Seguir Iterando
a=
5.506
SEGUNDA ITERACION
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=MU*10^5/0,9*fy
As=
5.850
cm^2
As=
a=As*fy/,85*f'c*b
a=
a=As*fy/,85*f'c*b
5.506
cm
Seguir Iterando
a=
TERCERA ITERACION
5.855
cm^2
As= 35/8''=
a=
5.511
As=
cm
OK
a=
Mur=
5.59
Mur= 9.20
5.855 cm^2
E) DISEO DE ESTRIBOS
TOMAMOS:
As=
5.85
TOMAMOS:
a=As*fy/,85*f'c*b
a=
5.511
As=
As=MU*10^5/0,9*fy*(d-a/2)
As=
5.855
35/8''=
5.94
cm^2
Apoyo 1:
5.591 cm
9.20
Ton-m
APOYO B: MB=
13.440 Tn-m
a=0,2d=
As=
5.94
a=
5.59
9 cm Mur=
9.20
PRIMERA ITERACION
Apoyo 2:
As=MU*10^5/0,9*fy*(d-a/2)
As=
9.024
cm^2
a=As*fy/,85*f'c*b
a=
8.493
cm
Seguir Iterando
As=
9.06
a=
8.53
Mur=
13.53
SEGUNDA ITERACION
Apoyo 3:
As=MU*10^5/0,9*fy*(d-a/2)
As=
8.994
a=As*fy/,85*f'c*b
cm^2
As=
5.94
a=
5.59
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a=
8.465
cm
Mur=
Seguir Iterando
9.20
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
8.991
E,2) DETERMINACION DE
cm^2
a=As*fy/,85*f'c*b
a=
Vi=Wui*l/2+(Muri-Mruj)/l
8.462
As=
cm
OK
8.991 cm^2
TOMAMOS:
As=
11''+25/8''=
a=
8.527 cm
Mur=
13.53 Ton-m
9.06
cm^2
V1=
4.65
V'2=
-7.20
V''2=
7.31
V3=
-4.54
Vud=Vu-Wu*d
11.85
7.31
5.625
4.65
8.41
x1
13.06
x1+x2
5.625
5.625
Colocanco estri
-7.20
-4.54
Vs=
6.38626 Ton
14.92
x1+x2+x3
Vc=0,53*(f'c)^0,5*b*d
Vc=
8.40623 Ton
Colocanco estribos
Vs= 17.407
17.41
Vu/=Vs+Vc
=
x1+x2+x3+x4
0.85
0.19217
SEGN LA NOR
Vs=2,1*(f'c)^0,5*b*d
Vsmax=
33.3077 Ton
>
Vs=
0.192
Ton
OK
Vs=
c) Espaciamientos en zon
Vs
1,1*(f'c)^0,5*b*d
<
17.4469 Ton
>
Vs=
b) Longitud de confinami
Vs
s=
d/2
s=
0.6 m
s=
d/4
s=
0.3 m
0.192
Ton
exceder de:
se escoge la
menor
d) Fuera de la zona de co
e) En todos los casos los
Smax=d/2
Smax=
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Smax=
20 cm
Espaciamiento en zona d
S= d/4=
S= 8*varilla=
Vs=Ar*fy*d/S
Vs=
S= 24*estribo=
13.0552 ton
S=
30 cm
1 3/8 @
Espaciamiento fuera de l
s=
x4
x3
x2
22
x1
3/8 @
QUINTO PISO
SECCIN DE VIGA:
ESTRIBOS DE 3/8''
b=
0.25 m
f'c=
210
kg/cm^2
h=
0.50 m
fy=
4200
kg/cm^2
Carga ultima:
Wu=
0 Ton/m
Wu=
50.00
5,625
asumir 1''
25.00
C) DISEO
C.1) ACERO POSITIVO
d= H-(r+3/8''+1''/2)
d=
TRAMO A: MAB=
43.78 cm
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a
As=
min=0,70*f'c^0,5/fy
a=As*fy/,85*f'c*b
min=
a=
0.00242
0,25
5.871
5.526
Asmin=min*b*d
SEGUNDA ITERACION
Asmin=
As=MU*10^5/0,9*fy*(d-a
2.64347 cm^2
SE TOMA:Asmin=11/2''+15/8''=
3.27 cm^2
As=
5.953
a=Asmin*fy/0,85*f'c*b
a=As*fy/,85*f'c*b
amin=
a=
3.07765 cm
Mumin=0,9*fy*Asmin(d-a/2)
Mumin= 5.22126 Ton-m
5.603
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a
As=
5.959
a=As*fy/,85*f'c*b
max=0,75*b
a=
b=0,85**f'c/fy(6300/(6300+4200))
5.608
As=
b=
0.02168
TOMAMOS:
bmx
0.01626
As= 31/2''+15/8''=
Asmax=bmx*b*d
a=
5.50588235
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Asmax= 17.7925 cm^2
Mur=
SE TOMA:Asmax=21''+23/4''+11/2''=
17.2 cm^2
TRAMOB: MAB=
amax=Asmax*fy/0,85*f'c*b
amax=
9.0723
PRIMERA ITERACION
16.16 cm
As=MU*10^5/0,9*fy*(d-a
Mumax=0,9*fy*Asmin(d-a/2)
As=
5.871
a=As*fy/,85*f'c*b
B.3) ANALISIS
a=
SEGUNDA ITERACION
MOMENTOS POSITIVOS:
As=MU*10^5/0,9*fy*(d-a
MAB=
9.230 Tn-m
As=
MBC=
9.230 Tn-m
a=As*fy/,85*f'c*b
5.526
5.953
a=
MOMENTOS NEGATIVOS
TERCERA ITERACION
MA=
5.25 Tn-m
MB=
11.12 Tn-m
MC=
5.25 Tn-m
a=
5.608
TOMAMOS: As=
As=
As=MU*10^5/0,9*fy*(d-a
As=
cm
5.959
OK
APOYO C: MA=
cm^2
PRIMERA ITERACION
5.85
cm^2
As=MU*10^5/0,9*fy
5.506 cm
Mur=
9.07
As=
Ton-m
Asumir
5.250 Tn-m
a=0,1d=
a=
4 cm
As=MU*10^5/0,9*fy
As=MU*10^5/0,9*fy*(d-a/2)
3.339
As=
cm^2
a=
3.143
cm
Seguir Iterando
As=MU*10^5/0,9*fy
As=MU*10^5/0,9*fy*(d-a/2)
3.291
As=
cm^2
a=
3.097
cm
Seguir Iterando
TERCERA ITERACION
3.289
As= 15/8''+11/2
cm^2
a=
cm
OK
E) DISEO DE ESTRIBOS
3.289 cm^2
TOMAMOS:
As=
a=
Mur=
15/8''+11/2''=
3.27
Apoyo 1:
cm^2
3.078 cm
5.22
Ton-m
APOYO B: MB=
11.120 Tn-m
As=MU*10^5/0,9*fy*(d-a/2)
7.466
a=0,2d=
As=
3.27
a=
3.08
Mur=
5.22
9 cm
Apoyo 2:
PRIMERA ITERACION
As=
3.08
Mur= 5.22
3.095
As=
3.29
TOMAMOS:
a=As*fy/,85*f'c*b
a=
3.095
As=
As=MU*10^5/0,9*fy*(d-a/2)
As=
3.289
a=As*fy/,85*f'c*b
a=As*fy/,85*f'c*b
a=
3.097
TERCERA ITERACION
SEGUNDA ITERACION
As=
3.291
a=As*fy/,85*f'c*b
a=As*fy/,85*f'c*b
a=
3.143
SEGUNDA ITERACIO
PRIMERA ITERACION
As=
3.339
a=As*fy/,85*f'c*b
5.959
a=As*fy/,85*f'c*b
15/8''+31/2''=
a=
5.603
cm^2
As=
7.23
a=
6.80
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mur=
a=As*fy/,85*f'c*b
a=
7.027
cm
Seguir Iterando
Apoyo 3:
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
7.306
cm^2
a=As*fy/,85*f'c*b
a=
6.876
11.03
cm
As=
3.27
a=
3.08
Mur=
5.22
Seguir Iterando
TERCERA ITERACION
E,2) DETERMINACION DE
As=MU*10^5/0,9*fy*(d-a/2)
As=
7.292
cm^2
Vi=Wui*l/2+(Muri-Mruj)/l
a=As*fy/,85*f'c*b
a=
6.863
As=
cm
Seguir Iterando
7.292 cm^2
TOMAMOS:
As=
11/2''+35/8''=
a=
6.805 cm
Mur=
11.03 Ton-m
7.23
cm^2
V1=
4.65
V'2=
-7.20
V''2=
7.31
V3=
-4.54
Vud=Vu-Wu*d
7.31
11.85
4.65
5.625
8.41
x1
13.06
5.625
5.625
x1+x2
-7.20
-4.54
Colocanco estri
Vs=
6.38626 Ton
14.92
Vc=0,53*(f'c)^0,5*b*d
Vc=
x1+x2+x3
8.40623 Ton
Colocanco estribos
Cortante tomado por el acero "Vs"
Vu<Vn
Vu/=Vs+Vc
Vs=Vu/-Vc
Vs=
Vs= 17.407
17.41
0.85
x1+x2+x3+x4
0.19217
SEGN LA NOR
Cortante maxima que debe tomar el acero:
Vs=2,1*(f'c)^0,5*b*d
Vsmax=
33.3077 Ton
>
Vs=
0.192
Ton
OK
b) Longitud de confinami
Espaciamiento maximo de los estribos:
Vs=
>
Vs
<
Vs
1,1*(f'c)^0,5*b*d
s=
d/2
c) Espaciamientos en zon
s=
0.6 m
exceder de:
s=
d/4
s=
0.3 m
se escoge la
menor
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Vs=
17.4469 Ton
>
Vs=
0.192
Ton
d) Fuera de la zona de co
Smax=d/2
Smax=
21.89 cm
Smax=
20 cm
Espaciamiento en zona d
S= d/4=
Vs=Ar*fy*d/S
Vs=
S= 8*varilla=
13.0552 ton
S= 24*estribo=
S=
30 cm
1 3/8 @
Espaciamiento fuera de l
x4
x3
x2
x1
s=
22
Z
DETERMINAMOS Z, X1, X2, X3 ,X4
3/8 @
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
DISEO DE VIG
VIGA A-B Y B-C:
Recubrimiento:
PRIMER PISO
r=
4 cm
c=
SECCIN DE VIGA:
ESTRIBOS DE 3/8''
0.003
b=
0.25 m
f'c=
210
s=
0.002
h=
0.50 m
fy=
4200
Carga ultima:
1 Ton-m
50.00
5,625
0,2
5
0,25
asumir 1''
25.00
CERO POSITIVO
10.060 Tn-m
a=0,1d= 4.378 cm
d= H-(r+3/8''+1''/2)
ERA ITERACION
d=
U*10^5/0,9*fy*(d-a/2)
cm^2
fy/,85*f'c*b
cm
43.78 cm
Seguir Iterando
NDA ITERACION
Asmin=min*b*d
U*10^5/0,9*fy*(d-a/2)
Asmin=
cm^2
2.6434686415 cm^2
SE TOMA:Asmin=11/2''+15/8''=
fy/,85*f'c*b
a=Asmin*fy/0,85*f'c*b
cm
Seguir Iterando
amin=
3.0776470588 cm
ERA ITERACION
Mumin=0,9*fy*Asmin(d-a/2)
U*10^5/0,9*fy*(d-a/2)
cm^2
Mumin=
fy/,85*f'c*b
5.2212628588 Ton-m
OK
max=0,75*b
cm^2
b=0,85**f'c/fy(6300/(6300+4200))
b=
5/8''+21/2''=
6.540
cm^2
bmx
0.021675
0.01625625
cm
Asmax=bmx*b*d
Ton-m
Asmax=
10.060 Tn-m
a=0,1d= 4.378 cm
17.792465625 cm^2
SE TOMA:Asmax=21''+23/4''+11/2''=
ERA ITERACION
amax=Asmax*fy/0,85*f'c*b
U*10^5/0,9*fy*(d-a/2)
amax=
cm^2
16.16 cm
Mumax=0,9*fy*Asmin(d-a/2)
fy/,85*f'c*b
Mumax=
cm
Seguir Iterando
23.1702282 Ton-m
B.3) ANALISIS
NDA ITERACION
U*10^5/0,9*fy*(d-a/2)
MOMENTOS POSITIVOS:
cm^2
fy/,85*f'c*b
cm
17.2
MAB=
14.150 Tn-m
MBC=
14.150 Tn-m
Seguir Iterando
ERA ITERACION
MOMENTOS NEGATIVOS
U*10^5/0,9*fy*(d-a/2)
MA=
9.97 Tn-m
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
cm^2
MB=
fy/,85*f'c*b
22.05 Tn-m
MC=
POYO C: MA=
6.950 Tn-m
a=0,1d= 4.378 cm
9.97 Tn-m
a=
8.959
RIMERA ITERACION
TOMAMOS: As=
s=MU*10^5/0,9*fy*(d-a/2)
As=
4.421
cm^2
=As*fy/,85*f'c*b
4.161
cm
Seguir Iterando
EGUNDA ITERACION
9.092
cm
14.33
Ton-m
As=MU*10^5/0,9*fy*(d-a/2)
As=
cm
Seguir Iterando
6.334
cm^2
5.961
cm
a=As*fy/,85*f'c*b
a=
Seguir Iterando
SEGUNDA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
=As*fy/,85*f'c*b
As=
cm
9.66
Mur=
s=MU*10^5/0,9*fy*(d-a/2)
4.149
23/4''+25/8''=
cm^2
PRIMERA ITERACION
cm^2
ERCERA ITERACION
4.409
9.519
APOYO A: MA=
=As*fy/,85*f'c*b
4.150
Seguir Iterando
a=
s=MU*10^5/0,9*fy*(d-a/2)
4.409
cm
OK
6.465
cm^2
6.084
cm
a=As*fy/,85*f'c*b
cm^2
a=
Seguir Iterando
TERCERA ITERACION
23/4''+11/2''=
4.14
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
cm
As=
Ton-m
a=As*fy/,85*f'c*b
a=
EO DE ESTRIBOS
OMENTOS RESISTENTES NEGATIVOS:
As=
TOMAMOS:
As=
6.474
cm^2
6.094
cm
6.474
OK
cm^2
25/8''+21/2''=
6.54
cm^2
cm^2
a=
6.155
cm
cm
Mur=
10.06
Ton-m
T-m
22.050 Tn-m
PRIMERA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
cm
As=
T-m
a=As*fy/,85*f'c*b
a=
d=
16.067
cm^2
15.122
cm
Seguir Iterando
SEGUNDA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
cm
As=
T-m
a=As*fy/,85*f'c*b
a=
16.106
cm^2
15.158
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
ui*l/2+(Muri-Mruj)/l
As=
16.114
cm^2
15.166
cm
a=As*fy/,85*f'c*b
T-m
a=
T-m
As=
T-m
TOMAMOS:
16.114
OK
cm^2
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
T-m
As=
21''+35/8''=
a=
15.191
Mur=
=
=
=
7.31
Z=
3.47
cm
22.08
Ton-m
x1=
3.99
Vud=Vu-Wu*d
3.47
7.31
cm^2
Z
7.31
16.14
7.31
;
x2=
2.21
4.65
3.47
5 3/8 @ 20
17.5
cm
5.625
5.625
15 Ton
-7.20
=
x1+x2+x3
7.31
x3=
0.89
3.47
Vud=
2 3/8 @ 17.5
15
cm
Vc=0,53*(f'c)^0,5*b*d
Ton
=
6.3862578764 Ton
Vc=
7.31
x4=
2.07
8.4062302798 Ton
3.47
Vu/=Vs+Vc
Vs=Vu/-Vc
0.85
Vs=
0.1921711135
Vsmax=
2.-
3.-
4.-
30cm
Vs=
33.307704882 Ton
Vs=
Smax=d/2
Smax=
21.89 cm
Smax=
20 cm
4*estribo=
10.945
cm
10.32
cm
22.86
cm
2d=
0.192
>
Vs
<
Vs
17.446893034 Ton
>
Vs=
0.192
0.8756
E.4) DETERMINACION DEL REFUERZO TRANSVERSAL
S=
10.32
S=
10
cm
Ar=
Vs=Ar*fy*d/S
Vs=
SE TOMA:
Vs=
1,1*(f'c)^0,5*b*d
>
13.055196 ton
cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
3/8 @
5;
3 3/8 @ 7,5;
6 3/8 @ 10
S=
4 3/8 @
20
x4
x3
x2
x1
Z
DETERMINAMOS Z, X1, X2, X3 ,X4
VIGA A-B Y B-C:
Recubrimiento:
SEGUNDO PISO
r=
4 cm
SECCIN DE VIGA:
ESTRIBOS DE 3/8''
c=
0.003
b=
0.25 m
f'c=
210
s=
0.002
h=
0.50 m
fy=
4200
Carga ultima:
2.10686
50.00
5,625
0,25
0,25
asumir 1''
25.00
CERO POSITIVO
9.750 Tn-m
a=0,1d= 4.378 cm
d= H-(r+3/8''+1''/2)
ERA ITERACION
d=
U*10^5/0,9*fy*(d-a/2)
43.78 cm
cm^2
fy/,85*f'c*b
min=0,70*f'c^0,5/fy
cm
Seguir Iterando
min=
0.0024152295
NDA ITERACION
Asmin=min*b*d
U*10^5/0,9*fy*(d-a/2)
Asmin=
cm^2
2.6434686415 cm^2
SE TOMA:Asmin=11/2''+15/8''=
fy/,85*f'c*b
a=Asmin*fy/0,85*f'c*b
cm
Seguir Iterando
amin=
3.0776470588 cm
ERA ITERACION
Mumin=0,9*fy*Asmin(d-a/2)
U*10^5/0,9*fy*(d-a/2)
Mumin=
5.2212628588 Ton-m
cm^2
fy/,85*f'c*b
OK
max=0,75*b
cm^2
b=0,85**f'c/fy(6300/(6300+4200))
b=
5/8''+21/2''=
6.540
cm^2
cm
0.01625625
Asmax=bmx*b*d
Ton-m
9.750 Tn-m
bmx
0.021675
Asmax=
a=0,1d= 4.378 cm
17.792465625 cm^2
SE TOMA:Asmax=21''+23/4''+11/2''=
ERA ITERACION
amax=Asmax*fy/0,85*f'c*b
U*10^5/0,9*fy*(d-a/2)
amax=
fy/,85*f'c*b
cm^2
17.2
16.16 cm
Mumax=0,9*fy*Asmin(d-a/2)
Mumax=
23.1702282 Ton-m
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
cm
Seguir Iterando
B.3) ANALISIS
NDA ITERACION
U*10^5/0,9*fy*(d-a/2)
MOMENTOS POSITIVOS:
cm^2
fy/,85*f'c*b
cm
MAB=
13.670 Tn-m
MBC=
13.670 Tn-m
Seguir Iterando
ERA ITERACION
MOMENTOS NEGATIVOS
U*10^5/0,9*fy*(d-a/2)
MA=
12.86 Tn-m
MB=
20.47 Tn-m
cm^2
fy/,85*f'c*b
MC=
12.86 Tn-m
a=
POYO C: MA=
9.080 Tn-m
a=0,1d= 4.378 cm
As=
s=MU*10^5/0,9*fy*(d-a/2)
a=
cm^2
5.436
cm
Seguir Iterando
d=
APOYO A: MA=
cm^2
42.5 cm
12.860 Tn-m
As=
8.606
cm^2
8.100
cm
a=As*fy/,85*f'c*b
cm
Seguir Iterando
a=
ERCERA ITERACION
Seguir Iterando
SEGUNDA ITERACION
s=MU*10^5/0,9*fy*(d-a/2)
As=MU*10^5/0,9*fy*(d-a/2)
cm^2
As=
=As*fy/,85*f'c*b
5.511
Ton-m
As=MU*10^5/0,9*fy*(d-a/2)
=As*fy/,85*f'c*b
5.855
9.06
PRIMERA ITERACION
s=MU*10^5/0,9*fy*(d-a/2)
5.506
cm^2
8.527 cm
13.53
EGUNDA ITERACION
5.850
9.163
OK
11''+25/8''=
Mur=
=As*fy/,85*f'c*b
cm
TOMAMOS: As=
RIMERA ITERACION
5.776
8.624
8.563
cm^2
8.059
cm
a=As*fy/,85*f'c*b
cm
OK
a=
cm^2
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
35/8''=
5.94
cm^2
As=
cm
a=As*fy/,85*f'c*b
Ton-m
a=
As=
cm^2
8.055
cm
8.559
EO DE ESTRIBOS
TOMAMOS:
As=
cm^2
8.559
OK
cm^2
13/4''+35/8''=
a=
8.273
cm
Mur=
13.17
Ton-m
8.79
cm^2
cm
T-m
APOYO B: MB=
20.470 Tn-m
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
cm^2
As=
cm
a=As*fy/,85*f'c*b
T-m
a=
14.643
cm^2
13.782
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
cm^2
As=
cm
a=As*fy/,85*f'c*b
14.680
cm^2
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
T-m
a=
13.817
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
ui*l/2+(Muri-Mruj)/l
a=
As=
T-m
TOMAMOS:
T-m
As=
T-m
a=
13.823
cm
14.687
13.327
7.31
Z=
3.47
x1=
3.99
19.87
cm^2
cm
Ton-m
7.31
3.47
7.31
14.16
Vud=Vu-Wu*d
Z
7.31
OK
cm^2
21''+25/8''=
Mur=
cm^2
a=As*fy/,85*f'c*b
T-m
14.687
4.65
17.71
;
x2=
2.21
3.47
5 3/8 @ 20
5.625
5.625
18 cm
-7.20
15 Ton
=
x1+x2+x3
7.31
x3=
0.89
3.47
Vud=
6.3862578764 Ton
15
Vc=0,53*(f'c)^0,5*b*d
cm
Vc=
8.4062302798 Ton
Ton
=
7.31
x4=
2.07
3.47
Vu/=Vs+Vc
Vs=Vu/-Vc
SEGN LA NORMA E-060 DISEO SISMICO
Vs=
0.85
0.1921711135
Vsmax=
1.-
d/4
2.-
3.-
4.-
30cm
Vs=
33.307704882 Ton
>
Vs=
0.192
>
Vs
<
Vs
1,1*(f'c)^0,5*b*d
Vs=
17.446893034 Ton
>
Vs=
0.192
Smax=d/2
Smax=
21.89 cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
cm
10.32
cm
22.86
cm
4*estribo=
2d=
0.8756
Smax=
20 cm
10.32
Vs=Ar*fy*d/S
Vs=
SE TOMA:
3/8 @
5;
S=
10
4 3/8 @ 7,5;
cm
Ar=
13.055196 ton
cm
6 3/8 @ 10
S=
4 3/8 @
20
x4
x3
x2
x1
Z
DETERMINAMOS Z, X1, X2, X3 ,X4
VIGA A-B Y B-C:
Recubrimiento:
QUINTO PISO
r=
4 cm
SECCIN DE VIGA:
ESTRIBOS DE 3/8''
c=
0.003
b=
0.25 m
f'c=
210
s=
0.002
h=
0.50 m
fy=
4200
Carga ultima:
0 Ton-m
50.00
5,625
0,2
5
0,25
asumir 1''
25.00
CERO POSITIVO
9.230 Tn-m
a=0,1d= 4.378 cm
d= H-(r+3/8''+1''/2)
ERA ITERACION
d=
U*10^5/0,9*fy*(d-a/2)
43.78 cm
cm^2
fy/,85*f'c*b
min=0,70*f'c^0,5/fy
cm
Seguir Iterando
min=
0.0024152295
NDA ITERACION
Asmin=min*b*d
U*10^5/0,9*fy*(d-a/2)
Asmin=
cm^2
2.6434686415 cm^2
SE TOMA:Asmin=11/2''+15/8''=
fy/,85*f'c*b
a=Asmin*fy/0,85*f'c*b
cm
Seguir Iterando
amin=
3.0776470588 cm
ERA ITERACION
Mumin=0,9*fy*Asmin(d-a/2)
U*10^5/0,9*fy*(d-a/2)
Mumin=
5.2212628588 Ton-m
cm^2
fy/,85*f'c*b
OK
max=0,75*b
cm^2
b=0,85**f'c/fy(6300/(6300+4200))
b=
1/2''+15/8''=
cm
5.850
cm^2
bmx
0.021675
0.01625625
Asmax=bmx*b*d
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Ton-m
Asmax=
9.230 Tn-m
a=0,1d= 4.378 cm
17.792465625 cm^2
SE TOMA:Asmax=21''+23/4''+11/2''=
ERA ITERACION
amax=Asmax*fy/0,85*f'c*b
U*10^5/0,9*fy*(d-a/2)
amax=
cm^2
16.16 cm
Mumax=0,9*fy*Asmin(d-a/2)
fy/,85*f'c*b
Mumax=
cm
Seguir Iterando
23.1702282 Ton-m
B.3) ANALISIS
NDA ITERACION
U*10^5/0,9*fy*(d-a/2)
MOMENTOS POSITIVOS:
cm^2
fy/,85*f'c*b
cm
MAB=
12.370 Tn-m
MBC=
12.370 Tn-m
Seguir Iterando
ERA ITERACION
MOMENTOS NEGATIVOS
U*10^5/0,9*fy*(d-a/2)
MA=
6.97 Tn-m
MB=
16.77 Tn-m
MC=
6.97 Tn-m
cm^2
fy/,85*f'c*b
POYO C: MA=
5.250 Tn-m
a=0,1d= 4.378 cm
a=
7.712
RIMERA ITERACION
TOMAMOS: As=
s=MU*10^5/0,9*fy*(d-a/2)
As=
3.339
cm^2
cm
Seguir Iterando
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
Seguir Iterando
a=
cm^2
4.173
cm
Seguir Iterando
SEGUNDA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
=As*fy/,85*f'c*b
As=
cm
4.433
a=As*fy/,85*f'c*b
s=MU*10^5/0,9*fy*(d-a/2)
3.095
Ton-m
6.970 Tn-m
As=
cm
8.28
PRIMERA ITERACION
ERCERA ITERACION
3.289
12.48
APOYO A: MA=
=As*fy/,85*f'c*b
3.097
cm^2
s=MU*10^5/0,9*fy*(d-a/2)
3.291
8.194
Seguir Iterando
7.793 cm
Mur=
EGUNDA ITERACION
cm
23/4''+21/2''=
a=
=As*fy/,85*f'c*b
3.143
17.2
OK
4.423
cm^2
4.162
cm
a=As*fy/,85*f'c*b
cm^2
a=
Seguir Iterando
TERCERA ITERACION
15/8''+11/2''=
3.27
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
cm
As=
4.422
Ton-m
a=As*fy/,85*f'c*b
a=
4.162
EO DE ESTRIBOS
As=
TOMAMOS:
As=
cm^2
a=
cm
Mur=
cm^2
4.422
cm
23/4''=
5.365
8.85
OK
cm^2
5.7
cm^2
cm
Ton-m
T-m
APOYO B: MB=
16.770 Tn-m
PRIMERA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
cm
As=
11.516
cm^2
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
T-m
a=As*fy/,85*f'c*b
a=
10.838
cm
Seguir Iterando
SEGUNDA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
cm
As=
T-m
a=As*fy/,85*f'c*b
a=
11.565
cm^2
10.885
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
ui*l/2+(Muri-Mruj)/l
As=
11.572
cm^2
10.892
cm
a=As*fy/,85*f'c*b
T-m
a=
T-m
As=
T-m
TOMAMOS:
11.572
OK
cm^2
T-m
As=
43/4''=
a=
10.729
Mur=
=
=
=
7.31
Z=
3.47
16.55
cm^2
cm
Ton-m
Vud=Vu-Wu*d
Z
7.31
11.4
7.31
;
x1=
3.99
x2=
2.21
4.65
3.47
7.31
3.47
5 3/8 @ 20
17.5
5.625
5.625
cm
-7.20
14.92022 Ton
=
x1+x2+x3
7.31
x3=
0.89
3.47
Vud=
6.3862578764 Ton
15
Vc=0,53*(f'c)^0,5*b*d
cm
Vc=
8.4062302798 Ton
Ton
=
7.31
x4=
2.07
3.47
Vu/=Vs+Vc
Vs=Vu/-Vc
SEGN LA NORMA E-060 DISEO SISMICO
Vs=
0.85
0.1921711135
Vsmax=
1.-
d/4
2.-
3.-
Vs=
33.307704882 Ton
>
Vs=
0.192
>
Vs
<
Vs
1,1*(f'c)^0,5*b*d
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
4.-
30cm
Vs=
17.446893034 Ton
>
Vs=
0.192
Smax=d/2
cm
10.32
cm
22.86
cm
4*estribo=
2d=
0.8756
Smax=
21.89 cm
Smax=
20 cm
10.32
Vs=Ar*fy*d/S
Vs=
SE TOMA:
3/8 @
5;
S=
10
4 3/8 @ 7,5;
cm
Ar=
13.055196 ton
cm
6 3/8 @ 10
4 3/8 @
S=
20
x4
x3
x2
x1
Z
DETERMINAMOS Z, X1, X2, X3 ,X4
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
DISEO DE VIGAS DE PORTICO 2-2 EN DIRECCION X-X
VIGA A-B Y B
ESTRIBOS DE 3/8''
Recubrimiento:
r=
210
kg/cm^2
c=
4200
kg/cm^2
s=
4 cm
SECCIN DE VIGA:
0.003
b=
0.002
h=
Ton/m
Carga ultima:
2
Wu=
2.11 Ton-m
50.00
asumir 1''
0,25
5,625
5,625
0,25
0,25
C) DISEO
C.1) ACERO POSITIVO
TRAMO A: MAB=
14.150 Tn-m
a=0,1d=
4.38 cm
d= H-(r+3/8''+1''/2)
PRIMERA ITERACION
E LLEVAR LA VIGA
d=
As=MU*10^5/0,9*fy*(d-a/2)
As=
9.000
cm^2
a=As*fy/,85*f'c*b
a=
8.471
cm
Seguir Iterando
SEGUNDA ITERACION
3.27 cm^2
Asmin=min*b*d
As=MU*10^5/0,9*fy*(d-a/2)
Asmi 2.643
As=
SE TOMA:Asmin=11/2''+1
9.466
cm^2
a=As*fy/,85*f'c*b
a=
8.909
a=Asmin*fy/0,85*f'c*b
cm
Seguir Iterando
amin 3.078
TERCERA ITERACION
Mumin=0,9*fy*Asmin(d-a/2)
As=MU*10^5/0,9*fy*(d-a/2)
As=
9.519
cm^2
Mumi 5.221
a=As*fy/,85*f'c*b
a=
8.959
cm
As=
9.519
Seguir Iterando
max=0,75*b
cm^2
b=0,85**f'c/fy(6300/(6300
TOMAMOS:
b= 0.022
As= 23/4''+25/8''=
a=
9.660
cm^2
bm 0.016
9.0917647 cm
Asmax=bmx*b*d
cm^2
TRAMOB: MAB=
Asma 17.79
14.150 Tn-m
a=0,1d=
PRIMERA ITERACION
4.38 cm
SE TOMA:Asmax=21''+23
amax=Asmax*fy/0,85*f'c*b
As=MU*10^5/0,9*fy*(d-a/2)
amax 16.16
As=
Mumax=0,9*fy*Asmin(d-a/2)
9.000
cm^2
a=As*fy/,85*f'c*b
a=
8.471
cm
Muma23.17
Seguir Iterando
SEGUNDA ITERACION
B.3) ANALISIS
MOMENTOS OBTENIDOS EN E
As=MU*10^5/0,9*fy*(d-a/2)
MOMENTOS POSITIVOS:
As=
MAB=
9.466
cm^2
a=As*fy/,85*f'c*b
a=
8.909
cm
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
MBC=
Seguir Iterando
MOMENTOS NEGATIVOS
MA=
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As=
9.519
cm^2
MB=
a=As*fy/,85*f'c*b
MC=
Seguir Iterando
APOYO C: MA=
cm^2
PRIMERA ITERACION
TOMAMOS: As=
As=MU*10^5/0,9*fy*(d-a/2)
As= 23/4''+21/2''=
As=
a=
7.793
Mur=
12.48
cm^2
6.326
9.970 Tn-m
a=0,1d=
4.17 cm
cm^2
a=As*fy/,85*f'c*b
Asumir
a=0,1d=
a=
4.3 cm
5.954
cm
Seguir Iterando
SEGUNDA ITERACION
a=
As=MU*10^5/0,9*fy*(d-a/2)
As=
6.464
PRIMERA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=As*fy/,85*f'c*b
a=
Seguir Iterando
6.084
As=
cm
Seguir Iterando
TERCERA ITERACION
6.474
a=
a=
6.094
As=
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=
cm
OK
a=
cm^2
a=0,2d=
42.71
6.54
cm^2
6.16 cm
10.06
As=MU*10^5/0,9*fy*(d-a/2)
As=
Ton-m
5.634
a=As*fy/,85*f'c*b
a=
5.303
E) DISEO DE ESTRIBOS
E,1) MOMENTOS RESISTENTES NEGATIVOS:
As=
TOMAMOS:
5.634
Apoyo 1:
As= 23/4''=
As=
6.54
cm^2
a=
a=
6.16
cm
Mur=
10.06
T-m
Mur=
CON d=42,71
5.299
TERCERA ITERACION
As= 25/8''+21/2''=
Mur=
5.631
a=As*fy/,85*f'c*b
6.47 cm^2
TOMAMOS:
a=
5.244
SEGUNDA ITERACION
a=As*fy/,85*f'c*b
Seguir Iterando
5.572
a=As*fy/,85*f'c*b
As=MU*10^5/0,9*fy*(d-a/2)
As=
7.735
15 cm
5.365
8.85
APOYO B: MB=
Apoyo 2:
PRIMERA ITERACION
As=
16.14
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=
15.19
cm
As=
Mur=
22.08
T-m
a=As*fy/,85*f'c*b
Seguir Iterando
13.763
a=
Apoyo 3:
12.954
SEGUNDA ITERACION
As=
6.54
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=
6.16
cm
As=
10.06
T-m
a=As*fy/,85*f'c*b
Mur=
Seguir Iterando
13.730
a=
E,2) DETERMINACION DEL DIAGRAMA DE CONTRANTE.
12.922
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
Vi=Wui*l/2+(Muri-Mruj)/l
As=
13.724
a=As*fy/,85*f'c*b
V1=
4.65
T-m
a=
12.917
V'2=
-7.20
T-m
As=
13.724
V''2=
7.31
T-m
TOMAMOS:
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
cm^2
V3=
-4.54
T-m
As=
21''+25/8''=
a=
13.327
Mur=
11.85
5.625
8.41
x1
13.06
x1+x2
=
=
=
7.31
Z=
3.47
Z
7.31
Vud=Vu-Wu*d
;
x1=
3.99
3.47
7.31
19.87
4.65
;
x2=
2.21
3.47
5 3/8 @
20
5.625
17.5 cm
14.9 Ton
-4.54
ANSVERSAL(ESTRIBOS)
14.92
x1+x2+x3
7.31
x3=
0.89
Vud= 6.386
3.47
15
17.5
Vc=0,53*(f'c)^0,5*b*d
cm
Vc= 8.406
7.31
x4=
2.07
3.47
Vu<Vn
Vs=Vu/-Vc
Vs= 0.192
Vs=2,1*(f'c)^0,5*b*d
Vsmax33.31
0.192
Ton
OK
Espaciamiento maximo de lo
s=
d/2
s=
0.6 m
s=
d/4
s=
0.3 m
Vs= 1,1*(f'c)^0,5*b*d
2.-
3.-
4.-
30cm
Vs= 17.45
0.192
Ton
Smax 21.89
Smax
RANSVERSAL
1.42 cm^2
espaciamiento max.
S=
d/4=
S=
S=
S=
10.945
cm
8*varilla=
10.32
cm
24*estribo=
22.86
cm
2d=
0.8756
20
10.32
Vs=Ar*fy*d/S
m
Vs= 13.06
30 cm
SE TOMA:
S=
10
cm
cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
1 3/8 @
5;
4 3/8 @ 7,5;
6 3/8 @
10
21.9
cm
x4
SE TOMA:
3/8 @
15;
S=
4 3/8 @
20
17,5;
rest. 3/8 @
20
ESTRIBOS DE 3/8''
Recubrimiento:
r=
4 cm
SECCIN DE VIGA:
210
kg/cm^2
c=
0.003
b=
4200
kg/cm^2
s=
0.002
h=
Ton/m
Carga ultima:
2
Wu=
2.11 Ton-m
50.00
asumir 1''
5,625
0,25
5,625
0,25
0,25
C) DISEO
C.1) ACERO POSITIVO
TRAMO A: MAB=
13.670 Tn-m
a=0,2d=
8.76 cm
d= H-(r+3/8''+1''/2)
PRIMERA ITERACION
E LLEVAR LA VIGA
d=
As=MU*10^5/0,9*fy*(d-a/2)
As=
9.178
cm^2
a=As*fy/,85*f'c*b
a=
8.638
min=0,70*f'c^0,5/fy
cm
Seguir Iterando
min 0.002
SEGUNDA ITERACION
3.27 cm^2
Asmin=min*b*d
As=MU*10^5/0,9*fy*(d-a/2)
Asmi 2.643
As=
SE TOMA:Asmin=11/2''+1
9.165
cm^2
a=As*fy/,85*f'c*b
a=
8.625
a=Asmin*fy/0,85*f'c*b
cm
Seguir Iterando
amin 3.078
TERCERA ITERACION
Mumin=0,9*fy*Asmin(d-a/2)
As=MU*10^5/0,9*fy*(d-a/2)
As=
9.163
Mumi 5.221
cm^2
a=As*fy/,85*f'c*b
a=
8.624
cm
As=
9.163
OK
max=0,75*b
cm^2
b=0,85**f'c/fy(6300/(6300
TOMAMOS:
b=
As= 11''+25/8''=
a=
Mur=
17.2
cm^2
9.060
cm^2
bm
8.5270588 cm
13.670 Tn-m
PRIMERA ITERACION
0.01625625
Asmax=bmx*b*d
13.53 Ton-m
TRAMOB: MAB=
0.021675
Asma 17.79
a=0,1d=
8.76 cm
SE TOMA:Asmax=21''+23
amax=Asmax*fy/0,85*f'c*b
As=MU*10^5/0,9*fy*(d-a/2)
amax 16.16
As=
Mumax=0,9*fy*Asmin(d-a/2)
9.178
cm^2
a=As*fy/,85*f'c*b
Muma23.17
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a=
8.638
cm
Seguir Iterando
B.3) ANALISIS
SEGUNDA ITERACION
MOMENTOS OBTENIDOS EN E
As=MU*10^5/0,9*fy*(d-a/2)
MOMENTOS POSITIVOS:
As=
MAB=
9.165
cm^2
a=As*fy/,85*f'c*b
a=
8.625
MBC=
cm
Seguir Iterando
TERCERA ITERACION
MOMENTOS NEGATIVOS
As=MU*10^5/0,9*fy*(d-a/2)
MA=
As=
MB=
9.163
cm^2
a=As*fy/,85*f'c*b
MC=
APOYO C: MA=
cm^2
12.860 Tn-m
a=0,2d=
a=0,2d=
As=MU*10^5/0,9*fy*(d-a/2)
As= 15/8''+23/4''=
As=
a=
7.228
Mur=
11.66
8.606
cm^2
8.100
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
8.563
PRIMERA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=As*fy/,85*f'c*b
a=
Seguir Iterando
8.059
cm
As=
Seguir Iterando
TERCERA ITERACION
As=
8.559
a=
8.055
As=
cm^2
cm
As=MU*10^5/0,9*fy*(d-a/2)
As=
OK
a=
cm^2
8.79
8.27 cm
13.17
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=
Ton-m
7.413
a=As*fy/,85*f'c*b
a=
6.977
E) DISEO DE ESTRIBOS
As=
7.413
TOMAMOS:
Apoyo 1:
As=
45/8''=
As=
8.79
cm^2
a=
7.454
8.27
cm
Mur=
11.99
13.17
T-m
a=
Mur=
a=0,32d=
6.974
TERCERA ITERACION
As= 13/4''+35/8''=
Mur=
7.410
a=As*fy/,85*f'c*b
8.56 cm^2
TOMAMOS:
a=
6.942
SEGUNDA ITERACION
a=As*fy/,85*f'c*b
a=
7.375
a=As*fy/,85*f'c*b
As=MU*10^5/0,9*fy*(d-a/2)
Seguir Iterando
7.431
TOMAMOS:
a=
8.5 cm
a=
PRIMERA ITERACION
a=As*fy/,85*f'c*b
Asumir
8.5 cm
14 cm
APOYO B: MB=
Apoyo 2:
PRIMERA ITERACION
As=
14.16
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=
13.33
cm
As=
Mur=
19.87
T-m
a=As*fy/,85*f'c*b
Seguir Iterando
a=
Apoyo 3:
12.638
11.894
SEGUNDA ITERACION
As=
8.79
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=
8.27
cm
As=
13.17
T-m
a=As*fy/,85*f'c*b
Mur=
12.577
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Seguir Iterando
a=
11.837
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
Vi=Wui*l/2+(Muri-Mruj)/l
As=
12.567
a=As*fy/,85*f'c*b
cm^2
V1=
4.65
T-m
a=
11.828
V'2=
-7.20
T-m
As=
12.567
V''2=
7.31
T-m
TOMAMOS:
V3=
-4.54
T-m
As= 11''+13/4''+25/8=
a=
11.209
Mur=
11.85
5.625
8.41
x1
13.06
x1+x2
=
=
=
7.31
Z=
3.47
x1=
3.99
x2=
2.21
17.19
Vud=Vu-Wu*d
Z
7.31
4.65
3.47
7.31
3.47
5 3/8 @
20
5.625
17.5 cm
-4.54
ANSVERSAL(ESTRIBOS)
Vs=
14.9 Ton
14.92
x1+x2+x3
7.31
x3=
0.89
3.47
Vud= 6.386
15
17.5
Vc=0,53*(f'c)^0,5*b*d
cm
Vc= 8.406
7.31
x4=
2.07
3.47
Vs= 0.192
0.192
Ton
s=
d/2
s=
0.6 m
s=
d/4
s=
0.3 m
0.192
Ton
OK
Vsmax33.31
Espaciamiento maximo de lo
exceder de:
se escoge la
menor
1.-
d/4
2.-
3.-
4.-
30cm
Vs= 1,1*(f'c)^0,5*b*d
Vs= 17.45
Smax=d/2
Smax 21.89
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Espaciamiento en zona de confinamiento:
RANSVERSAL
1.42 cm^2
espaciamiento max.
