RMTC

Compact
WWTP
RMTC
John Harrison & Dayna Fujimoto
March 16, 2010

Drivers
Drivers -- for
for Compact
Compact Plants
Plants
1. Land Cost or Availability
2. Reduce Impact to Neighbors
3. Site Constraints

Compact WWTPs 2010 HWEA

RMTC

Typical WWTP

Total = 7.05 A (100%)


Facility = 3.20 A (45% of Total)

2nd = 1.21 A (38% of Facility)

Typical Facility Areas (70%)


15% Pri Clarifiers

10% Admin Bldg

19% Aeration Basins


7% Disinfection
19% 2nd Clarifiers

Compact WWTPs 2010 HWEA

RMTC

Reducing
Reducing the
the Footprint
Footprint
1. Discharge Limitations
2. Physical Arrangement
3. Design Criteria
4. Process Choice

1. Discharge Standards
cBOD

1.0 x

Seasonal N

2.0 x

Yearly N

3.0 x

N/dN

3.5 x

High Flow Provision

Compact WWTPs 2010 HWEA

RMTC

2. Physical Arrangement
Modifying Shape
Deepening Reactor
Stacking Units
Buildings for Covers (Multipurpose)

Rectangular Tanks vs Circular Tanks


Can Decrease Footprint by 35 %

Insert graphic

Circular Tanks

Compact WWTPs 2010 HWEA

Rectangular Tanks

RMTC

There are Three-Tiered Settling Tanks

Incorporating Plant into Multipurpose


Buildings Saves Space

Compact WWTPs 2010 HWEA

RMTC

Stacking

3. Design Criteria

MLSS
MCRT
Organic Load Rate
Hydraulic Load Rate

Compact WWTPs 2010 HWEA

RMTC

4.1 Suspended Growth Processes

1.
2.
3.
4.

Conventional Activated Sludge (CAS)


Step Feed Activated Sludge (SFAS)
Cannibal Activated Sludge (CAAS)
Vertical Loop Activated Sludge (VLAS)

Compact WWTPs 2010 HWEA

RMTC

Compact WWTPs 2010 HWEA

RMTC

4.2 Fixed Film Related Processes


5.
6.
7.
8.

Moving Bed Bioreactor (MBBR)


Moving Bed Activated Sludge (MBAS)
High Rate Trickling Filter (HRTF)
Roughing Filter Activated Sludge (RF/AS)

Compact WWTPs 2010 HWEA

RMTC

Compact WWTPs 2010 HWEA

RMTC

Compact WWTPs 2010 HWEA

RMTC

4.3 Advanced Treatment Processes

9. Membrane Bioreactor (MBR)


10. Biological Aerated Filter (BAF)

Compact WWTPs 2010 HWEA

RMTC

Observations

Compact WWTPs 2010 HWEA

RMTC

Tradeoffs for Reduced Size


1. Capital Cost
2. Operation Cost / Ease
3. Perception & Needs
4. Peaking Capability
5. Flexibility & Adaptability
6. Support Systems

Mahalo !
Questions?

Compact WWTPs 2010 HWEA