Capitulo V Estimaciones y Finiquito de Obra
Capitulo V Estimaciones y Finiquito de Obra
estimaciones y finiquito
de obra.
ESTIMACIN
OBRA: E.P. LAZARO CARDENAS.
FECHA: 15/MAR/2007
No. DE OBRA:
06120365A
HOJA:
_1_DE __2_
PERIODO:15/02/07 al 15/03/07
VOLUMEN
CLAVE
A01
CONCEPTO
U. M.
P.U.
PRESUPUESTO
ESTIM.
ANTERIOR
ESTA
ESTIM.
ACUMULADO
EXCEDENTE
0.00
IMPORTE
ESTIMADO
P1.1
TRABAJOS PREELIMINARES
LIMPIA, TRAZO Y NIVELACION DEL TERRENO
M2
12.02
272.5125
0.00
272.5125
272.5125
P1.2
M2
249.05
136.25625
0.00
136.2562
136.2562
0.00
C2.1
EXCAVACION
M3
69.53
68.955
0.00
68.955
0.00
C2.2
PLANTILLA DE CONCRETO
M2
67.72
60.175
0.00
60.175
0.00
C2.3
ZAPATA AISLADA
1295.13
22.00
0.00
22.00
22.00
0.00
$ 28,492.93
C2.4
MURETE DE ENRACE
ML
279.76
67.25
0.00
67.25
67.25
0.00
$ 18,814.12
C2.5
90.20
50.40
0.00
50.40
50.40
0.00
$ 4546.21
AL3.2.1 FIRME
M2
329.32
247.00
0.00
247.00
247.00
0.00
$ 81,342.22
AL3.1.1
M2
279.76
0.00
168.13
168.13
0.00
$ 47,035.31
$226,310.98
DUCTO DE EXCAVACION
MUROS DE BLOCK
PZA
168.13
68.955
60.175
$ 3,275.51
$ 33,935.22
$
4,794.26
$4,075.2
SUB TOTAL
ESTIMACIN
FECHA: 15/MAR/2007
No. DE OBRA:
06120365A
HOJA:
_2_DE __2_
PERIODO:15/02/07 al 15/03/07
VOLUMEN
CLAVE
CONCEPTO
U. M.
P.U.
PRESUPUESTO
ESTIM.
ANTERIOR
ESTA ESTIM.
51.507
ACUMULADO
EXCEDENTE
IMPORTE
ESTIMADO
51.507
0.00
$8,889.
39
AL3.1.2
MUROS DE LADRILLO
M2
172.59
51.507
0.00
AL3.3.1
TRAVES DE LIGA
ML
239.36
96.75
0.00
96.75
96.75
0.00
$23,157.69
AL3.3.2
CONTRATRAVES
ML 4
239.36
83.05
0.00
83.05
83.05
0.00
$ 19,878.51
ML
467.34
96.80
0.00
41.48
41.48
0.00
$ 19,385.26
SUBTOTAL
$ 97,163.96
AL3.4
COLUMNAS
TOTAL DE ESTIMACION
$ 297621.83
Tabla V.1.6 resumen de la estimacin nmero uno de la escuela primaria LAZARO CARDENAS
COMIT ADMINISTRADOR DEL PROGRAMA ESTATAL DE CONSTRUCCIN DE ESCUELAS
RESUMEN DE LA ESTIMACIN
CLAVE
PARTIDA
EDIFICIO
EDIFICIO
EDIFICIO "A"
SUBTOTAL
$ 47,105.57
$ 47,105.57
HOJA:
_1_DE_1
TOTAL
A01
TRABAJOS
PREELIMINARES
A02
ESTRUCTURA
A03
ALBAILERIA Y
ACABADOS
$ 40,675.56
$ 40,675.56
A04
A05
HERRERIA
INSTALACIONES
A07
MONTAJE
T01
PLAZA Y ANDADORES
T02
RED ELECTRICA
SUB-TOTALES
$-
$ 87,781.13
30%
0%
$40,675.56
-
$ 87,781.13
$ 47,105.57
IMPORTE DE LA PRESENTE
ESTIMACION No.1 (UNO)
$
SUBT
OTAL
OBRA EXTERIOR
FECHA: 15/MAR/2007
No. DE OBRA:
06120365
AVANCE FINANCIERO EN EL
PERIODO %
AVANCE FINANCIERO
ANTERIOR (%)
$ -
$ -
$ 87,781.13
SUBTOTAL
15 % (IVA)
TOTAL
29.73 %
0.00%
$ 87,781.13
$ 13,167.17
$ 100,948.30
AVANCE FINANCIERO
GANERAL %
30%
29.73%
FECHA: 15/MAR/2007
No. DE OBRA:
ESTA ESTIMACION
LIQUIDACION:
IMPORTE DE ESTA
ESTIMACION
87,781.13
ACUMULADO ANTERIOR
0.00
I.V..A.
13,167.17
ACUMULADO TOTAL
100,948.30
SEGN CONTRATO
339,569.09
238,620.79
71,586.24
TOTAL
ESTA ESTIMACION $
100,948.30
SALDO POR
AMORTIZAR
DEDUCCIONES:
AMORTIZACION ANTICIPO
30,284.49
438.91
CMIC-CAPAC. 2 AL MILLAR
0.00
TOTAL
DEDUCCIONES
LIQUIDO A PAGAR
100,948.30
AVANCE FISICO:
AVANCE EN EL PERIODO %
30.00%
AVANCE ANTERIOR %
0.00%
30.00%
30,723.40
70,224.90
AVANCE
FINANCIERO:
AVANCE EN EL PERIODO %
29.73%
AVANCE ANTERIOR
0.00%
29.73%
ESTADO DE CUENTA
OBRA: E.P. LAZARO CARDENAS.
LOCALIDAD/MPIO: ATLIACA
IMPORTE DEL CONTRATO C/ IVA:
ESTIM. No.
1(UNO)
15 DE FEFRERO AL
15 DE MARZO DE
2007
TOTAL:
/ TIXTLA GUERRERO.
$339,569.09
PERIODO
ESTIMACION
FECHA: 15/MAR/2007
No. DE OBRA:
$101,870.73
IMPORTE
ESTIMACION
I.V.A.
2 AL MILLAR
C.M.I.C.
87,781.13
13,167.17
0.00
$ 87,781.13
$ 13,167.17
5 AL
MILLAR
INSP.
OBRAS
438.91
$ 438.91
AMORTIZACION
ANTICIPO
FECHA:
2007
06-FEB.-
TOTAL DEDUCCIONES
LIQUIDO A PAGAR
30,723.40
70,224.90
30,284.49
$ 30,284.49
30,723.40
70,224.90
SALDO:
$238,620.79
$71,586.24
ESTIMACIN
OBRA: E.P. LAZARO CARDENAS.
No. DE OBRA:
06120365A
HOJA:
_1_DE __1_
PERIODO:16-03-07/27-04-07
VOLUMEN
CLAVE
CONCEPTO
A
AL3.3.3
AL3.4
AL3.6.2
U. M.
P.U.
EDIFICIO "I"
VIGAS LATERALES
ML
COLUMNAS
LOSA
TOTAL DE ESTIMACION
IMPORTE
ESTIMADO
PRESUPUESTO
ESTIM.
ANTERIOR
ESTA
ESTIM.
239.36
142.05
0.00
142.05
142.05
0.00
$34,000.51
ML
467.34
96.8
41.48
55.31
96.79
0.00
$25,848.57
M2
650.80
331.17
0.00
272.03
272.03
0.00
$177,037.12
ACUMULADO EXCEDENTE
$236,886.20
CLAVE
PARTIDA
EDIFICIO
EDIFICIO
EDIFICIO "A"
SUBTOTAL
OBRA
EXTERIOR
FECHA:27-04-07
NO. DE OBRA:06120365A
HOJA: _1_DE_1_
SUBTOTAL
TOTAL
A01
TRABAJOS
PREELIMINARES
A02
ESTRUCTURA
$ 39.143,67
$ 39.143,67
$ 39.143,67
A03
ALBAILERIA Y
ACABADOS
$ 8.458,13
$ 8.458,13
$ 8.458,13
A04
HERRERIA
A05
INSTALACIONES
$ 3.749,60
$ 3.749,60
$ 3.749,60
A07
MONTAJE
T01
PLAZA Y ANDADORES
T02
RED ELECTRICA
SUB-TOTALES
$ -
$ 51.351,40
$ 51.351,40
$ 29.211,78
$ 29.211,78
$ 29.211,78
$ 29.211,78
SUBTOTAL
15 % (IVA)
TOTAL
40%
27,28%
30%
70%
29,73%
57,01%
$ 29.211,78
$ 80.563,18
$
$
$
80.563,18
12.084,48
92.647,66
ESTA ESTIMACION
LIQUIDACION:
IMPORTE DE ESTA
ESTIMACION
80.563,18
I.V.A.