S=
d/4=
10.945
cm
S=
8*varilla=
10.32
cm
S=
24*estribo=
22.86
cm
S=
2d=
0.8756
Smax
20
10.32
30 cm
Vs=Ar*fy*d/S
Vs= 13.06
SE TOMA:
1 3/8 @
5;
S=
10
4 3/8 @ 7,5;
cm
6 3/8 @
cm
10
21.9
cm
SE TOMA:
3/8 @
15;
S=
4 3/8 @
20
17,5;
x4
rest. 3/8 @
20
kg/cm^2
4200
kg/cm^2
4 cm
VIGA A-B Y B
c=
0.003
s=
0.002
SECCIN DE VIGA:
b=
h=
Ton/m
Carga ultima:
2.11 Ton-m
50.00
5,625
asumir 1''
0,25
5,625
0,25
C) DISEO
C.1) ACERO POSITIVO
TRAMO A: MAB=
E LLEVAR LA VIGA
12.370 Tn-m
a=0,1d=
0,25
PRIMERA ITERACION
d= H-(r+3/8''+1''/2)
As=MU*10^5/0,9*fy*(d-a/2)
d=
As=
7.868
cm^2
a=As*fy/,85*f'c*b
a=
7.405
cm
Seguir Iterando
SEGUNDA ITERACION
3.27 cm^2
4.38 cm
min=0,70*f'c^0,5/fy
min 0.002
As=MU*10^5/0,9*fy*(d-a/2)
Asmin=min*b*d
As=
Asmi 2.643
8.165
cm^2
a=As*fy/,85*f'c*b
a=
7.685
SE TOMA:Asmin=11/2''+1
cm
Seguir Iterando
TERCERA ITERACION
a=Asmin*fy/0,85*f'c*b
amin 3.078
As=MU*10^5/0,9*fy*(d-a/2)
Mumin=0,9*fy*Asmin(d-a/2)
As=
Mumi 5.221
8.194
cm^2
a=As*fy/,85*f'c*b
a=
7.712
As=
cm
8.194
Seguir Iterando
cm^2
max=0,75*b
TOMAMOS:
b=0,85**f'c/fy(6300/(6300
As= 23/4''+21/2''=
a=
Mur=
7.7929412 cm
12.482907 Ton-m
8.280
cm^2
b= 0.022
bm 0.016
Asmax=bmx*b*d
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
TRAMOB: MAB=
17.2
cm^2
12.370 Tn-m
a=0,1d=
4.38 cm
PRIMERA ITERACION
Asma 17.79
SE TOMA:Asmax=21''+23
As=MU*10^5/0,9*fy*(d-a/2)
amax=Asmax*fy/0,85*f'c*b
As=
amax 16.16
7.868
cm^2
a=As*fy/,85*f'c*b
a=
7.405
Mumax=0,9*fy*Asmin(d-a/2)
cm
Seguir Iterando
Muma23.17
SEGUNDA ITERACION
B.3) ANALISIS
As=MU*10^5/0,9*fy*(d-a/2)
MOMENTOS OBTENIDOS EN E
As=
MOMENTOS POSITIVOS:
8.165
cm^2
a=As*fy/,85*f'c*b
a=
7.685
MAB=
cm
Seguir Iterando
MBC=
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
MOMENTOS NEGATIVOS
As=
MA=
8.194
cm^2
a=As*fy/,85*f'c*b
MB=
MC=
Seguir Iterando
APOYO C: MA=
cm^2
6.970 Tn-m
a=0,1d=
Asumir
TOMAMOS:
As= 13/4''+25/8''=
As=
a=
6.409
Mur=
10.44
4.433
cm^2
4.173
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
4.423
PRIMERA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=As*fy/,85*f'c*b
a=
Seguir Iterando
4.162
cm
As=
Seguir Iterando
TERCERA ITERACION
As=
4.422
a=
4.162
cm^2
As=
cm
As=MU*10^5/0,9*fy*(d-a/2)
As=
OK
4.42 cm^2
a=
4.56
4.29 cm
a=0,24d=
3.608
TERCERA ITERACION
As= 15/8''+21/2''=
cm^2
3.833
a=As*fy/,85*f'c*b
TOMAMOS:
a=
3.640
SEGUNDA ITERACION
a=As*fy/,85*f'c*b
a=
3.867
a=As*fy/,85*f'c*b
As=MU*10^5/0,9*fy*(d-a/2)
Seguir Iterando
6.599
As=MU*10^5/0,9*fy*(d-a/2)
a=
4.4 cm
a=
PRIMERA ITERACION
a=As*fy/,85*f'c*b
a=0,1d=
4.38 cm
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=
3.832
a=As*fy/,85*f'c*b
a=
3.606
E) DISEO DE ESTRIBOS
As=
3.832
TOMAMOS:
Apoyo 1:
As= 25/8''=
As=
5.70
cm^2
a=
a=
5.36
cm
Mur=
Mur=
8.85
T-m
11 cm
3.727
6.27
APOYO B: MB=
Apoyo 2:
PRIMERA ITERACION
As=
11.40
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=
10.73
cm
As=
9.776
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mur=
16.55
T-m
a=As*fy/,85*f'c*b
Seguir Iterando
a=
9.201
Apoyo 3:
SEGUNDA ITERACION
As=
4.56
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=
4.29
cm
As=
Mur=
7.18
T-m
a=As*fy/,85*f'c*b
Seguir Iterando
9.831
a=
9.253
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
Vi=Wui*l/2+(Muri-Mruj)/l
As=
9.838
a=As*fy/,85*f'c*b
V1=
4.65
T-m
a=
9.259
V'2=
-7.20
T-m
As=
9.838
V''2=
7.31
T-m
TOMAMOS:
V3=
-4.54
T-m
As= 23/4''+25/8''=
cm^2
a=
9.092
Mur=
14.33
Vud=Vu-Wu*d
11.85
5.625
8.41
x1
13.06
x1+x2
=
=
=
7.31
Z=
3.47
Z
7.31
4.65
;
x1=
3.99
x2=
2.21
3.47
7.31
3.47
5.625
5 3/8 @
-4.54
17.5
20
cm
ANSVERSAL(ESTRIBOS)
14.92022 Ton
14.92
x1+x2+x3
7.31
x3=
0.89
3.47
Vc=0,53*(f'c)^0,5*b*d
2 3/8 @
15
17.5
Vc= 8.406
cm
x4=
2.07
3.47
Vu<Vn
Vs=Vu/-Vc
Vs= 0.192
0.192
Ton
Vs=2,1*(f'c)^0,5*b*d
OK
Vsmax33.31
Espaciamiento maximo de lo
s=
d/2
s=
0.6 m
exceder de:
s=
d/4
se escoge la
menor
1.-
d/4
Vs= 1,1*(f'c)^0,5*b*d
2.-
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
s=
0.192
0.3 m
se escoge la
menor
3.-
4.-
30cm
Ton
Vs= 17.45
d) Fuera de la zona de confinamiento no puede exceder de d/2.
e) En todos los casos los espaciamientos no deben exceder a los
Smax=d/2
Smax 21.89
Smax
RANSVERSAL
1.42 cm^2
espaciamiento max.
d/4=
S=
S=
S=
10.945
cm
8*varilla=
10.32
cm
24*estribo=
22.86
cm
2d=
0.8756
20
10.32
Vs=Ar*fy*d/S
m
Vs= 13.06
30 cm
SE TOMA:
1 3/8 @
5;
S=
10
4 3/8 @ 7,5;
cm
6 3/8 @
cm
10
21.9
cm
x4
SE TOMA:
3/8 @
15;
4 3/8 @
S=
17,5;
20
rest. 3/8 @
20
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
DISEO DE VIGAS DE PORTICO 3-3 EN DIRECCION X-X
PRIMER PISO
SECCIN DE VIGA:
ESTRIBOS DE 3/8''
Recubrimiento:
r=
0.25 m
f'c=
210
kg/cm^2
c=
0.50 m
fy=
4200
kg/cm^2
s=
Carga ultima:
4 cm
0.003
0.002
asumir 1''
0,25
25.00
5,625
5,625
0,25
0,25
C) DISEO
C.1) ACERO POSITIVO
d= H-(r+3/8''+1''/2)
43.78 cm
a=0,1d=
4.38
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
7.887 cm^2
a=As*fy/,85*f'c*b
a=
7.423 cm
Asmin=min*b*d
SEGUNDA ITERACION
cm^2
Seguir Iterando
As=MU*10^5/0,9*fy*(d-a/2)
SE TOMA:Asmin=11/2''+15/8''=
3.27 cm^2
a=Asmin*fy/0,85*f'c*b
As=
8.187
cm^2
a=As*fy/,85*f'c*b
cm
a=
Mumin=0,9*fy*Asmin(d-a/2)
7.705
cm
Seguir Iterando
TERCERA ITERACION
Ton-m
As=MU*10^5/0,9*fy*(d-a/2)
As=
8.216 cm^2
a=As*fy/,85*f'c*b
max=0,75*b
a=
b=0,85**f'c/fy(6300/(6300+4200))
7.733
cm
As=
8.216
Seguir Iterando
cm^2
TOMAMOS:
As= 23/4''+21/2''=
Asmax=bmx*b*d
a=
cm^2
8.280
cm^2
7.792941 cm
SE TOMA:Asmax=21''+23/4''+11/2''= 17.2
amax=Asmax*fy/0,85*f'c*b
cm
cm^2
TRAMOB: MAB=
12.400 Tn-m
a=0,15d= 6.57
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
Mumax=0,9*fy*Asmin(d-a/2)
Ton-m
As=
8.101
cm^2
a=As*fy/,85*f'c*b
B.3) ANALISIS
a=
7.624
cm
Seguir Iterando
SEGUNDA ITERACION
MOMENTOS POSITIVOS:
As=MU*10^5/0,9*fy*(d-a/2)
12.400 Tn-m
As=
12.400 Tn-m
a=As*fy/,85*f'c*b
a=
MOMENTOS NEGATIVOS
8.76 Tn-m
8.208
7.725
cm^2
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
19.36 Tn-m
As=
8.76 Tn-m
7.735
cm^2
a=As*fy/,85*f'c*b
cm
TOMAMOS: As=
8.218
8.218
23/4''+21/2''=
OK
APOYO C: MA=
cm^2
PRIMERA ITERACION
8.28
cm^2
8.760 Tn-m
cm
As=
12.48
Ton-m
a=As*fy/,85*f'c*b
Asumir
8.760 Tn-m
a=0,1d=
a=
4.38 cm
PRIMERA ITERACION
cm^2
a=
cm
Seguir Iterando
cm^2
cm
Seguir Iterando
cm^2
5.634
cm^2
23/4''=
5.7
a=
5.303
As=
5.63
cm
OK
cm^2
a=
5.36
Mur=
8.85
5.7
cm^2
cm
Ton-m
E) DISEO DE ESTRIBOS
E,1) MOMENTOS RESISTENTES NEGATIVOS:
Apoyo 1:
cm^2
cm
As=
5.70
cm^2
Ton-m
a=
5.36
cm
Mur=
8.85
T-m
19.360 Tn-m
a=0,2d=
13.1 cm
Apoyo 2:
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
cm^2
a=As*fy/,85*f'c*b
cm
As=
14.16
cm^2
a=
13.33
cm
Mur=
19.87
T-m
Seguir Iterando
Apoyo 3:
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
cm^2
a=As*fy/,85*f'c*b
12.922
cm^2
OK
TOMAMOS:
13.730
5.634
As= 23/4''=
cm
12.954
Seguir Iterando
TOMAMOS:
5.303
13.763
cm
a=As*fy/,85*f'c*b
a=As*fy/,85*f'c*b
APOYO B: MB=
cm^2
5.299
As=
As=MU*10^5/0,9*fy*(d-a/2)
8.85
5.631
As=MU*10^5/0,9*fy*(d-a/2)
TERCERA ITERACION
5.365
Seguir Iterando
TERCERA ITERACION
a=As*fy/,85*f'c*b
5.634
a=As*fy/,85*f'c*b
As=MU*10^5/0,9*fy*(d-a/2)
5.299
5.244
As=
SEGUNDA ITERACION
5.631
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=As*fy/,85*f'c*b
5.244
5.572
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
5.572
4.38
As=MU*10^5/0,9*fy*(d-a/2)
7.793
a=0,1d=
cm
As=
5.70
cm^2
a=
5.36
cm
Mur=
8.85
T-m
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
13.724
cm^2
Vi=Wui*l/2+(Muri-Mruj)/l
a=As*fy/,85*f'c*b
TOMAMOS:
12.917
cm
13.724
cm^2
OK
V1=
4.65
T-m
V'2=
-7.20
T-m
V''2=
7.31
T-m
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
21''+25/8''=
13.327
19.87
14.16
cm^2
V3=
-4.54
T-m
cm
Ton-m
11.85
Vud=Vu-Wu*d
5.625
7.31
8.41
x1
13.06
x1+x2
7.31
Z=
3.47
x1=
3.99
x2=
2.21
Z
7.31
3.47
7.31
3.47
5 3/8 @
20
5.625
Colocanco estribos 3/8 @
-7.20
-4.54
Vs=
17.5 cm
14.9 Ton
14.92
x1+x2+x3
7.31
Vc=0,53*(f'c)^0,5*b*d
2 3/8 @
Ton
x1+x2+x3+x4
=
0.89
15
17.5
cm
17.4 Ton
17.41
Vu/=Vs+Vc
Vs=Vu/-Vc
x3=
3.47
7.31
x4=
2.07
3.47
0.85
SEGN LA NORMA E-060 DISEO SISMICO
Vs=2,1*(f'c)^0,5*b*d
Ton
>
Vs=
0.192
Ton
OK
b) Longitud de confinamiento de 2 veces el peralte(2d).
Vs
s=
s=
d/2
0.6 m
<
Vs
s=
d/4
s=
0.3 m
1,1*(f'c)^0,5*b*d
Ton
>
Vs=
0.192
2.-
3.-
4.-
30cm
Ton
d) Fuera de la zona de confinamiento no puede exceder de d/2.
cm
cm
S=
d/4=
S=
S=
Ar=
1.42 cm^2
Vs=Ar*fy*d/S
ton
S=
10.945
cm
8*varilla=
10.32
cm
24*estribo=
22.86
cm
2d=
S=
30 cm
SE TOMA:
S=
10
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
1 3/8 @
5;
4 3/8 @ 7,5;
x2
x1
s=
21.9
cm
SE TOMA:
3 3/8 @ 15;
S=
4 3/8 @
20
17,5;
rest.
SEGUNDO PISO
SECCIN DE VIGA:
ESTRIBOS DE 3/8''
Recubrimiento:
r=
4 cm
0.25 m
f'c=
210
kg/cm^2
c=
0.003
0.50 m
fy=
4200
kg/cm^2
s=
0.002
Carga ultima:
asumir 1''
5,625
0,25
25.00
0,25
5,625
0,25
C) DISEO
C.1) ACERO POSITIVO
d= H-(r+3/8''+1''/2)
43.78 cm
As=MU*10^5/0,9*fy*(d-a/2)
As=
min=0,70*f'c^0,5/fy
a=As*fy/,85*f'c*b
a=
Asmin=min*b*d
7.813
7.353
cm^2
cm
As=MU*10^5/0,9*fy*(d-a/2)
3.27 cm^2
a=Asmin*fy/0,85*f'c*b
As=
7.890
cm^2
a=As*fy/,85*f'c*b
cm
a=
Mumin=0,9*fy*Asmin(d-a/2)
7.426
cm
As=MU*10^5/0,9*fy*(d-a/2)
As=
7.897
cm^2
a=As*fy/,85*f'c*b
max=0,75*b
a=
b=0,85**f'c/fy(6300/(6300+4200))
a=
cm^2
Ton-m
7.897
OK
cm^2
As= 23/4''+15/8''=
Asmax=bmx*b*d
Mumax=0,9*fy*Asmin(d-a/2)
cm
TOMAMOS:
0.01625625
cm
7.432
As=
0.021675
SE TOMA:Asmax=21''+23/4''+11/2''= 17.2
Seguir Iterando
TERCERA ITERACION
Ton-m
amax=Asmax*fy/0,85*f'c*b
Seguir Iterando
SEGUNDA ITERACION
cm^2
SE TOMA:Asmin=11/2''+15/8''=
a=0,15d= 6.57
PRIMERA ITERACION
Mur=
cm^2
7.680
cm^2
7.228235 cm
11.66032 Ton-m
TRAMOB: MAB=
11.960 Tn-m
a=0,1d=
4.38
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
7.607
cm^2
a=As*fy/,85*f'c*b
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
B.3) ANALISIS
a=
7.160
cm
Seguir Iterando
SEGUNDA ITERACION
MOMENTOS POSITIVOS:
As=MU*10^5/0,9*fy*(d-a/2)
11.960 Tn-m
As=
11.960 Tn-m
a=As*fy/,85*f'c*b
a=
MOMENTOS NEGATIVOS
7.871
7.408
cm^2
cm
Seguir Iterando
TERCERA ITERACION
11.29 Tn-m
As=MU*10^5/0,9*fy*(d-a/2)
17.99 Tn-m
As=
11.29 Tn-m
7.431
7.895
cm^2
a=As*fy/,85*f'c*b
cm
7.895
Seguir Iterando
APOYO C: MA=
cm^2
15/8''+23/4''=
7.68
11.290 Tn-m
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
cm
As=
11.66
Ton-m
a=As*fy/,85*f'c*b
Asumir
11.290 Tn-m
a=
a=0,15d= 6.57 cm
PRIMERA ITERACION
cm^2
a=
cm
Seguir Iterando
Seguir Iterando
7.427
cm^2
6.991
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
cm^2
cm
7.414
cm^2
a=As*fy/,85*f'c*b
a=As*fy/,85*f'c*b
Seguir Iterando
TERCERA ITERACION
a=
6.978
As=
7.41
cm
Seguir Iterando
cm^2
TOMAMOS:
As=MU*10^5/0,9*fy*(d-a/2)
7.413
cm
a=As*fy/,85*f'c*b
As=MU*10^5/0,9*fy*(d-a/2)
6.974
7.134
As=
SEGUNDA ITERACION
7.410
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=As*fy/,85*f'c*b
6.942
7.580
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
7.375
8.76
PRIMERA ITERACION
7.228
APOYO A: MA=
a=0,2d=
As= 45/8''=
cm^2
a=
a=As*fy/,85*f'c*b
7.45
Mur=
6.977
cm
7.413
cm^2
7.92
cm^2
cm
11.99
Ton-m
OK
E) DISEO DE ESTRIBOS
TOMAMOS:
7.92
cm^2
Apoyo 1:
7.454
cm
As=
11.99
Ton-m
a=
Mur=
APOYO B: MB=
17.986 Tn-m
cm^2
a=As*fy/,85*f'c*b
cm
As=MU*10^5/0,9*fy*(d-a/2)
a=As*fy/,85*f'c*b
cm
T-m
As=
11.91
cm^2
a=
11.21
cm
Mur=
17.19
T-m
Seguir Iterando
Apoyo 3:
SEGUNDA ITERACION
12.577
7.45
11.99
Apoyo 2:
As=MU*10^5/0,9*fy*(d-a/2)
11.894
cm^2
a=0,28d= 12.3 cm
PRIMERA ITERACION
12.638
7.92
cm^2
As=
7.92
cm^2
a=
7.45
cm
11.99
T-m
Mur=
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
11.837
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
12.567
cm^2
Vi=Wui*l/2+(Muri-Mruj)/l
a=As*fy/,85*f'c*b
11.828
cm
12.567
cm^2
OK
TOMAMOS:
11''+13/4''+25/8=
11.209
17.19
11.91
cm^2
V1=
4.65
T-m
V'2=
-7.20
T-m
V''2=
7.31
T-m
V3=
-4.54
T-m
cm
Ton-m
Vud=Vu-Wu*d
7.31
11.85
5.625
8.41
x1
13.06
5.625
x1+x2
=
=
=
7.31
Z=
3.47
x1=
3.99
x2=
2.21
Z
7.31
3.47
7.31
3.47
5 3/8 @
-7.20
-4.54
20
17.5 cm
Vs=
14.9 Ton
Ton
=
14.92
Vc=0,53*(f'c)^0,5*b*d
x1+x2+x3
7.31
Ton
2 3/8 @
Colocanco estribos 3/8 @
Vs=
Vu/=Vs+Vc
Vs=Vu/-Vc
x3=
0.85
15
17.5
cm
17.4 Ton
17.41
=
0.89
3.47
x1+x2+x3+x4
7.31
x4=
2.07
3.47
Vs=2,1*(f'c)^0,5*b*d
Ton
>
Vs=
0.192
Ton
OK
b) Longitud de confinamiento de 2 veces el peralte(2d).
Vs
1,1*(f'c)^0,5*b*d
<
Ton
>
Vs=
Vs
s=
d/2
s=
0.6 m
exceder de:
s=
d/4
s=
0.3 m
0.192
se escoge la
menor
1.-
d/4
2.-
3.-
4.-
30cm
Ton
d) Fuera de la zona de confinamiento no puede exceder de d/2.
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
cm
S=
d/4=
S=
S=
Ar=
1.42 cm^2
Vs=Ar*fy*d/S
ton
S=
10.945
cm
8*varilla=
10.32
cm
24*estribo=
22.86
cm
2d=
S=
30 cm
SE TOMA:
1 3/8 @
5;
S=
10
4 3/8 @ 7,5;
x2
x1
s=
21.9
cm
SE TOMA:
3 3/8 @ 15;
S=
4 3/8 @
20
17,5;
rest.
QUINTO PISO
SECCIN DE VIGA:
ESTRIBOS DE 3/8''
Recubrimiento: r=
4 cm
0.25 m
f'c=
210
kg/cm^2
c=
0.003
0.50 m
fy=
4200
kg/cm^2
s=
0.002
Carga ultima:
d
5,625
asumir 1''
0,25
5,625
0,25
0,25
C) DISEO
25.00
43.78 cm
As=MU*10^5/0,9*fy*(d-a/2)
As=
min=0,70*f'c^0,5/fy
a=As*fy/,85*f'c*b
a=
Asmin=min*b*d
cm
Mumin=0,9*fy*Asmin(d-a/2)
Ton-m
6.825
6.424
cm^2
cm
As=MU*10^5/0,9*fy*(d-a/2)
3.27 cm^2
As=
6.997
cm^2
a=As*fy/,85*f'c*b
a=
6.586
cm
As=MU*10^5/0,9*fy*(d-a/2)
As=
7.011
cm^2
a=As*fy/,85*f'c*b
max=0,75*b
a=
Asmax=bmx*b*d
Seguir Iterando
TERCERA ITERACION
b=0,85**f'c/fy(6300/(6300+4200))
Seguir Iterando
SEGUNDA ITERACION
cm^2
a=Asmin*fy/0,85*f'c*b
4.38
PRIMERA ITERACION
SE TOMA:Asmin=11/2''+15/8''=
a=0,1d=
6.599
As=
cm
7.011
Seguir Iterando
cm^2
TOMAMOS:
As= 13/4''+25/8''=
a=
6.810
cm^2
6.409412 cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
cm^2
Mur=
SE TOMA:Asmax=21''+23/4''+11/2''= 17.2
cm^2
10.44481 Ton-m
TRAMOB: MAB=
amax=Asmax*fy/0,85*f'c*b
10.730 Tn-m
a=0,12d= 5.25
PRIMERA ITERACION
cm
As=MU*10^5/0,9*fy*(d-a/2)
Mumax=0,9*fy*Asmin(d-a/2)
As=
Ton-m
6.898
cm^2
a=As*fy/,85*f'c*b
B.3) ANALISIS
a=
6.492
SEGUNDA ITERACION
MOMENTOS POSITIVOS:
As=MU*10^5/0,9*fy*(d-a/2)
10.730 Tn-m
As=
10.730 Tn-m
a=As*fy/,85*f'c*b
a=
MOMENTOS NEGATIVOS
6.591
Seguir Iterando
cm^2
cm
Seguir Iterando
TERCERA ITERACION
6.08 Tn-m
As=MU*10^5/0,9*fy*(d-a/2)
14.56 Tn-m
As=
6.08 Tn-m
6.599
7.003
cm
7.012
cm^2
a=As*fy/,85*f'c*b
cm
7.012
OK
APOYO C: MA=
cm^2
13/4''+25/8''=
6.81
6.080 Tn-m
As=MU*10^5/0,9*fy*(d-a/2)
cm
As=
10.44
Ton-m
a=As*fy/,85*f'c*b
Asumir
6.080 Tn-m
a=0,1d=
a=
4.38 cm
cm^2
a=
cm
Seguir Iterando
Seguir Iterando
3.833
cm^2
3.608
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=MU*10^5/0,9*fy*(d-a/2)
As=
cm^2
cm
3.832
cm^2
a=As*fy/,85*f'c*b
a=As*fy/,85*f'c*b
Seguir Iterando
TERCERA ITERACION
a=
3.606
As=
3.83
cm
OK
cm^2
TOMAMOS:
As=MU*10^5/0,9*fy*(d-a/2)
3.832
cm
a=As*fy/,85*f'c*b
SEGUNDA ITERACION
3.608
3.640
As=
a=As*fy/,85*f'c*b
3.833
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=MU*10^5/0,9*fy*(d-a/2)
3.640
3.867
SEGUNDA ITERACION
PRIMERA ITERACION
3.867
4.38
PRIMERA ITERACION
cm^2
6.409
APOYO A: MA=
a=0,1d=
As= 25/8''=
cm^2
a=As*fy/,85*f'c*b
3.606
cm
3.832
cm^2
3.96
a=
3.73
cm
Mur=
6.27
Ton-m
cm^2
OK
E) DISEO DE ESTRIBOS
TOMAMOS:
25/8''=
3.96
3.727
6.27
APOYO B: MB=
cm
As=
3.96
cm^2
Ton-m
a=
3.73
cm
Mur=
6.27
T-m
14.560 Tn-m
a=0,2d=
8.76 cm
Apoyo 2:
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
9.776
Apoyo 1:
cm^2
cm^2
As=
9.66
cm^2
a=
9.09
cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mur=
a=As*fy/,85*f'c*b
9.201
cm
Apoyo 3:
As=MU*10^5/0,9*fy*(d-a/2)
cm^2
a=As*fy/,85*f'c*b
9.253
T-m
Seguir Iterando
SEGUNDA ITERACION
9.831
14.33
cm
As=
3.96
cm^2
a=
3.73
cm
Mur=
6.27
T-m
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
9.838
cm^2
Vi=Wui*l/2+(Muri-Mruj)/l
a=As*fy/,85*f'c*b
9.259
cm
OK
9.838
cm^2
TOMAMOS:
23/4''+25/8''=
9.66
9.092
cm
14.33
Ton-m
V1=
4.65
T-m
V'2=
-7.20
T-m
V''2=
7.31
T-m
V3=
-4.54
T-m
cm^2
Vud=Vu-Wu*d
11.85
7.31
5.625
8.41
x1
13.06
x1+x2
=
=
=
7.31
Z=
3.47
x1=
3.99
x2=
2.21
Z
7.31
3.47
7.31
3.47
5.625
5 3/8 @
Colocanco estribos 3/8 @
-7.20
17.5
20
cm
-4.54
Vs=
14.92022 Ton
14.92
x1+x2+x3
7.31
2 3/8 @
Ton
x1+x2+x3+x4
=
15
17.5
cm
17.4 Ton
17.41
Vu/=Vs+Vc
0.89
3.47
Vc=0,53*(f'c)^0,5*b*d
Vs=Vu/-Vc
x3=
7.31
x4=
2.07
3.47
0.85
SEGN LA NORMA E-060 DISEO SISMICO
a) Los estribos seran como minimo de 3/8; para varillas
Vs=2,1*(f'c)^0,5*b*d
Ton
>
Vs=
0.192
Ton
Vs
1,1*(f'c)^0,5*b*d
<
OK
Vs
s=
d/2
s=
0.6 m
s=
d/4
exceder de:
se escoge la
menor
1.-
d/4
2.-
3.-
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
s=
Ton
>
Vs=
0.192
0.3 m
Ton
4.-
30cm
S=
d/4=
S=
S=
Ar=
1.42 cm^2
Vs=Ar*fy*d/S
ton
S=
10.945
cm
8*varilla=
10.32
cm
24*estribo=
22.86
cm
2d=
S=
30 cm
SE TOMA:
1 3/8 @
5;
S=
10
4 3/8 @ 7,5;
x2
Z
21.9
cm
x1
SE TOMA:
3 3/8 @ 15;
4 3/8 @
S=
17,5;
20
rest.
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
PRIMER PISO
SECCIN DE VIGA:
ESTRIBOS DE 3/8''
Recubrimiento:
b=
0.25 m
f'c=
210
kg/cm^2
h=
0.50 m
fy=
4200
kg/cm^2
Carga ultima:
2
Wu= 2.11 Ton-m
50.00
asumir 1''
0,25
25.00
5,625
0,25
C) DISEO
C.1) ACERO POSITIVO
cm
d= H-(r+3/8''+1''/2)
d=
43.78 cm
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
7.284 cm^2
a=As*fy/,85*f'c*b
a=
6.855 cm
Asmin=min*b*d
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
SE TOMA:Asmin=11/2''+15/8''=
3.27 cm^2
7.310
cm^2
a=Asmin*fy/0,85*f'c*b
a=As*fy/,85*f'c*b
amin 3.078 cm
a=
Mumin=0,9*fy*Asmin(d-a/2)
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
7.312 cm^2
a=As*fy/,85*f'c*b
max=0,75*b
a=
b=0,85**f'c/fy(6300/(6300+4200))
cm
As=
6.880
6.882
cm
cm
As=
7.312
b= 0.022
TOMAMOS:
bm 0.016
As= 35/8''+11/2''=
Asmax=bmx*b*d
a=
SE TOMA:Asmax=21''+23/4''+11/2''= 17.2
amax=Asmax*fy/0,85*f'c*b
cm^2
6.804706 cm
TRAMOB: MAB=
11.150 Tn-m
PRIMERA ITERACION
amax 16.16 cm
As=MU*10^5/0,9*fy*(d-a/2)
Mumax=0,9*fy*Asmin(d-a/2)
As=
Muma23.17 Ton-m
a=As*fy/,85*f'c*b
B.3) ANALISIS
a=
7.284
6.855
cm^2
cm
SEGUNDA ITERACION
MOMENTOS POSITIVOS:
As=MU*10^5/0,9*fy*(d-a/2)
MAB=
11.15 Tn-m
As=
MBC=
11.15 Tn-m
a=As*fy/,85*f'c*b
a=
7.310
6.880
cm^2
cm
MOMENTOS NEGATIVOS
TERCERA ITERACION
MA=
As=MU*10^5/0,9*fy*(d-a/2)
7.850 Tn-m
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
MB=
17.400 Tn-m
MC=
cm
As=
7.85 Tn-m
a=
6.882
cm^2
a=As*fy/,85*f'c*b
cm
TOMAMOS: As=
7.312
7.312
As= 35/8''+11/2''=
OK
APOYO C: MA=
cm^2
PRIMERA ITERACION
7.23
cm^2
7.850 Tn-m
As=MU*10^5/0,9*fy*(d-a/2)
a=
6.805
cm
As=
Mur=
11.03
Ton-m
a=As*fy/,85*f'c*b
Asumir
11.150 Tn-m
a=
a=0,15d= 6.57 cm
PRIMERA ITERACION
7.284
6.855
As=
cm^2
a=
cm
Seguir Iterando
6.880
As=
cm^2
cm
Seguir Iterando
5.014
cm^2
a=
4.719
As=
5.01
cm
cm^2
TOMAMOS:
As=MU*10^5/0,9*fy*(d-a/2)
7.312
cm
a=As*fy/,85*f'c*b
TERCERA ITERACION
As=
4.718
As=MU*10^5/0,9*fy*(d-a/2)
a=As*fy/,85*f'c*b
a=
cm^2
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
7.310
5.013
a=As*fy/,85*f'c*b
SEGUNDA ITERACION
As=
cm
As=MU*10^5/0,9*fy*(d-a/2)
a=As*fy/,85*f'c*b
a=
4.699
cm^2
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
4.993
As= 35/8''+11/2''=
cm^2
a=
a=As*fy/,85*f'c*b
6.80
Mur=
a=
6.882
cm
As=
TOMAMOS:
7.312
cm^2
As= 35/8''+11/2''=
cm
11.03
OK
7.23
E) DISEO DE ESTRIBOS
E,1) MOMENTOS RESISTENTES NEGA
Apoyo 1:
cm^2
a=
6.805
cm
As=
7.23
cm^2
Mur=
11.03
Ton-m
a=
6.80
cm
11.03
T-m
Mur=
APOYO B: MB=
17.400 Tn-m
a=0,25d= 10.9 cm
Apoyo 2:
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
12.016
cm^2
a=As*fy/,85*f'c*b
a=
11.310
cm
As=
11.91
cm^2
a=
11.21
cm
Mur=
17.19
T-m
Seguir Iterando
Apoyo 3:
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
7.23
cm^2
As=
a=
6.80
cm
11.03
T-m
12.074
cm^2
Mur=
a=As*fy/,85*f'c*b
a=
11.364
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
12.082
cm^2
Vi=Wui*l/2+(Muri-Mruj)/l
a=As*fy/,85*f'c*b
a=
11.372
cm
As=
12.082
cm^2
TOMAMOS:
OK
V1=
4.65
T-m
V'2=
-7.20
T-m
V''2=
7.31
T-m
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As= 11''+13/4''+25/8''=
a=
11.209
Mur=
17.19
11.91
cm^2
V3=
-4.54
cm
Ton-m
11.85
Vud=Vu-Wu*d
5.625
T-m
7.31
8.41
4.65
x1
13.06
x1+x2
5.625
7.31
Z
7.31
3.47
7.31
3.47
5.625
Colocanco estribos 3/8
-7.20
-4.54
Vs=
14.9 Ton
14.92
x1+x2+x3
7.31
3.47
Vc=0,53*(f'c)^0,5*b*d
Vc= 8.406 Ton
17.41
Vs=
m
Vu<Vn
Vu/=Vs+Vc
Vs=Vu/-Vc
17.4 Ton
=
x1+x2+x3+x4
=
7.31
3.47
0.85
O SISMICO
Vs= 0.192
; para varillas
Vs=2,1*(f'c)^0,5*b*d
Vsmax33.31 Ton
>
Vs=
0.192
Ton
OK
peralte(2d).
b) Longitud de confinamiento de 2 v
Espaciamiento maximo de los estribos:
o no deben
>
Vs
s=
s=
d/2
0.6 m
<
Vs
s=
d/4
s=
0.3 m
Vs= 1,1*(f'c)^0,5*b*d
illa de menor diametro
>
Vs=
0.192
2.-
8 veces el d
3.-
24 veces el di
4.-
30cm
Ton
0.8756
10.32
Smax 21.89 cm
Smax
20 cm
S=
d/4=
S=
8*varilla=
10.32
S=
24*estribo=
22.86
Ar=
1.42 cm^2
Vs=Ar*fy*d/S
m
S=
cm
cm
10.945
30 cm
SE TOMA:
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
3/8 @
10
1 3/8 @
5;
x3
x2
x1
s=
21.9
cm
Z
3/8 @
20
SE TOMA:
SEGUNDO PISO
SECCIN DE VIGA:
ESTRIBOS DE 3/8''
Recubrimiento:
b=
0.25 m
f'c=
210
kg/cm^2
h=
0.50 m
fy=
4200
kg/cm^2
Carga ultima:
3 3/8 @ 15;
asumir 1''
0,25
5,625
0,25
25.00
0,25
C) DISEO
C.1) ACERO POSITIVO
cm
d= H-(r+3/8''+1''/2)
d=
TRAMO A: MAB=
43.78 cm
As=MU*10^5/0,9*fy*(d-a/2)
As=
min=0,70*f'c^0,5/fy
a=As*fy/,85*f'c*b
min 0.002
a=
Asmin=min*b*d
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
SE TOMA:Asmin=11/2''+15/8''=
3.27 cm^2
As=
6.382
6.007
6.339
cm^2
cm
cm^2
a=Asmin*fy/0,85*f'c*b
a=As*fy/,85*f'c*b
amin 3.078 cm
a=
Mumin=0,9*fy*Asmin(d-a/2)
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
5.966
6.335
cm
cm^2
a=As*fy/,85*f'c*b
max=0,75*b
a=
b=0,85**f'c/fy(6300/(6300+4200))
5.963
cm
As=
6.335
b= 0.022
TOMAMOS:
bm 0.016
As= 25/8''+11/2''=
Asmax=bmx*b*d
a=
9.770 Tn-m
PRIMERA ITERACION
SE TOMA:Asmax=21''+23/4''+11/2''= 17.2
amax=Asmax*fy/0,85*f'c*b
Mur=
cm^2
6.155294 cm
10.06211 Ton-m
TRAMOB: MAB=
9.770 Tn-m
PRIMERA ITERACION
amax 16.16 cm
As=MU*10^5/0,9*fy*(d-a/2)
Mumax=0,9*fy*Asmin(d-a/2)
As=
Muma23.17 Ton-m
a=As*fy/,85*f'c*b
6.214
cm^2
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
B.3) ANALISIS
a=
cm
SEGUNDA ITERACION
MOMENTOS POSITIVOS:
As=MU*10^5/0,9*fy*(d-a/2)
MAB=
9.770 Tn-m
As=
MBC=
9.770 Tn-m
a=As*fy/,85*f'c*b
a=
6.326
5.954
cm^2
cm
MOMENTOS NEGATIVOS
TERCERA ITERACION
MA=
9.25 Tn-m
As=MU*10^5/0,9*fy*(d-a/2)
MB=
14.73 Tn-m
MC=
cm
5.849
As=
9.25 Tn-m
a=
5.962
TOMAMOS:
6.334
OK
APOYO C: MA=
cm^2
6.54
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
6.16 cm
As=
Asumir
9.250 Tn-m
a=0,2d=
a=
8.76 cm
PRIMERA ITERACION
5.845
As=
cm^2
cm
Seguir Iterando
5.637
As=
cm^2
cm
Seguir Iterando
As=
5.623
cm^2
a=
5.623
As=
5.97
cm
cm^2
As= 35/8''=
cm^2
a=
5.6 cm
Mur=
cm
9.20
Ton-m
Seguir Iterando
E) DISEO DE ESTRIBOS
5.97 cm^2
TOMAMOS:
As= 35/8''
a=
5.974
TOMAMOS:
a=As*fy/,85*f'c*b
a=
cm
a=As*fy/,85*f'c*b
As=MU*10^5/0,9*fy*(d-a/2)
5.974
5.637
As=MU*10^5/0,9*fy*(d-a/2)
TERCERA ITERACION
As=
cm^2
TERCERA ITERACION
a=As*fy/,85*f'c*b
a=
5.989
a=
As=MU*10^5/0,9*fy*(d-a/2)
5.989
cm
a=As*fy/,85*f'c*b
SEGUNDA ITERACION
As=
5.845
As=MU*10^5/0,9*fy*(d-a/2)
a=As*fy/,85*f'c*b
a=
cm^2
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
6.211
6.211
a=As*fy/,85*f'c*b
As=
9.250 Tn-m
PRIMERA ITERACION
cm^2
a=As*fy/,85*f'c*b
cm
As= 25/8''+11/2''=
a=
6.334
5.94
Apoyo 1:
cm^2
5.59 cm
14.730 Tn-m
a=0,2d=
As=
5.94
cm^2
a=
5.59
cm
Mur=
9.20
T-m
8.76 cm
Apoyo 2:
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
9.66
cm^2
As=
a=
9.09
cm
14.33
T-m
9.890
cm^2
Mur=
a=As*fy/,85*f'c*b
a=
9.308
cm
Apoyo 3:
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
9.960
a=As*fy/,85*f'c*b
Seguir Iterando
cm^2
As=
5.94
cm^2
a=
5.59
cm
Mur=
9.20
T-m
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a=
9.374
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
9.968
cm^2
Vi=Wui*l/2+(Muri-Mruj)/l
a=As*fy/,85*f'c*b
a=
9.382
cm
As=
9.968
cm^2
OK
TOMAMOS:
As=
a=
23/4''+25/8=
9.66
cm^2
V1=
4.65
T-m
V'2=
-7.20
T-m
V''2=
7.31
T-m
V3=
-4.54
T-m
9.09 cm
11.85
7.31
5.625
4.65
8.41
x1
13.06
x1+x2
5.625
=
=
=
7.31
Z
7.31
3.47
7.31
3.47
5.625
Colocanco estribos 3/8
-7.20
-4.54
Vs=
14.9 Ton
14.92
x1+x2+x3
7.31
3.47
Vc=0,53*(f'c)^0,5*b*d
Vc= 8.406 Ton
Vu<Vn
17.41
Vu/=Vs+Vc
Vs=Vu/-Vc
x1+x2+x3+x4
=
7.31
3.47
0.85
Vs= 0.192
O SISMICO
; para varillas
17.4 Ton
Vs=2,1*(f'c)^0,5*b*d
Vsmax33.31 Ton
>
Vs=
0.192
Ton
OK
b) Longitud de confinamiento de 2 v
peralte(2d).
Espaciamiento maximo de los estribos:
o no deben
>
Vs= 1,1*(f'c)^0,5*b*d
illa de menor diametro
<
>
Vs=
Vs
s=
d/2
s=
0.6 m
s=
d/4
s=
0.3 m
0.192
Ton
exceder de:
se escoge la
menor
1.-
d/4
2.-
8 veces el d
3.-
24 veces el di
4.-
30cm
Smax 21.89 cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Smax
0.8756
10.32
20 cm
S=
d/4=
S=
8*varilla=
10.32
S=
24*estribo=
22.86
Ar=
1.42 cm^2
Vs=Ar*fy*d/S
m
S=
10.945
30 cm
SE TOMA:
cm
cm
1 3/8 @
3/8 @
5;
10
x3
x2
20
cm
x1
SE TOMA:
Z
3/8 @
21.9
3 3/8 @ 15;
QUINTO PISO
SECCIN DE VIGA:
ESTRIBOS DE 3/8''
Recubrimiento:
b=
0.25 m
f'c=
210
kg/cm^2
h=
0.50 m
fy=
4200
kg/cm^2
Carga ultima:
2
Wu= 2.11 Ton-m
50.00
asumir 1''
25.00
0,25
5,625
0,25
C) DISEO
C.1) ACERO POSITIVO
cm
d= H-(r+3/8''+1''/2)
d=
TRAMO A: MAB=
43.78 cm
8.740 Tn-m
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
min=0,70*f'c^0,5/fy
a=As*fy/,85*f'c*b
min 0.002
a=
5.559
5.232
cm^2
cm
Asmin=min*b*d
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
SE TOMA:Asmin=11/2''+15/8''=
3.27 cm^2
As=
5.617
cm^2
a=Asmin*fy/0,85*f'c*b
a=As*fy/,85*f'c*b
amin 3.078 cm
a=
Mumin=0,9*fy*Asmin(d-a/2)
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
5.287
5.621
cm
cm^2
a=As*fy/,85*f'c*b
max=0,75*b
a=
b=0,85**f'c/fy(6300/(6300+4200))
b=
bm
0.021675
0.01625625
Asmax=bmx*b*d
5.290
As=
cm
5.621
TOMAMOS:
As= 23/4''=
a=
5.364706 cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Asma 17.79 cm^2
cm
Mur=
SE TOMA:Asmax=21''+23/4''+11/2''= 17.2
cm^2
TRAMOB: MAB=
amax=Asmax*fy/0,85*f'c*b
8.740 Tn-m
PRIMERA ITERACION
amax 16.16 cm
As=MU*10^5/0,9*fy*(d-a/2)
Mumax=0,9*fy*Asmin(d-a/2)
As=
Muma23.17 Ton-m
a=As*fy/,85*f'c*b
B.3) ANALISIS
a=
SEGUNDA ITERACION
MOMENTOS POSITIVOS:
As=MU*10^5/0,9*fy*(d-a/2)
MAB=
8.740 Tn-m
As=
MBC=
8.740 Tn-m
a=As*fy/,85*f'c*b
a=
cm
### Ton-m
5.559
5.232
5.617
5.287
cm^2
cm
cm^2
cm
MOMENTOS NEGATIVOS
TERCERA ITERACION
MA=
4.98 Tn-m
As=MU*10^5/0,9*fy*(d-a/2)
MB=
11.89 Tn-m
MC=
4.98 Tn-m
a=
5.290
TOMAMOS:
As=
cm
5.621
OK
APOYO C: MA=
cm^2
5.7
As=MU*10^5/0,9*fy*(d-a/2)
As=
a=0,1d=
a=
4.38 cm
As=
cm^2
a=
cm
Seguir Iterando
2.932
cm
Seguir Iterando
TERCERA ITERACION
3.114
cm^2
a=
2.930
As=
3.11
cm
cm^2
As= 25/8''=
cm^2
a=
2.930
cm
As=
3.114
cm^2
a=
3.73
cm
Mur=
6.27
Ton-m
OK
E) DISEO DE ESTRIBOS
TOMAMOS:
As= 25/8''=
3.96
3.727
Mur=
6.27
APOYO B: MB=
As=
3.96
cm^2
Ton-m
a=
3.73
cm
Mur=
6.27
T-m
11.890 Tn-m
a=0,15d= 6.57 cm
Apoyo 2:
As=MU*10^5/0,9*fy*(d-a/2)
7.767
Apoyo 1:
cm^2
cm
PRIMERA ITERACION
As=
3.114
TOMAMOS:
a=As*fy/,85*f'c*b
a=
cm
a=As*fy/,85*f'c*b
As=MU*10^5/0,9*fy*(d-a/2)
As=
2.932
As=
cm^2
a=As*fy/,85*f'c*b
a=
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=MU*10^5/0,9*fy*(d-a/2)
3.115
3.115
TERCERA ITERACION
SEGUNDA ITERACION
As=
cm
a=As*fy/,85*f'c*b
a=As*fy/,85*f'c*b
2.981
2.981
As=MU*10^5/0,9*fy*(d-a/2)
As=MU*10^5/0,9*fy*(d-a/2)
a=
cm^2
SEGUNDA ITERACION
PRIMERA ITERACION
3.168
3.168
a=As*fy/,85*f'c*b
As=
4.980 Tn-m
PRIMERA ITERACION
cm^2
5.36 cm
APOYO A: MA=
cm^2
a=As*fy/,85*f'c*b
As= 23/4''=
a=
5.621
cm^2
As=
7.92
cm^2
a=
7.45
cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mur=
a=As*fy/,85*f'c*b
a=
7.310
cm
Apoyo 3:
As=MU*10^5/0,9*fy*(d-a/2)
7.839
cm^2
a=As*fy/,85*f'c*b
a=
7.378
T-m
Seguir Iterando
SEGUNDA ITERACION
As=
11.99
cm
As=
3.96
cm^2
a=
3.73
cm
Mur=
6.27
T-m
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
7.846
cm^2
Vi=Wui*l/2+(Muri-Mruj)/l
a=As*fy/,85*f'c*b
a=
7.384
cm
OK
As=
7.846
cm^2
TOMAMOS:
As= 45/8''=
7.92
a=
7.454
cm
Mur=
11.99
Ton-m
4.65
T-m
V'2=
-7.20
T-m
V''2=
7.31
T-m
V3=
-4.54
T-m
cm^2
Vud=Vu-Wu*d
11.85
7.31
V1=
5.625
4.65
8.41
x1
13.06
x1+x2
5.625
=
=
=
7.31
Z
7.31
3.47
7.31
3.47
5.625
Colocanco estribos 3/8
-7.20
-4.54
Vs=
14.92022
14.92
x1+x2+x3
7.31
3.47
Vc=0,53*(f'c)^0,5*b*d
Vc= 8.406 Ton
17.41
Vu/=Vs+Vc
Vs=Vu/-Vc
O SISMICO
17.4 Ton
x1+x2+x3+x4
=
7.31
3.47
0.85
Vs= 0.192
; para varillas
Vs=2,1*(f'c)^0,5*b*d
peralte(2d).
Vsmax33.31 Ton
>
Vs=
o no deben
Vs= 1,1*(f'c)^0,5*b*d
>
<
0.192
Ton
OK
b) Longitud de confinamiento de 2 v
s=
d/2
s=
0.6 m
exceder de:
s=
d/4
se escoge la
menor
1.-
d/4
2.-
8 veces el d
3.-
24 veces el di
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
s=
>
Vs=
0.192
0.3 m
Ton
4.-
30cm
Smax 21.89 cm
0.8756
Smax
10.32
m
20 cm
S=
d/4=
S=
8*varilla=
10.32
S=
24*estribo=
22.86
cm
3/8 @
10
1.42 cm^2
Vs=Ar*fy*d/S
Vs= 13.06 ton
cm
Ar=
S=
10.945
30 cm
SE TOMA:
1 3/8 @
5;
20
x3
x2
Z
21.9
cm
x1
SE TOMA:
3 3/8 @ 15;
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
CION X-X
Recubrimiento:
r=
4 cm
PRIMER PISO
SECCIN DE VIGA:
ESTRIBOS DE 3/8''
c=
0.003
b=
0.25 m
f'c=
210
kg/cm^2
s=
0.002
h=
0.50 m
fy=
4200
kg/cm^2
Carga ultima:
Wu=
2.11 Ton/m
3
Ton-m
50.00
5,625
0,25
asumir 1''
0,25
25.00
11.150 Tn-m
a=0,1d=
6.57 cm
d= H-(r+3/8''+1''/2)
d=
9*fy*(d-a/2)
43.78 cm
Seguir Iterando
9*fy*(d-a/2)
3.27 cm^2
a=Asmin*fy/0,85*f'c*b
Seguir Iterando
amin=3.078 cm
Mumin=0,9*fy*Asmin(d-a/2)
9*fy*(d-a/2)
Mumin5.221 Ton-m
B.2) ACERO MXIMO:
OK
max=0,75*b
cm^2
b=0,85**f'c/fy(6300/(6300+4200))
b=
7.230
cm^2
bmx
0.021675
0.01625625
Asmax=bmx*b*d
Asmax17.79 cm^2
11.150 Tn-m
a=0,15d= 6.57 cm
SE TOMA:Asmax=21''+23/4''+11/2''=17.2
cm^2
amax=Asmax*fy/0,85*f'c*b
9*fy*(d-a/2)
amax 16.16 cm
Mumax=0,9*fy*Asmin(d-a/2)
Muma 23.17 Ton-m
Seguir Iterando
B.3) ANALISIS
MOMENTOS OBTENIDOS EN EL SAP-2000
9*fy*(d-a/2)
MOMENTOS POSITIVOS:
MAB=
11.150 Tn-m
MBC=
11.150 Tn-m
Seguir Iterando
9*fy*(d-a/2)
MOMENTOS NEGATIVOS
MA=
7.85 Tn-m
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
MB=
17.40 Tn-m
MC=
7.850 Tn-m
a=0,1d=
4.38 cm
7.85 Tn-m
a=
6.881
cm
TOMAMOS: As=
0^5/0,9*fy*(d-a/2)
cm^2
Seguir Iterando
Seguir Iterando
7.311
As=
35/8''+11/2''=
a=
6.805
cm
Mur=
11.03
Ton-m
cm^2
7.23
cm^2
0^5/0,9*fy*(d-a/2)
Asumir
7.850 Tn-m
a=0,1d=
4.38 cm
PRIMERA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=
Seguir Iterando
4.993
cm^2
a=As*fy/,85*f'c*b
a=
0^5/0,9*fy*(d-a/2)
4.699
cm
Seguir Iterando
SEGUNDA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=
OK
5.013
cm^2
a=As*fy/,85*f'c*b
cm^2
a=
4.718
cm
Seguir Iterando
TERCERA ITERACION
8''+11/2''=
7.23
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=
Ton-m
S RESISTENTES NEGATIVOS:
5.014
cm^2
a=As*fy/,85*f'c*b
a=
4.719
As=
5.014
TOMAMOS:
As=
25/8''+11/2''=
a=
4.941
Mur=
8.20
cm
OK
cm^2
5.25
cm^2
cm
Ton-m
APOYO B: MB=
17.400 Tn-m
a=0,2d=
8.76 cm
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
11.683
cm^2
a=As*fy/,85*f'c*b
a=
10.995
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
12.024
cm^2
a=As*fy/,85*f'c*b
a=
11.317
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
12.075
cm^2
a=As*fy/,85*f'c*b
a=
11.365
cm
Seguir Iterando
As=
12.075
cm^2
TOMAMOS:
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As=
11''+13/4''+25/8''=
a=
11.209
Mur=
7.31
Z=
3.47
cm
Ton-m
Vud=Vu-Wu*d
;
x1=
3.99
7.31
3.47
7.31
cm^2
Z
7.31
17.19
11.91
4.65
;
x2=
2.21
3.47
5 3/8 @
20
5.625
5.625
17.5 cm
-7.20
-4.54
x3=
0.89
3.47
estribos 3/8 @
7.31
15
;
x4=
17.5
Vc=0,53*(f'c)^0,5*b*d
cm
Vc=
2.07
8.406 Ton
3.47
Vu<Vn
Vu/=Vs+Vc
Vs=Vu/-Vc
0.85
Vs=
0.192
Vs=2,1*(f'c)^0,5*b*d
Vsmax 33.31 Ton
>
Vs=
0.192
Ton
OK
>
Vs
s=
s=
d/2
0.6 m
<
Vs
s=
d/4
s=
0.3 m
1,1*(f'c)^0,5*b*d
17.45 Ton
>
Vs=
0.192
Ton
Smax 21.89 cm
or la fuerza cortante.
