"SELECCIN"
EQ. Y HERRAMIENTA
EQ. Y HERRAMIENTA
EQ. Y HERRAMIENTA
Cdigo
BAI0001
EAN0001
EQGA003
MAAR0016
Descripcin
Unid.
COMPACTADOR BAILARINA
ANDAMIO METALICO DE 2 X 2
REVOLVEDORA MIPSA-KOHLER 1 SACO
ARMADURA SOLDADA CASTILLO ARMEX 15X15-4
HR
PZA
HR
MT
LISTA DE ELEM
Costo
$0.00
$0.00
$6.62
$4.20
No.
1
2
3
4
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
5
MAAR0017
MAGU0010
MALA0180
MALA0190
MARM0018
AGUA
ALAMBRE RECOCIDO No. 18
ALAMBRON LISO DEL No.2, DIAM. 1/4"(6MM.)
ARMADURA SOLDADA CASTILLO ARMEX 15X25-4
M3
KG
TON
MT
$2.21
$2.52
$2,000.00
$4.65
MBAR0009
MCEM0010
MCEM0050
MCEM0060
MCLA0021
MCOM0010
MDUE0001
MEZ0002
MEZ0005
MEZ0011
MHIL0001
MIMP0001
TON
TON
TON
TON
KG
LT
PT
M3
M3
M3
ML
LT
$1,250.10
$245.46
$241.82
$350.00
$2.87
$0.78
$3.90
$339.18
$165.89
$355.96
$0.00
$0.00
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MJUNT0001 JUNTEADOR
GRIS
CON ARENA
PERDURA STONE, SACO DE 10 K
MARCA SACO
$4.43
$37.39
MMAD0044
MMAD0045
MMAD0047
MMAD0049
MMAL0050
PT
PT
PT
PT
M2
$2.86
$2.86
$2.86
$0.00
$3.32
MMAL0080
$5.96
MMAL0090
$4.43
$0.00
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MANO DE OBRA.
MANO DE OBRA.
MANO DE OBRA.
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MMOR0060
MOMM01
MOMM30
MOMM32
MPET0040
MPET0170
MPGP0001
MPIN0001
MPIN0060
MPIN0069
MPIS0240
MRES0051
MSEL0001
MORTERO TOLTECA
PEON
OFICIAL ALBANIL
OFICIAL PINTOR
ARENA P/CONCRETOS
GRAVA P/CONCRETOS 3/4"
PEGAPISO GRIS MARCA PERDURA STONE
PINTURA ESMALTE
PINTURA COLOR BLANCA BERLINTE
SELLADOR VINILICO
PISO VITROMEX BCO. 2 AMERICAS 33X33 CM
YESO DE RESANADOR
SELLADOR PASA AISLAFLEX SELLO
TON
JOR
JOR
JOR
M3
M3
SACO
CUB
CUB
LT
M2
KG
LT
$1,043.47
$217.50
$362.50
$290.00
$45.46
$45.46
$40.87
$1,089.56
$668.69
$473.91
$96.52
$0.00
$0.00
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
MATERIALES
EQ. Y HERRAMIENTA
MTAB0070
MTAB0090
MVAR0009
MVAR0012
MVAR0013
MVAR0014
MVAR0015
MVAR0016
MVAR0017
PUR0001
VAGA001
MILL
MILL
TON
TON
TON
TON
TON
TON
TON
PZA
HR
$1,800.00
$1,280.10
$1,409.09
$1,595.00
$1,413.63
$1,404.54
$1,395.45
$1,395.45
$1,395.45
$0.00
$0.00
* Al seleccionar la celda de
"SELECCIN" B5, Se muestra la
cejilla del FILTRO, para verificar el
tipo de elemento constructivo.
Descripcin Corta.
Texto completoUnidad
DEMOLICIONES
DEM0001
DEMOLICIONM3
DEM0002
DEMOLICIONM3
DEM0004
DEMOLICIONM3
DEM0009
DEMOLICIONM2
DEM0010
DEMOLICIONM2
DEM0014
DEMOLICIONM3
DEM0020
DEMOLICIONM2
DEM0022
DEMOLICIONUnidad
DEM0028
DEMOLICIONM2
DEM0029
DEMOLICIONM2
DEM0043
DEMOLICIONM2
PRELIMINARES
LTZ0001
LIMPIEZA DE M2
EXC0001
EXCAVACINM3
LTZ0005
TRAZO Y NI M2
CIMENTACIN
CIM0001
CIMENTACION
M3
RELL01CC
RELLENO ENM3
RELL01CM
RELLENO DEM3
CASTILLOS Y COLUMNAS
CAST001V
CASTILLO COM
CAST002V
CASTILLO COM
CAST003V
CASTILLO COM
CAST004V
CASTILLO COM
CAST005V
CASTILLO COM
CAST010V
CASTILLO COM
CAST006V
CASTILLO COM
CAST007V
CASTILLO COM
CAST008V
CASTILLO COM
CAST009V
CASTILLO COM
DALA CON S M
DALA002A
DALA CON S M
DALA003A
DALA CON S M
DALA004A
DALA CON S M
DALA005A
DALA CON S M
DALA006A
DALA CON S M
DALA007A
DALA CON S M
DALA008A
DALA CON S M
DALA009A
DALA CON S M
FIRMES
PLA05-100
PLANTILLA DM2
PIS05-100
FIRME DE COM2
PIS05-150
FIRME DE COM2
PIS08-150
FIRME DE COM2
PIS08-200
FIRME DE COM2
PIS10-150
FIRME DE COM2
PIS10-200
FIRME DE COM2
PIS15-150
FIRME DE COM2
PIS15-200
FIRME DE COM2
MUROS
MURLAD7
MURO DE TAB
M2
MURO DE TAB
M2
MURO DE TAB
M2
MURTAB10
MURO DE TAB
M2
MURTAB14
MURO DE TAB
M2
MURTAB28
MURO DE TAB
M2
MURTABI1
MURTABE1
MURTABI2
MURTABE2
MURMIXID
MURMIXED
MURMIXIE
MURDUR2
PLATAB001
PLAPOLI001
DETTAB001
DETTAB002
MDURINT
MUROS ESPECIALES
MURO LAMBRN DE TABLAROCA TIPO INTERIOR
MURO LAMBRN DE TABLAROCA TIPO INTEMPERI
MURO DE TABLAROCA A 2 CARAS TIPO INTERIO
MURO DE TABLAROCA A 2 CARAS TIPO INTEMPE
MURO MIXTO TABLAROCA TIPO INTERIOR - DUR
MURO MIXTO TABLAROCA TIPO INTEMPERIE - D
MURO DE TABLAROCA TIPO INTERIOR - INTEM
MURO A 2 CARAS DE DUROK.
PLAFN DE TABLAROCA
PLAFN DE POLIESTIRENO DE 1" DE ESP. CON
FABRICACIN DE DETALLES DE TABLAROCA (EN
FABRICACIN DE BOQUILLAS.
MURO LAMBRIN DE DUROK
ENTREPISOS Y CUBIERTAS
LOSA10-200 LOSA TECHO 10 CM, VAR. #3, FC=200
LOSA10-250 LOSA TECHO 10 CM, VAR. #3, FC=250
MURO DE PRM
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
ML
M2
LOSA DE 10 M2
LOSA DE 10 M2
HERRERA Y CANCELERA
PTA0001
SUMINISTROPZA
VENT0001
SUMINISTROPZA
ACABADOS
PIS0080
SUMINISTROM2
PIN0001
SUMINISTROM2
PIN0002
SUMINISTROM2
IMP0001
SUMINISTROM2
APL0025
EMBOQUILLAM
APL0022
APLANADO EM2
PSO0001
ACABADO ESM2
PSO0002
ACABADO PUM2
MEZ0003
MEZ0004
MEZ0005
MEZ0006
MEZ0007
MEZ0009
MEZ0010
MEZ0011
MEZ0012
MEZ0013
MEZ0014
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
FCO100M
CONCRETO FM3
FCO100R
CONCRETO F'
M3
FCO150M
CONCRETO FM3
FCO150R
CONCRETO FM3
FCO200M
CONCRETO FM3
FCO200R
CONCRETO FM3
FCO250M
CONCRETO FM3
FCO250R
CONCRETO FM3
ACARREOS
ACR0009
ACARREO ENM3
ACR0012
ACARREO ENM3
ACR0013
ACARREO ENM3
ACR0037
ACR0082A
ACARREO A MIL
M3
HABILITADO TON
AREF2.5
HABILITADO TON
AREF3
HABILITADO TON
AREF4
HABILITADO TON
AREF5
HABILITADO TON
AREF6
HABILITADO TON
AREF8
HABILITADO TON
AREF10
HABILITADO TON
AREF12
HABILITADO TON
MAL66-6/6
HAB.ARM. D M2
MAL66-8/8
HAB.ARM. D M2
HAB.ARM. M M2
ARM15X15
SUMINISTROM
ARM15X20
SUMINISTROM
ARM15X25
SUMINISTROM
CUAD001
CUAD005
CUAD040
CUAD060
CUADRILLAS
CUADRILLA 001(1 PEON)
CUADRILLA 005(5 PEONES)
CUADRILLA 040(1ALBANIL+1PEON)
CUADRILLA 060 (1 PINTOR)
JOR
JOR
JOR
JOR
CIMBRAS
CFZAP
CIMBRA Y D M2
CDADO
CIMBRA Y D M2
CCADE
CIMBRA Y D M2
CCAST
CIMBRA Y D M2
CIMBRA Y DEM2
CIMBRA Y DEM2
VACIADOS
VDACAS150 VAC. DALA Y CAST, FC=150, RN. AGR. 3/4"
VACIADO DE M3
VACIADO DE M3
VACIADO DE M3
VCL200
VACIADO DE M3
VCL250
VACIADO DE M3
VZTL150
VACIADO DE M3
VZTL200
VACIADO DE M3
VZTL250
VACIADO DE M3
VCOL150
VACIADO DE M3
VCOL200
VACIADO DE M3
VCOL250
VACIADO DE M3
VACIADO DE M3
VACIADO DE M3
VLOSA150
VACIADO DE M3
VLOSA200
VACIADO DE M3
VLOSA250
VACIADO DE M3
VCIM100R
VACIADO DE M3
VCIM150R
VACIADO DE M3
VCIM200R
VACIADO DE M3
VCIM250R
VACIADO DE M3
Rend.
040
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA 001 (1 PEON)
040
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
040
040
040
040
040
unidad
1.50
0.60
5.50
12.50
6.50
0.65
16.67
7.52
25.00
19.00
22.22
M3/JOR
27.03
2.78
100.00
M2/JOR
2.75
4.35
4.35
M3/JOR
M3/JOR
M3/JOR
M2/JOR
M2/JOR
M3/JOR
M2/JOR
Unidad/JOR
M2/JOR
M2/JOR
M2/JOR
M3/JOR
M2/JOR
M3/JOR
M3/JOR
10.84
10.84
10.84
9.79
9.79
9.64
9.79
8.74
8.74
8.74
M/JOR
12.76
12.76
12.76
12.12
12.12
12.12
11.48
11.48
11.48
M/JOR
M/JOR
M/JOR
M/JOR
M/JOR
M/JOR
M/JOR
M/JOR
M/JOR
M/JOR
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
040
040
040
040
040
M/JOR
M/JOR
M/JOR
M/JOR
M/JOR
M/JOR
M/JOR
M/JOR
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
040
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
040
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
040
040
040
040
040
040
040
040
20.00
15.00
15.00
15.00
15.00
15.00
15.00
12.00
12.00
M2/JOR
12.00
10.00
6.49
10.00
10.00
10.00
5.00
M2/JOR
2.50
2.50
M2/JOR
M2/JOR
M2/JOR
M2/JOR
M2/JOR
M2/JOR
M2/JOR
M2/JOR
M2/JOR
M2/JOR
M2/JOR
M2/JOR
M2/JOR
M/JOR
PZA/JOR
PZA/JOR
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA 060 (1 PINTOR)
040
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
040
040
040
12.00
20.00
21.45
30.00
26.71
9.00
45.45
30.00
M2/JOR
M2/JOR
M2/JOR
M2/JOR
M/JOR
M2/JOR
M2/JOR
M2/JOR
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
040
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
040
040
040
040
040
040
040
040
1.59
15.02
1.59
15.02
1.59
15.02
1.50
15.00
M3/JOR
13.33
5.25
5.50
###
M3/JOR
0.10
0.12
0.14
0.16
0.17
0.18
0.22
0.25
0.28
82.10
84.03
98.04
120.05
120.05
120.05
7.97
7.97
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
MIL/JOR
TON/JOR
TON/JOR
TON/JOR
TON/JOR
TON/JOR
TON/JOR
TON/JOR
TON/JOR
TON/JOR
M2/JOR
M2/JOR
M2/JOR
M/JOR
M/JOR
M/JOR
M2/JOR
M2/JOR
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
040
040
14.01
14.01
6.95
6.65
M2/JOR
1.33
1.33
1.33
2.50
2.50
3.24
3.24
3.24
3.10
3.10
3.10
3.10
3.10
2.50
2.50
2.50
3.24
3.24
3.24
3.24
M3/JOR
M2/JOR
M2/JOR
M2/JOR
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
CUADRILLA
(1ALBANIL+1PEON)
CUADRILLA
040
(1ALBANIL+1PEON)
040
040
040
040
040
040
040
040
040
040
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
M3/JOR
Lista de elementos que componen la BASE de datos que intervienen generalmente en un Anlisis de PU.
