GRUPO CONSTRUCCION ARGREY S. DE R. L. DE C. V.

DOSIFICACION DE MORTEROS Y COSTO POR M3


CEMENTO ARENA AGUA IMPORTE TOTAL IMPORTE TOTAL

(TON) (TON) (M3) 1 M3 X BULTO


MORTEROS DOSIFICACION
$ COSTO $ COSTO $ COSTO
$ TOTAL $ TOTAL
2,200.00 340.00 4.50

CEMENTO-ARENA 1-2 1,386.0000 340.0000 1.2825 1,727.28 137.09

CEMENTO-ARENA 1-3 1,188.0000 357.0000 1.2600 1,546.26 143.17

CEMENTO-ARENA 1-4 968.0000 374.0000 1.2510 1,343.25 152.64


CEMENTO-ARENA 1-5 836.0000 391.0000 1.2375 1,228.24 161.61
CEMENTO-ARENA 1-6 682.0000 397.8000 1.2375 1,081.04 174.36

CEMENTO CALHIDRA ARENA AGUA


MORTEROS DOSIFICACION
(TON) (TON) (TON) (M3)
CEMENTO-ARENA 1-2 0.6300 1.0000 0.2850
CEMENTO-ARENA 1-3 0.5400 1.0500 0.2800

CEMENTO-ARENA 1-4 0.4400 1.1000 0.2780


CEMENTO-ARENA 1-5 0.3800 1.1500 0.2750

CEMENTO-ARENA 1-6 0.3100 1.1700 0.2750


UN BULTO CEMENTO GRIS + 1,5 CARRETILLAS ARENA = 4.50 Cubetas de 19lts. ( 0.0855m3 )

COSTO DE MATERIALES
CEMENTO ARENA GRAVA AGUA

PRECIO x TON: PRECIO x CAMIÓN PRECIO x CAMIÓN PRECIO x PIPA


20 Bultos de 50 Kg. DE 7M3 DE 7M3 DE 4000 LTS

$2,200.00 $2,450.00 $2,450.00 $18.00

PRECIO x BULTO:

DE 50 KG PRECIO x M3: PRECIO x M3: PRECIO x M3:


$110.00 $350.00 $350.00 $4.50

DESPERDICIO: DESPERDICIO: DESPERDICIO: DESPERDICIO:

3% 8% 8% 30%
1.03 1.08 1.08 1.30

COSTO CON DESP. COSTO CON DESP. COSTO CON DESP. COSTO CON DESP.
DOSIFICACION DE CONCRETOS $2,266.00 $378.00 $378.00 $5.85
CLASIFICACIÓN AGREGADO CEMENTO BULTOS ARENA GRAVA AGUA $$$ x M3 CON

F´C= REVENIMIENTO MÁXIMO TONELADA DE 50 KG M3 M3 M3 DESPERDICIO


8 A 10 CM 3/4" 0.260 5.20 0.500 0.680 0.195 $1,036.34
100kg/cm2 1 1/2" 0.254 5.08 0.470 0.700 0.190 $1,018.94
FIRMES Y
PLANTILLAS 12 A 15 CM 3/4" 0.286 5.72 0.500 0.680 0.215 $1,095.37
1 1/2" 0.280 5.60 0.470 0.700 0.210 $1,077.97

8 A 10 CM 3/4" 0.323 6.46 0.480 0.670 0.210 $1,167.85


150kg/cm2
FIRMES, 1 1/2" 0.308 6.16 0.450 0.700 0.200 $1,133.80
DALAS Y 12 A 15 CM 3/4" 0.354 7.08 0.480 0.670 0.230 $1,238.21
CASTILLOS
1 1/2" 0.338 6.76 0.450 0.700 0.220 $1,201.90
8 A 10 CM 3/4" 0.355 7.10 0.470 0.650 0.195 $1,228.93
200kg/cm2 1 1/2" 0.337 6.74 0.440 0.680 0.185 $1,188.08
LOSA DE
ENTREPISO 12 A 15 CM 3/4" 0.391 7.82 0.470 0.650 0.215 $1,310.62

1 1/2" 0.373 7.46 0.440 0.680 0.205 $1,269.78


250kg/cm2
PISOS 8 A 10 CM 3/4" 0.423 8.46 0.465 0.640 0.190 $1,377.32
ESTRUTURAL
ES, 1 1/2" 0.400 8.00 0.435 0.670 0.180 $1,325.14
COLUMNAS, 12 A 15 CM 3/4" 0.467 9.34 0.465 0.640 0.210 $1,477.14
DADOS,
ZAPATAS Y 1 1/2" 0.445 8.90 0.435 0.670 0.200 $1,427.23
TRABES

Página 1
GRUPO CONSTRUCCION ARGREY S. DE R. L. DE C. V.

Area (cm2)
varilla #
Número de varillas
#/8 1 2 3 4 5 6 7 8
3 0.713 1.425 2.138 2.850 3.563 4.275 4.988 5.700
4 1.267 2.534 3.800 5.067 6.334 7.601 8.867 10.134
5 1.979 3.959 5.938 7.917 9.897 11.876 13.855 15.835
6 2.850 5.700 8.551 11.401 14.251 17.101 19.952 22.802
7 3.879 7.759 11.638 15.518 19.397 23.277 27.156 31.036
8 5.067 10.134 15.201 20.268 25.335 30.402 35.470 40.537
9 6.413 12.826 19.239 25.652 32.065 38.478 44.891 51.304
10 7.917 15.835 23.752 31.669 39.587 47.504 55.421 63.338