TOTAL
FECHA:
06 DE
FEBRERO DE 2007
92.647,66
ACUMULADO ANTERIOR
100.948,30
12.084,48
ACUMULADO TOTAL
193.595,96
339.569,09
92.647,66
SEGN CONTRATO
SALDO POR
EJERCER
145.973,13
43.791,94
SALDO POR
AMORTIZAR
AMORTIZACION ANTICIPO
INSP. DE OBRAS 5 AL
MILLAR
27.794,30
402,82
CMIC-CAPAC. 2 AL MILLAR
0,00
LIQUIDO A PAGAR
ESTA ESTIMACION
DEDUCCIONES:
TOTAL
DEDUCCIONES
FECHA: 27-04-07
No. DE
OBRA:06120365A
AVANCE FISICO:
AVANCE EN EL PERIODO %
40,00%
AVANCE ANTERIOR %
30,00%
70,00%
28.197,12
64.450,54
AVANCE FINANCIERO:
AVANCE EN EL PERIODO %
27,28%
AVANCE ANTERIOR
29,73%
57,01%
ESTIM.
No.
1(UNO)
PERIODO
ESTIMACION
IMPORTE
ESTIMACION
I.V.A.
2 AL MILLAR
C.M.I.C.
5 AL MILLAR
INSP. OBRAS
87.781,13
13.167,17
0,00
438,91
80.563,18
12.084,48
0,00
402,82
$ 168.344,31
$ 25.251,65
$ -
AMORTIZACION
ANTICIPO
FECHA:
06-FEB.-2007
TOTAL DEDUCCIONES
LIQUIDO A PAGAR
30.284,49
30.723,40
70.224,90
27.794,30
28.197,12
64.450,54
$ 58.920,52
$ 134.675,44
15 DE FEFRERO AL
15 DE MARZO
2(DOS)
FECHA: 27-04-07
No. DE OBRA:
16 DE MARZO AL
27 DE ABRIL DE 2007
TOTAL:
SALDO:
$ 150.536,87
$ 841,73
$ 58.078,79
-$ 43.791,94
ESTIMACION No. 3
(TRES)
ESTIMACIN
OBRA: E.P. LAZARO CARDENAS.
FECHA: 30/04/2007
No. DE OBRA:
06120365
HOJA:
_1_DE __1_
PERIODO:28/04/07 al 30/04/07
VOLUMEN
CLAVE
AL3.6.2
I.E7
CONCEPTO
LOSA
INSTALACION ELECTRICA
U.M.
P.U.
M2
IMPORTE
ESTIMADO
ESTA
ESTIM.
ACUMULADO
EXCEDENTE
272.03
59.13
331.17
0.00
$38,481.80
0.00
0.00
$73,988.50
PRESUPUESTO
ESTIM.
ANTERIOR
650.80
331.17
LOTE
73,988.50
Ac8.2.1
M2
168.83
168.13
0.00
168.13
168.13
Ac8.3.1
M2
133.19
269.00
0.00
269.00
269.00
0.00
$35,828.74
Ac8.3.2
M2
134.23
51.50
0.00
51.50
51.50
0.00
$6,913.80
Ac8.4.1
M2
134.62
67.25
0.00
67.25
67.25
0.00
$9,053.44
Ac8.4.2
M2
134.62
51.50
0.00
51.50
51.50
0.00
$6,934.06
IMPERMEABILIZANTE
M2
152.21
165.58
0.00
165.58
165.58
0.00
$25,204.17
Ac8.6.1
MARMOL EN FIRME
M2
256.97
218.19
0.00
218.19
218.19
0.00
$56,068.51
He10.1
HERRERIA
LOTE
108,626.52
0.00
108,626.52
108,626.52
0.00
Ac8.5
TOTAL DE ESTIMACION
0.00
$31,411.59
$108,626.52
$392511.13
CLAVE
PARTIDA
EDIFICIO
EDIFICIO
SUBTOTAL
OBRA
EXTERIOR
FECHA:30-04-07
NO. DE OBRA:06120365A
HOJA:
_1_DE_1_
SUBTOTAL
TOTAL
EDIFICIO "A"
A01
TRABAJOS
PREELIMINARES
A02
ESTRUCTURA
A03
ALBAILERIA Y
ACABADOS
$ 34,154.61
$ 34,154.61
A04
HERRERIA
$ 1,600.43
$ 1,600.43
1,600.43
A05
INSTALACIONES
$ 4,153.67
$ 4,153.67
4,153.67
A07
MONTAJE
T01
PLAZA Y
ANDADORES
$ 13,297.81
$ 13,297.81
13,297.81
T02
RED ELECTRICA
$ 10,958.56
$ 10,958.56
$ 10,958.56
$ 24,256.37
$ 24,256.37
SUB-TOTALES
$ -
$ 39,908.71
$ 39,908.71
$ 34,154.61
SUBTOTAL
$ 64,165.08
15 % (IVA)
TOTAL
22%
21.73%
70%
57.01%
78.74%
92%
$ 64,165.08
9,624.76
73,789.84
FECHA: 30-04-07
No. DE OBRA:
ESTA ESTIMACION
LIQUIDACION:
IMPORTE DE ESTA
ESTIMACION
ESTA ESTIMACION
64,165.08
ACUMULADO ANTERIOR
193,595.96
I.V.A.
9,624.76
ACUMULADO TOTAL
267,385.80
SEGN CONTRATO
SALDO POR EJERCER
TOTAL
73,789.84
DEDUCCIONES:
AMORTIZACION ANTICIPO
INSP. DE OBRAS 5 AL
MILLAR
43,791.94
320.83
CMIC-CAPAC. 2 AL MILLAR
0.00
LIQUIDO A PAGAR
339,569.09
72,183.29
0.00
AVANCE FISICO:
AVANCE EN EL PERIODO
AVANCE ANTERIOR
TOTAL
DEDUCCIONES
73,789.84
22.00%
44,112.77
29,677.07
AVANCE
FINANCIERO:
70.00%
92.00%
AVANCE EN EL PERIODO %
21.73%
AVANCE ANTERIOR
57.01%
78.74%
ESTIM.
No.
1(UNO)
2(DOS)
3
(TRES)
PERIODO
ESTIMACION
FECHA:30-04-07
No. DE OBRA:
HOJA: _1_DE _1_
IMPORTE
ESTIMACION
I.V.A.
2 AL MILLAR
C.M.I.C.
5 AL MILLAR
INSP. OBRAS
15 DE MARZO
87,781.13
13,167.17
0.00
438.91
16 DE MARZO AL
27 DE ABRIL DE
2007
80,563.18
12,084.48
0.00
64,165.08
9,624.76
0.00
$ 232,509.39
$ 34,876.41
$ -
AMORTIZACION
ANTICIPO
FECHA:
06-FEB.-2007
TOTAL
DEDUCCIONES
LIQUIDO A PAGAR
30,284.49
30,723.40
70,224.90
402.82
27,794.30
28,197.12
64,450.54
320.83
43,791.94
44,112.77
29,677.07
$ 103,033.29
$ 164,352.51
15 DE FEFRERO AL
28 DE ABRIL AL
30 DE ABRIL DE 2007
TOTAL:
SALDO:
$ 61,757.82
$ 1,162.56
$ 101,870.73
$0.00
ESTIMACIN
ESTIMACION No.:
4 (CUATRO)
FECHA: 02/05/2007
No. DE OBRA:
06120365
HOJA:
_1_DE __3_
PERIODO:01/05/07 al 02/05/07
VOLUMEN
CLAVE
A03
31220
34003-A
37005
37030
SC3149
CONCEPTO
U.M.
