Está en la página 1de 1

LA COLUMNA 2 SE EXCAVA 1.

20 M DE PROFUNDIDAD
ZAPATA1 COLUMNA2

2.80*1.70= 4.76M2*2UND.(S`1`-S`2)

=9.52M2
TOTAL AREA =

9.52M2

LA COLUMNA 1 SE EXCAVA =1.00M DE PROFUNDIDAD


ZAPATA 4 COLUMNA 1 2.00*2.00= 4 M2 * 3UND. (S1-S2-R`1)=12M2
ZAPATA3

COLUMNA 1

3.00*2.00= 6 M2 *2UND. (S1`-S2)

=12M2

ZAPATA1 COLUMNA1

2.80*1.70= 4.76M2* 1UND.(S`-2)

=4.76M2

ZAPATA2

COLUMNA1

1.50*2.00= 3M2* 3UND.(R`2-R`2-R`1`)= 9M2

ZAPATA5

COLUMNA1

2.50*1.80= 4.50M2*1UND.(S`-1)

=4.50M2
TOTAL AREA =

42.26M2

DEMOLICION EN CONCRETO ZAPATAS


ZAPATA1 COLUMNA2

2.80*1.70= 4.76M3*2UND.(S`1`-S`2)

9.52M2*0.30=2.86M3
42.26M2 * 0.30 =12.68M3
TOTAL DEMOLICON EN CONCRETO = 15.54M3

EXCAVACIN MANUAL ZAPATAS


9.52M2 * 1.00 M =9.52M3
42.26M2 * 0.80 M = 33.81M3
TOTAL EXCAVACIN MANUAL = 43 33M3

=9.52M2