D E S I G N

O F

C A P A C I T Y -

S T A G I N G

S. B. C.

A T

R. C. C.

S. R.

500.00

K. L.

20.00

metres.

100.00 K.N./sqm.

R A M S A R.

D I S T R I C T

N A G A U R.

=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*
=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*

NOTATIONS AND DIMENSIONS


========================
CAPACITY OF THE SERVICE RESERVOIR - C
=
500
INNER DIA OF CYLINDRICAL WALL - D
= 10.800
HEIGHT OF CYLINDRICAL WALL - H
=
4.800
RISE OF TOP DOME
- H1 =
1.200
RISE OF BOTTOM DOME
- H2 =
1.100
HEIGHT OF CONE WALL - H3 =
1.700
THICKNESS OF TOP DOME
- T1 =
0.150
THICKNESS OF BOTTOM DOME - T2 =
0.200
THICKNESS OF ANNULAR SLAB - Ta =
0.200
THICKNESS OF CYLINDRICAL WALL AT TOP - T3 =
0.250
THICKNESS OF CYLINDRICAL WALL AT BOT.- T4 =
0.250
THICKNESS OF CONICAL WALL AT TOP - T5 =
0.275
THICKNESS OF CONICAL WALL AT BOTTOM - T6 =
0.275
BREADTH OF TOP RING BEAM - B1 =
0.300
DEPTH OF TOP RING BEAM - D1 =
0.500
BREADTH OF MIDDLE RING BEAM - B2 =
0.900
DEPTH OF MIDDLE RING BEAM - D2 =
0.225
BREADTH OF BOTTOM RING BEAM - B3 =
0.500
DEPTH OF BOTTOM RING BEAM - D3 =
1.050
BREADTH OF FOUNDATION RING BEAM - B4 =
0.500
DEPTH OF FOUNDATION RING BEAM - D4 =
1.000
BREADTH OF BRACES - B5 =
0.300
DEPTH OF BRACES - D5 =
0.600
FREEBOARD
- Fb =
0.300
NUMBER OF COLUMNS - N
=
10
NUMBER OF BRACES - M
=
4
LIVE LOAD ON TOP DOME - L
=
4000
GRADE OF CONCRETE - M
=
25
GRADE OF STEEL
- St. =HYSD
HORIZONTAL PROJECTION OF CONE WALL - Hc =
1.500
DIA OF COLUMN CENTRE - Do =
7.300
HEIGHT OF DEAD STORAGE
- Dst =
0.200
SAFE BEARING CAPACITY OF SOIL
- SBC =
100
STAGING OF S.R.
- STA = 20.000
DEPTH OF FOUNDATION - Df =
2.000
DIAMETER OF MAIN COLUMN PROVIDED - Dc =
0.500
DIAMETER OF INTERNAL COLUMN PROVIDED - Dci =
0.300
SIESMIC ZONE No. - Zn =
2
OUTER RADIUS OF RAFT a =
6.200
INNER RADIUS OF RAFT b =
1.100
OVERALL THICKNESS OF FOUNDATION SLAB - DS =
0.600
THICKNESS OF FOUNDATION SLAB AT END
- DSe =
0.300
THICKNESS OF PCC BELOW FOUNDATION SLAB(M-10)=
0.100

******************

K. L.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
N/sqm.
m.
m.
m.
K.N./sqm.
m.
m.
m.
m.
m.
m.
m.
m.
m.

CAPACITY CALCULATIONS
=====================
INNER DIAMETER OF CYLINDRICAL WALL -

10.800 m.

DIA OF CONE WALL AT BOTTOM EDGE Dcn =


10.800 1.500 * 2
DIA OF BOTTOM DOME Db =
7.300 0.500
HORIZONTAL PROJECTION OF CONE WALL - Hc =

7.800 m.

HEIGHT OF CONE WALL -

46.24 /8/

PI /4 * (

1.21 * (
116.64

6.800 m.
1.500 m.

H3

1.700 m.

RISE OF BOTTOM DOME

H2

1.100 m.

RADIUS OF BOTTOM DOME


1.1 )+(
1.1 /2)

R2

5.805 m.

REQUIRED CAPACITY OF THE TANK


PI*

- C

5.805

VOLUME OF BOTTOM DOME


-(
1.1 /3))

60.84

500 KL.

20.673 KL.

VOLUME OF CONE WALL = 116.481 KL.


84.24 ) *
1.700 / 3

WATER COLUMN IN DEAD STORAGE

0.200 m.

VOLUME IN DEAD STORAGE


PI*(DST^2*(Tan(xo)+(1/Tan(x2)) )/2*Do + PI*Do*B3*DST
VOLUME OF INTERNAL COLUMNS
PI / 4 *
0.300 *
0.300 *
10 *
6.200

3.333 KL.

4.383 K.L.

(
500
( PI / 4

WATER COLUMN REQUIRED IN CYLINDRICAL PORTION =


116.481 +
20.673 +
3.333 +
4.383 ) /
10.800 *
10.800 )
FREEBOARD =
TOTAL HEIGHT OF VERTICAL WALL REQUIRED
4.496 +
0.300

4.496 m.
0.300 m.

4.796 m.

4.800 m.

NET VOLUME ACTUALLY PROVIDED


PI / 4 * 116.64 * (
4.800 0.300 )
+ 116.481 20.673 3.333 4.383
GROSS VOLUME PROVIDED INCLUDING FREEBOARD AND DEAD STORAGE
500.33 + ( PI / 4 * 116.64 *
0.300 ) +
3.333

500.33 KL.

531.15 KL.

PROVIDE HEIGHT OF VERTICAL WALL

*********************

DESIGN OF TOP DOME


==================
GRADE OF CONCRETE :- M- 25
INNER DIA OF TOP DOME - (Dt)
7.300 0.300
RISE OF DOME - (h1)

7.000 metres

1.200 metres

RADIUS OF DOME - (R1)

5.704 metres

ASSUME TH.OF DOME - (t1)

0.150 metres

ANGLE (x1)=SIN^-1(Dt/2R1)
(x1)
LIVE LOAD - (L)
UNIT WEIGHT OF WATER - (Ww)
UNIT WEIGHT OF CONCRETE - (Wc)

= 0.660617 radians
= 37.85058 degrees
=
=
=

4000 Newtons/sqm.
9800 N/cum.
25000 N/cum.

U.D.L.PER sqm.OF SURFACE AREA DUE TO SELF WT. =


U.D.L.PER sqm DUE TO SELF WT.& LIVE LOAD

(25000*t) =

3750 N/sqm.

(w1) = (25000*t1+L) =

7750 N/sqm.

MAXIMUM MERIDIONAL STRESS, i.e. AT SPRINGINGS


(1-0.789613 )/(0.376510 ) *
7750 *
5704 /
150
MAXIMUM HOOP STRESS i.e. AT THE TOP OF THE DOME
7750 *
5704 /
150 /2
MIN AREA OF STEEL REQUIRED
@ 0.2286 % OF AREA
0.228571 *
150 * 1000 / 100
USING
8 mm. DIA BARS SPACING OF SQUARE MESH REQUIRED
PROVIDE 8 mm. BARS @
AND HOOP BARS AT EDGES OF TOP
OF
1100 mm.

Less than 51.8 Degree


so O.K.

=
=

0.1647 N/sqmm.
(COMP) SAFE
0.1474 N/sqmm.
(COMP) SAFE

=342.8571 sqmm/m.

=
147 mm. c/c.
say
140 mm. c/c.
140 mm c/c BOTH WAYS IN THE FORM OF MESH.
DOME 8 mm. DIA- 5
NOS. IN
A LENGTH

EXTEND THE TOP RADIAL BARS OF SLAB IN THE DOME FOR A DISTANCE

1100 mm.

DESIGN OF ANNULAR SLAB


======================
GRADE OF CONC : M 25

GRADE OF STEEL : HYSD

THE SLAB SHALL BE DESIGNED AS PARTIALY FIXED AT BOTH ENDS

ASSUME THICKNESS OF THE SLAB


(

10.800

CLEAR SPAN
7.300 0.300
EFFECTIVE SPAN
1.600
SELF WEIGHT
1 * 1 *
0.2

OF THE SLAB
) / 2
OF THE SLAB
+
0.200
OF THE SLAB
*
25000
LIVE LOAD

200 mm.

1.600 m.

1.800 m.

5000 N/sqm.

4000 N/sqm.
--------9000 N/sqm.

TOTAL--->

MAXIMUM BENDING MOMENT =


*
1.800 / 10
TOTAL DEPTH REQUIRED =
(
2916 *
6 /
1.8 )^0.5
USING 10 mm.BARS EFFECTIVE DEPTH PROVIDED =
200 40 10 / 2
AREA OF STEEL REQUIRED =
2916000 /
150 /
0.872 /
155
MIN AREA OF TEMPERATURE STEEL REQUIRED @ 0.24 % =
0.24 / 100 *
200 *
1000
SPACING OF BARS REQUIRED AT MID SPAN =
PI / 4 *
10 *
10 *
1000 /
480
SPACING OF BARS PROVIDED AT MID SPAN =
9000

PI(

Nos. OF RADIAL BARS PROVIDED


7.300 +
0.300 +
1.600 ) *
1000 /
160
USING 10 mm. CIRCUMFERENTIAL BARS SPACING REQUIRED
PI / 4 *
10 *
10 *
1000 /
480
SPACING OF BARS PROVIDED
PI / 4

0.200 * (

11.300 ^2-

DEAD LOAD
7.600 ^2)
LIVE LOAD
7.600 ^2)
TOTAL LOAD

OF SLAB
* 25000
ON SLAB
* 4000
OF SLAB

99 mm.
O.K.
155 mm.
144 Sqmm/m.
480 Sqmm/m.
164 mm. c/c
160 mm. c/c

181 Nos.

164 mm. c/c

160 mm. c/c

274614 N.

219692 N.
--------=
494306 N.
--------LOAD TRANSFERRED TO VERTICAL WALL =
263084 N.
10.800 +
7.300 )/( 10.800 +
7.300 ) * 494306 / 3
LOAD TRANSFERRED TO RING BEAM OVER INTERNAL COLUMNS =
231222 N.
494306 263084
PI / 4 * (

(2*

2916 N-m./m.

1.800

11.300 ^2-

DESIGN OF TOP RING BEAM


=======================
GRADE OF CONCRETE :- M- 25
LET THE BREADTH OF TOP RING BEAM - B1

0.300 m.

LET THE DEPTH OF TOP RING BEAM - D1

0.500 m.

MAXIMUM MERIDIONAL STRESS, i.e. AT SPRINGINGS OF TOP DOME


(1-0.789613 )/(0.376510 ) *
7750 *
5704 /
150
HORIZONTAL COMPONENT OF THRUST FROM TOP DOME

=
=

0.1647 N/sqmm.
19507 N/m.

24705 * Cos(x.1)
HOOP THRUST TRYING TO RUPTURE THE RING
19507 *
7.000 / 2
AREA OF STEEL REQD. TO RESIST THRUST IN THE RING
68275 /
TOTAL LOAD TRANSFERRED BY THE TOP
2 * PI *
5.704 *
1.200 *
TOTAL LOAD TRANSFERRED BY THE
PI*

7.300

28366 * (

BEAM

BEAM
150
DOME
7750
SLAB

68275 N.
455 sqmm.

333305 N.

231222 N.

SELF WEIGHT OF RING BEAM =


86001 N.
0.300 *
0.500 *
25000
--------TOTAL---->
650528 N.
LOAD PER METER LENGTH W4
650528 /
7.300 / PI
w * R^2 * 2 * THETA
7.300 / 2 )^2 * 2 * PI/N

=
=

28366 N/m.
237445

=================================================================================
S.
PARAMETER
SUPPORT
MID
POINT OF UNIT OF
NO.
SPAN
MAXIMUM MEASURETORSION MENT
--------------------------------------------------------------------------------1.DIA OF BARS USED FOR B.M. & TORSION
16
16
16 mm.
2.ALLOWABLE STRESS

150

150

150 N/sqmm.

3.LEVER ARM

394

394

394 mm.

