Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Metrado Camara Carga MARZO 2015
Metrado Camara Carga MARZO 2015
CONTRATISTA
SUPERVISIN
: COLPEXPROJECT
OBRA
Limpieza y Desbroce
2.18.
2.03
2.04
2.05
3.02
3.03
PROGRESIVA
(Km.)
VOLUMEN
(m)
CLASIFICACION DE SUELOS
(m)
DIST.
(m)
RELLENO
CORTE
RELLENO
CORTE
(m)
(m)
(m)
(m)
00 + 000.00
8.95
00 + 007.17
7.17
4.15
46.96
00 + 010.34
3.17
7.88
19.07
00 + 016.26
5.92
32.85
120.56
00 + 022.12
5.86
38.89
210.20
MAT.
SUELTO
2.03.
CONTRATANTE
CONTRATISTA
SUPERVISIN
: COLPEXPROJECT
OBRA
Limpieza y Desbroce
2.18.
2.03
2.04
2.05
3.02
3.03
PROGRESIVA
(Km.)
VOLUMEN
(m)
CLASIFICACION DE SUELOS
(m)
DIST.
(m)
RELLENO
CORTE
RELLENO
CORTE
(m)
(m)
(m)
(m)
2.03.
00 + 022.42
0.30
50.65
13.43
00 + 025.07
2.65
45.52
127.43
00 + 028.02
2.95
43.84
131.81
00 + 028.65
0.63
20.03
20.12
00 + 029.28
0.63
2.63
7.14
0.95
0.65
00 + 030.23
MAT.
SUELTO
1.56
698.28
015
CLASIFICACION DE SUELOS
ROCA
ROCA
SUELTA
FIJA
2.04.
2.05.
015
CLASIFICACION DE SUELOS
ROCA
ROCA
SUELTA
FIJA
2.04.
2.05.