P.U.
M2
IMPORTE
ESTIMADO
PRESUPUESTO
ESTIM.
ANTERIOR
ESTA ESTIM.
ACUMULADO
EXCEDENTE
197.63
59.95
57.96
0.18
58.14
0.00
35.57
M2
47.84
235.92
0.00
235.20
235.20
0.00
11,251.97
M2
7.28
54.04
0.00
54.04
54.04
0.00
393.41
M2
5.87
10.34
0.00
10.34
10.34
0.00
60.70
PZA
413.51
1.00
0.00
1.00
1.00
0.00
413.51
12,155.16
12,155.16
ALBAILERIA Y ACABADOS
ESTIMACIN
FECHA:02/05/2007
No. DE OBRA:
06120365A
CONCEPTO
U.M.
P.U.
PZA
149.91
PRESUPUESTO
ESTIMACION No.:
4 (CUATRO)
HOJA:
_2_DE __3_
PERIODO:01/05/07 al 02/05/07
VOLUMEN
ESTA
ESTIM.
ESTIM.
ANTERIOR
ACUMULADO
EXCEDENTE
3.00
0.00
IMPORTE
ESTIMADO
INSTALACIONES
4.00
1.00
2.00
TOTAL DE INSTALACIONES
A07
299.82
299.82
MONTAJE
PZA
10.68
1.00
0.00
1.00
1.00
0.00
10.68
PZA
16.19
40.00
0.00
40.00
40.00
0.00
647.60
PZA
134.94
1.00
0.00
1.00
1.00
0.00
134.94
PZA
32.38
1.00
0.00
1.00
1.00
0.00
32.38
825.60
SUB TOTAL:
1,125.42
ESTIMACIN
OBRA: E.P. LAZARO CARDENAS.
ESTIMACION No.:
4 (CUATRO)
FECHA:
02/05/2007
No. DE OBRA:
06120365A
HOJA:
_3_DE __3_
PERIODO:01/05/07 al 02/05/07
VOLUMEN
CLAVE
T
T01
37005
CONCEPTO
U.M.
P.U.
PRESUPUESTO
ESTIM.
ANTERIOR
100.00
0.00
ESTA
ESTIM.
ACUMULADO
EXCEDENTE
90.28
90.28
0.00
IMPORTE
ESTIMADO
OBRA EXTERIOR
PLAZA Y ANDADORES
LIMPIEZA DE PISO DE CONCRETO, MOZAICO
DE PASTA, CERAMICA, ETC. CON CEPILLO,
AGUA Y ACIDO CLORIDRICO.
M2
7.28
657.24
657.24
TOTAL DE ESTIMACION
13,937.82
SUB TOTAL:
657.24
FECHA:
02/05/2007
No. DE OBRA: 06120365A
CLAVE
EDIFICIO
PARTIDA
EDIFICIO
SUBTOTAL
OBRA EXTERIOR
HOJA: _1_DE_1_
SUBTOTAL
TOTAL
EDIFICIO "A"
A01
TRABAJOS PREELIMINARES
A02
ESTRUCTURA
A03
ALBAILERIA Y ACABADOS
$ 12,155.16
$ 12,155.16
A04
HERRERIA
A05
INSTALACIONES
$ 299.82
$ 299.82
$ 299.82
A07
MONTAJE
$ 825.60
$ 825.60
$ 825.60
T01
PLAZA Y ANDADORES
T02
RED ELECTRICA
$ 657.24
$ 657.24
-
SUB-TOTALES
$-
$ 13,280.58
$ 13,280.58
$ 12,155.16
4%
$ 657.24
$ 657.24
-
$ 657.24
$ 13,937.82
SUBTOTAL
$ 13,937.82
15 % (IVA)
TOTAL
$ 16,028.49
4.72%
2,090.67
AVANCE FISICO
ANTERIOR (%)
92%
AVANCE FISICO
GANERAL %
96%
78.74%
FECHA: 02/05/2007
No. DE OBRA:
ESTA ESTIMACION
LIQUIDACION:
IMPORTE DE ESTA
ESTIMACION
ESTA ESTIMACION
$
13,937.82
ACUMULADO ANTERIOR
267,385.80
I.V..A.
2,090.67
ACUMULADO TOTAL
283,414.29
SEGN CONTRATO
339,569.09
TOTAL
16,028.49
56,154.80
0.00
DEDUCCIONES:
AMORTIZACION ANTICIPO
INSP. DE OBRAS 5 AL MILLAR
CMIC-CAPAC. 2 AL MILLAR
TOTAL DEDUCCIONES
LIQUIDO A PAGAR
$
$
$
0.00
16,028.49
AVANCE FISICO:
69.69
0.00
69.69
15,958.80
AVANCE EN EL PERIODO %
4.00%
AVANCE ANTERIOR
92.00%
96.00%
AVANCE
FINANCIERO:
AVANCE EN EL PERIODO
4.72%
AVANCE ANTERIOR
78.74%
83.46%
1(UNO)
PERIODO
ESTIMACION
FECHA:
06-FEB.-2007
$101,870.73
IMPORTE
ESTIMACION
I.V.A.
2 AL MILLAR
C.M.I.C.
5 AL MILLAR
INSP. OBRAS
87,781.13
13,167.17
0.00
438.91
80,563.18
12,084.48
0.00
64,165.08
9,624.76
13937.82
2,090.67
AMORTIZACION
ANTICIPO
TOTAL
DEDUCCIONES
LIQUIDO A PAGAR
30,284.49
30,723.40
70,224.90
402.82
27,794.30
28,197.12
64,450.54
0.00
320.83
43,791.94
44,112.77
29,677.07
0.00
69.69
0.00
69.69
15,958.80
16 DE MARZO AL
27 DE ABRIL DE 2007
3 (TRES)
15 DE FEFRERO AL
15 DE MARZO
2(DOS)
FECHA: 02/05/2007
No. DE OBRA:
28 DE ABRIL AL
30 DE ABRIL DE 2007
4
(CUATRO
)
01 DE MAYO AL
02 DE MAYO DE 2007
$ 246,447.21
SALDO:
$ 36,967.08
$ 56,154.80
$ -
$ 1,232.25
$ 101,870.73
$ 103,102.98
$ 180,311.31
$ 0.00
ESTIMACIN
ESTIMACION No.:
5 (ULTIMA)
FECHA:05/05/2007
CLAVE
A01
11071
11101
11121
11131
12032
CONCEPTO
U.M.
P.U.
M3
99.74
35.00
35.00
M2
96.11
26.56
26.56
M3
81.48
25.98
25.98
M3
152.69
37.00
11.83
TRABAJOS PREELIMINARES
EXCAVACION A MANO PARA FORMACION DE
ZANJAS DE 0.0 A 2.00 MTR. DE PROFUNDIDAD,
ZONA "B" CLASE II EN SECO MEDIDO EN
BANCO. INCL. AFINE DE FONDO Y TALUD,
TRASPALEO, EXTRACCION Y ACARREO
DENTRO Y FUERA DE OBRA DE MATERIAL
NO UTIL
HOJA:
_1_DE __4_
PERIODO:01/05/07 al 02/05/07
ACUMULADO
EXCEDENTE
IMPORTE
ESTIMADO
40.02
5.02
500.69
27.66
1.10
105.72
2.73
28.71
2.73
222.44
3.80
15.63
0.00
580.22
5.02
1.10
KG
22.13
81.04
81.04
3.76
84.80
3.76
83.21
1,492.28
ESTIMACIN
OBRA: E.P. LAZARO CARDENAS.
ESTIMACION No.:
5 (ULTIMA)
FECHA:
05/05/2007
No. DE OBRA:
06120365A
HOJA:
_2_DE __4_
PERIODO:01/05/07 al 02/05/07
VOLUMEN
CLAVE
CONCEPTO
U. M.
P.U.
PRESUPUESTO
ESTIM.
ANTERIOR
44.89
26.77
ESTA
ESTIM.
