Está en la página 1de 1

Mari Petolreum Company Ltd

Doc. No. HP12-M


Rev. No. 01
Rev. Date: Jan 15, 2014

Halini Oil Field


Inspection Checklist
Equipment

Wellhead & X-Mass Tree

Unit/Item No.

SPF-01

Service

Well Flow Control

Inspection Interval

Monthly

S.No.

Activities

Visual inspection of Alemite style grease fittings

Visual inspection of manual valves for stem seal leakage

Visual inspection of all needle valves, manifolds and


instrumentation for leaks or damage

Visual inspection of test and bleeder port fittings for leaks

Visual inspection of valve bonnet seal areas for leaks

Visual inspection of XT Cap flanged connection and quick union.

Rust preventative to be applied to any exposed metal surfaces or


areas of damaged paintwork

Lubrication of Gate Valves

Date:
Checked
OK

/
Remarks

Inspected By:

Approved By:

Name:

_______________________________

Name:

Designation:

___________________________

Designation: ___________________________

Sign:

______________________________

Sign:

___________________________

______________________________

También podría gustarte