Item
01
01.01
01.02
01.03
01.04
01.05
02
02.01
02.02
03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.03
03.03.01
03.03.02
03.03.03
03.03.04
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.03
04.03.01
04.04
04.04.01
04.04.02
04.04.03
04.04.04
04.04.05
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
Descripcin
OBRAS PROVISIONALES
CASETA PARA ALMACEN Y GUARDIANIA
CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40m x 3.60m
TRANQUERAS DE MADERA PARA DESVIO DE TRANSITO VEHICULAR (2"x3" L=2.40m) H=1.20m
DESVIO DE TRANSITO VEHICULAR
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
TRABAJOS PRELIMINARES
TRAZO, NIVEL Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
PAVIMENTO RIGIDO
MOVIMIENTO DE TIERRAS
CORTE DE TERRENO NORMAL CON EQUIPO HASTA NIVEL DE SUBRASANTE
RELLENO CON MATERIAL PROPIO CON EQUIPO
PREPARACION DE LA SUBRASANTE PARA PAVIMENTO
SUB - BASE DE 0.15 m
BASE GRANULAR E=0.20m CON EQUIPO, EXTENDIDO, RIEGO Y COMPACTADO
EXCAVACION DE ZANJAS PARA UAS DE LOSAS EN TERRENO NORMAL
ELIMINACION DE MATERIAL EXCEDENTE R= 124 m3/da
PAVIMENTO RIGIDO Y ESTACIONAMIENTOS
ENCOFRADO Y DESENCOFRADO EN LOSAS MACIZAS (H=0.20 m)
CONCRETO f'c=210 kg/cm2 PARA PAVIMENTO RIGIDO (H=0.20 m)
CONCRETO f'c=210 kg/cm2 PARA UAS DE PAVIMENTO RIGIDO
CURADO DE CONCRETO CON ADITIVO
VARIOS
CONEXIN ENTRE LOSAS RIGIDAS (PAVIMENTO) CON DOWELLS CORRUGADO
JUNTAS DE DILATACION EN PAVIMENTO RIGIDO CON TECNOPOR Y SELLADO CON ASFALTO E=1", Hlosa=0.
PINTADO DE LINEAS REGLAMENTARIAS
NIVELACION DE BUZONES EN GENERAL
VEREDAS DE ADOQUIN
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO NORMAL HASTA NIVEL DE SUBRASANTE
RELLENO COMPACTADO CON MATERIAL PROPIO COMPACTACION CON EQUIPO LIVIANO
NIVELACION Y COMPACTACION DE TERRENO A NIVEL DE SUBRASANTE PARA VEREDAS
BASE DE AFIRMADO PARA VEREDAS, EXTENDIDO, RIEGO Y COMPACTACION 0.10m
EXCAVACION DE ZANJAS PARA SARDINELES EN TERRENO NORMAL
CAMA DE ARENA GRUESA E=5CM
ELIMINACION DE MATERIAL EXCEDENTE R= 124 m3/da
SARDINELES
ENCOFRADO Y DESENCOFRADO EN SARDINELES VISIBLES
CONCRETO f'c=175 kg/cm2 PARA SARDINEL VISIBLE
CURADO DE CONCRETO CON ADITIVO
JUNTAS DE DILATACION EN SARDINELES PERALTADOS
VEREDAS DE ADOQUIN
SUMINISTRO Y COLOCACION DE BLOQUETAS DE COLOR NATURAL DE 20x10x4cm
VARIOS
PINTURA DE SARDINEL VISIBLE
BANCAS - CONCRETO fc=175 kg/cm2 Y MADERA
PERGOLA Y SOMBRILLA DE MADERA, SEGUN DISEO INC. INSTALACION
PILETAS SEGUN DISEO
BASUREROS METALICOS INC. SUMINISTRO E INSTALACION
VEREDAS DE CONCRETO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO NORMAL HASTA NIVEL DE SUBRASANTE
RELLENO COMPACTADO CON MATERIAL PROPIO COMPACTACION CON EQUIPO LIVIANO
NIVELACION Y COMPACTACION DE TERRENO A NIVEL DE SUBRASANTE PARA VEREDAS
BASE DE AFIRMADO PARA VEREDAS, EXTENDIDO, RIEGO Y COMPACTACION 0.10m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
05.01.05
05.01.06
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.02.06
05.02.07
05.02.08
05.03
05.03.01
05.03.02
05.03.03
06
06.01
06.02
06.03
06.04
06.05
06.06
06.07
06.08
07
07.01
07.02
07.03
07.04
07.05
07.06
07.07
07.08
07.09
07.10
07.11
07.12
07.13
07.14
07.15
08
08.01
08.02
08.03
08.04
08.05
08.06
08.07
08.08
08.09
08.10
08.11
08.12
08.13
08.14
08.15
09
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
09.01
09.01.01
09.01.01.01
09.01.01.02
09.01.02
09.01.02.01
09.01.02.02
09.01.02.03
09.01.03
09.01.03.01
09.01.03.01.01
09.01.03.01.02
09.01.03.01.03
09.01.03.02
09.01.03.02.01
09.01.03.02.02
09.01.03.02.03
09.01.03.03
09.01.03.03.01
09.01.03.03.02
09.01.03.03.03
09.01.03.04
09.01.03.04.01
09.01.03.04.02
09.01.03.04.03
09.01.03.04.04
09.01.04
09.01.04.01
09.02
09.02.01
09.02.01.01
09.02.01.02
09.02.01.03
09.02.01.04
09.02.01.05
09.02.01.06
09.02.01.07
09.02.02
09.02.02.01
09.02.02.02
09.02.03
09.02.03.01
09.02.03.02
09.02.04
09.02.04.01
09.02.04.02
09.02.05
09.02.05.01
09.02.05.02
09.02.06
09.02.06.01
09.02.07
09.02.07.01
09.02.07.02
09.02.07.03
09.02.07.04
09.02.08
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CIMIENTOS
ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10M3 Y CARGADOR Dprom=5 km
CONCRETO SIMPLE
SOLADO C:H 1:12 e=4"
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
FALSO PISO MEZCLA C:H 1:8 e=10 cm
CONCRETO ARMADO