* Como se muestra en la mayor parte de las tarjetas, la mano de obra es de Albail y pen. Esto es, porque en obra pequea,
son ellos los que realizan la mayor parte de los trabajos. Pero para obra grande, es necesario desglosar la mano de obra, con
las categoras referentes a cada trabajo. En mi caso, estoy tomando la mano de obra de una obra comn.
MEZ0003
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MCEM0060
TON
0.00
0.433630
$350.00
$151.77
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.208030
$45.46
$54.92
MAGU0010
AGUA
M3
0.00
0.321600
$2.21
$0.71
Subtotal: MATERIALES
$207.40
Costo directo
$207.40
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
MEZ0004
$207.40
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MCEM0060
TON
0.00
0.361633
$350.00
$126.57
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.234700
$45.46
$56.13
MAGU0010
AGUA
M3
0.00
0.314000
$2.21
$0.69
Subtotal: MATERIALES
$183.39
Costo directo
$183.39
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
MEZ0005
$183.39
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MCEM0060
TON
0.00
0.307455
$350.00
$107.61
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.266880
$45.46
$57.59
MAGU0010
AGUA
M3
0.00
0.310800
$2.21
$0.69
Subtotal: MATERIALES
$165.89
Costo directo
$165.89
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
MEZ0006
Cdigo
MATERIALES
$165.89
M3
Unidad
Rend.
Cantidad
Costo
Importe
MCEM0060
TON
0.00
0.255440
$350.00
$89.40
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.353500
$45.46
$61.53
MAGU0010
AGUA
M3
0.00
0.302400
$2.21
$0.67
Subtotal: MATERIALES
$151.60
Costo directo
$151.60
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
MEZ0007
$151.60
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MCEM0060
TON
0.00
0.215270
$350.00
$75.34
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.396300
$45.46
$63.48
MAGU0010
AGUA
M3
0.00
0.296400
$2.21
$0.66
Subtotal: MATERIALES
$139.48
Costo directo
$139.48
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
MEZ0009
$139.48
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MCEM0010
MORTERO HIDRAULICO
TON
0.00
0.429500
$245.46
$105.43
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.203700
$45.46
$54.72
MAGU0010
AGUA
M3
0.00
0.356400
$2.21
$0.79
Subtotal: MATERIALES
$160.94
Costo directo
$160.94
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
MEZ0010
$160.94
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MMOR0060 MORTERO TOLTECA
TON
0.00
0.341960
$1,043.47
$356.83
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.232597
$45.46
$56.03
MAGU0010
AGUA
M3
0.00
0.341000
$2.21
$0.75
Subtotal: MATERIALES
$413.61
Costo directo
$413.61
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
MEZ0011
Cdigo
$413.61
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MMOR0060 MORTERO TOLTECA
TON
0.00
0.285300
$1,043.47
$297.70
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.264700
$45.46
$57.49
MAGU0010
AGUA
M3
0.00
0.346800
$2.21
$0.77
Subtotal: MATERIALES
$355.96
Costo directo
$355.96
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
MEZ0012
$355.96
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MMOR0060 MORTERO TOLTECA
TON
0.00
0.238900
$1,043.47
$249.28
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.286100
$45.46
$58.47
MAGU0010
AGUA
M3
0.00
0.344400
$2.21
$0.76
Subtotal: MATERIALES
$308.51
Costo directo
$308.51
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
MEZ0013
$308.51
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MMOR0060 MORTERO TOLTECA
TON
0.00
0.218300
$1,043.47
$227.79
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.296800
$45.46
$58.95
MAGU0010
AGUA
M3
0.00
0.338400
$2.21
$0.75
Subtotal: MATERIALES
$287.49
Costo directo
$287.49
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
MEZ0014
$287.49
Cdigo
Concepto
M3
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MMOR0060 MORTERO TOLTECA
TON
0.00
0.187400
$1,043.47
$195.55
MPET0040
ARENA P/CONCRETOS
M3
0.00
1.318200
$45.46
$59.93
MAGU0010
AGUA
M3
0.00
0.332400
$2.21
$0.73
Subtotal: MATERIALES
$256.21
Costo directo
$256.21
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
Anlisis: FCO100M
FCO100M
$256.21
Unidad: M3
M3
FCO100M
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MCEM0060
TON
0.00
0.275000
$350.00
$96.25
MPET0040
ARENA P/CONCRETOS
M3
0.00
0.544600
$45.46
$24.76
MPET0170
M3
0.00
0.659100
$45.46
$29.96
MAGU0010
AGUA
M3
0.00
0.260400
$2.21
$0.58
JOR
1.59
0.628931
$245.78
$154.58
MANO DE OBRA
CUAD001
$151.55
$154.58
Costo directo
$306.13
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
FCO100R
$306.13
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MCEM0060
TON
0.00
0.275000
$350.00
$96.25
MPET0040
ARENA P/CONCRETOS
M3
0.00
0.544600
$45.46
$24.76
MPET0170
M3
0.00
0.659100
$45.46
$29.96
MAGU0010
AGUA
M3
0.00
0.260400
$2.21
$0.58
HR
0.00
0.533330
$6.62
$3.53
JOR
15.02
0.066578
$1,228.88
$81.82
SUBCONTRATOS
EQGA003
MANO DE OBRA
CUAD005
$151.55
$81.81
Subtotal: SUBCONTRATOS
$3.53
Costo directo
$236.89
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
FCO150M
$236.89
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MCEM0060
TON
0.00
0.327500
$350.00
$114.63
MPET0040
ARENA P/CONCRETOS
M3
0.00
0.538200
$45.46
$24.47
MPET0170
M3
0.00
0.652700
$45.46
$29.67
JOR
1.59
0.628931
$245.78
$154.58
MANO DE OBRA
CUAD001
$168.77
$154.58
Costo directo
$323.35
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
FCO150R
$323.35
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MCEM0060
TON
0.00
0.327500
$350.00
$114.63
MPET0040
ARENA P/CONCRETOS
M3
0.00
0.538200
$45.46
$24.47
MPET0170
M3
0.00
0.652700
$45.46
$29.67
HR
0.00
0.533300
$6.62
$3.53
JOR
15.02
0.066578
$1,228.88
$81.82
SUBCONTRATOS
EQGA003
MANO DE OBRA
CUAD005
$168.77
$81.82
Subtotal: SUBCONTRATOS
$3.53
Costo directo
$254.12
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
FCO200M
$254.12
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MCEM0060
TON
0.00
0.369770
$350.00
$129.42
MPET0040
ARENA P/CONCRETOS
M3
0.00
0.532060
$45.46
$24.19
MPET0170
M3
0.00
0.645200
$45.46
$29.33
JOR
1.59
0.628931
$245.78
$154.58
MANO DE OBRA
CUAD001
$182.94
$154.58
Costo directo
$337.52
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
FCO200R
$337.52
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MCEM0060
TON
0.00
0.369770
$350.00
$129.42
MPET0040
ARENA P/CONCRETOS
M3
0.00
0.532060
$45.46
$24.19
MPET0170
M3
0.00
0.645200
$45.46
$29.33
HR
0.00
0.533330
$6.62
$3.53
SUBCONTRATOS
EQGA003
MANO DE OBRA
CUAD005
JOR
15.02
0.066578
$1,228.88
Subtotal: MATERIALES
$182.94
$81.82
Subtotal: SUBCONTRATOS
$3.53
Costo directo
$268.29
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
FCO250M
$268.29
Cdigo
$81.82
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MCEM0060
TON
0.00
0.413000
$350.00
$144.55
MPET0040
ARENA P/CONCRETOS
M3
0.00
0.537100
$45.46
$24.42
MPET0170
M3
0.00
0.639800
$45.46
$29.09
JOR
1.50
0.666667
$245.78
$163.85
MANO DE OBRA
CUAD001
$198.06
$163.85
Costo directo
$361.91
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
FCO250R
$361.91
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MCEM0060
TON
0.00
0.413000
$350.00
$144.55
MPET0040
ARENA P/CONCRETOS
M3
0.00
0.537100
$45.46
$24.42
MPET0170
M3
0.00
0.639800
$45.46
$29.09
HR
0.00
0.533300
$6.62
$3.53
JOR
15.00
0.066667
$1,228.88
$81.93
SUBCONTRATOS
EQGA003
MANO DE OBRA
CUAD005
$198.06
$81.93
Subtotal: SUBCONTRATOS
$3.53
Costo directo
$283.52
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
ACR0009
$283.52
Cdigo
MANO DE OBRA
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
CUAD001
ACR0012
JOR
13.33
0.075019
$245.78
$18.44
$18.44
Costo directo
$18.44
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$18.44
M3
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
Importe
MANO DE OBRA
CUAD001
JOR
5.25
0.190476
$245.78
$46.82
Costo directo
$46.82
INDIRECTO
$0.00
UTILIDADES
ACR0013
$46.82
$0.00
COSTO TOTAL
$46.82
M3
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
Importe
MANO DE OBRA
CUAD001
JOR
5.50
0.181818
$245.78
$44.69
Costo directo
$44.69
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
ACR0037
$44.69
$44.69
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
MIL