Smax
en zona de confinamiento:
10.945
cm
10.32
cm
22.86
cm
SE TOMA:
2d=
0.8756
20 cm
S=
10.32
10
cm
1.42 cm^2
Vs=Ar*fy*d/S
m
S=
Ar=
Vs=
13.06 ton
cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
4 3/8 @ 7,5;
6 3/8 @
10
S=
x2
20
17,5;
r=
x1
rest. 3/8 @
20
Recubrimiento:
x3
4 cm
SEGUNDO PISO
SECCIN DE VIGA:
ESTRIBOS DE 3/8''
c=
0.003
b=
0.25 m
f'c=
210
kg/cm^2
s=
0.002
h=
0.50 m
fy=
4200
kg/cm^2
Carga ultima:
Wu=
2.11 Ton/m
Ton-m
50.00
0,25
5,625
asumir 1''
0,25
25.00
9.770 Tn-m
a=0,15d= 6.57 cm
d= H-(r+3/8''+1''/2)
d=
9*fy*(d-a/2)
43.78 cm
Seguir Iterando
min=0.002
Asmin=min*b*d
9*fy*(d-a/2)
3.27 cm^2
a=Asmin*fy/0,85*f'c*b
Seguir Iterando
amin=3.078 cm
Mumin=0,9*fy*Asmin(d-a/2)
9*fy*(d-a/2)
Mumin5.221 Ton-m
B.2) ACERO MXIMO:
OK
max=0,75*b
cm^2
b=0,85**f'c/fy(6300/(6300+4200))
b=
6.540
cm^2
0.022
bmx0.016
Asmax=bmx*b*d
Ton-m
9.770 Tn-m
9*fy*(d-a/2)
Asmax17.79 cm^2
a=0,1d=
4.38 cm
SE TOMA:Asmax=21''+23/4''+11/2''=17.2
cm^2
amax=Asmax*fy/0,85*f'c*b
amax 16.16 cm
Mumax=0,9*fy*Asmin(d-a/2)
Muma 23.17 Ton-m
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Seguir Iterando
B.3) ANALISIS
MOMENTOS OBTENIDOS EN EL SAP-2000
9*fy*(d-a/2)
MOMENTOS POSITIVOS:
MAB=
10.730 Tn-m
MBC=
10.730 Tn-m
Seguir Iterando
MOMENTOS NEGATIVOS
9*fy*(d-a/2)
MA=
10.14 Tn-m
MB=
16.13 Tn-m
MC=
9.250 Tn-m
a=0,2d=
8.76 cm
10.14 Tn-m
a=
6.599
TOMAMOS: A
0^5/0,9*fy*(d-a/2)
cm^2
Seguir Iterando
cm
Seguir Iterando
7.011
cm^2
As=
35/8''+11/2''=
7.23
a=
6.805
cm
Mur=
11.03
Ton-m
cm^2
Asumir
APOYO A: MA=
0^5/0,9*fy*(d-a/2)
10.140 Tn-m
a=0,15d= 6.57 cm
PRIMERA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=
Seguir Iterando
6.624
cm^2
a=As*fy/,85*f'c*b
a=
0^5/0,9*fy*(d-a/2)
6.234
cm
Seguir Iterando
SEGUNDA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=
Seguir Iterando
cm^2
6.597
cm^2
a=As*fy/,85*f'c*b
a=
6.209
cm
Seguir Iterando
TERCERA ITERACION
5.94
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=
Ton-m
S RESISTENTES NEGATIVOS:
6.595
cm^2
a=As*fy/,85*f'c*b
a=
6.207
cm
OK
As=
6.595
cm^2
TOMAMOS:
As=
25/8''+21/2''=
6.54
a=
6.155
cm
Mur=
10.06
Ton-m
APOYO B: MB=
cm^2
16.130 Tn-m
a=0,15d= 6.57 cm
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
10.537
cm^2
a=As*fy/,85*f'c*b
a=
9.917
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
10.992
cm^2
a=As*fy/,85*f'c*b
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a=
10.345
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
11.053
cm^2
a=As*fy/,85*f'c*b
a=
10.403
cm
As=
11.053
cm^2
Seguir Iterando
TOMAMOS:
As=
11''+35/8''=
a=
10.391
Mur=
7.31
Z=
3.47
x1=
3.99
x2=
2.21
16.10
cm^2
cm
Ton-m
Vud=Vu-Wu*d
Z
7.31
11.04
7.31
4.65
3.47
7.31
3.47
5 3/8 @
20
5.625
5.625
17.5 cm
-7.20
-4.54
x3=
0.89
3.47
estribos 3/8 @
7.31
15
;
x4=
17.5
Vc=0,53*(f'c)^0,5*b*d
cm
Vc=
2.07
3.47
8.406 Ton
Vu/=Vs+Vc
Vs=Vu/-Vc
Vs=
0.85
0.192
>
Vs=
Vs=
<
30cm
Vs=
Vs
1,1*(f'c)^0,5*b*d
0.192
17.45 Ton
>
Vs=
Vs
Ton
s=
d/2
s=
0.6 m
s=
d/4
s=
0.3 m
0.192
OK
Ton
or la fuerza cortante.
Smax=d/2
Smax 21.89 cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
en zona de confinamiento:
10.945
cm
10.32
cm
22.86
cm
2d=
0.8756
Smax
10.32
S=
10
4 3/8 @ 7,5;
cm
6 3/8 @
Ar=
1.42 cm^2
Vs=Ar*fy*d/S
Vs=
SE TOMA:
20 cm
13.06 ton
cm
10
S=
3/8 @
20
17,5;
rest. 3/8 @
x4
x3
x2
20
x1
Z
DETERMINAMOS Z, X1, X2, X3 ,X4
VIGA A-B Y B
Recubrimiento: r=
4 cm
QUINTO PISO
SECCIN DE VIGA:
ESTRIBOS DE 3/8''
c=
0.003
b=
0.25 m
f'c=
210
kg/cm^2
s=
0.002
h=
0.50 m
fy=
4200
kg/cm^2
Carga ultima:
Wu=
2.11 Ton/m
3
Ton-m
50.00
0,25
5,625
asumir 1''
25.00
8.740 Tn-m
a=0,1d=
4.38 cm
d=
9*fy*(d-a/2)
0,25
d= H-(r+3/8''+1''/2)
43.78 cm
Seguir Iterando
min=0.002
Asmin=min*b*d
9*fy*(d-a/2)
3.27 cm^2
a=Asmin*fy/0,85*f'c*b
Seguir Iterando
amin=3.078 cm
Mumin=0,9*fy*Asmin(d-a/2)
9*fy*(d-a/2)
Mumin5.221 Ton-m
B.2) ACERO MXIMO:
OK
max=0,75*b
cm^2
b=0,85**f'c/fy(6300/(6300+4200))
b=
5.700
cm^2
0.022
bmx0.016
Asmax=bmx*b*d
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Asmax17.79 cm^2
8.740 Tn-m
a=0,1d=
4.38 cm
SE TOMA:Asmax=21''+23/4''+11/2''=17.2
cm^2
amax=Asmax*fy/0,85*f'c*b
9*fy*(d-a/2)
amax 16.16 cm
Mumax=0,9*fy*Asmin(d-a/2)
Muma 23.17 Ton-m
Seguir Iterando
B.3) ANALISIS
MOMENTOS OBTENIDOS EN EL SAP-2000
9*fy*(d-a/2)
MOMENTOS POSITIVOS:
MAB=
9.770 Tn-m
MBC=
9.770 Tn-m
Seguir Iterando
MOMENTOS NEGATIVOS
9*fy*(d-a/2)
4.980 Tn-m
a=0,1d=
4.38 cm
MA=
5.51 Tn-m
MB=
13.29 Tn-m
MC=
5.51 Tn-m
a=
5.962
TOMAMOS: A
0^5/0,9*fy*(d-a/2)
cm^2
Seguir Iterando
cm
OK
6.334
cm^2
As=
21/2''+25/8''=
6.54
a=
6.155
cm
Mur=
10.06
Ton-m
cm^2
Asumir
APOYO A: MA=
0^5/0,9*fy*(d-a/2)
5.510 Tn-m
a=0,1d=
4.38 cm
PRIMERA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=
Seguir Iterando
3.505
cm^2
a=As*fy/,85*f'c*b
a=
0^5/0,9*fy*(d-a/2)
3.299
cm
Seguir Iterando
SEGUNDA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=
OK
3.460
cm^2
a=As*fy/,85*f'c*b
cm^2
a=
3.256
cm
Seguir Iterando
TERCERA ITERACION
3.96
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=
Ton-m
S RESISTENTES NEGATIVOS:
3.458
cm^2
a=As*fy/,85*f'c*b
a=
3.255
cm
As=
3.458
cm^2
OK
TOMAMOS:
As=
a=
Mur=
25/8''=
3.727
6.27
3.96
cm^2
cm
Ton-m
APOYO B: MB=
13.290 Tn-m
a=0,2d=
8.76 cm
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
8.923
cm^2
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a=As*fy/,85*f'c*b
a=
8.398
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
8.883
cm^2
a=As*fy/,85*f'c*b
a=
8.360
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
8.878
cm^2
a=As*fy/,85*f'c*b
a=
8.356
cm
OK
As=
8.878
cm^2
TOMAMOS:
7.31
Z=
3.47
As=
13/4''+35/8''=
a=
8.273
cm
Mur=
13.17
Ton-m
cm^2
Vud=Vu-Wu*d
Z
7.31
8.79
7.31
;
x1=
3.99
x2=
2.21
4.65
3.47
7.31
3.47
5 3/8 @
17.5
20
5.625
5.625
cm
-7.20
Ton
-4.54
7.31
x3=
0.89
3.47
estribos 3/8 @
7.31
15
;
x4=
17.5
Vc=0,53*(f'c)^0,5*b*d
cm
Vc=
2.07
3.47
8.406 Ton
Vu/=Vs+Vc
Vs=Vu/-Vc
Vs=
0.85
0.192
>
Vs=
Vs=
0.192
Vs
1,1*(f'c)^0,5*b*d
<
Vs
Ton
s=
d/2
s=
0.6 m
s=
d/4
OK
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
30cm
s=
Vs=
17.45 Ton
>
Vs=
0.192
0.3 m
Ton
or la fuerza cortante.
Smax=d/2
Smax 21.89 cm
en zona de confinamiento:
10.945
cm
10.32
cm
22.86
cm
2d=
0.8756
Smax
10.32
S=
10
4 3/8 @ 7,5;
cm
Ar=
1.42 cm^2
Vs=Ar*fy*d/S
Vs=
SE TOMA:
20 cm
13.06 ton
cm
6 3/8 @
10
rest. 3/8 @
20
S=
17,5;
20
x4
x3
x2
x1
Z
DETERMINAMOS Z, X1, X2, X3 ,X4
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
D
VIGA A-B Y B-C:
Recubrimiento:
r=
4 cm
PRIMER PISO
SECCIN DE VIGA:
ESTRIBOS DE
c=
0.003
b=
0.25 m
f'c=
s=
0.002
h=
0.50 m
fy=
Carga ultima:
Wu= 2.11
0,25
5,625
5,625
0,25
0,25
asumir
C) DISEO
25.00
a=0,1d=
4.38 cm
d= H-(r+3/8''+1''/2)
PRIMERA ITERACION
d=
43.78 cm
As=MU*10^5/0,9*fy*(d-a/2)
As=
7.092 cm^2
a=As*fy/,85*f'c*b
a=
6.675 cm
Seguir Iterando
SEGUNDA ITERACION
Asmin=min*b*d
As=MU*10^5/0,9*fy*(d-a/2)
As=
SE TOMA:Asmin=11/2''+15/8''=
7.294
cm^2
a=As*fy/,85*f'c*b
a=
6.865
a=Asmin*fy/0,85*f'c*b
cm
Seguir Iterando
amin= 3.0776471 cm
TERCERA ITERACION
Mumin=0,9*fy*Asmin(d-a/2)
As=MU*10^5/0,9*fy*(d-a/2)
As=
7.311 cm^2
a=As*fy/,85*f'c*b
a=
6.881
cm
As=
7.311
Seguir Iterando
max=0,75*b
cm^2
b=0,85**f'c/fy(6300/(6300+4200))
TOMAMOS:
b=
As= 35/8''+11/2''=
a=
7.230
cm^2
bmx 0.0162563
6.804706 cm
Asmax=bmx*b*d
0.021675
11.150 Tn-m
a=0,1d=
PRIMERA ITERACION
4.38 cm
SE TOMA:Asmax=21''+23/4''+11/2''=
amax=Asmax*fy/0,85*f'c*b
As=MU*10^5/0,9*fy*(d-a/2)
amax=
As=
Mumax=0,9*fy*Asmin(d-a/2)
7.092
cm^2
a=As*fy/,85*f'c*b
a=
6.675
cm
16.16 cm
Mumax23.170228 Ton-m
Seguir Iterando
B.3) ANALISIS
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
MOMENTOS POSITIVOS:
As=
MAB=
8.060 Tn-m
MBC=
8.060 Tn-m
7.294
cm^2
a=As*fy/,85*f'c*b
a=
6.865
cm
Seguir Iterando
TERCERA ITERACION
MOMENTOS NEGATIVOS
As=MU*10^5/0,9*fy*(d-a/2)
MA=
6.00 Tn-m
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As=
7.311
cm^2
MB=
a=As*fy/,85*f'c*b
12.33 Tn-m
MC=
APOYO C: MA=
7.850 Tn-m
a=0,1d=
4.38 cm
6.00 Tn-m
a=
4.853
PRIMERA ITERACION
TOMAMOS: As=
As=MU*10^5/0,9*fy*(d-a/2)
As=
As=
a=
4.993
cm^2
a=As*fy/,85*f'c*b
a=
4.699
Seguir Iterando
SEGUNDA ITERACION
5.013
4.718
As=
Seguir Iterando
a=
4.719
As=
5.01
cm^2
3.592
OK
cm^2
a=
3.558
cm
TERCERA ITERACION
As= 25/8''+11/2''=
4.94
Mur=
3.781
a=As*fy/,85*f'c*b
cm^2
TOMAMOS:
a=
cm
As=MU*10^5/0,9*fy*(d-a/2)
As=
cm
cm^2
SEGUNDA ITERACION
a=As*fy/,85*f'c*b
a=
3.816
a=As*fy/,85*f'c*b
As=MU*10^5/0,9*fy*(d-a/2)
5.014
6.000 Tn-m
As=MU*10^5/0,9*fy*(d-a/2)
TERCERA ITERACION
As=
Ton-m
PRIMERA ITERACION
cm^2
cm
cm
8.20
APOYO A: MA=
a=As*fy/,85*f'c*b
a=
5.25
4.941
As=MU*10^5/0,9*fy*(d-a/2)
As=
5.156
11/2''+25/8''=
Mur=
cm
cm
5.25
cm^2
cm
8.20
As=MU*10^5/0,9*fy*(d-a/2)
As=
Ton-m
3.779
cm^2
a=As*fy/,85*f'c*b
a=
3.557
E) DISEO DE ESTRIBOS
E,1) MOMENTOS RESISTENTES NEGATIVOS:
As=
3.779
TOMAMOS:
Apoyo 1:
As=
As=
5.25
cm^2
a=
a=
4.94
cm
Mur=
Mur=
8.20
T-m
cm^2
25/8''=
3.727
3.96
cm
6.27
Ton-m
APOYO B: MB=
Apoyo 2:
cm
12.330 Tn-m
PRIMERA ITERACION
As=
11.91
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=
11.21
cm
As=
Mur=
17.19
T-m
a=As*fy/,85*f'c*b
8.279
a=
7.792
Apoyo 3:
cm^2
cm
SEGUNDA ITERACION
As=
5.25
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=
4.94
cm
As=
Mur=
8.20
T-m
a=As*fy/,85*f'c*b
8.178
a=
7.697
cm^2
cm
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
Vi=Wui*l/2+(Muri-Mruj)/l
As=
8.169
cm^2
a=As*fy/,85*f'c*b
V1=
4.65
T-m
a=
7.688
V'2=
-7.20
T-m
As=
V''2=
7.31
T-m
TOMAMOS:
8.169
cm
cm^2
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
V3=
-4.54
T-m
11.85
5.625
8.41
x1
13.06
x1+x2
As=
7.31
Z=
3.47
a=
7.454
cm
Mur=
11.99
Ton-m
Vud=Vu-Wu*d
;
x1=
3.99
7.31
3.47
7.31
7.92
Z
7.31
45/8''=
4.65
;
x2=
2.21
3.47
5 3/8 @
20
5.625
5.625
17.5 cm
14.9 Ton
-7.20
14.92
x1+x2+x3
7.31
x3=
Vud=
6.3862579 Ton
0.89
3.47
15
17.5
Vc=0,53*(f'c)^0,5*b*d
cm
Vc=
8.4062303 Ton
17.4 Ton
17.41
x1+x2+x3+x4
7.31
x4=
2.07
3.47
Vu<Vn
Vu/=Vs+Vc
Vs=Vu/-Vc
SEGN LA NORMA E-060 DISEO SISMICO
Vs=
0.85
0.1921711
Vs=2,1*(f'c)^0,5*b*d
Vsmax=33.307705 Ton
>
Vs=
>
Vs=
2.-
3.-
4.-
30cm
1,1*(f'c)^0,5*b*d
<
Vs=
17.446893 Ton
>
Vs=
Smax=
21.89 cm
Smax=
20 cm
d/4=
S=
S=
S=
10.945
cm
8*varilla=
10.32
cm
24*estribo=
22.86
cm
2d=
0.8756
S=
10.32
Vs=Ar*fy*d/S
m
Vs=
13.055196 ton
Para espaciamient
30 cm
SE TOMA:
S=
10
cm
cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
1 3/8 @
5;
4 3/8 @ 7,5;
6 3/8 @
10
21.9
cm
x4
SE TOMA:
3 3/8 @ 15;
4 3/8 @
Recubrimiento:
S=
x3
20
17,5;
r=
rest. 3/8 @
4 cm
c=
0.003
s=
0.002
x2
20
SEGUNDO PISO
SECCIN DE VIGA:
ESTRIBOS DE
b=
0.25 m
f'c=
h=
0.50 m
fy=
Carga ultima:
Wu= 2.11
0,25
0,25
5,625
0,25
asumir
C) DISEO
C.1) ACERO POSITIVO
25.00
a=0,1d=
4.38 cm
PRIMERA ITERACION
d= H-(r+3/8''+1''/2)
As=MU*10^5/0,9*fy*(d-a/2)
As=
6.825
d=
cm^2
a=As*fy/,85*f'c*b
a=
6.424
43.78 cm
cm
Seguir Iterando
min=0,70*f'c^0,5/fy
SEGUNDA ITERACION
min= 0.0024152
As=MU*10^5/0,9*fy*(d-a/2)
Asmin=min*b*d
As=
6.997
cm^2
a=As*fy/,85*f'c*b
a=
6.586
SE TOMA:Asmin=11/2''+15/8''=
cm
Seguir Iterando
a=Asmin*fy/0,85*f'c*b
TERCERA ITERACION
amin= 3.0776471 cm
As=MU*10^5/0,9*fy*(d-a/2)
Mumin=0,9*fy*Asmin(d-a/2)
As=
7.011
cm^2
a=As*fy/,85*f'c*b
a=
6.599
cm
As=
7.011
Seguir Iterando
cm^2
max=0,75*b
TOMAMOS:
b=0,85**f'c/fy(6300/(6300+4200))
As= 35/8''+11/2''=
a=
Mur=
7.230
cm^2
b=
6.804706 cm
bmx 0.0162563
11 Ton-m
TRAMOB: MAB=
0.021675
Asmax=bmx*b*d
10.730 Tn-m
a=0,1d=
PRIMERA ITERACION
4.38 cm
As=MU*10^5/0,9*fy*(d-a/2)
amax=Asmax*fy/0,85*f'c*b
As=
amax=
6.825
cm^2
a=As*fy/,85*f'c*b
a=
6.424
cm
16.16 cm
Mumax=0,9*fy*Asmin(d-a/2)
Seguir Iterando
Mumax23.170228 Ton-m
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
SEGUNDA ITERACION
B.3) ANALISIS
As=MU*10^5/0,9*fy*(d-a/2)
As=
MOMENTOS POSITIVOS:
6.997
cm^2
a=As*fy/,85*f'c*b
a=
6.586
cm
Seguir Iterando
MAB=
7.760 Tn-m
MBC=
7.760 Tn-m
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
MOMENTOS NEGATIVOS
As=
MA=
7.86 Tn-m
MB=
11.12 Tn-m
7.011
cm^2
a=As*fy/,85*f'c*b
MC=
APOYO C: MA=
10.140 Tn-m
a=0,1d=
4.38 cm
7.86 Tn-m
a=
4.661
PRIMERA ITERACION
TOMAMOS: As=
As=MU*10^5/0,9*fy*(d-a/2)
As=
As=
a=
6.450
cm^2
a=As*fy/,85*f'c*b
a=
6.070
cm
SEGUNDA ITERACION
6.584
6.196
As=
Seguir Iterando
6.206
As=
6.59
4.705
As=
OK
6.16
10.06
5.019
a=
4.724
6.54
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
cm
As=
Ton-m
a=As*fy/,85*f'c*b
5.020
4.725
E) DISEO DE ESTRIBOS
As=
TOMAMOS:
Apoyo 1:
As=
a=
Mur=
6.54
cm^2
a=
6.16
cm
Mur=
10.06
T-m
5.020
cm
25/8''+11/2''=
4.941
Apoyo 2:
cm^2
cm^2
5.25
cm
8.20
Ton-m
APOYO B: MB=
11.120 Tn-m
PRIMERA ITERACION
As=
11.04
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=
10.39
cm
As=
Mur=
16.10
T-m
a=As*fy/,85*f'c*b
a=
7.264
6.837
Apoyo 3:
cm^2
cm
SEGUNDA ITERACION
As=
6.54
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=
6.16
cm
As=
10.06
T-m
a=As*fy/,85*f'c*b
Mur=
cm
TERCERA ITERACION
a=
As=
cm^2
a=As*fy/,85*f'c*b
cm^2
As= 25/8''+21/2''=
Mur=
cm
As=MU*10^5/0,9*fy*(d-a/2)
TOMAMOS:
a=
cm^2
SEGUNDA ITERACION
cm^2
cm
7.860 Tn-m
5.000
a=
a=As*fy/,85*f'c*b
a=
Ton-m
a=As*fy/,85*f'c*b
As=MU*10^5/0,9*fy*(d-a/2)
6.594
8.20
As=MU*10^5/0,9*fy*(d-a/2)
TERCERA ITERACION
As=
5.25
PRIMERA ITERACION
cm^2
cm
25/8''+11/2''=
APOYO A: MA=
a=As*fy/,85*f'c*b
a=
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=
4.953
4.941 cm
Mur=
Seguir Iterando
cm
7.289
cm^2
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a=
6.860
cm
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
Vi=Wui*l/2+(Muri-Mruj)/l
As=
7.291
cm^2
a=As*fy/,85*f'c*b
V1=
4.65
T-m
a=
V'2=
-7.20
T-m
As=
V''2=
7.31
T-m
TOMAMOS:
V3=
-4.54
T-m
As=
11.85
5.625
8.41
x1
13.06
x1+x2
=
=
=
7.31
Z=
3.47
x1=
3.99
x2=
2.21
6.862
7.291
cm
cm^2
35/8''+11/2''=
a=
6.805
cm
Mur=
11.03
Ton-m
Vud=Vu-Wu*d
Z
7.31
7.23
7.31
4.65
3.47
7.31
3.47
5 3/8 @
20
5.625
5.625
17.5 cm
-7.20
Vs=
14.9 Ton
14.92
x1+x2+x3
7.31
x3=
3.47
Vud=
6.3862579 Ton
0.89
15
17.5
Vc=0,53*(f'c)^0,5*b*d
cm
Vc=
8.4062303 Ton
17.4 Ton
17.41
x1+x2+x3+x4
7.31
x4=
2.07
3.47
Vu/=Vs+Vc
Vs=Vu/-Vc
SEGN LA NORMA E-060 DISEO SISMICO
Vs=
0.85
0.1921711
Vsmax=33.307705 Ton
exceder de:
se escoge la
menor
1.-
d/4
2.-
3.-
4.-
30cm
>
Vs=
>
Vs=
1,1*(f'c)^0,5*b*d
<
Vs=
17.446893 Ton
>
Vs=
Smax=d/2
Smax=
21.89 cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Espaciamiento en zona de confinamiento:
S=
d/4=
10.945
cm
S=
8*varilla=
10.32
cm
S=
24*estribo=
22.86
cm
S=
2d=
0.8756
Smax=
10.32
30 cm
Vs=Ar*fy*d/S
Vs=
SE TOMA:
1 3/8 @
5;
20 cm
S=
10
4 3/8 @ 7,5;
cm
6 3/8 @
13.055196 ton
Para espaciamient
cm
10
21.9
cm
SE TOMA:
3 3/8 @ 15;
S=
4 3/8 @
20
17,5;
rest. 3/8 @
x4
x3
20
x2
Z
4 cm
QUINTO PISO
SECCIN DE VIGA:
ESTRIBOS DE
c=
0.003
b=
0.25 m
f'c=
s=
0.002
h=
0.50 m
fy=
Carga ultima:
Wu= 2.11
0,25
5,625
0,25
asumir
C) DISEO
25.00
9.770 Tn-m
a=0,1d=
4.38 cm
d= H-(r+3/8''+1''/2)
PRIMERA ITERACION
d=
43.78 cm
As=MU*10^5/0,9*fy*(d-a/2)
As=
6.214
cm^2
a=As*fy/,85*f'c*b
a=
5.849
min=0,70*f'c^0,5/fy
cm
Seguir Iterando
min= 0.0024152
SEGUNDA ITERACION
Asmin=min*b*d
As=MU*10^5/0,9*fy*(d-a/2)
As=
SE TOMA:Asmin=11/2''+15/8''=
6.326
cm^2
a=As*fy/,85*f'c*b
a=
5.954
a=Asmin*fy/0,85*f'c*b
cm
Seguir Iterando
amin= 3.0776471 cm
TERCERA ITERACION
Mumin=0,9*fy*Asmin(d-a/2)
As=MU*10^5/0,9*fy*(d-a/2)
As=
6.334
cm^2
a=As*fy/,85*f'c*b
a=
5.962
As=
cm
6.334
OK
max=0,75*b
cm^2
b=0,85**f'c/fy(6300/(6300+4200))
TOMAMOS:
As= 21/2''+25/8''=
a=
6.155294 cm
b=
6.540
cm^2
0.021675
bmx 0.0162563
Asmax=bmx*b*d
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mur=
10.1 Ton-m
TRAMOB: MAB=
9.770 Tn-m
a=0,1d=
4.38 cm
PRIMERA ITERACION
SE TOMA:Asmax=21''+23/4''+11/2''=
amax=Asmax*fy/0,85*f'c*b
As=MU*10^5/0,9*fy*(d-a/2)
amax=
As=
Mumax=0,9*fy*Asmin(d-a/2)
6.214
cm^2
a=As*fy/,85*f'c*b
a=
5.849
16.16 cm
Mumax23.170228 Ton-m
cm
Seguir Iterando
B.3) ANALISIS
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
MOMENTOS POSITIVOS:
As=
MAB=
6.840 Tn-m
MBC=
6.840 Tn-m
6.326
cm^2
a=As*fy/,85*f'c*b
a=
5.954
cm
Seguir Iterando
TERCERA ITERACION
MOMENTOS NEGATIVOS
As=MU*10^5/0,9*fy*(d-a/2)
MA=
4.41 Tn-m
As=
MB=
8.35 Tn-m
MC=
4.41 Tn-m
6.334
cm^2
a=As*fy/,85*f'c*b
APOYO C: MA=
5.510 Tn-m
a=0,1d=
4.38 cm
a=
4.080
PRIMERA ITERACION
TOMAMOS: As=
As=MU*10^5/0,9*fy*(d-a/2)
As=
As=
a=
3.505
cm^2
a=As*fy/,85*f'c*b
a=
3.299
cm
Seguir Iterando
3.460
3.256
As=
Seguir Iterando
3.255
As=
3.46
cm^2
2.640
cm
SEGUNDA ITERACION
cm^2
cm
2.805
a=
As=MU*10^5/0,9*fy*(d-a/2)
a=As*fy/,85*f'c*b
a=
4.410 Tn-m
a=As*fy/,85*f'c*b
As=MU*10^5/0,9*fy*(d-a/2)
3.458
Ton-m
As=MU*10^5/0,9*fy*(d-a/2)
TERCERA ITERACION
As=
4.56
PRIMERA ITERACION
cm^2
cm
7.18
APOYO A: MA=
a=As*fy/,85*f'c*b
a=
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=
4.335
21/2''+15/8''=
4.292 cm
Mur=
SEGUNDA ITERACION
cm
As=
OK
2.748
cm^2
a=As*fy/,85*f'c*b
cm^2
a=
2.586
TOMAMOS:
cm
TERCERA ITERACION
As= 25/8''=
3.96
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=
3.73
cm
As=
2.746
Mur=
6.27
Ton-m
a=As*fy/,85*f'c*b
a=
2.584
E) DISEO DE ESTRIBOS
As=
TOMAMOS:
Apoyo 1:
As=
As=
3.96
cm^2
a=
a=
3.73
cm
Mur=
Mur=
6.27
T-m
2.746
5.22
3.27
cm
Ton-m
APOYO B: MB=
Apoyo 2:
cm
cm^2
15/8''+11/2''=
3.078
cm^2
8.350 Tn-m
PRIMERA ITERACION
As=
8.79
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=
8.27
cm
As=
5.311
cm^2
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mur=
13.17
T-m
a=As*fy/,85*f'c*b
a=
4.999
Apoyo 3:
cm
SEGUNDA ITERACION
As=
3.96
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
a=
3.73
cm
As=
Mur=
6.27
T-m
a=As*fy/,85*f'c*b
5.351
a=
cm^2
5.036
cm
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
Vi=Wui*l/2+(Muri-Mruj)/l
As=
5.354
cm^2
a=As*fy/,85*f'c*b
V1=
4.65
T-m
a=
5.039
V'2=
-7.20
T-m
As=
V''2=
7.31
T-m
TOMAMOS:
As=
5.354
-4.54
11.85
5.625
8.41
x1
13.06
x1+x2
T-m
=
=
=
4.941
Mur=
7.31
Z=
3.47
cm^2
11/2''+25/8''=
a=
V3=
cm
8.20
cm
Ton-m
Vud=Vu-Wu*d
Z
7.31
5.25
7.31
;
x1=
3.99
x2=
2.21
4.65
3.47
7.31
3.47
5 3/8 @
17.5
20
5.625
5.625
cm
-7.20
Vs=
14.92022 Ton
14.92
x1+x2+x3
7.31
x3=
3.47
Vud=
6.3862579 Ton
0.89
15
17.5
Vc=0,53*(f'c)^0,5*b*d
cm
Vc=
8.4062303 Ton
17.4 Ton
17.41
x1+x2+x3+x4
7.31
x4=
2.07
3.47
Vu/=Vs+Vc
Vs=Vu/-Vc
SEGN LA NORMA E-060 DISEO SISMICO
Vs=
0.85
0.1921711
Vsmax=33.307705 Ton
exceder de:
se escoge la
menor
1.-
d/4
2.-
3.-
>
Vs=
>
Vs=
1,1*(f'c)^0,5*b*d
<
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
4.-
30cm
Vs=
17.446893 Ton
>
Vs=
Smax=d/2
d/4=
S=
S=
S=
10.945
cm
8*varilla=
10.32
cm
24*estribo=
22.86
cm
2d=
0.8756
Smax=
21.89 cm
Smax=
20 cm
10.32
30 cm
Vs=Ar*fy*d/S
Vs=
SE TOMA:
1 3/8 @
5;
S=
10
4 3/8 @ 7,5;
cm
13.055196 ton
Para espaciamient
cm
6 3/8 @
10
rest. 3/8 @
20
21.9
cm
SE TOMA:
3 3/8 @ 15;
4 3/8 @
S=
17,5;
20
x4
x3
x2
Z
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
DISEO DE VIGAS DE PORTICO 6-6 EN DIRECCION X-X
ESTRIBOS DE 3/8''
Recubrimiento:
r=
210
kg/cm^2
c=
4200
kg/cm^2
s=
4 cm
0.003
0.002
Ton/m
asumir 1''
0,25
5,625
0,25
0,25
C) DISEO
C.1) ACERO POSITIVO
TRAMO A: MAB=
8.060 Tn-m
a=0,1d=
4.38 cm
PRIMERA ITERACION
L SAP-2000
5,625
As=MU*10^5/0,9*fy*(d-a/2)
As=
5.127 cm^2
a=As*fy/,85*f'c*b
a=
4.825 cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
3.27 cm^2
As=
5.154
cm^2
a=As*fy/,85*f'c*b
a=
4.851
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
5.156 cm^2
a=As*fy/,85*f'c*b
a=
4.853
cm
As=
5.156
OK
cm^2
TOMAMOS:
As= 11/2''+25/8''=
a=
5.250
cm^2
4.941176 cm
cm^2
TRAMOB: MAB=
8.060 Tn-m
a=0,1d=
4.38 cm
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
5.127
cm^2
a=As*fy/,85*f'c*b
a=
4.825
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
5.154
cm^2
a=As*fy/,85*f'c*b
a=
4.851
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As=
5.156
cm^2
a=As*fy/,85*f'c*b
OK
APOYO C: MA=
cm^2
PRIMERA ITERACION
5.25
cm^2
6.000 Tn-m
a=0,1d=
4.38 cm
As=MU*10^5/0,9*fy*(d-a/2)
As=
3.816
cm^2
a=As*fy/,85*f'c*b
Asumir
00 Tn-m
a=0,1d=
a=
4.38 cm
3.592
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
3.781
cm^2
a=As*fy/,85*f'c*b
a=
Seguir Iterando
3.558
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
3.779
cm^2
a=As*fy/,85*f'c*b
Seguir Iterando
a=
3.557
As=
3.78
cm
OK
cm^2
TOMAMOS:
As= 25/8''=
a=
3.73
Mur=
6.27
3.96
cm^2
cm
Ton-m
OK
E) DISEO DE ESTRIBOS
E,1) MOMENTOS RESISTENTES NEGATIVOS:
Apoyo 1:
cm^2
12.330 Tn-m
a=0,2d=
As=
3.96
cm^2
a=
3.73
cm
Mur=
6.27
T-m
8.76 cm
Apoyo 2:
As=
a=
Mur=
7.92
cm^2
7.45
cm
11.99
T-m
Seguir Iterando
Apoyo 3:
As=
3.96
cm^2
a=
3.73
cm
Mur=
6.27
T-m
Seguir Iterando
E,2) DETERMINACION DEL DIAGRAMA DE CONTRANTE.
Vi=Wui*l/2+(Muri-Mruj)/l
OK
V1=
4.65
T-m
V'2=
-7.20
T-m
V''2=
7.31
T-m
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
cm^2
V3=
-4.54
T-m
11.85
5.625
8.41
x1
13.06
x1+x2
7.31
Z=
3.47
x1=
3.99
x2=
2.21
Z
7.31
3.47
7.31
3.47
5 3/8 @
20
5.625
Colocanco estribos 3/8 @
-4.54
Vs=
17.5 cm
14.9 Ton
UERZO TRANSVERSAL(ESTRIBOS)
=
14.92
x1+x2+x3
7.31
x3=
2 3/8 @
0.89
3.47
15
17.5
cm
17.4 Ton
17.41
x1+x2+x3+x4
7.31
x4=
2.07
3.47
mar el acero:
Ton
OK
b) Longitud de confinamiento de 2 veces el peralte(2d).
Vs
s=
s=
d/2
0.6 m
Vs
s=
d/4
s=
0.3 m
0.192
2.-
3.-
4.-
30cm
Ton
d) Fuera de la zona de confinamiento no puede exceder de d/2.
e) En todos los casos los espaciamientos no deben exceder a los
determinados por la fuerza cortante.
FUERZO TRANSVERSAL
Ar=
1.42 cm^2
d/4=
S=
S=
S=
10.945
cm
8*varilla=
10.32
cm
24*estribo=
22.86
cm
2d=
S=
0.8756
10.32
m
30 cm
SE TOMA:
S=
10
cm
cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
1 3/8 @
5;
4 3/8 @ 7,5;
6 3/8 @
10
rest. 3/8 @
20
s=
21.9
cm
SE TOMA:
3 3/8 @ 15;
4 3/8 @
Recubrimiento:
ESTRIBOS DE 3/8''
210
kg/cm^2
4200
kg/cm^2
Ton/m
S=
20
17,5;
r=
4 cm
c=
0.003
s=
0.002
5,625
0,25
asumir 1''
0,25
5,625
0,25
C) DISEO
C.1) ACERO POSITIVO
TRAMO A: MAB=
7.760 Tn-m
a=0,2d=
8.76 cm
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
5.210
cm^2
a=As*fy/,85*f'c*b
a=
4.904
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
3.27 cm^2
4.967
cm^2
a=As*fy/,85*f'c*b
a=
4.675
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
4.954
cm^2
a=As*fy/,85*f'c*b
a=
4.662
cm
As=
4.954
Seguir Iterando
cm^2
TOMAMOS:
As= 25/8''+11/2''=
a=
Mur=
cm^2
cm^2
4.941176 cm
8.2 Ton-m
TRAMOB: MAB=
17.2
5.250
7.760 Tn-m
a=0,1d=
4.38 cm
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
4.936
cm^2
a=As*fy/,85*f'c*b
a=
4.646
cm
Seguir Iterando
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
SEGUNDA ITERACION
L SAP-2000
As=MU*10^5/0,9*fy*(d-a/2)
As=
4.952
cm^2
a=As*fy/,85*f'c*b
a=
4.661
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
4.953
cm^2
a=As*fy/,85*f'c*b
OK
APOYO C: MA=
cm^2
7.860 Tn-m
a=0,1d=
4.38 cm
PRIMERA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=
5.000
cm^2
a=As*fy/,85*f'c*b
Asumir
7.860 Tn-m
a=0,1d=
a=
4.38 cm
4.705
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
5.019
cm^2
a=As*fy/,85*f'c*b
a=
Seguir Iterando
4.724
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
5.020
cm^2
a=As*fy/,85*f'c*b
Seguir Iterando
a=
4.725
As=
5.02
cm
OK
cm^2
TOMAMOS:
As= 25/8''+11/2''=
a=
4.94
cm
Mur=
8.20
Ton-m
5.25
cm^2
OK
E) DISEO DE ESTRIBOS
E,1) MOMENTOS RESISTENTES NEGATIVOS:
cm^2
11.120 Tn-m
Apoyo 1:
As=
5.25
cm^2
a=
4.94
cm
Mur=
8.20
T-m
a=0,15d= 6.57 cm
Apoyo 2:
As=
7.23
cm^2
a=
6.80
cm
11.03
T-m
Mur=
Seguir Iterando
Apoyo 3:
As=
5.25
cm^2
a=
4.94
cm
Mur=
8.20
T-m
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Seguir Iterando
E,2) DETERMINACION DEL DIAGRAMA DE CONTRANTE.
Vi=Wui*l/2+(Muri-Mruj)/l
OK
cm^2
V1=
4.65
T-m
V'2=
-7.20
T-m
V''2=
7.31
T-m
V3=
-4.54
T-m
11.85
5.625
8.41
x1
13.06
x1+x2
=
=
=
7.31
Z=
3.47
x1=
3.99
x2=
2.21
Z
7.31
3.47
7.31
3.47
5.625
5 3/8 @
Colocanco estribos 3/8 @
20
17.5 cm
-4.54
UERZO TRANSVERSAL(ESTRIBOS)
Vs=
14.92
14.9 Ton
=
x1+x2+x3
7.31
x3=
3.47
2 3/8 @
0.89
15
17.5
cm
17.4 Ton
17.41
x1+x2+x3+x4
7.31
x4=
2.07
3.47
mar el acero:
Ton
OK
Vs
Vs
s=
d/2
s=
0.6 m
s=
d/4
s=
0.3 m
0.192
Ton
exceder de:
se escoge la
menor
1.-
d/4
2.-
3.-
4.-
30cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Espaciamiento en zona de confinamiento:
FUERZO TRANSVERSAL
Ar=
1.42 cm^2
S=
d/4=
10.945
cm
S=
8*varilla=
10.32
cm
S=
24*estribo=
22.86
cm
S=
2d=
S=
0.8756
10.32
m
30 cm
SE TOMA:
1 3/8 @
5;
S=
10
4 3/8 @ 7,5;
cm
cm
6 3/8 @
10
rest. 3/8 @
20
21.9
cm
x1
SE TOMA:
3 3/8 @ 15;
ESTRIBOS DE 3/8''
S=
4 3/8 @
20
17,5;
Recubrimiento: r=
4 cm
210
kg/cm^2
c=
0.003
4200
kg/cm^2
s=
0.002
Ton/m
5,625
asumir 1''
0,25
5,625
0,25
C) DISEO
0,25
C.1) ACERO POSITIVO
TRAMO A: MAB=
6.840 Tn-m
a=0,1d=
4.38 cm
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
4.351
cm^2
a=As*fy/,85*f'c*b
a=
4.095
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
3.27 cm^2
As=
4.336
cm^2
a=As*fy/,85*f'c*b
a=
4.081
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
4.335
cm^2
a=As*fy/,85*f'c*b
a=
4.080
As=
cm
4.335
OK
cm^2
TOMAMOS:
As= 21/2''+15/8''=
a=
4.560
cm^2
4.291765 cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mur=
17.2
cm^2
7.18 Ton-m
TRAMOB: MAB=
6.840 Tn-m
a=0,1d=
4.38 cm
PRIMERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
4.351
cm^2
a=As*fy/,85*f'c*b
a=
L SAP-2000
4.095
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
4.336
cm^2
a=As*fy/,85*f'c*b
a=
4.081
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
4.335
cm^2
a=As*fy/,85*f'c*b
OK
APOYO C: MA=
cm^2
4.56
4.410 Tn-m
a=0,1d=
4.38 cm
PRIMERA ITERACION
cm^2
As=MU*10^5/0,9*fy*(d-a/2)
As=
2.805
cm^2
a=As*fy/,85*f'c*b
Asumir
4.410 Tn-m
a=0,1d=
a=
4.38 cm
2.640
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
2.748
cm^2
a=As*fy/,85*f'c*b
a=
Seguir Iterando
2.586
cm
Seguir Iterando
TERCERA ITERACION
As=MU*10^5/0,9*fy*(d-a/2)
As=
2.746
cm^2
a=As*fy/,85*f'c*b
Seguir Iterando
a=
2.584
As=
2.75
cm
OK
cm^2
TOMAMOS:
As= 15/8''+11/2''=
a=
3.08
cm
Mur=
5.22
Ton-m
3.27
cm^2
OK
E) DISEO DE ESTRIBOS
E,1) MOMENTOS RESISTENTES NEGATIVOS:
Apoyo 1:
cm^2
8.350 Tn-m
a=0,1d=
As=
3.27
cm^2
a=
3.08
cm
Mur=
5.22
T-m
4.38 cm
Apoyo 2:
As=
5.25
cm^2
a=
4.94
cm
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mur=
8.20
T-m
Seguir Iterando
Apoyo 3:
As=
3.27
cm^2
a=
3.08
cm
Mur=
5.22
T-m
Seguir Iterando
E,2) DETERMINACION DEL DIAGRAMA DE CONTRANTE.