SOBRECIMIENTO REFORZADO
ACERO DE REFUERZO fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO
CONCRETO PARA SOBRECIMIENTO REFORZADO f'c=210 Kg/cm2
COLUMNAS
ACERO DE REFUERZO fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
CONCRETO PARA COLUMNAS f'c=210 kg/cm2
VIGAS
ENCOFRADO Y DESENCOFRADO EN VIGAS
ACERO DE REFUERZO fy=4200 kg/cm2
CONCRETO f'c=210 kg/cm2 PARA VIGAS
LOSAS ALIGERADAS
ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS
ACERO DE REFUERZO fy=4200 kg/cm2
LADRILLO HUECO DE ARCILLA h=15 cm PARA TECHO ALIGERADO
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2
ALBAILERIA
MURO SOGA LADRILLO KK INDUSTRIAL CON CEMENTO ARENA
ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS
TABIQUERIA DE MELAMINE SEGUN DISEO
PUERTA DE MELAMINE SEGUN DISEO
TARRAJEO DE SUPERFICIE Y ARISTAS DE COLUMNAS C:A 1:5 e=1.5 cm
TARRAJEO DE SUPERFICIE Y ARISTAS DE VIGAS C:A 1:5 e=1.5cm
CIELO RASO INCLUYE VIGAS EMPOTRADAS CON MORTERO 1:4 X 1.5 cm
TARRAJEO PRIMARIO O RAYADO C:A 1:5
TARRAJEO EN MUROS INTERIORES Y EXTERIORES C:A 1:5 e=1.5cm
PISOS Y PAVIMENTOS
CONTRAPISO DE 25 mm
PISO CERAMICA ANTIDESLIZANTE DE ALTO TRANSITO 0.30 x 0.30 cm
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO CEMENTO SIN COLOREAR H = 20 cm
ZOCALO DE CERAMICA DE 20 x 30 cm
CARPINTERIA METALICA
PUERTA METALICA SEGUN DETALLE INC. COLOCACION
VENTANA DE FIERRO PERFIL DE 1" X 1/8" FIJA MARCO "T" DE 1" SEGUN DISEO
CERRAJERIA
BISAGRA CAPUCHINA DE 4"
CERRADURA PARA PUERTA DE 03 GOLPES
VIDRIOS, CRISTALES Y SIMILARES
VIDRIOS DOBLES NACIONALES
PINTURA
PINTURA LATEX EN VIGAS Y COLUMNAS 2 MANOS
PINTADO DE CIELO RASO CON LATEX
PINTURA DE CONTRAZOCALO CON ESMALTE H=0.20M
PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES 2 MANOS
COBERTURAS
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
09.02.08.01
09.02.08.02
09.02.08.03
09.02.09
09.02.09.01
09.03
09.03.01
09.03.01.01
09.03.01.01.01
09.03.01.01.02
09.03.01.01.03
09.03.01.02
09.03.01.02.01
09.03.01.02.02
09.03.01.02.03
09.03.01.03
09.03.01.03.01
09.03.01.03.02
09.03.01.03.03
09.03.01.04
09.03.01.04.01
09.03.01.04.02
09.03.01.04.03
09.03.01.04.04
09.03.01.04.05
09.03.01.04.06
09.03.01.04.07
09.03.01.05
09.03.01.05.01
09.03.01.05.02
09.03.01.06
09.03.01.06.01
09.03.01.06.02
09.03.01.06.03
09.03.02
09.03.02.01
09.03.02.01.01
09.03.02.02
09.03.02.02.01
09.03.02.02.02
09.03.02.02.03
09.03.02.02.04
09.03.02.02.05
09.03.02.03
09.03.02.03.01
09.03.02.03.02
09.03.02.03.03
09.03.02.03.04
09.03.02.03.05
09.03.02.03.06
09.03.02.03.07
09.03.02.03.08
09.03.02.03.09
09.03.02.04
09.03.02.04.01
09.03.02.04.02
09.03.02.04.03
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
09.03.03
09.03.03.01
09.03.03.01.01
09.03.03.01.02
09.03.03.01.03
09.03.03.02
09.03.03.02.01
09.03.03.02.02
09.03.04
09.03.04.01
09.03.04.01.01
09.03.04.01.02
09.03.04.01.03
09.03.04.01.04
09.03.04.01.05
09.03.04.01.06
09.04
09.04.01
09.04.01.01
09.04.01.02
09.04.01.03
09.04.01.04
09.04.02
09.04.02.01
09.04.02.02
09.04.03
09.04.03.01
09.04.03.02
09.04.04
09.04.04.01
09.04.05
09.04.05.01
09.04.05.02
09.04.06
09.04.06.01
09.04.06.02
10
10.01
10.01.01
10.01.02
10.02
10.02.01
10.03
10.03.01
10.03.02
10.03.03
10.03.04
11
11.01
11.02
11.03
Und. Metrado
m2
u
u
d
glb
20.00
1.00
5.00
90.00
1.00
90.50
1,594.39
185.82
83.10
4,243.10
m2
m2
10,182.48
10,182.48
1.30
2.37
Parcial (S/.)
16,055.59
1,810.00
1,594.39
929.10
7,479.00
4,243.10
37,369.70
13,237.22
24,132.48
m3
m3
m2
m2
m2
m3
m3
1,357.27
353.08
5,777.86
0.00
5,777.86
0.00
1,437.19
3.49
2.80
0.98
0.57
1.71
23.62
10.00
79,872.91
4,736.87
988.62
5,662.30
0.00
9,880.14
0.00
14,371.90
m2
m2
m3
m2
17.17
113.40
1.20
113.40
47.09
33.90
258.13
2.97
808.54
3,844.26
309.76
336.80
u
m
m
u
77.00
85.40
0.00
0.00
2.17
4.79
1.51
181.73
167.09
409.07
0.00
0.00
m3
m3
m2
m2
m3
m2
m3
93.42
0.00
0.00
1,912.29
105.20
5,777.86
1,437.19
23.62
34.40
3.70
6.22
23.62
3.56
10.00
m2
m3
m2
m
1,286.67
146.18
847.58
75.60
22.00
295.71
2.97
4.79
2,206.58
0.00
0.00
11,894.44
2,484.82
20,569.18
14,371.90
79,890.98
28,306.74
43,226.89
2,517.31
362.12
m2
0.00
6.74
0.00
m
u
u
u
u
0.00
0.00
0.00
0.00
0.00
3.04
228.36
600.02
0.00
10.74
0.00
0.00
0.00
0.00
0.00
93.42
0.00
0.00
1,912.29
23.62
34.40
3.70
6.22
2,206.58
0.00
0.00
11,894.44
m3
m3
m2
m2
Precio (S/.)