Importe
MANO DE OBRA
CUAD001
AREF2
Cdigo
JOR
4,347.83
0.000230
$245.78
$0.06
$0.06
Costo directo
$0.06
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$0.06
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MALA0190
TON
0.00
1.070000
$2,000.00
$2,140.00
MALA0180
KG
0.00
35.500000
$2.52
$89.46
MANO DE OBRA
CUAD040
JOR
0.10
10.000000
$655.40
Subtotal: MATERIALES
$2,229.46
$6,554.00
Costo directo
$8,783.46
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
AREF2.5
$6,554.00
$8,783.46
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MBAR0009
TON
0.00
1.070000
$1,250.10
$1,337.61
MALA0180
KG
0.00
35.500000
$2.52
$89.46
JOR
0.12
8.333333
$655.40
$5,461.67
MANO DE OBRA
CUAD040
$1,427.07
$5,461.67
Costo directo
$6,888.74
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
AREF3
$6,888.74
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MVAR0009
TON
0.00
1.070000
$1,409.09
$1,507.73
MALA0180
KG
0.00
35.500000
$2.52
$89.46
JOR
0.14
7.142857
$655.40
$4,681.43
MANO DE OBRA
CUAD040
$1,597.19
$4,681.39
Costo directo
$6,278.58
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
AREF4
Cdigo
$6,278.58
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MVAR0012
TON
0.00
1.080000
$1,595.00
$1,722.60
MALA0180
KG
0.00
35.500000
$2.52
$89.46
MANO DE OBRA
CUAD040
JOR
0.16
6.250000
$655.40
Subtotal: MATERIALES
$1,812.06
$4,096.25
Costo directo
$5,908.31
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
AREF5
$4,096.25
$5,908.31
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MVAR0013
TON
0.00
1.090000
$1,413.63
$1,540.86
MALA0180
KG
0.00
25.500000
$2.52
$64.26
JOR
0.17
5.882353
$655.40
$3,855.29
MANO DE OBRA
CUAD040
$1,605.12
$3,855.29
Costo directo
$5,460.41
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
AREF6
$5,460.41
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MVAR0014
TON
0.00
1.100000
$1,404.54
$1,544.99
MALA0180
KG
0.00
25.500000
$2.52
$64.26
JOR
0.18
5.555556
$655.40
$3,641.11
MANO DE OBRA
CUAD040
$1,609.25
$3,641.11
Costo directo
$5,250.36
INDIRECTO
$525.04
UTILIDADES
$525.04
COSTO TOTAL
AREF8
Cdigo
$0.00
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MVAR0015
TON
0.00
1.120500
$1,395.45
$1,563.60
MALA0180
KG
0.00
20.500000
$2.52
$51.66
MANO DE OBRA
CUAD040
JOR
0.22
4.545455
$655.40
Subtotal: MATERIALES
$1,615.26
$2,979.09
Costo directo
$4,594.35
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
AREF10
$2,979.09
$4,594.35
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MVAR0016
TON
0.00
1.120500
$1,395.45
$1,563.60
MALA0180
KG
0.00
20.500000
$2.52
$51.66
JOR
0.25
4.000000
$655.40
$2,621.60
MANO DE OBRA
CUAD040
$1,615.26
$2,621.60
Costo directo
$4,236.86
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
AREF12
$4,236.86
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
TON
Importe
MATERIALES
MVAR0017
TON
0.00
1.120500
$1,395.45
$1,563.60
MALA0180
KG
0.00
20.500000
$2.52
$51.66
JOR
0.28
3.571429
$655.40
$2,340.71
MANO DE OBRA
CUAD040
$1,615.26
$2,340.71
Costo directo
$3,955.97
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$3,955.97
Concepto
M2
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.107000
$2.52
$0.27
MMAL0080
M2
0.00
1.050000
$5.96
$6.26
82.10
0.012180
$655.40
$7.98
MANO DE OBRA
CUAD040
JOR
Subtotal: MATERIALES
$6.53
$7.98
Costo directo
$14.51
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$14.51
Anlisis: MAL66-8/8
Unidad: M2
Concepto
M2
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MMAL0090
M2
0.00
1.030000
$4.43
$4.56
MALA0180
KG
0.00
0.107000
$2.52
$0.27
JOR
84.03
0.011901
$655.40
$7.80
MANO DE OBRA
CUAD040
$4.83
$7.80
Costo directo
$12.63
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$12.63
Concepto
M2
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MMAL0050
MALA0180
MALLA ELECTROSOLDADATECNOMALLA
10/10
ALAMBRE RECOCIDO No. 18
6X6- M2
0.00
1.050000
$3.32
$3.49
KG
0.00
0.107000
$2.52
$0.27
JOR
98.04
0.010200
$655.40
$6.69
MANO DE OBRA
CUAD040
$3.76
Costo directo
$6.69
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$6.69
Concepto
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.007300
$2.52
$0.02
MAAR0016
MT
0.00
1.130000
$4.20
$4.75
120.05
0.008330
$655.40
$5.46
MANO DE OBRA
CUAD040
JOR
Subtotal: MATERIALES
Subtotal: MANO DE OBRA
$4.77
Costo directo
$5.46
INDIRECTO
$10.23
UTILIDADES
$1.02
COSTO TOTAL
$1.02
Concepto
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.007300
$2.52
$0.02
MAAR0017
MT
0.00
1.130000
$4.43
$5.01
120.05
0.008330
$655.40
$5.46
MANO DE OBRA
CUAD040
JOR
Subtotal: MATERIALES
Subtotal: MANO DE OBRA
$5.03
Costo directo
$5.46
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$5.46
Concepto
Unidad
Rend.
Cantidad
Costo
M
Importe
MATERIALES
MALA0180
KG
0.00
0.009300
$2.52
$0.02
MARM0018
MT
0.00
1.130000
$4.65
$5.25
120.05
0.008330
$655.40
$5.46
MANO DE OBRA
CUAD040
JOR
Subtotal: MATERIALES
CUAD001
$5.27
Costo directo
$5.46
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$5.46
Cdigo
Concepto
JOR
Unidad
Rend.
Cantidad
Costo
Importe
MANO DE OBRA
MOMM01
PEON
JOR
1.00
1.000000
$217.50
$217.50
7.69
0.130000
$217.50
$28.28
EQUIPO Y HERRAMIENTA
%MO001
$217.50
$28.28
$245.78
$0.00
$0.00
$245.78
CUAD005
Cdigo
Concepto
JOR
Unidad
Rend.
Cantidad
Costo
Importe
MANO DE OBRA
MOMM01
PEON
JOR
0.20
5.000000
$217.50
$1,087.50
7.69
0.130000
$1,087.50
$141.38
EQUIPO Y HERRAMIENTA
%MO001
$1,087.50
$141.38
Costo directo
$1,228.88
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
CUAD40
$1,228.88
Cdigo
Concepto
JOR
Unidad
Rend.
Cantidad
Costo
Importe
MANO DE OBRA
MOMM30
OFICIAL ALBANIL
JOR
1.00
1.000000
$362.50
$362.50
MOMM01
PEON
JOR
1.00
1.000000
$217.50
$217.50
7.69
0.130000
$580.00
$75.40
EQUIPO Y HERRAMIENTA
%MO001
$580.00
$75.40
Costo directo
$655.40
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
CUAD060
$655.40
Cdigo
Concepto
JOR
Unidad
Rend.
Cantidad
Costo
Importe
MANO DE OBRA
MOMM32
OFICIAL PINTOR
JOR
1.00
1.000000
$290.00
$290.00
7.69
0.130000
$290.00
$37.70
EQUIPO Y HERRAMIENTA
%MO001
$290.00
$37.70
Costo directo
$327.70
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
CFZAP
$327.70
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M2
Importe
MATERIALES
MMAD0049
PT
0.00
2.400000
$0.00
$0.00
MMAD0044
PT
0.00
1.050000
$2.86
$3.00
MCLA0021
KG
0.00
0.420000
$2.87
$1.21
MANO DE OBRA
CUAD040
JOR
7.97
0.125471
$655.40
$82.23
LT
0.00
0.780000
$0.78
$0.61
MATERIALES
MCOM0010 DIESEL
Subtotal: MATERIALES
$4.82
$82.23
Costo directo
$87.05
COSTO DIRECTO
$0.00
UTILIDADES
CDADO
$0.00
COSTO TOTAL
$87.05
M2
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MMAD0049
PT
0.00
2.930000
$0.00
$0.00
MMAD0044
PT
0.00
2.940000
$2.86
$8.41
MCLA0021
KG
0.00
0.320000
$2.87
$0.92
MCOM0010 DIESEL
LT
0.00
1.100000
$0.78
$0.86
MALA0180
KG
0.00
0.057000
$2.52
$0.14
JOR
7.97
0.125471
$655.40
$82.23
MANO DE OBRA
CUAD040
CCADE
$10.33
$82.23
Costo directo
$92.56
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$92.56
M2
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MMAD0044
PT
0.00
4.110000
$2.86
$11.75
MCLA0021
KG
0.00
0.490000
$2.87
$1.41
MALA0180
KG
0.00
0.860000
$2.52
$2.17
MCOM0010 DIESEL
LT
0.00
0.600000
$0.78
$0.47
MMAD0045
PT
0.00
6.310000
$2.86
$18.05
14.01
0.071378
$655.40
$46.78
MANO DE OBRA
CUAD040
JOR
Subtotal: MATERIALES
$33.85
$46.80
Costo directo
$80.65
INDIRECTO
$0.00
UTILIDADES
CCAST
$0.00
COSTO TOTAL
$80.65
M2
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MMAD0044
PT
0.00
3.660000
$2.86
$10.47
MCLA0021
KG
0.00
0.134000
$2.87
$0.38
MALA0180
KG
0.00
0.860000
$2.52
$2.17
MCOM0010 DIESEL
LT
0.00
0.600000
$0.78
$0.47
MMAD0045
PT
0.00
1.970000
$2.86
$5.63
14.01
0.071378
$655.40
$46.78
MANO DE OBRA
CUAD040
JOR
Subtotal: MATERIALES
$19.12
$46.80
Costo directo
$65.92
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$65.92
Concepto
Unidad
Rend.
Cantidad
Costo
M2
Importe
MATERIALES
MMAD0049
PT
0.00
2.759200
$0.00
MMAD0045
PT
0.00
2.485900
$2.86
$7.11
MMAD0047
PT
0.00
1.630000
$2.86
$4.66
MCLA0021
KG
0.00
0.306500
$2.87
$0.88
MALA0180
KG
0.00
0.240200
$2.52
$0.61
LT
0.00
0.610000
$0.78
$0.48
JOR
6.95
0.143885
$655.40
$94.30
MCOM0010 DIESEL
$0.00
MANO DE OBRA
CUAD040
$13.74
$94.30
Costo directo
$108.04
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$108.04
Concepto
Unidad
Rend.