0.0540

0.0270

12822

6411

0.0000

0.0000

712 N-m.

1117 N-m.

12822

6411

1117 N-m.

10.AREA OF STEEL REQUIRED FOR "Meq"

217

108

19 sqmm.

11.AREA OF STEEL REQD. FOR DOME THRUST

228

228

228 sqmm.

12.TOTAL AREA OF STEEL REQUIRED

445

336

247 sqmm.

13.MIN.AREA OF STEEL REQD.- 0.85*b*d/fy

278

278

278 sqmm.

603

402

402 N.

28272

18974 N.

4.COEFFICIENT FOR BENDING MOMENT


5.BENDING MOMENT

6.COEFFICIENT FOR TORSION


7.TORSION

8.MT = T x (1+D1/B1) / 1.7


9.EQUIVALENT B.M.-

Meq = M + MT

14.TOTAL NOS. OF BARS

PROVIDED

15.AREA OF STEEL PROVIDED


16.SHEAR FORCE

0
0 N-m.
0.0030

2 Nos.

17.SHEAR DUE TO TORSION - 1.6 * T/b


18.EQUIVALENT SHEAR FORCE
19.NOMINAL SHEAR STRESS

20.PERMISSIBLE SHEAR STRESS


21.DIA

OF

Veq

TAUc

2 LEGGED STIRRUPS

22.SPACING REQUIRED
23.MAXIMUM PERMISSIBLE SPACING

3797 N.

28272

22771 N/sqmm.

0.212

0.000

0.171 N/sqmm.

0.292

0.245

0.245 mm.

8 mm.

0 mm.

256

256

256 mm.

24.SPACING PROVIDED
250
250
250
---------------------------------------------------------------------------------

DIRECT TENSILE STRESS IN THE RING BEAM


68275 /
300 /
500

0.455 N/sqmm.

BENDING TENSILE STRESS IN THE RING BEAM


12822000 / (
275 *
300 ^2 / 6 )

1.0258 N/sqmm.

0.9199 < 1.0000


SO O.K.

0.4550
-----1.3000

1.0258
-----1.8000

DESIGN OF INTERIOR COLUMNS


==========================
GRADE OF CONCRETE :- M- 25
ASSUME NOS. OF COLUMNS TO BE PROVIDED - N =
1.700

4.800

UNSUPPORTED LENGTH - L =
+
0.200 0.500

6.2 m.

DIA OF INTERNAL COLUMN =

0.300 m.

TOTAL WEIGHT TRANSFERRED FROM TOP RING BEAM


PI / 4 *

0.300 ^2*

650528 N.

TOTAL SELF WEIGHT OF COLUMNS


=
109563 N.
10 *
6.2 *
25000
--------TOTAL---->
760091 N.

TOTAL WEIGHT AT THE BASE OF EACH COLUMN =


760091 /
10
MIMIMUM LATERAL DIMENSION - Dc =
L / Dc

10 Nos.

20.667 > 12 SO DESIGN AS A SLENDER COLUMN

76009 N.
0.300 m.

EFFECTIVE LENGTH

6.2 m.

LEAST LATERAL DIMENSION

0.300 m.

REDUCTION FACTOR
6.2 /
48 /
0.300 )
ALLOWABLE COMPRESSIVE STRESS IN CONCRETE
6.00 *
0.8194
TAKING MIN. % OF STEEL @ 0.8 % . AREA OF CONCRETE REQUIRED
76009 / (
0.992 *
4.916 +
0.008 *
175
DIA OF COLUMN REQUIRED
(
12617 / PI * 4)^0.5
DIA OF COLUMN PROVIDED

0.8194

4.9164 N/sqmm.

=
*
=

12617 sqmm.
0.8194 )
127 mm.

1.25 - (

=
>
=

MINIMUM AREA OF LONGITUDINAL STEEL REQUIRED


0.008 * PI / 4 *
127 *
127
IF USING 12 mm. DIA BARS NOS. OF BARS REQD. =

PI / 4 *

IF USING
PROVIDE

0.89 Nos.

NOS. OF BARS PROVIDED

AREA OF STEEL PROVIDED


PI / 4 *
12 *
12
AREA OF CONCRETE PROVIDED
300 *
300 ) 679

679 sqmm.

70007 sqmm.

LOAD CARRYING CAPACITY OF THE COLUMN =


6.000 *
70007 +
175 *
679 ) >

0.8194 * (

300 mm.
127 SO SAFE
101 sqmm.

8 mm. DIA

LINKS

8 mm. DIA LINKS @

SPACING REQUIRED

6 Nos.

441548 N.
76009
SO O.K.
190 mm c/c

190 mm. c/c

DESIGN OF TANK WALL


===================
GRADE OF CONCRETE :- M- 25
INNER DIA OF CYLINDRICAL WALL

10.800 m.

COLUMN

4.800 m.

AS PER CONTINUITY

AREA OF HOOP RINGS REQUIRED


302310 /
150
TAKING MAXIMUM ALLOWABLE TENSILE STRESS IN CONCRETE

THICKNESS REQUIRED TO RESIST HOOP TENSION


302310 /
1.300 - ( 11 - 1 ) *
2015 ) ) / 1000
AS PER CONTINUITY MAXIMUM B.M. AT THE BOTTOM OF THE WALL

THICKNESS REQUIRED FROM BENDING MOMENT POINT OF VIEW


( 6 * 8051000 /
1.800 /
1000 )^ 0.5
PROVIDE THICKNESS OF THE WALL AT THE BASE

HEIGHT OF WATER
MAXIMUM HOOP TENSION AT THE BASE

302310 N/m.
2015 sqmm./m.
1.300 N/sqmm.
212 mm.

-8051 N-m.
164 mm.
0.250 m.

PROVIDE THICKNESS OF THE WALL AT THE

TOP

0.250 m.

CALCULATION OF HOOP REINFORCEMENT AT DIFFERENT HEIGHTS IN WALL


=================================================================================
:
WALL
HOOP
TOTAL AREA OF STEEL REQD. DIA OF
SPACING
DEPTH OF WALL
:THICKNESS FORCE
------------------------- HOOP BARS PROVIDED
BELOW TOP
:AT LOWER
TO
MINIMUM MAXIMUM PROVIDED
:
END
RESIST TEMPERA OF TWO
FROM
TO :
HOOP
-TURE
VALUES
:
FORCE
STEEL
(m)
(m) :
mm.
N/m.
sqmm.
sqmm.
sqmm.
mm.
mm c/c.
--------------------------------------------------------------------------------4.800
3.755
250
302310
2015
571
2015
16
95
3.755

2.705

250

198715

1325

571

1325

16

150

2.705

1.670

250

143149

954

571

954

12

115

1.670

0.630

250

88376

589

571

589

10

130

0.630
0.000
250
40846
272
571 571.4285
10
135
=================================================================================
HOOP FORCES AT TOP & BOTTOM ENDS HAVE BEEN WORKED OUT FROM CONTINUITY ANALYSIS.

CALCULATION OF VERTICAL REINFORCEMENT AT DIFFERENT HEIGHTS IN WALL


=================================================================================
DEPTH OF WALL
:
WALL
MINIMUM BENDING STEEL
SPACING PROVIDED
BELOW TOP
:THICKNESS TEMPERA MOMENT
REQD.
--------------------------:AT BOTTOM -TURE
TO
OUTER FACE
INNER
FROM
TO :
STEEL
RESIST
----------------- --------:
REQD.
B.M.
8
10
8
(m)
(m) :
mm. sqmm.
N-m.
sqmm.
mm.
mm.
mm.
--------------------------------------------------------------------------------4.80
3.60
250
514
-8051
316
180
90
3.60

2.00

250

514

180

180

2.00
0.00
250
514
1848
72
180
180
=================================================================================
MAXIMUM HOOP STRESS IN THE WALL =
1.115
{ ( 1000 *
250 ) + (11 - 1) - PI / 4
16 *
16 /
95 } <
1.300
MAXIMUM BENDING STRESS IN THE WALL =
0.773
*
8051000
/
250
/
250
/
1000
<
1.800
DESIGN OF CONE TOP CUM BALCONY
==============================

302310 /
6

N/sqmm.
* 1000 *
SO SAFE
N/sqmm.
SO SAFE

GRADE OF CONCRETE :- M- 25
ASSUME BREADTH OF BALCONY SLAB - B2
ASSUME DEPTH OF BALCONY SLAB - D2
ASSUME DEPTH OF BALCONY SLAB AT THE TAPERED END
AVERAGE DEPTH OF BALCONY SLAB - D2av
(
0.225 +
0.175 ) / 2

=
=
=
=

0.900
0.225
0.175
0.200

m.
m.
m.
m.

LOADS UPTO TOP OF CONE


======================
DEAD LOAD FROM TOP SLAB
=
146158 N.
263084 *
5000 /
9000
LIVE LOAD FROM TOP SLAB
=
116926 N.
263084 *
4000 /
9000
DEAD LOAD OF CYLINDRICAL WALL
= 1041438 N.
PI*{(D+T3)*T3*H + (D+2*t3+2/3*(t4-t3))*(H-Ho)*(t4-t3)/2}*25000
DEAD LOAD OF BALCONY SLAB
=
172473 N.
PI * ( D + 2*t4 + B2 ) * B2 * D2av * 25000
LIVE LOAD ON BALCONY SLAB
=
193051 N.
PI/4*{(D+2*t4+2*B2)^2 - (D+2*t4)^2}*5000 + PI*(D+2*t4+2*B2)*500
CONCRETE IN TRIANGULAR PART BETWEEN WALL,RING BEAM & CONE
=
24593 N.
PI * ( D + 4/3*t4 ) * ( t4*D2/2 ) * 25000
--------TOTAL ----> 1694639 N.

LOAD PER UNIT LENGTH AT CENTRE OF THE CONE WALL


1694639 / ( 10.800 +
0.250 ) / PI
MERIDIONAL THRUST IN CONE PER UNIT LENGTH
48816 / Cos(xo)
HORIZONTAL COMPONENT OF THRUST IN CONE PER m. LENGTH
48816 * Tan(xo)
HORIZONTAL FORCE DUE TO WATER PRESSURE
9800 * (
0.225 0.275 * Sin(xo) *
4.800
HOOP TENSION IN RING BEAM
43075 +
2025 )*( 10.800 +
0.250 ) / 2

HOOP TENSION IN RING BEAM AS PER CONTINUITY ANALYSIS


AREA OF STEEL REQUIRED
249178 /
150
IF USING 16 mm. DIA BARS NOS. OF BARS REQD.
1661 /
201
HOWEVER PROVIDE
9 NOS
16 mm. DIA HOOP BARS

249178

AREA OF STEEL PROVIDED


9 *
201
AREA OF CONCRETE REQUIRED
1.3 )-(
11
- 1 )
*
1810
AVERAGE DEPTH OF RING BEAM REQUIRED
173575 /
0.900 / 1000000
AVERAGE DEPTH OF RING BEAM PROVIDED

48816 N/m.

65103 N/m.

43075 N/m.

2025 N.

249178 N.

217663 N.

1661 sqmm.

8.26 Nos.

1810 sqmm.

173575 sqmm.

0.193 m.

0.200 m.

HOOP STRESS ON EQUIVALENT AREA OF CONCRETE SECTION


=
249178 / (
0.900 *
0.200 *1000000 + 10 *
1810 )<
EXTEND THE TOP FACE BARS OF CONE AND INNER FACE VERTICAL
BARS OF CYLINDRICAL WALL TO ACT AS STIRRUPS.

1.258 N/sqmm.
1.300 SO SAFE

CHECK AS BALCONY SLAB


=====================
GRADE OF CONCRETE :- M- 25

0.2

CANTILEVER PROJECTION OF BALCONY SLAB

0.900 m.

DEPTH OF BALCONY SLAB

0.225 m.

DEPTH AT FREE END

0.175 m.

AVERAGE DEPTH

0.200 m.

DEAD LOAD OF BALCONY SLAB


0.200 * 25000
LIVE LOAD ON THE BALCONY SLAB

5000 N/sqm.

5000 N/sqm.

LOAD AT THE EDGE DUE TO RAILING

500 N/m.

=
*
=

4500 N-m.
0.900
56 mm.

225 mm.