Vi=Wui*l/2+(Muri-Mruj)/l
OK
cm^2
V1=
4.65
T-m
V'2=
-7.20
T-m
V''2=
7.31
T-m
V3=
-4.54
T-m
11.85
5.625
8.41
x1
13.06
x1+x2
=
=
=
7.31
Z=
3.47
x1=
3.99
x2=
2.21
Z
7.31
3.47
7.31
3.47
5.625
5 3/8 @
Colocanco estribos 3/8 @
17.5
20
cm
-4.54
UERZO TRANSVERSAL(ESTRIBOS)
Vs=
14.92
14.92022 Ton
=
x1+x2+x3
7.31
x3=
3.47
2 3/8 @
0.89
15
17.5
cm
17.4 Ton
17.41
x1+x2+x3+x4
7.31
x4=
2.07
3.47
mar el acero:
Ton
OK
Vs
Vs
s=
d/2
s=
0.6 m
s=
d/4
exceder de:
se escoge la
menor
1.-
d/4
2.-
3.-
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
s=
0.192
0.3 m
Ton
4.-
30cm
FUERZO TRANSVERSAL
Ar=
1.42 cm^2
S=
d/4=
S=
S=
S=
10.945
cm
8*varilla=
10.32
cm
24*estribo=
22.86
cm
2d=
S=
0.8756
10.32
m
30 cm
SE TOMA:
1 3/8 @
5;
S=
10
4 3/8 @ 7,5;
cm
cm
6 3/8 @
10
rest. 3/8 @
20
21.9
cm
x1
SE TOMA:
3 3/8 @ 15;
4 3/8 @
S=
17,5;
20
FACULTAD DE ING.CIVIL-UNPRG
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
PROYECTO VIVIENDA MULTIFAMILIAR - 5 PISOS
MOMENTOS VIGAS - PORTICOS Y-Y
No hay la necesidad de hacer conmbinaciones, ya que no intervienen la carga viva
MOMENTOS CALCULADOS CON EL SAP - PORTICO A-A
M Max. Negativos
ENVOLVENTE
PRIMER
PISO
SEGUNDO
PISO
VIGAS
TERCER
PISO
CUARTO
PISO
QUINTO
PISO
M Max. Posiitivo
Izquierda
Derecha
Volado
0.000 Tn-m
0.400 Tn-m
0.000 Tn-m
Viga 1 - 2
0.820 Tn-m
1.410 Tn-m
0.830 Tn-m
Viga 2 - 3
1.570 Tn-m
1.170 Tn-m
0.970 Tn-m
Viga 3- 4
0.870 Tn-m
0.450 Tn-m
0.200 Tn-m
Viga 4 - 5
0.510 Tn-m
0.720 Tn-m
0.300 Tn-m
Viga 5 - 6
0.920 Tn-m
0.410 Tn-m
0.790 Tn-m
Volado
0.000 Tn-m
0.420 Tn-m
Viga 1 - 2
0.920 Tn-m
1.370 Tn-m
0.800 Tn-m
Viga 2 - 3
1.590 Tn-m
1.170 Tn-m
0.950 Tn-m
Viga 3 - 4
0.780 Tn-m
0.510 Tn-m
0.210 Tn-m
Viga 4 - 5
0.590 Tn-m
0.610 Tn-m
0.310 Tn-m
Viga 5 -6
0.870 Tn-m
0.530 Tn-m
0.750 Tn-m
Volado
0.000 Tn-m
0.120 Tn-m
0.000 Tn-m
Viga 1 - 2
0.910 Tn-m
1.370 Tn-m
0.800 Tn-m
Viga 2 - 3
1.600 Tn-m
1.140 Tn-m
0.960 Tn-m
Viga 3 - 4
0.760 Tn-m
0.540 Tn-m
0.200 Tn-m
Viga 4 - 5
0.630 Tn-m
0.580 Tn-m
0.310 Tn-m
Viga 5 -6
0.840 Tn-m
0.540 Tn-m
0.760 Tn-m
Volado
0.000 Tn-m
0.420 Tn-m
Viga 1 - 2
0.880 Tn-m
1.380 Tn-m
0.810 Tn-m
Viga 2 - 3
1.630 Tn-m
1.120 Tn-m
0.960 Tn-m
Viga 3 - 4
0.760 Tn-m
0.550 Tn-m
0.200 Tn-m
Viga 4 - 5
0.650 Tn-m
0.560 Tn-m
0.310 Tn-m
Viga 5 -6
0.820 Tn-m
0.540 Tn-m
0.770 Tn-m
Volado
0.000 Tn-m
0.430 Tn-m
Viga 1 - 2
0.610 Tn-m
0.790 Tn-m
0.390 Tn-m
Viga 2 - 3
0.940 Tn-m
0.570 Tn-m
0.580 Tn-m
Viga 3 - 4
0.430 Tn-m
0.380 Tn-m
0.090 Tn-m
Viga 4 - 5
0.430 Tn-m
0.310 Tn-m
0.160 Tn-m
Viga 5 -6
0.430 Tn-m
0.430 Tn-m
0.530 Tn-m
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
ENVOLVENTE
PRIMER
PISO
SEGUNDO
PISO
VIGAS
TERCER
PISO
CUARTO
PISO
QUINTO
PISO
M Max. Posiitivo
Izquierda
Derecha
Volado
0.000 Tn-m
0.400 Tn-m
0.000 Tn-m
Viga 1 - 2
0.820 Tn-m
1.410 Tn-m
0.830 Tn-m
Viga 2 - 3
1.570 Tn-m
1.170 Tn-m
0.970 Tn-m
Viga 3- 4
0.870 Tn-m
0.450 Tn-m
0.200 Tn-m
Viga 4 - 5
0.510 Tn-m
0.720 Tn-m
0.300 Tn-m
Viga 5 - 6
0.920 Tn-m
0.410 Tn-m
0.790 Tn-m
Volado
0.000 Tn-m
0.420 Tn-m
Viga 1 - 2
0.920 Tn-m
1.370 Tn-m
0.800 Tn-m
Viga 2 - 3
1.590 Tn-m
1.170 Tn-m
0.950 Tn-m
Viga 3 - 4
0.780 Tn-m
0.510 Tn-m
0.210 Tn-m
Viga 4 - 5
0.590 Tn-m
0.610 Tn-m
0.310 Tn-m
Viga 5 -6
0.870 Tn-m
0.530 Tn-m
0.750 Tn-m
Volado
0.000 Tn-m
0.120 Tn-m
0.000 Tn-m
Viga 1 - 2
0.910 Tn-m
1.370 Tn-m
0.800 Tn-m
Viga 2 - 3
1.600 Tn-m
1.140 Tn-m
0.960 Tn-m
Viga 3 - 4
0.760 Tn-m
0.540 Tn-m
0.200 Tn-m
Viga 4 - 5
0.630 Tn-m
0.580 Tn-m
0.310 Tn-m
Viga 5 -6
0.840 Tn-m
0.540 Tn-m
0.760 Tn-m
Volado
0.000 Tn-m
0.420 Tn-m
Viga 1 - 2
0.880 Tn-m
1.380 Tn-m
0.810 Tn-m
Viga 2 - 3
1.630 Tn-m
1.120 Tn-m
0.960 Tn-m
Viga 3 - 4
0.760 Tn-m
0.550 Tn-m
0.200 Tn-m
Viga 4 - 5
0.650 Tn-m
0.560 Tn-m
0.310 Tn-m
Viga 5 -6
0.820 Tn-m
0.540 Tn-m
0.770 Tn-m
Volado
0.000 Tn-m
0.430 Tn-m
Viga 1 - 2
0.610 Tn-m
0.790 Tn-m
0.390 Tn-m
Viga 2 - 3
0.940 Tn-m
0.570 Tn-m
0.580 Tn-m
Viga 3 - 4
0.430 Tn-m
0.380 Tn-m
0.090 Tn-m
Viga 4 - 5
0.430 Tn-m
0.310 Tn-m
0.160 Tn-m
Viga 5 -6
0.430 Tn-m
0.430 Tn-m
0.530 Tn-m
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
ENVOLVENTE
PRIMER
PISO
SEGUNDO
PISO
VIGAS
TERCER
PISO
CUARTO
PISO
QUINTO
PISO
M Max. Posiitivo
Izquierda
Derecha
Viga 2 - 3
0.000 Tn-m
1.870 Tn-m
1.630 Tn-m
Viga 3- 4
0.810 Tn-m
0.370 Tn-m
0.220 Tn-m
Viga 4 - 5
0.400 Tn-m
0.580 Tn-m
0.250 Tn-m
Viga 5 - 6
0.820 Tn-m
0.600 Tn-m
0.700 Tn-m
Viga 2 - 3
0.000 Tn-m
1.870 Tn-m
1.630 Tn-m
Viga 3 - 4
0.680 Tn-m
0.440 Tn-m
0.250 Tn-m
Viga 4 - 5
0.470 Tn-m
0.490 Tn-m
0.250 Tn-m
Viga 5 -6
0.780 Tn-m
0.720 Tn-m
0.670 Tn-m
Viga 2 - 3
0.000 Tn-m
1.830 Tn-m
1.640 Tn-m
Viga 3 - 4
0.660 Tn-m
0.480 Tn-m
0.200 Tn-m
Viga 4 - 5
0.630 Tn-m
0.580 Tn-m
0.260 Tn-m
Viga 5 -6
0.750 Tn-m
0.730 Tn-m
0.670 Tn-m
Viga 2 - 3
0.000 Tn-m
1.790 Tn-m
1.660 Tn-m
Viga 3 - 4
0.680 Tn-m
0.460 Tn-m
0.240 Tn-m
Viga 4 - 5
0.480 Tn-m
0.490 Tn-m
0.260 Tn-m
Viga 5 -6
0.740 Tn-m
0.720 Tn-m
0.680 Tn-m
Viga 2 - 3
0.000 Tn-m
0.540 Tn-m
0.700 Tn-m
Viga 3 - 4
0.190 Tn-m
0.280 Tn-m
0.190 Tn-m
Viga 4 - 5
0.280 Tn-m
0.160 Tn-m
0.130 Tn-m
Viga 5 -6
0.250 Tn-m
0.290 Tn-m
0.300 Tn-m
ENVOLVENTE
VIGAS
Izquierda
Derecha
M Max. Posiitivo
PRIMER
PISO
Viga 7 - 1
0.000 Tn-m
0.370 Tn-m
0.000 Tn-m
Viga 1- 2
1.041 Tn-m
0.920 Tn-m
0.740 Tn-m
PRIMER
PISO
Viga 7 - 1
0.000 Tn-m
0.380 Tn-m
0.000 Tn-m
Viga 1- 2
1.190 Tn-m
0.820 Tn-m
0.730 Tn-m
PRIMER
PISO
Viga 7 - 1
0.000 Tn-m
0.380 Tn-m
0.000 Tn-m
Viga 1- 2
1.210 Tn-m
0.790 Tn-m
0.740 Tn-m
PRIMER
PISO
Viga 7 - 1
0.000 Tn-m
0.380 Tn-m
0.000 Tn-m
Viga 1- 2
1.175 Tn-m
0.800 Tn-m
0.740 Tn-m
PRIMER
PISO
Viga 7 - 1
0.000 Tn-m
0.390 Tn-m
0.000 Tn-m
Viga 1- 2
0.740 Tn-m
0.140 Tn-m
0.340 Tn-m
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
REFUERZO LONGITUDINAL
DISEO DE VIGAS PRINCIPALES
PISO
PRIMER PISO
SEGUNDO PISO
TRCER PISO
CUARTO PISO
QUINTO PISO
VIGAS
Viga A-D
Viga D-E
Viga E-C
Viga A-D
Viga D-E
Viga E-C
Viga A-D
Viga D-E
Viga E-C
Viga A-D
M Max. Posiitivo
5.240 Tn-m
0.480 Tn-m
3.875 Tn-m
5.039 Tn-m
0.870 Tn-m
3.690 Tn-m
5.090 Tn-m
0.850 Tn-m
3.720 Tn-m
5.050 Tn-m
Viga D-E
2.300 Tn-m
2.770 Tn-m
0.910 Tn-m
Viga E-C
Viga A-D
Viga D-E
Viga E-C
3.300 Tn-m
2.760 Tn-m
1.970 Tn-m
2.160 Tn-m
2.870 Tn-m
3.370 Tn-m
2.080 Tn-m
1.330 Tn-m
3.690 Tn-m
4.000 Tn-m
0.290 Tn-m
2.900 Tn-m
1. PERALTE EFECTIVO
b=
h=
f'c =
fy =
=
Recub =
25.00 cm
30.00 cm
210 Kg/cm
4200 Kg/cm
0.85
4.00 cm
As min =
Pmin.b.d
Pmin =
As min =
0.0024
Asumo :
Estribos :
d:
d:
1.436 cm
Err:514
Pb =
Pb =
Pmax =
As max =
Err:514
Err:514
1 1/2 + 2 3/8
As =2.710 cm
2.551 cm
Mur=
230508.097 kg-cm
Mur=
2.305 Ton-m
5. MOMENTO CON ACERO MAXIMO
As min =
a=
3 1+1 3/4
As =18.150 cm
17.082 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mur=
1045318.448 kg-cm
Mur=
10.453 Ton-m
6. DETERMINACION DEL REFUERZO EN LA VIGA
A. ACEROS POSITIVOS
FORMULAS
M max
5.240 Tn-m
M max
0.480 Tn-m
PRIMER PISO
0 = colocar acero minimo
M max
3.875 Tn-m
SEGUNDO PISO
TERCER PISO
CUARTO PISO
QUINTO PISO
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
5.039 Tn-m
0.870 Tn-m
3.690 Tn-m
5.090 Tn-m
0.850 Tn-m
3.720 Tn-m
5.050 Tn-m
0.910 Tn-m
3.690 Tn-m
4.000 Tn-m
0.290 Tn-m
2.900 Tn-m
Mmax (+)
b=
d=
=
5.240 Tn-m
25.00 cm
23.78 cm
0.9
Viga A-D
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
6.137 cm
6.636 cm
6.712 cm
6.723 cm
a =2.38 cm
a =5.78 cm
a =6.25 cm
a =6.32 cm
Err:514
Mmax
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
5.039 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
5.902 cm
6.348 cm
6.412 cm
6.421 cm
Mmax
b=
d=
=
Asumir:
As =
As =
5.090 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
5.961 cm
6.421 cm
As
Mu
. fy.( d a / 2)
As . fy
0.85 . f ' c.b
PRIMER PISO
Mmax (+)
b=
d=
=
REPETIR
REPETIR
REPETIR
Err:514
Viga A-D
a =2.38 cm
a =5.55 cm
a =5.97 cm
a =6.03 cm
Err:514
Viga A-D
2.38 cm
5.61 cm
6.04 cm
Asumir:
As =
As =
As =
As =
Usar
SEGUNDO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
REPETIR
As =
Err:514
Usar
TERCER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
3.875 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
4.538 cm
4.737 cm
4.757 cm
4.759 cm
Err:514
3.690 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
4.322 cm
4.490 cm
4.506 cm
4.507 cm
Err:514
3.720 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
4.357 cm
4.529 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
As =
Usar
6.488 cm
6.497 cm
Mmax
b=
d=
=
5.050 Tn-m
25.00 cm
23.78 cm
0.9
Viga A-D
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
5.914 cm
6.364 cm
6.428 cm
6.438 cm
2.38 cm
5.57 cm
5.99 cm
6.05 cm
Mmax
b=
d=
=
4.000 Tn-m
25.00 cm
23.78 cm
0.9
Viga A-D
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
5.961 cm
6.421 cm
6.488 cm
6.497 cm
2.38 cm
5.61 cm
6.04 cm
6.11 cm
Err:514
CUARTO PISO
Mmax (+)
b=
d=
=
REPETIR
REPETIR
REPETIR
Err:514
Err:514
6.034 Tn-m
25.00 cm
23.78 cm
0.9
As =
As =
Usar
REPETIR
Err:514
Err:514
B. ACEROS NEGATIVOS
M max
PRIMER PISO
M max
M max
M max
SEGUNDO PISO
M max
M max
M max
TERCER PISO
M max
M max
M max
CUARTO PISO
M max
M max
M max
QUINTO PISO
M max
M max
Mmax (-)
b=
d=
=
6.11 cm
QUINTO PISO
Mmax (+)
b=
d=
=
REPETIR
REPETIR
REPETIR
Err:514
Izquierda
6.034 Tn-m
3.985 Tn-m
5.120 Tn-m
6.838 Tn-m
1.730 Tn-m
3.450 Tn-m
5.080 Tn-m
1.770 Tn-m
3.330 Tn-m
5.230 Tn-m
2.300 Tn-m
3.300 Tn-m
2.760 Tn-m
1.970 Tn-m
2.160 Tn-m
Viga A-D
Asumir:
As =
As =
As =
As =
Usar
Derecha
7.537 Tn-m
3.710 Tn-m
3.407 Tn-m
7.381 Tn-m
2.700 Tn-m
2.780 Tn-m
5.280 Tn-m
2.710 Tn-m
2.790 Tn-m
5.230 Tn-m
2.770 Tn-m
2.870 Tn-m
3.370 Tn-m
2.080 Tn-m
1.330 Tn-m
Asumir:
As =
As =
As =
As =
Usar
4.546 cm
4.548 cm
Err:514
3.690 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
4.322 cm
4.490 cm
4.506 cm
4.507 cm
Err:514
2.900 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
3.396 cm
3.459 cm
3.464 cm
3.464 cm
Err:514
FORMULAS
0 = colocar acero minimo
As
Mu
. fy.(d a / 2)
As . fy
0.85 . f ' c.b
PRIMER PISO
Mmax (-)
b=
d=
=
7.537 Tn-m
25.00 cm
23.78 cm
0.9
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
a = 0.10.d
7.067 cm
7.805 cm
7.940 cm
7.965 cm
a =2.38 cm
a =6.65 cm
a =7.35 cm
a =7.47 cm
Err:514
Err:514
3.985 Tn-m
25.00 cm
23.78 cm
0.9
Viga D-E
a = 0.10.d
4.667 cm
4.885 cm
4.908 cm
4.911 cm
a =2.38 cm
a =4.39 cm
a =4.60 cm
a =4.62 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
5.120 Tn-m
25.00 cm
23.78 cm
0.9
Viga E-C
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
5.996 cm
6.464 cm
6.532 cm
6.542 cm
a =2.38 cm
a =5.64 cm
a =6.08 cm
a =6.15 cm
Mmax (-)
b=
d=
=
6.838 Tn-m
25.00 cm
23.78 cm
0.9
Viga A-D
Asumir:
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
a = 0.10.d
8.008 cm
9.041 cm
9.266 cm
9.317 cm
9.328 cm
a =2.38 cm
a =7.54 cm
a =8.51 cm
a =8.72 cm
a =8.77 cm
Asumir:
As =
As =
As =
As =
REPETIR
REPETIR
REPETIR
Err:514
Err:514
Viga D-E
a = 0.10.d
2.026 cm
2.005 cm
2.004 cm
2.004 cm
2.004 cm
a =2.38 cm
a =1.91 cm
a =1.89 cm
a =1.89 cm
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Err:514
Usar
SEGUNDO PISO
Mmax (-)
b=
d=
=
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
1.730 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
REPETIR
REPETIR
OK
a = 0.10.d
8.827 cm
10.161 cm
10.497 cm
10.585 cm
Err:514
3.710 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
4.345 cm
4.516 cm
4.533 cm
4.535 cm
Err:514
3.407 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
3.990 cm
4.116 cm
4.127 cm
4.128 cm
Err:514
7.381 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
2.700 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
As =
a = 0.10.d
3.162 cm
3.205 cm
3.207 cm
3.208 cm
3.208 cm
a = 0.10.d
8.644 cm
9.907 cm
10.215 cm
10.293 cm
10.313 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Usar
Err:514
Err:514
Usar
Err:514
Mmax (-)
b=
d=
=
3.450 Tn-m
25.00 cm
23.78 cm
0.9
Viga E-C
Mmax (-)
b=
d=
=
2.780 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
As =
Usar
a = 0.10.d
4.041 cm
4.172 cm
4.184 cm
4.185 cm
4.185 cm
a =2.38 cm
a =3.80 cm
a =3.93 cm
a =3.94 cm
a =3.94 cm
REPETIR
REPETIR
REPETIR
OK
Asumir:
As =
As =
As =
As =
a = 0.10.d
3.256 cm
3.306 cm
3.310 cm
3.310 cm
3.310 cm
Err:514
Usar
Mmax (-)
b=
d=
=
5.080 Tn-m
25.00 cm
23.78 cm
0.9
Viga A-D
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
a = 0.10.d
5.950 cm
6.406 cm
6.473 cm
6.482 cm
a =2.38 cm
a =5.60 cm
a =6.03 cm
a =6.09 cm
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Err:514
Err:514
TERCER PISO
Mmax (-)
b=
d=
=
REPETIR
REPETIR
REPETIR
Err:514
1.770 Tn-m
25.00 cm
23.78 cm
0.9
Viga D-E
a = 0.10.d
2.073 cm
2.054 cm
2.053 cm
2.053 cm
a =2.38 cm
a =1.95 cm
a =1.93 cm
a =1.93 cm
Err:514
REPETIR
REPETIR
OK
Err:514
2.790 Tn-m
25.00 cm
23.78 cm
0.9
Viga E-C
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
3.268 cm
3.319 cm
3.322 cm
3.323 cm
a =2.38 cm
a =3.08 cm
a =3.12 cm
a =3.13 cm
Mmax (-)
b=
d=
5.230 Tn-m
25.00 cm
23.78 cm
Err:514
Viga A-D
Err:514
5.280 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
a = 0.10.d
6.184 cm
6.694 cm
6.772 cm
Usar
Mmax (-)
b=
d=
=
2.710 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
CUARTO PISO
Mmax (-)
b=
d=
Err:514
a = 0.10.d
3.174 cm
3.217 cm
3.220 cm
3.220 cm
Err:514
3.330 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
3.900 cm
4.015 cm
4.025 cm
4.026 cm
Err:514
5.230 Tn-m
25.00 cm
23.78 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
=
0.9
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
a = 0.10.d
6.125 cm
6.622 cm
6.697 cm
6.708 cm
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
a =2.38 cm
a =5.76 cm
a =6.23 cm
a =6.30 cm
Err:514
Err:514
2.300 Tn-m
25.00 cm
23.78 cm
0.9
Viga D-E
a = 0.10.d
2.694 cm
2.080 cm
2.054 cm
2.053 cm
a =2.38 cm
a =2.54 cm
a =1.96 cm
a =1.93 cm
Err:514
Viga E-C
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
3.865 cm
3.976 cm
3.985 cm
3.986 cm
a =2.38 cm
a =3.64 cm
a =3.74 cm
a =3.75 cm
Mmax (-)
b=
d=
=
2.760 Tn-m
25.00 cm
23.78 cm
0.9
Viga A-D
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
a = 0.10.d
3.232 cm
3.281 cm
3.284 cm
3.284 cm
a =2.38 cm
a =3.04 cm
a =3.09 cm
a =3.09 cm
Err:514
REPETIR
REPETIR
OK
Err:514
Err:514
Viga D-E
a = 0.10.d
2.307 cm
2.297 cm
2.296 cm
2.296 cm
a =2.38 cm
a =2.17 cm
a =2.16 cm
a =2.16 cm
0.9
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
a = 0.10.d
6.125 cm
6.622 cm
6.697 cm
6.697 cm
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
QUINTO PISO
Mmax (-)
b=
d=
=
REPETIR
REPETIR
OK
Err:514
1.970 Tn-m
25.00 cm
23.78 cm
0.9
Err:514
REPETIR
REPETIR
REPETIR
Err:514
3.300 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
Usar
REPETIR
REPETIR
REPETIR
REPETIR
OK
OK
Err:514
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Err:514
2.770 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
3.244 cm
3.293 cm
3.297 cm
3.297 cm
Err:514
2.870 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
3.361 cm
3.421 cm
3.425 cm
3.425 cm
Err:514
3.370 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
3.947 cm
4.067 cm
4.078 cm
4.078 cm
Err:514
2.080 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
2.436 cm
2.431 cm
2.431 cm
2.431 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mmax (-)
b=
d=
=
2.160 Tn-m
25.00 cm
23.78 cm
0.9
Viga E-C
Mmax (-)
b=
d=
=
1.330 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
2.530 cm
2.530 cm
2.530 cm
2.530 cm
a =2.38 cm
a =2.38 cm
a =2.38 cm
a =2.38 cm
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
1.558 cm
1.527 cm
1.526 cm
1.526 cm
PISO
PRIMER PISO
SEGUNDO PISO
TERCER PISO
CUARTO PISO
QUINTO PISO
OK
OK
OK
Err:514
Err:514
VIGAS
M Max. Posiitivo
Viga A-B
22.370 Tn-m
25.750 Tn-m
21.270 Tn-m
Viga B -C
9.580 Tn-m
5.530 Tn-m
7.520 Tn-m
Viga A-B
24.540 Tn-m
24.450 Tn-m
20.170 Tn-m
Viga B -C
8.420 Tn-m
6.740 Tn-m
7.350 Tn-m
Viga A-B
24.540 Tn-m
24.450 Tn-m
20.170 Tn-m
Viga B -C
8.360 Tn-m
6.810 Tn-m
7.350 Tn-m
Viga A-B
8.380 Tn-m
6.700 Tn-m
7.350 Tn-m
Viga B -C
8.380 Tn-m
6.700 Tn-m
7.360 Tn-m
Viga A-B
12.330 Tn-m
15.980 Tn-m
14.130 Tn-m
Viga B -C
6.070 Tn-m
2.996 Tn-m
5.370 Tn-m
1. PERALTE EFECTIVO
b=
h=
f'c =
fy =
=
Recub =
As min =
Pmin =
As min =
25.00 cm
30.00 cm
210 Kg/cm
4200 Kg/cm
0.85
4.00 cm
Asumo :
Estribos :
d:
d:
Err:514
(0.75.f'c/fy)*(6300/(6300+fy))
0.0225
0.75.Pb
0.0169
18.469 cm
Err:514
As min =
Err:514
As =2.710 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a=
Mur=
Mur=
2.551 cm
230508.097 kg-cm
2.305 Ton-m
5. MOMENTO CON ACERO MAXIMO
3 1+1 3/4
As min =
a=
Mur=
Mur=
As =18.150 cm
17.082 cm
1045318.448 kg-cm
10.453 Ton-m
7.350 Tn-m
7.360 Tn-m
14.130 Tn-m
5.370 Tn-m
Mmax (+)
b=
d=
=
21.270 Tn-m
25.00 cm
23.78 cm
0.9
Viga A-B
Mmax (+)
b=
d=
=
7.520 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
a = 0.10.d
a =2.38 cm
Asumir:
a = 0.10.d
As =
24.911 cm
a =23.45 cm
As =
As =
As =
Usar
46.678 cm
310.670 cm
-4.596 cm
a =43.93 cm
a =292.40 cm
Mmax (-)
21.270 Tn-m
b=
25.00 cm
d=
=
42.45 cm
0.9
Asumir:
As =
As =
a = 0.10.d
13.953 cm
15.681 cm
CUARTO PISO
QUINTO PISO
PRIMER PISO
Err:514
REPETIR
REPETIR
REPETIR
Err:514
As =
8.807 cm
As =
As =
As =
Usar
10.133 cm
10.466 cm
10.553 cm
DOBLE CAPA
25/ 8"
21"+1"
a =4.25 cm
a =13.13 cm
a =14.76 cm
REPETIR
REPETIR
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
16.045 cm
a =15.10 cm
REPETIR
As =
16.123 cm
a =15.17 cm
REPETIR
As =
16.140 cm
a =15.19 cm
REPETIR
As =
16.144 cm
a =15.19 cm
OK
As =
16.123 cm
Usar
Err:514
Err:514
SEGUNDO PISO
Mmax
20.170 Tn-m
Mmax (+)
7.350 Tn-m
b=
25.00 cm
b=
25.00 cm
d=
=
23.78 cm
0.9
d=
=
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
a = 0.10.d
23.622 cm
42.145 cm
135.271 cm
-13.380 cm
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
8.608 cm
9.857 cm
10.160 cm
10.236 cm
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
a =2.38 cm
a =22.23 cm
a =39.67 cm
a =127.31 cm
Err:514
20.170 Tn-m
25.00 cm
42.70 cm
0.9
a = 0.10.d
13.154 cm
14.614 cm
14.895 cm
14.950 cm
14.961 cm
14.963 cm
14.950 cm
Err:514
25/ 8"
21"+1"
Err:514
20.170 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
a = 0.10.d
23.622 cm
42.145 cm
135.271 cm
-13.380 cm
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
OK
Err:514
TERCER PISO
Mmax (+)
b=
d=
=
a =2.38 cm
a =22.23 cm
a =39.67 cm
a =127.31 cm
Err:514
20.170 Tn-m
25.00 cm
42.70 cm
0.9
Err:514
DOBLE CAPA
a =4.27 cm
a =12.38 cm
a =13.75 cm
a =14.02 cm
a =14.07 cm
a =14.08 cm
a =14.08 cm
Mmax
b=
d=
=
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
Asumir:
As =
As =
As =
As =
Usar
DOBLE CAPA
25/ 8"
21"+1"
7.350 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
8.608 cm
9.857 cm
10.160 cm
10.236 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
a = 0.10.d
13.154 cm
14.614 cm
14.895 cm
14.950 cm
14.961 cm
14.963 cm
14.950 cm
a =4.27 cm
a =12.38 cm
a =13.75 cm
a =14.02 cm
a =14.07 cm
a =14.08 cm
a =14.08 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
OK
Err:514
CUARTO PISO
Mmax (+)
b=
d=
=
Mmax
b=
d=
=
7.350 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
8.608 cm
9.857 cm
10.160 cm
10.236 cm
Mmax
b=
d=
=
14.130 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
16.549 cm
23.378 cm
29.258 cm
37.348 cm
a =2.38 cm
a =8.10 cm
a =9.28 cm
a =9.56 cm
Err:514
Asumir:
As =
As =
As =
As =
Usar
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =15.58 cm
a =22.00 cm
a =27.54 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
Izquierda
22.370 Tn-m
9.580 Tn-m
Derecha
25.750 Tn-m
5.530 Tn-m
SEGUNDO PISO
M max
24.540 Tn-m
24.450 Tn-m
M max
8.420 Tn-m
6.740 Tn-m
M max
24.540 Tn-m
24.450 Tn-m
M max
8.360 Tn-m
6.810 Tn-m
CUARTO PISO
M max
8.380 Tn-m
6.700 Tn-m
QUINTO PISO
M max
M max
M max
8.380 Tn-m
12.330 Tn-m
6.070 Tn-m
6.700 Tn-m
15.980 Tn-m
2.996 Tn-m
PRIMER PISO
Mmax (-)
22.370 Tn-m
a = 0.10.d
8.620 cm
9.873 cm
10.177 cm
10.254 cm
Err:514
QUINTO PISO
Mmax (+)
b=
d=
=
B. ACEROS NEGATIVOS
PRIMER PISO
M max
M max
TERCER PISO
7.360 Tn-m
25.00 cm
23.78 cm
0.9
5.370 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
6.289 cm
6.824 cm
6.908 cm
6.921 cm
Err:514
FORMULAS
As
Mu
. fy.(d a / 2)
As . fy
0.85 . f ' c.b
Mmax (-)
25.750 Tn-m
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
b=
d=
=
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
25.00 cm
23.78 cm
0.9
b=
d=
=
Mmax (-)
b=
d=
=
22.370 Tn-m
25.00 cm
42.77 cm
0.9
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
a = 0.10.d
14.565 cm
16.477 cm
16.901 cm
16.998 cm
17.020 cm
17.025 cm
16.998 cm
DOBLE CAPA
25/ 8"
21"+1"
a =4.28 cm
a =13.71 cm
a =15.51 cm
a =15.91 cm
a =16.00 cm
a =16.02 cm
a =16.02 cm
Err:514
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
a = 0.10.d
30.158 cm
71.066 cm
-70.481 cm
11.963 cm
37.537 cm
111.435 cm
11.963 cm
Err:514
Mmax (-)
b=
d=
=
d=
25.750 Tn-m
25.00 cm
23.78 cm
0.9
5.90 cm
Area de acero en compresion
22.636 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
OK
A's =
A's =
Err:514
d' =
d=
As =
As =
A's =
A's =
As =
As =
a=
fs=
A's =
A's =
As =
Mmax (-)
b=
d=
=
9.580 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
a = 0.10.d
11.220 cm
13.701 cm
14.624 cm
15.000 cm
Mmax (-)
b=
d=
=
a =2.38 cm
a =10.56 cm
a =12.90 cm
a =13.76 cm
a =14.12 cm
REPETIR
REPETIR
REPETIR
REPETIR
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
d=
A's =
A's =
As =
As =
d' =
d=
A's =
A's =
As =
As =
a=
fs=
A's =
A's =
As =
15.159 cm
15.227 cm
15.000 cm
a =14.27 cm
a =14.33 cm
Err:514
REPETIR
REPETIR
Err:514
9.580 Tn-m
DOBLEMENTE REFORZADA
25.00 cm
23.78 cm
0.9
5.90 cm
Area de acero en compresion
-1.292 cm
Err:514
Err:514
Area de acero en traccin
14.190 cm
Err:514
Verificamos si el acero en comp. Fluye- peraltes
5.50 cm
42.45 cm
Area de acero en compresion
-0.102 cm
Err:514
Area de acero en traccin
14.190 cm
Err:514
Verificamos si el acero en com. Fluye
12.46
3934.9897665093 Acero en comp. No fluye
Rediseamos el acero en compresion
2.750 cm
Err:514
14.190 cm
Err:514
A's =
A's =
As =
As =
Err:514
d' =
d=
Err:514
A's =
A's =
Err:514
As =
As =
a=
fs=
A's =
A's =
As =
Err:514
Err:514
SEGUNDO PISO
Mmax (-)
b=
d=
=
Mmax (-)
b=
d=
=
24.540 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
d=
a = 0.10.d
a =2.38 cm
28.740 cm
a =27.05 cm
REPETIR
63.321 cm
a =59.60 cm
REPETIR
-107.829 cm
-a =101.49 cm
REPETIR
8.712 cm
a =8.20 cm
REPETIR
32.992 cm
Err:514
Err:514
24.540 Tn-m
DOBLEMENTE REFORZADA
25.00 cm
23.78 cm
0.9
5.90 cm
Area de acero en compresion
20.846 cm
A's =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
d=
Asumir:
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
d=
A's =
7.170 cm
7.170 cm
7.167 cm
Err:514
5.530 Tn-m
25.00 cm
23.78 cm
0.9
5.90 cm
Area de acero en compresion
-7.285 cm
Err:514
Area de acero en traccin
14.190 cm
Err:514
Verificamos si el acero en comp. Fluye- peraltes
5.50 cm
42.45 cm
Area de acero en compresion
-0.577 cm
Err:514
Area de acero en traccin
14.190 cm
Err:514
Verificamos si el acero en com. Fluye
12.46
3934.9897665093
Rediseamos el acero en compresion
2.750 cm
Err:514
14.190 cm
Err:514
24.450 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
28.635 cm
62.785 cm
-112.132 cm
8.450 cm
32.666 cm
Err:514
24.450 Tn-m
25.00 cm
23.78 cm
0.9
5.90 cm
Area de acero en compresion
20.712 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
A's =
As =
As =
d' =
d=
A's =
A's =
As =
As =
a=
fs=
A's =
A's =
As =
Err:514
Area de acero en traccin
18.150 cm
Err:514
Verificamos si el acero en comp. Fluye- peraltes
5.50 cm
42.45 cm
Area de acero en compresion
1.650 cm
Err:514
Area de acero en traccin
14.190 cm
Err:514
Verificamos si el acero en com. Fluye
12.46
3934.9897665093 Acero en comp. No fluye
Rediseamos el acero en compresion
2.750 cm
Err:514
14.190 cm
Err:514
Mmax (-)
b=
d=
=
8.420 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
As =
Usar
a = 0.10.d
9.861 cm
11.640 cm
12.172 cm
12.341 cm
12.396 cm
TERCER PISO
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
d=
Err:514
Err:514
A's =
As =
As =
d' =
d=
Err:514
A's =
A's =
Err:514
As =
As =
a=
fs=
Err:514
A's =
A's =
As =
Err:514
Err:514
Area de acero en traccin
18.150 cm
Err:514
Verificamos si el acero en comp. Fluye- peraltes
5.50 cm
42.45 cm
Area de acero en compresion
1.639 cm
Err:514
Area de acero en traccin
14.190 cm
Err:514
Verificamos si el acero en com. Fluye
12.46
3934.9897665093
Rediseamos el acero en compresion
2.750 cm
Err:514
14.190 cm
Err:514
Mmax (-)
b=
d=
=
6.740 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
As =
Usar
a = 0.10.d
7.894 cm
8.887 cm
9.100 cm
9.146 cm
9.156 cm
24.540 Tn-m
25.00 cm
23.78 cm
0.9
Mmax (-)
b=
d=
=
24.450 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
a =2.38 cm
28.740 cm
a =27.05 cm
REPETIR
63.321 cm
a =59.60 cm
REPETIR
-107.829 cm
-a =101.49 cm
REPETIR
8.712 cm
Err:514
Err:514
24.540 Tn-m
DOBLEMENTE REFORZADA
25.00 cm
23.78 cm
0.9
5.90 cm
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
d=
a = 0.10.d
28.635 cm
62.785 cm
-112.132 cm
8.450 cm
Err:514
24.450 Tn-m
25.00 cm
23.78 cm
0.9
5.90 cm
a =2.38 cm
a =9.28 cm
a =10.96 cm
a =11.46 cm
a =11.62 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
A's =
A's =
As =
As =
d' =
d=
A's =
A's =
As =
As =
a=
fs=
A's =
A's =
As =
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
7.976 cm
8.997 cm
9.218 cm
9.268 cm
Mmax (-)
b=
d=
=
8.380 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
a = 0.10.d
9.814 cm
11.571 cm
12.093 cm
12.257 cm
8.380 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
a = 0.10.d
a =2.38 cm
a =7.51 cm
a =8.47 cm
a =8.68 cm
Err:514
a =2.38 cm
a =9.24 cm
a =10.89 cm
a =11.38 cm
Err:514
Err:514
A's =
A's =
Err:514
As =
As =
d' =
d=
Err:514
A's =
A's =
Err:514
As =
As =
a=
fs=
Err:514
Err:514
Mmax (-)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
REPETIR
As =
Err:514
Usar
CUARTO PISO
Mmax (-)
b=
d=
=
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
A's =
A's =
As =
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
6.700 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
a = 0.10.d
a = 0.10.d
7.847 cm
8.825 cm
9.032 cm
9.077 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
As =
As =
As =
Usar
9.814 cm
11.571 cm
12.093 cm
12.257 cm
a =9.24 cm
a =10.89 cm
a =11.38 cm
Err:514
Mmax (-)
b=
d=
=
12.330 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
a = 0.10.d
14.440 cm
19.208 cm
22.132 cm
24.411 cm
Asumir:
As =
As =
As =
As =
Usar
As =
As =
As =
As =
Usar
REPETIR
REPETIR
REPETIR
Err:514
QUINTO PISO
Mmax (-)
b=
d=
=
a =2.38 cm
a =13.59 cm
a =18.08 cm
a =20.83 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
6.070 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
7.109 cm
7.859 cm
7.998 cm
8.023 cm
a =2.38 cm
a =6.69 cm
a =7.40 cm
a =7.53 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Viga A-B
Viga B -C
Viga A-B
Viga B -C
Viga A-B
Viga B -C
Viga A-B
Viga B -C
Viga A-B
Viga B -C
M Max. Negativos
Izquierda
Derecha
9.540 Tn-m
14.770 Tn-m
14.710 Tn-m
10.260 Tn-m
10.820 Tn-m
13.420 Tn-m
13.370 Tn-m
10.760 Tn-m
10.840 Tn-m
13.260 Tn-m
13.210 Tn-m
10.790 Tn-m
11.070 Tn-m
13.060 Tn-m
13.010 Tn-m
11.020 Tn-m
5.850 Tn-m
9.150 Tn-m
9.130 Tn-m
5.790 Tn-m
M Max. Posiitivo
10.390 Tn-m
9.470 Tn-m
9.600 Tn-m
9.560 Tn-m
9.660 Tn-m
9.520 Tn-m
9.600 Tn-m
9.560 Tn-m
7.180 Tn-m
7.150 Tn-m
1. PERALTE EFECTIVO
7.847 cm
8.825 cm
9.032 cm
9.077 cm
Err:514
15.980 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
18.715 cm
28.239 cm
40.306 cm
87.894 cm
Err:514
2.996 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
3.509 cm
3.582 cm
3.588 cm
3.588 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
b=
h=
f'c =
fy =
=
Recub =
1.436 cm
Err:514
0.0169
18.469 cm
Err:514
Err:514
1 1/2 + 2 3/8
As =2.710 cm
3 1+1 3/4
As =18.150 cm
2.551 cm
230508.097 kg-cm
2.305 Ton-m
Err:514
(0.75.f'c/fy)*(6300/(6300+fy))
2.54 cm
0.95 cm
17.082 cm
1045318.448 kg-cm
10.453 Ton-m
FORMULAS
10.390 Tn-m
9.470 Tn-m
9.600 Tn-m
9.560 Tn-m
9.660 Tn-m
9.520 Tn-m
9.600 Tn-m
9.560 Tn-m
7.180 Tn-m
7.150 Tn-m
As
Mu
. fy.(d a / 2)
As . fy
0.85 . f ' c.b
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
PRIMER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
10.390 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
12.168 cm
15.227 cm
16.547 cm
17.189 cm
Err:514
SEGUNDO PISO
Mmax
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.600 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
11.243 cm
13.738 cm
14.670 cm
15.051 cm
TERCER PISO
Mmax
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.660 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
11.313 cm
13.849 cm
14.806 cm
15.203 cm
CUARTO PISO
Mmax
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.600 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
11.243 cm
13.738 cm
14.670 cm
15.051 cm
QUINTO PISO
Mmax
b=
d=
=
Viga A-B
a =2.38 cm
a =11.45 cm
a =14.33 cm
a =15.57 cm
Err:514
a =2.38 cm
a =10.58 cm
a =12.93 cm
a =13.81 cm
Err:514
Err:514
7.180 Tn-m
25.00 cm
23.78 cm
0.9
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =10.65 cm
a =13.03 cm
a =13.93 cm
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =10.58 cm
a =12.93 cm
a =13.81 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.470 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
11.091 cm
13.500 cm
14.378 cm
14.727 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.560 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
11.196 cm
13.664 cm
14.579 cm
14.950 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.520 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
11.149 cm
13.591 cm
14.489 cm
14.851 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.560 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
11.196 cm
13.664 cm
14.579 cm
14.950 cm
Mmax (+)
b=
d=
=
7.150 Tn-m
25.00 cm
23.78 cm
0.9
Err:514
Err:514
Err:514
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
8.409 cm
9.583 cm
9.858 cm
9.925 cm
a =2.38 cm
a =7.91 cm
a =9.02 cm
a =9.28 cm
Err:514
B. ACEROS NEGATIVOS
M max
PRIMER PISO
M max
M max
SEGUNDO PISO
M max
M max
TERCER PISO
M max
M max
CUARTO PISO
M max
M max
QUINTO PISO
M max
PRIMER PISO
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
a =2.38 cm
a =10.52 cm
a =12.83 cm
a =13.68 cm
a =14.02 cm
a =14.17 cm
a =14.23 cm
Err:514
14.710 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
9.357 cm
9.883 cm
9.945 cm
9.953 cm
9.954 cm
9.954 cm
9.953 cm
Err:514
SEGUNDO PISO
Mmax (-)
b=
d=
=
10.820 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
a = 0.10.d
Err:514
Izquierda
9.540 Tn-m
14.710 Tn-m
10.820 Tn-m
13.370 Tn-m
10.840 Tn-m
13.210 Tn-m
11.070 Tn-m
13.010 Tn-m
5.850 Tn-m
9.130 Tn-m
9.540 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
11.173 cm
13.628 cm
14.534 cm
14.900 cm
15.054 cm
15.119 cm
14.900 cm
REPETIR
REPETIR
REPETIR
Derecha
14.770 Tn-m
10.260 Tn-m
13.420 Tn-m
10.760 Tn-m
13.260 Tn-m
10.790 Tn-m
13.060 Tn-m
11.020 Tn-m
9.150 Tn-m
5.790 Tn-m
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
a =4.38 cm
a =8.81 cm
a =9.30 cm
a =9.36 cm
a =9.37 cm
a =9.37 cm
a =9.37 cm
REPETIR
REPETIR
REPETIR
OK
OK
OK
Err:514
a =2.38 cm
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
8.374 cm
9.535 cm
9.806 cm
9.871 cm
Err:514
FORMULAS
As
Mu
. f y.(d a / 2)
As . fy
0.85 . f ' c.b
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
14.770 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
17.298 cm
24.988 cm
32.512 cm
46.089 cm
187.097 cm
-6.080 cm
46.089 cm
Err:514
10.260 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
12.016 cm
14.977 cm
16.225 cm
16.815 cm
17.109 cm
17.260 cm
16.815 cm
Err:514
Mmax (-)
b=
d=
=
13.420 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
a = 0.10.d
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
12.672 cm
16.068 cm
17.652 cm
18.502 cm
18.994 cm
a =11.93 cm
a =15.12 cm
a =16.61 cm
a =17.41 cm
Err:514
13.370 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
a =2.38 cm
15.658 cm
a =14.74 cm
21.556 cm
a =20.29 cm
As =
25.943 cm
As =
Usar
30.574 cm
a =24.42 cm
Err:514
REPETIR
REPETIR
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
REPETIR
As =
17.494 cm
As =
Usar
18.312 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
15.717 cm
21.673 cm
26.146 cm
30.943 cm
38.523 cm
Err:514
10.760 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
12.602 cm
15.950 cm
Err:514
TERCER PISO
Mmax (-)
b=
10.840 Tn-m
25.00 cm
Mmax (-)
b=
13.260 Tn-m
25.00 cm
d=
23.78 cm
d=
23.78 cm
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.9
a = 0.10.d
12.695 cm
16.108 cm
17.705 cm
18.566 cm
0.9
a = 0.10.d
15.530 cm
21.300 cm
25.505 cm
29.791 cm
Err:514
13.210 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
15.471 cm
21.184 cm
25.308 cm
29.447 cm
Err:514
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Err:514
10.790 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
12.637 cm
16.009 cm
17.573 cm
18.407 cm
Err:514
CUARTO PISO
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
11.070 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
12.965 cm
16.568 cm
18.325 cm
19.326 cm
Err:514
13.010 Tn-m
25.00 cm
23.78 cm
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
13.060 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
15.295 cm
20.839 cm
24.730 cm
28.460 cm
Err:514
11.020 Tn-m
25.00 cm
23.78 cm
a =2.38 cm
a =11.95 cm
a =15.16 cm
a =16.66 cm
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =14.56 cm
a =19.94 cm
a =23.82 cm
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =12.20 cm
a =15.59 cm
a =17.25 cm
REPETIR
REPETIR
REPETIR
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
=
Asumir:
As =
As =
As =
As =
Usar
QUINTO PISO
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.9
a = 0.10.d
15.237 cm
20.725 cm
24.541 cm
28.145 cm
a =2.38 cm
a =14.34 cm
a =19.51 cm
a =23.10 cm
Err:514
5.850 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
6.851 cm
7.530 cm
7.649 cm
7.670 cm
Err:514
a =2.38 cm
a =6.45 cm
a =7.09 cm
a =7.20 cm
Err:514
9.130 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
10.693 cm
12.885 cm
13.635 cm
13.913 cm
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =10.06 cm
a =12.13 cm
a =12.83 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
=
Asumir:
As =
As =
As =
As =
Usar
0.9
a = 0.10.d
12.906 cm
16.467 cm
18.189 cm
19.157 cm
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.150 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
10.716 cm
12.921 cm
13.678 cm
13.959 cm
M Max. Negativos
Izquierda
Derecha
M Max. Posiitivo
Err:514
Err:514
5.790 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
6.781 cm
7.441 cm
7.554 cm
7.574 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
PRIMER PISO
SEGUNDO PISO
TERCER PISO
CUARTO PISO
QUINTO PISO
1. PERALTE EFECTIVO
b=
h=
f'c =
fy =
=
Recub =
Viga A-B
Viga B -C
Viga A-B
Viga B -C
Viga A-B
Viga B -C
Viga A-B
Viga B -C
Viga A-B
Viga B -C
7.050 Tn-m
14.100 Tn-m
8.560 Tn-m
12.840 Tn-m
8.610 Tn-m
12.640 Tn-m
8.810 Tn-m
12.440 Tn-m
4.310 Tn-m
8.770 Tn-m
14.150 Tn-m
3.700 Tn-m
12.890 Tn-m
10.760 Tn-m
12.690 Tn-m
8.570 Tn-m
12.490 Tn-m
8.760 Tn-m
8.790 Tn-m
4.290 Tn-m
0.0169
18.469 cm
3 1+1 3/4
As =18.150 cm
1 1/2 + 2 3/8
As =2.710 cm
3 1+1 3/4
As =18.150 cm
2.551 cm
435384.097 kg-cm
4.354 Ton-m
As =2.710 cm
(0.75.f'c/fy)*(6300/(6300+fy))
2.54 cm
0.95 cm
2.643 cm
Err:514
9.720 Tn-m
9.770 Tn-m
9.320 Tn-m
9.290 Tn-m
9.320 Tn-m
9.350 Tn-m
9.370 Tn-m
9.310 Tn-m
7.000 Tn-m
7.050 Tn-m
17.082 cm
2417458.448 kg-cm
24.175 Ton-m
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
4. DETERMINACION DEL REFUERZO EN LA VIGA
A. ACEROS POSITIVOS
M max
PRIMER PISO
M max
M max
SEGUNDO PISO
M max
M max
TERCER PISO
M max
M max
CUARTO PISO
M max
M max
QUINTO PISO
M max
PRIMER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
14.770 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
9.395 cm
9.928 cm
9.992 cm
10.000 cm
Err:514
SEGUNDO PISO
Mmax
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.600 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
6.107 cm
6.209 cm
6.216 cm
6.217 cm
TERCER PISO
Mmax
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.660 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
6.145 cm
6.250 cm
6.258 cm
6.259 cm
CUARTO PISO
Mmax
b=
FORMULAS
9.720 Tn-m
9.770 Tn-m
9.320 Tn-m
9.290 Tn-m
9.320 Tn-m
9.350 Tn-m
9.370 Tn-m
9.310 Tn-m
7.000 Tn-m
7.050 Tn-m
a =4.38 cm
a =8.84 cm
a =9.34 cm
a =9.40 cm
As . fy
0.85 . f ' c.b
REPETIR
REPETIR
REPETIR
As =10.080 cm
Err:514
9.600 Tn-m
25.00 cm
Mu
. fy.(d a / 2)
Viga A-B
a =4.38 cm
a =5.75 cm
a =5.84 cm
a =5.85 cm
REPETIR
REPETIR
OK
As =6.540 cm
a =4.38 cm
a =5.78 cm
a =5.88 cm
a =5.89 cm
Err:514
As
REPETIR
REPETIR
OK
As =6.540 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.470 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
6.024 cm
6.119 cm
6.126 cm
6.126 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.560 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
6.081 cm
6.181 cm
6.188 cm
6.189 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.520 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
6.056 cm
6.154 cm
6.161 cm
6.161 cm
Mmax (+)
b=
9.560 Tn-m
25.00 cm
Err:514
Err:514
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
d=
=
Asumir:
As =
As =
As =
As =
Usar
QUINTO PISO
Mmax
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
43.78 cm
0.9
a = 0.10.d
6.107 cm
6.209 cm
6.216 cm
6.217 cm
Err:514
7.180 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
4.567 cm
4.563 cm
4.563 cm
4.563 cm
7.050 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
6.069 cm
6.167 cm
6.174 cm
6.175 cm
6.175 cm
6.175 cm
6.175 cm
REPETIR
REPETIR
OK
As =6.540 cm
a =4.38 cm
a =4.30 cm
a =4.29 cm
a =4.29 cm
Err:514
B. ACEROS NEGATIVOS
PRIMER PISO
M max
M max
M max
SEGUNDO PISO
M max
M max
TERCER PISO
M max
M max
CUARTO PISO
M max
QUINTO PISO
M max
M max
PRIMER PISO
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
a =4.38 cm
a =5.75 cm
a =5.84 cm