Cantidad
Costo
M2
Importe
MATERIALES
MMAD0049
PT
0.00
2.570000
$0.00
$0.00
MMAD0045
PT
0.00
1.480000
$2.86
$4.23
MMAD0047
PT
0.00
0.806500
$2.86
$2.31
MCLA0021
KG
0.00
0.306500
$2.87
$0.88
MALA0180
KG
0.00
0.240200
$2.52
$0.61
LT
0.00
0.610000
$0.78
$0.48
JOR
6.65
0.150376
$655.40
$98.56
MCOM0010 DIESEL
MANO DE OBRA
CUAD040
$8.51
$98.56
Costo directo
$107.07
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$107.07
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.030500
$2.21
$0.07
JOR
1.33
0.751880
$655.40
$492.78
HR
0.00
0.670000
$0.00
$0.00
ACR0009
0.00
0.250500
$18.44
$4.62
FCO150R
0.00
1.030000
$254.12
$261.74
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
Subtotal: MATERIALES
$0.07
$492.78
Subtotal: BASICOS
$266.36
Costo directo
$759.21
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$759.21
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.030500
$2.21
$0.07
JOR
1.33
0.751880
$655.40
$492.78
HR
0.00
0.670000
$0.00
$0.00
0.00
0.250500
$18.44
$4.62
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
ACR0009
FCO200R
0.00
1.030000
$268.29
Subtotal: MATERIALES
$276.34
$0.07
$492.78
Subtotal: BASICOS
$280.96
Costo directo
$773.81
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$773.81
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.030500
$2.21
$0.07
JOR
1.33
0.751880
$655.40
$492.78
HR
0.00
0.670000
$0.00
$0.00
ACR0009
0.00
0.250500
$18.44
$4.62
FCO200R
0.00
1.030000
$268.29
$276.34
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
Subtotal: MATERIALES
$0.07
$492.78
Subtotal: BASICOS
$280.96
Costo directo
$773.81
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
VCL200
$773.81
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.030500
$2.21
$0.07
JOR
2.50
0.400000
$655.40
$262.16
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
HR
0.00
0.670000
$0.00
$0.00
ACR0009
0.00
0.250500
$18.44
$4.62
FCO200R
0.00
1.030000
$268.29
$276.34
BASICOS
Subtotal: MATERIALES
$0.07
$262.16
Subtotal: BASICOS
$280.96
Costo directo
$543.19
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
VCL250
$543.19
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.030500
$2.21
$0.07
JOR
2.50
0.400000
$655.40
$262.16
HR
0.00
0.670000
$0.00
$0.00
ACR0009
0.00
0.250500
$18.44
$4.62
FCO250R
0.00
1.030000
$283.52
$292.03
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
Subtotal: MATERIALES
$0.07
$262.16
Subtotal: BASICOS
$296.65
Costo directo
$558.88
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
VZTL150
Cdigo
$558.88
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.025500
$2.21
$0.06
JOR
3.24
0.308642
$655.40
$202.28
HR
0.00
0.670000
$0.00
$0.00
ACR0009
0.00
0.250500
$18.44
$4.62
FCO150R
0.00
1.030000
$254.12
$261.74
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
Subtotal: MATERIALES
$0.06
$202.28
Subtotal: BASICOS
$266.36
Costo directo
$468.70
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
VZTL200
$468.70
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.025500
$2.21
$0.06
JOR
3.24
0.308642
$655.40
$202.28
HR
0.00
0.670000
$0.00
$0.00
ACR0009
0.00
0.250500
$18.44
$4.62
FCO200R
0.00
1.030000
$268.29
$276.34
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
Subtotal: MATERIALES
$0.06
$202.28
Subtotal: BASICOS
$280.96
Costo directo
$483.30
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$483.30
VZTL250
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.025500
$2.21
$0.06
JOR
3.24
0.308642
$655.40
$202.28
HR
0.00
0.670000
$0.00
$0.00
ACR0009
0.00
0.250500
$18.44
$4.62
FCO250R
0.00
1.030000
$283.52
$292.03
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
Subtotal: MATERIALES
$0.06
$202.28
Subtotal: BASICOS
$296.65
Costo directo
$498.99
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
VCOL150
$498.99
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.025500
$2.21
$0.06
JOR
3.10
0.322581
$655.40
$211.42
HR
0.00
0.510000
$0.00
$0.00
ACR0009
0.00
0.250500
$18.44
$4.62
FCO150R
0.00
1.030000
$254.12
$261.74
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
Subtotal: MATERIALES
$0.06
$211.42
Subtotal: BASICOS
$266.36
Costo directo
$477.84
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
VCOL200
$477.84
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.025500
$2.21
$0.06
JOR
3.10
0.322581
$655.40
$211.42
HR
0.00
0.510000
$0.00
$0.00
ACR0009
0.00
0.250500
$18.44
$4.62
FCO200R
0.00
1.030000
$268.29
$276.34
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
Subtotal: MATERIALES
$0.06
$211.42
Subtotal: BASICOS
$280.96
Costo directo
$492.44
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
VCOL250
$492.44
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.025500
$2.21
$0.06
JOR
3.10
0.322581
$655.40
$211.42
HR
0.00
0.510000
$0.00
$0.00
0.00
0.250500
$18.44
$4.62
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
ACR0009
FCO250R
0.00
1.030000
$283.52
Subtotal: MATERIALES
$292.03
$0.06
$211.42
Subtotal: BASICOS
$296.65
Costo directo
$508.13
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$508.13
Anlisis: VTRABE200
Unidad: M3
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.025500
$2.21
$0.06
JOR
3.10
0.322581
$655.40
$211.42
HR
0.00
0.510000
$0.00
$0.00
ACR0009
0.00
0.250500
$18.44
$4.62
FCO200R
0.00
1.030000
$268.29
$276.34
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
Subtotal: MATERIALES
$0.06
$211.42
Subtotal: BASICOS
$280.96
Costo directo
$492.44
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$492.44
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.025500
$2.21
$0.06
JOR
3.10
0.322581
$655.40
$211.42
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
HR
0.00
0.510000
$0.00
$0.00
ACR0009
0.00
0.250500
$18.44
$4.62
FCO250R
0.00
1.030000
$283.52
$292.03
BASICOS
Subtotal: MATERIALES
$0.06
$211.42
Subtotal: BASICOS
$296.65
Costo directo
$508.13
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$508.13
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.025500
$2.21
$0.06
JOR
2.50
0.400000
$655.40
$262.16
HR
0.00
0.510000
$0.00
$0.00
ACR0009
0.00
0.250500
$18.44
$4.62
FCO150R
0.00
1.030000
$254.12
$261.74
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
Subtotal: MATERIALES
$0.06
$262.16
Subtotal: BASICOS
$266.36
Costo directo
$528.58
INDIRECTO
UTILIDADES
COSTO TOTAL
VLOSA200 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN LOSAS
PLANAS Y RETICULARES DE SUPERESTRUCTURA, FC=200 KG/CM2, RN. AGR. MAX. 20 MM.
(3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA
HORIZONTAL, MATERIALES Y MANO DE OBRA.
$0.00
$0.00
$528.58
M3
Cdigo
Concepto
Unidad
Rend.
Cantidad
Costo
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.025500
$2.21
$0.06
JOR
2.50
0.400000
$655.40
$262.16
HR
0.00
0.510000
$0.00
$0.00
ACR0009
0.00
0.250500
$18.44
$4.62
FCO200R
0.00
1.030000
$268.29
$276.34
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
Subtotal: MATERIALES
$0.06
$262.16
Subtotal: BASICOS
$280.96
Costo directo
$543.18
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$543.18
Concepto
Unidad
Rend.
Cantidad
Costo
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.025500
$2.21
$0.06
JOR
2.50
0.400000
$655.40
$262.16
HR
0.00
0.510000
$0.00
$0.00
ACR0009
0.00
0.250500
$18.44
$4.62
FCO250R
0.00
1.030000
$283.52
$292.03
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
Subtotal: MATERIALES
$0.06
$262.16
Subtotal: BASICOS
$296.65
Costo directo
$558.87
INDIRECTO
UTILIDADES
COSTO TOTAL
$0.00
$0.00
$558.87
VCIM100R
Cdigo
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.030500
$2.21
$0.07
JOR
3.24
0.308642
$655.40
$202.28
HR
0.00
0.670000
$0.00
$0.00
FCO100R
0.00
1.030000
$236.89
$244.00
ACR0009
0.00
0.250500
$18.44
$4.62
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
Subtotal: MATERIALES
$0.07
$202.28
Subtotal: BASICOS
$248.62
Costo directo
$450.97
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
VCIM150R
Cdigo
$450.97
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.030500
$2.21
$0.07
JOR
3.24
0.308642
$655.40
$202.28
HR
0.00
0.670000
$0.00
$0.00
FCO150R
0.00
1.030000
$254.12
$261.74
ACR0009
0.00
0.250500
$18.44
$4.62
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
Subtotal: MATERIALES
$0.07
$202.28
Subtotal: BASICOS
$266.36
Costo directo
$468.71
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
VCIM200R
Cdigo
$468.71
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.030500
$2.21
$0.07
JOR
3.24
0.308642
$655.40
$202.28
HR
0.00
0.670000
$0.00
$0.00
FCO200R
0.00
1.030000
$268.29
$276.34
ACR0009
0.00
0.250500
$18.44
$4.62
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
Subtotal: MATERIALES
$0.07
$202.28
Subtotal: BASICOS
$280.96
Costo directo
$483.31
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
VCIM250R
Cdigo
$483.31
M3
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.030500
$2.21
$0.07
JOR
3.24
0.308642
$655.40
$202.28
HR
0.00
0.670000
$0.00
$0.00
FCO250R
0.00
1.030000
$283.52
$292.03
ACR0009
0.00
0.250500
$18.44
$4.62
MANO DE OBRA
CUAD040
SUBCONTRATOS
VAGA001
BASICOS
Subtotal: MATERIALES
$0.07
$202.28
Subtotal: BASICOS
$296.65
Costo directo
$499.00
INDIRECTO
UTILIDADES
COSTO TOTAL
$0.00
$0.00
$499.00
Cdigo
Concepto
Costo
JOR
$245.78
m3
Importe
MANO DE OBRA
CUAD001
1.50
0.666667
$163.85
Costo directo
$163.85
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
DEM0002
$163.85
$163.85
Cdigo
Concepto
Costo
JOR
$245.78
m3
Importe
MANO DE OBRA
CUAD001
0.60
1.666667
$409.63
Costo directo
$409.63
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
DEM0004
$409.63
$409.63
Cdigo
Concepto
m3
Costo
Importe
JOR
5.50
0.181818
$245.78
$44.69
ANDAMIO
DE
CABALLETE
FORMADO
POR
2 PZA
CABALLETES DE 1.10 M DE ALTO Y UN TABLON DE 0.30 X
2.50 X 11/2", PARA AMORTIZARSE SEN 20 USO, EN
TRABAJOS DE ALBAILERIA.
0.00
0.181810
$0.96
$0.17
MANO DE OBRA
CUAD001
BASICOS
CYA0001B
$44.69
Subtotal: BASICOS
$0.17
Costo directo
$44.86
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
DEM0009
Cdigo
$44.86
MANO DE OBRA
CUAD001
BASICOS
JOR
12.50
0.080000
$245.78
$19.66
CYA0001B
ANDAMIO
DE
CABALLETE
FORMADO
POR
2 PZA
CABALLETES DE 1.10 M DE ALTO Y UN TABLON DE 0.30 X
2.50 X 11/2", PARA AMORTIZARSE SEN 20 USO, EN
TRABAJOS DE ALBAILERIA.
0.00
0.080000
$0.96
$19.66
Subtotal: BASICOS
$0.08
Costo directo
$19.74
INDIRECTO
$0.00
UTILIDADES
DEM0010
$0.08
$0.00
COSTO TOTAL
$19.74
M2
Cdigo
Concepto
Costo
Importe
JOR
6.50
0.153846
$245.78
$37.81
ANDAMIO
DE
CABALLETE
FORMADO
POR
2 PZA
CABALLETES DE 1.10 M DE ALTO Y UN TABLON DE 0.30 X
2.50 X 11/2", PARA AMORTIZARSE SEN 20 USO, EN
TRABAJOS DE ALBAILERIA.
0.00
0.076920
$0.96
$0.07
MANO DE OBRA
CUAD001
BASICOS
CYA0001B
$37.81
Subtotal: BASICOS
$0.07
Costo directo
$37.88
INDIRECTO
$0.00
UTILIDADES
DEM0014
$0.00
COSTO TOTAL
$37.88
M3
Cdigo
Concepto
Costo
Importe
JOR
0.65
1.538462
$245.78
$378.12
ANDAMIO
DE
CABALLETE
FORMADO
POR
2 PZA
CABALLETES DE 1.10 M DE ALTO Y UN TABLON DE 0.30 X
2.50 X 11/2", PARA AMORTIZARSE SEN 20 USO, EN
TRABAJOS DE ALBAILERIA.
0.00
1.530000
$0.96
$1.47
MANO DE OBRA
CUAD001
BASICOS
CYA0001B
$378.12
Subtotal: BASICOS
$1.47
Costo directo
$379.59
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
DEM0020
Cdigo
$379.59
Costo
M2
Importe
MANO DE OBRA
CUAD001
JOR
16.67
0.059988
$245.78
$14.75
Costo directo
$14.75
INDIRECTO
$0.00
UTILIDADES
DEM0022
$14.74
$0.00
COSTO TOTAL
$14.75
M2
Cdigo
Concepto
Costo
JOR
$245.78
Importe
MANO DE OBRA
CUAD001
7.52
0.132979
$32.69
Costo directo
$32.69
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
DEM0028
Cdigo
$32.68
$32.69
MANO DE OBRA
CUAD001
JOR
25.00
0.040000
$245.78
$9.83
ANDAMIO
DE
CABALLETE
FORMADO
POR
2 PZA
CABALLETES DE 1.10 M DE ALTO Y UN TABLON DE 0.30 X
2.50 X 11/2", PARA AMORTIZARSE SEN 20 USO, EN
TRABAJOS DE ALBAILERIA.
0.00
0.040000
$0.96
$0.04
BASICOS
CYA0001B
DEM0029
$9.83
Subtotal: BASICOS
$0.04
Costo directo
$9.87
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$9.87
DEMOLICION A MANO DE FALSO PLAFON DE YESO, SIN INCLUIR ACARREOS, HASTA 2.50
M DE ALTURA.
Cdigo
Concepto
M2
Costo
Importe
JOR
19.00
0.052632
$245.78
$12.94
ANDAMIO
DE
CABALLETE
FORMADO
POR
2 PZA
CABALLETES DE 1.10 M DE ALTO Y UN TABLON DE 0.30 X
2.50 X 11/2", PARA AMORTIZARSE SEN 20 USO, EN
TRABAJOS DE ALBAILERIA.