m3
m3
0.00
1,437.19
23.62
10.00
0.00
14,371.90
m2
m3
m2
m2
m
m2
m2
m2
0.00
139.71
1,912.29
1,912.29
635.80
49.85
49.85
49.85
29.21
282.14
34.90
2.97
4.79
11.41
16.89
12.29
0.00
39,417.78
66,738.92
5,679.50
3,045.48
568.79
841.97
612.66
0.00
108.00
108.00
3.04
96.78
126.64
0.00
10,452.24
13,677.12
m2
m3
u
m2
m2
u
u
u
0.00
0.00
50.00
2,422.08
0.00
0.00
0.00
0.00
7.09
29.34
12.56
4.16
0.16
0.00
0.00
0.00
0.00
0.00
628.00
10,075.85
0.00
0.00
0.00
0.00
m3
m3
m2
m2
m3
m3
m2
m3
m2
kg
m3
m2
m
m
m
93.42
0.00
0.00
1,912.29
0.00
1,437.19
0.00
139.71
1,912.29
0.00
0.00
1,912.29
635.80
0.00
0.00
23.62
34.40
3.70
6.22
23.62
10.00
22.03
282.14
34.90
0.00
293.19
2.97
4.79
3.04
18.75
2,206.58
0.00
0.00
11,894.44
0.00
14,371.90
0.00
39,417.78
66,738.92
0.00
0.00
5,679.50
3,045.48
0.00
0.00
m3
m3
m2
m3
m2
m
m
m
m
u
u
u
u
u
u
105.20
0.00
1,286.67
146.18
847.58
75.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23.62
267.41
22.00
295.71
2.97
4.79
0.00
0.00
3.04
228.36
0.00
0.00
0.00
0.00
0.00
2,484.82
0.00
28,306.74
43,226.89
2,517.31
362.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m
u
u
m3
m3
0.00
48.91
20.66
11.85
0.00
579.58
m2
m3
m2
30.13
21.30
49.85
9.92
185.21
11.41
298.89
3,944.97
568.79
kg
m2
m3
468.18
69.27
6.81
4.15
52.71
415.26
1,942.95
3,651.22
2,827.92
kg
m2
m3
589.41
27.48
2.86
4.72
59.61
116.24
2,782.02
1,638.08
332.45
m2
kg
m3
33.16
832.21
5.61
61.57
4.15
457.15
2,041.66
3,453.67
2,564.61
m2
kg
u
m3
55.99
313.30
470.00
4.90
56.25
4.72
3.29
266.43
3,149.44
1,478.78
1,546.30
1,305.51
m2
92.29
19.82
1,829.19
m2
u
m2
m2
m2
m2
m2
0.00
0.00
24.00
33.16
55.99
149.49
141.14
65.22
65.22
30.67
30.67
26.69
14.68
22.82
0.00
0.00
736.08
1,017.02
1,494.37
2,194.51
3,220.81
m2
m2
49.85
49.85
16.89
12.29
841.97
612.66
m
m2
35.07
149.49
7.25
16.62
254.26
2,484.52
m2
u
0.00
0.00
0.00
0.00
0.00
0.00
pza
pza
12.00
4.00
11.50
100.60
138.00
402.40
p2
42.00
2.00
84.00
m2
m2
m
m2
57.16
55.99
35.07
141.14
3.69
7.08
5.36
10.88
210.92
396.41
187.98
1,535.60
m2
m
m
78.67
7.66
82.16
6.20
37.08
3.24
487.75
284.03
266.20
5.00
16.30
81.50
pto
pto
pto
11.00
13.00
2.00
75.63
47.06
73.37
831.93
611.78
146.74
m
m
m
53.53
17.92
35.61
3.63
14.24
22.25
194.31
255.18
792.32
m3
m3
m
1.51
1.51
7.55
27.19
40.54
22.25
41.06
61.22
167.99
pza
pza
pza
pza
pza
u
u
3.00
13.00
7.00
4.00
10.00
1.00
2.00
18.34
18.34
17.97
30.87
32.57
21.41
27.48
55.02
238.42
125.79
123.48
325.70
21.41
54.96
pza
pza
4.00
1.00
147.41
173.61
589.64
173.61
u
u
u
1.00
4.00
2.00
37.17
45.25
2.97
37.17
181.00
5.94
pto
24.00
37.00
888.00
m
m
m
m
m
6.40
16.00
26.50
48.90
48.90
8.27
10.23
6.02
6.80
10.24
52.93
163.68
159.53
332.52
500.74
u
u
u
u
u
u
u
u
u
8.00
4.00
7.00
4.00
9.00
9.00
10.00
2.00
11.00
7.86
8.86
11.93
7.86
8.76
13.03
17.66
18.29
18.09
62.88
35.44
83.51
31.44
78.84
117.27
176.60
36.58
198.99
u
u
u
2.00
2.00
4.00
54.04
84.62
81.50
108.08
169.24
326.00
u
pza
u
11.00
13.00
11.00
196.00
81.00
12.22
2,156.00
1,053.00
134.42
pza
pza
24.00
11.00
99.92
38.54
2,398.08
423.94
m
m
m
m
u
u
61.08
48.90
20.00
13.72
0.00
0.00
9.26
5.84
9.02
4.72
0.00
201.91
565.60
285.58
180.40
64.76
0.00
0.00
pto
pto
pto
pto
6.00
4.00
6.00
1.00
23.00
24.08
21.69
22.50
138.00
96.32
130.14
22.50
m
m
33.40
15.50
11.00
11.42
367.40
177.01
m
m
15.50
33.40
11.30
6.02
175.15
201.07
1.00
48.72
48.72
u
pto
2.00
6.00
17.89
26.58
35.78
159.48
u
u
1.00
0.00
328.61
0.00
328.61
0.00
m3
m3
0.00
48.91
3.79
11.85
0.00
579.58
m2
30.13
9.92
298.89
kg
m2
m3
m2
832.21
0.00
0.00
0.00
4.15
47.28
351.98
2.97
3,453.67
0.00
0.00
0.00
u
u
m2
0.00
0.00
0.00
0.00
0.00
1.05
0.00
0.00
0.00
COMPONENTE :
11
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
3/4"
TOTAL
CERCO PERIMETRICO
01
01.01
01.02
01.03
01.04
01.05
02
02.01
DESCRIPCIN
VOLUMEN
L
AREAS
n
vol
METRO LINEAL
rea
6.00
4.00
1.00
24.00
24.00
UND/GLOBAL
Lt
cantidad
Total
1.00
1.00
1.00
1.00
20.00
1.00
20.00
20.00
30.00
6.00
180.00
180.00
1.00
1.00
1.00
1.00
OBRAS PROVISIONALES
CASETA PARA ALMACEN Y GUARDIANIA
Durante todo el plazo de ejecucin de obra
TRABAJOS PRELIMINARES
TRAZO, NIVEL Y REPLANTEO
PARA PAVIMENTO RIGIDO
lado derecho
entre Av. Cruz del Chalpon y Av. J.M. ANTEPARRA