8 mm.

BENDING MOMENT AT THE EDGE OF THE CONICAL DOME


*
25000 +
5000 ) *
0.810 /2+
500
EFFECTIVE DEPTH REQUIRED
(
4500 /
1.423 )^ 0.5
OVERALL DEPTH PROVIDED
DIA OF BARS CHOOSEN

EFFECTIVE DEPTH AVAILABLE


=
8 /2 - 50
>
AREA OF STEEL REQUIRED
=
4500000 /
150 /
0.872 /
171
SPACING REQUIRED
=
PI / 4 *
64 *
1000 /
201
SPACING OF BARS EXTENDED FROM THE CONE WALL SHALL BE SUFFICIENT
225

171 mm.
56 mm. SO OK
201 sqmm.
250 mm. c/c

DESIGN OF CONE WALL


===================
GRADE OF CONCRETE :- M- 25

PI*

ASSUMING THICKNESS OF CONE WALL AT THE TOP - T5 =

0.275 m.

ASSUMING THICKNESS OF CONE WALL AT THE BOTTOM - T6 =

0.275 m.

AVERAGE THICKNESS OF THE CONE WALL


=
0.275
(
0.275 +
0.275 ) / 2
ANGLE OF INNER FACE WITH VERTICAL - (xo)
=
0.723
Tan inverse(
1.500 /
1.700 )
= 41.4237
SLANT LENGTH OF CONE WALL
=
2.267
(
1.500 ^2+
1.700 ^2)^ 0.5
SELF WEIGHT OF CONE WALL
=
468827
0.275 * ( 10.800 +
7.800 +2*
0.275 ) *
2.267 /2*25000
WEIGHT OF WATER OVER CONE WALL
= 2426602

m.
Radians.
Degrees.
m.
N.
N.

9800 * PI/4 * (

DIAMETER OF
D"=
7.800
P"=

63700

Q"=

6875

Po"= { P" /

116.64 60.84 )*(


4.800 +
1.700 /2)
LOAD COMING FROM TOP OF CONICAL WALL
= 1694639 N.
--------TOTAL ----> 4590068 N.
---------

WEIGHT PER UNIT LENGTH AT THE LOWER EDGE


=
187316 N/m.
4590068 / 3.141592 /
7.800
MERIDIONAL THRUST IN THE CONE WALL
=
249813 N/m.
187316 / Cos(xo)
MERIDIONAL STRESS
=
0.9084 N/sqmm.
249813 /
0.275 / 1000000
<
6.000 SO SAFE
CONE WALL AT HEIGHT H" ABOVE BOTTOM OF CONE - D"
+(
1.500 /
1.700 )*2*H"
INTENSITY OF WATER PRESSURE
- P"
N/sqm.
9800 x H"
SELF WEIGHT OF CONE WALL - Q"
N/sqm.
0 X H"
HOOP TENSION - Po"
N.
Cos(xo) + Q" * Tan(xo) } * D" / 2
FOR MAXIMUM HOOP TENSION dPo"/dH" = 0
H"

HOOP TENSION AT THE TOP OF


HOOP TENSION AT THE TOP OF
HOOP TENSION AT THE BOTTOM
HOOP TENSION AT THE BOTTOM
MAXIMUM HOOP TENSION AT

FOR MAXIMUM HOOP

1.272 m.

MAXIMUM HOOP TENSION

373638 N/m.

CONE WALL
CONE WALL AS PER CONTINUITY
OF CONE WALL
OF CONE WALL AS PER CONTINUITY
1.272 m. FROM BASE

=
=
=
=
=

371526 N/m.
332541 N/m.
354977 N/m.
44062 N/m.
373638 N/m.
--------MAXIMUM--->
373638 N/m.
---------

AREA OF HOOP STEEL REQUIRED


373638 /
150
USING 12 mm. BARS, Nos. OF BARS REQUIRED ON EACH FACE
2.267 *
2491 /
113 /
2

PROVIDE 25 NOS.BARS ON EACH FACE.


Ast. PROVIDED
2 *
25 *
113 /
2.267
MAXIMUM TENSILE STRESS ON EQUIVALENT AREA
373638 / {(t6 - (t6-t5)*H"/H3)*1000000 + (11 -1)*Ast}
MINIMUM TEMPERATURE STEEL REQUIRED IN RADIAL DIRECTION
0.24 *
0.25 / 0.30

2492 sqmm/m.

=
<
=

1.246 N/sqmm.
1.300 SO SAFE
0.2000 %

AREA OF TEMPERATURE STEEL REQUIRED


0.2 *
0.275 * 10000
AREA OF TEMPERATURE STEEL REQUIRED ON EACH FACE
550 / 2
IF USING 8 mm. DIA BARS SPACING OF RADIAL BARS REQD.
1000 * PI / 4 *
64 /
275
SAY

550 sqmm.

275 sqmm/m.

=
=

183 mm c/c
180 mm c/c

IF

2491 sqmm/m.
24.99 Nos.

NOS. OF BARS REQUIRED ON EACH FACE


+
0.275 ) /
180 } + 1
AREA OF STEEL PROVIDED
1000 * PI / 4 *
64 /
180
BENDING MOMENT ON WATER FACE AT BOTTOM EDGE
AS PER CONTINUITY ANALYSIS
TENSILE / COMPRESSIVE STRESS DUE TO BENDING
6 *
28346 /
0.275 /
0.275 / 1000,000
MERIDIONAL COMPRESSIVE STRESS

{ 1000 * PI * (

SIGMA-CC"
--------SIGMA-CC
28346

194 Nos.

280 sqmm/m.

10.800

SIGMA-CBC"
---------SIGMA-CBC

28346 N-m.

2.249 N/sqmm.

=
<
=
<

0.908
6.000
1.341
1.800

NET TENSILE STRESS


2.249 0.908
0.908
2.249
------ +
------ =
6.000
8.500

AREA OF STEEL REQUIRED TO RESIST BENDING MOMENT


/
150 /
0.872 /
221 * 1000
SPACING OF RADIAL BARS AT BOTTOM EDGE OF CONE
180 *
7.800 /
10.800
AREA OF STEEL PROVIDED
PI / 4 *
64 /
130 * 1000
AREA TO BE PROVIDED BY HAUNCH BARS
981 387
IF USING 10 mm. DIA BARS SPACING REQUIRED
AREA PROVIDED BY HAUNCH BARS

AREA OF STEEL REQUIRED


150 /
0.872 /
221 * 1000
AREA OF STEEL PROVIDED BY TEMPERATURE STEEL

TEMPERATURE STEEL WILL TAKE CARE OF THE

B.M.

0.416 < 1 SO OK

981 sqmm.

130 mm. c/c

387 sqmm.

594 sqmm.

=
say
=

LENGTH OF EXTENSION OF HAUNCH BARS IN CONE WALL


30 *
10
BENDING MOMENT NEAR TOP EDGE OF THE CONE
3559

N/sqmm.
SO SAFE
N/sqmm.
SO SAFE

132 mm. c/c


110 mm. c/c
714 sqmm.

400 mm.

3559 N-m.

123 sqmm.

280 sqmm.

AT TOP EDGE

*********************

DESIGN OF BOTTOM DOME


=====================
GRADE OF CONCRETE :- M- 25
SPAN OF BOTTOM DOME - (Db)
RISE OF DOME - (h2)
RADIOUS OF DOME - (R2)
ASSUME TH.OF DOME - (t2)
ANGLE (x2) = SIN^-1 (Db/2R2)

=
6.80
=
1.100
=
5.805
=
0.200
= 0.625745

metres
metres
metres
metres
radians

Less than 51.8 Degree

(x2)

= 35.85259 degrees

SELF WEIGHT OF DOME


2 * PI * R2 * h2 * t2 * 25000
WEIGHT OF WATER RESTING OVER DOME
{ PI/4 * Db^2 * (H + H3) - PI/3 * h2^2 *(3*R2 - h2) }*9800
TOTAL LOAD OVER DOME
200606 + 2110787
SURFACE AREA OF DOME
2 * PI *
5.805 *
1.100
LOAD PER sqm. ON DOME SURFACE - w2
2311393 /
40.121
MERIDIONAL STRESS i.e. AT SPRINGINGS
57611 *
5.805 /
0.200 /1000000 / (1+Cos(x2))
HOOP STRESS AT CROWN OF DOME
57611 *
5.805 *
0.200 / 2 / 1000000
HOOP TENSION AT EDGES OF DOME AS PER CONTINUITY ANALYSIS

so O.K.
=

200606 N.

2110787 N.

2311393 N.

=
=
=
<
=
<
=

40.121 sqm.
57611 N/sqm.
0.9236
6.0000
0.8361
6.0000
32045

N/sqmm.
SO SAFE
N/sqmm.
SO SAFE
N/m.

HOOP STRESS
=
0.160 N/sqmm.
32045 /
0.200 / 1000000
<
1.300 SO SAFE
LENGTH IN WHICH THIS HOOP TENSION WILL PERSIST
=
820 mm.
0.76 * (
5.805 *
0.200 )^0.5 * 1000
AREA OF HOOP STEEL REQUIRED
=
175 sqmm.
32045 *
820 /
150 / 1000
MINIMUM AREA OF STEEL REQUIRED @
0.217 % =
434 sqmm/m.
0.217 *
10000 *
0.200
IF USING 10 mm.DIA BARS SPACING OF SQUARE MESH REQUIRED
=
181 mm c/c
1000 * PI / 4 *
100 /
434
PROVIDE 10 mm. BARS @
180 mm c/c BOTH WAYS IN THE FORM OF MESH.
AND HOOP BARS AT EDGES OF TOP DOME 10 mm. DIA- 5
NOS. IN
A LENGTH
OF
1000 mm.
AS PER CONTINUITY ANALYSIS MOMENT AT EDGES OF DOME =
-17242 N-m.
FROM BENDING MOMENT POINT OF VIEW REQUIRED
t2 =
( 6 *
17242 /
1.8 )^0.5
INCREASE THE THICKNESS OF BOTTOM DOME AT EDGES TO
250 mm.
AND TAPER IT TO
200 mm. IN A LENGTH
1000 mm.
TENSILE/COMPRESSIVE STRESS DUE TO BENDING MOMENT =
6 *
17242 /
250 /
250
NET TENSILE STRESS =
1.655 0.9236 <
AREA OF STEEL REQUIRED TO RESIST BENDING MOMENT =
17242 /
150 /
0.872 /
195 * 1000
USING 10 mm. DIA BARS SPACING OF RADIAL BARS REQUIRED =
1000 * PI / 4 *
100 /
676
DEVELOPMENT LENGTH REQUIRED = 30
x
DIA OF BAR =
30
*
10
PROVIDE 10 mm. DIA RADIAL BARS @
110 mm. c/c AND
EXTEND THEM IN THE BOTTOM DOME FOR A DISTANCE OF
1000 mm.

DESIGN OF BOTTOM RING BEAM


==========================
GRADE OF CONCRETE :- M- 25

240 mm.

1.655 N/sqmm.
0.731 N/sqmm.
1.800 SO SAFE
676 sqmm.
116 mm. c/c
300 mm.

HORIZONTAL COMPONENT OF INWARD THRUST FROM CONE WALL


249813 * Sin(xo)
HORIZONTAL COMPONENT OF OUTWARD THRUST FROM BOTTOM DOME
0.9236 *
0.200 * 1000000 * Cos(x2)
NET RADIAL THRUST ON THE RING BEAM
165286 149720
HOOP FORCE DUE TO RADIAL THRUST
15566 *
7.300 / 2
NUMBER OF COLUMNS SUPPORTING THE TANK

MINIMUM
OF

165286 N/m.

149720 N/m.

=
=

15566 N.
(INWARD)
56816 N.

10 Nos.

36 Degrees.

ANGLE SUBTENDED BY TWO ADJACENT COLUMNS AT CENTRE


360 /10
DIA OF COLUMN CENTRES

7.300 m.

LET THE WIDTH OF THE BEAM

0.500 m.

LET THE DEPTH OF THE BEAM

1.050 m.

2.062 m.

