Documentos de Académico
Documentos de Profesional
Documentos de Cultura
l/s
CAUDAL DE BOMBEO
QSB =
23.53
l/s
NUMERO DE CICLOS
U=
4.00
HORA
TIEMPO DE BOMBEO
Tc =
900.00
4.41
m3
PRESION MINIMA
Vu =
PMIN =
30.00
PRESION MAXIMA
PMAX =
45.00
PORCENTAJE DE VOLUMEN
VULUMEN TOTAL
DIAMETRO
%Vu =
Vt =
D=
30%
14.71
3.00
m3
m
ALTURA DE TANQUE
H=
4.50
AREA DE TANQUE
A=
7.07
m2
TLL =
TV=
TLL/(TLL+TV)=
3.13
3.75
min
min
VOLUMEN UTIL
TIEMPO DE BOMBEO
TIEMPO DE VACIADO
% DE ENERGIA POR CICLO
TIEMPO DE CICLO
CICLOS HORA A CMH
TIEMPO USO BOMBA
Tc =
Nc =
Tu =
PSB =
PSB =
F=
E=
0.45
6.88
8.73
27.27
0.75
19.61
Ve =3.53
3.00
QB =
Ve =21.21
0.75
4.50
3.00
Ve =3.53
min
min
20
HP
15
0.55
9.00
Kw
Kw/HORA
QB =
13.07 l/s
CAUDAL DE BOMBEO
QSB =
23.53 l/s
NUMERO DE CICLOS
U=
4.00 HORA
0.75
3.00
Ve =3.53
PRESION MINIMA
Vu =
PMIN =
30.00 m
PRESION MAXIMA
PMAX =
45.00 m
PORCENTAJE DE VOLUMEN
VULUMEN TOTAL
DIAMETRO
%Vu =
Vt =
D=
30%
14.71 m3
3.00 m
ALTURA DE TANQUE
H=
4.50 m
AREA DE TANQUE
A=
7.07 m2
TIEMPO DE BOMBEO
TIEMPO DE VACIADO
TLL =
TV=
TLL/(TLL+TV)=
3.13 MIM
5.63 MIM
Tc =
Nc =
Tu =
PSB =
PSB =
F=
E=
0.75
VOLUMEN UTIL
3.00
Tc =
Ve =21.21
0.75
TIEMPO DE BOMBEO
Ve =3.53
Ve =3.53
900.00 s
0.36
8.75 MIM
6.86
21.43 MIN
20 HP
14.8 Kw
0.70
7.00 Kw/HORA
4.50
4.41 m3
Ve =3.53
Ve =21.21
QB =
19.61
l/s
CAUDAL DE BOMBEO
QSB =
23.53
l/s
QAireyAgua =
16.16
l/s
VOLUMEN DE AIRE
VE =
3.53
m2
Vc =
21.21
m3
TIEMPO DE BOMBEO
TLL =
9.88
min
TIEMPO DE VACIADO
TV =
18.03
MIM
TLL/(TLL+TV) =
0.35
27.91
2.15
MIM
Tu =
PSB =
21.25
MIN
30.00
HP
PSB =
Kw
F=
22.20
0.28
E=
8.08
Kw/HORA
Tc =
Nc =
Ve =3.53
QB =
19.61
l/s
CAUDAL DE BOMBEO
QSB =
23.53
l/s
QAireyAgua =
16.16
l/s
Ve =3.53
Ve =21.21
VOLUMEN DE AIRE
VE =
3.53
m2
Vc =
21.21
m3
TIEMPO DE BOMBEO
TLL =
12.09
min
TIEMPO DE VACIADO
TV =
27.04
min
TLL/(TLL+TV) =
0.31
39.13
1.53
min
Tu =
PSB =
18.54
min
30.00
HP
PSB =
Kw
F=
22.20
0.32
E=
7.01
Kw/HORA
Tc =
Nc =