0.00
0.052630
$0.96
$0.05
MANO DE OBRA
CUAD001
BASICOS
CYA0001B
$12.94
$0.05
Costo directo
$12.99
INDIRECTO
$0.00
UTILIDADES
DEM0043
$0.00
COSTO TOTAL
$12.99
M2
Cdigo
Concepto
Costo
JOR
$245.78
Importe
MANO DE OBRA
CUAD001
22.22
0.045005
$11.06
Costo directo
$11.06
INDIRECTO
$0.00
UTILIDADES
LTZ0001
$11.06
$0.00
COSTO TOTAL
$11.06
LIMPIEZA DEL TERRENO PLANO A MANO, INCLUYE: APILE DEL MATERIAL EN EL LUGAR Y
ACARREO DEL MISMO A 1a. ESTACIN DE 20 M.
M2
Cdigo
Concepto
Costo
JOR
$245.78
Importe
MANO DE OBRA
CUAD001
EXC0001
27.03
0.036996
$9.09
$9.09
Costo directo
$9.09
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$9.09
EXCAVACIN A MANO DE CEPAS PARA CIMENTACIN, EN SUELO TIPO II, HASTA UNA
ALTURA DE CEPA DE 2.00 M. NO INCLUYE ACARREO.
Cdigo
Concepto
Costo
JOR
$245.78
M3
Importe
MANO DE OBRA
CUAD001
LTZ0005
2.78
0.359712
$88.41
$88.48
Costo directo
$88.48
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$88.48
TRAZO Y NIVELACIN POR MEDIOS MANUALES DEL TERRENO PLANO, PARA DESPLANTE
DE ESTRUCTURAS, ESTABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS.
INCLUYE:MATERIALES Y MANO DE OBRA.
M2
Cdigo
Concepto
Costo
Importe
MATERIALES
MMAD0045
PT
0.00
0.027000
$2.86
$0.08
MCEM0050
CALHIDRA
TON
0.00
0.000250
$241.82
$0.06
MDUE0001
PT
0.00
0.018000
$3.90
$0.07
MHIL0001
ML
0.00
0.350000
$0.00
$0.00
MANO DE OBRA
CUAD040
CIM0001
JOR
100.00
0.010000
$655.40
$6.55
Subtotal: MATERIALES
$0.21
$6.55
Costo directo
$6.76
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$6.76
Cdigo
Concepto
M3
Costo
Importe
JOR
2.75
0.363636
$655.40
$238.33
M3
0.00
0.325500
$339.18
$110.40
0.00
1.200000
$1.78
$2.14
MANO DE OBRA
CUAD040
BASICOS
MEZ0002
SUBCONTRATOS
ACR0082A
$238.30
Subtotal: BASICOS
$110.40
Subtotal: SUBCONTRATOS
$2.14
Costo directo
$350.84
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$350.84
Concepto
M3
Costo
Importe
JOR
4.35
0.229885
$245.78
$56.50
HR
0.00
0.300000
$0.00
$0.00
MANO DE OBRA
CUAD001
SUBCONTRATOS
BAI0001
COMPACTADOR BAILARINA
Subtotal: MANO DE OBRA
$56.53
Costo directo
$56.53
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$56.53
Concepto
Costo
JOR
$245.78
M3
Importe
MANO DE OBRA
CUAD001
4.35
0.229885
$56.50
$56.53
Costo directo
$56.53
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$56.53
CAST001V CASTILLO CON SECCION DE 15X15 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.077000
$2.52
$0.19
JOR
10.84
0.092251
$655.40
$60.46
PZA
0.00
0.092251
$0.00
$0.00
AREF3
0.00
0.002340
###
$14.69
AREF2
0.00
0.001000
###
$8.78
CCAST
0.00
0.300000
$65.92
$19.78
VDACAS150
0.00
0.022500
$759.21
$17.08
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
BASICOS
Subtotal: MATERIALES
$0.19
$60.46
Subtotal: BASICOS
$60.33
Costo directo
$120.98
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$120.98
CAST002V CASTILLO CON SECCION DE 15X15 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.077000
$2.52
$0.19
JOR
10.84
0.092251
$655.40
$60.46
PZA
0.00
0.092251
$0.00
$0.00
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
BASICOS
AREF3
0.00
0.002340
###
$14.69
AREF2
0.00
0.001000
###
$8.78
CCAST
0.00
0.300000
$65.92
$19.78
VDACAS200
0.00
0.022500
$773.81
$17.41
Subtotal: MATERIALES
$0.19
$60.46
Subtotal: BASICOS
$60.66
Costo directo
$121.31
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$121.31
CAST003V CASTILLO CON SECCION DE 15X15 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.077000
$2.52
$0.19
JOR
10.84
0.092251
$655.40
$60.46
PZA
0.00
0.092251
$0.00
$0.00
AREF3
0.00
0.002340
###
$14.69
AREF2
0.00
0.001000
###
$8.78
CCAST
0.00
0.300000
$65.92
$19.78
VDACAS250
0.00
0.022500
$773.81
$17.41
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
BASICOS
Subtotal: MATERIALES
$0.19
$60.46
Subtotal: BASICOS
$60.66
Costo directo
$121.31
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$121.31
CAST004V CASTILLO CON SECCION DE 15X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
JOR
9.79
0.102145
$655.40
$66.95
PZA
0.00
0.102145
$0.00
$0.00
AREF3
0.00
0.002520
###
$15.82
AREF2
0.00
0.001680
###
$14.76
CCAST
0.00
0.350000
$65.92
$23.07
VDACAS150
0.00
0.030000
$759.21
$22.78
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
BASICOS
Subtotal: MATERIALES
$0.33
$66.95
Subtotal: BASICOS
$76.43
Costo directo
$143.71
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$143.71
CAST005V CASTILLO CON SECCION DE 15X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
MANO DE OBRA
CUAD040
JOR
9.79
0.102145
$655.40
$66.95
PZA
0.00
0.102145
$0.00
$0.00
AREF3
0.00
0.002520
###
$15.82
AREF2
0.00
0.001680
###
$14.76
CCAST
0.00
0.350000
$65.92
$23.07
VDACAS200
0.00
0.030000
$773.81
$23.21
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
BASICOS
Subtotal: MATERIALES
$0.33
$66.95
Subtotal: BASICOS
$76.86
Costo directo
$144.14
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$144.14
CAST010V CASTILLO CON SECCION DE 15X30 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
JOR
9.64
0.103734
$655.40
$67.99
PZA
0.00
0.103734
$0.00
$0.00
AREF3
0.00
0.002300
###
$14.44
AREF2
0.00
0.001300
###
$11.42
CCAST
0.00
0.600000
$65.92
$39.55
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
BASICOS
VDACAS250
0.00
0.046350
$773.81
Subtotal: MATERIALES
$35.87
$0.33
$67.99
Subtotal: BASICOS
$101.28
Costo directo
$169.60
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$169.60
CSAT006V CASTILLO CON SECCION DE 15X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
JOR
9.79
0.102145
$655.40
$66.95
PZA
0.00
0.102145
$0.00
$0.00
AREF3
0.00
0.002520
###
$15.82
AREF2
0.00
0.001680
###
$14.76
CCAST
0.00
0.350000
$65.92
$23.07
VDACAS250
0.00
0.030000
$773.81
$23.21
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
BASICOS
Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
$0.33
$66.95
$76.86
$144.14
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$144.14
CAST007V CASTILLO CON SECCION DE 20X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
JOR
8.74
0.114416
$655.40
$74.99
PZA
0.00
0.114416
$0.00
$0.00
AREF3
0.00
0.002520
###
$15.82
AREF2
0.00
0.001800
###
$15.81
CCAST
0.00
0.400000
$65.92
$26.37
VDACAS150
0.00
0.040000
$759.21
$30.37
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
BASICOS
Subtotal: MATERIALES
$0.33
$74.99
Subtotal: BASICOS
$88.37
Costo directo
$163.69
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$163.69
CAST008V CASTILLO CON SECCION DE 20X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
JOR
8.74
0.114416
$655.40
$74.99
PZA
0.00
0.114416
$0.00
$0.00
0.00
0.002520
###
$15.82
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
BASICOS
AREF3
AREF2
0.00
0.001800
###
$15.81
CCAST
0.00
0.400000
$65.92
$26.37
VDACAS200
0.00
0.040000
$773.81
$30.95
Subtotal: MATERIALES
$0.33
$74.99
Subtotal: BASICOS
$88.95
Costo directo
$164.27
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$164.27
CAST009V CASTILLO CON SECCION DE 20X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX.
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
JOR
8.74
0.114416
$655.40
$74.99
PZA
0.00
0.114416
$0.00
$0.00
AREF3
0.00
0.002520
###
$15.82
AREF2
0.00
0.001800
###
$15.81
CCAST
0.00
0.400000
$65.92
$26.37
VDACAS250
0.00
0.040000
$773.81
$30.95
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
BASICOS
Subtotal: MATERIALES
$0.33
$74.99
Subtotal: BASICOS
$88.95
Costo directo
$164.27
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$164.27
DALA001A DALA CON SECCION DE 15X15 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X15-4, CON CIMBRA COMN
2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
MARM0018
MT
0.00
1.030000
$4.65
$4.79
JOR
12.76
0.078370
$655.40
$51.36
PZA
0.00
0.078370
$0.00
$0.00
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
BASICOS
CCADE
0.00
0.300000
$80.65
$24.20
VDACAS150
0.00
0.022500
$759.21
$17.08
Subtotal: MATERIALES
$5.12
$51.36
Subtotal: BASICOS
$41.28
Costo directo
$97.76
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$97.76
DALA002A DALA CON SECCION DE 15X15 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X15-4, CON CIMBRA COMN
2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
JOR
12.76
0.078370
$655.40
$51.36
PZA
0.00
0.078370
$0.00
$0.00
MT
0.00
1.030000
$4.65
$4.79
0.00
0.300000
$80.65
$24.20
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
MATERIALES
MARM0018
BASICOS
CCADE
VDACAS200
0.00
0.022500
$773.81
Subtotal: MATERIALES
$17.41
$5.12
$51.36
Subtotal: BASICOS
$41.61
Costo directo
$98.09
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$98.09
DALA003A DALA CON SECCION DE 15X15 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X15-4, CON CIMBRA COMN
2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
JOR
12.76
0.078370
$655.40
$51.36
PZA
0.00
0.078370
$0.00
$0.00
MT
0.00
1.030000
$4.65
$4.79
CCADE
0.00
0.300000
$80.65
$24.20
VDACAS250
0.00
0.022500
$773.81
$17.41
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
MATERIALES
MARM0018
BASICOS
Subtotal: MATERIALES
$5.12
$51.36
Subtotal: BASICOS
$41.61
Costo directo
$98.09
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$98.09
DALA004A DALA CON SECCION DE 15X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN
2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
MANO DE OBRA
CUAD040
JOR
12.12
0.082508
$655.40
$54.08
PZA
0.00
0.082508
$0.00
$0.00
MT
0.00
1.030000
$4.65
$4.79
CCADE
0.00
0.350000
$80.65
$28.23
VDACAS150
0.00
0.030000
$759.21
$22.78
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
MATERIALES
MARM0018
BASICOS
Subtotal: MATERIALES
$5.12
$54.08
Subtotal: BASICOS
$51.01
Costo directo
$110.21
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$110.21
DALA005A DALA CON SECCION DE 15X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN
2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
JOR
12.12
0.082508
$655.40
$54.08
PZA
0.00
0.082508
$0.00
$0.00
MT
0.00
1.030000
$4.65
$4.79
CCADE
0.00
0.350000
$80.65
$28.23
VDACAS200
0.00
0.030000
$773.81
$23.21
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
MATERIALES
MARM0018
BASICOS
Subtotal: MATERIALES
$5.12
$54.08
Subtotal: BASICOS
$51.44
Costo directo
$110.64
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$110.64
DALA006A DALA CON SECCION DE 15X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN
2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
JOR
12.12
0.082508
$655.40
$54.08
PZA
0.00
0.082508
$0.00
$0.00
MT
0.00
1.030000
$4.65
$4.79
CCADE
0.00
0.350000
$80.65
$28.23
VDACAS250
0.00
0.030000
$773.81
$23.21
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
MATERIALES
MARM0018
BASICOS
Subtotal: MATERIALES
$5.12
$54.08
Subtotal: BASICOS
$51.44
Costo directo
$110.64
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$110.64
DALA007A DALA CON SECCION DE 20X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN
2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
JOR
11.48
0.087108
$655.40
$57.09
PZA
0.00
0.087108
$0.00
$0.00
MT
0.00
1.030000
$4.65
$4.79
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
MATERIALES
MARM0018
BASICOS
CCADE
0.00
0.400000
$80.65
$32.26
VDACAS150
0.00
0.040000
$759.21
$30.37
Subtotal: MATERIALES
$5.12
$57.09
Subtotal: BASICOS
$62.63
Costo directo
$124.84
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$124.84
DALA008A DALA CON SECCION DE 20X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN
2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
JOR
11.48
0.087108
$655.40
$57.09
PZA
0.00
0.087108
$0.00
$0.00
MT
0.00
1.030000
$4.65
$4.79
CCADE
0.00
0.400000
$80.65
$32.26
VDACAS200
0.00
0.040000
$773.81
$30.95
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
MATERIALES
MARM0018
BASICOS
Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL
DALA009A DALA CON SECCION DE 20X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN
2 CARAS.
$5.12
$57.09
$63.21
$125.42
$0.00
$0.00
$125.42
DALA009A DALA CON SECCION DE 20X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4"
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN
2 CARAS.
Cdigo
Concepto
Costo
Importe
MATERIALES
MALA0180
KG
0.00
0.130000
$2.52
$0.33
JOR
11.48
0.087108
$655.40
$57.09
PZA
0.00
0.087108
$0.00
$0.00
MT
0.00
1.030000
$4.65
$4.79
CCADE
0.00
0.400000
$80.65
$32.26
VDACAS250
0.00
0.040000
$773.81
$30.95
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
MATERIALES
MARM0018
BASICOS
Subtotal: MATERIALES
$5.12
$57.09
Subtotal: BASICOS
$63.21
Costo directo
$125.42
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$125.42
PLA05-100 PLANTILLA DE CONCRETO SIMPLE F`C =100 KG/CM2, RESISTENCIA NORMAL, DE 5 CM.
ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) INCLYE: MATERIALES Y MANO DE OBRA.
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.070500
$2.21
$0.16
20.00
0.050000
$655.40
$32.77
0.00
0.051500
$236.89
$12.20
MANO DE OBRA
CUAD040
JOR
BASICOS
FCO100R
$32.77
Subtotal: BASICOS
$12.20
Costo directo
$45.13
INDIRECTO
$0.00
UTILIDADES
PIS05-100
$0.16
$0.00
COSTO TOTAL
$45.13
M2
PIS05-100
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.070500
$2.21
$0.16
15.00
0.066667
$655.40
$43.69
MANO DE OBRA
CUAD040
JOR
BASICOS
ACR0012
0.00
0.051500
$46.82
$2.41
FCO100R
0.00
0.051500
$236.89
$12.20
PSO0001
0.00
1.000000
$14.98
$14.98
M2
Subtotal: MATERIALES
PIS05-150
$0.16
$43.69
Subtotal: BASICOS
$29.59
Costo directo
$73.44
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$73.44
M2
Cdigo
Concepto
Costo
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.070500
$2.21
$0.16
15.00
0.066667
$655.40
$43.69
MANO DE OBRA
CUAD040
JOR
BASICOS
ACR0012
0.00
0.051500
$46.82
$2.41
FCO150R
0.00
0.051500
$254.12
$13.09
PSO0001
0.00
1.000000
$14.98
$14.98
M2
Subtotal: MATERIALES
Subtotal: MANO DE OBRA
$43.69
Subtotal: BASICOS
$30.48
Costo directo
$74.33
INDIRECTO
$0.00
UTILIDADES
PIS08-150
$0.16
$0.00
COSTO TOTAL
$74.33
M2
PIS08-150
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.070500
$2.21
$0.16
15.00
0.066667
$655.40
$43.69
MANO DE OBRA
CUAD040
JOR
BASICOS
ACR0012
0.00
0.082400
$46.82
$3.86
FCO150R
0.00
0.082400
$254.12
$20.94
PSO0001
0.00
1.000000
$14.98
$14.98
M2
Subtotal: MATERIALES
$0.16
$43.69
Subtotal: BASICOS
$39.78
Costo directo
$83.63
INDIRECTO
$0.00
UTILIDADES
PIS08-200
$0.00
COSTO TOTAL
$83.63
M2
Cdigo
Concepto
Costo
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.070500
$2.21
$0.16
15.00
0.066667
$655.40
$43.69
MANO DE OBRA
CUAD040
JOR
BASICOS
ACR0012
0.00
0.084000
$46.82
$3.93
FCO200R
0.00
0.082400
$268.29
$22.11
PSO0001
0.00
1.000000
$14.98
$14.98
Subtotal: MATERIALES
M2
$0.16
$43.69
Subtotal: BASICOS
$41.02
Costo directo
$84.87
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$84.87
PIS10-150
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.070500
$2.21
$0.16
15.00
0.066667
$655.40
$43.69
MANO DE OBRA
CUAD040
JOR
BASICOS
ACR0012
0.00
0.103000
$46.82
$4.82
FCO150R
0.00
0.103000
$254.12
$26.17
PSO0001
0.00
1.000000
$14.98
$14.98
M2
Subtotal: MATERIALES
$0.16
$43.69
Subtotal: BASICOS
$45.97
Costo directo
$89.82
INDIRECTO
$0.00
UTILIDADES
PIS10-200
$0.00
COSTO TOTAL
$89.82
M2
Cdigo
Concepto
Costo
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.070500
$2.21
$0.16
15.00
0.066667
$655.40
$43.69
MANO DE OBRA
CUAD040
JOR
BASICOS
ACR0012
0.00
0.103000
$46.82
$4.82
FCO200R
0.00
0.103000
$268.29
$27.63
PSO0001
0.00
1.000000
$14.98
$14.98
Subtotal: MATERIALES
M2
$0.16
$43.69
Subtotal: BASICOS
$47.43
Costo directo
$91.28
INDIRECTO
$0.00
UTILIDADES
COSTO TOTAL
$0.00
$91.28
PIS15-150
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.070500
$2.21
$0.16
12.00
0.083333
$655.40
$54.62
MANO DE OBRA
CUAD040
JOR
BASICOS
ACR0012
0.00
0.153000
$46.82
$7.16
FCO150R
0.00
0.153000
$254.12
$38.88
PSO0001
0.00
1.000000
$14.98
$14.98
M2
Subtotal: MATERIALES
$0.16
$54.62
Subtotal: BASICOS
$61.02
Costo directo
$115.80
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
PIS15-200
$115.80
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MAGU0010
AGUA
M3
0.00
0.070500
$2.21
$0.16
12.00
0.083333
$655.40
$54.62
MANO DE OBRA
CUAD040
JOR
BASICOS
ACR0012
0.00
0.153000
$46.82
$7.16
FCO200R
0.00
0.153000
$268.29
$41.05
PSO0001
0.00
1.000000
$14.98
$14.98
Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
M2
$0.16
$54.62
$63.19
$117.97
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$117.97
MURLAD7 MURO DE TABIQUE ROJO RECOCIDO DE 71428 CM. DE 7 CM. DE ESP. (CAPUCHINO),
ASENTADO CON MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO
COMN HASTA UNA ALTURA DE 3.5 M.
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MTAB0070
MILL
0.00
0.031500
###
$56.70
MAGU0010
AGUA
M3
0.00
0.024000
$2.21
$0.05
JOR
12.00
0.083333
$655.40
$54.62
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.083000
$0.00
$0.00
M3
0.00
0.011600
$355.96
$4.13
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
BASICOS
MEZ0011
Subtotal: MATERIALES
$56.75
$54.62
Subtotal: BASICOS
$4.13
Costo directo
$115.50
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$115.50
MURLAD14 MURO DE TABIQUE ROJO RECOCIDO DE 71428 CM. DE 14 CM. DE ESP. ASENTADO
CON MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN
HASTA UNA ALTURA DE 3.5 M.
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MTAB0070
MILL
0.00
0.048000
###
$86.40
MAGU0010
AGUA
M3
0.00
0.048000
$2.21
$0.11
JOR
10.00
0.100000
$655.40
$65.54
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.056625
$0.00
$0.00
M3
0.00
0.040000
$355.96
$14.24
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
BASICOS
MEZ0011
Subtotal: MATERIALES
$86.51
$65.54
Subtotal: BASICOS
$14.24
Costo directo
$166.29
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$166.29
MURLAD28 MURO DE TABIQUE ROJO RECOCIDO DE 71428 CM. DE 28 CM. DE ESP. ASENTADO CON
MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN HASTA
UNA ALTURA DE 3.5 M.
Cdigo
MATERIALES
Concepto
Costo
M2
Importe
MTAB0070
MILL
0.00
0.086000
###
$154.80
MAGU0010
AGUA
M3
0.00
0.086000
$2.21
$0.19
JOR
6.49
0.154083
$655.40
$100.99
ANDAMIO METALICO DE 2 X 2
PZA
0.00
0.056625
$0.00
$0.00
M3
0.00
0.055000
$355.96
$19.58
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
BASICOS
MEZ0011
Subtotal: MATERIALES
$154.99
$100.93
Subtotal: BASICOS
$19.58
Costo directo
$275.50
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$275.50
Concepto
Costo
M2
Importe
MATERIALES
MTAB0090
MILL
0.00
0.024000
###
$30.72
JOR
10.00
0.100000
$655.40
$65.54
ANDAMIO METALICO DE 2 X 2
PZA
0.00
1.000000
$0.00
$0.00
M3
0.00
0.018600
$355.96
$6.62
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
BASICOS
MEZ0011
Subtotal: MATERIALES
$30.72
$65.54
Subtotal: BASICOS
$6.62
Costo directo
$102.88
INDIRECTO
$10.29
UTILIDADES
$10.29
COSTO TOTAL
$0.00
Concepto
Costo
M2
Importe
MATERIALES
MTAB0090
MILL
0.00
0.033000
###
$42.24
JOR
10.00
0.100000
$655.40
$65.54
ANDAMIO METALICO DE 2 X 2
PZA
0.00
1.000000
$0.00
$0.00
M3
0.00
0.031800
$355.96
$11.32
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
BASICOS
MEZ0011
Subtotal: MATERIALES
$42.24
$65.54
Subtotal: BASICOS
$11.32
Costo directo
$119.10
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$119.10
Concepto
Costo
M2
Importe
MATERIALES
MTAB0090
MILL
0.00
0.062000
###
$79.37
JOR
10.00
0.100000
$655.40
$65.54
ANDAMIO METALICO DE 2 X 2
PZA
0.00
1.000000
$0.00
$0.00
M3
0.00
0.078100
$355.96
$27.80
MANO DE OBRA
CUAD040
SUBCONTRATOS
EAN0001
BASICOS
MEZ0011
Subtotal: MATERIALES
$79.37
$65.54
Subtotal: BASICOS
$27.80
Costo directo
$172.71
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$172.71
Concepto
Costo
Importe
MATERIALES
MTAB0070
MILL
0.00
0.006000
###
$10.80
JOR
5.00
0.200000
$655.40
$131.08
0.00
1.000000
$24.78
$24.78
MANO DE OBRA
CUAD040
APL0025
Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: .
$10.80
$131.08
$24.78
Costo directo
$166.66
INDIRECTO
$16.67
UTILIDADES
$16.67
COSTO TOTAL
$0.00
LOSA10-200 LOSA DE 10 CM. DE PERALTE EN TECHO DE CUBIERTA, FABRICADA CON CONCRETO F`c
= 200 KG/CM2 AGREGADO MAXIMO 3/4" INCLUYE CIMBRA ,DESCIMBRA, KG. DE ACERO
DE REFUERZO X M3 DE CONCRETO, MATERIALES MANO DE OBRA Y EQUIPO
Cdigo
Concepto
Costo
M2
Importe
BASICOS
VLOSA200
0.00
0.103000
$543.18
$55.95
AREF3
0.00
0.022330
###
$140.20
CLOSA
0.00
1.000000
$62.40
$62.40
Subtotal: BASICOS
$196.15
Subtotal: .