a =5.85 cm
REPETIR
OK
OK
As =4.580 cm
Izquierda
7.050 Tn-m
14.100 Tn-m
8.560 Tn-m
12.840 Tn-m
8.610 Tn-m
12.640 Tn-m
8.810 Tn-m
12.440 Tn-m
4.310 Tn-m
8.770 Tn-m
a =4.38 cm
a =5.71 cm
a =5.80 cm
a =5.81 cm
a =5.81 cm
a =5.81 cm
a =5.81 cm
Err:514
14.100 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
a =4.38 cm
9.357 cm
a =8.81 cm
Derecha
14.150 Tn-m
3.700 Tn-m
12.890 Tn-m
10.760 Tn-m
12.690 Tn-m
8.570 Tn-m
12.490 Tn-m
8.760 Tn-m
8.790 Tn-m
4.290 Tn-m
REPETIR
REPETIR
OK
OK
OK
OK
As =6.540 cm
REPETIR
d=
=
Asumir:
As =
As =
As =
As =
Usar
43.78 cm
0.9
a = 0.10.d
6.081 cm
6.181 cm
6.188 cm
6.189 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
7.150 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
4.548 cm
4.543 cm
4.543 cm
4.543 cm
Err:514
Err:514
FORMULAS
As
Mu
. f y.(d a / 2)
A
s . fy
0.85 . f ' c.b
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
14.150 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
6.501 cm
6.640 cm
6.651 cm
6.652 cm
6.652 cm
6.652 cm
6.652 cm
Err:514
3.700 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
3.263 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
As =
As =
As =
As =
As =
Usar
9.883 cm
9.945 cm
9.953 cm
9.954 cm
9.954 cm
9.953 cm
a =9.30 cm
a =9.36 cm
a =9.37 cm
a =9.37 cm
a =9.37 cm
Err:514
REPETIR
REPETIR
OK
OK
OK
As =10.080 cm
As =
As =
As =
As =
As =
As =
Usar
3.213 cm
3.211 cm
3.211 cm
3.211 cm
3.211 cm
3.211 cm
Mmax (-)
b=
d=
=
12.890 Tn-m
25.00 cm
43.78 cm
0.9
Asumir:
a = 0.10.d
As =
As =
As =
As =
As =
Usar
8.537 cm
8.929 cm
8.971 cm
8.975 cm
8.976 cm
Err:514
SEGUNDO PISO
Mmax (-)
b=
d=
=
8.560 Tn-m
25.00 cm
43.78 cm
0.9
Asumir:
a = 0.10.d
a =4.38 cm
As =
As =
As =
As =
As =
Usar
6.883 cm
7.061 cm
7.076 cm
7.077 cm
7.077 cm
a =6.48 cm
a =6.65 cm
a =6.66 cm
a =6.66 cm
Mmax (-)
12.840 Tn-m
Mmax (-)
10.760 Tn-m
b=
d=
=
Asumir:
As =
As =
25.00 cm
43.78 cm
0.9
a = 0.10.d
8.505 cm
8.893 cm
a =4.38 cm
a =8.00 cm
a =8.37 cm
REPETIR
REPETIR
b=
d=
=
Asumir:
As =
As =
25.00 cm
43.78 cm
0.9
a = 0.10.d
6.845 cm
7.019 cm
As =
8.934 cm
a =8.41 cm
REPETIR
As =
7.033 cm
As =
Usar
8.938 cm
As =
Usar
7.034 cm
As =8.970 cm
Err:514
REPETIR
REPETIR
REPETIR
OK
As =7.080 cm
Err:514
Err:514
Err:514
TERCER PISO
Mmax (-)
b=
8.610 Tn-m
25.00 cm
Mmax (-)
b=
12.690 Tn-m
25.00 cm
d=
43.78 cm
d=
43.78 cm
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.9
a = 0.10.d
6.895 cm
7.075 cm
7.090 cm
7.091 cm
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.9
a = 0.10.d
8.435 cm
8.812 cm
8.852 cm
8.856 cm
a =4.38 cm
a =6.49 cm
a =6.66 cm
a =6.67 cm
Err:514
8.810 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
8.403 cm
8.776 cm
8.814 cm
8.818 cm
As =7.230 cm
a =4.38 cm
a =7.91 cm
a =8.26 cm
a =8.30 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
As =8.970 cm
Err:514
12.490 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
6.864 cm
7.040 cm
7.054 cm
7.055 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
CUARTO PISO
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
QUINTO PISO
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
8.810 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
7.042 cm
7.238 cm
7.254 cm
7.255 cm
a =4.38 cm
a =6.63 cm
a =6.81 cm
a =6.83 cm
Err:514
12.440 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
8.276 cm
8.630 cm
8.666 cm
8.670 cm
Err:514
4.310 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
3.721 cm
3.682 cm
3.681 cm
3.681 cm
As =7.410 cm
a =4.38 cm
a =7.79 cm
a =8.12 cm
a =8.16 cm
Err:514
REPETIR
REPETIR
OK
As =3.870 cm
a =4.38 cm
a =3.50 cm
a =3.47 cm
a =3.46 cm
Err:514
REPETIR
REPETIR
REPETIR
As =8.700 cm
a =4.38 cm
a =3.50 cm
a =3.47 cm
a =3.46 cm
8.770 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
3.721 cm
3.682 cm
3.681 cm
3.681 cm
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
OK
As =3.870 cm
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
12.490 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
8.308 cm
8.666 cm
8.703 cm
8.707 cm
Err:514
8.760 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
7.010 cm
7.202 cm
7.218 cm
7.220 cm
Err:514
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
8.790 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
5.820 cm
5.898 cm
5.904 cm
5.904 cm
Err:514
4.290 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
5.820 cm
5.898 cm
5.904 cm
5.904 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
1. PERALTE EFECTIVO
b=
h=
f'c =
fy =
=
Recub =
Viga A-B
Viga B -C
Viga A-B
Viga B -C
Viga A-B
Viga B -C
Viga A-B
Viga B -C
Viga A-B
Viga B -C
M Max. Negativos
Izquierda
Derecha
7.050 Tn-m
14.150 Tn-m
14.100 Tn-m
7.000 Tn-m
8.560 Tn-m
12.890 Tn-m
12.840 Tn-m
8.520 Tn-m
8.610 Tn-m
12.690 Tn-m
12.640 Tn-m
8.570 Tn-m
8.810 Tn-m
12.490 Tn-m
12.440 Tn-m
8.760 Tn-m
4.310 Tn-m
8.790 Tn-m
8.770 Tn-m
4.290 Tn-m
2.54 cm
0.95 cm
Err:514
(0.75.f'c/fy)*(6300/(6300+fy))
0.0169
18.469 cm
9.720 Tn-m
9.770 Tn-m
9.320 Tn-m
9.290 Tn-m
9.400 Tn-m
9.350 Tn-m
9.370 Tn-m
9.310 Tn-m
7.000 Tn-m
7.060 Tn-m
1.436 cm
Err:514
M Max. Posiitivo
Err:514
Err:514
1 1/2 + 2 3/8
As =2.710 cm
3 1+1 3/4
As =18.150 cm
2.551 cm
230508.097 kg-cm
2.305 Ton-m
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a=
Mur=
Mur=
17.082 cm
1045318.448 kg-cm
10.453 Ton-m
PRIMER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.720 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
11.384 cm
13.960 cm
14.943 cm
15.356 cm
SEGUNDO PISO
Mmax
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.320 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
10.915 cm
13.227 cm
14.047 cm
14.362 cm
TERCER PISO
Mmax
FORMULAS
9.720 Tn-m
9.770 Tn-m
9.320 Tn-m
9.290 Tn-m
9.400 Tn-m
9.350 Tn-m
9.370 Tn-m
9.310 Tn-m
7.000 Tn-m
7.060 Tn-m
a =2.38 cm
a =10.71 cm
a =13.14 cm
a =14.06 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =10.27 cm
a =12.45 cm
a =13.22 cm
Mu
. fy.(d a / 2)
Viga A-B
Err:514
9.400 Tn-m
As
REPETIR
REPETIR
REPETIR
Err:514
As . fy
0.85 . f ' c.b
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.770 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
11.442 cm
14.052 cm
15.058 cm
15.485 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.290 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
10.880 cm
13.173 cm
13.981 cm
14.290 cm
Mmax (+)
9.350 Tn-m
Err:514
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
25.00 cm
23.78 cm
0.9
a = 0.10.d
11.009 cm
13.372 cm
14.223 cm
14.556 cm
Err:514
CUARTO PISO
Mmax
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.370 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
10.974 cm
13.318 cm
14.156 cm
14.483 cm
QUINTO PISO
Mmax
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
7.000 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
8.198 cm
9.297 cm
9.544 cm
9.602 cm
a =2.38 cm
a =10.33 cm
a =12.53 cm
a =13.32 cm
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =7.72 cm
a =8.75 cm
a =8.98 cm
Err:514
7.050 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
8.257 cm
REPETIR
REPETIR
REPETIR
Err:514
Err:514
B. ACEROS NEGATIVOS
PRIMER PISO
M max
M max
M max
SEGUNDO PISO
M max
M max
TERCER PISO
M max
M max
CUARTO PISO
M max
QUINTO PISO
M max
M max
PRIMER PISO
Mmax (-)
b=
d=
=
Asumir:
As =
a =2.38 cm
a =10.36 cm
a =12.59 cm
a =13.39 cm
REPETIR
REPETIR
REPETIR
Err:514
Izquierda
7.050 Tn-m
14.100 Tn-m
8.560 Tn-m
12.840 Tn-m
8.610 Tn-m
12.640 Tn-m
8.810 Tn-m
12.440 Tn-m
4.310 Tn-m
8.770 Tn-m
a =2.38 cm
a =7.77 cm
Derecha
14.150 Tn-m
7.000 Tn-m
12.890 Tn-m
8.520 Tn-m
12.690 Tn-m
8.570 Tn-m
12.490 Tn-m
8.760 Tn-m
8.790 Tn-m
4.290 Tn-m
REPETIR
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
25.00 cm
23.78 cm
0.9
a = 0.10.d
10.950 cm
13.281 cm
14.112 cm
14.434 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
9.310 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
10.904 cm
13.209 cm
14.025 cm
14.338 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
7.060 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
8.268 cm
9.392 cm
9.648 cm
9.709 cm
Err:514
Err:514
Err:514
FORMULAS
As
Mu
. f y.(d a / 2)
A
s . fy
0.85 . f ' c.b
Mmax (-)
b=
d=
=
Asumir:
As =
14.150 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
16.572 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
9.376 cm
9.631 cm
9.691 cm
9.705 cm
9.709 cm
9.691 cm
a =8.82 cm
a =9.06 cm
a =9.12 cm
a =9.13 cm
a =9.14 cm
Err:514
14.100 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
8.969 cm
9.429 cm
9.481 cm
9.487 cm
9.488 cm
9.488 cm
9.487 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
OK
Err:514
a =4.38 cm
a =8.44 cm
a =8.87 cm
a =8.92 cm
a =8.93 cm
a =8.93 cm
a =8.93 cm
REPETIR
REPETIR
REPETIR
OK
OK
OK
Err:514
As =
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
23.427 cm
29.353 cm
37.568 cm
61.382 cm
-73.284 cm
37.568 cm
Mmax (-)
b=
d=
=
12.890 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
a = 0.10.d
As =
As =
As =
As =
As =
Usar
15.096 cm
20.452 cm
24.094 cm
27.414 cm
31.352 cm
Err:514
7.000 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
8.198 cm
9.297 cm
9.544 cm
9.602 cm
9.616 cm
9.619 cm
9.602 cm
Err:514
SEGUNDO PISO
Mmax (-)
b=
d=
=
8.560 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
a = 0.10.d
a =2.38 cm
As =
As =
As =
As =
As =
Usar
10.025 cm
11.881 cm
12.452 cm
12.639 cm
12.701 cm
Err:514
a =9.44 cm
a =11.18 cm
a =11.72 cm
a =11.90 cm
Mmax (-)
12.840 Tn-m
Mmax (-)
8.520 Tn-m
b=
d=
=
Asumir:
As =
As =
25.00 cm
23.78 cm
0.9
a = 0.10.d
15.038 cm
20.339 cm
a =2.38 cm
a =14.15 cm
a =19.14 cm
REPETIR
REPETIR
b=
d=
=
Asumir:
As =
As =
25.00 cm
23.78 cm
0.9
a = 0.10.d
9.978 cm
11.812 cm
As =
23.911 cm
a =22.50 cm
REPETIR
As =
12.372 cm
As =
Usar
27.120 cm
As =
Usar
12.553 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
Err:514
Err:514
Err:514
TERCER PISO
Mmax (-)
b=
8.610 Tn-m
25.00 cm
Mmax (-)
b=
12.690 Tn-m
25.00 cm
d=
23.78 cm
d=
23.78 cm
=
Asumir:
As =
As =
As =
0.9
a = 0.10.d
10.084 cm
11.968 cm
12.553 cm
=
Asumir:
As =
As =
As =
0.9
a = 0.10.d
14.862 cm
20.003 cm
23.371 cm
a =2.38 cm
a =9.49 cm
a =11.26 cm
a =11.81 cm
REPETIR
REPETIR
REPETIR
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
CUARTO PISO
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
QUINTO PISO
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
12.746 cm
Err:514
12.640 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
14.804 cm
19.891 cm
23.194 cm
25.997 cm
Err:514
8.810 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
10.318 cm
12.317 cm
12.962 cm
13.184 cm
Err:514
a =2.38 cm
a =13.93 cm
a =18.72 cm
a =21.83 cm
Err:514
a =2.38 cm
a =9.71 cm
a =11.59 cm
a =12.20 cm
Err:514
12.440 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
14.569 cm
19.449 cm
22.502 cm
24.954 cm
Err:514
4.310 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
5.048 cm
5.328 cm
5.361 cm
5.364 cm
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =13.71 cm
a =18.30 cm
a =21.18 cm
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =4.75 cm
a =5.01 cm
a =5.05 cm
Err:514
8.770 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
10.271 cm
12.247 cm
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =9.67 cm
a =11.53 cm
REPETIR
REPETIR
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
26.270 cm
Err:514
8.570 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
10.037 cm
11.899 cm
12.472 cm
12.660 cm
Err:514
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
12.490 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
14.628 cm
19.559 cm
22.673 cm
25.208 cm
Err:514
8.760 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
10.259 cm
12.230 cm
12.859 cm
13.074 cm
Err:514
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
8.790 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
10.295 cm
12.282 cm
12.921 cm
13.140 cm
Err:514
4.290 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
5.024 cm
5.300 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
As =
Usar
12.879 cm
13.096 cm
a =12.12 cm
REPETIR
Err:514
Err:514
1. PERALTE EFECTIVO
b=
h=
f'c =
fy =
=
Recub =
M Max. Posiitivo
7.090 Tn-m
7.060 Tn-m
6.220 Tn-m
6.200 Tn-m
6.270 Tn-m
6.250 Tn-m
6.260 Tn-m
6.240 Tn-m
4.850 Tn-m
4.830 Tn-m
2.54 cm
0.95 cm
1.436 cm
Err:514
As =
As =
Usar
Err:514
(0.75.f'c/fy)*(6300/(6300+fy))
5.332 cm
5.336 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Pb =
Pmax =
As max =
0.0225
0.75.Pb
0.0169
18.469 cm
Err:514
Err:514
1 1/2 + 2 3/8
As =2.710 cm
3 1+1 3/4
As =18.150 cm
2.551 cm
230508.097 kg-cm
2.305 Ton-m
17.082 cm
1045318.448 kg-cm
10.453 Ton-m
PRIMER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
7.090 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
8.304 cm
9.440 cm
9.701 cm
9.763 cm
FORMULAS
7.090 Tn-m
7.060 Tn-m
6.220 Tn-m
6.200 Tn-m
6.270 Tn-m
6.250 Tn-m
6.260 Tn-m
6.240 Tn-m
4.850 Tn-m
4.830 Tn-m
As
Viga A-B
a =2.38 cm
a =7.82 cm
a =8.88 cm
a =9.13 cm
Err:514
Mu
. fy.(d a / 2)
REPETIR
REPETIR
REPETIR
Err:514
As . fy
0.85 . f ' c.b
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
SEGUNDO PISO
7.060 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
8.268 cm
9.392 cm
9.648 cm
9.709 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mmax
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
TERCER PISO
Mmax
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
CUARTO PISO
Mmax
b=
d=
6.220 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
7.285 cm
8.086 cm
8.239 cm
8.269 cm
Err:514
6.270 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
7.343 cm
8.162 cm
8.320 cm
8.351 cm
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =6.91 cm
a =7.68 cm
a =7.83 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
6.260 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
7.331 cm
8.147 cm
8.304 cm
8.335 cm
QUINTO PISO
Mmax
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
a =2.38 cm
a =6.86 cm
a =7.61 cm
a =7.75 cm
a =2.38 cm
a =6.90 cm
a =7.67 cm
a =7.82 cm
Err:514
4.850 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
5.680 cm
6.080 cm
6.134 cm
6.142 cm
B. ACEROS NEGATIVOS
PRIMER PISO
M max
M max
M max
SEGUNDO PISO
M max
M max
TERCER PISO
M max
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =5.35 cm
a =5.72 cm
a =5.77 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
Izquierda
3.820 Tn-m
10.330 Tn-m
4.610 Tn-m
8.730 Tn-m
4.570 Tn-m
8.650 Tn-m
Derecha
10.350 Tn-m
3.800 Tn-m
8.760 Tn-m
4.580 Tn-m
8.670 Tn-m
4.550 Tn-m
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
6.200 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
7.261 cm
8.056 cm
8.207 cm
8.236 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
6.250 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
7.320 cm
8.132 cm
8.288 cm
8.318 cm
Mmax (+)
b=
d=
6.240 Tn-m
25.00 cm
23.78 cm
Err:514
Err:514
0.9
Asumir:
As =
As =
As =
As =
Usar
a = 0.10.d
7.308 cm
8.117 cm
8.271 cm
8.302 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
4.830 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
5.657 cm
6.051 cm
6.105 cm
6.112 cm
Err:514
Err:514
FORMULAS
As
Mu
. f y.(d a / 2)
A
s . fy
0.85 . f ' c.b
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
CUARTO PISO
QUINTO PISO
PRIMER PISO
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
M max
M max
M max
M max
4.540 Tn-m
8.600 Tn-m
4.280 Tn-m
6.570 Tn-m
3.820 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
4.474 cm
4.663 cm
4.682 cm
4.684 cm
4.684 cm
4.684 cm
4.684 cm
a =2.38 cm
a =4.21 cm
a =4.39 cm
a =4.41 cm
a =4.41 cm
a =4.41 cm
a =4.41 cm
Err:514
10.330 Tn-m
25.00 cm
43.78 cm
0.9
a = 0.10.d
6.571 cm
6.716 cm
6.728 cm
6.729 cm
6.729 cm
6.729 cm
6.729 cm
Err:514
8.620 Tn-m
4.520 Tn-m
6.590 Tn-m
4.260 Tn-m
REPETIR
REPETIR
REPETIR
OK
OK
OK
Err:514
a =4.38 cm
a =6.18 cm
a =6.32 cm
a =6.33 cm
a =6.33 cm
a =6.33 cm
a =6.33 cm
REPETIR
REPETIR
REPETIR
OK
OK
OK
Err:514
SEGUNDO PISO
Mmax (-)
b=
d=
=
4.610 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
a = 0.10.d
a =2.38 cm
As =
As =
As =
As =
As =
Usar
5.399 cm
5.743 cm
5.787 cm
5.793 cm
5.793 cm
Err:514
a =5.08 cm
a =5.40 cm
a =5.45 cm
a =5.45 cm
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
As =
As =
As =
Usar
10.350 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
12.122 cm
15.150 cm
16.447 cm
17.073 cm
17.392 cm
17.560 cm
17.073 cm
Err:514
3.800 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
4.450 cm
4.636 cm
4.655 cm
4.657 cm
4.657 cm
4.657 cm
4.657 cm
Err:514
Mmax (-)
b=
d=
=
8.760 Tn-m
25.00 cm
23.78 cm
0.9
Asumir:
a = 0.10.d
As =
As =
As =
As =
As =
Usar
10.259 cm
12.230 cm
12.859 cm
13.074 cm
13.149 cm
8.730 Tn-m
Mmax (-)
4.580 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
10.224 cm
12.177 cm
a =2.38 cm
a =9.62 cm
a =11.46 cm
REPETIR
REPETIR
b=
d=
=
Asumir:
As =
As =
25.00 cm
23.78 cm
0.9
a = 0.10.d
5.364 cm
5.701 cm
12.797 cm
a =12.04 cm
REPETIR
As =
5.744 cm
REPETIR
REPETIR
REPETIR
OK
Err:514
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
Usar
13.008 cm
Err:514
Err:514
As =
Usar
5.749 cm
Mmax (-)
b=
8.670 Tn-m
25.00 cm
Err:514
TERCER PISO
Mmax (-)
b=
4.570 Tn-m
25.00 cm
d=
23.78 cm
d=
23.78 cm
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.9
a = 0.10.d
5.352 cm
5.687 cm
5.729 cm
5.735 cm
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.9
a = 0.10.d
10.154 cm
12.072 cm
12.675 cm
12.876 cm
CUARTO PISO
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
QUINTO PISO
Mmax (-)
b=
d=
=
Asumir:
a =2.38 cm
a =5.04 cm
a =5.35 cm
a =5.39 cm
Err:514
8.650 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
10.131 cm
12.038 cm
12.634 cm
12.833 cm
Err:514
a =2.38 cm
a =9.53 cm
a =11.33 cm
a =11.89 cm
Err:514
4.540 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
5.317 cm
5.645 cm
5.687 cm
5.692 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =9.48 cm
a =11.25 cm
a =11.80 cm
Err:514
4.280 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =5.00 cm
a =5.31 cm
a =5.35 cm
8.600 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
10.072 cm
11.951 cm
12.533 cm
12.725 cm
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
Err:514
4.550 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
5.329 cm
5.659 cm
5.701 cm
5.706 cm
Err:514
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
8.620 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
10.095 cm
11.985 cm
12.573 cm
12.768 cm
Mmax (-)
b=
d=
=
Asumir:
6.590 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
Err:514
4.520 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
5.294 cm
5.618 cm
5.658 cm
5.663 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
5.013 cm
5.286 cm
5.318 cm
5.322 cm
a =4.72 cm
a =4.98 cm
a =5.01 cm
Err:514
6.570 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
7.695 cm
8.623 cm
8.814 cm
8.854 cm
Err:514
a =2.38 cm
a =7.24 cm
a =8.12 cm
a =8.30 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
7.718 cm
8.654 cm
8.847 cm
8.888 cm
Err:514
4.260 Tn-m
25.00 cm
23.78 cm
0.9
a = 0.10.d
4.989 cm
5.259 cm
5.290 cm
5.294 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
ACEROS COMERCIALES
BARRA
numero
3
4
5
6
7
8
9
10
11
12
DIAMETRO
pulg
3/8
1/2
5/8
3/4
7/8
1
1 1/8
1 1/4
1 3/8
1 1/2
cm
0.95
1.27
1.59
1.91
2.22
2.54
2.86
3.18
3.49
3.81
Peso
Kg/m
0.559
0.993
1.552
2.235
3.042
3.973
5.028
6.207
7.511
8.938
Area
1.420 cm
COMBINACIONES RECOMENDADAS
b min
1/2 - 5/8"
14.34 cm
1 1/2 + 1 5/8
2.000 cm
14.66 cm
2 5/8
17.83 cm
14.98 cm
18.15 cm
21.32 cm
18.47 cm
18.79 cm
21.96 cm
22.28 cm
22.60 cm
b min
16.57 cm
17.52 cm
21.65 cm
25.78 cm
2 1/2 + 1 5/8
1 1/2 + 2 5/8
3 1/2 + 1 5/8
3 5/8
2 1/2 + 2 5/8
1 1/2 + 3 5/8
4 5/8
1/2 - 3/4"
1 1/2 + 1 3/4
2 1/2 + 1 3/4
2 3/4
2 1+ 1 5/8
2 1+ 2 5/8
2.130 cm
2.580 cm
2.710 cm
2.840 cm
3.290 cm
3.870 cm
4.000 cm
4.580 cm
5.160 cm
Area
7.080 cm
10.200 cm
12.180 cm
14.160 cm
3 1
15.300 cm
22.60 cm
3/4 - 1"
1 3/4 + 1 1
Area
7.950 cm
b min
16.89 cm
4 3/4
3/4-5/8 - 1/2"
1 1/2 + 1 3/4+15/8
1 1 + 2 3/4
2 1 + 1 3/4
31
2 1+ 2 3/4
3 1+1 3/4
2 1+ 3 3/4
10.800 cm
21.34 cm
13.050 cm
15.300 cm
15.900 cm
18.150 cm
18.750 cm
21.97 cm
17.52 cm
26.42 cm
28.32 cm
34.04 cm
2 1/2 + 1 3/4+15/8
1 1/2 + 2 3/4+15/8
3 1/2 + 1 3/4+15/8
1 1/2 + 1 3/4+25/8
2 1/2 + 2 3/4+15/8
1 1/2 + 3 3/4+15/8
Area
b min
2 1/2 + 1 3/4+25/8
1 5/8 + 1 3/4+11
9.930 cm
21.02 cm
2 5/8 + 1 3/4+11
11.910 cm
22.61 cm
1 5/8 + 2 3/4+11
12.780 cm
22.93 cm
2 5/8 + 2 3/4+11
14.760 cm
24.52 cm
1 5/8 + 1 3/4+21
15.030 cm
23.56 cm
1 5/8 + 3 3/4+11
15.630 cm
24.84 cm
2 5/8 + 1 3/4+21
17.010 cm
25.15 cm
1/2 - 3/8"
2 3/8
1 1/2 + 1 3/8
3 3/8
2 1/2
1 1/2 + 2 3/8
4 3/8
2 1/2 + 1 3/8
3 1/2
2 1/2 + 2 3/8
3 1/2 + 1 3/8
4 1/2
5/8 - 1"
1 1 + 1 5/8
2 1
1 1/2 + 2 3/4
3 3/4
2 1/2 + 2 3/4
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
As =6.990 cm
As =8.100 cm
As =5.160 cm
As =5.160 cm
As =5.160 cm
As =6.990 cm
A-D
D-E
E-C
SEGUNDO PISO
VIGA PRINCIPAL
EJE 1-1
A-D
D-E
E-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
As =6.540 cm
As =9.390 cm
As =4.560 cm
As =3.960 cm
As =4.560 cm
As =4.560 cm
TERCER PISO
VIGA PRINCIPAL
EJE 1-1
Viga E-C
A-D
D-E
E-C
a =2.38 cm
a =4.27 cm
a =4.46 cm
a =4.48 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
As =6.540 cm
As =3.960 cm
As =4.560 cm
As =3.960 cm
As =4.560 cm
As =3.960 cm
CUARTO PISO
VIGA PRINCIPAL
EJE 1-1
A-D
D-E
E-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
As =6.540 cm
As =6.990 cm
As =4.560 cm
As =3.960 cm
As =4.560 cm
As =4.000 cm
Viga E-C
QUINTO PISO
a =2.38 cm
a =4.07 cm
a =4.23 cm
a =4.24 cm
Err:514
VIGA PRINCIPAL
EJE 1-1
REPETIR
REPETIR
REPETIR
A-D
D-E
E-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
As =6.540 cm
As =3.960 cm
As =3.960 cm
As =3.960 cm
As =4.560 cm
As =3.960 cm
Err:514
Viga E-C
3
a =2.38 cm
a =4.10 cm
a =4.26 cm
REPETIR
REPETIR
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =4.28 cm
Err:514
REPETIR
Err:514
Viga E-C
a =2.38 cm
a =4.07 cm
a =4.23 cm
a =4.24 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
Viga E-C
a =2.38 cm
a =3.20 cm
a =3.26 cm
a =3.26 cm
Err:514
REPETIR
REPETIR
OK
Err:514
Viga A-D
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =2.38 cm
a =8.31 cm
a =9.56 cm
a =9.88 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
Viga D-E
a =2.38 cm
a =4.09 cm
a =4.25 cm
a =4.27 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
Viga E-C
a =2.38 cm
a =3.76 cm
a =3.87 cm
a =3.88 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
Viga A-D
a =2.38 cm
a =8.14 cm
a =9.32 cm
a =9.61 cm
a =9.69 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
Viga D-E
a =2.38 cm
a =2.98 cm
a =3.02 cm
a =3.02 cm
a =3.02 cm
REPETIR
REPETIR
OK
OK
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Err:514
Err:514
Viga E-C
a =2.38 cm
a =3.06 cm
a =3.11 cm
a =3.11 cm
Err:514
REPETIR
REPETIR
OK
Err:514
Viga A-D
a =2.38 cm
a =5.82 cm
a =6.30 cm
Err:514
REPETIR
REPETIR
Err:514
Viga D-E
a =2.38 cm
a =2.99 cm
a =3.03 cm
a =3.03 cm
Err:514
REPETIR
REPETIR
OK
Err:514
Viga E-C
a =2.38 cm
a =3.67 cm
a =3.78 cm
a =3.79 cm
Err:514
REPETIR
REPETIR
OK
Err:514
Viga A-D
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =2.38 cm
a =5.76 cm
a =6.23 cm
a =6.30 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
Viga D-E
a =2.38 cm
a =3.05 cm
a =3.10 cm
a =3.10 cm
Err:514
REPETIR
REPETIR
OK
Err:514
Viga E-C
a =2.38 cm
a =3.16 cm
a =3.22 cm
a =3.22 cm
Err:514
REPETIR
REPETIR
OK
Err:514
Viga A-D
a =2.38 cm
a =3.71 cm
a =3.83 cm
a =3.84 cm
Err:514
REPETIR
REPETIR
OK
Err:514
Viga D-E
a =2.38 cm
a =2.29 cm
a =2.29 cm
a =2.29 cm
Err:514
REPETIR
OK
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Viga E-C
a =2.38 cm
a =1.47 cm
a =1.44 cm
a =1.44 cm
Err:514
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
As =17.010 cm
As =17.010 cm
As =10.800 cm
As =14.760 cm
SEGUNDO PISO
VIGA PRINCIPAL
EJE 1-1
A-B
B-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
As =15.030 cm
As =14.760 cm
As =10.260 cm
As =12.780 cm
TERCER PISO
VIGA PRINCIPAL
EJE 1-1
A-B
B-C
a =2.38 cm
a =8.29 cm
a =9.54 cm
a =9.85 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
As =15.030 cm
As =14.760 cm
As =10.260 cm
As =9.390 cm
CUARTO PISO
VIGA PRINCIPAL
EJE 1-1
A-B
B-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
As =10.260 cm
As =12.780 cm
As =10.260 cm
As =12.780 cm
QUINTO PISO
VIGA PRINCIPAL
EJE 1-1
A-B
B-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
Err:514
Err:514
As =6.990 cm
As =8.100 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =2.38 cm
a =8.10 cm
a =9.28 cm
a =9.56 cm
Err:514
Err:514
a =2.38 cm
a =8.10 cm
a =9.28 cm
a =9.56 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =2.38 cm
a =8.11 cm
a =9.29 cm
a =9.58 cm
Err:514
Err:514
a =2.38 cm
a =5.92 cm
a =6.42 cm
a =6.50 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =2.38 cm
a =28.38 cm
a =66.89 cm
-a =66.34 cm
a =11.26 cm
a =35.33 cm
a =104.88 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
DOBLEMENTE REFORZADA
ea de acero en compresion
Err:514
Err:514
Err:514
ea de acero en compresion
Err:514
Area de acero en traccin
Err:514
Err:514
amos si el acero en com. Fluye
Err:514
Err:514
Err:514
Err:514
a =2.38 cm
a =6.10 cm
a =6.64 cm
a =6.73 cm
a =6.75 cm
REPETIR
REPETIR
REPETIR
REPETIR
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =6.75 cm
a =6.75 cm
Err:514
OK
OK
Err:514
DOBLEMENTE REFORZADA
ea de acero en compresion
Err:514
Err:514
Err:514
ea de acero en compresion
Err:514
Area de acero en traccin
Err:514
Err:514
amos si el acero en com. Fluye
Err:514
Err:514
Err:514
Err:514
a =2.38 cm
a =26.95 cm
a =59.09 cm
-a =105.54 cm
a =7.95 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
DOBLEMENTE REFORZADA
ea de acero en compresion
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Err:514
Err:514
Err:514
ea de acero en compresion
Err:514
Area de acero en traccin
Err:514
Err:514
amos si el acero en com. Fluye
Err:514
Err:514
Err:514
Err:514
a =2.38 cm
a =7.43 cm
a =8.36 cm
a =8.56 cm
a =8.61 cm
Err:514
Err:514
a =2.38 cm
a =26.95 cm
a =59.09 cm
-a =105.54 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
DOBLEMENTE REFORZADA
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
ea de acero en compresion
Err:514
Err:514
Err:514
ea de acero en compresion
Err:514
Area de acero en traccin
Err:514
Err:514
amos si el acero en com. Fluye
Err:514
Err:514
Err:514
Err:514
a =2.38 cm
a =9.22 cm
a =10.86 cm
a =11.34 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =7.39 cm
a =8.31 cm
a =8.50 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =7.39 cm
a =8.31 cm
a =8.50 cm
Err:514
Err:514
a =2.38 cm
a =17.61 cm
a =26.58 cm
a =37.94 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =3.30 cm
a =3.37 cm
a =3.38 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =2.38 cm
a =10.44 cm
a =12.71 cm
a =13.53 cm
Err:514
Err:514
a =2.38 cm
a =10.54 cm
a =12.86 cm
a =13.72 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =10.49 cm
a =12.79 cm
a =13.64 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =10.54 cm
a =12.86 cm
a =13.72 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =2.38 cm
a =7.88 cm
a =8.97 cm
a =9.23 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =16.28 cm
a =23.52 cm
a =30.60 cm
a =43.38 cm
a =176.09 cm
-a =5.72 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =11.31 cm
a =14.10 cm
a =15.27 cm
a =15.83 cm
a =16.10 cm
a =16.24 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
RESUMEN DE REFUERZO LONGITUDINAL EJE 2-2
PRIMER PISO
Err:514
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =0.000 cm
As =15.030 cm
Err:514
As =0.000 cm
As =10.080 cm
As =17.010 cm
a =2.38 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =14.79 cm
a =20.40 cm
a =24.61 cm
a =29.12 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
SEGUNDO PISO
VIGA PRINCIPAL EJE 1-1
A-B
B-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =2.378 cm
Err:514
As =0.000 cm
As =0.000 cm
Err:514
Err:514
TERCER PISO
REPETIR
REPETIR
a =16.46 cm
REPETIR
A-B
B-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =14.024 cm
Err:514
As =0.000 cm
Err:514
Err:514
Err:514
CUARTO PISO
Err:514
Err:514
VIGA PRINCIPAL EJE 1-1
A-B
B-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =9.367 cm
Err:514
As =15.826 cm
Err:514
Err:514
Err:514
QUINTO PISO
a =2.38 cm
a =14.62 cm
a =20.05 cm
a =24.00 cm
Err:514
Err:514
a =2.38 cm
a =11.89 cm
a =15.07 cm
a =16.54 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =14.40 cm
a =19.61 cm
a =23.28 cm
Err:514
REPETIR
REPETIR
REPETIR
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =15.123 cm
As =7.920 cm
As =14.160 cm
As =20.398 cm
As =14.160 cm
As =7.920 cm
REPETIR
REPETIR
REPETIR
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =2.38 cm
a =12.15 cm
a =15.50 cm
a =17.12 cm
Err:514
Err:514
a =2.38 cm
a =10.09 cm
a =12.16 cm
a =12.87 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =6.38 cm
a =7.00 cm
a =7.11 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =4.38 cm
a =5.67 cm
a =5.76 cm
a =5.77 cm
Err:514
As =6.540 cm
a =4.38 cm
a =5.72 cm
a =5.82 cm
a =5.82 cm
Err:514
REPETIR
REPETIR
OK
As =6.540 cm
a =4.38 cm
a =5.70 cm
a =5.79 cm
a =5.80 cm
Err:514
REPETIR
REPETIR
OK
REPETIR
REPETIR
OK
As =6.540 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =4.38 cm
a =5.72 cm
a =5.82 cm
a =5.82 cm
Err:514
REPETIR
REPETIR
OK
As =6.540 cm
a =4.38 cm
a =4.28 cm
a =4.28 cm
a =4.28 cm
Err:514
REPETIR
OK
OK
As =4.560 cm
a =4.38 cm
a =6.12 cm
a =6.25 cm
a =6.26 cm
a =6.26 cm
a =6.26 cm
a =6.26 cm
Err:514
REPETIR
REPETIR
REPETIR
OK
OK
OK
As =6.990 cm
a =4.38 cm
a =3.07 cm
REPETIR
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.02 cm
a =3.02 cm
a =3.02 cm
a =3.02 cm
a =3.02 cm
Err:514
REPETIR
OK
OK
OK
OK
RESUMEN DE REFUERZO LONGITUDINAL EJE 4-4
PRIMER PISO
As =3.270 cm
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =0.000 cm
As =6.540 cm
As =6.990 cm
As =0.000 cm
As =10.080 cm
As =3.270 cm
a =4.38 cm
a =8.03 cm
a =8.40 cm
a =8.44 cm
a =8.45 cm
Err:514
REPETIR
REPETIR
REPETIR
OK
As =9.390 cm
SEGUNDO PISO
VIGA PRINCIPAL EJE 1-1
A-B
B-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =4.378 cm
As =7.080 cm
As =9.390 cm
As =0.000 cm
As =8.970 cm
As =7.080 cm
TERCER PISO
REPETIR
REPETIR
a =6.62 cm
REPETIR
A-B
B-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =5.812 cm
As =7.230 cm
As =8.970 cm
As =0.000 cm
As =8.970 cm
As =7.080 cm
CUARTO PISO
Err:514
As =7.080 cm
VIGA PRINCIPAL EJE 1-1
A-B
B-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =9.367 cm
As =7.410 cm
As =8.970 cm
As =3.022 cm
As =8.700 cm
As =7.230 cm
QUINTO PISO
a =4.38 cm
a =7.94 cm
a =8.29 cm
a =8.33 cm
Err:514
As =8.970 cm
a =4.38 cm
a =6.46 cm
a =6.63 cm
a =6.64 cm
Err:514
REPETIR
REPETIR
REPETIR
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =6.646 cm
As =3.870 cm
As =5.940 cm
As =8.404 cm
As =3.870 cm
As =5.940 cm
REPETIR
REPETIR
REPETIR
As =7.080 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =4.38 cm
a =7.82 cm
a =8.16 cm
a =8.19 cm
Err:514
As =8.970 cm
a =4.38 cm
a =6.60 cm
a =6.78 cm
a =6.79 cm
Err:514
REPETIR
REPETIR
REPETIR
As =7.230 cm
a =4.38 cm
a =5.48 cm
a =5.55 cm
a =5.56 cm
Err:514
REPETIR
REPETIR
OK
As =5.940 cm
a =4.38 cm
a =5.48 cm
a =5.55 cm
a =5.56 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
OK
As =5.940 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =2.38 cm
a =10.77 cm
a =13.23 cm
a =14.17 cm
Err:514
Err:514
a =2.38 cm
a =10.24 cm
a =12.40 cm
a =13.16 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =2.38 cm
a =10.31 cm
a =12.50 cm
a =13.28 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =10.26 cm
a =12.43 cm
a =13.20 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =7.78 cm
a =8.84 cm
a =9.08 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =15.60 cm
REPETIR
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =22.05 cm
a =27.63 cm
a =35.36 cm
a =57.77 cm
-a =68.97 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =7.72 cm
a =8.75 cm
a =8.98 cm
a =9.04 cm
a =9.05 cm
a =9.05 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
OK
RESUMEN DE REFUERZO LONGITUDINAL EJE 5-5
PRIMER PISO
Err:514
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =0.000 cm
As =9.930 cm
Err:514
As =0.000 cm
As =9.930 cm
As =9.930 cm
a =2.38 cm
a =14.21 cm
a =19.25 cm
a =22.68 cm
a =25.80 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
SEGUNDO PISO
VIGA PRINCIPAL EJE 1-1
A-B
B-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =2.378 cm
As =12.780 cm
Err:514
As =0.000 cm
Err:514
As =12.780 cm
TERCER PISO
REPETIR
REPETIR
a =11.64 cm
REPETIR
A-B
B-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =9.121 cm
As =12.780 cm
Err:514
As =0.000 cm
Err:514
As =12.780 cm
CUARTO PISO
Err:514
Err:514
VIGA PRINCIPAL EJE 1-1
A-B
B-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =8.929 cm
As =14.160 cm
Err:514
As =9.037 cm
Err:514
As =14.160 cm
QUINTO PISO
a =2.38 cm
a =13.99 cm
a =18.83 cm
a =22.00 cm
REPETIR
REPETIR
REPETIR
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =11.182 cm
As =5.430 cm
As =14.160 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
B-C
Err:514
As =19.249 cm
Err:514
a =2.38 cm
a =9.45 cm
a =11.20 cm
a =11.74 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =13.77 cm
a =18.41 cm
a =21.34 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =9.66 cm
a =11.51 cm
a =12.10 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =9.69 cm
a =11.56 cm
a =12.16 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =4.73 cm
a =4.99 cm
REPETIR
REPETIR
As =14.160 cm
As =5.430 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =5.02 cm
Err:514
REPETIR
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =2.38 cm
a =7.78 cm
a =8.84 cm
a =9.08 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =2.38 cm
a =6.83 cm
a =7.58 cm
a =7.72 cm
Err:514
Err:514
a =2.38 cm
a =6.89 cm
a =7.65 cm
a =7.80 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =6.88 cm
a =7.64 cm
a =7.78 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =5.32 cm
a =5.70 cm
a =5.75 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =2.38 cm
a =11.41 cm
a =14.26 cm
a =15.48 cm
a =16.07 cm
a =16.37 cm
a =16.53 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =4.19 cm
a =4.36 cm
a =4.38 cm
a =4.38 cm
a =4.38 cm
a =4.38 cm
Err:514
REPETIR
REPETIR
REPETIR
OK
OK
OK
RESUMEN DE REFUERZO LONGITUDINAL EJE 6-6
PRIMER PISO
Err:514
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =0.000 cm
As =5.160 cm
As =18.150 cm
As =0.000 cm
As =6.990 cm
As =5.160 cm
a =2.38 cm
a =9.66 cm
a =11.51 cm
a =12.10 cm
a =12.30 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
SEGUNDO PISO
VIGA PRINCIPAL EJE 1-1
A-B
B-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =2.378 cm
As =5.850 cm
As =14.160 cm
As =0.000 cm
As =13.050 cm
As =5.850 cm
TERCER PISO
REPETIR
REPETIR
a =5.41 cm
REPETIR
A-B
B-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =4.409 cm
As =5.850 cm
As =13.050 cm
As =0.000 cm
As =13.050 cm
As =5.850 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
CUARTO PISO
Err:514
Err:514
VIGA PRINCIPAL EJE 1-1
A-B
B-C
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =6.333 cm
As =5.700 cm
As =12.780 cm
As =4.383 cm
As =12.780 cm
As =5.700 cm
QUINTO PISO
a =2.38 cm
a =9.56 cm
a =11.36 cm
a =11.93 cm
Err:514
REPETIR
REPETIR
REPETIR
AREAS DE ACERO
NEGATIVO
POSITIVO
IZQUIERDO
DERECHO
As =5.405 cm
As =5.430 cm
As =8.970 cm
As =11.510 cm
As =8.970 cm
As =5.430 cm
Err:514
a =2.38 cm
a =5.02 cm
a =5.33 cm
a =5.37 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =9.50 cm
a =11.28 cm
a =11.83 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
a =4.98 cm
a =5.29 cm
a =5.33 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =2.38 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =7.26 cm
a =8.14 cm
a =8.33 cm
Err:514
Err:514
a =2.38 cm
a =4.70 cm
a =4.95 cm
a =4.98 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Area
cm2
0.71
1.29
1.98
2.85
3.88
5.1
6.45
8.19
9.58
11.4
RECOMENDADAS
1/2 - 5/8"
1 1/2 + 1 5/8
Area
3.270 cm
b min
15.30 cm
2 5/8
3.960 cm
15.62 cm
2 1/2 + 1 5/8
1 1/2 + 2 5/8
3 1/2 + 1 5/8
3 5/8
2 1/2 + 2 5/8
1 1/2 + 3 5/8
4 5/8
1/2 - 3/4"
1 1/2 + 1 3/4
2 1/2 + 1 3/4
2 3/4
4.560 cm
5.250 cm
5.850 cm
5.940 cm
6.540 cm
7.230 cm
7.920 cm
Area
4.140 cm
5.430 cm
5.700 cm
6.990 cm
8.550 cm
8.280 cm
19.11 cm
19.43 cm
22.92 cm
19.75 cm
23.24 cm
23.56 cm
23.88 cm
b min
15.62 cm
19.43 cm
15.62 cm
20.07 cm
20.71 cm
23.88 cm
4 3/4
3/4-5/8 - 1/2"
1 1/2 + 1 3/4+15/8
11.400 cm
25.16 cm
Area
6.120 cm
b min
22.29 cm
2 1/2 + 1 3/4+15/8
1 1/2 + 2 3/4+15/8
3 1/2 + 1 3/4+15/8
1 1/2 + 1 3/4+25/8
2 1/2 + 2 3/4+15/8
1 1/2 + 3 3/4+15/8
7.410 cm
23.56 cm
8.100 cm
8.700 cm
8.970 cm
9.390 cm
10.080 cm
23.88 cm
24.83 cm
24.20 cm
25.15 cm
25.47 cm
2 1/2 + 1 3/4+25/8
10.260 cm
25.47 cm
1 1/2 + 2 3/4
3 3/4
2 1/2 + 2 3/4
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
S DE ACERO
NEGATIVO
DERECHO
As =10.800 cm
As =4.560 cm
As =4.140 cm
SO
S DE ACERO
NEGATIVO
DERECHO
As =10.800 cm
As =3.960 cm
As =3.960 cm
S DE ACERO
NEGATIVO
DERECHO
As =3.960 cm
As =3.960 cm
As =4.140 cm
S DE ACERO
NEGATIVO
DERECHO
As =6.990 cm
As =3.960 cm
As =3.960 cm
S DE ACERO
NEGATIVO
DERECHO
As =4.140 cm
As =3.960 cm
As =3.960 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
S DE ACERO
NEGATIVO
DERECHO
As =14.760 cm
As =14.760 cm
SO
S DE ACERO
NEGATIVO
DERECHO
As =14.760 cm
As =9.390 cm
S DE ACERO
NEGATIVO
DERECHO
As =14.760 cm
As =12.780 cm
S DE ACERO
NEGATIVO
DERECHO
As =9.390 cm
As =9.390 cm
S DE ACERO
NEGATIVO
DERECHO
Err:514
As =3.960 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
REFUERZO LONGITUDINAL
DISEO DE VIGAS SECUNDARIAS
PISO
PRIMER PISO
SEGUNDO PISO
TERCER PISO
CUARTO PISO
QUINTO PISO
b=
h=