EFFECTIVE SPAN IF TREATED AS DEEP BEAM


|
PI /
10 *
7.300
| 1.15 * (PI /
10 *
7.300 Leff / D3
SO DESIGN THE

1.964

<

Leff
0.500 )

2.5

BEAM AS A DEEP BEAM

TOTAL WEIGHT TRANSFERRED BY CONE WALL ON RING BEAM

4590068 N.

TOTAL WEIGHT TRANSFERRED BY BOTTOM DOME ON RING BEAM

2311393 N.

PI * 9800

PI *

345907

FOR BEAM SEC.

WEIGHT OF WATER OVER BOTTOM RING BEAM =


730436 N.
7.300 *
0.500 * (
4.800 +
1.700 )
SELF WEIGHT OF CURVED BEAM =
301004 N.
0.500 *
1.050 *
7.300 * 25000
--------TOTAL-----> 7932901 N.
--------LOAD PER METER LENGTH - w3 =
345907
7932901 / 3.141592 /
7.300
w3 * R^2 * 2 THETA = 2895509
3.650 *
3.650 /
10 * 2 * PI
MAX EFFECTIVE HOOP STRESS IN CONCRETE =
0.108 N/sqmm.
56816 /
0.500 /
1.050 / 1000000
(COMP)
MAX BENDING COMPRESSIVE STRESS IN CONCRETE =
2.811 N/sqmm.

SIGMA-CC"
SIGMA-CBC"
0.108
2.811
--------- + ---------- =--------- + --------- = 0.348705 < 1
SIGMA-CC
SIGMA-CBC
6.000
8.500
SO SAFE
LEVER ARM =
727 mm.
0.2 * (
2.062 +
1.05 * 1.50
)
DEPTH OF TENSION ZONE NEAR TOP FACE =
210 mm.
0.2 * 1000 *
1.050
FRACTION OF STEEL REQUIRED =
0.732
0.5 * (
2.062 /
0.600 - 0.500)

=================================================================================

S.
NO.

PARAMETER

SUPPORT

MID
SPAN

POINT OF UNIT OF
MAXIMUM MEASURETORSION MENT
--------------------------------------------------------------------------------1.DIA OF BARS USED FOR B.M. & TORSION
20
20
20 mm.
2.ALLOWABLE STRESS

150

190

150 N/sqmm.

3.LEVER ARM

727

727

727 mm.

0.0540

0.0270

-156357

78179

0.0000

0.0000

8687 N-m.

15841 N-m.

156357

78179

15841 N-m.

10.AREA OF STEEL REQUIRED

1434

566

145 sqmm.

11.MIN.AREA OF STEEL REQD.- 0.85*b*d/fy

1039

1039

1039 sqmm.

12.NOS. OF BARS

REQUIRED FOR

" Meq "

4.56

3.31

3.31 Nos.

13.NOS. OF BARS

PROVIDED FOR

" Meq "

4 Nos.

14.AREA OF STEEL PROVIDED FOR

" Meq "

1571

1257

396645

231376 N.

27798 N.

396645

259174 N.

0.801

0.524 N/sqmm.

0.25

0.206

0.206 N/sqmm.

12

12

12 mm.

21.SPACING REQUIRED

123

408

213 mm.

22.MAXIMUM PERMISSIBLE SPACING

300

300

300 mm.

4.COEFFICIENT FOR BENDING MOMENT


5.BENDING MOMENT

6.COEFFICIENT FOR TORSION


7.TORSION

8.MT = T x (1+D3/B3) / 1.7


9.EQUIVALENT B.M.-

15.SHEAR FORCE

Meq = M + MT

16.SHEAR DUE TO TORSION

17.EQUIVALENT SHEAR FORCE

1.6 * T/B4

18.NOMINAL SHEAR STRESS

19.PERMISSIBLE SHEAR STRESS


20.DIA

OF

Veq

2 LEGGED STIRRUPS

TAUc

0
0 N-m.
0.0030

1257 sqmm.

23.SPACING PROVIDED
120
300
210 mm.
--------------------------------------------------------------------------------AREA OF SIDE FACE REINFORCEMENT REQD. @
0.1 % =
525 sqmm.
0.1 *
0.500 *
1.050 * 1000000 / 100
IF USING
10 mm.DIA BARS NOS. OF BARS REQD. ON EITHER FACE =
3.34 Nos.
525 / 2 / ( PI/4 *
100 )
NOS. OF BARS PROVIDED ON EITHER FACE =
4
525 / 2 / ( PI /4 *
100 ) + 1

DESIGN OF COLUMNS
=================
GRADE OF CONCRETE :- M- 25
HEIGHT OF STAGING ABOVE GROUND LEVEL

20.000 m.

DEPTH OF FOUNDATION BELOW GROUND LEVEL

2.000 m.

1.000 m.

TOTAL LENGTH OF COLUMNS


=
20.000 +
2.000 1.000 1.050
ASSUME NOS. OF COLUMNS TO BE PROVIDED - N =

19.950 m.

DEPTH OF FOUNDATION BEAM

ASSUME NOS. OF BRACES TO BE PROVIDED - M =


ASSUME BREADTH OF BRACE - B5 =
ASSUME
DEPTH OF BRACE - D5 =
DIAMETER OF COLUMN PROVIDED - Dc =
LENGTH OF A BRACE BETWEEN TWO COLUMNS
7.300 * Sin(PI/N) 0.500
LOAD TRANSFERRED BY BOTTOM RING BEAM

PI / 4 * N *
10

4 Nos.
0.300 m.
0.600 m.
0.500 m.

1.756 m.

7932901 N.

LOAD TRANSFERRED BY INTERIOR COLUMNS


=
760091 N.
TOTAL SELF WEIGHT OF COLUMNS
=
979293 N.
0.500 *
0.500 *
19.950
* 25000
TOTAL SELF WEIGHT OF BRACES
=
316080 N.
4 *
1.756 *
0.600 *
0.300 * 25000
TOTAL WEIGHTS FROM STAIRCASE PIPES ETC.
=
264249 N.
9 *
29361
--------TOTAL WEIGHT AT THE BASE OF STAGING----> 10252614 N.
TOTAL WEIGHT AT THE BASE OF EACH COLUMN
=
10252614 /
10
UNSUPPORTED LENGTH - L =
3.99 0.600
MIMIMUM LATERAL DIMENSION - Dc =

L / Dc

10 Nos.

1025261 N.
3.39 m.
0.5 m.

6.78 < 12 SO DESIGN AS A SHORT COLUMN

MINIMUM ECCENTRICITY FOR DESIGN OF COLUMNS - e =


3.990 / 500
+
0.500 / 30
AS "e" IS
>
0.025
AGE FACTOR =
0.05 *
0.500
ALLOWABLE COMPRESSIVE STRESS IN CONCRETE =
1 *
6.00
TAKING MIN. % OF STEEL @ 0.8 % . AREA OF CONCRETE REQUIRED =
1025261 / (
0.992 *
6.000 +
0.008 *
175 )
DIAMETER OF COLUMN REQUIRED =
( 139453 / PI * 4)^0.5
DIAMETER OF COLUMN PROVIDED =
>
MINIMUM AREA OF LONGITUDINAL STEEL REQUIRED =
0.008 * PI/4 *
421 *
421
IF USING 12 mm. DIA BARS NOS. OF BARS REQD. =

0.025 m.
1
6.00 N/sqmm.
139453 sqmm.
421 mm.
500 mm.
421 SO SAFE
1114 sqmm.
9.85 Nos.

NOS. OF BARS PROVIDED


AREA
PI / 4 *
AREA OF
( PI / 4 *
500 *
EQUIVALENT AREA
195219 +
1.5 *
MOMENT OF INERTIA
10

OF STEEL PROVIDED
12 *
12
CONCRETE PROVIDED
500 ) 1131
OF COLUMN SECTION
11 *
1131
OF COLUMN SECTION

( PI / 64 *

10 Nos.

1131 sqmm.

195219 sqmm.

213881 sqmm.

= 3432.736
x10E+6
mm^4
*
204 ^2
= 13730944 mm^3

500 ^4) + ( 11*1.5 - 1 ) / 2 *


1131
SECTION MODULUS
3432.736 * 1000000 / (
0.500 * 1000 / 2)
FACTORED LOAD = 1537891.
1.5 * 1025261
ULTIMATE LOAD CARRYING CAPACITY = 2266665
( 0.4 *
25 *
195219 + 0.67 * 415 *
1131 ) *
1
IF USING 8 mm. DIA LINKS SPACING REQUIRED =
190
PROVIDE

8 mm. DIA LINKS @

2.260

1285

2904

7.650

22216

CYLINDRICAL WALL

54.240

1285

69698

5.150

358945

MIDDLE RING BEAM

2.948

1285

3788

2.638

9993

15.810

1285

20316

1.946

39535

CONICAL DOME

N.
SAFE
mm c/c

190 mm. c/c

CHECK FOR WIND FORCES


=====================
BASIC WIND SPEED AS PER FIGURE-1 OF I.S. 875(PART 3 - 1987) =
ADOPTING k1 = 1.07, k2 = 1.1 & k3 = 1 DESIGN WIND SPEED =
DESIGN WIND PRESSURE =
REDUCTION FACTOR ON ACCOUNT OF CIRCULAR SHAPE(AS PER TABLE 23)=
NET WIND PRESSURE ON CIRCULAR SHAPES =
1285 * 0.7
CALCULATIONS FOR WIND FORCE ON CONTAINER AND BENDING MOMENT
===============================================================
NAME OF COMPONENT PROJECTED NET WIND
WIND LEVER ARM MOMENT
AREA
PRESSURE
FORCE ABOUT
ABOUT
COLUMN
COLUMN
TOP
TOP
sqm.
N/sqm.
N.
m.
N-m.
--------------------------------------------------------------TOP DOME
5.600
1285
7196
8.850
63685
ANNULAR SLAB

N.

BOTTOM RING BEAM


8.190
1285
10524
0.525
5525
--------------------------------------------------------------TOTAL---> 89.048
114426
4.37
499899
===============================================================

47
55.319
1836
0.70
1285

m/s.
m/s.
N/sqm.
N/sqm.

TOTAL WIND FORCE ON CONTAINER

114426 N.

LEVER ARM OF FORCE ON CONTAINER ABOVE TOP OF COLUMNS


499899
/
114426

4.37 m.

WIND FORCE ON COLUMNS OF A PANEL =


*
0.5
*
3.39
WIND FORCE ON BRACES OF A PANEL =
1836
*
1
*
0.600
*
7.800
WIND FORCE AT TOPMOST PANEL POINT =
{ (
21781
+
8592 / 2 ) } / 2
WIND FORCE AT SECOND TOPMOST PANEL POINT =
13039
+
30373 / 2
WIND FORCE AT INTERMEDIATE PANEL POINTS =
21781
+
8592
WEIGHT OF CONTAINER WITH WATER & WITHOUT LIVE LOAD =
7932901
116926
193051
WEIGHT OF COLUMNS IN A PANEL =
WEIGHT OF BRACES IN A PANEL =

21781 N.

1285

10

8592 N.
13039 N.
28226 N.
30373 N.
7622924 N.
195859 N.
79012 N.

CALCULATION OF WIND MOMENTS ON CONTAINER AND STAGING


=================================================================================
S.NO. OF HEIGHT
WIND
WIND
TOTAL
LEVER
MOMENT
MOMENT TOTAL
PANEL
OF
FORCE ON FORCE ON SHEAR
ARM OF
DUE TO
DUE TO MOMENT
FROM TOP PANEL
CONTAINER STAGING IN THE
FORCE
WIND
WIND
ABOVE
PANEL
ON
FORCE
FORCE
PANEL
CONTAINER ON
ON
CENTRE
CONTAINER STAGING
m.
N.
N.
N.
m.
N-m.
N-m.
N-m.
--------------------------------------------------------------------------------1
3.99
114426
13039
127465
6.065
693994
26013
720007
2

