PRESUPUESTO ESTIMADO

CUBIERTA DE TECHO ALMACEN, CON ASBESTO


SABANA DE LA MAR, PROV. SAMANA; REPUBLICA DOMINICANA
COD

PARTIDAS

1.0

CANT.

UNID

P.U

SUBTOTAL

TRABAJOS PRELIMINARES

1.1

LIMPIEZA Y ACONDICIONAMIENTO DEL AREA (120' X 40')

5011.96

P2

8.55

42,852.26

1.2

DESMONTE DE RESTO DE TECHO EXISTENTE (INSERVIBLE) (20' X 40')

5011.96

P2

22.43

112,418.26
155,270.52

2.0

CARPINTERIA

2.1

BASES PARA COLUMNAS DE SOPORTE DE PINO TRATADO (6" X 6" X 10' )

2.2

TIJERILLA DE MADERA SOPORTE EN COLUMNA 6" X 6" (PINO TRATADO)

UNID

754.28

5,279.96

307.43

2.3
2.4

7.00

PL

327.18

100,584.95

TIJERILLA DE MADERA (PINO TRATADO)

438.86

PL

212.03

93,051.49

CARGADERAS DE MADERA 2" X 4" X 10'

1377.54

PL

54.49

75,062.15

ML

695.45

70,073.54
12,992.61

2.5

CANALETAS DE DESAGUE LATERALES DE TECHO

100.76

2.6

CABALLETE DE FIBRO CEMENTO (SOBRE LIMA TESA)

125.23

PL

103.75

2.7

PINTURA DE MANTENIMIENTO EN MADERA TRATADA

822.00

PL

45.72

37,581.84

2.8

SALIDAS ELECTRICAS DE TECHO (INCLUYE MANO DE OBRA)

1.00

P.A

45,750.00

45,750.00
440,376.54

3.0
3.1

COLOCACION DE TECHO
CUBIERTA DE TECHO EN ALUZINC NATURAL CAL. 26

5011.96

72.56

P2

363,667.82

NOTA: NO SE COTIZA ASBESTO DEBIDO A QUE EL USO DEL MISMO ESTA DESCONTINUADO

363,667.82

SUB-TOTAL GENERAL

RD$959,314.88

GASTOS INDIRECTOS
10.00%

95,931.49

B).- GASTOS ADMINISTRATIVOS

3.00%

28,779.45

C).- SEGUROS Y FIANZAS

2.50%

23,982.87

D).-TRANSPORTE

1.75%

16,788.01

E)._ITBIS

1.80%

17,267.67

G)._ FONDO DE PENSIONES DE LOS OBREROS DE LA CONSTRUCCION

1.00%

9,593.15

H)._ CODIA

0.10%

A).- RESPONSABILIDAD TCNICA

959.31
193,301.95

SUB-TOTAL GASTOS INDIRECTOS

TOTAL GENERAL

RD$1,152,616.83

Ing. Maria Isabel Manon M.

Ing. Jose F. Vasquez T.