SPRINKLER SYSTEM — GENERAL INFORMATION
for
High-piled storage Yes Io Date:
Rack storage: aYes No Flow test data:
Commodity elass:___________ Stati,“ _____ psi
‘Max. storage ht = ___ft Resid: =________ psi
Aisle width min.) —___f Flow: = gpm.
Encapsulation aYes No Pitot, =< psi
Solid shelving: Yes 4No Date:
Flammable! Location:
‘combustible liquids: Yes No
Other storage: aes 4No
TT Lecation of aus/low point drains:
Hazardous materials: Yes 2 No
Idle pallets: aYes 4No
Antifreeze systems — QYes No
Location;______________ Original main drain test results:
Dryorauxsystems QYes No Static: ~—_____ psi
Location Residual: psi
[Name of contractor or designer:This system es shown on .
- company
print no...
for...
is designed to discharge at arate of ....
(Umin/m?) of floor area over a maximum area of
ft2 (m2) when supplied with water at a rate of
‘gpm (min) at ... psi (bar) at the base of the riser.
Hose stream allowance of ........ --gpm (Umin)
is included in the above.
‘Occupancy classification
Commodity classification .
Maximum storage height ..
FIGURE A.24.5 Sample Nameplate.oe zt
aedal elesTell ter UNA Ort CC RSy eth]
Moe are ce SPRieKice Cay
Eanes Pence |
fed Menocacy VALLCY CHURCH
‘Qee} aS MANONAC eee”
Pl reeceeice Mo Pen oz039
Perot 257-5 Aaa
(Umin) per'sq ft (m2) of floor area over a maximum area of
Po eee
eee > ae
322 er
eet ban
Aen on
Comer cise Hee
eee |
es |
tee
ERE) ico cance ns wari a]