M Max. Posiitivo
0.000 Tn-m
0.830 Tn-m
0.970 Tn-m
0.200 Tn-m
0.300 Tn-m
0.790 Tn-m
0.800 Tn-m
0.950 Tn-m
0.210 Tn-m
Viga 4 - 5
0.590 Tn-m
0.610 Tn-m
0.310 Tn-m
Viga 5 -6
Volado
Viga 1 - 2
Viga 2 - 3
Viga 3 - 4
Viga 4 - 5
Viga 5 -6
Volado
Viga 1 - 2
Viga 2 - 3
Viga 3 - 4
Viga 4 - 5
Viga 5 -6
Volado
0.870 Tn-m
0.000 Tn-m
0.910 Tn-m
1.600 Tn-m
0.760 Tn-m
0.630 Tn-m
0.840 Tn-m
0.000 Tn-m
0.880 Tn-m
1.630 Tn-m
0.760 Tn-m
0.650 Tn-m
0.820 Tn-m
0.000 Tn-m
0.530 Tn-m
0.120 Tn-m
1.370 Tn-m
1.140 Tn-m
0.540 Tn-m
0.580 Tn-m
0.540 Tn-m
0.420 Tn-m
1.380 Tn-m
1.120 Tn-m
0.550 Tn-m
0.560 Tn-m
0.540 Tn-m
0.430 Tn-m
0.750 Tn-m
0.000 Tn-m
0.800 Tn-m
0.960 Tn-m
0.200 Tn-m
0.310 Tn-m
0.760 Tn-m
Viga 1 - 2
0.610 Tn-m
0.790 Tn-m
0.390 Tn-m
Viga 2 - 3
Viga 3 - 4
0.940 Tn-m
0.430 Tn-m
0.570 Tn-m
0.380 Tn-m
0.580 Tn-m
0.090 Tn-m
Viga 4 - 5
0.430 Tn-m
0.310 Tn-m
0.160 Tn-m
Viga 5 -6
0.430 Tn-m
0.430 Tn-m
0.530 Tn-m
1. PERALTE EFECTIVO
25.00 cmPeralte Efectivo de la seccion:
40.00 cm
Asumo :
0.810 Tn-m
0.960 Tn-m
0.200 Tn-m
0.310 Tn-m
0.770 Tn-m
2.54 cm
Estribos :
0.375
0.95 cm
4200 Kg/cm
d:
0.85
d:
33.78 cm
Recub =
4.00 cm
f'c =
210 Kg/cm
fy =
Pmin.b.d
Pmin =
0.0024
As min =
2.040 cm
Err:514
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
(0.75.f'c/fy)*(6300/(6300+fy))
Pb =
Pmax =
As max =
0.0225
0.75.Pb
As min =
a=
Mur=
Mur=
0.0169
18.469 cm
Err:514
Err:514
As =2.710 cm
2.551 cm
332946.097 kg-cm
3.329 Ton-m
5. MOMENTO CON ACERO MAXIMO
3 1+1 3/4
As min =
a=
As =18.150 cm
17.082 cm
Mur=
1731388.448 kg-cm
Mur=
17.314 Ton-m
6. DETERMINACION DEL REFUERZO EN LA VIGA
A. ACEROS POSITIVOS
PRIMER PISO
SEGUNDO PISO
TERCER PISO
CUARTO PISO
QUINTO PISO
FORMULAS
M max
0.000 Tn-m
M max
0.830 Tn-m
M max
0.970 Tn-m
M max
0.200 Tn-m
M max
0.300 Tn-m
M max
0.790 Tn-m
M max
0.000 Tn-m
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
0.800 Tn-m
0.950 Tn-m
0.210 Tn-m
0.310 Tn-m
0.750 Tn-m
0.000 Tn-m
0.800 Tn-m
0.960 Tn-m
0.200 Tn-m
0.310 Tn-m
0.760 Tn-m
0.000 Tn-m
0.810 Tn-m
0.960 Tn-m
0.200 Tn-m
0.310 Tn-m
0.770 Tn-m
0.000 Tn-m
0.390 Tn-m
0.580 Tn-m
0.090 Tn-m
0.160 Tn-m
As
Mu
. fy.(d a / 2)
As . fy
0.85 . f ' c.b
EDIFICACION DE 5 PISOS
0.530 Tn-m
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Viga A-B
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.970 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.800 cm
0.768 cm
0.768 cm
0.768 cm
Viga A-B
a =3.38 cm
a =0.75 cm
a =0.72 cm
a =0.72 cm
Err:514
0.300 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.247 cm
0.236 cm
0.236 cm
0.236 cm
Viga A-B
a =3.38 cm
a =0.23 cm
a =0.22 cm
a =0.22 cm
Err:514
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.950 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.783 cm
Viga A-B
a =3.38 cm
a =0.74 cm
PRIMER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
SEGUNDO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
0.830 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.684 cm
0.656 cm
0.656 cm
0.656 cm
Err:514
0.200 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.165 cm
0.157 cm
0.157 cm
0.157 cm
Err:514
0.790 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.651 cm
0.624 cm
0.624 cm
0.624 cm
Err:514
0.800 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.660 cm
0.632 cm
0.632 cm
0.632 cm
Err:514
0.210 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.173 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.752 cm
0.752 cm
0.752 cm
a =0.71 cm
a =0.71 cm
Err:514
0.310 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.256 cm
0.244 cm
0.244 cm
0.244 cm
Err:514
Viga A-B
a =3.38 cm
a =0.24 cm
a =0.23 cm
a =0.23 cm
Err:514
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Mmax (+)
b=
d=
=
Asumir:
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.960 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.791 cm
0.760 cm
0.760 cm
0.760 cm
Viga A-B
a =3.38 cm
a =0.74 cm
a =0.72 cm
a =0.72 cm
Err:514
0.310 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.256 cm
0.244 cm
0.244 cm
0.244 cm
REPETIR
REPETIR
OK
Viga A-B
a =3.38 cm
a =0.24 cm
a =0.23 cm
a =0.23 cm
Err:514
Viga A-B
a =3.38 cm
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
TERCER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
CUARTO PISO
Mmax (+)
b=
d=
=
Asumir:
0.165 cm
0.165 cm
0.165 cm
Err:514
0.750 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.618 cm
0.593 cm
0.592 cm
0.592 cm
Err:514
0.800 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.660 cm
0.632 cm
0.632 cm
0.632 cm
Err:514
0.200 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.165 cm
0.157 cm
0.157 cm
0.157 cm
Err:514
0.760 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.627 cm
0.600 cm
0.600 cm
0.600 cm
Err:514
0.810 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
0.000 cm
0.000 cm
0.000 cm
0.000 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.960 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.791 cm
0.760 cm
0.760 cm
0.760 cm
Err:514
Viga A-B
a =3.38 cm
a =0.74 cm
a =0.72 cm
a =0.72 cm
Err:514
0.310 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.256 cm
0.244 cm
0.244 cm
0.244 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.24 cm
a =0.23 cm
a =0.23 cm
Err:514
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.580 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.478 cm
0.457 cm
0.457 cm
0.457 cm
Viga A-B
a =3.38 cm
a =0.45 cm
a =0.43 cm
a =0.43 cm
Err:514
0.160 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.132 cm
REPETIR
OK
OK
Viga A-B
a =3.38 cm
a =0.12 cm
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
QUINTO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
0.668 cm
0.640 cm
0.640 cm
0.640 cm
Err:514
0.200 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.165 cm
0.157 cm
0.157 cm
0.157 cm
Err:514
0.770 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.635 cm
0.608 cm
0.608 cm
0.608 cm
Err:514
0.390 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.322 cm
0.307 cm
0.307 cm
0.307 cm
Err:514
0.090 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.074 cm
0.071 cm
0.071 cm
0.071 cm
Err:514
0.530 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.437 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
As =
As =
Usar
0.126 cm
0.126 cm
0.126 cm
Err:514
B. ACEROS NEGATIVOS
M max
M max
M max
PRIMER PISO
M max
M max
M max
M max
M max
M max
SEGUNDO PISO
M max
M max
M max
M max
M max
M max
TERCER PISO
M max
M max
M max
M max
M max
M max
CUARTO PISO
M max
M max
M max
M max
M max
M max
QUINTO PISO
M max
M max
M max
Mmax (+)
b=
d=
=
Asumir:
As =
As =
a =0.12 cm
a =0.12 cm
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
Izquierda
0.000 Tn-m
0.820 Tn-m
1.570 Tn-m
0.870 Tn-m
0.510 Tn-m
0.920 Tn-m
0.000 Tn-m
0.920 Tn-m
1.590 Tn-m
0.780 Tn-m
0.590 Tn-m
0.870 Tn-m
0.000 Tn-m
0.910 Tn-m
1.600 Tn-m
0.760 Tn-m
0.630 Tn-m
0.840 Tn-m
0.000 Tn-m
0.880 Tn-m
1.630 Tn-m
0.760 Tn-m
0.650 Tn-m
0.820 Tn-m
0.000 Tn-m
0.610 Tn-m
0.940 Tn-m
0.430 Tn-m
0.430 Tn-m
0.430 Tn-m
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
Err:514
As =
As =
As =
Usar
Derecha
FORMULAS
OK
OK
0.400 Tn-m
1.410 Tn-m
1.170 Tn-m
0.450 Tn-m
0.720 Tn-m
0.410 Tn-m
0.420 Tn-m
1.370 Tn-m
1.170 Tn-m
0.510 Tn-m
0.610 Tn-m
0.530 Tn-m
0.120 Tn-m
1.370 Tn-m
1.140 Tn-m
0.540 Tn-m
0.580 Tn-m
0.540 Tn-m
0.420 Tn-m
1.380 Tn-m
1.120 Tn-m
0.550 Tn-m
0.560 Tn-m
0.540 Tn-m
0.430 Tn-m
0.790 Tn-m
0.570 Tn-m
0.380 Tn-m
0.310 Tn-m
0.430 Tn-m
As
0.418 cm
0.418 cm
0.418 cm
Err:514
Mu
. fy.(d a / 2)
As . fy
0.85 . f ' c.b
PRIMER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
0.400 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.330 cm
0.315 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
0.000 cm
0.000 cm
a =0.00 cm
Err:514
0.820 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.676 cm
0.648 cm
0.648 cm
0.648 cm
Err:514
Viga A-B
a =3.38 cm
a =0.64 cm
a =0.61 cm
a =0.61 cm
Err:514
1.570 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.294 cm
1.252 cm
1.251 cm
1.251 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =1.22 cm
a =1.18 cm
a =1.18 cm
Err:514
0.870 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.717 cm
0.688 cm
0.688 cm
0.688 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.68 cm
a =0.65 cm
a =0.65 cm
Err:514
0.510 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.420 cm
0.402 cm
0.402 cm
0.402 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.40 cm
a =0.38 cm
a =0.38 cm
Err:514
0.920 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.758 cm
0.728 cm
OK
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.71 cm
a =0.69 cm
REPETIR
REPETIR
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
0.315 cm
0.315 cm
Err:514
1.410 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.162 cm
1.123 cm
1.122 cm
1.122 cm
Err:514
1.170 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.965 cm
0.929 cm
0.928 cm
0.928 cm
Err:514
0.450 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.371 cm
0.354 cm
0.354 cm
0.354 cm
Err:514
0.720 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.594 cm
0.569 cm
0.568 cm
0.568 cm
Err:514
0.410 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.338 cm
0.323 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
As =
Usar
0.728 cm
0.728 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
1.590 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.311 cm
1.268 cm
1.268 cm
1.268 cm
a =0.69 cm
Err:514
Err:514
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.920 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.758 cm
0.728 cm
0.728 cm
0.728 cm
Viga A-B
a =3.38 cm
a =0.71 cm
a =0.69 cm
a =0.69 cm
Err:514
a =3.38 cm
a =1.23 cm
a =1.19 cm
a =1.19 cm
0.780 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.643 cm
0.616 cm
0.616 cm
0.616 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.61 cm
a =0.58 cm
a =0.58 cm
Err:514
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
As =
As =
Usar
SEGUNDO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Viga A-B
Err:514
0.590 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
OK
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
0.323 cm
0.323 cm
Err:514
0.420 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.346 cm
0.331 cm
0.330 cm
0.330 cm
Err:514
1.370 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.129 cm
1.090 cm
1.090 cm
1.090 cm
Err:514
1.170 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.965 cm
0.929 cm
0.928 cm
0.928 cm
Err:514
0.510 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.420 cm
0.402 cm
0.402 cm
0.402 cm
Err:514
0.610 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.486 cm
0.465 cm
0.465 cm
0.465 cm
a =0.46 cm
a =0.44 cm
a =0.44 cm
Err:514
0.870 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.717 cm
0.688 cm
0.688 cm
0.688 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.68 cm
a =0.65 cm
a =0.65 cm
Err:514
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Err:514
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.910 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.750 cm
0.720 cm
0.720 cm
0.720 cm
Viga A-B
a =3.38 cm
a =0.71 cm
a =0.68 cm
a =0.68 cm
Err:514
1.600 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.319 cm
1.277 cm
1.276 cm
1.276 cm
Viga A-B
a =3.38 cm
a =1.24 cm
a =1.20 cm
a =1.20 cm
Err:514
REPETIR
REPETIR
OK
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
TERCER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
0.503 cm
0.481 cm
0.481 cm
0.481 cm
Err:514
0.530 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.437 cm
0.418 cm
0.418 cm
0.418 cm
Err:514
0.120 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.099 cm
0.094 cm
0.094 cm
0.094 cm
Err:514
1.370 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.129 cm
1.090 cm
1.090 cm
1.090 cm
Err:514
1.140 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.940 cm
0.905 cm
0.904 cm
0.904 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.760 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.627 cm
0.600 cm
0.600 cm
0.600 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Viga A-B
a =3.38 cm
a =0.59 cm
a =0.57 cm
a =0.56 cm
Err:514
0.630 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.519 cm
0.497 cm
0.497 cm
0.497 cm
Err:514
Viga A-B
a =3.38 cm
a =0.49 cm
a =0.47 cm
a =0.47 cm
Err:514
0.840 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.693 cm
0.664 cm
0.664 cm
0.664 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.65 cm
a =0.63 cm
a =0.62 cm
Err:514
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.880 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.726 cm
0.696 cm
0.696 cm
0.696 cm
Viga A-B
a =3.38 cm
a =0.68 cm
a =0.66 cm
a =0.66 cm
Err:514
1.630 Tn-m
REPETIR
REPETIR
OK
Viga A-B
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
CUARTO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
0.540 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.445 cm
0.426 cm
0.425 cm
0.425 cm
Err:514
0.580 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.478 cm
0.457 cm
0.457 cm
0.457 cm
Err:514
0.540 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.445 cm
0.426 cm
0.425 cm
0.425 cm
Err:514
0.420 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.346 cm
0.331 cm
0.330 cm
0.330 cm
Err:514
1.380 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.138 cm
1.098 cm
1.098 cm
1.098 cm
Err:514
1.120 Tn-m
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.344 cm
1.301 cm
1.300 cm
1.300 cm
a =3.38 cm
a =1.26 cm
a =1.22 cm
a =1.22 cm
Err:514
0.760 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.627 cm
0.600 cm
0.600 cm
0.600 cm
Err:514
Viga A-B
a =3.38 cm
a =0.59 cm
a =0.57 cm
a =0.56 cm
Err:514
0.650 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.536 cm
0.513 cm
0.513 cm
0.513 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.50 cm
a =0.48 cm
a =0.48 cm
Err:514
0.820 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.676 cm
0.648 cm
0.648 cm
0.648 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.64 cm
a =0.61 cm
a =0.61 cm
Err:514
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.610 Tn-m
25.00 cm
REPETIR
REPETIR
OK
Viga A-B
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
QUINTO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.923 cm
0.889 cm
0.888 cm
0.888 cm
Err:514
299.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
246.506 cm
-96.199 cm
100.067 cm
-594.174 cm
Err:514
0.560 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.462 cm
0.441 cm
0.441 cm
0.441 cm
Err:514
0.540 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.445 cm
0.426 cm
0.425 cm
0.425 cm
Err:514
0.430 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.355 cm
0.338 cm
0.338 cm
0.338 cm
Err:514
0.790 Tn-m
25.00 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
33.78 cm
0.9
a = 0.10.d
0.503 cm
0.481 cm
0.481 cm
0.481 cm
a =3.38 cm
a =0.47 cm
a =0.45 cm
a =0.45 cm
Err:514
0.940 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.775 cm
0.744 cm
0.744 cm
0.744 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.73 cm
a =0.70 cm
a =0.70 cm
Err:514
0.430 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.355 cm
0.338 cm
0.338 cm
0.338 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.33 cm
a =0.32 cm
a =0.32 cm
Err:514
0.430 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.355 cm
0.338 cm
0.338 cm
0.338 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.33 cm
a =0.32 cm
a =0.32 cm
Err:514
0.430 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.355 cm
0.338 cm
0.338 cm
0.338 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.33 cm
a =0.32 cm
a =0.32 cm
Err:514
REPETIR
REPETIR
OK
Err:514
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
33.78 cm
0.9
a = 0.10.d
0.651 cm
0.624 cm
0.624 cm
0.624 cm
Err:514
0.570 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.470 cm
0.449 cm
0.449 cm
0.449 cm
Err:514
305.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
251.453 cm
-95.428 cm
102.545 cm
-557.268 cm
Err:514
0.310 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.256 cm
0.244 cm
0.244 cm
0.244 cm
Err:514
0.430 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.355 cm
0.338 cm
0.338 cm
0.338 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
PISO
PRIMER PISO
SEGUNDO PISO
M Max. Posiitivo
0.000 Tn-m
0.830 Tn-m
0.970 Tn-m
0.200 Tn-m
0.300 Tn-m
0.790 Tn-m
0.800 Tn-m
0.950 Tn-m
0.210 Tn-m
0.310 Tn-m
0.750 Tn-m
0.000 Tn-m
0.800 Tn-m
TERCER PISO
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
TERCER PISO
CUARTO PISO
QUINTO PISO
b=
h=
f'c =
fy =
=
Recub =
As min =
Pmin =
As min =
Pb =
Pb =
Pmax =
As max =
As min =
a=
Mur=
Mur=
As min =
a=
Viga 2 - 3
Viga 3 - 4
Viga 4 - 5
Viga 5 -6
Volado
Viga 1 - 2
Viga 2 - 3
Viga 3 - 4
Viga 4 - 5
Viga 5 -6
Volado
Viga 1 - 2
Viga 2 - 3
Viga 3 - 4
Viga 4 - 5
Viga 5 -6
1.600 Tn-m
0.760 Tn-m
0.630 Tn-m
0.840 Tn-m
0.000 Tn-m
0.880 Tn-m
1.630 Tn-m
0.760 Tn-m
0.650 Tn-m
0.820 Tn-m
0.000 Tn-m
0.610 Tn-m
0.940 Tn-m
0.430 Tn-m
0.430 Tn-m
0.430 Tn-m
1.140 Tn-m
0.540 Tn-m
0.580 Tn-m
0.540 Tn-m
0.420 Tn-m
1.380 Tn-m
1.120 Tn-m
0.550 Tn-m
0.560 Tn-m
0.540 Tn-m
0.430 Tn-m
0.790 Tn-m
0.570 Tn-m
0.380 Tn-m
0.310 Tn-m
0.430 Tn-m
0.960 Tn-m
0.200 Tn-m
0.310 Tn-m
0.760 Tn-m
0.810 Tn-m
0.960 Tn-m
0.200 Tn-m
0.310 Tn-m
0.770 Tn-m
0.390 Tn-m
0.580 Tn-m
0.090 Tn-m
0.160 Tn-m
0.530 Tn-m
1. PERALTE EFECTIVO
25.00 cmPeralte Efectivo de la seccion:
40.00 cm
Asumo :
1
210 Kg/cm
Estribos :
0.375
4200 Kg/cm
d:
h - Recub - estrib - asumo/2
0.85
d:
33.78 cm
4.00 cm
2.54 cm
0.95 cm
Err:514
Err:514
As =2.710 cm
2.551 cm
332946.097 kg-cm
3.329 Ton-m
5. MOMENTO CON ACERO MAXIMO
3 1+1 3/4
As =18.150 cm
17.082 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mur=
1731388.448 kg-cm
Mur=
17.314 Ton-m
6. DETERMINACION DEL REFUERZO EN LA VIGA
A. ACEROS POSITIVOS
PRIMER PISO
SEGUNDO PISO
TERCER PISO
CUARTO PISO
QUINTO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
FORMULAS
M max
0.000 Tn-m
M max
0.830 Tn-m
M max
0.970 Tn-m
M max
0.200 Tn-m
M max
0.300 Tn-m
M max
0.790 Tn-m
M max
0.000 Tn-m
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
0.800 Tn-m
0.950 Tn-m
0.210 Tn-m
0.310 Tn-m
0.750 Tn-m
0.000 Tn-m
0.800 Tn-m
0.960 Tn-m
0.200 Tn-m
0.310 Tn-m
0.760 Tn-m
0.000 Tn-m
0.810 Tn-m
0.960 Tn-m
0.200 Tn-m
0.310 Tn-m
0.770 Tn-m
0.000 Tn-m
0.390 Tn-m
0.580 Tn-m
0.090 Tn-m
0.160 Tn-m
0.530 Tn-m
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.970 Tn-m
25.00 cm
33.78 cm
Viga A-B
As
Mu
. fy.(d a / 2)
As . fy
0.85 . f ' c.b
PRIMER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
0.830 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.684 cm
0.656 cm
0.656 cm
0.656 cm
Err:514
0.200 Tn-m
25.00 cm
33.78 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.9
a = 0.10.d
0.800 cm
0.768 cm
0.768 cm
0.768 cm
a =3.38 cm
a =0.75 cm
a =0.72 cm
a =0.72 cm
Err:514
0.300 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.247 cm
0.236 cm
0.236 cm
0.236 cm
Err:514
Viga A-B
a =3.38 cm
a =0.23 cm
a =0.22 cm
a =0.22 cm
Err:514
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Mmax (+)
b=
0.000 Tn-m
25.00 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.950 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.783 cm
0.752 cm
0.752 cm
0.752 cm
Viga A-B
a =3.38 cm
a =0.74 cm
a =0.71 cm
a =0.71 cm
Err:514
0.310 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.256 cm
0.244 cm
0.244 cm
0.244 cm
REPETIR
REPETIR
OK
Viga A-B
a =3.38 cm
a =0.24 cm
a =0.23 cm
a =0.23 cm
Err:514
Viga A-B
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
SEGUNDO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
TERCER PISO
Mmax (+)
b=
0.9
a = 0.10.d
0.165 cm
0.157 cm
0.157 cm
0.157 cm
Err:514
0.790 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.651 cm
0.624 cm
0.624 cm
0.624 cm
Err:514
0.800 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.660 cm
0.632 cm
0.632 cm
0.632 cm
Err:514
0.210 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.173 cm
0.165 cm
0.165 cm
0.165 cm
Err:514
0.750 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.618 cm
0.593 cm
0.592 cm
0.592 cm
Err:514
0.800 Tn-m
25.00 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.960 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.791 cm
0.760 cm
0.760 cm
0.760 cm
Err:514
Viga A-B
a =3.38 cm
a =0.74 cm
a =0.72 cm
a =0.72 cm
Err:514
0.310 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.256 cm
0.244 cm
0.244 cm
0.244 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.24 cm
a =0.23 cm
a =0.23 cm
Err:514
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.960 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.791 cm
0.760 cm
0.760 cm
0.760 cm
Viga A-B
a =3.38 cm
a =0.74 cm
a =0.72 cm
a =0.72 cm
Err:514
0.310 Tn-m
25.00 cm
33.78 cm
REPETIR
OK
OK
Viga A-B
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
CUARTO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
33.78 cm
0.9
a = 0.10.d
0.660 cm
0.632 cm
0.632 cm
0.632 cm
Err:514
0.200 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.165 cm
0.157 cm
0.157 cm
0.157 cm
Err:514
0.760 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.627 cm
0.600 cm
0.600 cm
0.600 cm
Err:514
0.810 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.668 cm
0.640 cm
0.640 cm
0.640 cm
Err:514
0.200 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.165 cm
0.157 cm
0.157 cm
0.157 cm
Err:514
0.770 Tn-m
25.00 cm
33.78 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.9
a = 0.10.d
0.256 cm
0.244 cm
0.244 cm
0.244 cm
a =3.38 cm
a =0.24 cm
a =0.23 cm
a =0.23 cm
Err:514
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Err:514
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.580 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.478 cm
0.457 cm
0.457 cm
0.457 cm
Viga A-B
a =3.38 cm
a =0.45 cm
a =0.43 cm
a =0.43 cm
Err:514
0.160 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.132 cm
0.126 cm
0.126 cm
0.126 cm
B. ACEROS NEGATIVOS
M max
M max
M max
PRIMER PISO
M max
REPETIR
REPETIR
OK
Viga A-B
a =3.38 cm
a =0.12 cm
a =0.12 cm
a =0.12 cm
Err:514
Izquierda
0.000 Tn-m
0.820 Tn-m
1.570 Tn-m
0.870 Tn-m
=
Asumir:
As =
As =
As =
As =
Usar
QUINTO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Derecha
FORMULAS
0.400 Tn-m
1.410 Tn-m
1.170 Tn-m
0.450 Tn-m
0.9
a = 0.10.d
0.635 cm
0.608 cm
0.608 cm
0.608 cm
Err:514
0.390 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.322 cm
0.307 cm
0.307 cm
0.307 cm
Err:514
0.090 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.074 cm
0.071 cm
0.071 cm
0.071 cm
Err:514
0.530 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.437 cm
0.418 cm
0.418 cm
0.418 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
PRIMER PISO
SEGUNDO PISO
TERCER PISO
CUARTO PISO
QUINTO PISO
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
M max
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Mmax (+)
b=
1.570 Tn-m
25.00 cm
0.510 Tn-m
0.920 Tn-m
0.000 Tn-m
0.920 Tn-m
1.590 Tn-m
0.780 Tn-m
0.590 Tn-m
0.870 Tn-m
0.000 Tn-m
0.910 Tn-m
1.600 Tn-m
0.760 Tn-m
0.630 Tn-m
0.840 Tn-m
0.000 Tn-m
0.880 Tn-m
1.630 Tn-m
0.760 Tn-m
0.650 Tn-m
0.820 Tn-m
0.000 Tn-m
0.610 Tn-m
0.940 Tn-m
0.430 Tn-m
0.430 Tn-m
0.430 Tn-m
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.820 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.676 cm
0.648 cm
0.648 cm
0.648 cm
Viga A-B
a =3.38 cm
a =0.64 cm
a =0.61 cm
a =0.61 cm
Err:514
Viga A-B
0.720 Tn-m
0.410 Tn-m
0.420 Tn-m
1.370 Tn-m
1.170 Tn-m
0.510 Tn-m
0.610 Tn-m
0.530 Tn-m
0.120 Tn-m
1.370 Tn-m
1.140 Tn-m
0.540 Tn-m
0.580 Tn-m
0.540 Tn-m
0.420 Tn-m
1.380 Tn-m
1.120 Tn-m
0.550 Tn-m
0.560 Tn-m
0.540 Tn-m
0.430 Tn-m
0.790 Tn-m
0.570 Tn-m
0.380 Tn-m
0.310 Tn-m
0.430 Tn-m
As
Mu
. fy.(d a / 2)
As . fy
0.85 . f ' c.b
PRIMER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
0.400 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.330 cm
0.315 cm
0.315 cm
0.315 cm
Err:514
1.410 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.162 cm
1.123 cm
1.122 cm
1.122 cm
Err:514
1.170 Tn-m
25.00 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
33.78 cm
0.9
a = 0.10.d
1.294 cm
1.252 cm
1.251 cm
1.251 cm
a =3.38 cm
a =1.22 cm
a =1.18 cm
a =1.18 cm
Err:514
0.870 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.717 cm
0.688 cm
0.688 cm
0.688 cm
Err:514
Viga A-B
a =3.38 cm
a =0.68 cm
a =0.65 cm
a =0.65 cm
Err:514
0.510 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.420 cm
0.402 cm
0.402 cm
0.402 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.40 cm
a =0.38 cm
a =0.38 cm
Err:514
0.920 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.758 cm
0.728 cm
0.728 cm
0.728 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.71 cm
a =0.69 cm
a =0.69 cm
Err:514
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.920 Tn-m
25.00 cm
33.78 cm
REPETIR
REPETIR
OK
Viga A-B
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
SEGUNDO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
33.78 cm
0.9
a = 0.10.d
0.965 cm
0.929 cm
0.928 cm
0.928 cm
Err:514
0.450 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.371 cm
0.354 cm
0.354 cm
0.354 cm
Err:514
0.720 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.594 cm
0.569 cm
0.568 cm
0.568 cm
Err:514
0.410 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.338 cm
0.323 cm
0.323 cm
0.323 cm
Err:514
0.420 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.346 cm
0.331 cm
0.330 cm
0.330 cm
Err:514
1.370 Tn-m
25.00 cm
33.78 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
=
Asumir:
As =
As =
As =
As =
Usar
0.9
a = 0.10.d
0.758 cm
0.728 cm
0.728 cm
0.728 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
1.590 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.311 cm
1.268 cm
1.268 cm
1.268 cm
a =3.38 cm
a =0.71 cm
a =0.69 cm
a =0.69 cm
Err:514
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =1.23 cm
a =1.19 cm
a =1.19 cm
Err:514
0.780 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.643 cm
0.616 cm
0.616 cm
0.616 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.61 cm
a =0.58 cm
a =0.58 cm
Err:514
0.590 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.486 cm
0.465 cm
0.465 cm
0.465 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.46 cm
a =0.44 cm
a =0.44 cm
Err:514
0.870 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.717 cm
0.688 cm
0.688 cm
0.688 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.68 cm
a =0.65 cm
a =0.65 cm
Err:514
REPETIR
REPETIR
OK
Err:514
=
Asumir:
As =
As =
As =
As =
Usar
0.9
a = 0.10.d
1.129 cm
1.090 cm
1.090 cm
1.090 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
1.170 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.965 cm
0.929 cm
0.928 cm
0.928 cm
Err:514
Err:514
0.510 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.420 cm
0.402 cm
0.402 cm
0.402 cm
Err:514
0.610 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.503 cm
0.481 cm
0.481 cm
0.481 cm
Err:514
0.530 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.437 cm
0.418 cm
0.418 cm
0.418 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.910 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.750 cm
0.720 cm
0.720 cm
0.720 cm
Viga A-B
a =3.38 cm
a =0.71 cm
a =0.68 cm
a =0.68 cm
Err:514
1.600 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.319 cm
1.277 cm
1.276 cm
1.276 cm
Viga A-B
a =3.38 cm
a =1.24 cm
a =1.20 cm
a =1.20 cm
Err:514
0.760 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.627 cm
0.600 cm
0.600 cm
0.600 cm
Viga A-B
a =3.38 cm
a =0.59 cm
a =0.57 cm
a =0.56 cm
Err:514
0.630 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.519 cm
0.497 cm
0.497 cm
Viga A-B
a =3.38 cm
a =0.49 cm
a =0.47 cm
a =0.47 cm
TERCER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
0.120 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.099 cm
0.094 cm
0.094 cm
0.094 cm
Err:514
1.370 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.129 cm
1.090 cm
1.090 cm
1.090 cm
Err:514
1.140 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.940 cm
0.905 cm
0.904 cm
0.904 cm
Err:514
0.540 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.445 cm
0.426 cm
0.425 cm
0.425 cm
Err:514
0.580 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.478 cm
0.457 cm
0.457 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
0.497 cm
Err:514
0.840 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.693 cm
0.664 cm
0.664 cm
0.664 cm
Err:514
Viga A-B
a =3.38 cm
a =0.65 cm
a =0.63 cm
a =0.62 cm
Err:514
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Err:514
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.880 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.726 cm
0.696 cm
0.696 cm
0.696 cm
Viga A-B
a =3.38 cm
a =0.68 cm
a =0.66 cm
a =0.66 cm
Err:514
1.630 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.344 cm
1.301 cm
1.300 cm
1.300 cm
Viga A-B
a =3.38 cm
a =1.26 cm
a =1.22 cm
a =1.22 cm
Err:514
0.760 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.627 cm
0.600 cm
0.600 cm
0.600 cm
REPETIR
REPETIR
OK
Viga A-B
a =3.38 cm
a =0.59 cm
a =0.57 cm
a =0.56 cm
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
CUARTO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
0.457 cm
Err:514
0.540 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.445 cm
0.426 cm
0.425 cm
0.425 cm
Err:514
0.420 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.346 cm
0.331 cm
0.330 cm
0.330 cm
Err:514
1.380 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.138 cm
1.098 cm
1.098 cm
1.098 cm
Err:514
1.120 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.923 cm
0.889 cm
0.888 cm
0.888 cm
Err:514
299.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
246.506 cm
-96.199 cm
100.067 cm
-594.174 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Err:514
0.650 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.536 cm
0.513 cm
0.513 cm
0.513 cm
Err:514
Viga A-B
a =3.38 cm
a =0.50 cm
a =0.48 cm
a =0.48 cm
Err:514
0.820 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.676 cm
0.648 cm
0.648 cm
0.648 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.64 cm
a =0.61 cm
a =0.61 cm
Err:514
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Err:514
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.610 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.503 cm
0.481 cm
0.481 cm
0.481 cm
Viga A-B
a =3.38 cm
a =0.47 cm
a =0.45 cm
a =0.45 cm
Err:514
0.940 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.775 cm
0.744 cm
0.744 cm
0.744 cm
Viga A-B
a =3.38 cm
a =0.73 cm
a =0.70 cm
a =0.70 cm
Err:514
REPETIR
REPETIR
OK
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
QUINTO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Err:514
0.560 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.462 cm
0.441 cm
0.441 cm
0.441 cm
Err:514
0.540 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.445 cm
0.426 cm
0.425 cm
0.425 cm
Err:514
0.430 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.355 cm
0.338 cm
0.338 cm
0.338 cm
Err:514
0.790 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.651 cm
0.624 cm
0.624 cm
0.624 cm
Err:514
0.570 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.470 cm
0.449 cm
0.449 cm
0.449 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.430 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.355 cm
0.338 cm
0.338 cm
0.338 cm
Viga A-B
a =3.38 cm
a =0.33 cm
a =0.32 cm
a =0.32 cm
Err:514
0.430 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.355 cm
0.338 cm
0.338 cm
0.338 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.33 cm
a =0.32 cm
a =0.32 cm
Err:514
0.430 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.355 cm
0.338 cm
0.338 cm
0.338 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.33 cm
a =0.32 cm
a =0.32 cm
Err:514
REPETIR
REPETIR
OK
Err:514
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
305.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
251.453 cm
-95.428 cm
102.545 cm
-557.268 cm
Err:514
0.310 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.256 cm
0.244 cm
0.244 cm
0.244 cm
Err:514
0.430 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.355 cm
0.338 cm
0.338 cm
0.338 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
PISO
PRIMER PISO
SEGUNDO PISO
TERCER PISO
CUARTO PISO
QUINTO PISO
b=
h=
f'c =
fy =
=
Recub =
As min =
Pmin =
As min =
M Max. Posiitivo
1. PERALTE EFECTIVO
25.00 cmPeralte Efectivo de la seccion:
40.00 cm
Asumo :
1
210 Kg/cm
Estribos :
0.375
4200 Kg/cm
d:
h - Recub - estrib - asumo/2
0.85
d:
33.78 cm
4.00 cm
1.630 Tn-m
0.220 Tn-m
0.250 Tn-m
0.700 Tn-m
1.630 Tn-m
0.250 Tn-m
0.250 Tn-m
0.670 Tn-m
1.640 Tn-m
0.200 Tn-m
0.260 Tn-m
0.670 Tn-m
1.660 Tn-m
0.240 Tn-m
0.260 Tn-m
0.680 Tn-m
0.700 Tn-m
0.190 Tn-m
0.130 Tn-m
0.300 Tn-m
2.54 cm
0.95 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Err:514
Pb =
Pb =
Pmax =
As max =
Err:514
Err:514
As min =
a=
Mur=
Mur=
As =2.710 cm
2.551 cm
332946.097 kg-cm
3.329 Ton-m
5. MOMENTO CON ACERO MAXIMO
3 1+1 3/4
As min =
a=
As =18.150 cm
17.082 cm
Mur=
1731388.448 kg-cm
Mur=
17.314 Ton-m
6. DETERMINACION DEL REFUERZO EN LA VIGA
A. ACEROS POSITIVOS
PRIMER PISO
SEGUNDO PISO
TERCER PISO
CUARTO PISO
QUINTO PISO
Mmax (+)
b=
d=
=
FORMULAS
M max
1.630 Tn-m
M max
0.220 Tn-m
M max
0.250 Tn-m
M max
0.700 Tn-m
M max
1.630 Tn-m
M max
0.250 Tn-m
M max
0.250 Tn-m
M max
M max
M max
M max
M max
M max
M max
M max
M max
0.670 Tn-m
1.640 Tn-m
0.200 Tn-m
0.260 Tn-m
0.670 Tn-m
1.660 Tn-m
0.240 Tn-m
0.260 Tn-m
0.680 Tn-m
M max
0.700 Tn-m
M max
M max
M max
0.190 Tn-m
0.130 Tn-m
0.300 Tn-m
1.630 Tn-m
25.00 cm
33.78 cm
0.9
Viga A-B
As
Mu
. fy.(d a / 2)
As . fy
0.85 . f ' c.b
PRIMER PISO
Mmax (+)
b=
d=
=
0.220 Tn-m
25.00 cm
33.78 cm
0.9
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
a = 0.10.d
1.344 cm
1.301 cm
1.300 cm
1.300 cm
Err:514
0.250 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.206 cm
0.196 cm
0.196 cm
0.196 cm
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
a =3.38 cm
a =1.26 cm
a =1.22 cm
a =1.22 cm
Err:514
Viga A-B
a =3.38 cm
a =0.19 cm
a =0.18 cm
a =0.18 cm
Err:514
1.630 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.344 cm
1.301 cm
1.300 cm
1.300 cm
REPETIR
OK
OK
Err:514
Viga A-B
a =3.38 cm
a =1.26 cm
a =1.22 cm
a =1.22 cm
Err:514
0.250 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.206 cm
0.196 cm
0.196 cm
0.196 cm
Viga A-B
a =3.38 cm
a =0.19 cm
a =0.18 cm
a =0.18 cm
Err:514
1.640 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.352 cm
1.309 cm
1.308 cm
1.308 cm
REPETIR
REPETIR
OK
Viga A-B
a =3.38 cm
a =1.27 cm
a =1.23 cm
a =1.23 cm
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
a = 0.10.d
0.181 cm
0.173 cm
0.173 cm
0.173 cm
Err:514
0.700 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.577 cm
0.553 cm
0.553 cm
0.553 cm
Usar
SEGUUNDO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
TERCER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
0.250 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.206 cm
0.196 cm
0.196 cm
0.196 cm
Err:514
0.670 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.552 cm
0.529 cm
0.529 cm
0.529 cm
Err:514
0.200 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.165 cm
0.157 cm
0.157 cm
0.157 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Err:514
0.260 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.214 cm
0.204 cm
0.204 cm
0.204 cm
Err:514
Viga A-B
a =3.38 cm
a =0.20 cm
a =0.19 cm
a =0.19 cm
Err:514
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
1.660 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.369 cm
1.325 cm
1.325 cm
1.325 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
0.700 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.577 cm
0.553 cm
0.553 cm
0.553 cm
Err:514
Viga A-B
a =3.38 cm
a =1.29 cm
a =1.25 cm
a =1.25 cm
Err:514
0.260 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.214 cm
0.204 cm
0.204 cm
0.204 cm
Viga A-B
a =3.38 cm
a =0.20 cm
a =0.19 cm
a =0.19 cm
Err:514
Viga A-B
a =3.38 cm
a =0.54 cm
a =0.52 cm
a =0.52 cm
Err:514
0.130 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.107 cm
0.102 cm
0.102 cm
REPETIR
OK
OK
Viga A-B
a =3.38 cm
a =0.10 cm
a =0.10 cm
a =0.10 cm
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
CUARTO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
QUINTO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
Err:514
0.670 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.552 cm
0.529 cm
0.529 cm
0.529 cm
Err:514
0.240 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.198 cm
0.188 cm
0.188 cm
0.188 cm
Err:514
0.680 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.561 cm
0.537 cm
0.537 cm
0.537 cm
Err:514
0.190 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.157 cm
0.149 cm
0.149 cm
0.149 cm
Err:514
0.300 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.247 cm
0.236 cm
0.236 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
Usar
0.102 cm
Err:514
Err:514
B. ACEROS NEGATIVOS
M max
M max
PRIMER PISO
M max
M max
Izquierda
0.000 Tn-m
0.810 Tn-m
0.400 Tn-m
0.820 Tn-m
Derecha
1.870 Tn-m
0.370 Tn-m
0.580 Tn-m
0.600 Tn-m
M max
0.000 Tn-m
1.870 Tn-m
M max
M max
M max
M max
M max
M max
M max
0.680 Tn-m
0.470 Tn-m
0.780 Tn-m
0.000 Tn-m
0.660 Tn-m
0.630 Tn-m
0.750 Tn-m
0.440 Tn-m
0.490 Tn-m
0.720 Tn-m
1.830 Tn-m
0.480 Tn-m
0.580 Tn-m
0.730 Tn-m
M max
0.000 Tn-m
1.790 Tn-m
M max
M max
M max
M max
M max
M max
M max
0.680 Tn-m
0.480 Tn-m
0.740 Tn-m
0.000 Tn-m
0.190 Tn-m
0.280 Tn-m
0.250 Tn-m
0.460 Tn-m
0.490 Tn-m
0.720 Tn-m
0.540 Tn-m
0.280 Tn-m
0.160 Tn-m
0.290 Tn-m
SEGUNDO PISO
TERCER PISO
CUARTO PISO