entre Av. J.M. ANTEPARRA y Pasaje N 01
entre Pasaje N 01 y fin de pavimento
estacionamientos
Lado Izquierdo
entre Calle 28 de Julio y Av. J.M. ANTEPARRA
entre Av. J.M. ANTEPARRA y Pasaje N 01
entre Pasaje N 01 y fin de pavimento
estacionamientos
61,285.80
37,090.80
57.33
13.48
31.54
36.69
26.66
20.69
89.63
96.81
94.81
99.51
92.77
38.71
75.20
199.93
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
37.05
41.27
101.90
59.07
96.11
152.52
45.00
2.40
2.40
2.40
2.40
2.40
2.40
5.00
14.56
27.27
1.20
1.20
59.73
3.00
15.87
3.00
16.88
1.20
14.80
17.29
3.00
3.00
13.07
1.20
39.09
3.00
19.99
1.20
29.06
3.00
23.09
3.04
15.95
1.20
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
7,947.05
3,884.10
3,407.32
137.59
32.35
75.70
88.06
63.98
49.66
215.11
232.34
227.54
238.82
222.65
92.90
180.48
479.83
1.00
1.00
1.00
1.00
1.00
1.00
1.00
6,361.87
6,568.90
5,188.53
88.92
99.05
244.56
141.77
230.66
366.05
225.00
6,029.46
17.47
32.72
42.77
179.19
24.12
47.61
17.49
20.26
11.25
44.40
51.87
24.94
15.68
10.97
117.27
19.19
23.99
11.04
87.18
15.64
10.68
70.19
15.47
19.14
14.23
FIERRO
p
Cantid
COMPONENTE :
12
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
3/4"
TOTAL
CERCO PERIMETRICO
DESCRIPCIN
VOLUMEN
L
AREAS
n
vol
L
92.03
H
3.05
99.21
3.00
97.21
3.00
101.90
3.00
10.35
5.90
12.84
1.63
1.70
1.62
95.17
3.00
38.66
3.00
75.20
3.00
93.24
106.69
3.00
3.00
16.23
20.27
14.17
47.01
17.81
1.50
1.50
1.50
1.20
1.20
39.45
2.40
43.67
3.00
104.30
3.00
61.47
3.00
98.51
3.00
154.92
3.00
49.57
4.93
29.38
29.01
53.26
1.20
1.20
1.20
1.20
1.00
2.40
2.40
1.20
1.20
METRO LINEAL
rea
280.69
12.00
12.80
297.63
11.91
11.28
291.63
14.77
14.34
305.70
12.89
16.87
10.03
20.80
17.53
285.51
11.78
13.91
115.98
11.90
225.60
13.26
19.97
279.72
320.07
8.39
24.35
30.41
21.26
56.41
21.37
Lado Izquierdo
PARA RAMPAS
Lado derecho
Lado Izquierdo
23.21
94.68
15.03
22.59
131.01
15.35
16.64
312.90
10.00
14.18
184.41
10.61
18.79
295.53
23.99
15.58
464.76
15.08
357.60
63.27
59.48
5.92
35.26
34.81
53.26
28.00
13.00
8.64
8.77
1.00
118.08
80.64
37.44
14,577.07
1,780.78
-100.78
357.56
603.67
752.33
1,461.48
40.64
75.77
39.52
71.08
49.47
422.83
843.54
1,071.18
UND/GLOBAL
Lt
cantidad
Total
FIERRO
p
Cantid
COMPONENTE :
13
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
3/4"
TOTAL
CERCO PERIMETRICO
DESCRIPCIN
VOLUMEN
L
AREAS
n
vol
METRO LINEAL
rea
Lado Izquierdo
1,075.49
2,000.33
583.13
1,275.38
1,066.07
1,107.60
PARA AREAS VERDES
Lado derecho
1,303.17
100.78
67.62
24.71
17.48
436.89
Lado Izquierdo
226.28
226.28
203.13
14.76
02.02
03
03.01
03.01.01
03.01.02
116.60
116.60
2,050.61
2,050.61
61,285.80
61,285.80
PAVIMENTO RIGIDO
MOVIMIENTO DE TIERRAS
CORTE DE TERRENO NORMAL CON EQUIPO HASTA NIVEL DE SUBRASANTE
rea de pavimento
37,090.80
RELLENO CON MATERIAL PROPIO CON EQUIPO
Segn cuadro de explanaciones
7.90
0.45
1.00
16,690.86
16,690.86
500.73
500.73
500.73
03.01.03
37,090.80
37,090.80
03.01.04
37,090.80
37,090.80
03.01.05
37,090.80
37,090.80
03.01.06
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
93.50
0.81
0.23
0.23
0.51
0.92
1.52
1.48
1.23
0.89
0.77
0.71
0.40
0.71
0.40
0.22
0.39
0.77
0.35
0.28
0.57
0.31
0.38
0.22
1.04
0.33
0.66
0.44
UND/GLOBAL
Lt
cantidad
Total
FIERRO
p
Cantid
COMPONENTE :
14
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
3/4"
TOTAL
CERCO PERIMETRICO
DESCRIPCIN
VOLUMEN
AREAS
L
61.72
10.82
88.04
19.63
25.74
10.03
6.21
36.19
18.29
6.47
6.57
202.90
17.81
8.68
9.80
17.28
15.08
A
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
H
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
n
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
vol
2.31
0.41
3.30
0.74
0.97
0.38
0.23
1.36
0.69
0.24
0.25
7.61
0.67
0.33
0.37
0.65
0.57
26.76
4.76
10.74
7.86
19.11
8.90
4.41
37.92
44.00
14.69
17.40
25.25
89.63
17.73
26.76
14.12
287.32
21.53
9.03
7.11
7.58
173.20
38.60
4.47
18.16
16.91
10.90
82.77
215.29
202.64
19.50
2,493.32
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.18
0.40
0.29
0.72
0.33
0.17
1.42
1.65
0.55
0.65
0.95
3.36
0.66
1.00
0.53
10.77
0.81
0.34
0.27
0.28
6.50
1.45
0.17
0.68
0.63
0.41
3.10
8.07
7.60
0.73
% esp.