ACUMULADO
EXCEDENTE
11.34
38.11
0.00
IMPORTE
ESTIMADO
M2
209.91
2,380.38
3,872.66
ALBAILERIA Y ACABADOS
M2
37.03
54.04
54.04
0.86
54.90
0.86
31.85
SUB TOTAL:
2,412.23
ESTIMACIN
OBRA: E.P. LAZARO CARDENAS.
ESTIMACION No.:
5 (ULTIMA)
FECHA: 05/05/2007
No. DE OBRA:
06120365A
HOJA:
_3_DE __4_
PERIODO:01/05/07 al 02/05/07
VOLUMEN
CLAVE
31256
CONCEPTO
U.M.
P.U.
PRESUPUESTO
10.46
ESTIM.
ANTERIOR
ESTA ESTIM.
ACUMULADO
EXCEDENTE
10.46
0.24
10.70
0.24
IMPORTE
ESTIMADO
ML
90.98
A04
41139
53.69
HERRERIA
SUMINISTRO Y COLOCACION DE CHAPA
TIPO CAPECE CODIFICACION: 4-3034.
PZA
753.36
0.00
0.00
1.00
1.00
1.00
TOTAL DE HERRERIA.
A05
51403
21.84
753.36
753.36
INSTALACIONES
S Y C. DE INTERRUPTOR DE NAVAJAS DE 2 X 60
AMPERES INCLUYE FUSIBLES, MAT. DE FIJACION,
CONEXION Y PRUEBAS.
TOTAL DE INSTALACIONES.
PZA
706.17
0.00
0.00
1.00
1.00
1.00
706.17
706.17
SUB TOTAL:
1,481.37
ESTIMACIN
OBRA: E.P. LAZARO CARDENAS.
CONCEPTO
FECHA: 05/05/2007
CLAVE
ESTIMACION No.:
5 (ULTIMA)
No. DE OBRA:
06120365A
U.M.
HOJA:
_4_DE __4_
PERIODO:01/05/07 al 02/05/07
ACUMULADO
EXCEDENTE
IMPORTE
ESTIMADO
T
T01
OBRA EXTERIOR
PLAZA Y ANDADORES
12051 MAMPOSTERIA DE PIEDRA DE LA REGION
ASENTADA CON MORTERO CEMENTO/CAL/
ARENA PROPORCION 1:2:6 EN CIMENTACION
M3
1,082.38
3.00
3.00
1.32
4.32
1.32
1,428.74
M2
209.91
33.00
33.00
1.15
34.15
1.15
241.40
1,670.14
T02
RED ELECTRICA.
31296 REGISTRO ELECTRICO 60X60X80 CM CON
BLOCK CEMENTO O TABIQUE PILIDO CON
TAPA DE LAMINA Y FONDO DE ARENA.
51429 SUMINISTRO Y TENDIDO DE TUBO CONDUIT
PVC PESADO 25MM. INCLUYE CONEXIONES
TRAZO, EXCAVACION Y
RELLENO.
TOTAL DE RED ELECTRICA.
TOTAL DE ESTIMACION
PZA
1,695.07
3.00
3.00
ML
51.04
18.00
18.00
4.00
73.38
7.00
4.00
6,780.28
91.38
73.38
3,745.32
10,525.60
17,581.62
12,195.74
FECHA: 05/05/2007
No. DE OBRA: 06120365A
HOJA: _1_DE_1_
CLAVE
PARTIDA
EDIFICIO
EDIFICIO
SUBTOTAL
OBRA
EXTERIOR
SUBTOTAL
TOTAL
EDIFICIO "A"
A01
TRABAJOS PREELIMINARES
$ 3,872.66
$ 3,872.66
A02
ESTRUCTURA
A03
ALBAILERIA Y ACABADOS
$ 53.69
$ 53.69
$ 53.69
A04
HERRERIA
$ 753.36
$ 753.36
$ 753.36
A05
INSTALACIONES
$ 706.17
$ 706.17
$ 706.17
A07
MONTAJE
T01
PLAZA Y ANDADORES
$ 1,670.14
$ 1,670.14
$ 1,670.14
T02
RED ELECTRICA
$ 10,525.60
$ 10,525.60
$ 10,525.60
$ 12,195.74
$ 12,195.74
SUB-TOTALES
$ -
$ 5,385.88
$ 5,385.88
$ 3,872.66
-
$ 17,581.62
SUBTOTAL
IMPORTE DE LA PRESENTE ESTIMACION No.5 (CINCO,LTIMA)
$
15 % (IVA)
17,581.62
$
2,637.24
TOTAL
$ 20,218.86
5.95%
83.46%
89.41%
FECHA: 05/05/2007
No. DE OBRA:
ESTA ESTIMACION
LIQUIDACION:
TOTAL
17,581.62
ACUMULADO ANTERIOR
283,414.29
2,637.24
ACUMULADO TOTAL
303,633.15
SEGN CONTRATO
339,569.09
35,935.94
0.00
20,218.86
AMORTIZACION ANTICIPO
INSP. DE OBRAS 5 AL
MILLAR
0.00
87.91
CMIC-CAPAC. 2 AL MILLAR
0.00
AVANCE FISICO:
AVANCE EN EL PERIODO
AVANCE ANTERIOR
LIQUIDO A PAGAR
20,218.86
DEDUCCIONES:
TOTAL DEDUCCIONES
87.91
20,130.95
4.00%
96.00%
100.00%
AVANCE FINANCIERO:
AVANCE EN EL PERIODO
5.95%
AVANCE ANTERIOR
%
AVANCE GENERAL
DE LA OBRA %
83.46%
89.41%
I.V.A.
2 AL MILLAR
C.M.I.C.
87,781.13
13,167.17
0.00
438.91
80,563.18
12,084.48
0.00
64,165.08
9,624.76
02 DE MAYO DE 2007
13,937.82
5 (CINCO
ULTIMA) 03 DE MAYO AL
05 DE MAYO DE 2007
17,581.62
1(UNO)
TOTAL
DEDUCCIONES
LIQUIDO A
PAGAR
30,284.49
30,723.40
70,224.90
402.82
27,794.30
28,197.12
64,450.54
0.00
320.83
43,791.94
44,112.77
29,677.07
2,090.67
0.00
69.69
0.00
69.69
15,958.80
2,637.24
0.00
87.91
0.00
87.91
20,130.95
16 DE MARZO AL
27 DE ABRIL DE 2007
3 (TRES)
AMORTIZACION
ANTICIPO
06-FEB.-
15 DE FEFRERO AL
15 DE MARZO DE 2007
2(DOS)
5 AL MILLAR INSP.
OBRAS
06120365A
HOJA: _1_DE _1_
FECHA:
2007
$101,870.73
IMPORTE
ESTIMACION
PERIODO ESTIMACION
FECHA: 05/05/2007
No. DE OBRA:
28 DE ABRIL AL
30 DE ABRIL DE 2007
4
(CUATRO
)
01 DE MAYO AL
$
264,028.83
TOTAL:
SALDO:
$35,935.94
$
39,604.32
$
-
$
1,320.16
$
101,870.73
$
103,190.89
$0.00
$
200,442.26
No.:
FECHA:05/05/2007
FINIQUITO DE OBRA
OBRA:E.P. LAZARO CARDENAS.
LOCALIDAD / MPIO: ATLIACA/TIXTLA GUERRERO.
CLAVE
A
A01
11061
11071
11101
11121
CONCEPTOS / PARTIDAS
CONTRATADO
ESTIMADO
CANTI
DAD
IMPORTE
CANTID
AD
P.U.
VARIACIONES
CONCEPTOS
EJECUTADOS
P.U.
IMPORTE
CANTI
DAD
P.U.
NO
HOJA:_1_DE_11__
CONCEPTOS ADICIONALES
IMPORTE
CANTIDAD
P.U.
IMPORTE
NO.
EST.
TRABAJOS PRELIMINARES.
LIMPIA, TRAZO Y NIVELACION DEL TERRENO
(AREA DE EDIFICIOS)
EXCAVACION A MANO PARA FORMACION DE
ZANJAS DE 0.00 A 2.00 MTR. DE PROFUNDIDAD,
ZONA "B" CLASE II EN SECO MEDIDO EN BANCO
. INCL. AFINE DE FONDO Y TALUD, TRASPALEO,
EXTRACCION Y ACARREO DENTRO Y FUERA DE
OBRA DE MATERIAL NO UTIL
PLANTILLA DE CONCRETO HECHO EN OBRA F
C= 100 KG/CM2 DE 6.0 CM DE ESPESOR.