3.99

114426

41265

155691

10.055

1150553

134349

1284902

3.99

114426

71638

186064

14.045

1607113

359591

1966704

3.99

114426

102011

216437

18.035

2063673

706021

2769694

5
3.99
114426
132384
246810
22.025 2520233 1173639 3693872
=================================================================================
=================================================================================
S.NO. OF AVERAGE THRUST IN LOAD PER DESIGN DESIGN
ALLOWABLE BENDING
AGE
PANEL
WIND
LEEWARD
COLUMN
AXIAL
AXIAL
DIRECT
MOMENT
FACTOR
FROM TOP SHEAR
COLUMN
DUE TO
LOAD
DIRECT
COMP.
IN COLUMN AS PER
PER
DUE TO
DIRECT
PER
COMP.
STRESS
DUE TO
CLAUSE
COLUMN
WIND
VERTICAL COLUMN STRESS
WIND
5.2.1 OF
MOMENT
LOADS
SHEAR
I.S.-456
N.
N.
N.
N.
N/sqmm. N/sqmm. N/sqmm.
1978
--------------------------------------------------------------------------------1
22306
39452
781878
821330
3.840
8.000
37809
1.00
2

27246

70406

809365

879771

4.113

8.000

46182

1.00

32561

107765

836852

944617

4.417

8.000

55191

1.00

37876

151764

864339

1016103

4.751

8.000

64200

1.00

5
43192
202404
891826 1094230
5.116
8.000
73210
1.00
=================================================================================

==================================================================
S.NO. OF COMP.
ALLOWABLE COMP.
ALLOWABLE
PANEL
STRESS
COMP.
STRESS COMP.
SIGMA-CC" / SIGMA-CC
FROM TOP DUE TO
STERSS
DUE TO BENDING
+
VERTICAL WITH
BENDING STERSS
SIGMA-CBC"/SIGMA-CBC
LOADS
WIND
WITH WIND
N/sqmm. N/sqmm. N/sqmm. N/sqmm.
-----------------------------------------------------------------1
3.656
8.000
2.754
11.333
0.700
2

3.784

8.000

3.363

11.333

0.770

3.913

8.000

4.019

11.333

0.844

4.041

8.000

4.676

11.333

0.918

5
4.170
8.000
5.332
11.333
0.992
==================================================================

SEISMIC ANALYSIS
================
SEISMIC ANALYSIS IS AS PER CLAUSE 5.2 OF IS-1893-1975.
WEIGHT OF CONTAINER WITH WATER & WITHOUT LIVE LOAD =
7932901 +
760091 116926 193051
WEIGHT OF STAGING =
979293 +
316080 + (
9 *
29361 )
EQUIVALENT MASS WHEN TANK FULL
8383015 + 1559622 / 3
EQUIVALENT MASS WHEN TANK EMPTY
8902889 531.15 * 9800

8383015 N.
1559622 N.

8902889 N.

3697619 N.

LENGTH OF COLUMN c/c BETWEEN BRACE =


3.99 m.
19.95 / (
4 + 1
)
MOMENT OF INERTIA OF COLUMN SECTION -I = 3432.736
x10E-6
m^4
MODULUS OF ELASTICITY OF CONCRETE =
25000 N/sqm.
5000 * (
25 )^0.5 * 1000000
x10E+6
STIFFNESS OF A COLUMN = 18481952
12 *
25000 * 3432.736 /
3.99 ^3
EQUIVALENT SPRING OF THE SYSTEM - K = 36.96390
18481952 *
10 / (
4
+
1 )
x10E+6
FUNDAMENTAL PERIOD T = 2 * PI * (W/K.g)^.5
ACCELERATION DUE TO GRAVITY

9.81 N/sec^2

IMPORTANCE FACTOR

1.5

SEISMIC ZONE NUMBER

SEISMIC ZONE FACTOR

0.1

SOIL FOUNDATION SYSTEM FACTOR

PERCENTAGE DAMPING

5 %

TIME PERIOD WHEN TANK IS EMPTY

0.6345 Sec.

TIME PERIOD WHEN TANK IS FULL

0.9845 Sec.

AVERAGE ACCELERATION COEFFICIENT WHEN TANK IS EMPTY - Sa/g = 0.145687


AVERAGE ACCELERATION COEFFICIENT WHEN TANK IS

FULL - Sa/g =

0.11024

MAXIMUM SEISMIC FORCE WHEN TANK IS EMPTY


0.1 *
1.5 * 0.145687 * 3697619
MAXIMUM SEISMIC FORCE WHEN TANK IS FULL
0.1 *
1.5 * 0.11024 * 8902889
HENCE TANK FULL CONDITION IS MOST CRITICAL

80805 N.

147218 N.

HEIGHT OF CENTRE OF GRAVITY OF TANK ABOVE BOTTOM OF COLUMNS


19.950 +
4.370

24.320 m.

SIESMIC TABLES
=================================================================================
S.NO. OF SEISMIC LEVER ARM B.M. IN AXIAL
DIRECT
TOTAL
DIRECT
ALLOWABLE
PANEL
FORCE ON UPTO MID- PANEL
THRUST
AXIAL
AXIAL
COMP.
COMP.
FROM TOP CONTAINER POINT OF DUE TO IN PANEL THRUST
LOAD
STRESS
STRESS
PANEL
SEISMIC DUE TO
IN A
IN A
IN A
WITH
FORCE
B.M.
COLUMN
COLUMN
COLUMN
SEISMIC
FORCE
N.
N.
N-m.
N.
N.
N.
N/sqmm. N/sqmm.
--------------------------------------------------------------------------------1
147218
6.065
892877
48925
781878
830803
3.884
8.000
2

147218

10.055

1480277

81111

809365

890476

4.163

8.000

147218

14.045

2067677

113297

836852

950149

4.442

8.000

147218

18.035

2655077

145484

864339

1009823

4.721

8.000

5
147218
22.025 3242476
177670
891826 1069496
5.000
8.000
=================================================================================
=====================================================================================
S.NO. OF DIRECT
SHEAR
BENDING COMP.
ALLOWABLE COMP.
ALLOWABLE SIGMA-CC" /
PANEL
AXIAL
PER
MOMENT
STRESS
COMP.
STRESS
COMP.
SIGMA-CC
FROM TOP THRUST
COLUMN
IN THE
DUE TO
STRESS
DUE TO
BENDING
+
IN A
DUE TO
COLUMN
VERTICAL WITH
BENDING STERSS
SIGMA-CBC" /
COLUMN
SEISMIC
LOADS
SEISMIC MOMENT
WITH
SIGMA-CBC
LOAD
FORCE
SEIS.LOAD
N.
N.
N-m.
N/sqmm. N/sqmm. N/sqmm. N/sqmm.
------------------------------------------------------------------------------------1
857887
25763
43668
4.011
8.000
3.18
11.333
0.782
2

885374

25763

43668

4.140

8.000

3.18

11.333

0.798

912861

25763

43668

4.268

8.000

3.18

11.333

0.814

940348

25763

43668

4.397

8.000

3.18

11.333

0.830

5
967835
25763
43668
4.525
8.000
3.18
11.333
0.846
=====================================================================================
DESIGN OF BRACES
================
GRADE OF CONCRETE- M-

25
BREADTH OF BRACE- B5

0.300 m.

DEPTH OF BRACE- D5

0.600 m.

LET THE NUMBER OF BRACES

- m

LENGTH OF A BRACE BETWEEN c/c OF COLUMNS


7.3 * Sin(PI/N)

2.256 m.

CLEAR LENGTH OF A BRACE


2.256 0.500
ANGLE OF COLUMN WITH BENDING AXIS FOR
MAXIMUM VALUE
OF
BENDING
MOMENT

1.756 m.

BENDING MOMENT COEFFICIENT


SHEAR FORCE COEFFICIENT

4 Nos.

= 0.467050 radians.
= 0.47755
= 0.394402

=================================================================================
S.NO. OF S.NO. OF SHEAR PER SHEAR PER MAX. MOMENT
DESIGN
DIA OF
NOS. OF
PANEL
BRACE
COLUMN
COLUMN
SHEAR IN BRACE BENDING BARS
BARS
FROM TOP DUE TO
DUE TO
FORCE
MOMENT
CHOOSEN PROVIDED
WIND
SEISMIC
PER
AT TOP
FORCE
FORCE
COLUMN
AND BOTT.
N.
N.
N.
N-m.
N-m.
mm.
Nos.
--------------------------------------------------------------------------------1
22306
25763
25763
1
101005
109917
20
1
2
27246
25763
27246
16
2
2
113958
124013
20
2
3
32561
25763
32561
16
1
3
134212
146054
20
3
4
37876
25763
37876
16
0
4
154469
168099
20
4
5
43192
25763
43192
10
0
=================================================================================
=================================================================================
S.NO. OF TOTAL
NOMINAL % STEEL ALLOWABLE DESIGN DIA OF
SPACING SPACING
BRACE
SHEAR
SHEAR
SHEAR
SHEAR
TWO
REQUIRED PROVIDED
FROM TOP FORCE
STRESS
STRESS
FORCE
LEGGED
STIRRUPS
N.
N/sqmm.
%
N/sqmm.
N
mm.
mm c/c
mm c/c
---------------------------------------------------------------------------------

83419

0.515 0.397935

0.267

40176

311

300

94116

0.581 0.460766

0.287

47628

262

260

110844

0.684 0.523598

0.305

61398

203

200

4
127574
0.787 0.698131
0.34
72414
8
172
170
=================================================================================

DESIGN OF FOUNDATION RING BEAM


==============================
GRADE OF CONCRETE :- M- 25
LET THE BREADTH OF FOUNDATION BEAM - B4

0.500 m.

LET THE DEPTH OF FOUNDATION BEAM - D4

1.000 m.

EFFECTIVE SPAN IF TREATED AS DEEP BEAM - Lef =

2.062 m.

Leff / D4
SO DESIGN THE

2.062

<

2.5

BEAM AS A DEEP BEAM

TOTAL LOAD TRANSFERRED BY THE COLUMNS

= 10252614 N.

LOAD PER METER LENGTH W4 =


10252614 /
7.3 / PI
w4*R^2*2*ANG =
447056 * (
7.3 / 2 )^2 * 2 * PI/N
AREA OF SIDE FACE REINFORCEMENT REQD. @
0.1 % =
0.1 *
0.500 * 1000000 *
1.000 / 100
IF USING

10 mm.DIA BARS NOS. OF BARS REQD. ON EITHER FACE =


500 / 2 / ( PI/4 *
10 *
10 )
NOS. OF BARS PROVIDED ON EITHER FACE

447056 N/m.
3742205
500 sqmm.
3.18 Nos.
4 Nos.

=================================================================================
S.
PARAMETER
SUPPORT
MID
POINT OF UNIT OF
NO.
SPAN
MAXIMUM MEASURETORSION MENT
--------------------------------------------------------------------------------1.DIA OF BARS USED FOR B.M. & TORSION
20
20
20 mm.
2.ALLOWABLE STRESS

230

230

230 N/sqmm.

3.LEVER ARM

712

712

712 mm.

4.COEFFICIENT FOR BENDING MOMENT

0.0540

0.0270

5.BENDING MOMENT

202079

101040

0 N-m.

0.0000

0.0000

11227 N-m.

19812 N-m.

202079

101040

19812 N-m.

1234

617

6.COEFFICIENT FOR TORSION


7.TORSION

8.MT = T x (1+D3/B3) / 1.7


9.EQUIVALENT B.M.-

Meq = M + MT

10.AREA OF STEEL REQUIRED

0.0030

121 sqmm.

11.MIN.AREA OF STEEL REQD.- 0.85*b*d/fy

988

988

988 sqmm.

12.NOS. OF BARS

REQUIRED FOR

" Meq "

3.93

3.14

3.14 Nos.

13.NOS. OF BARS

PROVIDED FOR

" Meq "

4 Nos.

14.AREA OF STEEL PROVIDED FOR

" Meq "

1257

1257

512631

299035 N.

35926 N.

512631

334961 N.

1.091

0.713 N/sqmm.

0.234

0.234

0.234 N/sqmm.

12

12

12 mm.

21.SPACING REQUIRED

121

408

217 mm.

22.MAXIMUM PERMISSIBLE SPACING

300

300

300 mm.