1.25
-1.25
1.25
20,354.54
20,863.58
-625.91
116.87
METRO LINEAL
rea
10.12
0.20
2,318
4,691.99
4,691.99
UND/GLOBAL
Lt
cantidad
Total
2,318
10.00
23,182
23,182
Lado Izquierdo
03.01.07
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.03
03.03.01
03.03.02
37,090.80
37,090.80
0.15
0.25
1.00
93.50
93.50
37,090.80
37,090.80
VARIOS
CONEXIN ENTRE LOSAS RIGIDAS (PAVIMENTO) CON DOWELLS CORRUGADO
unin entre losas de concreto
JUNTAS DE DILATACION EN PAVIMENTO RIGIDO CON TECNOPOR Y SELLADO CON ASFALTO E=1", Hlosa=0.20 m
Juntas
10.12
2,318.18
23,459.93
23,459.93
FIERRO
p
Cantid
COMPONENTE :
15
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
3/4"
TOTAL
CERCO PERIMETRICO
03.03.03
03.03.04
04
04.01
04.01.01
DESCRIPCIN
VOLUMEN
L
AREAS
n
vol
METRO LINEAL
rea
4.00
0.10
1.00
1,457.71
1,457.71
04.01.02
04.01.03
14,577.07
14,577.07
04.01.04
14,577.07
14,577.07
04.01.05
50.14
246.79
74.62
75.81
399.38
206.59
353.53
62.68
287.24
292.27
4,238.75
04.01.06
04.01.07
04.02
04.02.01
04.02.02
04.02.03
291.54
291.54
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
158.95
11.43
2.01
3.29
4.64
7.96
16.21
1.13
1.27
1.31
1.41
1.47
5.99
3.95
6.53
10.95
1.84
0.74
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.88
9.25
2.80
2.84
14.98
7.75
13.26
2.35
10.77
10.96
14,577.07
14,577.07
1.25
-1.25
1.25
1,656.40
1,822.13
-364.43
198.69
SARDINELES
ENCOFRADO Y DESENCOFRADO EN SARDINELES VISIBLES
Longitud de sardineles
CONCRETO f'c=175 kg/cm2 PARA SARDINEL VISIBLE
Longitud de sardineles
CURADO DE CONCRETO CON ADITIVO
Longitud de sardineles
4,238.75
0.15
0.60
1.00
4,238.75
0.35
2.00
2,967.13
2,967.13
4,238.75
0.43
2.00
3,602.94
3,602.94
381.49
381.49
UND/GLOBAL
Lt
240.00
960.00
960.00
cantidad
Total
18.00
16.00
1.00
1.00
34.00
18.00
16.00
FIERRO
p
Cantid
COMPONENTE :
16
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
3/4"
TOTAL
CERCO PERIMETRICO
DESCRIPCIN
VOLUMEN
L
Total
118.00
115.00
1.00
1.00
233.00
118.00
115.00
59.00
52.00
1.00
1.00
111.00
59.00
52.00
4.00
3.00
1.00
1.00
7.00
4.00
3.00
86.00
81.00
1.00
1.00
167.00
86.00
81.00
04.04
04.04.01
VARIOS
04.04.04
04.04.05
05
05.01
05.01.01
vol
rea
0.10
n
1,413
Lt
211.94
211.94
4,238.75
1.00
4,238.75
4,238.75
14,577.07
14,577.07
VEREDAS DE CONCRETO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO NORMAL HASTA NIVEL DE SUBRASANTE
Area para veredas de concreto
6,029.46
l
0.15
UND/GLOBAL
cantidad
VEREDAS DE ADOQUIN
SUMINISTRO Y COLOCACION DE BLOQUETAS DE COLOR NATURAL DE 20x10x4cm
rea de veredas con adoquines
04.04.03
METRO LINEAL
04.03
04.03.01
04.04.02
AREAS
1.00
602.95
602.95
05.01.02
180.88
180.88
05.01.03
6,147.54
6,029.46
118.08
05.01.04
6,147.54
6,029.46
118.08
05.01.05
159.80
0.76
1.43
2.25
3.14
1.27
0.83
0.92
0.89
0.59
0.78
0.91
1.31
0.69
0.58
2.05
1.01
1.05
0.58
1.53
0.82
0.56
1.21
0.81
0.84
0.75
4.83
0.63
0.67
14.56
27.27
1.20
1.20
59.73
3.00
15.87
3.00
16.88
1.20
14.80
17.29
3.00
3.00
13.07
1.20
39.09
3.00
19.99
1.20
29.06
3.00
23.09
3.04
15.95
1.20
92.03
3.05
17.47
32.72
42.77
179.19
24.12
47.61
17.49
20.26
11.25
44.40
51.87
24.94
15.68
10.97
117.27
19.19
23.99
11.04
87.18
15.64
10.68
70.19
15.47
19.14
14.23
280.69
12.00
12.80
FIERRO
p
Cantid
COMPONENTE :
17
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
3/4"
TOTAL
CERCO PERIMETRICO
VOLUMEN
DESCRIPCIN
AREAS
L
99.21
11.91
11.28
97.21
14.77
14.34
101.90
12.89
10.35
5.90
12.84
17.53
95.17
11.78
13.91
38.66
11.90
75.20
13.26
19.97
93.24
106.69
8.39
16.23
20.27
14.17
47.01
17.81
A
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
H
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
n
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
vol
5.21
0.63
0.59
5.10
0.78
0.75
5.35
0.68
0.54
0.31
0.67
0.92
5.00
0.62
0.73
2.03
0.62
3.95
0.70
1.05
4.90
5.60
0.44
0.85
1.06
0.74
2.47
0.94
23.21
39.45
15.03
22.59
43.67
15.35
16.64
104.30
10.00
14.18
61.47
10.61
18.79
98.51
23.99
15.58
154.92
15.08
357.60
63.27
49.57
4.93
29.38
29.01
53.26
2,945.45
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.22
2.07
0.79
1.19
2.29
0.81
0.87
5.48
0.53
0.74
3.23
0.56
0.99
5.17
1.26
0.82
8.13
0.79
18.77
3.32
2.60
0.26
1.54
1.52
2.80
2.40
2.40
0.15
0.15
0.35
0.35
28.00
13.00
3.53
1.64
1.25
-1.25
1.25
727.33
753.68
-226.10
199.75
METRO LINEAL
L
99.21
H
3.00
rea
297.63
11.91
11.28
291.63
14.77
14.34
305.70
12.89
16.87
10.03
20.80
17.53
285.51
11.78
13.91
115.98
11.90
225.60
13.26
19.97
279.72
320.07
8.39
24.35
30.41
21.26
56.41
21.37
97.21
3.00
101.90
3.00
10.35
5.90
12.84
1.63