$62.40
Costo directo
$258.55
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$258.55
LOSA10-250 LOSA DE 10 CM. DE PERALTE EN TECHO DE CUBIERTA, FABRICADA CON CONCRETO F`c
= 250 KG/CM2 AGREGADO MAXIMO 3/4" INCLUYE CIMBRA ,DESCIMBRA, KG. DE ACERO
DE REFUERZO X M3 DE CONCRETO, MATERIALES MANO DE OBRA Y EQUIPO
Cdigo
Concepto
Costo
M2
Importe
BASICOS
VLOSA250
0.00
0.103000
$558.87
$57.56
AREF3
0.00
0.022330
###
$140.20
CLOSA
0.00
1.000000
$62.40
$62.40
Subtotal: BASICOS
Subtotal: .
Costo directo
INDIRECTO
UTILIDADES
PTA0001
$197.76
$62.40
$260.16
$0.00
$0.00
COSTO TOTAL
$260.16
PZA
Cdigo
Concepto
Costo
Importe
SUBCONTRATOS
PUR0001
PZA
0.00
1.000000
$0.00
$0.00
JOR
2.50
0.400000
$655.40
$262.16
0.00
1.000000
$24.78
$24.78
MANO DE OBRA
CUAD040
APL0025
$262.16
Subtotal: .
$24.78
Costo directo
$286.94
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
$286.94
Concepto
Costo
PZA
Importe
SUBCONTRATOS
PUR0001
PZA
0.00
1.000000
$0.00
$0.00
JOR
2.50
0.400000
$655.40
$262.16
0.00
1.000000
$24.78
$24.78
MANO DE OBRA
CUAD040
APL0025
$262.16
Subtotal: .
$24.78
Costo directo
$286.94
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
PIS0080
$286.94
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MPIS0240
M2
0.00
1.030000
$96.52
$99.42
MPGP0001
SACO
0.00
0.330000
$40.87
$13.49
PERDURA SACO
0.00
0.135500
$37.39
$5.07
12.00
0.083333
$655.40
$54.62
MJUNT0001
ARENA MARCA
MANO DE OBRA
CUAD040
JOR
$117.98
$54.62
Costo directo
$172.60
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
PIN0001
$172.60
Cdigo
Concepto
Costo
M2
Importe
MATERIALES
MPIN0069
SELLADOR VINILICO
LT
0.00
0.002762
$473.91
$1.31
MPIN0060
CUB
0.00
0.009209
$668.69
$6.16
MRES0051
YESO DE RESANADOR
KG
0.00
0.082500
$0.00
$0.00
JOR
20.00
0.050000
$327.70
$16.39
PZA
0.00
0.050000
$0.00
$0.00
MANO DE OBRA
CUAD060
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
Subtotal: MATERIALES
$7.47
$16.39
Costo directo
$23.86
INDIRECTO
$0.00
UTILIDADES
PIN0002
$0.00
COSTO TOTAL
$23.86
M2
Cdigo
Concepto
Costo
Importe
JOR
21.45
0.046620
$327.70
$15.28
PZA
0.00
0.050000
$0.00
$0.00
CUB
0.00
0.009734
###
$10.61
MANO DE OBRA
CUAD060
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
MATERIALES
MPIN0001
PINTURA ESMALTE
Subtotal: MATERIALES
$10.61
$15.28
Costo directo
$25.89
INDIRECTO
$0.00
UTILIDADES
IMP0001
$0.00
COSTO TOTAL
$25.89
M2
Cdigo
Concepto
Costo
Importe
MATERIALES
MIMP0001
LT
0.00
1.000000
$0.00
$0.00
MSEL0001
LT
0.00
0.250000
$0.00
$0.00
MMEM0001
MEMBRANA DE FIBRA
IMPERMEABILIZACIN
DE
POLIESTER#5
PARA M2
0.00
1.000000
$0.00
$0.00
30.00
0.033333
$655.40
$21.85
MANO DE OBRA
CUAD040
JOR
$21.85
Costo directo
$21.85
INDIRECTO
$0.00
UTILIDADES
APL0025
$0.00
COSTO TOTAL
$21.85
Cdigo
Concepto
Costo
JOR
M3
Importe
MANO DE OBRA
CUAD040
26.71
0.037439
$655.40
$24.54
0.00
0.001440
$165.89
$0.24
BASICOS
MEZ0005
$24.54
Subtotal: BASICOS
$0.24
Costo directo
$24.78
INDIRECTO
$0.00
UTILIDADES
APL0022
$0.00
COSTO TOTAL
$24.78
M2
Cdigo
Concepto
Costo
Importe
JOR
9.00
0.111111
$655.40
$72.82
M3
0.00
0.032500
$355.96
$11.57
PZA
0.00
1.000000
$0.00
$0.00
MANO DE OBRA
CUAD040
BASICOS
MEZ0011
SUBCONTRATOS
EAN0001
ANDAMIO METALICO DE 2 X 2
Subtotal: MANO DE OBRA
$72.82
Subtotal: BASICOS
$11.57
Costo directo
$84.39
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
PSO0001
$84.39
Cdigo
Concepto
M2
Unidad Rend. Cantidad
Costo
Importe
TON
0.00
0.001600
$350.00
$0.56
JOR
45.45
0.022002
$655.40
$14.42
MATERIALES
MCEM0060
MANO DE OBRA
CUAD040
Subtotal: MATERIALES
$0.56
$14.42
Costo directo
$14.98
INDIRECTO
$0.00
UTILIDADES
$0.00
COSTO TOTAL
PSO0002
$14.98
Cdigo
Concepto
M2
Unidad Rend. Cantidad
Costo
Importe
TON
0.00
0.032000
$350.00
$11.20
JOR
30.00
0.033333
$655.40
$21.85
MATERIALES
MCEM0060
MANO DE OBRA
CUAD040
$11.20
$21.85
Costo directo
$33.05
INDIRECTO
$0.00
UTILIDADES
COSTO TOTAL
$0.00
$33.05
CLCULO DE PIE TABLN PARA CIMBRA DE FRONTERAS DE ZAPATAS CON CONTRATRABE (DADO) SUPERIOR.
MEDIDA ZAPATA
SECCIN CIMBRADA DE DADO
LC
1.20
0.50
PERALTE DE ZAPATA
ALTURA DE DADO
0.30 M
0.80 M
FACTOR DE DESPERDICIO
PROFUNDIDAD DE ESTACA
HOLGURA YUGO 1 EXTREMO
SEPARACIN YUGO
20.00 %
0.15 M
0.05 M
0.50
LC
LL
2
2
2
2
LL
1.20 M
0.50 M
LC = LADO CORTO
LL = LADO LARGO
PT = PIE TABLN
FC = FACTOR DE CONTACTO
FD = FACTOR DE DESPERDICIO
FU = FACTOR DE USOS
MADERA
FU
5
5
5
DUELA
DUELA
BARROTE
5
5
5
DATOS CALCULADOS
MEDIDA PULG. MTS
CANT.
PT/M2
TOTAL
TOTAL
PZAS
PZAS" MTS."
.
ESP. ANCHO
PT
FC PT 1/FC FD=0.2 FU (PT/M2/USO) (PT/PZA/USO)
1
12
1.2
2
1.20 15.75 1.44 10.94 13.13 5
2.63
3.78
1
12
1.2
2
3
2
4
12
0.45 11.81 1.44 8.20 9.84 5
1.97
2.84
2
2
1
1
2
20
20
4
0.80
0.80
2
2
3
0.80
17.50 1.60
10.94 13.13 5
2.63
1.26
3.42
22.42 1.60
14.01 16.81 5
3.36
5.38
CLCULO DE PIE TABLN PARA CIMBRA DE UN CASTILLO, COLUMNA, TRABE, DALA O CADENA
LC
0.50
0.80 M
SECCIN
ALTURA O LONG. CIMBRADA
FACTOR DE DESPERDICIO
HOLGURA YUGO 1 EXTREMO
SEPARACIN YUGO
LL
0.50 M
LC = LADO CORTO
LL = LADO LARGO
PT = PIE TABLN
20.00 %
0.05 M
0.50
LC
LL
2
2
CARAS CIMBRADAS
FC = FACTOR DE CONTACTO
FD = FACTOR DE DESPERDICIO
FU = FACTOR DE USOS
ELEMENTO CONSTRUCTIVO
Elemento Horizontal
MADERA
DUELA
DUELA
BARROTE
POLN
BARROTE
FU
5
5
5
10
3
DATOS CALCULADOS
MEDIDA PULG. MTS
CANT.
PT/M2
TOTAL
TOTAL
PZAS
PZAS" MTS."
.
ESP. ANCHO
PT
FC PT 1/FC FD=0.2 FU (PT/M2/USO) (PT/PZA/USO)
1
1
2
4
2
4
4
4
4
4
1.00
1.00
2.70
0.40
10
10
3
4
4
1.00
21.88 2.00
10.94 13.13 5
2.63
4.20
3.42
2.70
0.40
22.42 2.00
47.25 2.00
3.50 2.00
11.21 13.45 5
23.63 28.35 10
1.75 2.10 3
2.69
2.84
0.70
8.85
4.30
4.54
1.12
14.16
ANALISIS DEL FACTOR DE LA MANO DE OBRA (FACTOR SALARIO REAL) PARA EL ESTADO DE COLIMA, MXICO.
TEXTO AZUL= CELDAS CAMBIABLES
TEXTO NEGRO = CELDAS CON FRMULAS
Datos
AO
3 S.M.G.D.F (3 SALARIOS MNIMOS GRAVABLE DEL DISTRITO FEDERAL. S.M.G.D.F.
Salario Nominal. Salario que se le paga directamente al trabajador
INFONAVIT
Salario Integrado. Salario real, que le cuesta el trabajador al contratista.
2005
46.80
5 %
DIAS NO TRABAJADOS AL AO
g) Domingos
h)Das festivos por ley
i)Das por costumbre
j)Das Sindicato
k) Vacaciones
l)Permisos y Enfermedad
m)Condiciones Climatolgicas
n)Horas inactivas por arrastre
o)Das no trabajados por guardia
DAS PAGADOS AL AO
52.00 Das Calendario
7.00 b) Aguinaldo por Ley
c)Prima Vacacional
33% por ley
d)Prima Dominical 0.25% por ley
10.00 e)Horas extra al ao (especifique) por ley en das
f)Prestaciones por Contrato de trabajo
g)Das por terminacin de obra al ao (CFE)
TOTAL Y1 (DIAS)=
TOTAL X1 (DIAS)=
8.63
4.84
2.375
4.275
7.590
1.000
1.425
0.950
%
%
%
%
%
%
418.00
1.4122 Suma en % de prestaciones del IMSS
17.62 %
CATEGORA
DIARIO
NOMINAL
1 CABO
2 ALBAIL
125.32
3 CARPINTERO
4 PINTOR
5 PLOMERO
109.92
6
7
8
9
10
A1
A2
A3
A4
109.92
109.92
109.92
ELECTRICISTA
109.92
PEON
56.67
AYUDANTE EN GRAL.