15.SHEAR FORCE

16.SHEAR DUE TO TORSION - 1.6 * T/B4


17.EQUIVALENT SHEAR FORCE
18.NOMINAL SHEAR STRESS

19.PERMISSIBLE SHEAR STRESS


20.DIA

OF

Veq

TAUc

2 LEGGED STIRRUPS

1257 sqmm.

23.SPACING PROVIDED
120
300
210 mm.
--------------------------------------------------------------------------------(

LEVER ARM
+
1 * 1.5 ) * 0.2 * 1000
DEPTH OF TENSION ZONE NEAR TOP FACE
0.2 *
1.000 * 1000
FRACTION OF STEEL REQUIRED
0.5 * (
2.062 /
1
- 0.5 )

712 mm.

200 mm.

2.062

4
REMAINING BARS TO BE PROVIDED IN
SIDE OF THE MID DEPTH OF THE BEAM.

NOS. OF BARS PROVIDED


*
0.781 + 1
0.300 m.ON EITHER

0.781

4 Nos.

DESIGN OF FOUNDATION
====================
GRADE OF CONCRETE- MGRADE OF STEEL

25

HYSD

SIGMAcbc =

8.5 N.sqmm.

k =0.289026

SIGMA st =

230 N.sqmm.

j =0.903657

m =

11

R =1.110018

LET THE BREADTH OF FOUNDATION BEAM - B4

0.500 m.

LET THE DEPTH OF FOUNDATION BEAM - D4

1.000 m.

TOTAL LOAD AT COLUMN BASE


SELF WEIGHT OF FOUNDATION BEAM
PI * Do * B4 * D4 * 25000

= 10252614 N.
=

286670 N.
---------

TOTAL------>10539284 N.
ADDING 10 % FOR SELF WEIGHT OF

FOUNDATION

1053928 N.
--------TOTAL LOAD------> 11593212 N.

SAFE BEARING CAPACITY OF THE SOIL - SBC

AREA OF FOUNDATION REQUIRED


11593212 /
100
/
1000

100 KN/sqm.

= 115.9321 sqm.

CENTRAL RADIUS OF RAFT

3.650 m.

PROVIDE OUTER RADIUS OF RAFT

6.200 m.

PROVIDE INNER RADIUS OF RAFT

1.100 m.

AREA OF RAFT PROVIDED


6.2 ^21.1 ^2 )
MOMENT OF INERTIA OF RAFT
PI / 4 * (
6.200 ^4+
1.100 ^4 )
SECTION MODULUS OF RAFT
1159.380 /
6.2
MOMENT OF WIND FORCES AT THE BASE OF RAFT
PI * (

= 116.9614 sqm.
> 115.9321 SO O.K.
= 1159.380 m^4
= 186.9969 m^3
=

4467395 N-m.

MOMENT OF SEISMIC FORCES AT THE BASE OF RAFT

3727560 N-m.

PRESSURE ON SOIL DUE TO WIND LOAD


4467395 / 186.9969
PRESSURE ON SOIL DUE TO SEISMIC LOAD
3727560 / 186.9969
PRESSURE ON SOIL DUE TO DIRECT LOAD
11593212 / 116.9614
MAXIMUM PRESSURE WHEN WIND OR SEISMIC LOADS ARE CONSIDERED
23890 +
99120
ALLOWABLE INCREASED PRESSURE ON THE SOIL
100 * 1000 * 1.3333
UNIFORMLY DISTRIBUTED LOAD BELOW FOUNDATION - w
10539284 / 116.9614

23890 N/sqm.

19934 N/sqm.

99120 N/sqm.

123010 N/sqm.

=
>
=

133333 N/sqm.
123010 SO SAFE
90109 N/sqm.

TAKING UNIT LENGTH OF THE FOOTING, CANTILEVER LEG


{(
6.2 1.1 ) 0.5 } / 2
MOMENT AT FACE OF THE BEAM
90109 *
2.3 *
2.3 / 2
EFFECTIVE DEPTH REQUIRED
( 238338 / 1.110018 )^0.5

2.3 m.

238338 N-m/m.

463 mm.

PROVIDE OVERALL THICKNESS

600 mm.

THICKNESS AT THE FREE END

300 mm.

IF USING 20 mm.DIA RADIAL BARS, EFFECTIVE DEPTH PROVIDED


600 50 20 / 2

=
>

540 mm.
463 SO O.K.

AREA OF STEEL REQUIRED


238338 * 1000 / 230 / 0.9025 /
540
MINIMUM AREA OF STEEL REQUIRED @ 0.12 %
0.12 / 100 *
600 *
1000
IF USING 20 mm.DIA RADIAL BARS, SPACING OF BARS REQUIRED

2124 sqmm/m.

720 sqmm/m.

147.91 mm. c/c

PROVIDE
20 mm. DIA RADIAL BARS @
140 mm.c/c AT OUTER FACE OF RING BEAM
CURTAIL ALTERNATE RADIAL BARS AT R =
2030 mm.
AND
R =
5270 mm.
AREA OF DISTRIBUTION STEEL REQUIRED @ 0.12 % =
2484 sqmm/m.
(
6.200 1.100 0.500 )*(
0.600 +
0.300 )/2*0.12/100
IF USING 16 mm. DIA DISTRIBUTION BARS, Nos OF BARS REQD.
PROVIDE 16 mm.

DIA

12.35 Nos.

7 Nos DISTRIBUTION BARS IN EACH LEG.

CHECK FOR PUNCHING SHEAR


-----------------------DISTANCE OF CRITICAL SECTION FROM BEAM EDGE
540 / 2
TOTAL SHEAR FORCE

270 mm.

TOTAL AREA UNDER SHEAR

SHEAR STRESS

0.324 N/sqmm.

PERMISSIBLE SHEAR STRESS


0.16 * 25 ^0.5

=
<

0.800 N/sqmm.
0.324 SO SAFE

DISTANCE OF CRITICAL SECTION FROM BEAM EDGE

CONSIDERING A SECTOR AT A DISTANCE "d" - TOTAL SHEAR FORCE

8390097 N.
25.905 sqm.

CHECK FOR BEAM SHEAR


--------------------

AREA UNDER SHEAR AT OUTER CRITICAL SECTION

540 mm.
944648 N.

= 3440362. sqmm.

SHEAR STRESS AT OUTER CRITICAL SECTION

0.275 N/sqmm.

% STEEL AT OUTER CRITICAL SECTION

0.391 %

PREMISSIBLE SHEAR STRESS AT OUTER CRITICAL SECTION

SELF WEIGHT OF FOUNDATION EXCLUDING THE PART OF BEAM

=
<

0.275 N/sqmm.
SO SAFE
379781 N.
1053928 SO OK.

CHECK FOR OVERTURNING


--------------------TOTAL OVERTURNING MOMENTS - Mo =

4467395 N-m.

TOTAL RESTORING MOMENTS WHEN TANK IS EMPTY- Mr = 37202883 N-m.


Mr / Mo

8.33

>

2.50 SO SAFE

*********************

DESIGN OF STAIRS
================
GRADE OF CONCRETE- MGRADE OF STEEL

25

HYSD

SIGMAcbc =

8.5 N.sqmm.

k =0.289026

SIGMA st =

230 N.sqmm.

j =0.903657

m =

11

R =1.110018

HEIGHT OF BOTTOM OF CURVED RING BEAM ABOVE GROUND LEVEL


20.000 1.050

18.950 m.

HORIZONTAL DISTANCE BETWEEN COLUMNS

2.256 m.

TREAD

0.250 m.

RISE

0.190 m.

NOS. OF TREADS IN A FLIGHT


2.256 / 0.25
NOS. OF RISERS IN A FLIGHT
9 + 1

9 Nos.

10 Nos.

TOTAL RISE IN A FLIGHT


0.19 *
10

1.900 m.

SLANT LENGTH
2.256 ^2
)^0.5

2.949 m.

ASSUME THICKNESS OF WAIST SLAB

0.110 m.

ASSUME WIDTH OF WAIST SLAB

0.900 m.

WEIGHT OF WAIST SLAB PER HORIZONTAL METER


0.110 *
2.949 /
2.256 * 25000

3235 N/sqm.

WEIGHT OF STEPS PER HORIZONTAL METER


0.900 *
0.190 / 2 * 25000

2138 N/sqm.

0.900

1.9 ^2+

LIVE LOAD PER HORIZONTAL METER =


4500 N/sqm.
5000 *
0.900
--------TOTAL------->
9873 N/sqm.
MAXIMUM BENDING MOMENT AT CENTRE

9873

2.256

2.256

5025

EFFECTIVE DEPTH REQUIRED


/ 1.110018 /
0.900 )^0.5

5025 N-m.

71 mm.

10

USING

5025

mm.

DIA BARS EFFECTIVE


1000 *
0.110 230

/ 0.903657

318

( PI / 4

DEPTH AVAILABLE
8 / 2
- 30

=
>

AREA OF STEEL REQUIRED


/
76 * 1000

NOS. OF BARS REQUIRED


*
64 )
NOS. OF BARS PROVIDED

6.33 Nos.

7 Nos.

AREA OF DISTRIBUTION STEEL REQUIRED @


0.12 *
0.11 *
PROVIDE

8 mm.

DIA

DIST.

BARS

76 mm.
71 SO O.K.
318 sqmm.

0.12 % =
10000

132 sqmm.

250 mm. c/c

LANDING SLAB
============
ASSUME THE THICKNESS OF LANDING SLAB

0.150 m.

LOAD FROM FLIGHT OF STAIRS


9873 *
2.256

22273 N.

SELF WEIGHT OF LANDING SLAB


0.900 *
0.150 * 25000

3037.5 N.

0.900

LIVE LOAD ON LANDING SLAB =


4050 N.
0.900 *
0.900 * 5000
--------TOTAL------>
29361 N.
BENDING MOMENT
0.900 / 2

EFFECTIVE DEPTH REQUIRED


/ 1.110018 /
0.900 )^0.5

115 mm.

DEPTH AVAILABLE
10 / 2 30

=
>

115 mm.
115 SO O.K.

AREA OF STEEL REQUIRED


/
115 * 1000

553 sqmm.

NOS. OF BARS REQUIRED


*
100 )

29361
(
USING 10

13212

13212

mm. DIA BARS EFFECTIVE


0.150 *
1000 230

/ 0.903657

553

( PI / 4

PROVIDE 10 mm. DIA BARS

13212 N-m.

7.04 Nos.

8 Nos.

LEVEL OF FIRST FLIGHT

0.000

HEIGHT GAINED IN ONE FLIGHT


10 *
0.190

1.900 m.

TOTAL NOS. OF FLIGHTS PROVIDED

9 Nos.

LEVEL OF LAST FLIGHT


9.000 +
0.000

17.100 m.

HEIGHT LEFT BELOW LOWER EDGE OF CONE WALL


18.950 17.100

1.850 m.

LEVEL OF BALCONY
1.050 +
1.700

21.700 m.

HEIGHT OF LADDER PORTION


21.7 17.1

4.600 m.

LET THE WIDTH OF STEP

0.250 m.

LET THE LENGTH OF STEP

0.750 m.

LET THE THICKNESS OF STEP

0.070 m.

EFFECTIVE SPAN OF STEP


0.75 +
0.07
TOTAL SELF WEIGHT OF STEP
0.25 *
0.75 *
25000
TOTAL LIVE LOAD
5000 *
0.25 *
0.75
TOTAL

0.820 m.

328 N.

938 N.
----1266 N.

1.900

18.950

*********************

DESIGN OF PRECAST STEPS


=======================
GRADE OF CONCRETE- MGRADE OF STEEL

25

HYSD

0.07

=
=

130 N-m

EFFECTIVE DEPTH REQUIRED


1.11 /
0.25 )^0.5

22 mm.

8 mm.BARS EFFECTIVE DEPTH PROVIDED


30 8 / 2

36 mm.

AREA OF STEEL REQUIRED


/
0.9 /
36

17 Sqmm.

AREA OF STEEL PROVIDED


51 *
3

153 Sqmm.

AREA OF DISTRIBUTION STEEL REQUIRED @ 0.12 %


0.12/100 *
250 *
36

10.8 Sqmm.

MAXIMUM BENDING MOMENT AT THE CENTRE


1266 *
0.82 /
8
130
IF USING
70
130000

230

PROVIDE 4 - 8 mm DIA BARS.