1.70
1.62
95.17
3.00
38.66
3.00
75.20
3.00
93.24
106.69
3.00
3.00
16.23
20.27
14.17
47.01
17.81
1.50
1.50
1.50
1.20
1.20
39.45
2.40
43.67
3.00
104.30
3.00
61.47
3.00
98.51
3.00
154.92
3.00
49.57
4.93
29.38
29.01
53.26
1.20
1.20
1.20
1.20
1.00
2.40
2.40
1.20
1.20
28.00
13.00
118.08
80.64
37.44
2,945.45
3.60
1.20
1.20
3.00
3.00
1.20
3.00
3.00
1.20
0.15
0.15
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
1.00
41.00
5
9
20
5
6
5
6
4
630.72
441.82
22.14
0.58
1.09
5.97
1.59
0.68
1.48
1.73
0.52
UND/GLOBAL
Lt
Lado Izquierdo
L=
PARA RAMPAS
Lado derecho
Lado Izquierdo
05.01.06
05.02
05.02.01
23.21
94.68
15.03
22.59
131.01
15.35
16.64
312.90
10.00
14.18
184.41
10.61
18.79
295.53
23.99
15.58
464.76
15.08
357.60
63.27
59.48
5.92
35.26
34.81
53.26
5.82
10.91
59.73
15.87
6.75
14.80
17.29
5.23
cantidad
Total
FIERRO
p
Cantid
COMPONENTE :
18
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
3/4"
TOTAL
CERCO PERIMETRICO
DESCRIPCIN
VOLUMEN
AREAS
vol
14.56
27.27
42.77
59.73
24.12
15.87
17.49
16.88
11.25
14.80
17.29
24.94
13.07
10.97
39.09
19.19
19.99
11.04
29.06
15.64
10.68
23.09
15.47
15.95
14.23
92.03
12.00
12.80
99.21
11.91
11.28
97.21
14.77
14.34
101.90
12.89
10.35
5.90
12.84
17.53
95.17
11.78
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
228.29
1.09
2.05
3.21
4.48
1.81
1.19
1.31
1.27
0.84
1.11
1.30
1.87
0.98
0.82
2.93
1.44
1.50
0.83
2.18
1.17
0.80
1.73
1.16
1.20
1.07
6.90
0.90
0.96
7.44
0.89
0.85
7.29
1.11
1.08
7.64
0.97
0.78
0.44
0.96
1.31
7.14
0.88
Lado Izquierdo
L
3.00
1.20
3.00
3.04
1.20
3.05
3.00
3.00
3.00
1.63
1.70
1.62
3.00
3.00
3.00
3.00
3.00
1.50
1.50
1.50
1.20
1.20
2.40
3.00
3.00
3.00
3.00
3.00
1.20
1.20
1.20
1.20
1.00
H
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
n
13
7
10
8
5
31
33
32
34
3
2
4
32
13
25
31
36
5
7
5
16
6
13
15
35
20
33
52
17
2
10
10
18
METRO LINEAL
rea
3.91
0.80
2.91
2.34
0.64
9.36
9.92
9.72
10.19
0.56
0.33
0.69
9.52
3.87
7.52
9.32
10.67
0.81
1.01
0.71
1.88
0.71
3.16
4.37
10.43
6.15
9.85
15.49
1.98
0.20
1.18
1.16
1.78
L=
05.02.02
Lt
39.09
8.00
29.06
23.40
6.38
93.56
99.21
97.21
101.90
5.62
3.34
6.93
95.17
38.66
75.20
93.24
106.69
8.12
10.14
7.09
18.80
7.12
31.56
43.67
104.30
61.47
98.51
154.92
19.83
1.97
11.75
11.60
17.75
1,667.67
UND/GLOBAL
cantidad
Total
FIERRO
p
Cantid
COMPONENTE :
19
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
3/4"
TOTAL
CERCO PERIMETRICO
VOLUMEN
DESCRIPCIN
AREAS
L
13.91
38.66
11.90
75.20
13.26
19.97
93.24
106.69
8.39
16.23
20.27
14.17
47.01
17.81
A
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
H
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
n
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
vol
1.04
2.90
0.89
5.64
0.99
1.50
6.99
8.00
0.63
1.22
1.52
1.06
3.53
1.34
23.21
39.45
15.03
22.59
43.67
15.35
16.64
104.30
10.00
14.18
61.47
10.61
18.79
98.51
23.99
15.58
154.92
15.08
357.60
63.27
49.57
4.93
29.38
29.01
53.26
2,945.45
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.74
2.96
1.13
1.69
3.28
1.15
1.25
7.82
0.75
1.06
4.61
0.80
1.41
7.39
1.80
1.17
11.62
1.13
26.82
4.75
3.72
0.37
2.20
2.18
3.99
2.40
2.40
0.15
0.15
0.50
0.50
28.00
13.00
5.04
2.34
METRO LINEAL
rea
UND/GLOBAL
Lt
1,667.67
1.00
1,667.67
1,667.67
2,945.45
1.00
2,945.45
2,945.45
cantidad
Total
225.00
1.00
225.00
225.00
Lado Izquierdo
L=
PARA RAMPAS
Lado derecho
Lado Izquierdo
05.02.03
6,147.54
6,029.46
118.08
05.02.04
6,147.54
6,029.46
118.08
05.02.05
05.02.06
10.35
5.90
12.84
1.63
1.70
1.62
1.00
1.00
1.00
47.70
16.87
10.03
20.80
05.02.07
CONTRAPISO DE 25 mm
Igual a rea de falso piso
47.70
47.70
05.02.08
47.70
47.70
05.03
05.03.01
05.03.02
VARIOS
PINTURA DE SARDINEL VISIBLE
Longitud de sardinel de veredas
NIVELACION DE CAJAS DOMICILIARIAS DE AGUA
Total de cajas de agua
FIERRO
p
Cantid
COMPONENTE :
20
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
3/4"
TOTAL
CERCO PERIMETRICO
06
06.01
06.02
06.03
DESCRIPCIN
VOLUMEN
L
AREAS
n
vol
METRO LINEAL
rea
UND/GLOBAL
Lt
cantidad
225.00
1.00
Total
225.00
225.00
212.00
205.00
1.00
1.00
417.00
212.00
205.00
1,303.17
1,303.17
1.00
260.63
260.63
06.04
1,303.17
1,303.17
06.05
1,303.17
1,303.17
06.06
06.07
62.00
52.00
1.00
1.00
114.00
62.00
52.00
28.00
26.00
1.00
1.00
54.00
28.00
26.00
06.08
07
07.01
07.02
07.03
417.00
417.00
SKATE PARK
EXCAVACION MANUAL DE TERRENO NORMAL HASTA NIVEL DE SUBRASANTE
Para curva
22.00
0.30
Para rampa
13.40
0.30
Para pozo
15.40
0.30
0.30
0.30
0.30
1.00
2.00
1.00
5.78
1.98
2.41
1.39
1.00
2.00
1.00
30.51
12.00
11.10
7.41
07.04
07.05
07.06