HERRERO
CHOFER
109.92
83.44
109.92
3 S.M.G.D.F.
EN DINERO
RIESGO
TRABAJO
SALARIO
FSR
INTEGRADO
Y RETIRO
8.63
8.63
1.19
1.04
1.79
1.57
9.51
8.34
2.98
2.61
5.36
4.70
1.25
1.10
6.27
5.50
1.8289
1.8425
229.20
202.53
8.63
8.63
8.63
1.04
1.04
1.04
1.57
1.57
1.57
8.34
8.34
8.34
2.61
2.61
2.61
4.70
4.70
4.70
1.10
1.10
1.10
5.50
5.50
5.50
1.8425
1.8425
1.8425
202.53
202.53
202.53
8.63
8.63
8.63
8.63
8.63
-
1.04
0.54
0.79
1.04
1.04
-
1.57
0.81
1.19
1.57
1.57
-
8.34
4.30
6.33
8.34
8.34
-
2.61
1.35
1.98
2.61
2.61
-
4.70
2.42
3.57
4.70
4.70
-
1.10
0.57
0.83
1.10
1.10
-
5.50
2.83
4.17
5.50
5.50
-
1.8425
1.9467
1.8777
1.8425
1.8425
-
202.53
110.32
156.68
202.53
202.53
-
A5 CONTADOR
A6 ADMINISTRADOR
A7
CATEGORA
PRESTACIONES EN %
DIARIO
CUOTA
NOMINAL
FIJA
-
IMSS
SALARIO
INFONAVIT
FSR
INTEGRADO
1 CABO
125.32
6.89
17.62
5.00
1.8289
229.20
2 ALBAIL
109.92
7.86
17.62
5.00
1.8425
202.53
3 CARPINTERO
109.92
7.86
17.62
5.00
1.8425
202.53
4 PINTOR
109.92
7.86
17.62
5.00
1.8425
202.53
5 PLOMERO
109.92
7.86
17.62
5.00
1.8425
202.53
6 ELECTRICISTA
109.92
7.86
17.62
5.00
1.8425
202.53
7 PEON
56.67
15.24
17.62
5.00
1.9467
110.32
8 AYUDANTE EN GRAL.
83.44
10.35
17.62
5.00
1.8777
156.68
9 HERRERO
109.92
7.86
17.62
5.00
1.8425
202.53
109.92
7.86
17.62
5.00
1.8425
202.53
10 CHOFER
A1 SECRETARIA
A2 DIBUJANTE
A3 BODEGUERO
A4 SUPERVISOR
A5 CONTADOR
A6 ADMINISTRADOR
A7
ANIEXO 29
Gasolina
Diesel
$120,000.00
Otro
10.00 Lt
20.00 Lt/Hr.
$12,000.00
$107,910.00
$36,000.00
30
%Vm
14,600.00 Horas
1.00
2.00
30.00 Horas
$40.00 Lt
2,920.00 Horas
50.00 Horas
8.00 Horas
$70.00
2.00 %
$80.00
2.00 %
$90.00
2.00 Lt
100.00 Horas
$8.00 Lt
I CARGOS FIJOS
I.1 Depreciacin
D= (Vm-Vr)/Ve
4.93
I.2 Inversin
49.28
I.3 Seguros
49.28
I.4 Mantenimiento
Mn= Ko x D
9.85
(1) SUMA CARGOS FIJOS =
113.34
II. CONSUMOS
II.1 Combustibles
CO= Gh x Pc
16.00
II.3 Lubricantes
Lb= (Ah+Ga) x Pa
1,200.00
II.4 Llantas
N= Pn/Vn
240.00
Ae= Ppe/Vpe
0.90
(2) SUMA CONSUMOS =
1,456.90
III. OPERACIN
CATEGORAS
CANTIDAD
SALARIO REAL
OPERADOR 001
$10.00
10
$0.00
$0.00
$0.00
$0.00
(Po)=
III.1 OPERACIN
IMPORTE
0
$10.00
Po=Sr/Ht
ANIEXO 29
PROGRAMA MONTOS MENSUALES DE UTILIZACIN DE PERSONAL TCNICO, ADMINISTRATIVO Y DE SERVICIOS ENCARGADOS DE LA DIRECCIN,
SUPERVISIN Y ADMINISTRACIN DE LOS TRAAJOS
* Aqu, se muestra un ejemplo sencillo y comn del desglose y factor de Indirectos
MONTO DE LA OBRA ACTUAL (C. D.)
MONTO DE CONTRATOS VIGENTES (AO)
PERIODICIDAD
Fecha de Inicio:
Fecha de terminacin:
Duracin en Dias:
$71,740.80
$400,000.00
SEMANAL
6/1/2005
6/20/2005
20.00
SEM1
2005
7
SEM2
2005
7
Factor
1.0000
1.0000
1.0000
1.0000
0.5714
SEM1
SEM2
Salario
4
0.0000
0.0000
0.0000
0.0000
0.0000
Importe
-
Total
Cant. Categora
SUPERINTENDENTE
RESIDENTE GENERAL
1
AUXILIAR DE RESIDENTE
ing. De seguridad industrial
control de calidad
Salario
$431.02
Importe
1,970.38
-
431.02
-
431.02
-
431.02
-
431.02
-
246.30
-
TECNICO SUPERVISOR B
tecnico 7
tecnico 8
1,970.38
Total
1.3- PERSONAL ADMINISTRATIVO
Cant. Categora
1
Salario
ADMINISTRADOR DE OBRA
AUXILIAR CONTABLE
auxiliar a
auxiliar b
auxiliar c
$417.01
Importe
1,906.33
-
417.01
-
417.01
-
417.01
-
417.01
-
238.29
-
328.97
-
328.97
-
328.97
-
328.97
-
187.98
-
1,906.33
Total
1.4.- PERSONAL DE SERVICIO
Cant. Categora
BODEGUERO
VELADOR
CHOFER
1
chofer 2
chofer 3
Salario
$328.97
Importe
1,503.86
-
1,503.86
Total
$71,740.80
###
PERIODICIDAD SEMANAL
II.-
CONCEPTO
1.1
1.2
1.3
1.4
1.5
1.6
1.7
2.1
2.2
2.3
2.4
2.5
2.6
1.0000
$
$
$
$
$
$
4,000.00
-
2.7465
2.6572
2.0962
$
$
$
$
1,970.38
1,906.33
1,503.86
0.5000
0.8000
$
$
$
$
$
$
358.70
573.93
430.44
0.6000
III.SERVICIOS
3.1
3.2
3.3
$
$
$
$
$
$
IV.4.1
4.2
4.3
4.4
$
$
$
$
$
$
$
$
V.-
GASTOS OFICINA
Papelera y tiles de escritorio
Correos, telfonos, fax, radio, telgrafos
Situacin de fondos
Copias y duplicados
Luz, gas y otros consumos
Gastos de concurso
$
$
$
$
$
$
$
$
5.1
5.2
5.3
5.4
5.5
5.6
VI.SEGUROS Y FIANZAS
6.1 Primas por Seguro
6.2 Primas por Fianzas
0.5000
0.7000
0.2000
1.0000
$
$
$
$
$
$
$
$
2,000.00
2,800.00
800.00
4,000.00
-
CAPACITACIN Y ADIESTRAMIENTO
7.1 Consultores,Asesores,Servicio y Laboratorios
0.2000
8.1
8.3
8.4
8.5
1.0000
1.0000
5.6000
INDIRECTO TOTAL %
$
$
$
800.00
4,000.00
$
$
$
$
$
$
$
$
4,000.00
22,400.00
$
$
$
$
$
9.4000
6,743.65
15.00
PERIODICIDAD
5.81 %
7.50 %
1.69 %
DIARIA
SEMANAL
QUINCENAL
15.00 %
TOTAL DE INDIRECTOS
INDIRECTOS DE CAMPO EN EL DESGLOSE DE IND.
PERSONAL DIRECTIVO
PERSONAL TCNICO
MENSUAL
7.50 % =
36.62 %
PERSONAL ADMINISTRATIVO
PERSONAL DE SERVICIO
TOTAL
35.43 %
27.95 %
100.00 %
2.75
2.66
2.10
7.50 %
$71,740.80
4.5714
1,970.36
1,906.33
1,503.87
PERSONAL DIRECTIVO
PERSONAL TCNICO
PERSONAL ADMINISTRATIVO
PERSONAL DE SERVICIO
5,380.56
SALARIO TOTAL DEL PERSONAL
431.02
417.01
328.97
PERSONAL DIRECTIVO
PERSONAL TCNICO
PERSONAL ADMINISTRATIVO
PERSONAL DE SERVICIO
$
$
83.00
Salario
35.00
TOTAL
35.00
$
$
20.00
8.00
$
$
40.00
8.00
83.00
CLAVE
CONCEPTO
FRMULA
CD
%CI
%FIN
CU
CI
CF
I.-INDIRECTO
II.-FINANCIAMIENTO
CI=CD %CI
CF=CD %FIN
IMPORTE
71,740.80
8,465.41
15.00
3.00
8.47
10,761.12
2,152.22
10.00
CARGOS ADICIONALES
CLAVE
CONCEPTO
CD
MOG
%SAR
%INF
FRMULA
IMPORTE
71,740.80
2,210.94
2.00
5.00
CSAR=(MOG)*%SAR
CINF=(MOG)*%INFONAVIT
44.22
110.55
DE CSEC=CD 0.005
358.70
SUBTOTAL
TOTAL DE CARGOS ADICIONALES
513.47
0.72
CEM.
(KG/CM2)
ARE
(SACO) (BOTE)
GRAV.
AGUA
VOL.
(BOTE)
(BOTE)
(M3)
CONCRETO FC
(KG/CM2)
7.50
8.00
3.00
0.175
5.50
6.50
2.50
0.151
4.00
6.00
2.00
0.133
3.50
5.00
1.75
0.120
2.50
4.50
1.25
0.103
FUENTE: BIMSA
3%
10%
10%
30%
5%
pulg.
mm.
Kg/m.
mm2
0.0143
pulg. 2
No.
pulg.
mm.
Kg/m.
mm2
pulg. 2
(M2)
ALAMBRE #18
(7/8")
22.2
3.034
387
0.6
TRR 71428 CM. DE 7CM. ESP. (CAPUCHINO), MORTERO CON JUNTAS DE 1.5 CM
2.5
(1/4")
6.35
0.251
ALAMBRN
(1")
25.4
3.975
507
0.79
TRR 71428 CM. DE 14CM. ESP. (A SOGA), MORTERO CON JUNTAS DE 1.5 CM.
(3/8")
9.5
0.557
71
0.11
(1 1/8")
28.6
5.033
642
0.99
TRR 71428 CM. DE 28CM. ESP. (A TIZN), MORTERO CON JUNTAS DE 1.5 CM.
(1/2")
12.7
0.996
127
0.2
10
(1 1/4")
31.8
6.225
794
1.23
TABICN 101428 CM. DE 10CM. ESP. (CAPUCHINO), MORT CON JUNTAS DE 1.5
(5/8")
15.9
1.56
199
0.31
11
(1 3/8")
34.9
7.503
957
1.48
TABICN 101428 CM. DE 14CM. ESP. (A SOGA), MORT. CON JUNTAS DE 1.5 CM.
(3/4")
19.1
2.25
287
0.44
12
(1 1/2")
38.1
8.938
1140
1.77
TABICN 101428 CM. DE 28CM. ESP. (A TIZN), MORT. CON JUNTAS DE 1.5 CM.
MORT.
ARE
AGUA
VOL.
MEZCLA
(BOTE)
(BOTE)
(BOTE)
(M3)
MORTERO-ARENA
4.00
3.00
0.095
5.00
2.50
0.110
6.00
2.00
0.127
7.00
1.75
0.146
8.00
1.25
0.168
3%
3%
10%
30%
MORTERO-ARENA
DETALLE
pulg.
NERVADURA
(1/4")
40
25
60
40
(3/8")
13
40
30
60
45
(1/2")
17
10
50
40
75
60
(5/8")
10
21
11
65
50
95
70
(3/4")
11
26
12
75
60
115
85
pulg.
(7/8")
14
30
13
90
70
(1")
15
34
10
14
100
75
(1 1/8")
17
38
11
15
115
85
(1 1/4")
19
43
13
16
125
95
(1 1/2")
23
51
15
18
150
115
LOSA Y COL.
FC=150 FC=200
CEM.
ARE
GRAV.
AGUA
(TON)
(M3)
(M3)
(M3)
(M3)
0.2750
0.5446
0.6591
0.2604
1.000
0.3275
0.5382
0.6527
0.2532
1.000
0.3697
0.5320
0.6452
0.2424
1.000
0.4130
0.5371
0.6396
0.2340
1.000
3%
10%
10%
30%
5%
AGUA
RECOCIDO Y TABICN)
VOL.
LAD.
MEZ.
PZAS.
(M3)
(M3)
24
0.0166
0.024
48
0.0397
0.048
86
0.0987
0.086
24
0.0186
0.024
33
0.0318
0.033
62
0.0781
0.062
MORT.
ARE
AGUA
VOL.
(TON)
(M3)
(M3)
(M3)
0.3000
1.1500
0.2900
1.00
0.2600
1.2000
0.2850
1.00
0.2250
1.2400
0.2800
1.00
0.1950
1.2700
0.2750
1.00
0.1700
1.2900
0.2700
1.00
3%
3%
10%
30%
2)
ENA
IN Y COLOC.
DETALLE
NERVADURA
FC=150 FC=200
135
100
150
115
170
130
190
145
230
170