RELLENO Y COMPACT. DE MAT. PROD. DE EXC.
CON PISON Y AGUA, EN CAPAS DE 20 CM, ESP.
INCL. ACARREO DENTRO DE LA OBRA.
SUM.Y
RELLENO
DE
MAT.
INERTE,
COMPACTADO CON PISON Y AGUA, EN CAPAS
DE 20 CM. ESP. INCL. ACARREO DENTRO DE LA
OBRA .
12010
CONCRETO
F'C=250KG/CM2
EN
CIMENTACION, T.M.A 3/4", INCLUYE
COLOCADO, VIBRADO Y CURADO.
CIMBRA
PARA
CIMENTACION
CON
MADERA DE PINO DE 3a., ACABADO
COMUN,
INCLUYE
CIMBRADO
Y
DESCIMBRADO.
ACERO
DE
REFUERZO
EN
CIMENTACION, CON ALAMBRON #2
F'Y=2530KG/CM2
INCL.
SUMINISTRO,
HABILITADO,
ARMADO, TRASLAPE
GANCHOS Y DESPERDICIO.
12032
OBRA:
EDIFICIO "A"
11131
12021
U.
M.
No.
DE
06120365A
M2
74.88
6.34
474.74
74.88
6.34
474.74
0.00
6.34
0.00
0.00
6.34
0.00
M3
35.00
99.74
3,490.90
40.02
99.74
3,991.59
0.00
99.74
0.00
5.02
99.74
500.69
1Y5
M2
26.56
96.11
2,552.68
27.66
96.11
2,658.40
0.00
96.11
0.00
1.10
96.11
105.72
1Y5
M3
25.98
81.48
2,116.85
28.71
81.48
2,339.29
0.00
81.48
0.00
2.73
81.48
222.44
4Y5
M3
37.00
152.69
5,649.53
15.63
152.69
2,386.54
21.37
152.69
3,262.99
0.00
152.69
0.00
M3
8.00
1,691.77
13,534.16
6.17
1,691.77
10,438.22
1.83
1,691.77
3,095.94
0.00
1,691.77
0.00
M2
40.00
129.45
5,178.00
38.94
129.45
5,040.78
1.06
129.45
137.22
0.00
129.45
0.00
KG
81.04
22.13
1,793.42
84.80
22.13
1,876.62
0.00
22.13
0.00
3.76
22.13
83.21
1Y5
FECHA:05/05/2007
FINIQUITO DE OBRA
OBRA:E.P. LAZARO CARDENAS.
LOCALIDAD / MPIO: ATLIACA/TIXTLA GUERRERO.
HOJA:__2__ DE__11__
VARIACIONES
CLAVE
CONCEPTOS / PARTIDAS
U.M
.
CONTRATADO
CANTIDA
D
ESTIMADO
P.U.
IMPORTE
CANTIDAD
P.U.
CONCEPTOS NO
EJECUTADOS
IMPORTE
CANTIDA
D
P.U.
CONCEPTOS ADICIONALES
IMPORTE
CANTIDAD
P.U.
IMPORTE
NO.
EST.
12034 ACERO
12035
12076
12113
DE
REFUERZO
EN
CIMENTACION
DIAMETRO
#3
F'Y=4200KG/CM2
INCLUYE
SUMINISTRO, HABILITADO, ARMADO,
TRASLAPES, SILLETAS, GANCHOS Y
DESPERDICIOS.
ACERO DE REFUERZO DIAMETRO #4
F'Y=4200KG/CM2
INCLUYE
SUMINISTRO, HABILITADO, ARMADO,
TRASLAPES, SILLETAS, GANCHOS Y
DESPERDICIOS.
MURETE DE ENRASE EN CIMENTACION
CON TABIQUE DE CONCRETO 15 X 20
X 40 CM.
JUNTA DE 1.5 CM. DE
ESPESOR, ASENTADO CON MORTERO
CEMENTO-ARENA 1:3
CADENA DE CONCRETO F'C=250
KG/CM2 DE 20 X 20 CM. ARMADA CON 4
VAR. # 3 Y ESTRIBOS # 2 @ 20 CM.
INC. CIMBRA COMUN
TOTAL DE CIMENTACION
A02
ESTRUCTURA
21110
21115
KG
271.78
18.73
5,090.44
208.57
18.73
3,906.52
63.21
KG
153.26
18.40
2,819.98
152.15
18.40
2,799.56
1.11
M2
44.89
209.91
9,422.86
38.11 209.91
7,999.67
ML
32.20
219.45
7,066.29
32.20 219.45
7,066.29
59,189.85
18.73 1,183.92
0.00
18.73
0.00
18.40
20.42
0.00
18.40
0.00
6.78
209.91 1,423.19
0.00
209.91
0.00
219.45
0.00
219.45
50,978.22
0.00
9,123.68
0.00 1 y 5
0.00
912.06
M2
70.24
164.22
11,534.81
70.24 164.22
11,534.81
0.00
164.22
0.00
0.00
164.22
0.00
M2
10.96
179.25
1,964.58
10.17 179.25
1,822.97
0.79
179.25
141.61
0.00
179.25
0.00
KG
33.87
22.95
777.32
777.32
0.00
22.95
0.00
0.00
22.95
0.00
33.87
22.95
Tabla V.2.3 tercera parte del finiquito de obra de la escuela primaria LAZARO CRDENAS.
FECHA:05/05/2007
FINIQUITO DE OBRA
OBRA:E.P. LAZARO CARDENAS.
LOCALIDAD / MPIO: ATLIACA/TIXTLA GUERRERO.
HOJA:__3__DE__11__
VARIACIONES
CLAVE
21203
21204
21301
A03
31001
31002
31021
31024
SC2011
CONCEPTOS / PARTIDAS
ACERO REFUERZO EN ESTRUCTURA
DIAMETRO #3 F'Y=4200KG/CM2 INCLUYE
SUMINISTRO, HABILITADO, ARMADO,
TRASLAP, GANCHOS, SILLETAS Y
DESPERDICIO.
ACERO REFUERZO EN ESTRUCTURA
DIAMETRO #4 F'Y=4200KG/CM2 INCLUYE
SUMINISTRO, HABILITADO, ARMADO,
TRASLAPES, GANCHOS, SILLETAS Y
DESPERDICIO.
CONCRETO
F'C=250
KG/CM2
EN
ESTRUCTURA Y LOSAS T.M.A.3/4"
COLOCADO, VIBRADO Y CURADO EN
LOSAS INCLUYE PLANA EN LOSA PARA
RECIBR IMPERMEABILIZACION.
TOTAL ESTRUCTURA
ALBAILERIA Y ACABADOS
CADENA DE CONCRETO F'C=250KG/CM2
DE 14X10CM. SIN ARMAR, INCLUYE
CIMBRA APARENTE.
CADENA DE CONCRETO F'C=250KG/CM2
DE 21 X 10 CM SIN ARMAR INCLUYE
CIMBRA APARENTE.
CADENA O CASTILLO DE CONCRETO F
C=250 KG/CM2 20 X 20 CM. ARMADA
CON 4 VARILLAS # 3 FY=4200 KG/CM2
EST. # 2 @ 20 CM. INC. CIMBRA COMUN
Y CRUCES DE VARILLAS
CADENA O CASTILLO DE CONCRETO
F'C=250 KG/CM2 14 X 15 CM. ARM. CON
4 VAR # 3 FY=4200 KG/CM2 EST.# 2 @ 30
CM. INCLUYE CIMBRA COMUN Y
CRUCES DE VARILLA.
CADENA O CASTILLO DE CONCRETO F
C= 250 KG/CM2 20 X 20 CM. ARMADA
CON 4 VAR. DEL # 4 Y EST. # 2 @ 20
CM. INC. CIMBRA COMUN Y CRUCES
DE VARILLAS
CONTRATADO
U.M.
ESTIMADO
CONCEPTOS NO
EJECUTADOS
P.U.
IMPORTE
CANTIDAD
P.U.