07.07
0.15
0.15
16.18
0.25
0.25
5.78
2.03
2.00
2.00
2.03
1.21
0.82
1.25
1.25
9.76
7.22
2.54
16.18
10.93
22.00
13.40
15.40
16.18
10.93
0.15
0.15
1.00
176.85
176.85
176.85
176.85
Para curva
Para rampa
Para pozo
07.08
10.93
0.35
0.35
2.00
2.00
0.15
0.15
0.35
0.35
0.35
4.00
4.00
2.00
4.00
2.00
61.21
9.71
6.56
15.40
18.76
10.78
2.85
1.70
1.15
16.18
10.93
2.00
2.00
L=
07.09
16.18
10.93
1.00
176.85
176.85
32.36
21.86
54.22
FIERRO
p
Cantid
COMPONENTE :
21
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
3/4"
TOTAL
CERCO PERIMETRICO
07.10
07.11
07.12
07.13
07.14
07.15
08
08.01
08.02
08.03
08.04
08.05
08.06
08.07
08.08
08.09
08.10
08.11
08.12
DESCRIPCIN
VOLUMEN
L
AREAS
n
vol
METRO LINEAL
rea
UND/GLOBAL
Lt
cantidad
Total
FIERRO
p
Cantid
164.08
22.00
13.40
15.40
0.15
0.15
0.15
0.60
0.60
0.60
1.00
1.00
1.00
4.57
1.98
1.21
1.39
8.00
3.70
3.85
3.00
3.00
3.85
1.00
2.00
1.00
61.02
24.00
22.20
14.82
16.18
10.93
2.00
3.00
65.15
32.36
32.79
54.22
1.00
54.22
54.22
3.00
3.00
1.82
2.00
2.00
4.00
19.28
6.00
6.00
7.28
0.15
0.15
73
60
19.88
10.89
9.00
217.70
1.00
217.70
217.70
179.92
1.00
179.92
179.92
217.70
179.92
1.00
1.00
397.62
217.70
179.92
0.60
0.60
0.15
0.15
0.60
0.60
0.25
0.25
0.80
0.60
1.00
1.00
48
40
37.48
8.16
6.75
13.93
8.64
0.60
0.60
0.80
0.60
48.38
39.98
22.57
13.93
8.64
1.00
2.00
1.00
217.70
179.92
0.15
0.15
0.40
0.40
1.00
1.00
217.70
179.92
0.15
0.15
2.00
2.00
119.29
65.31
53.98
217.70
179.92
0.23
0.23
2.00
2.00
178.93
97.97
80.96
23.86
13.06
10.80
15.00
6.00
90.00
90.00
3.00
1.00
3.00
3.00
6.00
1.00
6.00
6.00
3/8"
3/8"
3/8"
0.56
0.56
0.56
85.00
65.00
35.00
1.20
1.20
1.00
57.12
87.36
19.60
COMPONENTE :
22
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
9.30
14.60
20.70
36.36
3/4"
TOTAL
CERCO PERIMETRICO
08.14
08.15
09
09.01
09.01.01
09.01.01.01
VOLUMEN
DESCRIPCIN
vol
4.00
1.00
Total
4.00
4.00
2.00
1.00
2.00
2.00
2.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
2.00
30.62
7.18
3.79
2.76
1.99
2.78
3.67
1.98
2.34
2.05
2.06
09.01.01.02
38.28
38.28
09.01.02
09.01.02.01
CONCRETO SIMPLE
SOLADO C:H 1:12 e=4"
Para fondo de columnas
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
rea
L=
09.01.02.02
09.01.02.03
control
09.01.03.01.02
09.01.03.01.03
09.01.03.02
09.01.03.02.01
09.01.03.02.02
09.01.03.02.03
09.01.03.03
09.01.03.03.01
09.01.03.03.02
09.01.03.03.03
0.60
18.00
10.80
10.80
5.45
4.05
5.45
4.05
5.60
4.10
2.72
4.73
2.72
4.10
1.00
1.00
1.00
1.00
1.00
93.12
22.35
11.02
25.78
11.02
22.96
CONCRETO ARMADO
SOBRECIMIENTO REFORZADO
ACERO DE REFUERZO fy=4200 kg/cm2
refuerzo principal
estribos
63.80
0.30
1.00
0.30
2.00
FIERRO
p
Cantid
2.30
5.04
1/4"
87.73
14.96
7.90
5.75
4.15
5.80
7.65
4.13
4.88
4.28
4.30
63.80
1.00
1.00
3/8"
1/4"
0.56
0.25
4.00
319.00
63.80
1.10
18.00
18.00
1/2"
3/8"
0.99
0.56
6.00
24.00
5.50
1.02
1.00
1.00
1/2"
1/4"
0.99
0.25
6.00
382.80
63.80
1.00
142.91
38.28
38.28
2.87
2.87
COLUMNAS
ACERO DE REFUERZO fy=4200 kg/cm2
refuerzo principal
estribos
837.19
0.25
0.25
3.20
18.00
0.70
3.20
18.00
40.32
40.32
63.80
0.25
1.00
15.95
15.95
590.44
246.76
3.60
3.60
VIGAS
ENCOFRADO Y DESENCOFRADO EN VIGAS
Longitud de vigas
ACERO DE REFUERZO fy=4200 kg/cm2
Refuerzo principal
estribos
CONCRETO f'c=210 kg/cm2 PARA VIGAS
230.64
Lt
30.62
30.62
09.01.03
09.01.03.01
09.01.03.01.01
1.00
UND/GLOBAL
cantidad
14.96
7.90
5.75
4.15
2.90
7.65
4.13
4.88
4.28
2.15
METRO LINEAL
SERVICIOS HIGIENICOS
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CIMIENTOS
posterior
lateral izquierdo
lateral derecho
central
divisorios
frontal
AREAS
476.20
3.19
380.50
95.70
COMPONENTE :
23
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
3/4"
TOTAL
CERCO PERIMETRICO
DESCRIPCIN
Longitud de vigas
09.01.03.04
09.01.03.04.01
VOLUMEN
L
63.80
A
0.25
H
0.20
AREAS
n
1.00
vol
3.19
LOSAS ALIGERADAS
ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS
rea de losa aligerada
Area interior SS.HH Mujeres
control
09.01.03.04.03
09.01.03.04.04
09.01.04
09.01.04.01
09.02
09.02.01
09.02.01.01
09.02.01.02
5.45
4.05
5.45
4.05
5.60
4.10
2.72
4.73
2.72
4.10
1.00
1.00
1.00
1.00
1.00
rea
Lt
cantidad
Total
FIERRO
p
Cantid
756.08
35.00
35.00
1.00
22.35
11.02
25.78
11.02
22.96
93.12
ALBAILERIA
MURO SOGA LADRILLO KK INDUSTRIAL CON CEMENTO ARENA
Longitud de muros
ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS
TABIQUERIA DE MELAMINE SEGUN DISEO
Para cubiles de inodoros
Para cubiles de duchas
0.0875
63.80
2.60
1.00
165.88
165.88
2.20
2.30
1.80
1.80
6.00
8.00
56.88
23.76
33.12
40.32
40.32