DESIGN OF LADDER BEAM


=====================
GRADE OF CONCRETE- MGRADE OF STEEL

25

HYSD

SIGMAcbc =

7 N.sqmm.

k =0.289026

SIGMA st =

230 N.sqmm.

j =0.903657

m =

0.250 m.

RISE

0.200 m.

DISTANCE OF HORIZONTAL TRAVEL

3.900 m.

HEIGHT OF BALCONY BEAM ABOVE GROUND LEVEL =


20.000 +
1.700

21.700 m.

LEVEL OF LAST FLIGHT


9.000 +
0.000

17.100 m.

TOTAL HEIGHT GAINED


21.700 17.100

4.600 m.

SLANT LENGTH
4.600 ^2
)^0.5

6.031 m.

ASSUME WIDTH OF LADDER BEAM

0.150 m.

ASSUME DEPTH OF LADDER BEAM

0.250 m.

WEIGHT OF LADDER BEAM PER HORIZONTAL METER


0.250 *
6.031 /
3.900 * 25000

2900 N.

WEIGHT OF STEPS PER HORIZONTAL METER


0.750 *
0.070 *
25000

1313 N.

0.150

R =1.110018
TREAD

1.900

2 *

13

3.900 ^2+

LIVE LOAD PER HORIZONTAL METER =


3750 N.
5000 *
0.750
--------TOTAL------->
7963 N.
=

3982 N.
7571 N-m.

MAXIMUM BENDING MOMENT AT CENTRE


3.900 *
3.900 / 8

3982

EFFECTIVE DEPTH REQUIRED


/ 1.110018 /
0.750 )^0.5

95 mm.

7571

(
USING 16

LOAD ON EACH BEAM


7963 / 2

mm.

DIA

BARS

EFFECTIVE
250 -

DEPTH AVAILABLE
16 / 2
- 30

=
>

212 mm.
71 SO O.K.

AREA OF STEEL REQUIRED

172 sqmm.

7571

230

/ 0.903657

172

PI / 4 *

IF USING

212

1000

NOS. OF BARS REQUIRED


*
256 )
NOS. OF BARS PROVIDED

0.86 Nos.

2 Nos.

SHEAR FORCE AT SUPPORT ON EACH BEAM


7963 *
3.9 / 2 / 2

SHEAR STRESS
150 /
212

PERCENTAGE STEEL
150 /
212 *
100
PERMISSIBLE SHEAR STRESS

=
=

0.4212 N/Sqmm

mm DIA - 2 LEGGED STIRRUPS,SPACING REQUIRED

695 mm c/c

( PI / 4

7764
2

16 ^2/

7764 N.
0.2442 N/Sqmm.
1.26 %

PROVIDE 8 mm DIA - 2 LEGGED STIRRUPS @ 250 mm c/c

=*=*=*=*==*==*=*=*=*=

CONTINUITY ANALYSIS
===================
JUNCTION:- TOP DOME, RING BEAM & WALL (TOP JOINT)
===================================================
TOP DOME
--------1) U.D.L. ON DOME
(w1)
2) RADIOUS
(R1)
3) THICKNESS
(t1)
4) SEMICENTRAL ANGLE
(x1)
5) RISE OF THE DOME
(h1)
6) ALPHA1t = (3 x (R1/t1)^2 )^.25
(ALPHA1)
7) K1t = 1 - Cot(x1) / 2 / ALPHA1
(K1)
CYLINDRICAL WALL
---------------1) CENTRAL DIAMETER
2) THICHNESS
3) HEIGHT
4) ALPHAt = (12 / (D+t3)^2 / t3^2 )^.25
5) Zt = E x t3^3 /12
TOP RING BEAM
------------1) BREADTH
2) DEPTH
3) RADIOUS

=
7750 N/sqm.
=
5.704 mt.
=
0.150 mt.
= 0.660617 radians
=
1.200 mt.
= 8.115671
= 0.920718

(D+t3) =
11.050 mt.
(t3) =
0.250 mm.
(H) =
4.800 mt.
= 1.119809
= 0.001302 E

(B1) =
(D1) =
(D+B1)/2 =

0.300 m.
0.500 m.
5.550 m.

JUNCTION:- WALL, MIDDLE RING BEAM & CONICAL DOME (MIDDLE JOINT)
================================================================
.
CYLINDRICAL WALL
---------------1) CENTRAL DIAMETER
(D+t4) =
11.050 mt.
2) THICHNESS
(t4) =
0.250 m.
3) HEIGHT
(H) =
4.800 m.
4) ALPHA = (12 / D^2 / t4^2 )^ .25
= 1.119809
5) Z = E x t4^3 /12
= 0.001302
MIDDLE RING BEAM
---------------1) BREADTH
2) AVERAGE DEPTH
3) RADIOUS
CONICAL DOME
-----------1) DIAMETER AT THE TOP

(B2) =
(D2) =
(D+2xt4+B2)/2 =

(D+t5)

0.900 m.
0.200 m.
6.100 m.

11.075 m.

2)
3)
4)
5)
6)
7)
8)
9)

10)
11)
12)
13)

DIAMETER AT THE BOTTOM


(Dcn+t6)
SLANT LENGTH MEASURED FROM VERTEX OF CONE (L)
THICKNESS AT THE TOP
(t5)
ANGLE OF CONE WITH VERTICAL
(xo)
HOOP TENSION AT THE TOP
(Ht)
MERIDIONAL THRUST AT TOP
(Mt)
DELTA = (12 x Cot^2(xo) / t5^2 )^.25
(DELt)
Zt = 2 x DELt x L^0.5
(Zt)

=
8.075
=
8.369
=
0.275
=
0.723
=
371526
=
65103
= 3.778320
= 21.86077

K1
K2
K3
K4

= 1794.358
=
114.81
=
114.81
=
15.001

(K1)
(K2)
(K3)
(K4)

m.
m.
m.
radians.
N/m.
N/m.

JUNCTION:- BOTTOM DOME, BOTTOM RING BEAM & CONE (BOTTOM JOINT)
===============================================================
BOTTOM DOME
----------1) U.D.L. ON DOME
2) RADIOUS
3) THICKNESS
4) SEMICENTRAL ANGLE
5) RISE OF THE DOME
6) ALPHA2b = (3 x (R2/t2)^2 )^0.25
7) K2b = 1 - Cot(x2) / 2 / ALPHA2b
BOTTOM RING BEAM
---------------1) BREADTH
2) DEPTH
3) RADIOUS

(w2)
(R2)
(t2)
(x2)
(h2)
(ALPHA2)
(K2)

=
57611 N/sqm.
=
5.805 mt.
=
0.200 mt.
= 0.625745 radians
=
1.100 mt.
= 7.090329
= 0.902412

(B3) =
(D3) =
(Do/2) =

CONICAL DOME
-----------1) DIAMETER AT THE TOP
(D+t5)
2) DIAMETER AT THE BOTTOM
(Do+t6)
3) SLANT LENGTH MEASURED FROM VERTEX OF CONE (L")
4) THICKNESS
(t6)
5) ANGLE OF CONE WITH VERTICAL
(xo)
6) HOOP TENSION AT THE BOTTOM
(Hb)
7) MERIDIONAL THRUST AT BOTTOM
(Mb)
8) DELTAb=(12 x Cot^2(xo) / t6^2)^0.25
(DELb)
9) Zb = 2 x DELb x L^.5
(Zb)
10) K1"
(K1")
11) K2"
(K2")
12) K3"
(K3")
13) K4"
(K4")

0.500 mm.
1.050 mm.
3.650

=
11.075
=
8.075
=
6.102
=
0.275
=
0.723
=
354977
=
249813
= 3.778320
= 18.66658
= 1160.652
=
86.866
=
86.866
=
13.397

m.
m.
m.
m.
radians.
N/m.
N/m.

Continued....

TOP JOINT
========================================================================
AREA
CLOCKWISE DISPLAC- THRUST MOMENT
NET HOOP
MEMBER :
OF
ROTATION EMENTS
BORNE
TENSION
MEMBER
(NET)
(NET)
(sqm.) (rad./E) (met./E) (Newtons)(Nm/m.)
-----------------------------------------------------------------------TOP DOME:

0.150

457948

1140794

9740

-1932

TOP BEAM:

0.15

819615

902695

4396

83

0.250

-376990

902695

5371

1848

WALL

24508

(New/m.)

24397 (Newtons)
40846

(New/m.)

========================================================================
TOTAL--->
19507
-0
MIDDLE JOINT
========================================================================
AREA
CLOCKWISE DISPLAC- THRUST MOMENT
NET HOOP
MEMBER :
OF
ROTATION EMENTS
BORNE
TENSION
MEMBER
(NET)
(NET)
(sqm.) (rad./E) (met./E) (Newtons) (Nm/m.)
-----------------------------------------------------------------------WALL
:
0.25 -1711219
937350
12443
-8051
302310 (New/m.)
MID.BEAM:

0.18

-514615

6681051

32319

-8

217663 (Newtons)

CONE
:
0.275 2078504 -800131
338
3559
332541 (New/m.)
========================================================================
TOTAL--->
45100
-4500
BOTTOM JOINT
========================================================================
AREA
SLOPE
DISPLAC- THRUST MOMENT
NET HOOP
MEMBER :
OF
EMENTS
BORNE
TENSION
MEMBER
(NET)
(NET)
(sqm.) (rad./E) (met./E) (Newtons) (Nm/m.)
------------------------------------------------------------------------

CONE

BOT.BEAM:

0.2750

1388658 -4564794

0.5250 -1690937

28346

-9490

-11104

646914

-75249

44062

(New/m.)

84119 (Newtons)

BOT.DOME: 0.2000 -893824 4192590


69173
-17242
32045 (New/m.)
========================================================================
TOTAL---> -15566
-0

******************

G-SCHEDULE
==========
R.C.C. SR. 500 K.L. CAPACITY - 20 m STAGING10 T/Sqm SBC- July'2009 BSR
================================================================================
S.NO.
PARTICULARS
QUANTITY UNIT RATE
AMOUNT
Rs.
-------------------------------------------------------------------------------1. Earthwork in excavation over
areas (exceeding 30 cm in depth,
1.5 m in depth as well as 10 Sqm
on plan) including disposal of
excavated earth, lead upto 50 m
and lift upto 1.5 m, disposed earth
to be levelled and neatly dressed
All kinds of soil
1.6
245.62 Cum.
99.00
24316.38
2.

3.

Providing & laying cement conc.


including curing,compaction etc.
complete using stone aggregate
20 mm. nominal size in foundation
and plinth,excl. cost of shuttering, using : 1 cement : 2 sand :
4 aggregate mix) M-15 grade
Providing & laying cement conc.
in R.C.C. works in foundation,
rafts,roofing,strap beams bases of
columns etc. including curing,compc.
finishing with rendring in cement
sand mortar 1:3 (1 cement : 3
coarse sand) and making good the
joints,excluding cost of centring
and shuttering & reinforcement
M - 25 grade mix 1 : 1 : 2
(1 cement : 1 coarse sand : 2
graded stone aggregate 20 mm.
nomonal size.

3.2.3

11.696 Cum.

2157.00

25228.27

i) Top dome
ii) Annular slab
Deductions
a) For ventilator
b) For manhole
iii) Interior columns
iv) Top ring beam
v) Tank wall
vi) Balcony Beam
vii) Cone Wall
viii)Bottom Ring Beam
ix) Bottom Dome
x) Columns
xi) Braces
xiii)Foundation Beam
xiv) Foundation Slab
xv) Stairs & landing
4.