IMPORTE
NO.
EST.
P.U.
IMPORTE
CANTIDAD
P.U.
IMPORTE
KG
354.87
19.86
7,047.72
354.87
19.86
7,047.72
0.00
19.86
0.00
0.00
19.86
0.00
KG
134.82
18.84
2,540.01
134.82
18.84
2,540.01
0.00
18.84
0.00
0.00
18.84
0.00
M3
8.69
1,774.5
5
8.69 1,774.55
15,420.84
39,143.67
0.00 1,774.55
0.00
141.61
0.00 1,774.55
0.00
0.00
ML
6.80
105.23
715.56
6.80
105.23
715.56
0.00
105.23
0.00
0.00
105.23
0.00
ML
24.40
135.23
3,299.61
24.40
135.23
3,299.61
0.00
135.23
0.00
0.00
135.23
0.00
ML
43.40
254.65
11,051.81
43.40
254.65
11,051.81
0.00
254.65
0.00
0.00
254.65
0.00
ML
7.54
169.66
1,279.24
7.53
169.66
1,277.54
0.01
169.66
1.70
0.00
169.66
0.00
ML
14.60
246.16
3,593.94
14.60
246.16
3,593.94
0.00
246.16
0.00
0.00
246.16
0.00
15,420.84
39,285.28
CANTIDAD
CONCEPTOS ADICIONALES
CANTIDAD
Tabla V.2.4 cuarta parte del finiquito de obra de la escuela primaria LAZARO CRDENAS.
COMIT ADMINISTRADOR DEL PROGRAMA ESTATAL DE CONSTRUCCIN DE ESCUELAS
FINIQUITO DE OBRA
OBRA:E.P. LAZARO CARDENAS.
LOCALIDAD / MPIO: ATLIACA/TIXTLA GUERRERO.
HOJA:__4__ DE__11__
VARIACIONES
CLAVE
CONCEPTOS / PARTIDAS
CONTRATADO
U.M.
CANTIDAD
SC2017
31105
31115
31200
31220
31251
31256
31262
32001
P.U.
ESTIMADO
IMPORTE
CANTIDAD
P.U.
CONCEPTOS NO
EJECUTADOS
IMPORTE
CANTIDAD
P.U.
CONCEPTOS ADICIONALES
IMPORTE
CANTIDAD
P.U.
IMPORTE
NO.
EST.
ML
6.72
416.11
2,796.26
6.40
416.11
2,663.10
0.32
416.11
133.16
0.00
416.11
0.00
M2
4.99
222.37
1,109.63
4.85
222.37
1,078.49
0.14
222.37
31.13
0.00
222.37
0.00
M2
50.68
337.95 17,127.31
50.29
337.95
16,995.51
0.39
337.95
131.80
0.00
337.95
0.00 1 Y 5
M2
54.04
2,001.10
54.90
37.03
2,032.95
0.00
37.03
0.00
0.86
37.03
31.85 3 Y 5
M2
59.95
197.63 11,847.92
58.14
197.63
11,490.21
1.81
197.63
357.71
0.00
197.63
0.00 3 Y 4
ML
9.90
213.96
2,118.20
0.00
213.96
0.00
9.90
213.96
2,118.21
0.00
213.96
0.00
ML
10.46
90.98
951.65
10.70
90.98
973.49
0.00
90.98
0.00
0.24
90.98
ML
29.10
123.40
3,590.94
29.10
123.40
3,590.94
0.00
123.40
0.00
0.00
123.40
0.00
M2
146.05
104.81 15,307.50
140.60
104.81
14,736.29
5.45
104.81
571.21
0.00
104.81
0.00
37.03
21.84 3 Y 5
Tabla V.2.5 quinta parte del finiquito de obra de la escuela primaria LAZARO CRDENAS.
FECHA:05/05/2007
FINIQUITO DE OBRA
OBRA:E.P. LAZARO CARDENAS.
LOCALIDAD / MPIO: ATLIACA/TIXTLA GUERRERO.
HOJA:__5_ DE__11_
VARIACIONES
CLAVE
CONCEPTOS / PARTIDAS
CONTRATADO
U.M.
CANTIDAD
32019
34003A
35005
37005
37030
EMBOQUILLADOS EN PUERTAS Y
VENTANAS DE 14 A 21 CM. DE ANCHO,
CON MORTERO CEMENTO ARENA
PROP. 1:5 , ACABADO EXTRAFINO CON
ESPONJA
SUM. Y APLICACIN DE PINT. VINIMEX
COMEX LAVABLE Y/O SUPERNOVADUPONT EN MUROS, COLUM. TRABES
Y
PLAF.
TRABAJO
TERMINADO,
INCLUYE
PREPARACIN
DE
SUPERFICIE,
REBABEAR,
PLASTE
NECESARIO Y ZOCLOS.
SUMINISTRO Y COLOCACION
DE
SISTEMA
PREFABRICADO
IMPERMEABILIZANTE MULTICAPA DE
ASFALTO
MODIFICADO
."SBS"
(ESTIRENO-BUTADIENO-ESTIRENO)
CON UN ESPESOR DEL MANTO DE 3.5
MM,
MEMBRANA DE REFUERZO
CENTRAL DE FIBRA DE VIDRIO DE 90
GRS/M2, ACABADO APARENTE
CON
GRAVILLA
EN
COLOR
TERRACOTA. LA APLICACION SERA LA
SIGUIENTE; LA SUPERFICIE DEBERA
ESTAR LIMPIA, SECA O LIGERAMENTE
HUMEDA, LIBRE DE GRASAS, POLVO O
PROTUBERANCIAS QUE IMPIDAN LA
BUENA ADHERENCIA, SE APLICARA
POR MEDIO DE CALENTAMIENTO DE SU
LIMPIEZA DE PISO DE CONCRETO,
MOSAICO DE PASTA, CERAMICA, ETC.
CON
CEPILLO,
AGUA
Y
ACIDO
CLORHIDRICO.
LIMPIEZA DE VIDRIOS Y TABLETAS POR
AMBAS CARAS
P.U.
ESTIMADO
IMPORTE
CANTIDAD
P.U.
CONCEPTOS NO
EJECUTADOS
IMPORTE
CANTIDAD
P.U.
CONCEPTOS ADICIONALES
IMPORTE
CANTIDAD
P.U.
IMPORTE
NO.
EST.
1,424.61
24.64
57.63
1,420.00
0.08
57.63
4.61
0.00
57.63
0.00
47.84 11,286.41
235.20
47.84
11,251.97
0.72
47.84
34.44
0.00
47.84
0.00
8,614.76
75.60
111.88
8,458.13
1.40
111.88
156.63
0.00
111.88
0.00
7.28
393.41
54.04
7.28
393.41
0.00
7.28
0.00
0.00
7.28
0.00
5.87
60.70
10.34
5.87
60.70
0.00
5.87
0.00
0.00
5.87
0.00
ML
24.72
57.63
M2
235.92
M2
77.00
111.88
M2
54.04
M2
10.34
Tabla V.2.6 sexta parte del finiquito de obra de la escuela primaria LAZARO CRDENAS
ESTIMACION No.:
5(ltima)
FECHA:05/05/2007
FINIQUITO DE OBRA
HOJA:__6__ DE__11__
VARIACIONES
CLAVE
CONCEPTOS / PARTIDAS
U.M
.
CONTRATADO
CANTIDAD
SC3149
SUMINISTRO
Y
COLOCACION
DE
LOGOTIPO C . A .P . C . E . DE 30 CM. DE
DIAMETRO A BASE ACRILICO DE 30 X 60
CM. INCRUSTADO A FACHADA PRINCIPAL
.
PZA
1.00
P.U.
413.51
A04
41313
41154
41139
ESTIMADO
IMPORTE
413.51
CANTIDAD
1.00
P.U.
413.51
98,984.07
HERRERIA
COLOCACION DE CANCELERIA DE
ALUMINIO FIJADA CON TAQUETES Y
TORNILLOS,
SUMINISTRADA
POR
CAPECE, INCLUYE FLETE DEL ALMACEN
CAPECE A LA OBRA Y MANIOBRAS.