QUINTO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.810 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.668 cm
0.640 cm
0.640 cm
0.640 cm
Viga A-B
a =3.38 cm
a =0.63 cm
a =0.60 cm
a =0.60 cm
Err:514
0.400 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
Viga A-B
a =3.38 cm
As =
Usar
0.236 cm
Err:514
FORMULAS
As
Mu
. fy.(d a / 2)
As . fy
0.85 . f ' c.b
PRIMER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
1.870 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.542 cm
1.497 cm
1.496 cm
1.496 cm
Err:514
0.370 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.305 cm
0.291 cm
0.291 cm
0.291 cm
Err:514
0.580 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.330 cm
0.315 cm
0.315 cm
0.315 cm
a =0.31 cm
a =0.30 cm
a =0.30 cm
Err:514
0.820 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.676 cm
0.648 cm
0.648 cm
0.648 cm
Err:514
Viga A-B
a =3.38 cm
a =0.64 cm
a =0.61 cm
a =0.61 cm
Err:514
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
0.470 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.387 cm
0.370 cm
0.370 cm
0.370 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.680 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.561 cm
0.537 cm
0.537 cm
0.537 cm
Viga A-B
a =3.38 cm
a =0.53 cm
a =0.51 cm
a =0.51 cm
Err:514
a =3.38 cm
a =0.36 cm
a =0.35 cm
a =0.35 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
SEGUNDO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Viga A-B
Err:514
0.780 Tn-m
25.00 cm
33.78 cm
REPETIR
REPETIR
OK
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
0.478 cm
0.457 cm
0.457 cm
0.457 cm
Err:514
0.600 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.495 cm
0.473 cm
0.473 cm
0.473 cm
Err:514
1.870 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.542 cm
1.497 cm
1.496 cm
1.496 cm
Err:514
0.440 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.363 cm
0.346 cm
0.346 cm
0.346 cm
Err:514
0.490 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.404 cm
0.386 cm
0.386 cm
0.386 cm
Err:514
0.720 Tn-m
25.00 cm
33.78 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
=
Asumir:
As =
As =
As =
As =
Usar
0.9
a = 0.10.d
0.643 cm
0.616 cm
0.616 cm
0.616 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
a =3.38 cm
a =0.61 cm
a =0.58 cm
a =0.58 cm
Err:514
Err:514
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.660 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.544 cm
0.521 cm
0.521 cm
0.521 cm
Viga A-B
a =3.38 cm
a =0.51 cm
a =0.49 cm
a =0.49 cm
Err:514
0.630 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.519 cm
0.497 cm
0.497 cm
0.497 cm
Viga A-B
a =3.38 cm
a =0.49 cm
a =0.47 cm
a =0.47 cm
Err:514
0.750 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.618 cm
0.593 cm
0.592 cm
0.592 cm
Viga A-B
a =3.38 cm
a =0.58 cm
a =0.56 cm
a =0.56 cm
Err:514
REPETIR
REPETIR
OK
=
Asumir:
As =
As =
As =
As =
Usar
TERCER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
0.9
a = 0.10.d
0.594 cm
0.569 cm
0.568 cm
0.568 cm
Err:514
1.830 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.509 cm
1.464 cm
1.463 cm
1.463 cm
Err:514
0.480 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.396 cm
0.378 cm
0.378 cm
0.378 cm
Err:514
0.580 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.478 cm
0.457 cm
0.457 cm
0.457 cm
Err:514
0.730 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.602 cm
0.577 cm
0.576 cm
0.576 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.680 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.561 cm
0.537 cm
0.537 cm
0.537 cm
Viga A-B
a =3.38 cm
a =0.53 cm
a =0.51 cm
a =0.51 cm
Err:514
0.480 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.396 cm
0.378 cm
0.378 cm
0.378 cm
Viga A-B
a =3.38 cm
a =0.37 cm
a =0.36 cm
a =0.36 cm
Err:514
0.740 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.610 cm
0.585 cm
0.584 cm
0.584 cm
Viga A-B
a =3.38 cm
a =0.57 cm
a =0.55 cm
a =0.55 cm
Err:514
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
CUARTO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
QUINTO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
1.790 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
1.476 cm
1.431 cm
1.430 cm
1.430 cm
Err:514
0.460 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.379 cm
0.362 cm
0.362 cm
0.362 cm
Err:514
0.490 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.404 cm
0.386 cm
0.386 cm
0.386 cm
Err:514
0.720 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.594 cm
0.569 cm
0.568 cm
0.568 cm
Err:514
0.540 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.445 cm
0.426 cm
0.425 cm
0.425 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.190 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.157 cm
0.149 cm
0.149 cm
0.149 cm
Viga A-B
a =3.38 cm
a =0.15 cm
a =0.14 cm
a =0.14 cm
Err:514
0.280 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.231 cm
0.220 cm
0.220 cm
0.220 cm
REPETIR
OK
OK
Err:514
Viga A-B
a =3.38 cm
a =0.22 cm
a =0.21 cm
a =0.21 cm
Err:514
0.250 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.206 cm
0.196 cm
0.196 cm
0.196 cm
REPETIR
REPETIR
OK
Err:514
Viga A-B
a =3.38 cm
a =0.19 cm
a =0.18 cm
a =0.18 cm
Err:514
REPETIR
OK
OK
Err:514
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
M Max. Posiitivo
0.000 Tn-m
0.740 Tn-m
0.000 Tn-m
0.730 Tn-m
0.000 Tn-m
0.740 Tn-m
0.000 Tn-m
0.740 Tn-m
0.000 Tn-m
0.340 Tn-m
0.280 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.231 cm
0.220 cm
0.220 cm
0.220 cm
Err:514
0.160 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.132 cm
0.126 cm
0.126 cm
0.126 cm
Err:514
0.290 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.239 cm
0.228 cm
0.228 cm
0.228 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
1. PERALTE EFECTIVO
b=
h=
f'c =
fy =
=
Recub =
As min =
Pmin =
As min =
Pb =
Pb =
Pmax =
As max =
As min =
a=
Mur=
Mur=
As min =
a=
Mur=
Mur=
25.00 cm
40.00 cm
210 Kg/cm
4200 Kg/cm
0.85
4.00 cm
Asumo :
Estribos :
d:
d:
Err:514
Err:514
As =2.710 cm
2.551 cm
332971.706 kg-cm
3.330 Ton-m
5. MOMENTO CON ACERO MAXIMO
3 1+1 3/4
As =18.150 cm
17.082 cm
1731559.966 kg-cm
17.316 Ton-m
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mmax (+)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Mmax
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Mmax
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Mmax
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Mmax
b=
0.000 Tn-m
25.00 cm
0.740 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.610 cm
0.624 cm
0.625 cm
0.625 cm
Err:514
PRIMER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
0.730 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.602 cm
0.615 cm
0.616 cm
0.616 cm
Err:514
SEGUNDO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
0.740 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.610 cm
0.624 cm
0.625 cm
0.625 cm
Err:514
TERCER PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
0.740 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.610 cm
0.624 cm
0.625 cm
0.625 cm
Err:514
CUARTO PISO
Mmax (+)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Viga A-B
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
QUINTO PISO
Mmax (+)
b=
Err:514
Err:514
Err:514
Err:514
0.340 Tn-m
25.00 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
d=
=
Asumir:
As =
As =
As =
As =
Usar
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
B. ACEROS NEGATIVOS
M max
PRIMER PISO
M max
M max
SEGUNDO PISO
M max
M max
TERCER PISO
M max
M max
CUARTO PISO
M max
M max
QUINTO PISO
M max
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
As =
Usar
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Mmax (-)
b=
d=
=
Asumir:
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
Err:514
Izquierda
0.000 Tn-m
1.041 Tn-m
0.000 Tn-m
1.190 Tn-m
0.000 Tn-m
1.210 Tn-m
0.000 Tn-m
1.175 Tn-m
0.000 Tn-m
0.740 Tn-m
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
1.041 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.858 cm
0.906 cm
0.912 cm
0.913 cm
0.913 cm
REPETIR
OK
OK
a =3.38 cm
a =6.78 cm
a =7.16 cm
a =7.21 cm
a =7.22 cm
Err:514
a =3.38 cm
Derecha
0.370 Tn-m
0.920 Tn-m
0.380 Tn-m
0.820 Tn-m
0.380 Tn-m
0.790 Tn-m
0.380 Tn-m
0.800 Tn-m
0.390 Tn-m
0.140 Tn-m
d=
=
Asumir:
As =
As =
As =
As =
Usar
33.78 cm
0.9
a = 0.10.d
0.280 cm
0.275 cm
0.275 cm
0.275 cm
Err:514
FORMULAS
As
Mu
. fy.(d a / 2)
As . fy
0.85 . f ' c.b
PRIMER PISO
Mmax (-)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
SEGUNDO PISO
Mmax (-)
b=
d=
=
Asumir:
0.370 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.305 cm
0.300 cm
0.300 cm
0.300 cm
Err:514
0.920 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.758 cm
0.791 cm
0.794 cm
0.794 cm
0.794 cm
Err:514
0.380 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
0.000 cm
0.000 cm
0.000 cm
0.000 cm
0.000 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
1.190 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.981 cm
1.053 cm
1.063 cm
1.064 cm
1.064 cm
Err:514
a =3.38 cm
a =7.76 cm
a =8.32 cm
a =8.40 cm
a =8.41 cm
Err:514
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
Err:514
a =3.38 cm
a =7.89 cm
a =8.48 cm
a =8.57 cm
Err:514
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
1.175 Tn-m
25.00 cm
REPETIR
REPETIR
REPETIR
REPETIR
Err:514
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
1.210 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.997 cm
1.073 cm
1.084 cm
1.085 cm
REPETIR
OK
OK
OK
As =
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
As =
Usar
TERCER PISO
Mmax (-)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
REPETIR
As =
Err:514
Usar
CUARTO PISO
Mmax (-)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (-)
b=
0.313 cm
0.309 cm
0.309 cm
0.309 cm
0.309 cm
Err:514
0.820 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.676 cm
0.697 cm
0.699 cm
0.699 cm
0.699 cm
Err:514
0.380 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.313 cm
0.309 cm
0.309 cm
0.309 cm
Err:514
0.790 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.651 cm
0.670 cm
0.671 cm
0.671 cm
Err:514
0.380 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.313 cm
0.309 cm
0.309 cm
0.309 cm
Err:514
0.800 Tn-m
25.00 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
d=
=
Asumir:
As =
As =
As =
As =
Usar
33.78 cm
0.9
a = 0.10.d
0.969 cm
1.038 cm
1.047 cm
1.049 cm
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
As =
As =
As =
Usar
0.000 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.000 cm
0.000 cm
0.000 cm
0.000 cm
a =3.38 cm
a =7.66 cm
a =8.21 cm
a =8.28 cm
Err:514
Err:514
a =3.38 cm
a =0.00 cm
a =0.00 cm
a =0.00 cm
Err:514
0.740 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.610 cm
0.624 cm
0.625 cm
0.625 cm
a =3.38 cm
a =4.82 cm
a =4.93 cm
a =4.94 cm
Err:514
REPETIR
REPETIR
REPETIR
d=
=
Asumir:
As =
As =
As =
As =
Usar
QUINTO PISO
Mmax (-)
b=
d=
=
Asumir:
As =
REPETIR
As =
OK
As =
OK
As =
Err:514
Usar
Mmax (-)
b=
d=
=
Asumir:
As =
REPETIR
As =
REPETIR
As =
OK
As =
Err:514
Usar
33.78 cm
0.9
a = 0.10.d
0.660 cm
0.679 cm
0.681 cm
0.681 cm
Err:514
0.390 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.322 cm
0.317 cm
0.317 cm
0.317 cm
Err:514
0.140 Tn-m
25.00 cm
33.78 cm
0.9
a = 0.10.d
0.115 cm
0.111 cm
0.111 cm
0.111 cm
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
BARRA
numero
3
4
5
6
7
8
9
10
11
12
ACEROS COMERCIALES
DIAMETRO
pulg
cm
3/8
0.95
1/2
1.27
5/8
1.59
3/4
1.91
7/8
2.22
1
2.54
1 1/8
2.86
1 1/4
3.18
1 3/8
3.49
1 1/2
3.81
Peso
Kg/m
0.559
0.993
1.552
2.235
3.042
3.973
5.028
6.207
7.511
8.938
Area
1.420 cm
COMBINACIONES RECOMENDADAS
b min
1/2 - 5/8"
14.34 cm
1 1/2 + 1 5/8
2.000 cm
14.66 cm
2 5/8
17.83 cm
14.98 cm
18.15 cm
21.32 cm
18.47 cm
18.79 cm
21.96 cm
22.28 cm
22.60 cm
b min
16.57 cm
17.52 cm
21.65 cm
25.78 cm
2 1/2 + 1 5/8
1 1/2 + 2 5/8
3 1/2 + 1 5/8
3 5/8
2 1/2 + 2 5/8
1 1/2 + 3 5/8
4 5/8
1/2 - 3/4"
1 1/2 + 1 3/4
2 1/2 + 1 3/4
2 3/4
2 1+ 1 5/8
2 1+ 2 5/8
2.130 cm
2.580 cm
2.710 cm
2.840 cm
3.290 cm
3.870 cm
4.000 cm
4.580 cm
5.160 cm
Area
7.080 cm
10.200 cm
12.180 cm
14.160 cm
3 1
15.300 cm
22.60 cm
3/4 - 1"
1 3/4 + 1 1
Area
7.950 cm
b min
16.89 cm
4 3/4
3/4-5/8 - 1/2"
1 1/2 + 1 3/4+15/8
1 1 + 2 3/4
2 1 + 1 3/4
31
2 1+ 2 3/4
3 1+1 3/4
2 1+ 3 3/4
10.800 cm
21.34 cm
13.050 cm
15.300 cm
15.900 cm
18.150 cm
18.750 cm
21.97 cm
17.52 cm
26.42 cm
28.32 cm
34.04 cm
2 1/2 + 1 3/4+15/8
1 1/2 + 2 3/4+15/8
3 1/2 + 1 3/4+15/8
1 1/2 + 1 3/4+25/8
2 1/2 + 2 3/4+15/8
1 1/2 + 3 3/4+15/8
Area
b min
2 1/2 + 1 3/4+25/8
1 5/8 + 1 3/4+11
9.930 cm
21.02 cm
2 5/8 + 1 3/4+11
11.910 cm
22.61 cm
1 5/8 + 2 3/4+11
12.780 cm
22.93 cm
2 5/8 + 2 3/4+11
14.760 cm
24.52 cm
1 5/8 + 1 3/4+21
15.030 cm
23.56 cm
1 5/8 + 3 3/4+11
15.630 cm
24.84 cm
2 5/8 + 1 3/4+21
17.010 cm
25.15 cm
1/2 - 3/8"
2 3/8
1 1/2 + 1 3/8
3 3/8
2 1/2
1 1/2 + 2 3/8
4 3/8
2 1/2 + 1 3/8
3 1/2
2 1/2 + 2 3/8
3 1/2 + 1 3/8
4 1/2
5/8 - 1"
1 1 + 1 5/8
2 1
1 1/2 + 2 3/4
3 3/4
2 1/2 + 2 3/4
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =0.64 cm
a =0.62 cm
a =0.62 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.16 cm
a =0.15 cm
a =0.15 cm
Err:514
REPETIR
OK
OK
Err:514
a =3.38 cm
a =0.61 cm
a =0.59 cm
a =0.59 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.62 cm
a =0.60 cm
a =0.59 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.16 cm
REPETIR
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =0.16 cm
a =0.16 cm
Err:514
OK
OK
Err:514
a =3.38 cm
a =0.58 cm
a =0.56 cm
a =0.56 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.62 cm
a =0.60 cm
a =0.59 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.16 cm
a =0.15 cm
a =0.15 cm
Err:514
REPETIR
OK
OK
Err:514
a =3.38 cm
a =0.59 cm
a =0.57 cm
a =0.56 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =0.63 cm
a =0.60 cm
a =0.60 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.16 cm
a =0.15 cm
a =0.15 cm
Err:514
REPETIR
OK
OK
Err:514
a =3.38 cm
a =0.60 cm
a =0.57 cm
a =0.57 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.30 cm
a =0.29 cm
a =0.29 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.07 cm
a =0.07 cm
a =0.07 cm
Err:514
REPETIR
OK
OK
Err:514
a =3.38 cm
a =0.41 cm
REPETIR
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =0.39 cm
a =0.39 cm
Err:514
REPETIR
OK
Err:514
a =3.38 cm
a =0.31 cm
a =0.30 cm
REPETIR
REPETIR
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =0.30 cm
Err:514
OK
Err:514
a =3.38 cm
a =1.09 cm
a =1.06 cm
a =1.06 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.91 cm
a =0.87 cm
a =0.87 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.35 cm
a =0.33 cm
a =0.33 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.56 cm
a =0.54 cm
a =0.53 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.32 cm
a =0.30 cm
REPETIR
REPETIR
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =0.30 cm
Err:514
OK
Err:514
a =3.38 cm
a =0.33 cm
a =0.31 cm
a =0.31 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =1.06 cm
a =1.03 cm
a =1.03 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.91 cm
a =0.87 cm
a =0.87 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.40 cm
a =0.38 cm
a =0.38 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =0.47 cm
a =0.45 cm
a =0.45 cm
Err:514
Err:514
a =3.38 cm
a =0.41 cm
a =0.39 cm
a =0.39 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.09 cm
a =0.09 cm
a =0.09 cm
Err:514
REPETIR
OK
OK
Err:514
a =3.38 cm
a =1.06 cm
a =1.03 cm
a =1.03 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.88 cm
a =0.85 cm
a =0.85 cm
Err:514
REPETIR
REPETIR
OK
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =0.42 cm
a =0.40 cm
a =0.40 cm
Err:514
Err:514
a =3.38 cm
a =0.45 cm
a =0.43 cm
a =0.43 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.42 cm
a =0.40 cm
a =0.40 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.33 cm
a =0.31 cm
a =0.31 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =1.07 cm
a =1.03 cm
a =1.03 cm
Err:514
REPETIR
REPETIR
OK
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =0.87 cm
a =0.84 cm
a =0.84 cm
Err:514
Err:514
a =3.38 cm
a =232.01 cm
-a =90.54 cm
a =94.18 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =3.38 cm
a =0.43 cm
a =0.42 cm
a =0.42 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.42 cm
a =0.40 cm
a =0.40 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.33 cm
a =0.32 cm
a =0.32 cm
Err:514
REPETIR
REPETIR
OK
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =0.61 cm
a =0.59 cm
a =0.59 cm
Err:514
Err:514
a =3.38 cm
a =0.44 cm
a =0.42 cm
a =0.42 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =236.66 cm
-a =89.81 cm
a =96.51 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =3.38 cm
a =0.24 cm
a =0.23 cm
a =0.23 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.33 cm
a =0.32 cm
a =0.32 cm
Err:514
REPETIR
REPETIR
OK
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =0.64 cm
a =0.62 cm
a =0.62 cm
Err:514
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =0.16 cm
a =0.15 cm
a =0.15 cm
Err:514
Err:514
a =3.38 cm
a =0.61 cm
a =0.59 cm
a =0.59 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.62 cm
a =0.60 cm
a =0.59 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.16 cm
a =0.16 cm
a =0.16 cm
Err:514
REPETIR
OK
OK
Err:514
a =3.38 cm
a =0.58 cm
a =0.56 cm
a =0.56 cm
Err:514
REPETIR
OK
OK
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =0.62 cm
a =0.60 cm
a =0.59 cm
Err:514
Err:514
a =3.38 cm
a =0.16 cm
a =0.15 cm
a =0.15 cm
Err:514
REPETIR
OK
OK
Err:514
a =3.38 cm
a =0.59 cm
a =0.57 cm
a =0.56 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.63 cm
a =0.60 cm
a =0.60 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.16 cm
a =0.15 cm
a =0.15 cm
Err:514
REPETIR
REPETIR
OK
REPETIR
OK
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =0.60 cm
a =0.57 cm
a =0.57 cm
Err:514
Err:514
a =3.38 cm
a =0.30 cm
a =0.29 cm
a =0.29 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.07 cm
a =0.07 cm
a =0.07 cm
Err:514
REPETIR
OK
OK
Err:514
a =3.38 cm
a =0.41 cm
a =0.39 cm
a =0.39 cm
Err:514
REPETIR
REPETIR
OK
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =0.31 cm
a =0.30 cm
a =0.30 cm
Err:514
Err:514
a =3.38 cm
a =1.09 cm
a =1.06 cm
a =1.06 cm
Err:514
REPETIR
REPETIR
OK
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =0.91 cm
a =0.87 cm
a =0.87 cm
Err:514
Err:514
a =3.38 cm
a =0.35 cm
a =0.33 cm
a =0.33 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.56 cm
a =0.54 cm
a =0.53 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.32 cm
a =0.30 cm
a =0.30 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.33 cm
a =0.31 cm
a =0.31 cm
Err:514
REPETIR
REPETIR
OK
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =1.06 cm
a =1.03 cm
a =1.03 cm
Err:514
Err:514
a =3.38 cm
a =0.91 cm
a =0.87 cm
a =0.87 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.40 cm
a =0.38 cm
a =0.38 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.47 cm
a =0.45 cm
a =0.45 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.41 cm
a =0.39 cm
a =0.39 cm
Err:514
REPETIR
REPETIR
OK
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =0.09 cm
a =0.09 cm
a =0.09 cm
Err:514
REPETIR
OK
OK
Err:514
a =3.38 cm
a =1.06 cm
a =1.03 cm
a =1.03 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.88 cm
a =0.85 cm
a =0.85 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.42 cm
a =0.40 cm
a =0.40 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.45 cm
a =0.43 cm
a =0.43 cm
REPETIR
REPETIR
OK
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Err:514
Err:514
a =3.38 cm
a =0.42 cm
a =0.40 cm
a =0.40 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.33 cm
a =0.31 cm
a =0.31 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =1.07 cm
a =1.03 cm
a =1.03 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.87 cm
a =0.84 cm
a =0.84 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =232.01 cm
-a =90.54 cm
a =94.18 cm
REPETIR
REPETIR
REPETIR
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Err:514
Err:514
a =3.38 cm
a =0.43 cm
a =0.42 cm
a =0.42 cm
Err:514
Err:514
a =3.38 cm
a =0.42 cm
a =0.40 cm
a =0.40 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.33 cm
a =0.32 cm
a =0.32 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.61 cm
a =0.59 cm
a =0.59 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.44 cm
a =0.42 cm
a =0.42 cm
Err:514
REPETIR
REPETIR
OK
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =236.66 cm
-a =89.81 cm
a =96.51 cm
Err:514
Err:514
a =3.38 cm
a =0.24 cm
a =0.23 cm
a =0.23 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.33 cm
a =0.32 cm
a =0.32 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =0.17 cm
a =0.16 cm
a =0.16 cm
Err:514
REPETIR
OK
OK
Err:514
a =3.38 cm
a =0.54 cm
a =0.52 cm
a =0.52 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.19 cm
a =0.18 cm
a =0.18 cm
Err:514
REPETIR
OK
OK
Err:514
a =3.38 cm
a =0.52 cm
a =0.50 cm
a =0.50 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.16 cm
a =0.15 cm
a =0.15 cm
REPETIR
OK
OK
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Err:514
Err:514
a =3.38 cm
a =0.52 cm
a =0.50 cm
a =0.50 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.19 cm
a =0.18 cm
a =0.18 cm
Err:514
REPETIR
OK
OK
Err:514
a =3.38 cm
a =0.53 cm
a =0.51 cm
a =0.51 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.15 cm
a =0.14 cm
a =0.14 cm
Err:514
REPETIR
OK
OK
Err:514
a =3.38 cm
a =0.23 cm
a =0.22 cm
a =0.22 cm
REPETIR
REPETIR
OK
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Err:514
Err:514
a =3.38 cm
a =1.45 cm
a =1.41 cm
a =1.41 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.29 cm
a =0.27 cm
a =0.27 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =0.45 cm
a =0.43 cm
a =0.43 cm
Err:514
Err:514
a =3.38 cm
a =0.47 cm
a =0.45 cm
a =0.45 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =1.45 cm
a =1.41 cm
a =1.41 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.34 cm
a =0.33 cm
a =0.33 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.38 cm
a =0.36 cm
a =0.36 cm
Err:514
REPETIR
REPETIR
OK
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =0.56 cm
a =0.54 cm
a =0.53 cm
Err:514
Err:514
a =3.38 cm
a =1.42 cm
a =1.38 cm
a =1.38 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.37 cm
a =0.36 cm
a =0.36 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.45 cm
a =0.43 cm
a =0.43 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.57 cm
a =0.54 cm
a =0.54 cm
Err:514
REPETIR
REPETIR
OK
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =1.39 cm
a =1.35 cm
a =1.35 cm
Err:514
Err:514
a =3.38 cm
a =0.36 cm
a =0.34 cm
a =0.34 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.38 cm
a =0.36 cm
a =0.36 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.56 cm
a =0.54 cm
a =0.53 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.42 cm
a =0.40 cm
a =0.40 cm
Err:514
REPETIR
REPETIR
OK
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =0.22 cm
a =0.21 cm
a =0.21 cm
Err:514
Err:514
a =3.38 cm
a =0.12 cm
a =0.12 cm
a =0.12 cm
Err:514
REPETIR
OK
OK
Err:514
a =3.38 cm
a =0.23 cm
a =0.21 cm
a =0.21 cm
Err:514
REPETIR
REPETIR
OK
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =4.82 cm
a =4.93 cm
a =4.94 cm
Err:514
Err:514
a =3.38 cm
a =4.76 cm
a =4.86 cm
a =4.87 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =4.82 cm
a =4.93 cm
a =4.94 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =4.82 cm
a =4.93 cm
a =4.94 cm
Err:514
REPETIR
REPETIR
OK
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =2.22 cm
a =2.18 cm
a =2.18 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =2.41 cm
a =2.38 cm
a =2.37 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =6.00 cm
a =6.25 cm
a =6.28 cm
a =6.28 cm
Err:514
REPETIR
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =2.48 cm
a =2.44 cm
a =2.44 cm
a =2.44 cm
Err:514
Err:514
a =3.38 cm
a =5.34 cm
a =5.51 cm
a =5.53 cm
a =5.53 cm
Err:514
REPETIR
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =2.48 cm
a =2.44 cm
a =2.44 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =5.15 cm
a =5.29 cm
a =5.31 cm
Err:514
REPETIR
REPETIR
REPETIR
Err:514
a =3.38 cm
a =2.48 cm
a =2.44 cm
a =2.44 cm
Err:514
REPETIR
REPETIR
OK
OK
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a =3.38 cm
a =5.21 cm
a =5.37 cm
a =5.38 cm
Err:514
Err:514
a =3.38 cm
a =2.54 cm
a =2.51 cm
a =2.51 cm
Err:514
REPETIR
REPETIR
OK
Err:514
a =3.38 cm
a =0.91 cm
a =0.88 cm
a =0.88 cm
Err:514
REPETIR
REPETIR
REPETIR
REPETIR
REPETIR
OK
Err:514
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Area
cm2
0.71
1.29
1.98
2.85
3.88
5.1
6.45
8.19
9.58
11.4
ONES RECOMENDADAS
1/2 - 5/8"
1 1/2 + 1 5/8
Area
3.270 cm
b min
15.30 cm
2 5/8
3.960 cm
15.62 cm
2 1/2 + 1 5/8
1 1/2 + 2 5/8
3 1/2 + 1 5/8
3 5/8
2 1/2 + 2 5/8
1 1/2 + 3 5/8
4 5/8
1/2 - 3/4"
1 1/2 + 1 3/4
2 1/2 + 1 3/4
2 3/4
4.560 cm
5.250 cm
5.850 cm
5.940 cm
6.540 cm
7.230 cm
7.920 cm
Area
4.140 cm
5.430 cm
5.700 cm
6.990 cm
8.550 cm
8.280 cm
19.11 cm
19.43 cm
22.92 cm
19.75 cm
23.24 cm
23.56 cm
23.88 cm
b min
15.62 cm
19.43 cm
15.62 cm
20.07 cm
20.71 cm
23.88 cm
4 3/4
3/4-5/8 - 1/2"
1 1/2 + 1 3/4+15/8
11.400 cm
25.16 cm
Area
6.120 cm
b min
22.29 cm
2 1/2 + 1 3/4+15/8
1 1/2 + 2 3/4+15/8
3 1/2 + 1 3/4+15/8
1 1/2 + 1 3/4+25/8
2 1/2 + 2 3/4+15/8
1 1/2 + 3 3/4+15/8
7.410 cm
23.56 cm
8.100 cm
8.700 cm
8.970 cm
9.390 cm
10.080 cm
23.88 cm
24.83 cm
24.20 cm
25.15 cm
25.47 cm
2 1/2 + 1 3/4+25/8
10.260 cm
25.47 cm
1 1/2 + 2 3/4
3 3/4
2 1/2 + 2 3/4
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
REFUERZO TRANSVERSAL
DISEO DE VIGAS PRINCIPALES EJE 1-1
1. CARACTERISTICAS
b=
25.00 cm
Peralte Efectivo de la seccion:
h=
30.00 cm
2.54 cm
Asumo :
1.00pulg
f'c =
210 Kg/cm
0.95 cm
Estribos :
0.375
fy =
4200 Kg/cm
d:
h - Recub - estrib - asumo/2
=
0.85
d:
23.78 cm
Recub =
4.00 cm
2.- MOMENTOS ULTIMOS RESISTENTES
Area de acero negativo
PISO
VIGAS
Izquierda
Derecha
Viga A-D
3.960 cm
5.160 cm
PRIMER
Viga D-E
3.960 cm
3.960 cm
Viga E-C
3.960 cm
3.960 cm
Viga A-D
4.560 cm
5.160 cm
SEGUNDO
Viga D-E
3.960 cm
3.960 cm
Viga E-C
3.960 cm
3.960 cm
Viga A-D
3.960 cm
3.960 cm
TERCER
Viga D-E
3.960 cm
3.960 cm
Viga E-C
3.960 cm
3.960 cm
Viga A-D
3.960 cm
3.960 cm
CUARTO
Viga D-E
3.960 cm
3.960 cm
Viga E-C
3.960 cm
3.960 cm
Viga A-D
3.960 cm
3.960 cm
QUINTO
Viga D-E
3.960 cm
3.960 cm
Viga E-C
3.960 cm
3.960 cm
4.164 Tn-m
3.280 Tn-m
3.280 Tn-m
4.164 Tn-m
3.280 Tn-m
3.280 Tn-m
3.280 Tn-m
3.280 Tn-m
3.280 Tn-m
3.280 Tn-m
3.280 Tn-m
3.280 Tn-m
3.280 Tn-m
3.280 Tn-m
3.280 Tn-m
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
PRIMER
SEGUNDO
TERCER
CUARTO
QUINTO
VIGAS
LONGITUD
WU
Viga A-D
Viga D-E
Viga E-C
Viga A-D
Viga D-E
Viga E-C
Viga A-D
Viga D-E
Viga E-C
Viga A-D
Viga D-E
Viga E-C
Viga A-D
Viga D-E
Viga E-C
5.337
2.438
4.225
5.337
2.438
4.225
5.337
2.438
4.225
5.337
2.438
4.225
5.337
2.438
4.225
2.107
3.743
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1.916
3.335
CORTANTE
Vi
5.79 Ton
4.56 Ton
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
2.34 Ton
7.04 Ton
Vj
-5.46 Ton
-4.56 Ton
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-2.34 Ton
-7.04 Ton
WU
Vud
VIGA
CORTANTE MAXIMA
Vi
Vj
VIGA
Viga A-D
Ar
1.420 cm
1.420 cm
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
CORTANTE TOMADO
POR
CONCRETO
4.57 Ton
4.57 Ton
4.57 Ton
4.57 Ton
4.57 Ton
Err:509
Err:509
Err:509
Err:509
Err:509
E MAX. DE
ESTRIBOS
POR ACERO
CORT.MAX.
TOMADO X
ACERO
Err:509
Err:509
Err:509
Err:509
Err:509
22.82 Ton
22.82 Ton
22.82 Ton
22.82 Ton
22.82 Ton
Err:509
Err:509
Err:509
Err:509
Err:509
TOMAMOS
Err:509
Err:509
Err:509
Err:509
Err:509
SUPONER
Vs POR emax.
Vs
Err:509
Err:509
25.00 cm
5.67 Ton
Err:509
25.00 cm
5.67 Ton
Err:509
Err:509
Vs
X1
X2
Err:509
X3
Err:509
Err:509
0.00 m
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
TERCER
Viga A-D
1.420 cm
Err:509
25.00 cm
5.67 Ton
Err:509
0.00 m
CUARTO
Viga A-D
1.420 cm
Err:509
25.00 cm
5.67 Ton
Err:509
-4.57 m
QUINTO
Viga A-D
1.420 cm
Err:509
11.00 cm
Z=
Err:509
0.00 m
Err:509
Err:509
X3=0.07 m
4.57 Ton
5.67 Ton
Err:509
3/8
@ 0.05
Err:509
@ 10.0
3/8
1
@ 0.05
47.555 cm
5.94 cm
10.16 cm
22.80 cm
30.00 cm
Err:509
@ 15.0
@ 20.0
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
5.94 cm
8
7.1588686784
@ 10.0
3/8
@ 0.05
@ 10.0
@ 20.0
3/8
@ 0.05
Err:509
@ 10.0
@ 20.0
@ 20.0
@ 20.0
3/8
3/8
1
@ 0.05
47.555 cm
5.94 cm
10.16 cm
22.80 cm
30.00 cm
5.94 cm
8
7.1588686784
1
@ 0.05
@ 10.0
@ 10.0
@ 20.0
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
REFUERZO TRANSVERSAL
DISEO DE VIGAS PRINCIPALES EJE 2-2
1. CARACTERISTICAS
b=
h=
f'c =
fy =
=
Recub =
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
VIGAS
LONGITUD
WU
Viga A-D
5.337
2.438
5.337
2.438
5.337
2.438
5.337
2.438
5.337
2.438
2.107
3.743
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1.916
Viga D-E
Viga A-D
Viga D-E
Viga A-D
Viga D-E
Viga A-D
Viga D-E
Viga A-D
Viga D-E
CORTANTE
Vi
Vj
5.54 Ton
-5.70 Ton
4.56 Ton
-4.56 Ton
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.03 Ton
-4.65 Ton
WU
Vud
PRIMER
SEGUNDO
TERCER
CUARTO
QUINTO
VIGA
Viga A-D
Viga A-D
Viga A-D
Viga A-D
Viga A-D
CORTANTE MAXIMA
Vi
Vj
5.54 Ton
Err:509
Err:509
Err:509
Err:509
-5.70 Ton
Err:509
Err:509
Err:509
Err:509
3.743
Err:509
Err:509
Err:509
Err:509
4.65 Ton
Err:509
Err:509
Err:509
Err:509
CORTANTE TOMADO
POR
CONCRETO
4.57 Ton
4.57 Ton
4.57 Ton
4.57 Ton
4.57 Ton
E MAX. DE
ESTRIBOS
POR ACERO
CORT.MAX.
TOMADO X
ACERO
1.95 Ton
Err:509
Err:509
Err:509
Err:509
22.82 Ton
22.82 Ton
22.82 Ton
22.82 Ton
22.82 Ton
5.94 cm
Err:509
Err:509
Err:509
Err:509
TOMAMOS
5.00 cm
Err:509
Err:509
Err:509
Err:509
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
PISO
PRIMER
SEGUNDO
TERCER
CUARTO
QUINTO
VIGA
Viga A-D
Viga A-D
Viga A-D
Viga A-D
Viga A-D
SUPONER
Ar
Vs POR emax.
1.420 cm 28.36 Ton
Err:509
1.420 cm
Err:509
1.420 cm
Err:509
1.420 cm
Err:509
1.420 cm
Z=
X1=2.17 m
X2=3.95 m
Vs
4.00 Ton
4.00 Ton
4.00 Ton
4.00 Ton
4.00 Ton
S
11.00 cm
Err:509
Err:509
Err:509
Err:509
Vs con e21
12.89 Ton
2.63 m
-X3=2.27 m
S
17.50 cm
17.50 cm
17.50 cm
17.50 cm
17.50 cm
Vs con e17,5
8.10 Ton
8.10 Ton
8.10 Ton
8.10 Ton
8.10 Ton
X4=0.64 m
S
15.00 cm
15.00 cm
15.00 cm
15.00 cm
15.00 cm
Vs con e15
9.45 Ton
9.45 Ton
9.45 Ton
9.45 Ton
9.45 Ton
S
Vs con e10
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
Z
2.63 m
Err:509
Err:509
Err:509
Err:509
X5=2.24 m
4.57 Ton
12.89 Ton
8.10 Ton
9.45 Ton
14.18 Ton
5.54 Ton
DISEO DE 1 A 4TO NIVEL
Estribo
3/8
@ 0.05
40
@ 10.0
@ 0.05
3/8
47.555 cm
-16
@ 15.0
@ 17.5
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a.
b.
c.
d.
d/4
10 x ( menor)
24 x ( Estribo)
30 cm
Se toma el menor valor
N (#estrib @ 0.10)
FINALEMENTE:
>>
5.94 cm
>>
12.70 cm
>>
22.80 cm
>>
30.00 cm
5.94 cm
8
7.1588686784
Estribo
3/8
@ 0.05
@ 10.0
Estribo
3/8
@ 0.05
#VALUE!
@ 10.0
@ 10.0
@ 20.0
@ 20.0
@ 15.0 Err:509
@ 17.5
@ 10.0
@ 20.0
3/8
3/8
1
@ 0.05
47.555 cm
5.94 cm
12.70 cm
22.80 cm
30.00 cm
5.94 cm
8
7.1588686784
1
@ 0.05
@ 10.0
@ 20.0
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
REFUERZO TRANSVERSAL
DISEO DE VIGAS PRINCIPALES EJE 3-3
1. CARACTERISTICAS
b=
h=
f'c =
fy =
=
Recub =
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
CUARTO
QUINTO
Viga D-E
Viga A-D
Viga D-E
8.700 cm
3.870 cm
5.940 cm
7.230 cm
5.940 cm
3.870 cm
6.473 Tn-m
3.212 Tn-m
4.711 Tn-m
5.568 Tn-m
4.711 Tn-m
3.212 Tn-m
VIGAS
LONGITUD
WU
Viga A-D
5.337
2.438
5.337
2.438
5.337
2.438
5.337
2.438
5.337
2.438
2.107
3.743
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1.916
Viga D-E
Viga A-D
Viga D-E
Viga A-D
Viga D-E
Viga A-D
Viga D-E
Viga A-D
Viga D-E
CORTANTE
Vi
Vj
5.68 Ton
-5.57 Ton
2.72 Ton
-6.41 Ton
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1.72 Ton
-2.95 Ton
WU
Vud
VIGA
CORTANTE MAXIMA
Vi
Vj
CORTANTE TOMADO
POR
CONCRETO
POR ACERO
CORT.MAX.
TOMADO X
ACERO
E MAX. DE
ESTRIBOS
TOMAMOS
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
PRIMER
SEGUNDO
TERCER
CUARTO
QUINTO
Viga A-D
Viga A-D
Viga A-D
Viga A-D
Viga A-D
5.68 Ton
Err:509
Err:509
Err:509
Err:509
-6.41 Ton
Err:509
Err:509
Err:509
Err:509
3.743
Err:509
Err:509
Err:509
Err:509
4.79 Ton
Err:509
Err:509
Err:509
Err:509
POR
CONCRETO
4.57 Ton
4.57 Ton
4.57 Ton
4.57 Ton
4.57 Ton
E MAX. DE
ESTRIBOS
POR ACERO
CORT.MAX.
TOMADO X
ACERO
2.11 Ton
Err:509
Err:509
Err:509
Err:509
22.82 Ton
22.82 Ton
22.82 Ton
22.82 Ton
22.82 Ton
5.94 cm
Err:509
Err:509
Err:509
Err:509
TOMAMOS
5.00 cm
Err:509
Err:509
Err:509
Err:509
VIGA
Viga A-D
Viga A-D
Viga A-D
Viga A-D
Viga A-D
Ar
1.420 cm
1.420 cm
1.420 cm
1.420 cm
1.420 cm
SUPONER
Vs POR emax.
28.36 Ton
Err:509
Err:509
Err:509
Err:509
Z=
X1=2.02 m
X2=3.68 m
Vs
4.00 Ton
4.00 Ton
4.00 Ton
4.00 Ton
4.00 Ton
S
11.00 cm
Err:509
Err:509
Err:509
Err:509
2.51 m
-X3=2.11 m
Vs con e21
12.89 Ton
S
17.50 cm
17.50 cm
17.50 cm
17.50 cm
17.50 cm
X4=0.60 m
Vs con e17,5
8.10 Ton
8.10 Ton
8.10 Ton
8.10 Ton
8.10 Ton
S
15.00 cm
15.00 cm
15.00 cm
15.00 cm
15.00 cm
Vs con e15
9.45 Ton
9.45 Ton
9.45 Ton
9.45 Ton
9.45 Ton
S
Vs con e10
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
X5=2.09 m
4.57 Ton
12.89 Ton
8.10 Ton
9.45 Ton
14.18 Ton
5.68 Ton
Z
2.51 m
Err:509
Err:509
Err:509
Err:509
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
DISEO DE 1 A 4TO NIVEL
Estribo
3/8
@ 0.05
37
@ 10.0
@ 0.05
-15
@ 15.0
@ 10.0
@ 17.5
3/8
47.555 cm
5.94 cm
12.70 cm
22.80 cm
30.00 cm
5.94 cm
7.1588686784
Estribo
3/8
@ 0.05
@ 10.0
Estribo
3/8
@ 0.05
#VALUE!
@ 10.0
@ 20.0
@ 20.0
@ 15.0 Err:509
@ 17.5
@ 10.0
@ 20.0
3/8
1
@ 0.05
47.555 cm
5.94 cm
12.70 cm
22.80 cm
30.00 cm
5.94 cm
7.1588686784
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
FINALEMENTE:
Estribo
3/8
@ 0.05
@ 10.0
REFUERZO TRANSVERSAL
DISEO DE VIGAS PRINCIPALES EJE 4-4
1. CARACTERISTICAS
b=
h=
f'c =
fy =
=
Recub =
@ 20.0
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
PRIMER
SEGUNDO
TERCER
CUARTO
QUINTO
Viga A-D
Viga D-E
Viga A-D
Viga D-E
Viga A-D
Viga D-E
Viga A-D
Viga D-E
Viga A-D
Viga D-E
Izquierda
6.540 cm
10.080 cm
7.080 cm
8.970 cm
7.230 cm
8.970 cm
7.410 cm
8.700 cm
3.870 cm
3.870 cm
Derecha
6.990 cm
3.270 cm
9.390 cm
7.080 cm
8.970 cm
7.080 cm
8.970 cm
7.230 cm
5.940 cm
5.940 cm
Izquierda
Derecha
5.117 Tn-m
5.413 Tn-m
7.252 Tn-m
2.749 Tn-m
5.472 Tn-m
6.871 Tn-m
6.631 Tn-m
5.472 Tn-m
5.568 Tn-m
6.631 Tn-m
6.631 Tn-m
5.472 Tn-m
5.683 Tn-m
6.631 Tn-m
6.473 Tn-m
5.568 Tn-m
3.212 Tn-m
4.711 Tn-m
3.212 Tn-m
4.711 Tn-m
VIGAS
LONGITUD
WU
Viga A-D
5.337
2.438
5.337
2.438
5.337
2.438
5.337
2.107
3.743
Err:509
Err:509
Err:509
Err:509
Err:509
Viga D-E
Viga A-D
Viga D-E
Viga A-D
Viga D-E
Viga A-D
CORTANTE
Vi
Vj
5.68 Ton
-5.57 Ton
2.72 Ton
-6.41 Ton
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
CUARTO
QUINTO
Viga D-E
Viga A-D
Viga D-E
2.438
5.337
2.438
Err:509
Err:509
1.916
Err:509
Err:509
Err:509
Err:509
2.95 Ton
-1.72 Ton
WU
Vud
PRIMER
SEGUNDO
TERCER
CUARTO
QUINTO
VIGA
Viga A-D
Viga A-D
Viga A-D
Viga A-D
Viga A-D
CORTANTE MAXIMA
Vi
Vj
5.68 Ton
Err:509
Err:509
Err:509
Err:509
-6.41 Ton
Err:509
Err:509
Err:509
Err:509
3.743
Err:509
Err:509
Err:509
Err:509
4.79 Ton
Err:509
Err:509
Err:509
Err:509
CORTANTE TOMADO
POR
CONCRETO
4.57 Ton
4.57 Ton
4.57 Ton
4.57 Ton
4.57 Ton
E MAX. DE
ESTRIBOS
POR ACERO
CORT.MAX.
TOMADO X
ACERO
2.11 Ton
Err:509
Err:509
Err:509
Err:509
22.82 Ton
22.82 Ton
22.82 Ton
22.82 Ton
22.82 Ton
5.94 cm
Err:509
Err:509
Err:509
Err:509
TOMAMOS
5.00 cm
Err:509
Err:509
Err:509
Err:509
VIGA
Viga A-D
Viga A-D
Viga A-D
Viga A-D
Viga A-D
Ar
1.420 cm
1.420 cm
1.420 cm
1.420 cm
1.420 cm
SUPONER
Vs POR emax.
28.36 Ton
Err:509
Err:509
Err:509
Err:509
Z=
X1=2.02 m
X2=3.68 m
Vs
4.00 Ton
4.00 Ton
4.00 Ton
4.00 Ton
4.00 Ton
2.51 m
-X3=2.11 m
S
11.00 cm
Err:509
Err:509
Err:509
Err:509
Vs con e21
12.89 Ton
X4=0.60 m
S
17.50 cm
17.50 cm
17.50 cm
17.50 cm
17.50 cm
Vs con e17,5
8.10 Ton
8.10 Ton
8.10 Ton
8.10 Ton
8.10 Ton
X5=2.09 m
4.57 Ton
12.89 Ton
S
15.00 cm
15.00 cm
15.00 cm
15.00 cm
15.00 cm
Vs con e15
9.45 Ton
9.45 Ton
9.45 Ton
9.45 Ton
9.45 Ton
S
Vs con e10
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
Z
2.51 m
Err:509
Err:509
Err:509
Err:509
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
8.10 Ton
9.45 Ton
14.18 Ton
5.68 Ton
DISEO DE 1 A 4TO NIVEL
Estribo
3/8
@ 0.05
37
@ 10.0
@ 0.05
-15
@ 15.0
@ 10.0
@ 17.5
3/8
47.555 cm
5.94 cm
12.70 cm
22.80 cm
30.00 cm
5.94 cm
7.1588686784
Estribo
3/8
@ 0.05
@ 10.0
Estribo
3/8
@ 0.05
#VALUE!
@ 10.0
@ 20.0
@ 20.0
3/8
1
@ 0.05
47.555 cm
Err:509
@ 15.0 Err:509
@ 17.5
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
a.
b.
c.
d.
d/4
10 x ( menor)
24 x ( Estribo)
30 cm
Se toma el menor valor
N (#estrib @ 0.10)
FINALEMENTE:
Estribo
3/8
>>
5.94 cm
>>
12.70 cm
>>
22.80 cm
>>
30.00 cm
5.94 cm
8
7.1588686784
:
@ 0.05
@ 10.0
REFUERZO TRANSVERSAL
DISEO DE VIGAS PRINCIPALES EJE 5-5
1. CARACTERISTICAS
b=
h=
2.54
@ 10.0
@ 20.0
@ 20.0
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
f'c =
fy =
=
Recub =
210 Estribos :
4200 d:
0.85 d:
4
0.375
0.9525
h - Recub - estrib - asumo/2
23.7775
VIGAS
LONGITUD
WU
Viga A-D
5.337
2.107
CORTANTE
Vi
Vj
6.27 Ton
-4.98 Ton
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
PRIMER
SEGUNDO
TERCER
CUARTO
QUINTO
Viga D-E
Viga A-D
Viga D-E
Viga A-D
Viga D-E
Viga A-D
Viga D-E
Viga A-D
Viga D-E
2.438
5.337
2.438
5.337
2.438
5.337
2.438
5.337
2.438
3.743
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1.916
3.15 Ton
-5.97 Ton
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1.42 Ton
-3.25 Ton
WU
Vud
PRIMER
SEGUNDO
TERCER
CUARTO
QUINTO
VIGA
Viga A-D
Viga A-D
Viga A-D
Viga A-D
Viga A-D
CORTANTE MAXIMA
Vi
Vj
-5.97 Ton
Err:509
Err:509
Err:509
Err:509
3.743
Err:509
Err:509
Err:509
Err:509
Vs POR emax.