4.5
4.3.2

6.451 Cum.
10.985 Cum.

2701.00
3310.00

17424.15
36360.35

4.5
4.3.2
4.2.1
4.2.1
4.2.1
4.3.2
4.2.1
4.3.2
4.5
4.2.1
4.3.2
4.1.1
4.1.1
4.3.2

-0.095
-0.072
4.383
3.440
41.658
6.899
18.753
12.040
8.024
39.172
12.643
11.467
47.473
5.645

2701.00
3310.00
3065.00
3224.00
3224.00
3310.00
3224.00
3310.00
2701.00
3224.00
3310.00
3152.00
3152.00
3310.00

-256.60
-238.32
13433.90
11090.56
134305.39
22835.69
60459.67
39852.40
21672.82
126290.53
41848.33
36143.98
149634.90
18684.95

25.00

967.65

Add extra for each


subsequent ht. of 4.5 m.
i) Top dome

Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.

4.8

================================================================================
S.NO.
PARTICULARS
QUANTITY UNIT RATE
AMOUNT
Rs.
-------------------------------------------------------------------------------ii) Top ring beam
4.8
25.00
430
================================================================================
S.NO.
PARTICULARS
QUANTITY UNIT RATE
AMOUNT
Rs.
-------------------------------------------------------------------------------iii) Tank wall
4.8
25.00
4404.47
iv) Balcony Beam
4.8
25.00
689.9
v) Cone Wall
4.8
25.00
1875.3
vi) Bottom Ring Beam
4.8
25.00
1204
vii) Bottom Dome
4.8
25.00
802.4
viii Columns
4.8
25.00
1511.9
ix) Braces
4.8
25.00
474.15
x) Stairs & landing
4.8
25.00
219.80
5.

Centring and shuttering with


plywood or steel sheets including struting,propping,bothways with wooden member and
removal of formwork for
superstructure upto 4.5 m.
height above plinth level
for :

i) Top dome
ii) Top ring beam - vertical
-horizontal
iii) Tank wall
iv) Balcony Beam - vertical
-horizontal

4.12.6
4.12.1
4.12.1
4.12.1
4.12.2
4.12.2

43.01
34.87
1.74
333.26
7.20
34.49

sqm.
sqm.
sqm.
sqm.
sqm.
sqm.

450.00
129.00
129.00
129.00
135.00
135.00

19354.50
4498.23
224.46
42990.54
972.00
4656.15

v)
vi)
vii)
viii
ix)
x)
xi)

Cone Wall
Bottom Ring Beam
Bottom Dome
Columns
Braces
Foundation Beam
Foundation Slab - vertical
-horizontal
xii) Stairs
-waist & steps
-landings

4.12.2
4.12.1
4.12.6
4.12.3
4.12.2
4.12.2
4.12.2
4.12.2
4.12.2
4.12.2

6.

Add extra for circular work

4.12.13

7.

Add extra for each


subsequent ht. of 4.5 m.
i) Top dome
ii) Top ring beam
iii) Tank wall
iv) Balcony Beam
v) Cone Wall
vi) Bottom Ring Beam
vii) Bottom Dome
viii Columns
ix) Braces
x) Stairs

4.12.15
4.12.15
4.12.15
4.12.15
4.12.15
4.12.15
4.12.15
4.12.15
4.12.15
4.12.15

136.39
47.01
40.12
313.37
126.43
18.35
11.69
105.49
45.12
7.29

sqm.
sqm.
sqm.
sqm.
sqm.
sqm.
sqm.
sqm.
sqm.
sqm.

135.00
129.00
450.00
157.00
135.00
135.00
135.00
135.00
135.00
135.00

18412.65
6064.29
18054.00
49199.09
17068.05
2477.25
1578.15
14241.15
6091.20
984.15

1043.86 sqm.

16.00

16701.76

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00

1806.42
1281.35
9865.88
1167.32
3818.92
1316.28
1123.36
3386.66
6163.56
79.38

================================================================================
S.NO.
PARTICULARS
QUANTITY UNIT RATE
AMOUNT
Rs.
-------------------------------------------------------------------------------8.

Providing and fabricating


steel reinforcement for
R.C.C. work including
cutting, bending,placing
================================================================================
S.NO.
PARTICULARS
QUANTITY UNIT RATE
AMOUNT
Rs.
-------------------------------------------------------------------------------in position and binding
comp. including cost of
binding wire in foundations and superstructure
upto 4.50 Mt.height above
plinth level.
Thermo mechanically
treated bars (Tata, SAIL)
Reinforcement bars - (Tor)
Dia
Fe-415
--i) Top dome
Square mesh
8
Hoop bars
5 Nos.
8
Radial Bars
193 Nos.
8
ii) Top ring beam

Length
-----614 mt.
97 mt.
338 mt.

Weight
-----239
38
132

Hoop bars
Stirrups
iii) Tank wall
Verticals Outer
Inner
Hoop bars

iv) Balcony Beam


Hoop bars
v) Cone Wall
Hoop bars
Radial bars
Extra Radials
vi) Bottom ring beam
Hoop bars top
Curtailment
Hoop bars bott.
Curtailment
Stirrups
Side Face
vii) Bottom Dome
Square mesh
Hoop bars
Radial Bars
viii)Columns
Longitudinal
Links

5 Nos.
92 Nos.
193
386
0
13
9
19

16
8

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

8
8
8
10
12
16

9 Nos.

92 mt.
110 mt.
1007
897
0
451
312
660

145
43

mt.
mt.
mt.
mt.
mt.
mt.

393
350
0
280
278
1043

16

345 mt.

545

50 Nos.
388 Nos.
223 Nos.

12
8
10

1504 mt.
1468 mt.
205 mt.

1339
573
127

5
0
4
0
109
8

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

20
20
20
20
12
10

115
0
92
0
316
183

mt.
mt.
mt.
mt.
mt.
mt.

284
0
227
0
281
113

5 Nos.
195 Nos.

10
10
10

446 mt.
91 mt.
296 mt.

277
56
184

100 Nos.
900 Nos.

12
8

2200 mt.
1188 mt.

1958
463

================================================================================
S.NO.
PARTICULARS
QUANTITY UNIT RATE
AMOUNT
Rs.
-------------------------------------------------------------------------------ix) Braces
Longitudinal
0 Nos.
8
0 mt.
0
0 Nos.
10
0 mt.
0
0 Nos.
12
0 mt.
0
6 Nos.
16
135 mt.
213
20 Nos.
20
451 mt.
1114
Stirrups
240 Nos.
8
384 mt.
150
Side Face
0 Nos.
10
0 mt.
0

================================================================================
S.NO.
PARTICULARS
QUANTITY UNIT RATE
AMOUNT
Rs.
-------------------------------------------------------------------------------x) Foundation Beam
Hoop bars top
4 Nos.
20
92 mt.
227
Curtailment
0 Nos.
20
0 mt.
0
Hoop bars bottom
4 Nos.
20
92 mt.
227
Curtailment
0 Nos.
20
0 mt.
0
Stirrups
109 Nos.
12
305 mt.
271
Side Face
8 Nos.
10
183 mt.
113
xi) Foundation raft
Radial bars
176 Nos.
20
729 mt.
1801
Dist. bars
14 Nos.
16
321 mt.
507
xii) Staircase
Waist slab
Longitudinal
7 Nos.
8
372 mt.
145
Distribution
108 Nos.
8
97 mt.
38
Landing
72 Nos.
10
101 mt.
63
--------ABSTRACT
14237

========
---------------------------------------Dia
Weight
+ 10 %
Total
mm.
kg
wastage
kg
---------------------------------------8
2564
256
2820
10
1213
121
1334
12
4127
413
4540
16
2453
245
2698
20
3880
388
4268
25
0
0
0
---------------------------------------14237
1423
15660 Kg.
---------------------------------------9. Add extra

for each subsequent ht. of 4.5 m.

48.00

4.14 0.22 L.S.

10. Steel work welded in built up


sections, trusses and frame work
including cutting and hoisting,
fixing in position and applying a
priming coat of approved steel
primer upto 4.5 Mtr height above
plinth level. In tees, angles,
flats and channels.
9.4 + 9.6

L.S

11. Providing and fixing G.I. pipe


(external work) with G.I. fittings
(IS:1239 Mark) incl. trenching
& refilling earth : 20 mm-Cl-B.

S-17/2.2.2
L.S.
230 m.

600 Kg.

751680.00
23490.00

79.88

47928.00

89.00

20470.00

12. Providing, lowering, laying in


trenches, aligning, fixing in
position double flanged (screwed
welded) centrifugally (spun)

================================================================================
S.NO.
PARTICULARS
QUANTITY UNIT RATE
AMOUNT
Rs.
-------------------------------------------------------------------------------pipes as per IS:8329-2000.
RUIDP BSR-16.5.
Inlet- 200 dia
32.00 m.
4240.00 135680.00
Outlet- 350 dia
26.10 m.
8895.00 232159.50
Overflow- 200 dia
32.00 m.
4240.00 135680.00
Washout- 100 dia
26.10 m.
2362.00
61648.20
13. Providing & fixing in position
CI puddle collar (approx. 1 m length)
inside the wall incl. all material
labour as per technical specifications
and as per direction of Engineer
RUIDP BSR-16.28.
Inlet- 200 dia
1.00 No.
Outlet- 350 dia
1.00 No.

19772.00
38211.00

19772.00
38211.00

Overflow- 200 dia


Washout- 100 dia

1.00 No.
1.00 No.

19772.00
9410.00

19772.00
9410.00

14. Providing, lowering, laying, aligning,


fixing in position in pipeline, manually
operated CI D/F sluice valves of approved
make (IS:14846 amended uptodate) PN-1.0
class of following dia complete (excluding
jointing & jointing material) incl. all
material, labour, testing and commissioning
alongwith pipeline as per technical specifications and as per direction of Engineer
Class - B
RUIDP BSR-16.17.
Inlet- 200 dia
1.00 No.
Outlet- 350 dia
1.00 No.
Overflow- 200 dia
1.00 No.
Washout- 100 dia
1.00 No.

10399.00
32822.00
10399.00
3702.00

10399.00
32822.00
10399.00
3702.00

117.00

234000.00

16. Providing and fixing electronic water


level indicator with specified Nos of
level indications incl. P/F prons in
overhead tank, necessary cabling from
level indicating panel to prones in
overhead tank (upto 5 m length) in
proper manner as per specifications
and direction of Engineer, 5 level
indications and cabling upto a length
of 5 m.
RUIDP BSR-16.29.1
1.00 Each 10000.00

10000.00

15. Providing, lowering, laying, aligning,


fixing in position at all level/depths
flanged stanard specials such as tees,
bends, tapers, caps etc. within trenches
in DI pipeline complete as per technical
specifications and as per direction of
Engineer. Specials flanged DI K-9
above 300 mm dia.
RUIDP BSR 16.7.2.2
2000.00 Kg.

17. Providing and fixing of lightening

================================================================================
S.NO.
PARTICULARS
QUANTITY UNIT RATE
AMOUNT
Rs.
-------------------------------------------------------------------------------conductor final made of 25 mm. dia
300 mm. long copper tube having
single prong at top with 85 mm.
dia 3 mm. thick copper base plate
including holes etc. complete as
required.
E160100
1 Job
581.00
581.00
18. Providing and fixing of copper
tape 20 mm. x 3 mm. thick on

parapet or on surface of wall


for lightening conductor as
required for horizontal runs. E160400
19. Plate earthing as per IS:3043 with
with copper earth plate of size
600mmx600mmx3.0mm by embodying 3 to 4 m
below the ground level with 20 mm
dia GI "B" class watering pipe incl.
all accessories....
E150300
20. Finishing wall with water proof
cement paint of approved brand &
manufacture and or reqd. shade to
give an even shade incl. scaffolding
New work(Three or more coats)B145-12.53.1
21. Plinth protection work a) Brick masonary in foundation
& plinth with bricks of class
designation 75 mm in:
Cement mortar 1:5 ( 1 cement :5
coarse sand)
B-5.1.5

30 mt.

212.85

6385.50

1 Each

4725.00

4725.00

543 Sqm.

35.00

19005.00

23.2 Cum.

1722.00

39950.40

b) Providing & laying cement conc.


including curing,compaction etc.
complete in specified grade
excl. cost of centring & shuttering. All work upto plinth level
1:2:4 (1 cement : 2 course sand :
B-15
4 graded stone aggregate 20 mm)
3.2.3 26.170 Cum. 2157.00
56448.69
-------------------------------------------------------------------------------TOTAL - 2969561.96
================================================================================