M2
COLOCACION DE PUERTA Y MARCO DE
ALUMINIO SUMINISTRADA POR CAPECE,
INCLUYE FLETE DEL ALMACEN CAPECE
A LA OBRA Y MANIOBRAS.
PZA
SUMINISTRO Y COLOCACION DE CHAPA
TIPO CAPECE CODIFICACION: 4-3034.
PZA
10.34
123.06 1,272.44
CONCEPTOS NO
EJECUTADOS
IMPORTE
413.51
CANTIDAD
0.00
P.U.
10.34
IMPORTE
413.51
95,497.16
CONCEPTOS ADICIONALES
0.00
CANTIDAD
P.U.
0.00 413.51
3,540.60
IMPORTE
NO.
EST.
0.00
53.69
123.06 1,272.44
0.00
123.06
0.00
0.00 123.06
0.00
1.00
327.99
327.99
1.00
327.99
327.99
0.00
327.99
0.00
0.00 327.99
0.00
0.00
0.00
0.00
1.00
753.36
753.36
0.00
753.36
0.00
1.00 753.36
753.36
1.00
80.95
80.95
0.00
80.95
0.00
1.00
80.95
80.95
PZA
TOTAL HERRERIA
A05
51004
51059
INSTALACIONES
SALIDA ALUMBRADO O CONTACTO
POLARIZADO CON CAJA DE PVC Y TUBO
DE PVC LIGERO INCLUYE TODO LO
NESESARIO
PARA
EL
BUEN
FUNCIONAMIENTO.
SUMINISTRO, ARMADO Y COLOCACION
DE
LAMPARA
DE
ALUMINIO
INCANDESCENTE DE SOBREPONER DE
30 X 30 INCLUYE DIFUSORES, FOCOS,
INC. LO NECESARIO PARA SU BUEN
FUNCIONAMIENTO.
1,681.38
2,353.79
0.00
80.95
80.95
0.00
753.36
SA
9.00
468.70 4,218.30
9.00
468.70 4,218.30
0.00
468.70
0.00
0.00 468.70
0.00
2Y
3
PZA
5.00
338.33 1,691.65
5.00
338.33 1,691.65
0.00
338.33
0.00
0.00 338.33
0.00
Tabla V.2.1 sptima parte del finiquito de obra de la escuela primaria LAZARO CRDENAS
FECHA:05/05/2007
FINIQUITO DE OBRA
OBRA:E.P. LAZARO CARDENAS.
LOCALIDAD / MPIO: ATLIACA/TIXTLA GUERRERO.
HOJA:__7__ DE__11__
VARIACIONES
CLAVE
CONCEPTOS / PARTIDAS
U.M.
CONTRATADO
CANTIDAD
51354
51060
51378
51403
A07
71143
71152
71303
71306
SC7026
SUMINISTRO Y COLOCACION DE
TABLERO DE CONTROL PARA 4
CIRCUITOS MONOFASICOS.
SUMINISTRO Y COLOCACION DE
VENTILADOR DE TECHO MARCA
PHILLIPS O SIMILAR DE 48" INCLUYE
CONTROL Y CONEXIONES.
SUMINISTRO Y COLOCACION DE
INTERRUPTOR TERMOMAGNETICO
DE 1 POLO 15 A 50AMP. TIPO QO,
INCLUYE CONEXION Y PRUEBA.
S Y C. DE INTERRUPTOR DE
NAVAJAS DE 2 X 60 AMPERES
INCLUYE
FUSIBLES,
MAT.
DE
FIJACION, CONEXION Y PRUEBAS.
TOTAL INSTALACIONES
MONTAJE
010104 MANIOBRAS Y MONTAJE DE
SILLA APILABLE DE PLASTICO 0124.
MANIOBRAS Y MONTAJE DE SILLA
DE PALETA CON CONCHA DE
PLASTICO Y/O MADERA CON PALETA
INTEGRADA DE MADERA EN FORMA
ESPECIAL HEPTAGONAL.
MANIOBRAS
Y
MONTAJE
DE
PIZARRON
METALICOS (BLANCO)
DE 90X300CM. 0020, 0034 Y DE 60
X120CM. 0033.
010106 MANIOBRAS Y MONTAJE DE
MESA ARMABLE PARA MAESTRO DE
120 X60 X75CM. BINARIA 0015.
SUMINISTRO Y COLOCACION DE
SEALIZACION DE ESTILENO CAL.
40
PARA ESCUELA PRIMARIA
INCLUYE SEALAMIENTOS
DE:
EXTINTOR DE 30 X 25 CM. (1.00
PZA.), QUE HACER EN CASO DE
SISMO E INCENDIOS DE 50 X 60 CM.
(1 PZA), RUTA DE EVACUACION DE
20 X 40 CM. (6.00
P.U.
ESTIMADO
IMPORTE
CANTIDAD
P.U.
CONCEPTOS NO
EJECUTADOS
IMPORTE
CANTIDAD
P.U.
CONCEPTOS ADICIONALES
IMPORTE
CANTIDAD
P.U.
IMPORTE
NO.
EST.
PZA
1.00
342.31
342.31
1.00
342.31
342.31
0.00
342.31
0.00
0.00
342.31
0.00
PZA
2.00
750.55 1,501.10
2.00
750.55 1,501.10
0.00
750.55
0.00
0.00
750.55
0.00
PZA
4.00
149.91
599.64
3.00
149.91
449.73
1.00
149.91
149.91
0.00
149.91
0.00 3 Y 4
PZA
0.00
0.00
0.00
8,353.00
1.00
706.17
706.17
8,909.26
0.00
706.17
0.00
149.91
1.00
706.17
706.17
706.17
PZA
1.00
10.68
10.68
1.00
10.68
10.68
0.00
10.68
0.00
0.00
10.68
0.00
PZA
40.00
16.19
647.60
40.00
16.19
647.60
0.00
16.19
0.00
0.00
16.19
0.00
PZA
1.00
134.94
134.94
1.00
134.94
134.94
0.00
134.94
0.00
0.00
134.94
0.00
PZA
1.00
32.38
32.38
1.00
32.38
32.38
0.00
32.38
0.00
0.00
32.38
0.00
JGO
1.00
892.51
892.51
0.00
892.51
0.00
1.00
892.51
892.51
0.00
892.51
0.00
Tabla V.2.8 octava parte del finiquito de obra de la escuela primaria LAZARO CRDENAS.
FECHA:05/05/2007
FINIQUITO DE OBRA
OBRA:E.P. LAZARO CARDENAS.
LOCALIDAD / MPIO: ATLIACA/TIXTLA GUERRERO.
CONCEPTOS / PARTIDAS
CONTRATADO
U.M.
CANTIDAD
P.U.
TOTAL MONTAJE
TOTAL EDIFICIO "A"
T
T01
11061
11080
11121
11131
12051
12076
31200
IMPORTE
CANTIDAD
P.U.
HOJA:__8__ DE__11__
VARIACIONES
CONCEPTOS NO EJECUTADOS
CONCEPTOS ADICIONALES
ESTIMADO
IMPORTE
CANTIDAD
P.U.
IMPORTE
CANTIDAD
P.U.
IMPORTE
1,718.11
825.60
892.51
0.00
209,211.69
197,707.70
13,929.26
2,425.28
NO.
EST.
OBRA EXTERIOR
PLAZA Y ANDADORES
LIMPIA, TRAZO Y NIVELACION DEL
TERRENO (AREA DE EDIFICIOS)
EXCAVACION
A MANO EN TERRENO
ZONA "B" CLASE II EN SECO MEDIDO
EN BANCO PARA
FORMACIN DE
PISOS, PLAZAS CIVICAS Y CANCHAS
DEPORTIVAS, INCL. ACARREO DENTRO
Y FUERA DE OBRA DE MATERIAL NO
UTIL.
RELLENO Y COMPACT. DE MAT. PROD.
DE EXC. CON PISON Y AGUA, EN CAPAS
DE 20 CM, ESP. INCL. ACARREO
DENTRO DE LA OBRA.
SUM.Y RELLENO DE MAT. INERTE,
COMPACTADO CON PISON Y AGUA, EN
CAPAS DE 20 CM. ESP. INCL. ACARREO
DENTRO DE LA OBRA .