1.420 cm 28.36 Ton
Err:509
1.420 cm
Err:509
1.420 cm
Err:509
1.420 cm
Err:509
1.420 cm
Vs
4.00 Ton
4.00 Ton
4.00 Ton
4.00 Ton
4.00 Ton
6.27 Ton
Err:509
Err:509
Err:509
Err:509
5.38 Ton
Err:509
Err:509
Err:509
Err:509
CORTANTE TOMADO
E MAX. DE
ESTRIBOS
POR ACERO
CORT.MAX.
TOMADO X
ACERO
2.81 Ton
Err:509
Err:509
Err:509
Err:509
22.82 Ton
22.82 Ton
22.82 Ton
22.82 Ton
22.82 Ton
5.94 cm
Err:509
Err:509
Err:509
Err:509
POR
CONCRETO
4.57 Ton
4.57 Ton
4.57 Ton
4.57 Ton
4.57 Ton
Vs con e21
12.89 Ton
S
17.50 cm
17.50 cm
17.50 cm
17.50 cm
17.50 cm
TOMAMOS
5.00 cm
Err:509
Err:509
Err:509
Err:509
VIGA
SUPONER
Ar
Z=
X1=1.99 m
X2=3.63 m
2.73 m
-X3=2.09 m
S
11.00 cm
Err:509
Err:509
Err:509
Err:509
X4=0.59 m
Vs con e17,5
8.10 Ton
8.10 Ton
8.10 Ton
8.10 Ton
8.10 Ton
X5=2.06 m
S
15.00 cm
15.00 cm
15.00 cm
15.00 cm
15.00 cm
Vs con e15
9.45 Ton
9.45 Ton
9.45 Ton
9.45 Ton
9.45 Ton
S
Vs con e10
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
Z
2.73 m
Err:509
Err:509
Err:509
Err:509
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
4.57 Ton
12.89 Ton
8.10 Ton
9.45 Ton
14.18 Ton
6.27 Ton
DISEO DE 1 A 4TO NIVEL
Estribo
3/8
@ 0.05
37
@ 10.0
@ 0.05
-14
@ 15.0
@ 10.0
@ 17.5
3/8
3/8
47.555 cm
5.94 cm
12.70 cm
22.80 cm
30.00 cm
5.94 cm
7.1588686784
1
@ 0.05
@ 10.0
@ 20.0
@ 20.0
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Estribo
3/8
@ 0.05
#VALUE!
@ 10.0
Err:509
@ 15.0 Err:509
@ 17.5
@ 10.0
@ 20.0
3/8
3/8
1
@ 0.05
47.555 cm
5.94 cm
12.70 cm
22.80 cm
30.00 cm
5.94 cm
8
7.1588686784
1
@ 0.05
@ 10.0
@ 20.0
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
REFUERZO TRANSVERSAL
DISEO DE VIGAS PRINCIPALES EJE 5-5
1. CARACTERISTICAS
b=
h=
f'c =
fy =
=
Recub =
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
VIGAS
LONGITUD
WU
Viga A-D
5.337
2.438
5.337
2.438
5.337
2.438
5.337
2.438
5.337
2.438
2.107
3.743
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1.916
Viga D-E
Viga A-D
Viga D-E
Viga A-D
Viga D-E
Viga A-D
Viga D-E
Viga A-D
Viga D-E
CORTANTE
Vi
Vj
6.20 Ton
-5.04 Ton
3.29 Ton
-5.84 Ton
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1.75 Ton
-2.92 Ton
WU
Vud
PRIMER
SEGUNDO
TERCER
CUARTO
QUINTO
VIGA
Viga A-D
Viga A-D
Viga A-D
Viga A-D
Viga A-D
CORTANTE MAXIMA
Vi
Vj
-5.84 Ton
Err:509
Err:509
Err:509
Err:509
3.743
Err:509
Err:509
Err:509
Err:509
Vs POR emax.
1.420 cm 28.36 Ton
Err:509
1.420 cm
Err:509
1.420 cm
Vs
4.00 Ton
4.00 Ton
4.00 Ton
6.20 Ton
Err:509
Err:509
Err:509
Err:509
5.31 Ton
Err:509
Err:509
Err:509
Err:509
CORTANTE TOMADO
E MAX. DE
ESTRIBOS
POR ACERO
CORT.MAX.
TOMADO X
ACERO
2.73 Ton
Err:509
Err:509
Err:509
Err:509
22.82 Ton
22.82 Ton
22.82 Ton
22.82 Ton
22.82 Ton
5.94 cm
Err:509
Err:509
Err:509
Err:509
POR
CONCRETO
4.57 Ton
4.57 Ton
4.57 Ton
4.57 Ton
4.57 Ton
Vs con e21
12.89 Ton
S
17.50 cm
17.50 cm
17.50 cm
TOMAMOS
5.00 cm
Err:509
Err:509
Err:509
Err:509
VIGA
Ar
SUPONER
S
11.00 cm
Err:509
Err:509
Vs con e17,5
8.10 Ton
8.10 Ton
8.10 Ton
S
15.00 cm
15.00 cm
15.00 cm
Vs con e15
9.45 Ton
9.45 Ton
9.45 Ton
S
Vs con e10
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
14.18 Ton
10.00 cm
Z
2.75 m
Err:509
Err:509
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
CUARTO
QUINTO
Viga A-D
Viga A-D
1.420 cm
1.420 cm
Err:509
Err:509
4.00 Ton
4.00 Ton
Z=
X1=2.02 m
X2=3.69 m
Err:509
Err:509
8.10 Ton
8.10 Ton
17.50 cm
17.50 cm
2.75 m
-X3=2.12 m
X4=0.60 m
15.00 cm
15.00 cm
9.45 Ton
9.45 Ton
14.18 Ton
14.18 Ton
10.00 cm
10.00 cm
Err:509
Err:509
X5=2.10 m
4.57 Ton
12.89 Ton
8.10 Ton
9.45 Ton
14.18 Ton
6.20 Ton
DISEO DE 1 A 4TO NIVEL
Estribo
3/8
@ 0.05
37
@ 10.0
@ 0.05
3/8
47.555 cm
5.94 cm
12.70 cm
22.80 cm
30.00 cm
-15
@ 15.0
@ 17.5
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
5.94 cm
8
7.1588686784
Estribo
3/8
@ 0.05
@ 10.0
Estribo
3/8
@ 0.05
#VALUE!
@ 10.0
@ 10.0
@ 20.0
@ 20.0
@ 15.0 Err:509
@ 17.5
@ 10.0
@ 20.0
3/8
3/8
1
@ 0.05
47.555 cm
5.94 cm
12.70 cm
22.80 cm
30.00 cm
5.94 cm
8
7.1588686784
1
@ 0.05
@ 10.0
@ 20.0
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
X1
2.17 m
X2
X3
X4
3.95 m -2.27 m 0.64 m
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
X5
2.24 m
Err:509
Err:509
Err:509
Err:509
@ 20.0
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
@ 20.0
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
X1
2.02 m
X2
X3
X4
3.68 m -2.11 m 0.60 m
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
X5
2.09 m
Err:509
Err:509
Err:509
Err:509
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
@ 20.0
@ 20.0
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
X1
2.02 m
X2
X3
X4
3.68 m -2.11 m 0.60 m
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
X5
2.09 m
Err:509
Err:509
Err:509
Err:509
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
@ 20.0
@ 20.0
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
X1
1.99 m
X2
X3
X4
3.63 m -2.09 m 0.59 m
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
X5
2.06 m
Err:509
Err:509
Err:509
Err:509
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
@ 20.0
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
@ 20.0
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
X1
2.02 m
X2
X3
X4
3.69 m -2.12 m 0.60 m
Err:509 Err:509
Err:509 Err:509
X5
2.10 m
Err:509
Err:509
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
@ 20.0
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
@ 20.0
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
DISEO DE LOSA ALIGERADA
300 Kg/m
100 Kg/m
226 Kg/m
626 Kg/m
876 Kg/m
Sobrecarga (S/C)
Carga Viva (Cv)
Cv = 1.7 Cv
Carga Ultima (Wu)
200 Kg/m
200 Kg/m
340 Kg/m
1216 Kg/m
CARGA PUNTUAL EN VOLADOS
Espesor de muro
Altura de Muro
Ancho
Pum =
0.150 m
0.800 m
0.550 m
166.32 K
PARA 1.00 m DE ANCHO DE LOSA
1.00 m = 2.5 viguetas
Cm
Cv
Carga Ultima (Wu)
876 Kg/m
340 Kg/m
1216 Kg/
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
TOMAMOS:
Area de acero/metro =
3.94 cm^2
Area de acero/vigueta = 1.574 cm^2
P=
166.32 Kg
0.555 m
0.555
4.51
2.00
ALIGERADO TIPO A1
I) ANALISIS
MOMENTOS POSITIVOS:
TRAMO 1-2:
M+= Wu*l^2/8-((P*a+Wu*a^2/2+Wu*b^2/2)/2)=
M+= 1743 kg-m
MOMENTO NEGATIVO:
APOYO1:
M-= P*a+Wu*l^2/2
M-=
280 kg-m
APOYO2:
M-= Wu*l^2/2
M-=
2421 kg-m
DIAGRAMA DE MOMENTOS
279.65
0.555
2420.651
2
hf=
25
H=
50cm
bw=
25
APOYO1: M1=
280 kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.347
cm^2
a=As*fy/,85*f'c*b
a=
0.327
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.341
cm^2
a=As*fy/,85*f'c*b
a=
0.321
cm
OK
tomamos As=Asmin=
0.98 cm^2
TOMAMOS:
Area de acero/metro =
0.98 cm^2
Area de acero/vigueta = 0.394 cm^2
1742.5624
DETERMINACION DEL REFUERZO LONGITUDINAL
1.-PARA MOMENTOS POSITIVOS
TRAMO1-2:
Mu=
1743 kg-m
f'c=
210 kg/cm^2
H=
0.25 m
bw=
25 cm
B=
100 cm
H=
4.51 m
bw=25cm
4.51
13/8''
11/2''
5 cm
d= 21.87 cm
bw=25cm
d=
H-recub.- 1/2''/2=21.87 cm
Se supone que a=hf=
5 cm
Area de acero:Mu/*fy*8d-a/2)
= 0.9
As=
2.38 cm^2
a=
0.56 <
hf=
5 cm
Se trata de una vigueta rectangular de ancho B=1m
TRAMO A: M12=
1743 kg-m
a=0,05d= 1.0933 cm
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
2.162
cm^2
a=As*fy/,85*f'c*b
a=
0.509
cm
Seguir Iterando
APOYO2: M2=
2421 kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
3.149
cm^2
a=As*fy/,85*f'c*b
a=
2.964
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
3.142
cm^2
a=As*fy/,85*f'c*b
a=
2.957
cm
OK
tomamos As=
3.14 cm^2
TOMAMOS:
Area de acero/metro =
3.14 cm^2
Area de acero/vigueta = 1.26 cm^2
DISPOSICIN DE ACERO NEGATIVO
SEGUNDA ITERACION
13/8''
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As=MU*10^2/0,9*fy*(d-a/2)
As=
2.133
cm^2
a=As*fy/,85*f'c*b
a=
0.502
cm
MOMENTOS RESISTENTES
MOMENTOS POSITIVOS:
Tramo1-2:
As=
3.94 cm^2
a=
0.926 cm
Mur=
3184 kg-m
MOMENTOS NEGATIVOS:
Apoyo 1:
As=
0.98 cm^2
a=
0.926 cm
Mur=
795.99 kg-m
13/8''
Asmin=0,0018*b*d
Asmin=
3.9357 cm^2
OK
2426.718
Apoyo2:
As=
3.14 cm^2
a=
2.957 cm
Mur=
2421.1 kg-m
0.555
4.51
166.3
-841.422
-4368.06
15
Vud=
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
ESPECIFICACIONES:
f'c=
210 kg/cm^2
fy=
4200 kg/cm^2
recub.=
2.5 cm
Wcm=
626 kg/m
Wcv=
200 kg/m
Wu=
1216 kg/m
P
1
P=
166.32 Kg
1216.4
0.67
4.51
4.95
ALIGERADO TIPO A2
I) ANALISIS OBTENIDO CON EL METODO DE CROSS.
MOMENTOS POSITIVOS:
TRAMO 12:
M12=
2238.55
kg-m
TRAMO 23:
M23=
2708.64
kg-m
M1=
M2=
M3=
1231.20
3407.01
1489.75
kg-m
kg-m
kg-m
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
3.338
cm^2
a=As*fy/,85*f'c*b
a=
0.785
cm
OK
TOMAMOS:
Area de acero/metro =
3.9 cm^2
Area de acero/vigueta = 1.574 cm^2
MOMENTO NEGATIVO:
APOYO1:
APOYO2:
APOYO3:
DIAGRAMA DE MOMENTOS
1231
0.67
4.51
2238.55
1489.75
4.95
2708.64
0.67 m
25
d=
4.51 m
H=
hf=
H=
13/8''
11/2''
5 cm
21.9 cm
bw=25cm
d=
H-recub.- 1/2''/2=21.87 cm
Se supone que a=hf=
5 cm
Area de acero:Mu/*fy*8d-a/2)
= 0.9
As=
3.06 cm^2
a=
0.72 <
hf=
5 cm
Se trata de una vigueta rectangular de ancho B=1m
TRAMO A: M12=
2239 kg-m
a=0,05d= 1.0933 cm
PRIMERA ITERACION
50cm
bw=25cm
bw=
25
APOYO1: M1=
1231 kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.552
cm^2
a=As*fy/,85*f'c*b
a=
1.460
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.541
cm^2
a=As*fy/,85*f'c*b
a=
1.450
cm
OK
tomamos As=Asmin=
1.54 cm^2
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As=MU*10^2/0,9*fy*(d-a/2)
As=
2.778
cm^2
a=As*fy/,85*f'c*b
a=
0.654
cm
TOMAMOS:
Area de acero/metro =
1.54 cm^2
Area de acero/vigueta = 0.616 cm^2
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
2.750
cm^2
a=As*fy/,85*f'c*b
a=
0.647
cm
Asmin=0,0018*b*d
Asmin=
3.9357 cm^2
OK
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
4.573
cm^2
a=As*fy/,85*f'c*b
a=
4.304
cm
tomamos As=
TOMAMOS:
Area de acero/metro =
Area de acero/vigueta =
Asmin=0,0018*b*d
Asmin=
0.98 cm^2
OK
4.57
cm^2
4.57 cm^2
1.83 cm^2
APOYO2: M2=
1490
kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.879
cm^2
a=As*fy/,85*f'c*b
a=
1.768
cm
13/8''=
0.71 cm^2
11/2''=
1.29 cm^2
11/2''+13/8''=
2.00
a=0,08d=
APOYO2: M2=
3407 kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
4.580
cm^2
a=As*fy/,85*f'c*b
a=
4.311
cm
Seguir Iterando
1.8 cm
1505.040
-3225.489
3398.033
-2623.147
kg
kg
kg
kg
DIAGRAMA DE CORTANTES
1505.040
3398.033
OK
SEGUNDA ITERACION
0.67
4.51
As=MU*10^2/0,9*fy*(d-a/2)
Asmin=0,0018*b*d
166
As=
1.878
cm^2
Asmin=
0.98 cm^2
a=As*fy/,85*f'c*b
-981.308
-3225.49
a=
1.768
cm
Seguir Iterando
Cortante a una distancia "d+b/2" del apoyo.
tomamos As=
1.88
cm^2
Vud=Vn-Wu*d
TOMAMOS:
Area de acero/metro =
1.88 cm^2
13/8''=
0.71 cm^2 Vud= 3130.547 kg
Area de acero/vigueta =
0.75 cm^2
11/2''=
1.29 cm^2
11/2''+13/8''=
2.00 Cortante tomado por el concreto:
DISPOSICIN DE ACERO NEGATIVO
Vc=*0,53*(f'c)^0,5*b*d
Vc= 3568.57 kg
>
Vud=
No
se
necesita
ensanchamiento
de vigueta
11/2''
13/8''
0.67
13/8'''
4.51
11/2''
4.95
MOMENTOS RESISTENTES
MOMENTOS NEGATIVOS:
Apoyo 1:
As=
1.54 cm^2
a=
1.450 cm
Mur=
1231.5 kg-m
Apoyo2:
As=
a=
4.57 cm^2
4.304 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Mur=
3407.6 kg-m
Apoyo3:
As=
a=
Mur=
1.88 cm^2
1.768 cm
1489.8 kg-m
ESPECIFICACIONES:
f'c=
210 kg/cm^2
fy=
4200 kg/cm^2
recub.=
2.5 cm
Wcm=
626 kg/m
Wcv=
200 kg/m
Wu=
1216 kg/m
3
P
P=
166.32 Kg
1216.4
0.88
3.2
ALIGERADO TIPO A1
3.10
I) ANALISIS
MOMENTOS POSITIVOS:
TRAMO 45:
TRAMO 34:
M45=
M34=
1131.99
1062.34
kg-m
kg-m
M5=
M4=
M3=
622.59
1399.78
584.29
kg-m
kg-m
kg-m
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.380
cm^2
a=As*fy/,85*f'c*b
a=
0.325
cm
OK
TOMAMOS:
Area de acero/metro =
3.9 cm^2
Area de acero/vigueta = 1.574 cm^2
MOMENTO NEGATIVO:
APOYO5:
APOYO4:
APOYO3:
DIAGRAMA DE MOMENTOS
584
0.88
3.2
1062.34
622.59
3.10
1131.99
13/8''
11/2''
0.88 m
3.2 m
Mu=
f'c=
H=
bw=
1062 kg-m
210 kg/cm^2
0.25 m
25 cm
B=
100 cm
b=
H=
hf=
H=
25
d= 21.87 cm
bw=25cm
d=
H-recub.- 1/2''/2=21.87 cm
Se supone que a=hf=
5 cm
Area de acero:Mu/*fy*8d-a/2)
=
0.9
5 cm
50cm
bw=25cm
bw=
25
APOYO3: M3=
584 kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.725
cm^2
a=As*fy/,85*f'c*b
a=
0.682
cm
Seguir Iterando
SEGUNDA ITERACION
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As=
1.45 cm^2
a=
0.341 <
hf=
5 cm
Se trata de una vigueta rectangular de ancho B=1m
TRAMO A: M34=
1062 kg-m
a=0,05d= 1.0933 cm
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.318
cm^2
a=As*fy/,85*f'c*b
a=
0.310
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.295
cm^2
a=As*fy/,85*f'c*b
a=
0.305
cm
Asmin=0,0018*b*d
Asmin=
3.9357 cm^2
OK
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.760
cm^2
a=As*fy/,85*f'c*b
a=
1.657
cm
OK
tomamos As=
1.76
cm^2
TOMAMOS:
Area de acero/metro =
1.76 cm^2
Area de acero/vigueta =
0.70 cm^2
Asmin=0,0018*b*d
Asmin=
0.98 cm^2
13/8''=
0.71 cm^2
11/2''=
1.29 cm^2
11/2''+13/8''=
2.00
a=0,05d=
1.1 cm
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.718
cm^2
a=As*fy/,85*f'c*b
a=
0.676
cm
OK
tomamos As=Asmin=
0.98 cm^2
TOMAMOS:
Area de acero/metro =
0.98 cm^2
Area de acero/vigueta = 0.394 cm^2
APOYO4: M4=
1400 kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.755
cm^2
a=As*fy/,85*f'c*b
a=
1.652
cm
Seguir Iterando
APOYO5: M5=
623
kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.773
cm^2
a=As*fy/,85*f'c*b
a=
0.727
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.766
cm^2
a=As*fy/,85*f'c*b
a=
0.721
cm
OK
tomamos As=
0.98
cm^2
TOMAMOS:
Area de acero/metro =
0.98 cm^2
Area de acero/vigueta =
0.39 cm^2
DISPOSICIN DE ACERO NEGATIVO
11/2''
13/8''
13/8'''
0.88
3.2
DIAGRAMA DE CORTANTES
1757.605
0.88
Asmin=0,0018*b*d
Asmin=
0.98 cm^2
2080.140
3.2
166
-1236.752
-2134.87
13/8''=
0.71 cm^2
11/2''=
1.29 cm^2
11/2''+13/8''=
2.00 Cortante tomado por el concreto:
Vc=*0,53*(f'c)^0,5*b*d
Vc= 3568.57 kg
>
Vud=
No se necesita ensanchamiento de vigueta
13/8''
3.10
MOMENTOS RESISTENTES
MOMENTOS NEGATIVOS:
Apoyo 1:
As=
0.98 cm^2
a=
0.926 cm
Mur=
795.99 kg-m
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Apoyo2:
As=
1.76 cm^2
a=
1.657 cm
Mur=
1399.6 kg-m
Apoyo3:
As=
0.98 cm^2
a=
0.926 cm
Mur=
795.99 kg-m
ESPECIFICACIONES:
f'c=
210 kg/cm^2
fy=
4200 kg/cm^2
recub.=
2.5 cm
Wcm=
626 kg/m
Wcv=
200 kg/m
Wu=
1216 kg/m
3
TRAMO B: M45=
779 kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.966
cm^2
a=As*fy/,85*f'c*b
a=
0.227
cm
Seguir Iterando
1216.4
3.1
3.2
ALIGERADO TIPO A1
4.00
I) ANALISIS
MOMENTOS POSITIVOS:
TRAMO 12:
TRAMO 23:
TRAMO 34:
M12=
M23=
M34
1936.26
778.50
1769.31
kg-m
kg-m
kg-m
M1=
M2=
M3=
M4=
584.48
1206.97
1833.48
973.12
kg-m
kg-m
kg-m
kg-m
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.947
cm^2
a=As*fy/,85*f'c*b
a=
0.223
cm
OK
TOMAMOS:
Area de acero/metro =
3.9 cm^2
Area de acero/vigueta = 1.574 cm^2
MOMENTO NEGATIVO:
APOYO1:
APOYO2:
APOYO3:
APOYO4:
DIAGRAMA DE MOMENTOS
584
1206.97
1936.26
778.50
1833.48
973.12
1769.31
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
hf=
H=
25
d= 21.87 cm
5 cm
As=
2.166
cm^2
a=As*fy/,85*f'c*b
a=
0.510
cm
OK
TOMAMOS:
Area de acero/metro =
3.9 cm^2
Area de acero/vigueta = 1.574 cm^2
DISPOSICIN DE ACERO POSITIVO
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
bw=25cm
13/8''
d=
H-recub.- 1/2''/2=21.87 cm
Se supone que a=hf=
5 cm
Area de acero:Mu/*fy*8d-a/2)
= 0.9
As=
2.65 cm^2
a=
0.622 <
hf=
5 cm
Se trata de una vigueta rectangular de ancho B=1m
TRAMO A: M34=
1936 kg-m
a=0,05d= 1.0933 cm
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
2.403
cm^2
a=As*fy/,85*f'c*b
a=
0.565
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
2.373
cm^2
a=As*fy/,85*f'c*b
a=
0.558
cm
Asmin=0,0018*b*d
Asmin=
3.9357 cm^2
OK
SEGUNDA ITERACION
As=
0.718
cm^2
a=As*fy/,85*f'c*b
a=
0.676
cm
OK
tomamos As=Asmin=
0.98 cm^2
TOMAMOS:
Area de acero/metro =
0.98 cm^2
Area de acero/vigueta =
0.39 cm^2
Asmi 0.983925
3.1 m
3.2 m
H=
50cm
bw=25cm
bw=
25
APOYO3: M3=
584 kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.729
cm^2
a=As*fy/,85*f'c*b
a=
0.686
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
DISPOSICIN DE ACERO NEGATIVO
13/8''
13/8''=
11/2''=
13/8''
11/2''
0.71 cm^2
1.29 cm^2
13/8''
3.1
3.2
APOYO4: M4=
1207 kg-m
a=0,10d=
1.5 cm
MOMENTOS RESISTENTES
PRIMERA ITERACION
MOMENTOS NEGATIVOS:
As=MU*10^2/0,9*fy*(d-a/2)
Apoyo 1:
As=
1.513
cm^2
As= 0.98
cm^2
a=As*fy/,85*f'c*b
a=
0.926
cm
a=
1.424
cm
Seguir Iterando
Mur= 796
kg-m
As=MU*10^2/0,9*fy*(d-a/2)
Asmin=0,0018*b*d
As=
1.510
cm^2
Asmin=
0.98 cm^2 Apoyo2:
a=As*fy/,85*f'c*b
As= 1.51
cm^2
a=
1.421
cm
OK
a=
1.421
cm
tomamos As=
1.51
cm^2
Mur= 1207
kg-m
TOMAMOS:
Area de acero/metro =
1.51 cm^2
13/8''=
0.71 cm^2 Apoyo3:
Area de acero/vigueta =
0.60 cm^2
11/2''=
1.29 cm^2 As= 2.34
cm^2
11/2''+13/8''=
2.00 a=
2.198
cm
APOYO5: M5=
1833
kg-m
a=0,10d=
2.2 cm
Mur= 1833
kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
2.335
cm^2
a=As*fy/,85*f'c*b
3.-VERIFICACIN POR CORTANTE
a=
2.198
cm
Seguir Iterando
FORMULA DE CORTANTE: Vi=Wui*Li/2+(Mi+Mj)
CLCULO DE CORTANTES:
SEGUNDA ITERACION
Vn1=
1752.81 kg
As=MU*10^2/0,9*fy*(d-a/2)
Asmin=0,0018*b*d
V'n2=
-2018.03 kg
As=
2.336
cm^2
Asmin=
0.98 cm^2 V''n2=
1750.496 kg
a=As*fy/,85*f'c*b
V'n3=
-2141.984 kg
a=
2.198
cm
OK
V''n3=
2647.857 kg
Vn4=
-2217.743 kg
tomamos As=
2.34
cm^2
TOMAMOS:
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Area de acero/metro =
Area de acero/vigueta =
2.34 cm^2
0.93 cm^2
13/8''=
0.71 cm^2
11/2''=
1.29 cm^2
11/2''+13/8''=
2.00
a=0,06d=
1.3 cm
APOYO5: M5=
973
kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.214
cm^2
a=As*fy/,85*f'c*b
a=
1.142
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.209
cm^2
a=As*fy/,85*f'c*b
a=
1.138
cm
OK
tomamos As=
1.21
cm^2
TOMAMOS:
Area de acero/metro =
1.21 cm^2
Area de acero/vigueta =
0.48 cm^2
2647.857
B=
-2018.027
-2141.98
11/2''
1216
5.95
ALIGERADO TIPO A7
5.95 23/8''
m
I) ANALISIS
MOMENTOS POSITIVOS:
TRAMO 1-2:
M+= Wu*l^2/8
M+= 5383 kg-m
H=
50cm
bw=25cm
MOMENTO NEGATIVO:
APOYO2:
M-= Wu*l^2/20
M-=
2153 kg-m
APOYO3:
M-= Wu*l^2/20
M-=
2153 kg-3
DIAGRAMA DE MOMENTOS
2153.2
1750.496
1752.8
0.00
Asmin=0,0018*b*d
Asmin=
0.98 cm^2
ESPECIFICACIONES:
f'c=
210 kg/cm^2
fy=
4200 kg/cm^2
recub.=
2.5 cm
Wcm=
626 kg/m^2
Wcv=
200 kg/m^2
Wu=
1216.4 kg/m^2
2
DIAGRAMA DE CORTANTES
2153.18
5.95
5383
bw=
25
APOYO2: M2=
2153 kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
2.771
cm^2
a=As*fy/,85*f'c*b
a=
2.608
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
2.770
cm^2
a=As*fy/,85*f'c*b
a=
2.607
cm
OK
tomamos As=Asmin=
2.77 cm^2
TOMAMOS:
Area de acero/metro =
2.77 cm^2
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
H=
bw=
0.25 m
25 cm
B=
100 cm
hf=
H=
25
5 cm
d= 21.87 cm
bw=25cm
d=
H-recub.- 1/2''/2=21.87 cm
Se supone que a=hf=
5 cm
Area de acero:Mu/*fy*8d-a/2)
=
0.9
As=
7.35 cm^2
a=
1.73 <
hf=
5 cm
Se trata de una vigueta rectangular de ancho B=1m
TRAMO 12: M12=
5383 kg-m
a=0,08d= 1.7492 cm
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
6.784
cm^2
a=As*fy/,85*f'c*b
a=
1.596
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
6.760
cm^2
a=As*fy/,85*f'c*b
a=
1.591
cm
APOYO2: M2=
2153 kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
2.771
cm^2
a=As*fy/,85*f'c*b
a=
2.608
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
2.770
cm^2
a=As*fy/,85*f'c*b
a=
2.607
cm
OK
tomamos As=Asmin=
2.77 cm^2
TOMAMOS:
Area de acero/metro =
2.77 cm^2
Area de acero/vigueta = 1.11 cm^2
DISPOSICIN DE ACERO NEGATIVO
11/2''
Asmin=0,0018*b*d
Asmin=
3.9357 cm^2
OK
MOMENTOS RESISTENTES
MOMENTOS NEGATIVOS:
Apoyo 1:
As=
2.77 cm^2
a=
2.607 cm
Mur=
2153.2 kg-m
Apoyo2:
As=
2.77 cm^2
a=
2.607 cm
Mur=
2153.2 kg-m
5.95
-3618.8
5.95
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Cortante a una distancia "d+b/2" del apoyo.
Vud=Vn-Wu*(d+b/2)
Vud=
3351.304
kg
Cortante tomado por el concreto:
Vc=*0,53*(f'c)^0,5*b*d
Vc=
3568.57
kg
<
Vud=
No se necesita ensanchamiento de vigueta
3351.304
ESPECIFICACIONES:
f'c=
210 kg/cm^2
fy=
4200 kg/cm^2
recub.=
2.5 cm
Wcm=
626 kg/m
Wcv=
200 kg/m
Wu=
1216 kg/m
P
4
P=
166.32 Kg
1216.4
1.44
kg
3.2
ALIGERADO TIPO A1
As=
2.195
cm^2
a=As*fy/,85*f'c*b
a=
0.516
cm
4.00
I) ANALISIS
MOMENTOS POSITIVOS:
TRAMO 45:
TRAMO 56:
M45=
M56=
1131.99
1768.73
kg-m
kg-m
M4=
M5=
M6=
1295.45
1867.29
972.80
kg-m
kg-m
kg-m
MOMENTO NEGATIVO:
APOYO4:
APOYO5:
APOYO6:
DIAGRAMA DE MOMENTOS
1295
0.555
4.51
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
2.166
cm^2
a=As*fy/,85*f'c*b
a=
0.510
cm
OK
TOMAMOS:
Area de acero/metro =
3.9 cm^2
Area de acero/vigueta = 1.574 cm^2
DISPOSICIN DE ACERO POSITIVO
1867.29
972.80
1.995
11/2''
13/8''
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
1131.99
1768.73
1.44 m
H=
hf=
H=
25
5 cm
d= 21.87 cm
bw=25cm
d=
H-recub.- 1/2''/2=21.87 cm
Se supone que a=hf=
5 cm
Area de acero:Mu/*fy*8d-a/2)
= 0.9
As=
1.55 cm^2
a=
0.364 <
hf=
5 cm
Se trata de una vigueta rectangular de ancho B=1m
TRAMO A: M34=
1132 kg-m
a=0,05d= 1.0933 cm
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.405
cm^2
a=As*fy/,85*f'c*b
a=
0.331
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.380
cm^2
a=As*fy/,85*f'c*b
a=
0.325
cm
Asmin=0,0018*b*d
Asmin=
3.9357 cm^2
OK
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
2.381
cm^2
a=As*fy/,85*f'c*b
a=
2.241
cm
OK
tomamos As=
2.38
cm^2
TOMAMOS:
Area de acero/metro =
2.38 cm^2
Area de acero/vigueta =
0.95 cm^2
Asmin=0,0018*b*d
Asmin=
0.98 cm^2
13/8''=
0.71 cm^2
11/2''=
1.29 cm^2
11/2''+13/8''=
2.00
a=0,05d=
1.1 cm
50cm
bw=25cm
0.56
1661.675
4.51
166
-841.422
0.71 cm^2
25
APOYO4: M4=
1867 kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
2.378
cm^2
a=As*fy/,85*f'c*b
a=
2.238
cm
Seguir Iterando
2616.269
Asmin=0,0018*b*d
Asmin=
0.98 cm^2
13/8''=
bw=
APOYO3: M3=
1295 kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.633
cm^2
a=As*fy/,85*f'c*b
a=
1.537
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.624
cm^2
a=As*fy/,85*f'c*b
a=
1.529
cm
OK
tomamos As=Asmin=
1.62 cm^2
TOMAMOS:
Area de acero/metro =
1.62 cm^2
Area de acero/vigueta = 0.65 cm^2
APOYO5: M5=
973
kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.207
cm^2
a=As*fy/,85*f'c*b
a=
1.136
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.208
cm^2
a=As*fy/,85*f'c*b
a=
1.137
cm
OK
tomamos As=
1.21
cm^2
TOMAMOS:
Area de acero/metro =
1.21 cm^2
3.2 m
-2869.70
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Area de acero/vigueta =
0.48 cm^2
11/2''=
1.29 cm^2
11/2''+13/8''=
2.00 Cortante tomado por el concreto:
Vc=*0,53*(f'c)^0,5*b*d
Vc= 3568.57 kg
>
Vud=
No se necesita ensanchamiento de vigueta
13/8''
1.44
13/8''
3.2
4.00
MOMENTOS RESISTENTES
MOMENTOS NEGATIVOS:
Apoyo 1:
As=
1.62 cm^2
a=
1.529 cm
Mur=
1295.7 kg-m
Apoyo2:
As=
2.38 cm^2
a=
2.241 cm
Mur=
1867.2 kg-m
Apoyo3:
As=
1.21 cm^2
a=
1.137 cm
Mur=
972.77 kg-m
ESPECIFICACIONES:
f'c=
210 kg/cm^2
fy=
4200 kg/cm^2
recub.=
2.5 cm
Wcm=
626 kg/m^2
Wcv=
200 kg/m^2
Wu=
1216.4 kg/m^2
2
P=
1216
4.63
ALIGERADO TIPO A7
166.32 Kg
0.67
I) ANALISIS
MOMENTOS POSITIVOS:
TRAMO 1-2:
M+= Wu*l^2/8-((Wu*a^2/2+P*a)/2)=
M+= 3067 kg-m
11/2''
M-=
M-=
384 kg-m
Wu*l^2/2
H=
50cm
bw=25cm
MOMENTO NEGATIVO:
APOYO1:
M-= P*a+Wu*a^2/2
APOYO2:
13/8''
4.63
bw=
APOYO2: M2=
1086 kg-m
PRIMERA ITERACION
25
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.348
cm^2
a=As*fy/,85*f'c*b
a=
1.269
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
1.354
cm^2
a=As*fy/,85*f'c*b
a=
1.274
cm
OK
tomamos As=Asmin=
1.35 cm^2
TOMAMOS:
Area de acero/metro =
1.35 cm^2
Area de acero/vigueta = 0.542 cm^2
M-=
1086 kg-3
DIAGRAMA DE MOMENTOS
1086.5
384.4554
0.555
4.63
3067
0.67
H=
25
5 cm
d= 21.87 cm
bw=25cm
d=
H-recub.- 1/2''/2=21.87 cm
Se supone que a=hf=
5 cm
Area de acero:Mu/*fy*8d-a/2)
=
0.9
As=
4.19 cm^2
a=
0.986 <
hf=
5 cm
Se trata de una vigueta rectangular de ancho B=1m
TRAMO 12: M12=
3067 kg-m
a=0,05d= 1.0933 cm
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
3.806
cm^2
a=As*fy/,85*f'c*b
a=
0.896
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
Asmin=0,0018*b*d
As=
3.789
cm^2
a=As*fy/,85*f'c*b
a=
0.891
cm
MOMENTOS RESISTENTES
MOMENTOS NEGATIVOS:
Apoyo 1:
As=
1.35 cm^2
a=
1.274 cm
Mur=
1086.4 kg-m
Asmin=
APOYO2: M2=
384 kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.480
cm^2
a=As*fy/,85*f'c*b
a=
0.451
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.470
cm^2
a=As*fy/,85*f'c*b
a=
0.442
cm
OK
tomamos As=Asmin=
0.98 cm^2
TOMAMOS:
Area de acero/metro =
0.98 cm^2
Area de acero/vigueta = 0.39 cm^2
DISPOSICIN DE ACERO NEGATIVO
3.9357 cm^2
OK
Apoyo2:
As=
0.98 cm^2
a=
0.926 cm
Mur=
795.99 kg-m
3.-VERIFICACIN POR CORTANTE
FORMULA DE CORTANTE: Vi=Wui*Li/2+(Mi+Mj)/Li
CLCULO DE CORTANTES:
Vn1=
2878.68
kg
V'n2=
-2753.25
kg
V''n2=
814.988
kg
DIAGRAMA DE CORTANTES
2878.68
814.988
13/8''
4.63
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
4.63
-2753.3
Cortante a una distancia "d-b/2" del apoyo.
Vud=Vn-Wu*(d-b/2)
Vud=
2614.235
kg
Cortante tomado por el concreto:
Vc=*0,53*(f'c)^0,5*b*d
Vc=
3568.57
kg
<
Vud=
No se necesita ensanchamiento de vigueta
2614.235
kg
ESPECIFICACIONES:
f'c=
210 kg/cm^2
fy=
4200 kg/cm^2
recub.=
2.5 cm
Wcm=
626 kg/m^2
Wcv=
200 kg/m^2
Wu=
1216.4 kg/m^2
1'
1216
P=
1.16
ALIGERADO TIPO A8
166.32 Kg
0.67
I) ANALISIS
MOMENTOS POSITIVOS:
TRAMO 1-2:
M+= Wu*l^2/8-((Wu*a^2/2+P*a)/2)=
M+= 12.37 kg-m
11/2''
13/8''
1.16
H=
50cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
bw=25cm
MOMENTO NEGATIVO:
APOYO1:
M-= P*a+Wu*a^2/2
M-=
384 kg-m
APOYO2:
M-= Wu*l^2/2
M-=
68.2 kg-3
DIAGRAMA DE MOMENTOS
68.199
4.63
12.37
0.67
H=
25
5 cm
d= 21.87 cm
bw=25cm
d=
H-recub.- 1/2''/2=21.87 cm
Se supone que a=hf=
5 cm
Area de acero:Mu/*fy*8d-a/2)
=
0.9
As=
0.02 cm^2
a=
0.004 <
hf=
5 cm
Se trata de una vigueta rectangular de ancho B=1m
TRAMO 12: M12=
12 kg-m
a=0,05d= 1.0933 cm
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.015
cm^2
a=As*fy/,85*f'c*b
a=
0.004
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.015
cm^2
a=As*fy/,85*f'c*b
a=
0.004
cm
MOMENTOS RESISTENTES
MOMENTOS NEGATIVOS:
Apoyo 1:
As=
0.98 cm^2
a=
0.926 cm
Mur=
795.99 kg-m
25
APOYO2: M2=
68 kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.085
cm^2
a=As*fy/,85*f'c*b
a=
0.080
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.083
cm^2
a=As*fy/,85*f'c*b
a=
0.078
cm
OK
tomamos As=Asmin=
0.98 cm^2
TOMAMOS:
Area de acero/metro =
0.98 cm^2
Area de acero/vigueta = 0.394 cm^2
384.4554
0.555
bw=
APOYO2: M2=
384 kg-m
PRIMERA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.480
cm^2
a=As*fy/,85*f'c*b
a=
0.451
cm
Seguir Iterando
SEGUNDA ITERACION
As=MU*10^2/0,9*fy*(d-a/2)
As=
0.470
cm^2
a=As*fy/,85*f'c*b
a=
0.442
cm
OK
tomamos As=Asmin=
0.98 cm^2
TOMAMOS:
Area de acero/metro =
0.98 cm^2
Area de acero/vigueta = 0.39 cm^2
DISPOSICIN DE ACERO NEGATIVO
13/8''
Asmin=0,0018*b*d
Asmin=
3.9357 cm^2
OK
Apoyo2:
As=
0.98 cm^2
a=
0.926 cm
Mur=
795.99 kg-m
1.16
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
CLCULO
Vn1=
V'n2=
V''n2=
DE CORTANTES:
2815.97
kg
-2815.97
kg
814.988
kg
DIAGRAMA DE CORTANTES
2815.97
814.988
12.37
-2816.0
Cortante a una distancia "d-b/2" del apoyo.
Vud=Vn-Wu*(d-b/2)
Vud=
2551.521
kg
Cortante tomado por el concreto:
Vc=*0,53*(f'c)^0,5*b*d
Vc=
3568.57
kg
<
Vud=
No se necesita ensanchamiento de vigueta
2551.521
kg
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
R 5 NIVELES
POR METRO CUADRADO
200 Kg/m
o (0.25cm)
350 Kg/m
0.050 m
0.150 m
220 Kg/m
226 Kg/m
100 Kg/m
300 Kg/m
100 Kg/m
226 Kg/m
626 Kg/m
876 Kg/m
200 Kg/m
200 Kg/m
340 Kg/m
1216 Kg/m
0.150 m
0.800 m
0.550 m
166.32 Kg
876 Kg/m
340 Kg/m
1216 Kg/m
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
23/8''=
1.42 cm^2
11/2''+13/8= 2.0 cm^2
2.00 m
100
hf=
d=
21.87 cm
cm
a=0,05d=
1.1 cm
Seguir Iterando
Asmin=0,0018*b*d
Asmin 0.983925
13/8''=
11/2''=
a=0,14d=
0.71 cm^2
1.29 cm^2
3.1 cm
Seguir Iterando
Asmin=0,0018*b*d
Asmin=
0.98 cm^2
13/8''=
11/2''=
0.71 cm^2
1.29 cm^2
11/2''
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
11/2''
i=Wui*Li/2+(Mi+Mj)/Li
CORTANTES
2426.718
2.0
-4368.06
4100.576
kg
4102.096
kg
to de vigueta
cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
23/8''=
1.42 cm^2
11/2''+13/8= 2.0 cm^2
a=0,05d=
1.093 cm
Seguir Iterando
Asmin=0,0018*b*d
Asmin
3.9357
cm^2
23/8''=
1.42 cm^2
11/2''+13/8= 2.0 cm^2
13/8''
4.95 m
100
hf=
d=
21.87 cm
cm
a=0,08d=
1.7 cm
Seguir Iterando
Asmin=0,0018*b*d
Asmin 0.983925
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
13/8''=
11/2''=
0.71 cm^2
1.29 cm^2
a=0,20d=
4.4 cm
Seguir Iterando
i=Wui*Li/2+(Mi+Mj)/Li
CORTANTES
3398.033
5.0
-3225.49
-2623.15
3130.547
ento de vigueta
kg
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
23/8''=
1.42 cm^2
11/2''+13/8= 2.0 cm^2
a=0,05d=
1.093 cm
Seguir Iterando
Asmin=0,0018*b*d
Asmin
3.9357
cm^2
23/8''=
1.42 cm^2
11/2''+13/8= 2.0 cm^2
13/8''
3.10 m
100
hf=
d=
21.87 cm
cm
a=0,05d=
1.1 cm
Seguir Iterando
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Asmin=0,0018*b*d
Asmin 0.983925
13/8''=
11/2''=
0.71 cm^2
1.29 cm^2
a=0,07d=
1.5 cm
Seguir Iterando
i=Wui*Li/2+(Mi+Mj)/Li
CORTANTES
2080.140
3.1
-2134.87
-1690.70
1867.388
ento de vigueta
kg
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
23/8''=
1.42 cm^2
11/2''+13/8= 2.0 cm^2
a=0,05d=
1.093 cm
Seguir Iterando
Asmin=0,0018*b*d
Asmin
3.9357
cm^2
23/8''=
1.42 cm^2
11/2''+13/8= 2.0 cm^2
a=0,05d=
1.093 cm
Seguir Iterando
Asmin=0,0018*b*d
Asmin
3.9357
cm^2
23/8''=
1.42 cm^2
11/2''+13/8= 2.0 cm^2
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
13/8''
4.00 m
100
hf=
d=
21.87 cm
cm
a=0,06d=
1.3 cm
Seguir Iterando
Asmin=0,0018*b*d
RO NEGATIVO
13/8''
11/2''
4.00
Apoyo3:
As=
1.21
a=
1.138
Mur= 973.2
cm^2
cm
kg-m
i=Wui*Li/2+(Mi+Mj)/Li
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
CORTANTES
2647.857
0.0
-2141.98
-2217.74
2380.371
ento de vigueta
kg
23/8''=
1.42 cm^2
11/2''+13/8=2.00 cm^2
11/2''+23/8=2.71 cm^3
0.00 m
100
hf=
d=
21.87 cm
cm
a=0,12d=
2.6 cm
Seguir Iterando
Asmin=0,0018*b*d
Asmin 0.983925
13/8''=
0.71 cm^2
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
11/2''=
a=0,12d=
1.29 cm^2
2.6 cm
Seguir Iterando
Asmin=0,0018*b*d
Asmin=
0.98 cm^2
13/8''=
11/2''=
0.71 cm^2
1.29 cm^2
11/2''
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
23/8''=
1.42 cm^2
11/2''+13/8= 2.0 cm^2
a=0,05d=
1.093 cm
Seguir Iterando
Asmin=0,0018*b*d
Asmin
3.9357
cm^2
23/8''=
1.42 cm^2
11/2''+13/8= 2.0 cm^2
13/8''
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
4.00 m
100
hf=
d=
21.87 cm
cm
a=0,08d=
1.7 cm
Seguir Iterando
Asmin=0,0018*b*d
Asmin 0.983925
13/8''=
11/2''=
a=0,10d=
0.71 cm^2
1.29 cm^2
2.2 cm
Seguir Iterando
i=Wui*Li/2+(Mi+Mj)/Li
CORTANTES
1661.675
1.995
-2869.70
-765.04
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
2602.209
ento de vigueta
kg
23/8''=
1.42 cm^2
11/2''+13/8=2.00 cm^2
0.67 m
100
hf=
d=
21.87 cm
cm
a=0,05d=
1.1 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
Seguir Iterando
Asmin=0,0018*b*d
Asmin 0.983925
13/8''=
11/2''=
a=0,06d=
0.71 cm^2
1.29 cm^2
1.3 cm
Seguir Iterando
Asmin=0,0018*b*d
Asmin=
0.98 cm^2
13/8''=
11/2''=
0.71 cm^2
1.29 cm^2
13/8''
0.67
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
23/8''=
1.42 cm^2
11/2''+13/8=2.00 cm^2
0.67 m
100
hf=
d=
21.87 cm
EDIFICACION DE 5 PISOS
CONCRETO ARMADO I
cm
a=0,05d=
1.1 cm
Seguir Iterando
Asmin=0,0018*b*d
Asmin 0.983925
13/8''=
11/2''=
a=0,06d=
0.71 cm^2
1.29 cm^2
1.3 cm
Seguir Iterando
Asmin=0,0018*b*d
Asmin=
0.98 cm^2
13/8''=
11/2''=
0.71 cm^2
1.29 cm^2
13/8''
0.67
EDIFICACION DE 5 PISOS