09.02.01.04
15.95
15.95
09.02.01.05
93.12
93.12
09.02.01.06
25.07
27.13
1.80
1.80
1.00
1.00
63.80
2.80
2.00
93.96
45.13
48.83
263.32
357.28
-93.96
09.02.02
09.02.02.01
PISOS Y PAVIMENTOS
CONTRAPISO DE 25 mm
rea de falso piso
93.12
93.12
09.02.02.02
93.12
93.12
09.02.03
09.02.03.01
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO CEMENTO SIN COLOREAR H = 20 cm
Contrazocalo exterior
09.02.03.02
ZOCALO DE CERAMICA DE 20 x 30 cm
rea de tarrajeo rayado
09.02.04
09.02.04.01
CARPINTERIA METALICA
PUERTA METALICA SEGUN DETALLE INC. COLOCACION
Ingreso principal
Para ingreso a Discapacitados
Deposito
93.12
8.40
782
782
6.00
8.00
1.00
1.00
14.00
6.00
8.00
8.15
8.15
09.02.01.03
09.02.01.07
UND/GLOBAL
93.12
09.01.03.04.02
METRO LINEAL
14.96
7.90
93.96
93.96
1.20
1.00
0.80
2.80
2.80
2.80
2.00
1.00
1.00
11.76
6.72
2.80
2.24
2.00
2.00
45.72
29.92
15.80
1/2"
1/2"
1/4"
0.99
0.99
0.25
1.00
3.00
31.00
7.90
3.50
14.96
274.84
365.30
115.94
COMPONENTE :
24
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
3/4"
TOTAL
CERCO PERIMETRICO
VOLUMEN
DESCRIPCIN
L
A
H
VENTANA DE FIERRO PERFIL DE 1" X 1/8" FIJA MARCO "T" DE 1" SEGUN DISEO
AREAS
vol
Total
CERRAJERIA
BISAGRA CAPUCHINA DE 4"
Puerta Ingreso principal
Puerta Para ingreso a Discapacitados
Puerta para Deposito
2.00
1.00
1.00
4.00
4.00
4.00
16.00
8.00
4.00
4.00
2.00
1.00
1.00
1.00
1.00
1.00
4.00
2.00
1.00
1.00
4.80
2.00
1.60
2.00
1.20
12.00
12.00
12.00
12.00
12.00
139.20
57.60
24.00
19.20
24.00
14.40
VA-2
VA-1
09.02.05
09.02.05.01
09.02.05.02
09.02.06
09.02.06.01
2.00
1.20
0.50
0.50
2.00
2.00
1.20
1.00
0.80
2.00
1.20
2.00
2.00
2.00
0.50
0.50
2.00
1.00
1.00
2.00
2.00
rea
3.20
2.00
1.20
UND/GLOBAL
cantidad
09.02.04.02
METRO LINEAL
Lt
4.80
2.00
1.60
2.00
1.20
09.02.07
09.02.07.01
PINTURA
PINTURA LATEX EN VIGAS Y COLUMNAS 2 MANOS
rea de tarrajeo de vigas
rea de tarrajeo de columnas
56.27
15.95
40.32
09.02.07.02
93.12
93.12
09.02.07.03
09.02.07.04
263.32
263.32
09.02.08
09.02.08.01
COBERTURAS
COBERTURA CON PLANCHA TIPO TEJA ANDINA
rea de losa aligerada
93.12
93.12
09.02.08.02
7.90
1.00
7.90
7.90
7.90
12.00
94.80
94.80
VARIOS
BARANDA DE TUBO FIERRO GALVANIZADO PASAMANO CONFECCION Y COLOCACION
Para ss.hh discapacitados
1.00
1.00
1.00
1.00
09.02.08.03
09.02.09
09.02.09.01
10
10.01
10.01.01
24.00
24.00
10.01.02
30.00
30.00
10.02
10.02.01
CONCRETO SIMPLE
SOLADO C:H 1:12 e=4"
Alcantarillas
3.00
8.00
0.50
8.00
3.00
2.00
CONCRETO ARMADO
ACERO DE REFUERZO fy=4200 kg/cm2
Losa de fondo
3,686.64
2.00
2.00
4.00
4.00
2.00
2.00
Losa de techo
FIERRO
p
Cantid
48.00
48.00
muros
10.03.02
45.72
45.72
2.00
10.03
10.03.01
8.00
3.00
0.30
0.30
4.00
4.00
141.20
9.60
3.60
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
0.99
0.99
0.99
0.99
0.99
0.99
30.00
80.00
70.00
30.00
30.00
80.00
8.00
3.00
3.00
8.00
8.00
3.00
477.12
475.20
831.60
950.40
477.12
475.20
COMPONENTE :
25
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
3/4"
TOTAL
CERCO PERIMETRICO
DESCRIPCIN
VOLUMEN
AREAS
vol
8.00
8.00
8.00
3.00
0.20
3.00
0.30
2.50
0.20
2.00
4.00
2.00
40.00
14.40
16.00
9.60
muros
losa de techo
10.03.03
10.03.04
11
11.01
11.02
11.03
L
8.00
8.00
H
2.50
3.00
n
4.00
2.00
METRO LINEAL
rea
80.00
48.00
Lt
cantidad
Total
13.00
1.00
13.00
13.00
2.00
1.00
2.00
2.00
141.20
141.20
VARIOS
CONFECCIN E INSTALACIN DE ESTAND SEGUN DISEO
estand
PORTICOS DE ENTRADA SEGUN DISEO
Porticos
LIMPIEZA FINAL DE OBRA
Igual a trazo nivel y replanteo
UND/GLOBAL
61,285.80
61,285.80
FIERRO
p
Cantid
COMPONENTE :
26
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
3/4"
TOTAL
CERCO PERIMETRICO
DESCRIPCIN
VOLUMEN
L
AREAS
n
vol
METRO LINEAL
rea
UND/GLOBAL
Lt
cantidad
Total
FIERRO
p
Cantid
COMPONENTE :
27
PLANTILLA DE METRADOS
PROYECTISTA :
FECHA :
ENERO DE 2014
DIAMETROS
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Area cm2
Peso ml
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
Peso Kg.
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
3/4"
TOTAL
CERCO PERIMETRICO
DESCRIPCIN
VOLUMEN
L
AREAS
n
vol
METRO LINEAL
rea
UND/GLOBAL
Lt
cantidad
Total
FIERRO
p
Cantid
PROYECTO :
COMPONENTE :
UBICACIN:
ITEM
PROYECTISTA :
FECHA :
DESCRIPCIN
VOLUMEN
L
AREA
n
vol
PROYECTISTA :
DIAMETROS
Area cm2
Peso ml
FEBRERO DE 2014
Peso Kg.
Peso Kg.
AREAS
H
METRO LINEAL
n
rea
UND/GLOBAL
Lt
cantidad
Total
DIAMETROS
FIERRO
p
Cantid
1/4"
3/8"
1/2"
5/8"
3/4"
1"
0.32
0.25
0.71
0.56
1.29
0.99
2.00
1.60
2.84
2.26
5.10
4.04
2.30
5.04
9.30
14.60
20.70
0.00
2.30
5.04
9.30
14.60
20.70
36.36
1/4"
TOTAL
5.04
5.04