MAMPOSTERIA DE PIEDRA DE LA
REGION ASENTADA CON MORTERO
CEM-CAL-ARENA, PROPORCION 1:2:6
EN CIMENTACION.
MURETE DE ENRASE EN CIMENTACION
CON TABIQUE DE CONCRETO 15 X 20 X
40 CM. JUNTA DE 1.5 CM. DE ESPESOR,
ASENTADO CON MORTERO CEMENTOARENA 1:3
REFUERZO
CON
MALLA
ELECTROSOLDADA 66-10/10 EN PISOS,
INCLUYE SUMINISTRO Y COLOCACION.
634.00
100.00
6.34
634.00
0.00
6.34
0.00
0.00
6.34
35.00
99.74 3,490.90
18.73
99.74
1,868.13
16.27
99.74
1,622.77
0.00
99.74
2Y
0.00 3
M3
22.00
81.48 1,792.56
5.21
81.48
424.51
16.79
81.48
1,368.05
0.00
81.48
2Y
0.00 3
M3
39.70
152.69 6,061.79
29.56
152.69
4,513.52
10.14
152.69 1,548.28
0.00
152.69
2Y
0.00 3
4.32
1,082.38
4,675.88
0.00
1,082.38
0.00
1.32
1,082.38
3Y
1,428.74 5
M2
100.00
M3
M3
6.34
0.00
M2
33.00
209.91 6,927.03
34.15
209.91
7,168.43
0.00
209.91
0.00
1.15
209.91
1Y
241.40 5
M2
100.00
37.03 3,703.00
90.28
37.03
3,343.07
9.72
37.03
359.93
0.00
37.03
2Y
0.00 3
Tabla V.2.9 novena parte del finiquito de obra de la escuela primaria LAZARO CRDENAS
FECHA:05/05/2007
FINIQUITO DE OBRA
OBRA:E.P. LAZARO CARDENAS.
LOCALIDAD / MPIO: ATLIACA/TIXTLA GUERRERO.
HOJA:__9__ DE__11__
CLAVE
CONCEPTOS / PARTIDAS
CONTRATADO
U.M.
CANTIDAD
P.U.
VARIACIONES
ESTIMADO
IMPORTE
CANTIDAD
P.U.
CONCEPTOS NO EJECUTADOS
IMPORTE
CANTIDAD
P.U.
CONCEPTOS ADICIONALES
IMPORTE
CANTIDAD
P.U.
IMPORTE
NO.
EST.
31220 PISO
CONCRETO
F'C=150KG/CM2
10CM. ESP. ACABADO PULIDO O
RAYADO/BROCHA/ PELO; LOSAS 3.06 X
2.0 M. JUNTAS FRIAS ACABADO CON
VOLTEADOR INCLUYE CIMBRA.
2Y
3
M2
100.00
197.63
19,763.00
90.28
197.63
17,842.04
9.72
197.63
1,920.96
0.00
197.63
0.00
ML
64.44
213.96
13,787.58
0.00
213.96
0.00
64.44
213.96
13,787.58
0.00
213.96
0.00
71.00
90.98
6,459.58
40.78
90.98
3,710.16
30.22
90.98
2,749.42
0.00
90.98
0.00
100.00
7.28
728.00
90.28
7.28
657.24
9.72
7.28
70.76
0.00
7.28
0.00
31251 GUARNICION
31256
37005
DE
CONCRETO
F
C=150KG/CM2 DE 15X30CM SIN ARMAR
INCLUYE CIMBRA.
FORJADO DE NARIZ EN BANQUETAS,
SE INCLUYE UNICAMENTE CIMBRA Y
MANO DE OBRA.
LIMPIEZA DE PISO DE CONCRETO,
MOSAICO DE PASTA, CERAMICA, ETC.
CON
CEPILLO, AGUA Y ACIDO
CLORHIDRICO.
TOTAL PLAZA Y ANDADORES
66,594.58
23,427.75
44,836.98
1,670.14
51428
ELECTRICO
60X60X80CM.CON BLOCK CEMENTO O
TABIQUE PULIDO CON TAPA DE LAMINA
Y FONDO DE ARENA.
SUMINISTRO
Y
TENDIDO
TUBO
CONDUIT PVC PESADO 19 MM.
DIAMETRO INCLUYE CONEXIONES,
TRAZO, EXCAVACION Y RELLENO.
51429 SUMINISTRO
3.00
1,695.0
7
5,085.21
7.00
1,695.0
7
11,865.49
0.00
1,695.0
7
0.00
4.00
1,695.07
6,780.28
92.00
38.21
3,515.32
0.00
38.21
0.00
92.00
38.21
3,515.32
0.00
38.21
0.00
18.00
51.04
918.72
91.38
51.04
4,664.04
0.00
51.04
0.00
73.38
51.04
3,745.31
180.00
15.11
2,719.80
0.00
15.11
0.00
180.00
15.11
2,719.80
0.00
15.11
0.00
TENDIDO
TUBO
CONDUIT PVC PESADO 25 MM.
INCLUYE
CONEXIONES,
TRAZO,
EXCAVACION Y RELLENO.
3Y
5
3Y
5
COBRE
CON AISLAMIENTO THW
CALIBRE
# 10 INCLUYE CINTA
AISLANTE.
Tabla V.2.10 decima parte del finiquito de obra de la escuela primaria LAZARO CRDENAS.
FECHA:05/05/2007
FINIQUITO DE OBRA
OBRA:E.P. LAZARO CARDENAS.
NO. DE CONTRATO:FAM-B/313/2006/A.D.
MONTO CONTRATADO: $ 339,569.09 C/IVA.
CLAVE
CONCEPTOS / PARTIDAS
U.M.
CONTRATADO
ESTIMADO
HOJA:__10__DE__11__
VARIACIONES
51469
51493
P.U.
IMPORTE
CANTIDAD
P.U.
IMPORTE
CANTIDAD
P.U.
CONCEPTOS ADICIONALES
IMPORTE
CANTIDAD
P.U.
IMPORTE
ML
199.50
26.11
5,208.95
189.76
26.11
4,954.63
9.74
26.11
254.31
0.00
26.11
0.00
ML
90.00
22.48
2,023.20
0.00
22.48
0.00
90.00
22.48
2,023.20
0.00
22.48
0.00
NO.
EST.
21,484.16
8,512.63
10,525.59
86,065.78
66,321.14
31,940.38
12,195.73
TOTAL DE OBRA
295,277.47
264,028.84
45,869.64
14,621.01
Tabla V.2.11 resumen de finiquito de obra por partidas, de la escuela primaria LAZARO CRDENAS
FECHA:05/05/2007
FINIQUITO DE OBRA
OBRA:E.P. LAZARO CARDENAS.
LOCALIDAD / MPIO: ATLIACA/TIXTLA GUERRERO.
HOJA:__11__DE__11__
VARIACIONES
CLAVE
CONCEPTOS / PARTIDAS
CONTRATADO
U.M.
CANTIDAD
P.U.
IMPORTE
ESTIMADO
CANTIDAD
P.U.
CONCEPTOS NO
EJECUTADOS
IMPORTE
CANTIDAD
P.U.
IMPORTE
CONCEPTOS ADICIONALES
CANTIDAD
P.U.
IMPORTE
NO.
EST.
RESUMEN DE PARTIDAS
EDIFICIO "A"
A01
A02
CIMENTACION
ESTRUCTURA
59,189.85
50,978.22
9,123.68
912.06
39,285.28
39,143.67
141.61
0.00
A03
ALBAILERIA Y ACABADOS
98,984.07
95,497.16
3,540.60
53.69
A04
HERRERIA
1,681.38
2,353.79
80.95
753.36
A05
INSTALACIONES
8,353.00
8,909.26
149.91
706.17
A07
MONTAJE
1,718.11
825.60
892.51
0.00
T
T01
TO2
209,211.69
197,707.70
13,929.26
2,425.28
66,594.58
44,836.98
23,427.75
1,670.14
RED ELECTRICA
19,471.20
21,484.16
8,512.63
10,525.59
86,065.78
66,321.14
31,940.38
12,195.73
OBRA EXTERIOR
PLAZA Y ANDADORES
295,277.47
264,028.84
45,869.64
14,621.01